Page 1

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 20 May 2024
___________________________________________________________________
Report by: Chief Auditor
___________________________________________________________________
Heading: Summary of Internal Audit Reports for period 01 January to 13
May 2024
___________________________________________________________________
1. Summary
1.1 In line with the Public Sector Internal Audit Standards, Internal Audit
must communicate the results of each engagement to the Board. To
comply with this requirement, Internal Audit submits regular reports
on the findings and conclusions of audit engagements to the Audit,
Risk and Scrutiny Board. 
1.2 Appendix 1 provides details those audit engagements completed
during the period 1 January to 13 May 2024 with the overall
assurance rating and the number of recommendations in each risk
category. The committee summary for each report is also attached.
For each audit assignment where recommendations have been
made, the relevant managers have put action plans in place to
address the issues raised. 
1.3 In addition to the reports listed in the Appendix, Internal Audit has an
ongoing commitment to: 
• A range of corporate and service initiatives;
• Progressing of information security matters in partnership with
ICT and Legal Services;
• The regular provision of advice to departmental officers;
• The provision of internal audit services to the associated
bodies for which Renfrewshire Council is the lead authority
and to OneRen and Renfrewshire Health and Social Care
Integrated Joint Board;

Page 2

• Co-ordination of the Council’s corporate risk management
activity;
• Management of the counter fraud team;
• Management of the risk management and insurance team.
___________________________________________________________________ 
2. Recommendations
2.1 Members are invited to consider and note the Summary of Internal Audit
Reports finalised during the period from 1 January to 13 May 2024. 
___________________________________________________________________
Implications of the Report
1. Financial - None 
2. HR & Organisational Development - None 
3. Community Planning – 
Safer and Stronger - effective internal audit is an important element of good
corporate governance. 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None 
7.  Equality & Human Rights – None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk - The summary reported relates to the delivery of the risk-based internal
audit plan. 
11. Privacy Impact – None 
12. COSLA Implications – None 
13. Climate Risk - None 
________________________________________________________________
Author:           Karen Campbell – 07768354651

Page 3

Appendix 1 
Renfrewshire Council 
Internal Audit Service 
Update for Audit, Risk and Scrutiny Board 
Final Audit Reports issued from 1 January – 30 April 2024 
Category  Service  Engagement  Assurance
Rating
Recommendation Ratings
Critical Important Good
Practice
Service
Improvement
Assurance Chief Executives Commercial and
Industrial Rents
No Assurance 3 4 0 0 
Children’s
Services/Finance &
Resources
Supply Teachers Reasonable 0 0 3 1 
Corporate Procurement – Service
Controls - Purchasing
Processes 
Limited 3 4 5 0 
Finance &
Resources
Hardship and
Discretionary Funds
Reasonable 0 1 3 0  
ICT Asset Management Limited 2 9 0 1  
Health & Safety Limited 2 5 1 0 
Environment,
Housing &
Infrastructure
Building Services -
Stores
Limited 2 2 2 0 
Note  – No assurance rating can be given in respect of investigation assignments

Page 4

Assurance Level 
Substantial Assurance • There is a sound system of internal control designed to achieve the objectives of the area being reviewed. 
• The control processes tested are being consistently applied. 
Reasonable Assurance • The internal control processes are generally satisfactory with some areas of weakness being identified that could
put some objectives of the area being reviewed at risk
• There is evidence that the level of non-compliance with some of the control processes may put some of the
objectives of the area being reviewed at risk. 
Limited Assurance • Weaknesses in the system of internal controls are such as to put the objectives of the area being reviewed at risk. 
• The level of non-compliance puts the objectives of the area being reviewed at risk. 
No Assurance • Control processes are generally weak with significant risk to the achievement of the objectives of the area being
reviewed. 
• Significant non-compliance with control processes leaves the processes/systems open to error or abuse. 
Recommendation
Rating 
Service Improvement  Implementation will improve the efficiency / housekeeping of the area under review.
Good Practice  Implementation will contribute to the general effectiveness of control.
Important  Implementation will raise the level of assurance provided by the control system to acceptable levels.
Critical  Addresses a significant risk, impacting on the objectives of the area under review.

Page 5

Internal Audit Report
Chief Executives
Commercial & Industrial Rents (A0048/2024/001) 
Date: January 2024 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the review were to ensure that:
1. A record of all commercial and industrial properties for rental is maintained which
is accurate and up to date.
2. There is a clearly defined letting policy for commercial and industrial properties,
which is comprehensive and supported by appropriate documented guidance.
3. Terms of tenancy (including reletting) are established and formally recorded and
agreed.
4. Rents are regularly reviewed, reflect current market rates and are collected in full.
5. Enforcement action is taken to recover unpaid rents.
6. Void properties are actively managed to minimise loss of rental income. 
Audit Scope
1. Interviewed the appropriate staff, evaluated the system in place for allocation and
reletting commercial and industrial properties and identified any possible
improvements to the system.
2. Undertook a series of tests to ensure the processes for allocation and reletting of
commercial and industrial properties are operating effectively and as described. 
Key Audit Assurances
No assurances can be given in relation to this audit review. 
Key Audit Risks
1. In the absence of a formalised letting policy, the process for letting commercial
properties may lack clear direction and the fragmented nature of record keeping
can make it more difficult to effectively manage these properties.
2. When physical inspections to check that the correct tenants are occupying leased
commercial properties are not regularly carried out, there is an increased risk that
subletting will not be identified.
3. Where letting agreements are not reviewed, errors or changes required to the
leases will not be reflected and could lead to inappropriate contract terms and
rental income not being maximised.
4. Where rents arrears are not followed up timeously, the council could fail to
maximise the income generated from the let of commercial properties.
5. Where tenants responsible for insurance are not recharged from council insurance
payments, there are increased costs to the council.

Page 6

Internal Audit Report
Chief Executives
Commercial & Industrial Rents (A0048/2024/001) 
Date: January 2024 
6. When void properties are not identified for repair as soon as possible, this will
delay the release of properties and reduced rental income will be received. 
Overall Audit Opinion
The audit highlighted significant weaknesses in the system of internal control. Specifically,
there are a number of tasks that are not being completed or are behind schedule,
including physically inspecting leased properties, following up arrears and sending void
properties for repair quickly so that they can be re-let. There is no systematic review of
lease terms or rents charged and most rents have not been changed for several years.
The auditor was unable to provide any positive assurance over the objectives being
reviewed and recommendations were made to address these areas. 
At the time of the review, the team had a number of vacancies for a prolonged period of
time, so progressing the desired improvements to the processes had been held back. 
Management Commentary
The Head of Economy and Development will lead on a strategic review of the Council’s
commercial property portfolio and function. We agreed a number of actions to address the
audit recommendations and improve the current operating processes for the letting and
managing of commercial properties and are currently working on their implementation.

Page 7

Internal Audit Report
CHILDREN'S SERVICES/FINANCE & RESOURCES
Supply Teachers (A0063/2023/001) 
Date: January 2024 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the audit were to: - 
1. Review and evaluate the process for the recruitment of teachers to the Supply
Register.
2. Examine and assess for adequacy the processes followed for the deployment of
Supply Teachers to schools ensuring that the distribution of hours is fair and
equitable.
3. Ensure that hours worked are appropriately recorded, authorised and paid
correctly.
4. Identify any areas for improvement and outline actions to address these. 
Audit Scope
1. Obtained copies of appropriate guidance relating to the recruitment and
deployment of Supply Teachers.
2. Interviewed relevant officers to obtain the required information relating to the
Supply Teachers processes.
3. Prepared a series of tests to meet the detailed audit objectives. 
Key Audit Assurances
1. There are satisfactory processes in place in relation to the recruitment of supply
teachers. 
2. The hours worked by supply teachers are appropriately recorded, authorised and
paid correctly. 
Key Audit Risks
There are no key risks to report. 
Overall Audit Opinion
The deployment and payment of supply teachers is labour intensive and there is
duplication of effort. These processes are currently under review by management in both
Children’s Services and Finance and Resources to establish if there are any opportunities
to streamline the process.  The auditor has made recommendations mainly in relation to
the payment process which will improve efficiency in this area.

Page 8

Internal Audit Report
CHILDREN'S SERVICES/FINANCE & RESOURCES
Supply Teachers (A0063/2023/001) 
Date: January 2024 
Management Commentary
It has been agreed to progress the recommendations made in the audit report.

Page 9

Internal Audit Report
Corporate
Procurement - Service Controls - Purchasing Processes
(A0032/2024/001) 
Date: February 2024 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the audit were to: - 
1. Review any Amazon Prime Memberships across the Council and analyse Amazon
purchases to ensure that the correct procurement route has been utilised.
2. Identify the level of purchase cards held within Services and establish their
Purchase Card ordering processes.
3. Ensure that purchase card purchase requests have been appropriately authorised.
4. Ascertain the role performed by the Purchase to Pay Team in terms of ordering
goods and services on behalf of other services and subsequent payment and
ensure that there is adequate segregation of duties.
5. Ascertain the controls in place surrounding purchase card transaction and monthly
limits. 
Audit Scope
1. Interviewed the relevant officers and obtained the required information and
documentation relating to the specified purchasing processes.  
2. Prepared and carried out a series of tests on appropriate sample groups to meet
the detailed audit objectives. 
Key Audit Assurances
1. The segregation of duties relating to orders placed by the Purchase to Pay Team
are satisfactory.
2. A new corporate process for ordering from Amazon has been introduced.  This has
reduced costs relating to Amazon Prime memberships.  Furthermore, the new
process provides more control over purchases and increased oversight of goods
ordered from this supplier.   
Key Audit Risks
1. Contract agreements are not maintained, and benefits are not realised when
purchase cards are used with non-contract suppliers for goods where there is already
a contract in place.
2. Unauthorised purchases could be made, if the stipulated procedures are not followed
for authorising the order of goods or where an electronic signature has been used
with no backup. 
3. Increased limits to monthly expenditure or individual transactions could be in place for
longer than necessary if there is inadequate management oversight in place.

Page 10

Internal Audit Report
Corporate
Procurement - Service Controls - Purchasing Processes
(A0032/2024/001) 
Date: February 2024 
Overall Audit Opinion
The main weaknesses identified were in relation to purchasing goods outwith the agreed
procurement routes and the authorisation of goods ordered.  There was also a lack of
evidence relating to the authorisation of the increase of purchase card spend limits.  A
number of other housekeeping issues were also identified.  For these reasons, assurance
within this area was found to be limited.  Recommendations have been made which, if
implemented, will improve controls over purchase card purchases.   
Management Commentary
All purchase card holders and approvers have been formally reminded of the purchasing
procedures they must follow when acquiring goods and services in terms of the correct
routes to purchases and the authorisation process for purchases/transactions.  Supporting
guidance has also been update. Reports on card usage will now be run more regularly
and queries raised with the appropriate service management, to determine if the card is
still required.

Page 11

Internal Audit Report
FINANCE & RESOURCES
Other Financial Assistance Payments - Hardship and
Discretionary Funds (A0051/2024/001) 
Date: April 2024 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the review were to ascertain that: 
1. There are documented processes in place for payments from the Scottish Welfare
Fund and the Discretionary Housing Payments Fund.
2. Roles and responsibilities are clear in relation to decision making, escalation and
dispute resolution.
3. Grants and payments have been made in line with the documented procedures,
applicants confirmed as eligible and all relevant documentation has been provided,
or other explanation recorded.
4. Each case has been treated strictly on its merits and all applicants have received
fair and equal treatment within any agreed flexibility guidelines.
5. Reasons for rejected applications are confirmed to applicants.
6. The costs associated with grants and payments are being tracked, monitored and
reported on as required. 
Audit Scope
1. Interviewed the relevant officers and obtained the required information and
documentation relating to the processes surrounding the Scottish Welfare Fund
and the Discretionary Housing Payments Fund. 
2. Prepared and carried out a series of tests on appropriate sample groups to meet the
detailed audit objectives. 
Key Audit Assurances
1. The processes in place for payments from the Scottish Welfare Fund and the
Discretionary Housing Payments Fund are documented. 
2. Grants and payments are made in line with the documented procedures. 
3. Each case is treated strictly on its merits and all applicants have received fair and
equal treatment within any agreed flexibility guidelines.
4. Grants and payments are being tracked, monitored and reported on as required. 
Key Audit Risks
No key risks identified.

Page 12

Internal Audit Report
FINANCE & RESOURCES
Other Financial Assistance Payments - Hardship and
Discretionary Funds (A0051/2024/001) 
Date: April 2024 
Overall Audit Opinion
In the main the processes surrounding payments made from the Scottish Welfare Fund
(SWF) and  the Discretionary Housing Payment (DHP) funds were found to be
satisfactory.     Weaknesses were found relating to verification of awards and ensuring
that customers are advised of the reasons why their application has been declined. 
Recommendations have been made  to strengthen the controls in these areas. 
Management Commentary
We are in the process of actioning the internal audit recommendations and staff will be
reminded of the information that should included in client correspondence.

Page 13

Internal Audit Report
FINANCE & RESOURCES
ICT Planning and Organisation - Asset Management 
(A0072/2024/001) 
Date: April 2024 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the audit were to ensure that:
1. Documented procedures, which includes any necessary provisions for the current
mix of office based and home working arrangements, are in place covering the use
of physical IT assets and the procedures are easily accessible to all users to ensure
they are aware of their responsibilities in relation to the policy.
2. Standard IT equipment asset lists have been created for predefined user roles and
deviations from the standard equipment is appropriately approved.
3. All IT assets are procured through the ICT Service, and equipment purchased is
stored centrally and securely until they have been issued to end users.
4. All IT assets must be assigned to individual users or to a department who will be
held responsible for them and there is a mechanism for recording the physical
location for all ICT assets that have been issued.
5. All IT assets that are no longer in use must be returned to the ICT Service for
redeployment.
6. All receipts and issues from the centralised ICT store are appropriately
documented and approved and stock is held securely until issued.
7. End of life disposal of ICT assets are co-ordinated by the ICT Service and
procedures are in place to ensure that confidential information is removed prior to
disposal. 
Audit Scope
1. Obtained copies of appropriate policies and procedures relating to IT asset
procurement, deployment, assignation and disposal.
2. Interviewed relevant officers to obtain the required information relating to the
above processes.
3. Prepared a series of tests to meet the detailed audit objectives. 
Key Audit Assurances
1. Documented procedures are in place covering the use of physical IT assets and the
procedures are easily accessible to all users to ensure they are aware of their
responsibilities in relation to the policy.
2. Orders for equipment which deviate from standard equipment are appropriately
approved.

Page 14

Internal Audit Report
FINANCE & RESOURCES
ICT Planning and Organisation - Asset Management 
(A0072/2024/001) 
Date: April 2024 
Key Audit Risks
1. Given that the physical location and user details for all ICT assets could not be fully
verified as the systems used to record assets are not fit for purpose in their current
format, there is a risk that council assets are not protected.
2. Without evidence of disposals, there is a risk that all disposal processes may not
have been followed. 
Overall Audit Opinion
The Auditor was advised that the ICT Support Team have only recently taken
responsibility for the area of ICT asset management under review.  The main weakness
identified was that the mechanism in place to record the physical location for all ICT
assets was not fit for purpose in its current format as the asset information is not held
centrally but is held on a number of documents and inaccuracies were found in the
recorded data.  Although there is a disposals process in place, there was also a lack of
evidence in some cases to support that this process had been followed.  Furthermore,
officers within the ICT team do not proactively contact line managers for the return of
leavers equipment despite there being a process in place to facilitate this.  In addition,
there is no requirement for users to sign for assets upon receipt.  For these reasons
identified, assurance within this area was found to be limited. Recommendations were
made which, if implemented, will improve controls in these areas. 
Management Commentary
The new ICT Support team was formed during 2023/24 and a lot of work has since been
undertaken or is in progress in this area.  We have completed a data cleanse of our
records and now have an accurate stock record of ICT Assets.  A new process for
managing the PC/Laptop refresh process has also been introduced which strengthens the
controls in this area.  Longer term. a service desk system which has full asset
management capability is being procured which will automate many of the manual
processes currently in place and therefore reduce the likelihood of errors/omissions
occurring.

Page 15

Internal Audit Report
Finance & Resources
Health & Safety (A0091/2024/001) 
Date: May 2024 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the audit are to ensure that:- 
1. There are clearly defined and understood roles and responsibilities for health and
safety, including risk identification.
2. There are adequate and up to date policies and procedures in place which are
readily available to those who need them.
3. There is regular engagement with other service areas to ensure compliance with
legislative requirements.
4. There is a programme of health and safety audits and these are followed up
adequately.
5. There are adequate arrangements in place for reporting, accidents, incidents and
near misses and these are adequately followed up. 
6. Performance monitoring and reporting arrangements are appropriate. 
Audit Scope
1. Interviewed the appropriate staff to obtain the required information and
documentation to evaluate the system in place for corporate health and safety. 
2. Prepared a series of tests to ensure the processes relating to corporate Health &
Safety are operating effectively and as described. 
Key Audit Assurances
1. There are clearly defined roles and responsibilities for health and safety, including
risk identification documented in the Council’s Policy on Health, Safety & Welfare.
2. There is regular engagement between members of the Health & Safety team with
other service areas which includes weekly, monthly and quarterly meetings as well
as ad hoc conversations and emails.
3. There are adequate arrangements in place for reporting, accidents, incidents and
near misses which are followed up as and when required. 
Key Audit Risks
1. There are a number of policies and procedures which have not been refreshed or
reviewed timeously. In some cases, guidance that has been updated is not
accessible to all staff. There is a risk that staff may not be aware of, or be following,
the correct processes and procedures.
2. Whilst there is evidence of programmed physical inspections being undertaken on
a number of premises. There was no evidence of a programme of health and safety
audits being undertaken of the health and safety management systems within
Services of the by the Health & Safety team. There is, therefore, there is no oversight

Page 16

Internal Audit Report
Finance & Resources
Health & Safety (A0091/2024/001) 
Date: May 2024 
of the level of compliance within services with the requirements documented in the
Council’s Policy on Health, Safety & Welfare.
3. The performance reporting currently in place does not include target levels which
means that trends may not be identified and addressed appropriately and
performance is not suitably scrutinised.
4. In line with Management of Health and Safety at Work Regulations, the council must
be able to demonstrate that it operates effective planning, organisation, control,
monitoring and review of health and safety. Given the key risks arising from the
audit, it is a matter of concern that current practices may be deemed insufficient
should an incident occur which could leave the council open to adverse
consequences. 
Overall Audit Opinion
Although the Principal HR & OD Adviser has explained future implementation plans
regarding health and safety audits and performance monitoring and reporting, these
processes are not in place at the moment. Furthermore, it was noted that three findings
detailed in this report, had previously been reported to Finance & Resources management
in a prior audit report issued in March 2018. It is the auditor’s opinion that it is imperative
that the recommendations made in this report are addressed to ensure compliance with
regulations and to demonstrate the council’s commitment to the health, safety and
wellbeing of its stakeholders. The auditor has therefore provided a limited assurance rating
for corporate health & safety based on the current arrangements. 
Management Commentary
The Director of Finance and Resources will seek to engage an appropriately qualified
external consultant to review and make recommendation on the strategic governance and
operational arrangements for health and safety. This review is intended to go wider than
the recommendations included in this report to ensure that governance and operational
procedures and processes are aligned to the needs of the organisation. Management has
also agreed to implement the recommendations made in the internal audit report and an
action plan is in place to ensure this.

Page 17

Internal Audit Report
ENVIRONMENT, HOUSING AND INFRASTRUCTURE
Building Services Stores (A0047/2024/001) 
Date: April 2024 
COMMITTEE SUMMARY 
Audit Objectives
A new building services management system went live in April 2022 has not been fully
operational since it was introduced, partly due to the loss of key staff by the external
developer. In relation to the stores element, the subject of this audit review, there are a
number of temporary manual processes that have been put in place to compensate for the
lack of current functionality within the system.  The audit review sought to confirm that the
manual processes that have been put in place are sufficient in relation to the objectives
below.
The objectives of the audit were to ensure that:
1. There are adequate checks of the quantity, quality and price of stock received and
receipts are correctly recorded on the stock system;
2. Stock issues are controlled to ensure that they are only for approved work
requirements and are correctly recorded on the stock system;
3. Stock is held securely and access is appropriately restricted;
4. Stock counts are regularly carried out and reconciled to stock records and
differences identified are investigated;
5. Stock is regularly checked to identify obsolete/slow moving items and appropriate
actions are taken for items identified;
6. Stock write offs/ disposals are appropriately authorised. 
Audit Scope
1. Interviewed the appropriate officers to understand the arrangements in place for
the control of stock.
2. Examined the relevant procedures and assessed their adequacy.
3. Carried out sample testing to confirm the adequacy of the controls in place over
the stock records. 
Key Audit Assurances
1. The manual processes put in place to record receipts and issues of stock were
found to be accurately recorded into the system. 
2. There are adequate checks of the quantity, quality and price of stock received.
3. Stock issues are controlled to ensure that they are only for approved work
requirements.
4. Stock counts are regularly carried out and reconciled to stock records and
differences identified are investigated

Page 18

Internal Audit Report
ENVIRONMENT, HOUSING AND INFRASTRUCTURE
Building Services Stores (A0047/2024/001) 
Date: April 2024 
Key Audit Risks
• The Workhub system does not currently have the required functionality to operate
efficiently as a stores system or a job costing system, development work on the system
has been on hold due to contractor issues and has only operationally re-started. As a
result, manual processes have been introduced which are resource intensive and
inherently at risk of error. The costs associated with Workhub are around £100,000 per
annum and there are additional, currently unquantified, costs associated with the manual
processes. However, it should be noted that Workhub and the associated packages (and
costs) relate to systems wider than just stores e.g. job scheduling, operative workload and
financial costings. 
Overall Audit Opinion
The sample testing undertaken indicates that the manual processes in place are sufficient
to meet operational needs and were found to be accurate. However, it is a concern that
the Workhub system is currently not fit for purpose and development has only recently
recommenced. The Auditor has provided a limited level of assurance in this regard and
has recommended that management continue to undertake a review of the continued
economic viability of the Workhub system. The auditor notes that both the Director of
Environment, Housing and Infrastructure and the Director of Finance and Resources have
been kept fully briefed on the on-going challenges around Workhub. 
Management Commentary
Facilities and Property Services have committed a lot of resource (both financially and
staff resource) since early 2022 into the repairs and maintenance management system
(WorkHub). This was needed due to the old system being removed and with
approximately 85,000 jobs per year by Building Services, an electronic system is
essential.
There remain on-going challenges with the system and contractor, however, Senior
Management including the Directors of both Finance and Resources and Environment,
Housing and Infrastructure have been kept up to date with the system and next steps.
The manual processes for the Building Services stores have been found to be working,
however, certain processes have been tightened following the outcome of the internal
audit. The actions will be monitored over the coming months to ensure compliance and
improvements wherever possible.