To: Council
On: 15 December 2022
___________________________________________________________________
Report by: Director of Finance & Resources
___________________________________________________________________
Heading: Financial Sustainability and General Fund Financial Outlook
___________________________________________________________________
1. Summary 
1.1 Successive reports to the Council over the course of 2022 have
highlighted the increasingly challenging financial and economic
environment the Council is facing. The recent publication by the UK
Government of their ‘mini-budget’, subsequent policy reversals and
then a new package of tax and spending measures in the Autumn
Statement has added to volatility in financial markets which were
already dealing with very high levels of inflation, high energy prices and
a looming economic recession. This results in a financial and economic
environment within which the Council is operating characterised by
rapidly increasing levels of risk; placing the Council’s financial stability
and ongoing sustainability under much greater pressure than that
experienced over the past decade. 
1.2 Previous financial updates to Council outlined the requirement for the
Council to restart transformation activity which would underpin a level
of savings which would address sustainability concerns, along with a
range of financial sustainability workstreams which would support the
delivery of savings at the scale required.

Page 2

1.3 This report provides an update with regards progress with these
workstreams, and also provides an update with regards the current
year financial position as cost pressures – largely driven by high levels
of inflation, but also service demand – continue to build. 
1.4 The report outlines a potential ‘central’ scenario for the medium term
financial position, and the risks to this. Highlighted is the need for the
Council to prioritise a range of measures to maintain financial
sustainability in the short and medium term, and the use of financial
flexibilities including the use of reserve balances to address a projected
financial gap over the medium term; including principles around the use
of reserve balances. 
___________________________________________________________________ 
2. Recommendations 
2.1 Note the economic outlook provided in the report
2.2 Note the update provided in relation to the current financial year and
the potential use of reserve balances – both in year and over the
medium term
2.3 Note the update provided in section 7 in relation to the net forecast
financial position, the importance of Council understanding that the use
of reserve balances to support the Council’s financial position is a short
term tool only; and agree the principles outlined in relation to the
planned use of reserves. 
_________________________________________________________
3. Economic outlook
3.1 The main event which provides context for the current and future
economic outlook was the UK Government Autumn Statement which
was published on 17 November, accompanied by economic and fiscal
forecast updates from the Office of Budget Responsibility (OBR). The
main task of the Autumn Statement was to provide a way forward for
UK public finances which satisfied expectations - of the OBR and
markets - that the UK Government had a plausible plan to deal with the
difficulties brought about by rising inflation, interest rates and a slowing

Page 3

economy. Such difficulties may be traced back to a mixture of COVID,
the war in Ukraine and Brexit. 
3.2 The Chancellor outlined a number of measures across a range of policy
areas, with the impact being planned to take effect in some instances
out until 2028:
- increasing tax: this came from a variety of sources, with a big
contribution from energy related levies on companies. In terms of
income related taxes, the significant freezing of income tax
thresholds contribution will likely only partially compensated for the
decision to not go ahead with the health and social care levy on
National Insurance contributions;
- increasing payments to households: to compensate for higher
inflation, including specifically to help with energy costs and
generally with regards to most benefit payments, including
pensions; 
- squeezing departmental budgets: whilst some areas are protected
to some degree from inflationary pressures, most are not. This
means that what had been relatively promising real terms increases
outlined in the October 2021 Spending Review are now much
reduced, with the outlook now for real terms cuts to unprotected
budgets.
3.3 In terms of the economic outlook, the combined announcements from
the Treasury and OBR may be summarised as follows:
o The Economy (GDP): a recession is forecast to have started in the
third quarter of 2022 and to last for just over a year. This is followed
by a stronger, migration led, bounce back than before;
o Inflation (CPI): is now forecast to peak at 11.1% in the 4th quarter
of 2022 (14.1% in the case of RPI) and to remain high in 2023 but
falling. The speed of decline is such that there is negative inflation
by 2025 and it is still very low in 2026, as shown in Figure 1 below.
Clearly these forecasts are heavily dependent on future energy,
and other, prices, as well as wage settlements Note that different
inflation measures - CPI, RPI, GDP deflator - can vary considerably
in some years due to recent exceptional circumstances. This helps
explain why it is difficult to be definitive about real, rather than cash,
terms changes in the OBR forecasts;

Page 4

Figure 1: Contributions to CPI inflation 
o Interest rates: are based on market expectations and are expected
to peak, briefly, at around 5% in the second half of 2023, then to fall
back but remain around 4% until the end of the forecast; 
o Unemployment: rises by just over half a million, peaking at 4.9% in
the third quarter of 2024 before starting to slowly fall back;
o Living standards: are set to decline by a cumulative 7% in real
terms over the next two financial years, by some margin the biggest
recorded fall on record.
3.4 In terms of the impact for the Scottish Budget, Barnett consequentials
cumulatively amount to around £1.5 billion for the two years 2023-24
and 2024-25, with much of this sum relating to the NHS, adult social
care and education. The Scottish Government has announced that it
will pass on all health consequentials but has made no such
commitment for education. The real terms budget position for 2023-24
is unclear but the Deputy First Minister has suggested it was likely to be
a real terms cut. Calculation of the actual position in real terms is made
difficult by the large variation in deflator measures which could be
applied.
3.5 Changes to the threshold for the UK additional rate of tax may also
negatively impact on the Scottish Budget if copied by the Scottish
Government as the sum raised in Scotland is relatively smaller than for
the UK given fewer households in this tax bracket. However, the net
impact will depend on where that extra UK money is spent. The next
key Budget event will be the Scottish Government’s Draft Budget, due

Page 5

on December 15th, with publication of the detail of the local government
settlement following some days thereafter. It is likely to be into the New
Year before clarity is achieved with regards the Budget implications for
the Council.
3.6 In a recent report Audit Scotland highlighted the risk of overspend in
the Scottish Budget for 2022-23, with the possible consequence of this
money being clawed back by the UK Government in the financial year
2023-24. The Scottish Government has revised its 2022/23 budget over
two recent announcements; with significant reallocation of resource
within budget headings in order to fund the increased cost of public
sector pay awards.
3.7 In light of the above events, the Council’s financial strategy remains
dynamic and is constantly updated to reflect emerging new pressures
or changing levels of existing pressure. This position underlines the
necessity for the Council to take steps to address the immediate
financial position, while also prioritising the development and
implementation at pace of the financial sustainability and potentially
other savings measures outlined later in this report.
4 2022/23 Financial Position
4.1 Members are aware of the current very high levels of inflation being
experienced in the economy, driven in large part by the dramatic
increase in energy costs. These cost increases are impacting on
families and household finances, as well as the Council and associated
bodies, community organisations and businesses. While the outlook for
inflation has moderated slightly in recent weeks - the Bank of England
has reduced its forecast for CPI inflation in December 2022 from 13%
to 11%, remaining at high levels of around 10% possibly for the first
half of 2023. This is obviously manifesting itself in a cost of living crisis
for many households with many already in or facing the prospect of fuel
poverty; however food prices are also increasing at a very high rate. 
4.2 As has been previously reported, the Council is equally facing a surge
in supplies costs – energy costs obviously - but also food,
transportation and diesel costs. Vehicle parts costs are increasingly an
issue, while building and construction cost pressures remain an
ongoing concern. This volatile cost environment, while undoubtedly
driven by soaring energy costs, is also affected by supply constraints. 
4.3 In addition to cost increases, and as has been reported regularly
throughout the year, the council is also experiencing higher demand for
some services – most pressingly in children and families’ social care
following the pandemic. Despite intensive social work support, there

Page 6

has been an increase in the level of risk for some children and young
adults, resulting in them being placed in kinship care, accommodated in
foster care or residential accommodation. For some, this entails highly-
intensive care packages which are increasingly expensive. This
position has been building over the past 12-18 months with an
overspend being incurred in 2021/22 which was offset to some degree
by the availability of Covid-related resource. However, in 2022/23, the
service is – based on current levels of demand – forecasting an
overspend of £4-5 million. The service anticipates that the level of
demand being experienced is unlikely to reduce significantly over the
medium term, therefore Council will require to make financial provision
over this period in order to fund these unavoidable costs. As members
are aware, increased social care funding has in recent years been
passed in full to the HSCP as a specific condition of the local
government settlement. This position is not sustainable moving
forward. Council will continue to work through COSLA to emphasise the
restrictive financial impact of such conditions.  There remain other
Covid-related pressures, with parking income still well below pre-
pandemic levels and household waste levels remaining high but
beginning to moderate.
4.4 The Council Overview finance report to the recent Finance, Resources
and Customer Services Policy Board outlined a 2022/23 projected
overspend (excluding the underspend projected in adult social care) of
£8.4 million. This projection is exclusive of a number of other risks to
the 2022/23 financial position:
• The 2022/23 pay award has been agreed for those employees
on local government and craft terms & conditions. The
agreement reached for these groups is broadly a combination of
a core pay increase of 5% with further consolidated elements to
support the lowest paid in the workforce who will receive a
maximum £2,000 increase (based on a 36 hour working week,
equivalent to a 10.2% increase for the lowest paid), and a
£3,000 cap for those on salaries in excess of £60,000. An
additional day of annual leave was also agreed on a
consolidated basis. In setting the 2022/23 base budget, Council
agreed a provision for pay awards based on the Scottish public
sector pay policy, which broadly equates to a 2% level of
provision.  While additional Scottish Government funding has
been provided to support the pay settlement, the amount
allocated will be insufficient to meet the expected total cost,
requiring the Council to fund the differential (estimated at c£3m)
and to build this substantial deficit in to future base budgets.

Page 7

• The position for teachers remains to be formally agreed, with
trades unions seeking a pay settlement of 10%. Negotiations
remain ongoing and having successfully balloted members with
regards industrial action, a number of teachers strike days have
been announced. Agreement on the 22/23 pay award has also
still to be concluded with the chief officer group.
• As outlined above, energy costs are surging and while the
Council made provision for increased costs in 2022/23, it is clear
that this will not now be sufficient to meet the anticipated costs
given spiralling gas prices. It is estimated that an additional £2m
cost will be incurred in 2022/23 over existing energy budgets – a
position again that will require to be incorporated into future
base budgets. It is also now likely that additional financial
support will require to be provided to OneRen, who are also
experiencing dramatically increased energy costs despite taking
proactive measures to try and mitigate this cost.
• There are a range of other cost pressures the Council is facing
in relation to reduced parking income, increased streetlighting
maintenance costs, higher levels of overtime due to annual
leave which was accrued over the pandemic period now being
taken and under-recovery of planning fees. While much of these
cost pressures are incorporated into the forecast outturn figure
above, there is a risk that other pressures may emerge over the
winter period.
• The projection does not include any variance relating to the
collection of Council Tax. Current forecasts suggest a slightly
lower yield than 2021/22; however, it is recognised that the full
impact of the cost-of-living crisis is yet to materialise which could
have significant effect on yield. 
4.5 One of the actions agreed by Council in September 2022 was to
exercise in year the financial flexibility permitted by the Scottish
Government in relation to accounting for service concession
arrangements – in effect a revised approach to accounting for PPP
contracts. This will allow an in year saving estimated at £1.5m to be
generated, with reduced costs also being possible in future years out to
2036/37 which will be incorporated into the base budget. However, this
revised approach will mean costs will be incurred in years after 2036/37
which were not previously, and the Council’s longer term financial plans
will require to take account of these. In addition, the decision by the UK
Government to reverse the increase in National Insurance contributions
(the Health and Social Care Levy) from November 2022 will part
release the provision made for this cost in the 2022/23 base budget,
providing in year capacity estimated at £0.5 million.

Page 8

4.6  The sum of these pressures and in year savings, on top of the £8.4m
outlined above, could result in the Council delivering a £10-12 million
gross revenue overspend by the end of the 2022/23 financial year –
some 2.5% of total spend. Directors and management teams are
closely monitoring their costs, restricting spend to essential spend only
and are aiming to mitigate increases where possible in line with
agreement of Council. However, even taking this action, given the
above pressures it is certain the Council will require to utilise reserve
balances to fund the projected overspend and support a break even
position at year end.
4.7 In terms of reserves use, Council has prudently held a number of
reserve balances and made additional provision at the close of the
2021/22 financial year to support what was forecast to be a very
challenging medium term outlook. This included the ringfencing of
funding related to the Covid-19 pandemic, in anticipation that there
would be both longer term costs incurred over the final stages of the
pandemic, but also recognising that there was likely to be long term
behavioural change by residents and communities which would have a
financial impact on the Council. 
4.8 A number of these reserves will require to be drawn down in order to
achieve a breakeven position at year end, with the following reserves
likely to be those utilised: 
Table 1
Ringfenced reserve Opening
balance
£m
Potential
drawdown
£m
COVID construction recovery 10 4
COVID Education recovery 6.3 2-3
COVID general recovery 9.1 4-5
Inflation mitigation 5 2-4 
It should be noted the estimates above are subject to significant
change given the current volatile financial environment. It should also
be noted that the £4m drawdown from the construction recovery fund
relates to the 2022/23 pay award funding provided by the Scottish
Government as capital resource, and which Council agreed in
September would be switched from this reserve ie this drawdown is not
related to funding the £10-12 million potential overspend.

Page 9

4.9 Members will note that the above potential use of reserves is on a scale
which is not sustainable over the medium term, and reinforces the need
for the Council to address its projected core funding deficit over this
period as soon as possible. Members will also note that – at this point –
there is no requirement to utilise unallocated reserves in 2022/23;
however this has only been possible due to the prudent ringfencing of
resources in prior years. Given the heightened financial risk
environment, maintaining unallocated reserves at least at their current
level is recommended. 
Medium Term Financial Pressures
5.1 Previous reports to Council have outlined a central scenario potential
funding gap over the medium term (ie 2023/24 – 2025/26) of £35
million, after assuming a council tax increase of 3% in each of these
years (£44 million before any decision on council tax). Applying
differing assumptions to reflect optimistic to pessimistic scenarios
suggest a range of £28 – 61 million before any decision on council tax,
reducing to a range of £19 – 52 million after council tax. The table
below attempts to summarise the main movements for the central
scenario:
Table 2 
2023/24 2024/25 2025/26
£m £m £m
Income
Movement in revenue grant 0.0 0.0 0.0
Movement in council tax base 2.5 1.0 0.8
2.5 1.0 0.8
Expenditure
Pay award % 3.0% 3.0% 2.5%
Pay award £ 11.9 8.1 7.0
Contract and inflationary pressures 7.8 6.0 6.0
Long term debt 0.5 0.5 0.5
20.2 14.6 13.5 Total
Gross expenditure 17.6 13.5 12.7 43.8
Council tax @ 3% 3.0 3.0 3.1
Net pressure 14.6 10.5 9.6 34.7

Page 10

5.2 The above position is based on a range of assumptions which are
outlined in further detail below:
5.3 Revenue Grant 
The central assumption is for a flat cash allocation over the medium
term, as was outlined in the Resource Spending Review published
earlier in 2022. Given the current very high rates of inflation this will
obviously constrain the Council given it represents a significant real
terms cut to funding. While the Scottish Government is projected to
receive an additional £1.5 billion from the UK Government over the next
two financial years as outlined in the UK Government Autumn
Statement, given the demands on the Scottish Government and the
impact of inflation, there is little to suggest any improvement in the flat
cash position for local government over the medium term. This position
will be clarified (for 2023/24 at least) when the Scottish Government
publishes its Draft Budget on 15 December.
5.4 Council tax 
Each year an assessment is made with regards movement in the
council tax base ie the number and banding of domestic properties for
which a council tax liability may arise. Over the period of the pandemic,
a prudent approach was taken with regards the potential growth in the
base from new house building; and on review it is apparent that there is
some “catch-up” which can be confidently assumed in 2023/24, which
will increase the total council tax collected regardless of any decision
on the rate of council tax. Risk remains however with regards actual
yield as the cost of living crisis continues – council tax payments may
be viewed as less of a priority than heating for example.
5.5 Pay inflation 
As outlined above, the pay award for 2022/23 remains to be settled for
all staff groups but is currently assumed at 5%, which despite additional
funding from the Scottish Government will leave an unfunded gap in
2022/23 in the order of £3 million. The pay assumptions for future years
are outlined in the table above; however given the current high levels of
inflation, which are forecast to endure for a large proportion of 2023,
there may again be pressure on these assumed levels of increase.
5.6 Non-pay inflation 
The Council has a long standing principle of no general inflationary
pressures being funded, with an expectation that Directors and their
management teams will seek ongoing efficiencies in order to meet

Page 11

general inflationary pressures. However, where a pressure is
“unavoidable”, and there is no scope for the manager to mitigate these
costs, then provision will be made within the Council’s base budget.
Given the very high levels of inflation currently, the unavoidable
pressure is unsurprisingly higher as we move in to 2023/24. The
estimate for 2023/24 included in the table above is based on detailed
returns from services which have been assessed and only the most
pressing issues and costs are proposed to be funded. Pressures
totalling in excess of £13 million have been outlined by services,
however only a proportion of these are proposed to be funded,
including an initial contribution to addressing the severe demand in
children’s social care.
5.7 Long term debt 
Members will recall that the 2022/23 revenue budget included use of
longer term capital financing flexibilities totalling £7.5 million, which it
was acknowledged would result in higher costs in the longer term but
were required in order to manage through the medium term; with
appropriate base budget adjustments being made in future years. 
5.8 The above assumptions and anticipated costs represent only those for
existing services. Of course there may be other issues which arise
which have not been anticipated; or the assumed levels above may
prove to be inadequate. There is also no provision within the above
summary for further investment in Council priorities eg climate change,
social renewal and Fairer Renfrewshire etc, over that which has already
been set aside. 
6 Efficiencies and Financial Sustainability Workstreams 
6.1 The Council’s main transformation programme – branded Right for
Renfrewshire (RFR) most recently – is the main route for the Council to
transform services and release efficiencies, thereby supporting the
delivery of recurring savings over the medium term. Members will be
aware that, at the onset of the coronavirus pandemic, a decision was
taken to formally pause the programme, recognising the capacity of the
Council required to be fully diverted to support the emergency
response. As has been outlined in previous update reports, the longer
term impact of this decision is that the Council’s pipeline of associated
savings has now fallen behind the requirements to secure overall
financial sustainability. Members agreed in June that a revised savings
target of £15 million be set for the remaining phases of the existing

Page 12

medium term transformation programme, and that the programme be
revised to clearly align with the financial sustainability portfolio.
6.2 Where management capacity has allowed, service reviews have taken
place in discrete areas of the Council – corporate finance and ICT
services have been reviewed utilising the RFR approach and recurring
savings have been generated. In addition, reviews of the operations
and infrastructure service within Environment and Infrastructure have
also commenced with a view to savings being generated over the
course of 22/23 to 24/25. Remaining areas of the Council where
reviews will be undertaken include legal and committee services,
events and communications, policy and commissioning and people and
organisational development. 
6.3 An area of significant spend within the Council relates to Children’s
Services (the service makes up nearly 50% of the Council total net
revenue budget); however it is acknowledged that the current
pressures being faced by elements of this service and wider obligations
in terms of specific funding streams will make the delivery of recurring
savings particularly challenging.
6.4 It is therefore apparent that the £15 million target is unlikely to be
achieved over the medium term without impacting on service delivery.
Based on work undertaken by services to date, and that for which
specific plans are being developed over the next 12 – 18 months, it is
estimated that £8 million of savings could be deliverable against the
£15 million target.
6.5 Previous reports to Council have outlined a number of financial
sustainability workstreams which are aiming to generate £20 million of
savings over the medium term. Work has progressed over recent
months with regards many of these; however it is becoming apparent
that the ambition with regards the scale of savings is in some cases not
going to be achievable within the 3 year period under consideration
now that further investigation has been undertaken. 
6.6 That being said, many of the workstreams have indicated potential to
deliver savings in the longer term, or in some cases, while not
delivering significant savings in their own right, the work is important to
undertake as it is a critical enabler in the delivery of other service
changes or savings. For example, development and improvement of
the Council’s web presence through the Digital Experience project will
take some investment in the short to medium term, however this is a
key enabler in increasing digital ways of working and digital customer
services, which may generate efficiencies in the longer term.

Page 13

6.7 In terms of savings which - at this point - can be confidently included
within current financial plans, the total across all workstreams is in
excess of £6 million. While this is well short of the £20 million target, as
outlined above there remains a considerable amount of development of
some proposals and there is scope for further achievement of savings
from for example a more critical examination of the Council’s property
holdings. This work will continue over the coming months with update
reports to be provided to Council and Policy Boards as appropriate;
including consideration at Council budget setting. Development of
further proposals and delivery of those which have been developed
must remain a key Council priority and will be one which demands
significant management capacity.  
7 Medium Term Financial Position and Reserves
7.1 The culmination of the above pressures and savings can be
summarised as follows:
Table 3 
7.2 It is apparent from the above table that there remains a considerable
gap over the medium term – one which is increasing year on year –
which will require to be addressed as Council considers most
immediately the 2023/24 budget. As has been outlined in previous
reports, there is a timing disconnect between the speed at which the
financial gap is expected to emerge and the ability of the Council to
generate and secure recurring savings to sustainably close it. The need
for the Council to make spending and service prioritisation decisions at
a greater scale and pace than over recent years in order to fully commit
to the delivery of the material change and transformation required over
the medium term has been consistently highlighted in every recent
financial outlook report. This will require the lower level of real terms
resources and spending capacity at the Council’s disposal to be
focused on those areas of greatest need and priority. These decisions
2023/24 2024/25 2025/26
£m £m £m
Net pressure as per Table 2 14.6 10.5 9.6
Transformation programme 3.9 3.8 0
Financial sustainability workstreams 5.4 0.8 0.2 Total
Gross pressures 5.3 5.9 9.4 20.6

Page 14

will be challenging for the Council; and must be balanced with the
requirement to continue to deliver core services. 
7.3 The application of financial flexibilities agreed by the Scottish
Government, in particular that relating to service concession accounting
mechanisms, has been agreed by Council and is outlined earlier in this
report. The revised arrangements have a two-fold benefit: an ongoing
reduction in revenue costs (which are in effect deferred to the end of
the relevant contract period, linked to the remaining service potential
from the underlying assets); and where the revised arrangements are
put in place from the commencement of the original contract,
retrospective application will generate a one-off benefit representing the
position that (in accounting terms, not cash terms) the Council has
‘overpaid’ for the use of assets to this point. This benefit must be
utilised prudently by the Council; recognising that there is a future cost
which the Council will have to fund. However, the Council may consider
short to medium term use of this funding to support the current financial
challenge.
7.4 The planned use of reserves as a support to the Council’s medium term
financial position has been outlined in previous reports as likely to be
required; and the above analysis clearly demonstrates this requirement.
The application of reserves is a legitimate tool in managing shorter term
financial challenges while sustainable savings are generated to match
financial pressures, but it cannot ever be more than a short term
measure.
7.5 While there remain uncertainties in much of the analyses above, it is
prudent at this point to agree principles in terms of the planned use of
specific reserve balances which could be deployed to support the
Council’s medium term financial position.  It is proposed that the
following principles are agreed:
• No planned use of unallocated reserve balances, which are held
as a risk contingency
• Unallocated balances are maintained at a minimum of £10
million (2.3% of net running costs) over the medium term
• The Council clearly sets out the planned use of ringfenced or
specific reserves which have been set aside to support the
medium term financial position over a maximum 3 year period,
and in the interim develops and implements plans to address the
underlying financial gap in a sustainable manner.
• Initially, use of the reserve balances included in Table 1 above
will be considered; along with use of the service concession
flexibility one-off benefit outlined in 7.3 above.

Page 15

7.6 An updated financial outlook will be provided to future Council meetings
including the annual budget setting meeting, incorporating the
confirmed level of Scottish Government revenue support, any revised
financial assumptions and any potential requirement to utilise ring-
fenced reserve balances. 
___________________________________________________________________
Implications of the Report
1. Financial - the report highlights the scale of the short and medium term
financial challenge facing the Council. The development and
implementation of the transformation programme and other financial
sustainability workstreams as outlined in the report are critical to
ultimately supporting the Council secure a financially sustainable
position.   
2. HR & Organisational Development - the medium term financial
position and associated plans require to align with workforce and
service plans to ensure the size and composition of the Council
workforce remains appropriate and affordable. 
3. Community/Council Planning – the Council requires to remain
financially sustainable in order to deliver on its priorities as outlined in
the Council and Community Plans; and these revised Plans will in turn
require to inform the financial strategy. 
4. Legal - none 
5. Property/Assets - the report outlines a proposal to undertake a
strategic review of property which will aim to ensure the Council’s asset
base remain effective and efficient 
6. Information Technology - the report outlines the need to ensure the
Council Digital strategy support ongoing financial sustainability; with
any digital developments being underpinned by a robust business case
7. Equality & Human Rights - The recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential

Page 16

for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report. If required
following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the
results of the assessment will be published on the Council’s website. 
8. Health & Safety - none
9. Procurement – the report outlines a proposal for a strategic review of
procurement practice in order to support the Council’s ongoing financial
sustainability.
10. Risk - as outlined in the report, the Council’s financial risk exposure is
increasing in the immediate term and over the medium term remains
high. The report outlines increasing financial risks as well as a range of
key measures to be implemented as part of the medium term financial
planning arrangements to protect the Council’s immediate financial
stability and resilience but also continue to progress toward medium
term financial sustainability.
11. Privacy Impact - none. 
12. Cosla Policy Position – none
13. Climate Risk – none 