22.06.30- Council - Financial Sustainability and General Fund Financial Outlook

Renfrewshire Council · 30 June 2022
Back to Council — 30 June 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________
To: Council
On: 30 June 2022
___________________________________________________________________
Report by: Chief Executive and Director of Finance and Resources
___________________________________________________________________
Heading: Financial Sustainability and General Fund Financial Outlook
___________________________________________________________________
1. Overview and Key Messages 
1.1 The Council’s financial outlook is subject to increasing risk over the short and
medium term as the Council continues to support both community and
organisational recovery from the COVID19 pandemic; however the financial
position in the current financial year remains stable. 
1.2 The Scottish Government Resource Spending Review (RSR) outlines the
priorities that the Scottish Government will support over the next 5 years of the
current Parliament ie reform to improve outcomes for children living in poverty;
achievement of the just transition to a net zero and climate resilient society;
continued recovery from the Covid-19 pandemic and transformation of the
economy to enable growth, opportunity and a sustainable outlook. The RSR is
not a Budget - the annual budget process will remain. This will provide more
detailed final data and will confirm annually revenue and capital financial
settlements for local government which may ultimately differ from that outlined
in the RSR. However, it should nevertheless be noted that the RSR does
constitute the Scottish Government’s best estimate at this stage of what they
forecast to be their medium term financial position and planned expenditure
across the public sector in Scotland. 
1.3 The RSR outlines a position of increasing financial constraint for the Scottish
Government, with slowing economic growth, higher inflation and increasing
spend in demand-led areas of the budget eg health and social security; leaving
unprotected budgets being squeezed. It is estimated around 90% of the
anticipated increase in income to the Scottish Government over the RSR period
is allocated to health and social care and social security; resulting in practically
all other areas planned to receive a flat cash settlement or a cash terms
reduction.

Page 2

1.4 The future local government settlement is forecast by the Scottish Government
as flat cash, which based on forecast inflation rates would suggest an estimated
7-8% real terms reduction over the RSR period. The RSR also commits to build
on a new deal for local government, with finalisation of work on a fiscal
framework for local government and a new Partnership Agreement. The RSR
suggests greater flexibility over financial arrangements being matched with
increased accountability for the delivery of national priorities.
1.5 The Cabinet Secretary has stated that given the financial constraints being
faced by the Scottish Government, there is a need to prioritise spending, and
to reset growth in the public sector, with a focus on efficiency and innovation.
The Cabinet Secretary also outlines a need for a sharp focus on structural
change and collaboration. The RSR outlines a range of efficiency measures
which will be taken by the Scottish Government including efforts to contain pay
growth, public sector reform, income maximisation and improved public sector
procurement. 
1.6 While there is now relatively greater certainty with regards the overall forecast
quantum of future local government settlements, the forecast allocation to
individual councils will be subject to the updating of the distribution process and
factors within that. Notwithstanding, the Council’s medium term outlook has
been revised to reflect the flat cash projection outlined in the RSR; noting the
downside risks should there be increased pressure in the Scottish Government
budget to fund for example further increases to the NHS or social security.  
 
1.7 Despite there being now relatively greater certainty in terms of future grant
settlements, the prospects for pay and supplies spend are now much more
volatile, linked to current exceptional levels of inflation. Therefore, the forecast
financial gap as previously reported to members, while not significantly differing
from previous forecasts in absolute terms, does have a different context in that
the main drivers for the gap relate to spend pressures. Importantly, the profile
of the gap is also more immediate – predominantly being related to near term
pay considerations and high inflation levels. 
1.8 It is therefore recommended the Council agree to develop at pace a portfolio of
work aimed at ensuring future financial sustainability (and shorter term financial
stability) is prioritised; and that savings of £35m are targeted over the next three
years in order to close the forecast financial gap outlined above and allowing
for a degree of flexibility to manage risks associated with challenges in delivery
of savings at this scale and over this period. Proposed workstreams are
outlined in Section 6 of the report. 
1.9 The combined impact of financial savings arising from the application of
accounting flexibilities and service transformation will not be sufficient to close
the financial gap the Council is facing, meaning a range of other financial
sustainability measures will require to be explored. It is recommended that the
portfolio of measures be developed by Directors over the summer period. with
appropriate future board reporting, and note that in line with practice in previous
years regular financial update reports will be brought back to future Council
cycles as appropriate to outline key changes in the Council’s financial outlook,
confirmation of key announcements from the Scottish Government over the
coming months and the impact of savings arising from progress achieved in
relation to the financial sustainability and transformation programme.

Page 3

It is also considered that the project management and support arrangements
for the transformation programme will require to be revised so they clearly align
with the financial sustainability portfolio outlined above. 
1.10 The shift in the scale and nature of the financial risks outlined above reinforce
the need for the Council to be decisive in order to fully commit to the delivery
of the significant change and transformation which will be required over the
short to medium term. 
1.11 In relation to the capital programme, significantly higher risk in relation to
construction inflation has been emerging. Energy, supplies and labour
shortages are being experienced which is driving inflation in the construction
sector higher, along with increased demand as backlog maintenance is tackled
and new projects commence as the public sector emerges from the worst of
the pandemic. The Scottish Government have taken the opportunity to revise
their capital spending in light of these pressures, but also in light of the reduced
capital settlement compared to what had been expected from the UK
Government. Revised spending allocations have been published by the
Scottish Government alongside their Resource Spending Review (RSR). 
1.12 The capital grant allocation for the portfolio containing local government in
23/24 is £60m less than in 22/23, dropping by a further £30m in 24/25 before
recovering slightly in 25/26 but still to a level below that allocated in 22/23. This
allocation exacerbates the pressures the Council will experience in its capital
investment programme; in addition to supply and price pressures. In order to
maintain current levels of contingencies and risk mitigation within the capital
programme, and faced with extraordinary levels of price inflation, some revision
to the capital plan is required. 
__________________________________________________________________ 
2. Recommendations
2.1  It is recommended that members: 
 Note the update provided in the report with regards the Scottish
Government’s Resource Spending Review, including measures related
to public service reform 
 Note the update to the Council’s medium term financial strategy, the
estimated financial gap the Council is facing over the medium term and
the increasingly heightened financial risk environment the Council is
facing in the shorter term 
 Agree that officers progress a range of financial sustainability and
transformation workstreams with appropriate future board reporting;  and
note that in line with practice in previous years regular financial update
reports will be brought back to appropriate future  Council cycles to outline
key changes in the Council’s financial outlook, confirmation of key
announcements from the Scottish Government over the coming months
and the impact of savings arising from progress achieved in relation to
the financial sustainability and transformation programme.

Page 4

 Note the capital programme update; and agree the revisions to the capital
plan as outlined in section 7 
3. Revenue Update 
Current Financial Position 
3.1 The outturn position for the 2021/22 financial year is reported within the annual
accounts report elsewhere on the agenda for this meeting, with a broadly
breakeven position being delivered, after the application of reserves of £16m. 
3.2 As approved by Council, unallocated reserves have been maintained at a
minimum of £10 million moving into 2022/23 - approximately 2.3% of the
Council’s net revenue expenditure. This prudent step has increased the
immediate financial resilience of the Council and is reflective of the heightened
financial risks the Council will continue to face from the pandemic, in terms of
its ongoing impact, legacy risks and the recovery period, but also from the wider
impact on the Council’s financial strategy and additional financial risks caused
by the disruption to the council transformation programme.
3.3 Council agreed the 2022/23 budget on 3 March, including the utilisation of non-
recurring revenue grant funding of £3.982m and the use of reserve funding of
£1.650m to generate an in year breakeven budget position. While still early in
the financial year, owing to the current cost of living crisis and extraordinary
levels of inflation being experienced, it is anticipated that the 2022/23 financial
position will come under pressure as the year progresses.  However, currently
there is no firm data on which a forecast outturn position could be based with
the exception of a forecast overspend related to childcare, where exceptional
levels of demand driven by mental health crises amongst a significant number
of young people is being experienced. Key risks will be in relation to the 2022/23
pay award which remains to be agreed, and as mentioned above, the cost of
living crisis will be a significant factor in determining the level of pay award.
National pay negotiations are ongoing and are anticipated to be challenging
given affordability constraints facing local government. As was the case in
2021/22, the level of pay provision which has been incorporated into the
2022/23 base budget may require to be adjusted depending on the concluded
outcome of the negotiations.
3.4 In summary in relation to the current year financial outlook, there is still
expected to be some reliance placed on COVID19 non-recurring resource to
meet exceptional costs still being incurred, particularly in relation to childcare,
waste management and soft FM services. As the Council moves towards
recovery and new ways of working are developed there is also the potential for
some cost to be incurred in relation to the transitioning of both workplace
accommodation and ICT provision to a post-Covid environment that remains
suitable and appropriate to facilitate safe and efficient working practice. It is
anticipated again these costs would be funded from Covid-related reserve
balances. In addition, and as outlined in previous reports to members,
increasing pressure is being experienced in the council’s capital investment
programme owing to high levels of construction inflation. Further detail on this
issue is provided later in this report.

Page 5

4 Scottish Government Resource Spending Review
4.1 The Scottish Government Resource Spending Review (RSR) was published on
31 May 2022, outlining its spending plans for the remainder of this term of
Parliament. The Scottish Government also published an updated Medium Term
Financial Strategy and updated Capital Spending Allocations. At the same time,
the Scottish Fiscal Commission published updated economic and fiscal
forecasts.
4.2 The RSR covers the period from 2022/23 to 2026/27 – providing forecasts for
a period two years after the current UK spending review period which runs to
2024/25. Therefore, the final two year period of the RSR is based on projected
block grant income figures as opposed to those confirmed by the UK
government. 
4.3 The RSR includes forecast spend at “level 2” in the Budget, which is a relatively
aggregated level and does not provide detailed data for each public body, but
rather for portfolios of spend. The RSR is not a Budget, and the annual budget
process will remain which will provide more detailed data with regards revenue
and capital spending, and tax decisions; however the RSR does provide an
indication of the prioritisation of spend by the Scottish Government within an
increasingly constrained financial envelop. In this regard, the RSR provides
welcome financial planning context over an extended period and is the first
multi-year review of this nature to be published in a decade. 
Scottish Government Resource and Spending
4.4 The total Scottish Government revenue budget is anticipated to increase from
£41.8bn in 22/23 to £47.5bn in 26/27, based on both known and assumed levels
of block grant increase from the UK government. The block grant is anticipated
to increase marginally in real terms over the current UK spending review period
to 24/25 as has been previously outlined to members, with a slight increase
anticipated in the later 2 years of the RSR period. Funding from the Scottish
Income Tax is projected to increase from £13.6bn to £17.5bn over the RSR
period, likely based on SFC assumptions of no inflationary increases to higher
rate thresholds over the full RSR period, and no decision on the current UK
government commitment to reduce the basic rate to19p in 24/25. The RSR also
makes an assumption that in 23/24 and 24/25 additional Barnett consequentials
of £250m and £400m respectively will be received over and above the block
grant figures confirmed by the UK government to date.
4.5 The pressures facing the Scottish Government budget over the current
Parliament are detailed in the publication, with significant spending
commitments from previous decisions flowing through the projections,
particularly in relation to health and social care where a manifesto commitment
to increase the NHS front line budget by 20% over the course of this Parliament
is detailed. Even at this level of increase (equating to a 2.6% real terms increase
over the RSR period), there is likely to be pressure to grow NHS resources
beyond this planned level given the position with waiting times and the ongoing
recovery from the pandemic. The commitment to create a new National Care
Service is reaffirmed, with an increase of 25% in social care investment – some
£840m – to strengthen self-directed support, improve prevention and increase
community based support.

Page 6

4.6 The significantly increased level of spend on social security is also outlined,
with spend anticipated to increase from £3.9bn in 22/23 to £6.4bn in 26/27,
reflecting increased spend in relation to the Scottish Child Payment and adult
disability payments. The level of funding from the UK government in relation
social security increases over the RSR period, but not to the same extent as
anticipated spend due to more generous allowances and eligibility in Scotland
as opposed to rUK.
4.7 Broadly speaking, around 90% of the anticipated increase in income for the
Scottish Government over the RSR period is allocated to health, social care
and social security; resulting in practically all other areas planned to receive a
flat cash settlement or a cash terms reduction. This impact is outlined in the
table below which illustrates the degree of real terms movement from 2022/23
as the baseline index year: 
Local Government Settlement
4.8 The RSR outlines a planned flat cash position for the local government core
settlement from 2022/23 to 2025/26, with a £100m increase in 2026/27. This
includes baselining the £120m previously included in the 2022/23 settlement
on a non-recurring basis. In the context of forecast inflation levels over this
period, this suggests an estimated real terms reduction in future revenue
funding for local government at 7-8% over the RSR period. The RSR also
outlines a commitment to continue at existing levels transfers from other
portfolios in relation to health and social care, early learning and childcare and
additional teachers; but not other transfers.

Page 7

It should be noted however, while the quantum may not change, the application
of updated indicators to the distribution of actual funding across the local
government sector will still be applied, meaning the Council’s future financial
settlement will be impacted by distributional effects and the Council is not
therefore guaranteed to access its existing share of overall local government
funding over this medium term period. By way of example, the Council is likely
to receive a reducing share of early learning funding in the coming years as a
revised distribution methodology is phased in.
4.9 The RSR also commits to build on a new deal for local government, with
finalisation of work on the fiscal framework (which has been ongoing in
discussion with COSLA for some time) and a new Partnership Agreement. The
RSR suggests greater flexibility over financial arrangements being matched
with “increased accountability for the delivery of national priorities”. Exploring
discretionary revenue raising is mentioned (workplace parking and the visitor
levy); as well as a commitment to explore digitising the administration of NDR.
4.10 COSLA, supported by Directors of Finance, have been exploring with the
Scottish Government a range of financial flexibilities which would assist in
addressing in particular Covid-related spend, but there has also been
discussion with regards service concession accounting arrangements – in
effect how local government accounts for long term contracts such as PPP or
other long term leases. The local government proposed approach has been
agreed to; however this is contingent on a full capital accounting review to be
chaired independently. A substantial review was carried out in 2021, led by
CIPFA Directors of Finance and COSLA so it is not clear what a further review
will aim to achieve; although worryingly there is comment in the RSR about a
“phased approach towards alignment with the CIPFA Code of practice” which
potentially suggests a phased removal of statutory mitigation – this could have
major financial implications for councils which could outweigh any benefit from
the change to accounting treatment for service concessions. COSLA officers
are clarifying the position with the Scottish Government. A letter from the
Cabinet Secretary to the COSLA President has also confirmed that a previously
suggested financial flexibility whereby capital receipts could be used to mitigate
the impact of Covid costs has not been agreed by the UK Government and is
therefore no longer permissible. The Council had no plans to utilise this
flexibility. 
Budget constraint and cost reduction
4.11 The Cabinet Secretary has stated that given the financial constraints being
faced by the Scottish Government, there is a need to prioritise spending, and
to reset growth in the public sector, with a focus on efficiency and innovation.
The Cabinet Secretary also outlines a need for a sharp focus on structural
change and collaboration. The RSR outlines a range of measures which will be
taken by the SG over the coming months and years:
• Returning the size of the public sector workforce to pre-pandemic levels (a
reduction of 6-8%) in order to hold pay bill costs at 22/23 levels 
• Continued hybrid working, linked to an estate rationalisation programme based
on increased co-location and collaboration
• Consideration of the range and number of public sector bodies, and an
expectation that public bodies will deliver annual efficiency savings of at least
3%

Page 8

• An increased focus on income maximisation
• Programme of digital reform and digital transformation of public services allied
to inclusion and connectivity
• A reformed approach to procurement building on increased collaboration and
value for money (building on current sectoral centres of expertise to realise
financial efficiencies)
• Allowing public bodies to try approaches that may involve more risk but which
could deliver greater reward ie increased innovation and commercialisation
• Identifying ways to recover more costs through alternative charging regimes
• Encouragement of shared services and common digital platforms
• Improved management of grants, including additional conditionality and
evaluation
4.12 With regards public sector pay, as mentioned above the RSR proposes to hold
the public sector pay bill (as opposed to pay levels) at 22/23 levels whilst
returning the overall size of the public sector workforce to broadly pre-Covid
levels by 26/27. Discussion with trade unions (excluding local government
given their separate responsibilities and negotiating arrangements) will include
greater flexibility on rates of pay, terms and conditions, and reshaping and
reprioritising public services. There is also suggested a greater focus on
absence and an aim to reduce this across the public sector through a greater
focus on employee wellbeing
4.13 In summary, the RSR outlines a forecast position of increasing financial
constraint for the Scottish Government, with slowing economic growth, higher
inflation and increasing spend in demand-led areas of the budget eg health and
social security; leaving a continued squeeze on unprotected budgets such as
local government over the medium term future. 
5  Updated Financial Outlook 
5.1  As outlined in previous reports to Council, the financial plan of the Council over
the medium term suggested a financial gap in the range of £25m-£58m, with a
central planning assumption of a gap of £41m over the three year period
2023/24 to 2025/26. This forecast is prior to any decision on council tax.
Assuming a 3% uplift in council tax in each year, the cumulative gap would
reduce to a range of £18m-£50m. These forecasts were based on projections
of revenue grant, which can now be updated to reflect the forecast flat cash
settlement outlined in the RSR. However, there remain a number of key risks
to the medium term financial position which are further detailed below. 
Government Grant
5.2 The section above outlines the forecast position for the local government
settlement ie a flat cash position, with a marginal uplift in the final year of the
RSR. Based on estimated inflation levels this would be equivalent to a forecast 
7-8% reduction over the RSR period, and this projection may be at the lower
end of the scale given the very high levels of inflation currently being
experienced.

Page 9

The information in the RSR outlines the core local government settlement,
however there is an added complexity in that in recent years there has been
transfers from other portfolios (notably health & social care and education) for
specific priorities which local government is mandated to deliver eg increased
teacher numbers. In 2022/23 these transfers amounted to 15% of the total
funding available to local government – circa £1.5bn. Therefore while there is
welcome clarity in relation to planned core revenue settlement, this is not the
case for all these other elements, with only transfers in relation to health and
social care, early learning and additional teachers being confirmed. 
5.3 In addition, while there is now relatively greater certainty with regards the
overall quantum of the local government settlement, the allocation to individual
councils is subject to the updating of the distribution process and factors within
that. The Council is already aware of future pressure on the early learning
funding as the agreed distribution is embedded within the overall settlement.
5.4 In general terms however, the medium term outlook has been revised to reflect
the flat cash projection outlined in the RSR; noting some downside risk should
there be increased pressure in the Scottish Government budget to fund for
example further demand led funding increases to the NHS or social security.   
Pay
5.5 The pay settlement for 2021/22 was agreed at a level which exceeded the
budget provision made in setting the 2021/22 by £2.2m. This position was
addressed in setting the 22/23 budget, with further provision for 2022/23 being
incorporated based broadly on the parameters set out in the Scottish
Government public sector pay policy. The very high levels of inflation being
experienced and the associated impact on household finances has resulted in
an environment where agreeing the 2022/23 pay award is going to be extremely
challenging. This is clearly demonstrated in the current balloting by Trade
Unions of members with regards industrial action following their outright
rejection of a 2% pay offer from COSLA. 
5.6 Current forecasts for inflation suggest further rises may be possible, (peaking
at up to 11% by the end of 2022) this should be followed by a relatively steady
decline over the next 18-24 months (the Bank of England forecast a fall to 2.1%
by Summer 2024). In this context, the outlook for pay settlements is increasingly
challenging in terms of affordability; and in terms of a history of relatively low
increases over the past decade. This is clearly demonstrated by the information
within the SFC publication which suggests a significant fall in real household
disposable income – an effect which is disproportionately experienced by low
income households.
5.7 The impact on the council budget strategy however, is higher forecast cost
pressures in the immediate term which the Council has limited flexibility to
address without the utilisation of reserve balances. The financial strategy
response to this altered outlook is explored later in this report. 
COVID19 longer term impact
5.8 It is expected that there will be longer term costs incurred in relation to the
pandemic or from decisions the Council has taken in order to respond and to
support communities and the organisation recover.

Page 10

These costs continue to evolve but it is expected that there will be permanent
behavioural and societal changes which will demand a service response and
which may manifest themselves in terms of both increased cost and/or reduced
income. Examples of this include increased levels of household waste, longer
term hybrid or remote working, increased cleaning requirements and ongoing
support to communities – in particular children and families where demand for
mental health support is increasing. The longer term impact on council tax
collection levels will also require to be closely monitored with there still being
some uncertainty as to how collection levels will be affected. Collection rates
have encouragingly held up well over the course of 2021/22 although the impact
of the developing cost of living crisis in 2022 may yet have a negative impact
on future collection rates.   
Other medium term financial issues
5.9 There are a range of other considerations for the financial strategy which are
likely to impact over the medium term and which are summarised below:
 HSCP – the National Care Service proposals which are being
considered for implementation over the course of the current Parliament
will potentially impact on the Council’s financial arrangements, but more
significantly on the HSCP. The practice of requiring ring-fenced
elements of the local government revenue grant to be passed through
to the HSCP is anticipated to continue, with the Council’s budget
assumption being that no further contribution from Council resources
will be made.
 Education recovery – the Council has received specific resource from
the Scottish Government to support education recovery, with costs
being incurred on additional teaching staff and pupil support; and also
on devices which enable remote learning. It is expected that this funding
will continue to be utilised over a number of academic years to ensure
ongoing recovery and additionality of teaching resource; however there
are likely to be recurring costs which arise and endure after the current
funding has been utilised which the Council will require to fund.
 Council Commitments – as previously reported to Council, the financial
plan includes provision for the recurring impact of existing commitments
including City Deal investments and schools investment; and will
require to reflect longer term impacts which may emerge from service
changes required to support current initiatives in regard to Tackling
Poverty, Social Renewal, Alcohol and Drugs and Climate Change. The
updated Council Plan currently being developed will be a key
determinant of these potential costs. The current high levels of inflation
will also manifest themselves in unavoidable cost pressures in some
long term contracts where annual contractual uplifts are linked to
inflation indices eg the schools PPP contract and some ICT contracts. 
5.10 The Council’s medium term financial plan is continually updated in light of new
information as outlined above and in response to evolving views on
uncertainties linked particularly to grant and pay. While there is now relatively
more certainty in terms of grant, the prospects for pay and supplies spend are
now much more volatile, linked to current exceptional levels of inflation.

Page 11

The updated outlook continues to consider a range of scenarios which suggest
that over the next three year period, the Council will without doubt require to
deliver significant budget savings to achieve a balanced budget. Since the
previous update in March, the scale of these has remained broadly consistent
and likely to fall within a range of £29 million - £61 million, with a central forecast
of a deficit of £44m over the three year period. These estimates are prior to the
impact of any decision with regards council tax increases in each year.
Members will recall that council tax provides a critical but limited avenue to
increase resources.  For illustrative purposes these lower and upper forecasts
would reduce to circa £16 million - £49 million after adjusting for an exemplar
3% per annum increase in Council Tax levels each year, with a central forecast
gap of £31m.
5.11 This three year forecast continues to represent a wide variation in potential
optimistic and pessimistic planning scenarios and it is probable that over the
three year period the actual outcome has a greater likelihood of falling closer to
the central scenario of a financial gap of circa £44 million (circa £31 million after
adjusting for the illustrative Council tax increase). 
5.12 This updated position, while not significantly differing from previous forecasts
in terms of total gap, does have a different context in that the main drivers for
the gap relate to spend issues – grant income now being relatively more certain.
The profile of the gap is also now more immediate – predominantly being
related to near term pay considerations as have been outlined above. The
Council will therefore need to act decisively at the required pace to secure the
future financial stability and sustainability of the Council moving forward. In this
context it is recommended the Council agree to develop at pace a portfolio of
work aimed at ensuring financial sustainability (and short term financial stability)
is prioritised; and that savings of £35m are targeted over the next three years
in order to close the projected financial gap outlined above and allow for a
degree of flexibility to manage the risks associated with the challenge to deliver
this scale of savings over a relatively short period.
6 Financial Strategy Response  
6.1 The Council has a history of sound financial management as evidenced in
annual audit reports from Audit Scotland. This position has in the past been
underpinned by the Council prioritising key financial decision making, whereby
the financial sustainability of the Council was protected by adopting a medium
term perspective and taking savings decisions early and in good time relative
to the forecast requirements outlined in the medium financial plan. As well as
ensuring continued financial stability, this strategy has also in many years
provided the financial capacity to support investment decisions – usually on a
non-recurring basis – which support Council agreed priorities such as Tackling
Poverty and addressing climate change.
6.2  The Council’s main route to delivering recurring savings has been through its
long term transformation programme, branded Right for Renfrewshire in its
latest incarnation. The three year financial strategy 2020 – 2023 was
underpinned by a requirement for the transformation programme to support the
delivery of £25 million of recurring revenue savings over the medium term
period to 2023.

Page 12

An initial phasing assumption of savings of £7 million, £13 million and £5 million
was made for each financial year through to 2023. Members will however be
aware that, at the onset of the coronavirus pandemic, a decision was taken to
formally pause the programme, recognising the capacity of the Council was
required to be fully diverted to support the emergency response. As has been
outlined in previous update reports, the longer term impact of this decision is
that the Council’s pipeline of associated savings has now fallen behind the
requirements to secure overall financial sustainability – a position which needs
appropriately addressed at sufficient pace.
6.3 The approved Council budgets over the 2020/21 to 2022/23 financial years
have included £6.5m of recurring savings agreed from Right for Renfrewshire
service redesigns.  In line with the original savings objective, there would
remain approximately £18.5m of associated savings yet to be delivered through
the Council’s transformation programme as a contribution to the £35m target
outlined above. However, the approach to target setting within the programme
has previously been based on an assumed level of saving being deliverable
from “influencable spend” ie those council budgets for which there is a
reasonable degree of management influence over how those budgets could be
deployed – with the target saving being in the region of 15%-20% of current
spend. In reviewing the programme and associated council budgets in light of
the experience and demands of the past two years, it is now considered that
the original £25m target will need to be revised, and it is suggested that a
balance of savings from transformation activity be realigned to £15m. It is also
considered that the project management and support arrangements for the
programme will also require to be revised so they clearly align with the financial
sustainability portfolio outlined above.
6.4 Council has been previously advised that there remains a significant risk that
even once fully remobilised and restarted, the pace at which transformation
work can progress may continue to be hampered and constrained by the
capacity of the organisation, and therefore the use of capital financing
flexibilities would be required in order to balance the financial position in the
short term. Council agreed in setting the 2022/23 budget to use these
flexibilities to bridge the savings gap over the medium term. This approach will
result in higher borrowing costs in the longer term, and this will require to be
met through appropriate base budget adjustments in the coming years and the
release of long-term flexibility resources. The required support to the Council’s
2022/23 budget from this approach was significant at £7.5 million, and this
position will require to be unwound over the medium to longer term. Any further
potential for efficiencies from this approach will continue to be explored, as will
any potential for savings from the revised accounting arrangements for service
concession arrangements agreed by the Cabinet Secretary and announced as
part of the RSR outlined above.
6.5 However, the combined measures from accounting flexibilities and
transformation are together not going to be sufficient to close the forecast
financial gap the Council is facing, meaning a range of other financial
sustainability measures will require to be explored. It is recommended that
Council agree a portfolio of additional measures be explored and developed by
Directors over the summer period with appropriate future board reporting as to
the savings potential from each of these. It is proposed the portfolio would
comprise the following programmes (many of which mirror the approach being
taken by the Scottish Government):

Page 13

a. Strategic Property Review and new ways of working
o Review of all property assets being utilised by the Council
(owned or leased) with the aim to assess and identify 
rationalisation options and an overall reduction in the Council’s
property holdings increasing utilisation rates and focusing
activities in better quality assets; development of core principles
for property management;  consider opportunities from new
ways of working in a post-pandemic environment eg hybrid
working and the subsequent impact on property demand,
particularly office accommodation and utilisation; develop
simplified arrangements for the management of property assets,
including those related to management, maintenance, and
associated charging; consider any commercial opportunities in
terms of property holdings
b. Charging, fees and commercialisation 
o Assess and benchmark the current level of fees and charges
relative to peer councils and cost of service delivery, considering
the potential impact on service users and demand; review the
corporate concession policy (last agreed by the General
Management and Finance Policy Board March 2011) to ensure
it remains fit for purpose; review the current level of internal
charging and assess both whether charging levels are
appropriate; explore any further opportunities for increasing
income or increasing the council’s commercial approach to
service delivery eg EV charging, advertising or other options as
may be permitted by the Scottish Government 
c. Review of council risk tolerance 
o An assessment of the position council services practice with
regards risk mitigation and tolerance; and where this potentially
may be adjusted to secure cashable efficiencies eg insurance
premiums; consider where an alternative position on risk may
allow the council to change the way it delivers services or
operates as an organisation 
d. Strategic review of procurement 
o Assessment of the Council’s purchasing patterns, processes
and areas for improvement (potentially with support from
Scotland Excel  based on their knowledge of carrying out similar
reviews in other local authorities); Consideration for reduced
scope of purchased items/standardised options for purchases;
reduced volumes of purchases/stockholding (always
considering the management of supply risks for key services);
consideration of increased use of national contracts across both
revenue and capital areas; and other contract optimisation
opportunities

Page 14

e. Review of local policy position 
o Review of current  policy position in terms of service delivery,
including an understanding of service delivery standards or
obligations, to assess where the council delivers a
standard/quantity/quality of service which is above comparative
benchmarks or national  minimums; develop an understanding
of costs involved in service provision due to local policy position
across services and potential saving options which may be
generated from an alternative approach; including current costs
and potential inflationary forecasts from current service
provision standards 
f. Review of management grades and structures 
o Review of management structures across the council to
understand the current structures and grades of staff, spans of
control etc; consider the impact of specialist skills on grades and
structures and whether these require to be reflected in
alternative standards for spans of control/structures etc; develop
standard principles for management structures and suggestions
for implementation recognising the current/recent reviews of
service undertaken under the transformation programme which
have resulted in revised management structures in some
services. 
g. Connected communities 
o Consider potential areas where continued development and
expansion of community participation/ownership of council-
delivered services or council operated assets may release
service efficiencies in line with community empowerment
objectives; assess potential for increased levels of participatory
budgeting which may inform future service delivery decisions;
assess overall levels of grant support to community groups from
across council services; and council procured services from the
third sector 
h.  Digital strategy 
o Review the council digital strategy for areas of investment or
redesign which will focus on generating longer term efficiencies
and/or improved customer service or internal process
improvement; develop a prioritisation framework for digital
proposals which bases investment decisions on a clear
business case 
i. Council tax and tax policy 
o Review the current council tax base for any potential scope to
increase the level of budgeted income through increased
housebuilding and a risk based review of prospective collection
rates; develop options for consideration of other local taxes in
line with Scottish Government proposals

Page 15

6.6 Indicative potential savings for each workstream will also be developed, based
on the work to be undertaken over the summer period, and these will be
reflected in future reports. The proposed workstreams are likely to be
accompanied by tactical reviews of discretionary spend across departments;
with a view to an overall savings programme being developed totalling an
estimated £20m over the next three years, which is in addition to the £15m
targeted from service transformation and will culminate in a total financial
sustainability portfolio savings of circa £35m as recommended above. 
6.7 In addition, the Council will need to consider how it can flexibly utilise reserves
to assist managing the financial risks associated with the challenge of delivering
future savings at this scale on over a relatively short period of time, or from
spending pressures which manifest themselves at a level above that
anticipated; always considering the overall levels of financial risk and longer
term financial sustainability. 
6.8 Members should remain aware that securing £35m of financial savings
represents a very significant challenge for the organisation, not just reflecting
the scale of savings but in the context of the Council being required to do so
after such a long preceding period of similar financial challenge having been in
existence.  The Council has been delivering financial savings at significant
scale since 2011/12 following the onset of the austerity agenda across the
public sector (with savings predominantly secured from non-protected areas of
service such as corporate functions, community based services and financial
flexibilities) and reflecting the cumulative impact of long term cost pressures
over the past decade or so. It was long expected that the scale of required
medium term savings would gradually soften with an eventual return to growth
in local government spending capacity as we progressed into 2020 and the new
decade. However, following the economic impact of major global events such
as the pandemic and current Ukrainian crisis the outlook for the public
expenditure landscape has shifted very materially in a short period of time. In
this context, it should be recognised that following the recent Resource
Spending Review announcement by the Scottish Government, local
government in Scotland and the Council is expected to be moving into a
distinctly new phase of heightened financial challenge and risks where
delivering high levels of financial savings is likely to have greater implications
for the delivery of future services and outcomes than it has over the past
decade. 
6.9 The financial risks outlined above reinforce the need for the Council to be
decisive, and to make substantial decisions at a greater scale than over recent
years in order to fully commit to the delivery of the material change and
transformation which will be required over the medium term. This is likely to
require the lower level of resources at the Council’s disposal to be focused on
those areas of greatest need and priority. 
7 Capital Investment Programme
7.1 Previous reports to Council have outlined the impact that COVID19 has been
having on the capital programme, with initial lockdown measures severely
delaying progress with investment projects since 2019; and subsequent supply
constraints continuing to impact progress with projects since then.

Page 16

7.2 In addition to delays however, a significantly higher risk in relation to construction
inflation has been emerging. Energy, supplies and labour shortages are being
experienced which is driving inflation in the construction sector higher, along with
increased demand as backlog maintenance is tackled and new projects
commence as we emerge from the worst of the pandemic. The war in Ukraine is
exacerbating these constraints. Key materials such as steel, timber, roof tiles and
copper are experiencing both significantly increased costs and supply shortages.
The Office for National Statistics is tracking construction inflation generally at 8%;
with the UK Government Department for Business, Energy and Industrial
Strategy index for material prices tracking at 21% in March 2022. 
7.3 The Scottish Government have taken the opportunity to revise their capital
spending in light of these pressures, but also in light of the reduced capital
settlement compared to what had been expected from the UK Government.
Revised spending allocations have been published by the Scottish Government
alongside their Resource Spending Review (RSR), which also updates
allocations to reflect the priorities set out in the RSR, particularly in terms of
investment in infrastructure to support the transition to net zero carbon
emissions.
7.4 The detail published in the review is at budget level 2 portfolio which includes
social justice, housing and local government together, so it is not possible to
ascertain exactly what the impact is for the local government capital settlement
alone, however, the allocation in 23/24 is £60m less than in 22/23, dropping by
a further £30m in 24/25 before recovering slightly in 25/26 but still to a level below
that allocated in 22/23. This allocation exacerbates the spending pressures the
Council will experience in its capital investment programme, potentially requiring
an increased level of borrowing which simply translates into further revenue
pressures. This is a particular concern in terms of schools investment under the
LEIP programme, where the Scottish Futures Trust have confirmed there is
unlikely to be any expansion to the overall funding available, so any increase in
allocation for Phase 2 projects (which includes the new Paisley Grammar
Community Campus) would simply reduce funding available for Phase 3 (which
the Council plans to bid for in relation to Thorn Primary School).
7.5 Members will recall that the current level of capital grant funding is able only to
support a limited rolling lifecycle maintenance programme across all asset
classes. The Council will therefore be required to continue to seek out and
pursue alternative capital grant opportunities from government funds and other
grant providing bodies as well as recognising that prudential borrowing now
represents the most significant tool at the Council’s disposal to support major
investment. However, prudential borrowing requires to be financially sustainable
and underpinned by recurring revenue resources to ensure this is the case. As
the Council moves forward and major financial challenges persist for the revenue
budget, the capacity to sustainably support prudential borrowing will become an
increasing challenge.
7.6 The impact of inflationary price rises is now being increasingly experienced in
both live Council projects and as Council projects are coming to the market.
Council has previously been advised that it will need to keep under careful and
detailed review the cumulative impact on both individual projects and the overall
approved capital plan as set against available resources and contingencies; and
remain alert to the prospect of capital projects requiring additional funding to
maintain the deliverability of the overall programme.

Page 17

Council has previously agreed to earmark £5 million of COVID19 resources for
this purpose in the first instance, however is increasingly apparent that this sum
is insufficient given increasing prices of two commodities in particular – steel and
bitumen. European steel prices have increased from an average £500 per tonne
in early 2021, peaking at nearly £1,200 per tonne in late summer 2021, before
falling back slightly to around £950 per tonne currently. In particular, the high
energy usage required to produce steel is a factor, as is the overall production
capacity as many European plants are based in Ukraine. A separate report to
this Council meeting seeks approval to ringfence £10m of reserve balances in
order to address anticipated pressures which continue to emerge across the live
capital programme.
7.7 In assessing the impact of these inflationary pressures on the overall capital
programme, and with regards in particular to those projects which have a
significant exposure to steel commodity price increases, an emerging risk in
relation to the Council funded element of City Deal projects has become evident
– in particular with the live Clyde Waterfront and Renfrew Riverside (CWRR)
project. The Council’s long-term financial commitment in relation to the delivery
of these projects extends to the element of investment that requires to be funded
outwith the national government grant contributions. This is funded by the
Council via prudential borrowing which ultimately results in a long term annual
debt servicing cost charged to the revenue budget. In this regard, a level of
provision has been built into the Council’s revenue planning arrangements for
some time to ensure this financial requirement is appropriately accommodated.
Council agreed in December 2020 that the borrowing required deliver the
projects be set at £37 million. This requirement could be comfortably
accommodated within the existing revenue provision that has already been built
into the Council’s financial plans through matching the Council’s borrowing to
those elements of the projects with the longest asset life coupled with a low
interest rate environment that currently exists. 
7.8 In order to maintain current levels of contingencies and risk mitigation within
these projects, and faced with the extraordinary levels of price inflation as
outlined above, a revised level of provision is required, estimated at £49m. A
reassessment of the level of borrowing which could be accommodated within the
existing revenue provisions incorporated into current financial plans; again based
on the principles outlined above, confirms capacity to deliver a further £8m of
borrowing. In addition, it is proposed that £4m of funding from within the Covid
construction ringfenced provision set aside in closing the 2021/22 financial year
be allocated to the CWRR project; with appropriate revision being made to the
capital plan.

Page 18

_______________________________________________________________
Implications of the Report
1. Financial – the report highlights the scale and shape of the short and medium
term financial challenge facing the Council. The early recommencement and
delivery of the transformation programme and other financial sustainability
workstreams as outlined in the report are critical to ultimately supporting the
Council secure a financially sustainable position.   
2. HR & Organisational Development – the medium term financial position and
associated plans require to align with workforce and service plans to ensure
the size and composition of the Council workforce remains appropriate and
affordable. 
3. Community/Council Planning – the Council requires to remain financially
sustainable in order to deliver on its priorities as outlined in the Council and
Community Plans; and these revised Plans will in turn require to inform the
financial strategy.  
4. Legal - none 
5. Property/Assets – the report outlines a proposal to undertake a strategic
review of property which will aim to ensure the Council’s asset base remain
effective and efficient 
6. Information Technology – the report outlines the need to ensure the Council
Digital strategy support ongoing financial sustainability; with any digital
developments being underpinned by a robust business case
7. Equality & Human Rights – The recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights.
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report. If required following implementation,
the actual impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be published
on the Council’s website. 
8. Health & Safety - none
9. Procurement – the report outlines a proposal for a strategic review of
procurement practice in order to support the Council’s ongoing financial
sustainability.
10. Risk – as outlined in the report, the Council’s financial risk exposure both in the
immediate term and over the medium term remains high.

Page 19

The report outlines  ongoing uncertainty as well as a range of key measures to
be implemented as part of the medium term financial planning arrangements to
protect the Council’s immediate financial stability and resilience but also
continue to progress toward medium term financial sustainability. 
11. Privacy Impact - none
12. Cosla Policy Position – COSLA are undertaking active engagement with the
Scottish Government in relation to the outcome of the Resource Spending
Review in order to protect as far as possible the interests of local government.
13. Climate Risk - none
__________________________________________________________________ 
Author:           Alastair MacArthur, Director of Finance & Resources