To:  Council
On:  26 September 2024
___________________________________________________________________
Report by: Director of Finance & Resources
___________________________________________________________________
Heading: Park Lane Developments (Renfrewshire) LLP
___________________________________________________________________
1. Summary 
1.1 Council agreed in December 2009 to participate in regenerating the
Arnotts site in partnership with Park Lane Developments through
membership of a Limited Liability Partnership (LLP). Since then, the
LLP has through a phased approach steadily progressed the
redevelopment of the site in Paisley town centre into a successful mix
of residential and commercial space; with the full redevelopment of the
site now complete. 
1.2 The objectives of the LLP now being satisfied, it is proposed that the
LLP be voluntarily wound up.  
___________________________________________________________________ 
2. Recommendations
It is recommended that the Council: 
2.1 Note the redevelopment of the former Arnotts site in Paisley town
centre is now complete.

Page 2

2.2 Agree the proposal that Park Lane Developments (Renfrewshire) LLP
be voluntarily wound up, noting that this decision will rest with the LLP
Board. 
2.3 Authorise the Director of Finance & Resources in consultation with the
Director of Environment, Housing and Infrastructure and the Head of
Housing Services (all as Council representatives on the LLP Board) to
take all necessary action to proceed with the voluntary winding up of
the LLP.
2.4 Authorise the Head of Corporate Governance to sign on the Council’s
behalf all documents required to formally conclude the Council’s
participation in the LLP and voluntarily wind up the LLP.
2.5 Note that a further report will be provided to the Economy and
Regeneration Policy Board to advise on the conclusion of the voluntary
winding up process.
_________________________________________________________
3. Background
3.1 Council agreed in December 2009 to participate in regenerating the
Arnotts site in partnership with Park Lane Developments through
membership of a Limited Liability Partnership (LLP). Since then, the
LLP has through a phased approach steadily progressed the
redevelopment of the site in Paisley town centre into a successful mix
of residential and commercial space; with the full redevelopment of the
site now complete.
3.2 The Arnotts site was a particularly prominent vacant and derelict site
and its regeneration offered the opportunity to deliver transformational
change in the appearance of the town centre. Through the joint working
of the Council along with Park Lane Developments, supported by
financial contributions from both as well as from the Town Centre
Regeneration Fund and the Scottish Government’s Affordable Housing
Supply Programme, the redevelopment of the site – through the
operation of the LLP - is a good example of the Council exercising its
wider power of wellbeing to achieve a positive outcome which would
not otherwise occur. 
3.3 It was intended that the LLP would have a 6 - 8 year lifespan, reflecting
the likely development period for full regeneration of the site. However,
the economic situation over the past decade or more combined with the
impact of the pandemic impacted on the original delivery timescales.

Page 3

3.4 The Council’s patient approach has however now proved successful,
with the site now fully developed to include 149 residential apartments
and 330sqm of ground floor commercial space. The development has a
mix of tenures, with 11 private homes, 31 new homes for mid-market
rent and low cost home ownership shared equity as well as 107 new
homes for social rent.  The Arnotts site was identified as a key priority
site for redevelopment within the Council’s Strategic Housing
Investment Plan (SHIP) and the social rented, mid market and shared
equity homes were supported by £11,303,216 of Scottish Government
Affordable Housing Supply Programme (AHSP) funding. Attached at
Appendix 1 for members information is a summary economic and social
value statement produced by the LLP which provides both background
to the redevelopment and further information on the impact the
redevelopment has made in the town centre.
3.5 As agreed by Council in February 2024, the Council’s representatives
on the LLP Board are the Director of Finance and Resources, the
Director of Environment, Housing and Infrastructure and the Head of
Housing Services. It is proposed that authority be granted to the
Director of Finance & Resources, in consultation with the other Council
representatives on the LLP Board, to now progress jointly with the
representatives from Park Lane Developments with the voluntary
winding up of the LLP. There are two potential routes to achieve this –
a voluntary strike off of the LLP, or a members’ voluntary liquidation.
Advice as to the most appropriate route will be secured from both
advisers to the LLP Board and from the Council’s own legal services. It
is anticipated the process will take several months to work through.
3.6 In addition to the voluntary winding up, there are three small areas of
the site which will revert to the Council. Two of these areas will require
to be held in perpetuity to enable resident access otherwise not
possible, and are the subject of long term factoring arrangements with
relevant apartment owners. The remaining small site is undevelopable
due to the condition of adjacent buildings and will be hard landscaped
prior to the transfer of ownership back to the Council. Solicitors acting
for both the LLP and the Council will progress with the relevant
conveyancing at the same time as the winding up progresses.
3.7 It is proposed that authority is granted to the Head of Corporate
Governance to sign any documentation required from the Council to
progress with the conveyancing and the winding up. It is also proposed
that at the conclusion of the above legal processes, that a report is
provided to the Economy & Regeneration Policy Board to advise of the
outcome of the above processes.

Page 4

___________________________________________________________________
Implications of the Report
1. Financial – there are not anticipated to be any significant costs which
will be incurred in the winding up process. The LLP has appointed its
own legal advisers and costs will be funded from remaining LLP cash
balances. It is anticipated there may be a small cash balance remaining
on the winding up of the LLP which would revert to the Council.   
2. HR & Organisational Development - none 
3. Community/Council Planning –  
• Our Renfrewshire is thriving – the redevelopment of this prominent
town centre site into both commercial and housing provision is a
clear indication of the Council’s aim to grow the Renfrewshire
economy. 
• Working together to improve outcomes - the LLP model, working in
partnership with an expert developer, has delivered both
regeneration and economic development in Paisley town centre. 
4. Legal – as outlined in the report 
5. Property/Assets – three small areas of land will revert to the
ownership of the Council. There will be insignificant ongoing
maintenance costs which the Council is likely to incur for one of these
areas. 
6. Information Technology - none. 
7. Equality & Human Rights - the recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified. 
8. Health & Safety - none
9. Procurement – none
10. Risk - none
11. Privacy Impact - none 
12. Climate Risk – not applicable

Page 5

13. Children’s Rights – none
14. Cosla Policy Position – not applicable 
___________________________________________________________________ 
Author:           Alastair MacArthur, Director of Finance & Resources

Page 6

No embedded text on this page.

Page 7

Economic and Social Value Statement
Regeneration of the former Arnotts
Department Store, Paisley
September 2024

Page 8

Content
Executive Summary     4 
Introduction      5
Economic Strategy and Investment Context 8
Economic impacts     10
Social Value      14
Summary       18
1
2
3
4
5

Page 9

No embedded text on this page.

Page 10

£2.8 MILLION
£0.9 MILLION
£5.9 MILLION
149 new
homes
Former
Arnotts,
Paisley
£0.7 MILLION
£1.1 MILLION
Total additional 
expenditure
generated
40 Retail and
Leisure Jobs
Supported by resident
expenditure
accommodating 
450 residents
Total additional
leisure expenditure
generated 
by residents
Total salaries
collected by new
residents annually
Total additional 
comparison goods
expenditure generated by
residents
Total additional
convenience
expenditure 
generated 
by residents
Combined, the residential and commercial elements
associated with the regeneration of the former Arnotts
Department Store in Paisley willhelp to increase footfall,
have a positive impact on local expenditure and support
the ongoing vitality of the town centre.
The expenditure generated by the increased resident
and working population, together with the ‘Full Circle’
spin-off benefits generated for Paisley Town Centre are
presented below.
Note: Some figures may
not sum due to rounding.
Executive Summary
4

Page 11

Introduction
This Economic and Social Value Statement quantifies the major
economic, regenerative and social value benefits being generated through
the delivery of the Abbey Quarter Masterplan in Paisley, which is centred
around the redevelopment of the former Arnotts Department Store.
The Arnotts site occupies a prominent location in the heart of Paisley
Town Centre adjacent to Paisley Abbey and Paisley Town Hall. This site is
bounded by the railway line to the north, Gauze Street to the south and
Lawn Street and Smithhills Street to the east and west respectively. The
Piazza Shopping Centre is also located immediately to the west.
The Arnotts Department Store laid vacant for a number
of years, having most recently been occupied by House of
Fraser which closed in 2004.
Various options for redevelopment were subsequently
explored over a number of years containing varying
amounts of retail, leisure, office space and residential
space. After many failed attempts to secure larger retail
occupiers on Gauze Street, the resultant masterplan,
1
Gauze Street
Paisley Abbey
Town Hall
Smithhills Street
Former Arnotts Building
Piazza Shopping Centre
Figure 1 – Site Location within Masterplan Context
approved in 2009 based on the delivery of a residential-
led scheme with a smaller element of lower ground floor
commercial, was proven to be a deliverable version of that
mixed use vision. 
5

Page 12

Phase Date of works Description
Phase 1 2011-2014 New build residential development of 31 apartments on the corner of Gauze Street               
and Lawn Street which was completed in autumn 2015
Phase 2 2014-2016 Retention of a B-Listed façade on Gauze Street to deliver a residential development of 11
apartments over ground floor retail space and was subsequently completed March 2016.
Phase 3 2016-2018 Demolition of 6-12 Smithhills Street and redevelopment of the site to provide                                  
26 apartments completed in 2018.
Phase 4 2022-2024 New-build residential development  of a further 81 apartments to the north 
of the site. Completed in summer 2024.
Table 1.1
The approved masterplan has since been implemented
introducing 149 residential apartments and 330 sqm of
ground floor commercial space over the period from 2011
to 2024 via four separate phases of development,  
as described in Table 1.1.
A vision for Paisley Town Centre1 has also subsequently
been published by Renfrewshire Council in partnership
with Scotland’s Towns Partnership and the Scottish
Government. The document outlines the vision for
Paisley Town Centre up to 2030 and explores how existing
vacant retail space could be transformed to enhance the
community experience for residents and visitors to Paisley.
The creation of a new residential quarter, introducing
significant levels of urban living to the town centre as
well as a variety of tenures, represents a key priority for
repopulating the town centre with the associated increase
in footfall and consolidation of underutilised retail space
offering the potential to support the retention of the
remaining key retailers.
The redevelopment of the former Arnotts Department
Store is evidently acting as a major catalyst for investment
in support of this vision, whilst also delivering many
economic, regeneration and social benefits for the town
and wider Council area. 
Figure 2 – Aerial photograph of the site
6

Page 13

Purpose of this statement
The purpose of this statement is to evidence the benefits
that the redevelopment of the former Arnotts Department
Store has generated for Paisley, the local economy of
Renfrewshire and more widely across Scotland. 
Three distinctive pieces of analysis are presented which
each consider the economic and fiscal impacts, wider
regenerative benefits of the mixed-use scheme (the ‘Full
Circle’ analysis) and social impact of the development.
The three areas of analysis and reported benefits are
summarised to the right.
The assessment draws on a variety of methodologies. The
economic impact assessment and Full Circle analysis are
informed by a bespoke Economic Impact Model developed 
by Turley Economics. This utilises approaches in line with
UK and Scottish government guidance. 
The Social Value assessment is more qualitative in nature
and draws on published research on the wider societal and
health benefits of regeneration projects such as this. A case
study illustrating how wider community benefits have been
delivered in partnership with a local contractor is 
also presented.   
Economic and fiscal impact modelling
Documenting the supportive  expenditure
impacts of mixed use schemes
Wider societal  benefits
• Construction and operational
employment
• Economic Productivity
• Council Tax
• Business Rates
• Increased resident and working population
• Discretionary spend to support town
centre
• High quality housing
• Employment and skills
• Increased physical activity
• Reducing social isolation
• Mental wellbeing
Economic Impact
Assessment
Full Circle Analysis
Social Value Assessment
Document Structure
The remainder of this Economic and Social Value
Statement is structured as follows:
• Section 2: Economic Strategy and Investment
Context – Provides a summary of the key policy
and strategy relevant to the development.
• Section 3: Economic Impacts – Provides an
assessment of economic and wider regenerative
(‘Full Circle’) impacts of the development. 
• Section 4: Social Value – Provides an
assessment of the anticipated social value
and community benefits generated by the
development.
• Section 5: Summary – Summarises the
economic, regenerative and social value benefits
generated.
7

Page 14

2 Economic Strategy and 
Investment Context
This section provides an overview of the relevant economic policy and
strategy context. It demonstrates the national and local Government
commitment to supporting sustainable economic development through
the planning system, particularly in terms of policies focusing on housing
delivery and town centre regeneration and investment.
National Policy and Strategy
National Planning Framework 4
The fourth National Planning Framework, NPF4,2 was
adopted by Ministers in February 2023. The development
plan for any area therefore includes NPF4 as well as the
relevant local development plan. It sets out the Scottish
Government’s development priorities over the next 20-30
years and is guided by six overarching spatial principles which
include ensuring the transition to net-zero is fair and inclusive,
supporting local living and community health and balancing
development to create opportunities for investment in areas
of past decline.
NPF4 sets out the National Spatial Strategy for Scotland,
which incorporates 18 national developments. National
developments will be a focus for delivery, as well as exemplars
of the Place Principle, placemaking and a Community Wealth
Building (CWB) approach to economic development.  
NPF4 identifies CWB as a policy objective (Policy 25).
The purpose of this policy is to encourage a new strategic
approach to economic development. This approach is
primarily targeted at improving wellbeing and delivering
community benefits by supporting employment and local
supply chains to improve community resilience, reduce
inequalities and support local supply chains.
Housing to 2040
In March 2021, the Scottish Government published ‘Housing
2040’,3 a long-term vision for housing in Scotland. This
outlines a delivery plan to support its ambition for everyone
to have a safe, good quality and affordable home that meets
their needs. Community is also key to this strategy, with the
Scottish Government aiming to implement an approach to
housing that puts quality places at its core.
Scotland’s Economic Strategy for
Economic Transformation
Scotland’s National Strategy for Economic Transformation
was published by the Scottish Government in October
2022 and recognises housing as key to economic
transformation. This document outlines the Government’s
ambition to create a ‘wellbeing’ economy over the next
10 years, which is fairer, wealthier and greener. There is a
desire that Scotland will be recognised internationally as a
great place to live and work with high living standards and a
vibrant, diverse culture in which all sectors of the economy
work to eliminate poverty.
The strategy emphasises the importance of aligning with 
existing strategies (such as Housing 2040) in order to
create and sustain a resilient national infrastructure that
can support a high-productivity economy.
8

Page 15

A Vision for Paisley Town Centre
The vision for Paisley Town Centre5 was published in 2020
which outlines the vision for Paisley Town Centre up to
2030 and explores how existing vacant retail space could
be transformed to enhance the community experience
for residents and visitors.  This includes consolidation of
the retail elements of the town centre and reintroducing a
variety of uses including residential.
The Vision Strategy outlines a number of themes in which
the Town Centre could be enhanced including rebalancing,
repopulating and repositioning.  The repopulating theme
includes creating a new residential quarter. By creating a
new residential quarter, this will enable clusters of retail
space to form and evolve away from the “80s/90s Clone
Town”.
The Strategy states that after 60 years of town centre
erosion, there has been a reduction in the residential offer
of the town centre, and therefore Paisley Town Centre
would benefit from an increased residential offer to
energise the town centre and encourage town centre living.
Specifically, the Vision Strategy emphasises that a key
element to rebalance the town centre is to introduce
significant levels of urban living in mixed use blocks and
developing residential units that are inclusive with a variety
of tenures, including affordable and social housing.
Summary
Planning and economic priorities as expressed through 
national and local policy and strategy documents,
which highlight the importance of regeneration and
housing projects in order to support growth in the local
economy as well as across the regional and national
economy, population and workforce.
There is also a clear local policy priority to safeguard
and enhance the vitality of Paisley town centre, and
for the town centre to adapt to serve the changing
needs of communities. Through the publication of the
Paisley Town Centre Vision there is also a recognition
of the role of mixed-use development (incorporating
residential alongside a range of retail and leisure units)
in offering greater resilience in the face of recent
macro-economic challenges and declining demand 
for retail floorspace.
Local Policy and Strategy
Renfrewshire Development Plan
The Renfrewshire Development Plan4 was adopted in
December 2021 by Renfrewshire Council. The Local
Development Plan has five key principles namely:
Economy, Centres, Infrastructure, Places and Environment.
The purpose of the main two principles relevant to the
development are outlined below:
• Centres: The Local Development Plan supports
investment in Renfrewshire’s centres which will deliver
vibrant, well designed and accessible spaces. This will
help to create a safe and well-maintained environment.
• Places: The Local Development Plan supports
investment which will help to create stronger
communities and contribute to the creation of attractive
places in Renfrewshire with a focus on regeneration and
enhancing existing places. This also includes delivering
housing in the right locations to meet the needs of both
existing and future residents.
Policy P3 outlines that “Development proposals that
provide a mix of housing types and tenures to meet current
and future housing needs and support sustainable mixed
communities will be supported”. The mix of 1-3 bedroom
apartments that have been delivered via the Arnotts
redevelopment project have evidently made an important
contribution to this policy, ensuring that the “smaller
units” being targeted in the policy are provided within
Renfrewshire, whilst also enhancing the choice and mix 
of homes available in Paisley. 
9

Page 16

3 Economic impacts
The redevelopment of the former Arnotts Department Store has introduced new
vibrancy to a landmark site in Paisley town centre, whilst also generating a range of
economic and fiscal benefits for Paisley, Renfrewshire and the wider Scottish economy.
The quantified employment impacts generated during the construction phase
and over the longer term through the development’s subsequent operation are
presented below. The assessed impacts include full-time equivalent (FTE) jobs and
economic productivity impacts, which is measured as Gross Value Added (GVA),
along with the financial benefits accrued for Renfrewshire Council. 
Homes and Communities Agency’s Additional Guide (4th Edition, 2014)6 and the 2008
Scottish Enterprise Additionality & Economic Impact Assessment Guidance Note7 and
draws on published statistical data sources. The evaluation considers the quantifiable
impacts of the development during both the construction and it’s operational lifetime.
Economic impact estimates are presented as net figures, accounting for leakage,
displacement and multipliers, and outlined with respect to Renfrewshire (local impact
area) and Scotland (wider impact area).
Construction Phase
Operational Phase
£29.7 million
Productivity Boost
Total GVA2 generated during
construction, including 
£19 million in Renfrewshire
40 gross direct jobs
Full time equivalent (FTE) jobs supported    
on average during construction (c. 8 years) 
Generating 30 net direct jobs
FTE jobs in Scotland, including 15 for Renfrewshire residents
Plus 25 net indirect/induced jobs
FTE jobs in the Scotland, including 5 for Renfrewshire residents
15 £540,000 £275,000 £21,000
Gross jobs
Accommodated on site
Gross value added
To the Renfrewshire
economy per annum
Council Tax
Paid annually to
Renfrewshire  Council
Business rates
Collected annually
10

Page 17

Construction Phase  Economic Benefits
Employment
The investment in the construction phase of the project
is estimated to have generated an average of 40 full-time
equivalent (FTE)8 construction jobs on-site annually over 
the construction period.
Reflecting on the skills of the labour force and the latent demand
for construction employment9, a proportion of the construction
jobs could have drawn from the local labour market within
Renfrewshire and wider labour market across Scotland.10 Circa
30 direct FTE jobs are likely to have been held by residents living
within Renfrewshire, with a further 15 jobs likely to have been taken
by those living elsewhere in Scotland.
The positive economic impacts of the development will have
extended beyond construction employment. Expenditure on
construction materials, goods and other services will have far-
ranging benefits both locally and further afield as it filters down
the supply chain. As a result, the initial investment is amplified
in an economic ‘multiplier’ effect both locally and across the
wider impact area. Construction of the development is therefore
likely to have supported a further 25 FTE jobs within Scotland per
annum via indirect and induced effects, 5 of which are likely to
have been taken by Renfrewshire residents. 
Taking the above factors into account, a total of 55 net additional
FTE positions11 are estimated to have been generated across
Scotland during each year of construction, with 20 of these
taken by Renfrewshire residents.
Economic Output (Gross Value Added)
The construction phase of the development will have also
generated a significant increase in Gross Value Added (GVA).
GVA measures the value of output created (i.e. turnover) net 
of inputs purchased and used to produce a good or service 
(i.e. production of the output). Therefore, GVA provides a
measure of economic productivity.
Applying the appropriate GVA measures to the net additional
employment impact generated by construction of the development
indicates that an additional £3.7 million in GVA is estimated to
have been generated annually across the wider impact area
during the construction period. This is inclusive of £2.4 million in
the local impact area. Over the 8 years of construction activity,
this equates to £29.7 million in GVA generated across the wider
impact area and £19 million across the local impact area. 
11

Page 18

Operational Phase Impacts
Employment
Once fully operational, the development will deliver
additional jobs within Renfrewshire. It is estimated
that the uses proposed could generate a total of 15
additional FTE jobs on site. After accounting for leakage
and displacement, it is estimated that the scheme will
generate an uplift of 10 direct jobs which are likely to be
held by residents across Scotland, of which 5 jobs are
likely to be held by residents of Renfrewshire.
The operation of the Development will have indirect
/ induced effects through supply chain spending,
procurement and employee spend. Therefore, the direct
effect is amplified, resulting in a multiplier effect. It is
estimated that an additional 20 indirect / induced FTE jobs
will be generated across the wider impact area, of which 10
jobs are likely to be taken by those living in Renfrewshire.
Economic Productivity (measured as
Gross Value Added)
The operational phase of the Development will also
contribute to economic productivity across the local and
wider impact areas. 
Applying relevant measures to the net additional
employment effects presented above, suggests that an
additional £870,000 GVA will be generated annually
across the Scotland, including £540,000 concentrated
within the local Renfrewshire economy.
Increased Revenue to Local Authority
Council Tax Revenue
The occupation of new housing will also increase
Council Tax revenue to Renfrewshire Council. Based on
the current mix of homes, the development is expected
to generate circa £275,000 in additional Council Tax
payments annually, equating to circa £2.6 million over
10 years at 2023/24 rates. This could provide an important
source of revenue funding for Renfrewshire Council to
support public service delivery and investment across
Renfrewshire.
Generation of Business Rates
Occupiers of the commercial floorspace will make
business rate payments to Renfrewshire Council.
Analysis of nearby floorspace in similar use indicates that
the business rates to be collected annually by Renfrewshire
Council will equate to circa £21,000 per annum or
£210,000 over ten years.
Phase 3
12

Page 19

1.5 Context: Site Photos
Above L&R : View West from Gauze Street with and without corner building which is  now demolished
Below: Panorama View West from Gauze Street (current) showing relationship with adjacent  Methodist Hall
Arnott Building Regeneration, Paisley:  Development Proposals. June 2014
DESIGN STATEMENT
1.0 Site Overview / Analysis
Panorama View West from Gauze Street (current) showing relationship with adjacent Methodist Hall
Local Labour Force
The delivery of 149 new homes could grow the local
population by up to 450 residents, once fully occupied.12
The latest evidence suggests that 48.1% of Renfrewshire
residents are of working age and economically active.13
Assuming that the delivery of 149 new homes will grow the
local population by up to 450 residents, the Development
could attract up to 215 additional economically active
residents of working age. Based on employment rates for
the local area, the development could accommodate 210
employed residents.
Enhanced Local Spending Power
An occupied new home represents a net gain to the
local economy, as household income and expenditure
in the local economy will occur over a long period. The
Annual Survey of Hours and Earnings (ASHE) provides
income data by occupational group. Applying this to the
estimated occupational profile of new residents indicates
that employed residents of the new homes could receive a
collective income of circa £5.9 million per annum.
This income will be used to meet housing and other fixed
household costs, although a considerable proportion
will be available for discretionary expenditure within the
local economy. Expenditure from new residents will make a
significant contribution towards sustaining local shops and
businesses in Renfrewshire and the wider economy, thus
supporting local employment.
Oxford Economics estimates that households in the local
area spend an average of £13,175 annually on convenience
and comparison retail goods and services.14 On this basis,
new residents could generate total retail expenditure
of circa £1.9 million on convenience and comparison
goods and services.
In addition, it is estimated that residents in the local area
spend an average of £6,382 annually on leisure goods and
services.15 New residents could therefore generate further
expenditure of £0.9 million per annum on leisure goods
and services.
Collectively, this uplift in local expenditure will increase
footfall, vitality and trading performance for existing shops
and leisure services within the site’s locality which could
support an additional 40 retail and leisure related jobs
in Renfrewshire and the wider regional economy annually.
13

Page 20

4 Social Value
This section considers the broader social value benefits which can also be
expected to be generated for new and existing local residents, workers and
other users of the development over the long term for Renfrewshire, with
impacts also extending to other areas of Scotland. These fall under the
following themes: increasing the housing supply, supporting employment
and wellbeing, increasing social cohesion and promoting active, healthy
lifestyles and integration within the wider green network.
Social Value Impacts
Healthy housing
Helping to meet Paisley 
and Renfrewshire’s 
housing needs
Promoting 
active-travel
Through people-focused 
streets and on-site green 
amenity spaces
Increasing Social
Cohesion
through the delivery of a
mixed-use development with
communal spaces helping to
reduce social isolation
Employment and skills
opportunities
through the delivery of new
jobs and apprenticeships,
which can positively affect
local wellbeing
A socially conscious contractor
Contractors working on the site have supported the delivery of a range of community
benefits, including:
• Providing graduate, apprenticeship and work placement opportunities
• Holding mock interviews and other careers engagement sessions as part of an ongoing
partnership with Glasgow Clyde College and Mary Russell School
• Work alongside local charities such as Spifox aswell as the Community Payback Team 
at Renfrewshire Council
• Support Mental Health Awareness Day by providing information to employees and
donating money to Public Health Scotland to sponsor a Mental Health First Aid Course
14

Page 21

Increasing housing supply
A person’s ability or otherwise to access housing which is
of good quality and which meets their needs can have a
significant impact on their physical and mental health.
As outlined by guidance published by Public Health
Scotland,16  housing is a key ‘social determinant of health’,
and to improve physical health and mental wellbeing
and tackle health inequalities in communities across
Scotland, everyone must have access to a warm, dry and
safe home which meets their needs. Factors relating to
housing conditions determine the potential ‘risk factors’
associated with poor-quality housing (for example, damp
and humidity, overcrowding, fuel poverty and anti-
social behaviour) which in turn can cause or exacerbate
physical and mental health conditions (such as respiratory
diseases, allergies and stress anxiety and depression).
Poor housing conditions have also been shown to be
associated with physical illnesses including eczema,
hypothermia and heart disease, with respiratory health
also having been shown to be particularly affected in
both adults and children. Poor physical conditions can
also negatively impact on mental health, due to the stress
caused by living in insecure, overcrowded, cold, polluted
or damp conditions.17
The delivery of new homes across private sale, shared
ownership and social rented tenures, provides high
quality, healthy housing that will support the wellbeing
of 149 households and c.450 new residents living on the
site, whilst also making an important contribution to much
needed affordable housing in the Paisley area.
Increasing social cohesion
For most people, the easiest and most appropriate forms
of physical activity are those that can be incorporated
into everyday life, such as walking or cycling. Therefore,
it is imperative that the built environment is designed,
created and built to support and enable people to
incorporate movement, particularly walking and cycling
into their daily lives. Active travel – for example, walking
and cycling integrated as part of general daily activities
– is highlighted by the UK Chief Medical Officers Physical
Activity Guidelines18 as a key means of improving physical
activity rates and, by extension, health and wellbeing.
The key active travel routes within the scheme will run
parallel to the proposed green amenity space and will
include an integrated cycle and footpath network which will
provide access to road paths. The provision of cycle and
footpaths is beneficial in connecting the site to existing
networks and will help to encourage residents and workers
to use sustainable and active modes of travel as well as
improve the mental health outcomes due to the access to
amenity space.
The delivery of a mixed-use development will contribute
to the creation of a sustainable and cohesive community
in this part of Renfrewshire.  The delivery of communal
spaces will reduce social isolation and foster a sense of
community amongst residents.
Annual Council Tax receipts of c. £275,000, will contribute 
to maintaining and enhancing local services and
infrastructure, thereby supporting social cohesion within
the local area. This will further be supported by annual
Business Rates receipts of c. £20,000.
Phase 4
15

Page 22

Promoting active, healthy lifestyles 
and integrate developments with wider
green network
As highlighted by the NHS HUDU,19 strong, vibrant,
sustainable and cohesive communities require good
quality, accessible public services and infrastructure,
supported by high-quality public realm and places which
enable people to lead healthy lifestyles. 
The development provides residential uses alongside
on-site green amenity spaces which will promote physical
and mental wellbeing. Furthermore, the provision of cycle
and footpaths will maximise the potential for walking
and cycling, resulting in health benefits for residents and
make a positive contribution towards reducing emissions.
This will also be supported through the provision of cycle
storage and through the site’s proximity to a wide range of
public services and amenities.
Supporting employment and wellbeing
The UK Government’s Office for Health Improvements
and Disparity highlights20 that unemployment causes
psychological stressors related to status and self-esteem,
lead to unhealthy behaviours, including increased smoking
and alcohol consumption, decreased physical exercise
and can increase the risk of poor mental health among the
families of those who are unemployed. The ONS regularly
monitors national wellbeing, and its research21  highlights
a correlation between unemployment and people
experiencing feelings of loneliness. 
The Community Wealth Building Strategy for
Scotland,22 which was recently published by the
Scottish Government, sets out how Community Wealth
Building can deliver local economic development
by giving people a greater stake in the economy. The
strategy places emphasis on increasing fair work and
developing local labour markets that support the
wellbeing of communities.
Employment and skills opportunities created
throughout the construction and operation of the
development therefore offer the potential to meet
both an economic and a social need and can be
considered as contributing effectively towards
supporting wellbeing of Renfrewshire residents.
16

Page 23

Community Benefit Report
Abbey Quarter
Link
Case Study:
Ashleigh Building - Delivery of Contractor-Led Community Benefits
Working in Partnership with local contractor, Ashleigh
Building, has enabled a range of community benefits
to be realised during the construction phase of the
Arnotts site.
This has been reflected in Ashleigh Buildings
commitment to supporting local employment training
and skills initiatives, working in close partnership with
local schools and other education providers such
as Glasgow Clyde College. They have partnered with
local charities and Public Health Scotland, sponsoring
events and Mental Health First Aid training courses.
The following summarises the range of initiatives and
outcomes supported:
Local Employment:
• Supporting local employment and providing
opportunities for apprenticeships and graduate
entrants to the labour force.
• Recruitment of an apprentice Administration
Assistant as well as a graduate Business
Development Coordinator from the local community.
• Providing two one-week work placements at Abbey
Quarter with the Painting and Decorating team and
half-a-days work placement shadowing the Health
and Safety Advisor.
• Supporting training for the National General
Certificate in Occupational Health & Safety, SVQ
Level 2 - Diploma in Administration, NVQ Level
2 – Joinery, NEBOSH – Construction, Adobe
Illustrator Training Course and Modern Apprentice -
Occupational Work Supervisor at SVQ Level 3.
School Engagement:
• Mock interviews at Paisley Grammar school. This
includes engaging with 20 students to ensure
students are ready for the workplace.
• Partnership built with Glasgow Clyde College.
This provided opportunities to offer trade work
experience placements to students to help develop
students’ knowledge and skills within the sector.
Furthermore, Ashleigh Building provided a careers
fair to allow students to explore careers within the
construction sector.
• Trade lecturers from Glasgow Clyde College were
also invited to receive Passivehaus training, which
comprised a site visit and an information sharing
session.
• Partnership with Mary Russell ASN which is a school
that provides facilities for those with additional
support needs. Ashleigh Building run sessions to
provide students with opportunities to engage with
the workplace and engage with career support. This
included career presentations, STEM activities as
well as site visits for 5th year pupils (which equates to
approximately 12 students).
Charitable Giving:
• Working alongside local charities such as Spifox
raising money for children’s charities within Scotland
as well as volunteering for the ‘Zip-slide the Clyde’
fundraising event.
• Recurring support for the Community Payback Team
at Renfrewshire Council for supporting the building of
a fence at a local church.
Mental Health Support
• Supporting a Mental Health Awareness Day by
providing information to employees including
helplines and long-term support.
• Donation of £100 to Public Health Scotland for the
sponsorship of a Mental Health First Aid Course.
Ashleigh Building has ensured that the Community
Coordinator has completed the Scottish Mental
Health First Aid Qualification.
17

Page 24

5 Summary
This report has considered the quantifiable economic impacts generated
by construction and operation of the Development, both locally within
Renfrewshire and across Scotland, which are summarised again below.
Construction of the Development generated the following economic impacts:
• Investment in the construction sector of a scale that will
support 40 FTE gross jobs on an annual basis during the
demolition and construction period;
• Creating an average of 55 direct, indirect and induced net
additional FTE employment opportunities in Scotland
throughout construction, inclusive of 20 for residents 
of Renfrewshire; and
• Contributing a total net additional £29.7 million GVA to
the economic output of the Scotland economy during
construction, of which £19 million will be concentrated 
in Renfrewshire.
18

Page 25

Page 3Arnott Building Regeneration, Paisley:  Development Proposals. June 2014
Introduction 
Section 1.0 Site Overview and Analysis     
Section 2.0 Masterplan Concept
Section 3.0 Regeneration Vision
Section 4.0 Building Condition and Recommendations  
Section 5.0 Developing Proposals  
Section 6.0 Conclusion  
Above: Arnott Building (Left) In Abbey Quarter Context
CONTENTS
Arnott Building (Left) In Abbey Quarter Context
Operational impacts that will persist  
over the longer term include:
• Supporting 20 FTE net additional employment
opportunities once operational for residents of
Scotland, supporting a GVA uplift of £870,000 in the
Scotland economy including £540,000 concentrated
within the local Renfrewshire economy. 
• The development is expected to generate circa
£275,000 in additional Council Tax payments
annually, to be collected by Renfrewshire Council.
Further, on-site commercial floorspace are anticipated
to induce an uplift in business rate collections of
£21,000 per annum.
• The 149 new homes are expected to have a population
of 450 residents, once fully occupied. Of this, it is
expected that 210 will be economically active and
employed having a combined resident income of 
circa £5.9 million per annum.
• It is estimated that the new households will spend
£2.8 million a year on retail and leisure goods
which will increase footfall and boost the vitality and
trading performance of Paisley town centre aswell as
other nearby shops and leisure services within the
site’s locality. This expenditure is expected to support
an additional 40 retail and leisure related jobs in
Renfrewshire and the wider regional economy annually.
The development has also generated,
both directly and indirectly, a number of
social value impacts which will be benefit
both existing and new members of the
community. These include:
• Providing 149 high-quality new homes that will ensure
the c. 450 new residents can live in accommodation
that will support their physical and mental health.
• A range of employment, skills and training 
opportunities created throughout the construction
and operation contributing to the mental wellbeing
of Renfrewshire residents, by helping to reduce the
negative impacts of unemployment.
• The delivery of a mixed-use development, with
communal spaces, will contribute to the creation 
of a sustainable and cohesive community in 
Paisley town centre. 
• Contractor-led delivery of community benefits
including support for local education facilities, in
particular colleges, through the provision of work
placements, apprenticeships and careers
presentations. They have also partnered with local
charities and Public Health Scotland, sponsoring
events and Mental Health First Aid training courses.
19

Page 26

1  Threesixty Architecture on behalf of Renfrewshire Council (2020) A Vision for Paisley town centre 2030.
2  Scottish Government (February 2023) National Planning Framework 4 Revised.
3  Scottish Government (2021) Housing to 2040.
4  Renfrewshire Council (2021) Renfrewshire Local Development Plan.
5  Threesixty Architecture on behalf of Renfrewshire Council (2020) A Vision for Paisley town centre 2030.
6  Homes and Communities Agency (2014) Additionality Guide (4th Edition).
7  Scottish Enterprise (November 2008) Additionality & Economic Impact Assessment Guidance Note.
8  FTE is equivalent to 1 employee working full-time for 1 year. A person-year of employment is defined 
as the amount of work done by an individual during a working year.
9  ONS (2023) Jobseeker’s Allowance by Occupation (August 2023) Construction Sector Groups.
10  ONS (2021) Census 2011 - Location of usual residence and place of work by sex (WU01UK).
11  Net additional is the sum of the direct and indirect impacts.
12  Based on the estimate of 450 residents from living at the Development provided by the client.
13  ONS (2023) Annual Population Survey (April 2022-March 2023).
14  Oxford Economics (2023) Resident Expenditure Data, via Precisely – average spend in Renfrewshire.
15  Ibid.
16  Public Health Scotland (2021) Healthy housing for Scotland: A briefing paper setting out the  
fundamental link between housing and public health.
17   Shelter (2013) People living in bad housing – numbers and health impacts.
18  Department for Health & Social Care (2019) UK Chief Medical Officers’ Physical Activity Guidelines.
19  NHS Healthy Urban Development Unit (2019) Rapid Health Impact Assessment Tool (fourth edition).
20  Office for Health Improvement and Disparities [formerly Public Health England] (2015) Local action 
on health inequalities: Increasing employment opportunities and improving workplace health.
21  Office for National Statistics (2021) Opinions and Lifestyles Survey.
22  Scottish Government (2022) Community Wealth Building.
20

Page 27

21

Page 28