Page 1

09/12/2022 
Notice of Meeting and Agenda
Council 
Date Time Venue
Thursday, 15 December
2022
09:30 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN               
Membership 
Provost Lorraine Cameron (Convener):    Councillor Iain Nicolson (Leader):   Councillor Cathy
McEwan (Depute Convener):   Councillor Jacqueline Cameron (Depute Leader):    
Councillor Jennifer Adam:  Councillor Fiona Airlie-Nicolson:  Councillor Alison  Ann-Dowling: 
Councillor Stephen Burns:  Councillor Michelle Campbell:  Councillor Graeme Clark:  Councillor
Carolann Davidson:  Councillor Eddie Devine:  Councillor Andy Doig:  Councillor Audrey Doig: 
Councillor Chris Gilmour:  Councillor Edward Grady:  Councillor Gillian Graham:  Councillor Neill
Graham:  Councillor John Gray:  Councillor Anne Hannigan:  Councillor John Hood:  Councillor
Lisa-Marie Hughes:  Councillor Robert Innes:  Councillor Alec Leishman:  Councillor Bruce
MacFarlane:  Councillor James MacLaren:  Councillor Kenny MacLaren:  Councillor Mags
MacLaren:  Councillor Colin McCulloch:  Councillor Janis McDonald:  Councillor David
McGonigle:  Councillor Jamie McGuire:  Councillor Marie McGurk:  Councillor Iain McMillan: 
Councillor John McNaughtan:  Councillor Kevin Montgomery:  Councillor Sam Mullin:  Councillor
Will Mylet:  Councillor Jim Paterson:  Councillor Emma Rodden:  Councillor John Shaw: 
Councillor Ben Smith:  Councillor Andy Steel:   
Further Information
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior to the
meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please either email
democratic-services@renfrewshire.gov.uk or telephone 07534 058160.
MARK CONAGHAN
Head of Corporate Governance
Page 1 of 60

Page 2

09/12/2022 
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting. 
Webcasting of Council Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Provost will confirm if all or part of the meeting is being
filmed.  Generally the public seating areas will not be filmed.  The cameras focus on the main
participants.  If you have any queries regarding this please contact Committee Services on
07534 058160.  To find the webcast please navigate to
http://renfrewshire.cmis.uk.com/renfrewshire/meetings.aspx and select the meeting from the
calendar. 
Page 2 of 60

Page 3

09/12/2022 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest
Members are asked to declare an interest in any item(s) on the agenda
and to provide a brief explanation of the nature of the interest. 
1 Minutes of Meetings of Council, Boards and Panels
(attached separately)
Council, 29 September 2022, pages 285 - 306
Special Personnel Appeals and Applied Conditions of Service Appeals
Panel, 6 October 2022, pages 307 - 308
Communities and Housing Policy Board, 25 October 2022, pages 309 -
328
Regulatory Functions Board, 26 October 2022, pages 329 - 340
Special Personnel Appeals and Applied Conditions of Service Policy
Board, 27 October 2022, pages 341 - 342
Education and Children's Services Policy Board, 27 October 2022,
pages 343 - 348
Economy and Regeneration Policy Board, 1 November 2022, pages 349
- 352
Planning and Climate Change Policy Board, 1 November 2022, pages
353 - 362
Personnel Appeals and Applied Conditions of Service Appeals Panel, 3
November 2022, pages 363 - 364
Special Education and Children's Services Policy Board, 7 November
2022, pages 365 - 368
Petitions Board, 7 November 2022, pages 369 - 370
Infrastructure, Land and Environment Policy Board, 9 November 2022,
pages 371 - 380
Regulatory Functions Board, 10 November 2022, pages 381 - 390
Audit, Risk and Scrutiny Board, 14 November 2022, pages 391 - 398
Local Review Body, 15 November 2022, pages 399 - 402
Finance, Resources and Customer Services Policy Board, 17 November
2022, pages 403 - 416
Special Council, 17 November 2022, pages 417 - 420
Special Personnel Appeals and Applied Conditions of Service Appeals
Panel,  22 November 2022, pages 421 - 422
Special Personnel Appeals and Applied Conditions of Service Appeals
Panel, 28 November 2022, pages 423 - 424
Leadership Board, 30 November 2022, pages 425 - 436
Special Regulatory Functions Board, 5 December 2022, pages 437 -
438
Special Finance, Resources and Customer Services Policy Board, 13
December 2022 (copy to follow)
Placing Requests and Exclusion Appeals Panel, 13 December 2022
(copy to follow) 
Page 3 of 60

Page 4

09/12/2022 
2 Provost's Update
Hear from Provost 
3 Financial Sustainability and General Fund Financial
Outlook
Report by Director of Finance & Resources 
9 - 24 
4 A Prudential Framework for Capital Finance – Progress
Report
Report by Director of Finance & Resources 
25 - 36 
5 Right for Renfrewshire - Management Structures
Report by Chief Executive 
37 - 46 
6 Governance Arrangements
Report by Director of Finance & Resources 
47 - 50 
7 2023 Review of UK Parliament Constituencies –
Consultation on Revised Proposals
Report by Chief Executive 
51 - 60 
8 Notice of Motion 1 by Councillors Ann-Dowling and
Davidson
“Women Against State Pension Injustice (WASPI) 
This council is disappointed in what it sees as the Conservative
Government's inaction to end the injustice experienced by Renfrewshire
women affected by the changes to state pension laws. Council notes the
campaign of the Women Against State Pension Injustice (WASPI) group
together with similar campaign groups, to achieve fair and fast
compensation arrangements for all women who were born in the 1950s
and were affected by these changes to the state pension age. 
Council calls for the UK Government to accept the reported findings of
the Parliamentary and Health Service Ombudsman that 1950s-born
women have been severely affected by Department for Work and
Pensions maladministration, to take the swift action that many believe is
needed to provide the recommended level of compensation to the
women, and to compensate beneficiaries of the estates of those who are
deceased and failed to receive a pension.”         
Page 4 of 60

Page 5

09/12/2022 
9 Notice of Motion 2 by Councillors Ann-Dowling and J
Cameron
“Women, Life, Freedom 
Council notes that women and girls in Iran are facing lethal levels of
violence, perpetuated against them by Islamic Republic security forces. 
Council condemns the atrocities committed against women and girls in
Iran and stands in solidarity with their legitimate desire for autonomy and
freedom of expression. 
Council agrees to write to the UN Women's Rights Commission to
request that Iran is removed from its membership, as a gesture of
solidarity and to signal that the international community stands with
Iranian women and girls defending their human rights against the Iranian
regime.” 
10  Notice of Motion 3 by Councillors Smith and MacFarlane
"St Charles’ RC Church- 125th Anniversary 
Renfrewshire Council congratulates St. Charles’ Roman Catholic
Church, Paisley, on the 125th anniversary of the parish, founded on the
4th of November 1897. Now in its 13th decade, the parish continues to
serve the wider community in Charleston and beyond. Under the
leadership of the parish priest, Fr. Jim Duggan, St. Charles’ continues to
be a vibrant, multicultural community and the Council expresses its
gratitude for the parish’s commitment to serving and supporting the
people of Charleston and Paisley." 
11  Notice of Motion 4 by Councillors McMillan and Davidson
"GP Practices 
Council understands the frustration being felt by local communities who
are finding it difficult to access local G.P. services. 
Council therefore agrees to write to the Health Secretary to ask that
more be done by the Scottish government to restore people’s
confidence in their local practices." 
12  Notice of Motion 5 by Councillors McMillan and Gilmour
"Type 26 Frigates 
Renfrewshire Council welcomes the recent announcement that five
more Type 26 frigates are to be built on the Clyde. 
This will support 1700 jobs across the Govan and Scotstoun shipyards
over the next decade. Council recognises that many of these jobs are
held by Renfrewshire residents. 
Council notes that these jobs are a result of Scotland being part of the
United Kingdom." 
Page 5 of 60

Page 6

09/12/2022 
13  Notice of Motion 6 by Councillors Leishman and N
Graham
"Gender Recognition Reform (Scotland) Bill 
That Renfrewshire Council opposes the proposed new laws of the
Gender Recognition Reform (Scotland) Bill currently supported by the
Scottish Government. 
That this Council recognises that the Bill’s current proposals, while
probably well-intentioned, will have ill consequences for the greater part
of the broader population. 
That this Council is gravely concerned about the impact this Bill in its
current form would have on the safety, well-being and welfare of other
groups within society that already experience marginalisation and
unique challenges, specifically: women and girls; homosexuals,
particularly young homosexuals and gay women; children; young
persons; adolescents with Autistic Spectrum Disorder, learning
difficulties/ disabilities or mental health issues; and post-operative
transsexuals. 
That this Council agrees that the protection of children, young persons
and vulnerable persons is of paramount importance; and that they
should be encouraged to consider long and carefully before committing
to legal, pharmacological and surgical interventions that are life-altering,
permanent and risk-prone; and that safeguards should be in place to
discourage succumbing to socio-cultural contagions. 
That this Council agrees that the negation or diminishment of the hard-
won sex-based rights of women and girls is both wrongful and alarming. 
That this Council agrees the rights of young persons and adolescents to
experience healthy sexual and psychological development is self-
evident and indisputable. 
That this Council agrees that young gay persons should be encouraged
to embrace and feel comfortable with their sexual orientation without
their gender-identity being questioned. 
That this Council agrees to communicate its concerns and opposition
directly to the Scottish Government." 
14  Notice of Motion 7 by Councillors G Graham and Smith
"Projected school rolls and section 75 agreements 
The public has lost confidence in those involved in the gross
miscalculation of the school roll for Dargavel Primary. This appalling
miscalculation has caused significant distress to parents and will cost
the people of Renfrewshire millions of pounds to resolve. Millions which
would have been paid for by the developer had this Council got its
figures right. 
Page 6 of 60

Page 7

09/12/2022 
In light of the Dargavel debacle, Council will postpone signing off
Section 75 agreements for both the Dykebar and Thornly Park
developments until the Council’s projected impact upon the school rolls
of both St Andrews’ Academy and Todholm Primary have been
externally reviewed via the procurement of professional consultants.
This review should also include the new Paisley Grammar
development." 
15  Notice of Motion 8 by Councillors Andy Doig and
Hannigan
"Accessibility of UK National Energy Companies to Renfrewshire
Consumers 
"Council deplores the lack of accessibility of all UK national energy
companies to the consumers of Renfrewshire, a dire situation which
over recent years has got increasingly worse over the current cost of
living crisis. The inability to contact energy suppliers easily and quickly is
a source of considerable mental ill-health and stress to the most
vulnerable service users, especially those with pay as you go meters”. 
“Council believes the status quo actively discriminates against the less
digitally and IT proficient, and those financially excluded from IT
networks, and therefore calls on all UK national energy companies to
use their excessive profits to re-establish a network of shop front energy
hubs where consumers can obtain face to face advice and support”." 
16  Notice of Motion 9 by Councillors Innes and MacFarlane
"The UK Supreme Court Decision and Defending Scottish Democracy
Council upholds the right of the Scottish people to national self-
determination, as recognised in Part 1, Article 1, of the United Nations
International Covenant on Civil and Political Rights, an international
treaty which the UK signed in 1976. 
Council further notes that pro-independence parties won a majority of
seats at the 2021 Scottish elections. 
Council deeply regrets, therefore, the recent decision by the UK
Supreme Court to deny the Scottish Government the right to hold an
independence referendum and believes this means that the UK is no
longer a voluntary union of nations. 
As a majority pro-independence council, Renfrewshire Council therefore
supports the right of political parties to contest national parliamentary
elections on an independence mandate platform in defence of Scottish
democracy." 
17  Notice of Motion 10 by Councillors Innes and McGurk
"“Green spaces and play parks” 
That council welcomes the continued investment in improving our green 
Page 7 of 60

Page 8

09/12/2022 
spaces and play parks around Renfrewshire. Further, it welcomes the
inclusion of local members, communities and schools in shaping these
plans going forward. Council recognises the positive impact that
enhancing our play parks and green spaces has on Renfrewshire
residents’ health and well-being. 
Council recognises the recent park improvements at Dunvegan Avenue,
Elderslie; Campbell Street, Renfrew; Ardgryffe Park, Houston; Churchill
Drive, Bishopton; Crags Park, Paisley and Elm Drive, Johnstone. It also
recognises the completed improvements to equipment at Kilbarchan
Park, Kilbarchan; Sandyflats, Johnstone; Tinto Square, Renfrew;
Lochwinnoch Park, Lochwinnoch; Barwood Park, Erskine; Maxwellton
Park, East End Park, Durrockstock Park, Morar Drive, Ben Lawers Park,
Paisley. Further welcomes the planned refurbishments to Moss Road
Park, Bridge of Weir; Inchinnan Playing Fields, Inchinnan; and Houston
Public Park, Houston." 
18  Notice of Motion 11 by Councillors J MacLaren and
Leishman
"Bishopton Football Pitch 
Council agrees that it is good to encourage sport including football in
Renfrewshire and recognises the size of the growing community in
Bishopton and Dargavel, which has 17 adult and youth teams and 460
registered players. 
As the existing grassed football pitch is rendered unplayable for much of
the winter due to it being water logged, council agrees to make the
provision of a 3g or 4g pitch a priority for Bishopton and Dargavel." 
19  Notice of Motion 12 by Councillors Ann-Dowling and
McMillan
"Supreme Court Referendum Ruling 
Council notes that the Supreme Court unanimously ruled that matters
relating to holding an independence referendum are outwith the legal
remit of Scottish Parliament and Scottish Government. Council therefore
requests that £20 million set aside by Scottish Government for a 2023
referendum should be directed to local government general funding
settlements to support councils in alleviating the cost of living crisis." 
20  Notice of Motion 13 by Councillors J MacLaren and Gray
"Cycle Paths Motion 
Council is pleased to promote cycling for a healthy lifestyle and
recognises that cycle paths need to be kept clean if cyclists are going to
use them without risk of punctures. Council agrees that council owned
cycle paths be swept on a frequent and regular basis." 
Page 8 of 60

Page 9

___________________________________________________________________
To: Council
On: 15 December 2022
___________________________________________________________________
Report by: Director of Finance & Resources
___________________________________________________________________
Heading: Financial Sustainability and General Fund Financial Outlook
___________________________________________________________________
1. Summary 
1.1 Successive reports to the Council over the course of 2022 have
highlighted the increasingly challenging financial and economic
environment the Council is facing. The recent publication by the UK
Government of their ‘mini-budget’, subsequent policy reversals and
then a new package of tax and spending measures in the Autumn
Statement has added to volatility in financial markets which were
already dealing with very high levels of inflation, high energy prices and
a looming economic recession. This results in a financial and economic
environment within which the Council is operating characterised by
rapidly increasing levels of risk; placing the Council’s financial stability
and ongoing sustainability under much greater pressure than that
experienced over the past decade. 
1.2 Previous financial updates to Council outlined the requirement for the
Council to restart transformation activity which would underpin a level
of savings which would address sustainability concerns, along with a
range of financial sustainability workstreams which would support the
delivery of savings at the scale required. 
Item 3
Page 9 of 60

Page 10

1.3 This report provides an update with regards progress with these
workstreams, and also provides an update with regards the current
year financial position as cost pressures – largely driven by high levels
of inflation, but also service demand – continue to build. 
1.4 The report outlines a potential ‘central’ scenario for the medium term
financial position, and the risks to this. Highlighted is the need for the
Council to prioritise a range of measures to maintain financial
sustainability in the short and medium term, and the use of financial
flexibilities including the use of reserve balances to address a projected
financial gap over the medium term; including principles around the use
of reserve balances. 
___________________________________________________________________ 
2. Recommendations 
2.1 Note the economic outlook provided in the report
2.2 Note the update provided in relation to the current financial year and
the potential use of reserve balances – both in year and over the
medium term
2.3 Note the update provided in section 7 in relation to the net forecast
financial position, the importance of Council understanding that the use
of reserve balances to support the Council’s financial position is a short
term tool only; and agree the principles outlined in relation to the
planned use of reserves. 
_________________________________________________________
3. Economic outlook
3.1 The main event which provides context for the current and future
economic outlook was the UK Government Autumn Statement which
was published on 17 November, accompanied by economic and fiscal
forecast updates from the Office of Budget Responsibility (OBR). The
main task of the Autumn Statement was to provide a way forward for
UK public finances which satisfied expectations - of the OBR and
markets - that the UK Government had a plausible plan to deal with the
difficulties brought about by rising inflation, interest rates and a slowing
Page 10 of 60

Page 11

economy. Such difficulties may be traced back to a mixture of COVID,
the war in Ukraine and Brexit. 
3.2 The Chancellor outlined a number of measures across a range of policy
areas, with the impact being planned to take effect in some instances
out until 2028:
- increasing tax: this came from a variety of sources, with a big
contribution from energy related levies on companies. In terms of
income related taxes, the significant freezing of income tax
thresholds contribution will likely only partially compensated for the
decision to not go ahead with the health and social care levy on
National Insurance contributions;
- increasing payments to households: to compensate for higher
inflation, including specifically to help with energy costs and
generally with regards to most benefit payments, including
pensions; 
- squeezing departmental budgets: whilst some areas are protected
to some degree from inflationary pressures, most are not. This
means that what had been relatively promising real terms increases
outlined in the October 2021 Spending Review are now much
reduced, with the outlook now for real terms cuts to unprotected
budgets.
3.3 In terms of the economic outlook, the combined announcements from
the Treasury and OBR may be summarised as follows:
o The Economy (GDP): a recession is forecast to have started in the
third quarter of 2022 and to last for just over a year. This is followed
by a stronger, migration led, bounce back than before;
o Inflation (CPI): is now forecast to peak at 11.1% in the 4th quarter
of 2022 (14.1% in the case of RPI) and to remain high in 2023 but
falling. The speed of decline is such that there is negative inflation
by 2025 and it is still very low in 2026, as shown in Figure 1 below.
Clearly these forecasts are heavily dependent on future energy,
and other, prices, as well as wage settlements Note that different
inflation measures - CPI, RPI, GDP deflator - can vary considerably
in some years due to recent exceptional circumstances. This helps
explain why it is difficult to be definitive about real, rather than cash,
terms changes in the OBR forecasts; 
Page 11 of 60

Page 12

Figure 1: Contributions to CPI inflation 
o Interest rates: are based on market expectations and are expected
to peak, briefly, at around 5% in the second half of 2023, then to fall
back but remain around 4% until the end of the forecast; 
o Unemployment: rises by just over half a million, peaking at 4.9% in
the third quarter of 2024 before starting to slowly fall back;
o Living standards: are set to decline by a cumulative 7% in real
terms over the next two financial years, by some margin the biggest
recorded fall on record.
3.4 In terms of the impact for the Scottish Budget, Barnett consequentials
cumulatively amount to around £1.5 billion for the two years 2023-24
and 2024-25, with much of this sum relating to the NHS, adult social
care and education. The Scottish Government has announced that it
will pass on all health consequentials but has made no such
commitment for education. The real terms budget position for 2023-24
is unclear but the Deputy First Minister has suggested it was likely to be
a real terms cut. Calculation of the actual position in real terms is made
difficult by the large variation in deflator measures which could be
applied.
3.5 Changes to the threshold for the UK additional rate of tax may also
negatively impact on the Scottish Budget if copied by the Scottish
Government as the sum raised in Scotland is relatively smaller than for
the UK given fewer households in this tax bracket. However, the net
impact will depend on where that extra UK money is spent. The next
key Budget event will be the Scottish Government’s Draft Budget, due
Page 12 of 60

Page 13

on December 15th, with publication of the detail of the local government
settlement following some days thereafter. It is likely to be into the New
Year before clarity is achieved with regards the Budget implications for
the Council.
3.6 In a recent report Audit Scotland highlighted the risk of overspend in
the Scottish Budget for 2022-23, with the possible consequence of this
money being clawed back by the UK Government in the financial year
2023-24. The Scottish Government has revised its 2022/23 budget over
two recent announcements; with significant reallocation of resource
within budget headings in order to fund the increased cost of public
sector pay awards.
3.7 In light of the above events, the Council’s financial strategy remains
dynamic and is constantly updated to reflect emerging new pressures
or changing levels of existing pressure. This position underlines the
necessity for the Council to take steps to address the immediate
financial position, while also prioritising the development and
implementation at pace of the financial sustainability and potentially
other savings measures outlined later in this report.
4 2022/23 Financial Position
4.1 Members are aware of the current very high levels of inflation being
experienced in the economy, driven in large part by the dramatic
increase in energy costs. These cost increases are impacting on
families and household finances, as well as the Council and associated
bodies, community organisations and businesses. While the outlook for
inflation has moderated slightly in recent weeks - the Bank of England
has reduced its forecast for CPI inflation in December 2022 from 13%
to 11%, remaining at high levels of around 10% possibly for the first
half of 2023. This is obviously manifesting itself in a cost of living crisis
for many households with many already in or facing the prospect of fuel
poverty; however food prices are also increasing at a very high rate. 
4.2 As has been previously reported, the Council is equally facing a surge
in supplies costs – energy costs obviously - but also food,
transportation and diesel costs. Vehicle parts costs are increasingly an
issue, while building and construction cost pressures remain an
ongoing concern. This volatile cost environment, while undoubtedly
driven by soaring energy costs, is also affected by supply constraints. 
4.3 In addition to cost increases, and as has been reported regularly
throughout the year, the council is also experiencing higher demand for
some services – most pressingly in children and families’ social care
following the pandemic. Despite intensive social work support, there
Page 13 of 60

Page 14

has been an increase in the level of risk for some children and young
adults, resulting in them being placed in kinship care, accommodated in
foster care or residential accommodation. For some, this entails highly-
intensive care packages which are increasingly expensive. This
position has been building over the past 12-18 months with an
overspend being incurred in 2021/22 which was offset to some degree
by the availability of Covid-related resource. However, in 2022/23, the
service is – based on current levels of demand – forecasting an
overspend of £4-5 million. The service anticipates that the level of
demand being experienced is unlikely to reduce significantly over the
medium term, therefore Council will require to make financial provision
over this period in order to fund these unavoidable costs. As members
are aware, increased social care funding has in recent years been
passed in full to the HSCP as a specific condition of the local
government settlement. This position is not sustainable moving
forward. Council will continue to work through COSLA to emphasise the
restrictive financial impact of such conditions.  There remain other
Covid-related pressures, with parking income still well below pre-
pandemic levels and household waste levels remaining high but
beginning to moderate.
4.4 The Council Overview finance report to the recent Finance, Resources
and Customer Services Policy Board outlined a 2022/23 projected
overspend (excluding the underspend projected in adult social care) of
£8.4 million. This projection is exclusive of a number of other risks to
the 2022/23 financial position:
• The 2022/23 pay award has been agreed for those employees
on local government and craft terms & conditions. The
agreement reached for these groups is broadly a combination of
a core pay increase of 5% with further consolidated elements to
support the lowest paid in the workforce who will receive a
maximum £2,000 increase (based on a 36 hour working week,
equivalent to a 10.2% increase for the lowest paid), and a
£3,000 cap for those on salaries in excess of £60,000. An
additional day of annual leave was also agreed on a
consolidated basis. In setting the 2022/23 base budget, Council
agreed a provision for pay awards based on the Scottish public
sector pay policy, which broadly equates to a 2% level of
provision.  While additional Scottish Government funding has
been provided to support the pay settlement, the amount
allocated will be insufficient to meet the expected total cost,
requiring the Council to fund the differential (estimated at c£3m)
and to build this substantial deficit in to future base budgets.
Page 14 of 60

Page 15

• The position for teachers remains to be formally agreed, with
trades unions seeking a pay settlement of 10%. Negotiations
remain ongoing and having successfully balloted members with
regards industrial action, a number of teachers strike days have
been announced. Agreement on the 22/23 pay award has also
still to be concluded with the chief officer group.
• As outlined above, energy costs are surging and while the
Council made provision for increased costs in 2022/23, it is clear
that this will not now be sufficient to meet the anticipated costs
given spiralling gas prices. It is estimated that an additional £2m
cost will be incurred in 2022/23 over existing energy budgets – a
position again that will require to be incorporated into future
base budgets. It is also now likely that additional financial
support will require to be provided to OneRen, who are also
experiencing dramatically increased energy costs despite taking
proactive measures to try and mitigate this cost.
• There are a range of other cost pressures the Council is facing
in relation to reduced parking income, increased streetlighting
maintenance costs, higher levels of overtime due to annual
leave which was accrued over the pandemic period now being
taken and under-recovery of planning fees. While much of these
cost pressures are incorporated into the forecast outturn figure
above, there is a risk that other pressures may emerge over the
winter period.
• The projection does not include any variance relating to the
collection of Council Tax. Current forecasts suggest a slightly
lower yield than 2021/22; however, it is recognised that the full
impact of the cost-of-living crisis is yet to materialise which could
have significant effect on yield. 
4.5 One of the actions agreed by Council in September 2022 was to
exercise in year the financial flexibility permitted by the Scottish
Government in relation to accounting for service concession
arrangements – in effect a revised approach to accounting for PPP
contracts. This will allow an in year saving estimated at £1.5m to be
generated, with reduced costs also being possible in future years out to
2036/37 which will be incorporated into the base budget. However, this
revised approach will mean costs will be incurred in years after 2036/37
which were not previously, and the Council’s longer term financial plans
will require to take account of these. In addition, the decision by the UK
Government to reverse the increase in National Insurance contributions
(the Health and Social Care Levy) from November 2022 will part
release the provision made for this cost in the 2022/23 base budget,
providing in year capacity estimated at £0.5 million.
Page 15 of 60

Page 16

4.6  The sum of these pressures and in year savings, on top of the £8.4m
outlined above, could result in the Council delivering a £10-12 million
gross revenue overspend by the end of the 2022/23 financial year –
some 2.5% of total spend. Directors and management teams are
closely monitoring their costs, restricting spend to essential spend only
and are aiming to mitigate increases where possible in line with
agreement of Council. However, even taking this action, given the
above pressures it is certain the Council will require to utilise reserve
balances to fund the projected overspend and support a break even
position at year end.
4.7 In terms of reserves use, Council has prudently held a number of
reserve balances and made additional provision at the close of the
2021/22 financial year to support what was forecast to be a very
challenging medium term outlook. This included the ringfencing of
funding related to the Covid-19 pandemic, in anticipation that there
would be both longer term costs incurred over the final stages of the
pandemic, but also recognising that there was likely to be long term
behavioural change by residents and communities which would have a
financial impact on the Council. 
4.8 A number of these reserves will require to be drawn down in order to
achieve a breakeven position at year end, with the following reserves
likely to be those utilised: 
Table 1
Ringfenced reserve Opening
balance
£m
Potential
drawdown
£m
COVID construction recovery 10 4
COVID Education recovery 6.3 2-3
COVID general recovery 9.1 4-5
Inflation mitigation 5 2-4 
It should be noted the estimates above are subject to significant
change given the current volatile financial environment. It should also
be noted that the £4m drawdown from the construction recovery fund
relates to the 2022/23 pay award funding provided by the Scottish
Government as capital resource, and which Council agreed in
September would be switched from this reserve ie this drawdown is not
related to funding the £10-12 million potential overspend. 
Page 16 of 60

Page 17

4.9 Members will note that the above potential use of reserves is on a scale
which is not sustainable over the medium term, and reinforces the need
for the Council to address its projected core funding deficit over this
period as soon as possible. Members will also note that – at this point –
there is no requirement to utilise unallocated reserves in 2022/23;
however this has only been possible due to the prudent ringfencing of
resources in prior years. Given the heightened financial risk
environment, maintaining unallocated reserves at least at their current
level is recommended. 
Medium Term Financial Pressures
5.1 Previous reports to Council have outlined a central scenario potential
funding gap over the medium term (ie 2023/24 – 2025/26) of £35
million, after assuming a council tax increase of 3% in each of these
years (£44 million before any decision on council tax). Applying
differing assumptions to reflect optimistic to pessimistic scenarios
suggest a range of £28 – 61 million before any decision on council tax,
reducing to a range of £19 – 52 million after council tax. The table
below attempts to summarise the main movements for the central
scenario:
Table 2 
2023/24 2024/25 2025/26
£m £m £m
Income
Movement in revenue grant 0.0 0.0 0.0
Movement in council tax base 2.5 1.0 0.8
2.5 1.0 0.8
Expenditure
Pay award % 3.0% 3.0% 2.5%
Pay award £ 11.9 8.1 7.0
Contract and inflationary pressures 7.8 6.0 6.0
Long term debt 0.5 0.5 0.5
20.2 14.6 13.5 Total
Gross expenditure 17.6 13.5 12.7 43.8
Council tax @ 3% 3.0 3.0 3.1
Net pressure 14.6 10.5 9.6 34.7
Page 17 of 60

Page 18

5.2 The above position is based on a range of assumptions which are
outlined in further detail below:
5.3 Revenue Grant 
The central assumption is for a flat cash allocation over the medium
term, as was outlined in the Resource Spending Review published
earlier in 2022. Given the current very high rates of inflation this will
obviously constrain the Council given it represents a significant real
terms cut to funding. While the Scottish Government is projected to
receive an additional £1.5 billion from the UK Government over the next
two financial years as outlined in the UK Government Autumn
Statement, given the demands on the Scottish Government and the
impact of inflation, there is little to suggest any improvement in the flat
cash position for local government over the medium term. This position
will be clarified (for 2023/24 at least) when the Scottish Government
publishes its Draft Budget on 15 December.
5.4 Council tax 
Each year an assessment is made with regards movement in the
council tax base ie the number and banding of domestic properties for
which a council tax liability may arise. Over the period of the pandemic,
a prudent approach was taken with regards the potential growth in the
base from new house building; and on review it is apparent that there is
some “catch-up” which can be confidently assumed in 2023/24, which
will increase the total council tax collected regardless of any decision
on the rate of council tax. Risk remains however with regards actual
yield as the cost of living crisis continues – council tax payments may
be viewed as less of a priority than heating for example.
5.5 Pay inflation 
As outlined above, the pay award for 2022/23 remains to be settled for
all staff groups but is currently assumed at 5%, which despite additional
funding from the Scottish Government will leave an unfunded gap in
2022/23 in the order of £3 million. The pay assumptions for future years
are outlined in the table above; however given the current high levels of
inflation, which are forecast to endure for a large proportion of 2023,
there may again be pressure on these assumed levels of increase.
5.6 Non-pay inflation 
The Council has a long standing principle of no general inflationary
pressures being funded, with an expectation that Directors and their
management teams will seek ongoing efficiencies in order to meet
Page 18 of 60

Page 19

general inflationary pressures. However, where a pressure is
“unavoidable”, and there is no scope for the manager to mitigate these
costs, then provision will be made within the Council’s base budget.
Given the very high levels of inflation currently, the unavoidable
pressure is unsurprisingly higher as we move in to 2023/24. The
estimate for 2023/24 included in the table above is based on detailed
returns from services which have been assessed and only the most
pressing issues and costs are proposed to be funded. Pressures
totalling in excess of £13 million have been outlined by services,
however only a proportion of these are proposed to be funded,
including an initial contribution to addressing the severe demand in
children’s social care.
5.7 Long term debt 
Members will recall that the 2022/23 revenue budget included use of
longer term capital financing flexibilities totalling £7.5 million, which it
was acknowledged would result in higher costs in the longer term but
were required in order to manage through the medium term; with
appropriate base budget adjustments being made in future years. 
5.8 The above assumptions and anticipated costs represent only those for
existing services. Of course there may be other issues which arise
which have not been anticipated; or the assumed levels above may
prove to be inadequate. There is also no provision within the above
summary for further investment in Council priorities eg climate change,
social renewal and Fairer Renfrewshire etc, over that which has already
been set aside. 
6 Efficiencies and Financial Sustainability Workstreams 
6.1 The Council’s main transformation programme – branded Right for
Renfrewshire (RFR) most recently – is the main route for the Council to
transform services and release efficiencies, thereby supporting the
delivery of recurring savings over the medium term. Members will be
aware that, at the onset of the coronavirus pandemic, a decision was
taken to formally pause the programme, recognising the capacity of the
Council required to be fully diverted to support the emergency
response. As has been outlined in previous update reports, the longer
term impact of this decision is that the Council’s pipeline of associated
savings has now fallen behind the requirements to secure overall
financial sustainability. Members agreed in June that a revised savings
target of £15 million be set for the remaining phases of the existing
Page 19 of 60

Page 20

medium term transformation programme, and that the programme be
revised to clearly align with the financial sustainability portfolio.
6.2 Where management capacity has allowed, service reviews have taken
place in discrete areas of the Council – corporate finance and ICT
services have been reviewed utilising the RFR approach and recurring
savings have been generated. In addition, reviews of the operations
and infrastructure service within Environment and Infrastructure have
also commenced with a view to savings being generated over the
course of 22/23 to 24/25. Remaining areas of the Council where
reviews will be undertaken include legal and committee services,
events and communications, policy and commissioning and people and
organisational development. 
6.3 An area of significant spend within the Council relates to Children’s
Services (the service makes up nearly 50% of the Council total net
revenue budget); however it is acknowledged that the current
pressures being faced by elements of this service and wider obligations
in terms of specific funding streams will make the delivery of recurring
savings particularly challenging.
6.4 It is therefore apparent that the £15 million target is unlikely to be
achieved over the medium term without impacting on service delivery.
Based on work undertaken by services to date, and that for which
specific plans are being developed over the next 12 – 18 months, it is
estimated that £8 million of savings could be deliverable against the
£15 million target.
6.5 Previous reports to Council have outlined a number of financial
sustainability workstreams which are aiming to generate £20 million of
savings over the medium term. Work has progressed over recent
months with regards many of these; however it is becoming apparent
that the ambition with regards the scale of savings is in some cases not
going to be achievable within the 3 year period under consideration
now that further investigation has been undertaken. 
6.6 That being said, many of the workstreams have indicated potential to
deliver savings in the longer term, or in some cases, while not
delivering significant savings in their own right, the work is important to
undertake as it is a critical enabler in the delivery of other service
changes or savings. For example, development and improvement of
the Council’s web presence through the Digital Experience project will
take some investment in the short to medium term, however this is a
key enabler in increasing digital ways of working and digital customer
services, which may generate efficiencies in the longer term. 
Page 20 of 60

Page 21

6.7 In terms of savings which - at this point - can be confidently included
within current financial plans, the total across all workstreams is in
excess of £6 million. While this is well short of the £20 million target, as
outlined above there remains a considerable amount of development of
some proposals and there is scope for further achievement of savings
from for example a more critical examination of the Council’s property
holdings. This work will continue over the coming months with update
reports to be provided to Council and Policy Boards as appropriate;
including consideration at Council budget setting. Development of
further proposals and delivery of those which have been developed
must remain a key Council priority and will be one which demands
significant management capacity.  
7 Medium Term Financial Position and Reserves
7.1 The culmination of the above pressures and savings can be
summarised as follows:
Table 3 
7.2 It is apparent from the above table that there remains a considerable
gap over the medium term – one which is increasing year on year –
which will require to be addressed as Council considers most
immediately the 2023/24 budget. As has been outlined in previous
reports, there is a timing disconnect between the speed at which the
financial gap is expected to emerge and the ability of the Council to
generate and secure recurring savings to sustainably close it. The need
for the Council to make spending and service prioritisation decisions at
a greater scale and pace than over recent years in order to fully commit
to the delivery of the material change and transformation required over
the medium term has been consistently highlighted in every recent
financial outlook report. This will require the lower level of real terms
resources and spending capacity at the Council’s disposal to be
focused on those areas of greatest need and priority. These decisions
2023/24 2024/25 2025/26
£m £m £m
Net pressure as per Table 2 14.6 10.5 9.6
Transformation programme 3.9 3.8 0
Financial sustainability workstreams 5.4 0.8 0.2 Total
Gross pressures 5.3 5.9 9.4 20.6
Page 21 of 60

Page 22

will be challenging for the Council; and must be balanced with the
requirement to continue to deliver core services. 
7.3 The application of financial flexibilities agreed by the Scottish
Government, in particular that relating to service concession accounting
mechanisms, has been agreed by Council and is outlined earlier in this
report. The revised arrangements have a two-fold benefit: an ongoing
reduction in revenue costs (which are in effect deferred to the end of
the relevant contract period, linked to the remaining service potential
from the underlying assets); and where the revised arrangements are
put in place from the commencement of the original contract,
retrospective application will generate a one-off benefit representing the
position that (in accounting terms, not cash terms) the Council has
‘overpaid’ for the use of assets to this point. This benefit must be
utilised prudently by the Council; recognising that there is a future cost
which the Council will have to fund. However, the Council may consider
short to medium term use of this funding to support the current financial
challenge.
7.4 The planned use of reserves as a support to the Council’s medium term
financial position has been outlined in previous reports as likely to be
required; and the above analysis clearly demonstrates this requirement.
The application of reserves is a legitimate tool in managing shorter term
financial challenges while sustainable savings are generated to match
financial pressures, but it cannot ever be more than a short term
measure.
7.5 While there remain uncertainties in much of the analyses above, it is
prudent at this point to agree principles in terms of the planned use of
specific reserve balances which could be deployed to support the
Council’s medium term financial position.  It is proposed that the
following principles are agreed:
• No planned use of unallocated reserve balances, which are held
as a risk contingency
• Unallocated balances are maintained at a minimum of £10
million (2.3% of net running costs) over the medium term
• The Council clearly sets out the planned use of ringfenced or
specific reserves which have been set aside to support the
medium term financial position over a maximum 3 year period,
and in the interim develops and implements plans to address the
underlying financial gap in a sustainable manner.
• Initially, use of the reserve balances included in Table 1 above
will be considered; along with use of the service concession
flexibility one-off benefit outlined in 7.3 above. 
Page 22 of 60

Page 23

7.6 An updated financial outlook will be provided to future Council meetings
including the annual budget setting meeting, incorporating the
confirmed level of Scottish Government revenue support, any revised
financial assumptions and any potential requirement to utilise ring-
fenced reserve balances. 
___________________________________________________________________
Implications of the Report
1. Financial - the report highlights the scale of the short and medium term
financial challenge facing the Council. The development and
implementation of the transformation programme and other financial
sustainability workstreams as outlined in the report are critical to
ultimately supporting the Council secure a financially sustainable
position.   
2. HR & Organisational Development - the medium term financial
position and associated plans require to align with workforce and
service plans to ensure the size and composition of the Council
workforce remains appropriate and affordable. 
3. Community/Council Planning – the Council requires to remain
financially sustainable in order to deliver on its priorities as outlined in
the Council and Community Plans; and these revised Plans will in turn
require to inform the financial strategy. 
4. Legal - none 
5. Property/Assets - the report outlines a proposal to undertake a
strategic review of property which will aim to ensure the Council’s asset
base remain effective and efficient 
6. Information Technology - the report outlines the need to ensure the
Council Digital strategy support ongoing financial sustainability; with
any digital developments being underpinned by a robust business case
7. Equality & Human Rights - The recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
Page 23 of 60

Page 24

for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report. If required
following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the
results of the assessment will be published on the Council’s website. 
8. Health & Safety - none
9. Procurement – the report outlines a proposal for a strategic review of
procurement practice in order to support the Council’s ongoing financial
sustainability.
10. Risk - as outlined in the report, the Council’s financial risk exposure is
increasing in the immediate term and over the medium term remains
high. The report outlines increasing financial risks as well as a range of
key measures to be implemented as part of the medium term financial
planning arrangements to protect the Council’s immediate financial
stability and resilience but also continue to progress toward medium
term financial sustainability.
11. Privacy Impact - none. 
12. Cosla Policy Position – none
13. Climate Risk – none 
___________________________________________________________________ 
Author:           Alastair MacArthur, Director of Finance & Resources 
Page 24 of 60

Page 25

___________________________________________________________________
To: Council
On: 15 December 2022
___________________________________________________________________
Report by: Director of Finance & Resources
___________________________________________________________________
Heading: A Prudential Framework for Capital Finance – Progress Report
___________________________________________________________________
1. Summary
1.1 The Local Government in Scotland Act 2003 and supporting regulations
require local authorities to have regard to The Prudential Code for
Capital Finance in Local Authorities (“the Prudential Code”). 
1.2 The Council set its prudential indicators for 2022/23 on 3 March 2022.
The purpose of this report is to consider the indicators as they stand at
14 October 2022, approximately halfway through the financial year, and
revise them where appropriate. 
___________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that members consider this report and approve the
changes to the prudential indicators as detailed in the report.
___________________________________________________________________
3. Background
3.1 The key objectives of the Prudential Code are to ensure, within a clear
framework, that:
 Capital investment plans are affordable, prudent and sustainable;
 Treasury management decisions are taken in accordance with good
professional practice and in full understanding of the risks involved;
Item 4
Page 25 of 60

Page 26

1  
 
 
 That these risks will be managed to an acceptable level to the
organisation; 
 Capital investment plans are being made in light of the overall
organisational strategy and resources, ensuring that decisions are
being made with sufficient regard to the long run financial
implications and potential risks to the authority.        
3.2 To demonstrate that local authorities have fulfilled these objectives, the
Prudential Code sets out the indicators that must be used and the factors
that must be taken into account.  The Code does not include suggested
indicative limits or ratios; these are for the Council to set. 
3.3 The prudential indicators required by the Code are specifically designed
to support local decision making in a manner that is publicly accountable.
They are not designed to be comparative performance indicators. 
3.4 CIPFA has recently issued a secondary consultation on updates to the
Prudential Code following an initial consultation in early 2021. The main
focus of the consultation is to bring greater clarity over any commercial
investments, which may result in some changes or amendments to the
Prudential Indicators. Any resulting changes to the Code will be
incorporated into 2023/23 Prudential Indicators for Council approval in
March 2023. 
4  Capital Expenditure Indicators 
4.1 The Council has a duty to determine and keep under review the
maximum amount  it can afford to allocate to capital expenditure.
4.2 The Council is required to make estimates of the capital expenditure it
plans to incur for the forthcoming financial year and at least the following
two years. Separate estimates should be made for Housing and Non-
Housing services. 
The Capital Investment Programmes for Housing and Non-Housing
Capital Investment Programme were approved by Council on 3 March
2022, and the resulting indicators were updated to reflect the approved
programme, incorporating the decisions taken by the Council at the
budget meeting.
Page 26 of 60

Page 27

2  
 
 
4.3 Council approved the following as an indicator for capital expenditure:-
CAPITAL EXPENDITURE 
2022/23
Estimate
£000
2023/24
Estimate
£000
2024/25
Estimate
£000
Non-Housing* 131,756 174,617 82,044
Housing 29,995 53,227 67,747
Total 161,751 227,844 149,791 
*The 2022/23 Non-Housing estimate excludes the estimated expenditure in relation to
the Private Sector Housing Grant. 
4.4 Total capital expenditure to 14 October 2022 was £36.629m, of which
£30.754m relates to Non-Housing and £5.876m relates to Housing.
4.5 A review of the forecast capital spending for 2022/23 suggests that the
indicators need to be revised as follows for the current year. Indicators
for 2023/24 and 2024/25 will be reviewed in March 2023 alongside the
budget proposals.
CAPITAL EXPENDITURE 
2022/23
Probable
£000
Non-Housing 113,043
Housing 21,507
Total 134,550
4.6  The decrease of £18.713m in the planned Non-Housing capital
expenditure during 2022/23 is mainly attributable to: 
 The change in the cashflow profile of a number of programmes,
resulting in a net adjustment of £36.993m from 2022/23 into 2023/24
and future years, as reported to relevant policy boards; 
 Carry forward of programmed expenditure from 2021/22 to 2022/23
totalling £11.135m; and 
 The addition of £7.145m funding for projects approved during
2022/23.
 
Page 27 of 60

Page 28

3  
 
 
4.7 The decrease of £8.488m in the planned Housing capital expenditure
during 2022/23 arises from the  change in the cashflow profile of a
number of programmes resulting in a net adjustment of £8.488m from
2021/22 into 2022/23 and future years as reported to the Communities,
Housing & Planning Policy Board. 
5 Capital Financing Requirement Indicator 
5.1  Capital Financing Requirement: The Council has available to it a number
of ways of financing traditionally procured capital investment. The term
“financing” does not refer to the payment of cash, but the resources that
are applied to ensure that any underlying amount arising from capital
payments is dealt with absolutely, whether at the point of spend or over
the longer term. A number of financing options involve resourcing the
investment at the time that it is incurred. These are:
 Application of useable capital receipts
 A direct charge to revenue for capital expenditure
 The application of capital grants
 Up-front contributions from project partners 
5.2 Capital expenditure which is not financed up front by one of the above
methods will increase the Capital Financing Requirement of the Council. 
5.3  Members approved the following as the indicator for the Capital
Financing Requirement at the end of each of the next three years at the
Council meeting on 3 March 2022: 
CAPITAL FINANCING REQUIREMENT 
31/03/2023
Estimate
£m
31/03/2024
Estimate
£m
31/03/2025
Estimate
£m
Non-Housing 364 442 467
Housing 122 160 211
Total 486 602 678 
5.4 The revised projected capital financing requirement for 2022/23, based
on the position at 14 October 2022 is noted in the table below. The
2023/24 and 2024/25 requirements will be reviewed in March 2023
alongside the budget proposals for 2023/24 and beyond.
Page 28 of 60

Page 29

4  
 
 
CAPITAL FINANCING REQUIREMENT 
31/03/2023
Probable
£m
Non-Housing 352
Housing 110
Total 462 
5.5 The decrease of £12 million in the probable Capital Financing
Requirement at 31st March 2023 in Non-Housing services arises from
the reduced capital expenditure forecast to the end of 2022/23 described
in 4.6, partly offset by an increase in other liabilities in relation to new
service concession flexibility arrangements. These were announced by
the Scottish Government in September 2022 and the impact for
Renfrewshire Council is explained in section 10. 
5.6 The decrease of £12 million in the probable Capital Financing
Requirement at 31 March 2023 in Housing arises from:
 The reduced capital expenditure forecast to the end of 2022/23
described in 4.7; and
 An accelerated repayment from the HRA to the loans fund in 2021/22
in order to smooth future loan fund repayments. 
6 External Debt Indicators
6.1  External debt is referred to as the sum of external borrowing and other
long term liabilities (e.g. covenants). The prudential indicators for
external debt are set and revised taking into account their affordability. It
is through this means that the objective of ensuring that external debt is
kept within sustainable prudent limits is addressed year on year. 
6.2  External debt indicators are set at two levels: an Operational Boundary
and an Authorised Limit. Both of these need to be consistent with the
Council’s plans for capital expenditure and financing and with its
Treasury Management policy statement and practices.
 
Page 29 of 60

Page 30

5  
 
 
6.3  Operational Boundary: This is the focus of day-to-day treasury
management activity within the Council, and is an estimate of the most
likely scenario in terms of cashflow. Risk analysis and risk management
strategies have been taken into account; as have plans for capital
expenditure, estimates of the Capital Financial Requirement and
estimates of cashflow requirements for all purposes. It is possible that
this boundary could be breached occasionally and this would not be
regarded as significant. However, a sustained or regular trend would
require investigation and action. 
6.4  The Council has set for the current financial year and following two years
an Operational Boundary for its total external debt, identifying separately
borrowing from other long term liabilities. 
OPERATIONAL BOUNDARY FOR EXTERNAL DEBT 
31/03/2023
Estimate
£m
31/03/2024
Estimate
£m
31/03/2025
Estimate
£m
Borrowing 408 528 607
Other long-term liabilities 78 74 71
Total 486 602 678 
6.5  The probable outturn for the current financial year is anticipated at £462
million, a decrease in the Operational Boundary of £24 million. This is
mainly as a result of the reduced Capital Finance Requirement due to
lower capital expenditure for both Housing and Non-Housing Services
outlined above, offset by the increase in revised service concession
liabilities. There have been no breaches during the period from 1 April to
14 October that have required action. The 2022/23 and 2023/24
Operational Boundary will be reviewed in March 2023 alongside the
budget proposals. 
OPERATIONAL BOUNDARY FOR EXTERNAL DEBT 
31/03/2023
Probable
£m
Borrowing 366
Other long-term liabilities 96
Total 462 
 
Page 30 of 60

Page 31

6  
 
 
6.6  Authorised Limit: This is based on the same assumptions as the
Operational Boundary, with sufficient “headroom” to allow for
unusual/exceptional cash movements. Headroom of approximately 5%
has been added to the Operational Boundary to arrive at an Authorised
Limit which is sufficient to allow for cashflow management without
breaching the limit. 
6.7   The Council has set for the forthcoming financial year and following two
years an Authorised Limit for its total external debt, but identifying
separately borrowing from other long term liabilities. 
AUTHORISED LIMIT FOR EXTERNAL DEBT 
31/03/2023
Estimate
£m
31/03/2024
Estimate
£m
31/03/2025
Estimate
£m
Borrowing 428 554 637
Other long-term liabilities 78 74 71
Total 506 628 708 
6.8  The revised anticipated authorised limit for this financial year is projected
at £481 million, a decrease of £25 million to the estimate and in line with
the operational boundary reduction as outlined in 6.5.  The authorised
limit will be reviewed on an annual basis and any changes will require
approval by Council. 
AUTHORISED LIMIT FOR EXTERNAL DEBT 
31/03/2023
Probable
£m
Borrowing 385
Other long-term liabilities 95
Total 480 
6.9  In December 2018 the CIPFA/LASAAC Local Authority Accounting
Board confirmed that from 1 April 2020 the CIPFA Code of Practice on
Local Authority Accounting would be adopting the accounting standard
IFRS 16 Leases. 
After consultation, in April 2022 the deadline for implementation of IFRS
was extend to 1 April 2024 due to significant delays as a result of the
Covid-19 pandemic. However, the Code will allow authorities to adopt
IFRS 16 on 1 April 2022 or 1 April 2023.
Page 31 of 60

Page 32

7  
 
 
The practical effect of adopting IFRS 16 will be to require any contract
the Council has signed which provides the right to rent or lease exclusive
use of an asset, such as property or vehicles, could potentially require to
be recognised as an asset on the Council’s balance sheet, with a
corresponding debt liability recognised at the present value of the future
lease payments. This liability will be treated as additional borrowing,
therefore increasing the Capital Financing Requirement and other
associated Prudential Indicators such as Operational Boundary,
Authorised Limit and Revenue to Financing Cost ratios. A full review of
all contracts that could be impacted by this is currently under way and
will be factored into future Prudential Indicators once the full effect is
known. The Council is likely to adopt IFRS 16 during 2023/24. 
7 Loan Fund Advances 
7.1 Loans fund accounting arrangements are governed by the provisions set
in the Local Authority (Capital Finance and Accounting) (Scotland)
Regulations 2016.
7.2 Repayment of loans fund advances are required to be made in line with
the Scottish Government’s statutory Guidance on Loans Fund
Accounting. 
7.3 The aim of prudent repayment is to ensure that the Council’s net capital
expenditure is financed over a period of years in which that expenditure
is expected to provide a benefit and that the repayment each year is
reasonably commensurate with the period and pattern of benefits.
Housing and Non-Housing advances and associated annual repayments
are identified separately.
7.4 Members approved the 2022/23 policy on loan fund repayments on 3
March 2022. Statutory guidance requires the policy to be approved each
year and the 2023/24 policy will be reviewed in March 2023 alongside
the budget proposals. 
7.5 The Council’s current policy is as follows: 
Asset Life Method: Loans fund advances will be repaid with reference
to the life of an asset using an average life of 40 years for General Fund
assets and 30 years for HRA assets, with an annuity rate of 6.00%. 
Assets constructed under City Deal arrangements will have differing
asset lives and loans fund repayments will be over 60 years at the asset
life method. This will ensure that the repayments are reasonably
commensurate with that over which the assets will provide benefits. 
Page 32 of 60

Page 33

8  
 
 
7.6 The Council’s latest estimates of its loan fund account information are as
follows:  
 
8  Treasury Management Indicators
 
8.1  The prudential indicator in respect of treasury management is that the
local authority has adopted CIPFA Treasury Management in the Public
Services: Code of Practice and Cross-Sectoral Guidance Notes (the
“Treasury Management Code”). 
8.2 Compliance with the Treasury Management Code requires a mid-year
review of Treasury Management activity. This was reported to Finance,
Resources and Customer Services Policy Board on 17 November 2022.
9 Indicators for Affordability
9.1 A key measure of affordability is the incremental impact of investment
decisions on the council tax or house rents. Estimates of the ratio of
financing costs to net revenue stream provide an indication of how much
of the Council’s revenue is committed to the repayment of debt.
9.2 As reported to Council on 3 March 2022 the ratios for the next 3 years
are shown in the table below:  
Year
Opening
Balance £m
Advances to
GF £m
Advances to
HRA £m
Repayment
by GF £m
Repayment to
GF by City
Deal Grant
£m
Repayment
by HRA £m
Closing
Balance £m
2021-22 actual 273 19 13 - - (16) 289
2022/23 289 70 19 - - (11) 367
2023/24 - 27/28 367 196 216 (7) (4) (40) 728
2028/29 - 32/33 728 - - (18) (38) (36) 636
2033/34 -37/38 636 - - (38) (25) (39) 534
2038/39 -42/43 534 - - (48) - (43) 443
2043/44 - 47/48 443 - - (52) - (56) 335
2048/49 - 52/53 335 - - (42) - (72) 221
2053/54 -57/58 221 - - (72) - (39) 110
2058/59 -62/63 110 - - (71) - (2) 37
2063/64 - 67/68 37 - - (18) - - 19
2068/69 - 72/73 19 - - (4) - - 15
2073/78 - 77/78 15 - - (5) - - 10
2078/79 - 82/83 10 - - (6) - - 4
2083/84 - 87/88 4 - - (1) - - -
Page 33 of 60

Page 34

9  
 
  
RATIO OF FINANCING COSTS TO NET REVENUE STREAM 
2022/23
Estimate
2023/24
Estimate
2024/25
Estimate
Non-Housing 3.47% 3.62% 3.48%
Housing 34.16% 30.10% 30.12% 
9.3 The revised ratios for 2022/23, based on the position at 14 October 2022
is noted in the table below. The 2023/24 and 2024/25 requirements will
be reviewed in March 2023 alongside the budget proposals;
RATIO OF FINANCING COSTS TO NET
REVENUE STREAM 
31/03/2023
Probable
Non-Housing 3.22%
Housing 33.44%
10  Service Concession Flexibility
10.1 The term ‘service concession’ relates to a type of finance lease
arrangement whereby annual contract payments (such as the unitary
charge for PPP schools) are subject to accounting disclosure in the
annual accounts that splits the full cost into different elements, being:
 Rental element, for occupying the asset;
 Service charge element, for servicing the asset;
 Interest element, to pay interest on the financing of the asset;
 Lease principal (capital) element, to repay debt on the financing of
the asset, spread over the life of the contract. 
10.2 In September 2022, the Scottish Government published Finance Circular
10/2022, which sets out a new accounting flexibility for local authorities
who have service concession arrangements dated prior to 1 April 2022,
that allows this last element to be spread over the life of the asset, rather
than the life of the contract. 
10.3 Renfrewshire Council’s PPP schools contract was established in 2006
and its term is 32 years. The capital element is spread on an annuity
basis using the contractual interest rate of 7.65%. 
Page 34 of 60

Page 35

10  
 
 
The Council treats other school assets as having an expected useful life
of 40 years, and therefore, as previously agreed by Council, the flexibility
permitted under the Finance Circular will be employed from the 2022/23
financial year. 
10.4 This revised accounting methodology will provide support to the
Council’s medium-term financial position, with increased costs over the
useful life of the asset being incorporated into the Council’s longer term
financial planning arrangements. 
___________________________________________________________________
Implications of the Report
1. Financial – Prudential indicators are being monitored by the Director of
Finance and Resources throughout the year. They are based directly
on the Council’s capital and revenue budgets, as detailed in other
reports considered by the Council on 3 March 2022 and reported to the
Council’s Policy Boards on a regular basis.
2. HR & Organisational Development – None arising directly from this
report
3. Community/Council Planning – None arising directly from this report
4. Legal – None arising directly from this report
5. Property/Assets – None arising directly from this report
6. Information Technology – None arising directly from this report
7. Equality & Human Rights – None arising directly from this report  
8. Health & Safety - None arising directly from this report
9. Procurement - None arising directly from this report
10. Risk - None arising directly from this report
11. Privacy Impact – None arising directly from this report
12. Climate Risk – None arising directly from this report
13. Cosla Policy Position – None arising directly from this report
_______________________________________________________
 
Page 35 of 60

Page 36

11  
 
 
List of Background Papers
Non-Housing Capital Investment Programme 2022/23 – 2026/27, Appendix 6:
Prudential Framework for Capital Finance 2022-2025 (estimates) and Treasury
Management Strategy Statement 2022-25. Council, 3 March 2022.
Treasury Management Mid-Year Review 2022/32. Finance, Resources and
Customer Services Policy Board, 17 November 2022.
___________________________________________________________________ 
Author:         Geoff Borland, Finance Manager, 0141 487 0875  
geoffrey.borland@renfrewshire.gov.uk
Page 36 of 60

Page 37

___________________________________________________________________
To: Council
On: 15 December 2022
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Right for Renfrewshire - Management Structures 
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to seek approval to implement a revised
chief officer management arrangement for the Council. As part of the
ongoing organisational recovery from the sustained period of the
COVID19 pandemic, these changes will support a renewed focus to the
delivery of the Council’s strategic priorities as outlined in the recently
approved Council Plan 2022 – 27. 
1.2 Specifically, the changes will provide an improved focus on progressing
the Council’s response to increasing challenges presented by the net
zero agenda, as well as continuing plans to develop further the
connected communities and tackling the inequality agenda across
Renfrewshire. As well as providing the right mix of skills and capacity at
a senior management level, the changes represent a direct response to
the ongoing financial challenges the Council will continue to face over
the medium term by providing a further tranche of financial savings from
the chief officer structure and aligning with the management structure
design principles developed as part of the Right for Renfrewshire
programme. The changes also provide a revised service structure that
will better support and compliment a range of future service redesign and
modernisation opportunities that have been identified as part of the
ongoing Right for Renfrewshire programme. 
___________________________________________________________________ 
Item 5
Page 37 of 60

Page 38

2. Recommendations 
2.1 Members are asked to approve the proposed chief officer structures as
detailed at Appendix 1, and delegate authority to the Chief Executive to
implement the new structures in consultation with the relevant
conveners.  
_________________________________________________________
3. Proposed Changes to Management Structures
3.1 It is important for the Council that the management arrangements
continue to support the ongoing delivery of services, but also provide the
right mix of skills, experience, and capacity to enable the Council to
deliver on its strategic policy priorities and continue to manage what will
be an increasingly difficult financial outlook for the foreseeable future. 
3.2 It is essential that the Council, even in the face of constrained resources,
remains policy and priority led. A review of existing management
arrangements has been undertaken by the Chief Executive in
consultation with the management team and several changes are now
being proposed to ensure the management structure remains best
placed to deliver for the Council moving forward. 
3.3 Overview of Key Strategic Drivers
3.3.1  The revised structure is directly influenced by and designed to respond
to the recently updated Council plan 2022 – 27. Although the existing
structure was already well placed to support the Council to progress its
strategic ambitions, the proposed changes seek to provide a greater
alignment to the growing strategic emphasis that is given within the new
plan to priorities associated with the climate agenda and journey to net
zero as well as the ambition to continue to tackle inequality and,
strengthen our partnership working and delivery of key outcomes with
and for our local communities in a way which promotes a fairer
Renfrewshire. 
3.3.2  Climate and Net Zero 
The climate agenda and transition towards net zero is a key strategic
priority for the Council – encapsulated within the “Green” priority in the
recently approved Council Plan. At present, the corporate lead for the
Climate Agenda is provided through the corporate policy function within
the Chief Executives Service. This reflects the predominant focus over
recent years of understanding, developing and positioning the Council’s
priorities and route map in relation to this developing strategic agenda. 
Moving forward, it is recognised that the Council will be increasingly
required to transition its focus to an action led net zero agenda which
drives forward at pace the very significant change, both within the
Council as an organisation and across our wider communities, that will
be required to further our ambition of progressing towards net zero by
Page 38 of 60

Page 39

2030. In this context there is a need a need to create a clearer corporate
identity for leading the delivery of the required programme of change
linked to the green and net zero agenda within the Council’s service and
chief officer structure, albeit policy support will continue to be provided
to this agenda by the Corporate Policy function. 
3.3.3 Fairer Renfrewshire
The Council has for several years progressed a journey to build a range
of services and interventions that look to increasingly support from within
and with our communities to tackle inequalities. The new council plan
has re-enforced and strengthened this commitment as part of the
strategic priority for a fairer Renfrewshire where we seek a nurturing,
bright, happy, and healthy futures for all. In developing this strategic
priority there will be a greater focus on strengthening and developing our
partnership working and delivery of key outcomes with and for our local
communities in a way which promotes a fairer Renfrewshire. At present
the Council’s existing arrangements in relation to services which
currently support the Council’s focus on tackling inequalities and aspects
of prevention and early intervention are fragmented across several
service areas and functions. To better facilitate ambitions to increasingly
progress in the future towards a model redesign that provides a more co-
ordinated and consolidated set of sustainable services and support
arrangements for our communities, the creation of a single strategic lead
within the Chief Officer structure is identified as a key pre-requisite. This
will provide a structural arrangement that will directly facilitate
opportunities to consolidate and redesign services for the future and
provide a focal point to develop increased partnership and co-ordinated
delivery of services and support within our communities by both the
council, partners and with communities themselves. 
3.3.4  Right for Renfrewshire and Financial Sustainability
The Council has over a long period remained committed to progressing
transformation, change and improvement across the organisation. This
has included ensuring that the council’s chief officer structure and
service arrangements reflect the needs of the Council and is reflective of
the financial sustainability challenges faced by the Council.
Demonstrating sound leadership and vision, taking difficult decisions
around the shape of our organisation to safeguard our future resilience
and leading and supporting our people through these changes remains
a key objective outlined in the Council plan. The proposed changes to
the chief officer structure outlined below are reflective of this commitment
and specifically support key organisational design objectives
underpinning the Right for Renfrewshire Programme: - 
• Management Structure Design Principles - work is being progressed
to review the Council’s existing management structures against a
defined set of over-arching design principles focused primarily on the
number of management layers and spans of control. These
principles provide an overall framework from which to position and
Page 39 of 60

Page 40

guide the detailed design of the management structure the Council
will carry moving forward. It is appropriate that the chief officer
structure is demonstrably assessed against and guided by these
design principles. Additionally, this will provide greater confidence
that the revised structure will support effective long term succession
planning, ensuring that within each layer of the management
structure that officers are exposed to appropriate breadth of remits
as part of their longer-term development and preparation as potential
candidates for future roles within the Council. 
• Strategic Management of Property - The Council’s current service
structures and approach in terms of the strategic management of the
Council’s property asset portfolio, its maintenance, long term
investment approach is currently fragmented across several service
structures. This current structural arrangement creates several
challenges, with unnecessary service barriers, fragmented strategic
and operational working, duplication of effort and hand-offs and
fragmentation of professional property resources which adds to
already increasing resilience and capacity challenges. 
• Existing structures and service boundaries are adding unnecessary
complexity to detailed service redesign opportunities and in its
current form the existing service structure will potentially inhibit the
pace at which the transformation and improvement agenda can be
progressed. The prospect of bringing together a wider breadth of
specific services under a single service structure and senior
management team provides the best opportunity to drive forward a
range of service redesign potential moving forward. 
3.4 Overview of Key Changes
3.4.1 The principal change will bring together the current remits of the
Environment and Infrastructure Service, the Communities and Housing
Service (with exclusion of the Community Development team) along with
Property Services from within Finance and Resources, within a new
Environment, Housing, and Infrastructure Service. In addition, the
following revised head of service structure is proposed to replace the
existing arrangements which will reduce the establishment from five to
four associated Heads of Service: -
o Head of Facilities & Property Services 
Addressing the current fragmentation of existing arrangements, this
role will consolidate services which support the strategic management
of the Council’s non housing property estate including professional
property and technical support to major capital investment
programmes and delivery of soft and hard facilities management
services as well as the management of the operational and delivery
arrangements supporting council housing day to day repairs service,
planned maintenance, and compliance programmes. 
Page 40 of 60

Page 41

This strategic and operational remit may be subject to further
adjustments as the ongoing strategic corporate property review
progresses and wider Right for Renfrewshire service designs
progress in coming months.
o Head of Housing Services 
This post predominantly maintains the existing arrangements,
reflecting the importance of clear chief officer leadership of the
delivery of the significant housing and homelessness functions
provided by the Council. 
o Head of Operations & Service Development
This division will be responsible for a range of environment and
operational functions as well as providing the strategic lead for
service development and improvement. The operational functions
will consist of waste management and collection, neighbourhood
services – street cleaning, litter picking and land maintenance,
including providing a single corporate lead for the asset
management of Council’s open space areas. The head of service
would retain responsibility for strategic and operational maintenance
of the Council’s vehicle fleet and operational depot and would
provide line management support for the Council’s Civil
Contingencies function that is delivered through a Lead Authority
model in partnership with three other local authorities. 
o Head of Climate, Public Protection & Roads 
This post will provide the strategic lead for the Council’s response to
the climate and net zero agenda, as well as leading the strategic and
operation delivery of the roads infrastructure and services along with
regulatory & public protection services and arrangements. This will
include community safety services and providing the key link with
police, fire and other multiagency partners including the CCTV hub.
The provision of Community Development services which is
currently aligned to this service cluster will transfer to the Chief
Executives Service as detailed below. 
3.4.2 The existing Procurement Function, which is currently part of the Chief
Executives Service (Policy and Commissioning) will transfer to Finance &
Resources. This will align corporate procurement support with a range of
other professional support functions providing a greater level of integration
of the procurement function within a single team where a significant degree
of cross professional relationship exists. 
3.4.3 The existing Head of Policy and Commissioning will be redesignated Head
of Policy and Partnerships and will assume responsibility for the Community
Development Service. This re-shaped remit will provide clearer chief officer
leadership and capacity to take forward increasing the pace of development
of priorities aligned to the Connected Communities, Fairer Renfrewshire
Page 41 of 60

Page 42

and Inequalities agenda. It is likely as this agenda continues to be
developed over the medium term further service functions that are currently
dispersed across several services, will be subject to redesign and
consolidated within this division. Any changes in this regard will be reported
as appropriate through the ongoing Right for Renfrewshire reporting
arrangements.
___________________________________________________________________
Implications of the Report
1. Financial – The proposals result in a net recurring revenue from the
Chief Officer structure that will provide support to the Council’s ongoing
financial sustainability programme. 
2. HR & Organisational Development – Implementation of the revised
management structures are expected to be implemented in a managed
transitional fashion over the course of 2023 in accordance with the
Council’s HR policies, including the recognised recruitment and
redeployment procedures and where appropriate use of the Council’s
VR/VER scheme. Future and ongoing consultation will be maintained
throughout the process with Trade Unions and relevant workforce
groups. The proposals facilitate a reduction in chief officer posts within
the Council by 2 FTEs. 
3. Community/Council Planning – none  
4. Legal – none 
5. Property/Assets – none 
6. Information Technology - none
7. Equality & Human Rights - The Recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified arising
from the recommendations contained in the report as it is for noting only
and sets out the detail of an external investigation.   If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.  (Report author
to arrange this). 
8. Health & Safety - none
9. Procurement – none
10. Risk - none
Page 42 of 60

Page 43

11. Privacy Impact - none 
12. Cosla Policy Position – none.
_________________________________________________________
List of Background Papers 
___________________________________________________________________ 
Author:          Alan Russell 
Chief Executive 
alan.russell@renfrewshire.gov.uk
_________________________________________________________
List of Background Papers 
(a)  Background - none 
___________________________________________________________________ 
Author:  Alan Russell 
Page 43 of 60

Page 44

Page 44 of 60

Page 45

APPENDIX 1
** The HSCP management structure is jointly funded with NHS GG&C through the integrated financial arrangements associated with the IJB/HSCP
Chief Executive
Chief Officer HSCP**
Chief Finance Officer**
Head of Strategic
Planning and Health
Improvement**
Head of Health and Social
Care x 2**
Head of  Mental Health
and Addictions**
Director of Children's
Services
Head of Education
Head of Education
Head of  Childcare and
Criminal Justice Services
(Chief Social Work
Officer)
Director of Finance and
Resources
Head of Finance and
Business Services
Head of Digital 
Transformationand
Customer Services
Head of HR and OD
Head of Governance
Chief Internal Auditor
Director of Environment ,
Housing and
Infrastructure Services
Head of Facilities and
Property Services
Head of Housing Services
Head of Operations and
Service Development
Head of Climate, Public
Protection & Roads
Head of Policy and
Partnerships
Head of Communication
and Markating
Programme Director -
City Deal
Head of Economy &
Development
Page 45 of 60

Page 46

Page 46 of 60

Page 47

___________________________________________________________________ 
To: Council 
On: 15 December 2022 
___________________________________________________________________ 
Report by: Director of Finance and Resources 
___________________________________________________________________ 
Heading: Governance Arrangements 
1. Summary 
1.1 The report sets out a number of Board nominations by the Labour Group
to fill the vacancies created following the resignation of Councillor Hood
from that group. 
1.2.  The report also proposes the undernoted additional terms of reference
to the Finance, Resources and Customer Services Policy Board in
relation to the devolution from the Scottish Government to local
authorities of empty property relief from 2023/24 onwards.  The terms of
reference of all Boards were agreed at the meeting of the Council held
on 29 September 2022.  However, the Provost is satisfied that the
circumstances relevant to these additional terms of reference was not
apparent at the time the decision on 29 September 2022 was made. 
• To determine the operation and policies of any locally determined
non-domestic rates schemes or reliefs in line with relevant legislation 
• To determine the operation and policies of any locally determined
council tax schemes, discounts, or reductions in line with relevant
legislation 
_________________________________________________________________________________ 
Item 6
Page 47 of 60

Page 48

2. Recommendations 
2.1 Council is asked to: 
Approve the following Board nominations by the Labour Group: 
Councillor McDonald will fill the vacancy on the Audit, Risk and Scrutiny
Board 
Councillor Davidson will fill the vacancy on the Communities and
Housing Policy Board 
Councillor McMillan will fill the vacancy on the Infrastructure, Land and
Environment Policy Board 
Councillor Ann-Dowling will fill the vacancy on the Planning and Climate
Change Policy Board 
Councillor McDonald will fill the vacancy on the Regulatory Functions
Board 
Councillor Montgomery will fill the vacancy on the Renfrewshire
Valuation Joint Board 
2.2 Approve the addition to the terms of reference of the Finance, Resources
and Customer Services Policy Board as follows: 
35 To determine the operation and policies of any locally determined
non-domestic rates schemes or reliefs in line with relevant legislation 
36 To determine the operation and policies of any locally determined
council tax schemes, discounts, or reductions in line with relevant
legislation; and 
that the remaining paragraphs be renumbered accordingly. 
3 Background 
3.1 Councillor Hood has resigned from the Labour Group.  This has created a
vacancy on each of the Boards and Joint Board on which he had been
nominated by the Labour Group as a member. Councillor McMillan has advised
of the Labour Group nominations to fill these vacancies. 
3.2 Empty Property Relief (EPR) provides certain rates relief on unoccupied non-
domestic properties. Empty Property Relief is currently mandatory and fully
funded by the Scottish Government through the Local Government Settlement.
The Scottish Government have devolved Empty Property Relief to local
authorities from 2023-24 onwards. The devolution of this relief to the Council
Page 48 of 60

Page 49

will permit the Council to administer any support for unoccupied properties in a
way that is tailored to local needs. 
3.3 The Council will be required to consider, set and operate local policies as a
result of this power being devolved. It is suggested that the most appropriate
board to consider such matters is Finance, Resources and Customer Services
Policy Board and that the terms of reference of that Board should be amended
accordingly. 
Implications of the Report 
1. Financial - none  
2. HR & Organisational Development - none
3. Community/Council Planning – none
4. Legal – as detailed in paragraph 3.2
5. Property/Assets – none
6. Information Technology – none
7.  Equality & Human Rights - The Recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified arising
from the recommendations contained in the report as it deals with
Member appointments to Board, and the Council’s internal governance
arrangements in respect of terms of reference of boards.   If required
following implementation, the actual impact of the recommendations and
the mitigating actions will be reviewed and monitored, and the results of
the assessment will be published on the Council’s website.  (Report
author to arrange this).
8.  Health & Safety – none
9.   Procurement – none
10. Risk – none
11. Privacy Impact – none
12. CoSLA Policy Position – as detailed in Settlement and Distribution
Group (SDG) Paper September 2022 - Devolution of Empty Property
Relief on 1 April 2023
13. Climate change - none
_________________________________________________________ 
List of Background Papers
(a) Correspondence from Councillors McMillan and N Graham
intimating their nominations to Boards and Outside Bodies. 
(b) Settlement and Distribution Group (SDG) Paper September 2022 -
Devolution of Empty Property Relief on 1 April 2023
___________________________________________________________________ 
Author:          Lilian Belshaw/Dave Low 
Democratic Services Managers 
0141 618 7112/7105 
Lilian.belshaw@renfrewshire.gov.uk/David.low@renfrewshire.gov.uk
Page 49 of 60

Page 50

Page 50 of 60

Page 51

___________________________________________________________________
To: Council 
On: 15 December 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: 2023 Review of UK Parliament Constituencies – Consultation on
Revised Proposals
___________________________________________________________________
1. Summary
1.1  The Boundary Commission for Scotland has published its Revised
Proposals for UK Parliamentary constituencies and invited comments
on those Proposals no later than 5 December 2022. 
1.2 A response was issued by the Returning Officer which is attached as
an appendix to this report. The Commission has indicated that provided
an initial response was submitted to them, they would be willing to
accept a final response from the Council by 15 December 2022 once it
had been considered at the Council meeting. 
1.3 After considering the responses to the consultation on the Revised
Proposals, the Commission will develop its final recommendations and
submit its report to Parliament by 1 July 2023.
___________________________________________________________________ 
2. Recommendations 
2.1 Council is asked to: 
a) approve and adopt the response issued by the Returning Officer as a
response on behalf of the Council to the Boundary Commission for Scotland’s 2023
Review of UK Parliament Constituencies - Publication of Revised Proposals, which
forms the appendix to this report 
Item 7
Page 51 of 60

Page 52

3. Background 
3.1  At its meeting held on 16 December 2021 the Council agreed a
response to the Boundary Commission for Scotland’s Initial Proposals
for the 2023 Review of UK Parliamentary constituencies. 
3.2 The Commission has now published its Revised Proposals for the 2023
Review of UK Parliament Constituencies and has invited comments
concerning those proposals to be submitted by 5 December 2022. 
3.2  A link to the consultation on the Revised Proposals was issued to all
elected members on 9 November 2022 and the consultation was also
included on the Council’s website. 
3.3  The existing constituencies have been in place since 2005 and the last
two reviews have not been implemented. 
3.4  Scotland has been allocated 57 constituencies for the 2023 Review,
two fewer than at present. Two constituencies, the Western Isles and
Orkney and Shetland are protected by legislation and will not be
subject to change. 
3.5  Each constituency that the Commission recommends must contain no
fewer than 69,724 Parliamentary electors, and no more than 77,062
(except the two protected constituencies) although the Commission can
recommend a constituency with an electorate lower than the minimum
if it is larger than 12,000 square kilometres. 
3.6  Due to the reduction in the number of constituencies, and the
requirements for each constituency to have a number of electors within
set limits, the Commissioner has indicated that significant changes to
existing constituencies are required. 
3.7  The Commission’s Revised Proposals are available through the
following link 
https://www.bcomm-scotland.independent.gov.uk/?q=reviews/2023-review-uk-
parliament-constituencies 
Page 52 of 60

Page 53

4.  Renfrewshire Constituencies 
4.1  At present Renfrewshire Council administers elections for two UK
Parliament constituencies. These are Paisley and Renfrewshire North
and Paisley and Renfrewshire South. 
4.2 In terms of the Commission’s Initial Proposals, Renfrewshire retained
responsibility for two constituencies. However, both were different in
several respects from the existing constituencies.  
4.3 The main changes proposed were: 
• Significant areas in Wards 10 and 11 were included in a new
Inverclyde and Bridge of Weir constituency.
• Part of Glasgow City Council’s Ward 4 in Cardonald was
included within the boundaries of the proposed Renfrew North
constituency.
• The boundaries between the Renfrew North and Renfrew South
constituencies were different in some places than the boundaries
between the two existing constituencies.
• The new constituencies had been named Renfrew North and
Renfrew South. 
4.4 The Revised Proposals at this second stage remain as they were at
first stage with only the proposed constituency names having altered.
However, the proposals are still a significant change from the existing
arrangements. The proposals see two constituencies which now retain
the same names as before. However, the boundaries of those
constituencies are significantly different from the existing boundaries. 
 Paisley and Renfrewshire North will consist of Wards 1, 2, 3 &
12. In addition it includes part of ward 4 (Shortroods and Ferguslie) and
part of Ward 11 (Bishopton, Dargavel and Langbank). It also includes
Ward 4 from Glasgow City Council (Cardonald). 
 Paisley and Renfrewshire South will consist of the remaining
part of Ward 4, Wards 5, 6, 7, 8 & 9 and part of Ward 10 (Linwood and
Brookfield). 
 An extended Inverclyde seat, now called Inverclyde and
Renfrewshire West, includes the remaining parts of the Renfrewshire
Page 53 of 60

Page 54

Council Area i.e. Ward 10 (Houston and Crosslee) and Ward 11
(Bridge of Weir). 
5.  Response to the Revised Proposals 
5.1  The Returning Officer has submitted a response to the Commission
forming the appendix to this report. The Commission has agreed to
accept a final response from the Council by 15 December 2022 to
enable it to be considered at the Council meeting today. 
5.2  The response identifies some criticisms of the approach taken by the
Commission in preparing both their Initial and Revised Proposals. The
Commission has developed its proposals in council area groupings with
Renfrewshire being in a grouping with Inverclyde and Glasgow. 
5.3  The main points raised in the response are: 
• There is no justification for the grouping of Renfrewshire with
Inverclyde and Glasgow and excluding other authorities bordering on
Glasgow.
• A different approach should be taken with identifying how the
reduction in the number of constituencies in Glasgow can be achieved
by looking at its boundaries with other authorities, not just
Renfrewshire.
• The grouping of Renfrewshire with Inverclyde inevitably means
that parts of existing Renfrewshire wards will be included in a new
expanded parliamentary constituency based in Inverclyde, and that
parts of Glasgow would be taken into one of the Renfrewshire
constituencies to balance this.  
5.4  After the end of this consultation, the Commission will develop their
final recommendations which they will submit in a report to the Speaker
of the House of Commons by 1 July 2023. 
Members will be kept updated on developments throughout this
process.
___________________________________________________________________
Implications of the Report
1. Financial.- None   
2. HR & Organisational Development  - None
 
Page 54 of 60

Page 55

3. Community/Council Planning – None  
4. Legal – as detailed in the report
 
5. Property/Assets – None 
6. Information Technology - None
7. Equality & Human Rights - The Recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report.   If required
following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the
results of the assessment will be published on the Council’s website.  
 
8. Health & Safety - None
9. Procurement – None
10. Risk - None
11. Privacy Impact - None
12. Cosla Policy Position – None
_________________________________________________________
List of Background Papers 
(a)   
___________________________________________________________________ 
Author:           Mark Conaghan, Head of Corporate Governance 
Page 55 of 60

Page 56

Page 56 of 60

Page 57

Appendix 1 
2023 Review of UK Parliament Constituencies 
Response to Proposals 
 
 
1. Introduction 
 
This response is issued on behalf of Returning Officer for the Renfrewshire Council Area. The Council 
will also be asked to consider the terms of this response at the Council Meeting on 15 December and 
it may be adopted as formal response by the Council on that date. 
 
As was set out in the Council’s initial response to this consultation, it is noted that the last two reviews 
of UK parliamentary constituencies were cancelled which means that the existing constituencies have 
remained in place since 2005. Therefore, in principle it is accepted that a review is overdue and 
necessary. 
 
It is also noted that the Commission must apply the rules on constituency population as set out by the 
UK Parliament. This has inevitable consequences for constituency sizes across the whole of Scotland 
and reflects the reduction in the total number of seats allocated to Scotland. 
 
2. Constituency Design Approach 
 
It is disappointing to note that despite the terms of the Council’s response the Commission appear to 
have maintained the “constituency design approach” set out in the original consultation document. 
This grouped Renfrewshire with Inverclyde and Glasgow City Council. As set out previously, the logic 
for this is difficult to understand. It created a self‐fulfilling outcome that to achieve the electoral  
quota for a revised Inverclyde based constituency, that constituency will need to include population 
centres from either one or both of the Renfrewshire based constituencies.  
 
More importantly, it was also then a self‐fulfilling outcome that this would require part of one of the 
Glasgow constituencies being incorporated in to at least one of the Renfrewshire Constituencies. 
 
There was no logical basis for excluding all of the Glasgow constituencies from review with all of the 
neighbouring council areas (West and East Dunbartonshire, North and South Lanarkshire and East 
Renfrewshire). 
 
There was also no logical basis for any grouping involving Inverclyde not to also include the only other 
constituency with which it currently shares a border, which is North Ayrshire and Arran. 
 
The outcome of this approach is that the Commission has excluded itself from considering possible 
boundaries which would recognise local geographical and community connections, both in respect of 
Glasgow and Inverclyde. It then also means that recommendations are made for areas to sit within 
constituencies where there are no such connections. 
 
It is submitted that parts of the Inverclyde constituency have as good geographical and transport links 
to the North Ayrshire and Arran area, particularly along the Clyde Coast, as they do with the areas of  
Page 57 of 60

Page 58

Appendix 1 
Renfrewshire included in the proposed Inverclyde and West Renfrewshire constituency. 
 
It is also submitted that there is no reason why East Renfrewshire constituency is maintained as a 
stand‐alone  constituency  outwith  any  grouping,  which  means  that  it  is  not  included  in  any 
consideration of changes to the boundaries to the Paisley and Renfrewshire South constituency.  
 
This approach also immediately excludes several of the factors established by rules  
for the distribution of seats namely 5(a), (c) and (e).  
 
In particular, it excludes the existing Scottish Parliamentary boundaries between East Renfrewshire 
and Renfrewshire Councils. 
 
The position of Glasgow is even more fundamental. At present the seven Glasgow City constituencies 
are bordered by nine other constituencies that are dealt with by six local authorities: Renfrewshire, 
West  Dunbartonshire,  East  Dunbartonshire,  North  Lanarkshire,  South  Lanarkshire  and  East 
Renfrewshire Councils. 
 
The consequence of this approach is that Cardonald is now split in two and a substantial part placed 
in the Paisley and Renfrewshire North Constituency. South Cardonald remains within the Glasgow 
South West Constituency. It is immediately clear from any examination of the map of the latter that 
all of Cardonald should remain within that constituency. 
 
There is also no community or geographical connection between the relevant parts of Cardonald and 
the rest of the Paisley and North Renfrewshire constituency. 
 
There are however clear community and geographical links between areas such as South Nitshill and 
Darnley, and Mansewood and Newlands (from the neighbouring Glasgow constituency) with East 
Renfrewshire. 
 
By excluding East Renfrewshire from any grouping with Glasgow, the Commission has arrived at a 
result  which  sees  areas  of  Glasgow  with  no  logical  connection  with  Renfrewshire  placed  in  a 
Renfrewshire constituency, while ignoring close links with East Renfrewshire. 
 
It is submitted that all of Cardonald should be placed in the Glasgow South West Constituency. The 
boundaries of that constituency should then be revisited to take the appropriate parts into the East 
Renfrewshire constituency.  
 
The increase in population of the revised East Renfrewshire and South Glasgow constituency could 
then be balanced by Barrhead and Neilston transferring to Paisley and Renfrewshire South. This would 
reflect the existing Scottish Parliamentary arrangements. 
 
Should there be any balancing required between the two Renfrewshire constituencies that can easily 
be adjusted by adjusting the boundaries within Paisley itself. 
 
 
Page 58 of 60

Page 59

Appendix 1 
It is hoped that you will consider these comments on the proposals and take them into account when 
producing the final submission to Parliament. 
 
Mark Conaghan 
Head of Corporate Governance and Depute Returning Officer 
Page 59 of 60

Page 60

Page 60 of 60