Page 1

___________________________________________________________________
To:  Audit, Risk and Scrutiny Board
On:  22 September 2025
___________________________________________________________________
Report by:  Chief Executive 
___________________________________________________________________
Heading: Best Value thematic work - Transformation
___________________________________________________________________
1. Summary 
1.1 The duty of Best Value applies to all public bodies in Scotland and requires
organisations to ensure that there is good governance and effective
management of resources, whilst also ensuring activities focus on
improvement and deliver the best possible outcomes for the public. The
Accounts Commission’s approach to Best Value involves reporting on
individual local government bodies and thematically across the local
government sector through performance reports. 
1.2  The Accounts Commission reports nationally on thematic aspects of local
government bodies’ approaches to, and performance in, meeting their Best
Value and community planning duties. Local government appointed auditors
report locally on any such Best Value thematic work prescribed by the
Accounts Commission. 
1.3 The Commission directed auditors to report on transformation in each local
authority by considering four key areas: 
• To what extent does the council have clear plans for transformation that
link to its priorities and support long-term financial sustainability?
• To what extent do the council’s programme management arrangements
facilitate effective oversight of its transformation plans?
• To what extent are communities and partners involved in the development
and delivery of the council’s plans for transformation?

Page 2

• To what extent has the council considered the impact of its transformation
activity, including on vulnerable or protected groups? 
1.4 This paper presents background information on Renfrewshire Council’s
transformation agenda and summarises the findings of our external auditor
Azets in relation to the scope set out in 1.3 above.  Azets’ full report is
included as Appendix 1 to this paper. 
2.  Recommendations 
2.1 Elected members are requested to: 
• Note the contents of this report;
• Note the work to date on transformation across Renfrewshire Council; and
• Note that further regular updates on Reshaping Renfrewshire will continue
to be provided to the Leadership Board. 
3. Background – Reshaping Renfrewshire 
3.1 In February 2025, the Chief Executive and the Director of Finance and
Resources set out the vision and scope of the Council’s new Reshaping
Renfrewshire transformation programme in a report to the Leadership Board. 
That paper noted the scale of the savings already delivered but reaffirmed a
commitment to designing modern, efficient services which respond to societal
changes and achieve positive outcomes for Renfrewshire’s residents whilst
still delivering savings which will ensure the Council remains financially
sustainable. 
3.2 The key themes of Reshaping Renfrewshire are: 
• Financial sustainability and planning
• Investment in our place
• Community engagement 
• Digital
• Early intervention
• Our people
• Economic growth 
3.3 As well as a continued focus on the development of the organisation, the
Reshaping Renfrewshire programme also has an outward-facing dimension
that seeks to contribute to long-term transformational economic growth, drive
progress on place-planning, and use the digital agenda to improve service  
delivery and also create opportunities for our communities.

Page 3

3.4 Partnership working and collaboration with partner organisations and with our
communities is critical to our transformation ambitions.  A specific
communication and engagement programme, based on our Council values, is
a core element of Reshaping Renfrewshire, ensuring that the voices of our
citizens and other key stakeholders are part of the transformation
conversation. 
3.5 An officer Transformation Board has been established to provide strategic
oversight of Reshaping Renfrewshire, and to provide regular updates to the
Corporate Management Team and to the Leadership Board.  However, the
scale and breadth of transformation is considerable and there are a number of
other officer governance groups providing oversight and leading on delivery of
elements of this.  Details are provided in the February 2025 report, and a
progress report was provided to Leadership Board in June 2025. 
4.       Best Value Thematic Report on Transformation in Renfrewshire Council 
4.1 The Best Value Thematic Report is a positive report, reflecting good practice
across a range of areas. As outlined in paragraph 1.3, Azets considered four
specific areas when reaching a judgement on the Council’s transformation
activity. As detailed in appendix 1, Azets concluded that effective and
appropriate arrangements are in place for two of the four elements, and that
some scope for minor improvement exists in relation to the other two. 
4.2 Azets found that Renfrewshire Council is ‘well-placed to deliver complex
transformation and change programmes, having successfully delivered a
range of transformation programmes over the past 15 years’. Whilst noting the
links between the Council’s corporate objectives and transformations plans,
Azets considered that there is minor scope for improvement in how
transformation plans could be presented more clearly to improve clarity and to
help measure the impact. 
4.3 Azets found that the Council’s programme management and oversight
arrangements were effective and appropriate. The structure of reporting was
also found to be clear and consistent.  Azets highlighted an area for
improvement in the monitoring arrangements to be supported by consistent
reporting to Leadership Board on timelines, costs, benefits and measurement
methods in order to support achieving the transformation objectives. 
4.4 Effective and appropriate arrangements were also found to be in place
regarding the involvement of communities and partners in the Council’s
transformation plans. Effective partnership working and engaging with
vulnerable groups were also highlighted as strengths. A number of examples

Page 4

of good practice are outlined in the report and the work on digital exclusion
and in Customer and Business Services are both highlighted as case studies
within the audit report. The report notes the new Consultation and
Engagement Policy to support best practice and consistency in community
engagement. 
4.5 Azets reflected on effective and appropriate arrangements in place in terms of
considering the impact of transformation programmes, including on vulnerable
groups, with auditors noting that the Council have equality impact
assessments which are prepared for a range of projects, policy decisions and
service redesigns. 
4.6 Reflecting on the areas outlined above, two minor recommendations have
been made by Azets as follows: 
• We recommend that the Council should consider demonstrating the links
between the transformation programme and its corporate plan with more
clarity to help demonstrate measurement of impact of the transformation
plan against the corporate plan.
• We recommend that the Council continues to update its reporting to the
Leadership Board to improve high level oversight. 
4.7 Actions to address these recommendations will be added to the Corporate
Improvement Plan, with progress reported to Leadership Board. 
Implications of the Report
1. Financial – updates in the appended report relate to work that supports the
Council’s financial sustainability. 
2. HR & Organisational Development – none 
3. Community/Council Planning – none arising from the report but
transformation activity is linked to Council and Community Plan priorities. 
4. Legal - none 
5. Property/Assets – none 
6. Information Technology – although no direct implications, digital
technologies are noted as critical to transformation. 
7. Equality and Human Rights - The Recommendations contained within this
report have not been assessed in relation to their impact on equalities and
human rights because the is for noting only.  However, the report and the

Page 5

appendix make reference to current arrangements in relation to equality
impact assessments and considering the impact of transformation activity on
vulnerable groups. 
8. Health and Safety - none 
9.  Procurement – although no direct implications from the report, procurement
activity is a key element of transformation work. 
10. Risk – none 
11.  Privacy Impact – none 
12. COSLA Policy Position – none 
13. Climate Risk – although no direct implications, the report notes that achieving
Net Zero is a key element of transformation activity.  
14. Children’s Rights – none directly arising from the report, but the audit of
transformation activity does include consideration of the impact of
transformation on vulnerable groups. 
Appendices: 
Appendix 1, Transformation: how councils are redesigning and delivering more
efficient services to achieve planned outcomes, Renfrewshire Council Best Value
Review Work 
Author:  
Laura McIntyre, Head of Policy and Partnerships.

Page 6

azets.co.uk
Transformation: how councils are redesigning and
delivering more efficient services to achieve planned
outcomes 
Best Value thematic work in councils 2024-25 
September 2025
Renfrewshire Council

Page 7

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 2 of 44 
Table of Contents 
Key messages 3
Scope of the audit 8
Transformation planning 9
Programme management 15
Partnership working and community engagement 19
Impact of transformation 23
Appendices 27
Appendix 1: Case studies 29
Appendix 2: Transformation workstream and strategy reporting arrangements 40
Appendix 3: Action plan 42

Page 8

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 3 of 44                                                                                                               www.azets.co.uk 
Key messages
To what extent does
the council have clear
plans for
transformation that
link to its priorities
and support long-
term financial
sustainability? 
Auditor judgement
Minor scope for improvement exists 
Renfrewshire Council has had a corporate transformation
programme in place since 2009. These have been overarching,
transformative and adapted to changing circumstances.
The most recent phase of the Council’s transformation
programme, Reshaping Renfrewshire, commenced in early
2025 and continues this ambitious approach. The Council is
well-placed to deliver complex transformation and change
programmes, having successfully delivered a range of
transformation programmes over the past 15 years. 
Over this past period the Council have achieved £190m of
savings and efficiencies through various projects and debt
smoothing.
The Council has outlined with appropriate detail its key future
transformation projects, the importance of financial
sustainability, and how these are to be achieved in the
medium term.
We are satisfied that links exist between the Council’s
corporate objectives and the transformation plans, however
these could be presented more clearly to improve clarity and
to help measure the impact.

Page 9

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 4 of 44                                                                                                               www.azets.co.uk 
To what extent do the
council’s programme
management
arrangements
facilitate effective
oversight of its
transformation plans? 
Auditor judgement
Scope for improvement exists 
The governance arrangements to monitor and scrutinise the
transformation programmes are in place.
The Council operates the monitoring arrangements at the
Boards and management levels with a clear structure of
reporting in place.
This is supported at an operational level by the existence of
appropriate capacity and expertise at Project Management
Office function and by using external specialist support where
this is deemed more effective.
Monitoring arrangements should be supported by further
clarity in reporting to Leadership Board on timelines, costs,
benefits and measurement methods to support achieving the
transformation objectives.

Page 10

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 5 of 44                                                                                                               www.azets.co.uk 
To what extent are
communities and
partners involved in
the development and
delivery of the
council’s plans for
transformation? 
Auditor judgement
Effective and appropriate arrangements are in
place 
Renfrewshire Council works effectively with partners, including
other councils, third and private sector to achieve its
transformation objectives.
There are good examples of working with communities
demonstrating the Council’s increased focus on the needs of
service users. 
Renfrewshire Council is meeting requirements of working with
partners to develop a clear approach to tackling digital
exclusion as part of their strategies and plans, understanding
digital exclusion locally, who is affected and how.
The Council engages with vulnerable groups and considers the
impact of service delivery changes and improvements that
could be made to support those communities.

Page 11

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 6 of 44                                                                                                               www.azets.co.uk 
To what extent has
the council
considered the
impact of its
transformation
activity, including on
vulnerable or
protected groups?  
Auditor judgement
Effective and appropriate arrangements are in
place 
The Council have equality impact assessments which are
prepared for a range of projects, policy decisions and service
redesigns.
The approaches to measuring, monitoring and reporting varies
project to project depending on the nature of the project, the
benefits and the timescales in which the benefits are seen. The
arrangements are appropriate at a project level. 
Community Benefits are built into contracts with third party
suppliers.

Page 12

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 7 of 44                                                                                                               www.azets.co.uk 
Definitions
We use the following gradings to provide an overall assessment of the arrangements in place
as they relate to the wider scope areas. The text provides a guide to the key criteria we use in
the assessment, although not all of the criteria may exist in every case. 
There is a fundamental absence or failure of arrangements
There is no evidence to support necessary improvement
Substantial unmitigated risks affect achievement of corporate objectives.
Arrangements are inadequate or ineffective
Pace and depth of improvement is slow / needs to extend further
Significant unmitigated risks affect the achievement of corporate
objectives
No major weaknesses in arrangements but scope for
improvement exists
Pace and depth of improvement are adequate
Risks exist to the achievement of operational objectives
Effective and appropriate arrangements are in place
Pace and depth of improvement are effective
Risks to the achievement of objectives are managed

Page 13

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 8 of 44                                                                                                               www.azets.co.uk 
Scope of the audit
The Audit Scotland’s 2023 Local Government Overview (LGO) notes that councils have never
faced such a challenging situation. Service demands have increased after the Covid-19
pandemic and funding is forecast to reduce in real terms. Transformation, through greater
collaboration with partners, will be key for councils to deliver more sustainable service
models in challenging financial climates.
This report sets out how the council is redesigning and delivering more efficient services to
achieve planned outcomes.
The Accounts Commission’s Strategy (2021-26) sets out its priorities to focus on inequalities,
funding, communities and recovery. The Code of Audit Practice sets out the Best Value work
required to report on these priorities. 
This report covers the thematic aspect of the Best Value audit requirements. The Commission
has directed auditors to report on transformation and how councils are redesigning and
delivering more efficient services to achieve planned outcomes. In carrying out the work,
auditors have considered the following questions: 
• To what extent does the council have clear plans for transformation that link to its
priorities and support long-term financial sustainability?
• To what extent do the council’s programme management arrangements facilitate
effective oversight of its transformation plans?
• To what extent are partners and communities involved in the development and delivery
of the council’s plans for transformation?
• To what extent has the council considered the impact of its transformation activity,
including on vulnerable or protected groups?  
An improvement action plan is included at Appendix 1 of this report. This sets out audit
recommendations in key areas, and the council’s planned response including responsible
officers and dates for implementation.
The coverage of the work is in line with the expectations for council’s arrangements for the
seven Best Value themes in the Local Government in Scotland Act 2003, Best Value Statutory
Guidance 2020.

Page 14

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 9 of 44                                                                                                               www.azets.co.uk 
Transformation planning
The Council needs to ensure it can deliver sustainable services now and in the future, and
difficult decisions will need to be made to achieve this. The Accounts Commission’s Local
government budgets 2024/25 briefing noted that the cumulative funding gap local
authorities across Scotland estimate between 2025/26 and 2026/27 is £780m. This means
that, cumulatively, councils need to identify and deliver recurring measures such as savings
or increased income of five per cent of their overall revenue budget to be financially
sustainable in the short term. 
Transformation plans
The Council have had a corporate transformation programme in place since 2009. This
transformation programme has been introduced due to growing demand and cost pressures,
increasing public expectations, the corporate objective to modernise the Council and the
sustained long term financial challenge that the Council faces. 
The programme has had four phases, and the fifth phase is currently in the process of being
implemented:
Phase Introduced
Transforming Renfrewshire 2010-2015
Better Council 2015-2019
Right for Renfrewshire Phase 1 2020-2022
Right for Renfrewshire Phase 2 2023-2025
Reshaping Renfrewshire 2025-2028 
The initial phases have focused on internal transformation; how the Council and services
have been structured and organised, how business processes operate and activities are
designed, and how the Council internally has made use of technology to help deliver services.
The Right for Renfrewshire (R4R) programme commenced in late 2019 and was intended to
be a three-year programme, however, due to the impact of the Covid-19 pandemic, this was
paused to allow Council resources to be fully diverted to managing the widespread impact of
and response to the COVID19 pandemic.  This phase is now coming to its end in 2025. 
The change delivered to date has been considerable and wide ranging, from deploying new
technologies and digital capability, to innovating on a range of fronts with new delivery
models, redesigning services and business processes, as well as key collaborative and shared
service projects covering strategic waste and City Region arrangements. Financial benefits

Page 15

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 10 of 44                                                                                                               www.azets.co.uk 
have been realised through opportunities to reconfigure both Council structures as well as
discrete services and functions, streamlining of the size and shape of the workforce has been
significant over the past 15 years, rationalising the scale of the Council’s assets utilised to
deliver services as well as growing existing and establishing new income streams available to
the Council.
Case studies
Full case studies are included in Appendix 1 and we present summaries below.
Digital Journey
The Council’ s Digital journey has evolved over the last 10 years with a core aim of
transforming how the Council delivers services and enables digital inclusion. The programme
is closely linked to the organisation’s strategic corporate objectives and has involved
communities and a number of third party partners over a long term basis. A good example of
working with partners and communities on this programme, has been the use of UK wide
funding to progress the development of a business case to install free superfast broadband in
80% of social homes, building on the Council’s initial foundation of a 20 year Connectivity as a
Service Framework which invested around £2m to connect all council buildings to a new
superfast broadband network and which attracted an additional £40m of follow-on private
investment to develop a commercial gigabit network across Renfrewshire. This resulted in
connecting businesses and homes alike and promoting Renfrewshire as one of the most
digitally connected geographies in the UK.  
Underpinning the digital transformation programme are the principles of fairness, equality
and ensuring citizens benefit from the programme. The Council worked with partners and
communities to establish Citizen Voice, a cross-sector partnership with private and third
sectors to explore collaboration opportunities and minimise digital exclusion. For example,
the impact on vulnerable and protected groups was considered through a specific initiative to
work with a local charity to create a community-led secure device recycling point.
Outcomes that the Council highlights as achieved through the programme include: Green
Print – aimed at a reduction of cost and contribution to net zero targets, introduction of an
ICT model ‘as a service’, Digital Health & Care with almost 100% digital telecare provision and
Renfrewshire HCSP being first in Scotland to achieve Platinum accreditation in this area.
Other outcomes have included digital learning and teaching, including tackling inequalities
and improving health and wellbeing of citizens. A volunteer digital community champions
network was also established, with digital inclusion events and measuring of the digital
inclusion in the area.
Customer and Business Services
This started with redesign of the Council’s structure in 2015 when several functions within
the council were consolidated into a single Customer and Business Service. The project has

Page 16

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 11 of 44                                                                                                               www.azets.co.uk 
significantly redesigned how customers contact the council and how their requests are
fulfilled. It also changed how the Council manages large scale financial and business
transactions and manages and provides business support resources across all service areas of
the Council.
There were a number of methods used to transform the services including: robotic process
automation, enterprise resource planning, provision of over 170 digital services for
customers and introduction of a digital customer service advisor supported by AI technology.
In establishing these tools, the Council has been working with several carefully selected third
party partners. These partners have been involved to provide support and expertise to the
Council based on their experience of involvement in similar projects. In many instances they
have delivered against key skill transfer strategies to ensure the Council’s capability in
relation to a range of specialist digital skills has been achieved to support long term
transformation objectives. 
Reshaping Renfrewshire
The fifth phase of the transformation, which was branded Reshaping Renfrewshire and
introduced formally in February 2025, will continue to have a significant focus on the
development of the organisation, including ensuring financial sustainability. At the same
time, it will combine its internal focus with a wider outward perspective that considers
Renfrewshire's geography, economy, demography and communities.
The current phase of transformation is influenced strongly by financial sustainability
objectives, but also by local considerations which include population changes and
expectations of increase delivery of services in digital form and infrastructure regeneration
programmes. What also informs the transformation programme are national issues which
include climate net zero targets, health and social care reforms, education, population
change, equalities considerations and trauma informed and person-centred policy making. 
The key themes of Reshaping Renfrewshire are:
1. Financial sustainability and planning
2. Investment in our place
3. Community engagement 
4. Digital
5. Early intervention
6. Our people
7. Economic growth
The current transformation programme contains several specific projects in different areas
with appropriate level of detail given for each. Some of them are continuing from the past
priorities reflecting their long term and continuing nature, while some are new.

Page 17

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 12 of 44                                                                                                               www.azets.co.uk 
Transformation is a key aspect that runs in parallel to the Council’s plan and financial
planning, as shown in the diagram below. The corporate plan covers the five-year period
from 2022-2027 and was refreshed at its midpoint in June 2024. 
The Council has five strategic outcomes in the corporate plan:
1. Place - working together to enhance wellbeing across communities
2. Economy - building an inclusive, green and resilient economy (matching people, skills
and opportunities)
3. Fair - nurturing bright, happy and healthy futures for all
4. Green - leading Renfrewshire to Net Zero
5. Living our Values - making a difference together
There is also the theme of 'improving outcomes for children and families' which runs through
all five of the strategic outcomes and underpins all that Renfrewshire Council wish to achieve.
We are satisfied that links exist between the Council’s corporate objectives and the
transformation plans and while we note there is alignment between transformation
programme objectives and the corporate plan outcomes, these were not formally mapped
against each other. The Council should consider demonstrating the links between the
transformation programme and its corporate plan with more clarity to help demonstrate
measurement of impact of the transformation plan against the corporate plan.
Recommendation 1
Financial planning and transformation
The Council links its previously achieved savings to the first four phases of the project and
have achieved the following savings:

Page 18

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 13 of 44                                                                                                               www.azets.co.uk 
The original financial savings target for the previous phase of the transformation programme,
R4R, was to support delivery of £25m of recurring savings. The actual savings delivered were
approximately £45m, which was made up of £26m of service savings and £19m of savings
from continuation of the long-term corporate financing and debt smoothing arrangements,
including changes to loan charges. Although the Council exceeded their savings target, it is
worth noting that this target was for the first two years of R4R (2020-2022). After that period
of R4R the Council was recovering from the COVID-19 pandemic and additional financial
pressures. The additional savings were in response to this dynamic financial environment. 
The next phase of the transformation programme (Reshaping Renfrewshire) does not
currently have detailed saving plans or financial targets as presented in a report to the
Leadership Board in February 2025. However, the report from February did confirm an
expectation that the level of savings required to be delivered as part of this phase will be
similar to those delivered in the previous phase (around £25m). The exact level is subject to
clarification as the financial position emerges over the course of this year.
Service Modernisation and Reform Fund
To support the transformation and improvement of council services the Council established a
Service Modernisation and Reform Fund (SMARF). This fund is used to support services in
implementing change and funding development costs for projects that are expected to bring
long-term benefits to the Council. Throughout any financial year, service directors will also
utilise any short-term capacity within existing service budgets to support change activity
which reduces any required draw on the SMARF reserve as well as accessing external funding
opportunities where these become available. This allows the Council to protect the fund’s
capacity to support further work over the long term. SMARF had a balance of £10.2m at 1
April 2025.
The fund is increased where there are one-off surpluses in revenue budgets in anticipation of
further change and transformation costs being likely. Based on current commitments the
Council estimates that there is sufficient funding available for 2-3 years of costs, but they also
anticipate there to be further funding required in order to exploit potential opportunities
arising in relation to utilisation of AI.
Medium to long term planning
The Council has long term planning in place for a number of strategic areas, which include
capital programmes such as; housing, digital, the Learning Estate, workforce planning and
roads maintenance. These key programmes are linked to long term strategies and can stretch
between 5 to 30 years. The council breaks these projects down into shorter 3 year cycles,
including R4R or Reshaping Renfrewshire to effectively manage , implement and monitor
individual projects and programmes. This allows the Council to demonstrate a strong history

Page 19

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 14 of 44                                                                                                               www.azets.co.uk 
of delivering transformation, efficiency savings and improved outcomes over the medium to
longer term.
As an example the current 2025-28 Reshaping Renfrewshire cycle of the transformation
programme will have links to longer term objectives and themes which in this case include:
• Digital – new 5 year strategy – building on the successful programme to date and moving
into the next phase of delivery based on current technological advances.
• Learning Estate strategy – will be delivered over a period of up to 25 years – reflecting the
complexity of the process, drivers of demand and the scale of the financial costs involved,
all of which will require longer term financial strategies to be developed.
• Housing regeneration programme has initially been focused on a delivery programme
encompassing a 10 year major regeneration programme, with an overall programme
likely to be progressed over a period of 20-30 years.
• Strategic Property Review and place shaping strategy (including priorities arising from the
One Ren review) are being progressed through the Reshaping Renfrewshire programme,
with key programmes of work and projects informing the medium to longer term
ambitions of the organisation.
The Council is also developing a strategic funding model which will set out a long-term
approach for the Council to support future strategic investment planning long term savings
as part of the Learning Estate Strategy and wider place-shaping strategic agendas which  will
present significant investment requirements to support long term transformation objectives.
The Council plans to set out the detail in relation to the financial requirements of this funding
model, as part of the Council’s long term financial planning arrangements, in their updated
financial outlook to be presented to the Council in September 2025.
As shown by the savings profile above, the level and scale of savings that the Council has
delivered has been reducing as the transformation programme progressed over the last 15
years. This provides a challenge in the ability to continue to deliver savings at a level required
by the Council, especially in the current financial climate. 
Going forward, the Council have noted that there is an increasing level of challenge to deliver
the scale of savings over a sustained period. Without multi-year funding settlements, long-
term financial planning for transformation programmes is challenging and can be further
impacted by Scottish Government changes or ring-fencing in national funding streams. The
cost of a range of goods and services can also add challenge within transformation
programmes, particularly over infrastructure and regeneration programmes.

Page 20

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 15 of 44                                                                                                               www.azets.co.uk 
Programme management
It is essential that the Council has good programme management arrangements in place to
ensure it is making sufficient progress against its transformation plans. It is important that
the Council has the structures and the staffing resource in place to deliver its transformation
ambitions. In addition, the Council must ensure that both senior officers and elected
members have appropriate oversight of progress.
Governance structure
The Council have established a refreshed Transformation Board to provide strategic oversight
of the current Reshaping Renfrewshire phase of the transformation programme. In the
previous phases the transformation updates were presented to the corporate management
team through ‘portfolio’ updates on themes aligned to the strategic outcomes a minimum of
twice a year. 
The diagram below gives the detail of the Council’s governance arrangements for
transformation and the oversight of its transformation plans. The Leadership board is
responsible for approving and providing the highest level of governance oversight of the
overall Transformation Programme with individual workstreams overseen by a relevant
officer governance group and reporting to the relevant political Board. Such Boards would
receive updates at appropriate points in time on the progress against the objectives set. To
allow a more efficient oversight of the complex environment, the responsibility of governing
the project is done at a workstream level and split between different council Boards (for
political oversight) and governance groups (for officer oversight) chaired by Head of Service
or Director or the Chief Executive. All of the officer level structure is then reported to the
corporate management team at appropriate points during the project progress (see
Appendix 2 for further detail). 
Principle Governance Group Political Board Reporting Group 
Digital Strategy Finance,
Resources and
Customer
Services (FRCS)
Board
Digital Board
Service Redesign
Projects
Leadership
Board
Transformation
Board
Connected
Communities
Leadership
Board
Transformation
Board

Page 21

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 16 of 44                                                                                                               www.azets.co.uk 
Procurement
Review with
Scotland Excel 
Transformation
Board
FRCS Board
OneRen
Commissioning
Review 
Leadership
Board
Transformation
Board
Income
Generation
Projects
Transformation
Board
Policy Board
Strategic
Finance
Flexibilities
CMT Council
People &
Workforce
Planning
People &
Workforce
Planning Chief
Officer Group 
FRCS Board
Strategic
Property Review 
SPR Board Infrastructure,
Land and
Environment (ILE)
Board
Learning Estate Education &
Children’s
Services Board 
Learning Estate
Board
Placeshaping &
Regeneration
City Deal and
Regeneration
Board 
Leadership
Board
ILE Board Transport City Deal and
Regeneration
Board

Page 22

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 17 of 44                                                                                                               www.azets.co.uk 
The Council also has a corporate Project Management Office (PMO) function with
Programme Management Unit specialists who are able to support major transformation
projects and programmes. The Council recognises the importance of this function being
appropriately resourced and having the required knowledge to be able to provide this
support. There are specialists in the following three areas:
• Project and Programme Management 
• Business Change Analysis
• PMO/ Governance 
Capacity and expertise
The Council has recently reviewed industry best practice, and the strategic direction of the
wider change management industry, and are undergoing a programme of training staff in the
Association of Project Management (APMP) qualifications to keep their skills current and in
line with industry best practice. The project and programme management staff use their
Project Management Framework (a toolset based on Prince 2 and APMP methods) to ensure
consistent quality delivery of the service.  
The Council’s capability has been recognised by national professional bodies in recent years
with awards including Programme of the Year (APM), and some staff being nominated for
awards such as Emerging Project Professional of the Year (APM), and Business Analyst of the
Year (British Computer Society). The PMU has also just been selected as a finalist by the APM
as 'Public Sector Organisation of the Year' for 2025.
A number of corporate support teams including finance, legal, ICT, procurement, comms,
policy and PMO staff have ‘business partnering’ arrangements across council services and
meet regularly to share updates, progress, best practice and troubleshoot any issues.
Capability and new technologies can be both an enabler and a barrier and as new
technologies and priorities emerge nationally, all local authorities could struggle to recruit
the technical specialist expertise required. The Council therefore complements its internal
expertise with externally commissioned technical and professional support where required. 
An example is through an implementation of ICT “as a service” which provides flexibility to
expand or contract capacity as the Council’s requirements change. This approach removes
the need to carry the same level of in-house capacity in particular areas, or to keep pace with
Net Zero Planning &
Climate Policy
Board 
RenZero
Oversight Group

Page 23

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 18 of 44                                                                                                               www.azets.co.uk 
the rapidly changing skills and expertise where demand for new skills escalated in a highly
competitive and increasingly costly market.  
Monitoring arrangements
The Leadership Board (one of the Council’s committees) considered the update on the
transformation programme in February 2025 and will have oversight of regular reports to be
presented at key points during the transformation progress. The first of such reports was
considered in June 2025. 
Regular reports on transformation and key strategic programmes are provided to the
corporate management team for oversight. This is in addition to programme boards which
members of the corporate management team (CMT) may also chair or participate in.  Regular
updates have been provided on the Learning Estate Strategy, Digital Board, Connected
Communities and Strategic Property Review amongst others. 
Taking the learning estate strategy as an example, this included an overview of the strategy,
timelines, updates on the key projects, key risks, background, strategic vision, how the vision
will be delivered, core facts, prioritisation matrix and core team to allow the CMT to have
oversight of the programme.
As part of further strengthening and linked to the new Reshaping Renfrewshire programme,
the Council intends that to complement the ongoing Board reporting already in place.  An
additional annual report on the overarching transformation programme to be presented to
the Audit, Risk and Scrutiny Board to allow for overview and scrutiny of progress. In 2023/24
the Council undertook a self-assessment of the Audit, Risk and Scrutiny Board using the CIPFA
best practice guidance. As a result, the Council have undertaken work to respond to the
recommendations, with the aim of strengthening the scrutiny arrangements for the Council.
This additional activity in relation to transformation oversight will further strengthen the role
of this Board.
Reporting to the Leadership Board
We note that the timescales and financial impact or expected savings is provided for some of
the projects in the reporting to the Leadership Board, but not for all. As different projects
mature in their progress the Council should ensure consistency of the reporting it presents in
its updates on the transformation programme. Also, while the Council develops its strategy
and savings plan it should report timing, savings, cost and benefits expected to measure
against those.
Recommendation 2

Page 24

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 19 of 44                                                                                                               www.azets.co.uk 
Partnership working and community engagement
The Best Value in Scotland report noted that councils must now rethink how they work
together, and with local partners and communities, to provide financially sustainable
services. Few councils provide services jointly or share support services across different
councils to a great extent.
Community engagement overview
The Council has a new Consultation and Engagement Policy which was presented to the
Council's Leadership Board in February 2025. Before this policy was introduced, the Council
had a consultation policy and toolkit, which had been in place since the mid 2000’s and had
been subject to regular updates. This provided guidance on the key stages of consultation,
consultation methods to use, deciding who to consult and an overall overview of
consultation. 
This has been developed to provide best practice guidance for Council officers and services
and is underpinned by the Council's vision, mission and values. The nature of the community
engagement is bespoke to the nature of the programme and is tailored to specific groups.
The introduction of the policy is to give the community engagement a more structured
approach.
One of the examples of the way the Council approaches its working with communities during
transformation programmes is a housing regeneration programme which uses a number of
different mechanisms to support community engagement including:
• Social media pages
• Neighbourhood pop-ups
• Neighbourhood shops
• Consultation events
• Attendance at community events
• Provisions of newsletters
• A dedicated Housing Regeneration and Renewal section on the Council’s website
In line with legislation, a range of services for which the Council has responsibility are
delegated for delivery to Renfrewshire Health and Social Care Partnership which is facing
significant financial challenges. In response, the HSCP has approved a new Sustainable
Futures programme to identify transformation and change and secure significant recurring
savings. Although this programme is reported through the HSCP and does not directly form
part of the Reshaping Renfrewshire programme, the Council has a key interest in the success
of this due to the HSCP delivering a range of priority outcomes across Renfrewshire and the
financial risk exposure to the Council. There will also likely be opportunities where the
Council can work with the HSCP and NHS to identify transformation opportunities. One of

Page 25

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 20 of 44                                                                                                               www.azets.co.uk 
such activities was launched in June 2025 by a public consultation on proposed efficiencies
and savings with feedback gathered through public and staff engagement. These
engagement activities included face to face and online evets as well as on online and paper
questionnaire.
Another example of the Council engaging with communities is through the Council Events
Strategy 2025-2028. The strategy sets out the delivery of the programme of visitor and local
events. A programme of research was carried out to gain public and  stakeholder input to the
Council’s events strategy. An online consultation survey was carried out and 778 responses
were received. Four focus groups were also carried out. The results of this survey were
collated, summarised and factored into the development of the Events Strategy. 
Renfrewshire Council have also been involved in Citizen Voice, which is a cross-sector
partnership across the public, third and private sectors and included the Council, housing
associations, health authorities and voluntary sector organisations to address digital
exclusion. Digital is one of the key areas of the Reshaping Renfrewshire phase of
transformation. 
Other partners the council works with to deliver its transformation ambitions include:
• OneRen – providing leisure services in the area
• Regional partners (including through the Glasgow City Region, or cross local authority
initiatives linked to waste)
• Long term private sector delivery partners for key transformation projects across for
example digital projects, development of the Advanced Manufacturing and Innovation
District (AMIDs).
Specific community and third sector engagement
Housing Led Regeneration and Renewal Programme had an extensive engagement,
consultation and communications programme sitting alongside the investment programme
itself, ensuring tenants and residents and the local community are kept informed of the plans
as they evolve, have the active opportunity to influence this and then can collaborate with
the Council on the wider regeneration plans for the area. As part of the initial scoping work,
door to door surveys were carried out with the tenants and residents in the identified areas,
which gave insight into their needs, experiences and views and helped to shape the next
steps. 
Throughout the ‘on the ground’ regeneration, consultation and engagement continues
including through pop up events, newsletters and teams will also base themselves on site
where possible – for example, housing staff are based in Howwood Road two days a week to
answer any questions and build up relationships in that community, alongside a Facebook
page too.

Page 26

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 21 of 44                                                                                                               www.azets.co.uk 
Neighbourhood renewal plans are being developed involving Council services and community
representatives in each of the eight regeneration areas which will operate in parallel with the
physical regeneration plans. These will be tailored to the needs and circumstances of each
area, going beyond housing and the immediate external environment and taking account of
broader issues such as links to health and wellbeing, access to outdoor space and sustainable
travel and employment or training opportunities to maximise the benefits achievable for
local residents.
The Our Energy from Waste programme is a £700m, 25-year Clyde Valley Residual Waste
Project between Renfrewshire, East Dunbartonshire, East Renfrewshire, North Ayrshire,
North Lanarkshire and Viridor, which serves almost one-sixth of Scotland’s population. This
project will see up to 190,000 tonnes of general waste diverted from landfill and converted
to low-carbon energy and is expected to provide a net saving of almost 50,000 tonnes of
CO2e every year. Renfrewshire makes up approximately 21% of the total waste handled in
the facility, and each council has to provide a guaranteed minimum tonnage for processing.
The main commercial contract is between North Lanarkshire Council (NLC) as lead authority
and Viridor. This is supported by an Inter Authority Agreement which sets out the
relationship between NLC and the other member councils. Renfrewshire expects to pay
£4.6m for the service in 2024/25. This is funded from mainline revenue budgets.
The Renfrewshire Alcohol and Drugs Commission reported in 2020 with the Council agreeing
the allocation of £2m of funding to support the implementation of the Commission’s
recommendations.  This was prior to national funding streams such as the Drug Deaths
Mission and Medication Assisted Treatment standards being provided to local Alcohol and
Drugs Partnerships.  This has meant that additional national funding has been drawn down
which has been able to complement and add to the funding provided by the Council,
including some services now being mainstreamed.  The funding from the Council has
supported numerous projects, with a formal evaluation of the programme now nearing
completion. Programme oversight has been provided by a board chaired by the chief
executive which meets every 8 weeks.
Vulnerable groups engagement  
Services progressing transformation projects are required as part of corporate guidance to
complete equality impact assessment processes from the start of a transformation project. 
This helps them identify potential impacts as a project develops and ensure that officers and
partners focus their efforts on identifying impacts and mitigating these where possible.
Positive examples of this include work with the Fairer Renfrewshire Lived Experience Panel to
ensure we are considering the impacts of service delivery changes and improvements for
low-income households.  This has successfully shaped processes relating to school meal debt,
provision of free school meals, employability services and a summer holiday programme for
low-income families.

Page 27

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 22 of 44                                                                                                               www.azets.co.uk 
A key strategic area that the Council has focused on linked to their digital transformation
aspirations has been in relation to Digital Inclusion.  A network of support for communities
was developed across Renfrewshire to ensure they could benefit from the opportunities
within this transformation programme. This included dedicated and trained volunteer digital
champions, 21 Digi Zones and a mobile Digi Zone supporting communities to get on-line
through the provision of digital inclusion support, Renfrewshire’s first ever Digital Inclusion
week was delivered with over 30 events taking place over 5 days and an annual Digital
Inclusion impact report was developed to measure Digital Inclusion in Renfrewshire.
Renfrewshire has been recognised as an exemplar and case study in Audit Scotland’s
“Tackling Digital Exclusion” report for enabling digital inclusion, delivered through multi-
sector collaboration using person-centred and place-based approaches. 
The independent evaluation of the digital champions, which is detailed in the case study in
Appendix 1, concluded that in the first year of delivery, the Digital Champion Network has, as
part of Citizen Voice, supported and increased the digital inclusion of Renfrewshire citizens.

Page 28

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 23 of 44                                                                                                               www.azets.co.uk 
Impact of transformation
It is important that the Council has success measures in place to demonstrate the impact of
its transformational activity on service quality; outcomes for people who use services,
inequalities and/or savings. 
Overall performance measurement 
The Council has a performance framework to measure against its 2022-27 Council Plan
objectives. A high level summary of the Framework is presented below: 
The framework assumes 6 monthly reporting to Leadership Board with performance
indicators against action progress grouped by Council Plan strategic outcomes. These
outcomes have also one cross-cutting theme – Improving outcomes for children and families.
Service Improvement Plans (SIP) at each service level were also given a new format to make
them aligned with the above. The reporting is done on 6 monthly basis to relevant Boards
including an annual outturn report. All performance indicators and actions in the Council Plan
Framework are included in SIPs.
The next stage of performance reporting is carried out at operational level with a range of
service-specific performance reporting across Council to the appropriate Policy Board,
together with statutory performance reports.
The Council also has an officer performance board in place to drive improved performance
across Council Plan strategic outcomes, explore the LGBF and other benchmarking in more
depth and undertake ‘deep dives’ on Council-wide performance, with a particular focus on
outcomes and the golden thread between performance and priorities.

Page 29

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 24 of 44                                                                                                               www.azets.co.uk 
Project level impact measurement 
The Council have equality impact assessments (EQIAs) which are prepared for a range of
projects, policy decisions and service redesigns. There is corporate guidance that requires an
EQIA to be completed at the start of a change process and this ensures that impacts on
relevant groups are identified.
An example of the assessment was an EQIA for Clyde Waterfront and Riverside Project in
November 2021. The assessment included a number of different types of consultation to
determine the potential equity issues of the project. These are summarised as follows:
• Research 
• Officer/ Practitioner Knowledge and experience
• Consultation
• Stakeholder meetings
• Publication and feedback
• Planning Process
• Contractor Negotiation and Award
Overall, through the above methods, there were few potential significant equality issues
identified for further consideration by the Council. The most significant potential issues were
found through research where it was noted that older people and people with disabilities can
be disproportionately negatively affected and economic development has the potential to
impact any equality groups. An assessment of the Clyde Waterfront  and Renfrew Riverside
Project impact on Equality Protected Characteristics and all other stakeholders is also
produced which further considers the impact on vulnerable or protected groups.
Other recent examples of EQIAs include:
For the Housing Innovation Project (HIP) the EQIA included consultations with service leads
within the housing service including homelessness and was informed by statutory
consultation with service users as well as partnership working with the Renfrewshire HSCP.
For the Housing Regeneration Programme extensive pre-implementation consultation has
been carried out with tenants in the regeneration areas, (all within 5-10% Scottish Index of
Multiple Deprivation, SIMD zone). Neighbourhood renewal groups are set up to facilitate
ongoing engagement with tenants during the regeneration process and Engage Renfrewshire
have been actively involved particularly at Howwood Road, Johnstone.
The Council has been rolling out a new early intervention model, funded by the
Government’s Whole Family Wellbeing initiative. This extensive project involves collaboration
with third sector partners, whose contributions have been essential to the successful launch
and ongoing integration of the service. The third sector has been instrumental in the

Page 30

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 25 of 44                                                                                                               www.azets.co.uk 
implementation of this model and has, therefore, been included in the Equalities Impact
Assessment. 
Benefits measurement
Benefits management approaches are designed to be consistent with industry best practice –
following principles of PRINCE 2 and APM guidance. Potential benefits of projects are
identified when the initial business cases are developed and are the focus of the justification
for delivering the project. As options are considered for delivering the project, these are
compared in terms of their ability to deliver the project requirements, project benefits, and
overall value for money.   
As the project is defined and designed, the details of the expected benefits are set, agreed
how they will be measured, monitored and reported.  The approaches to measuring,
monitoring and reporting varies project to project depending on the nature of the project,
the benefits and the timescales in which the benefits are seen.  
Using City Deal as an example, quarterly performance reviews are submitted to the City Deal
PMO in respect of each of the projects. The business case for each project set out the
outputs and outcomes for each project and included timelines for when these are expected
to be realised, particularly for follow-on investment, as the deliverable of both projects is
enabling infrastructure to encourage future development.  On a quarterly basis the Council
review delivery of both outputs and outcomes to ensure they are delivering as per the
business case expectation.  In carrying out the benefits realisation monitoring, a range of
council teams are involved, and also spatially map out the development that has arisen as a
result of the investment.
Some recent examples of the benefits measurement include:
Housing Regeneration Programme a benefits management profile has been established since
the planning stage of the 10 year programme. This is monitored via a benefits tracker. As the
programme involves multi-faceted regeneration outcomes, including housing stock
retrofitting new build, energy efficiency, land regeneration and health outcomes these
benefits are tracked and managed by thematic groups which are multi agency partnerships.
Benefits are reported at Programme Board level, Council, and directly to communities via
Neighbourhood Renewal Groups.
Housing Innovation Project benefits have been embedded from the start with a Benefits
Profile (setting out intended and potential benefits) and how to track these. This is being
followed up by benefits tracking at the Solution Design phase of the project whereby
business analysts are working with subject matter experts to catalogue benefits that can be
achieved and will be able to measure them as they will be applied in the new system and
therefore allowing these benefits to be effectively managed. These success measures are and
will continue to be reported at Project Board, Council Board level, and via corporate

Page 31

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 26 of 44                                                                                                               www.azets.co.uk 
communications and, post implementation, will be reported to the public through tenant
newsletters.
The Green Print Project has followed a robust project methodology from the outset. The
project has utilised a data orientated approach to baseline the current position and to inform
options for consideration. As part of gathering the options, the project team were able to
evidence clear opportunities where savings could be made. Analysis of data was used to
inform the number and type of printers required for each location, and importantly, to reach
agreement with stakeholders on significantly reducing the numbers of printers to be located
across council buildings, including schools. This data was then included in the procurement
specification to market. The procurement specification aligned with the Council’s Green Print
Strategy, future-proofing the solution for the duration of the new contract and ensuring
suppliers understood the current printer estate and the future model that the Council was
seeking to implement.  
Community Benefits 
Community Benefits are built into contracts with third party suppliers.  For example, on the
Green Print Project, work on wider community benefits in partnership with Canon is an
additional benefit from the project. One of the community benefit offerings is to provide a
tailored course to help S3 and S4 pupils with life skills and career advice with a focus on
positive destination outcomes for school leavers. The team are aiming to run a course with 3
schools in 2025, the first being Johnstone High in May.  There will also be linkages with social
media presence, cyber protection, sustainability and Net Zero.

Page 32

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 27 of 44                                                                                                               www.azets.co.uk 
Appendices 
1
Appendix 1: C
Contents 
1
Key messages 3
Auditor judgement 5
Auditor judgement 6
Definitions 7
Scope of the audit 8
Transformation planning 9
Transformation plans 9
Phase 9
Introduced 9
Casestudies 10
Reshaping Renfrewshire 11
Recommendation 1 12
Financial planning and transformation 12
12
Service Modernisation and Reform Fund 13
Medium to long term planning 13
Programme management 15
Governance structure 15
Capacity and expertise 17
Monitoring arrangements 18

Page 33

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 28 of 44                                                                                                               www.azets.co.uk 
Reporting to the Leadership Board 18
Partnership working and community engagement 19
Community engagement overview 19
Specific community and third sector engagement 20
Vulnerable groups engagement 21
Impact of transformation 23
Overall performance measurement 23
Project level impact measurement 24
Benefits measurement 25
Community Benefits 26
Appendices 27
Appendix 1: Case studies 29
Case study 1 – Digital Journey 29
Case Study 2 – Customer and Business Services 34
Appendix 2: Transformation workstream and strategy reporting arrangements 40
Appendix 3: Action plan 42 
ase studies 29
Appendix 2: Transformation workstream and strategy reporting arrangements 40
Appendix 3: Action plan 42

Page 34

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 29 of 44                                                                                                               www.azets.co.uk 
Appendix 1: Case studies
Case study 1 – Digital Journey
This has been a ten-year long programme that has changed how the Council work and deliver
services to their communities whilst incorporating digital inclusion. 
Digital is cross-cutting and supports all of the Council’s strategic priorities and outcomes but
the projects most closely align with place, economy, fair and living our values.
The Council have involved a wide range of commissioned partners in their strategic digital
redesign journey, including:
• CommsWorld & City Fibre – Connectivity
• Data Vita (formerly Pulsant) – Data Centre (IaaS)
• Intelligens Consulting – Horizon Scanning
• ICS.AI – Digital Assistant
• Derby City Council – ‘Millie’
• DigiRen Network / Citizens Voice Forum (involved multi/cross-sector partners from across
a range of industries – Digital Inclusion
• Fairer Renfrewshire “Lived Experience” Panel – Digital Inclusion
• YMCA Scotland – The Promise / Digital Inclusion
• Unit 4 – ERP (SaaS)
• Quorum – Specialist Security Operations Centre
• Microsoft via Phoenix – Microsoft 365 application
• As part of Glasgow City Region, securing £3.2m from the UK Government’s Department
for Science Innovation and Technology (DSIT) to support the  development of 4
innovative business cases including Smart Social Housing
Renfrewshire Council is the lead partner across the projects. 
The approach to partnership working and collaboration across this programme has been to
select, develop and cultivate key strategic partners who will work with the Council over the
longer-term (rather than one-off short term projects) and who recognise Renfrewshire
Council as a local authority they want to work with to deliver sector leading projects that can
showcase the development of capability and new approaches.
The Council have maximised funding opportunities across this transformation programme,
including in digital where, for example, funding was secured nationally from the UK DSIT to
fund the first stage of the business case development. The Council is currently funding the
second stage of this process and if approved, this project will result in the installation of free
superfast broadband and Internet of Things sensors in 10,000+ (over 80%) of social homes

Page 35

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 30 of 44                                                                                                               www.azets.co.uk 
with the overarching aim of keeping people safe, well and socially connected in their own
home.
The Connectivity as a Service Framework (CaaS) also secured £2m internally and attracted in
excess of £40m in follow-on private investment across Renfrewshire to install future-proofed
connectivity across the region placing Renfrewshire as one of the most digitally connected
regions across the UK.
The Fairer Renfrewshire Panel, comprises of people with lived or living experiences of
poverty and inequalities, have helped shaped the creation of 21 DigiZones and a mobile
DigiZone, which further strengthens the Digital Inclusion approach in Renfrewshire and
underpins all of the projects outlined in this case study. 
An example of the bespoke engagement with service-users is through the user-centred
design approach to reporting a ‘special uplift’ request. This process has been transformed,
through people-centred redesign with the input of a user panel of 50 customers who had
recently used the service. This process has now been fully digitised, and 2 case studies were
produced for customers and staff, to explain what had happened and to act as a good
practice example demonstrating the opportunities within the digital programme. The team
examined ‘pain points’ for customers, mapping the entire end to end process from a
customer’s point of view. These were all addressed using digital solutions and these were
fully implemented, with customers and staff being kept fully informed and involved
throughout. The new process scored 4.7 out of 5 for resident satisfaction. 
Underpinning the Council’s digital transformation is the principle of fairness and equality –
ensuring that all of Renfrewshire’s citizens can benefit from the opportunities of digital
transformation. 
Citizen Voice works in partnership across the public, third and private sectors, exploring
collaborative approaches to digital equity. Citizen Voice seeks to minimise the number of
people who are digitally excluded in Renfrewshire and to maximise the opportunity for
everyone to have equal access to the benefits and opportunities of digital. 
The Council has also considered the impact of the project on protected and vulnerable
groups. For example, work is being progressed with a local charity that works with diverse
minority ethnic groups across a broad range of protected characteristics.  This work will
enable digital inclusion, through the creation of a community-led secure device recycling
project, which, once developed will provide an opportunity for local communities and
businesses to donate their unwanted digital devices.  
Phase 1 of this transformation took place from 2015 to 2020, Phase 2 from 2020 to the
current time. Phase 3 will be launched through the Council’s new digital strategy, which was
presented to Policy Board in April 2025 and will support the Council’s digital transformation
journey through to 2030.

Page 36

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 31 of 44                                                                                                               www.azets.co.uk 
One of the individual projects in this transformation programme, Green Print is considered in
more detail below. 
Within Green Print, the expected cost of the new printer contract is £1.8m over 6 years. 
There were a number of project objectives:
• To reduce costs through:
• A reduction in the number of printers leased over the duration of the contract
• A reduction in print consumables 
• Contributing to net zero targets through the reduction in use of paper and energy
associated with a reduced printer estate
• Digital upskilling and use of digital solutions
• Reducing information governance risks associated with a reduction in the incidence of
print related securing incidents
The project has had a positive contribution to the Council’s RenZero strategy:
• The printers have been configured so print jobs are not automatically printed when they
are sent. This has resulted in saving a significant amount of printing as many users will
send a document for printing and then not collect it. 
• The Green Print project contributes to the RenZero key theme, Circular Economy: we will
make Renfrewshire a circular economy society: minimising waste and maximising reuse,
recycling and recovery of resources rather than treating them as waste. The circa 40%
reduction in the printer estate makes more effective use of printers and in doing so
reducing the use of raw materials and water at source.
The contract saving is projected to realise £600k over the life of the contract, which is 25% of
the overall contract value.
The project team successfully managed to reduce the number of devices deployed by over
40% (from 952 to 554). Opportunities for further savings, over and above the £600k, have
been identified and plans are in place to:
• Move from laser jet paper to recycled paper, with effect from 1 April 2025. This would be
a reduction of £2 per box.
• Move to electronic payslips across the organisation, enabling all staff to view their payslip
via the ERP, from 1 April 2025. 
Extensive engagement with the Corporate Management Team and Senior Management
Teams has taken place to highlight current print behaviours and identifying opportunities to
reduce down print volumes and where appropriate, utilise more digital ways of working (e.g.)
electronic newsletters.

Page 37

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 32 of 44                                                                                                               www.azets.co.uk 
There are a wide range of service quality benefits across the programme, a selection of these
are outlined below. 
• ICT as an Operating Model – this project was progressed from 2015 over a 5-year period.
The “as a service” model provides organisations with the opportunity to fulfil their ICT &
digital requirements externally, delivering access to the best technology and skills
through hosted services solutions, with significant flexibility to expand or contract
capacity as the Council’s requirements change. This strategic transition removed the
need to carry the same level of in-house capacity, or to keep pace with the rapidly
changing skills and expertise, something which the Council found an increasing workforce
planning risk as technology rapidly developed, existing workforce skills lost pace with
technology development and as demand for new skills escalated in a highly competitive
and increasingly costly market. The “as a service model” developed quickly and provided
the Council with the opportunity to radically redesign and strategically transition the
service model, pushing the majority of the Council’s key infrastructure and major
corporate systems into cloud hosted solutions provided by external service providers.
• Becoming a Digitally Enabled Council - sector leading deployment of advanced
technology, including advanced automation and artificial intelligence base digital
assistants, has been achieved to significantly reduce costs to serve customer contact
whilst simultaneously expanding and improving citizen access to services on a 24/7 basis,
redirecting over 1 million contacts and transactions per year away from traditional
people-based interactions.
• Digital Infrastructure Foundations - significant transformation and modernisation of the
Council’s underlying ICT and digital infrastructure has been delivered, providing the
critical foundations that are a pre-requisite if the Council is to have the capability to take
advantage of rapidly digital technology opportunities to transform service delivery and
how the services work.
• A Digital Place – establishing Renfrewshire as one of the most digitally connected regions
in the UK – with 92% of all domestic and business premises now connected to a sector
leading broadband infrastructure, recognising the critical nature of this capability in the
modern world to attract people and business to visit, live, work, invest and locate here.
• Digital Leadership and Skills – significant progress has been made to develop leadership
and skill across the organisation including the establishment of a network of digital
Champions, completion of a digital Maturity Assessment in partnership with the Digital
office, transitioning employees full on line with the Business World ERP system which
provides a wider range of 24/7 on-line services to workforce and developed better use of
data and insight through bespoke workspaces and dashboards for employees, line
managers and Services, assisting all to do their job roles much more effectively.
Consumption of digital capability and channels is expected to increase significantly across
all workforce as digital capability increases and this will remain a key area of development
for the People Strategy.

Page 38

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 33 of 44                                                                                                               www.azets.co.uk 
• Smart Data – the Council has made progress to make better use of data and secure
intelligence to inform service provision and decisions. This has included:
a. Development and implementation of a Data Strategy Framework across all Services to
improve data management and exploitation capabilities and established a Data
Advisory Group to provide a corporate approach to data governance.
b. The successful rollout of new printer fleet solution, with a dedicated dashboard
developed with key insight data on usage to allow managers to better understand
print behaviours. This evidence-based approach supports the Council’s Green Print
Strategy and climate ambitions.
c. Used data to predict, track and manage absence of children and young people across
the learning estate and used data sources to automate the awarding of Free School
Meals and Clothing and Footwear Grant provision. 
Across the programme, there are a wide range of positive outcomes for the people who use
services, a selection of these are outlined below:
• Digital Health & Care - over 99% of the switchover from analogue to digital telecare
provision has been completed and Renfrewshire is the 1st HSCP in Scotland to achieve
Platinum accreditation for digital telecare. The HSCP workforce is now benefiting from
the Digital Enablement of frontline Care at Home Services through implementation of
Totalmobile scheduling and Public Access WI-FI has been installed in Care Homes,
Sheltered Housing complexes and in Health & Social Care Settings such as Adult Day Care
Centre. A local directory (Well in Renfrewshire) was established to enable professionals to
access a range of person centred and place-based supports for people they support and
in response to COVID-19 Pandemic, expanded provision of digital day support for older
people.
• Digital Learning and Teaching – there has been a significant increase in internet
bandwidth across the learning estate with 1 gigabit internet lines in most sites and 5
gigabit in high schools, scalable in the future to 10 gigabit across all sites making
Renfrewshire Schools some of the most connected in the country. A national CoSLA
Excellence awards was secured for tackling inequalities and improving health and
wellbeing through collaborative work delivering an alcohol and drugs awareness
education resource for children and young people and Rollout of GroupCall and Parents
Portal has been embedded to improve communication with parents and carers. A current
priority for Children’s Services is to develop a new strategy for digital learning and
teaching which will begin to set out how the newly secured connectivity within the
learning estate can be capitalised on to provide a step change in the role digital plays to
support the teaching workforce and pupils. 
• Digital Citizen –progress has been made to develop a network of support across
Renfrewshire with a dedicated and trained volunteer Digital Champions, 21 Digi Zones
and a mobile Digi Zone supporting communities to get on-line through the provision of

Page 39

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 34 of 44                                                                                                               www.azets.co.uk 
digital inclusion support, delivered Renfrewshire’s first ever Digital Inclusion week with
over 30 events taking place over 5 days, developed annual Digital Inclusion impact report
to measure Digital Inclusion in Renfrewshire. Renfrewshire has been recognised as an
exemplar and case study in Audit Scotland’s “Tackling Digital Exclusion” report for
enabling digital inclusion, delivered through multi-sector collaboration using person-
centred and place-based approaches.
Case Study 2 – Customer and Business Services
In February 2015, the Council’s Leadership board approved the consolidation of several
existing Finance and Resources functions covering Operational Services, Customer Services
and Corporate Business Support to become a single Customer and Business Services (CBS)
division. This project has significantly redesigned how customers contact the council and how
their request is fulfilled and how critical internal corporate support functions are managed
and delivered.
The Council has used the following methods in its transformation of Customer and Business
Services:
- Robotic Process Automation as a way of reducing unnecessary manual processes by
automating administrative, logic-based tasks. There are currently 51 live processes
ranging from regular daily processes; Council tax Direct Debit, Housing Universal
Credit Managed payments; Seasonal bulk processes; Garden Waste permit checks,
Free School Meals & Clothing grants and One-off ad hoc runs like the updating of
70,000 thousand Unique Property Reference Numbers to provide enhanced data
quality. From 20/21 to 22/23 over 44,000 resource hours were saved, equating to a
value of approx. £660k and in 24/25 the Council are predicting that RPA processes will
result in a saving of 13,400 resource hours equating to £317k.
- ERP (Enterprise Resource Planning) system: This single system combined human
resources, payroll, procurement and finance functions. ERP has been a key
component of the savings delivered within Business Services over the past few years.
With approx. 17 live forms and embracing the principle of self service has resulted in
most of the Council’s employees and managers submitting a wide range of requests
including overtime, expense claims, employee leave notifications, flexible working
requests, planned leave request, unplanned leave recording online. 
- The provision of digital services, specifically for routine and simple enquiries. Over
170 digital services providing customers with a choice in how they can interact with
the Council.  
- Optimising the existing digital capabilities and horizon scan for new emerging
technology. 
- Introducing a digital customer service advisor (‘Millie’), powered by AI technology to
further support customers with telephone enquiries – 24/7 365 days per year.  This
implementation opens the digital world to customers who would not necessarily have

Page 40

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 35 of 44                                                                                                               www.azets.co.uk 
chosen to interact online and releases customer service capacity to enable the
Council to support more vulnerable customers with more complex needs. 
Renfrewshire Council don’t view this as a ‘stand-alone’ project. Transformation is an
embedded part of their business-as-usual model, and they are continually looking at ways to
improve the services they provide. 
Renfrewshire Council used the following partners to aid this transformation: 
• Granicus (CRM, MyAccount, Engagement HQ)
• Commsworld (Contact Centre Telephony), 
• ICS.AI (Digital Customer Advisor), 
• Unit 4 (ERP)
• Derby City Council
These partners have been involved to provide support and expertise to the Council based on
their experience of involvement in similar projects in order for Renfrewshire Council to
achieve the best outcome possible. The partners have supported a range of community
benefits, however, have not funded the transformation.
The Council engaged with communities on the digital consultation tool (Engagement HQ)
during the development of that strategy in 2023. As part of the service design methodology,
the Council developed User Researcher capabilities within the team to engage with
customers at the start of the process to help shape requirements and then again at the end
of the process to support testing of the newly designed service.
An example of the bespoke engagement with service-users in order to improve services and
put their needs at the heart of the transformation is through the user-centred design
approach to reporting a ‘special uplift’ request. This process has been transformed, through
people-centred redesign with the input of a user panel of 50 customers who had recently
used the service. This process has now been fully digitised, and 2 case studies were produced
for customers and staff, to explain what had happened and to act as a good practice example
demonstrating the opportunities within the digital programme. The team examined ‘pain
points’ for customers, mapping the entire process from a customer’s point of view. These
were all addressed using digital solutions and these were fully implemented, with customers
and staff being kept fully informed and involved throughout. The new process scored 4.7 out
of 5 for resident satisfaction. 
The Digital Operations team are part of the Digiren network, co-led by a third sector interface
(Engage Renfrewshire), which plays a pivotal role in laying the groundwork for digital
inclusion initiatives across the area.  As part of this membership, they are aware of the views
of all member groups and have sought feedback on new services which have been

Page 41

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 36 of 44                                                                                                               www.azets.co.uk 
developed. Additionally, the revenues team within Business Services has participated in the
‘Fairer Renfrewshire Lived Experience Panel’ and as a direct result of customer feedback has
used the enhanced technical skills of its team to introduce a wider range of payment plans
for Council taxpayers.
The project savings are outlined below. The current service budget is £17m and taking
account of indexation, the cost to deliver the service is approximately 60% of what it
otherwise would have been had it not been for the transformational programme.
In terms of cost associated with the technology and in-house skills used to support the
service change, this has totalled around £6.5m over the same period, providing a cumulative
cash payback ratio of 5.7:1. Recurringly, the costs of the technology and team is around £1m
per annum providing a payback ratio running at around 8:1 demonstrating a very strong rate
of return for the investment. This cost has been met by the Council’s service modernisation
and reform fund and will continue to support the technology and functions as opportunities
to deploy the learning across other service areas are now explored.
Since the start of this transformation of Customer and Business Services in 2015, a total
cumulative savings of almost £59m (cash terms) have been achieved, with the running annual
recurring saving of £8.2m (cash terms) as outlined in the table below (taking account of
inflationary factors this is closer to £10m in 2024/25 price base). To put this in context of
real-life front-line service impact, the recurring savings have protected the ability of the
Council to employ 200 newly qualified teachers or 285 homecare workers.
Better Council Change Programme 15/16 - 16/17 £3,200,000
Council Tax Savings  18/19 £200,000
Water Direct Phase 1  18/19 £300,000
Digital First / RPA / ERP 19/20 £1,000,000
HB Subsidy Saving  19/20 £50,000
Water Direct Phase 2  19/20 £250,000
Customer Transactions (Right For
Renfrewshire Programme)
20/21 - 22/23 £3,200,000

Page 42

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 37 of 44                                                                                                               www.azets.co.uk 
From the charts above, you can see the shift in contact channel since 2018, as more
customers choose to interact through the online customer portal.  This provides customers
with the freedom to carry out their transaction in a manner and at a time that suits them.  
The business case created for the introduction of the AI digital advisor assumed a call
deflection rate of 5% as indicated in the target demand model chart below.  Since
introduction in November 2024, the Council are already seeing that deflection higher than
30%.
70%
16%
6%
8%
CUSTOMER
OPERATIONS - 2018/19
DEMAND PROFILE
Telephone Online E-mail F2F
44%
45%
8% 3%
CUSTOMER
OPERATIONS -
2022/23 DEMAND
PROFILE
Telephone Online E-mail F2F

Page 43

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 38 of 44                                                                                                               www.azets.co.uk 
The service redesign methodology ensures efficiencies are gained end to end, and not just at
the start of the process. Below are a few examples of the improvements made to outcomes
for people:
• Free School Meals and Clothing Grant applications were previously paper based and
could take up to 4 weeks.  Following the redesign, this process now takes less than 5
days.
• Taxi and Private Hire applications were also paper based, and in the move to a digital
solution, this has removed the need for drivers to attend a face-to-face appointment,
therefore maximising the time they can spend on the road.
• During COVID, the approach to digital service design allowed new grants to be
available swiftly, taking the Low-Income Pandemic Payment as an example, this was
built within a matter of days, and included a fully automated approval process
resulting in payments being made to 66% of applicants within 24-hours.
• Committed to continuous improvement and the ongoing transformation, in 2021
Business Services created a small team dedicated to Continuous improvement,
Employee Engagement and Workload & Resource planning. 
• Over and above efficiency savings, with the support of the Continuous Improvement
Team, the use of optimised technology RPA, ERP and in-house systems has enabled
Business Services to respond quickly and easily to new and increasing demand.
• Development of in-house software systems, supported with RPA have been critical to
the Service in respect of increasing demands; DWP’s transition to Universal Credit,
the growth in administration of Discretionary Housing Payments, Free School Meals &
Clothing Grants, Garden waste charge exemptions, and the desire to reduce Council
Tax credit balances. 
35%
49%
8%
3% 5%
CUSTOMER OPERATIONS TARGET
DEMAND MODEL
Telephone Online E-mail F2F AI Assistant

Page 44

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 39 of 44                                                                                                               www.azets.co.uk 
The service’s continuous drive for improvement through transformation has also resulted in a
number of improved outcomes:
• Aligned with the Council’s Net Zero ambitions, the launch of e-billing for Council tax
has resulted in a simplified solution for the issue of bills electronically. The Council is
undertaking a take-up campaign prior to annual billing this year, with Non-Domestic
Rates also going live with e-bills this year.
• Using RPA as a key support, the challenge of reducing Credits within the Council Tax
account has resulted in a 22% reduction in the overall level since start of 2023. 
• Utilising the Council’s digital form capability, the Children’s Services admin support
team now provides online forms for school placing requests, school transport
requirements and milk/snack funds. 
• Automation of the ISP (Independent Sector Payments) process using RPA reduces the
chance of error and speeds up critical charging information need to be transmitted to
Care Homes used by the Council for vulnerable residents.
• Adoption of automation functionality within the Council’s Revenues and Benefits
system, layered with RPA functionality has resulted in a more efficient process for
customers in receipt of Universal Credit and needing to apply for Council Tax
Reduction support. This has resulted in 52% of work generated by DWP notifications
being automated.
• Recognising the criticality of smooth and efficient recruitment to key council services,
the recruitment optimisation project was dedicated to refining processes for
efficiency and effectiveness, in collaboration with HR colleagues and services across
the Council. As a result, significant transformation has been achieved. By leveraging
the ERP system capability, the Council’s Document and Workflow System and Robotic
Process Automation Software has resulted in a significant reduction in the time taken
to undertake recruitment: from an average of 79 days taken to prepare a preferred
candidate pack (required to agree a start date) in 2022 to just 19 days in 2023.
These are just a few examples which demonstrate how the outcomes for the people of
Renfrewshire have been improved through the evolutionary transformation of Customer and
Business Services over the past ten years.  Processes are not intrusive on the lives of
customers, and critically, the Council aims to ensure financial support is provided to the right
people as quickly and efficiently as possible.   Because of the approach taken at Renfrewshire
Council when redesigning services, this helps to create positive outcomes for service users
and the result has been a positive reflection of transformation of service delivery.

Page 45

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 40 of 44                                                                                                               www.azets.co.uk 
Appendix 2: Transformation workstream and strategy
reporting arrangements
Workstream /
Strategy
Officer Governance Arrangements 
Political
Board
Reporting
Route
Principal
Governance
Group 
Officer
Chair
Monitored as
part of overall
Transformation
Arrangements 
Reports into
CMT
Digital Strategy  Digital Board Head of
Digital 
Yes - specific
projects
Yes FRCS Board
Service Redesign
Projects 
Transformation
Board 
Director of
Finance &
Resources
Yes Yes - as part of
Transformation
Update Report
Leadership Board
Connected
Communities 
Transformation
Board 
Director of
Finance &
Resources
Yes Yes Leadership Board
Procurement Review
with Scotland Excel
Transformation
Board
Director of
Finance &
Resources
Yes Yes - as part of
Transformation
Update Report
FRCS Board
OneRen
Commissioning
Review
Transformation
Board 
Director of
Finance &
Resources
Yes Yes Leadership Board 
Income Generation
Projects 
Transformation
Board
Director of
Finance &
Resources
Yes Yes - as part of
Transformation
Update Report
Policy Board
subject to
specific income
stream being
considered
Strategic Finance
Flexibilities 
CMT as part of
financial strategy 
Chief
Executive
No Yes – as part of
financial strategy
updates 
Council as part of
financial strategy
updates
People & Workforce
Planning 
People &
Workforce Planning
Chief Officer Group
Head of HR &
OD
Yes Yes FRCS Board
Strategic Property
Review
SPR Board Director of
EH&I
Yes Yes ILE Board
Learning Estate  Learning Estate
Board 
Director of
Children’s
Services
No Yes Education &
Children’s
Services Board
Placeshaping &
Regeneration 
City Deal and
Regeneration
Board
Chief
Executive
No Yes Leadership Board
and  
Transport  City Deal and
Regeneration
Board
Chief
Executive
No Yes ILE Policy Board

Page 46

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 41 of 44                                                                                                               www.azets.co.uk 
Workstream /
Strategy
Officer Governance Arrangements 
Political
Board
Reporting
Route
Principal
Governance
Group 
Officer
Chair
Monitored as
part of overall
Transformation
Arrangements 
Reports into
CMT
Net Zero  RenZero Oversight
Group
Director of
EH&I
No Yes Planning &
Climate Policy
Board

Page 47

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 42 of 44                                                                                                               www.azets.co.uk 
Appendix 3: Action plan
Our action plan details the weaknesses and opportunities for improvement that we have
identified during this audit.  
Issue / risk Recommendation Agreed management
action / timing
1. Links to corporate
objectives
We are satisfied that links exist
between the Council’s corporate
objectives and the
transformation plans and while
we note there is alignment
between transformation
programme objectives and the
corporate plan outcomes, these
were not formally mapped
against each other. 
We recommend that
the Council should
consider demonstrating
the links between the
transformation
programme and its
corporate plan with
more clarity to help
demonstrate
measurement of impact
of the transformation
plan against the
corporate plan.
Schematic to be produced
mapping Transformation
projects to Council
priorities. Corporate reports
on transformation will also
clearly denote alignment
with Council Plan priorities. 
Responsible officer: Director
of Finance and Head of
Policy and Partnerships 
Due date: March 2026

Page 48

Renfrewshire Council: Transformation -  how councils are redesigning
and delivering more efficient services to achieve planned outcomes. 
Best Value thematic work in councils 2024-25 
Page 43 of 44                                                                                                               www.azets.co.uk 
Issue / risk Recommendation Agreed management
action / timing
2. Reporting to the
Leadership Board
We note that the timescales and
financial impact or expected
savings is provided for some of
the projects in the reporting to
the Leadership Board, but not for
all. As different projects mature
in their progress the Council
should ensure consistency of the
reporting it presents in its
updates on the transformation
programme. Also, while the
Council develops its strategy and
savings plan it should report
timing, savings, cost and benefits
expected to measure against
those. 
We recommend that
the Council continues to
update its reporting to
the Leadership Board to
improve high level
oversight.
Six monthly reports will be
submitted to the Leadership
Board and the format will
be developed to address
the auditor
recommendations. 
Responsible officer: Director
of Finance
Due date: December 2025