Renfrewshire Council · 29 September 2022
Back to Council — 29 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________
To: Council
On: 29 September 2022
___________________________________________________________________
Report by: Director of Finance & Resources
___________________________________________________________________
Heading: Financial Sustainability and General Fund Financial Outlook
___________________________________________________________________
1. Summary 
1.1 The Council is facing a financial and economic environment
characterised by rapidly increasing levels of risk; placing the Council’s
financial stability and ongoing sustainability under much greater
pressure than that experienced over the past decade. 
1.2 Previous financial updates to Council outlined the requirement for the
Council to restart transformation activity which would underpin a level
of savings which would address sustainability concerns, along with a
range of financial sustainability workstreams which would support the
delivery of savings at the scale required. 
1.3 This report provides an update with regards progress with these
workstreams, and also provides an update with regards the current
year financial position which has changed markedly since the previous
report in June as cost pressures – largely driven by high levels of
inflation – continue to build. 
1.4 The report outlines a range of measures which the Council will require
to consider in the short and medium term, and the use of financial
flexibilities including the use of reserve balances to address a timing

Page 2

disconnect between the Council’s ability to generate savings at scale
whilst maintaining stability within the organisation and the delivery of
services, and the speed at which costs are increasing. 
___________________________________________________________________ 
2. Recommendations 
2.1 Note the update to the Council’s financial outlook provided in the report
2.2 Note the update provided in relation to service concession accounting
arrangements and agree the revised accounting policies outlined in
paragraph 3.3  
2.3 Note the update provided in section 4 in relation to the financial
pressures being forecast in the current financial year and agree the
mitigating actions outlined in paragraph 4.6 
2.4 Note the capital investment update as outlined in section 6 and agree
to delegate authority to the Director of Finance & Resources to
implement the proposed amendments to the Council’s capital planning
and borrowing arrangements (noting that these may require to be
adjusted should the current proposals for Scottish Government funding
change). 
_________________________________________________________
3. Revenue Update
3.1 The financial update report to Council in June outlined a medium term
financial position which was informed by the publication of the Scottish
Government Resource Spending Review (RSR) and the likely level of
the local government revenue grant settlement, along with the spending
pressures the Council is likely to face over the medium term. This
updated outlook forecast that over the next three year period the
Council would require to deliver savings within a range of £29m – 61m,
with a central forecast of a deficit of £44m over this period, before any
decisions on council tax. Assuming a 3% council tax increase in each
year, this central deficit forecast would reduce to £31m.

Page 3

3.2 The June report also highlighted that this gap – while not significantly
differing from previous forecasts – had a different context in that the
main drivers related to increasing near-term spend pressures with grant
levels being relatively more certain. The profile of the gap was also
highlighted as being more immediate, and Council agreed a range of
financial sustainability measures be developed with a savings level of
£35m being targeted over the next three years. Updates are provided
later in this report with regards the work progressed on the financial
sustainability workstreams over the summer months. Since the June
report however, and underlining the very volatile financial and
economic environment within which the Council is operating, there
have been further updates in the forecast spend pressures facing the
Council. These are outlined in section 4 below. 
3.3 The RSR had also committed to potentially greater financial flexibility
for local government with a range of options being outlined, including
further exploring discretionary revenue raising and alternative
accounting proposals for service concession arrangements, contingent
on a full review of capital accounting. Progress has been made since
the June report on these issues in that an independent chair for the
capital accounting review has been appointed and the terms of
reference for the review have been consulted upon. In addition, a
finance circular has been issued which will enable the flexibility in terms
of accounting for service concessions arrangements to be put in place.
It is proposed that the Council would seek to adopt the flexibility
outlined in the 22/23 financial year, with Council agreeing to amend its
accounting policy with regards service concessions; the flexibilities
possible then being incorporated into the Council long term capital
accounting, borrowing and debt management strategies which remain a
key element of the Council’s financial position over the medium term. 
3.4 The Council’s financial strategy remains dynamic and is constantly
updated to reflect emerging new pressures or changing levels of
existing pressure. Even in the short period since June, the medium
term outlook has deteriorated somewhat, with the central forecast
extending to a deficit of £35 million over three years from the £31
million outlined in the previous report. Section 4 below outlines the
main reasons for this movement, relating to immediate financial
pressures and now widely accepted forecast that UK inflation will
remain higher for longer; and the possibility of an economic recession
in 2023 now all but “baked-in” to the current economic environment.
3.5 This position underlines the necessity for the Council to take steps to
address the immediate financial position, while also prioritising the

Page 4

development and implementation at pace of the financial sustainability
measures outlined later in this report.
3.6 The pressures the Council is facing are mirrored in the Scottish
Government financial position, with in-year savings requiring to be
found to offset increased inflationary costs and additional costs of
public sector pay awards. The Scottish Government has committed to
an Emergency Budget within two weeks of any UK Government fiscal
announcement – possibly to be expected later in September. The
measures taken by the Scottish Government to date include securing
savings from a range of public services, including resource set aside to
support employability. The precise impact of this on resource the
Council may have been anticipating is yet to be determined. In addition,
the Scottish Government has outlined a capital reprioritisation
programme across multiple portfolios.
4 Current Financial Position
4.1 Members will be aware of the current very high levels of inflation being
experienced in the economy, driven in large part by the dramatic
increase in energy costs. These costs increases are impacting on
families and household finances, as well as the Council, community
organisations and businesses. The Bank of England has forecast CPI
inflation will hit 13% by the end of 2022, with other economic forecaster
suggesting this could be an underestimate. Citigroup, EY, Goldman
Sachs and other financial institutions forecast UK inflation in 2023 could
range from 14% to 18% - driven predominantly by surging gas costs as
supply constraints force prices higher. This is obviously manifesting
itself in a cost of living crisis for many households with many already in
or facing the prospect of fuel poverty.
4.2 The Council is equally facing a surge in supplies costs – energy costs
obviously - but also food, transportation and diesel costs. Vehicle parts
costs are increasingly an issue, while building and construction cost
pressures are outlined in more detail in section 6 below. This volatile
cost environment, while undoubtedly driven by soaring energy costs, is
also affected by supply constraints. It is now increasingly impractical to
discern and disentangle which cost increases are related to which
driver – the Russian invasion of Ukraine and resulting impact on gas
supplies, supply issues from China as Covid measures continue to
constrain output, longer term pandemic-related issues within the UK
and Europe, Brexit and potential impact on labour supply, or more pay-
linked price increases as higher inflation understandably drives up
wages.

Page 5

4.3 In addition to cost increases, the council is also experiencing higher
demand for some services – most pressingly in children and families’
social care. During the pandemic period the stress on some families
has increased significantly. The pressures for some families and
children have been in relation to stress on family relationships and
some young people experiencing serious mental health
concerns. Children and families’ social workers have readily provided
support for families including intensive support.  Despite the intensive
social work intervention, there has been an increase in the level of risk
for some children resulting in children being placed in kinship care,
accommodated in foster care or residential accommodation. For some,
this entails highly-intensive care packages which are increasingly
expensive. This position has been building over the past 12-18 months
with an overspend being incurred in 2021/22 which was offset to some
degree by the availability of Covid-related resource. However, in
2022/23, the service is – based on current levels of demand –
forecasting an overspend of £4-5 million. Council will require to
consider the position moving forward given the spend pressure in this
area, and the fact that increased social care funding has in recent years
been passed in full to the HSCP as a specific condition of the local
government settlement, as to whether this position is sustainable.
Council will continue to work through COSLA to emphasise the
restrictive financial impact of such conditions.  There remain other
Covid-related pressures, with parking income still well below pre-
pandemic levels and household waste levels remaining high but
beginning to reduce.
4.4 The Council Overview finance report to the recent Finance, Resources
and Customer Services Policy Board outlined a 2022/23 projected
overspend (removing the underspend projected in adult social care) of
£7.7 million. This projection is exclusive of a number of other risks to
the 2022/23 financial position:
• The 2022/23 pay award (at the time of writing) remains to be
formally accepted by trades unions, although it is anticipated
that in balloting their members, the trades unions will
recommend acceptance of the offer. The offer tabled by COSLA
is a combination of a core pay increase of 5% with further
consolidated elements to support the lowest paid in the
workforce who will receive a maximum £2,000 increase
(equivalent to a 10.2% increase for the lowest paid), and a
£3,000 cap for those on salaries in excess of £60,000. An
additional day of annual leave was also offered to all staff. The
Council agreed in setting the 2022/23 pay provision for this to be

Page 6

based on the Scottish public sector pay policy, which broadly
equates to a 2% level of provision.  While additional Scottish
Government funding has been provided to support the current
pay offer (this is explored in section 6 below), this will be
insufficient to meet the expected total cost, requiring the Council
to fund the differential in 22/23 from reserve balances, and to
build this substantial deficit in to future base budgets.
• As outlined above, energy costs are surging and while the
Council made some provision for increased costs in 2022/23, it
is unlikely that this will now be sufficient to meet the anticipated
costs given spiralling gas prices. 
• The projection does not include any variance relating to the
collection of Council Tax. Current forecasts suggest a slightly
lower yield than 2021/22; however, it is recognised that the full
impact of the cost-of-living crisis is yet to materialise which could
have significant effect on yield. 
4.5 Directors and management teams are closely monitoring their costs
and are aiming to mitigate increases where possible, however further
corporate action to limit spending will be required in the coming weeks
and months. Even assuming these actions, given all the above
pressures it is all but guaranteed that the Council will require to utilise
reserve balances to fund the projected overspend and support a break
even position at year end.
4.6 In order to try and mitigate the scale of required use of reserve
balances in 2022/23 a number of actions are proposed including
Directors and management teams being restricted to essential spend
only and pausing recruitment to posts which are not essential. It is
acknowledged these measures may impact on service responsiveness
more widely. It is now of the utmost importance that the financial
sustainability measures and workstreams outlined in the June report
are progressed at pace to underpin both short term financial stability
and financial sustainability over the medium term.
5 Financial Sustainability Workstreams 
5.1 The Council’s main transformation programme – branded Right for
Renfrewshire (RFR) most recently – is the main route for the Council to
transform services and release efficiencies, thereby supporting the
delivery of recurring savings over the medium term. Members will
however be aware that, at the onset of the coronavirus pandemic, a
decision was taken to formally pause the programme, recognising the
capacity of the Council was required to be fully diverted to support the
emergency response. As has been outlined in previous update reports,

Page 7

the longer term impact of this decision is that the Council’s pipeline of
associated savings has now fallen behind the requirements to secure
overall financial sustainability. Members agreed in June that a revised
savings target of £15 million be set for the remaining phases of the
existing medium term transformation programme, and that the
programme be revised to clearly align with the financial sustainability
portfolio.
5.2 Where management capacity has allowed, service reviews have taken
place in discrete areas of the Council – corporate finance and ICT
services have been reviewed utilising the RFR approach and recurring
savings have been generated. In addition, reviews of the operations
and infrastructure service within Environment and Infrastructure has
also commenced with a view to savings being generated over the
course of 22/23 to 24/25. Remaining areas of the Council where
reviews will be undertaken include legal and committee services,
events and communications, policy and commissioning and people and
organisational development. Further consideration will also be required
in terms of Children’s Services; however it is acknowledged that the
current pressures being faced by elements of this service and wider
obligations in terms of specific funding streams will make the delivery of
recurring savings particularly challenging.
5.3 The combined measures from accounting flexibilities outlined in section
3 and transformation are together insufficient to close the forecast
financial gap the Council is facing, meaning a range of other financial
sustainability measures require to be explored, and Council agreed in
June to develop a portfolio of additional measures over the summer
period. Updates on each of these workstreams is provided below:
a. Strategic Property Review and new ways of working
o In the context of the financial outlook the Council can no
longer support maintaining, servicing and sustaining the
scale and breadth of the property estate it currently
carries. Baseline data in relation to all Council owned and
leased properties has been collated, including running
costs, condition, occupancy and energy efficiency. This
will be further assessed to determine opportunities for
estate consolidation and rationalisation which will allow
scarce resource to be better directed to key facilities in
communities, support the Council’s net zero ambitions
and facilitate the sustainability and in some cases
improvement in service availability within communities. A
number of building management principles will be

Page 8

developed including a presumption against leasing
buildings and exiting from currently leased properties.
Plans for improved working environments and
opportunities from new ways of working continue to be
developed, with particular focus on new technology and
ways this can be exploited to further enable efficient ways
of working and employee wellbeing. Further work is
ongoing in relation the management and maintenance of
property assets, including charging proposals. 
b. Charging, fees and commercialisation
o Work to assess and benchmark the current level of fees
and charges relative to peer councils and cost of service
delivery is progressing and options for member
consideration are being developed. Early analysis
suggests that in some areas the level of fees is not
reflective of costs, resulting in increasing levels of subsidy
being provided by the Council and which are out of step
with the position in other local authorities. Members may
consider whether this is a position they wish to continue
in relation to supporting key Council priorities, however
this decision should be based on sound evidence of the
subsidy being offered.  Internal charging levels and inter-
company charges will progress at the same pace as the
wider work on fees and charges, with the aim that revised
levels will be incorporated into 2023/24 base budgets. It is
likely that development of further commercialisation
opportunities to generate new income streams for the
Council will take longer to produce given the business
case for each proposal will require to be tested before
being presented to members.       
c. Review of Council risk tolerance
o Early work across a range of areas including an
examination of insurance arrangements would suggest
this workstream will have limited opportunities to deliver
recurring savings; however where opportunities arise
these will be examined. It is suggested staff resource is
re-prioritised to other reviews which have better savings
generation potential.

Page 9

d. Strategic review of procurement
o Initial work to progress the collation of baseline data
regarding purchasing processes, preferences and
compliance with preferred catalogues is underway. This is
largely work which can be undertaken in house without
the need for external support, but may involve some
limited engagement and support from Scotland Excel, in
particular with regards to exploring optimal use of national
contracts. It is also proposed, linking with the digital
strategy work, to implement the full purchase to pay
(P2P) functionality within Business World - this work is
currently being scoped.   
e. Review of local policy position
o An assessment of current policy positions is ongoing with
a view to collating a clear view of where local policy or
service levels may be adapted to potentially deliver
savings or increased income. Options for member
consideration will be developed in the near future with a
view to implementation where possible in the current or
next financial year. 
f. Review of management grades and structures
o Work carried out so far has focussed on the
establishment and the development of principles based
on industry best practice from which to assess existing
management structures that are in place eg spans of
control and differentials between management grades as
well as considering the Council’s future medium term
strategic agenda. This work has highlighted a number of
areas that merit further review which may result in some
structure and team redesign. However, the work to date
has confirmed that there is likely to be limited
opportunities for significant savings to be generated with
the Council’s existing structure being broadly consistent
with the key design principles, likely linked to recent or
ongoing redesigns of many areas of the Council under
the RFR programme. Nonetheless, and where

Page 10

appropriate, the targeted use of agreed VR/VER
processes will continue to be used. 
g. Connected communities
o Collation of data in relation to all grant streams currently
in operation is nearing completion at which point
consideration of options for future redesign in the context
of the work the Council is progressing in relation to both
Connected Communities as well as expanding the role of
Participatory Budgeting with our communities will begin.
Initial work suggests there are in excess of 25 varying
grant streams currently operating and there may be
opportunities to better coordinate how these are managed
while still supporting the delivery of Council and
community objectives. There is also work underway to
examine the range of advice and support services offered
to communities and families which are delivered from
various council services in order to again assess and
ensure these are appropriately coordinated, or whether
there are alternative configurations which could better
deliver services to individuals and communities.   
h.  Digital strategy
o The Digital Board has agreed a new operating
methodology, with a focus and prioritisation of resource
on digital projects which will deliver efficiencies over the
medium to longer term, a focus on fully exploiting the
functionality of systems already in operation within the
Council as opposed to introducing further systems, and a
requirement to ensure future investment decisions are
underpinned by a sound business case. The prioritisation
of current projects is ongoing; with timescales for
developments and projects being clarified. While it is not
expected that immediate savings will be delivered, some
initial work has identified some early wins such as a
revised print strategy for the Council which has the
potential to both secure efficiencies and support the
Council’s net zero agenda.

Page 11

i. Council tax and tax policy
o Council tax base projections are being updated with a
view to assessing whether further income could prudently
be budgeted for in 2023/24; however the cost of living
crisis has tempered increased yield prospects. While
income levels held up well over the course of the
pandemic the pressure on household finances in the
coming months is potentially going to have a more
significant impact and risks offsetting any financial benefit
from better than planned completion of new build
properties. In relation to other taxation options the
requirement for secondary legislation to be laid is a
restraining factor in the development of future proposals,
however it should be noted that the recently published
Programme for Government outlined a plan to introduce a
bill in relation to the Local Visitor Levy. 
5.4 From the above updates it can be seen that while work is well
underway, it is not currently possible to determine whether the £20
million savings target for the above reviews (over and above the £15
million targeted from the transformation programme) will be fully
achieved, or in what timescale. In many cases the potential for savings
is realistic but may have practical limitations which will influence the
speed at which savings may be realised. Members have been advised
previously and in the sections above that spend pressures are
emerging more immediately, therefore there is a timing disconnect
between the speed at which the financial gap is expected to emerge
and the ability to generate and secure recurring savings to sustainably
close it. This context will require the Council to carefully utilise reserve
balances in the near term to temporarily provide financial support to
bridge this shortfall. 
5.5 This position of increased financial risk reinforces the need for the
Council to be decisive, and to make prioritisation decisions at a greater
scale and pace than over recent years in order to fully commit to the
delivery of the material change and transformation required over the
medium term. As has been reported previously, this is likely to require
the lower level of real terms resources and spending capacity at the
Council’s disposal to be focused on those areas of greatest need and
priority.

Page 12

6  Capital investment and borrowing
6.1 The effects of inflation on both service and supplies costs have been
outlined earlier in this report, however inflationary concerns are
particularly prevalent with regards construction materials. The financial
outlook report from June highlighted cost pressures in relation to steel,
timber and copper which is resulting in additional costs being
experienced across capital projects, including lifecycle maintenance of
existing council buildings.
6.2 The continuing surge in gas prices feeding in to higher levels of inflation
will potentially result in a second wave of inflationary rises as higher
inflation feeds through into higher wages, transportation costs and
manufacturing costs of building materials. There is therefore an
increasing likelihood that construction and refurbishment schemes in
progress as part of the Council’s current investment programme will
come under increasing financial pressure, and this is indeed beginning
to manifest itself in reducing levels of contingency funds being available
on some projects. Equally, tender prices being received for planned
projects are in some cases significantly higher than what had been
anticipated – even based on relatively recent plans and incorporating
inflationary indexation in to projected costs. 
6.3 Council previously agreed to set aside £10 million of reserve balances
to support the capital programme, with £4 million of this balance being
specifically held in relation to the Clyde Waterfront and Renfrew
Riverside project. This total reserve has been set aside from revenue
resources as at the end of the 2021/22 financial year. There remains a
risk that this additional funding coverage may not be sufficient to relieve
inflationary pressures on the capital programme which may necessitate
further decision at a later date and which could involve reconsidering
the deliverability and or deferring elements of the existing programme.
6.4 In an effort to support COSLA and councils reach agreement with
trades unions in relation to the 2022/23 pay settlement, the Scottish
Government has agreed that additional resource will be contributed
through the local government settlement. The structure of this
additional resource is understood to be £140 million in recurring
revenue resource, with a further £120 million in 2022/23 (and £120
million in 2023/24) funded from capital resources; which councils would
then use to substitute for planned revenue funding to capital
programmes, thereby releasing one-off revenue resource to contribute
to the funding of pay settlement costs in year. It is proposed to amend
the capital plan and associated funding accordingly to facilitate this
approach.

Page 13

6.5 Given the acute revenue pressure in 2022/23 outlined elsewhere in this
report, it is further proposed that any remaining balance of the
construction recovery fund be substituted within the council’s revenue
and capital financial plans for borrowing in order to release these
revenue resources to address revenue costs. While this approach will
incur higher borrowing costs over the very long term, it will provide
greater short to medium term flexibility and will be appropriately
reflected in the Council’s capital investment and borrowing plans; with
the consequential impact being incorporated into the Council’s longer
term debt management strategy. 
___________________________________________________________________
Implications of the Report
1. Financial - the report highlights the scale and shape of the short and
medium term financial challenge facing the Council. The development
and implementation of the transformation programme and other
financial sustainability workstreams as outlined in the report are critical
to ultimately supporting the Council secure a financially sustainable
position.   
2. HR & Organisational Development - the medium term financial
position and associated plans require to align with workforce and
service plans to ensure the size and composition of the Council
workforce remains appropriate and affordable. 
3. Community/Council Planning – the Council requires to remain
financially sustainable in order to deliver on its priorities as outlined in
the Council and Community Plans; and these revised Plans will in turn
require to inform the financial strategy. 
4. Legal - none 
5. Property/Assets - the report outlines a proposal to undertake a
strategic review of property which will aim to ensure the Council’s asset
base remain effective and efficient 
6. Information Technology - the report outlines the need to ensure the
Council Digital strategy support ongoing financial sustainability; with
any digital developments being underpinned by a robust business case

Page 14

7. Equality & Human Rights - The recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report. If required
following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the
results of the assessment will be published on the Council’s website. 
8. Health & Safety - none
9. Procurement – the report outlines a proposal for a strategic review of
procurement practice in order to support the Council’s ongoing financial
sustainability.
10. Risk - as outlined in the report, the Council’s financial risk exposure is
increasing in the immediate term and over the medium term remains
high. The report outlines increasing financial risks as well as a range of
key measures to be implemented as part of the medium term financial
planning arrangements to protect the Council’s immediate financial
stability and resilience but also continue to progress toward medium
term financial sustainability.
11. Privacy Impact - none. 
12. Cosla Policy Position – none
13. Climate Risk – none 
___________________________________________________________________ 
Author:           Alastair MacArthur, Director of Finance & Resources