To: Audit, Risk and Scrutiny Board
On: 16 March 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: External Audit Plan 2025/26
___________________________________________________________________
1. Background
1.1 The Council’s appointed external auditor, Azets, has submitted an Audit Plan
that outlines its approach to the audit of the 2025/26 annual accounts of
Renfrewshire Council, and the Coats Observatory Trust. The audit will
assess whether the accounts provide a true and fair view of the Council and
Trust’s financial positions and also whether they have been prepared in
accordance with proper accounting practice, i.e. the 2025 Code of Practice
on Local Authority Accounting in the UK.  
1.2 The Audit Plan also outlines the responsibilities of the Council and of Azets;
its assessment of key challenges and risks and the approach and timetable
for completion of the audit. 
1.3 The statutory deadline for the approval of the audited accounts for 2025/26
is 30 September 2025, and the annual audit report is scheduled to be
reported to the Audit, Risk and Scrutiny Board at its meeting on 21
September 2026. 
1.4 On page 35 of the Audit Plan, the proposed audit fee is detailed. For the
Council, this is indicated at £499,590 for the 2025/26 audit, and represents
an increase of 2.5% above the previous year audit fee.
1.5 The expected audit fee is reviewed by Audit Scotland each year. The
2025/26 expected audit fee is based on applying a 3.8% increase to the
2024/25 fee. This increase is applied on a sector basis and reflects the
conditions of the public sector market.

Page 2

PUBLIC
1.6 On page 36 of the Audit Plan, the proposed audit fee for the Coats
Observatory Trust for 2025/26 is indicated at £6,760 which also represents
4.3% increase in line with Audit Scotland’s approach.
___________________________________________________________________ 
2. Recommendations 
2.1 Members are asked to note the content of the attached report, including the
proposed audit fees for the Council and the Coats Observatory Trust.
_________________________________________________________
Implications of the Report
1. Financial –The audit fee is set by Audit Scotland, with some discretion
afforded to local audit teams. The proposed audit fee for the Council for
2025/26 is £499,590 and for the Coats Observatory Trust it is £6,760. 
2. HR & Organisational Development – None arising directly from this report. 
3. Community Planning – None arising directly from this report. 
4. Legal – An audit opinion free from qualification demonstrates compliance
with the statutory accounting requirements set out in the Local Government
(Scotland) Act 1973. 
5. Property/Assets – None arising directly from this report. 
6. Information Technology – None arising directly from this report. 
7. Equality & Human Rights - None arising directly from this report. 
8. Health & Safety – None arising directly from this report. 
9. Procurement – None arising directly from this report. 
10. Risk – the audit plan highlights audit issues and risks, and the approach that
Azets will adopt in seeking assurance that these risks are being managed. 
11. Privacy Impact – None arising directly from this report. 
12. COSLA Policy position – None arising directly from this report. 
13. Climate Risk – None arising directly from this report.
________________________________________________________
Author:           Christine McCourt, Head of Finance and Procurement

Page 3

PUBLIC
azets.co.uk
External Audit Annual Plan
Year ended 31 March 2026
February 2026
azets.co.uk
Renfrewshire Council
PUBLIC
azets.co.uk
y
azets.co.ukazets.co.ukazets co ukazets co uk
External Audit Annual Plan
Year ended 31 March 2026
February 2026
Renfrewshire Council
y
External Audit Annual Plan
Year ended 31 March 2026
March 2026
azets.co.uk
azets.co.uk

Page 4

Renfrewshire Council: External Audit
Annual Plan 2025/26| Azets 
Page 2 of 48 
PUBLIC
Table of Contents 
IIntroduction 3
Audit scope and general approach 5
Financial statements - significant and other risks of material misstatement 15
Wider scope of public audit 255
Audit team, logistics and requirements 311
Independence, objectivity and other services provided 333
Audit Fees 355
Appendices 377
Appendix 1: Materiality 38
Appendix 2: Responsibilities of the Council and the Auditor 411

Page 5

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 3 of 48 
PUBLIC
IIntroduction
Purpose
This audit plan highlights the key elements of our proposed audit strategy and provides an
overview of the planned scope and timing of the statutory external audit of Renfrewshire
Council (“the Council”), including the charitable trust administered by the Council for the year
ended 31 March 2026 for those charged with governance. 
The main elements of the audit include:
x an audit of the financial statements and an opinion on whether they give a true and
fair view and are free from material misstatement;
x an audit opinion on other statutory information published with the financial
statements in the annual accounts, including the Management Commentary, Annual
Governance Statement, and the Remuneration Report;
x consideration of arrangements in relation to wider scope areas: financial
management; financial sustainability; vision, leadership and governance; and use of
resources to improve outcomes;
x the audit of Best Value arrangements, including  a separate Thematic Review on Best
Value – Asset management and Fairness and Equality;
x the audit of the Council’s Housing Benefit Subsidy Claim, Non-Domestic Rates Return
and where relevant, the Whole of Government Accounts (WGA) return;
x review of the Council’s arrangements for preparing and publishing statutory
performance information; and
x any other work requested by Audit Scotland.
Responsibilities of the auditor and the Council
The Code of Audit Practice outlines the responsibilities of external auditors appointed by the
accounts Commission for Scotland and it is a condition of our appointment that we follow it.
Auditor responsibilities are derived from statute, International Standards on Auditing (UK)
and the Ethical Standard for auditors, other professional requirements and best practice, the
Code of Audit Practice and guidance from Audit Scotland. 
The Council has primary responsibility for ensuring the proper financial stewardship of public
funds. This includes preparing a set of accounts and an annual report that are in accordance
with proper accounting practices. The Council is also responsible for complying with
legislation and putting arrangements in place for governance and propriety that enable it to
successfully deliver its objectives.
Appendix 2 provides further details of our respective responsibilities.

Page 6

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 4 of 48 
PUBLIC
AAdding Value through the Audit
All of our clients demand of us a positive contribution to meeting their ever-changing
business needs. Our aim is to add value through our external audit work by being
constructive and forward looking, by identifying areas of improvement and by recommending
and encouraging good practice. In this way, we aim to help promote improved standards of
governance, better management and decision making and more effective use of resources.
Feedback
Any comments you may have on the service we provide, the quality of our work, and our
reports would be greatly appreciated at any time. Comments can be reported directly to any
member of your audit team.
This plan has been prepared for the sole use of those charged with governance and
management and should not be relied upon by third parties. No responsibility is assumed by
Azets Audit Services to third parties..
Openness and transparency
This report will be published on Audit Scotland’s website  http://www.audit-scotland.gov.uk/

Page 7

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 5 of 48 
PUBLIC
AAudit scope and general approach
Risk-based audit approach
Our objective when performing an audit is to obtain reasonable assurance about whether the
financial statements as a whole are free from material misstatement and to issue an auditor’s
report that includes our auditor’s opinion.
As part of our risk-based audit approach, we will:
x perform risk assessment procedures including updating our understanding of the
Council, including its environment, the financial reporting framework and its system
of internal control;
x review the design and implementation of key internal controls;
x identify and assess the risks of material misstatement, whether due to fraud or error,
at the financial statement level and the assertion level for classes of transaction,
account balances and disclosures;
x design and perform audit procedures responsive to those risks, to obtain audit
evidence that is sufficient and appropriate to provide a basis for our opinion; and
x exercise professional judgment and maintain professional scepticism throughout the
audit recognising that circumstances may exist that cause the financial statements to
be materially misstated.
We will undertake a variety of audit procedures designed to provide us with sufficient
evidence to give us reasonable assurance that the financial statements are free from material
misstatement, whether caused by fraud or error. 
Reasonable assurance is a high level of assurance but is not a guarantee that an audit
conducted in accordance with ISAs (UK) will always detect a material misstatement when it
exists. Misstatements can arise from fraud or error and are considered material if,
individually or in the aggregate, they could reasonably be expected to influence the economic
decisions of users taken on the basis of these financial statements. The risk of not detecting a
material misstatement resulting from fraud is higher than for one resulting from error, as
fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the
override of internal control. 
We include an explanation in the auditor’s report of the extent to which the audit was
capable of detecting irregularities, including fraud and respective responsibilities for
prevention and detection of fraud.

Page 8

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 6 of 48 
PUBLIC
CCommunication with those charged with governance
Auditing standards require us to make certain communications throughout the audit to those
charged with governance.  These communications will be through the Audit, Risk and
Scrutiny Board. We perform our audit of the financial statements in accordance with
International Standards on Auditing UK (ISAs (UK)), Ethical Standards, and applicable Practice
Notes and other guidance issued by the Financial Reporting Council (FRC).
Partnership working
We coordinate our work with Audit Scotland, internal audit, other external auditors and
relevant scrutiny bodies, recognising the increasing integration of service delivery and
partnership working within the public sector.
Our Audit Scotland appointment includes Renfrewshire Council, Renfrewshire Valuation Joint
Board, Scotland Excel and the Coats Observatory Trust. Azets Audit Services is separately
appointed as external auditors of Renfrewshire Leisure Limited (OneRen). Where practicable
and appropriate we will share knowledge between our teams to generate efficiencies in the
delivery of our audits.
Audit Scotland
Although we are independent of Audit Scotland and are responsible for forming our own
views and opinions, we do work closely with Audit Scotland throughout the audit. This helps
identify common priorities and risks, treat issues consistently across the sector, and improve
audit quality and efficiency. We share information about identified risks, good practices and
barriers to improvement so that lessons to be learnt and knowledge of what works can be
disseminated to all relevant bodies.
Audit Scotland undertakes national performance audits on issues affecting the public sector.
We may also be required to provide information to Audit Scotland to support the national
performance audits and we may review the Council’s arrangements for taking action on any
issues reported in the national performance reports which have a local impact. We also
consider the extent to which the Council uses the national performance reports as a means
to help improve performance at the local level.
Shared Risk assessment and joint scrutiny planning
The Shared Risk Assessment (SRA) process is a vehicle for scrutiny bodies to share intelligence
and agree scrutiny risks at councils. A local area network (LAN) has been established for each
council in Scotland which comprises representatives from the main local government scrutiny
bodies. The LAN is led by external audit and meet as and when is considered appropriate.

Page 9

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 7 of 48 
PUBLIC
IInternal Audit
As part of our audit, we consider the scope and nature of internal audit work and look to
minimise duplication of effort, to ensure the total audit resource to the Council is used as
efficiently and effectively as possible.
Delivering the audit
Hybrid audit approach
We intend to adopt a hybrid approach to our audit which combines on-site visits with remote
working. 
All of our people have the equipment, technology and systems to allow them to work
remotely or on-site, including secure access to all necessary data and information. All of our
staff are fully contactable by email, phone call and video-conferencing. Meetings can be held
over Microsoft Teams or by telephone.
We employ greater use of technology to examine evidence, but only where we have assessed
both the sufficiency and appropriateness of the audit evidence produced.
Secure sharing of information
We use a cloud-based file sharing service that enables users to easily and securely exchange
documents and provides a single repository for audit evidence.
Regular contact
During the ‘fieldwork’ phases of our audit, we will arrange regular catch-ups with key
personnel to discuss the progress of the audit. The frequency of these meetings will be
discussed and agreed with management. 
Materiality
We apply the concept of materiality both in planning and performing the audit, and in
evaluating the effect of identified misstatements on the audit and of uncorrected
misstatements. 
Judgments about materiality are made in the light of surrounding circumstances and are
affected by our perception of the financial information needs of users of the financial
statements, and by the size or nature of a misstatement, or a combination of both. 
Our determination of materiality:
x Informs the scope of our audit and audit procedures
x Informs the sample sizes required for substantive testing
x Informs our consideration in evaluation the effect of actual and projected
misstatements in the financial statements

Page 10

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 8 of 48 
PUBLIC
Materiality is revised as our audit progresses, should we become aware of any information
that would have caused us to determine a different amount had we known about it during
our planning. The basis for our assessment of materiality for the year is set out in Appendix 1.
PPlanning Materiality: We have set our materiality at 2% of the Council’s gross expenditure
based on the annual accounts for 2024/25, resulting in £18.100million for the Group and
£18.000million for the Council.
Performance Materiality: Using our professional judgement, we have assessed performance
materiality at 75% of planning materiality, resulting in £13.575million for the Group and
£13.500million for the Council.
Trivial threshold:  We are required to report to those charged with governance on all
unadjusted misstatements more than the ‘reporting threshold' amount. We have set this at
approximately 5% of planning materiality, resulting in £0.905million for the Group and
£0.900million for the Council.
Specific Materiality: We also consider whether any specific items of account require a
separate, lower materiality. We have determined that no specific materiality levels needed to
be set for this audit.
When planning, we make judgements about the size of misstatements which we consider to
be material, and which provide a basis for determining the nature and extent of our audit
procedures. Materiality is revised as our audit progresses, should we become aware of any
information that would have caused us to determine a different amount had we known
about it during our planning. The basis for our assessment of materiality is set out in
Appendix 2.
Accounting systems and internal controls 
The purpose of an audit is to express an opinion on the financial statements. We will follow a
substantive testing approach to gain audit assurance rather than relying on tests of controls.
As part of our work, we consider certain internal controls relevant to the preparation of the
financial statements such that we are able to design appropriate audit procedures. However,
this work does not cover all internal controls and is not designed for the purpose of
expressing an opinion on the effectiveness of internal controls. If, as part of our consideration
of internal controls, we identify significant deficiencies in controls, we will report these to you
in writing.
Going Concern
Management responsibility
Management is required to make and document an assessment of whether the Council and
Group is a going concern when preparing the financial statements. The review period should

Page 11

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 9 of 48 
PUBLIC
cover at least 12 months from the date of approval of the financial statements. Management
are also required to make balanced, proportionate and clear disclosures about going concern
within the financial statements where material uncertainties exist in order to give a true and
fair view. 
AAuditor responsibility
Under ISA (UK) 570, we are required to consider the appropriateness of management’s use of
the going concern assumption in the preparation of the financial statements and consider
whether there are material uncertainties about the Council and Group’s ability to continue as
a going concern that need to be disclosed in the financial statements.  
In assessing going concern, we will consider the guidance published in the Code of Practice
on Local Authority Accounting in the UK 2025/26 and Practice Note 10 (PN10), which focuses
on the anticipated future provision of services in the public sector rather than the future
existence of the entity itself.
Group audit scope and risk assessment 
As Group auditor, under ISA (UK) 600 (Revised September 2022) we are required to obtain
sufficient appropriate audit evidence regarding the financial information of the components
and the consolidation process to express an opinion on whether the group financial
statements are prepared, in all material respects, in accordance with the applicable financial
reporting framework. 
Group audit scope 
Based on the initial assessment the Group consists of the following entities:
Component
Nature and extent of
further audit
procedures
Level of response required
Renfrewshire council Full Scope Full scope statutory audit, as set out in
this audit plan. 
Renfrewshire Leisure Ltd Specific procedures Specific procedures in relation to
pension asset/liability 
Common Good Funds Specific procedures
Specific procedures performed - 
1.Long-term investments
2.Property, plant and equipment
Paisley Museum Reimagined Ltd None No procedures planned.
Park Lane Developments
(Renfrewshire) LLP None No procedures planned. 
Coats Observatory Trust None No procedures planned. (*)
Strathclyde Partnership for
Transport Specific procedures
Specific procedures performed - 
Investments in associates and joint
ventures

Page 12

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 10 of 48 
PUBLIC
Strathclyde Concessionary Travel
Scheme Joint Committee None No procedures planned.
Renfrewshire Valuation Joint Board None No procedures planned. (*)
Renfrewshire Health and Social Care
Integration Joint Board None No procedures planned.
AMIDS Renfrewshire LLP None No procedures planned. 
(*) Azets Audit Services perform separate statutory audits of these accounts which are not
related to the group accounts audit.
DDefinitions:
Full Scope Design and perform further audit procedures on the entire financial information of
the component, beyond procedures completed to review the consolidation. 
Specific Scope Design and perform further audit procedures on one or more classes of
transactions, account balances or disclosures, beyond procedures completed to review the
consolidation. 
None No further audit procedures required, beyond procedures completed to review the
consolidation. 
Risks at the component-level
The risks identified at the Council are set out in this external audit plan. There are no other
significant risks identified in any of the other components above in respect of the Group
audit. 
Note that a component may require a statutory audit under UK or overseas company law
irrespective of whether an audit is required for group reporting purposed. Management
should therefore satisfy themselves that all UK and overseas company law requirements are
adhered to on a company-by-company basis. 
Prevention and detection of fraud or error
In order to discharge our responsibilities regarding fraud and irregularity we require any
fraud or irregularity issues to be reported to us as they arise. In particular we require to be
notified of all frauds which:
x involve the misappropriation of theft of assets or cash which are facilitated by
weaknesses in internal control and;
x are over £5,000.

Page 13

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 11 of 48 
PUBLIC
We also require a historic record of instances of fraud or irregularity to be maintained and a
summary to be made available to us after each year end.
NNational Fraud Initiative
The National Fraud Initiative (NFI) in Scotland is a biennial counter-fraud exercise led by Audit
Scotland and overseen by the Public Sector Fraud Authority for the UK. It uses technology to
compare information held by different public bodies, and on different financial systems that
might suggest the existence of fraud or error.
The most recent NFI exercise commenced in 2024, the findings of which will be published in
Audit Scotland’s NFI report in summer 2026.
We continue to monitor the Council’s participation and progress in NFI and, where
appropriate, will include references to NFI in our 2025/26 Annual Audit Report. In addition,
we are required, in 2025/26, to complete a return for Audit Scotland, assessing the Council’s
participation in the NFI exercise. The return will review the adequacy of NFI governance
arrangements and follow-up activity. The information provided is a key source of information
for Audit Scotland’s NFI report.
Anti-money laundering
We require the Council to notify us on a timely basis of any suspected instances of money
laundering so that we can inform Audit Scotland who will determine the necessary course of
action.
Wider audit scope work
The special accountabilities that attach to the conduct of public business, and the use of
public money, mean that public sector audits must be planned and undertaken from a wider
perspective than in the private sector. This means providing assurance, not only on the
financial statements, but providing audit judgements and conclusions on the
appropriateness, effectiveness and impact of corporate governance and performance
management arrangements and financial sustainability. Appendix 2 provides detail of the
wider scope areas of public sector audit work. 
Our initial risk assessment and scope of work planned for 2025/26 is outlined in the “Wider
scope of public audit” section of this plan.
National risk assessment
Where particular areas of national or sectoral risk have been identified by the Auditor
General, they will request auditors to consider and report on those risks as they apply at a
local level. For 2025/26 no such risks have been specified.

Page 14

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 12 of 48 
PUBLIC
BBest Value
Appointed auditors have a duty to be satisfied that local government bodies have 
made proper arrangements to secure best value. 
Under the Code of Audit Practice, the audit of Best Value in councils is fully 
integrated within the annual audit work performed by appointed auditors. We are 
required to evaluate and report on the performance of councils in meeting their Best 
Value duties. There are six aspects to our work: 
1. Follow up: our work will follow up on Accounts Commission findings, Controller 
of Audit recommendations and any outstanding improvement actions reported in 
Best Value Assurance Reports, Best Value thematic reports and Annual Audit 
Reports. Our work will reflect the Council’s self-assessment against outstanding 
improvement actions and our findings will be based on the Council’s current 
arrangements for delivering best value. 
2. Risk based approach to Best Value themes: we pay due regard to the 
Council’s arrangements in respect of the seven Best Value themes in identifying 
any significant risks. 
3. Assessing the effectiveness of performance reporting: the best value theme, 
effective use of resources, includes an expectation that councils report effectively 
on their performance. Councils should be able to demonstrate a trend of 
improvement over time in delivering their strategic priorities. 
4. Thematic review of asset management: we are required to report on Best Value or
related themes prescribed by the Accounts Commission. The thematic work for 2025/26
is on how well the councils are managing their assets to achieve their corporate
objectives and respond to challenges around financial sustainability and climate change. 
5. Fairness and Equality assessment: Audit Scotland has requested that we carry out audit
work on the Council’s arrangements relating to the best value theme of fairness and
equality at least once during the audit appointment. Under the statutory Best Value
framework, councils are required to demonstrate continuous improvement across a set
of national themes, including fairness and equality. 
6. Contributing to Controller of Audit reports: the Controller of Audit reports to the
Accounts Commission on each council’s performance in meeting its Best Value duties at
least once over the five year audit appointment. The report is a summary of information
and judgements reported by each auditor. The Controller of Audit prepared a Best Value
report for Renfrewshire Council and was considered by the Accounts Commission on 15
May 2025. Following this, the Accounts Commission published their findings on 5 June
2025 and the report was presented to the Council on 26 June 2025.

Page 15

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 13 of 48 
PUBLIC
RReporting our findings
At the conclusion of the audit we will issue:
x an independent auditor’s report setting out our formal audit opinions within the
annual report and accounts, and;
x an annual audit report describing our audit findings, conclusions on key audit risks,
judgements on the pace and depth of improvement on the wider scope areas, and
any recommendations.
Definitions
We will use the following gradings to provide an overall assessment of the arrangements in
place as they relate to the wider scope areas. The text provides a guide to the key criteria we
use in the assessment, although not all of the criteria may exist in every case. 
There is a fundamental absence or failure of arrangements
There is no evidence to support necessary improvement
Substantial unmitigated risks affect achievement of corporate
objectives.
Arrangements are inadequate or ineffective
Pace and depth of improvement is slow
Significant unmitigated risks affect the achievement of
corporate objectives
No major weaknesses in arrangements but scope for
improvement exists
Pace and depth of improvement are adequate
Risks exist to the achievement of operational objectives
Effective and appropriate arrangements are in place
Pace and depth of improvement are effective
Risks to the achievement of objectives are managed

Page 16

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 14 of 48 
PUBLIC
IIT Audit strategy
In accordance with ISA (UK) 315, we are required to obtain an understanding of the IT
environment related to all key business processes, identify all risks from the use of IT related
to those walkthrough key controls judged relevant to our audit and assess the relevant IT
general controls (ITGCs) in place to mitigate them.
Our audit will include completing an assessment of the design and implementation of ITGCs
related to security management; technology acquisition, development and maintenance; and
technology infrastructure.
We will consult internally with our Technology Risk team for them to support the audit team
by assessing the information technology general controls (ITGC) of the following systems:
IT Application  Audit area  Planned llevel of IT audit assessment 
Finance System (Business
World)
Financial
Reporting
ITGC assessment (design and
implementation effectiveness only).
Active Directory  Network Access ITGC assessment (design and
implementation effectiveness only)

Page 17

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 15 of 48 
PUBLIC
FFinancial statements - significant and other risks of
material misstatement
Significant risks are defined as risks that require special audit consideration and include risks
of material misstatement that are close to the upper range of inherent risk due to their
nature and a combination of the likelihood and potential magnitude of misstatement, or are
required to be treated as significant risks due to requirements of auditing standards.
The table below summarises each significant risk.  Detail behind each risk and the work
undertaken is set out on the following pages.
Significant risk  Financial
Statement/Assertion
Level Risk
Fraud Risk  Approach to
controls
Level of
judgement /
estimation
uncertainty 
Management
ooverride of
controls
Financial Statement Level Yes
Assess design
and
implementation
Low
Fraud in
rrevenue
recognition
(Rebutted)
Assertion Level No
Assess design
and
implementation
Low 
Fraud in
eexpenditure
recognition
(Rebutted)
Assertion Level No
Assess design
and
implementation
Low
Valuation of
PPension Asset/ 
Liability 
Assertion Level No
Assess design
and
implementation
High
Valuation of
lland and
buildings 
Assertion Level No
Assess design
and
implementation
High
Valuation of
CCouncil
Dwellings 
Assertion Level No
Assess design
and
implementation
High

Page 18

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 16 of 48 
PUBLIC
SSignificant risks at the financial statement level
The table below summarises significant risks of material misstatement identified at the
financial statement level.  These risks are considered to have a pervasive impact on the
financial statements as a whole and potentially affect many assertions for classes of
transaction, account balances and disclosures.
Management override of controls
(Council and Group) 
Planned audit procedures 
Auditing Standards require auditors to
treat management override of controls as
a significant risk on all audits. This is
because management is in a unique
position to perpetrate fraud by
manipulating accounting records and
overriding controls that otherwise appear
to be operating effectively.   
Although the level of risk of management
override of controls will vary from entity to
entity, the risk is nevertheless present in
all entities. Due to the unpredictable way
in which such override could occur, it is a
risk of material misstatement due to fraud
and thus a significant risk. Specific areas of
potential risk include manual journals,
management estimates and judgements
and one-off transactions outside the
ordinary course of the business. 
Risk of material misstatement: Very High
Procedures performed to mitigate risks of
material misstatement in this area will
include:
x documenting our understanding of
the journals posting process and
evaluating the design and
implementation effectiveness of
management controls over journals; 
x analysing the journals listing and
determining the criteria for selecting
high risk and/or unusual journals; 
x testing high risk and/or unusual
journals posted during the year and
after the draft accounts stage back to
supporting documentation for
appropriateness, corroboration and to
ensure approval has been undertaken
in line with the Council’s journals
policy; 
x gaining an understanding of the key
accounting estimates and critical
judgements made by management.
We will challenge assumptions and
consider for reasonableness and
indicators of bias which could result in
material misstatement due to fraud;
and 
x evaluating the rationale for any
changes in accounting policies,
estimates or significant unusual
transactions.

Page 19

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 17 of 48 
PUBLIC
SSignificant risks at the assertion level for classes of transaction,
account balances and disclosures
Fraud in revenue recognition  
-  Rebutted (Council and Group)
Audit approach 
Material misstatement due to
fraudulent financial reporting relating to
revenue recognition is a rebuttable
presumed risk in ISA (UK) 240. 
Having considered the nature of the
revenue streams at the Council, we
consider that the risk of fraud in
revenue recognition can be rebutted
due to the following:
x There is little incentive to
manipulate revenue recognition;
x Opportunities to manipulate
revenue recognition are very
limited;
x The culture and ethical
frameworks of local authorities
mean that all forms of fraud are
seen as unacceptable 
Therefore, we do not consider this to be
a significant risk for the Council and 
group. 
We do not consider this to be a significant risk
for the Council and Group and standard audit
procedures will be carried out. We will keep this
rebuttal under review throughout the audit to
ensure this judgement remains appropriate. 
Fraud in eexpenditure
-  Rebutted (Council and Group)
Audit approach 
Due to the presumption that there are
risks of fraud in expenditure
recognition, we are required to evaluate
which types of expenditure,
expenditure transactions or assertions
give rise to such risks. 
We do not consider this to be a significant risk
for the Council and Group and standard audit
procedures will be carried out. We will keep this
rebuttal under review throughout the audit to
ensure this judgement remains appropriate.

Page 20

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 18 of 48 
PUBLIC
FFraud in eexpenditure
--  RRebutted (Council and Group)
Audit approach 
We have considered Practice Note 10,
which comments that for certain public
bodies, the risk of manipulating
expenditure could exceed the risk of
manipulating revenue. We have
therefore considered the risk of fraud in
expenditure at the Council for all
expenditure streams and concluded
that there is not a significant risk. This is
due to the low fraud risk in the
underlying nature of the transactions,
the high predictability of certain
expenditure streams, such as payroll or
interest, or the immaterial nature of the
expenditure streams both individually
and collectively. 
Our consideration of expenditure
streams also included capital
expenditure and similarly we concluded
that there is not a significant risk.
Capital expenditure transactions are
likely to be larger and subject to more
scrutiny, reducing the risk of improper
recognition.

Page 21

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 19 of 48 
PUBLIC
VValuation of PPension AAsset/LLiability  –– 
IIAS 19  
(key accounting estimate) ((Council and
Group)
Planned audit procedures 
The pension fund net liability/asset is
considered a significant estimate due to
the size of the numbers involved and
the sensitivity of the estimate to
changes in key assumptions. An
actuarial estimate of the net defined
benefit pension liability/asset is
calculated on an annual basis under IAS
19 ‘Employee Benefits’, and on a
triennial funding basis, by an
independent firm of actuaries with
specialist knowledge and experience.
The triennial estimates are based on the
most up to date membership data held
by the pension fund and a roll forward
approach is used in intervening years,
as permitted by the CIPFA Code. 
The calculations involve a number of
key assumptions, such as discount rates
and inflation and local factors such as
mortality rates and expected pay rises.
The estimates are highly sensitive to
changes in these assumptions and the
calculation of any asset ceiling when
determining the value of a pension
asset (where relevant). ISAs (UK) 500
and 540 require us to undertake audit
procedures on the use of external
experts (the actuary) and the methods,
assumptions and source data
underlying the estimates. 
Procedures performed to mitigate risks of
material misstatement in this area will include:
x evaluating managements processes for
the calculation of the estimate, the
instructions issued to management’s
expert (the actuary) and the scope of
their work;
x evaluating the competence, capabilities
and objectivity of the actuary;
x assessing the controls in place to ensure
that the data provided to the actuary by
the Council and their pension fund was
accurate and complete;
x evaluating the methods, assumptions
and source data used by the actuary in
their valuations, with the support of an
auditors’ expert;
x testing the consistency of the pension
fund asset and liability and disclosures in
the notes to the core financial
statements with the actuarial report
from the actuary;
x if the pension fund is in surplus, ensuring
that any asset recorded in the financial
statements, and any additional liabilities
for secondary contributions have been
accounted for correctly in line with the
requirements of IFRIC 14;
x obtaining assurances from the pension
fund auditor as to the controls
surrounding the validity and accuracy of
membership data; contributions data
and benefits data sent to the actuary by
the pension fund and the fund assets

Page 22

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 20 of 48 
PUBLIC
VValuation of PPension AAsset/LLiability  –– 
IIAS 19  
(key accounting estimate) ((Council and
Group)
Planned audit procedures 
This represents a key accounting
estimate made by management within
the financial statements due to the size
of the gross asset and liability values
involved, the subjectivity of the
measurement and the sensitive nature
of the estimate to changes in key
assumptions. We have therefore
identified the valuation of the net
pension liability/asset as a significant
risk.  
Inherent risk of material mmisstatement:
PPension Asset/Liability (Valuation): High 
valuation in the pension fund financial
statements; andensuring pension
valuation movements for the year and
related disclosures have been correctly
reflected in the financial statements.

Page 23

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 21 of 48 
PUBLIC
VValuation of LLand and Buildings   
((key accounting estimate) ((Council and
GGrroup)
Planned audit procedures 
The Council held land and building
assets at a net book value of £366.032
million at 31 March 2025. The Council
revalues land and buildings on a five-
year rolling basis.
Revaluation of operational land and
buildings should be performed in line
with the revised revaluation
requirements for 2025/26 onwards set
out in the CIPFA Code. The Council has
adopted the following revaluation
approach to its land and buildings
valuations for 2025/26 onwards on a
rolling five year programme with use of
indexation in intervening years, to
ensure compliance with the revised
requirements set out in the 2025/26
CIPFA Code. Management engaged the
services of  and employed a qualified
valuer, who is a Regulated Member of
the Royal Institute of Chartered
Surveyors (RICS) to undertake any
valuations required as of 31 March
2026 and to provide advice on
appropriate indices. 
The valuations and index uplifts involve
a wide range of assumptions and source
data and are therefore sensitive to
changes in market conditions. ISAs (UK)
500 and 540 require us to undertake
audit procedures on the use of external
expert valuers and the methods,
assumptions and source data
underlying the fair value estimates. This
represents a key accounting estimate
made by management within the
Procedures performed to mitigate risks of
material misstatement in this area will include:
x evaluating management processes,
controls and assumptions for the
calculation of the estimate, the
instructions issued to the valuation
experts and the scope of their work;
x evaluating the competence, capabilities
and objectivity of the valuation expert;
x considering the basis on which the
valuations and indexation uplifts are
carried out and challenging the key
assumptions applied;
x evaluating the reasonableness of the
valuation movements for assets revalued
during the year, with reference to
market data;
x for unusual or unexpected valuation
movements, testing the information
used by the valuer to ensure it is
complete and consistent with our
understanding;
x ensuring revaluations made during the
year have been input correctly to the
fixed asset register and the accounting
treatment within the financial
statements is correct; 
x evaluating the assumptions made by
management for any assets not revalued
or indexed during the year and how
management are satisfied that these are
not materially misstated; and
x engaging our own valuations expert,
where necessary, to assess any

Page 24

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 22 of 48 
PUBLIC
VValuation of LLand and Buildings   
((key accounting estimate) ((Council and
GGrroup)
Planned audit procedures 
financial statements due to the size of
the values involved, the subjectivity of
the measurement and the sensitive
nature of the estimate to changes in key
assumptions. We have therefore
identified the valuation of operational
land and buildings as a significant risk. 
We will further pinpoint this risk to
specific assets, or asset types, on
receipt of the draft financial statements
and the year-end updated asset
valuations, to those assets where the
valuation movement falls outside of our
expectations, there are significant
changes to any of the key assumptions
or the year-end valuation is considered
material. 
Inherent risk of material misstatement: 
Land and Buildings (Valuation): High 
judgemental assumptions used that
underpin the final valuations.

Page 25

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 23 of 48 
PUBLIC
VValuation oof CCouncil dwellings   
((key accounting estimate) ((Council and
GGroup) 
Planned audit procedures 
The Council held council dwellings with
a net book value of £800.387 million at
31 March 2025. The Council revalues
council dwellings on a five-year rolling
basis.
Revaluation of council dwellings should
be performed with sufficient regularity
so that carrying amounts are not
materially misstated. Council dwellings
are valued using the beacon method,
which aggregates the vacant possession
value of each unit of housing stock
based on the value of a beacon or
sample property. A discount factor is
applied to reflect the lower rent yield
from social housing compared to
market rates. Management engaged
the services of and employed a qualified
valuer, who is a Regulated Member of
the Royal Institute of Chartered
Surveyors (RICS) to undertake these
valuations as of 31 March 2026. 
The valuations involve a wide range of
assumptions and source data and are
therefore sensitive to changes in market
conditions. ISAs (UK) 500 and 540
require us to undertake audit
procedures on the use of external
expert valuers and the methods,
assumptions and source data
underlying the fair value estimates. This
represents a key accounting estimate
made by management within the
financial statements due to the size of
Procedures performed to mitigate risks of
material misstatement in this area will include:
x evaluating management processes,
controls and assumptions for the
calculation of the estimate, the
instructions issued to the valuation
experts and the scope of their work;
x evaluating the competence, capabilities
and objectivity of the valuation expert;
x considering the basis on which the
valuations are carried out and
challenging the key assumptions applied;
x evaluating the reasonableness of the
valuation movements for assets revalued
during the year, with reference to
market data;
x for unusual or unexpected valuation
movements, testing the information
used by the valuer to ensure it is
complete and consistent with our
understanding;
x testing a sample of Beacon properties in
respect of council dwellings, to consider
whether their valuation assumptions are
appropriate and representative of other
Beacon properties within the Beacon
group;
x ensuring revaluations made during the
year have been input correctly to the
fixed asset register and the accounting
treatment within the financial
statements is correct; 
x evaluating the assumptions made by
management for any assets not revalued
during the year and how management

Page 26

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 24 of 48 
PUBLIC
VValuation oof CCouncil dwellings   
((key accounting estimate) ((Council and
GGroup) 
Planned audit procedures 
the values involved, the subjectivity of
the measurement and the sensitive
nature of the estimate to changes in key
assumptions. We have therefore
identified the valuation of council
dwellings as a significant risk. 
We will further pinpoint this risk to
specific assets, or asset types, on
receipt of the draft financial statements
and the year-end updated asset
valuations, to those assets where the
valuation movement falls outside of our
expectations, there are significant
changes to any of the key assumptions
or the year-end valuation is considered
material. 
Inherent risk of material misstatement: 
Council dwellings (Valuation): High 
are satisfied that these are not materially
different to the current value; and
x engaging our own valuations expert,
where necessary, to assess any
judgemental assumptions used that
underpin the final valuations. 
Other material balances and transactions
Under International Standards on Auditing, “irrespective of the assessed risks of material
misstatement, the auditor shall design and perform substantive procedures for each material
class of transactions, account balance and disclosure”. All other material balances and
transaction streams will therefore be audited. However, the procedures will not be as
extensive as those adopted for the risks identified in this report.

Page 27

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 25 of 48 
PUBLIC
WWider scope of public audit
Introduction
The Code of Audit Practice frames a significant part of our responsibilities in terms of four
wider scope audit areas: 
x Financial sustainability 
x Financial management 
x Vision, leadership and governance 
x Use of resources to improve outcomes.
Our planned audit work is risk based and proportionate. Our initial assessment builds upon
our understanding of the Council’ key priorities and risks along with discussions with
management and review of Council minutes and key strategy documents. 
Our audit approach to the wider scope audit areas
Appointed auditors are required to consider the wider scope areas when:
x identifying significant audit risks at the planning stage of the audit
x reaching conclusions on those risks
x making recommendations for improvement
x where appropriate, setting out conclusions on the audited body’s performance.
Appendix 2 provides further detail on the definition, scope and audit considerations under
each wider scope area.
We have identified one significant risk in relation to financial sustainability as set out in the
table below.
Audit planning is a continuous process and we will report all identified significant risks, as
they relate to our wider scope audit, in our annual audit report.

Page 28

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 26 of 48 
PUBLIC
WWider scope significant risk
Financial sustainability
The Council continues to consider its medium-term financial planning through its financial
outlook and medium-term financial plan, which are regularly presented to the full Council.
The most recent medium-term financial plan update was presented to the full Council in
February 2026. The latest cumulative forecast indicates a budget gap of £c.80million over the
period 2026/27 to 2030/31 prior to council tax decisions. Assuming a 5.0-6.5% council tax
increase in over this period, this would reduce the funding gap to c£40m. The scale of the
projected funding shortfall demonstrates the continuing structural financial challenge facing
the Council over the medium term. 
At the time of drafting this report the Council  is still to approve  its 2026/27 revenue budget
at its February 2026 meeting. The budget estimates total expenditure of £622.794million
with a deficit of £2.121million, prior to any council tax decisions. The deficit could be
temporarily addressed through the use of the financial sustainability fund.
The financial sustainability fund estimated balance as of 31 March 2026 is £34.199 million.
The fund was established for this primary reason, to support the financial position of the
Council in circumstances where, in the short term, savings have not been generated at the
scale or pace required to ensure financial balance. In 2025/26, the Financial Sustainability
Fund benefited from the second (and final) year of low employer pension contributions. 
The overall council General Fund balance is forecast to be £146.285million at 31 March 2026
(£138.769million in prior year). The majority of the reserves and funds are ring fenced for
specific purposes, with the unallocated reserves standing at £10.280million, equivalent to
1.9% of the Council budgeted net expenditure.
Council agreed in September 2025 a £6.3m savings target for 2026/27 to maintain recurring
financial balance over the medium term. Directors and their management teams have been
developing options to deliver savings at this scale; however, the implementation of proposals
is now expected to be phased towards future years. Based on work undertaken by services to
date, and that for which specific plans are being developed over the next two years, the
Council estimates that £2.8m of savings can be confidently incorporated into the 2026/27
base budget.
The Scottish Government’s draft budget announced in January 2026 allocated £493million to
the Council, representing a 5% increase (£23.6million) on the prior year allocation. After
adjusting for new responsibilities, areas of growing responsibility and other conditional
aspects of the settlement, this provides a like-for like comparison to 2025/26 where the
Council’s underlying core grant has increased by £11.9m (2.5%).

Page 29

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 27 of 48 
PUBLIC
Pay inflation remains a significant financial risk. The Scottish Government’s medium-term
public sector pay policy indicates a 9% increase over the period 2025/6 to 2027/28, with
flexibility for employers to configure three-year proposals within this range. The current
agreed pay deal leaves only 2.5% of this envelope for 2027/28. 
The Council has highlighted a timing disconnect between its ability to develop recurring
savings and the pace at which the cost pressures are emerging. The medium-term financial
plan projects increasing annual funding gaps over the planning period before mitigating
actions are implemented. The Council recognises that future financial balance will require a
combination of recurring savings, service redesign, income generation, and potentially
further council tax increases.
There remains uncertainly regarding future Scottish Government settlements, ongoing cost
pressures, and the financial sustainability of Renfrewshire Integration Joint Board. The
Council acknowledges that while short-term reserve utilisation can assist in managing in-year
pressures, underlying structure deficits must be addressed on a recurring basis to ensure
long-term financial sustainability. 
Given the scale of the medium-term funding gap, reliance on reserves, external funding risks,
financial sustainability remains a significant audit risk for 2026/27 and will continue to be
subject to detailed review as part of our wider scope audit work. 
OOur audit response:
During our audit we will review whether the Council has appropriate arrangements in place
to manage its financial position. Our work will include an assessment of progress made in
developing financially sustainable plans which reflect the medium and longer term impact of
cost pressures and that continue to support the delivery of the Council’s statutory functions
and strategic objectives. 
Further wider scope considerations
In formulating our audit plan, we identified areas of further focus for our work in other wider
scope areas: 
Financial management 
x Whether there are effective arrangements in place to budget for, monitor and deliver
its capital plans, including whether capital budgets and profiling reflect delivery
capacity and prevailing market conditions.

Page 30

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 28 of 48 
PUBLIC
x Whether the planned savings in the year have been set realistically, monitored
effectively and were achieved. 
VVision, leadership and governance 
x Whether the Council has effective arrangements in place to support transparent and
open decision making, including how options appraisals and business cases are
presented to members to support effective scrutiny.  
x Whether the leadership development has been embedded across the organisation
and whether the impact of the leadership programme continues to be assessed on a
regular basis, including the Council’s ongoing approach to organisational culture and
governance improvement. 
Use of resources to improve outcomes 
x  Impact of the savings exercises and budget reductions on the quality of the delivery
of the Council services. 
x Whether the Council has effective arrangements in place to deliver major capital
projects. 
x  Whether the Council reported its performance in line with the requirements of the 
Statutory Performance Indicators Direction applicable to 2025/26 to 2027-28.

Page 31

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 29 of 48 
PUBLIC
CCoats Observatory Trust Fund
The Charities Accounts (Scotland) Regulations 2006 outline the accounting and auditing
requirements for charitable bodies. The Regulations require an auditor to prepare a report to
the charity trustees where an audit is required by any other enactment. 
The Council’s charitable trust is covered by the requirements of section 106 of the Local
Government (Scotland) Act 1973 and consequently requires a full audit. Each registered
charitable trust has required a full audit since 2013/14. The council has one registered charity
– Coats Observatory Trust Fund.
Significant risks at the financial statement level
The table below summarises the significant risk of material misstatement identified at the
financial statement level. This risk is considered to have a pervasive impact on the financial
statements as a whole and potentially affect many assertions for classes of transaction,
account balances and disclosures.
Identified risk of material misstatement  Audit approach 
Management override of controls (The
Coats Observatory) 
Management is in a unique position to
perpetrate fraud because of their ability
to manipulate accounting records and
prepare fraudulent financial statements
by overriding controls that otherwise
appear to be operating effectively.   
Although the level of risk of
management override of controls will
vary from entity to entity, the risk is
nevertheless present in all entities. Due
to the unpredictable way in which such
override could occur, it is a risk of
material misstatement due to fraud and
thus a significant risk. 
Risk oof material misstatement: Very High 
Procedures performed to mitigate risks of
material misstatement in this area will include:
x documenting our understanding of the
journals posting process and evaluating
the design and implementation
effectiveness of management controls
over journals; 
x analysing the journals listing and
determining the criteria for selecting
high risk and/or unusual journals; 
x testing high risk and/or unusual journals
posted during the year and after the
draft accounts stage back to supporting
documentation for appropriateness,
corroboration and to ensure approval
has been undertaken in line with the
Trust’s journals policy; 
x gaining an understanding of the key
accounting estimates and critical

Page 32

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 30 of 48 
PUBLIC
IIdentified risk of material misstatement  AAudit approach 
Management override of controls (The
Coats Observatory) 
judgements made by management. We
will challenge assumptions and consider
for reasonableness and indicators of
bias which could result in material
misstatement due to fraud; and 
x valuating the rationale for any changes
in accounting policies, estimates or
significant unusual transactions.

Page 33

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 31 of 48 
PUBLIC
AAudit team, logistics and requirements
Your core audit team
Engagement DDirector
Rebecca Lister
Rebecca.Lister@azets.co.uk
Rebecca is the key contact for senior management and has overall responsibility for the
audit quality and the audit opinion. 
Engagement Manager 
Adrian Kolodziej
Adrian.Kolodziej@azets.co.uk
Adrian is responsible for the overall management of the audit and quality assurance of
audit work. He is the key contact for the finance team management. 
Engagement Assistant Manager 
Ava Campbell
Ava.Campbell@azets.co.uk
Ava leads the on and off-site audit visits. Ava is the key day-to-day contact for the
finance team. 
Audit Timetable
The following timetable indicates the key milestones of the audit.
Event  Date 
Audit planning wwork, including planning
meetings
February 2026
Audit, Risk and Scrutiny Board to consider audit
pplan
March 2026
Best Value work  February – May 2026

Page 34

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 32 of 48 
PUBLIC
IInterim  aaudit work  March 2026
RReceipt of draft accounts   30 June 2026
CCommencement of audit ffieldwork  6 July 2026
AAudit, Risk and Scrutiny Board to consider
aaccounts and audit report 
21 September 2026
Council meeting to approve accounts for signing  24 September 2026
Grant claims and returns:  
• Non domestic Rate Income return (NDRI) 
• Housing Benefit subsidy claim (HB)
31 December 2026 
Our expectations and requirements 
For us to be able to complete our work in line with the agreed fee and timetable, we require
the following:
x Draft financial statements to be produced to a good quality by the deadlines agreed
with us. These should be complete including all notes, the management commentary,
annual governance statement and the remuneration report;
x The provision of good quality working papers at the same time as the draft financial
statements. These will be discussed in advance to ensure clarity over our
expectations; 
x The provision of agreed data reports at the start of the audit, fully reconciled to the
values in the accounts, to facilitate our selection of samples for testing;
x Ensuring staff are available and on site (as agreed) during the period of the audit; and 
x Prompt and sufficient responses to audit queries to minimise delays. 
The audit process is underpinned by effective project management to co-ordinate and apply
our resources efficiently to meet your deadlines. It is essential that the audit team and the
Council’s finance team work closely together to achieve the above timetable.

Page 35

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 33 of 48 
PUBLIC
IIndependence, objectivity and other services provided
The Ethical Standards and ISA (UK) 260 require us to give you full and fair disclosure of
matters relating to our independence. In accordance with our profession’s ethical
requirements and further to our audit plan issued confirming audit arrangements we confirm
that there are no further facts or matters that impact on our integrity, objectivity and
independence as auditors that we are required or wish to draw to your attention. We
consider an objective, reasonable and informed third party would take the same view. 
We confirm that Azets Audit Services and the engagement team complied with the FRC’s
Ethical Standard. We confirm that all threats to our independence have been properly
addressed through appropriate safeguards and that we are independent and able to express
an objective opinion on the financial statements.
In particular: 
Non-audit services:  Separate teams within Azets provides the following services to two of
the Council subsidiaries (Paisley Museum Reimagined Ltd, Renfrewshire Leisure Ltd):  tax
returns/compliance and preparation of the accounts. The fees for these services add up to
c.£3,300. 
We have considered the following threats to independence could be present as a result of
non-audit services: self-review, self-interest, management. Accounts preparation services is a
straightforward process of the client trial balances being imported and statutory accounts
being produced. Any adjustments will be put forward to the clients management for approval
before they are made. Accounts are prepared using clients trial balances, any adjustments
are agreed with management before posting and second manager review of accounts will be
undertaken.
We assess the risk of management, self-interest and self-review is mitigated due to the fact
that the: audit of subsidiaries is performed by separate audit teams led by a different
responsible individuals; preparation of the accounts is an admin task with no judgement
applied and adjustment approved by management; impact on group audit of Paisley
Museums Reimagined is not significant and normally the Council group audit team would
perform specific procedures as required on pension asset of Renfrewshire Leisure Ltd; the
fees for preparation of the accounts are significantly lower than audit fees.
We assess the risk of management, self-interest and self-review mitigated due to the fact
that the separate team members work on the tax computation and audit which is reviewed
by separate manager/partner/director. Tax fees are substantially lower than the audit fees.

Page 36

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 34 of 48 
PUBLIC
x Contingent fees: No contingent fee arrangements are in place for any services
provided.
x Gifts and hospitality: We have not identified any gifts or hospitality provided to, or
received from, any member of the Council, senior management or staff.
x Relationships: We have no other relationships with the Council, its directors, senior
managers and affiliates, and we are not aware of any former partners or staff being
employed, or holding discussions in anticipation of employment, as a director, or in a
senior management role covering financial, accounting or control related areas.

Page 37

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 35 of 48 
PUBLIC
AAudit Fees
The Group and the Council audit
The quality of audit work is an essential requirement in successfully delivering a fully
compliant ISA and Code of Audit Practice audit. Audit Scotland sets an expected audit fee
that assumes the body has sound governance arrangements in place, has been operating
effectively throughout the year, prepares comprehensive and accurate unaudited accounts
and meets the agreed timetable for audit.  
The expected fee is reviewed by Audit Scotland each year, based on Audit Scotland’s overall
budget proposals. The budget proposal and fee levels (for the 2025/26 audits) have been
developed in the context of a challenging economic financial environment and the challenges
facing public services.  
As auditors we negotiate a fee with the Council during the planning process.  The fee may be
varied above the expected fee level to reflect the circumstances and local risks within the
body.
The expected fee for auditor remuneration set by Audit Scotland for the 2025/26 audit of the
Renfrewshire Council is £311,220. We have proposed an increase of 10% due to additional
work required in relation to the group specific scope procedures, quality and complexity of
the working papers,  additional procedures in relation to payroll testing, and heightened
scrutiny over significant risk areas and the need to meet increasing audit quality and
regulatory standards
It is our policy to bill for overruns or scope extensions e.g., where we have incurred delays,
deliverables have been late or of poor quality, where key personnel have not been available,
or we have been asked to do extra work.   
2025/26  (£s)  2024/25  (£s) 
Auditor remuneration (expected fee level) 311,220 299,830
Auditor remuneration (above expected fee
level for additional areas noted above)
31,120 38,464
Pooled costs 10,730 7,530
Contribution to PABV costs 81,090 79,800
Sectoral cap adjustment 65,430 61,830
Total fee  4999,5990 487,454 
We will take account of the risk exposure of the Council and the management assurances in
place. We assume receipt of the draft working papers at the outset of our on-site final audit
visit. If the draft accounts and papers are late, or agreed management assurances are

Page 38

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 36 of 48 
PUBLIC
unavailable, we reserve the right to charge an additional fee for additional audit work. An
additional fee will be required in relation to any other significant exercises not within our
planned audit activity.
RRenfrewshire Council Charitable Trust (Coats Observatory) audit
The audit fee in the table above does not include the cost of auditing charitable trust fund. 
We propose setting the audit fee for the audit of the charitable trust at £6,760 which
represents 4.3% increase in line with Audit Scotland notification.

Page 39

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 37 of 48 
PUBLIC
AAppendices 
Appendix 1: Materiality 3838
Appendix 2: Responsibilities of the Council and the Auditor 411

Page 40

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 38 of 48 
PUBLIC
AAppendix 1: Materiality
Whilst our audit procedures are designed to identify misstatements which are material to our
audit opinion, we also report to those charged with governance and management any
uncorrected misstatements of lower value errors to the extent that our audit identifies these. 
Under ISA (UK) 260 we are obliged to report uncorrected omissions or misstatements other
than those which are ‘clearly trivial’ to those charged with governance. ISA (UK) 260 defines
‘clearly trivial’ as matters that are clearly inconsequential, whether taken individually or in
aggregate and whether judged by any quantitative or qualitative criteria.
An omission or misstatement is regarded as material if it would reasonably influence the
users of the financial statements. The assessment of what is material is a matter of
professional judgement and is affected by our assessment of the risk profile of the Council
and the needs of the users.  
When planning, we make professional judgements about the size of misstatements which we
consider to be material, based on our knowledge of the Council, considering factors such as
financial stability, expectations of readers and stakeholders, sector developments and
financial reporting requirements. In determining materiality we consider the level of
misstatement that could reasonably be expected to influence the economic decisions of
users taken on the basis of the financial statements.
Our assessment, at the planning stage, of materiality for the year ended 31 March 2026 was
calculated as follows.
Group and Council Materiality 
Group Materiality
£ 
Council  Materiality
£ 
Overall materiality for the financial statements  18,100,000 18,000,000
Performance materiality (75% of materiality)  13,575,000 13,500,000
Trivial tthreshold 905,000 900,000
Materiality
Our initial assessment is based on approximately 2% of the Council’s
gross expenditure as disclosed in the 2024/25 audited annual accounts.
We consider this to be the principal consideration for the users of the
financial statements when assessing financial performance of the Council.
The financial statements are considered to be materially misstated where
total errors exceed this value.
Performance
materiality 
75% of materiality

Page 41

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 39 of 48 
PUBLIC
Performance materiality is the working level of materiality used
throughout the audit. We use performance materiality to determine the
nature, timing and extent of audit procedures carried out. We perform
audit procedures on all transactions, or groups of transactions, and
balances that exceed our performance materiality.  This means that we
perform a greater level of testing on the areas deemed to be at
significant risk of material misstatement.
Performance materiality is set at a value less than overall materiality for
the financial statements as a whole to reduce to an appropriately low
level the probability that the aggregate of the uncorrected and
undetected misstatements exceed overall materiality.
TTrivial
tthreshold 
5% of overall materiality
Trivial misstatements are matters that are clearly inconsequential,
whether taken individually or in aggregate and whether judged by any
quantitative or qualitative criteria.
Individual errors above this threshold are communicated to those
charged with governance. 
We also consider whether any specific items of account require a separate, lower materiality.
We have determined that no specific materiality levels needed to be set for this audit.
Common Good Funds and Coats Observatory Materiality 
The Council maintains three Common Good funds, which were deregistered as charities two
years ago and do not require a separate audit opinion. However, we set out separate
materiality levels for these funds as these will be specifically covered by the Renfrewshire
Council auditor’s opinion and are shown as a separate statement in the Council’s financial
statements. 
Overall
Materiality £ 
Performance
Materiality £ 
Trivial Threshold 
£
CGF Paisley  197,000 147,750 9,850
CGF Johnstone  1,500 1,125 100
CGF Renfrew  1,104,000 828,000 55,200
Coats Observatory Trust  55,000 41,250 2,750 
Overall materiality: our assessment is based on approximately 3% of net assets. We consider
this benchmark to be the principal consideration for the users of the financial statements
when assessing the performance of each charitable trust. Performance materiality: Using our

Page 42

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 40 of 48 
PUBLIC
professional judgement we have calculated performance materiality at approximately 75% of
overall materiality. Trivial threshold: 5% of overall materiality for the financial statements,
with the Johnstone Fund rounded up to £100.

Page 43

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 41 of 48 
PUBLIC
AAppendix 2: Responsibilities of the Council and the
Auditor
The Council’s responsibilities 
The Council has primary responsibility for ensuring the proper financial stewardship of public
funds, compliance with relevant legislation and establishing effective arrangements for
governance, propriety and regularity that enables it to successfully deliver its objectives. The
features of proper financial stewardship include the following:
Area  Council rresponsibilities
Corporate
ggovernance
The Council is responsible for establishing arrangements to ensure the
proper conduct of its affairs including the legality of activities and
transactions, and for monitoring the adequacy and effectiveness of these
arrangements. Those charged with governance should be involved in
monitoring these arrangements.
Financial
sstatements
and related
rreports
The Council has responsibility for: 
x preparing financial statements which give a true and fair view of
the financial position and its expenditure and income, in
accordance with the applicable financial reporting framework and
relevant legislation;
x maintaining accounting records and working papers that have
been prepared to an acceptable professional standard and
support the balances and transactions in its financial statements
and related disclosures;
x ensuring the regularity of transactions, by putting in place
systems of internal control to ensure that they are in accordance
with the appropriate authority; and
x preparing and publishing, along with the financial statements, an
annual governance statement, management commentary (or
equivalent) and a remuneration report in accordance with
prescribed requirements. 
Management commentaries should be fair, balanced and
understandable. Management is responsible, with the oversight of those
charged with governance, for communicating relevant information to
users about the entity and its financial performance, including providing
adequate disclosures in accordance with the applicable financial

Page 44

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 42 of 48 
PUBLIC
AArea  CCouncil rresponsibilities 
reporting framework. The relevant information should be communicated
clearly and concisely. 
The Council is responsible for developing and implementing effective
systems of internal control as well as financial, operational and
compliance controls. These systems should support the achievement of
its objectives and safeguard and secure value for money from the public
funds at its disposal. The Council is also responsible for establishing
effective and appropriate internal audit and risk-management functions.
SStandards of
cconduct for
pprevention and
ddetection of
ffraud and error 
The Council is responsible for establishing arrangements to prevent and
detect fraud, error and irregularities, bribery and corruption and also to
ensure that its affairs are managed in accordance with proper standards
of conduct by putting proper arrangements in place.
FFinancial
pposition 
The Council is responsible for putting in place proper arrangements to
ensure the financial position is soundly based having regard to: 
x Such financial monitoring and reporting arrangements as may be
specified; 
x Compliance with statutory financial requirements and
achievement of financial targets; 
x Balances and reserves, including strategies about levels and their
future use; 
x Plans to deal with uncertainty in the medium and long term; and 
x The impact of planned future policies and foreseeable
developments on the financial position.
Best value
The Council has a specific responsibility to make arrangements to secure
Best Value. Best Value is defined as continuous improvement in the
performance of the body’s functions. In securing Best Value, the local
government body is required to maintain an appropriate balance among:
• The quality of its performance of its functions
• The cost to the body of that performance
• The cost to persons of any service provided by it for them on a wholly
or partly rechargeable basis. 
In maintaining that balance, the Council shall have regard to: 
• Efficiency

Page 45

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 43 of 48 
PUBLIC
AArea  CCouncil rresponsibilities 
• Effectiveness 
• Economy
• The need to meet the equal opportunity requirements. 
The Council should discharge its duties in a way which contributes to the
achievement of sustainable development. 
Specified audited bodies are required to prepare and publish 
performance information in accordance with Directions issued by 
the Accounts Commission.

Page 46

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 44 of 48 
PUBLIC
TThe Accounts Commission, Controller of Audit and Audit Scotland
The Accounts Commission is an independent public body. Its members are appointed by
Scottish Ministers and are responsible for holding local government to account. 
Under statute, the Accounts Commission appoints a Controller of Audit to consider the
results of the audit of accounts, including the wider-scope responsibilities and Best Value
auditing. The Controller of Audit makes reports to the Accounts Commission on matters
arising from the accounts and on Best Value and acts independently of the Accounts
Commission when reporting to it.
Audit Scotland is an independent statutory body that co-ordinates and supports the delivery
of high-quality public sector audit in Scotland. Audit Scotland oversees the appointment and
performance of auditors, provides technical support, delivers performance audit and Best
Value work programmes and undertakes financial audits of public bodies.
Auditor responsibilities
Code of Audit Practice 
The Code of Audit Practice (the Code) describes the high-level, principles-based purpose and
scope of public audit in Scotland. 
The Code of Audit Practice outlines the responsibilities of external auditors appointed by the
Accounts Commission and it is a condition of our appointment that we follow it. 
Our responsibilities 
Auditor responsibilities are derived from the Code, statute, International Standards on
Auditing (UK) and the Ethical Standard for auditors, other professional requirements and best
practice, and guidance from Audit Scotland.
We are responsible for the audit of the accounts and the wider-scope responsibilities
explained below. We act independently in carrying out our role and in exercising professional
judgement. We report to the Council and others, including Audit Scotland, on the results of
our audit work.
Weaknesses or risks, including fraud and other irregularities, identified by auditors, are only
those which come to our attention during our normal audit work in accordance with the
Code and may not be all that exist.
Wider scope audit work
Reflecting the fact that public money is involved, public audit is planned and undertaken from
a wider perspective than in the private sector.

Page 47

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 45 of 48 
PUBLIC
The wider scope audit specified by the Code broadens the audit of the accounts to include
additional aspects or risks in areas of financial management; financial sustainability; vision,
leadership and governance; and use of resources to improve outcomes. 
FFinancial MManagement  
Financial management means having sound budgetary processes.
Audited bodies require to understand the financial environment and
whether their internal controls are operating effectively.
AAuditor considerations
Auditors consider whether the body has effective arrangements to
secure sound financial management. This includes the strength of the
financial management culture, accountability, and arrangements to
prevent and detect fraud, error and other irregularities. 
FFinancial sustainability 
Financial sustainability means being able to meet the needs of the
present without compromising the ability of future generations to
meet their own needs.
AAuditor considerations 
Auditors consider the extent to which audited bodies show regard to
financial sustainability. They look ahead to the medium term (two to
five years) and longer term (over five years) to consider whether the
body is planning effectively so it can continue to deliver services.

Page 48

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 46 of 48 
PUBLIC
VViision, leadership and governance 
Audited bodies must have a clear vision and strategy and set priorities
for improvement within this vision and strategy. They work together
with partners and communities to improve outcomes and foster a
culture of innovation.
AAuditor considerations 
Auditors consider the clarity of plans to implement the vision, strategy
and priorities adopted by the leaders of the audited body. Auditors
also consider the effectiveness of governance arrangements for
delivery, including openness and transparency of decision-making;
robustness of scrutiny and shared working arrangements; and
reporting of decisions and outcomes, and financial and performance
information. 
Use of resources to improve outcomes   
Audited bodies need to make best use of their resources to meet
stated outcomes and improvement objectives, through effective
planning and working with strategic partners and communities. This
includes demonstrating economy, efficiency and effectiveness through
the use of financial and other resources, and reporting performance
against outcomes.
Auditor considerations
Auditors consider the clarity of arrangements in place to ensure that
resources are deployed to improve strategic outcomes, meet the
needs of service users taking account of inequalities, and deliver
continuous improvement in priority services.
Best Value
Appointed auditors have a duty to be satisfied that local government bodies have made
proper arrangements to secure best value.
Our work in respect of the Council’s best value arrangements is integrated into our audit
approach, including our work on the wider scope areas as set out in this plan.
Audit quality 
The Auditor General and the Accounts Commission require assurance on the quality of public
audit in Scotland through comprehensive audit quality arrangements that apply to all audit

Page 49

Renfrewshire Council: External Audit Plan 2025/26 |   Azets 
Page 47 of 48 
PUBLIC
work and providers. These arrangements recognise the importance of audit quality to the
Auditor General and the Accounts Commission and provide regular reporting on audit quality
and performance. 
Audit Scotland maintains and delivers an Audit Quality Framework.
The most recent audit quality report can be found at Quality of public audit in Scotland:
Annual report 2024/25 | Audit Scotland

Page 50

PUBLICPUBLIC
info@azets.co.uk     |    azets.co.uk
© Azets 2026. All rights reserved. Azets refers to Azets Audit
Services Limited. Registered in England & Wales Registered
No. 09652677. VAT Registration No. 219 0608 22. Registered
to carry on audit work in the UK and regulated for a range of
investment business activities by the Institute of Chartered
Accountants in England and Wales.
Moving forward with confidence