Renfrewshire Council · 20 May 2024
Back to Audit, Risk and Scrutiny Board — 20 May 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 20 May 2024
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Risk Report, May 2024
___________________________________________________________________
1. Summary
1.1 Each year the Board considers and approves the council’s risks.
1.2 This paper sets out the latest position in managing the council’s risks, on entering
the new financial year. The appendices attached provide details of:
• 1: longer-term or imminent strategic risks
• 2: longer-term significant corporate risks
• 3: service risks
• 4: assurance levels for business-as-usual risks
________________________________________________________________________________ 
2. Recommendations
2.1 It is recommended that the Board approves the report.
_________________________________________________________
3. Background
3.1 The key areas of risk
previously reported to the
Audit, Risk & Scrutiny Board in
November 2023 were:
Strategic Risks:
Very High Economy  
Very High Reducing inequalities
High Migration and asylum related impacts
High Global environmental sustainability and
route to Net Zero
High Strategic sustainable planning for people
and assets 
Corporate Risks:
Very High Successful Cyber Attack
Very High Financial sustainability 
High     Asset management
High     Commercial vehicle & operator’s license
High     Financial Stability
High     Delivery of the Dargavel solution
High     Organisational learning from Dargavel
High Workforce planning, recruitment, and
retention 
Moderate RAAC and the school estate
Moderate Programme and project management
Moderate National Care Service -governance and       
financial implications

Page 2

3.2 The strategic and corporate risk profile for the council in terms of its longer-term or
imminent risks was as shown by the matrix below: 
Evaluation: Low Moderate High Very High Total
LT or Imm Strategic Risks: 00 00 03 02 05
LT or Imm Corporate Risks: 00 03 06 02 11 
3.3 Risks are evaluated using the Council’s adopted risk matrix; this involves multiplying
the likelihood of a risk occurring by its potential impact. Risks are then evaluated as
either ‘low’ (green), ‘moderate’ (yellow), ‘high’ (amber) or ‘very high’ (red). 
3.4 It was noted in November that all service departments were revisiting their risk
profiles, especially following the integration of Housing Services into Environment,
Housing and Infrastructure services and that this activity was work in progress, to
ensure good visibility of all risks across services.  This work continues with current
risks captured in Appendix 3. 
3.5 It is worth noting (as set out in a recent key white paper from Zurich Municipal) that
“Since 2020, the risk environment in which public services operate has been among
the most unpredictable and challenging in recent times. Described by some as
being the ‘perfect storm’, the combination of a global pandemic, cost of living crisis,
fuel crisis and funding pressures has resulted in inter-related and concurrent
challenges. Public service organisations, many of whom are over-stretched and
fatigued, are having to manage the demand of competing and sometimes conflicting
priorities, with limited ways of answering the questions being asked of them. Many
leadership teams have remarked that they are constantly operating in ‘crisis mode’,
unable to see a light at the end of the tunnel. There are few signs that the turbulent
risk landscape will change or become easier to navigate.” 
This ‘turbulent’ position is further supported by findings in the recent Global Risk
Report – see figure A extracted below.

Page 3

It is with this context in mind that the Corporate Management Team has approached
its regular review of the council’s risk profile, and the current risk information is
again presented to Board, setting out the key risks as we enter the 2024-25
financial year. 
3.6 Movement in risk profile since the previous risk report to Board in November 2023: 
• Risks added/ NEW
Strategic  (nothing new to report here)
Corporate
o Administering elections (CRR24.04.16 – page 36)
A UK General Election must be called by December 2024 and so with this in
mind early preparations are underway. Most council service departments are
involved in the administration of electoral events. While administering an
electoral event can result in a significant impact in terms of the council’s
reputation, the overall likelihood associated with the risk is low, given
established governance arrangements, project management approach and
experience of officers involved. The risk is currently assessed as moderate.
Service – Environment, Housing and Infrastructure
o Collection and disposal of waste upholstered domestic seating/ persistent
organic pollutants (EHI 15 – page 39)
New guidance has come into force changing the collection, storage and
disposal of waste containing Persistent Organic Pollutants which must be
separated and sent for incineration.  The impact of this could be both financial
and environmental.
o Collection management/ routing software for waste and recycling service (EHI 16
– page 40)
In looking to improve performance and maximise efficiencies in collection
management, a new waste & recycling management/ routing system is being
procured and there is a risk that during the implementation process the service
to customers may fluctuate and customers not be kept as fully informed as we
would wish.
• Risks remaining, where scoring has 
Strategic  (nothing new to report here)
Corporate  (nothing new to report here)
Service (nothing new to report here) 
• Risks remaining, where scoring has   (other than de-escalated risks) 
Strategic  (nothing new to report here)
Corporate  (nothing new to report here)
Service
o Last in block properties – from HIGH to MEDIUM  (EHI 8 – page 38)
Application has been submitted and has now been approved in principle by
Scottish Government Minister.

Page 4

• Risks escalated from service/s to strategic or corporate
o Delivering homeless duties (CRR24.04.14 – page 35)
There is a requirement to provide temporary/ settled accommodation for an
increased number of homeless applicants, Ukraine and Afghan resettlement
programmes, and those asylum seekers living in Renfrewshire receiving
positive decisions. It is becoming more difficult to fulfil our statutory duties so 
breaches may occur with an increase in rough-sleeping and reputational harm.
• Risks escalated from 'business as usual’ to strategic or corporate
(Nothing new to report here) 
• Risks removed or de-escalated to service 
Strategic  (nothing new to report here) 
Corporate  (de-escalated back to service)
o Programme and project management
Health checks have provided reassurance regarding our corporate approach
to programme and project management. The ‘moderate’ programme and
project management risk has therefore been de-escalated back to Finance
and Resource Services for monitoring in relation to arrangements for smaller
projects that might sit outside of the programme management unit’s
awareness.
o RAAC and the school estate
All inspections and checks have been completed and works are underway in
Castlehead HS to remediate. The risk is back now with Environment, Housing
& Infrastructure Services. 
Service (risk removed)
o Change to the Antisocial Behaviour etc. (Scotland) Act 2004, Part 7 (S68 1a)
This is now being actioned as “Business as Usual” for Environment, Housing &
Infrastructure Services.
• Horizon Scanning and other points of note
While not necessarily included on risk registers, there are always matters that
the Corporate Management Team will keep a watching brief on. External
sources of rich data include for example the Global Risks Report, – the survey
produced annually by the World Economic Forum in partnership with Marsh
McLennan and Zurich Insurance Group. 
Additionally, there is ongoing consideration internally of other matters that have
been raised with the Corporate Risk Management Group that are kept on the
radar. At this review, some examples included:
o The increasing use of artificial intelligence (AI)
While AI brings significant benefits in many settings, it can also bring
significant risk and challenges. Presently we are seeking to better understand
the risks this may pose to council operations and reputation, and this may
feature on future risk reports.
o Increasing public interest around the process of council decision making
This has been brought to the Corporate Risk Management Group’s attention
recently with a petition for judicial review lodged with the Court of Session in

Page 5

regard to Mirin and Milldale services. The Group will maintain a watching brief
to determine if any lessons flow from the review and new risks emerge.
o Emerging duties and current uncertainty around implications
Current examples in scope include the new equalities duty, consumer duties
and the United Nations Convention on the Rights of the Child. 
3.7 With all of 3.6 in mind, the risk strategic and corporate risk profile is therefore now
as follows: 
Evaluation: Low Moderate High Very High Total
LT or Imm Strategic Risks: 00 00 03 02 05
LT or Imm Corporate Risks: 00 02 07 02 11   
Strategic
Moderate risk Very high risk
Economy
Reducing inequalities
High risk
Migration and asylum related impacts
Global environmental sustainability and route
to Net Zero
Strategic sustainable planning for people and
assets
Corporate
Moderate risk
National Care Service -
governance and financial
implications
Administering Elections
Very high risk
Successful Cyber Attack
Financial sustainability
High risk
Asset management - ongoing
Commercial vehicle & operators license
Financial Stability
Delivery of the Dargavel solution
Organisational learning from Dargavel
Workforce planning, recruitment and retention
Delivery of homeless duties

Page 6

3.8 What is reassuring
is that in relation to
the Global Risk
Report – (image
extracted to the
right), we can see
that the top five
material risks set
out there have been
captured within this
risk report – either
as risks or matters
being kept on our
radar. 
3.9  Appendix 1 provides the detail for 05 longer-term or imminent strategic risks.
Appendix 2 provides the detail for 11 longer-term or imminent corporate risks. 
Appendix 3 provides the detail for 15 longer-term or imminent service risks.
Appendix 4 provides the assurance levels (to date) for business-as-usual risks.
3.10 The strategic and corporate risks are aligned with the council plan themes that were
approved in 2022. 
__________________________________________________________________
Implications of the Report
1. Financial 
Recurring costs associated with the measures in place for each risk are considered
proportionate to the level of risk, and new planned actions are also considered to be
cost effective. 
The financial requirements to support the risks should be met within the budget of
each relevant risk owner, nevertheless, any unplanned and unbudgeted cost
pressures that arise in relation to any of the risks identified will be subject to review
in consultation with the Director of Finance and Resources. 
2. HR & Organisational Development – not relevant to report recommendations 
3. Community/Council Planning – effective risk management supports the delivery
of all community/ council plan outcomes 
4. Legal – not relevant to report recommendations 
5. Property/Assets – not relevant to report recommendations 
6. Information Technology – not relevant to report recommendations 
7. Equality & Human Rights – not relevant to report recommendations 
8. Health & Safety – not relevant to report recommendations

Page 7

9. Procurement – not relevant to report recommendations 
10. Risk – as per the subject matter of this report 
11. Privacy Impact – not relevant to report recommendations 
12. Cosla Policy Position – not relevant to report recommendations 
13. Climate Risk – not relevant to report recommendations
_________________________________________________________
Author:          Karen Locke, Risk Manager 
05/04/2024 
Email: riskmanager@renfrewshire.gov.uk

Page 8

7 | P a g e
Appendix 1: Strategic Risks, longer-term or imminent 
• ECONOMY – building an inclusive, green and resilient economy
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.24.01.01 Economy Even before the COVID-19 crisis, the
Scottish economy was facing several
strategic challenges including climate
change, Brexit and lower than average
productivity. Likewise, Renfrewshire’s
economy was facing challenges such
as: growing the working age
population; more closely aligning the
education and skills provision with the
needs of local employers; and
achieving a strong and inclusive
economy. 
The risk therefore is that significant
economic improvement and upskilling
of local workforce is difficult to
progress until the current landscape
improves and our investment
programmes are completed
Head of
Economy and
Development 
Head of
Finance and
Procurement 
Programme
Director – City
Deal &
Infrastructure
(1) Economic Recovery Plan
(2) Capital investment such as
investment in housing and heritage
assets; supporting Scotland’s 
(3) delete?
(4) investment by identifying and
developing opportunities such as
AMIDS1 and supporting local
businesses seeking to export to new
markets
(5) Taking forward measures to counter
any education learning loss
(6) Developing skills interventions to
address the risks of unemployment,
in particular those in low-paid
employment, and parents.
(7) Support for local businesses to bid
for council contracts
(8) Support for local businesses to
become more carbon neutral
05 05 25
V.High The coronavirus pandemic  resulted in
significant challenges for economies across the
world. The UK and Scottish Governments
invested billions to support businesses through
lockdowns and furlough in order to keep
businesses viable and retain people in
employment.   Subsequently, the cost-of-living
crisis and supply chain issues have meant that
economic conditions remain challenging. 
Renfrewshire’s economy has well established
strengths in transport (including Glasgow
Airport), retail (including Braehead),
manufacturing (including significant
international exports) and construction and
major initiatives such as AMIDs are key to future
growth.  There is a risk that failure to support
economic growth will have a negative impact on
residents, businesses, and public services.
Action Codes Actions Latest Note Assigned To Date Status
CESIP22.01.02 Maximise funding for
regeneration of Renfrewshire’s
places through grant
submissions to external sources
including UK and Scottish
Governments. 
The Regeneration and Place Team have successfully been able to secure and receive funding
through various external sources.  Between 21/22 and 25/26 we have been allocated £4.4m from
the Place Based Investment Fund for capital regeneration projects. Between 22/23 and 24/25 we
have received £1.5m in funding for capital and revenue regeneration spend from the Shared
Prosperity fund.   We have consistently been successful in RCGF funding applications.  Most recent
successful application received £800k in funding for the PACE theatre project.  Four applications
have been submitted this year for the 24/25 allocation.  We have now been invited to Stage 2 for
two of these applications.  Stage 2 applications will be submitted in November, with decisions
expected in the new year. 
Head of
Economy and
Development
31-Mar-
2026 
1 Advanced Manufacturing Innovation District

Page 9

8 | P a g e
An application was also submitted this year to the Scottish Governments Vacant and Derelict Land
Investment Programme (VDLIP).  Again have been successful in progressing to Stage 2, with a
further application to be submitted in November. 
Funding worth £85k has been secured from SEPA to investigate the potential deculverting and
environmental enhancement of the Candren Burn in Ferguslie.  We have recently secured £35k
funding from Visit Scotland to develop a strategic Tourism Infrastructure Development Plan for
Clyde Muirshiel Regional Park.  Will be looking to make further applications to the Rural Tourism
Infrastructure fund in the near future.   The Regeneration team will continue to explore external
funding opportunities to help deliver our place shaping agenda
CESDP21 - 01 -
27
Monitor benefits of City Deal
Projects, including AMIDS, Clyde
Waterfront and Renfrew
Riverside and City Region wide
employment programmes.
Clyde Waterfront & Renfrew Riverside:  All required community benefits have been delivered to
date, with the rest remaining on track during the project lifespan. Project is advancing with the
completion of a new culvert and foundations of bridge structure in place. Fabrication of bridge
components is progressing with these due to arrive on site in early 2024.
Glasgow Airport Investment Area project is now complete which is enabling the development of
AMIDS
Programme
Director - City
Deal and
Infrastructure
31-Mar-
2025 
CESDP21 - 01 -
13
The transformation of Paisley
on the back of the Action Plan is
advancing at pace. Goals such
as creating an international
culture and heritage destination
and acting as a stimulus for
property investment,
development and re-use has
already been realised. 
There are a number of significant regeneration projects currently under construction nearing
completion including the restoration of the Museum, Town Hall and Arts Centre and the creation
of a new Culture and Learning Hub in the High Street.
The publication of the Paisley Vision document will also act as a further catalyst to inspire future
development in and around the town centre. The Liberal Club, which was identified as a key
building in the Vision, is currently under restoration, securing its long-term status.
The Regeneration Team will be looking to refresh our town centre strategies to reflect changes
that have taken place in a post pandemic environment.  These Strategies will align with the
guidance and principles outlined in NPF4.  We await the publication of applicable supplementary
guidance.  In the meantime, work has been ongoing in respect of outlining potential regeneration
priorities and projects.  This includes commissioning visioning work in Johnstone, a review of
potential projects in Erskine and the submission last year of a bid to the Levelling Up Fund in
respect of a project in Renfrew.  The team will continue to bring forward regeneration proposals
across our town centres.  This action carries forward into the new Service Improvement Plan but
has been widened in scope.
Chief
Economic and
Regeneration
Manager
31-Mar-
2026 
CESIP23 - 01 -
02
Work with the development
partner and stakeholders to
maximise the potential of
AMIDS for Renfrewshire
Development partner (Buccleuch) now in place with contracts being signed. Work has already
commenced to secure new leads to AMIDS with phase 1 which will deliver the next building on
site, beginning the design process.
Programme
Director, City
Deal and
Infrastructure
31-Mar-
26 
CP.22.02.01 Develop an Investment
Proposition for Renfrewshire
Two reports have been commissioned to analyse Renfrewshire’s Growth Sectors.  The first
highlighted that there are several opportunities which Renfrewshire needs to capitalise on to
support the growth of its economy further.  The second report aims to reconcile existing priorities,
Head of
Economy and
Development
31-Mar-
25

Page 10

9 | P a g e
that is clear on our economic
ambitions for place 
team capacity and skills engaged in the economic development and regeneration functions of the
Chief Executive’s Department, with the future opportunities and challenges outlined in the first
report and the Council’s Economic Strategy.  This report highlights that there is a requirement to
grow and increase visibility of Renfrewshire’s inward investment proposition to drive future
economic growth and development.  The development of a web site which signposts the area’s
investment portfolio is recommended.  Officers are now looking to progress this action in
conjunction with the Marketing/Communications team .
CP.22.02.07 Develop a Community Wealth
Building Plan for Renfrewshire 
Community Wealth Building [CWB] is at the heart of the council’s approach to inclusive economic
growth and aims to support a wellbeing economy in Renfrewshire. A new Community Wealth
Building Act is expected next year and a council framework/plan is currently being prepared. Key
actions to report are:  i)Ensuring the Council CWB plan is aligned to a regional approach with
Glasgow City Region; ii)  Reporting quarterly to the Scottish Governments Community Wealth
Building Policy Manager and liaising directly with colleagues in the SG CWB policy team;
iii)Contributing to Economic Development Association Scotland (EDAS) and Centre for Local
Economic Strategies [CLES] workshops.
As part of a Scottish Government pilot, Renfrewshire Council (Economic Development and
Procurement) were one of four local authorities to participate in a CWB project delivered by
Scotland Excel. The project involved data analysis of local spend, practice sharing workshops and a
Spotlight on Community Wealth Building from the Scottish Government’s Heads of Procurement.
Economic Development are working on a draft paper which will provide an overview of CWB
practice within the Council and will outline the Council’s key objectives and levers to maximise the
impact of CWB at a local level. In order to ensure the paper is aligned to national policy, the draft
paper will be revised to reflect the proposed new CWB Bill due to be put forward during the
current parliamentary term. [Due date pushed out – awaiting Bill]
Head of
Economy and
Development
31-Mar-
25 
CESDP21 - 01 -
03
Support and grow supply chain
management and knowledge
exchange among manufacturing
SMEs to supply Scottish / UK
businesses and global supply
chain 
A key aim of the recent Growth Sectors report is for the Council to identify opportunities for local
supply chain growth and development.  For the past 18 months the Economic Development and
Procurement teams in the council have been developing and delivering a wide range of new
supports to local businesses to encourage them to bid for public sector contracts. This builds on
existing work with the Supplier Development Programme and Business Gateway support. The
main driver of this is work around the Community Wealth Building agenda and the aim of
increasing and sustaining local economic growth and also increasing council, and other public
sector spend, in the local area. Further opportunities for local growth and development are also
being explored. [Due date pushed out – awaiting Bill]
Head of
Economy and
Development
31-Mar-
2025

Page 11

10 | P a g e
• PLACE - working together to enhance wellbeing across communities
• FAIR - nurturing bright, happy and healthy futures for all 
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.24.02.02 
Reducing inequalities in Renfrewshire
If we don’t have a
coordinated approach
to tackling inequalities
across Renfrewshire
(including for example,
the causes and
consequences of
poverty), this could
jeopardise the effort in
reducing both the
short-term impacts on
households but also
have wider long-term
consequences on
attainment and health
for people living on low
incomes. 
Head of
Policy &
Partnerships
(1) Fairer Renfrewshire Programme
(2) Attainment Challenge and Pupil
Equity Funding
(3) Strong partnership working (e.g.
Community Planning Partnership
(CPP). Advice Partnership,
Empowering Communities
Forum, Improving Life Chances,
CPP Board
(4) Community Plan identifies ‘Fair’
priorities with associated actions
relating to cost of living crisis,
addressing the impact of alcohol
and drugs, and a just transition to
Net Zero. Social Renewal Plan
has been developed through a
programme of analysis,
research, and engagement. 
05 05 25
V.High
The Council plays a key role in tackling inequalities and providing the
best possible services to our communities, particularly those who are
experiencing the poorest outcomes. As well as our focus on health
and wellbeing, we are also committed to support vulnerable
individuals, groups or communities through early intervention and
prevention, responding to poverty, supporting routes to employment
as well as dealing with welfare reforms. The pandemic is thought to
have exacerbated existing inequalities in terms of for example
educational attainment, health, poverty and mental health. There is a
significant focus on ensuring that people receive the economic and
wellbeing support that is needed, with a real opportunity to work in a
different way, and to tackle some of the existing inequalities across
communities as we do this. The current cost of living crisis impacts
disproportionately on particular groups in society.  In the short term,
significant focus is on supporting food insecurity and supporting
people on low incomes to maximise income and seek advice with
income and debt management.
Action Codes Actions Latest Note Assigned To Date Status
CESIP22.03.01 Develop the new Fairer Renfrewshire programme.
The Fairer Renfrewshire Sub-Committee has been
meeting since August 22 and a Fairer Renfrewshire
Officers Group made up of officers from across
services is meeting monthly. Work with partners to
develop the Fairer Renfrewshire Programme is
ongoing. There are four key emerging themes which
are shared across all elements of the programme,
and these are:
•Improving financial security 
•Advancing equality of opportunity 
•Building community capacity and resilience
•Listening to lived experience 
Funding has been allocated from the Fairer Renfrewshire budget to a
number of projects to support residents with immediate Cost of Living
increases. These include supports around food, fuel and advice. Work is also
ongoing around digital access and supporting residents to get online through
the Citizen Voice group, with a new post of Digital Champion in libraries has
been recruited. Our Winter Connections programme was set up to support
residents over the Winter 22/23 and 23/24 period, and has provided grants
to a number of organisations to run activities.  The development of a panel of
people with lived experience of poverty to inform the Council’s policy and
practice is ongoing. A diverse panel has been recruited and meet regularly. In
addition, officers are undertaking a ‘deep dive’ child poverty data exercise, to
support the Local Child Poverty Action Plan as well as the wider Fairer
Renfrewshire programme.
Strategic
Partnerships &
Inequalities
Manager
31-Mar-
2025

Page 12

11 | P a g e
CESIP22.03.02 Develop the Trauma Informed and Responsive
Renfrewshire Programme
Trauma Road map approved by Leadership Board in February 2024 and will
now be progressed and implemented on a partnership basis.
Head of Policy
& Partnerships
31-Mar-
2024 
CESIP22.03.03 Deliver the Stigma/Language Matters project. I am Me were commissioned to develop a suite of Stigma/Language
resources in partnership with local people with lived experienced and wider
stakeholders. Work is now underway to develop a campaign to launch these
resources over Summer 2024
[Due date amended to 30/09/2024]
Head of Policy
& Partnerships
30-Sep
2024 
CESIP22.03.09 Carry out an evaluation of the Tackling Poverty
programme and develop a transition plan for
mainstreaming this work.
Work has been underway with services to review projects and to transition
to Fairer Renfrewshire funding arrangements, 24/25 funding proposals to be
presented to Leadership Board on 1 May 2024.
Strategic
Partnerships &
Inequalities
Manager
30-Sep-
2023 
CP.22.01.09 Develop new options for services and partners to
work together more closely across localities to
provide advice and support to local people and
develop community capacity.
We are progressing new connected communities approach - considering how
we develop our ‘front door’ services for people accessing advice and
support; exploring family advice services; and developing options for locality
working.
Head of Policy
& Partnerships
31 Dec
25 
CESIP23 - 01 -
01
Deliver a participatory budgeting framework for the
Council
This year £1.2M was allocated by Environment, Housing  & Infrastructure
through their #Youdecide programme. The project delivery is well underway,
and an evaluation report is being finalised. The updated CONSUL site for
Renfrewshire is now ready to be put into use. Arrangements are being put in
place for the Data Analytics teams to manage the site in the interim while a
permanent host is agreed. A range of services have undertaken training in
CONSUL to enable potential future PB projects to take place within their
services. The planning of the £25k PB project for Johnstone Christmas event
is ongoing with a steering group including residents being formed and the
group are currently planning the initial engagement work.  
Strategic
Partnerships &
Inequalities
Manager 
31-Mar-
24 
CP.22.03.08 Take forward the recommendations of the Alcohol and
Drugs Commission
Programme continues to be implemented with 12 projects receiving funding
to date. Work is now ongoing on a project evaluation with an external
partner commissioned to support this work over Summer 2024
Head of Policy
& Partnerships 
31-Mar-
25 
CP.22.03.02 Work with partners to support Renfrewshire residents
through the cost-of-living crisis 
Fairer Renfrewshire continues to deliver range of supports with partners to
respond to the cost of living crisis.  This includes Summer Holiday Funding,
Winter School Clothing grants, schools advice etc.
Strategic
Partnerships &
Inequalities
Manager
31-Dec-
23 
CESIP22.03.07 Develop mechanisms for supporting individuals with
lived experience of poverty to influence policy in this
area 
Fairer Renfrewshire Lived Experience was established over the past 18 months,
supported by the Poverty Alliance and Star project.  The Panel has a regular
programme of meetings and has engaged with services, partners and elected
members on issues identified.  Officers will continue to work with Panel and
ensure there is a strong link to the wider Fairer Renfrewshire programme.
Strategic
Partnerships &
Inequalities
Manager 
31-Mar-
24

Page 13

12 | P a g e
CESIP23.03.02 Develop the Fair Food Renfrewshire strategy. A new Strategy Group was formed in 2023 which is chaired by the Head of Policy
and Partnerships.  Work is underway to map current provision and wider
opportunities which would be prioritised through a strategy
[Date amended 31/3/24 to 31/12/24]
Strategic
Partnerships &
Inequalities
Manager
31-Dec-
24 
CESIP23.03.01 Deliver targeted programmes of community-based
adult literacy and numeracy, ESOL, digital, personal and
social development, and family learning activities in
response to identified need and as set out in
Renfrewshire’s CLD Strategy 2021-24 (CF) 
61 courses and activities delivered across Renfrewshire between Jan-March 24,
with the following delivered weekly:
• 12 numeracy courses for adult learners and families with Fun With Numbers
and Talk, Learn & Do delivered in 2 primary and 6 early years campuses.
• 10 New Scots groups working on their languages skills and integration into the
community though Beginners ESOL classes and conversation sessions, including
a new Craft, Culture and Conversation group established for older Ukrainian
refugees in Gallowhill.
• 7 adult literacies sessions for people needing help with reading, writing,
spelling or numbers both in-person and online.
• 18 groups for learners wanting to build confidence, skills and self esteem with a
range of activities including  crafting, sewing, singing, gardening and growing
and lively discussion-based sessions including an evening tabletop gaming
sessions for autistic adults from the Lived Experience group.
• 10 digital learning groups including Get Safe Online, Digital Beginners and
Digital Life Skills supporting people access technology.
• 4family Play and Learn events were held in February on school in-service days
for parents and younger children to have fun together with games and creative
activities in Southend Action Centre, Bargarran CLD Centre and Glenburn
Learning Centre.  
Community
Development
Manager
31-Mar-
26 
CESIP23.03.03 Continue to deliver new approaches to Building
Communities and identify further new opportunities for
locality area-based support which builds community
capacity. 
“Take the Lead” was launched in May 2023 to promote responsible dog walking
behaviours, primarily to reduce instances of dog fouling within communities. 
Dog owners who sign the Pledge agree to adhere to good practices such as
picking up after their dog.  Signatories receive a free lead, mobile dog fouling
dispenser, (bags included) and bandana promoting the Campaign.  The Green
Spaces, Play Parks and Villages Investment Fund has supported 104 community
projects since its launch in 2018.  In 2023, 16 projects have been supported
including gala days, community gardening projects and community murals. 
Feedback from communities demonstrates the Team’s support is appreciated
and the funds bring neighbourhoods together, as well as deliver physical
improvements.
Community
Development
Manager
31-Mar-
26 
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation

Page 14

13 | P a g e
SRR.24.02.03
Migration and asylum related service
pressures
The pace at which asylum dispersal
and refugee resettlement has taken
place in Renfrewshire since 2022 has
been significant, and beyond
anything previously experienced. 
Partnership governance structures
have been established to enable
partners to share information and to
identify and respond to issues as
these emerge.  In the short term,
these are anticipated to be in relation
to potential pressure on local
education, health and social care
services.  There are significant
pressure on, homelessness and
housing services, given the tightness
of the current housing market locally
and on children’s social work due to
availability of foster care and
residential provision.
Head of Child
Care & Criminal
Justice  
Head of Policy
and Partnerships 
Head of Housing
Services
(1) The Migration and Resettlement
Strategic Group meets regularly to review
and discuss developments across all
migration and resettlement programmes.
This group is comprised of senior officers
from across appropriate council services.
(2) Asylum Dispersal meetings are held once
every two weeks with senior council
officers and representatives from the UK
Government Home Office and their agent
Mears.
(3) Liaison Meetings with Migrant Help are
held approximately once every six weeks
with senior council officers and other
partner organisations such as Police
Scotland and HSCP. 
(4) The Renfrewshire Community Protection
Chief Officer Group receives regular
updates on migration and asylum issues
and any emerging issues.
(5) The Renfrewshire Community Protection
Member Officer Group receives regular
updates on migration and asylum issues
and any emerging issues.
(6) Updates are provided, as required, to the
Leadership Board of the council.
04 04 16
High
Migration/ Ukraine/ Asylum programmes - this
is an area which is developing and could be a
potential major issue moving forward.
The impact of the conflict in Ukraine is
reflected within the Financial Sustainability
Risk, but only in relation to pricing volatility
and global supply issues. 
The risk here is wider ranging and includes: 
- Ukrainian Displaced Persons
- Home Office Asylum dispersal programme
– use of hotel accommodation in
Renfrewshire 
- – increase in volume and speed of decision
making
- Unaccompanied Asylum-Seeking Children –
new requirement from UK Government for
Renfrewshire to provide for children and
young people under the National Transfer
Scheme 
- Syrian/ Afghan resettlement programme
- Support to ensure effective resettlement
to New Scots
Action Codes Actions Assigned To Date Status  
Ongoing Monitoring     
• GREEN – leading Renfrewshire to Net Zero

Page 15

14 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.24.03.04
Global environmental sustainability and route to Net
Zero
(Renamed from Climate, Sustainability risk)
A key risk to the Council is that it may not
achieve its target to become net zero by
2030 in both its own operational
emissions and Renfrewshire’s area-wide
emissions.  Decarbonising our domestic
and non-domestic properties and fleet
alone will require significant capital
investment.  In terms of reducing
Renfrewshire’s area-wide emissions
there are challenges around influencing
behavioural changes, and a risk that
others do not contribute towards the
2030 target.
The climate emergency also brings a risk
to the Council in terms of increased
frequency of severe weather events may
lead to more instances of damage to
Council infrastructure and property,
interruptions to service delivery and
increased demands on services, often
with little notice. There is risk to life,
transport disruption and pollution to the
local environment, as well as impact
adversely on the local economy if
businesses are unable to operate. The
Council has a requirement to provide
immediate response and manage the
adverse effects of more frequent and
severe weather emergency situations,
including support to local communities
and businesses. 
Head of Climate,
Public
Protection and
Roads 
(1) Renfrewshire’s Plan for Net
Zero has specific objectives
to reduce emissions, and
these are included in other
key documents such as the
Council Plan
(2) Governance through the
Planning & Climate Change
Policy Board
(3) Development of Costed
Delivery Plans and a Climate
Delivery Action Plan.
(4) Sustainable Communities
Fund – to support local
people to develop
sustainable projects that will
promote or improve
community collaboration,
health and wellbeing, local
spaces, economic
development, biodiversity
and the environment.
(5) Use of an emissions
modelling tool to quantify
the impact of actions, inform
future targets and present
emissions data.
(6) A Project and Carbon
Footprint Register
04 04 16
High
Climate change is expected to continue and worsen in the
future if no action is taken, with increases to mean global
temperatures, sea level rises and the increasing frequency
and severity of weather events such as floods, heatwaves,
droughts and storms. More frequent and intense heavy
rainfall events increase the risk of soil erosion and flooding.
Severe weather is already affecting public services across
Scotland, with operational, reputational, financial and legal
consequences. There is also an ongoing impact of severe
winter weather including snowfall and freezing
temperatures which impact service delivery and the
integrity of our roads open space and buildings
infrastructure. This shift in weather patterns caused by
climate change is also affecting biodiversity across Scotland.  
Renfrewshire Council declared a Climate Emergency in 2019
and approved the target to work towards being net zero,
for both Council estate emissions and area – wide emissions
by 2030.  In 2022 the Council approved RenZero, the first
stage of Renfrewshire’s Plan for Net Zero.  This Plan sets out
the strategic framework required to work towards our
climate change targets.  The Planning and Climate Change
Policy Board oversee this work.  Actions include: leading by
example by decarbonising our estate and fleet, publishing
our Local Heat and Energy Efficiency Strategy and Delivery
Plan, maximising the carbon absorption potential of our
natural environment and supporting communities to
become more resilient to the impact of extreme weather
events.
Action Codes New Actions Assigned To Date Status
SRR.24.03.04a Continue to report transparently on our emissions to ensure that Renfrewshire’s emissions baseline is clearly
understood.
Head of Climate, Public
Protection and Roads
31-Mar-
25

Page 16

15 | P a g e
SRR.24.03.04b  Develop the Local Heat and Energy Efficiency Strategy Delivery Plan. Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04c  Identify opportunities for Partnership Delivery Models for clean energy projects such as solar and battery
storage
Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04d  Prioritise actions in relation to the biggest emissions sources, where we have the most influence, through
project pathfinder approaches for decarbonisation of domestic and non-domestic properties and vehicles to
bring scale and pace to emissions reduction.  
Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04e  Continue to work with stakeholders to articulate the potential costs and skills required to reach our net zero
target.
Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04f  Continue to develop our adaptation measures, as we are aware that mitigation alone will not protect
communities from the impact of climate change.
Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04g  Develop a Zero Waste Strategy to minimise waste generation and encourage reuse and recycling to support a
more sustainable and circular economy.
Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04h  Explore opportunities for expansion of carbon sinks and other carbon capture technologies.  Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04i  Explore the options around developing a carbon budget for the Council. Head of Climate, Public
Protection and Roads
31-Mar-
25 
SRR.24.03.04j  Continue to work with communities to ensure a holistic approach to tacking climate change is taken and to
ensure no community is left behind.
Head of Climate, Public
Protection and Roads
31-Mar-
25 
Forward action linked to Net Zero plan: Climate change action to make Renfrewshire net zero - Renfrewshire Website

Page 17

16 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.24.03.05
Strategic sustainable planning for people and assets
There is a risk that
decisions could be
made in the short
term, for example to
address financial
pressures, which may
then impact
adversely on
sustainability goals
for the longer term
impacting on our
communities and
organisation.
CMT (1) Learning Estate Programme Board established
(2) Implementation of the Corporate Asset Management
Strategy ensures that property assets are managed
effectively and efficiently through the provision of
relevant management and performance information 
(3) The Energy Management Team: ensure energy
management initiatives are aligned to the capital
investment programme and corporate asset strategy to
optimise use of property estate and reduce overall
running costs and energy consumption levels. Promote
reductions in energy usage and advise employees and
residents about energy efficiency 
(4) Through the Procurement Unit, sustainability and
community benefits are considered in the development
of all contract strategies
04 04 16
High
- Deliver sustainable person-centred public services
(the Verity Agreement) and an engaged sustainable
workforce
- Ensure infrastructure future-proofing, with
investment in solar and wind farms, electric charging
networks and public transport, showing that taking
the right risks right now, can transform communities
- For capital projects, ensure new assets are fit for
purpose for the future and have sustainable
maintenance and repairs strategies
- Strategic decision making regarding the estate,
including the condition and sufficiency of the learning
estate
Action Codes Linked Actions Latest Note Assigned Date Status
It is recognised that Dargavel Village has a significant amount of housing development yet to be delivered (circa 2000 housing units over a 10-year
period) and therefore many of the associated risks that existed at the beginning of the development continue to exist today albeit there is live data to
inform future projections from the first circa 2,300 units that have been delivered. 
The Council therefore continues to face risk and uncertainty in relation to accurately projecting the scale and timing of future education demand which
will continue to have inherent uncertainty and risk. In recognition of this the Council will continue to progress the following actions to manage and
mitigate this risk:     
SRR.23.03.05a  Securing robust long term demand projections which provide both a core projection, potential
upper scenario and a long-term view of the potential scale and timing of short-term peak demand
to inform decisions on capacity provision.
Further updates will be completed
in this respect for updated
datasets available from November
registration data and recently
released NRS Census data
Director of
Children’s
Services
30-Sep-
2023 
SRR.23.03.05a  Identify now a range of flexible options that are and will remain available to in future years to
deliver, if required additional capacity (both temporary capacity and permanent long-term
capacity) to ensure the Council can be reassured of being able to respond appropriately to the
potential for upper end demand scenarios and or temporary demand peaks to emerge. 
Based on data and a range of
scenarios, flexible additional
capacity options have been
outlined and shared with relevant
boards.
Director of
Children’s
Services
31-Jan-
2024 
SRR.23.03.05a  Establish process and arrangements to support and provide detailed monitoring and updates to
projections for updates to actual data sets to facilitate a continual re-assessment of longer-term
trend and likely requirements/ decision point required in relation to deployment of potential
additional interventions.
Director of
Children’s
Services
31-Jan-
2024

Page 18

17 | P a g e
Appendix 2: Corporate Risks, longer-term or imminent 
• LIVING our VALUES – making a difference together
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.06
Financial Sustainability
If significant cost
pressures are not
successfully
planned for and
managed
effectively over
the medium to
longer term, this
could jeopardise
the financial
sustainability of
the council and
result in a
significant impact
on availability and
quality of front-
line services and
capital
investment
resources.
Decisions will
then be required
on the continuity
or scope of some
services currently
offered.
Director of
Finance and
Resources;
and
Head of
Finance and
Procurement
(1) Revised medium- to long-term Financial Outlook reassessed the
various risks to the Council’s short, medium- and longer-term
financial sustainability. Refreshed report to Council on 14 December
2023 outlined the immediate financial concerns and plans to address
these, including R4R savings (see 3 below), financial sustainability
workstreams, and managed use of reserve balances; however, as the
position continues to develop and evolve, close monitoring will be
required to ensure that the Council manages costs in the short term
and fully appreciates the longer term consequences of actions taken
to address short-term risks.  Committee reports of this nature cover a
wide range of current and future financial and economic factors e.g.,
Strategic Economic and National Policy Context, Cost Pressures,
Pressures on Income and Mitigation Strategies to deal with such
uncertainties.
(2) A well-developed and embedded budget planning, budget setting and
budgetary control system is in place throughout the organisation, and
this informs members and officers regarding financial performance
and stability. This facilitates robust and transparent decision making
and incorporates an escalation process with regards budget
management issues which may arise. The Council agreed the 2024/25
budget on 29 February 2024.
(3) In conjunction with the medium to longer term financial outlook and
the Council’s continued “Right for Renfrewshire (R4R) Programme”,
Renfrewshire Council has been proactive in planning for the future by
identifying and agreeing a planned release of resources. It remains
the case that savings will continue to require be generated at scale in
order to ensure the ongoing financial sustainability of the Council.
(4) The Council approved a number of Financial Sustainability
Workstreams in June 2022. These are led by Directors and continue
to progress recurring revenue savings.
(5) There is close financial monitoring of the agreed savings to ensure
that they are delivered within the agreed timescales, or where this is
not possible, to understand and reschedule planned delivery to
05 05 25
V.High
Financial recovery from global events 
- Anticipated reduced income from
NDR/CT over the medium term as
full economic implications of the
pandemic and cost-of-living crisis hit
local businesses and communities
- Pricing volatility and global supply
issues leading to shortage of labour
and materials following Brexit and
the outbreak of the Ukraine war
Best value report
- Recommendation in Best Value
report to prioritise how services
need to be provided in future to be
funded from within available
resources.
Cost and Income pressures
- Future grant settlements and the
level of funding available.
- Implications of national economic
policy choices to protect certain
services from real-terms reductions
in funding such as the Police and
NHS
- Future Local Government pay
settlements, and non-payroll
inflation
- Demographics and demand
pressures, such as an ageing
population with increased
associated service demands, and

Page 19

18 | P a g e
increases in demand for children’s
social care
- Implications of welfare policies and
poverty levels, exacerbated by cost-
of-living crisis.
- Reductions in income from fee-
generating services such as car
parking; implications of the national
economic recovery and associated
risks/uncertainty in economic
factors e.g., interest rates and
inflation.
- Implications of third party provider
financial stability, such as childcare
providers in current economic
climate
- Liability for predecessor
organisations, in light of the
removal of the limitation period for
historic child abuse claims
achieve the associated objectives. Monitoring is undertaken via a
combination of financial and operational measures, actions and
related update reports.
(6) Regular updates and bespoke reports are provided to CMT and the
Council with regards the national fiscal position, likely developments
and the impact on the council through close liaison with national
groups e.g., CIPFA DoFs, COSLA and the Scottish Government. This
liaison remains critical in ensuring the Council is aware of potential
financial developments and is in a position to influence these.
(7) Managing the level and use of reserves has been a key tool in
addressing the costs of the pandemic, therefore the planned use of
reserves in the medium term, and the Council’s Capital Investment
and Treasury Management Strategy, are key to ensuring ongoing
financial sustainability.
(8) Reports and publications from Audit Scotland in relation to the Local
Government financial outlook, financial planning and related
developments and improvements are supplemented with a
Renfrewshire context report, with both reports being submitted to
the Council's Audit Risk and Scrutiny Board. 
(9) Energy consumption data and condition surveys are used to identify 
priority areas for investment in the Council’s estate,  support
informed investment decisions and formulate the Council’s Capital
and Revenue budgets.
Action Codes Linked Actions Latest Note Assigned To Due Status
CRR22.05.05a  Strategic Property Review and new ways of working
/ Review of local policy positions
Work on all of the financial
sustainability workstreams is being
progressed with updates regularly
to Council. Agreed budget changes
will then be incorporated into the
General Fund base budget in future
years to capture the recurring
savings. 
[Some due dates extended from
original to 2025 as certain
workstream targets were phased
across financial years]
Director of Environment, Housing and
Infrastructure
31-Mar-
2025 
CRR22.05.05b  Charging, fees and commercialisation / review of
Council risk
Director of Finance and Resources 31-Mar-
2025 
CRR22.05.05c  Strategic review of procurement  Head of Finance and Procurement 31-Mar-
2023 
CRR22.05.05d  Connected Communities Chief Executive (Head of Policy and Partnerships) 31-Mar-
2025 
CRR22.05.05e  Digital Strategy Director of Finance and Resources 31-Mar-
2025 
CRR22.05.05f  Council Tax and Tax Policy Director of Finance and Resources 31-Mar-
2023

Page 20

19 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.07
Successful Cyber Attack
Regardless of the Council’s
technical preparedness for a cyber
attack, the threat remains acute
and present, as evidenced by
successful attacks on partner
bodies, with the risk of significant
impact on council operations. 
CMT For security
reasons, technical
security controls
are not published in
the public domain. 
04 05 20
V.High
Context: 
The risk has been updated from cyber attack to risk of a successful cyber
attack as more and more this risk comes closer to home, despite the
sophisticated technical security protocols and cyber architecture in
place, and for those organisations who have been impacted by
successful attacks, we see that the effects are devastating.
No matter what technology is deployed, the risk is materially impacted
by individual employee behaviours – i.e. learning how to recognise a
cyber attack and keeping that knowledge up to date by reading cyber
updates and doing mandatory cyber training, being alert to phishing
attacks and understanding the need for rapid escalation should an error
inadvertently be made and criticality of urgently reporting when they
have reacted to a phishing email and explaining all actions taken.
Action Codes Linked Actions Latest Note Assigned Due Date Status
As agreed by the Corporate Management Team

Page 21

20 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.08
Financial Stability
If significant short-term
costs and income losses
are not closely
monitored and
understood, this could
destabilise the finances
of the Council to an
extent beyond the
financial resilience of
the Council, resulting in
a need for immediate
cost control measures,
or short-term savings
which have an
immediate impact on
service delivery.
Head of
Finance and
Procurement
(1) Revenue budget monitoring reports to Policy Boards focus on the forecast year-
end outturn position rather than the historic periodic position, so that significant
variances are reported early, and any mitigating steps can be taken. This is
already highlighting severe price pressures (such as contractual inflation) across
different services. The impact of pay inflation is also highlighted through this
reporting mechanism.
(2) Review of all Right for Renfrewshire programmes has been undertaken in order
to recalculate potential cost savings in-year and to reprofile agreed savings, the
delivery of which was interrupted by the pandemic.
(3) Review of Financial Sustainability workstreams following approval of the 2024/25
Revenue Budget to ensure targets remain achievable.
(4) Clear analysis of the Council’s reserves position and potential for reprioritisation
or redirection; including the development of plans to rebuild financial resilience
of the Council in the medium term.
(5) Ongoing discussion with directors to understand the financial consequences of
the current economic climate for each service and how these will be managed. 
(6) Review of capital plan and ongoing projects to ensure clear understanding of
phasing of potential spend.
03 05 15
High
Context: 
Imminent shorter-
term risk for
financial stability,
recognising the
immediate
financial situation
of the Council
(note: the
medium to
longer-term
financial position
is captured under
financial
‘sustainability’)
Action Codes Linked Actions Latest Note Assigned Due Date Status
Ongoing monitoring

Page 22

21 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.09
Commercial vehicle
and operator licence
compliance 
Renfrewshire
Council requires its
fleet of vehicles to
be effectively
managed,
otherwise there
could be sustained
impact in several
areas including
community care,
housing
maintenance and
repairs,  
Neighbourhood
Services and waste
collection. 
Head of
Operations and 
Service
Development
Governance
(1) Compliance and Business Lead Officer in post monitoring compliance
performance and performing vehicle spot audits to make sure compliance
is adhered too.   
(2) Vehicles serviced and maintained within the DVSA roadworthiness
guidelines. Tachograph analysis system ensuring monitoring and
compliance of driving staff. 
(3) Operator Licencing Awareness Training (OLAT) conducted for all
operational service managers
(4) Vehicle Tracking system monitoring vehicle performance and vehicle
utilisation for all services. Driver CPC training to enhance driving
knowledge for all HGV fleet drivers.  
(5) Driver Certificate of Professional Competence (CPC) and driving hours of
HGV employees monitored daily on the Vision system and reported to
operational departments.
(6) Quarterly attendance at Logistics UK (formerly FTA) and APSE Transport
boards
(7) HAVS (Hand-Arm Vibration Syndrome) working group set up with
operational departments to introduce new working practices and monitor
risk.
(8) Fleet Services have introduced specific Fleet risk assessments that will be
shared with operational departments.
Operational
(9) Reduction in average age of Council Fleet
(10) Workshop equipment and tooling improvements
(11) Vehicle User group created with all fleet users to improve operational
performance.
(12) New Requirement for Fleet Management system – Fit for purpose
conducted with IT. (Digital working requirement to improve service for
operational departments.)
(13) New fleet management system in progress of being procured as upgrade
has been approved
03 05 15 
High
Context:  
The council’s vehicle
fleet, managed by
Environment,
Housing &
Infrastructure
Services, comprises
around 500 vehicles
including heavy and
large goods vehicles,
light vans and
cars.  The council
implements a range
of measures to
ensure ongoing
vehicle operator
licence compliance. 
Action Codes Linked Actions  Latest Note Assigned To Due Status
CRR24.04.09a  Updating the fleet management
system, to create a digital working
environment within Fleet
Operations for all service users.
A supplier has recently been appointed to provide a new Fleet
Management System.  A project timeline and milestones,
which will include work around data transfer and employee
training in the new system, will be finalised shortly.
Head of Operations and
Service Development
30-Apr-
2025

Page 23

22 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.10
Asset Management - Ongoing
Effective
governance and
management of the
council’s property
assets is essential,
otherwise there is a
significant risk of
harm, financial loss,
service disruption,
non-compliances,
fines, rising energy
costs and inability
to recover losses via
insurance proceeds
Director of
Environment,
Housing & Infra-
structure. 
Head of
Economy &
Development
Services
Corporately:
Key responsibilities with regards
to the Estate span 2 specific
service departments, but they
come together through a CAMIS
Development Group (Corporate
Asset Management Information
System) which is taking forward
a workplan to more effectively
consolidate and oversee asset
management risk 
Heads of Service:
Effective asset management in
practice on the frontline is
included within the new Risk
Assurance model which went
live on 1 April 2023.
03 05 15
High
Context:
GOVERNANCE – roles and responsibilities
- Estates (Leases – by and from the council, and on behalf of
HSCP)
- Facilities management (security, housekeeping, statutory
duties/ inspection, maintenance, repair, building fire risk
assessment)
- Property services (capital works, and CAMIS development)
- All services (inspection inventories and response, people
elements of fire risk assessment)
OTHER MATTERS IN SCOPE
- Fluorescent Lights – requiring LED replacement.  We continue
to work through this and spot replacements will be on a like
for like basis, however, larger complete renewal is being
considered for Renfrewshire House.
- Action in relation to Unwanted Fire Alarm Signalling and
upgrade costs.  Ongoing action to replace signalling equipment
across the estate including changes to any
activations/protocols to ensure this is being managed
appropriately (responsible of duty holder on site)
Action
Codes
Linked Actions  Latest Note Assigned To Due Status
CRR22.0
5.10d
Undertake gap analysis to
identify activities that take
place outside of the CAMIS
environment and consider if
these can be brought into
CAMIS by way of system
development
Due to competing demands, development work on CAMIS has moved to virtual
environment and slower than initially planned. Work still being undertaken to assess what
sits outside CAMIS and what can be brought in. Discussions with other Local Authorities
that use CAMIS to see what can be added with Health and Safety module being reviewed.
Due date therefore amended to June 2024, 2025.
CAMIS
Development
Group
30-Jun-
2025 
CRR22.0
5.10e
Explore data and status
monitoring
Whilst CAMIS is noted to be a good repository for data, development work is required to
improve the data and how it can be easily accessed. Due to resource requirements
elsewhere in the Council, this has been delayed. However, conversations continue virtually
to assess what can be done to improve CAMIS for users to ensure robust, up to date data
is stored within the application.
Due date therefore amended to June 2024, 2025.
CAMIS
Development
Group
30-Jun-
2025

Page 24

23 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.11
Delivery of the Dargavel solution
If the Learning Estate
is not appropriately
adapted in time, then
there is a risk of
insufficient places to
meet pupil numbers
associated with the
Dargavel Village
development, with
consequent impact on
families, education
experience and
further significant
damage to the
council’s reputation
Director of
Children’s
Services
(1) Effective programme and
project governance
established
(2) Project risk management
workshop delivered to the
project management team
03 05 15
High
The newbuild Dargavel Primary school was delivered under a Section
75 agreement with the development company building a substantial
housing development at Dargavel Village. The capacity of the new
school was, and is, not sufficient for accommodating forecasted pupil
numbers. The council needs to expand the learning estate in this area
to ensure sufficient capacity for local education. The Independent
Review into Dargavel resulted in 4 specific recommendations to be
addressed to deliver the solution.
▪ Recommendation 1 - Build a more robust model of primary school
need for Dargavel
▪ Recommendation 2 - Reconsider catchment areas 
▪ Recommendation 3 - Produce robust supplementary guidance on
developer contributions 
▪ Recommendation 4 - Seek to work cooperatively with BAE
Action Codes Linked Actions  Latest Note Assigned To Date Status
For Rec 1    
CRR23.04.11-1a  Complete Council modelling through to the
anticipated end date for the housing development
(2033/34) based on assumed 4,300 units and
available live data. 
Completed October 2022 Director of
Children’s
Services
31-Oct-
2023 
CRR23.04.11-1b  Engage and appoint Edge Analytics to deliver
enhanced modelling approach for both Dargavel
primary requirements as well as PMHS out to
2033/34 and updated live datasets.
Completed February 2022 including additional upper forecast
scenarios for Dargavel non-denominational requirements to
support management of risk associated with long term yield
remaining at similar level to 2023/24. Informed reports to
Education and Children’s Services Board in March and May 2023
Director of
Children’s
Services
28-Feb-
2023 
CRR23.04.11-1c  Extend Edge engagement to deliver an enhanced
model projecting out to 2038 to provide longer
term forecast to assess the full impact on the
secondary sector and allow identification of likely
timing and scale of peak demand encapsulating any
relevant updates to live datasets.
Modelling completed which has identified an anticipated peak
period in both primary and secondary sectors and will be
reported to Education and Children’s Services Board in November
2023.
Director of
Children’s
Services
30-Sep-
2023

Page 25

24 | P a g e
CRR23.04.11-1d  Provide update to November Education &
Children’s Service Policy Board.
Two update reports were taken to the November ECSPB:
1. Learning Estate
2. Dargavel Housing Development – Impact on Denominational
Education Provision
Link
Director of
Children’s
Services
30-Nov-
2023 
CRR23.04.11-1e  Update Edge Analytics modelling for newly released
national Census data and expand across the whole
school estate and establish modelling dashboard to
support ease of updating and rapid re-assessment
of revised projection that will be utilised on an
ongoing basis over future years, both for Dargavel /
PMHS but also as part of the strategic Learning
Estate programme.
The Edge Analytics modelling for newly released national
census data was completed last year. A modelling dashboard
was also designed last year with further discussions to take
place on how this is used to inform the wider learning estate.
Edge have been commissioned to expand the model to include
the whole estate and we are expecting a data output in 6‐8
weeks. A schedule has been developed which outlines
reassessment and monitoring timescales.
Director of
Children’s
Services
[31-Jan-
2024] 
For Rec 2    
CRR23.04.11-2a  Complete assessment of anticipated P1 intake from
Dargavel catchment and assess against revised DPS
capacity availability, establish planned P1 intake
capacity cap and anticipated P1 intake requiring
accommodation at Bishopton Primary School. 
Planned use of Bishopton Primary School along with planned
capped entry levels to Dargavel Primary School reported an
approved at Education and Children’s Services Policy Board in
August 2023. There will be a requirement to annually monitor
anticipated and actual P1 intakes carefully to assess adequacy of
short-term capacity provision across both Dargavel and
Bishopton Primary Schools to meet demand pending the second
primary school in Dargavel coming on stream. 
Director of
Children’s
Services
31-Aug-
2023 
CRR23.04.11-2b  Complete an exercise to assess the timing, scale and
range of potential demand level scenarios, in
particular understanding the scale and timing of the
peak demand and likely settled long term demand.
This information will be used to inform the
assessment of how Bishopton Primary School could,
if required, potentially be utilised as an option in
the longer term. 
Completion of the updated work with Edge Analytics has
provided a view of the likely timing and length of the peak
demand period – with peak primary demand being forecast in
2033/34 which will fall over the second half of the 2030s to a
more settled level. Further work is being progressed to update
this information for the recently released 2023 census
information and November registration data to inform an overall
assessment.
Director of
Children’s
Services 
31-Jan-
2024 
CRR23.04.11-2c  Complete financial analysis to understand the
potential financial context of utilising Bishopton
Primary School Capacity 
Bishopton PS is a predominantly 1960s construction and is more
than 60 years old. This building will, along with the whole school
estate, undergo an updated condition survey over coming
months. Notwithstanding, given the underlying age of the
Director of
Finance and
Resources
31-May-
2023

Page 26

25 | P a g e
building it will inevitably have a limited remaining lifespan before
being considered for replacement. 
Existing surplus capacity if used permanently to reduce the
required size of a second Dargavel primary school, will require to
be replaced as part of a renewal programme. The determination
of the timing of that will be subject to work progressed as part of
the strategic learning estate programme. 
Consequently, it has been assessed that any financial advantage
from utilising Bishopton PS will be restricted to a temporary time
value of money benefit and consequently will be relatively
limited. 
In addition, there is also a risk that utilising Bishopton PS
permanently removes its availability to provide supporting
capacity to manage both a temporary peak that may arise from
upper end educational demand scenarios and longer-term upper
end demand. There could be the risk that in such circumstances if
Bishopton capacity was no longer available this would lead to
higher overall costs over the longer term for the Council.
The financial considerations and risks will be incorporated into
the overall assessment scheduled to be reported as part of the
Education & Children’s Services Board report in January.
CRR23.04.11-2d  Set out overview in a report to the Education and
Children’s Services Policy Board in respect to the
potential long-term utilisation of Bishopton Primary
School which will be subject to detailed
consideration at an appropriate point in future
years as actual long term demand trends
increasingly emerge.
Work to allow appropriate recommendation to be made is
progressing in line with plans and scheduled to be reported to
Board in January 2024. A paper was presented to Board in
January 2024
Director of
Children’s
Services
31-Jan-
2024 
For Rec 3    
CRR23.04.11-3a  Undertake a desk top review of other local
authorities across Scotland and identify key best
practice councils to engage. 
Head of
Economy and
Development
30-Jun-
2023 
CRR23.04.11-3b  Complete detailed engagement with identified best
practice councils arising from desk top research
Detailed engagement completed with Fife, Falkirk and West
Lothian councils.
Head of
Economy and
Development
31-Aug-
2023

Page 27

26 | P a g e
CRR23.04.11-3c  Complete data analysis exercise of a range of
datasets of mixed historic sites across Renfrewshire
to provide empirical evidence to support actual
pupil yields to inform establishment of appropriate
yield factors to be used in future contribution
policy.
• Refresh % capacity of all schools (vs school rolls)
• Sample research of Pupil Product Ratio (PPR) for
developed housing sites (< 10 units) [min 10 site
sample]
• Sample research of PPR for developed housing
sites (> 100 units) [min 10 site sample]
• Sample research of PPR for established / mature
housing development to provide longer term
perspective (e.g. 15 years old) (> 100 units) [min
4 site sample]
• Identify individual schools where pupil capacity
is above notional threshold (85%) 
• Identify all known undeveloped housing sites in
individual school catchments
• [Subset of 5] identify all housing sites with
current "live" planning application
Identify schools where it is anticipated intervention
would be required to increase capacity based on
potential future housing to be delivered over next
10 years to inform likely future developer
discussions.
Work on this is now complete, agreed new draft planning
guidance presented to March 2024 PCC Board.
Head of
Economy and
Development
31-Oct-
2023 
CRR23.04.11-3d  Incorporate into the development of the draft
contributions policy targeted to be presented to the
Planning and Climate Change Policy Board in
January 2024.
Work on this is now complete, new draft planning guidance
presented to March 2024 PCC Board
Head of
Economy and
Development
31-Jan-
2024 
For Rec 4    
CRR23.04.11-4a  Secure with BAE agreement on Heads of Terms for
allow for mutual governance approval from each
organisation to inform detailed legal agreement
drafting and final sign off 
This was completed and approved by ILE Board end of August Chief
Executive
31-Aug-
2023

Page 28

27 | P a g e
CRR23.04.11-4b  Secure completed and signed legal missives to
deliver in full the objectives outlined above to
provide certainty and timing of availability of
remediated and infrastructure proofed land to
support wider school delivery planning and
consultation arrangements that will be progressed
by the Council team.  
Legal missives concluded mid-September Chief
Executive
31-Aug-
2023 
CRR23.04.11-4c  Proposed revisions to S.75 negotiated with BAE
Systems were approved by ILE. Revised S.75 signed
off by both the Council and BAE Systems to legally
conclude matters.
Approved by planning and Climate Change Board end of August Head of
Economy &
Development 
31-Aug-
2023

Page 29

28 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.12
Organisational learning from Dargavel
investigation
The council must progress the
actions as a matter of urgency
or there is a risk that without
sufficient learning, similar
errors to those made in the
past could occur again, with
further financial implications
and significant reputational
damage for the council
CMT (1) Corporate leads identified to
ensure recommendations are
taken forward.
02 05 10
High
The recent Independent Review into Dargavel, and
the council’s response to the review, highlighted
several recommendations and agreed actions. The
first 4 recommendations related to the delivery of
the solution for Dargavel specifically and the other 
▪ Recommendation 5 - Corporate working and
organisational culture
▪ Recommendation 6 - Risk management
▪ Recommendation 7 - Role of members
▪ Recommendation 8 - Public confidence
The Accounts Commission has also issued a
Section 102 Report in January 2024.
Action Codes Linked Actions  Latest Note Assigned To Date Status
For Rec 5    
CRR23.04.12-5a  Undertake a health check assessment on major
capital programmes to provide reassurance in
respect to all aspects of governance, control,
reporting and management of programmes.
City Deal and Infrastructure Health Check report was submitted
to CMT on 21 November 2023. Other programmes to be reported
to CMT through regular scheduled portfolio update sessions.
Chief
Executive
supported
by CMT
31-Oct-2023 
CRR23.04.12-5b  Put in place arrangements to deliver a
comprehensive Leadership Development
Programme (circa 12 months + programme)
for chief officers and senior managers which
amongst other things will cover any key areas
referenced in the Bowles report in respect to
governance, accountability, risk management,
collaborative working, member officer
relations etc.
Contract engagement in place and resources secured from SOLACE
Enterprises to support co-designed and co-delivered programme.
Initial Chief Officer programme launch event occurred on 3rd
October with focusing on personal resilience with the following
Learning Development events scheduled: -
October – Effective Communications and Elected Member
Relations
November - Governance and Risk Management
December – Programme Management, Leading and Navigating
Strategic Change
January – Transformational Leadership
February – Delivering Corporate/Team Values and Vision
Delivery of wider tier of management / leadership cohort to
commence early 2024.
Director of
Finance &
Resources
and Head of
HR & OD
30-Sep-2023

Page 30

29 | P a g e
CRR23.04.12-5c  Design and undertake an evaluation process of
the Leadership Development Programme for
Chief Officer cohort to inform required
changes / adjustments to programme delivery
for next management cohort.
Initial feedback was requested as part of the final workshop of
this first programme. An evaluation request, designed in
partnership with SOLACE, will be sent out to each of the
participants asking if their knowledge has increased, if they feel
more confident and informed and what changes, if any, would
participants suggest for the next cohort. The formal evaluation
will be sent out w/c 20/02/24 and will have a 2‐week completion
window. There will a further evaluation on what changes have
been made as a result of the programme will also be carried out
6 months each cohort completion. 
Head of HR
and OD
31-Mar-2024 
For Rec 6    
CRR23.04.12-6a A review of risk profiles across all service
departments to ensure visibility of all risks and
confirmation of where certain risks are being
monitored if outwith the standard Risk Reports
to the Audit, Risk and Scrutiny Board (i.e.,
Health and Safety Planning Groups, Service
Improvement Plans etc)
Reviewing service risk profiles is now business as usual via the 6-
monthly risk report To Board
Director of
Finance and
Resources
31-Oct- 2023 
CRR23.04.12-6b A review of the ‘service risk representative’
roles in each service department to ensure the
representatives who sit on the Corporate Risk
Management Group are sufficiently involved in
risk matters within the service, to feed this into
the Corporate Risk Management Group and
that they also have authority within the service
to provide challenge as a ‘critical friend.’
Action completed. CMT agreed (10 Oct), that each Director will
nominate a Head of Service and one other colleague to support the
Head of Service in the role going forward.
Director of
Finance and
Resources
31-Oct- 2023 
CRR23.04.12-6c Delivery of a project risk management
workshop specific to the planned new primary
school in Dargavel (complete)
Workshop delivered covering nature of project risks, risk changes
over lifecycle of the project; reminder of Council PM framework
and PMU support; key issues re good governance
Director of
Finance and
Resources
31-Aug-2023 
CRR23.04.12-6d Delivery of project risk management training
with all PMU colleagues (in a train the trainer
format) so colleagues are delivering this as part
of project kick-offs to support a more risk
focused culture in the organisation.
This was completed on 12/10/2023. PMU staff received a ‘train
the trainer’ session to enable them to cover running risk
awareness sessions at project kick‐offs to support a more risk
focussed culture in the organisation.
Director of
Finance and
Resources
30-Sep-2023

Page 31

30 | P a g e
CRR23.04.12-6e Undertaking a ‘health check’ of project
management arrangements across the council
to ensure governance, management, reporting
and risk management is appropriate to the
scale of the project.
Compliance review of all PMU supported projects complete. All
projects demonstrated a satisfactory level of risk governance and
management.
Director of
Finance and
Resources
30-Nov-2023 
CRR23.04.12-6f An update to the risk management course on
iLearn and consideration of whether it should
be a mandatory course.
This action is now complete. The new online risk management
course is now live on the new learning management system and
CMT have advised that the course will be mandatory (one-off) for
all staff on GR9 or above.
Director of
Finance and
Resources
30-Nov-2023 
CRR23.04.12-6g Embed and deliver risk management training
into the new leadership development
programme that is currently under
development, particularly in relation to
commercial risk
Risk management session was delivered in line with the
programme , including internal and external subject matter
experts.
Director of
Finance and
Resources
30-Nov-2023 
CRR23.04.12-6h Reviewing governance documents to ensure
delegations in relation to liability caps are clear
and unambiguous.
Consultation with Head of Corporate Governance concluded that
governance documents do not require amendment, but rather,
more training would be required on what was expected within
existing delegations. The training was delivered to CMT on 28
November 2023. Governance refresher training sessions have
been delivered to every department senior management team in
January.
Director of
Finance and
Resources
31-Dec-2023 
CRR23.04.12-6i Deliver a targeted risk management
development day for Chief Officers
• Project risk management (and risk
simulation exercise) 
• Risk horizon scanning and sustainability
(the Global Risk Report) 
• Liability caps and their implications
The training session has been prepared and was delivered to CMT
on 28 November 2023.
Director of
Finance and
Resources
31-Dec-2023 
For Rec 7    
CRR23.04.12-7a Undertake a health check assessment on major
capital programmes to provide reassurance in
respect to extent to which elected member
involvement has been appropriately secured
through formal governance reporting as well
as via other appropriate informal engagement
routes.
City Deal and Infrastructure Health Check report was submitted
to CMT on 21 November 2023. Other programmes to be reported
to CMT through regular scheduled portfolio update sessions.
Chief
Executive
supported
by CMT 
31-Oct-2023

Page 32

31 | P a g e
CRR23.04.12-7b Support Council Leader and other nominated
elected members to determine a review remit,
progress the review and develop suitable
recommendations.
The Cross Party Working Group has been established and met
five times. A report was submitted to the Council Meeting on 29
February 2024 setting out the findings of the review.
Head of
Corporate
Governance
31-Mar-2024 
CRR23.04.12-7c Carry out an assessment of the Audit Risk and
Scrutiny Board against CIPFA’s published good
practice guide for audit committees and
identify any recommendations for change in
remit or operational arrangements.
The self assessment is complete with recommendations for
improved clarity of roles and remits agreed by the ARSB, with a
further report to Council in May 2023 seeking agreement of
these recommendations.
Director of
Finance and
Resources
[31-Dec-
2023] 
For Rec 8    
CRR23.04.12-8a Develop a communication and engagement
strategy to meet the following objectives:  
• Improve the flow and regularity of
information to parents and carers and the
wider Dargavel community, so they are first
to hear about decisions impacting their
community.
• Ensure parents and carers have access to all
projection data available to the council. 
• Introduce direct communication channels
with Dargavel residents, enabling all sections
of the community to engage on matters that
are important to them and making sure the
latest information is accessible and easy to
find.
• Provide residents with a feedback loop to
enable them to ask questions of the council
in relation to the development and have
questions answered quickly.
• Include the community in formal planning
and design of a new primary school and high
school extension. 
This plan supported and guided all initial comms and engagement
in the initial months of the issue being reported and has guided the
following key activities:
Hosting two parent and carer meetings, attended by council
officers and more than 220 parents or carers,
Establishing a dedicated enquiries email inbox and encouraged
residents to contact us with any questions and concerns,
Attending several parent council meetings with all primary schools
and PMHS to support direct engagement, discussion on key
activities, immediate estate decisions in respect to deployment of
modular classrooms and post occupancy adjustments at Dargavel
Primary, sharing and discussion of revised projection data and
modelling, key council decision points, independent review
outcomes etc
Attending several community meetings from community council,
Community Liaison Group as well as supporting coordination and
delivery of wider community representative round table session to
maintain ongoing engagement, sharing of information and data
sharing etc.
Issuing 12 letters/updates to impacted parents and carers at
Dargavel Primary School
Issuing 9 updates to Bishopton Community Council
Issuing 3 media releases or proactive statements and responding to
almost 50 media enquiries 
Issuing 11 elected member briefings and 8 MP/MSP briefings to
support members in their engagement with local families.  
Monthly updates to the council website
Head of
Marketing
and Comms
30-Nov-2023

Page 33

32 | P a g e
CRR23.04.12-8b Post Review, deliver a revised comms and
engagement strategy to re-establish trust and
confidence across the Dargavel community.
Complete. As above.  Head of
Marketing
and Comms
31-Aug-2023 
CRR23.04.12-8c Establish a new parent council liaison group to
provide a single PC forum (at the request of PC
chairs) to provide a streamlined opportunity
for consistent engagement and
communication with the whole PC community
for all schools associated with Dargavel /
Bishopton and PMHS and all feeder primaries. 
Group has been established and has met following school summer
break with positive feedback from Parent Council Chairs with
engagement to date.
Head of
Education 
31-Aug-2023 
CRR23.04.12-8d Establish regular opt-in digital community
newsletter to facilitate regular communication
updates direct to interested members of the
community. 
Take up of opt-in digital channel newsletter is currently sitting at
309 users and it is expected that this will continue to grow in the
coming months as school delivery and design engagement
commences more significantly. 
Head of
Marketing
and Comms
31-Aug-2023 
CRR23.04.12-8e Establish and track key indicators of
community sentiment. 
Over 800 people submitted formal responses to the Statutory
Consultation on a proposed new primary school for Dargavel and
over 150 individuals attended events that were part of the
consultation programme. Exit surveys were provided at all events
included in the programme to understand if engagement was
helpful. General feedback indicates the flexibility of events was
helpful and being able to ask questions of officers was useful, but
community concerns about ensuring the right solutions are
delivered remain. This will take time to significantly change.
We continue to provide regular updates to the community through
a variety of channels – including face‐to‐face forums, monitoring
reach, engagement and feedback. We continue to grow
membership of our opt‐in community newsletter. From qualitative
analysis of the statutory consultation, parts of the community
continue to express frustration at the council’s previous error and
carry concern about current planning and projections. This will
require ongoing and steadfast commitment to information sharing
and using established community forums for ongoing engagement.
Head of
Marketing
and Comms
Ongoing 
CRR23.04.12-8f Develop, deploy (at appropriate key points
post formal consultation period) and evaluate
The Consultation Institute is supporting the service to carry out a
thorough assessment of the effectiveness of the council’s
Head of
Marketing
and comms
Expected
April/May
2024

Page 34

33 | P a g e
a community survey to understand the impact
of engagement with the community.
engagement strategy with the Dargavel community (Bishopton and
wider Park Mains High School community) so far. This includes:
Development of a process based on tCI’s Certificate of Consultation
Readiness to assess the current Dargavel process and produce a
report making recommendations on what to do in future
consultations based on that process – this involve desk research
and is underway. Following this, in May, we will launch a
community pulse survey, to understand if our engagement
approach is helping to improve public trust and a more positive
relationship between the council and the Dargavel community.
This timeline was confirmed to first allow the Statutory
Consultation on a proposed new primary school for Dargavel to
conclude and be reported. The results of the analysis and opinion
survey, with recommendations for our future strategy will be
reported to Audit and Scrutiny Board in September. Our agreed
plan has been shared with the council’s auditors to inform their
update report to the Accounts Commission in June.

Page 35

34 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.13
Workforce planning, recruitment and retention
There is a national shortage in the UK
labour market for certain trades and
professional services. For Renfrewshire
Council that is impacting on certain
specialist recruitment campaigns.  This
combined with diminution of salaries,
the reality is that there is a risk the
council may lose key personnel, it may
be very difficult to recruit suitably
qualified and skilled officers for
compliance, advisory, investigative and
assurance work, with significant impact
on statutory responsibilities and slippage
in professional activity.
Director of
Finance &
Resources
(1) Data analytics to look at areas of risk,
trends both recruitment and attrition.
(2) Ensuring we hire the right people in the
first place by having solid recruitment
methods
(3) Offering workplace flexibility which can
help enhance work life balance, and
burnout
(4) Creating opportunities for 
development 
(5) Partnering with employability,
community, and further/higher
education programmes to support the
Council as an employer of choice
04 04 16
High
Workforce planning risk is captured by our
model for business-as-usual risk, however over
recent months it has been clear that a live issue
is emerging in relation to recruitment and
retention challenges, particularly for various
trades and professional services.
Particular pressure points at April 2024:
• Soft FM and building services
• Hard FM and property services
• Legal and Registrars
• Social services
• Others, as being identified/ confirmed
Action Codes Actions Latest Note Assigned To Date Status
CRR23.04.13a  Agreed to introduce a working group focussed on workforce planning,
the purpose of this is to look at new and innovation ways to support
the recruitment, retention and upskilling of the Councils workforce.
Workforce planning group now formed and an initial
meeting held, further meeting dates have been
scheduled. Work streams have been identified.
Head of
People and
OD
31-Oct-
2023 
CRR23.04.13b Review our recruitment training for managers with a focus on
supporting onboarding, induction, and development support.
Training has been reviewed and updated in line with the
new policy provisions. Ongoing and induction processes
are being updated. [Date amended 31/12/23 to 31/8/24]
Head of
People and
OD
31-Aug-
2024 
CRR23.04.13c Develop an Equality, Diversity and Inclusion strategy, this aim of this is
to enable colleagues to have equity of opportunity within the council
during the whole employee lifecycle 
Complete, EDI plan was approved at the FARS board in
February 2024.
Head of
People and
OD
31-Dec-
2023 
CRR23.04.13d Introduce a programme that enables our colleagues voice and provides
platform for recognition 
Partially complete within some council services, work
continues to drive this across the organisation.
Development of employee recognition is in the early
stages. [Date amended 31/12/23 to 31/12/24]
Head of
People and
OD
31-Dec-
2024 
CRR23.04.13e Continue the roll out of our Health & Wellbeing strategy, ensuring
colleagues can have the best experience at work 
The H&WB plan was approved at the FARS board in
February 2024. There is ongoing work underway to drive
the 4 themes identified within the plan and target specific
work groups. We have trained more mental health first
aiders to support the workforce.  
Head of
People and
OD
31-Dec-
2024

Page 36

35 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.14
Delivering homeless duties
It is becoming more
difficult to fulfil our
statutory duties for
providing
accommodation so 
breaches may occur
with an increase in
rough-sleeping and
reputational harm.
Director of
Environment,
Housing &
Infrastructure
(1) Monitored at weekly Housing SMT meetings with Head of Service and
senior housing managers
(2) Reports to Communities and Housing Policy Board (latest May 2024)
(3) The Council’s stock of furnished properties being used to provide
temporary accommodation for those who have nowhere to stay has
been increased on a stepped basis to 276
(4) Additional staffing resources have been appointed within Homeless
Services, with 3 x Accommodation Officer and 2 x Housing Options
Adviser posts now filled on a temporary basis to support the Councils
response to the increase in homelessness.  Also, extension of 2
temporary posts to improve access to support, housing options advice
and advocacy for tenants in the private rented sector
(5) Two additional Housing Support Officer posts have now been created
and filled on a temporary basis to help ensure the legal duty to assess
the support needs of those who are homeless and ensure these needs
are met can be complied with
(6) Attendance at regular multi-agency meetings regarding utilisation of
temporary hotel accommodation
04 04 16
High
We are at risk of being
unable to provide
temporary/ settled
accommodation for the
increased number of
homeless applicants,
Ukraine and Afghan
resettlement programmes,
and those asylum seekers
living in Renfrewshire
receiving positive decisions.  
Action Codes Actions Assigned To Date Status
CRR24.04.14a  In response to the increase in the level of homelessness over the last two to three years, The Council has increased its target to
provide 55% of general lets to homeless applicants in 2024/25 and this was approved by the Policy Board in March 2024. 
Head of
Housing
Services
31/03/2025  
CRR24.04.14b  Deliver the key initiatives detailed in Renfrewshire’s Rapid Rehousing Transition Plan, including, the provision of adequate
temporary accommodation, increasing the number of lets to homeless in order to meet needs, provide assistance to help new
tenants resettle, and upscaling the provision of wraparound support initiatives such as Housing First.
Homeless &
Housing
Support
Services
Manager
31/03/2025

Page 37

36 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.15
National Care Service – governance and financial
implications
The council will need to
ensure clear governance
arrangements are established
otherwise there will be
increased risk in terms of
liabilities, with financial
impacts.
Director of
Finance &
Resources
(1) Maintaining a watching brief through
various professional networks
03 03 09
Moderate
There has been recent confirmation that for the
proposed new National Care Service, staff will continue
to be employed by councils. However, under the terms
of a new partnership arrangement, legal responsibility
for the service is to be ‘shared’ between the health
service, councils and Scottish government, with
councils also responsible for buildings and the delivery
of services.
**29 FEB 2024 UPDATE ** Parliament approved the
general aims of the National Care Service (Scotland) Bill
at Stage One. Significant amendment to follow
however at Stage Two.
Action Codes Actions Assigned Date Status 
Monitoring only   
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR24.04.16
Administering elections
Administering an electoral
event carries a significant
responsibility. Each event
must be carefully planned for
in accordance with statutory
procedures, and all risks
identified with appropriate
responses/ mitigations,
otherwise there is a risk to
delivery of election results
within the required
timeframe.
Chief
Executive
(1) Experienced elections office team to
support the Returning Officer and Deputy
Returning Officers re election integrity
(2) Experienced wrap-around services for all
logistics
(3) Project management discipline applied
(4) Fully risk assessed (using both EMB
guidance and internal methods)
(5) Comprehensive contingency pack
developed for each and every electoral
event
02 04 08
Moderate
A UK General Election must be called by December
2024 and so with this in mind early preparations are
underway. Most council service departments are
involved in the administration of electoral events.
While administering an electoral event can result in a
significant impact in terms of the council’s reputation,
the overall likelihood associated with the risk is low,
given established governance arrangements, project
management approach and experience of officers
involved. The risk is currently assessed as moderate.
Action Codes Actions Assigned Date Status
CRR24.04.16a Deliver on all aspects of the project plan EO
Manager
TBC

Page 38

37 | P a g e
Appendix 3: Service Risks 
Risk 
(Cause and effect)
Risk Capture
 Service RR
 Project RR
 H&S PLAN 
Evaluation
 Low
 Moderate
 High
 Very High
Means of Monitoring
 Board Risk-Reporting
 SIP
 Project Board
 H&S Planning Group
Notes
Chief Executive’s Service    
(1) Discontinuation of Shared Prosperity Fund
If there is a change in government and the SPF ceases,
funding for current economic development and place-
based initiatives would be reduced by £5-6m. 
Service RR  Moderate  Board Risk-Reporting  Any new update?
(2) AMIDS does not achieve Investment Zone status
Would dampen placeshaping ambitions and weaken
local economy 
Project RR  Moderate  Board Risk-Reporting Any new update?
Children’s Services    
(3) Portfolio Management
Unintended delays in progress in each of the three
portfolios listed below will impact on our ability to
ensure that children and young people thrive, learning
and achieve: 
1. Curriculum, learning, teaching and assessment;
2. Inclusion; and 
3. Families and Communities
Project RR Moderate Project Board Effective governance arrangements are in place with
oversight, leadership and direction being provided by the
Portfolio Governance Board which meets on a monthly
basis. The three portfolio groups provide updates to the
Board.
(4) Availability of Alternative Care Placement 
(Foster Care and Residential Care)
This could result in a higher level of risk being managed
within the community. 
Service RR Moderate Board/Committee Risk
-Reporting
Case managed by Social Work Management Teams with
contingency plans in place.
Environment, Housing and Infrastructure Services    
(5) Review of electric vehicle (fleet) infrastructure
Risks associated with the installation of charging
facilities were managed during the related installation
projects.  There is however a need to review any
residual risks that remain in relation to the siting,
inspection, and maintenance of the facilities, to further
reduce any risks to people or property within their
vicinity.
Service RR High Board Risk-Reporting Electric Vehicle fleet comprises around 116 vehicles.  The
council implements a range of measures to ensure vehicles
are roadworthy and serviced accordingly. The EV Charging
Infrastructure is electrically tested at final commissioning
stage by a competent EV contractor.   EV Chargers are
serviced annually as part of warranty/ maintenance
contract.  Chargers are also monitored remotely by
ChargePlace Scotland for any faults and site attended by

Page 39

38 | P a g e
Risk 
(Cause and effect)
Risk Capture
 Service RR
 Project RR
 H&S PLAN 
Evaluation
 Low
 Moderate
 High
 Very High
Means of Monitoring
 Board Risk-Reporting
 SIP
 Project Board
 H&S Planning Group
Notes
contractor if fault is not able to be fixed by back-office
support.
(6) Tree Fall and Ash Die Back & Larch Infection
With the emergence of Ash Die back in the UK there is
now an increased potential for public injury and
property damage, awards against the Council,
reputational damage and statutory notices
Service RR High Board Risk-Reporting The main trigger for this risk was a significant outbreak of
Ash Dieback in the UK which is resulting in a significant
number of trees within Renfrewshire having to be felled.
Work is underway.
(7) Housing Regeneration and Renewal Programme
Risks associated with delivering £100m regeneration
and renewal programme.
Project RR High Project Board  Risk registers have been produced for each project and are
regularly reviewed to identify, manage and mitigate known
risks associated with the programme.
(8) Last in Block Properties
Initial discussions have commenced with Scottish
Government officials on the feasibility of ‘last in the
block’ properties being repaired and used for the
resettlement of UDP’s, and a further report will be
submitted to the Communities and Housing Policy
Board providing an update on progress.
Project RR Moderate Board Report Risk register has been produced and shared with Scottish
Government.
Application has been submitted and now been approved
in principle by Scottish Government Minister.
(9) Housing IT System Replacement Programme
Ensuring replacement system procured fulfils all
requirements and is delivered within target.
Project RR High Project Board Renewal of main system dealing with Housing Services,
Housing Asset Management and Homeless Services.
(10) Housing Investment Programme
Risk of delivering approved capital investment
programmes and ensuring stock complies with
statutory and regulatory standards.
Project RR High Project Board   As part of governance arrangements, a new project board
is being established. Monthly project teams meetings have
been scheduled and risk registers for each programme are
being developed.  
(11) Delivering Homeless duties
The risk is of breaching a statutory duty to provide
accommodation and would be likely to lead to an
increase in rough-sleeping and reputational harm.
Project RR High Board Report We are at risk of being unable to provide temporary/
settled accommodation for the increased number of
homeless applicants, Ukraine and Afghan resettlement
programmes, and those asylum seekers living in
Renfrewshire receiving positive decisions.  
(12) Disposal of Coal Tar 
Coal tar is now classed as hazardous waste material.
There is consequently a knock-on risk to the council’s
resurfacing scheme with some moderate delays in only
a few locations as alternative solutions are developed.
Service RR Moderate Board Reporting  We carry out test samples prior to our resurfacing
programme, and any that are found to be positive will be
removed from resurfacing programme and placed on the
surface treatment / recycling programme.  This ensures

Page 40

39 | P a g e
Risk 
(Cause and effect)
Risk Capture
 Service RR
 Project RR
 H&S PLAN 
Evaluation
 Low
 Moderate
 High
 Very High
Means of Monitoring
 Board Risk-Reporting
 SIP
 Project Board
 H&S Planning Group
Notes
that potentially hazardous material is left in-situ and
doesn’t require to be disposed off.
(13) Implementation of Local Heat and Energy
Efficiency Strategy
Key risk is reputational damage if the Council does not
deliver on their Local Heat and Energy Efficiency
Strategy and Local Heat and Energy Efficiency Delivery
Plan. Work is currently underway to develop the
delivery plan.
Project RR Moderate Board Reporting The Scottish Parliament passed the Local Heat and Energy
Efficiency Strategies (Scotland) Order in May 2022. The
LHEES Order places a duty on local authorities to prepare,
publish and update a Local Heat and Energy Efficiency
Strategy and Delivery Plan.
(14) RAAC in the learning estate
During the check at Castlehead High School, structural
engineers identified the presence of RAAC limited to
the school gym halls. The inspection concluded that
our analysis of the construction materials of the main
school building was correct, but that different material,
RAAC, had been used in the construction of the gym
halls.
Service RR Moderate Board Risk-Reporting  Estate wide inspection/check for RAAC has concluded.
Only Castlehead HS had a positive result and works are
underway to remediate.
(15) Collection and Disposal of Waste Upholstered
Domestic Seating (WUDS) / Persistent Organic
Pollutants (POP’s)
From 31st January 2024 new guidance came into force
that changed the collection, storage and disposal of
waste containing Persistent Organic Pollutants (POP’s)
which must be separated and sent for incineration. 
The impact of this could be both financial and
environmental. 
Project RR Moderate Project Board From 1st February 2024 we have allocated additional
resources to assist at the Household Waste Recycling
Centres (HWRC’s) to ensure that WUDS/POP's waste does
not contaminate other waste streams as set out in the
Changes to Upholstered Furniture Collection, Storage and
Disposal approved by the ILE Board on 24th January 2024.
A separate Special Uplift squad has been formed, as part
of the Council's Special Uplift Service, to manage the
collection of WUDS and POPs.
Linwood Household Waste Recycling Centre (HWRC) is the
only Council site which accepts POP’s waste.
We will monitor waste trends/patterns over the coming
year.  However, until a full years' data that identifies
seasonal demands is available the scale of financial and
service risks are difficult to determine.

Page 41

40 | P a g e
Risk 
(Cause and effect)
Risk Capture
 Service RR
 Project RR
 H&S PLAN 
Evaluation
 Low
 Moderate
 High
 Very High
Means of Monitoring
 Board Risk-Reporting
 SIP
 Project Board
 H&S Planning Group
Notes
(16) Collection Management / Routing Software for
Waste and Recycling Service
The Service is looking to improve performance and
maximise efficiencies by procuring and implementing a
new Waste & Recycling Management/Routing system.   
This will assist in the setup and day-to-day
management of the waste and recycling collection
service.  There is a risk that during the implementation
process the service to customers may fluctuate and
they are not kept fully informed.
Project RR Moderate Project Board A Project team is being assembled, with cross-service
representation to ensure the effective procurement and
implementation of the new Waste and Recycling
Management System. 
The project team will be responsible for the planning and
implementation of a comprehensive communication
strategy at each stage of the project.  
The service will liaise with colleagues from Customer
Services Unit to share information and ensure this is
available to customers timeously.   
Finance and Resources Services    
(17) PCI certification
Certification is required for taking credit and debit card
payments.  If certification is not consistently achieved,
there is a risk of significant financial penalties applied
by our Acquiring Bank and/ or removal of our ability to
accept credit & debit cards completely.  This would
have a significant impact on Customers, Council
income and the Council’s digital aspirations.
Service RR High Board Risk-Reporting To accept credit and debit card payments the Council is
contractually obligated to comply with the Payment Card
Industry Data Security Standards (PCI).  This must be
proven by submitting annual Self-Assessment.
Questionnaires that match payment forms taken. Security
& Compliance Mgr responsible for PCI compliance across
Council. Internal procedures for applying compliance
standards to card payment services. Annual independent
audit of card payment procedures against PCI standards.
PCI Governance Group to be established consisting of
representatives from all Services who deliver ‘pay for’
services in the community. Training for staff handling card
payments
(18) Programme and project management
Where some projects might sit outside of the
programme management unit’s knowledge/
awareness, there is a risk that those projects fail either
in timescales, quality, or costs or even if successfully
concluded, do not deliver the intended outcomes.
Service RR Moderate Board Risk-Reporting This risk had been on the corporate risk register but recent
health checks have provided reassurance regarding our
corporate approach to programme and project
management. The risk has therefore been de-escalated
back to Finance and Resource Services for monitoring in
relation to arrangements for smaller projects that might sit
outside of the programme management unit’s awareness.

Page 42

41 | P a g e
Appendix 4: Business-as-Usual Risks 
The council has 12 areas of risk now monitored via the new risk assurance model introduced in April 2023. Each Head of Service (and three other officers who report
directly to a Service Director), must undertake an annual self-assessment against a set of questions for each risk and indicate what level of assurance they are able to
provide in relation to how they and their teams perform in these areas.  The results shown are system outputs, and for transparency these are presented with some
caveats.  Not all responses are captured by the system; in some instances data has been manually passed to the Chief Auditor. In a couple of instances, Heads of Service
repeated completion of modules with different levels of self-assurance and PowerBI counted two returns instead of accepting the latter and discounting the first. These
anomalies are being addressed for year 2 going live on 15 April.  It is important to recognise that the quality of responses underpinning self-assessment is the focus of
separate reporting by the Chief Auditor, with the data being the foundation for her annual discussions with Service Directors in relation to the annual governance
statement. It is also worth remembering that year 1 is a marker in the ground, with the aim being to see incremental improvement over time. 
For 2024/25, some specific
points of note going forward:
• Using feedback from Year 1
debrief sessions and an
extensive review of the
question sets, by the Chief
Auditor and her team,
modules have been updated
ready for Year 2 to
commence
• A ‘corporate gap’ tracker has
been established from Year
1 responses and the Risk
Manager will now monitor
progress against the actions.
• In line with revised risk
management KPIs, the
Corporate Risk Management
Group will monitor % of
modules with assurance
ratings equal to or greater
than reasonable assurance.

Page 43

42 | P a g e
While these are the council’s business-as-usual risks, where there is recognised need for specific corporate action in any of these aspects of risk, these are escalated from
time to time to the corporate risk register. An example of this is nos. 2 and 7 below. Aspects of these risks are reflected not only within the risk assurance model but are
also reflected in the corporate risk register.
BAU RISK AREA ENCOMPASSING BAU RISK AREA ENCOMPASSING      
1. Community & public
safety
Child and adult protection
Serious and organised crime (external)
2. Asset management Statutory compliance
Arrangements for void properties
Fleet and other infrastructure
ICT hardware and software assets and responsibilities
3. People wellbeing &
development
Staff health and wellbeing
Training and development
Corporate and local induction
4. Information handling GDPR compliance
Information asset management
Information security
Records management
5. Health, safety &
managing adverse
events
Staff incident recording
RIDDOR arrangements
Incident monitoring and trends analysis
6. Programme and project
management
Governance
Compliance with industry standards/ adopted methods
7. Organisation resilience Business continuity:
- Staffing resource
- ICT and/ or power outages
- Facility issue
- Cyber security
8. Partnership management Partnership registers
Agreements
Liabilities
9. Financial control and
governance
Authorities and delegation
Budgeting and accounting
Conflict and whistleblowing
Insider threat and crime
Counter fraud
10. Service planning and
performance monitoring
Customer engagement
Public/ stakeholder engagement
KPI trends analysis
Links to risk management and service improvement
11. Procurement and
contract management
Standing orders
Roles and responsibilities
Monitoring & Performance Mgt
12. Complaints, comments and
claims handling
Compliance
Trends analysis
Links to service improvement 
[Item End]