PUBLIC 
___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 18 May 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Risk Report, May 2026
___________________________________________________________________
1. Summary
1.1 Each year the Board considers and approves the council’s risks.
1.2 This paper sets out the latest position in managing the council’s risks, on entering
the new financial year. The appendices attached provide details of:
1: longer-term or imminent strategic risks
2: longer-term significant corporate risks
3: service risks
4: assurance levels for business-as-usual risks
1.3 This paper does not include specific programme or project risks as each
programme board has established governance arrangements for the ongoing
monitoring of such risks throughout the lifetime of the various projects.
________________________________________________________________________________ 
2. Recommendations
2.1 It is recommended that the Board approves the report. 
3. Background
3.1 The key areas of risk previously
reported to the Audit, Risk & Scrutiny
Board in November 2025 were:
Strategic Risks:
Very High Reducing inequalities
High Migration and asylum related impacts
High Global environmental sustainability and route to Net Zero
High Strategic sustainable planning for people and assets
Moderate Economy
Corporate Risks:
Very High  Successful Cyber Attack
Very High  Partner financial sustainability
High   Asset management
High   Delivery of homeless duties
High   Financial Stability
High   Financial Sustainability
High   Increasing scrutiny/ info requests
High   Misinformation/ disinformation
High    Workforce planning,  recruitment,
and  retention
Moderate  National Care Service
Moderate  Renfrew Bridge

Page 2

PUBLIC 
3.2 The strategic and corporate risk profile for the council in terms of its longer-term or
imminent risks was: 
Evaluation: Low Moderate High Very High Total
LT or Imm Strategic Risks: 00 01 03 01 05
LT or Imm Corporate Risks: 00 02 07 02 11 
3.3 Service department risk profiles were as follows: 
Chief Executives  Children’s
Services 
Environment,
Housing &
Infrastructure 
Finance &
Resources
- -  6 -  7 -  - -
- 2  - 3  - 5  - 1 
3.4 All risks were evaluated using the Council’s risk matrix; this involves multiplying the
likelihood of a risk event occurring by its potential impact. Risks are then evaluated
as either ‘low’ (green), ‘moderate’ (yellow), ‘high’ (amber) or ‘very high’ (red). 
3.5 Turning to 2026/2027, as is our normal practice, we look to the annual Global Risk
Report for risk context in terms of the immediate risk landscape, the next two year
period and then ten year period. 
The standout theme of the report is uncertainty with a ‘darkening outlook.’ “As
global risks continue to spiral in scale, interconnectivity and velocity, 2026 marks an
age of competition. As cooperative mechanisms crumble, with governments
retreating from multilateral frameworks, stability is under siege. A contested
multipolar landscape is emerging where confrontation is replacing collaboration, and
trust – the currency of cooperation – is losing its value.” 
The images below, taken from the report provide an overview of the current global
risk landscape (figure 2, specifically the top 10 global risks and figure 3, risk ranked
in severity both short and longer term). 
Share of Respondents

Page 3

PUBLIC 
While international instability does not feature in the council’s risk registers
specifically, some potential impacts (for example cost of living pressures, pricing
volatility) are captured within other risks. 
3.6 Focusing on a national rather than global context, the council turns to the UK
National Risk Register [2025] for further intelligence. In our review of risk data/
intelligence for the May Risk Report, it is noted that there has been no update to the
2025 edition of the National Risk Register.  The NRR provides reasonable worst-
case scenarios for ‘acute’ risks, described as discrete events requiring an
emergency response. What the NRR does not do, is provide any sense of
imminency or timeframe. 
3.7 Focusing more on local matters, which include the West Community Risk Register
(2024 edition), and indeed those risks for which we have more influence, in terms of
our ability to control or mitigate, the Corporate Management Team has captured,
assessed and reviewed what we believe to be the material risks going forward, in
relation to delivery of the council plan and related services, both in terms of strategic
and corporate risks. 
3.8 Individually, service directors have captured, assessed and reviewed their service-
specific risks. 
3.9 This section of the report sets out the movement in risks from the November 2025
report to now.

Page 4

PUBLIC 
• Risks added/ **NEW**
Strategic
o SRR.26.03.04 - Learning Estate Programme – High
The Learning Estate risk was previously included within the Strategic
sustainable planning for people and assets risk (SRR.25.03.05). This risk is
now captured on its own merits, given the inherent risk in the scale of the
investment and the importance of delivering on this programme of work for our
citizens.
o SRR.26.03.05 – Housing Investment and Regeneration Programmes – High
This risk is included in the service risk register as two separate risks (one
about investment and the other about regeneration), and further detailed risks
are captured and monitored via the project board/s. This risk is however being
added to the strategic risk register to better reflect the strategic importance of
delivering on this work for the benefit of our citizens. 
Corporate  - nil 
Service
o Education Reform    - Moderate (Children’s Services)
Education reform in Scotland refers to a programme of structural,
curricular and assessment change led by the Scottish Government to
improve outcomes for learners, strengthen accountability, and modernise
how education is governed, inspected, and assessed across the system
(from early years to senior secondary and post school learning).  This
programme is now gathering some momentum and so it is beneficial now
to have an increased focus on related emerging risk. 
o DWP subsidy     – High - (Finance & Resources) 
The migration of customers from Housing Benefit to Universal Credit
makes housing benefit accuracy increasing challenging due to the
decreased volume of claims, increased complexity of claims and overall
reduction in HB expenditure - and this means that the council could be at
much higher risk of being impacted financially through subsidy loss. 
• Risks remaining, where scoring has Ï / Ð
Strategic
o SRR26.01.01 Economy – this risk has increased Ï from moderate to high to
reflect current geoeconomic pressures and uncertainties. 
Corporate
o CRR.26.04.14 Information demands and deadlines - this risk has increased
Ï from high to high (scoring up from 12 to 16), as we are experiencing the
negative impact of Artificial Intelligence on volume, complexity and length of
requests and the speed with which requesters and complainers are seeking
reviews and appeals.

Page 5

PUBLIC 
Service - nil 
• Risks escalated from service/s to strategic or corporate
o CRR.26.04.17 Administering Elections risk - escalated from Finance and
Resources service risk register to corporate risk register.
This risk has been monitored over the past couple of years via the Finance
and Resources service risk register. Historically the risk has escalated back to
the corporate risk register when electoral events are in the nearer future. The
risk was escalated again in light of the Scottish Parliamentary Election in May
2026 and the forthcoming Local Government Elections in May 2027.  That said
however, the intention is to keep this risk on the corporate risk register going
forward, recognising that we must always be prepared for any unplanned by-
elections or “snap” elections. 
o CRR26.04.15 21-hours risk – reduction in teacher class contact time -
escalated from Children’s Services service risk register to corporate risk
register.
This risk was captured in the Children’s Services risk register in the November
2025 report. It was noted that to deliver on the national commitment of a
reduction in teacher class contact time from 22.5 hours to 21 hours, there
would be significant financial implications and planning for a required an
increase in teacher numbers.  Although ‘service’ related in nature, the risk
qualifies for escalation to the corporate risk register given the significant
financial pressures.  Although funding has been confirmed by the Scottish
Government, it is part-funded (at the time of this report), and so additional
funding will still need to be sought ensuring that delivery is sustainable and
beneficial for both the education system and local authority. 
• Risks escalated from 'business as usual’ to strategic or corporate – nil 
• Risks removed or de-escalated to service
Strategic
o Sustainable planning for people and assets
Noting that this risk is not so much ‘removed’ but rather, different elements of
the risk are now being picked up in other existing risks. For example, the
financial sustainability/ funding aspects of the Verity Agreement align to the
financial sustainability risk, and the future proofing/ longer-term investment of
assets aligns with the asset management and learning estate risks.
Corporate
o National Care Service
This risk had been put on hold when the related bill failed to be passed in the
Scottish Parliament. With no further development over the past year, the risk
has now been removed.

Page 6

PUBLIC 
Service
o Discontinuation of Shared Prosperity Fund (Chief Executives) This risk was about
service, and staff impacts if the Fund were to cease without a replacement.
While the fund has ceased, it has been replaced with Pride in Place funding
and local growth funding administered via the City Region.
o AMIDS – Investment Zone status (Chief Executives) This risk was about place
shaping ambitions and impact to local economy if IZ status was not achieved,
however IZ status has now been achieved.
o Collections Management /Routing Software for Waste and Recycling Services
(EHI Services) This risk was directly associated with the introduction of the waste
route management system and the transition from paper based to digital
routes. Although the system is now fully implemented, the service remains
committed to improving service delivery and continues to closely monitor
system performance to ensure any issues are identified and resolved
promptly.
o Recruitment and Retention in Technical Services (EHI Services) Noting that the
risk is not so much removed but merged into the existing corporate risk for
workforce planning, recruitment and retention.
• Risks with material updates but no change to scores
o SRR.26.02.02 Reducing inequalities – the title of this risk has been revised to
“Tackling health, wellbeing and low-income inequalities” to make the scope of
the risk clearer.
o SRR.26.03.06 Global environmental sustainability and route to Net Zero – title
of this risk has been revised to Climate change and transition to Net Zero
since the latter was more action specific and reflective of what we are doing at
a local level in Renfrewshire to tackle climate change directly through
decarbonisation and transition actions.
o CRR.26.04.10 Property Asset Management – officers have developed a
Property Asset Management Strategy 2026 – 2030 to outline the strategy
moving forward. This strategic document highlights the on-going work
including a detailed lifecycle plan, condition surveys and work on repairs and
maintenance across the portfolio. A new Strategic Facilities Manager (Asset
Management and Hard FM) and Lead Facilities Manager – Development and
Strategy (Assets) have been recruited to focus on Assets moving forward. On-
going work in relation to CAMIS to improve the system continues.   
o CRR.26.04.14, Increased scrutiny burden/ information requests – this risk has
been revised to “Information Demands and Deadlines.” The increased scrutiny
burden element of the risk has receded following a positive Best Value report
and the Council being recognised by APSE as Council of the Year.
o CRR.26.04.16 Workforce planning, recruitment and retention – updated to
reflect recruitment and retention difficulties across various housing-related
services and to include the Technical Services risk that had been recorded in
the EHI service risk register.

Page 7

PUBLIC 
• Risk-related actions running behind original timescales
o CRR.26.04.10 Property Asset Management
Some actions relating to the development of CAMIS (the Corporate Asset
Management and Information System, are behind original planned
timescales, however for reassurance the appointment of a new Lead Facilities
Manager – Development and Strategy (Assets) will assist in driving this
forward. 
o SRR.26.03.06 Climate change and transition to Net Zero
The action to “explore the options around developing a carbon budget for the
Council” is ongoing and so the original due date of 31 March 2026 will be
extended. 
3.10 Horizon scanning and other points of note
There are a number of matters that the Corporate Management Team keep a
watching brief on. This is particularly relevant for ‘known unknowns’ i.e. matters that
we know could be of concern but are not yet tangible enough for an informed
assessment of risk, or, risks where we will be called upon to respond to, but most
likely at the direction of national government. These are captured below for
information. 
a) Geopolitical context
In keeping with views reflected in the global risk report, CMT continually monitor
the geopolitical landscape as what has become clearer in recent months and
years is how strategic decisions taken elsewhere globally can very quickly lead
to local impacts being felt. As mentioned earlier in the covering paper, while
international instability does not feature in the council’s risk registers specifically,
some potential impacts (for example cost of living pressures, pricing volatility)
are captured within other risks. 
b) Emerging duties and current uncertainty around implications
In the previous report we advised that a developing area to be assessed was a
new corporate offence of failure to prevent fraud (the Economic Crime and
Corporate Transparency Act 2023 that came into force on 1 September 2025).
An organisation is only criminally liable when the offence to commit fraud is for
the benefit of the organisation and the organisation does not have adequate
prevention measures in place.  Since the council has a Corporate Fraud Policy
stating we have zero tolerance of fraud, we have a Corporate Fraud Team, and
a host of other fraud prevention measures, we no longer see this as something
that needs to be reflected under the horizon scanning section of this report. 
Separately, work continues in relation to ascertaining consumer duty compliance
under provisions set out in the Consumer Scotland Act 2020. 
c) Public health matters
A watching brief is kept in relation to the potential for a further pandemic.
Additionally, there is recognition of the potential for animal-related public health
incidents which include diseases such as avian flu, swine flu etc. The council
would take guidance from the Department for Environment, Food & Rural Affairs
(DEFRA), on such matters.

Page 8

PUBLIC 
3.11 With 3.5 - 3.10 in mind, the strategic and corporate risk profile is now as follows: 
Evaluation: Low Moderate High Very High Total
LT or Imm Strategic Risks: 00 00 06 01 07
LT or Imm Corporate Risks: 00 02 07 02 11 
00 02 13 03 18 
3.12 The service department risk profiles are now as follows: 
Chief Executives  Children’s
Services 
Environment,
Housing &
Infrastructure 
Finance &
Resources
- -  5 -  8 -  1 -
- -  - 4   3  - - 
3.13  Appendix 1 provides the detail for 07 longer-term or imminent strategic risks.
Appendix 2 provides the detail for 11 longer-term or imminent corporate risks. 
Appendix 3 provides the detail for 21 longer-term or imminent service risks.
Appendix 4 provides the assurance levels (to date) for business-as-usual risks.
3.14 The strategic and corporate risks remain aligned with the council plan themes that
were approved in 2022. 
Strategic Risks:
Very High  Tackling health, wellbeing and low-income     
inequalities
High  Economy
High  Climate Change and transition to Net Zero
High  Housing Investment & Regen. Programmes
High  Learning Estate Programme
High  Migration and asylum related impacts
High  Misinformation/ disinformation 
Corporate Risks:
Very High  Successful Cyber Attack
Very High  Partner financial sustainability
High   Property Asset management
High   Delivery of homeless duties
High   Financial stability
High   Financial sustainability
High   Information demands & deadlines
High  The 21-hours commitment
High    Workforce planning,  recruitment,
and retention
Moderate  Administering elections
Moderate  Renfrew Bridge

Page 9

PUBLIC 
_________________________________________________
Implications of the Report
1. Financial 
Recurring costs associated with the measures in place for each risk are considered
proportionate to the level of risk, and new planned actions are also considered to be
cost effective. 
The financial requirements to support the risks should be met within the budget of
each relevant risk owner, nevertheless, any unplanned and unbudgeted cost
pressures that arise in relation to any of the risks identified will be subject to review
in consultation with the Director of Finance and Resources. 
2. HR & Organisational Development – not relevant to report recommendations 
3. Community/Council Planning – effective risk management supports the delivery
of all community/ council plan outcomes 
4. Legal – not relevant to report recommendations 
5. Property/Assets – not relevant to report recommendations 
6. Information Technology – not relevant to report recommendations 
7. Equality & Human Rights – not relevant to report recommendations 
8. Health & Safety – not relevant to report recommendations 
9. Procurement – not relevant to report recommendations 
10. Risk – as per the subject matter of this report 
11. Privacy Impact – not relevant to report recommendations 
12. Climate Risk – not relevant to report recommendations 
13. Children’s Rights – This report does not present a new policy, function, or
strategy, nor a substantive change to an existing policy, function or strategy which
will have an impact on children’s rights. The report itself is therefore largely neural
on children.  However, management of certain risks described in the report support
a number of the Articles contained within the United Nations Convention on the
Rights of the Child (Incorporation) (Scotland) Act 2024. For example, managing the
risk relating to ‘Community and Public Safety’ supports Articles:
a. 19 – protection from violence
b. 34 – protection from sexual abuse
c. 35 – protection from sale and trafficking
d. 36 – protection from exploitation 
14. Cosla Policy Position – not relevant to report recommendations
_________________________________________________________
Author:          Karen Locke, Strategic Risk & Insurance Services Manager, 21/04/2026 
Email: riskmanagement@renfrewshire.gov.uk

Page 10

9 | Page 
PUBLIC
Appendix 1: Strategic Risks, longer-term
or imminent
•
ECONOMY – Building an inclusive, green and resilient economy (matching people, skills and opportunities) 
Context  
Risk Detail  
Ref, Title, and Narrative:    
Risk Owner/s:
Cause/ Source 
SRR.26.01.01 Economy 
Renfrewshire’s economy faces challenges such as growing the economically active working age
population; more closely aligning the employability and skills provision with the needs of local
employers; and achieving a strong and inclusive economy.
Head of Economy and
Development; Head of  
Finance and Procurement;  
Insufficient support for economic growth, combined
with current geo-economic pressures. 
Category: (Picklist)  
Event 
Finance and Economy 
Reduction in employment
opportunities, construction and growth initiatives. 
Key RISK indicators: (metrics linked to cause/ effects) 
Effect (Council and/ or Community Plan) 
National and Renfrewshire data
Data on standard of living vs cost of living, GDP, Unemployment. 
Negative impact on businesses, residents and public
services. 
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT)
Evaluation
04
03
12 [High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
Head of Economy and
Development 
Identifying and developing opportunities to support
Scotland and the local economy (e.g. capital
investment programmes and local business seeking to
export to new
markets). 
Ongoing
Development of an upǦtoǦdate investment
proposition that clearly positions and
promotes Renfrewshire as a location to
invest and grow
a business. 
To be confirmed
Economic Development
Manager 
Developing skills interventions to address labour
market shortages and the risks of future
unemployment (for those in work, particularly those in
low-paid employment, and parents). 
Ongoing
Number of people getting support through
Renfrewshire Council Employability
Services.
To be confirmed
Procurement Manager;
Economic Development
Manager
Increasing the level and %
of procurement spend with
local businesses.   
Ongoing
Ensuring council services adopt community
wealth building practises and include local
businesses in the ITT.
Supporting local businesses to bid for
council contracts.
To be confirmed

Page 11

10 | Page 
PUBLIC
Economic Development
Manager
Supporting local businesses to become more carbon
neutral 
Ongoing
Number of local businesses undertaking
carbon baseline assessments and / or
securing Net Zero growth grants from
Renfrewshire Council Business Grants  
To be confirmed
Chief Planning Officer
Monitoring the supply and take-up of land readily
available for employment/ business uses in
Renfrewshire 
Ongoing
Annual publication of land supply audit by
Council [monitor trends / change in
volume]
To be confirmed
Head of Economy and
Development
Monitoring the occupation of the proposed AMIDS Tax
Site 
Ongoing
Number of new
businesses locating in
AMIDS Netherton Farm
site per annum
[floorspace and job creation]
To be confirmed
Economic Development
Manager
Growing the working age economically active
population:
Continuing to support local unemployed people into
work through the delivery of targeted support through
the Council’s employability programme. 
Ongoing
Number of people getting support through
Renfrewshire Council Employability
Services. 
Number of unemployed/ low
waged
people moving into paid employment
through Renfrewshire Council
Employability Programme
To be confirmed
Head of Economy and
Development
Continuing to progress core actions to support local
and regional economic growth. 
Ongoing
Existence of an approved economic
development / regeneration strategy and
associated action plan explicitly
referencing support to:
• capital investment
• local supply chain
• business growth
To be confirmed
Regeneration and Place
Manager
Collaborating with partners to transform
our key
centres and progress the actions outlined in our town
centre strategies/visions 
Ongoing
Periodic production of town centre
strategies and vision documents for
Renfrewshire’s towns.
To be confirmed 
Response 
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
տ
ց
տ
տ
Action (SMART – Specific, Measurable, Achievable, Realistic, Timebound) 
Action
Due
Progress Monitoring Key

Page 12

11 | Page 
PUBLIC
Action
code
Responsible
Officer/s
Evidence of
completion  
Achieved
On target 
Slippage-
recoverable 
Unlikely to
achieve
03/26
06/26
09/26
12/26
03/27
06/27
09/27
12/27
03/28
SRR26.01
.01a
Develop a Community Wealth
Building Plan for Renfrewshire
Economic
Development
Manager
30 Oct
2026
Community
Wealth
Building Plan
approved 
SRR26.01
.01b
Ensure there is sufficient
employment land allocated in
adopted Local Development Plan
Chief Planning
Officer
1 Dec
2028
LDP adopted
with sufficient
employment
land 
SRR26.01
.01c
Complete the Tech Terrace
development and attract the first
large occupier.
AMIDS JV
(Buccleuch
and RenfCo)
1 Dec
2028 
Tech Terrace
operational

Page 13

12 | Page 
PUBLIC
•
PLACE - working together to enhance wellbeing across communities
•
FAIR - nurturing bright, happy and healthy futures for all 
Context  
Risk Detail  
Ref, Title, and Narrative:    
Risk Owner/s:
Cause/ Source 
SRR.26.02.02 Tackling health, wellbeing and low-income inequalities
This covers health and wellbeing challenges, welfare reform
impacts, barriers to
employment, and poverty – particularly the ongoing cost of living crisis. In response,
the Council has developed a Fairer Renfrewshire programme.
Chief Executive/
delegation to:
Head of Policy and
Partnerships
Persistent inequality driven by poverty, the disproportionate impact of
the cost-of-living crisis on low-income households, and ongoing
changes to welfare reforms. 
Category: (Picklist)  
Event 
Social and Community  
Worsening social and economic outcomes for vulnerable and low-
income households.
Key RISK indicators: (metrics linked to cause/ effects) 
Effect (Council and/ or Community Plan) 
e.g.  
Health inequalities – for example, healthy life expectancy gap
Poverty rates including %
of children living in poverty
Various metrics tracked through Cost of Living dashboard reported to Fairer Renfrewshire Sub Committee
Increased demand for support services and reduced progress in
reducing inequalities. Note - short-term
impacts on households but
also wider long-term
consequences on attainment and health for
people experiencing inequality through for example low
income.
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT)
Evaluation
05
05
25 [V.High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
W
hat and Why
Freq.
Connected
Communities
Manager
Progressing the delivery of the Fairer Renfrewshire Action
Plan, including supporting residents through the cost-of-
living crisis
Ongoing 
Income maximisation statistics
Regular progress updates to Fairer Ren
Officer Group and Fairer Ren sub; delivery of
key programmes such as W
inter Connections
To be confirmed
Head of
Education 
Administering Pupil Equity Funding to improve outcomes
for children affected by socioǦeconomic disadvantage
Ongoing
Reports to Education and Children’s Services
Policy Board
To be confirmed
Connected
Communities
Manager
Progressing a new
workstream
that will
focus on advancing equality of opportunity and ensuring
we have a robust and authentic organisational approach to
implementing our duties (including UNCRC). 
Ongoing 
Progress against actions identified within
Equality Outcomes Action Plan
To be confirmed

Page 14

13 | Page 
PUBLIC
Response 
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
տ
ց
տ
տ
Action (SMART – Specific, Measurable, Achievable, Realistic, Timebound) 
Action
code
Action
Responsible
Officer/s
Due
Evidence of
completion
Progress Monitoring Key  
Achieved
On target 
Slippage-
recoverable 
Unlikely to
achieve
03/26
06/26
09/26
12/26
03/27
06/27
09/27
12/27
03/28 
SRR.26.0
2.02a
Develop Family Poverty Insight
Partnership to better understand
local child poverty data and
intelligence, and most effective
service response
Connected
Communities
Manager
April
2027
To be confirmed 
SRR.26.0
2.02b
Design a new
Connected
Communities service
model for the Council –
implementing a new
service structure and
developing the
corporate approach for
the whole organisation
Connected
Communities
Manager
April
2027
To be confirmed

Page 15

14 | Page 
PUBLIC
Context  
Risk Detail  
Ref, Title, and Narrative:    
Risk Owner/s:
Cause/ Source 
SRR.26.02.03 Migration and Asylum-Related Service Pressures
*Ongoing refugee resettlement, asylum
dispersal, and inward migration
continue *Asylum
dispersal programme, support for Ukrainian displaced
persons, statutory responsibilities for Unaccompanied Asylum-Seeking
Children under the National Transfer Scheme, and Syrian/Afghan
resettlement commitments. *Supporting resettlement through the New
Scots approach.
Head of Policy and
Partnerships 
Head of Child Care and
Criminal Justice 
Head of Housing Services
The rapid scale and pace of asylum
dispersal and refugee resettlement since
2022, exceeding previous local experience, combined with a constrained housing
market, limited foster and residential care capacity, and heightened national
discourse on migration.
Category:
Event 
Social and Community  
Increased and sustained pressure on housing and homelessness services,
education, health and social care, and children’s social work
Key RISK indicators: (metrics linked to cause/ effects) 
Effect (Council and/ or Community Plan) 
Taken from
CAHS SIP 2026-29
• Average time from
households presenting themselves as homeless to completion of duty (number of
weeks) 
• Review
operation and impact of ‘No.31 Well-being Hub’
Reduced service capacity and increased costs, challenges in meeting statutory
duties—
particularly for housing and children—
and potential negative impacts
on community integration, cohesion, and public confidence if pressures are not
effectively managed.
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT)
Evaluation
04
04
16 [High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
Strategic Migration Group
Reviewing and discussing developments across all
migration and resettlement programmes
Quarterly
Quarterly reporting provides early
visibility of migration pressures and
agreed mitigating actions.
(Work in progress)
Head of Policy and Partnerships, 
Head of Child Care and Criminal
Justice, 
Head of Housing Services
Asylum
Dispersal meetings are held every 8 weeks with
senior Council officers and representatives from
the UK
Government Home Office and their agent Mears to
ensure effective communication and collaboration
between all relevant partners
8 weekly
Regular information sharing enables
forward planning and reduces
unplanned or emergency dispersal
impacts.
(Work in progress)
Head of Policy and Partnerships, 
Head of Child Care and Criminal
Justice, 
Head of Housing Services
Undertake liaison meetings with Migrant Help and
other partner organisations such as Police Scotland and
HSCP to ensure effective communication and
collaboration between all relevant partners
8 weekly
Coordinated partner engagement
supports timely response to
safeguarding, welfare and community
safety issues.
(Work in progress)

Page 16

15 | Page 
PUBLIC
Renfrewshire Community
Protection Chief Officer Group
Receiving regular updates on migration and asylum
issues and any emerging issues to ensure membership
of the Chief Officer Group are fully informed.
8 weekly
Senior officers maintain oversight of
migrationǦrelated risks and escalate
emerging issues appropriately.
(Work in progress)
Renfrewshire Community
Protection Member Officer
Group
Receiving regular updates on migration and asylum
issues and any emerging issues to ensure Elected
Members and senior Council officials and partners are
fully informed.
8 weekly
Elected Members are kept informed
of migration pressures, supporting
informed leadership and
decisionǦmaking.
(Work in progress)
Fairer Renfrewshire Officer’s
Group
Monitoring progress against New
Scots/population
changes and community cohesion actions contained in
the Equalities Action Plan
As required
Monitoring of New
Scots and equality
actions identifies and addresses
community cohesion risks.
(Work in progress)
Head of Policy and Partnerships
Providing updates to the Leadership Board of the
council. Between cycles, briefings are provided to
Group Leaders by the Head of Policy and Partnerships
and the Head of Housing
As required
Corporate leadership receives timely
intelligence to inform
strategic and
resource decisions.
(Work in progress) 
Response 
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
տ
ց
տ
տ
Action (SMART – Specific, Measurable, Achievable, Realistic, Timebound) 
Action
code
Action
Responsible
Officer/s
Due
Evidence of
completion
Progress Monitoring Key  
Achieved
On target 
Slippage-
recoverable 
Unlikely to
achieve
03/26
06/26
09/26
12/26
03/27
06/27
09/27
12/27
03/28
SRR26.02
.03a
Finalise strategic Needs
Assessment in relation to New
Scots
Senior Policy
Officer
Sept
2026
Needs
assessment
completed 
Context   
Risk Detail 
Ref, Title, and Narrative:  
Risk Owner/s:   
Cause/ Source

Page 17

16 | Page 
PUBLIC
SRR.26.02.04 Learning Estate Programme (Scale, Complexity and Investment Value) 
The Learning Estate Strategy is a high value capital programme involving numerous school
refurbishments and/ or replacements. 
There is a risk that the scale and value of the Learning Estate investment programme,
combined with delivery complexity, outstrip the Council’s financial, organisational and
market capacity. Resulting in affordability challenges, delayed delivery and diminished
strategic benefits.
Director of Children’s Services
(Shared accountability with
Director of Finance &
Resources
and Director of Environment,
Housing &
Infrastructure) 
High levels of capital investment sensitive to construction
inflation, interest rates, contractor capacity and market
volatility. 
External dependencies such as Scottish Government
funding, supply chain performance, planning and
statutory approvals introduce additional complexity and
uncertainty. 
Category:   
Event
Programmes and Projects
Inability to deliver the Learning Estate Strategy
Key RISK indicators: (metrics linked to cause/ effects) 
Effect (Council and/ or Community Plan) 
Capital costs exceeding approved budgets, placing pressure on the wider Council Capital Plan and borrowing limits. 
Slippage to agreed delivery timescales, delaying educational and community benefits. 
Requirement to defer, rephase or reduce scope of projects, undermining strategic objectives. 
Adverse impact on stakeholder or partners confidence in programme delivery and governance. 
Reduced ability to progress other priority capital investments due to constrained financial capacity.
Capital affordability pressure.
Delays to delivery.
Reduction in scope or quality of Learning Estate projects.
Increased revenue impacts. 
Reputational damage.
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT)
Evaluation
03
05
15 [High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
Learning Estate
Delivery Board
Ensuring a phased delivery approach with clear affordability
gateways and break points in order to manage cost and delivery
risks and ensure the learning estate investment remains sustainable
and strategically aligned.
Monthly
Project Status Reports, Programme and
Project Plans, Risk and Actions Register
Substantial
Learning Estate
Delivery Board
Implementing robust programme governance, including Gateway
reviews, escalation routes and Member oversight in order to
provide clear accountability, transparent decision making, and
appropriate Member assurance throughout the life of the
programme
Monthly
Project Status Reports, Programme and
Project Plans, Risk, Decisions and Actions
Register
Substantial
Learning Estate
Delivery Board
Regularly reviewing capital affordability, borrowing assumptions
and whole life cost impacts in order to ensure investment decisions
remain aligned with organisational strategy and funding
constraints.
Monthly
Formal governance and financial scrutiny
Substantial

Page 18

17 | Page 
PUBLIC
Learning Estate
Delivery Board
Ensuring ongoing market testing, cost benchmarking and early
contractor engagement to manage inflation and capacity risk.
Ongoing
Formal market engagement strategy, live
benchmarking data, early contractor
involvement, and commercial governance
oversight.
Reasonable
Learning Estate
Delivery Board
Implementing strengthened programme management and client
side capacity, including use of external support where appropriate
to reduce delivery risk, address capability gaps, and provide
resilience during peak or complex phases of the programme.
Ongoing
Clear governance, experienced technical
leadership, targeted external support,
regular performance reporting and
independent gateway reviews.
Substantial
Learning Estate
Delivery Board
Ensuring clear prioritisation framework to align investment
decisions with educational outcomes and statutory need.
Ongoing
A documented and approved prioritisation
framework with clear criteria linking
investment decisions to educational
outcomes and statutory duties.
Substantial
Learning Estate
Team
Supporting the delivery of the programme on a day-to-day basis in
order to ensure effective and timely programme delivery.
Ongoing
The Terms of Reference for the Programme
clearly defines roles and responsibilities for
dayǦtoǦday programme support which is
embedded within agreed governance
arrangements.
Substantial
Learning Estate
Team
Undertaking planned and coordinated engagement and
consultation to inform
strategic decision making and provide
confidence that business case proposals are robust, evidence led
and stakeholder informed.
Ongoing
A defined engagement strategy,
representative stakeholder input, structured
analysis of feedback, and governance
oversight demonstrating its influence on
business case decisions.
Substantial
Learning Estate
Project Board
Implementation of a data governance framework supported by
defined ownership and access controls in order to reduce data
related risk, prevent unauthorised use, and provide assurance over
the quality and reliability of data.
Ongoing
Role specific access controls and segregation
of duties, embedded within corporate
systems and reviewed regularly.
Reasonable
Response:
Terminate տ
Tolerate տ
Treat ܈
Transfer տ
Take տ
Action
code
Action
Responsible
Officer/s
Due
Evidence of
completion
Progress Monitoring Key  
Achieved
On target 
Slippage-
recoverable 
Unlikely to
achieve
03/26
06/26
09/26
12/26
03/27
06/27
09/27
12/27
03/28
SRR26.02
.04a
Further strengthen
benefit realisation
reporting.
Programme
Manager
Aug-2027
All business cases
detail benefits
realisation

Page 19

18 | Page 
PUBLIC
Context   
Risk Detail 
Ref, Title, and Narrative:  
Risk Owner/s:   
Cause/ Source 
SRR.26.02.05 Housing Investment and Regeneration Programmes
The Council’s Housing Investment and Regeneration Programmes are multi
year programmes of significant investment in our Council housing stock,
delivering a range of internal and external improvement works as well as
the delivery of new-build housing projects. 
Head of Housing
Services
Inflationary pressures, contractor capacity, lower than anticipated owner participation
in mixed tenure blocks. 
Category:   
Event
Social and Community
Programmes and Projects
Failure to meet the required regulatory standards.
The anticipated outcomes from
the programmes are not wholly achieved.
Impact on Housing Revenue Account (HRA) Business Plan if costs increase. 
Key RISK indicators: (metrics linked to cause/ effects) 
Effect (Council and/ or Community Plan) 
Increased costs
Any delays to programmes / impact on timescales
Lack of owner participation in mixed tenure blocks 
Impact on financial stability of HRA Business Plan
Logistical or capacity challenges across the Programmes. 
Impact on tenants whose properties cannot be improved due to lack of owner
participation.
Reputational impact for Council. 
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT)
Evaluation
04
04
16 [High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
Housing Asset
&
Investment
Programme
Board
Monitoring programme risk register that reflects assumptions,
interdependencies and common risks across all projects to ensure early
identification and response as challenges emerge.
Annual report on Programme to Communities and Housing Policy Board to
ensure transparency and governance.
Ongoing
KPIs to monitor contractor
performance
Monitor owner participation
Monthly budget review
process
Reasonable
Housing-led
Regeneration
and Renewal
Programme
Board
Monitoring programme risk register that reflects assumptions,
interdependencies and common risks across all projects to ensure early
identification and response as challenges emerge.
Providing regular updates on the Programme to Corporate Management Team
(CMT) to ensure transparency and involvement in key decisions involving risk.
Annual report on Programme to Communities and Housing Policy Board to
ensure transparency and governance.
Ongoing
KPIs to monitor contractor
performance
Monitor owner participation
Monthly budget review
process 
Reasonable

Page 20

19 | Page 
PUBLIC
Response 
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
տ
܈
տ
տ
Action (SMART – Specific, Measurable, Achievable, Realistic, Timebound) 
Action
code
Action
Responsible
Officer/s
Due
Evidence of
completion
Progress Monitoring Key  
Achieved
On target 
Slippage-
recoverable 
Unlikely to
achieve
03/26
06/26
09/26
12/26
03/27
06/27
09/27
12/27
03/28
SRR.26.0
2.05a
Deliver the housing capital
investment programme as set
out in the Housing Revenue
Account (HRA) Budget and Rent
Levels 2026/27 to 2027/28 and
Capital Investment Plan 2026/27
to 2030/31 approved by Council
in February 2026
Head of
Housing
Services. 
Housing Asset
and Investment
Manager
2030/31 
SRR.26.0
2.05b
Deliver the 10 year Housing-led
Regeneration and Renewal
Programme approved by the
Communities, Housing and
Planning Policy Board in January
2022
Head of
Housing
Services.
Housing
Regeneration
and
Development
Manager
2032

Page 21

20 | Page 
PUBLIC
•
GREEN – leading Renfrewshire to Net Zero 
Context  
Risk Detail  
Ref, Title, and Narrative:    
Risk Owner/s:
Cause/ Source 
SRR26.03.06 CClimate Change and Transition to Net Zero
The Council has statutory duties under the Climate Change (Scotland) Act 2009 to achieve net zero
emissions and deliver climate change adaptation and mitigation. There is an urgent need to secure
the funding, resources, tools and powers to enable us to deliver net zero and become nature positive. 
Climate change and increasing extreme weather pose risks to service delivery and resilience. Progress
towards net zero is constrained by significant investment requirements and the absence of
sustainable funding. 
Head of Climate, Public
Protection and Roads
Insufficient financial and skills resources locally, to meet
the scale of the climate and nature emergency. Under
investment in the public building portfolio with
buildings now
requiring significant resource to meet
targets. 
Cost pressures cannot be met through existing budgets
or current grant funding.
Category:
Event 
Environmental and Natural  
Unable to meet net zero targets and sustain public
services
Key RISK indicators: (metrics linked to cause/ effects) 
Effect (Council and/ or Community Plan) 
Decarbonising the Council’s estate is estimated to require £550m, with further substantial but uncertain costs associated with
transitioning the fleet and supporting infrastructure to zero emission technologies.
Statutory duty under Scotland’s Climate Change Act (2009) 
Statutory duty under the Nature Conservation (Scotland) Act 2004. 
Council’s own target of working towards net zero by 2030 in both its own operational emissions and Renfrewshire’s areawide
emissions.
Disruption to and reshaping of the Renfrewshire area,
change in biodiversity, increase in extreme weather
that impacts service delivery and the integrity of our
roads, open space and buildings infrastructure, and
operational, financial, legal and reputational impacts
for the council. 
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT)
Evaluation
04
04
16 [High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
Head of
Climate, Public
Protection and
Roads
Monitoring of Net Zero objectives (such as those included in the
Council Plan), to ascertain progress towards reducing emissions.
[Note - work is underway to develop a new
iteration of the Plan for
Net Zero]
Ongoing
https://www.renfrewshire.gov.uk/arti
cle/11733/Climate-change-action-to-
make-Renfrewshire-net-zero
Reasonable
Planning &
Climate Change
Policy Board
Receiving regular updates to ensure full project management
oversight 
Quarterly
Full project management
methodology:
Project milestones on track etc
Net Zero Oversight Group
Reasonable

Page 22

21 | Page 
PUBLIC
Head of Policy
and
Partnerships
Administering the Sustainable Communities Fund – (applications
considered and approved/ declined), to support local people develop
sustainable projects that promote or improve community
collaboration, health and wellbeing, local spaces, economic
development, biodiversity and the environment
Monthly 
Currently developing interventions in
Climate View
to allow
emissions to be
tracked, considered and reduced
where possible. 
Reasonable
Sustainability
Team 
Using an emissions modelling tool to quantify the impact of actions,
inform
future targets and present emissions data. 
Annually 
Annual progress reports to the
Infrastructure, Land and Environment
Board. 
Reasonable
Sustainability
Team
Monitoring the Carbon Management Plan to ensure delivery 
Every 5
years 
Annual progress reports to the
Planning and Climate Change Board 
Reasonable
Sustainability
Team
Monitoring an approved Adaptation Plan to ensure delivery 
Every 5
years 
Annual progress reports to the
Planning and Climate Change Board  
Reasonable
Sustainability
Team
Rolling out Climate Change Impact Assessments for all projects or
policy changes 
Ongoing  
Annual progress reports to the
Planning and Climate Change Board
and quarterly updates to the NetZero
Oversight Group 
Substantial
Senior Manager,
Climate and
Public
Protection 
Monitoring the approved capital programme in year 25/26 to ensure
expansion of Building Management Systems and Solar Array across
non-domestic buildings. 
Annually  
Annual progress reports to the
Infrastructure, Land and Environment
Board. 
Reasonable
Senior Manager,
Climate and
Public
Protection
Monitoring implementation of the Local Heat and Energy Efficiency
Strategy Delivery Plan. 
Every 3
years  
Regular updates provided to the
Oversight Board  
Reasonable
Sustainability
Team 
Identifying opportunities for Partnership Delivery Models for clean
energy projects such as solar and battery storage 
Ongoing  
Regular updates provided to the
Oversight Board 
Reasonable
Sustainability
Team
Prioritising actions in relation to the biggest emissions sources, where
we have the most influence, through project pathfinder approaches
for decarbonisation of domestic and non-domestic properties and
vehicles to bring scale and pace to emissions reduction. 
Ongoing  
Regular updates provided to the
Oversight Board 
Reasonable
Sustainability
Team
Continuing to work with stakeholders to articulate the potential costs
and skills required to reach our net zero target. 
Ongoing  
Regular updates provided to the
Oversight Board 
Reasonable
Sustainability
Team
Continuing to work with communities to ensure a holistic
approach to tacking climate change is taken and to ensure no
community is left behind 
Ongoing  
Regular updates provided to the
Oversight Board 
Reasonable

Page 23

22 | Page 
PUBLIC
Response 
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
տ
ց
տ
տ
Action (SMART – Specific, Measurable, Achievable, Realistic, Timebound) 
Action
code
Action
Responsible
Officer/s
Due
Evidence of
completion
Progress Monitoring Key  
Achieved
On target 
Slippage-
recoverable 
Unlikely to
achieve
03/26
06/26
09/26
12/26
03/27
06/27
09/27
12/27
03/28
SRR.26.0
3.04a
Report transparently on
our emissions to ensure
that Renfrewshire’s
emissions baseline is
clearly understood. 
Head of Climate,
Public
Protection and
Roads 
30-Nov-
2026 
Annual Return
submitted to the
Scottish Government
in line with Climate
Change (Duties of
Public Bodies:
Reporting
Requirements)
(Scotland) Order
2015, 
SRR.26.0
3.04b
Develop our adaptation
measures, as part of an
approved Adaptation Plan,
as we are aware that
mitigation alone will not
protect communities from
the impact of climate
change.
Head of Climate,
Public
Protection and
Roads
31-Aug
2026
Adaptation Plan
developed 
SRR.24.0
3.04a
Develop a Circular
Economy Strategy to
minimise waste generation
and encourage reuse and
recycling to support a
more sustainable and
circular economy
Head of Climate,
Public
Protection and
Roads
31-Mar
2027
The Circular Economy
Strategy developed 
SRR.24.0
3.04b
Explore opportunities for
expansion of carbon sinks
Head of Climate,
Public
31-Mar
2030
Carbon sinks and
carbon capture

Page 24

23 | Page 
PUBLIC
and other carbon capture
technologies
Protection and
Roads
technologies
implemented
SRR.24.0
3.04c
Explore the options around
developing a carbon
budget for the Council.
Head of Climate,
Public
Protection and
Roads
31-Mar
2027 
A carbon budget
developed 
SRR.24.0
3.04d
Develop a route map to
decarbonise our estate
Head of Climate,
Public
Protection and
Roads
31 Mar
2027
Route map to
decarbonising our
estate develop

Page 25

24 | Page 
PUBLIC
•
LIVING our VALUES – making a difference together 
Context
Risk Detail
Ref, Title, and Narrative: 
Risk Owner/s:
Cause/ Source
SRR.26.04.07 Misinformation and Disinformation
The proliferation of information providers and social media and online channels
has increased the risk of mal/mis/disinformation which can undermine trust in
public bodies through creating and/ or spreading false information.
Head of Marketing
and Comms
A significant increase in the number of online channels available, the
diversification of audiences and spread of false information.  
Category:
Event 
Social and Community
Intentional or accidental spreading of false information and shared by others
who may not be aware of any inaccuracies in the information.
Key RISK indicators: (metrics linked to cause/ effects)
Effect (Council and/ or Community Plan)
Online information observed
Potential for growing mistrust within communities because of inaccurate/
false information being shared, causing tension within communities and
undermining trust in public organisations. 
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL
Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT)
Evaluation
04
04
16 [High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
Comms
Team
Reviewing our comms channels to ensure our information is reaching key audiences and is accurate
and appropriate for the audience, keeping in mind the expanding use of AI search tools.
Annually or
more freq.
as required
Comms and
marketing KPIs
Reasonable
Comms
Team
Reviewing our social media strategy to ensure effective performance of online channels and
content, and that it is achieving the objectives in the marketing and communications strategy
Annually or
more freq.
as required
Social media KPIs
Reasonable
Comms
Team
Reviewing our Marketing and Communications Strategy 2024-2027 to ensure our approach is
addressing any risk, can respond to issues in a timely way and support the council as a trusted
source of information
Annually or
more freq.
as required
KPIs
Reasonable
Comms
Team 
Equipping key partners and stakeholders with accurate information to mitigate the spread of any
dis/misinformation.
As required
Assurance only
Reasonable

Page 26

25 | Page 
PUBLIC
Response 
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
տ
܈
տ
տ
Action (SMART – Specific, Measurable, Achievable, Realistic, Timebound) 
Action
code
Action
Responsible
Officer/s
Due
Evidence
of completion
Progress Monitoring Key  
Achieved
On target 
Slippage-
recoverable 
Unlikely to
achieve
03/26
06/26
09/26
12/26
03/27
06/27
09/27
12/27
03/28
CRR26.0
4.07a
Launch a new
Council website –
Renfrewshire.gov.uk – and implement
the digital experience strategy,
transforming how
citizens interact with
the Council across digital platforms.
Head of
Marketing and
Communications
31-
Mar-
2027
New
website
launched

Page 27

26 | Page 
PUBLIC
Appendix 2: Corporate Risks, longer-term
or imminent 
•
LIVING our VALUES – making a difference together 
Context   
Risk Detail 
Ref, Title, and Narrative:  
Risk Owner/s:   
Cause/ Source 
CRR.26.04.08 Successful cyber attack
The risk is specific to a successful cyber-attack as increasingly, this risk comes closer to home, despite
the sophisticated technical security protocols and cyber architecture in place, and for those
organisations who have been impacted by successful attacks, and we know
that the effects are
devastating.  No matter the technology deployed, the risk is materially impacted by individual
employee behaviours – i.e. learning how
to recognise a cyber-attack and keeping that knowledge up
to date by reading cyber updates and doing mandatory cyber training, being alert to phishing attacks
and understanding the need for rapid escalation should an error inadvertently be made and criticality
of urgently reporting when they have reacted to a phishing email and explaining all actions taken.
Director of Finance
&
Resources 
(But noting that all
service Directors
have a
responsibility
here)
An ever-present threat which remains acute, despite the
Council’s technical preparedness for an attack.  
Category:   
Event
Cyber and Digital
Successful cyber attack
Key RISK indicators: (metrics linked to cause/ effects) 
Effect (Council and/ or Community Plan) 
Increasing no of successful attacks on partner bodies including other local authorities
Number of local threats successfully dealt with
Risk of significant impact on all council operations and the
ability to recover
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL
Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT)
Evaluation
04
05
20 [V. High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
For security reasons, technical security controls and any further planned actions are not published in the public domain

Page 28

27 | Page 
PUBLIC
Context
Risk Detail
Ref, Title, and Narrative: 
Risk Owner/s:
Cause/ Source
CRR.26.04.09 Partnership Financial Sustainability
Medium
to long-term
risk of the HSCP’s ability to meet
expected future costs of service delivery.
Director of Finance
and Resources
The HSCP is currently forecasting a budget gap in 2026/27 of £7.2m. Reserves are expected to bridge
this gap, but in doing so will close the year at c£6m, which is not sufficient to cover 2027/28 budget
pressures, and leaves no reserves available for future years.
Category:
Event
Finance and Economy
The HSCP would formally enter Financial Recovery if this situation materialises and be unable to meet
service delivery.
Key RISK indicators: (metrics linked to cause/ effects)
Effect (Council and/ or Community Plan)
Budget Monitoring discussions
Medium
term
financial monitoring and Reserves tracking
The Integration Scheme states that should the IJB be unable to achieve a balanced budget for future
years, it would be required to seek additional funding from
its Partner Bodies, including the Council.
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL
Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT)
Evaluation
05
04
20 [V. High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
HSCP Budget holders and Finance
Team
The IJB’s Sustainable Futures programme looks to mitigate some
of the pressure through a portfolio of savings measures
Ongoing
Board Reports on
savings programme /
IJB decisions
Reasonable
Director of Finance and Resources
The Council is fully passing through settlement funding for Free
Personal Care and Adult Social Care Real Living Wage increases
Annual
Local Government
Finance Settlement
Reasonable
Director of Finance and Resources
and Head of Finance and
Procurement
Regular budget monitoring discussions between Council and
HSCP finance officers
Quarterly
Budget monitoring
reports / projections
Reasonable
Director of Finance and Resources
/ HSCP CFO
Regular medium
term
financial monitoring between Council and
HSCP finance officers
Bi-annual
Medium
term
plans
and forecasts
Reasonable
Response 
Terminate
Tolerate ց
Treat* See Action Log Below
Transfer
Take

Page 29

28 | Page 
PUBLIC
Context
Risk Detail
Ref, Title, and Narrative: 
Risk Owner/s:
Cause/ Source
CRR.26.04.10 Property Asset Management
The Council’s property asset portfolio faces challenges in ensuring effective
governance, clarity of roles and responsibilities, and ongoing statutory
compliance across estates, facilities management, property services and
operational services. These challenges are compounded by financial pressures,
rising costs, supply chain constraints, the need to modernise assets (including
lighting upgrades), and the requirement to meet Net Zero targets ahead of the
Scottish Government’s 2045 deadline.
Head of Facilities and Property
Services; Head of Economy &
Development Services
(But noting that all Heads of Service
have a responsibility here in terms of
Responsible Persons, inspection
inventories and response, people
elements of fire risk assessment)
Financial challenges in managing the public building portfolio,
alongside the longstanding compliant, wind and watertight
policy, has adversely impacted the condition of Council assets.
In addition, Scottish Government Net Zero requirements place
increasing demands on the property portfolio to meet the
2045 targets
Category:
Event
Finance and Economy; Environmental and Natural; Programmes and Projects; Social and Community
Decline in effective governance and management of the
Council’s property assets (within existing resources)
Key RISK indicators: (metrics linked to cause/ effects)
Effect (Council and/ or Community Plan)
Condition surveys undertaken for Public Building portfolio
Overspend in compliance, repairs and maintenance budgets over financial years
Planned Preventative Maintenance experience
Anecdotal evidence from
building users
Potential risk of harm, financial loss, service disruption,
statutory noncompliance, fines, rising energy costs, reduced
insurability, and failure to meet national Net Zero
commitments.
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT)
Evaluation
04
04
16 [High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
W
hat and Why
Freq.
Head of Facilities and
Property Services; Head
of Economy &
Development Services
Meeting regularly and through the CAMIS Development Group
(Corporate Asset Management Information System), taking
forward a workplan to more effectively consolidate and oversee
asset management risk
Quarterly
CAMIS workplan performance
indicators
Reasonable
Lead Facilities Manager
(Hard FM); Estates Lead
Monitoring Heads of Service responses to the Asset
Management module within the BAU Risk Assurance Model to
identify any support required
Annually
Subject Matter Expert Dashboard
results
Reasonable
Heads of Service 
Monitoring Responsible Person inventories for properties to
ensure compliance, clear roles etc
Ongoing
CAMIS data
Reasonable

Page 30

29 | Page 
PUBLIC
Head of Facilities and
Property Services
Measuring and maintaining Key Performance indicators for
compliance (gas/water/electrics) to ensure checks and remedial
works undertaken. Increase in Planned Preventative
Maintenance in 2026/27 (where possible and budget
dependent).
Each
Board
reporting
period
Key Performance Indicators
reported to Finance, Resources
and Customer Services Policy
Board for each cycle.
Substantial
[Approx 15,000 jobs, plus 4000 statutory
compliance inspections undertaken per
year for compliance, repairs and
maintenance]
Head of Facilities and
Property Services
Undertaking capital lifecycle works (5-year plan of works,
including Net Zero surveys across Category C premises), to
improve the fabric of the building. Aligned with condition
surveys and the Core Facts for Learning Estate, targeted works
to improve the Public Building portfolio
Annually
Reviewing of condition surveys
and linking to Strategic Property
Programme. Delivery of de-
carbonisation surveys and
delivering work in relation to this.
Reasonable
Head of Facilities and
Property Services
Prioritising allocation of funding to different elements of
upgrades to target poorer performing buildings
Annually
Budget Monitoring and review.
Physical delivery of works to
buildings.
Reasonable
Head of Facilities and
Property Service
Head of Finance and
Procurement
Administering additional funding allocated in 2025/26 and
2026/2027 to ensure no overspend in budgets.
Annually
New
structure reported and
monthly budget monitoring with
the Finance Business Partner.    
Substantial
Head of Facilities and
Property Services
Head of Economy and
Development
Undertaking routine checks on vacant/ surplus buildings on a 2
weekly basis to ensure assets are protected and insurance
requirements are met.
2-weekly
Checklist of inspection and any
remedial actions required.
Reasonable
Response 
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
տ
ց
տ
տ
Action (SMART – Specific, Measurable, Achievable, Realistic, Timebound) 
Action
code
Action
Responsible
Officer/s
Due
Evidence of completion
Progress Monitoring Key  
Achieved
On target 
Slippage-
recoverable 
Unlikely to
achieve
03/26
06/26
09/26
12/26
03/27
06/27
09/27
12/27
03/28
CRR22.
05.10d
Undertake gap analysis to identify
activities that take place outside
of the CAMIS environment and
consider if these can be brought
CAMIS
Development
Group
31-
Mar-26
ƒ Gap analysis completed
ƒ List of outside CAMIS
activities identified

Page 31

30 | Page 
PUBLIC
into CAMIS by way of system
development
ƒ Identified activities
added to CAMIS
system.
CRR22.
05.10e
Explore data and status
monitoring
CAMIS
Development
Group
31-
Mar-26
ƒ Data access Improved 
ƒ  Status monitoring
achieved 
CRR22.
05.10f
Progress first phase of radon
monitoring programme and
evaluation of results to determine
whether mitigation measures are
required within any affected
premises
Heads of Service/
Corporate Health
and Safety
31-
Mar26
Required mitigation
measures are identified 
CRR22.
05.10f
Progress radon monitoring
programme for buildings with
basements
Heads of Service/
Corporate Health
and Safety
30 June
2026
Required mitigation
measures are
identified. 
CRR.26.0
4.10a
Review
and update structure
within Facilities and Property
Services to recruit additional 6
posts to support key work around
Public Building portfolio.:
ƒ  Strategic Facilities Manager
(Asset Management and Hard FM)
ƒ Lead Facilities Manager –
Development and Strategy (Assets
ƒ Asset Management Coordinator
ƒ Senior Building Surveyor (Hard
FM)
ƒ Facilities Coordinator (Hard FM)
ƒ Apprentice Administrator
Head of Facilities
and Property
Services
30 June
2026
Recruitment process
complete and all posts
filled.
.  
CRR.26.0
4.10b
Increase investment in Facilities
and Property Services to ensure
budget is realigned to current
costs and outturn. 
Head of Facilities
and Property
Services
31
March
2027
Investment increased 
CRR.26.0
4.10c
Undertake further works in
relation to Planned Preventative
Maintenance, repairs,
maintenance, capital lifecycle
works and Asset rationalisation.
Strategic Facilities
Manager – Asset
Management and
Hard FM
31
March
2027
ƒ All KPI reviewed
ƒ All identified work are
complete
ƒ Reports to relevant
Policy Boards

Page 32

31 | Page 
PUBLIC
CRR.26.0
4.10d
Review
and update roles and
responsibilities across both
Estates, and Facilities and
Property Services (focus on
Building Security first, then
expand to other parts of Asset
Management)
Lead Facilities
Manager –
Development and
Strategy (Assets)
&
Estates Lead
30 June
2026
Documented
procedure and process
being prepared 
CRR.26.0
4.10e
Undertake review
to ascertain if
CAMIS is best repository for
Responsible Person inventories
Facilities and
Property Services
Senior Managers
31 Oct.
2026
Spreadsheet
completed 
CRR.26.0
4.10f
Develop process for ensuring
Responsible Person data is
updated in response to changes
such as new
starts, leavers etc
Lead Facilities
Manager –
Development and
Strategy (Hard
FM)
31 Oct.
2026
Written process in
place and being
adhered to 
CRR.26.0
4.10g
Prepare a checklist and identify
suitable resource to ensure
vacant/ surplus public buildings
are checked at the required
frequency. 
Head of Facilities
and Property
Services and Head
of Economy and
Regeneration
30 June
2026
Nominated Officer in
place
Checklist and visits
being undertaken and
recorded.

Page 33

32 | Page 
PUBLIC
Context
Risk Detail
Ref, Title, and Narrative:
Risk Owner/s: 
Cause/ Source
CRR26.04.11 Delivering Homeless Duties
Renfrewshire Council has several legal duties in relation to meeting the
needs of those who are statutorily homeless.  
The sustained demand pressures on social rented housing are increasing
the risk that the Council is unable to always meet all legal duties.  
Head of
Housing
Services
The increase in homelessness in Renfrewshire is in line with the national trend. 
The causes of homelessness include the impact of cost-of-living crisis, national migration
policies, changes in the private rented sector, changes to homeless legislation and reduced
turnover of social rented housing.
Category: (Picklist) Employees and Service Users; Finance and Economy; Social and
Community; Digital and Cyber; Environmental and Natural; Geopolitical and Supply Chain
Resilience; Public Health and Biological; Programmes and Projects
Event   
Employees – on-going strain / pressure on dealing with high service demand and people
waiting to be provided with accommodation. Increased risk of ‘burn out’
Service Users – risk of increase in rough-sleeping if Council cannot provide temporary
accommodation
Finance and Economy – cost of hotel accommodation for those who require temporary
accommodation but no furnished flats available
Social and Community - increase in rough-sleeping within communities
Increase in scale of statutory homelessness which exceeds available temporary
accommodation and social rented tenancies.   
Key RISK indicators: (metrics linked to cause/ effects)
Effect (Council and/ or Community Plan)
Increase in homeless applications from
834 in 2020/21 to over 1200 in 2025/26
Cost of temporary accommodation and placement in hotels
Council currently has 290 furnished properties for use as temporary accommodation for
those who present as homeless, which is not adequate for the scale of increase in
homeless presentations.
Increased challenges in providing temporary accommodation for those who have nowhere to
stay, meeting the support needs of those who are homeless, and providing settled
accommodation.
People who have nowhere to stay not being provided with temporary or settled
accommodation. 
Reputational risk for Council if unable to fulfil legal duties towards those who are homeless
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT)
Evaluation
04
03
12 [High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
Homeless &
Housing Support
Services Manager
Implementing a comprehensive Homelessness Action
Plan for Renfrewshire which includes tasks for
Council services and partners which will mitigate the
Ongoing
ƒ Number of homeless applications
ƒ Increase in number of properties that can be used
as temporary accommodation
Reasonable

Page 34

33 | Page 
PUBLIC
impacts from
the increase in homelessness and
demand for temporary accommodation, covered in
the Risk Indicators and Effect section, above
ƒ Number of breaches of Unsuitable
Accommodation Order
ƒ Number of ‘failures to offer temporary
accommodation’
ƒ Number of lets to homeless applicants
Homeless &
Housing Support
Services Manager
Continuing with the increased target of 55%
of
general lets to homeless applicants in 2025/2026 (as
was approved by the Policy Board in January 2025).  
Ongoing
ƒ Performance against target 
Reasonable
Response 
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
տ
ց
տ
տ
Action (SMART – Specific, Measurable, Achievable, Realistic, Timebound) 
Action
code
Action
Responsible
Officer/s
Due
Evidence of
completion
Progress Monitoring Key  
Achieved
On target 
Slippage-
recoverable 
Unlikely to
achieve
03/26
06/26
09/26
12/26
03/27
06/27
09/27
12/27
03/28
CRR24.
04.14a
Increase the stock of temporary
accommodation by 30 new
properties
between June 2025 and March 2026.
Head of Housing
Services
31-
Mar-
2026
30 new
properties
added.
Note – currently
22 / 30
properties) 
CRR26.
04.11a
Policy Board approval for detailed
Homelessness Action Plan 2026-2028
Homeless &
Housing Support
Services Manager
31-
May-
2026
Policy Board
approval (being
sought May 2026) 
CRR26.
04.11b
Increase stock of furnished temporary
accommodation from
Council and RSL
mainstream
housing stock.
Homeless &
Housing Support
Serv. Mgr/ Housing
Services Manager
31-
Mar-
2028
Reduced the need
to place homeless
applicants in
hotels / B&B 
CRR26.
04.11c
Reduction in breaches of Unsuitable
Accommodation Orders by having
homeless applicants spending less than
7 days in hotels if / when stock of
temporary accommodation meets
demand.
Homeless &
Housing Support
Services Manager
31-
Mar-
2028
ƒ No. breaches of
Unsuitable
Accommodation
Orders.

Page 35

34 | Page 
PUBLIC
Context
Risk Detail
Ref, Title, and Narrative: 
Risk
Owner/s:
Cause/ Source
CRR.26.04.12 Financial Stability
Imminent shorter-term
risk for Financial Stability, recognising the immediate financial
situation of the Council. Note: the medium
to longer term
financial position is captured
under the Financial Sustainability risk.
Head of
Finance and
Procurement
Significant short-term
costs and income losses emerging but not fully
anticipated.
Category: (Picklist) Employees and Service Users; Finance and Economy; Social and Community; Digital
and Cyber; Environmental and Natural; Geopolitical and Supply Chain Resilience; Public Health and
Biological; Programmes and Projects 
Event
Finance and Economy
Finances potentially destabilised in-year with immediate cost control measures,
or short-term
savings required.
Key RISK indicators: (metrics linked to cause/ effects)
Effect (Council and/ or Community Plan)
Budget Monitoring projections 
Budget v actual reporting from
the general ledger
Reserves balances tracking
A deterioration of the Council’s financial position (in-year or year-end deficit)
would see the Council having to draw
from
reserves that could be earmarked
for other commitments with significant impact on service delivery
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT)
Evaluation
03
05
15 [High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
Budget
holders and
Finance
Team
Providing Revenue and Capital budget monitoring reports to Policy Boards
to focus on the forecast year-end position so that significant variances are
reported early and any mitigating action can be taken. Incorporates ongoing
discussion with Directors to understand financial consequences of the
current economic climate and how
these will be managed.
Five
times per
year
Forecast spend v budget for the
current financial year
Reasonable
Budget
holders and
Finance
Team
Reviewing savings workstreams to ensure targets remain achievable
Quarterly
Actual and Forecast spend v budget
(net of saving) for each impacted
budget line
Reasonable

Page 36

35 | Page 
PUBLIC
Budget
holders and
Finance
Team
Clear tracking and analysis of the Council’s reserves position to consider
adequacy, prioritisation potential redirection, including the development of
plans to rebuild financial resilience in the medium
term.
Quarterly
Actual reserve balances v forecast
year-end balance for each earmarked
reserve (and uncommitted balance)
Substantial
Project
Owners and
Finance
Team
Reviewing capital spend v plan and ongoing projects to ensure clear
understanding of phasing of future spend
Every 4-
weekly
period
Forecast capital spend v budget for the
current financial year
Profiling of spend in-year v future years
compared to Capital Plan 
Reasonable
Response 
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
ց
տ
տ
տ

Page 37

36 | Page 
PUBLIC
Context
Risk Detail
Ref, Title, and Narrative: 
Risk Owner/s:
Cause/ Source
CRR.26.04.13 Financial Sustainability
Medium
to long-term
sustainability of the Council’s ability to meet its expected
costs. Note: shorter term
risk is included in Financial Stability measure.
Director of Finance and Resources and
Head of Finance and Procurement
Significant cost pressures that cannot be adequately
funded, successfully planned for or managed effectively
over the medium
to longer term
Category: (Picklist) Employees and Service Users; Finance and Economy; Social and Community; Digital and Cyber;
Environmental and Natural; Geopolitical and Supply Chain Resilience; Public Health and Biological; Programmes and Projects 
Event
Finance and Economy
Financial sustainability of the Council jeopardised 
Key RISK indicators: (metrics linked to cause/ effects)
Effect (Council and/ or Community Plan)
Medium-Term
Financial Outlook
Well-developed budget planning, budget setting and budgetary control system
Reserves tracking and planning
Planning and monitoring of savings targets
Decisions required on the continuity or scope of some
services currently offered, and capital investment
resources that the Council can deliver. 
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL
Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT) Evaluation
03
05
15 [High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
Dir. of FARs; Head
of Finance and
Procurement
Revised medium
- to long-term
Financial Outlook reassessed the various risks to the
Council’s short, medium
- and longer-term
financial sustainability. Refreshed medium
term
outlook was reported to Council on 25 September 2025 and outlined the immediate
financial concerns and plans to address these, including savings, and managed use of
reserve balances; however, as the position continues to develop and evolve, close
monitoring will be required to ensure that the Council manages costs in the short term
and
fully appreciates the longer term
consequences of actions taken to address short-term
risks.
Committee reports of this nature cover a wide range of current and future financial and
economic factors e.g., Strategic Economic and National Policy Context, Cost Pressures,
Pressures on Income and Mitigation Strategies to deal with such uncertainties.
Bi-annual
Medium-term
budget gap /
financial outlook
Substantial
Dir. of FARs; Head
of Finance and
Procurement
A well-developed and embedded budget planning, budget setting and budgetary control
system
is in place throughout the organisation, and this informs members and officers
regarding financial performance and stability. This facilitates robust and transparent
Annual
Revenue Estimates
report, Financial
Strategy planning,
Substantial

Page 38

37 | Page 
PUBLIC
decision making and incorporates an escalation process with regards budget management
issues which may arise. The Council will consider the 2026/27 budget on 26 February 2026.
budget monitoring
reporting
Dir. of FARs; Head
of Finance and
Procurement;
Budget holders
and Finance Team
Proactively planning for the future by identifying and agreeing a series of savings targets
over the medium
term. It remains the case that savings will continue to require be
generated at scale to ensure the ongoing financial sustainability of the Council. There is
close financial monitoring of the agreed savings to ensure that they are delivered within the
agreed timescales, or where this is not possible, to understand and reschedule planned
delivery to achieve the associated objectives. Monitoring is undertaken via a combination of
financial and operational measures, actions and related update reports.
Year-
round /
Ongoing
Board papers,
budget monitoring
reports
Substantial
CMT
The CMT now
has a regular formal focus on financial sustainability, and quarterly as a
Financial Sustainability and Transformation Board. These spotlight director-led savings and
any associated policy changes or risks for discussion.
Quarterly
Board papers,
budget monitoring
reports
Reasonable
Dir. of FARs; Head
of Finance and
Procurement;
Finance Team
Managing the level and use of reserves has been a key tool in addressing the costs of the
pandemic, therefore the planned use of reserves in the medium
term, and the Council’s
Capital Investment and Treasury Management Strategy, are key to ensuring ongoing
financial sustainability.
Year-
round /
Ongoing
Financial Strategy /
Balances Tracker
Reasonable
Audit Risk and
Scrutiny Board
Reports and publications from
Audit Scotland in relation to the Local Government financial
outlook, financial planning and related developments and improvements are supplemented
with a Renfrewshire context report, with both reports being submitted to the Council's
Audit Risk and Scrutiny Board.
Board
cycle
Audit, Risk and
Scrutiny Board
reports
Limited
Dir. of FARs; Head
of Finance and
Procurement
Regular review
of HSCP financial position along with HSCP colleagues (please refer to new
related risk CRR25.04.07)
Quarterly
IJB Board Reports,
financial monitoring
discussions
Reasonable
Response 
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
տ
ց
տ
տ
Action (SMART – Specific, Measurable, Achievable, Realistic, Timebound) 
Action
code
Action
Responsible
Officer/s
Due
Evidence of
completion
Progress Monitoring Key  
Achieved
On 
target 
Slippage-recoverable 
Unlikely to
achieve
03/26
06/26
09/26
12/26
03/27
06/27
09/27
12/27
03/28
CRR25.04.
10
Directorate savings targets
2025/26 to 2027/28
CMT
31-
Mar-28
Budget monitoring

Page 39

38 | Page 
PUBLIC
Context
Risk Detail
Ref, Title, and Narrative: 
Risk Owner/s:
Cause/ Source
CRR.26.04.14 Information demands and deadlines
Significant volumes of enquiries (FOIs, EIRs, SARs, Complaints from
public/ residents, elected
members, MPs and MSPs), all requiring responses to be managed, responded to timeously
and actions be planned and taken.  W
e are now
also experiencing the negative impact of AI on
volume, complexity and length of requests and the speed with which requesters and
complainers are seeking reviews and appeals.
SIRO (Director
of FARs)
Increasing use of AI to lodge requests, to complain/appeal
Increasing numbers of requests
Increasing complexity of requests
Category: 
Event
Information and Communication
Unable to keep pace with requests, and deadlines missed
Key RISK indicators: (metrics linked to cause/ effects)
Effect (Council and/ or Community Plan)
No./ vvolumes of requests/ comparison year on year
Services impacted as resources/ focus diverted to requests. Potential
errors in information disclosed, failure to meet statutory deadlines,
reputational damage, and potential fines.
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL
Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT) Evaluation
04
04
16 [High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
CMT 
Monitors FOI/ EIR and SARs information report to track corporate compliance
and identify any areas of concern and mitigations required. 
Ongoing 
Performance
against targets
Reasonable
Services Directors 
Monitor Councillor, MP and MSP enquiries to track compliance with
timescales, identify any areas of concern and any mitigations required 
Ongoing 
Performance
against targets
Reasonable
Head of Policy
and Partnerships
Monitor corporate complaints performance to track compliance with
timescales, identify any areas of concern and any mitigations required 
Ongoing 
Performance
against targets
Reasonable
Head of Policy
and Partnerships
Audit of corporate complaints 
Annually 
Performance
against targets
Reasonable
SIRO; Managing
Solicitor (DPO)
Reviewing stats, DPO complaints, FOI review
process (DPO complaints and reviews as
received and 20 working days to respond)
Ongoing
Discussion/
assurance only 
Reasonable
Response

Page 40

39 | Page 
PUBLIC
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
տ
ց
տ
տ
Action (SMART – Specific, Measurable, Achievable, Realistic, Timebound) 
Action
code
Action
Responsible
Officer/s
Due
Evidence of
completion
Progress Monitoring Key  
Achieved
On 
target 
Slippage-recoverable 
Unlikely to
achieve
03/26
06/26
09/26
12/26
03/27
06/27
09/27
12/27
03/28
CRR.26.04.
14a
Explore the potential
to streamline the FOI
and SAR process by
implementing
centralised electronic
searches for
information
requested.
Head of Digital
and
Transformation
TBC
Solution ruled in or
out.

Page 41

40 | Page 
PUBLIC
Context
Risk Detail
Ref, Title, and Narrative: 
Risk Owner/s:
Cause/ Source
CRR26.04.15 Reduction in Teacher Class Contact Time
(The 21-hrs Commitment) This Scottish Government policy reduces teachers’ maximum
weekly class contact time to 21 hours, aiming to address workload pressures, improve teacher
wellbeing, and support retention while maintaining educational standards. Partial funding only
is in place.
Director of
Children’s
Services
Insufficient detail, recruitment challenges, lead time and flexible funding
for implementing the ’21-hour’ changes.
Category: 
Event
Programmes and Projects
Recruitment difficulties in the sector and unable to meet its statutory
duties regarding education
Key RISK indicators: (metrics linked to cause/ effects)
Effect (Council and/ or Community Plan)
Workforce and recruitment data
Financial landscape 
Operational readiness
Impact on children’s outcomes, delivery of statutory duties and
increased financial pressures
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL
Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT) Evaluation
03
04
12 [High] 
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
Short Life
Working Group 
Monitoring project milestones to ensure we keep on track the key workstream
areas as
identified below.  
Monthly
Status of
workstream
plan
actions
(Work in Progress)
Response 
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
տ
ց
տ
տ
Action (SMART – Specific, Measurable, Achievable, Realistic, Timebound) 
Action code
Action
Responsible
Officer/s
Due
Evidence of
completion
Progress Monitoring Key  
Achieved
On 
target 
Slippage-recoverable 
Unlikely to
achieve
03/26
06/26
09/26
12/26
03/27
06/27
09/27
12/27
03/28

Page 42

41 | Page 
PUBLIC
CRR26.04.15a
Deliver on all actions within
the wworkforce planning and
recruitment project
workstream
W
orkstream
Lead
Aug 27 (P)
Aug 29 (S)
Workstream
meets all
milestones 
CRR26.04.15b
Deliver on all actions within
the ffinancial planning project
workstream
W
orkstream
Lead
Aug 27 (P)
Aug 29 (S)
Workstream
meets all
milestones 
CRR26.04.15c
Deliver on all actions within
the ttimetabling and
operational readiness project
workstream
W
orkstream
Lead
Aug 27 (P)
Aug 29 (S)
Workstream
meets all
milestones 
CRR26.04.15d
Deliver on all actions within
the sstakeholder engagement
project workstream
W
orkstream
Lead
Aug 27 (P)
Aug 29 (S)
Workstream
meets all
milestones 
CRR26.04.15e
Deliver on all actions within
the mmonitoring and evaluation
project workstream
W
orkstream
Lead
Aug 27 (P)
Aug 29 (S)
Workstream
meets all
milestones 
CRR26.04.15f
Deliver on all actions within
the ccontingency planning
project workstream
W
orkstream
Lead
Aug 27 (P)
Aug 29 (S)
Workstream
meets all
milestones

Page 43

42 | Page 
PUBLIC
Context
Risk Detail
Ref, Title, and Narrative: 
Risk Owner/s:
Cause/ Source
CRR.26.04.16 Workforce planning, recruitment &
retention
The workforce planning risk is captured by our model for business-as-usual risk,
however a live issue exists in relation to recruitment and retention challenges for
particular roles, such as trades, various professional services, social services, and
various housing services.
Head of People and
Organisational Development
(But noting that all Heads of
Service have a responsibility
here)
National shortage in the UK labour market for certain jobs/ roles/
professions, combined with public sector challenges in competing
with commercial sector salaries
Category:
Event
Employees and Service Users
Challenges for specialist recruitment campaigns
Potential loss of key personnel
Difficult to recruit and/ or retain certain roles, suitably qualified
skills and officers
Key RISK indicators: (metrics linked to cause/ effects)
Effect (Council and/ or Community Plan)
Turnover within service areas
Exit questionnaire data
Recruitment metrics
Implications for service delivery, compliance, advisory, investigative
and assurance work
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT)
Evaluation
04
04
16 [High]
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
Head of People &
OD
Monitoring with reporting twice yearly to the FRCS
Board.
6 mthly
Board Reports on People Strategy Progress
and People Metrics
Reasonable
Corporate Workforce
Planning Grp
Managing and implementing the Corporate Workforce/
People Strategy 
Ongoing
Board Reports on People Strategy annual
progress
Reasonable
Head of People &
OD
Using data analytics to look at areas of risk, trends both
recruitment and attrition
Ongoing
People Metrics Reports
Reasonable
Head of People &
OD
Ensuring we hire the right people in the first place by
having solid recruitment methods
Ongoing
Regular reviews to Recruitment Policy and
People Metrics – Turnover data and
Mainstreaming Equality Statutory Reports
Reasonable

Page 44

43 | Page 
PUBLIC
Head of People &
OD
Creating opportunities for development 
Mandatory training/Leadership
Development and People Development
Programmes
Reasonable
All managers
Offering workplace flexibility which can help enhance
work life balance, and burnout
Ongoing
Flexible Working Provision and supportive
policies, Programme of Health &
Wellbeing,
Employee Engagement Surveys / Turnover
trends
Reasonable
Head of People &
OD
Partnering with employability, community, and further/
higher education programmes to support the Council as
an employer of choice 
Graduate Apprenticeships, Supporting DFN
Project Search / Keeping the Promise
Partnership Work 
Reasonable
Head of People &
OD
Taking different approaches to advertising hard-to-fill
roles, such as advertising through Chartered Institute of
Housing recruitment
Ongoing
To be confirmed
To be confirmed
Response 
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
ց
տ
տ
տ

Page 45

44 | Page 
PUBLIC
Context
Risk Detail
Ref, Title, and Narrative: 
Risk Owner/s:
Cause/ Source
CRR.26.04.17 Administering elections
Ongoing election preparedness is important to respond to snap elections or
by-elections. If we are not prepared and do not monitor on an ongoing basis
the supply chain relied upon could struggle to deliver the administration of an
event.  The council however has a highly experienced group of staff to lead
and deliver workstreams that support each electoral event with integrity.  
Planned:
2026 – Scottish Parliament
2027 – Local Government
Unplanned:
Snap elections
By-elections
Head of
Corporate
Governance
Different types of electoral events involve different
processes and procedures, and the supply chain for key
processes is limited to a few
companies across the UK. In
addition, electoral events see a period of increased risk
in terms of cyber security threats.
Category:
Event
Programmes and Projects
An adverse event which has a material bearing on the
administration and/ or integrity of an electoral event
Key RISK indicators: (metrics linked to cause/ effects)
Effect (Council and/ or Community Plan)
Track record in administering elections
Results in question; Reputational impact for all involved;
Possible additional financial costs.
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL
Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT) Evaluation
02
04
08 Mod
Effectiveness (Assurance)
Sub/Reas/Limited
Who
What and Why
Freq.
Elections Board
Monitoring project plans, milestones, risks, budgets for each electoral event to ensure
we are on track to deliver on time
Routine approach
Project Reports
Substantial
W’stream
leads
Delivering workstreams (logistics, contingency planning etc), to ensure preparedness
Routine approach
Board agendas
Substantial
Elections Team
Ensuring experienced colleagues appointed to the Elections Team
to reduce risk of
potential error
Routine approach
Skills/ experience
Substantial
Elections Team
Engaging with Electoral Commission and Elections Management Board for Scotland to
ensure rules are understood/ clarified and incorporated in training
Routine approach
Briefings
Substantial
Elections Team
Training for all involved to ensure rules, roles and actions are understood
Routine approach
Training data
Substantial
Elections Team
Monitoring of supply chain to ensure resilience
Ongoing
Board agendas
Substantial
ICT
Monitoring of cyber risk to minimise cyber threat and facilitate cyber resilience 
Routine approach
Project Reports
Substantial
Response: 
Terminate
Tolerate ܈
Treat* See Action Log Below
Transfer
Take

Page 46

45 | Page 
PUBLIC
Context
Risk Detail
Ref, Title, and Narrative: 
Risk Owner/s:
Cause/ Source
CRR.26.04.18 Renfrew
Bridge
The Council owns and operates a complex, firstǦofǦitsǦkind opening road bridge over the
River Clyde, which must operate continuously (24/7), to balance the needs of road users,
river traffic and community safety. This is compounded by challenges in maintaining
specialist staffing cover, increasing maintenance and insurance costs, fluctuating
volumes of river traffic outside Council control, and heightened public and economic
expectations regarding connectivity and regeneration benefits.
Head of Climate,
Public
Protection and
Roads
Technical and complex operations, technical skills requirement and some
potential unforeseeable factors.
Category:
Event
Employees and Service Users
A prolonged adverse technical, safety or operations incident which results in
the bridge being unavailable
Key RISK indicators: (metrics linked to cause/ effects)
Effect (Council and/ or Community Plan)
Tracking of any bridge downtime
Tracking of any formal complaints
Tracking of any safety incidents
Tracking of compliance with Peel Port requirements
Disruption to road users and river traffic; potential liability for costs linked to
vessel delays; financial loss through reactive repairs, claims, rising
maintenance or insurance costs; reputational damage; and negative impacts
on connectivity, economic activity and investor confidence in the area.
Controls, Analysis and Evaluation  
Current Controls
Key CONTROL Indicators
Likelihood
(of EVENT)
Impact
(of EFFECT) Evaluation
03
03
09 Mod
Effectiveness (Assurance)
Sub/Reas/Limited
Who
W
hat and Why
Freq.
Bridge Team 
Operating the Bridge as per the procedures and legal agreement
with Peel Port (opened to road traffic in May 2025). 
Ongoing 
Instances where bridge has failed
to operate.
Instances of any repairs not meeting
defect repair targets
Substantial
Bridge Manager
Ensuring Bridge operatives are trained for full operations as well as
all aspects of health and safety and public safety 
Ongoing 
Training records, including
mandatory/ essential training stats
Substantial
Bridge Team 
Ensuring effective Emergency Procedures should a vessel travelling
inbound be unable to pass under the bridge and require berthing in
the adjacent purpose-built layby dock 
Annual 
Number of occasions this procedure
was used. 
Reasonable

Page 47

46 | Page 
PUBLIC
Bridge Team 
Providing clear and accurate comms
(Road traffic comms, Variable Message Signs across road
network, website and Whatsapp group, live information on when
the bridge is available / unavailable to road traffic. VHF Radio used
to speak to Harbour Authority and Pilots. 
Ongoing 
Visits to webpage
WhatsApp group member levels
Suggestions/ complaints records. 
Substantial
Bridge Manager
Monitoring of the Maintenance Contract in place
Annual 
Service Reports
Unplanned maintenance stats 
Annual Contract KPI review  
Substantial
Infrastructure &
Transportation
Manager
Ensuring regular Bridge Board meetings with Peel Port, emergency
services and neighbouring Councils to allow
Stakeholders to voice
any concerns
Quarterly
Status of any agreed actions
Substantial
Bridge Manager
Keeping contingency plans in place and under review, including
ability to operate in manual mode to allow
unrestricted movement,
or use of alternative routes.
Annual
(Contingency only)   
Reasonable
Response 
Terminate
Tolerate
Treat* See Action Log Below
Transfer
Take
տ
տ
ց
տ
տ
Action (SMART – Specific, Measurable, Achievable, Realistic, Timebound) 
Action code
Action
Responsible
Officer/s
Due
Evidence of
completion
Progress Monitoring Key  
Achieved
On 
target 
Slippage-
recoverable 
Unlikely to
achieve
03/26
06/26
09/26
12/26
03/27
06/27
09/27
12/27
03/28
CRR26.04.19a
Refresher of training for
existing Bridge Operators
Bridge Manager 
May
2026 
Refresher Training
Completed 
CRR26.04.19b
Complete the annual
review
of procedures or
documents. 
Bridge Manager 
June
2026 
Review
completed 
CRR26.04.19c
Ensure contracts due for
renewal are completed
on time
Bridge Manager 
June
2026 
Contracts
awarded

Page 48

47 | Page 
PUBLIC
Appendix 3: Service Risks 
Risk 
(Cause and effect)
Risk Capture
†
Service RR
†
Project RR
†
H&S PLAN 
Evaluation
o Low
o Moderate
o High
o Very High
Means of Monitoring
o Board Risk-Reporting
o SIP
o Project Board
o H&S Planning Group
Notes
Chief Executive’s Service   
Children’s Services 
(1) Future school capacity planning
If demand projections are not sufficiently robust there
is a risk that the learning estate will be insufficient over
the longer term 
Service RR
High
Board Risk-Reporting
Robust demand projections (core projection, potential upper
scenario and a long-term
view) for scale and timing of short-
term
peak demand to inform
decisions.
Process and arrangements to support and provide detailed
monitoring and updates to projections, for updates to actual
data sets to facilitate a continual re-assessment of longer-term
trend and likely requirements/ decision point required in
relation to deployment of potential additional interventions.
Options identified to deliver, if required, additional capacity
(both temporary capacity and permanent long-term
capacity) to
ensure the council can respond appropriately to the potential
for upper end demand scenarios and or temporary demand
peaks to emerge.  A new
learning estate strategy has been
approved by Elected Members, and this will be the blueprint for
future decisions and developments 
(2) Temporary Funding Streams ending 
A number of service funding streams are coming to an
end in the next two years.  This will impact on the
continuation of projects and programmes, staffing,
services and goods which are linked to the service
priorities such as closing poverty related attainment
gap, improving mental health and wellbeing and
delivering whole family wellbeing.
Service RR
High
Board Risk-Reporting
There are a number of funding streams which are ending in
March 2026 including the Scottish Attainment Challenge and
Pupil Equity Fund.  Exit planning and the sustainability of
projects has been regularly discussed at portfolio board
meetings and as part of the Quality Improvement Framework in
schools. 
(3) Pupil Attendance and Exclusion monitoring
Pupil attendance in school has been declining over a
number of years.  This is due to a number of factors
such as the impact of covid, inequalities, additional
Service RR
High
Board Risk-Reporting
This is a national issue which is being monitored on a monthly
basis at DMT.  Effective strategies and interventions are in place
to support and improve attendance of identified children and
young people.  A number of our schools are participating in a

Page 49

48 | Page 
PUBLIC
Risk 
(Cause and effect)
Risk Capture
†
Service RR
†
Project RR
†
H&S PLAN 
Evaluation
o Low
o Moderate
o High
o Very High
Means of Monitoring
o Board Risk-Reporting
o SIP
o Project Board
o H&S Planning Group
Notes
supports needs and poor mental health and wellbeing. 
As a result, this can impact on pupil attainment,
achievement as well as health and wellbeing.  At the
same time, the service in monitoring exclusion rates
across all establishments with a view
to these reducing.  
national pilot developed by Education Scotland.  There is an
Emotional Based School Avoidance working group led by REPS
developing a response to this issue locally.  
(4) Addressing Violence and Aggression
Following feedback from
staff and regular monitoring
of data, the number of violent and aggressive incidents
across the service has significantly increased and this
poses a risk to children, young people and staff safety.
It can lead to absence of children and young people
which can have an impact on attainment, achievement
and a sense of belonging.  It can also have a significant
impact on staff absence and wellbeing.    
Service RR
High
Board Risk-Reporting 
Work is ongoing to monitor violence and aggression in all
establishments.  A policy was recently launched as part of the
support to colleagues and data is regularly reviewed from
Business World.  Strategies and interventions are in place to
support the de-escalation of incidents. Addressing violence and
aggression in the classroom
must be considered in the context
of Getting it Right for Every Learner.
(5) Additional Support for Learning 
Establishments are reporting increased additional
support needs and as a result require additional
resource and staffing capacity to support needs all of
learners within existing budgets. If needs are not
supported, children and young people will not thrive in
their learning and can also have an impact on
wellbeing and sense of belonging.  
Service RR
High
Board Risk-Reporting
Recent engagement sessions took place with staff to better
understand the issues and potential solutions for schools going
forward. 
(6) Portfolio Management
Unintended delays in progress in each of the three
portfolios listed below
will impact on our ability to
ensure that children and young people thrive, learning
and achieve: 
1.
Curriculum, learning, teaching and assessment.
2.
Inclusion; and 
3.
Families and Communities
Project RR
Moderate
Board Risk-Reporting
Effective governance arrangements are in place with oversight,
leadership and direction being provided by the Portfolio
Governance Board which meets on a monthly basis. The three
portfolio groups provide updates to the Board.
(7)
Availability of Alternative Care Placement 
(Foster Care and Residential Care)
This could result in a higher level of risk being managed
within the community. 
Service RR
Moderate
Board Risk-Reporting
Case managed by Social Work Management Teams with
contingency plans in place.

Page 50

49 | Page 
PUBLIC
Risk 
(Cause and effect)
Risk Capture
†
Service RR
†
Project RR
†
H&S PLAN 
Evaluation
o Low
o Moderate
o High
o Very High
Means of Monitoring
o Board Risk-Reporting
o SIP
o Project Board
o H&S Planning Group
Notes
(8)
Home to School Transport
(ASN and Mainstream)
Rapidly increasing costs and contractor availability
places additional pressure on the Service and Council
to deliver this provision.  This is coupled with the
increasing number of children and young people with
ASN and expansion of Gaelic schooling provision.  
Service RR
Moderate
Board/Committee Risk
-Reporting
Renfrewshire Council currently provides home to school
transport with primary school pupils provided with home to
school transport if they live 1 mile or more from
their
catchment school, and secondary school pupils can access
home to school transport at 2 miles or more. Home to school
transport is also provided for pupils with no safe walking route
to school, with particular medical issues and with some
additional support needs.  
(9)
Education Reform
The Scottish Government is leading on an education
reform
which will have a systemic impact on education
governance, accountability and leaner outcomes. As a
result of the reform, there will be systemic changes to
the education system. Local authorities will need to
respond and adapt to the reform
recommendation.     
Service RR
Moderate
Board Risk-Reporting
Education reform
in Scotland refers to a programme of
structural, curricular and assessment change led by the Scottish
Government to improve outcomes for learners, strengthen
accountability, and modernise how
education is governed,
inspected, and assessed across the system
(from
early years to
senior secondary and post school learning).
Change resulting from
the reform 
At system
level, the greatest risks are associated with the
following:
•Pace versus capacity; •Affordability versus ambition
•Coherence versus accumulation of change
Effective mitigation depends on sequencing, workforce support,
governance, and sustained stakeholder engagement.
Environment, Housing and Infrastructure Services 
(10)
Commercial Vehicle and Operators License
Renfrewshire Council requires its fleet of vehicles to be
effectively managed, otherwise there could be
sustained impact in several areas including community
care, housing maintenance and repairs,
Neighbourhood Services and waste collection.
Service RR
High 
The fleet comprises around 500 vehicles including heavy and
large goods vehicles, light vans and cars.  The council
implements a range of governance and operational measures to
ensure ongoing vehicle operator licence compliance.  External
auditors carry out ongoing 6 monthly reviews of the operator’s
compliance licence.  
(11)
Review
of electric vehicle (fleet) infrastructure
Risks associated with the installation of charging
facilities were managed during the related installation
projects.  There is however a need to review
any
residual risks that remain in relation to the siting,
Service RR 
High 
The Council’s electric vehicle fleet comprises 99 vehicles,
supported by a structured programme of safety, servicing, and
maintenance to ensure continued operational readiness. All EV
charging infrastructure is electrically tested at commissioning by
a competent EV contractor and is serviced annually under the

Page 51

50 | Page 
PUBLIC
Risk 
(Cause and effect)
Risk Capture
†
Service RR
†
Project RR
†
H&S PLAN 
Evaluation
o Low
o Moderate
o High
o Very High
Means of Monitoring
o Board Risk-Reporting
o SIP
o Project Board
o H&S Planning Group
Notes
inspection, and maintenance of the facilities, to further
reduce any risks to people or property within their
vicinity. 
existing warranty and maintenance arrangements. The wider
backǦoffice system, communications platform, and maintenance
contract for the EV charging network are currently under
review, with a revised specification to be issued for tender
within the next month, offering threeǦ or fiveǦyear terms with
options for extended warranty cover. Chargers are also
remotely monitored for faults, with onǦsite attendance
arranged where issues cannot be resolved through backǦoffice
diagnostics, ensuring the infrastructure remains safe, compliant,
and reliable. 
(12)
Tree Fall and Ash Die Back &
Larch Infection
With the emergence of Ash Die back in the UK there is
now
an increased potential for public injury and
property damage, awards against the Council,
reputational damage and statutory notices
Service RR
High 
The primary driver of this risk is the widespread outbreak of Ash
Dieback across the UK, which has resulted in a substantial
number of trees in Renfrewshire requiring removal.
Mitigation measures have been implemented to identify
diseased trees and to plan their removal through a structured
approach. This includes assessing and prioritising locations
where the risk is greatest—
such as trees situated close to
frequently used public areas, roads, paths, and buildings, and
those that are large or mature enough that partial or total
failure could cause significant damage. 
(13)
Alcohol, drugs or prescription medication
impacting employee performance
If the Council is unable to identify employees whose
performance is impaired by alcohol, drugs or
prescription medications when driving or operating
machinery, this could lead to an adverse event with
impact on employees, service users, and/ or local
citizens, and the Council’s Commercial Vehicle and
Operator's Licence.
Service RR
High 
The Council fleet currently includes around 75 LGVs (Large
Goods Vehicles) and social transport buses. The current
corporate policy will be reviewed to clarify ways in which we can
identify employees who need support for their own wellbeing,
and the general safety of themselves and others when operating
equipment
(14)
Housing renewal and regeneration programme
Risks associated with delivering £100m
regeneration
and renewal programme
Project RR
High 
Risk Registers have been produced for each project and are
regularly reviewed to identify, manage and mitigate known risks
associated with the programme.
(15)
Housing IT System
Replacement Programme
Project RR
High 
Renewal of main system
dealing with Housing Services, Housing
Asset Management and Homeless Services.

Page 52

51 | Page 
PUBLIC
Risk 
(Cause and effect)
Risk Capture
†
Service RR
†
Project RR
†
H&S PLAN 
Evaluation
o Low
o Moderate
o High
o Very High
Means of Monitoring
o Board Risk-Reporting
o SIP
o Project Board
o H&S Planning Group
Notes
Ensuring replacement system
procured fulfils all
requirements and is delivered within target.
(16)
Housing Landlord Compliance
Risk of failing to comply with statutory duties in
relation to landlord compliance. This could result in
legal penalties, financial losses, reputational damage
and potential harm
to tenants, staff or appointed
contractors.
Service RR
High 
Housing Landlord Strategy and six associated policies approved
at Communities and Housing Policy Board during 2025 and
2026.  Additional policy on damp and mould to be established.
Bi-annual Board reports presented to Communities, Housing
and Policy Board in May and October, with updates on Landlord
compliance. Additional reassurance provided through internal
and external audit and scrutiny checks.
(17)
Housing Investment Programme
Risk to delivering approved capital investment
programmes and ensuring stock complies with
statutory and regulatory standards.
Project RR
High 
Risk Registers have been produced for each project and are
regularly reviewed to identify, manage and mitigate known risks
associated with the programme.
(18)
Disposal of Coal Tar 
Coal tar is now
classed as hazardous waste material.
There is consequently a knock-on risk to the council’s
resurfacing scheme with some moderate delays in only
a few
locations as alternative solutions are developed.
Service RR
Moderate 
Once detected, it is moved from
resurfacing to another
treatment type which ensures the material remains in-situ.  We
test all roads / footways in advance of our Roads Capital
programme.  
For the resurfacing programme 26/27, the coal tar testing has
already taken place and we have the results. Resurfacing is only
taking place in carriageways where no coal tar has been
detected.
(19)
Implementation of Local Heat and Energy
Efficiency Strategy
Key risk is reputational damage if the Council does not
deliver on their Local Heat and Energy Efficiency
Strategy and Local Heat and Energy Efficiency Delivery
Plan.  Both Strategy and Delivery Plan have been
published.  Work has commenced on the Delivery Plan.
Project RR
Moderate 
We have established an LHEES working group that has a wide
mix of disciplines represented. Activity is underway to support
delivery of the plan across our domestic and non-domestic
buildings. One key project is the ongoing development of an
outline business case for the creation of a new
district heating
network within Renfrewshire.   
(20)
Risk that waste and recycling contractors are
unable to accept waste materials
Service RR
Moderate 
Arrangements are in place to address this risk through our
procurement process.  Work is on-going to explore the
opportunities which may exist to develop a Waste Transfer
Station for handling this material.
Finance and Resources Services

Page 53

52 | Page 
PUBLIC
Risk 
(Cause and effect)
Risk Capture
†
Service RR
†
Project RR
†
H&S PLAN 
Evaluation
o Low
o Moderate
o High
o Very High
Means of Monitoring
o Board Risk-Reporting
o SIP
o Project Board
o H&S Planning Group
Notes
(21)
DW
P subsidy – potential income loss
The migration of customers from
Housing Benefit to
Universal Credit makes housing benefit accuracy
increasing challenging due to the decreased volume of
claims, increased complexity of claims and overall
reduction in HB expenditure - and this means that the
council could be at much higher risk of being impacted
financially through subsidy loss. 
Service RR
High 
(4x4)
Board risk reporting
Risk controls and mitigating actions are currently being actively
considered.

Page 54

53 | Page 
PUBLIC
Appendix 4: Business-as-Usual Risks 
The council has 12 areas of risk monitored via BaURAM
©
Renfrewshire Council. Each Head of Service (and other officers who report directly to a Service Director),
undertake an annual self-assessment against a set of questions for each risk and indicate what level of assurance they can provide in relation to how
they and their teams
perform
in these areas.  The image below
shows the system
output for 2025/26, and this compares favourably with the 2024/25 outputs. The CRMG monitors a
performance target of 95%
module responses providing reasonable or substantial assurance. The KPI for the year is 99.5%. 
It should be noted that
the corporate risk
function reports here on
system
outputs,
whereas the Interim
Chief Auditor will report
separately on the
quality of responses and
levels of assurance, in
discussion with
individual Directors
regarding the annual
assurance statement 
A reminder of what the
modules cover is
provided overleaf.

Page 55

54 | Page 
PUBLIC
While these are the council’s business-as-usual risks, where there is recognised need for specific corporate action in any of these aspects of risk, these are escalated from
time to time to the corporate risk register. An example of this is nos. 2 and 7 below. Aspects of these risks are reflected not only within the risk assurance model bbut are
also reflected in the corporate risk register. 
BAU RISK AREA
ENCOMPASSING
BAU RISK AREA
ENCOMPASSING     
1. Community &
public
safety
Child and adult protection
Serious and organised crime (external)
2. Asset management
Statutory compliance
Arrangements for void properties
Fleet and other infrastructure
ICT hardware and software assets and responsibilities
3. People wellbeing &
development
Staff health and wellbeing
Training and development
Corporate and local induction
4. Information handling
GDPR compliance
Information asset management
Information security
Records management
5. Health, safety &
managing adverse
events
Staff incident recording
RIDDOR arrangements
Incident monitoring and trends analysis
6. Programme and project
management
Governance
Compliance with industry standards/ adopted methods
7. Organisation resilience
Business continuity:
- Staffing resource
- ICT and/ or power outages
- Facility issue
- Cyber security
8. Partnership management
Partnership registers
Agreements
Liabilities
9. Financial control and
governance
Authorities and delegation
Budgeting and accounting
Conflict and whistleblowing
Insider threat and crime
Counter fraud
10. Service planning and
performance monitoring
Customer engagement
Public/ stakeholder engagement
KPI trends analysis
Links to risk management and service improvement
11. Procurement and
contract management
Standing orders
Roles and responsibilities
Monitoring &
Performance Mgt
12. Complaints, comments and
claims handling
Compliance
Trends analysis
Links to service improvement      