Notice of Meeting and Agenda
Audit, Risk and Scrutiny Board 
Date Time  Venue
Monday, 04 November
2024
15:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN 
MARK CONAGHAN
Head of Corporate Governance 
Membership 
Councillor Andy Doig (Convener):     Councillor Janis McDonald (Depute Convener):    
Councillor Jennifer Adam:  Councillor Chris Gilmour:  Councillor John Gray:  Councillor
Lisa-Marie Hughes:  Councillor Robert Innes:  Councillor James MacLaren:  Councillor
Ben Smith:   
Further Information 
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior
to the meeting at the Customer Service Centre, Renfrewshire House, Cotton Street,
Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk 
Members of the Press and Public 
Members of the press and public wishing to attend the meeting should report to the
customer service centre where they will be met and directed to the meeting. 
Hybrid Meeting 
Please note that this meeting is scheduled to be held in the Council
Chambers.  However, it is a hybrid meeting and arrangements have been made for
members to join the meeting remotely should they wish.

Page 2

Webcasting of Meeting 
This meeting will be filmed for live or subsequent broadcast via the Council’s internet
site – at the start of the meeting the Convener will confirm if all or part of the meeting
is being filmed.  To find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home

Page 3

Apologies 
Apologies from members. 
Declarations of Interest and Transparency Statements 
Members are asked to declare an interest or make a
transparency statement in any item(s) on the agenda and to
provide a brief explanation of the nature of the interest or the
transparency statement. 
AUDIT 
1 Summary of Internal Audit Reports for the period 1 July
to 30 September 2024 
Report by Interim Chief Auditor. 
1 - 10 
2 Internal Audit & Counter Fraud Progress &
Performance for period 1 July to 30 September 2024 
Report by Interim Chief Auditor. 
11 - 16 
3 Summary of Internal Audit Activity in Partner
Organisations for period 1 July to 30 September 2024 
Report by Interim Chief Auditor. 
17 - 24 
4 Audit Scotland Report – The National Fraud Initiative in
Scotland 2024 
Report by Interim Chief Auditor. 
25 - 66 
MONITORING & REVIEWING SERVICE DELIVERY PERFORMANCE
POLICIES AND PRACTICE 
5 Risk Report November 2024 
Report by Director of Finance & Resources. 
67 - 98 
6 Audit Scotland Report on ‘Tackling Digital Exclusion’ 
Report by Director of Finance & Resources. 
99 - 110

Page 4

7  Actions Monitoring Report - Dargavel Primary School 
Report by Chief Executive. 
111 - 146

Page 5

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 4 November 2024
___________________________________________________________________
Report by: Chief Auditor
___________________________________________________________________
Heading: Summary of Internal Audit Reports for period 1 July to 30
September 2024
___________________________________________________________________
1. Summary
1.1 In line with the Public Sector Internal Audit Standards, Internal Audit
must communicate the results of each engagement to the Board. To
comply with this requirement, Internal Audit submits regular reports
on the findings and conclusions of audit engagements to the Audit,
Risk and Scrutiny Board. 
1.2 Appendix 1 provides details of audit engagements completed during
the period 1 July to 30 September 2024 with the overall assurance
rating and the number of recommendations in each risk category.
The committee summary for each report is also attached. For each
audit assignment where recommendations have been made, the
relevant managers have put action plans in place to address the
issues raised. 
1.3 In addition to the reports listed in the Appendix, Internal Audit has an
ongoing commitment to: 
• A range of corporate and service initiatives;
• Progressing of information security matters in partnership with
ICT and Legal Services;
• The regular provision of advice to departmental officers;
• The provision of internal audit services to the associated
bodies for which Renfrewshire Council is the lead authority
and to OneRen and Renfrewshire Health and Social Care
Integrated Joint Board;
Item 1
Page 1 of 146

Page 6

• Co-ordination of the Council’s corporate risk management
activity;
• Management of the counter fraud team;
• Management of the risk management and insurance team.
___________________________________________________________________ 
2. Recommendations
2.1 Members are invited to consider and note the Summary of Internal Audit
Reports finalised during the period from 1 July to 30 September 2024. 
___________________________________________________________________
Implications of the Report
1. Financial - None 
2. HR & Organisational Development - None 
3. Community Planning – 
Safer and Stronger - effective internal audit is an important element of good
corporate governance. 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None 
7.  Equality & Human Rights – None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk - The summary reported relates to the delivery of the risk-based internal
audit plan. 
11. Privacy Impact – None 
12. COSLA Implications – None 
13. Climate Risk – None 
14. Children’s Rights - None 
________________________________________________________________
Author:           Karen Campbell, Interim Chief Auditor– 07768354651
Page 2 of 146

Page 7

Appendix 1 
Renfrewshire Council 
Internal Audit Service 
Update for Audit, Risk and Scrutiny Board 
Final Audit Reports issued from 1 July – 30 September 2024 
Category  Service  Engagement  Assurance
Rating
Recommendation Ratings
Critical Important Good
Practice
Service
Improvement
Assurance Finance &
Resources
Non-Domestic Rates Reasonable
Assurance 0 2 3 0 
Environment,
Housing &
Infrastructure
Transportation and
Fleet – External Vehicle
Hire
Limited
Assurance 1 5 2 0 
Environment,
Housing &
Infrastructure
Waste Management Limited
Assurance 2 4 5 1 
Note  – No assurance rating can be given in respect of investigation assignments                 
Assurance Level 
Substantial Assurance • There is a sound system of internal control designed to achieve the objectives of the area being reviewed. 
• The control processes tested are being consistently applied. 
Reasonable Assurance • The internal control processes are generally satisfactory with some areas of weakness being identified that could
put some objectives of the area being reviewed at risk.
• There is evidence that the level of non-compliance with some of the control processes may put some of the
objectives of the area being reviewed at risk. 
Limited Assurance • Weaknesses in the system of internal controls are such as to put the objectives of the area being reviewed at risk. 
Page 3 of 146

Page 8

• The level of non-compliance puts the objectives of the area being reviewed at risk. 
No Assurance • Control processes are generally weak with significant risk to the achievement of the objectives of the area being
reviewed. 
• Significant non-compliance with control processes leaves the processes/systems open to error or abuse. 
Recommendation
Rating 
Service Improvement  Implementation will improve the efficiency / housekeeping of the area under review.
Good Practice  Implementation will contribute to the general effectiveness of control.
Important  Implementation will raise the level of assurance provided by the control system to acceptable levels.
Critical  Addresses a significant risk, impacting on the objectives of the area under review. 
Page 4 of 146

Page 9

Internal Audit Report
Finance & Resources
Non-Domestic Rates (A0082/2024/001)
Date: September 2024 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the audit were to ensure that:
a) There is an adequate system in place to ensure the calculation and payment of non-
domestic rates.
b) All exemptions and discounts have been properly applied. 
c) All NDR income due is properly accounted for and recorded on the system.
d) All accounts have been issued in line with statutory timescales.
e) All income due to East Renfrewshire Council has been remitted to their bank account.
f) Outstanding debt at the year-end is being appropriately managed. 
Audit Scope
1. Interviewed the appropriate officers to ascertain the system in place in relation to the billing,
collecting and monitoring of NDR income and updating for any recent changes. Identified any
areas for improvement.
2. Undertook a series of tests to ensure the system was adequate and operating as intended.
3. Prepared a certificate for East Renfrewshire Council based on the outcome of the audit. 
Key Audit Assurances
1. There is an adequate system in place for the calculation and payment of Non-Domestic
Rates.
2. All exemptions and discounts tested were properly applied.
3.   All NDR income due is properly accounted for and recorded on the system.
4.   Demand notices are issued according to statutory timescales.
5.   All income due to East Renfrewshire Council has been remitted to their bank account. 
Key Risks
Where income and refund reconciliations are not carried out regularly, errors may not be identified
timeously. 
Page 5 of 146

Page 10

Internal Audit Report
Finance & Resources
Non-Domestic Rates (A0082/2024/001)
Date: September 2024 
Overall Audit Opinion
The audit identified that satisfactory controls are in place for the billing and collection of NDR.
Reviews of NDR reliefs, granted on the basis of a prior year's applications, have not been carried out
in the 2023/24 financial year because management needed to consider the impact of changes in
legislation, specifically relating to reliefs, which superseded the normal review process. 
Evidence for current year reliefs and refunds were available for the samples tested. However, some
actions that management stated would be put in place after previous audit recommendations are not
fully implemented. It was noted that staff changes have resulted in income and refund reconciliations
not being carried out regularly.  Also, a significant number of historic credit balances were found to
still exist on the NDR system, for which no actions had been taken to identify if these should be
cleared or result in refunds to customers. 
Recommendations in the report to address areas of weakness identified will, if implemented, help
strengthen the controls in place for NDR. 
Management Commentary
We are currently in the process of implementing the audit recommendations.  Detailed plans have
now been put in place to undertake reviews and independent checks on Non-Domestic Reliefs and
Discounts.  A procedure note has been drafted detailing the process to be followed by staff to review
and action credit balances.   
In relation to the income and refund reconciliations, this is a complex area and we are currently
working with our external partners on plans to improve the current process.   
Page 6 of 146

Page 11

Internal Audit Report
Environment, Housing & Infrastructure
Transportation and Fleet - External Vehicle Hire
(A0025/2024/001)
Date: August 2024 
COMMITTEE SUMMARY 
Audit Objectives
In order to achieve best value when a vehicle is required, there is a centralised service operated by
Environment, Housing & Infrastructure Service for the external hire of vehicles. Senior Management
Team recognised that there had been a complete change of staff responsible for operating this
service and therefore requested a review of the processes in place to ensure that they were
adequate. 
The objectives of the audit were to ensure that:
a) There is a clear process for obtaining external vehicle hires and determine if there are any
exceptions that do not go through the hire desk and identify the reasons for this. 
b) There is an authorisation process in place for requesting an external hire.
c) There is a clear justification of business need for each hire.
d) Contracts are in place for external vehicle hires where necessary and only contracted
suppliers are being used.
e) Hire costs are being verified prior to processing the invoices and are in line with the
contracted rates.
f) Determine if costs are recharged and if so, ensure that recharges are accurate. 
Audit Scope
1. Interviewed the appropriate officers to understand the arrangements in place for
administering hire vehicles.
2. Carried out sample testing to confirm the adequacy of the controls in place over hire
vehicles. 
Key Audit Assurances
A contract framework has been put in place by Scotland Excel covering vehicle hires. Through
sample audit testing we ascertained that all hires are procured from approved suppliers that are on
this framework. 
Key Risks
1. Council staff could be unaware of how to request a vehicle hire as no document guidance
could be found.
2. Unsanctioned expenditure spend could be committed  as the internal controls surrounding
the request and ordering processes for external vehicle hires was found to be
unsatisfactory. 
Page 7 of 146

Page 12

Internal Audit Report
Environment, Housing & Infrastructure
Transportation and Fleet - External Vehicle Hire
(A0025/2024/001)
Date: August 2024 
3. There is a risk that incorrect rates could be being charged and paid for as there are no
verification checks in place to confirm that hire costs on received invoices are in line with
the most up to date contracted rates from Scotland Excel. 
Overall Audit Opinion
Hiring external vehicles on behalf of Council Departments is one of the services the Fleet and
Sustainable Transport section is responsible for. The current processes being carried out in relation
to this task need to be amended to ensure there is a satisfactory level of internal control, particularly
in relation to the ordering and authorisation processes. Clear, concise instructions also need to be
readily available to services to ensure they are aware of the process to follow for requesting the hire
of a vehicle and this would help services to submit properly completed hire request forms to the hire
desk. The auditor made recommendations to address these issues. 
Management Commentary
We are currently in the process of actioning the recommendations. Procedures for both service staff
and fleet management staff are being finalised detailing the processes to be followed when an
external hire is required.  The procedures for fleet management staff will cover the checks that require
be undertaken when a request is received as well as the ordering, payment and recharging
processes. 
Page 8 of 146

Page 13

Internal Audit Report
Environment, Housing & Infrastructure
Waste Management (A0028/2024/001)
Date: August 2024 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the review were to ensure that: 
a) There is an adequate management and supervisory structure in place with clearly defined
roles and responsibilities for the collection of commercial waste.
b) There is procedural/guidance documentation in place in relation to commercial waste which
has been communicated to and is easily accessible by staff. 
c) Up to date route lists, which include the number of bins to be collected from each
commercial property, are issued and followed by operatives.
d) Any deviations from the route lists, including missed uplifts are properly authorised and
there is an adequate audit trail which supports any changes.
e) There are appropriate contracts in place with commercial customers.
f) Arrangements are in place within the service to ensure that commercial clients are invoiced
accurately, non-payment is notified timeously and services suspended where required and
any updates to invoicing are communicated to the debtors’ team.
g) There are appropriate Key Performance Indicators (KPI’s) in place which are adequately
monitored by management and when necessary, action is taken to investigate and resolve
any issues where targets are not met. 
Audit Scope
1. Interviewed the relevant officers and obtained the required information and documentation
relating to commercial waste uplifts.
2. Prepared a series of tests to meet the detailed audit objectives. 
Key Audit Assurances
1. An adequate supervisory structure is in place with clearly defined roles and responsibilities.
2. Route lists are prepared and issued to operatives detailing the number of bins to be
collected from each commercial property. 
Key Risks
1. Outstanding debts will continue to rise in the absence of a policy for dealing with the service
provision to those customers who do not pay their invoices.
2. Income is not maximised where customers are not issued with invoices or where invoices
are incorrect. 
Overall Audit Opinion
Although roles and responsibilities relating to the provision of the commercial waste service are clearly
defined and processes are in place in relation to providing this service, issues were identified in relation
to the invoicing of customers for the uplift of commercial waste.  Furthermore, concerns were identified in
relation to the level of outstanding debts for the uplift of commercial waste.  Although work has
commenced by the Waste Service to determine the information available on clients not paying their
invoices, there is no formal policy in place for staff to follow regarding the continued provision of the
Page 9 of 146

Page 14

Internal Audit Report
Environment, Housing & Infrastructure
Waste Management (A0028/2024/001)
Date: August 2024 
service for clients with outstanding debts and this needs to be addressed as soon as possible. For these
reasons, assurance within this area was found to be limited.   
Management Commentary
We are currently working on implementing the recommendations.  Processes are being amended to
ensure invoices are correct.  Commercial customers are required to submit Duty of Care documents
annually and when these are received the service provided and subscription invoice will be checked
to ensure they are accurate.  Prior to suspension of the service, a review/reminder process is now in
place to ensure these documents are returned by customers if they wish to continue with the service. 
In relation to the outstanding debt, we are working with our Finance and Resources colleagues to
ensure procedures are tightened up to ensure customers pay for the service timeously and if they
fail to pay, suspension of service action will be invoked. 
Page 10 of 146

Page 15

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 04 November 2024
___________________________________________________________________
Report by: Chief Auditor
___________________________________________________________________
Heading: Internal Audit and Counter Fraud Progress and Performance for
Period to 30 September 2024
___________________________________________________________________
1. Summary
1.1 The Internal Audit Annual Plan was approved by the Audit, Risk and
Scrutiny Board on 18 March 2024. Internal Audit measures the
progress and performance of the team on a regular basis using a range
of performance indicators.  This report monitors progress from 1 April
2024 to 30 September 2024, in terms of the delivery of the Audit Plan
for the year and compares actual performance against targets set by
the Director of Finance and Resources. 
1.2 In terms of Counter Fraud, no formal performance targets for fraud
investigation have been established for the following reasons.  A major
part of their work involves being the single point of contact (SPOC) for
the Department for Work and Pension’s (DWP) Single Fraud
Investigation Service and the Service Level Agreement for this work
contains time targets for completing this work.  The types of fraud
referrals received to date are wide ranging and the team’s objective is
to concentrate on investigating those referrals considered to contain the
greatest fraud risk.  They are also involved in promoting fraud
awareness and assisting with the implementation of adequate fraud
prevention measures within the Council.  
1.3 All of the Internal Audit Team and Counter Fraud Team are currently
working on a hybrid basis and also undertake home/site visits when the
need arises.  We also provide advice and support where necessary to
council services.
Item 2
Page 11 of 146

Page 16

1.4 The report details progress against local and national initiatives
involving Internal Audit and the Counter Fraud Team from 1 April 2024
to 30 September 2024. 
___________________________________________________________________ 
2. Recommendations
2.1 Members are invited to note the Internal Audit and Counter Fraud
Team progress and performance to 30 September 2024. 
_________________________________________________________
3. Background
3.1 The progress and performance of the Internal Audit Team is subject to
regular monitoring using a number of performance measures.  The
Director of Finance and Resources has set annual targets for the team
to demonstrate continuous improvement. In terms of the Counter Fraud
team, there are time targets in place for responding to requests from
the DWP’s Single Fraud Investigation Service.  Due to the diverse
nature of fraud referrals no formal performance targets have been
established and the outcomes from investigations is regularly
monitored by management.
3.2 Internal Audit and the Counter Fraud Team support a variety of local
and national initiatives through participation in professional practitioner
groups and co-ordination of national initiatives such as the National
Fraud Initiative.
3.3 This report measures the progress and performance of both the
Internal Audit and Counter Fraud Team for the period from 1 April 2024
to 30 September 2024.
4.                 Internal Audit Team Performance
(a) Percentage of audit plan completed as at 30 September 2024 
This measures the degree to which the Audit Plan has been
completed.   
Actual 2023/24 Annual Target
2024/25
Audit Plan
Completion
Target to 30
September
2024
Audit Plan
Completion
Actual to 30
September
2024
93.2% 90.0% 45% 51.5%       
Actual performance is ahead of  target.  
Page 12 of 146

Page 17

(b) Percentage of assignments complete by target date 
This measures the degree with which target dates for audit work have
been met.
Target 2024/25 Actual to 30 September 2024
95.0% 100%           
Actual performance is ahead of the target set for the year.  
(c) Percentage of audit assignments completed within time budget 
This measures how well the time budget for individual assignments has
been adhered to. 
Target 2024/25 Actual to 30 September 2024  
95.0% 100% 
Actual performance is ahead of the target set for the year, although this
is likely to reduce over the remainder of the year.   
(d) Percentage of audit reports issued within 6 weeks of completion
of audit field work 
This measures how quickly draft audit reports are issued after the audit
fieldwork has been completed.
Target 2024/25 Actual to 30 September 2024
95.0% 100% 
Actual performance is ahead of the target set for the year, although this
is likely to reduce over the remainder of the year.   
5. Review of the 2024/25 Internal Audit Plan 
5.1 Our 2024/25 Audit Plan is subject to ongoing review in light of any
organisational risks arising, and also to determine whether any
assignments will have to be amended or cancelled as result of us being
unable, for any reason, to undertake the work planned. At this stage we
are not recommending any further amendments to the plan. 
5.2 However this may change over the second half of the year as the team
are currently involved in a number of audit investigations and therefore
a substantial amount of the contingency budget is being spent.  
5.2 In addition, the team is also carrying a vacancy since the retiral of the
Chief Auditor in June and the Assistant Chief Auditor is covering this
post.  A vacancy factor was built into the Plan.
5.3 Discussions are continuing with the Chief Financial Officers (Section 95
Officers) of Inverclyde Council and West Dunbartonshire Council to
consider the resilience risks facing Internal Audit and Counter Fraud
Page 13 of 146

Page 18

Teams and with the assistance of Renfrewshire Council’s Project
Management Team, work is ongoing to explore possible options which
would address the resilience issues all three councils are facing. As all
three teams work differently, this is taking some time to collate the
information required.  The potential models identified, highlighting the
associated issues, risks and benefits will be considered at a future
Finance, Resources and Customer Services Policy Board.
5.4 It should be noted that the delivery of financial savings is not an
objective of this exercise, and each Chief Financial Officer is committed
to maintaining the current level of resource.
5.5 The Audit Plan progress will be closely monitored over the next period
and any changes required to the Internal Audit Plan will be brought to
this Board for approval.
6   Counter Fraud Team Progress and Performance
6.1 In line with the Service Level Agreement, the Counter Fraud Team act
as the Single Point of Contact (SPOC) to route potential housing
benefit fraud referrals to the DWP, liaise with the Council’s Housing
Benefit Team and DWP Fraud Officers and retrieve the necessary
evidence for the DWP Fraud Officers from the Housing Benefit System. 
Where a suspicion of fraud arises, the team investigate and report their
findings to management. Where appropriate, follow-on action is taken,
such as reporting the matter to Police Scotland for further investigation,
or directly to the Procurator Fiscal. In addition, they also work jointly
with DWP Fraud Officers on criminal fraud investigations which focuses
on the investigation and prosecution of the Local Authority administered
Council Tax Reduction Scheme and Social Security benefit fraud. In
addition to investigation work the team also undertake fraud prevention
work.
6.2 During this quarter, we have mainly been working on the various fraud
referrals and we are continuing to validate any bank account or
remittance contact changes received from the Council’s suppliers and
contractors. 
6.3 The financial and non-financial results for the period (April 2024 to
September 2024) are noted in the table below. 
Financial Outcomes Period to 30 September
2024 (£)
Cash savings directly attributable to
preventative counter fraud intervention
2,720
Cash recoveries in progress directly
attributable to counter fraud investigations
35,103 
Notional savings identified through
counter fraud investigation, (e.g. housing
tenancy and future council tax)
181,689
Page 14 of 146

Page 19

Housing Benefit Savings Attributable to
Joint Working by Counter Fraud and
DWP Counter Fraud Officers
40,490
Other DWP Benefit or Tax Credit Savings
identified through other Counter Fraud
work or through joint working with DWP
63,385
Non-Financial Outcomes Period to 30 September
2024  
Housing properties recovered 2
Housing applications amended/cancelled 2
Housing Allocation Priority Changed 0
Blue badge misuse warning letters issued 15
Blue Badges Cancelled 2
Supplier/Contractor Checks Undertaken 83  
6.4 Our notional savings are based on the methodology prepared by the
Cabinet Office.  
7.  Local and National Initiatives   
Scottish Local Authorities Chief Internal Auditors Group 
7.1 The Local Authorities Chief Internal Auditors Group met in September
and presentations were received from Audit Scotland on their best
value area of focus - workforce planning and from the Improvement
Service on how to utilise the data held on their system for the Financial
Sustainability indicators which form part of the Local Government
Benchmarking Framework. 
7.2 New Global Internal Audit Standards are being introduced from January
2025 and an update was received from a member of the Internal Audit
Standards Sub-Group which has been established to help implement
these standards.  It has now been confirmed that new Public Sector
Internal Audit Standards will be issued by CIPFA in draft format for
consultation very soon and will be introduced in  April 2025 and that no
changes to local government working practices  will be required until
the new standards are formally issued. 
7.3 On receipt of the draft Public Sector Internal Audit Standards, a review
will be undertaken to assess what amendments are required to our
current internal audit processes to enable us to fully conform to the new
standards. 
Scottish Local Authorities Investigation Sub-Group 
7.4 The Local Authorities Investigation Sub-Group also met in September
and various useful updates from other local authorities was provided
regarding the work they are currently undertaking.
Page 15 of 146

Page 20

National Fraud Initiative 
7.5 We are currently preparing for the next National Fraud Initiative.  The
required communications, notifying staff and the appropriate
Renfrewshire residents that their data is about to be submitted to the
Cabinet Office as part of the data matching initiative has been
undertaken.  Data files are now being checked and will be submitted
before the submission deadline date.   
7.6 A separate report providing details of the outcomes of the last exercise
is also being submitted to this Board. 
Implications of the Report
1. Financial - The Council has in place arrangements to recover the any
overpayments identified from the work of the Counter Fraud Team and
the National Fraud Initiative. 
2. HR & Organisational Development - None 
3. Community Planning – 
Safer and Stronger - effective internal audit is an important element of
good corporate governance. 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None 
7.  Equality & Human Rights - None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk - The progress and performance reported relates to the delivery of
the risk-based internal audit plan and the mitigation of the risk of fraud
and error. 
11. Privacy Impact – None 
12. COSLA Implications – None 
13. Climate Risk – None 
14. Children’s Rights - None
________________________________________________________________
Author:           Karen Campbell – 07768354651
Page 16 of 146

Page 21

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 4 November 2024
___________________________________________________________________
Report by: Chief Auditor
___________________________________________________________________
Heading: Summary of Internal Audit Activity in Partner Organisations July 2024 to
September 2024
___________________________________________________________________
1. Summary 
1.1 Members of the Audit, Risk and Scrutiny Committee expressed an interest in
the outcomes of audits undertaken in partner organisations. A proposed
revision to the Audit, Risk and Scrutiny Board’s Terms of Reference, to
facilitate this, was agreed at Council on 4 May 2024. 
1.2 This report provides members with a summary of the internal audit
arrangements within each partner body and a summary of the internal audit
activity from1 July 2024 to 30 September 2024. 
1.3 Renfrewshire Valuation Joint Board – Internal audit services are provided by
Renfrewshire Council’s Internal Audit Service.  An audit on the non-domestic
rates valuation system is currently in progress and will be reported upon to
the Renfrewshire Valuation Joint Board once finalised. 
1.4 Scotland Excel Joint Committee - Internal audit services are provided by
Renfrewshire Council’s Internal Audit Service.  An audit has been finalised in
relation to contract monitoring (implementation of collaborative procurement)
and was reported to the Executive Sub-Committee on 23 August 2024. A
summary of this audit engagement is included at appendix 1 of this report. 
1.5 Renfrewshire Integration Joint Board - Internal audit services are provided by
Renfrewshire Council’s Internal Audit Service. An audit on the processes
followed for financial planning has commenced and the fieldwork is currently
ongoing.  An exercise to ensure that previous internal audit
Item 3
Page 17 of 146

Page 22

recommendations have been implemented by their due date has also
commenced. 
1.6 Glasgow City Region City Deal – Internal audit services are provided by
Glasgow City Council Internal Audit Services, finalised reports for each
completed audit engagement are reported to the Glasgow City Region
Cabinet and the reports are shared with member Council’s. During the
reporting period, one audit review on the UK Shared Prosperity Fund (SPF)
Assurance Framework across Glasgow City Region was  completed and has
been included at appendix 2. 
___________________________________________________________________ 
2. Recommendations
2.1 All of these Audit Reports and Summaries have been submitted and
considered by the partner organisations’ audit committees.  Members are
therefore invited to note the content of the audit reports and audit summaries.
__________________________________________________________________
Implications of the Report
1. Financial - None 
2. HR & Organisational Development - None 
3. Community Planning – 
Safer and Stronger - effective internal audit is an important element of good
corporate governance. 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None 
7.  Equality & Human Rights – None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk - The summary reported relates to the delivery of the risk-based internal
audit plans for the partner bodies 
11. Privacy Impact – None 
12. COSLA Implications – None 
Page 18 of 146

Page 23

13. Climate Risk – None 
14.  Children’s Rights – None. 
________________________________________________________________
Author:           Karen Campbell, Interim Chief Auditor 
Page 19 of 146

Page 24

Internal Audit Report
Scotland Excel
Contract Monitoring – Implementing Collaborative Procurement
(A0008/2024/005) 
Date: July 2024 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the audit were to ensure that:
1. All Members views are sought on potential future frameworks.
2. Member engagement in framework development is widely sought and obtained
from relevant clients and their views and requirements are taken into consideration
as much as possible.
3. Member likely usage is obtained from reliable sources and taken into consideration
when frameworks are being established.
4. Frameworks are fair and equitable for all relevant members.
5. Communication and publicity regarding new frameworks is adequate for members.
6. A satisfactory mobilisation strategy has been approved and implemented.
7. Member framework usage is being monitored and addressed as early as possible.
8. Any major issues/problems raised by Members re the utilisation are escalated to
the  Executive Team at an early stage.
9. Member involvement in the framework management process is maximised
throughout the lifespan of the framework. 
Audit Scope
1. Interviewed relevant officers within Scotland Excel to obtain the required
information relating to processes for member visibility of forthcoming frameworks.
2. Prepared a series of tests to meet the above objectives. Three contracts were
selected for testing purposes. 
Key Audit Assurances
1. All members views are sought on potential future frameworks through various
methods of communication such as regular Business Reviews by Project &
Account Managers.
2. Member engagement in framework development is widely sought and obtained
from relevant clients and their views and requirements are taken into consideration
as much as possible, by the Commercial User Intelligence Group Meetings held
regularly throughout the year.
3. Member likely usage is obtained from reliable sources and taken into consideration
when frameworks are being established, by the Contract Steering Group.
4. Regular Business Review meetings ensure that frameworks are fair and equitable
for all relevant members.
5. Communication and publicity regarding new frameworks is adequate for members,
using Prior Information Notices.
6. For the sample of contracts tested, a satisfactory mobilisation strategy has been
approved and implemented.
7. Member framework usage is being monitored and addressed as early as possible,
by the User Intelligence Group.
8. Any major issues/problems raised by members re the utilisation are escalated to
the  Executive Team at an early stage by Category Managers.
Page 20 of 146

Page 25

Internal Audit Report
Scotland Excel
Contract Monitoring – Implementing Collaborative Procurement
(A0008/2024/005) 
Date: July 2024 
9. Meetings with Project Account managers ensure member involvement in the
framework management process is maximised throughout the lifespan of the
framework. 
Key Audit Risks
There were no key risks identified during the audit. 
Overall Audit Opinion
The audit identified that satisfactory arrangements are in place for member visibility of
forthcoming frameworks. Scotland Excel staff and processes encourage member
participation in framework development to maximise usage and deliver benefits for all
members.  As a result, there were no audit findings identified during this review and the
auditor has made a provision of substantial assurance for the areas tested. 
Management Commentary
N/A as no key risks were identified. 
Page 21 of 146

Page 26

Internal Audit | Chief Executive’s Department and Neighbourhoods, Regeneration and Sustainability | Mini Comp B Process 
0 Introduction Audit Opinion Main Findings Action Plan 
Internal Audit
Glasgow City Region City Deal
Shared Prosperity Fund - Assurance
Framework Compliance
Final Report
August 2024
FS 57095
Page 22 of 146

Page 27

Internal Audit | Glasgow City Region City Deal | SPF Assurance Framework Compliance 
1 Introduction Audit Opinion Main Findings Action Plan
1 Introduction
1.1 As part of the agreed Internal Audit plan, we have carried out
a review of the UK Shared Prosperity Fund (SPF) Assurance
Framework compliance arrangements across Glasgow City
Region (GCR). 
1.2 SPF is administered by the UK Government (UKG) and
provides funding for local investment by March 2025, with all
areas of the UK receiving an allocation from SPF via a funding
formula rather than a competitive process. 
1.3 The GCR is the only area in Scotland to adopt a regional
approach to SPF, receiving in the region of £73m over the 3-
year period between April 2022 and March 2025. While the
GCR Programme Management Office (PMO) has overall
programme responsibility as the Lead Authority, delivery will
take place, in the main, at the Member Authority level, with a
small number of projects being administered at a regional
level. A SPF GCR Assurance Framework was created to
support member authorities in the administration of SPF and
outlines the key requirements that should be adopted
throughout the course of the 3-year funding period. 
1.4 The objective of the audit was to ensure that that member
authorities are complying with the requirements outlined in
the SPF Assurance Framework and that an adequate audit
trail is maintained to support this. The scope of the audit
included: 
• Documented policies and procedures, roles and
responsibilities.
• Governance and monitoring arrangements.
• Reporting activities to track the progress and adherence
to the SPF Assurance Framework.
• The Change Control process.
• Reporting requirements to the GCR PMO and UKG, and 
• Record keeping arrangements to maintain an audit trail.
1.5 This audit did not include a review of the governance
arrangements for individual SPF funded projects at both a
regional or member authority level. The review focused on
the governance and reporting arrangements between the
member authorities and the GCR PMO.   
Page 23 of 146

Page 28

Internal Audit | Glasgow City Region City Deal | SPF Assurance Framework Compliance 
2 Introduction Audit Opinion Main Findings Action Plan
2 Audit Opinion
2.1 Based on the audit work carried out, assurance can be taken that the control environment is satisfactory. 
3 Main Findings
3.1 We are pleased to report that a number of key controls are in
place and generally operating effectively. The SPF Assurance
Framework was developed by the PMO, in partnership with
UKSPF Lead Officers from each member authority, when the
funding initiative was first introduced and rolled out by the UK
Government in 2022. Key officers responsible for SPF within
both the PMO and member authorities are fully aware of their
role in the process and the requirements that are outlined in
the Framework. All relevant officers at each member authority
were provided with details of the document and this has been
made readily available to all appropriate staff. 
3.2 We noted that there are appropriate monitoring and reporting
activities in place across the GCR and within each member
authority. This includes internal reporting within each
organisation and more widely across the different GCR
Support Groups. Member authorities are also required to
submit returns to the PMO on both a quarterly and 6-monthly
basis. We were satisfied that these were submitted as
required and any discrepancies are appropriately
investigated by the PMO.   
3.3 Although there has been no requirement for the PMO to
complete a formal Change Control process to date, we were
satisfied that staff were aware of the thresholds and
occasions where a formal change control should be adopted.
We also noted that there were appropriate arrangements in
place across the Region to ensure that documents relating to
SPF were adequate retained for audit purposes and where
required these were restricted to relevant staff. 
3.4 The audit has been undertaken in accordance with the Public
Sector Internal Audit Standards. 
3.5 We would like to thank officers involved in this audit for their
cooperation and assistance. 
3.6 It is recommended that Cabinet notes the content of this
report. 
Page 24 of 146

Page 29

1 
___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 4 November 2024
___________________________________________________________________
Report by: Interim Chief Auditor
___________________________________________________________________
Heading: Audit Scotland Report – The National Fraud Initiative in Scotland
2024. 
___________________________________________________________________
1. Summary
1.1 Audit Scotland’s report on the National Fraud Initiative (NFI) 2022/23
was published in August 2024 and is attached at Appendix 1. 
1.2 The report highlights that Scottish public bodies have recorded
outcomes of £21.5 million arising from the 2022/23 exercise. The
2022/23 figure has increased by approximately £6.6 million since the last
exercise and the increase has been across most data match areas. The
NFI outcome figures include amounts for fraud and error detected as well
as an estimate for those future losses that have been prevented.
However it is not clear whether underlying levels of fraud have increased
since the reports states that there have been improvements in the
recording of the results by participating bodies and there has also been
a change in the estimation methodologies which has contributed to
higher outcomes in some areas. 
1.3 Renfrewshire Council’s approach and outcomes for the 2022/23
exercise is attached at Appendix 2. 
1.4 Our self-assessment of our arrangements in preparation for the 2024/25
exercise is also included in Appendix 3.
___________________________________________________________________
Item 4
Page 25 of 146

Page 30

2 
2. Recommendations 
2.1 It is recommended that the Audit, Risk and Scrutiny Board: 
• note the report from Audit Scotland, and 
• note Renfrewshire Council’s current arrangements, outcomes
and self-assessment to support the 2024/2025 NFI exercise.
_________________________________________________________
3. Background
3.1 The NFI aims to detect and prevent fraud and error through a national
data matching exercise across public bodies carried out by the Cabinet
Office and overseen, in Scotland, by Audit Scotland, with the aim of
identifying instances of possible fraud or error.  Overpayments that are
identified through the initiative allow public bodies to take appropriate
action to recover the money.
3.2 The initiative, which is co-ordinated in this council by internal audit,
operates biennially with the data downloaded and electronically matched
in year one and the results issued, investigated and reported in year two. 
In relation to this report data was downloaded from our systems in
September 2022 and uploaded onto the secure NFI web portal in
October 2022, to be matched against other council data or other
participant data.  
3.3 The Audit Scotland report highlights 3 recommendations for councils to
consider in relation to counter fraud activities and their response to the
National Fraud Initiative.  These are summarised below along with the
current arrangements in Renfrewshire Council and any identified
improvement actions: 
1. Maximise the benefits 
All participants should ensure that an appropriate level of resource is
available to deliver NFI follow-up activities in an efficient and effective
manner, in line with local priorities. 
The Interim Chief Auditor co-ordinates the NFI exercise in Renfrewshire
Council.  Time is included in the counter fraud work and audit plan and
there is regular engagement with services throughout the National Fraud
Initiative. If any issues are identified in progressing the matches, these 
are highlighted to Senior Management for action. Revenues and Benefit
services have included NFI match investigation in their work plan. 
Page 26 of 146

Page 31

3 
2. Self-appraisal 
The NFI self-appraisal checklist is used as part of planning for the
2024/25 exercise. 
The Interim Chief Auditor completes the NFI self-appraisal checklist as
part of the planning arrangements for each NFI exercise and the
completed checklist for the 2024/25 exercise is attached in Appendix 3
of this Report.  Only one improvement action has been identified and that
is to include reference to the National Fraud Initiative in the Council’s
Code of Corporate Governance.
3. Follow-Up Activity Arrangements
Participants should put in place arrangements for monitoring follow-up
activity, and where it is necessary seek to understand reasons for low or
nil outcomes.
Internal Audit is responsible for co-ordinating the exercise and regularly
review outcomes.   Where any control issues are identified, meetings are
held with the appropriate parties to highlight them and determine any
action required.  Processes followed to investigate matches are also
reviewed where low and nil outcomes are recorded.
3.4 The Council has made financial savings of £401,199 as a result of
investigative work on the 2022/2023 NFI matches and further future
estimated savings of £810,056 have also been noted. Non-financial
outcomes relate to 2 housing properties being recovered, 11 housing
applications being amended or cancelled and 152 blue badges being
cancelled.   
___________________________________________________________________
Page 27 of 146

Page 32

4 
Implications of the Report
1. Financial - The Council has in place arrangements to recover any
financial overpayments identified through the National Fraud Initiative.   
2. HR & Organisational Development - None 
3. Community Planning – 
Wealthier and fairer – The National Fraud Initiative (NFI) exercises
make a significant contribution to the security of public sector finances
by confirming that services are provided to the correct people and by
eliminating fraud and error.
4. Legal – None 
5. Property/Assets - None 
6. Information Technology - None
7. Equality & Human Rights - None
8. Health & Safety - None
9. Procurement - None
10. Risk – Priority is given to investigating matches with a higher risk of
fraud and error.
11. Privacy Impact – There is a requirement to take best reasonable
attempts to notify people of the NFI exercise as part of the preparation
for the exercise.  This requirement has been complied with.
12. Cosla Policy Position – None
13. Climate Risk – None
14.  Children’s Rights - None
___________________________________________________________________ 
Author:           Karen Campbell, Interim Chief Auditor 
Page 28 of 146

Page 33

Prepared by Audit Scotland
August 2024
The National Fraud
Initiative in
Scotland 2024
Page 29 of 146

Page 34

2The National Fraud Initiative in Scotland 2024
Contents
Key messages 3
Recommendations 4
1. Introduction 5
2. Overall outcomes  7
3. NFI delivery 11
4. Specific match areas 14
5. Pilot exercises and future developments 25
Appendix 26
Accessibility
You can find out more and read this report using assistive
technology on our website www.audit.scot/accessibility.
Audit team
The core audit team
consisted of: 
Tim Bridle, under the
direction of Cornilius
Chikwama.
Page 30 of 146

Page 35

3Key messages
Key messages
Key messages
Key messages
1 Fraud against the public sector costs the taxpayer money and
can undermine both confidence in government and the delivery
of public services. The proactive detection and prevention of
fraud using the National Fraud Initiative (NFI) remains vitally
important to public sector financial management as public bodies
continue to recover from Covid-19 and to deal with the impact of
the cost-of-living crisis.
2 NFI savings and outcomes have increased from £14.9 million
in 2020/21 to £21.5 million in 2022/23, with increases across
most data match areas. However, savings from council tax single
person discounts are slightly reduced and additional outcomes
in some areas are attributable to changes in estimation
methodologies. Overall, it is not clear whether underlying levels
of fraud have increased since 2020/21.
3 NFI governance and follow-up arrangements remained sound
for most participating bodies over the period covered by the
2022/23 exercise. However, when compared to previous
exercises, slightly fewer bodies have been assessed by their
auditors as having fully satisfactory arrangements, and there
remains scope for some bodies to follow up on data matches
more effectively.
Page 31 of 146

Page 36

4Recommendations
Recommendations
Participating bodies should:
• Ensure that an appropriate level of resource is available to deliver NFI
follow-up activities in an efficient and effective manner, in line with
local priorities.
• Use the NFI Self-Appraisal Checklist as part of planning for the 2024/25
exercise.
• Put in place arrangements for monitoring follow-up activity, and where
it is necessary seek to understand reasons for low or nil outcomes.
Page 32 of 146

Page 37

5
1.
1. Introduction
1. Introduction
The proactive detection and prevention of fraud using the
National Fraud Initiative (NFI) remains vitally important to
public sector financial management as public bodies
continue to recover from the Covid-19 pandemic and to deal
with the impact of the cost-of-living crisis.
1. Fraud against the public sector costs the taxpayer and can undermine
both confidence in government and the delivery of public services.
The National Fraud Initiative (NFI) is a proactive data matching exercise
designed to identify and prevent fraud. It remains vitally important during
a time of ongoing financial pressure as public bodies continue to recover
from the Covid-19 pandemic and to deal with the impact of the cost-of-
living crisis.
2. The Public Sector Fraud Authority (PSFA) oversees the NFI across
the UK, and Audit Scotland leads the exercise in Scotland, working with a
range of Scottish public bodies and their external auditors. The NFI takes
place every two years, and this report considers the outcomes from the
2022/23 exercise.
Statutory basis for NFI
3. We carry out the NFI under powers introduced by the Criminal
Justice and Licensing (Scotland) Act 2010 and incorporated in Part 2A
of the Public Finance and Accountability (Scotland) Act 2000. It is
important for all parties involved that this exercise is properly controlled,
and that data is handled in accordance with the law. The Audit Scotland
Code of Data Matching Practice includes a summary of the key
legislation and controls governing the NFI data matching exercise.
Participating bodies
4. In 2022/23, 110 public sector bodies in Scotland participated in
the NFI, submitting data and following up on matches. The Scottish
Government also submitted data for another 17 central government
bodies who share their systems for payroll and/or creditors. Many
councils also submit payroll data for their Arm’s-Length External
Organisations (ALEOs). Across the UK there are over 1,100 participating
bodies and data matching takes place across them all.
Page 33 of 146

Page 38

1. Introduction 6
Main data match areas in 2022/23
5. The main data match areas for the 2022/23 NFI exercise were:
• Payroll
• Creditor payments
• Council Tax (Single Person Discounts and Reduction Scheme
reliefs)
• Pensions
• Housing Benefit
• Housing Tenancy and waiting lists
• Blue Badges (disabled parking)
• Adult concessionary bus travel (new in 2022/23 exercise).
6. The 2022/23 NFI exercise matched new data from His Majesty’s
Revenue and Customs (HMRC) using powers under the Digital Economy
Act (2017).
7. Non-Domestic Rates Small Business Bonus Scheme (NDR SBBS)
matching was postponed for the 2022/23 exercise due to the national
NDR revaluation exercise in 2023. Results will be reported as part of the
2024/25 exercise.
Basis for reported outcomes
8. All monetary outcomes included in this report are on a cash basis,
prior year totals have not been adjusted to reflect inflation or changes in
estimation methodologies since amounts were originally reported. Details
of estimate methodologies used can be found at Appendix.
Page 34 of 146

Page 39

72. Overall outcomes
2. Overall outcomes
Overall outcomes from the NFI have increased from 
£14.9 million in 2020/21 to £21.5 million in 2022/23.
Overall outcomes by type
9. The value of outcomes from the NFI, recorded since our last report,
total £21.5 million (up from the £14.9 million in 2022). The cumulative
value of outcomes from the NFI in Scotland since participation started
in 2006/07 now stands at around £180 million. Exhibit 1 shows NFI
outcomes by type for 2022/23 and the previous three exercises.
Exhibit 1. 
NFI outcomes by exercise and type, 2016/17 to 2022/23
Reported outcomes have increased to £21.5 million in 2022/23.
Source: Audit Scotland analysis of NFI outcomes
0
10
25
2022/232020/212018/192016/17
£ million
£17.8m 
£15.3m  £14.9m 
£21.5m
3.1
2.7 4.2
6.8
9.2 7.0
6.2
8.9
5.5 5.6 4.5 5.7
Actual savings:
overpayments and
additional income
Forward savings
estimates: from
overpayments,
additional income and
prevented fraud
Notional outcome
estimates: not directly
linked to actual
overpayments or
additional income, eg
blue badges, housing
tenancy and waiting lists
10. Increased outcomes reported in 2022/23 partly reflect improvement
in recording of results as bodies continue to recover from Covid-19. There
have also been changes to estimation methodologies which contribute to
higher outcomes in some areas (details of methodologies can be found
in the Appendix). It is not possible to extrapolate from these figures that
underlying levels of fraud have increased.
Page 35 of 146

Page 40

2. Overall outcomes 8
Outcomes by data match area
11. Most monetary outcomes from the NFI accrue to councils, the Scottish
Public Pensions Agency and the Department for Work and Pensions (DWP)
in the form of savings arising from council tax, pensions and housing
benefits matches.
12. Many participating bodies only submit payroll and creditors datasets
for matching, and this limits the monetary outcomes available to them.
However, overpayments associated with duplicate creditor payments and
payroll matches are not insignificant. NFI outcomes analysed by main data
match area, are shown for the last three exercises in Exhibit 2 (page 9).
Page 36 of 146

Page 41

2. Overall outcomes 9
Exhibit 2. 
NFI outcomes by area and exercise
Most savings arise from Council Tax, Pensions and Housing Benefits matches.
Notional outcome
estimates
Forward savings
estimates
Overpayments and
additional income
0 1 2 3 4 5 6
Care Home Payments
Payroll
Concessionary Bus Travel
Creditors
Housing waiting lists
Council Tax Reduction Scheme
Housing Tenancy
Housing Benefit
Pensions
Non-Domestic Rates
Blue Badges
Council Tax SPD
Care Home Payments
Payroll
Concessionary Bus Travel
Creditors
Housing waiting lists
Council Tax Reduction Scheme
Housing Tenancy
Housing Benefit
Pensions
Non-Domestic Rates
Blue Badges
Council Tax SPD
Care Home Payments
Payroll
Concessionary Bus Travel
Creditors
Housing waiting lists
Council Tax Reduction Scheme
Housing Tenancy
Housing Benefit
Pensions
Non-Domestic Rates
Blue Badges
Council Tax SPD
£ million
2020/21
2018/19
2022/23
Page 37 of 146

Page 42

2. Overall outcomes 10
Notes:
1.  Non-Domestic Rates Small Business Bonus Scheme data was first submitted for the 2020/21
exercise but did not form part of the 2022/23 exercise due to the revaluation exercise taking place
in 2023.
2.  Care home payments have not been matched since 2018/19 due to legislative constraints.
3.  Adult concessionary bus travel was a pilot exercise in 2020/21 and has been mainstreamed in
2022/23.
Source: Audit Scotland analysis of NFI outcomes
Wider benefits of NFI
13. The NFI also delivers benefits which are more difficult to quantify.
These include its fraud deterrent effect and the financial governance
assurance it provides to bodies where no issues are identified (Exhibit 3).
Exhibit 3. 
Non-monetary benefits of NFI
Source: Audit Scotland
Acts as a deterrent to 
potential fraudsters
Can provide assurance that
systems are operating well
Can identify where system
improvements are required
Page 38 of 146

Page 43

113. NFI delivery
3. NFI delivery
NFI governance and follow-up arrangements remain sound
for most participating bodies. However, when compared to
previous exercises, appointed auditors assessed slightly
fewer bodies as having fully satisfactory arrangements.
Auditor assessments
14. NFI governance and follow-up arrangements remain sound for most
of the 110 bodies in Scotland that participated in the 2022/23 exercise.
However, several bodies have struggled with delivery and there remains
some scope for improvement.
15. We asked auditors to assess participating body NFI arrangements,
and rate them as Green (satisfactory), Amber (mostly adequate) or Red
(unsatisfactory). Auditor returns for 2022/23 included a slightly increased
number of amber and red ratings Exhibit 4 (page 12).
16. In most cases amber or red assessments reflect deficiencies with
follow-up activity. Participating bodies routinely cited the lack of 
adequate resources as the main reason for delay or lack of progress 
with follow-up activity.
17. Our NFI Self-Appraisal Checklist includes requirements for
participating bodies to consider Leadership, Commitment and
Communication. The checklist also asks NFI key contacts and users
to consider potential improvements to the efficiency and effectiveness
of follow-up activity. The checklist can be found on our Counter Fraud
webpage and has been updated for the 2024/25 exercise.
Page 39 of 146

Page 44

3. NFI delivery 12
Exhibit 4. 
Auditor assessments of NFI delivery arrangements
Amber and red assessments were up slightly in 2022/23.
Source: Audit Scotland analysis of Auditor Returns
Percentage
Satisfactory
Mostly adequate
Unsatisfactory
0 10 20 30 40 50 60 70 80 90 100
Colleges 2022/23
Colleges 2020/21
Colleges 2018/19
CG 2022/23
CG 2020/21
CG 2018/19
NHS 2022/23
NHS 2020/21
NHS 2018/19
LG 2022/23
LG 2020/21
LG 2018/19
Page 40 of 146

Page 45

3. NFI delivery 13
18. Exhibit 5 shows the main determinants of successful NFI delivery that
participating bodies should be focusing on to strengthen their arrangements.
Exhibit 5. 
NFI participation – main determinants of success
Successful delivery of NFI requires a clear commitment to a well-thought-out
approach that optimises the use of available resources to follow up matches
appropriately.
Source: Audit Scotland
19. Audit Scotland will continue to work with bodies to support effective
and efficient delivery of NFI through its ongoing engagement activities.
Knowledge Resources
Leadership
Effective
NFI delivery
Page 41 of 146

Page 46

144. Specific match areas
4. Specific match areas
NFI outcomes have increased in most data match areas in
2022/23. However, savings from council tax single person
discounts decreased slightly, and increases in some areas
are partly due to changes in estimation methodologies.
Payroll
20. The number of payroll and multi-contract working frauds identified
as a result of the NFI has increased. There were 12 cases identified in
2022/23. This is the highest number since 2016/17, which is the last
exercise for which immigration data was matched. Overpayments and
case numbers for the 2022/23 exercise are shown alongside those for
the three previous exercises at Exhibit 6.
Exhibit 6. 
Payroll outcomes and case numbers by NFI exercise
There has been an increase in the level of identified fraud in 2022/23.
Note. Notional outcomes of £5,685 per case are allocated where staff resign or have been 
dismissed (Appendix).
Source: NFI management information
0
80
140
2022/232020/212018/192016/17
0
8
16
2022/232020/212018/192016/17
Number of cases
Overpayments
£ thousand
13
8
3
12
£20,000
£129,000
£27,000
£100,000
Notional outcomes
Page 42 of 146

Page 47

4. Specific match areas 15
Creditor payments
21. Participating bodies submit details of payments made to people or
organisations supplying them with goods and services. Data is matched
by the NFI to identify potential duplicate payments. Bodies identifying
duplicate payments often refresh procedures and tighten controls to
reduce future risk.
22. In 2022/23 outcomes worth £0.75 million were identified from 146
duplicate payments across 31 bodies. This is broadly in line with previous
exercises as shown in Exhibit 7.
Exhibit 7. 
Duplicate creditor payment savings and case numbers by NFI exercise
£0.75 million of recoverable duplicate creditor payments was identified in 2022/23.
Source: NFI management information
0
0.6
1.2
2022/232020/212018/192016/17
Number of duplicate
payments
Overpayments
£ million
168
147 144 146
£0.6m
£1.1m
£0.5m
£0.75m
130
150
170
2022/232020/212018/192016/17
Page 43 of 146

Page 48

4. Specific match areas 16
Adult Concessionary Bus Travel
23. Following a successful pilot exercise in 2020/21, adult concessionary
bus travel mortality screening was rolled out to councils in 2023. The
National Entitlement Card Project Office, working in partnership with
councils, submitted details of all live travel passes for matching.
24. The NFI identified 99,600 travel passes that belonged to holders who
had died. Transport Scotland was able to check usage of these passes
and identified that 1,075 had been used after the date of death.
25. The full fare value of fraudulent bus trips associated with these
passes amounted to £0.31 million, with a cost to Transport Scotland of 
around £0.18 million, based on the applicable reimbursement rates to 
bus companies.
26. The cancellation of these passes will prevent future fraudulent use
with an estimated value of £0.45 million (based on £420 per travel pass
used fraudulently, see Appendix (page 26). The resultant saving to
Transport Scotland is estimated at around £0.25 million based on current
reimbursement rates.1
Council Tax Single Person Discounts
27. People living on their own, or in some cases with adults who can
be ‘disregarded’, are eligible for a 25 per cent single person discount
(SPD) on their annual council tax bill. The NFI matches SPD recipients to
the electoral register and to other datasets to identify where other adult
residents have not been declared on applications, have subsequently
turned 18 or have moved in.
28. Councils withdrew £1.8 million worth of SPDs because of the NFI.
The additional income, based on a forward projection of annual savings
for two years, in line with the Cabinet Office methodology, equates to an
additional £2.7 million. These amounts are shown together and alongside
savings for the previous three exercises in Exhibit 8 (page 17).
29. Only 19 councils recorded NFI activity in relation to SPDs, as more
councils are now making use of third party providers for data matching
and follow-up. Seven councils using third-party providers now record no
NFI outcomes (an increase of two from the previous exercise).
1   Total outcomes for this area (Exhibit 2) includes a notional amount
of £0.91 million relating to the pilot exercise in 2020/21 (based on the
Cabinet Office methodology at the time which applied £550 to each
travel pass cancelled).
Page 44 of 146

Page 49

4. Specific match areas 17
Exhibit 8. 
Council Tax SPD savings and case numbers by NFI exercise
Case numbers and savings from single person discounts decreased in 2022/23.
Source: NFI management information
Thousand
4,846 4,588
3,720 3,419
1.8
2.6 2.7
Case numbers0
3
6
2022/232020/21 2018/19 2016/17 
0
3
6
2022/232020/212018/192016/17
£4.4m 
£4.9m 
£4.6m  £4.5m
3.1
1.8
2.8
1.5
2.9
1.7
2.7
1.8
Forward savings estimate
Discounts removed
£ million
Council Tax Reduction Scheme (CTRS)
30. Council tax reduction is available to low-income households in
Scotland. The NFI matches CTRS data to other datasets, such as payroll
and pensions, for example, to identify undeclared income.
31. In 2022/23, additional council tax income of £0.92 million was
identified because of follow-up on NFI matches (up from £0.65 million
in 2020/21). Savings and case numbers are shown alongside those from
the previous three NFI exercises in Exhibit 9 (page 18).
Page 45 of 146

Page 50

4. Specific match areas 18
32. Actual additional income from the removal of council tax reductions
has increased, as have forward savings estimates. The forward savings
estimate methodology has, however, changed with savings now based
on 33 weeks, compared to the 21 weeks previously used.
Exhibit 9. 
Council Tax Reduction Scheme savings and case numbers by NFI exercise
Total potential savings from CTRS have increased to £0.92 million in 2022/23.
Source: NFI management information
115
280
772
395
Case numbers0
400
800
2022/23 2020/212018/192016/17
0.0
0.5
1.0
2022/232020/212018/192016/17
£0.48m 
£0.30m 
£0.65m 
£0.92m
0.08
0.23
0.09
0.38
0.12
0.53
0.23
0.69
Forward savings estimate
Reductions removed
£ million
33. Only 18 councils identified savings from CTRS, with most savings
arising from matches to pensions (around 40 per cent) and payroll (around
30 per cent), where income had not been declared.
Page 46 of 146

Page 51

4. Specific match areas 19
Housing Benefits
34. Housing benefits (HB) help people on low incomes pay their rent.
HBs in payment continues to decrease as more benefit recipients move
on to universal credit.
35. The DWP’s Verify Earnings and Pensions alerts service has also
impacted HB savings from NFI as alerts are sent directly to councils for
investigation, allowing them to follow up outside the NFI process. We no
longer match HB to payroll and pension as part of the NFI.
36. There has, however, been an increase in reported savings in
2022/23 due to the inclusion of late DWP savings from the 2020/21
exercise which was affected by Covid-19. Exhibit 10 shows the HB
overpayments and forward savings reported for the current and previous
three NFI exercises.
Exhibit 10. 
Housing Benefit savings by NFI exercise
2022/23 includes significant late DWP savings from the 2020/21 exercise.
Source: NFI management information
0.0
1.5
3.0
2022/232020/212018/192016/17
£2.1m
£2.8m 
£1.2m
£2.2m
2.1
0.7
1.4
0.7
0.3
0.9
0.4
1.8
Forward savings estimate
Overpayments
£ million
37. HB matches involving suspected fraud are referred to the DWP for
investigation and resultant savings are not attributed back to councils.
In 2022/23 almost £2 million of savings arose from these referrals. £0.2
million of savings was identified locally by 17 councils, largely from the
follow-up of matches to student loans.
Page 47 of 146

Page 52

4. Specific match areas 20
Exhibit 11.
Pensions savings by NFI exercise
Follow-up activity and recording of outcomes in 2020/21 was impacted by Covid 19.
Source: NFI management information
0
3
6
2022/232020/212018/192016/17
£5.4m
£3.2m 
£1.5m
£5.6m
2.8
0.40.7
4.8
0.1
1.4
5.1
0.5
Estimated forward savings
Actual overpayments
£ million
Pensions
38. The NFI is an efficient and effective way for the Scottish Public
Pensions Agency (SPPA) and councils that administer pensions to check
that they are only paying pensions to people who are alive.
39. The follow-up of matches has led to the identification of actual
overpayments of £0.5 million as at 31 March 2024, with projected
forward savings amounting to a further £5.1 million. These savings are
shown along with those reported for previous exercises in Exhibit 11.
40. Forward savings are estimated based on a potential payment period
from the date overpayments are identified until the date the deceased
pensioner would have reached the age of 85 (consistent with actuarial
assumptions used to value public sector pension schemes).
41. In 2022/23 we have seen improved follow-up of pensions matches.
However, not all overpayments identified had been recorded by 31 March
2024. Late savings will be reported as part of the 2024/25 exercise as 
a result.
Page 48 of 146

Page 53

4. Specific match areas 21
Exhibit 12.
Blue Badges outcomes and case numbers by NFI exercise
There have been higher levels of recorded cancellation in 2022/23 than for 
recent exercises.
Source: NFI management information
0.0
2.0
4.0
2022/232020/212018/192016/17
Badges cancelled
Notional outcomes
£ million
Thousand
4,505
3,215
4,616 5,140
£1.8m
£2.6m £2.7m
£3.3m
0
3
6
2022/232020/212018/192016/17
Blue Badges
42. The Blue Badge scheme allows individuals with mobility problems
to park for free at on-street parking meters, in ‘pay and display’ bays, in
designated Blue Badge spaces, and on single or double yellow lines in
certain circumstances. Badges are sometimes used by unauthorised
persons after the badge holder has died. Not only is this an offence under
the Disabled Persons’ Parking Badges (Scotland) Act 2014, but it may also
result in parking spaces being denied to people who legitimately use the
Blue Badge scheme.
43. The NFI matches Blue Badges issued to records of deaths, enabling
badges to be cancelled. The number of badges cancelled in 2022/23 has
gone up to 5,140, as shown at Exhibit 12.
Page 49 of 146

Page 54

4. Specific match areas 22
44. The increased number of cancellations, together with a new estimate
multiplier, has resulted in a higher notional outcome value. The Cabinet
Office estimation methodology now applies £650 per badge cancelled
(compared to £575 per badge in 2020/21).
Housing Tenancy
45. With reported housing shortages and high levels of homelessness,
tenancy fraud is increasingly an issue for councils. Where fraudulent
subletting exists, it means that properties are not available to house
people who are in most need and this can be costly to councils.
46. The NFI uses council housing tenancy data to identify possible cases
where tenants may have sublet their property. It also helps identify cases
where the tenant has died, and the property is either empty or has other
individuals living in it.
47. As a result of the 2022/23 exercise, councils were able to identify and
recover ten properties. A housing association property was also identified
and made available for social housing. The numbers of properties
recovered along with the notional outcome estimates for the last four
exercises are shown at Exhibit 13 (page 23).
48. Notional outcomes of £78,300 are allocated per property recovered
(£93,000 in 2020/21). This is based on an average four-year fraudulent
tenancy and includes estimated costs of temporary accommodation for
genuine applicants; legal costs to recover property; re-let cost; and rent
foregone during the void period between tenancies.
49. In addition to recovery of properties, NFI has enabled several councils
to update tenancy details where there has been legitimate succession
following a bereavement.
Page 50 of 146

Page 55

4. Specific match areas 23
Exhibit 13.
Housing Tenancy outcomes and case numbers by NFI exercise
Tenancies recovered as a result of NFI have remained in double figures in 2022/23.
Source: NFI management information
0.00
0.50
1.00
2022/232020/212018/192016/17
£ million
2 1
10 11
£0.09m
£0.19m
£0.93m £0.86m
Notional outcomes
Tenancies recovered0
6
12
2022/232020/212018/192016/17
Housing Waiting Lists
50. Councils maintain waiting lists for council housing, and in some
cases for all social housing in their area. The NFI matches waiting list
data to housing tenancy data and other data sets, enabling undisclosed
changes in circumstances to be picked up. This enables removal of
ineligible applicants from the waiting list, stops inappropriate allocations,
and accelerates allocations to people in genuine need of social housing.
51. In 2022/23 we have seen an increase in the number of applicants
removed from waiting lists as a result of NFI. Notional outcomes have
also increased as shown in Exhibit 14 (page 24).
Page 51 of 146

Page 56

4. Specific match areas 24
52. Notional outcomes are attributed to applicants removed from the
waiting list on the basis that social housing could have been allocated
inappropriately. The estimation methodology allocates £4,283 per case
removed from the waiting list (an increase from £3,240 per application in
2020/21).
Exhibit 14.
Housing Waiting List outcomes and case numbers by NFI exercise
More applicants have been removed from the waiting list in 2022/23 than in 
previous exercises.
Source: NFI management information
0.0
0.8
1.4
2022/232020/212018/192016/17
£ million
90
230
187
280
£0.7m
£0.3m
£0.6m
£1.2m
Notional outcomes
Applicants removed
from waiting list0
150
300
2022/232020/212018/192016/17
Page 52 of 146

Page 57

255. Pilot exercises and future developments
5. Pilot exercises and future
developments
Social Security Scotland took part in a pilot data-matching
exercise which identified limited fraud and error. We 
are also exploring the possibility of involving wider 
public sector bodies in the 2024/25 NFI exercise on a
voluntary basis.
Social Security Scotland – benefits pilot 2022
53. In 2022 a pilot exercise was undertaken with Social Security Scotland
(SSS) to identify any instances where claimants received support but
were not residing in Scotland, or where claimants appear to have claimed
benefits more than once (eg, from more than one Scottish address). The
pilot exercise included payments made in the three-month period from
April to June 2021.
54. Around 45,000 lines of data relating to benefit payments were
submitted for matching, resulting in the identification of 367 claimants
who appeared to be residing outwith Scotland. Following review and
corroboration of addresses by SSS there were just 17 cases where
claimants were not entitled to benefits. Overpaid benefits of £16,450
were identified, a further £20,000 could have been paid out in relation to
these claims, over the remaining eligibility periods.
55. Despite the identification of fraud and error, the number and value
of cases was not deemed sufficient to justify the inclusion of this match
type in the main biennial NFI exercise in 2022/23. The intention is to
run another pilot in 2024/25 which may also include Adult Disability
Payments for the first time.
Inclusion of bodies on a voluntary basis
56. There are potential benefits from expanding the NFI to include 
more public sector bodies in Scotland. We invited Scottish housing
associations and universities to participate in the 2024/25 NFI on a
voluntary pilot basis.
57. While no universities have volunteered for participation, we are
working with several interested housing associations. At this time, it is
unclear how many of those interested will actually participate.
Page 53 of 146

Page 58

26Appendix
Appendix
Estimated outcomes methodologies
In some cases NFI outcomes include an estimated
element for forward savings or for where no
monetary value can be recovered
The NFI uses the term ‘outcomes’ to refer to the financial value of fraud,
error and overpayment that can be attributed to NFI data matching. In
some cases NFI outcomes include an estimated element which seeks 
to capture:
• The value of loss from a fraud or error detected because of an NFI
match, in instances where no monetary value can be recovered -
such as the value of recovering a property from a tenant who has
fraudulently obtained that tenancy. We have called these ‘notional
outcome estimates’ in our report.
• The value of any future losses that may have been incurred without
intervention as a result of an NFI match. For example, the value
of future overpayments prevented through detecting and stopping
a fraudulent or erroneous housing benefit claim. We have called
these ‘forward savings’ in our report.
Most NFI datasets have a methodology to calculate estimated outcomes.
These methodologies account for:
• data relevant to the fraud problem, including national published data
and data from previous NFI cases
• the policy context relative to the fraud problem
• any regional variances that may result in the generation of estimate
methodologies specific to a region or area
• alignment where possible with relevant estimated savings
methodologies used in other central government departments.
All methodologies are reviewed prior to the start of each new NFI
exercise. Any changes are reviewed by the Cabinet Office NFI
Governance Board and approved by the Cabinet Office Fraud Prevention
Panel. This panel consists of cross government counter fraud experts
(including representatives from DWP, HMRC, NHS, MOD, BEIS, DFID,
NAO, etc.) who review and challenge, where necessary, methodologies
for calculating the estimated value of fraud prevention initiatives across
government departments.
Page 54 of 146

Page 59

Appendix 27
Once approved, these methodologies are built into the NFI web
application to enable the estimated outcomes element to be
automatically generated.
A summary of the outcomes methodology calculations applied to NFI
datasets is set out in the following table:
Data match 
Basis of calculation of forward savings and 
estimated outcomes 
Council tax single 
person discount 
Forward savings – Annual value of the discount cancelled
multiplied by two years. 
Council tax 
reduction scheme
Forward savings – Weekly change in council tax discount
multiplied by 33 weeks (increased from 21 weeks in 2020/21).
Housing benefit  Forward savings – Weekly benefit reduction multiplied by 
21 weeks. 
Pensions  Forward savings – Annual pension multiplied by the number of
years until the pensioner would have reached the age of 85.
Housing Tenancy Notional outcomes – £78,300 per property recovered, based
on average four–year fraudulent tenancy. Includes: temporary
accommodation for genuine applicants; legal costs to recover
property; re–let cost; and rent foregone during the void period
between tenancies (reduced from £93,000 in 2020/21).
Housing waiting lists Notional outcomes – £4,283 for each case based on the annual
estimated cost of housing a family in temporary accommodation,
the duration a fraud may continue undetected and the likelihood a
waiting list applicant would be provided a property (increased from
£3,240 in 2020/21).
Blue Badges  Notional outcomes – Number of badge holders confirmed
as having died multiplied by £650 to reflect lost parking and
congestion charge revenue (increased from £575 in 2020/21).
Concessionary bus travel Forward savings – Number of bus passes used fraudulently
multiplied by £420. Based on average fraudulent use and
reflecting two years forward use.
Payroll   Notional outcomes – £5,685 for each employee dismissed or
resigns as a result of NFI matching. (up from £5000 in 2020/21).
Page 55 of 146

Page 60

The National Fraud
Initiative in Scotland
2024
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit.scot
www.audit.scot
ISBN 978 1 915839 46 6 
Page 56 of 146

Page 61

Appendix 2
National Fraud
Initiative
2022/2023 
Renfrewshire Council
Summary of arrangements and outcomes
Page 57 of 146

Page 62

1. INTRODUCTION 
The National Fraud initiative is a biennial data matching exercise run by the UK Cabinet
Office and overseen in Scotland by Audit Scotland. It supports the Council’s commitment
to protecting public funds and preventing and detecting fraud.
Each local authority across the UK alongside other government organisations such as the
NHS and Department for Work and Pensions participate under the relevant Public Finance
legislation, which in Scotland is the Public Finance and Accountability (Scotland) Act 2000.
Information Security
Participation in the exercise is communicated across the Council’s social media platforms
to inform our customers and staff.  All information is shared and stored in line with the
Council’s privacy policy. 
Page 58 of 146

Page 63

2. PROCESS 
All matches generated from the data matching exercise require an outcome.  To
allow Audit Scotland and the Cabinet Office to report accurately across all
organisations involved the outcomes available are prescribed and used by all
organisations. 
Possible outcomes 
Updates for 2022/24
The Cabinet Office have included 1 new area for investigation – Adult concessionary
bus travel (not our responsibility to investigate) and postponed Non-Domestic Small
Business Bonus Scheme matching due to the national NDR revaluation exercise in
2023.
External Auditor Assessment of Arrangements
Our external auditors have stated in their Renfrewshire Council Group Annual
Accounts 2023/24 in relation to 2023/24 NFI exercise that :- 
The most recent NFI exercise was for 2022/23. There has been a good level of follow-up activity at
Renfrewshire Council  with 100% of Very High Risk matches processed in most areas. As of March
2024, all reports have been closed except for two which the Council is waiting for further information
from.
The audited body has engaged well with the NFI exercise. The Council had a good level of follow up
activity, meaning that most matches have been closed down. In addition, the body has strong
governance arrangements in relation to communication and transparency of NFI. 
No savings identifiedClosed - Already known
•These are matches that after investigation it is identified that the information available in the match
has already been reported and acted on within the time of the data being uploaded and the match
being released.
No savings identifiedClosed - No Issue
•After investigation the information received from the match has no impact on the benefit or service
received.
Savings identifiedClosed - Error
•Savings are identified however the cause is considered to have been error and not fraud. 
Savings identifiedClosed - Fraud
•A full investigation is carried out and evidence is identified to indicate that a material benefit was
gained by the failure of the subject to declare information
No savings identfiedClosed - Not selected for investigation
•The match details do not offer sufficient evidence to allow for an investigation
No savings identifiedClosed - referred to DWP
•The match information relates primaily to state benefits that require to be investigated by the DWP.
Page 59 of 146

Page 64

2. PROCESS 
All required datasets were exported in September 2022 and submitted to the
National Fraud Initiative web portal.
The National Fraud Initiative data matching cases were released on the web portal in
January 2023.
The matches are categorised by the fraud risk area and risk score.  The risk score
matrix has been designed by the Cabinet Office and is established to assist
organisations to prioritise the resources required to carry out the match investigation
to those most likely to identify savings and error or fraud.
Renfrewshire Council process 
2022 
All
Matches
2022
High
Risk
2020
All
Matches
Housing Benefit claimants 67 51 85
Payroll 103 52 105
Housing Tenants 828 369 316
Blue Badge Parking Permit 524 524 522
Housing Waiting List 79 55 191
Council Tax Reduction Scheme 770 405 1326
Creditors 822 74 2160
Procurement 92 31 66
Business Rates 183 183 127
Business Grants N/A N/A 3    
cumulative total 3468 1744 4901
Analysis of Renfrewshire council NFI matches 2022/24 
Matches allocated ‘high risk’ status are prioritised for investigation.  
Blue Badge Parking Permit matches and Creditor matches are passed to the service
to assess and any suspected fraud escalated to the Counter Fraud team to pursue.
Housing Tenant matches saw the most significant increase in total number of
matches from the previous exercise in 2020/21 and this was as a result of new
matches to the data supplied by HMRC. 
Page 60 of 146

Page 65

3. RESULTS 
2022/23 Fraud and error identified by Renfrewshire Council Staff
Fraud Area No. of
cases
Actual
Overpayment
Estimated
Savings
CTRS1 40 £55,711 £13,753
HB2 1 £16,527 £3,925
Housing Tenancy 2 N/A3 £156,600
Waiting List 11 N/A £46,753
Procurement 0 0 N/A
Payroll 0 0 N/A4
Blue Badge 152 N/A £98,800
Creditors 0 0 N/A
NDR5 16 £104,117 £83,451
CT Discount6 534 £224,843 £406,414
All 756 £401,199 £810,056 
Overall outcomes are down slightly from the previous exercise. The main reason for
this is that for the matches that the Counter Fraud Staff investigate, a lot of work was
undertaken during the previous exercise to investigate and close down a lot of the
lower risk matches to prevent them from being listed again in this exercise.  We were
able to undertake this work as it was during the pandemic and some of our other
work could not be undertaken as a result of the restrictions in place. 
The financial savings in excess of £401,000 are set to be recovered following the
Council’s usual debt recovery processes.
Our participation in the 2022/23 NFI exercise is estimated to have prevented further
financial loss to Renfrewshire Council in excess of £810,000. 
1 Council Tax Reduction Scheme
2 Housing Benefit
3 There are no Actual Overpayments recorded for Housing Tenancy, Waiting List and Blue Badge fraud and error cases
4 There are no Estimated Savings recorded for Payroll and Creditors fraud and error cases
5 Non-Domestic Rates / Business Rates
6 Council Tax Discounts 
Page 61 of 146

Page 66

Self-Appraisal for NFI 2024/25 – Appendix 3
Part A: For Those Charged with Governance:
Leadership, Commitment and Communication Yes/No/Partly Is Action
Required?
1. Are we aware of emerging fraud risks and have we taken
appropriate preventative and detective action?
Yes - National Anti-Fraud Network and other anti-fraud network alerts are
subscribed to and monitored for emerging fraud risks. Attendance at regular
SLAIG/SLACIAG meetings provide opportunity for the sharing of best
practice across local authorities to improve and develop preventative
controls and detective methods.
No
2. Are we committed to NFI? Has the council/board, audit
committee and senior management expressed support for
the exercise and has this been communicated to relevant
staff?
Yes - Counter Fraud Team work jointly with operational services to
investigate matches. Training is provided to operational teams and NFI
outcomes reported to the CMT and the Audit, Risk and Scrutiny Board.
No
3. Is the NFI an integral part of our corporate policies and
strategies for preventing and detecting fraud and error. And
do we make reference to NFI in our governance codes and
statements?
Partly - There is a Counter Fraud Policy in place, and it is incorporated into
the Counter Fraud Business Plan.
Reference to NFI will be added to Corporate Code of Governance.
Yes:
Interim
Chief
Auditor -
31/03/25
4. Does our Key Contact have sufficient authority and time
to ensure that NFI is delivered effectively?
Yes. No
5. Has the approach to follow up of different NFI match
types been clearly set out and reported as part of the bodies
NFI planning process?
Yes - We review high risk matches in the first instance and then undertake a
risk analysis to decide what our approach will be for the remainder of the
matches.
No
Page 62 of 146

Page 67

Self-Appraisal for NFI 2024/25 – Appendix 3
6. Are NFI progress and outcomes reported regularly to
senior management and elected/board members (eg, the
audit committee or equivalent)?
Yes - Counter fraud activity outcomes, including NFI results are reported
quarterly alongside the outcome and performance report presented to the
Audit, Scrutiny and Risk board.  Audit Scotland's NFI reports are shared with
Senior Management.  The overall NFI outcomes and results are reported at
the end of the biennial exercise.
No
7. Where we have not submitted data or used the matches
returned to us (eg, council tax single person discounts), are
we satisfied that alternative fraud detection arrangements
are in place and that we know how successful they are?
Yes - Risk based assessment of matches, high risk matches given priority. We
have established regular data matching exercises in regard to Housing
Waiting List, Licensing and Council Tax discounts and Reductions.  Revenues
and Benefits have recently established a Review Team which will carry out
checks and reviews aimed at ensuring accuracy in Council Tax discounts and
reductions.  The effectiveness of data matching exercises is demonstrated in
the outcomes and corrections identified; these are reported as part of the
quarterly reports to board.
No
8. Does internal audit, or equivalent, monitor our approach
to NFI and our main outcomes, ensuring that any
weaknesses are addressed in relevant cases?
Yes - Internal Audit is responsible for co-ordinating the exercise and
regularly review outcomes identified.   The findings from the NFI are
considered as part of Internal Audit annual planning.
No
9. Do we review how frauds and errors arose and use this
information to improve our internal controls?
Yes - This is considered in the annual audit planning.  Meetings are held with
the appropriate parties where issues are identified to improve internal
controls.
No
10. Do we need and have access to fraud investigation
officers to enable frauds to be followed up fully?
Yes - Counter Fraud officers are part of the Internal Audit Team. No
11. Do we publish, as a deterrent, internally and externally
the achievements of our fraud investigators (e.g. successful
prosecutions)?
Yes - Report to members of the Audit, Risk and Scrutiny Board. Other
publicity is considered on a case-by-case basis.
No
Page 63 of 146

Page 68

Self-Appraisal for NFI 2024/25 – Appendix 3
Part B: For NFI Key Contacts & Users
Leadership, Commitment and Communication Yes/No/Partly Is Action
Required?
1. Are we aware of emerging fraud risks and taken
appropriate preventative and detective action?
Yes - NAFN and other anti-fraud network alerts are subscribed to and
monitored for emerging fraud risks. Service departments are made aware of
any fraud risks we are alerted to. Attendance at regular SLAIG/SLACIAG
meetings provide opportunity for the sharing of best practice across local
authorities to improve and develop preventative controls and detective
methods.
No
2. Are we investing sufficient resources in the NFI exercise? Yes - Time is included in the counter fraud work and audit plan and regular
engagement with services through counter fraud team monitoring.
Revenues and Benefit services have included NFI match investigation in their
work plan.
No
3. Do we plan properly for NFI exercises, both before
submitting data and prior to matches becoming available?
This includes considering the quality of data and being clear
about the approach to follow up of different match types.
Yes - Full planning process and detailed action plan in place. Resource made
available within the Counter Fraud Team to prepare for the upload of data
to the NFI portal this includes a quality check of the data prior to upload.
No
4. Where NFI outcomes have been low in the past, do we
recognise that this may not be the case the next time, that
NFI can deter fraud and that there is value in the assurances
that we can take from low outcomes?
Yes - Considered as part of risk-based assessment and consideration given to
the deterrence our involvement has in the NFI exercise on potential fraud.
No
5. Do we confirm promptly (using the online facility on the
secure website) that we have met the fair processing notice
requirements?
Yes - Deadline met. No
6. Do we plan to provide all NFI data on time using the
secure data file upload facility properly?
Yes - Detailed action plan in place to ensure compliance, this has been
successfully fulfilled in previous exercises.
No
Page 64 of 146

Page 69

Self-Appraisal for NFI 2024/25 – Appendix 3
Part B: For NFI Key Contacts & Users
Effective Follow Up of Matches Yes/No/Partly Is Action
Required?
7. Do all departments involved in NFI start the follow up of
matches promptly after they become available?
Yes - Monitored by Internal Audit and any resource difficulties are discussed
with the service and the Director of Finance & Resources.
No
8. Do we give priority to following up high-risk matches,
those that become quickly out of date and those that could
cause reputational damage if a fraud is not stopped quickly?
Yes - Risk based assessment of matches. High risk matches are prioritised,
consideration is also given to matches that may cause increased hardship if
further delay in correction.
No
9. Are we investigating the circumstances of matches
adequately before reaching a ‘no issue’ outcome, in
particular?
Yes. No
10. Are we drawing appropriately (in health bodies) on the
help and expertise available from NHS Scotland Counter
Fraud Service?
N/A N/A
11. Are we taking appropriate action in cases where fraud is
alleged (whether disciplinary action, penalties/cautions or
reporting to the Procurator Fiscal)? Are we recovering funds
effectively?
Yes - All relevant actions are considered. No
12. Do we deploy resources in proportion to risks, and scale
down work on match reports where early work has not
found any fraud or error?
Yes - Risk based assessment of matches, where high risk matches show no
fraud or error low risk matches are not considered for investigation. 
However, this is reviewed on a report-by-report basis and where there is a
potential for hardship or reputational damage consideration is given to
deploying resources to investigate low risk matches.
No
13. Where the number of high-risk matches is very low, are
we adequately considering the medium and low-risk
matches before we cease our follow-up work?
Yes - We will undertake a small sample of medium and low risk matches to
determine if we are likely to get any outcomes.
No
14. Overall, are we deploying appropriate resources on
managing the NFI exercise?
Yes - Any resourcing issues are discussed with the Service and Director of
Finance & Resources as appropriate. Counter Fraud resources are
committed within the workplan to the NFI exercise.
No
Page 65 of 146

Page 70

Self-Appraisal for NFI 2024/25 – Appendix 3
Part B: For NFI Key Contacts & Users
Effective Follow Up of Matches Yes/No/Partly Is Action
Required?
15. Are we recording outcomes properly in the secure
website and keeping it up to date?
Yes - Monitored by Internal Audit No
16. Do staff use the online training modules and guidance on
the secure website, and do they consult the Cabinet Office
NFI team if they are unsure about how to record outcomes
(to be encouraged)?
Yes - Training is provided to staff responsible for following up matches,
training includes notifying of online training modules and videos available on
NFI web application.
No
17. If, out of preference, we record some or all outcomes
outside the secure website, have we made arrangements to
inform Audit Scotland and the Cabinet Office NFI team about
these outcomes?
Yes - This is included in the Report notes. No 
Page 66 of 146

Page 71

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 4 November 2024
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Risk Report, November 2024
___________________________________________________________________
1. Summary
1.1 Each year the Board considers and approves the council’s risks.
1.2 This paper sets out the latest position in managing the council’s risks, at the mid-
year point. The appendices attached provide details of:
• 1: longer-term or imminent strategic risks
• 2: longer-term significant corporate risks
• 3: service risks
• 4: assurance levels for business-as-usual risks
________________________________________________________________________________ 
2. Recommendations
2.1 It is recommended that the Board approves the report.
_________________________________________________________
3. Background
3.1 The key areas of risk
previously reported to the
Audit, Risk & Scrutiny Board in
May 2024 were:
Strategic Risks:
Very High Economy  
Very High Reducing inequalities
High Migration and asylum related impacts
High Global environmental sustainability and
route to Net Zero
High Strategic sustainable planning for people
and assets 
Corporate Risks:
Very High Successful Cyber Attack
Very High Financial sustainability 
High  Asset management - ongoing
High   Commercial vehicle & operators license
High  Financial Stability
High  Delivery of the Dargavel solution
High  Organisational learning from Dargavel
High  Workforce planning, recruitment, and retention
High  Delivery of homeless duties 
Moderate Administering elections
Moderate National Care Service - governance and       
financial implications 
Item 5
Page 67 of 146

Page 72

3.2 The strategic and corporate risk profile for the council in terms of its longer-term or
imminent risks was as shown in the matrix below: 
Evaluation: Low Moderate High Very High Total
LT or Imm Strategic Risks: 00 00 03 02 05
LT or Imm Corporate Risks: 00 02 07 02 11
3.3 Risks are evaluated using the Council’s adopted risk matrix; this involves multiplying
the likelihood of a risk occurring by its potential impact. Risks are then evaluated as
either ‘low’ (green), ‘moderate’ (yellow), ‘high’ (amber) or ‘very high’ (red).
3.4 It was noted that all service departments were revisiting their risk profiles on an
ongoing basis to ensure good visibility of all risks across services.  This work being
captured in Appendix 3.
3.5 In recent weeks, the Corporate Risk Management Group has worked with service
colleagues and risk owners to ensure risk information is readily available for this
mid-year progress report.  
3.6 The movement in risk profile since the May risk report to Board is summarised as
follows:
- Risks added/ NEW
Strategic/ Corporate/ Service  – nil report
- Risks remaining, where scoring has 
Strategic/ Corporate/ Service – nil report
- Risks remaining, where scoring has 
Strategic – nil report
Corporate – nil report
Service – RAAC in the learning estate - remedial works have almost completed,
and the score is reduced to a low, acceptable risk, and is being removed from
this report for local monitoring by Environment, Housing and Infrastructure (EHI)
Services until completion.
- Risks escalated from service/s to strategic or corporate - Nil report
- Risks escalated from 'business as usual’ to strategic or corporate - nil report
- Risks removed or de-escalated to service
Strategic – nil report
Corporate 
o The two risks relating to Dargavel (both high) have now been removed with
any ongoing actions being monitored through business-as-usual activities or
service risk registers. For example, future school capacity planning features
on the Children’s Service risk register. 
o Following external review of the council’s fleet operations, the risk (high),
relating to the Commercial Vehicle and Operators License has been de-
escalated to EHI service. 
o Administering elections, the risk (moderate) is de-escalated to Finance and
Resources service. The next scheduled election is 2026 however election
preparedness is ongoing.
Service – RAAC, as above. 
Page 68 of 146

Page 73

- Horizon Scanning and other points of note
Firstly, in May, we highlighted three potential areas of risk on our radar that we
were currently monitoring for possible addition to appropriate risk registers.  At
this mid-year review, the following updates can be noted.
- Increasing public interest around the process of council decision making
This had initially been brought to the Corporate Risk Management Group’s
attention following a petition for judicial review lodged with the Court of
Session regarding Mirin and Milldale services. The petition was subsequently
withdrawn. In addition, the recent Accounts Commission report (a follow up to
the Section 102 notice), did not draw out any further concerns, and so with this
in mind, the risk will not be added to the corporate risk register and will
hereafter be removed from this section of the report.
- Emerging duties and current uncertainty around implications
This was previously debated in relation to examples in scope which included
the United Nations Convention on the Rights of the Child (UNCRC), the new
equalities duty, and consumer duties. Since the previous risk report the
UNCRC legislation has come into place and council papers have required to
have UNCRC implications captured. Implementation and monitoring of other
duties and their potential implications are still being monitored for risk, by the
relevant lead services.
- The increasing use of artificial intelligence (AI)
In May we had noted that we were seeking to better understand the risks that
AI might pose to council operations and reputation.  Dis/misinformation and
impact on council reputation as a trusted voice amongst stakeholders and
communities is where we may be impacted and so this continues to be on our
radar at present. In terms of the use of AI within the council, there is very
limited use at present.
Secondly, there are two specific care related matters we are closely monitoring. 
- The proposed National Care Service – governance and financial implications.
This is, has been, and indeed continues to be recorded as one of our
corporate risks.  With COSLA’s recent withdrawal of support for the Bill in its
present form, the situation is now more uncertain than before. There is no
change to the scoring at present, but the shift in context is highlighted here.
- Health and Social Care Partnership - financial stability
As reported on 13 September to the Renfrewshire Integration Joint Board
Audit, Risk and Scrutiny Committee, there is an increasing likelihood that the
Integration Joint Board may require to enter financial recovery in the next
financial year. This risk is now reflected within the context for the council’s
financial sustainability risk and there is close monitoring of the position
between senior council officers and colleagues in the HSCP, and the risk of
knock on financial and service delivery risks that may arise should the position
deteriorate.  
3.7 With all of 3.6 in mind, the risk strategic and corporate risk profile is therefore now
as follows: 
Evaluation: Low Moderate High Very High Total
LT or Imm Strategic Risks: 00 00 03 02 05
LT or Imm Corporate Risks: 00 01 04 02 07
Page 69 of 146

Page 74

3.8  Appendix 1 provides the detail for 05 longer-term or imminent strategic risks.
Appendix 2 provides the detail for 07 longer-term or imminent corporate risks. 
Appendix 3 provides the detail for 20 longer-term or imminent service risks.
Appendix 4 provides the assurance levels (to date) for business-as-usual risks.
3.9 The strategic and corporate risks are aligned with the council plan themes that were
approved in 2022. 
Strategic
Moderate riskVery high risk
Economy
Reducing inequalities
High risk
Migration and asylum related impacts
Global environmental sustainability and route
to Net Zero
Strategic sustainable planning for people and
assets
Corporate
Moderate risk
National Care Service
Very high risk
Successful Cyber Attack
Financial sustainability
High risk
Asset management - ongoing
Financial Stability
Workforce planning, recruitment and retention
Delivery of homeless duties
Page 70 of 146

Page 75

__________________________________________________________________
Implications of the Report
1. Financial 
Recurring costs associated with the measures in place for each risk are considered
proportionate to the level of risk, and new planned actions are also considered to be
cost effective. 
The financial requirements to support the risks should be met within the budget of
each relevant risk owner, nevertheless, any unplanned and unbudgeted cost
pressures that arise in relation to any of the risks identified will be subject to review
in consultation with the Director of Finance and Resources.
2. HR & Organisational Development – not relevant to report recommendations
3. Community/Council Planning – effective risk management supports the delivery
of all community/ council plan outcomes
4. Legal – not relevant to report recommendations
5. Property/Assets – not relevant to report recommendations
6. Information Technology – not relevant to report recommendations
7. Equality & Human Rights – not relevant to report recommendations
8. Health & Safety – not relevant to report recommendations
9. Procurement – not relevant to report recommendations
10. Risk – as per the subject matter of this report
11. Privacy Impact – not relevant to report recommendations
12. Climate Risk – not relevant to report recommendations
13. Children’s Rights – This report does not present a new policy, function, or
strategy, nor a substantive change to an existing policy, function or strategy which
will have an impact on children’s rights. The report itself is therefore largely neural
on children.  However, management of certain risks described in the report support
a number of the Articles contained within the United Nations Convention on the
Rights of the Child (Incorporation) (Scotland) Act 2024. For example, managing the
risk relating to ‘Community and Public Safety’ supports Articles:
• 19 – protection from violence
• 34 – protection from sexual abuse
• 35 – protection from sale and trafficking
• 36 – protection from exploitation 
14. Cosla Policy Position – not relevant to report recommendations 
_________________________________________________________
Author:          Karen Locke, Risk Manager 
14/10/2024 
Email: riskmanager@renfrewshire.gov.uk 
Page 71 of 146

Page 76

5 | P a g e
Appendix 1: Strategic Risks, longer-term or imminent 
• ECONOMY – building an inclusive, green and resilient economy
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.24.01.01 Economy Renfrewshire’s economy faces
challenges such as: growing the
working age population; more closely
aligning the Education and skills
provision with the needs of local
employers; and achieving a strong and
inclusive economy. 
The risk therefore is that significant
economic improvement and upskilling
of local workforce is difficult to
progress until the current landscape
improves and our investment
programmes are completed
Head of
Economy and
Development 
Head of
Finance and
Procurement 
Programme
Director – City
Deal &
Infrastructure
(1) Capital investment such as
investment in housing and heritage
assets; supporting Scotland’s
investment by identifying and
developing opportunities such as
AMIDS1 and supporting local
businesses seeking to export to new
markets
(2) Developing skills interventions to
address the risks of unemployment,
in particular those in low-paid
employment, and parents.
(3) Support for local businesses to bid
for council contracts
(4) Support for local businesses to
become more carbon neutral
05 05 25
V.High Renfrewshire’s economy has well established
strengths in transport (including Glasgow
Airport), retail (including Braehead),
manufacturing (including significant
international exports) and construction and
major initiatives such as AMIDs are key to future
growth.  There is a risk that failure to support
economic growth will have a negative impact on
residents, businesses, and public services.
Action Codes Actions Latest Note Assigned To Date Status
CESIP22.01.02 Maximise funding for
regeneration of Renfrewshire’s
places through grant
submissions to external sources
including UK and Scottish
Governments. 
The Regeneration and Place Team have successfully secured funding through various external
sources.  Between 21/22 and 25/26 it has been allocated £2.9m from the Place Based Investment
Fund for capital regeneration projects. Between 22/23 and 23/24 we have received £1.5m in
funding for capital and revenue regeneration spend from the Shared Prosperity fund.   
The Council has consistently been successful in RCGF funding applications, most recently receiving
£800k in funding for the PACE theatre project.  Four applications have been submitted this year
for the 24/25 allocation.  We were invited to Stage 2 for two of these applications, which were
duly submitted in November 2024.  An application was also submitted this year to the Scottish
Governments Vacant and Derelict Land Investment Programme (VDLIP) and again we were
successful in progressing to Stage 2, with a further application submitted in November.  However,
all these applications have subsequently been put on hold by the Scottish Government indefinitely
whilst a decision is made on the regeneration grant funding as a whole. However, due to funding
reductions to the Scottish Government’s Regeneration funding, it has recently been announced
that both the RCGF and VDLIP schemes have been put on hold indefinitely. 
Head of
Economy and
Development
31-Mar-
2026 
1 Advanced Manufacturing Innovation District
Page 72 of 146

Page 77

6 | P a g e
Funding worth £85k has been secured from SEPA to investigate the potential deculverting and
environmental enhancement of the Candren Burn in Ferguslie. 
The Regeneration team will continue to explore external funding opportunities to help deliver our
place shaping agenda.
CESDP21 - 01 -
27
Monitor benefits of City Deal
Projects, including AMIDS, Clyde
Waterfront and Renfrew
Riverside and City Region wide
employment programmes.
Monitoring of benefits reported through the City Region PMO is ongoing. 
Note:  City Region wide employment programmes delivered a number of years ago and no longer
monitored. 
Programme
Director - City
Deal and
Infrastructure
31-Mar-
2025 
CESDP21 - 01 -
13
The transformation of Paisley
on the back of the Action Plan is
advancing at pace. Goals such
as creating an international
culture and heritage destination
and acting as a stimulus for
property investment,
development and re-use has
already been realised. 
A number of significant regeneration projects have successfully concluded (the Town Hall, the Arts
Centre and the new Culture and Learning Hub in the High Street). The restoration of the Museum
is also currently progressing.
The publication of the Paisley Vision document acts as a further catalyst to inspire future
development in and around the town centre.
The Town Centre Strategies align with the guidance and principles outlined in NPF4.  
Chief
Economic and
Regeneration
Manager
31-Mar-
2026 
CESIP23 - 01 -
02
Work with the development
partner and stakeholders to
maximise the potential of
AMIDS for Renfrewshire
Development partner (Buccleuch) now in place with LLP joint venture company now set up. Work
ongoing to secure new opportunities at AMIDS. Investment zone bid has been submitted to City
Region. 
Construction of phase 1 which will deliver the next building on site, is progressing through the
design phase. Construction of this phase is due for completion in 2025. 
Branding exercise underway to develop a core brand for AMIDS. This will see the launch of
material and a specific website. Work ongoing with strategic advisory group to develop AMIDS
further as well as discussions with key public and government agencies for support. 
Programme
Director, City
Deal and
Infrastructure
31-Mar-
26 
CP.22.02.01 Develop an Investment
Proposition for Renfrewshire
that is clear on our economic
ambitions for place 
Two reports have been commissioned to analyse Renfrewshire’s Growth Sectors.  The first
highlighted that there are several opportunities which Renfrewshire needs to capitalise on to
support the growth of its economy further.  The second report aims to reconcile existing priorities,
team capacity and skills engaged in the economic development and regeneration functions of the
Chief Executive’s Department, with the future opportunities and challenges outlined in the first
report and the Council’s Economic Strategy.  This report highlights that there is a requirement to
grow and increase visibility of Renfrewshire’s inward investment proposition to drive future
economic growth and development.  A new web page has been created which signposts the area’s
Head of
Economy and
Development
31-Mar-
25 
Page 73 of 146

Page 78

7 | P a g e
main investment locations. (https://www.renfrewshire.gov.uk/article/13818/Renfrewshire-
investment-prospectus)   Future works includes looking at developing a dedicated investment
page on the Invest Renfrewshire webpage.  Moreover, a dedicated website to drive investment at
AMIDS is being developed and is hoped to be launched later this year. 
CP.22.02.07 Develop a Community Wealth
Building Plan for Renfrewshire 
Community Wealth Building featured as a key theme in the 2024 Renfrewshire Economy
Conference. A workshop on the principles and strategies of Community Wealth was delivered to
council colleagues, senior management and local businesses from all sectors as part of the
conference agenda, which was supported by the Procurement Team. The workshop provided the
opportunity for engagement, discussion, collaboration and practice sharing across colleagues and
organisations. Agreed actions from the workshop will be taken forward to form working groups
and to inform the next steps in progressing Community Wealth Building in Renfrewshire. 
A new Community Wealth Building Co-ordinator role has been created to drive forward
community wealth as a key development area for Renfrewshire. The Co-ordinator will progress
the council’s role as an anchor organisation through strong internal engagement and alignment of
Community Wealth Building aims with council policies, practices and work streams. A key focus for
the Co-ordinator will be to progress the development of a Renfrewshire Community Wealth
Building Partnership. The partnership will collaborate on building resources, identifying new
initiatives and raising awareness and engagement of the principles of Community Wealth Building
across all of Renfrewshire’s business, communities and people, creating a strong community of
practice. 
Head of
Economy and
Development
with Head of
Finance and
Procurement
31-Mar-
25 
CESDP21 - 01 -
03
Support and grow supply chain
management and knowledge
exchange among manufacturing
SMEs to supply Scottish / UK
businesses and global supply
chain 
A key aim of the recent Growth Sectors report is for the Council to identify opportunities for local
supply chain growth and development. 
For the past 18 months the Economic Development and Procurement teams in the council have
been developing and delivering a wide range of new supports to local businesses to encourage
them to bid for public sector contracts. This builds on existing work with the Supplier
Development Programme and Business Gateway support. The main driver of this is work around
the Community Wealth Building agenda and the aim of increasing and sustaining local economic
growth and also increasing council, and other public sector spend, in the local area. 
NMIS has recently been approved a £100k allocation from the Business Challenge Fund to support
and bring together manufacturing SMEs for innovation development and new productivity
models. The programme commences in April 2024 for 12 months. 
Head of
Economy and
Development
With Head of
Finance and
Procurement
31-Mar-
2025 
Page 74 of 146

Page 79

8 | P a g e
• PLACE - working together to enhance wellbeing across communities
• FAIR - nurturing bright, happy and healthy futures for all 
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.24.02.02 
Reducing inequalities in Renfrewshire
If we don’t have a
coordinated approach
to tackling inequalities
across Renfrewshire
(including for example,
the causes and
consequences of
poverty), this could
jeopardise the effort in
reducing both the
short-term impacts on
households but also
have wider long-term
consequences on
attainment and health
for people living on low
incomes. 
Head of
Policy &
Partnerships
(1) Fairer Renfrewshire Programme
(2) Attainment Challenge and Pupil
Equity Funding
(3) Strong partnership working (e.g.
Community Planning Partnership
(CPP). Advice Partnership,
Empowering Communities
Forum, Improving Life Chances,
CPP Board
(4) Community Plan identifies ‘Fair’
priorities with associated actions
relating to cost of living crisis,
addressing the impact of alcohol
and drugs, and a just transition to
Net Zero. Social Renewal Plan
has been developed through a
programme of analysis,
research, and engagement. 
05 05 25
V.High
The Council plays a key role in tackling inequalities and providing the
best possible services to our communities, particularly those who are
experiencing the poorest outcomes. As well as our focus on health
and wellbeing, we are also committed to support vulnerable
individuals, groups or communities through early intervention and
prevention, responding to poverty, supporting routes to employment
as well as dealing with welfare reforms. The pandemic is thought to
have exacerbated existing inequalities in terms of for example
educational attainment, health, poverty and mental health. There is a
significant focus on ensuring that people receive the economic and
wellbeing support that is needed, with a real opportunity to work in a
different way, and to tackle some of the existing inequalities across
communities as we do this. The current cost of living crisis impacts
disproportionately on particular groups in society.  In the short term,
significant focus is on supporting food insecurity and supporting
people on low incomes to maximise income and seek advice with
income and debt management.
Action Codes Actions Latest Note Assigned To Date Status
CESIP22.03.01 Develop the new Fairer Renfrewshire programme.
The Fairer Renfrewshire Sub-Committee has been
meeting since August 22 and a Fairer Renfrewshire
Officers Group made up of officers from across
services is meeting monthly. Work with partners to
develop the Fairer Renfrewshire Programme is
ongoing. There are four key emerging themes which
are shared across all elements of the programme,
and these are:
•Improving financial security 
•Advancing equality of opportunity 
•Building community capacity and resilience
•Listening to lived experience 
The Fairer Renfrewshire Sub-Committee has been meeting since August
2022 and a Fairer Renfrewshire Officers Group from across services is
meeting monthly. In March 2023 existing funds were brought together into a
single resource for Fairer Renfrewshire at around £5million, and partners are
working together to further develop the programme. 
There are four key emerging themes which are shared across all elements of
the programme, under which key projects are being funded: 
·       Improving financial security 
·       Advancing equality of opportunity 
·       Building community capacity and resilience 
·       Listening to lived experience 
Strategic
Partnerships &
Inequalities
Manager
31-Mar-
2025 
Page 75 of 146

Page 80

9 | P a g e
The new School Support service is now in place across all Renfrewshire
secondary schools. This service, provided by Renfrewshire Citizens Advice
Bureau (RCAB), embeds advice workers in schools, and referrals can be
received by pupils over 16, parents/carers, and school staff. 
Advice Works is providing a Family Support service to families with younger
children, which can be accessed by telephone or online. 
Both services provide support to maximise family income and both also
receive referrals under the new school meal debt processes, which prioritises
supporting families. 
Winter Connections ran for a 2nd year in Winter 23/24, providing
opportunities for communities to come together and take part in free
activities and including food. This has contributed to wellbeing over the
winter. 
The Fairer Renfrewshire Panel has provided insight in a number of areas
including holiday provision in Renfrewshire, with the Panel contributing to
the plans for our ‘Summer of Fun’, both for summer 23 and 24, the Council’s
new School Meal Debt processes, digital exclusion employability, especially
parental employability. 
CESIP22.03.02 Develop the Trauma Informed and Responsive
Renfrewshire Programme
Trauma Road map approved by Leadership Board in February 2024 and will
now be progressed and implemented on a partnership basis.
Head of Policy
& Partnerships
31-Mar-
2024 
CESIP22.03.03 Deliver the Stigma/Language Matters project. I Am Me were commissioned to deliver a training resource for Council staff
on stigma and its impact, with a specific focus on people who use alcohol and
drugs.  The I Am Me team have engaged with a group of people with lived
experience to develop and test the materials.  The materials are in the final
stage of review and will be available on the Council's iLearn platform within
the next quarter, and work is ongoing with colleagues in HR and Comms to
promote the new resources and encourage uptake.  Work is underway to
launch the resource in Summer 2024.  The due date has been revised to 30
September 2024 [Q2 update due 15 October]
Head of Policy
& Partnerships
30-Sep
2024 * *
CESIP22.03.09 Carry out an evaluation of the Tackling Poverty
programme and develop a transition plan for
mainstreaming this work.
Work has been underway with services to review projects and to transition
to Fairer Renfrewshire funding arrangements, 24/25 funding proposals to be
presented to Leadership Board on 1 May 2024.
Strategic
Partnerships &
Inequalities
Manager
30-Sep-
2023 
CP.22.01.09 Develop new options for services and partners to
work together more closely across localities to
provide advice and support to local people and
develop community capacity.
We are progressing new connected communities approach - considering how
we develop our ‘front door’ services for people accessing advice and
support; exploring family advice services; and developing options for locality
working.
Head of Policy
& Partnerships
31 Dec
25 
Page 76 of 146

Page 81

10 | P a g e
CESIP23 - 01 -
01
Deliver a participatory budgeting framework for the
Council
This year £1.2M was allocated by Environment, Housing  & Infrastructure
through their #Youdecide programme. The project delivery is well underway,
and an evaluation report is being finalised. The updated CONSUL site for
Renfrewshire is now ready to be put into use. Arrangements are being put in
place for the Data Analytics teams to manage the site in the interim while a
permanent host is agreed. A range of services have undertaken training in
CONSUL to enable potential future PB projects to take place within their
services. The planning of the £25k PB project for Johnstone Christmas event
is ongoing with a steering group including residents being formed and the
group are currently planning the initial engagement work.  
Strategic
Partnerships &
Inequalities
Manager 
31-Mar-
24 
CP.22.03.08 Take forward the recommendations of the Alcohol and
Drugs Commission
The Alcohol and Drug Change Programme is in its final phase and during
2024/25 evaluation work will be undertaken and responsibility for
governance and oversight will transition to Renfrewshire Alcohol and Drug
Partnership.  The Programme Board will continue to meet in 2024 until those
arrangements have been finalised.  As the funding associated with the
Programme will also come to an end, decisions will be required as to the
future of projects in receipt of test-of-change funding.  Qualitative research
has been commissioned to support project leads in gathering information
about the impact of their work which can support decision making.  This
research will also help inform the programme evaluation which will be
reported in the autumn. 
▪ Several projects have been mainstreamed or completed: 
o The Alcohol and Substance Awareness Education pack is in use in
education establishments across Renfrewshire. 
o The additional specialist training for First Crisis means that specialist
support for people using alcohol or drugs is now part of the core First
Crisis service. 
o The Youth Health and Wellbeing pilot has concluded. 
o Two research pieces on Hidden Harm and Family Support are complete. 
o The Alcohol Policy post has ended, and elements will be incorporated into
a new ADP post. 
o Connecting and Caring Renfrewshire is near completion, with only the
evaluation element to complete. 
o Recovery Change Fund has concluded. 
▪ Several projects have funding remaining and so continue: 
o MYLA, supporting people to sustain settled housing. 
o Safeguarding Vulnerable Young People, creating additional pastoral
support for a small number of pupils in a Renfrewshire secondary school. 
Head of Policy
& Partnerships 
31-Mar-
25 
Page 77 of 146

Page 82

11 | P a g e
o Peer support work as part of CIRCLE.
o HARRT, delivering mobile outreach services for those not currently
engaged with other services.
o Stigma/Language Matters, a training resource for staff. 
Specific work on trauma is part of the wider Trauma Informed and
Responsive Renfrewshire programme. 
This action will be closed and the final evaluation work and transition to new
governance will be reported as part of the Fairer Renfrewshire programme. 
CP.22.03.02 Work with partners to support Renfrewshire residents
through the cost-of-living crisis 
Fairer Renfrewshire continues to deliver range of supports with partners to
respond to the cost-of-living crisis.  This includes Summer Holiday Funding,
Winter School Clothing grants, schools advice etc.
Strategic
Partnerships &
Inequalities
Manager
31-Dec-
23 
CESIP22.03.07 Develop mechanisms for supporting individuals with
lived experience of poverty to influence policy in this
area 
Fairer Renfrewshire Lived Experience was established over the past 18 months,
supported by the Poverty Alliance and Star project.  The Panel has a regular
programme of meetings and has engaged with services, partners and elected
members on issues identified.  Officers will continue to work with Panel and
ensure there is a strong link to the wider Fairer Renfrewshire programme.
Strategic
Partnerships &
Inequalities
Manager 
31-Mar-
24 
CESIP23.03.02 Develop the Fair Food Renfrewshire strategy. The Fair Food Renfrewshire Steering Group, which met initially in September
2023 has continued to meet. A baselining exercise was carried out to
establish the current position within Renfrewshire regarding three priority
areas: 
Working to reduce, then eradicate food poverty, by promoting a
collaborative approach across all communities, ensuring a dignified and fair
access to healthy and affordable food for all. 
Increased access and availability of growing grounds in every town and
village within Renfrewshire. 
Widen access and availability to educational opportunities regarding
nutrition and cooking skills, and wider use of "home economics" type classes
within education, health, and community settings. 
The survey will inform the Fair Food Renfrewshire Plan, and Renfrewshire is
pursuing membership of Sustainable Food Places. 
Strategic
Partnerships &
Inequalities
Manager
31-Dec-
24 
CESIP23.03.01 Deliver targeted programmes of community-based
adult literacy and numeracy, ESOL, digital, personal and
social development, and family learning activities in
response to identified need and as set out in
Renfrewshire’s CLD Strategy 2021-24 (CF) 
61 courses and activities delivered across Renfrewshire between Jan-March 24,
with the following delivered weekly:
• 12 numeracy courses for adult learners and families with Fun With Numbers
and Talk, Learn & Do delivered in 2 primary and 6 early years campuses.
• 10 New Scots groups working on their languages skills and integration into the
community though Beginners ESOL classes and conversation sessions, including
Community
Development
Manager
31-Mar-
26 
Page 78 of 146

Page 83

12 | P a g e
a new Craft, Culture and Conversation group established for older Ukrainian
refugees in Gallowhill.
• 7 adult literacies sessions for people needing help with reading, writing,
spelling or numbers both in-person and online.
• 18 groups for learners wanting to build confidence, skills and self-esteem with
a range of activities including  crafting, sewing, singing, gardening and growing
and lively discussion-based sessions including an evening tabletop gaming
sessions for autistic adults from the Lived Experience group.
• 10 digital learning groups including Get Safe Online, Digital Beginners and
Digital Life Skills supporting people access technology.
• 4family Play and Learn events were held in February on school in-service days
for parents and younger children to have fun together with games and creative
activities in Southend Action Centre, Bargarran CLD Centre and Glenburn
Learning Centre.  
CESIP23.03.03 Continue to deliver new approaches to Building
Communities and identify further new opportunities for
locality area-based support which builds community
capacity. 
“Take the Lead” was launched in May 2023 to promote responsible dog
walking behaviours, primarily to reduce instances of dog fouling within
communities.  Dog owners who sign the Pledge agree to adhere to good
practices such as picking up after their dog.  Signatories receive a free lead,
mobile dog fouling dispenser, (bags included) and bandana promoting the
Campaign.  The Green Spaces, Play Parks and Villages Investment Fund has
supported 104 community projects since its launch in 2018.  In 2023, 16
projects have been supported including gala days, community gardening
projects and community murals.  Feedback from communities demonstrates
the Team’s support is appreciated and the funds bring neighbourhoods
together, as well as deliver physical improvements. 
Community
Development
Manager
31-Mar-
26 
Page 79 of 146

Page 84

13 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.24.02.03
Migration and asylum related service
pressures
The pace at which asylum dispersal
and refugee resettlement has taken
place in Renfrewshire since 2022 has
been significant, and beyond
anything previously experienced. 
Partnership governance structures
have been established to enable
partners to share information and to
identify and respond to issues as
these emerge.  In the short term,
these are anticipated to be in relation
to potential pressure on local
education, health and social care
services.  There are significant
pressure on, homelessness and
housing services, given the tightness
of the current housing market locally
and on children’s social work due to
availability of foster care and
residential provision.
Head of Child
Care & Criminal
Justice  
Head of Policy
and Partnerships 
Head of Housing
Services
(1) The Migration and Resettlement
Strategic Group meets regularly to review
and discuss developments across all
migration and resettlement programmes.
This group is comprised of senior officers
from across appropriate council services.
(2) Asylum Dispersal meetings are held once
every two weeks with senior council
officers and representatives from the UK
Government Home Office and their agent
Mears.
(3) Liaison Meetings with Migrant Help are
held approximately once every six weeks
with senior council officers and other
partner organisations such as Police
Scotland and HSCP. 
(4) The Renfrewshire Community Protection
Chief Officer Group receives regular
updates on migration and asylum issues
and any emerging issues.
(5) The Renfrewshire Community Protection
Member Officer Group receives regular
updates on migration and asylum issues
and any emerging issues.
(6) Updates are provided, as required, to the
Leadership Board of the council.
04 04 16
High
Migration/ Ukraine/ Asylum programmes - this
is an area which is developing and could be a
potential major issue moving forward.
The impact of the conflict in Ukraine is
reflected within the Financial Sustainability
Risk, but only in relation to pricing volatility
and global supply issues. 
The risk here is wider ranging and includes: 
- Ukrainian Displaced Persons
- Home Office Asylum dispersal programme
– use of hotel accommodation in
Renfrewshire 
- – increase in volume and speed of decision
making
- Unaccompanied Asylum-Seeking Children –
new requirement from UK Government for
Renfrewshire to provide for children and
young people under the National Transfer
Scheme 
- Syrian/ Afghan resettlement programme
- Support to ensure effective resettlement
to New Scots
Action Codes Actions Assigned To Date Status  
Ongoing Monitoring     
Page 80 of 146

Page 85

14 | P a g e
• GREEN – leading Renfrewshire to Net Zero
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.24.03.04
Global environmental sustainability and route to Net
Zero
(Renamed from Climate, Sustainability risk)
A key risk to the Council is that it may not
achieve its target to become net zero by
2030 in both its own operational
emissions and Renfrewshire’s area-wide
emissions.  Decarbonising our domestic
and non-domestic properties and fleet
alone will require significant capital
investment.  In terms of reducing
Renfrewshire’s area-wide emissions
there are challenges around influencing
behavioural changes, and a risk that
others do not contribute towards the
2030 target.
The climate emergency also brings a risk
to the Council in terms of increased
frequency of severe weather events may
lead to more instances of damage to
Council infrastructure and property,
interruptions to service delivery and
increased demands on services, often
with little notice. There is risk to life,
transport disruption and pollution to the
local environment, as well as impact
adversely on the local economy if
businesses are unable to operate. The
Council has a requirement to provide
immediate response and manage the
adverse effects of more frequent and
severe weather emergency situations,
including support to local communities
and businesses. 
Head of Climate,
Public
Protection and
Roads 
(1) Renfrewshire’s Plan for Net
Zero has specific objectives
to reduce emissions, and
these are included in other
key documents such as the
Council Plan
(2) Governance through the
Planning & Climate Change
Policy Board
(3) Development of Costed
Delivery Plans and a Climate
Delivery Action Plan.
(4) Sustainable Communities
Fund – to support local
people to develop
sustainable projects that will
promote or improve
community collaboration,
health and wellbeing, local
spaces, economic
development, biodiversity
and the environment.
(5) Use of an emissions
modelling tool to quantify
the impact of actions, inform
future targets and present
emissions data.
(6) A Project and Carbon
Footprint Register
04 04 16
High
Climate change is expected to continue and worsen in the
future if no action is taken, with increases to mean global
temperatures, sea level rises and the increasing frequency
and severity of weather events such as floods, heatwaves,
droughts and storms. More frequent and intense heavy
rainfall events increase the risk of soil erosion and flooding.
Severe weather is already affecting public services across
Scotland, with operational, reputational, financial and legal
consequences. There is also an ongoing impact of severe
winter weather including snowfall and freezing
temperatures which impact service delivery and the
integrity of our roads open space and buildings
infrastructure. This shift in weather patterns caused by
climate change is also affecting biodiversity across Scotland.  
Renfrewshire Council declared a Climate Emergency in 2019
and approved the target to work towards being net zero,
for both Council estate emissions and area – wide emissions
by 2030.  In 2022 the Council approved RenZero, the first
stage of Renfrewshire’s Plan for Net Zero.  This Plan sets out
the strategic framework required to work towards our
climate change targets.  The Planning and Climate Change
Policy Board oversee this work.  Actions include: leading by
example by decarbonising our estate and fleet, publishing
our Local Heat and Energy Efficiency Strategy and Delivery
Plan, maximising the carbon absorption potential of our
natural environment and supporting communities to
become more resilient to the impact of extreme weather
events.
Action Codes New Actions Assigned To Date Status
SRR.24.03.04a Continue to report transparently on our emissions to ensure that Renfrewshire’s emissions baseline is clearly
understood.
Head of Climate, Public
Protection and Roads
31-Mar-
25 
Page 81 of 146

Page 86

15 | P a g e
SRR.24.03.04b  Develop the Local Heat and Energy Efficiency Strategy Delivery Plan. Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04c  Identify opportunities for Partnership Delivery Models for clean energy projects such as solar and battery
storage
Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04d  Prioritise actions in relation to the biggest emissions sources, where we have the most influence, through
project pathfinder approaches for decarbonisation of domestic and non-domestic properties and vehicles to
bring scale and pace to emissions reduction.  
Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04e  Continue to work with stakeholders to articulate the potential costs and skills required to reach our net zero
target.
Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04f  Continue to develop our adaptation measures, as we are aware that mitigation alone will not protect
communities from the impact of climate change.
Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04g  Develop a Zero Waste Strategy to minimise waste generation and encourage reuse and recycling to support a
more sustainable and circular economy.
Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04h  Explore opportunities for expansion of carbon sinks and other carbon capture technologies.  Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04i  Explore the options around developing a carbon budget for the Council. Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04j  Continue to work with communities to ensure a holistic approach to tacking climate change is taken and to
ensure no community is left behind.
Head of Climate, Public
Protection and Roads
31-Mar-
25 
Forward action linked to Net Zero plan: Climate change action to make Renfrewshire net zero - Renfrewshire Website 
Page 82 of 146

Page 87

16 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.24.03.05
Strategic sustainable planning for people and assets
There is a risk that
decisions could be
made in the short
term, for example to
address financial
pressures, which may
then impact
adversely on
sustainability goals
for the longer term
impacting on our
communities and
organisation.
CMT (1) Learning Estate Programme Board established
(2) Implementation of the Corporate Asset Management
Strategy ensures that property assets are managed
effectively and efficiently through the provision of
relevant management and performance information 
(3) The Energy Management Team: ensure energy
management initiatives are aligned to the capital
investment programme and corporate asset strategy to
optimise use of property estate and reduce overall
running costs and energy consumption levels. Promote
reductions in energy usage and advise employees and
residents about energy efficiency 
(4) Through the Procurement Unit, sustainability and
community benefits are considered in the development
of all contract strategies, with a Sustainable
Procurement Strategy approved in November 2023.
04 04 16
High
- Deliver sustainable person-centred public services
(the Verity Agreement) and an engaged sustainable
workforce
- Ensure infrastructure future-proofing, with
investment in solar and wind farms, electric charging
networks and public transport, showing that taking
the right risks right now, can transform communities
- For capital projects, ensure new assets are fit for
purpose for the future and have sustainable
maintenance and repairs strategies
- Strategic decision making regarding the estate,
including the condition and sufficiency of the learning
estate
Action Codes Linked Actions Latest Note Assigned Date Status
Previous actions in relation to the learning estate/ school capacity planning are now reflected in Children’s Services risk register
Further action TBC 
Page 83 of 146

Page 88

17 | P a g e
Appendix 2: Corporate Risks, longer-term or imminent 
• LIVING our VALUES – making a difference together
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.06
Financial Sustainability
If significant
cost pressures
are not
successfully
planned for and
managed
effectively over
the medium to
longer term, this
could jeopardise
the financial
sustainability of
the council and
result in a
significant
impact on
availability and
quality of front-
line services and
capital
investment
resources.
Decisions will
then be
required on the
continuity or
scope of some
services
currently
offered.
Director of
Finance and
Resources;
and
Head of
Finance and
Procurement
(1) Revised medium- to long-term Financial Outlook reassessed the various
risks to the Council’s short, medium- and longer-term financial
sustainability. Refreshed report to Council on 26 September 2024
outlined the immediate financial concerns and plans to address these,
including, financial sustainability workstreams, and managed use of
reserve balances; however, as the position continues to develop and
evolve, close monitoring will be required to ensure that the Council
manages costs in the short term and fully appreciates the longer term
consequences of actions taken to address short-term risks.  Committee
reports of this nature cover a wide range of current and future financial
and economic factors e.g., Strategic Economic and National Policy
Context, Cost Pressures, Pressures on Income and Mitigation Strategies
to deal with such uncertainties.
(2) A well-developed and embedded budget planning, budget setting and
budgetary control system is in place throughout the organisation, and
this informs members and officers regarding financial performance and
stability. This facilitates robust and transparent decision making and
incorporates an escalation process with regards budget management
issues which may arise. The Council agreed the 2024/25 budget on 29
February 2024.
(3) In conjunction with the medium to longer term financial outlook and
the Council’s ongoing financial sustainability workstreams,
Renfrewshire Council has been proactive in planning for the future by
identifying and agreeing a series of directorate-led savings targets over
the medium term (2025/26 to 2027/28). It remains the case that
savings will continue to require be generated at scale in order to
ensure the ongoing financial sustainability of the Council.
(4) There is close financial monitoring of the agreed savings to ensure that
they are delivered within the agreed timescales, or where this is not
possible, to understand and reschedule planned delivery to achieve the
associated objectives. Monitoring is undertaken via a combination of
financial and operational measures, actions and related update reports.
(5) Regular updates and bespoke reports are provided to CMT and the
Council with regards the national fiscal position, likely developments
05 05 25
V.High
Financial recovery from global events 
- Potential reduced income from
NDR/CT over the medium term as
full economic implications of the
cost-of-living crisis, in particular
energy cost inflation, continue to
impact local businesses and
communities
- Volatility in the global supply chains
leading to shortage of labour and
materials following Brexit and the
outbreak of the Ukraine war
Best value report
- Recommendation in Best Value
report to prioritise how services
need to be provided in future to be
funded from within available
resources.
Cost and Income pressures
- Future grant settlements and the
level of funding available.
- Implications of national economic
policy choices to protect certain
services from real-terms reductions
in funding such as the Police and
NHS
- Local Government pay settlements,
and non-payroll inflation
- Demographics and demand
pressures, such as an ageing
population with increased
associated service demands, and
Page 84 of 146

Page 89

18 | P a g e
increases in demand for children’s
social care
- HSCP financial situation and real risk
of entering financial recovery in
2024/25
- Implications of welfare policies and
poverty levels, exacerbated by cost-
of-living crisis.
- Reductions in income from fee-
generating services such as car
parking; implications of the national
economic recovery and associated
risks/uncertainty in economic
factors e.g., interest rates and
inflation.
- Implications of third party provider
financial stability, such as childcare
providers in current economic
climate
- Liability for predecessor
organisations, in light of the
removal of the limitation period for
historic child abuse claims
and the impact on the council through close liaison with national
groups e.g., CIPFA DoFs, COSLA and the Scottish Government. This
liaison remains critical in ensuring the Council is aware of potential
financial developments and is in a position to influence these.
(6) The CMT now has a regular formal focus on financial sustainability, with
one meeting in four being a Financial Sustainability and Transformation
Board. These spotlight director-led savings and any associated policy
changes or risks for discussion.
(7) Managing the level and use of reserves has been a key tool in
addressing the costs of the pandemic, therefore the planned use of
reserves in the medium term, and the Council’s Capital Investment and
Treasury Management Strategy, are key to ensuring ongoing financial
sustainability.
(8) Reports and publications from Audit Scotland in relation to the Local
Government financial outlook, financial planning and related
developments and improvements are supplemented with a
Renfrewshire context report, with both reports being submitted to the
Council's Audit Risk and Scrutiny Board. 
(9) Energy consumption data and condition surveys are used to identify 
priority areas for investment in the Council’s estate,  support informed
investment decisions and formulate the Council’s Capital and Revenue
budgets.
(10) Regular review of HSCP financial position along with HSCP colleagues
Action Codes Linked Actions Latest Note Assigned To Due Status
CRR22.05.05a  Strategic Property Review and new ways of
working / Review of local policy positions
Work on all of the financial
sustainability workstreams is being
progressed with updates regularly to
Council. Agreed budget changes will
then be incorporated into the
General Fund base budget in future
years to capture the recurring
savings. 
[Some due dates extended from
original to 2025 as certain
workstream targets were phased
across financial years]
Director of Environment, Housing and
Infrastructure
31-Mar-
2025 
CRR22.05.05b  Charging, fees and commercialisation / review of
Council risk
Director of Finance and Resources 31-Mar-
2025 
CRR22.05.05c  Strategic review of procurement  Head of Finance and Procurement 31-Mar-
2023 
CRR22.05.05d  Connected Communities Chief Executive (Head of Policy and Partnerships) 31-Mar-
2025 
CRR22.05.05e  Digital Strategy Director of Finance and Resources 31-Mar-
2025 
CRR22.05.05f  Council Tax and Tax Policy Director of Finance and Resources 31-Mar-
2023 
Page 85 of 146

Page 90

19 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.07
Successful Cyber Attack
Regardless of the Council’s
technical preparedness for a cyber
attack, the threat remains acute
and present, as evidenced by
successful attacks on partner
bodies, with the risk of significant
impact on council operations. 
CMT For security reasons,
technical security
controls are not
published in the
public domain. 
04 05 20
V.High
Context: 
The risk has been updated from cyber attack to risk of a successful cyber
attack as more and more this risk comes closer to home, despite the
sophisticated technical security protocols and cyber architecture in
place, and for those organisations who have been impacted by
successful attacks, we see that the effects are devastating.
No matter what technology is deployed, the risk is materially impacted
by individual employee behaviours – i.e. learning how to recognise a
cyber attack and keeping that knowledge up to date by reading cyber
updates and doing mandatory cyber training, being alert to phishing
attacks and understanding the need for rapid escalation should an error
inadvertently be made and criticality of urgently reporting when they
have reacted to a phishing email and explaining all actions taken.
Action Codes Linked Actions Latest Note Assigned Due Date Status
As agreed by the Corporate Management Team   
Page 86 of 146

Page 91

20 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.08
Financial Stability
If significant short-term
costs and income losses
are not closely
monitored and
understood, this could
destabilise the finances
of the Council to an
extent beyond the
financial resilience of the
Council, resulting in a
need for immediate cost
control measures, or
short-term savings which
have an immediate
impact on service
delivery.
Head of Finance and
Procurement
(1) Revenue budget monitoring reports to Policy Boards focus on the
forecast year-end outturn position rather than the historic
periodic position, so that significant variances are reported early,
and any mitigating steps can be taken. This is already highlighting
severe price pressures (such as contractual inflation) across
different services. The impact of pay inflation is also highlighted
through this reporting mechanism.
(2) Review of Financial Sustainability workstreams following approval
of the 2024/25 Revenue Budget to ensure targets remain
achievable.
(3) Clear analysis of the Council’s reserves position and potential for
reprioritisation or redirection; including the development of plans
to rebuild financial resilience of the Council in the medium term.
(4) Ongoing discussion with directors to understand the financial
consequences of the current economic climate for each service
and how these will be managed. 
(5) Review of capital plan and ongoing projects to ensure clear
understanding of phasing of potential spend.
03 05 15
High
Context: 
Imminent shorter-
term risk for
financial stability,
recognising the
immediate
financial situation
of the Council
(note: the
medium to
longer-term
financial position
is captured under
financial
‘sustainability’)
Action Codes Linked Actions Latest Note Assigned Due Date Status
Ongoing monitoring 
CRR24.04.09 – Removed: Commercial vehicle and operator licence compliance 
Page 87 of 146

Page 92

21 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.10
Asset Management - Ongoing
Effective
governance and
management of
the council’s
property assets
is essential,
otherwise there
is a significant
risk of harm,
financial loss,
service
disruption, non-
compliances,
fines, rising
energy costs
and inability to
recover losses
via insurance
proceeds
Director of
Environment
, Housing &
Infra-
structure. 
Head of
Economy &
Developmen
t Services
Corporately:
Key responsibilities with regards to the
Estate span 2 specific service
departments, but they come together
through a CAMIS Development Group
(Corporate Asset Management
Information System) which is taking
forward a workplan to more effectively
consolidate and oversee asset
management risk 
Heads of Service:
Effective asset management in practice
on the frontline is included within the
new Risk Assurance model which went
live on 1 April 2023. 
All UFAS related works should be
completed by March 2025. 
Responsible person inventory currently
being updated for all properties.
03 05 15
High
Context:
GOVERNANCE – roles and responsibilities
- Estates (Leases – by and from the council, and on behalf of
HSCP)
- Facilities management (security, housekeeping, statutory
duties/ inspection, maintenance, repair, building fire risk
assessment)
- Property services (capital works, and CAMIS development)
- All services (inspection inventories and response, people
elements of fire risk assessment)
OTHER MATTERS IN SCOPE
- Fluorescent Lights – requiring LED replacement.  We
continue to work through this and spot replacements will be
on a like for like basis, however, larger complete renewal is
being considered for Renfrewshire House.
- Action in relation to Unwanted Fire Alarm Signalling and
upgrade costs.  Ongoing action to replace signalling
equipment across the estate including changes to any
activations/protocols to ensure this is being managed
appropriately (responsible of duty holder on site)
Codes Linked Actions  Latest Note Assigned Due Status
CRR22.
05.10d
Undertake gap analysis to identify
activities that take place outside of
the CAMIS environment and consider
if these can be brought into CAMIS by
way of system development
Due to competing demands, development work on CAMIS has moved to virtual
environment and slower than initially planned. Work still being undertaken to assess what
sits outside CAMIS and what can be brought in. Discussions with other Local Authorities
that use CAMIS to see what can be added with Health and Safety module being reviewed.
Due date therefore amended to June 2024, 2025.
CAMIS
Developmen
t Group
30-Jun-
2025 
CRR22.
05.10e
Explore data and status monitoring Whilst CAMIS is noted to be a good repository for data, development work is required to
improve the data and how it can be easily accessed. Due to resource requirements
elsewhere in the Council, this has been delayed. However, conversations continue virtually
to assess what can be done to improve CAMIS for users to ensure robust, up to date data
is stored within the application.
Due date therefore amended to June 2024, 2025.
Engagement continues with Concerto and recent developments.  Short life working group
currently discussing the property “Responsible Person” to ensure known across the entire
portfolio.
CAMIS
Developmen
t Group
30-Jun-
2025 
CRR24.04.11 – Removed: Delivery of the Dargavel solution   CRR24.04.12 – Removed Organisational learning from Dargavel investigation
Page 88 of 146

Page 93

22 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.13
Workforce planning, recruitment and retention
There is a national shortage in the UK
labour market for certain trades and
professional services. For Renfrewshire
Council that is impacting on certain
specialist recruitment campaigns.  This
combined with diminution of salaries,
the reality is that there is a risk the
council may lose key personnel, it may
be very difficult to recruit suitably
qualified and skilled officers for
compliance, advisory, investigative and
assurance work, with significant impact
on statutory responsibilities and slippage
in professional activity.
Director of
Finance &
Resources
(1) Data analytics to look at areas of risk,
trends both recruitment and attrition.
(2) Ensuring we hire the right people in the
first place by having solid recruitment
methods
(3) Offering workplace flexibility which can
help enhance work life balance, and
burnout
(4) Creating opportunities for 
development 
(5) Partnering with employability,
community, and further/higher
education programmes to support the
Council as an employer of choice
04 04 16
High
Workforce planning risk is captured by our
model for business-as-usual risk, however over
recent months it has been clear that a live issue
is emerging in relation to recruitment and
retention challenges, particularly for various
trades and professional services.
Particular pressure points at April 2024:
• Soft FM and building services
• Hard FM and property services
• Legal and Registrars
• Social services
• Others, as being identified/ confirmed
Action Codes Actions Latest Note Assigned To Date Status
CRR23.04.13a  Agreed to introduce a working group focussed on workforce planning, the
purpose of this is to look at new and innovation ways to support the
recruitment, retention and upskilling of the Councils workforce.
Workforce planning group now formed and an initial
meeting held, further meeting dates have been
scheduled. Work streams have been identified.
Head of
People and
OD
31-Oct-
2023 
CRR23.04.13b Review our recruitment training for managers with a focus on supporting
onboarding, induction, and development support.
Training has been reviewed and updated in line with the
new policy provisions. Induction processes have been
reviewed and updated
Head of
People and
OD
31-Aug-
2024 
CRR23.04.13c Develop an Equality, Diversity and Inclusion strategy, this aim of this is to
enable colleagues to have equity of opportunity within the council during
the whole employee lifecycle 
Complete, EDI plan was approved at the FARS board in
February 2024.
Head of
People and
OD
31-Dec-
2023 
CRR23.04.13d Introduce a programme that enables our colleagues voice and provides
platform for recognition 
Partially complete within some council services, work
continues to drive this across the organisation.
Development of employee recognition is in the early
stages. [Date amended 31/12/23 to 31/12/24]
Head of
People and
OD
31-Dec-
2024 
CRR23.04.13e Continue the roll out of our Health & Wellbeing strategy, ensuring
colleagues can have the best experience at work 
The H&WB plan was approved at the FARS board in
February 2024. There is ongoing work underway to drive
the 4 themes identified within the plan and target specific
work groups. We have trained more mental health first
aiders to support the workforce.  
Head of
People and
OD
31-Dec-
2024 
Page 89 of 146

Page 94

23 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.14
Delivering homeless duties
It is becoming more
difficult to fulfil our
statutory duties for
providing
accommodation so 
breaches may occur
with an increase in
rough-sleeping and
reputational harm.
Director of
Environment,
Housing &
Infrastructure
(1) Monitored at weekly Housing SMT meetings with Head of Service and
senior housing managers
(2) Reports to Communities and Housing Policy Board (latest May 2024)
(3) The Council’s stock of furnished properties being used to provide
temporary accommodation for those who have nowhere to stay has
been increased on a stepped basis to 276
(4) Additional staffing resources have been appointed within Homeless
Services, with 3 x Accommodation Officer and 2 x Housing Options
Adviser posts now filled on a temporary basis to support the Councils
response to the increase in homelessness.  Also, extension of 2
temporary posts to improve access to support, housing options advice
and advocacy for tenants in the private rented sector
(5) Two additional Housing Support Officer posts have now been created
and filled on a temporary basis to help ensure the legal duty to assess
the support needs of those who are homeless and ensure these needs
are met can be complied with
(6) Attendance at regular multi-agency meetings regarding utilisation of
temporary hotel accommodation
04 04 16
High
We are at risk of being
unable to provide
temporary/ settled
accommodation for the
increased number of
homeless applicants,
Ukraine and Afghan
resettlement programmes,
and those asylum seekers
living in Renfrewshire
receiving positive decisions.  
Action Codes Actions Assigned To Date Status
CRR24.04.14a  In response to the increase in the level of homelessness over the last two to three years, The Council has increased its target to
provide 55% of general lets to homeless applicants in 2024/25 and this was approved by the Policy Board in March 2024. 
Head of
Housing
Services
31/03/2025  
CRR24.04.14b  Deliver the key initiatives detailed in Renfrewshire’s Rapid Rehousing Transition Plan, including, the provision of adequate
temporary accommodation, increasing the number of lets to homeless in order to meet needs, provide assistance to help new
tenants resettle, and upscaling the provision of wraparound support initiatives such as Housing First.
Homeless &
Housing
Support
Services
Manager
31/03/2025 
Page 90 of 146

Page 95

24 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.15
National Care Service – governance and financial
implications
Cause:
Consultation and negotiation
breakdown in relation to
fundamental elements of the
Bill, with Government
continuing to pursue this
Policy.
Event:
Legislation for the new
National Care Service being
passed with insufficient
resourcing or detail on how
the service will operate, and
unclear lines of accountability.
Effect:
The council will face further
financial and operational
pressures and increased risk in
terms of liabilities for both the
council and HSCP.
CMT (1) Maintaining a watching brief through
various professional networks
03 03 09
Moderate
Under current proposals for the planned National Care
Service, staff will continue to be employed by councils.
However, under the terms of a partnership
arrangement, legal responsibility for the service is to
be ‘shared’ between the health service, councils, and
Scottish government, with councils also responsible for
buildings and the delivery of services. 
Parliament approved the general aims of the National
Care Service (Scotland) Bill at Stage One with
significant amendment to follow at Stage Two. 
Further to Stage Two consultation, COSLA has
withdrawn support (in addition to trade unions), for
the Bill in its present form, and the situation is now
more uncertain than before. The risk statement is
updated to reflect the above.
Action Codes Actions Assigned Date Status
Monitoring only 
CRR24.04.16 – De-escalated to service: Administering elections 
Page 91 of 146

Page 96

25 | P a g e
Appendix 3: Service Risks 
Risk 
(Cause and effect)
Risk Capture
 Service RR
 Project RR
 H&S PLAN 
Evaluation
 Low
 Moderate
 High
 Very High
Means of Monitoring
 Board Risk-Reporting
 SIP
 Project Board
 H&S Planning Group
Notes
Chief Executive’s Service    
(1) Discontinuation of Shared Prosperity Fund
If there is a change in government and the SPF ceases,
funding for current economic development and place-
based initiatives would be reduced by £5-6m. 
Service RR  Moderate  Board Risk-Reporting Renfrewshire Council benefits from the Fund through the
Glasgow City Region arrangements.   The current
arrangements end in March 2025 and as yet, a
replacement has not been identified.
(2) AMIDS - Investment Zone status
If AMIDS were not to achieve Investment Zone status it
could dampen placeshaping ambitions and weaken
local economy 
Project RR  Moderate  Board Risk-Reporting Investment Zone status would enhance the attractiveness
of the site to investors, as status means various tax reliefs
as well as practical support from the Scottish Government. 
The designation of an alternative site could reduce the
appeal of AMIDS.
Children’s Services    
(3) Future school capacity planning
If demand projections are not sufficiently robust there
is a risk that the learning estate will be insufficient over
the longer term 
Service RR High  Board Risk-Reporting Robust demand projections (core projection, potential
upper scenario and a long-term view) for scale and timing
of short-term peak demand to inform decisions.
Process and arrangements to support and provide detailed
monitoring and updates to projections, for updates to
actual data sets to facilitate a continual re-assessment of
longer-term trend and likely requirements/ decision point
required in relation to deployment of potential additional
interventions. Options identified to deliver, if required,
additional capacity (both temporary capacity and
permanent long-term capacity) to ensure the council can
respond appropriately to the potential for upper end
demand scenarios and or temporary demand peaks to
emerge. 
(4) Portfolio Management
Unintended delays in progress in each of the three
portfolios listed below will impact on our ability to
ensure that children and young people thrive, learning
and achieve: 
1. Curriculum, learning, teaching and assessment;
Project RR Moderate Project Board Effective governance arrangements are in place with
oversight, leadership and direction being provided by the
Portfolio Governance Board which meets on a monthly
basis. The three portfolio groups provide updates to the
Board.
Page 92 of 146

Page 97

26 | P a g e
Risk 
(Cause and effect)
Risk Capture
 Service RR
 Project RR
 H&S PLAN 
Evaluation
 Low
 Moderate
 High
 Very High
Means of Monitoring
 Board Risk-Reporting
 SIP
 Project Board
 H&S Planning Group
Notes
2. Inclusion; and 
3. Families and Communities
(5) Availability of Alternative Care Placement 
(Foster Care and Residential Care)
This could result in a higher level of risk being managed
within the community. 
Service RR Moderate Board/Committee Risk
-Reporting
Case managed by Social Work Management Teams with
contingency plans in place.
Environment, Housing and Infrastructure Services    
(6) Commercial Vehicle and Operators License
Renfrewshire Council requires its fleet of vehicles to be
effectively managed, otherwise there could be
sustained impact in several areas including community
care, housing maintenance and repairs,  
Neighbourhood Services and waste collection.
Service RR High Board Risk-Reporting The fleet comprises around 500 vehicles including heavy
and large goods vehicles, light vans and cars.  The council
implements a range of governance and operational
measures to ensure ongoing vehicle operator licence
compliance. A good report was received following a recent
external review of arrangements and the risk has been de-
escalated from the corporate risk register to the service.
(7) Review of electric vehicle (fleet) infrastructure
Risks associated with the installation of charging
facilities were managed during the related installation
projects.  There is however a need to review any
residual risks that remain in relation to the siting,
inspection, and maintenance of the facilities, to further
reduce any risks to people or property within their
vicinity.
Service RR High Board Risk-Reporting Electric Vehicle fleet comprises around 116 vehicles.  The
council implements a range of measures to ensure vehicles
are roadworthy and serviced accordingly. The EV Charging
Infrastructure is electrically tested at final commissioning
stage by a competent EV contractor.   EV Chargers are
serviced annually as part of warranty/ maintenance
contract.  Chargers are also monitored remotely by
ChargePlace Scotland for any faults and site attended by
contractor if fault is not able to be fixed by back-office
support.
(8) Tree Fall and Ash Die Back & Larch Infection
With the emergence of Ash Die back in the UK there is
now an increased potential for public injury and
property damage, awards against the Council,
reputational damage and statutory notices
Service RR High Board Risk-Reporting The main trigger for this risk was a significant outbreak of
Ash Dieback in the UK which is resulting in a significant
number of trees within Renfrewshire having to be felled.
Work is underway.
(9) Housing Regeneration and Renewal Programme
Risks associated with delivering £100m regeneration
and renewal programme.
Project RR High Project Board  Risk registers have been produced for each project and are
regularly reviewed to identify, manage and mitigate known
risks associated with the programme.
(10) Last in Block Properties Project RR Moderate Board Report Risk register has been produced and shared with Scottish
Government.
Page 93 of 146

Page 98

27 | P a g e
Risk 
(Cause and effect)
Risk Capture
 Service RR
 Project RR
 H&S PLAN 
Evaluation
 Low
 Moderate
 High
 Very High
Means of Monitoring
 Board Risk-Reporting
 SIP
 Project Board
 H&S Planning Group
Notes
Initial discussions have commenced with Scottish
Government officials on the feasibility of ‘last in the
block’ properties being repaired and used for the
resettlement of UDP’s, and a further report will be
submitted to the Communities and Housing Policy
Board providing an update on progress.
Application has been submitted and now been approved in
principle by Scottish Government Minister.
(11) Housing IT System Replacement Programme
Ensuring replacement system procured fulfils all
requirements and is delivered within target.
Project RR High Project Board Renewal of main system dealing with Housing Services,
Housing Asset Management and Homeless Services.
(12) Housing Investment Programme
Risk of delivering approved capital investment
programmes and ensuring stock complies with
statutory and regulatory standards.
Project RR High Project Board   As part of governance arrangements, a new project board
is being established. Monthly project teams meetings have
been scheduled and risk registers for each programme are
being developed.  
(13) Delivering Homeless duties
The risk is of breaching a statutory duty to provide
accommodation and would be likely to lead to an
increase in rough-sleeping and reputational harm.
Project RR High Board Report We are at risk of being unable to provide temporary/
settled accommodation for the increased number of
homeless applicants, Ukraine and Afghan resettlement
programmes, and those asylum seekers living in
Renfrewshire receiving positive decisions.  
(14) Disposal of Coal Tar 
Coal tar is now classed as hazardous waste material.
There is consequently a knock-on risk to the council’s
resurfacing scheme with some moderate delays in only
a few locations as alternative solutions are developed.
Service RR Moderate Board Reporting  We carry out test samples prior to our resurfacing
programme, and any that are found to be positive will be
removed from resurfacing programme and placed on the
surface treatment / recycling programme.  This ensures
that potentially hazardous material is left in-situ and
doesn’t require to be disposed of.
(15) Implementation of Local Heat and Energy
Efficiency Strategy
Key risk is reputational damage if the Council does not
deliver on their Local Heat and Energy Efficiency
Strategy and Local Heat and Energy Efficiency Delivery
Plan. Work is currently underway to develop the
delivery plan.
Project RR Moderate Board Reporting The Scottish Parliament passed the Local Heat and Energy
Efficiency Strategies (Scotland) Order in May 2022. The
LHEES Order places a duty on local authorities to prepare,
publish and update a Local Heat and Energy Efficiency
Strategy and Delivery Plan.
(16) RAAC in the learning estate
During the check at Castlehead High School, structural
engineers identified the presence of RAAC limited to
Service RR Low Board Risk-Reporting  Estate wide inspection/check for RAAC was undertaken.
Only Castlehead HS had a positive result and works to
remediate are almost complete.  The risk has been
Page 94 of 146

Page 99

28 | P a g e
Risk 
(Cause and effect)
Risk Capture
 Service RR
 Project RR
 H&S PLAN 
Evaluation
 Low
 Moderate
 High
 Very High
Means of Monitoring
 Board Risk-Reporting
 SIP
 Project Board
 H&S Planning Group
Notes
the school gym halls. The inspection concluded that
our analysis of the construction materials of the main
school building was correct, but that different material,
RAAC, had been used in the construction of the gym
halls. **RISK now REMOVED**
reduced to low and removed from report for local
monitoring to conclusion, by EHI.
(17) Collection and Disposal of Waste Upholstered
Domestic Seating (WUDS) / Persistent Organic
Pollutants (POP’s)
From 31st January 2024 new guidance came into force
that changed the collection, storage and disposal of
waste containing Persistent Organic Pollutants (POP’s)
which must be separated and sent for incineration. 
The impact of this could be both financial and
environmental. 
Project RR Moderate Project Board From 1st February 2024 we have allocated additional
resources to assist at the Household Waste Recycling
Centres (HWRC’s) to ensure that WUDS/POP's waste does
not contaminate other waste streams as set out in the
Changes to Upholstered Furniture Collection, Storage and
Disposal approved by the ILE Board on 24th January 2024.
A separate Special Uplift squad has been formed, as part
of the Council's Special Uplift Service, to manage the
collection of WUDS and POPs.
Linwood Household Waste Recycling Centre (HWRC) is the
only Council site which accepts POP’s waste.
We will monitor waste trends/patterns over the coming
year.  However, until a full years' data that identifies
seasonal demands is available the scale of financial and
service risks are difficult to determine.
(18) Collection Management / Routing Software for
Waste and Recycling Service
The Service is looking to improve performance and
maximise efficiencies by procuring and implementing a
new Waste & Recycling Management/Routing system.   
This will assist in the setup and day-to-day
management of the waste and recycling collection
service.  There is a risk that during the implementation
process the service to customers may fluctuate and
they are not kept fully informed.
Project RR Moderate Project Board A Project team is being assembled, with cross-service
representation to ensure the effective procurement and
implementation of the new Waste and Recycling
Management System. 
The project team will be responsible for the planning and
implementation of a comprehensive communication
strategy at each stage of the project.  
The service will liaise with colleagues from Customer
Services Unit to share information and ensure this is
available to customers timeously.    
Finance and Resources Services    
Page 95 of 146

Page 100

29 | P a g e
Risk 
(Cause and effect)
Risk Capture
 Service RR
 Project RR
 H&S PLAN 
Evaluation
 Low
 Moderate
 High
 Very High
Means of Monitoring
 Board Risk-Reporting
 SIP
 Project Board
 H&S Planning Group
Notes
(19) PCI certification
Certification is required for taking credit and debit card
payments.  If certification is not consistently achieved,
there is a risk of significant financial penalties applied
by our Acquiring Bank and/ or removal of our ability to
accept credit & debit cards completely.  This would
have a significant impact on Customers, Council
income and the Council’s digital aspirations.
Service RR High Board Risk-Reporting To accept credit and debit card payments the Council is
contractually obligated to comply with the Payment Card
Industry Data Security Standards (PCI).  This must be
proven by submitting annual Self-Assessment.
Questionnaires that match payment forms taken. Security
& Compliance Mgr responsible for PCI compliance across
Council. Internal procedures for applying compliance
standards to card payment services. Annual independent
audit of card payment procedures against PCI standards.
PCI Governance Group to be established consisting of
representatives from all Services who deliver ‘pay for’
services in the community. Training for staff handling card
payments
(20) Programme and project management
Where some projects might sit outside of the
programme management unit’s knowledge/
awareness, there is a risk that those projects fail either
in timescales, quality, or costs or even if successfully
concluded, do not deliver the intended outcomes.
Service RR Moderate Board Risk-Reporting This risk had been on the corporate risk register but
project health checks provided reassurance regarding our
corporate approach to programme and project
management. The risk has therefore been de-escalated
back to Finance and Resource Services for monitoring in
relation to arrangements for smaller projects that might sit
outside of the programme management unit’s awareness.
(21) Administration of elections
While there are no planned electoral events until 2026,
election preparedness is important on an ongoing basis
to respond to snap elections or by-elections. If we are
not prepared and do not monitor on an ongoing basis
the supply chain relied upon for various elements of
the then there is a risk that we will struggle to deliver
the administration of an event with significant
reputational impact.
Service RR Moderate Board Risk-Reporting The council has a highly experienced group of staff that
can be relied upon to lead and deliver on the governance,
logistics, risk and contingency workstreams required to
deliver an electoral event with integrity.  There is also
ongoing monitoring of supply chain, such as for printing
and distribution of postal votes, ballots papers, availability
of electronic voting equipment etc.
Page 96 of 146

Page 101

30 | P a g e
Appendix 4: Business-as-Usual Risks 
The council has 12 areas of risk monitored via BaURAM © Renfrewshire Council. Each Head of Service (and other officers who report directly to a Service Director),
undertake an annual self-assessment against a set of questions for each risk and indicate what level of assurance they can provide in relation to how they and their teams
perform in these areas.  In keeping with risk management KPIs, the Corporate Risk Management Group monitors % of modules with assurance ratings equal to or greater
than reasonable assurance.  For year 2 of the model it has been agreed that there should be a schedule of three specific modules to be completed each quarter. 
The image on the left shows the system output for 2024-25 Q2   The image on the right shows the system output for 2023-24 Q2 for comparison 
Page 97 of 146

Page 102

31 | P a g e
While these are the council’s business-as-usual risks, where there is recognised need for specific corporate action in any of these aspects of risk, these are escalated
from time to time to the corporate risk register. An example of this is nos. 2 and 7 below. Aspects of these risks are reflected not only within the risk assurance model but
are also reflected in the corporate risk register. 
BAU RISK AREA ENCOMPASSING BAU RISK AREA ENCOMPASSING      
1. Community & public
safety
Child and adult protection
Serious and organised crime (external)
2. Asset management Statutory compliance
Arrangements for void properties
Fleet and other infrastructure
ICT hardware and software assets and responsibilities
3. People wellbeing &
development
Staff health and wellbeing
Training and development
Corporate and local induction
4. Information handling GDPR compliance
Information asset management
Information security
Records management
5. Health, safety &
managing adverse
events
Staff incident recording
RIDDOR arrangements
Incident monitoring and trends analysis
6. Programme and project
management
Governance
Compliance with industry standards/ adopted methods
7. Organisation resilience Business continuity:
- Staffing resource
- ICT and/ or power outages
- Facility issue
- Cyber security
8. Partnership management Partnership registers
Agreements
Liabilities
9. Financial control and
governance
Authorities and delegation
Budgeting and accounting
Conflict and whistleblowing
Insider threat and crime
Counter fraud
10. Service planning and
performance monitoring
Customer engagement
Public/ stakeholder engagement
KPI trends analysis
Links to risk management and service improvement
11. Procurement and
contract management
Standing orders
Roles and responsibilities
Monitoring & Performance Mgt
12. Complaints, comments and
claims handling
Compliance
Trends analysis
Links to service improvement 
[Item End] 
Page 98 of 146

Page 103

___________________________________________________________________
To: Audit, Risk and Scrutiny Board 
On: 04 November 2024
___________________________________________________________________
Report by:  Director of Finance and Resources
___________________________________________________________________
Heading:  Audit Scotland Report on ‘Tackling Digital Exclusion’
___________________________________________________________________
Summary 
1. Audit Scotland regularly publishes national reports on matters relating to local
government in Scotland.  This report provides an overview of the recently
published audit on Tackling Digital Exclusion, which has been summarised for
Board members and provides an overview of the challenges and
recommendations outlined by Audit Scotland regarding digital exclusion in
Scotland. 
2. As digital technology continues to transform public services, addressing digital
exclusion is essential to ensuring that everyone can participate fully in society,
access essential services, and benefit from the opportunities that digital
connectivity offers. 
3. The audit adopted a human rights-based approach, allowing people with
experience of digital exclusion and use of digital services to participate in and
inform the audit and comprised of the following three parts, which aims to
inform, provide assurance, and support improvement: 
• What is digital exclusion?
• How well is the public sector tackling digital exclusion?
• Enabling digital inclusion 
Item 6
Page 99 of 146

Page 104

2 
Recommendations 
4. It is recommended that members of the Audit, Risk and Scrutiny Board: 
• Note the content of this report; and
• Note the considerable collective action already in place across
Renfrewshire to support and enable digital inclusion, whilst ensuring no one
is left behind;
• Note plans to further strengthen digital inclusion activity across
Renfrewshire as referenced at paragraphs 25, 26, 34-38 and 43-48. 
Audit Scotland Report on Tackling Digital Exclusion 
5. In August 2024, the Accounts Commission and Auditor General published their
joint Digital Exclusion Report, with the overall aim of considering how well public
bodies understand digital exclusion and are taking action to reduce it.  This
briefing considers the context of the report and its recommendations and sets
out how Renfrewshire’s person-centred and place-based approaches have
been highlighted as an exemplar by Audit Scotland. 
6. The report, “Tackling Digital Exclusion,” prepared by Audit Scotland, provides
a comprehensive assessment of public bodies’ efforts to address digital
exclusion. Digital technology has become integral to everyday life, from public
services to education and social connections. However, it notes that not
everyone can access or benefit from digital resources. The report also
highlights the extent of digital exclusion in Scotland, the public sector’s
response to it, and the key challenges ahead. 
7. The Report explains that digital exclusion, sometimes called digital poverty, can
change over time, and can affect people in many ways, including: 
• Inability to afford an appropriate device or internet connection;
• Not having the skills and confidence to use digital technology;
• Having a fear or mistrust of using online services or lack motivation to do it;
• Having difficulty in accessing digital services and devices or an internet
connection; 
• Being unable to keep up with the pace of change of digital technology. 
Key messages from the Audit 
8. The Report notes that digital exclusion can have a severe impact on people’s
lives and for public service reform to be effective it needs to make sure that
digitalisation leaves no one behind.  The key messages from the Audit, include:
Page 100 of 146

Page 105

3 
• Digital technology has brought benefits to many of Scotland’s people and
communities.
• In an increasingly digital world not everyone can get the services and
support they need or are entitled to.
• This has a severe impact on some people’s lives, which public bodies
are often not aware of or do not consider when moving services online.
• The public sector response to digital exclusion increased significantly
during the pandemic.
• But national leadership for tackling this critical issue has weakened since
then and momentum has now slowed.
• Significant pressures on public finances mean that the Scottish
Government and councils are making difficult choices about public
spending priorities, including reducing the direct investment in tackling
digital exclusion.
• All public bodies have a responsibility for enabling digital inclusion in
their programmes for reform. 
The Scope of Digital Exclusion 
9. The report presents key statistics that illustrate the prevalence of digital
exclusion in Scotland: 
• 15% of Scotland’s adults lack essential digital skills, such as the ability to
turn on a device or browse the internet.
• 9% of households lack an internet connection.
• Lower-income households are disproportionately affected, with 69% of
households earning less than £10,000 having internet access compared to
99% of households earning more than £40,000. 
10. Additionally, rural areas often experience poorer connectivity, further
exacerbating the exclusion of rural communities from digital services. As digital
technology becomes central to public services, the risk of excluding those who
lack digital access grows. This exclusion can affect access to healthcare,
education, and employment opportunities and can result in greater social
isolation. 
11. Digital exclusion can prevent individuals from realising their human rights. For
example, it can limit their access to education, social security, and healthcare
services. The Audit notes that online public services often do not consider the
needs of digitally excluded people, placing them at a further disadvantage. The
report emphasises that digital inclusion is a fundamental aspect of securing
equal access to services and protecting individuals’ rights.
Page 101 of 146

Page 106

4 
The Public Sector’s Response to Digital Exclusion 
12. The COVID-19 pandemic accelerated the digitalisation of services and brought
digital exclusion to the forefront. During this period, the Scottish Government,
councils, and third-sector organisations worked together to mitigate the impact
of digital exclusion on vulnerable populations with key initiatives including: 
• Connecting Scotland: Launched in May 2020, this program provided
digital devices, internet access, and skills training to over 61,000
households across Scotland. The initiative supported vulnerable groups,
including low-income families, socially isolated older adults, and people at
high risk of COVID-19.
• Digital Participation Charter: This initiative promotes an inclusive and
ethical approach to digital services and provides organisations with tools
and resources to foster digital participation.
• Place-Based Approaches: Several councils, including Renfrewshire
Council, adopted local strategies tailored to address the unique needs of
their communities. Renfrewshire’s approach is highlighted as an exemplar
in Case Study 3 of the Audit Report, which also references programmes
like Stirling Council’s tablet lending service and Perth and Kinross Council’s
consultation efforts are examples of place-based responses to digital
exclusion. 
Challenges and Declining Momentum 
13. Despite early success, the momentum in addressing digital exclusion has
slowed since the pandemic. The report identifies several key challenges: 
• Weakened National Leadership: Leadership at the national level has
diminished, with unclear responsibilities and a lack of coordination in
delivering digital inclusion.
• Reduced Funding: The Scottish Government reduced its funding
commitments to programs like Connecting Scotland. The budget for
2023/24 allocated only £1.3 million, a significant drop from the previous
investment of £50 million during the pandemic.
• Lack of Clear Strategy: Although the Scottish Government and COSLA
launched a national digital strategy in 2021 with the aim to “leave no one
behind,” the strategy lacks a clear action plan, roles, responsibilities, and
accountability mechanisms. The report highlights the need for a refreshed
strategy to address these gaps. 
Page 102 of 146

Page 107

5 
Enabling Digital Inclusion 
14. To truly enable digital inclusion, public services must prioritise inclusivity in
service design and delivery. The report outlines a set of key principles for
enabling digital inclusion, which includes: 
• Collaboration: Cross-sector collaboration is essential, including
partnerships between public bodies, third-sector organisations, and private
providers.
• Accessible Services: Services should be designed to meet the needs of
all users, ensuring that non-digital or assisted digital options are available
for those who cannot access online services.
• Digital Literacy and Confidence: Public bodies should invest in digital
skills training for both staff and the public, ensuring that individuals have the
confidence to navigate the digital world.
• Affordability: Access to affordable devices and internet connectivity is a
crucial aspect of digital inclusion, especially for low-income households.
Public bodies should support initiatives that make devices and data more
accessible. 
Audit Report Recommendations and Conclusion 
15. The report provides detailed recommendations to ensure that digital exclusion
is effectively tackled across Scotland, noting specific recommendations for: 
• The Scottish Government and CoSLA;
• The Scottish Government;
• CoSLA;
• All public bodies, including the Scottish Government, councils, NHS
boards and others; and
• Councils 
16. The report concludes that while digital inclusion is critical to Scotland’s public
service reform agenda, efforts to tackle digital exclusion must be revitalised.
There is a need for renewed national leadership, clear strategies, and sustained
investment to ensure that no one is left behind in the digital age. The Scottish
Government and public bodies must work together to develop and implement
comprehensive solutions to address digital exclusion and enable equitable
access to digital services for all. 
Page 103 of 146

Page 108

6 
Enabling Digital Inclusion in Renfrewshire 
17. Renfrewshire has a strong history of enabling digital inclusion through multi and
cross-sector collaboration with our partners.  This work has been commended
by Audit Scotland and is highlighted as a case study in their Tackling Digital
Exclusion Report. 
18. A key recommendation within the Report specifically for Councils is to: 
• “Work with partners to develop a clear approach to tackling digital
exclusion as part of their strategies and plans, based on an
understanding of digital exclusion locally, who is affected and how.
They should map out local resources and assets across the public,
private and third sectors, and provide clear routes to digital support
and accessible information on the support available to local
communities.” 
19. The following paragraphs highlight the breadth of digital inclusion activity being
delivered by partners across Renfrewshire to enable digital inclusion and
ensure no one is left behind. 
DigiRen Network 
20. DigiRen is one of two key vehicles for both driving and delivering digital
inclusion through multi and cross-sector collaboration. 
21. Over 180 individuals from over 80 unique local and national organisations,
DigiRen represent the Public, Third, Community and Voluntary, Academia and
Social Housing sectors that all share a common goal of promoting Digital and
Data inclusion in Renfrewshire.   
22. In September 2024, DigiRen hosted a joint hybrid event in Paisley Central
Library, where almost 100 delegates attended either in person or online.  The
event coincided with the Digital Poverty Alliance’ National End Digital Poverty
Day and provided a platform for Audit Scotland to present their findings from
their Report and this was followed by a digital inclusion showcase covering the
following themes: 
• Keeping People Safe, Confident and Protected through our innovative
RenSafeOnline Programme
• Enabling and empowering older adults using digital;
• Enabling and empowering Children and Young People using digital;
• Enabling and empowering people within a health and social care setting
using digital; 
Page 104 of 146

Page 109

7 
23. Audit Scotland commended and highlighted the approach taken in
Renfrewshire as an exemplar at the event and members can watch the
recording of the event at
https://www.youtube.com/watch?feature=shared&v=i29tmmVKOMs   
Demonstrating impact through cross-sector collaboration 
24. Work to understand the impact and provision of digital inclusion in Renfrewshire
has been progressed at pace and during 2023/24 DigiRen partners collectively: 
• Helped over 86k people get online;
• Delivered 800+ digital related courses;
• Supported around 50 businesses around digital;
• Have access to over 100 online safety ambassadors through our
RenSafeOnline programme.
• Have access to almost 200 Digital Champions
• Distributed almost 700 devices / connectivity. 
25. In November, DigiRen will be hosting its first every DigiKnow(vember), 5 days
of activities to promote digital and data inclusion to help build a digitally inclusive
Renfrewshire. 
26. Over 20 partners to date, have pledged their support which will involve a series
of both online and offline events including, 1-2-1 & group sessions, volunteering
opportunities, showcases, webinars and more. 
Citizens Voice Forum 
27. Citizens Voice Forum seeks to co-design digital inclusion solutions by taking a
person-centred and place-based approach and by working with organisations
involved in delivering digital inclusion as well as those impacted by digital
exclusion. 
28. Members of Citizens Voice agreed the following priorities and updates have
been provided in the paragraphs below: 
Digital Champions Programme 
29. Digital Champions play a key role in helping people build capacity, capability,
and digital skills to help them navigate the digital world. 
30. Last year, following a successful bid via the Fairer Renfrewshire Fund, a Digital
Champion Coordinator was recruited on a 2-year temporary basis. 
Page 105 of 146

Page 110

8 
31. The post was filled in May 2023 and is hosted within Renfrewshire Libraries
(ONEREN) and continues to play a vital role in promoting digital and data equity
across Renfrewshire. 
32. To date, the project has: 
• Supported 696 Learners across 6 libraries.
• Issued 156 pre-loaded data SIMs to families from a low-income household.
• Recruited and trainee 27 Committed Digital Champion volunteers.
• Collectively delivered over 1,000 Volunteer hours. Almost 900 in this year
alone. 
33. A Digital Champions Network has now launched, and is available to all Digital
Champions, or organisations hosting Digital Champions across Renfrewshire,
which: 
• Connects Digital Champions with other Digital Champions and provide a
space for Peer-to-Peer support and networking.
• Provide up to date information to all Digital Champions or local third sector
groups and training offers.
• Provide space for organisations to request the support of other Digital
Champions in the area. 
Digizones 
34. A Digizone is a place where people can Connect, Learn, and Explore through
having online access and offers a variety of services to enhance a person’s
digital experience. 
35. Digizones will help to further strengthen our approach and help to build a
digitally inclusive Renfrewshire by building capacity, capability and awareness
of digital inclusion and help tackle loneliness and isolation by bringing people
together. 
36. This will be delivered using “a trusted face in local place” approach where
people will be able to access either a mix or all of the following: 
• Connectivity; or 
• Digital Device; or 
• Digital Skills Support; or
• Signposting – to where a person can access digital inclusion supports. 
37. A sub-group has been progressing this work at pace and during National Get
Online Week, between 14-20 October 2024, Digizones started rolling out in over
21 venues and a mobile Digizone, using the Skoob Mobile, across
Renfrewshire.
Page 106 of 146

Page 111

9 
Community-Led Secure Device Recycling Project 
38. Council and ONEREN Officers are exploring options to develop a community-
led secure device recycling project, linked to employability.  The project seeks
to provide a pathway for our citizens, communities, and businesses to recycle
their digital devices and where possible, devices will be refurbished and used
to support digital inclusion in Renfrewshire. 
Keeping People Safe, Confident and Protected online 
39. Evidence shows that if a person is not confident or motivated then they won’t
go online.  One of the many approaches adopted in Renfrewshire to help Keep
People Safe, Confident and Protected Online is via an innovative approach
through our RenSafeOnline Programme. 
40. RenSafeOnline is a collaboration between Renfrewshire Council and Get Safe
Online, the UK’s leading internet safety website, that provides unbiased,
factual, and easy-to-understand information on online safety.  Its mission is to
support Renfrewshire Council’s aspirations by taking a hyperlocal and place-
based approach using byte-sized messaging and is available to anyone living,
learning, or working in the Renfrewshire area. 
41. Lead by the Council’s Security and Compliance Manager, RenSafeOnline is
helping to build confidence, capacity, and resilience when it comes to online
safety by providing greater awareness of online scams and harms and
educating people about the various layers and preventative measures available
to keep them safe. 
42. To date, RenSafeOnline, through their internationally certified Online Safety
Ambassador programme has: 
• Recruited and trained almost 150 Online Safety Ambassadors;
• Issued monthly focussed campaigns via DigiRen Network; and
• In March 2024, Renfrewshire hosted its first ever Cyber Escape Room
Experience where over 400 people participated by completing a series of
puzzles and riddles with the aim of beating the hacker. 
Connecting Communities through Council Managed Secure Public
Access WI-FI 
43. Through Renfrewshire Council’s Connectivity as a Service Framework, our
Secure Public Access WI-FI is enabling greater collaboration opportunities in
the Digital Inclusion space.
Page 107 of 146

Page 112

10 
44. Renfrewshire is recognised as one of the best-connected regions in the UK,
with over 92% coverage of gigabit capable broadband; 
45. Once fully rolled out Free Secure Public Access WI-FI will be broadcast from
up to 180 Council venues, including in 3 town centres across Renfrewshire. 
46. Last year, the Council’s Public Access WI-FI helped connect around 60K people
to the internet and in terms of Fairness, our infrastructure now offers greater
flexibility, particularly: 
• Across our Learning Estate; by providing internet in areas both inside and
outside schools;
• Providing Internet Access TO AND THROUGH our Care Homes; 
• Providing Internet Access TO AND THROUGH our Children’s Homes; 
• Providing Internet Access in Communal Areas in our Sheltered Housing
complexes; and
• Supporting many of our vulnerable citizens within a Health & Social Care
Setting to get online; 
Smart Social Housing / Assets 
47. Renfrewshire Council has a vision for enabling Smart Social Housing across
our portfolio of 12,000 social homes to improve the health and wellbeing of our
tenants, to tackle poverty and inequalities head-on, and to enable prevention
and service sustainability at scale. 
48. Work has been accelerated at pace to determine the financial viability and
sustainability of this first-of-type invest to save model.  This could result in the
deployment of a digital bundle of superfast broadband and IoT environment
monitoring into 10,000 social homes.  This has the potential to provide the
foundation for deploying a portfolio of in-the-home digital solutions to powerfully
enable housing as a social determinant of health and to shift the balance of care
by keeping people safe, well, and socially connected in their own homes.  
Page 108 of 146

Page 113

11 
__________________________________________________________________ 
Implications of the Report 
1. Financial – none arising from the report; however, Audit Scotland publications
note the Scottish Government should consider funding priorities and funding
requirements for an updated digital strategy and plan for tackling digital
exclusion as part of medium-term financial planning. 
2. HR & Organisational Development – none arising from the report. 
3. Community/Council Planning – none arising from the report, though a key
recommendation notes the importance of public bodies building digital inclusion
into strategies and design for digital services and reform, aligned with Scottish
Digital Services Standards, and carry our equality and human rights impact
assessments. 
4. Legal - none 
5. Property/Assets – none 
6. Information Technology - none 
7. Equality & Human Rights – none arising from the report, though it notes that
requirement for equality and human rights impact assessments when building
digital inclusion into strategies and design for digital services and reform. 
8. Health & Safety – none 
9. Procurement – none 
10. Risk – none arising, though the publication referred to highlights that building
digital inclusion into strategies is key to public service reform. 
11. Privacy Impact – none 
12. COSLA Policy Position – none 
13. Climate Risk - none arising from this report, though some of the projects which
enable digital inclusion e.g. community-led device recycling project, will
positively contribute to Renfrewshire Council’s climate agenda. 
14.  Children’s Rights: none
_______________________________________________________  
Page 109 of 146

Page 114

12 
List of Background Papers: 
Audit Scotland report:  Tackling Digital Exclusion
__________________________________________________________________ 
Author:          Patrick Murray, Head of Digital, Transformation and Customer Services  
patrick.murray@renfrewshire.gov.uk
Page 110 of 146

Page 115

To: Audit, Risk and Scrutiny Board 
On: 4 November 2024 
Report by: Chief Executive 
Heading: Actions Monitoring Report - Dargavel Primary School 
1. Summary 
1.1 Following the findings of an independent review into the circumstances
of the errors in planning and delivery of primary school provision in the
Dargavel area, a SMART action plan was developed detailing the
Council’s response with a commitment that updates on this plan would
be provided to Audit Risk & Scrutiny Board meetings going forward. 
1.2 Findings by the Accounts Commission in relation to their S.102
investigation were reported to the Council on 26 September 2024. That
report included the Council’s response to the Accounts Commission,
with further work being predominantly addressed through continued
engagement and monitoring by the local external audit team through
their Annual Audit work and upcoming Best Value audit.
 
1.3 The appendix to this report provides an update in relation to the Bowles
independent review report, the Accounts Commission S.102 report, and
the actions related to the report of the Cross Party Working Group. In
previous updates, Appendix 1 detailed the position in relation to
remaining live actions while Appendix 2 summarised all completed
actions from each of the three reviews. There are no open actions
remaining, therefore only one appendix is now required and attached
detailing the completed actions. Within that appendix Members should
note that where an update has changed from that previously reported
to the Board, these are shown in italics and underlined. 
Item 7
Page 111 of 146

Page 116

1.4 Given there are no remaining open actions, with all actions either
complete or now incorporated into other reporting arrangements, it is
intended that there will be no further specific monitoring reports
provided to the Board. The Board will receive updates as appropriate
through existing monitoring arrangements e.g. risk management
updates. 
2. Recommendations 
2.1 Note the completed actions outlined in the appendix.
2.2 Note that this report will be the final specific monitoring report the Board
will receive, with updates being provided to relevant Policy Boards or
though risk monitoring arrangements. 
Implications of the Report 
1. Financial – whilst there will be significant capital and revenue
implications for the Council in resolving the Dargavel issue, there are no
financial implications for the Council as a result of this update report. 
2. HR & Organisational Development – the report outlines a leadership
development programme with a focus on key issues raised in the
independent review around governance, risk management, corporate
working and culture. 
3. Community/Council Planning – the report outlines ongoing action
being taken to develop an engagement and ongoing communication
process with affected communities. 
4. Legal – none 
5. Property/Assets – none
 
6. Information Technology – none 
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and
human rights. 
Page 112 of 146

Page 117

No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report as it is for noting only. If required
following implementation, the actual impact of the recommendations and
the mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.
8. Health & Safety – none 
9. Procurement – none 
10. Risk – the report outlines the action being taken in relation to risk
management.
11. Privacy Impact – none 
12. Climate Risk – none 
13. Children’s Rights – none 
14. COSLA Policy Position - none 
Author: Alan Russell, Chief Executive 
Page 113 of 146

Page 118

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
Bowles Report Recommendation 1
Build a more robust model of primary school need for Dargavel ‐ the Council should continue to refine its pupil forecast model for Dargavel. 
Response Objectives 
Deliver robust projection modelling for Dargavel and PMHS which: ‐ 
 considers live information arising from NHS, pupil & ELC registrations, the pace of development to date, certainty over development size and likely 
pace of future build out rate,
 utilises external data analytics and projection expertise to augment and enhance the Council’s in‐house forecasting approach to ensure modelling is 
robust, underpinned by external challenge and specialist input reflecting the complexity and significant portion of Dargavel that has yet to be 
developed out over a circa 10 year period,
 provides modelling output which considers potential future upper scenarios reflecting the high yield factors reflected in the 2023/24 P1 intake to 
inform immediate decisions on scale of capacity to be delivered as well as planning for potential additional interventions at a future time,
 delivers modelling output which provides a long‐term view beyond the anticipated completion timeline for Dargavel to ensure the long term impact of 
Dargavel is modelled and understood,
 provides modelling output over the long term which indicates both the scale, timing and shape of an anticipated peak in demand that will accompany 
a development of this scale and nature. This will provide visibility of the anticipated short‐lived peak in demand and long term settled demand to 
ensure this is appropriately reflected in estate/capacity decisions and in particular to mitigate against delivery of excessive long term / permanent 
increase in capacity that would result in excess unused surplus capacity over the long term.
 Provides modelling that can be tested and revised as necessary as new key data becomes available such as P1 and S1 registrations, actual 
scale and pace of the development and any new developments, which will continue to inform decisions on any future estate interventions if 
required. 
Page 114 of 146

Page 119

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
Complete Council modelling through to the anticipated end 
date for the housing development (2033/34) based on 
assumed 4,300 units and available live data. 
October 
2022 
Director of 
Children’s 
Services 
Completed October 2022 
Engage and appoint Edge Analytics to deliver enhanced 
modelling approach for both Dargavel primary 
requirements as well as PMHS out to 2033/34 and updated 
live datasets. 
February 
2023 
Director of 
Children’s 
Services 
Completed February 2023 including additional upper forecast 
scenarios for Dargavel non‐denominational requirements to 
support management of risk associated with long term yield 
remaining at similar level to 2023/24. Informed reports to 
Education and Children’s Services Board in March and May 2023 
Extend Edge engagement to deliver an enhanced model 
projecting out to 2038 to provide longer term forecast to 
assess the full impact on the secondary sector and allow 
identification of likely timing and scale of peak demand 
encapsulating any relevant updates to live datasets. 
September 
2023 
Director of 
Children’s 
Services 
Modelling completed which has identified an anticipated peak 
period in both primary and secondary sectors and reported to 
Education and Children’s Services Board in November 2023. 
Provide update to November Education & Children’s Service 
Policy Board. 
November
2023 
Director of 
Children’s 
Services 
Two update reports were taken to the November 2023 ECSPB: 
1. Learning Estate 
2. Dargavel Housing Development – Impact on 
Denominational Education Provision 
 
Update Edge Analytics modelling for newly released 
national Census data and expand across the whole school 
estate and establish modelling dashboard to support ease of 
updating and rapid re‐assessment of revised projection that 
will be utilised on an ongoing basis over future years, both 
for Dargavel / PMHS but also as part of the strategic 
Learning Estate programme. 
January 
2024 
Director of 
Children’s 
Services 
A detailed update was provided to the Audit Risk and Scrutiny 
Board in September 2024 to explain the timeline of events 
surrounding this action throughout the duration of 2024. In 
summary, an elongated programme of work was undertaken with 
Edge Analytics to develop a bespoke model that is suitable for a 
full school estate projection in Renfrewshire. This action is 
therefore complete with the successful delivery of this full estate 
model that incorporates the latest available national and local 
data sets. This model and the pupil projections will be presented to 
the October Education and Children’s Services Policy Board. 
Page 115 of 146

Page 120

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Bowles Report Recommendation 2
Use of Bishopton Primary - in its future plans the Council should reconsider how surplus capacity at Bishopton can be used effectively.
Response Objectives 
Consider and assess how existing capacity within Bishopton Primary School may be best utilised to support the Dargavel catchment over the immediate term 
and potentially over the longer term, taking into consideration the uncertainty and risk over the long‐term demand levels that will ultimately emerge for 
primary education from Dargavel as well as the expectation of a temporary peak period of demand. 
Provide a report to Education and Children’s Services Board setting out a clear overview as to how Bishopton PS capacity will be utilised to support temporarily 
over the short term period and how it may be considered amongst other options for use to support Dargavel in the longer term (noting that any such longer 
term use will be subject to detailed consideration and decision at an appropriate point in future years). 
Action  Target 
Completion 
Responsible 
Officer 
Update 
Complete assessment of anticipated P1 intake from 
Dargavel catchment and assess against revised DPS capacity 
availability, establish planned P1 intake capacity cap and 
anticipated P1 intake requiring accommodation at 
Bishopton Primary School. 
August 
2023 
Director of 
Children’s 
Services 
Planned use of Bishopton Primary School along with planned 
capped entry levels to Dargavel Primary School reported an 
approved at Education and Children’s Services Policy Board in 
August 2023. There will be a requirement to annually monitor 
anticipated and actual P1 intakes carefully to assess adequacy of 
short term capacity provision across both Dargavel and 
Bishopton Primary Schools to meet demand pending the second 
primary school in Dargavel coming on stream. 
Complete an exercise to assess the timing, scale and range 
of potential demand level scenarios, in particular 
understanding the scale and timing of the peak demand and 
likely settled long term demand. This information will be 
used to inform the assessment of how Bishopton Primary 
School could, if required, be potentially be utilised as an 
option in the longer term. 
January 
2024 
Director of 
Children’s 
Services 
Completion of the updated work with Edge Analytics has 
provided a view of the likely timing and length of the peak 
demand period – with peak primary demand being forecast in 
2033/34 which will fall over the second half of the 2030s to a 
more settled level. Further work is being progressed to update 
this information for the recently released 2023 census 
information and November registration data to inform an overall 
assessment. 
 
Revised roll projections for the entire learning estate are 
currently being produced. In anticipation of these, work is 
underway by utilizing current live data and matching this with 
draft roll projection data to run scenario planning for the short, 
medium, and long term capacity demand on both Dargavel 
Page 116 of 146

Page 121

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Primary and Bishopton Primary. 
 
Entire Learning Estate modelling completed and reported to 
ECSPB October 2024 and which includes a full update on 
Dargavel / Bishopton and the position short term in 2025 – 2026 
and longer term post completion of Dargavel Village 
development in circa 2033/34. 
Complete financial analysis to understand the potential 
financial context of utilising Bishopton Primary School 
Capacity 
May 
2023 
Director of 
Finance and 
Resources 
Bishopton PS is a predominantly 1960s construction and is more 
than 60 years old. This building will, along with the whole school 
estate, undergo an updated condition survey over coming 
months. Notwithstanding, given the underlying age of the 
building it will inevitably have a limited remaining lifespan 
before being considered for replacement. 
 
Existing surplus capacity if used permanently to reduce the 
required size of a second Dargavel primary school, will require to 
be replaced as part of a renewal programme. The determination 
of the timing of that will be subject to work progressed as part of 
the strategic learning estate programme. 
 
Consequently, it has been assessed that any financial advantage 
from utilising Bishopton PS will be restricted to a temporary time 
value of money benefit and consequently will be relatively 
limited. 
 
In addition, there is also a risk that utilising Bishopton PS 
permanently removes its availability to provide supporting 
capacity to manage both a temporary peak that may arise from 
upper end educational demand scenarios and longer term upper 
end demand. There could be the risk that in such circumstances if 
Bishopton capacity was no longer available this would lead to 
higher overall costs over the longer term for the Council. 
 
The financial considerations and risks were incorporated into the 
overall assessment reported as part of the Education & Children’s 
Services Board report in January. 
 
 
Page 117 of 146

Page 122

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
Set out overview in a report to the Education and Children’s 
Services Policy Board in respect to the potential long‐term 
utilisation of Bishopton Primary School which will be subject 
to detailed consideration at an appropriate point in future 
years as actual long term demand trends increasingly 
emerge. 
January
2024 
Director of 
Children’s 
Services 
Work to allow appropriate recommendation to be made is 
progressing in line with plans and scheduled to be reported to 
Board in January 2024. A paper was presented to Board in 
January 2024 
Page 118 of 146

Page 123

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
Bowles Report Recommendation 3
As the Council progresses its plans to issue supplementary guidance on developer contributions for education it should seek to learn from other Councils in 
Scotland. 
A development the size of Dargavel is exceptional and would need its own modelling techniques. However, for smaller developments the Council should create 
an evidence base to calculate specific yield factors derived from recent developments in Renfrewshire. Such robust data will ease future negotiations. 
Undertake a desk top review of other local authorities 
across Scotland and identify key best practice councils to 
engage. 
June 2023  Head of 
Economy and 
Development 
Completed 
Complete detailed engagement with identified best practice 
councils arising from desk top research 
Summer 
2023 
Head of 
Economy and 
Development 
Detailed engagement completed with Fife, Falkirk and West 
Lothian councils. 
Complete data analysis exercise of a range of datasets of 
mixed historic sites across Renfrewshire to provide 
empirical evidence to support actual pupil yields to inform 
establishment of appropriate yield factors to be used in 
future contribution policy. 
 Refresh % capacity of all schools (vs school rolls) 
 Sample research of Pupil Product Ratio (PPR) for developed housing 
sites (< 10 units) [min 10 site sample] 
 Sample research of PPR for developed housing sites (> 100 units)[min 
10 site sample] 
 Sample research of PPR for established / mature housing 
development to provide longer term perspective (eg. 15 years old) (> 
100 units)[min 4 site sample] 
 Identify individual schools where pupil capacity is above notional 
threshold (85%) 
October 
2023 
Head of 
Economy and 
Development 
Work on this is now complete, agreed new draft planning 
guidance presented to March 2024 PCC Board. 
Page 119 of 146

Page 124

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
 Identify all known undeveloped housing sites in individual school 
catchments
 [Subset of 5] identify all housing sites with current "live" planning 
application
 Identify schools where it is anticipated intervention would be required 
to increase capacity based on potential future housing to be delivered 
over next 10 years to inform likely future developer discussions.
Incorporate into the development of the draft contributions 
policy targeted to be presented to the Planning and Climate 
Change Policy Board in January 2024. 
March 2024  Head of 
Economy and 
Development 
Work on this is now complete, new draft planning guidance 
presented to March 2024 PCC Board. 
Bowles Report Recommendation 4
Council needs to work co‐operatively with BAE. Unless the Council and BAE can work together to resolve the current problems, BAE may face accusations, 
whether founded or not and regardless of Council incompetence, that it has increased its profits at the expense of Council taxpayers. 
Response Objectives 
Secure legal ownership of suitable land to facilitate delivery of a second school within Dargavel Village as well as additional land next to existing school site to 
provide increased flexibility to meet potential future extension of the school and or establishment of greater outdoor space. 
Secure legal commitment from BAE to provide land remediation and associated infrastructure requirements as part of legal agreement at nil cost to the 
Council. 
Secure as part of the legal agreement certainty on consented planning numbers and any associated adjustments to s.75 agreement to reflect revised 
agreement. 
 
Secure with BAE agreement on Heads of Terms for allow for 
mutual governance approval from each organisation to 
inform detailed legal agreement drafting and final sign off 
As soon as 
possible 
Chief 
Executive 
This was completed and approved by ILE Board end of August 
2023 
Page 120 of 146

Page 125

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
was 
targeted. 
Secure completed and signed legal missives to deliver in full 
the objectives outlined above to provide certainty and 
timing of availability of remediated and infrastructure 
proofed land to support wider school delivery planning and 
consultation arrangements that will be progressed by the 
Council team. 
August 
2023 
Chief 
Executive 
Legal missives concluded mid‐September 2023 
Proposed revisions to S.75 negotiated with BAE Systems 
were approved by ILE. Revised S.75 signed off by both the 
Council and BAE Systems to legally conclude matters. 
August 
2023 
Head of 
Economy & 
Development 
Approved by Planning and Climate Change Board August 2023 
Bowles Report Recommendation 5
Corporate working and organisational culture ‐ although I understand that the Council has sought to improve and strengthen corporate working in recent 
years, the evidence would suggest there is a long way to go; simply establishing corporate working groups is insufficient if staff are in a mindset of ‘not my 
problem’. 
The failure of management oversight, if symptomatic of the Council as a whole, would be deeply disturbing. The Council needs to consider a significant change 
programme, not just on the of issue of corporate working and personal responsibility, but also its organisational culture and values. It needs plans to build a 
stronger organisation where constructive challenge is welcomed and there is a clarity of what is expected of all of those in a leadership role. 
Response Objectives 
Provide assurance that established programme governance framework and operations of governance for other major capital investment programmes and 
specifically that the Bowles findings on the historic failings on the handling of Dargavel by officers are not representative of the Council’s current culture and 
approach to the management and delivery of major programmes. 
Page 121 of 146

Page 126

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
The Council is committed to living its values as a learning and collaborative organisation and post COVID was already in the process of re‐establishing an 
Leadership Development programme for senior leadership teams and managers across the Council in recognition that this required to be reinvigorated post 
COVID and that there has been significant turnover in management and senior positions over the past three years and this would support growing and 
maturing the current culture and collaborative connections across the organisation. 
In response to the Bowles recommendations, the objective is to ensure the new Leadership Development programme is appropriately cognisant and reflective 
of the key learning points from the Bowles report and takes the opportunity to ensure its coverage seeks to re‐enforce the development of skills related to 
governance, risk management, commercial risk, corporate working and culture etc and effectively utilises failures referenced in the Bowles report as key 
examples for learning throughout the programme. Collective reflection and learning of such significant failures – albeit historical – is recognised as an 
important element of building an effective future culture and ways of working across the organisation. 
Undertake a health check assessment on major capital 
programmes to provide reassurance in respect to all aspects 
of governance, control, reporting and management of 
programmes. 
October 
2023 
Chief 
Executive 
supported by 
CMT 
City Deal and Infrastructure and Housing Investment 
Programme Health Check report was submitted to CMT on 21 
November 2023. 
Put in place arrangements to deliver a comprehensive 
Leadership Development Programme (circa 12 months + 
programme) for chief officers and senior managers which 
amongst other things will cover and key areas referenced in 
the Bowles report in respect to governance, accountability, 
risk management, collaborative working, member officer 
relations etc. 
Commence 
programme 
by 
September 
2023 
Director of 
Finance & 
Resources 
and Head of 
HR & OD 
Contract agreed between the Council and Solace Enterprises 
to support the design and delivery of leadership 
development programmes for Chief Officers and Senior 
Managers. 
Leadership development programme focus on: 
 Personal resilience 
 Effective Communications and Elected Member Relations 
 Programme Management, Leading and 
Navigating Strategic Change 
 Risk Management and Governance 
 Transformational Leadership 
Delivering Corporate/Team Values and Vision 
 
The leadership development programmes for chief officers 
(cohort 1) and all senior managers (cohort 2 &3) are now 
complete.   
 
Page 122 of 146

Page 127

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
Design and undertake an evaluation process of the 
Leadership Development Programme for Chief Officer 
cohort to inform required changes / adjustments to 
programme delivery for next management cohort. 
March 2024  Head of HR 
and OD 
An evaluation of cohort 1 was carried out and presented 
to members in the previous report.  Cohorts 2 & 3 have 
just completed are in the process of being evaluated.  
 
Bowles Report Recommendation 6
Risk management 
From documents I have seen the Council was unaware of the scale of risk it was taking in the calculation of pupil numbers. The identified risk in Council 
documents related to providing the school on time, not that the size of the school may prove to be inadequate.  The failure to identify that risk has had two 
consequences; first the Council has been slow to react to the increase in pupil numbers and second the Council did not negotiate with BAE with that risk in mind. 
 
The Council needs to review how it both identifies risk and manages it. 
Response Objectives 
Progress actions to provide reassurance in relation to the Council’s current risk management approach, in particular how this is approached, deployed and 
managed as part of major projects as well as considering and assessing the seniority / appropriateness of officer involvement and related skills across officers 
involved in the process. 
A review of risk profiles across all service departments to 
ensure visibility of all risks and confirmation of where 
certain risks are being monitored if outwith the standard 
Risk Reports to the Audit, Risk and Scrutiny Board (i.e., 
Health and Safety Planning Groups, Service Improvement 
Plans etc) 
 
 
 
 
 
 
 
 
 
October 
2023 
Director of 
Finance and 
Resources 
Risk report submitted to Audit, Risk & Scrutiny Board as 
planned on 6 November 2023. 
Page 123 of 146

Page 128

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
A review of the ‘service risk representative’ roles in each 
service department to ensure the representatives who sit 
on the Corporate Risk Management Group are sufficiently 
involved in risk matters within the service, to feed this into 
the Corporate Risk Management Group and that they also 
have authority within the service to provide challenge as a 
‘critical friend.’ 
October 2023  Director of 
Finance and 
Resources 
Action completed. CMT agreed (10 October 2023), that each 
Director will nominate a Head of Service and one other 
colleague to support the Head of Service in the role going 
forward. 
Delivery of a project risk management workshop specific to 
the planned new primary school in Dargavel (complete) 
August 
2023 
Director of 
Finance and 
Resources 
Workshop delivered covering nature of project risks, risk 
changes over lifecycle of the project; reminder of Council 
PM framework and PMU support; key issues re good 
governance. 
Delivery of project risk management training with all PMU 
colleagues (in a train the trainer format) so colleagues are 
delivering this as part of project kick‐offs to support a more 
risk focussed culture in the organisation. 
September 
2023 
Director of 
Finance and 
Resources 
This was completed on 12/10/2023. PMU staff received a 
‘train the trainer’ session to enable them to cover running 
risk awareness sessions at project kick‐offs to support a 
more risk focused culture in the organisation. 
Undertaking a ‘health check’ of project management 
arrangements across the council to ensure governance, 
management, reporting and risk management is 
appropriate to the scale of the project. 
November
2023 
Director of 
Finance and 
Resources 
Compliance review of all PMU supported projects complete. 
All projects demonstrated a satisfactory level of risk 
governance and management. 
An update to the risk management course on iLearn and 
consideration of whether it should be a mandatory course. 
December
2023 
Director of 
Finance and 
Resources 
The course if now developed and ready to be 
launched to relevant staff on iLearn. 
In addition, face to face training of a new “Who’s risk is it 
anyway” half day course is also being delivered in 
February and May. 
Embed and deliver risk management training into the new 
leadership development programme that is currently under 
development, particularly in relation to commercial risk 
December
2023 
Director of 
Finance and 
Resources 
 
 
 
 
Session delivered 12 December 2023, and is included in 
the training programme for further cohorts. 
Page 124 of 146

Page 129

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
Reviewing governance documents to ensure delegations in 
relation to liability caps are clear and unambiguous. 
December
2023 
Director of 
Finance and 
Resources 
Consultation with Head of Corporate Governance concluded 
that governance documents do not require amendment, 
but rather, more training would be required on what was 
expected within existing delegations. The training was 
delivered to CMT on 28 November 2023. Governance 
refresher training sessions have 
been delivered to every department senior management 
team in January. 
Deliver a targeted risk management development day for 
Chief Officers:‐ 
 Project risk management (and risk simulation exercise) 
 Risk horizon scanning and sustainability (the Global Risk 
Report) 
 Liability caps and their implications. 
December
2023 
Director of 
Finance and 
Resources 
The training session has been prepared and was delivered to 
CMT on 28 November 2023. 
Page 125 of 146

Page 130

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
It is recognised that Dargavel Village has a significant 
amount of housing development yet to be delivered (circa 
2000 housing units over a 10 year period) and therefore 
many of the associated risk that existed at the beginning of 
the development continue to exist today albeit there is live 
data to inform future projections from the first circa 2,300 
units that have been delivered. Manage ongoing education 
demand risk relating to Dargavel through: 
The Council therefore continues to face risk and uncertainty 
in relation to accurately projecting the scale and timing of 
future education demand which will continue to have 
inherent uncertainty and risk. In recognition of this the 
Council will continue to progress the following actions to 
manage and mitigate this risk:‐ 
Securing robust long term demand projections which 
provide both a core projection, potential upper scenario 
and a long term view of the potential scale and timing of 
short term peak demand to inform decisions on capacity 
provision. 
September 
2023 
Director of 
Children’s 
Services 
Further updates will be completed in this respect for updated 
datasets available from November registration data and recently 
released NRS Census data. A full learning estate projection 
model has been delivered by Edge Analytics in August 2024. This 
will directly inform this action.   
Identify now a range of flexible options that are and will 
remain available to in future years to deliver, if required 
additional capacity (both temporary capacity and 
permanent long term capacity) to ensure the Council can be 
reassured of being able to respond appropriately to the 
potential for upper end demand scenarios and or 
temporary demand peaks to emerge. 
January 
2024 
Based on data and a range of scenarios, flexible additional 
capacity options have been outlined and shared with relevant 
boards. 
Page 126 of 146

Page 131

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
Establish process and arrangements to support and provide 
detailed monitoring and updates to projections for updates 
to actual data sets to facilitate a continual re‐assessment of 
longer term trend and likely requirements / decision point 
required in relation to deployment of potential additional 
interventions. 
January 
2024 
A schedule is in place with timelines for detailed monitoring and 
updates to projections and actual data. This will ensure continual 
re‐assessment of long term trends and likely requirements / 
decision points required. 
Work has commenced to map out the next iteration of roll 
projection release for 2025 with Edge Analytics. This will inform 
what data sets are required and set a road map and responsibility 
matrix for who is accountable for obtaining and collating each 
data set or model input. This also requires input form the Head of 
Economy & Development to factor in the next iteration of the 
Housing Land Audit (HLA) to the projection model.  
 
Bowles Report Recommendation 7 
Whilst protecting the integrity of the planning process, the Council needs to ensure the appropriate involvement of members in such developments. 
Additional Council Motion 
Council agrees that in light of the Independent External Review of Dargavel that there is a requirement to convene a cross party body to discuss and review 
existing governance arrangements of Renfrewshire Council. 
Response Objectives 
Assess the extent to which major investment projects have provided sufficient engagement with elected members through both formal governance routes as 
well as through briefing sessions, engagement sessions, group presentations, site tours etc. Identify any adjustments or improvements required moving 
forward. 
Provide officer support to a cross party group to of elected members to agree the remit and progress a discussion and review of the Council’s formal 
governance arrangements in line with the motion approved. 
Carry out an assessment of the Audit Risk and Scrutiny Board against CIPFA’s published good practice guide for audit committees. 
Page 127 of 146

Page 132

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
Undertake a health check assessment on major capital 
programmes to provide reassurance in respect to extent to 
which elected member involvement has been appropriately 
secured through formal governance reporting as well as via 
other appropriate informal engagement routes 
October 
2023 
Chief 
Executive 
supported by 
CMT 
City Deal and Infrastructure + housing Investment Programme 
Health Check report was submitted to CMT on 21 November 
2023. Other programmes to be reported to CMT through regular 
scheduled portfolio update sessions. 
Support Council Leader and other nominated elected 
members to determine a review remit, progress the review 
and develop suitable recommendations. 
March 2024  Head of 
Corporate 
Governance 
The Cross Party Working Group was established and met five 
times. A report was submitted to the Council Meeting on 29 
February 2024 setting out the findings of the review. The 
recommendations were agreed by Council. 
Carry out an assessment of the Audit Risk and Scrutiny 
Board against CIPFA’s published good practice guide for 
audit committees and identify any recommendations for 
change in remit or operational arrangements. 
December
2023 
Director of 
Finance and 
Resources 
The self assessment is complete with recommendations for 
improved clarity of roles and remits agreed by the ARSB, with 
formal final approval agreed by Council in May 2024.  
 
Bowles Report Recommendation 8 
Public confidence 
These recent events and the matters described in this report will dent public confidence in the Council. The Council should work in an open and transparent 
manner in the resolution of these issues and particularly with the residents of Dargavel, who have legitimate concerns about the implications for their children 
during both their primary and secondary education. 
Response Objectives 
The key aim has been to provide straightforward messaging and up to date sitreps to ensure publics (and council representatives) have the most up‐to‐date 
position and the complexity of the issue is explained in a simple and honest way and that parental/carer concerns in respect to the school and educational 
environment are able to be appropriately discussed through structured engagement arrangements with the parent councils with appropriate agreed actions 
taken forward. 
The strategy has been designed to: 
− Improve the flow and regularity of information to parents and carers and the wider Dargavel community, so they are first to hear about decisions 
impacting their community. 
− Ensure parents and carers have access to all projection data available to the council. 
Page 128 of 146

Page 133

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
− Introduce direct communication channels with Dargavel residents, enabling all sections of the community to engage on matters that are important to 
them and making sure the latest information is accessible and easy to find. 
− Provide residents with a feedback loop to enable them to ask questions of the council in relation to the development and have questions answered 
quickly. 
− Include the community in formal planning and design of a new primary school and high school extension. 
It is recognised that effective communication and engagement is important to building a new relationship between the Council and the Dargavel community, 
but ultimately it will take the delivery of the solution and investment in long term engagement to reduce local anxiety and fully rebuild trust and confidence in 
the Council. 
Develop communication plan to drive tactical engagement, 
ensuring the Dargavel community and specifically parents 
and carers kept updated on progress and the decisions 
being made by Council Boards. 
November
2022 
Head of 
Marketing 
and Comms 
The strategy has directed media and stakeholder engagement in 
relation to council decisions pertaining to Dargavel, the initial 
announcement and short‐term mitigation arrangements, and the 
publication of the Independent external review by David Bowles. 
The specific activities delivered include: 
 Arranging and hosting two parent and carer meetings, 
attended by council officers and more than 220 parents or 
carers. 
 Attending several parent council meetings with all primary 
schools and PMHS to support direct engagement, discussion 
on key activities, immediate estate decisions in respect to 
deployment of modular classrooms and post occupancy 
adjustments at Dargavel Primary, sharing and discussion of 
revised projection data and modelling, key council decision 
points, independent review outcomes. 
 Attending several community meetings from community 
council, Community Liaison Group as well as supporting 
coordination and delivery of wider community representative 
Page 129 of 146

Page 134

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Action  Target 
Completion 
Responsible 
Officer 
Update 
round table session to maintain ongoing engagement, 
sharing of information and data sharing. 
 Updating parents and carers at Dargavel Primary on progress 
and all reports to Council Boards and decision making in 
relation to immediate solutions to address capacity issues at 
Dargavel/ 
 Updating Bishopton Community Council on progress above. 
 Responding to media enquiries, requests for interview and 
ensuring the media were proactively updated on progress. 
 Ensuring the wider area stakeholders were kept up to date 
on progress – this includes community representatives, wider 
Parent Council groups and local and national politicians. 
 Maintaining updated information on the council website 
 Delivered a creative partnership with Glasgow School of Art 
and Dargavel Primary School to support pupils design the 
interiors of the new modular classroom block. 
Deliver a revised comms and engagement strategy to 
coincide with the return to school period along with timing 
of key milestone points in relation to post independent 
review and moving towards confirmation of progress with 
BAE systems and moving more significantly into a delivery 
phase. This will ensure long term engagement process 
continues to build pro‐active and positive engagement to 
continue to re‐establish trust and confidence across the 
Dargavel community. 
August 
2023 
Head of 
Marketing 
and Comms 
Action Completed. The Dargavel communication and 
engagement strategy was implemented in October 2022 and 
reviewed and following the publication of the Bowles Report. 
The strategy covers engagement throughout the development 
of long‐term solutions to increase primary and secondary 
capacity. 
The strategy: 
 Improves the flow and regularity of information to parents 
and carers and the wider Dargavel community, so they are 
first to hear about decisions impacting their community. 
Ensure parents and carers have access to all projection data 
available to the council. 
 Has introduced new direct communication channels with 
Dargavel residents, enabling all sections of the community 
to engage on matters that are important to them and 
making sure the latest information is accessible and easy to 
find. 
 
Page 130 of 146

Page 135

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
 Provides residents with a feedback loop to enable them to 
ask questions of the council in relation to the development 
and have questions answered quickly. 
 Includes the community in formal planning and design of 
a new primary school and high school extension. 
 
Establish a new parent council liaison group to provide a 
single PC forum (at the request of PC chairs) to provide a 
streamlined opportunity for consistent engagement and 
communication with the whole PC community for all 
schools associated with Dargavel / Bishopton and PMHS and 
all feeder primaries. 
August 
2023 
Head of 
Education 
Group has been established and has met following school 
summer 2023 break with positive feedback from Parent Council 
Chairs with engagement to date. 
Establish regular opt‐in digital community newsletter to 
facilitate regular communication updates direct to 
interested members of the community. 
August 
2023 
Head of 
Marketing 
and Comms 
Action completed. The opt‐in digital newsletter is live. 
Establish and track key indicators of community 
sentiment. 
Ongoing  Head of 
Marketing 
and Comms 
The council has an established communication and engagement 
strategy directing communication and community engagement in 
relation the delivery of increased school provision for the Dargavel 
community. New channels of regular communication have been 
established with the community and the effectiveness of those 
channels is regularly assessed. The statutory consultation process 
was assessed by The Consultation Institute as showing 
considerable good practice. Exit surveys are provided at 
engagement events to test ongoing effectiveness and a variety of 
tools are in place to measure engagement with communications 
and track sentiment, including an annual pulse survey.  
 
Develop, deploy (at appropriate key points post formal 
consultation period) and evaluate a community pulse 
survey to assess and track community sentiment and 
view of ongoing handling and satisfaction with delivery 
of key interventions within the community. 
Sept 
2024 
Head of 
Marketing 
and comms 
A baseline survey was completed in September 2024, and will be 
used for future tracking. The response rate was low, but findings 
show almost three quarters of respondents believe they have been 
kept informed by the Council on Dargavel school‐related issues and 
70% agree the flow and regularity of information has improved. 
Engagement was highest through the statutory consultation 
process and via attendance at public meetings. Results show that 
while communication is regular and useful, rebuilding trust will 
take time. Engagement will continue ongoing with the community 
as increased capacity is delivered. 
Page 131 of 146

Page 136

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
ACCOUNTS COMMISSION SECTION 102 REPORT – FINDINGS & COUNCIL RESPONSE/UPDATE
Community and Other Engagement 
The  council  must,  as  a  matter  of  urgency,  conduct  a 
robust and transparent assessment of the effectiveness of 
its  community  engagement  and  then  move  swiftly  to 
implement any improvements needed. 
February 2024  Head of 
Communications 
and Marketing 
Action completed. The council’s approach to engagement and the 
statutory consultation process was assessed by The Consultation
Institute as showing considerable good practice. 
A comprehensive communication and engagement strategy is in
place. Please see response to Bowles report recommendation 8
above. 
 
The Commission is particularly concerned by the council’s 
failure both to transparently consider alternative options 
in relation to expanding secondary school capacity in the 
area, and to consult or engage appropriately with the 
community, whom their decision directly affects. 
This 
engagement 
activity will 
remain 
ongoing as 
part of the 
PMHS 
extension 
project 
through to 
August 2027 
and beyond 
recognising 
the long‐term 
monitoring 
of school roll 
projections at 
the high 
school. 
Director of 
Children’s 
Services 
It is accepted that the report to the Education and Children’s 
Services Policy Board in May 2023 could have articulated the 
reasons  why  no  other  options  to  address  secondary  school 
capacity beyond an extension to Park Mains High School were 
deemed viable for detailed consideration. 
Additionally,  although  engagement  in  relation  to  updated 
school projections and developing plans for a larger extension 
to PMHS were shared and discussed with the PMHS parent 
council  prior  to  the  May  report,  plans  to  expand  this 
engagement process to a wider group to encapsulate all feeder 
primaries following the board meeting could have been outlined 
in the report and or considered earlier in the process. 
Council officers have since May 2023 been progressing positive 
and ongoing community engagement in relation to the Park 
Mains  extension,  principally  through  the  Park  Mains  Liaison 
Group which was established to provide a single engagement 
forum with representatives from the Parent Councils of Park 
Mains High School and all associated feeder primaries. 
August 2024  
This engagement process has shared and explained detailed 
pupil projection data, the underlying rationale for the proposed 
extension  decision  as  well  as  listening  and  responding  to Page 132 of 146

Page 137

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
concerns and or requests for further information from the wider 
parent and  carer community.  This included sharing detailed 
information  on  an  option  promoted  by  some  community 
representative  from  Dargavel  and  Bishopton  for  a  new 
secondary  school  for  Dargavel,  Bishopton  and  Langbank.  As 
reported through the Education and Children’s Services Policy 
Board in August 2023, such an option had significant negative 
implications from a financial, educational, value for money and 
school estate perspective that discounted it as a credible option 
for detailed consideration. 
The Park Mains Liaison Group is proving to be a highly valuable 
engagement forum, providing a single route of engagement 
across the wider community as well as a key route to assist the 
Council  to  disseminate  consistent  key  messages  and 
information  updates  across  communities  through  trusted 
Parent  Council  communication  channels.  This  engagement 
approach  will  inform  how  non  statutory  and  informal 
engagement in relation to potential school estate changes and 
long‐term strategic learning estate work may be taken forward 
in the future by the Council. 
Additionally,  high  levels  of  positive  engagement  are  being 
secured  as  part  of  the  space  planning  process  for  the  new 
extension, supporting active parental and carer participation 
and influence in the design process of the new extension and 
wider changes to the school that are planned to be delivered. 
This is increasingly building a positive community commitment 
and level of direct participation in the delivery of the school 
extension and improvement project. 
Page 133 of 146

Page 138

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Director of 
Children’s 
Services 
The review of the Council’s engagement strategy as referred to 
above will include a qualitative assessment of the effectiveness 
of the Park Mains Liaison Group. 
Lastly, work is being progressed by officers to research how 
other  councils  have  approached  school  extension  projects, 
where a statutory consultation process is not required. The 
objective of this work is to inform the design of a framework to 
inform any future approach to early informal engagement that 
can  be  adopted  by  the  Council  in  relation  to  school  estate 
considerations or changes. 
Desk top work completed to date has identified a mixed picture 
with several councils having adopted a similar approach to that 
employed by the Council for the PMHS extension. However, 
there  are  some  examples  of  the  use  of  published  options 
appraisals as part of Council reports and identified examples of 
planned informal engagement strategies deployed as part of 
long‐term strategic school estate planning which provide some 
good practice approaches for reference. 
These individual elements of good practice that are evident 
across other councils can be collectively brought together and 
used  to  inform  and  guide  the  development  of  a  proposed 
framework for use by the Council in its future learning estate 
strategy (where appropriate this will pay due regard to the 
Scottish Government guidance on informal engagement that 
may occur prior to a statutory consultation process). 
In completing this work consideration will be given to sharing 
the output across the local authority sector given what appears 
Page 134 of 146

Page 139

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
to be a level of mixed and inconsistent approaches deployed 
across the country. 
We note that the new primary school is subject to a full 
public consultation. 
We expect the council to engage meaningfully with the 
community  on  this  issue,  and  other  decisions  on  the 
school estate. 
Again, we ask that the Controller monitors this situation, 
and reports to us in June 2024 on progress and earlier if 
necessary. 
Consultation 
process has 
completed as 
reported to 
the Education 
and Children’s 
Services Policy 
Board in May 
2024 
Director of 
Children’s 
Services 
The Education and Children’s Services Policy board approved 
the planned consultation programme in January with a report 
on the outcome of the consultation planned to be brought back 
to Policy Board in May. 
A  full  programme  of  planned  consultation  and  engagement 
activity has been developed with input from the Institute of 
Consultation  to  bring  to  the  design  process  experience  of 
recognised best practice deployed across the UK. 
Full details of the planned consultation process and activity will 
be provided to the external auditors as well as the opportunity 
to observe any of the planned information events and or formal 
consultation meetings. 
The  consultation  has  now  been  completed  with  817 
respondents  to  the  online  questionnaire  and  a  further  150 
attending the events which were held: 
6 informal drop in sessions 
4 Information exchanges 
2 public meetings 
Meetings with Parent Councils of both primary schools 
Meetings with staff and children from both primary schools. 
Education Scotland also engaged with the community and 
produced their report of their findings. 
A final consultation report has been finalised and presented to 
the Policy Board in May 2024 with approval granted to 
construct a new primary school on the recommended location. 
Page 135 of 146

Page 140

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Learning Lessons and Building Capacity 
While the council’s initial response to the Bowles report 
was high level, we are assured by the Controller that its 
action plan in response is now sufficiently detailed and 
includes SMART objectives 
It will be important that this action plan is well‐managed 
by  senior  officers  and  closely  scrutinised  by  elected 
members of the council. 
Complete  Director of 
Finance and 
Resources 
This action plan and subsequent action plan relating to the s102 
report are closely monitored and reported to each cycle of the 
Audit, Risk & Scrutiny Board. 
However, there are still significant uncertainties relating 
to 
 the capacity needed in the long term, and 
 to the completion of the two building projects – 
the new primary school and the secondary school 
extension. 
We  therefore  request  that  these  matters  are  closely 
monitored in the annual audit work, and the Controller 
uses her powers to report any slippage or other issues to 
us if necessary. 
March 2024  Director of 
Children’s 
Services 
Managing the Risk of Future Capacity Uncertainty 
The inherent uncertainty in relation to long term (15 year) pupil 
growth projections has been widely reported by the Council 
over the past year as an ongoing risk through both formal board 
reports,  as  well  as  engagement  and  communications  with 
communities and in sharing data and reports with the external 
auditors. This is particularly recognised by the Council in the 
context of Dargavel Village having approximately 10 years of 
development still to deliver before achieving completion. It has 
also been trailed that the Council’s projection work to date with 
Edge  Analytics  has  identified  an  expectation  of  a  peak  in 
demand to be reached which will then fall to a stabilised long‐ 
term level of demand – a similar pattern of demand growth has 
been  evidenced  across  other  similar  long  term  community 
growth areas in the UK. 
The Council will regularly monitor actual pupil numbers and 
update long term projections on a regular basis over coming 
years as a key response to being able to pro‐actively manage 
this risk moving forward. 
Page 136 of 146

Page 141

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
This monitoring process will be key to assess the extent to which 
actual  demand  and  revised  projections  is  or  is  not  tracking 
against the current projections that have informed the planned 
capacity levels that will be delivered by the current learning 
estate interventions and provide early indication of any risk of 
material  deviation.  The  planned  annual  monitoring  and 
updating approach that will be deployed over coming years will 
be shared with the External Auditors as required. 
Long  term  projection  work  completed  to  date  has  already 
modelled a range of potential demand scenarios for the primary 
sector and identified an expected peak of demand in 2033/34. 
Options that can be considered for deployment in future years 
to  manage  upper  demand  scenarios  that  would  exceed  the 
planned capacity being delivered for primary sector education 
within  Dargavel  village,  have  already  been  identified  and 
reported through the Education and Children’s Services Policy 
Board  in  November  2023  and  shared  with  community 
representatives. 
Should the monitoring arrangements over the coming years 
highlight projection of sustained demand trending towards the 
upper demand scenarios, an appraisal will be required to assess 
which of the options is most appropriate for consideration to be 
deployed to meet the scale and nature of the additional future 
demand. This process will include early community engagement 
with school communities and will require timely assessment 
and associated decision making to allow planned delivery of any 
additional intervention well ahead of the developing need. 
In  relation  to  the  secondary  sector,  the  impact  of  higher 
demand scenarios will take longer to emerge (mid to late 2030s) 
and similarly it has been well trailed in Council reports and with 
Page 137 of 146

Page 142

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
the  community  that  long  term  monitoring  and  projection 
modelling  may  identify  the  need  to  consider  options  at  an 
appropriate  future  point  in  time  in  respect  to  any  further 
intervention and or decisions in relation to secondary sector 
provision across West Renfrewshire. 
Similarly, the long‐term monitoring arrangements will facilitate 
early  identification  of  such  risks  and  will  support  early 
engagement  with  the  appropriate  primary  and  secondary 
schools  that  may  be  impacted  by  any  future  school  estate 
changes. 
 
Annual update in relation to all modelling projections has been 
reported to the Education and Children’s Services PB in October 
2024 as part of a report covering the whole school estate – this 
action is now complete and will form part of the business as 
usual Schools Estate Strategy work. 
 
Delivery of New School Facilities 
It has been recognised by the Council that as a result of the very 
late identification of the significant under‐capacity problems 
within both the primary and secondary sectors serving Dargavel, 
the Council has since late 2023 been operating within a highly 
compressed non‐typical timeline to undertake all the associated 
capacity  planning,  land  assembly,  community  engagement, 
statutory  consultation,  space  planning,  procurement 
arrangements before moving into project delivery in order to 
achieve  operational  delivery  of  the  new  facilities  by  August 
2027. 
In broad terms, the Council is seeking to achieve all that is 
associated with the long‐term strategic planning, engagement, 
consultation and operational delivery of a new school and major 
extension of a secondary school in a 4 ½ year period, when such 
an end‐to‐end process would normally run over a much longer 
period – a timeline of around 6‐8 year would not be an untypical Page 138 of 146

Page 143

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
period  of  timeframe.  Consequently,  the  Council  is  parallel 
running several activities that would in most circumstances be 
delivered in a broadly consecutive manner. 
The  Council  has  established  governance,  programming,  and 
resource arrangements in place to support the delivery of the 
new primary school and secondary school extension over the 
remaining 3 ½ year period through to the operational target 
date of August 2027. 
To date the external auditors have not undertaken any detailed 
scrutiny  of  the  delivery  programme  or  the  arrangements  in 
place. To provide assurance officers will provide a full overview 
of the current arrangements for the external auditors for their 
review and will support whatever audit work is required to allow 
them to assess the Council’s current approach. 
Impact on Service Provision 
We note that the council has assessed that currently there 
has been no detriment to either teaching delivery or pupil 
education in the Dargavel and Bishopton areas from the 
interim measures introduced. 
We consider it critical that the council reports the results 
of  these  assessments  publicly,  regularly  and  in  an 
accessible  way,  to  maintain  and  rebuild  community 
confidence. 
Ongoing as 
part of the 
Service’s 
Quality 
Assurance 
Framework 
Ongoing and 
will be 
incorporated 
into parent 
and school 
Director of 
Children’s 
Services 
Head of 
Marketing and 
Communications 
Renfrewshire Council has a robust Quality Assurance framework 
involving regular meetings with Education Managers and school 
staff and planned school visits which focus in on the national 
quality assurance indicators (reviews). 
DPS had a visit in January as part of this process where key 
strengths under the national Quality Assurance indicators from 
How Good is Our School were evaluated, self‐improvement and 
self‐evaluation and Learning, Teaching and Assessment and a 
report was produced. In addition, Bishopton Primary School and 
Park Mains High School were both recently inspected by HMI, 
receiving very positive reports. 
Page 139 of 146

Page 144

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
newsletters at 
appropriate 
points. 
Further, every school submits a school improvement plan and a 
school improvement report (published on website) and their 
evaluations under the 4 key Quality Indicators (QIs) of their 
performance, based on data gathered through self‐evaluation, 
HMI visits, internal visits and stakeholder input is submitted to 
Children’s Services in April. 
These  are  shared  with  the  parent  councils  and  will  also  be 
published on the school website as part of the self‐evaluation 
process. This is in line with Education Scotland guidelines, the 
National Improvement Framework and statutory requirements. 
This communication with parents will be an ongoing process. 
The Commission is also concerned at the possible wider 
impacts of the council’s failings regarding the estimation 
of pupil numbers and whether this has had any impact on 
services provided by the council in the Dargavel area. 
We request that the Controller seeks further information 
on these issues so that we can understand the work that 
the council has done to understand these impacts. 
In line with 
requests 
emerging 
from defined 
audit 
programme to 
be set by 
Azets 
Chief Executive  Full details of all the additional areas of potential service 
impact (noted below) considered by the Council have been 
shared and discussed in detail with the External Auditor to 
support the Controller of Audit’s follow‐up report to the 
Accounts Commission. 
Support to Schools 
Early Learning & Childcare Provision 
Children’s social Care support 
NHS Service Provision & facilities 
Community Leisure & Recreation within wider Masterplan 
Transport & Active Travel Infrastructure Provision 
Public Bus Transport Provision 
Page 140 of 146

Page 145

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
Financial Management and Consequences 
The financial impact of these failings on the council is 
significant. The council capped the risk and contributions 
from BAE Systems under the Section 75 agreement, and 
as a direct result faces estimated net additional capital 
costs of £60 million, to be met by borrowing. This is a 
substantial sum of public money. The council needs to 
clarify the opportunity costs of this in terms of its overall 
capital programme. The council projects that it will have 
a revenue budget deficit of up to £50 million by 2026/27 
and will need to make difficult decisions on prioritising its 
spending, compounded by the financial consequences of 
this issue 
The council has recently negotiated a transfer of land 
from BAE for the construction of a new primary school. 
The Controller’s report indicates that this was in exchange 
for amendments to the extent and composition of the 
housing units for which planning permission has been 
granted. 
Given the reported determination of BAE to fully protect 
their commercial interests in the development, and the 
absence of alternative solutions for the council, it will be 
important to ensure and demonstrate that this exchange 
represents Best Value for the public purse. 
Ongoing 
March 2024 
Director of 
Finance and 
Resources 
Head of 
Economy and 
Development 
The Council will be required to manage the financial impact of 
the unplanned  delivery  of a new primary school and larger 
extension at PMHS through the delivery of its wider financial 
strategy  and  any  opportunity  costs  articulated  as  part  of 
developing and delivering that strategy. Regular reports with 
regards  the  Council’s  financial  position  and  outlook  are 
provided to Council, which include the financial consequences 
of the Dargavel failings. The next report to Council updating the 
financial outlook will be in September 2024. 
The financial and wider factors considered by officers as part 
of the negotiation process with BAE systems to secure the 
associated  land  agreement  and  adjustments  to  the  S.75 
agreement have been shared with the external auditors.  
Council Leadership, Governance, and Culture 
The  council’s  action  plan  will  be  hugely  important  in 
further  embedding  improvements  in  this  area.  In 
particular, the following elements must be progressed 
urgently and transparently: 
February 2024 
and ongoing 
in relation to 
the outcomes 
Director of 
Finance and 
Resources 
This report and combined action plan provides the Audit, Risk & 
Scrutiny  Board  with  an  overarching  view  of  all  progress 
associated with the Dargavel issue, subsequent investigations, 
reviews and agreed actions. 
Page 141 of 146

Page 146

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
• the council’s review of its scrutiny arrangements against 
CIPFA good practice guidelines 
• the council’s review of its approach to risk management 
• the council’s leadership development programme for 
officers. 
To be satisfied of progress in these areas, the Commission 
requires  the  Controller  to  request  further  information 
from the council on the scope and timing of these actions, 
and  report  back  to  the  Commission  in  the  update 
requested for June 2024, or earlier if she thinks necessary. 
We also expect these issues to be covered in the 
accelerated Best Value report. 
associated 
with each 
action. 
The Commission is also concerned about the culture of 
the council and whether it has truly learned the lessons it 
needs to. 
We expect organisational culture to be an area of focus in 
the accelerated Best Value report. 
In particular, we request an update on whether the 
 culture of the organisation is appropriately open 
and transparent, 
 encourages continuous improvement, 
December 
2024 (ie the 
confirmed 
timescale for 
BV audit work 
to conclude) 
Chief Executive  The  Council’s  auditors  concluded  that  the  Council  has 
appropriate  governance  arrangements  in  place  with 
improvements  over  the  years  in  member  and  officer 
relationships and effective leadership overall and were satisfied 
through  their  detailed  audit  work  that  the  Council  had 
demonstrated that the governance failings identified by the 
Bowles report were limited to the historic handling of Dargavel. 
The  auditors  did  not  highlight  any  concerns  over  the  wider 
organisational  culture  in  the  Council  or  in  its  approach  to 
managing major capital programmes but did identify that the 
role of the Audit, Risk and Scrutiny Board in ensuring effective 
scrutiny is not sufficiently clear.  The Council has recognised this 
and has completed a review of the Audit,  Risk  and  Scrutiny 
Board  governance  and  operating  arrangements,  with 
recommended  changes  being  agreed  by  the  Board  and 
subsequently by full Council.  
 
Page 142 of 146

Page 147

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
 effective  joint  working  between  officers  and 
members,  effective  scrutiny  and  challenge 
(especially by elected members), and 
 engagement and discussion with stakeholders. 
In addition, we request an assessment of 
 whether it has the right skills in the right places to 
deliver on its responsibilities, and 
 whether issues are escalated to the right level. 
Despite the finding of the Council’s auditors, the Commission 
has expressed concern in relation to the Council’s culture and 
have sought further assurances in relation to a wide range of 
organisational issues. 
It has been confirmed that consideration and assessment of 
such  issues  will  form  part  of  the  planned  Best  Value  Audit 
process and subject to confirmation of the planned detailed 
best value audit programme. 
Council  officers  will  provide  all  the  necessary  support, 
assistance,  and  information  to  allow  the  audit  team  to 
appropriately assess all key areas of interest and are actively 
progressing an internal self‐assessment and evidence process to 
support this element of the audit engagement in due course 
over the anticipated 2024/25 audit programme. 
Finally,  the  Commission  notes  that  the  auditor  has 
concluded  that  the  council  has  obtained  appropriate 
external legal advice and determined there is no potential 
for any form of action against former senior employees 
involved in the Dargavel School decision‐making. 
In addition, no disciplinary action has been taken against 
any senior officer involved in decision‐making relevant to 
the Section 75 approval process for the Dargavel Village 
development. 
The  Commission  accepts  that  these  are  management 
issues. 
March 2024  Head of 
Corporate 
Governance 
No senior officers involved in the Dargavel S.75 decision making 
process and identified in the Bowles Report remain employed 
by the Council or remained employed at the time of the Bowles 
report publication. In this context no senior officer could be 
subject to any form of internal Council disciplinary investigation 
or action. 
Full details of the process of consideration and legal advice that 
was sought regard to any other form of external legal action has 
been shared with the local external audit team as requested by 
the Commission. 
Page 143 of 146

Page 148

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
However, we request that the Controller asks the council 
for further information on the process followed and 
factors taken into account by the council in considering 
disciplinary action against staff involved. 
In addition, and looking forward, the Commission asks for 
information on 
 the council’s approach to performance 
management and 
March 2024  Head of HR & 
OD 
A full package of information in relation to current HR policies 
and procedures and future planned revisions has been 
provided to the external auditor. 
 
In June 2024, the Council in consultation with key 
stakeholders and trade unions revised both its people, 
performance and talent policy and discipline policy.   
Additional guidance and training is currently being developed 
for managers and employees, with an expected role out in 
the Autumn 2024. 
 its current policy on disciplinary action,   
so we can be assured that appropriate arrangements are 
in place to ensure that staff have the necessary skills and 
that  senior  officers  are  properly  accountable  for  their 
areas of responsibility. 
Page 144 of 146

Page 149

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
CROSS PARTY WORKING GROUP AGREED ACTIONS
Refresher training for management teams across all of the 
Council’s  directorates  on  the  operation  of  delegated 
authority should be implemented. 
April 2024  Head of 
Corporate 
Governance 
and 
Chief Auditor 
Training was delivered to all directorates by the Head of 
Corporate Governance and the Council’s Chief Auditor in 
January 2024 to Chief Officers and tier 3 managers. A further 
“catch up” session was held on 23 April 2024. 
Refresher training for management teams across all of the   
Council’s directorates on the operation of the Protocol for   
Relationships between Political Groups, Elected Members   
and Officers should be implemented.   
That the Bulletin be issued with the minutes of each Council 
and board meeting for the meetings of Full Council. 
May 2024  Head of 
Corporate 
Governance 
The Bulletin is now issued with the minutes pack at each Full 
Council Meeting commencing with the meeting of 9 May 2024. 
All major projects and programmes will report to the 
appropriate board at least twice a year. 
Any such reports will include a note of all project groups 
involved. 
May 2024  Chief Executive  Update reports on City Deal Projects and cultural Infrastructure 
programmes have gone to boards in December and February 
respectively as part of twice yearly reporting cycles. Housing 
investment programme update provided as part of update 
report at each cycle with an additional full update provided in 
august of each year. 
The content of the Protocol for Relationships between 
Political Groups, Elected Members and Officers be refreshed. 
February 
2024 
Head of 
Corporate 
Governance 
The Revised Protocol was approved at the Council Meeting of 29 
February 2024 
A health check of all major projects will be completed and 
reported through the Audit, Risk and Scrutiny Board 
March 
2024 
Chief 
Executive 
This has separately been reported to the ARS Board as part of the 
independent review action plan 
A  structure  chart  for  all  Council  directorates  should  be 
prepared and circulated to all Elected Members. This should 
be regularly updated and recirculated as necessary. 
March 
2024 
Chief 
Executive 
The structure chart was circulated to all Elected Members, and 
the first updated version was issued in March 
That a Chief Planning Officer report brought to the Planning 
and Climate Change Policy Board at least twice a year advising 
on the position in respect of s75 Agreements. Planning 
applications, or where officers cannot not reach agreement 
May 2024  Head of 
Economy and 
Development 
Arrangements have been put in place by officers for this bi‐ 
annual reporting 
Page 145 of 146

Page 150

APPENDIX 
Action Plan Response Monitoring (Completed Items) – November 2024 
on substantive matters in a specific s75 Agreement 
negotiation will also be brought back to the Board for further 
consideration. 
The outcome of the management training programme will 
be reported to the Audit, Risk and Scrutiny Board 
Sept 
2024 
Director of 
Finance and 
Resources 
and Head of 
HR & OD 
The evaluation of Cohort 1 (Chief Officers) has been completed 
and feedback presented to the Council’s Corporate Management 
Team.  Generally, the feedback from this cohort indicated a high 
level of satisfaction with the programme overall. Collaboration 
with other colleagues during the programme featured strongly 
with learning through shared experiences. There was positive 
feedback around learning from colleagues, strengthening 
networks across services and shared experiences, which will 
create consistent approaches around best practice. Some 
feedback was received around the content being more 
‘Renfrewshire’ specific, including organisational challenges and 
use of case studies.    
 
Cohorts 2&3 have recently completed their training and are in 
the process of being evaluated.  
 
 
Page 146 of 146