21/02/2024 
Notice of Meeting and Agenda
Council 
Date Time Venue
Thursday, 29 February 2024 09:30 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN               
Membership 
Provost Lorraine Cameron (Convener):    Councillor Iain Nicolson (Leader):   Councillor Cathy
McEwan (Depute Convener):   Councillor Jacqueline Cameron (Depute Leader):    
Councillor Jennifer Adam:  Councillor Fiona Airlie-Nicolson:  Councillor Alison  Ann-Dowling: 
Councillor Stephen Burns:  Councillor Michelle Campbell:  Councillor Graeme Clark:  Councillor
Carolann Davidson:  Councillor Eddie Devine:  Councillor Andy Doig:  Councillor Audrey Doig: 
Councillor Chris Gilmour:  Councillor Edward Grady:  Councillor Gillian Graham:  Councillor Neill
Graham:  Councillor John Gray:  Councillor Anne Hannigan:  Councillor John Hood:  Councillor
Lisa-Marie Hughes:  Councillor Robert Innes:  Councillor Alec Leishman:  Councillor Bruce
MacFarlane:  Councillor James MacLaren:  Councillor Kenny MacLaren:  Councillor Mags
MacLaren:  Councillor Colin McCulloch:  Councillor Janis McDonald:  Councillor David
McGonigle:  Councillor Jamie McGuire:  Councillor Marie McGurk:  Councillor Iain McMillan: 
Councillor John McNaughtan:  Councillor Kevin Montgomery:  Councillor Sam Mullin:  Councillor
Will Mylet:  Councillor Jim Paterson:  Councillor Emma Rodden:  Councillor John Shaw: 
Councillor Ben Smith:  Councillor Andy Steel:   
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting. 
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers.  However, it is a
hybrid meeting and arrangements have been made for members to join the meeting remotely
should they wish.
MARK CONAGHAN
Head of Corporate Governance

Page 2

21/02/2024 
Further Information
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior to the
meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk 
Webcasting of Council Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Provost will confirm if all or part of the meeting is being
filmed.  Generally the public seating areas will not be filmed.  The cameras focus on the main
participants.  If you have any queries regarding this please contact Committee Services on
democratic-services@renfrewshire.gov.uk. 
To find the webcast please navigate to: https://renfrewshire.public-i.tv/core/portal/home  and
select the meeting from the calendar. 
Procedures for Budget Meeting
Copies of the notes of the procedures to be followed in respect of consideration of (i)
the Revenue Estimates and Council Tax; and (ii) the Housing Revenue Account Budgets,
Rent Levels and Capital Investment Plans are attached to the relevant reports. 
Section 112 Statement
Members’ attention is drawn to the enclosed statement regarding declarations in terms of
Section 112 of the Local Government Finance Act, 1992.

Page 3

21/02/2024 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest and Transparency Statements
Members are asked to declare an interest or make a transparency
statement in any item(s) on the agenda and to provide a brief
explanation of the nature of the interest or the transparency statement. 
1 Minutes of Meetings of Council, Boards and Panels
Council, 14 December 2023, pages 1139 - 1156
Communities and Housing Policy Board, 16 January 2024, pages 1157 -
1164
Regulatory Functions Board, 17 January 2024, pages 1165 - 1172
Education and Children's Services Policy Board, 18 January 2024,
pages 1173 - 1180
Audit, Risk and Scrutiny Board, 22 January 2024, pages 1181 - 1186
Economy and Regeneration Policy Board, 23 January 2024, pages 1187
- 1192
Planning and Climate Change Policy Board, 23 January 2024, pages
1193 - 1198
Infrastructure, Land and Environment Policy Board, 24 January 2024,
pages 1199 - 1206
Local Review Body, 30 January 2024, pages 1207 - 1210
Regulatory Functions Board, 1 February 2024, pages 1211 - 1220
Placing Requests and Exclusions Appeals Panel, 7 February 2024,
pages 1221-1222
Finance, Resources and Customer Services Policy Board, 8 February
2024, pages 1223 - 1236
Placing Requests and Exclusions Appeals Panel, 20 February 2024,
pages 1237 - 1238
Leadership Board, 21 February, 2024 (copy to follow) 
2 Provost's Update
Hear from Provost 
3 Revenue Budget and Council Tax 2024/25
Report by Director of Finance & Resources 
3 - 40 
4 Non-Housing Capital Investment Programme, Prudential
Framework and Treasury Management Strategy, and
Capital Strategy 2024/25 – 2028/29
Report by Director of Finance & Resources     
41 - 98

Page 4

21/02/2024 
5 Housing Revenue Account Budget & Rent Levels 2024/25
and Housing Capital Investment Plan 2024/25 to 2028/29
Joint report by the Directors of Environment, Housing & Infrastructure
and Finance & Resources 
99 - 116 
6 Accounts Commission Section 102 Report (S.102) –
School Accommodation for Dargavel Village
Report by Chief Executive 
117 - 164 
7 Cross Party Working Group: Review of Governance
Arrangements
Report by Director of Finance & Resources 
165 - 188 
8 Governance Arrangements
Report by Director of Finance & Resources 
189 - 192 
9 Notice of Motion 1 by Councillors Nicolson and Hughes
"Renfrewshire HSCP Review 
Renfrewshire Council calls on Renfrewshire HSCP to stop its current
review and proposals for Adult Day and Flexi-care Services and to
prioritise work on other areas of its budget options. The Fraser of
Allander Report into disability services makes it clear that individuals
with vulnerabilities were impacted significantly by Covid. This requires
time and consideration to be taken, on how these services are shaped
for the future and to place the service users at the heart of these
discussions." 
10  Notice of Motion 2 by Councillors Devine and Hood
"Sma Shot Day Parade - 2024  
This Council instructs Council Officers to return the Sma Shot Parade to
its historic route of Brodie Park – Braids Road - Neilston Road –
Causeyside Street – Gauze Street, finishing in Abbey Close where the
cork effigy will be burnt.   This should be implemented for the Parade on
6 July 2024." 
11  Notice of Motion 3 by Councillors Davidson and
McDonald
"Sma Shot Day - 2024 
Council will reverse the decision to downgrade the Sma Shot Parade
and festivities. Council will honour the well-established route of the Sma

Page 5

21/02/2024 
Shot Parade and celebrations this year and for the foreseeable future.
Council will also honour the traditions involved with this day of the
workers conquest over the corks and will continue with the burning of
the cork. Sma Shot Day is a day of immense pride to the people of
Paisley. Council will agree to continuing to take the parade to the top of
Causeyside Street onto the High Street and round onto Cotton Street
and ending on Bridge Street, with all the stalls and entertainment
historically provided as expected and enjoyed by the people of
Renfrewshire." 
12  Notice of Motion 4 by Councillors Steel and J Cameron
“TALBOT BRIDGE GRAPHICS 
“Council notes the deterioration in the condition of the ‘Talbot Bridge’
graphics at Linwood Toll. 
Council agrees that preservation of heritage plays an important role in
community identity and directs the chief executive to write to Network
Rail asking them to engage with stakeholders to explore options to
restore the signage.””

Page 6

No embedded text on this page.

Page 7

LOCAL GOVERNMENT FINANCE ACT 1992 - SECTION 112
RESTRICTIONS ON VOTING BY MEMBERS
The attention of Members is drawn to the provisions of Section 112 of the Local
Government Finance Act, 1992. This section has the effect of restricting the voting
rights of Members on certain issues if they are in arrears with Council Tax payments.
The legislation applies to a Member in attendance at a meeting of the Council, or of
a Committee or Sub-Committee of the Council or representing the Council’s interest
at a Joint Committee meeting or Sub-Committee thereof.
If at the time of the meeting a Member is 2 months or more in arrears in payment of
the Council Tax, the Member will be restricted in voting on matters which relate to:
1. Setting or adjusting the rate of Council Tax;
2. Matters relating to the administration, enforcement and collection of the
Council Tax or Council Water Tax.
If a Member falls into arrears as defined by the legislation, the Member is required to
disclose this fact at any relevant meeting as soon as practical after it starts. The
Member may participate in any debate on the relevant agenda item but the Member
should not vote on any matters related to the agenda item.
If the Member does not disclose the restriction due to arrears of Tax and/or votes on
a restricted issue the Member will have committed an offence, and on convictions,
will be liable to a fine not exceeding level 3 on the standard scale (currently £1,000).
The Member will not be guilty of the offence if he/she can prove he/she did not know:
(a) that Section 112 of the 1992 Act applied to him/her at the time of the meeting;
(b) the tax item was the subject of consideration at that meeting.
The responsibility for identifying whether a Member is in arrears with Council Tax
rests with the Member.
Page 1 of 192

Page 8

Page 2 of 192

Page 9

PROCEDURE TO BE FOLLOWED AT THE MEETING 
OF RENFREWSHIRE COUNCIL 
TO BE HELD ON 29 FEBRUARY 2024 
DURING CONSIDERATION OF ITEM 3 CONCERNING 
REVENUE ESTIMATES AND COUNCIL TAX 
FOR THE FINANCIAL YEAR 2024/25 
The purpose of this note is to give Members advance notice of the procedure which Provost
Cameron has agreed should be followed at the Meeting of the Council on 29 February 2024. 
1. The Convener of the Finance, Resources & Customer Services Policy Board (the Convener)
will make his budget statement for financial year 2024/25 and move as appropriate. He will
then speak to the principal points of his proposals. The motion will require to be seconded.
2. The Leader of the Council will second the motion and may address the meeting then or
reserve the right to speak at a later stage of the debate.
3. For the purposes of the subsequent discussion and voting, the Convener's proposals will be
taken as one motion.
4. An opportunity will then be given to the Leaders of the opposition groups and any other
Members to move, and to have duly seconded, comprehensive amendments to the motion
(i.e. taking together proposals for resource allocations, budget proposals, revenue estimates
and the level of the council tax for the financial year 2024/25).
5. The motion and any amendments will require to be produced in writing and a copy given to
each of the Members present prior to being spoken to at the meeting. Provost Cameron may
then adjourn the meeting for 20 minutes to allow Members to consider the terms of the
motion by the administration and any amendments by the opposition groups or other
Members.  Corporate Meeting Rooms have been arranged for the adjournment as follows: 
Administration – Corporate Meeting Room 2, Labour - Corporate Meeting Room 1,
Conservative – Corporate Meeting Room 3.  The other Members will be able to remain in the
Chambers.
6. There shall be no formal restriction upon the length of time given to the Convener and the
Leaders of the opposition groups and any other Members to move their respective budget
statements and speak in support of the principal points of their proposals. However, Provost
Cameron shall have the power to require any person speaking to limit their speech in order
to facilitate the conduct of the meeting.
7. Provost Cameron will then invite other Members to take part in the debate including
Conveners of the Policy Boards who may wish to take the opportunity to respond concerning
the services for which they have responsibility.
8. The debate will conclude with Provost Cameron giving the Convener the opportunity to reply.
9. A vote or votes will then be taken in accordance with the provisions of standing orders.
Item 3
Page 3 of 192

Page 10

Page 4 of 192

Page 11

___________________________________________________________________ 
To:  Council  
On: 29 February 2024
___________________________________________________________________ 
Report by: Director of Finance & Resources 
___________________________________________________________________ 
Heading: Revenue Budget and Council Tax 2024/25
___________________________________________________________________ 
1. SUMMARY 
1.1 This report provides Members with an overview of the Council’s anticipated financial position
on the General Fund revenue budget and sets out the information required for the Council to
set its budget and Council Tax for 2024/25. Members are expected to bring forward proposals
to secure a balanced budget, and to assist in this, Directors have been providing details of
the financial, service and equality implications of any changes to current service levels, as
requested by Members.
1.2 Members will be aware that the Council is experiencing a hugely challenging and complex
set of financial circumstances. It is recognised that moving into 2024/25 and beyond, the
financial environment that local government in Scotland is facing will remain heavily
constrained, with substantial risks even in the short term in relation to cost growth and income
constraints.  Longer lasting legacy impacts on service costs, service demand and income
streams are anticipated. 
1.3 Members will be required to take these circumstances into account when setting the 2024/25
budget, recognising that the Council’s immediate and medium-term challenges remain
significant. Additionally, as reported to Members throughout the year and subject to decisions
taken by Council, there will be a need for the budget position in 2024/25 - as was the case
in 2023/24 - to rely heavily on the use of ringfenced reserves to address the forecast budget
deficit. This solution must be viewed as temporary, and the Council must act in the near term
to contain spend within available resource on a recurring basis. 
Page 5 of 192

Page 12

1.4 The economic outlook remains very subdued, with fears of a recession now confirmed.
Inflation rates have begun to fall, but core inflation remains stubbornly high. The year ahead
is unfortunately unlikely to see much improved prospects over that experienced in recent
years; but the degree of uncertainty remains high due to geo-political concerns, the outcome
of wage settlements, and government spending and taxation decisions. 
1.5 The Scottish Budget was announced on 19 December, again for one financial year only.
Resource is prioritised to social security and the Scottish Government priorities of eradicating
child poverty, supporting the transition to net zero and ensuring sustainable public services. 
1.6 The local government settlement benefits from a headline cash increase; however COSLA
has calculated there is a £63 million cut in core revenue funding. In addition, funding of
£147m has been set aside in the Scottish Budget to compensate councils who agree to
freeze council tax at 2023/24 levels. 
1.7 The key elements of the Council’s revenue settlement are set out as follows: - 
(i) Circular 8/2023 confirmed Scottish Government revenue grant funding in 2024/25 for the
Council of £416.455 million. The local government finance order laid before Parliament
on 7 February updated this allocation to £422.373 million.
(ii) After adjusting for new responsibilities, areas of growing responsibility and other
conditional aspects of the settlement, this provides a like for like comparison to 2023/24
where the Council’s underlying core grant has increased by £1.507 million (0.4%) –
marginally ahead of the flat-cash position the Council had assumed.
1.8 The Scottish Government has opted not to announce a Public Sector Pay Policy for 2024/25
until after the UK Spring Budget is announced on 6 March. Despite a falling forecast, the high
levels of inflation still being experienced will present a challenging environment in which to
reach agreement on pay levels. 
1.9 The medium-term financial outlook for the Council remains bleak. There are now permanent
cost and service impacts from the pandemic (particularly in relation to children’s social care);
however, pay and revenue grant continue to be the two biggest determinants of the Council’s
financial outlook. Members have previously been advised that the Scottish Government block
grant is likely to incorporate only very moderate increases over the remainder of the spending
review period to 2025/26. This provides no confidence that the local government settlement
in future years will reflect a sufficient degree of increase to address core budget pressures.
1.10 The Council has consistently and correctly taken a medium-term view of its financial position,
agreeing transformation and savings measures that have ensured the Council positively
addressed the forecast medium-term budget deficit, whilst supporting temporary investment
in priority areas. There has however been significant disruption to the Council’s
transformation programme in recent years which has left the Council in a position where the
traditional position of savings being delivered ahead of need has dissolved. It is certain that
transformation and efficiency saving activity alone will not address the scale of financial
pressures the Council is facing over the medium term.
Page 6 of 192

Page 13

1.11 Applying a central range of assumptions for the three-year period beyond 2024/25, derives
a forecast budget deficit range of broadly £45 - 50 million over this period (before any
decisions on the level of Council Tax but after assumed delivery of £30 million of recurring
savings). This forecast outlook is based on relatively tight grant and pay assumptions
informed by the current financial settlement and the Government’s Medium Term Financial
Strategy, as well as likely affordability constraints in relation to future pay awards. Factoring
in an assumption of 5% increase each year in Council Tax levels would reduce this range to
£30 - 35 million.
1.12 For 2024/25, budget assumptions have been updated as appropriate, including the
confirmed grant available to the Council and associated conditions, the impact of new
obligations, the likely impact of increasing demographic and demand pressures and
expected Council Tax yield levels for 2024/25. After taking account of the cumulative impact
of each of these issues, there is a recurring budget deficit for 2024/25 of £9.284 million,
subject to any further decisions taken by Members. 
1.13 Given the scale and unprecedented nature of the financial sustainability challenge that lies
ahead for the Council, in setting the 2024/25 budget, it is strongly recommended that any
commitments by Members that would result in additional recurring expenditure that would
have the effect of increasing the projected medium-term deficit in future years should be
supported by offsetting sustainable savings or increased resources arising from an increase
in Council Tax. Finally, Members are encouraged to take a holistic view of the Council’s total
resources, covering both capital and revenue. In coming to final budget decisions, Members’
attention is drawn to unallocated capital resources available to the Council of £2.000 million,
as detailed at Item 4 of this agenda. 
2. RECOMMENDATIONS 
Members are asked to:- 
2.1 Submit for approval proposals for any savings, investments, and service changes as part of
delivering a balanced budget for 2024/25, and in doing so: -   
x to consider the equality impact of any proposed service changes as referred to at
paragraph 8.3
x to assess whether adequate provision is being made in the 2024/25 budget to deliver
against the specified commitments linked to the Council’s grant settlement for 2024/25,
as detailed at section 4. 
2.2 Approve the provisions for inflationary pressures, as recommended at section 5. 
2.3 Approve the revenue estimates for all services for 2024/25 subject to adjustment for the
allocation of specific grants, inflationary allowances and any proposals for service changes
approved by Council. 
Page 7 of 192

Page 14

2.4 Approve the financial measures outlined in section 5, including the release of additional
resources made available in 2024/25, to Renfrewshire Health and Social Care Partnership. 
2.5 Approve the proposals in relation to reserve balances as recommended in section 12. 
2.6 Submit for approval the Council Tax banding levels A to H inclusive to apply for 2024/25,
noting the information outlined in paragraph 9.4. 
3. FINANCIAL OUTLOOK UPDATE
3.1 Successive reports to the Council have highlighted the increasingly challenging financial and
economic environment the Council is facing, predominantly linked to continually increasing
costs and continuing high (but falling) levels of inflation. While volatility in financial markets
appears to have subsided (although risks remain largely driven by increasing geo-political
tensions), there remain challenges for both Scottish and UK economies, with the recent
announcement that the UK entered a ‘technical recession’ in the latter half of 2023 being of
little surprise given the general economic environment of flat growth.
3.2 Inflation remains relatively high, with the Bank of England again in January holding rates
steady at 5.25% an effort to tackle this. While inflation rates have begun to fall, core inflation
(which excludes energy and food costs) remain stubbornly high ranging from 5-6%.
Construction inflation is particularly problematic for the council, with both repairs and capital
projects significantly affected. Energy prices also continue to be a concern. Forecasts
generally imply that inflation will gradually fall over the course of 2024, with the Bank of
England suggesting CPI will fall to around 3% by the end of the year; however, the ongoing
uncertainty with regards wage inflation could materially affect these forecasts. High levels of
inflation have created a cost of living crisis for households, with many struggling to fund
rapidly increasing household costs even as wage growth is improving.
3.3 The year ahead is unlikely to see much improved prospects over that experienced in the past
2-3 years; but the degree of uncertainty remains high depending on several factors such as
the war in Ukraine, the outcome of wage settlements, and UK government spending and
taxation decisions. It is expected there will be a UK general election in the later half of 2024,
however the incoming administration is unlikely to have much room for manoeuvre given
their inheritance of a very high tax burden, strained public services and high levels of public
debt.
3.4 In terms of the public finances, and particularly those in Scotland, previous reports to Council
have outlined the pressure the Scottish Government budget is under with increasing service
demands in the NHS and the transfer of social security benefits under the administration of
the Scottish Government bringing additional costs. Therefore, significant medium-term
uncertainty remains for the Council in relation to future government grant prospects and the
Council will be required to continue to plan for a range of potential scenarios, predominantly
reflecting downside risks. There appears to be little prospect of multi-year settlements being
possible so the year-to-year cycle will continue, making longer term financial planning difficult
for both Scottish and local government.
Page 8 of 192

Page 15

3.5  The Council’s medium term financial outlook continues to be based largely on an assumed
“flat-cash” revenue settlement over the medium term with a slight uptick of 1% possibly from
26/27. However, and as outlined in previous reports, it is cost increases which are driving the
extremely challenging financial outlook. Incorporating an affordable level of pay increase
over the period 2024/25 to 2027/28, and a reducing level of inflation on supplies and services
costs suggests that the Council is facing a £45-50 million funding gap over this period, before
any decisions on council tax. Assuming an average 5% council tax increase in each of these
years would reduce the funding gap to £30-35 million. This position was outlined in the
financial update to Council in December 2023, and has not materially changed since. It is
worth reiterating the broad context as detailed in the December financial update – even after
an assumed delivery of £8m of savings each year from 2025/26, there remains an £8m
recurring financial gap at the end of 2027/28. Assuming this level of saving is actually
delivered, over the period from 2021/22, savings in the order of £50 million will have been
delivered, simply to enable the Council to stand still financially.
3.6 Given the long period since 2010 of securing very significant transformation, efficiency and
corporate financing savings totalling in the region of £180 million (including 2024/25), the
Council will be unable to generate further recurring transformation and efficiency savings at
this scale without impacting on service delivery or quality. Additionally, over the last decade,
nationally set directives as part of grant settlements as well as local priorities, has protected
spend in key areas such as Education and Social Care - which constitute around two thirds
of the Council’s budget. This has resulted in the other non-protected service budgets - which
account for the remaining one-third of total spend and cover service areas such as
Environment & Infrastructure, Economic Development & Employability, Community Services
and Customer & Corporate Support functions - being required to carry the burden of
delivering cost reduction and savings over this long term period. Securing further savings at
scale from these service areas will be exceptionally challenging. While transformation and
the opportunity for increased efficiency will continue to be key priorities, it is likely that
material service reductions and spending cuts will be a necessary requirement if the Council
is to remain financially sustainable. 
3.7 As outlined later in this report, the Scottish Government has in 2024/25 continued to set
conditions which will require each council across Scotland to protect spending on teaching
and other school staff as well as social care spending – with financial sanctions applying
where conditions have not been met. These continuing restrictions reduce the flexibility for
the Council to manage delivery of the required cost reductions and focus financial savings
disproportionately from the non-protected areas of spend. 
4. GRANT SETTLEMENT 
4.1 On 19 December 2023, the Scottish Government published its draft budget for 2024/25,
which is subject to parliamentary approval over the course of February 2024. On 21
December, the draft local government finance settlement was published, as set out in the
Local Government Finance Circular 8/2023, which provided details of the provisional revenue
and capital funding allocations for 2024/25 for local government across Scotland. 
Page 9 of 192

Page 16

4.2 Circular 8/2023 confirmed Scottish Government revenue grant funding in 2024/25 for the
Council of £416.455 million. The Deputy First Minister (DFM) outlined associated issues in a
letter to all Council Leaders that set out specific commitments to be read in conjunction with
the detail of the financial settlement that make up the provisional funding allocation and which
constitute: - 
a) The continued prioritisation of financial support for social care. Included within the local
government settlement, the Government has provided an additional £241.5 million
nationally to support health and social care as delegated to Integration Joint Boards
broken down as follows:
x £230m to deliver a £12 per hour minimum pay settlement for adult social care
workers in commissioned services via agreed contract uplifts; 
x £11.5m to uplift free personal nursing care rates
The government confirmed that taken together, the total additional funding of £241.5
million is to be additional to each Council’s 2023/24 recurrent spending delegated to
Integration Authorities and not be substitutional i.e. these allocations must be passed to
the HSCP for these delegated services. This position is explained further in section 5
below. 
b) The Deputy First Minister also outlined a number of other issues:
x Under the Verity House Agreement, the Scottish Government will continue to work
with COSLA in the development of a fiscal framework and reduced ringfencing of
resource. 
x The local government settlement figures excludes funding for teacher pension
contributions due to an increase in the employer contribution rate. The rate is set to
increase from 23% to 26% from 1 April 2024, following the conclusion of the 2020
scheme valuation. The UK Government have publicly stated that the funding will be
allocated to individual UK Government departments in Spring 2024. Scottish
Ministers will make decisions on funding allocations once the UK Government funding
position is clearer, however the DFM has confirmed that funding received by the
Scottish Government in relation this rate increase will be passed to local government.
x An expectation that local government will continue in good faith to engage in a range
of discussions about future policy direction eg the development of the National care
Service. 
x The settlement includes £145.5m to continue to maintain teachers and support staff
as well as £242m to support teacher pay uplifts. The offer to baseline this and other
education related funding totalling £564.1m funding is conditional upon the
agreement that, by the end March 2024, the assurance framework being sought by
the Cabinet Secretary for Education and Skills is in place and that the new joint
Education Assurance Board has been established. The position on this has changed
over the course of the budget approval process as outlined in 4.4 below.
x The settlement also included £144m in relation the proposed council tax freeze,
subsequently marginally increased to £147m nationally over the budget consultation
period. Receipt of this funding is conditional on councils agreeing to freeze council
tax for 24/25 at 23/24 rates. 
Page 10 of 192

Page 17

The Renfrewshire grant figure as outlined in Table 1 below excludes the Renfrewshire
share of this £147m – currently estimated at £4.897m – equivalent to a 4.4% council
tax increase. 
4.3 Subsequent to the finance circular being issued, the local government finance order was laid
before Parliament on 7 February, which provided an update to the settlement figures
previously advised. The movement is predominantly due to the distribution of items within
the settlement which were previously undistributed eg the £230 million to deliver a £12 per
hour minimum pay settlement for adult social care. The revised revenue grant allocation for
Renfrewshire is therefore confirmed at £422.373 million. The increased grant does not
however translate to an increase in available resource, given much of the increase relates to
committed spend or is mandated to be passed to the Integration Joint Board. 
4.4 In addition, the Council has received a letter from the Cabinet Secretary for Education and
Skills which outlines a change of approach from the Scottish Government in relation to the
£145.5 million in the settlement related to teacher numbers mentioned above. The Cabinet
Secretary is concerned with the reduction in teacher numbers nationally, and has therefore
decided that this funding will be allocated to councils via specific resource grants, and those
grants will be conditional on councils agreeing at the outset to maintain teacher numbers.
The Council has not been advised as at the time of writing what the conditions associated
with this now specific grant funding will be, and therefore cannot judge whether these
conditions will be acceptable for the Council. The base budget outlined in the remainder of
this report is based on an assumption that this funding – estimated to be £4.801 million – will
be received; however in the event the associated conditions of the grant are unacceptable,
this funding will be at risk. 
4.5 The Council’s settlement figure includes a number of adjustments for new spending burdens,
responsibilities, and conditional funding totalling £32.658 million, linked primarily to the pass-
through of funding to the Integration Joint Board; and the baselining of funding for the
2023/24 pay award. 
4.6 After adjusting for these areas of new burdens funding, new responsibilities, conditional
funding and timing differences in the distribution of funding, the Council’s 2023/24 core grant
figure as set out in the provisional local government finance settlement has, on a like-for-like
basis, increased by 0.4% from 2023/24, marginally improved on the flat cash assumption
which the Council had been working to. The Council’s share of the overall local government
revenue funding settlement has increased marginally from 3.20% to 3.23%. 
Page 11 of 192

Page 18

4.7 The total revenue grant funding therefore available to the Council is set out in Table 1 below: 
Table 1 – Grant Settlement 2024/25   
4.8 At the time of writing, the Budget Bill remains to be approved by the Scottish Parliament. 
5. SPENDING AND DEMAND PRESSURES 
5.1 An analysis has been enclosed with this report detailing, for each service, the proposed
budget changes between 2023/24 and 2024/25. The budget has been adjusted to reflect: - 
(i) the continuing costs of the current level of service, including inflationary costs related
to current service levels; 
(ii) the financial impact of any decisions already taken by the Council or its Policy Boards,
as well as required adjustments to budgets to reflect specific aspects included within
the financial settlement. 
5.2 Demographic, socio-economic and - significantly - inflationary factors continue to play a
major role in driving core spending pressures for the Council, with practically all areas of the
Council affected either in terms of income loss or increased cost pressures. As has been
reported to Council over the course of 2023, high levels of inflation have continued, which
along with specific service pressures has resulted in a projected overspend position in
2023/24 which is outlined in further detail in section 12 below. Economic forecasts suggest
that the level of inflation will continue to reduce over the course of 2024, however the price
increases which have been experienced are very unlikely to be reversed – simply the pace
of increases in prices will slow. 
5.3 In setting previous budgets, the Council has traditionally opted not to apply any general
inflationary uplift to non-pay budgets. Given the very significant financial challenges facing
the Council, in particular over the medium term and in line with historic practice, general non-
pay inflation is not provided for in the 2024/25 budget. However, where specific price and
cost pressures are obvious, for example in relation to food and catering supplies, additional
budget provision has been incorporated into the draft position outlined in this report. 
£000 £000
EstimatedFunding
SpecificGrants(includingteachernumbers) 12,102
NonDomesticRateIncome 107,505
RevenueSupportGrant(excludingCTfreezecompensation) 307,567
TotalGovernmentGrantanticipated 427,174
2024/25SummaryofRevenueEstimate2024/25
Page 12 of 192

Page 19

5.4 Over the course of the pandemic, the level of income from on and off street parking (and
associated fine income) reduced considerably. In the past three financial years an under-
recovery of income of approximately £1m has been incurred. The revised parking strategy
agreed by the Infrastructure, Land and Environment Board in November 2023 is assumed to
partially address this under-recovery position, however the actual levels of income secured
will require to be closely monitored. It is anticipated that income levels will not return to pre-
pandemic levels and therefore provision has been made within the base budget to address
this. 
5.5 The recommended 2024/25 base budget position detailed in Table 3 includes a provision for
pay inflation that reflects what is affordable for the Council, recognising that there is also an
element of unfunded pay award from 2023/24 which also requires to be addressed. It is noted
that initial pay claims received by COSLA exceed the level of provision which has been
incorporated into the budget, and the position remains subject to negotiation. 
5.6 In agreeing the 2023/24 pay award, the Scottish Government provided additional funding to
local government, being a combination of revenue and capital funding which is now largely
baselined within the 2024/25 grant settlement. In recent years, the Council and HSCP have
operated under a financial planning assumption that pay award costs will be funded within
the total resource available to the HSCP, with no general pay inflation funding being provided
by the Council. However, given the specific funding received and now baselined in 2024/25
in relation to the 2023/24 pay award, and following discussion with the HSCP Chief Financial
Officer, it is proposed that a proportion of this funding will be provided to the HSCP on a
recurring basis. This sum (£1.426 million) will be provided to the HSCP in addition to the
funding provided within the settlement (outlined at paragraph 5.9 below) which the Scottish
Government has mandated be passed to the HSCP. 
5.7 The Financial Regulations require charges for services to be reviewed at least annually. The
overview of the Council’s spending in Table 3 makes provision of £0.279 million for an
inflation adjustment to charges at 5%. 
Adult Social Care 
5.8 In terms of the core Adults and Older People Services budget, the HSCP is reporting a
2023/24 forecast year end overspend position of £1.8m. It is expected that this year-end core
overspend will be funded from reserve balances. The HSCP is also indicating that it faces
significant financial pressures moving in to 2024/25 and is considering a range of savings
options in order to address this forecast position.   
5.9 As outlined above, there are specific conditions within the local government settlement which
mandate the pass-through of funds related to social care to Integration Authorities. In
2024/25 there is a total of £241.5 million within the settlement nationally which requires to be
passed through:  
Page 13 of 192

Page 20

Table 2
Funding National funding
£m
Renfrewshire
allocation
£m
£12ph minimum pay in commissioned services 230  7.657
Personal & Nursing Care 11.5 0.234
Total 24/25 funding per FC 8/23 241.5 7.891
23/24 Living Wage funding confirmed 100 3.035
Baselined 23/24 pay funding  1.426
Total pass through  12.352 
5.10 In addition to the £241.5m, the Council will require to baseline funding agreed in 23/24 in
relation to the Living Wage. When the 23/24 Council budget was set, the distribution of this
funding was not confirmed, however now the Renfrewshire share is confirmed, this requires
to be baselined.  Further, as outlined above, it is proposed that the funding secured from the
Scottish Government in relation to the 2023/24 pay award (and which is baselined within the
2024/25 settlement) will be passed to the IJB on a proportionate basis. The HSCP share is
£1.426 million; which when added to the other funding outlined above will result in £12.352
million of funding being passed to the IJB, fully complying with Scottish Government direction. 
Children’s Services 
5.11 Funding in relation to teacher numbers has been assumed within the grant allocation from
the Scottish Government. This funding will however be formally ringfenced with associated
conditions, the risks of which are outlined in section 4 above, and the Council must remain
alert to the possibility that some or all of this £4.801 million of funding may be retained by the
Scottish Government if the associated conditions are not satisfied. 
5.12 In terms of known pressures on the education service financial position, the increased costs
of pupil transport are noted and provision has been included within the draft budget to
address this; however the position will continue to require close monitoring. Within the wider
Children’s Service, additional budget provision has been made in order to fund the costs
associated with the introduction of a national payment rate for foster and kinship carers from
1 April 2023. While additional funding was received from the Scottish Government related to
this, the funding received is insufficient to cover the full cost. 
5.13 Successive reports to Council and relevant policy boards have highlighted the very significant
cost and service pressures being experienced in children’s social care, particularly in relation
to external placements. Council agreed in setting the 2023/24 budget to incorporate an
additional £2 million into base budgets for this purpose, while also acknowledging that this
amount was likely to be insufficient and potentially a further £3 million may be required to be
funded from reserve balances. This forecast position has broadly held, and the 24/25 base
budget has been increased to reflect the current level of cost pressure being experienced. 
Page 14 of 192

Page 21

5.14 Table 3 below summarises the recommended base budget adjustments for 24/25. 
Table 3 - Summary of Recommended Base Budget Adjustments 2024/25 
6. FINANCING COSTS AND LONG-TERM BORROWING 
6.1 The provision for financing costs includes both debt charges payable as a result of the
Council's capital investment programme and the interest gained on temporary investment of
cash. The Council has previously agreed to a number of corporate financing adjustments in
order to address the longer term financial outlook for the Council – including agreement to
revise the Council’s accounting for service concession arrangements – most notably the
schools PPP contract. The implementation of these revised accounting arrangements will
provide ongoing support to the Council’s revenue budgets over the medium term. 
6.2 The pausing of the Right for Renfrewshire programme during the pandemic years impacted
on the level of planned savings, with the result that the Council has required to use longer
term capital financing flexibilities to bridge the savings gap over the medium term. This
approach will result in higher borrowing costs in the longer term, and this will require to be
met through appropriate base budget adjustments in the coming years and the release of
long-term flexibility resources. In setting the 2022/23 budget, Members agreed to adjust the
base budget by £7.5 million, in the knowledge that this position would require to be unwound
over the medium to longer term.  
ImpactofpreviousCouncilandBoardDecisions £000 £000
ReversalofoneͲoffinvestments(Mod2023) (300)
RightforRenfrewshireSavings (1,577)
FinancialSustainabilityWorkstreams (2,802)
Corporatebudgetadjustments (4,185)
TotalReductions (8,864)
AddUnavoidablePressures:
FinancialSettlementadjustmentsHealthandSocialCare 10,926
HSCPshareof23/24payfunding 1,426
FinancialSettlementadjustmentsOther 3,195
Pay/staffrelated 1,234
ContractPaymentAdjustments 8,390
RequisitionAdjustments 613
OtherUnavoidablePressures 2,073 27,857
Longtermdebtbudget 1,225
NetIncreaseinProvisionforinflationarypressures(pay) 27,702
NetBaseBudget(Reduction)/Increase 47,919
2024/25
Page 15 of 192

Page 22

The proposed base budget for 2024/25 incorporates the continued re-building of the loans
charges budget, with a provision of £1.225 million being made, which also includes provision
for loans charges associated with City Deal investments. Provision on this scale will require
to be made over the medium to longer term in order to rebuild the core loans charges budget;
with non-recurring support in the interim being provided through a draw on the ringfenced
loan charges flexibility fund. The actual position will be influenced predominantly by the
progress of capital investments, with any rephasing of spend on capital projects in effect
deferring the requirement to draw from balances. Updates on this position will be reflected in
future reports to Council. 
7. SAVINGS 
7.1 Reports to Council over the course of 2023 and previous years have outlined a range of
service transformation activity alongside the development of a range of financial sustainability
workstreams which aim to achieve savings over the medium term. 
7.2 The Council’s main transformation programme – Right for Renfrewshire (RFR) – has been
the main route for the Council to transform services and release efficiencies, supporting the
delivery of recurring savings over the medium term. Members will be aware that, at the onset
of the coronavirus pandemic, a decision was taken to pause the programme, recognising the
capacity of the Council required to be fully diverted to support the emergency response. Due
to both the time taken to recommence transformation activity, and, more acutely, the
significant increase in cost pressures over the past 24 months, the Council’s development
and delivery of savings has fallen behind the level required to support overall financial
sustainability. 
7.3 Nonetheless, service reviews have taken place in discrete areas of the Council –
predominantly within Finance & Resources and the Chief Executive’s Service, and also the
operations and infrastructure service within Environment, Housing and Infrastructure, with
further work ongoing within Children’s Services headquarters. Based on work undertaken by
services to date, and that for which specific plans are being developed over the next 12 – 18
months, it is estimated that £1.6 million of savings can be confidently incorporated into the
2024/25 base budget. 
7.4 In relation to the financial sustainability workstreams, work has progressed over recent
months with regards many of these; however it is apparent that the original ambition with
regards the scale of savings (£20 million target) is not going to be achievable within the 3-
year period under consideration now that further investigation has been undertaken.
Nonetheless, many of the workstreams have indicated potential to deliver savings in the
longer term, or in some cases, while not delivering significant savings in their own right, the
work is important to undertake as it is a critical enabler in the delivery of other service
changes or savings. For example, development and improvement of the Council’s web
presence through the Digital Experience project will take some investment in the short to
medium term, however this is a key enabler in increasing digital ways of working and digital
customer services, which will generate efficiencies in the longer term. Work to date would
suggest that £2.8 million of savings can be confidently incorporated into the 2024/25 base
budget (incorporating the inflationary uplift in fees and charges as outlined at 5.7 above). 
Page 16 of 192

Page 23

As outlined above there remains a considerable amount of development required for some
proposals and there is scope for further achievement of savings, in particular from a much
more critical examination of the Council’s property holdings – not just in terms of current
operating costs but importantly having an eye to future very significant lifecycle maintenance
and component replacement requirements. 
7.5 In addition, a recurring saving has been possible through the reduction in employer pension
contributions for the local government workforce as previously advised. A saving of £2.3
million has been incorporated into the draft budget. This is exclusive of the temporary saving
which will be generated from the temporary further reduction in employer contributions
payable in 2024/25 and 2025/26 which Council has previously agreed will be utilised to
support the Council’s medium term financial position. 
7.6 Taken together, the above savings total of £8.564 million will, when added to the reversal of
one-off spend associated with delivery of the Royal National Mòd in 2023, provides £8.864
million of recurring support to the 2024/25 revenue budget position. 
8. EXPENDITURE OVERVIEW 
8.1 The Council approved spending for 2023/24 of £499.343 million. It is estimated that £547.262
million (as detailed in Table 4) is needed to fund the costs of maintaining present service
levels, provide for new responsibilities and conditional funding commitments provided as part
of the financial settlement, new cost burdens and addressing known pressures and demands
in 2024/25. 
Table 4 – Estimated Spending Need 2024/25 
£000 £000
EstimatedFunding
EstimatedSpendingneed2023/24 499,343
AdjustmentsperTable3
Budgetreductions (8,864)
Unavoidablebudgetincreases 27,857
LongͲtermdebtbudgetprovision 1,225
20,218
BaseBudget2024/25 519,560
Inflationarycostprovision(pay) 27,702
EstimatedSpendingNeed2024/25 547,262
SummaryofRevenueEstimate2024/25 2024/25
Page 17 of 192

Page 24

8.2 As is well recognised by Members and as highlighted throughout this report, significant cost
pressures are anticipated to persist beyond 2024/25 for the Council. Members will continue
to be updated with regards the medium term financial position, but they should be aware that
in setting the 2024/25 budget any commitments to additional recurring expenditure will
increase the projected deficit in future years, unless they are offset by recurring savings or
increases in Council Tax or other income. Similarly, any decision taken now to address the
future year budget deficits provides greater certainty for service planning and the workforce,
and also supports the future financial stability of the Council. 
8.3 Where the Council is making decisions in relation to its spending priorities, it is obliged to
comply with the public sector equality duty set out in the Equalities Act 2010. This means
that the Council must have due regard to the need to: 
x Eliminate unlawful discrimination, harassment and victimisation and other prohibited
conduct;
x Advance equality of opportunity between people who share a relevant characteristic and
those who do not; and
x Foster good relations between people who share a protected characteristic and those
who do not. 
8.4 To meet this requirement, where necessary the Council must assess the impact of applying
a new policy or decision against these three needs and at the point where a decision is made,
elected members must have sufficient information available to them to assess that impact.
Members, in considering their budget proposals prior to presentation at the Council meeting,
are therefore encouraged to seek advice from Directors on the equality implications of each
proposal, including any which are covered by the Fairer Scotland duty.  Specific service areas
may also need to be impact assessed in relation to Armed Forces Covenant duties or the
Environmental Assessment (Scotland) Act 2005. 
9. COUNCIL TAX 
9.1 The Council’s level of Council Tax (Band D) for 2023/24 is £1,436.17 and is £7.91 (0.6%)
above the Scottish average. It is estimated that in 2024/25 each £1 of Council Tax will yield
£76,804 gross (£62,894 net of adjustment for Council Tax Reduction), higher than 2023/24.
The increase in the yield reflects anticipated growth in the Council Tax base. 
9.2 A maximum net gross yield of £110.9 million can be anticipated from the forecast Council
Tax base, the new agreed policy in relation to an additional charge on second homes and
present Council Tax levels. Within the context of the current service resources, specific
collection initiatives continue to be implemented to support the collection of Council Tax,
including the recovery of arrears for prior years.  It is anticipated that £0.500 million will be
collected next year from prior years.  
Page 18 of 192

Page 25

9.3 As outlined above, the Scottish Government has announced their intention to provide
compensatory funding to those councils who agree to freeze council tax at 23/24 levels. An
initial sum of £144m nationally has been earmarked within the Scottish Budget for this
purpose, marginally increased to £147m over the period since to the draft budget was
published. Renfrewshire’s share of this funding, assuming the Council agrees to freeze
council tax, will be £4.897 million – broadly equivalent to a 4.4% council tax increase. 
9.4 Members will recall from the financial update report to Council in December, the assumed
level of council tax increase in 24/25 was 6%, with a cumulative minimum 19.5% increase
assumed over the next four financial years. Increases at this level will still leave the Council
with close to a £30 million financial gap over this period – after savings of close to £30 million
are assumed to have been delivered. Accepting the council tax freeze funding will place the
council further behind in terms of meeting this challenging financial outlook; and members
should be aware that this position will require to be recovered in terms of future years council
tax increases. 
9.5 Members are required to determine the level of Council Tax for Bands A to H inclusive, which
should apply for 2024/25. 
10. RESOURCE ALLOCATIONS 
10.1 Appendix 1 attached summarises the provisional resource allocation for each service.  The
resource allocations will be subject to amendment to reflect the Council's views on budget
proposals, inflationary pressures and the allocation of central support costs, specific grants
and capital charges. 
11. BUDGET OVERVIEW – 2024/25 
11.1 The overview budget position for the Council for 2024/25, prior to any changes in service
levels or Council Tax levels, is outlined in Table 5 below. For clarity, this position excludes
the £4.897 million compensatory funding on offer from the Scottish Government. This
overview position confirms a recurring budget deficit position which will be temporarily
addressed through the application of the ringfenced financial sustainability fund. As members
are aware, the use of ringfenced reserves can only ever be a temporary solution to the
financial position and should only be agreed while substantive measures are taken to move
the Council’s finances back to recurring financial balance. 
Page 19 of 192

Page 26

Table 5 – Budget Overview 2024/25 
11.2 As outlined at section 4 above, there is a risk that the income related to teacher numbers is
now subject to specific grant conditions. Should the Council not be able to satisfy these
conditions, the estimated deficit above will increase to £14.085 million. 
12. PROBABLE OUTTURN 2023/24, BALANCES AND RESERVES 
12.1 Appendix 1 to this report details an overview of the Probable Outturn for 2023/24. The
Council’s general fund balances as at 1 April 2023 were £127.391 million and, as outlined in
Table 6 below, the significant majority of this was earmarked for specific purposes. This
balance also reflects the previously agreed de minimis in unallocated balances of £10 million,
reflecting the current heightened financial risk environment. As reported to Members over
the course of 2023/24, a year-end overspend position in the order of £7-8 million is projected
for the Council (excluding adult social care services), with an expectation that the financial
sustainability fund would require to be utilised to fund the overspend. 
12.2 The budget agreed by council for 2023/24 also relied on the use of the loans charges
flexibility fund which is to be utilised over the medium term to flexibly support the anticipated
budget gap in loans fund interest repayments and the cessation of loans charges support
while the base budget is rebuilt as outlined at section 6 above. Officers will continue to revise
capital spending and borrowing forecasts, and utilise existing budget and accounting
mechanisms flexibly in order to minimise the potential draw on this fund in 2023/24; however
a draw of up to £3 million may be required – less than the anticipated position agreed by
Council, predominantly due to the delayed completion of City Deal and cultural infrastructure
capital projects. 
12.3 It remains important that the Council maintains sufficient unallocated reserves to provide an
appropriate degree of financial protection and immediate financial resilience moving forward,
and that the level of unallocated reserves held is guided by the risk profile faced by the
Council.  
2024/25
£000
EstimatedFunding
TotalGovernmentGrantadvised 427,174
CouncilTaxIncome 110,304
CouncilTax/CommunityChargeArrearsRecovery 500
TotalIncome 537,978
TotalEstimatedSpendingNeed 547,262
EstimatedDeficit (9,284)
SummaryofRevenueEstimate2024/25
Page 20 of 192

Page 27

12.4 It is recognised that the financial risk profile for the Council has increased significantly over
the past number of years and in this context the Council previously approved to maintain
unallocated balances at a minimum £10 million. The actual outturn on unallocated balances
in 2022/23 of £10.318 million represented 2.3% of the Council’s budgeted net expenditure.
It is estimated that this balance will remain broadly static in closing the 2023/24 financial year
- a level that remains both prudent and appropriate for the Council’s circumstances. As
always, the Accounts Commission will continue to closely monitor the Council’s position in
respect to unallocated reserves as part of its wider assessment of the Council’s financial
stability and resilience. 
12.5 Table 6 below summarises the forecast movement and year-end position of General Fund
balances, including those earmarked for agreed purposes and estimated future liabilities. It
should be noted this forecast is subject to some volatility as the 2023/24 financial position is
closed out.   
Page 21 of 192

Page 28

Table 7 – General Fund Balances 2023/24 
12.6 As previously reported to Council in its consideration of the annual accounts, and as
detailed in Table 7 below, other specific reserves continue to be maintained. 
SummaryofUsableReserves2024/25 Balancesat
1/4/2023
Forecast
Movement
Forecast
Closing
Positionat
31/03/2024
GeneralFundBalances £000 £000 £000
AlcoholandDrugsCommission 1,303 (625) 678
Children'sServices 5,243 (1,123) 4,120
CityDeal 1,619 (1,175) 444
CivilContingenciesSharedService 114 Ͳ 114
CultureBidLegacy 3,093 (2,138) 955
DevelopmentContribution–PaisleyTownCentre 1,057 (1,057) Ͳ
DigitalInfrastructure 2,422 (1,000) 1,422
DiscretionaryBusinessGrants 392 (100) 292
EarlyYearsChangeFund 2,900 (397) 2,503
Employability 9,310 (1,286) 8,024
Environment&Infrastructure 560 (500) 60
FairerRenfrewshireProgramme 4,497 (2,132) 2,365
FinancialSustainabilityFund 21,506 (7,595) 13,911
FlyTippingEnforcement 242 (242) Ͳ
Leisure:InclusivePlayFacility 7 Ͳ 7
LoanChargesFlexibilityFund 44,759 (3,000) 41,759
LocalAuthorityEconomicRecoveryFund 305 (305) Ͳ
LocalHeatandEnergyEfficiencyStrategy 75 (75) Ͳ
MemorialHeadstoneSafety 114 (114) Ͳ
PaisleyTownCentreHeritageAssetStrategy 885 (885) Ͳ
PrivateSectorHousingGrant 2,039 (41) 1,998
PupilEquityFund 1,030 Ͳ 1,030
RapidRehousingTransitionPlan 40 (40) Ͳ
ResettlementandAsylumFund 585 503 1,088
SchoolMusicParticipationFunding 222 (188) 34
ServiceModernisationandReformFund 11,018 (2,015) 9,003
SustainableCommunitiesFund 656 (92) 564
VillagesInvestmentFund Ͳ 200 200
WelfareReform 1,079 (593) 486
UnallocatedGeneralFundBalance 10,318 (10) 10,308
TotalGeneralFundBalances 127,390 (26,025) 101,365
Page 22 of 192

Page 29

Table 7 – Specific Reserves 2023/24 
12.7 The Insurance Fund covers the main classes of insurance and is earmarked for insurance
purposes such as the cost of insurance excesses and premiums. 
12.8 The Reservoir Repairs Fund represents funding received from a developer for repairs in
perpetuity in relation to the Thornly Dam. 
12.9 The Education Capital Items fund is earmarked for specific schools for the planned
purchases of a capital nature such as computers and information communication
technology equipment. 
12.10 The Investment Capital Fund is used to hold planned contributions to the delivery of the
ongoing capital investment programmes, as well as resources that support the long-term
debt smoothing strategy. These debt smoothing resources are utilised to manage both the
debt levels linked with the capital investment programme and the associated debt servicing
costs i.e. principal repayments, charged to the revenue account each year. 
13. BUDGETARY CONTROL 
13.1 Directors are expected to manage their approved budgets on a bottom-line basis in
accordance with the Financial Regulations.  If an overspend emerges during the year on
any approved budget line the Director is expected to take corrective action, seeking Policy
Board approval for any policy changes involved in such actions. Members should also be
aware that, given the reliance on non-recurring reserves to produce a balanced budget, any
further decisions taken by the Council or Policy Boards to increase spend over the course
of the year must give consideration to how this spend will be funded. 
14. FURTHER ACTION 
14.1 Members wishing clarification of the details of this report or the enclosed Revenue
Estimates pack should contact the Director of Finance & Resources or the Chief Executive
or any Director in relation to their specific service responsibilities. 
14.2 Members wishing advice on budget proposals should contact the appropriate service
Director.
SummaryofUsableReserves2024/25 Balancesat
1/4/2023
Forecast
Movement
Forecast
Closing
Positionat
31/03/2024
SpecificReserves £000 £000 £000
InsuranceFund 2,653 Ͳ 2,653
ReservoirRepairFund 321 Ͳ 321
EducationCapitalItemsFund 2,145 Ͳ 2,145
InvestmentProgrammeCapitalFund 87,956 (5,300) 82,656
TotalSpecificReserves 93,075 (5,300) 87,775
Page 23 of 192

Page 30

—————————————————————————————————————
Implications of the Report
1. Financial - The report and enclosures provide the background information on the
2024/25 revenue budget, identifying a recurring deficit position in year, with a
significant budget deficit of up to £45-50 million forecast over the following three
years. As detailed in the report, if the Council does not comply with the specified set
of commitments linked to the financial settlement offer as part of agreeing the 2024/25
budget, it would be anticipated that the grant settlement will be subject to review by
the Scottish Government, albeit detail on the specific action that would be taken by
the Government has not been confirmed. 
2. HR & Organisational Development - implications will be subject to any budget
proposals agreed. 
3. Community/Council Planning – implications will be subject to any budget proposal
agreed. Members should however keep in mind that over the medium term the
Council is anticipated to have to continue to increasingly make key choices to direct
resources to support the delivery of those outcomes of greatest priority as defined in
the Council Plan. 
4. Legal – the Council is legally required to set a balanced budget. 
5. Property/Assets - implications will be subject to any budget proposals agreed. 
6. Information Technology - implications will be subject to any budget proposals
agreed. 
7. Equality & Human Rights - The Recommendations contained within this report have
been assessed in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the report,
however the final implications will be determined by the budget proposals agreed. If
required following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored. 
8. Health & Safety - none
9. Procurement – none 
Page 24 of 192

Page 31

10. Risk - As outlined in the report, the Council continues to be faced with significant
financial risk in setting its 2024/25 budget in the context of inflationary costs, service
demands and potential funding claw backs. The financial outlook over the medium
term remains loaded with downside risks, principally in relation to factors out with the
Council’s direct control. In addition, the scope of service change required and scale
of cost reduction necessary to align Council spending with available resources over
the medium term brings with it additional risk for the Council. In recognition of this it
is critical that the Council’s financial resilience is maintained and that decisions taken
by the Council pay due regard to the medium-term financial outlook.
11. Privacy Impact - implications will be subject to any budget proposals agreed.
12. Cosla Policy Position – implications will be subject to any budget proposals agreed.
13. Climate Risk – implications will be subject to any budget proposals agreed. 
___________________________________________________________________ 
Author:           Alastair MacArthur, Director of Finance & Resources
Page 25 of 192

Page 32

Page 26 of 192

Page 33

APPENDIX1
2024/25
NetExpenditure
Approved
Estimates
Revised
Estimates
Probable
Outturn Estimates
COMMUNITIESANDHOUSINGSERVICES £000 £000 £000 £000
Children'sServices 242,225 248,982 251,056 253,831
AdultServices 94,264 94,138 95,686 106,490
Environment,HousingandInfrastructure 58,538 57,123 63,072 58,924
FinanceandResources 41,400 41,767 41,767 44,488
MiscellaneousServices 27,243 22,647 21,847 6,750
LeisureServices 13,119 12,629 12,629 13,243
ChiefExecutiveServices 13,352 11,185 11,181 10,580
LoansFund 4,377 5,976 5,976 7,201
StrathclydePassengerTransport 3,168 3,237 3,237 3,238
RenfrewshireValuationJointBoard 1,657 1,657 1,657 1,665
NetExpenditure 499,343 499,341 508,108 506,410
FundingIncome (498,738) (498,737) (498,737) (524,828)
BudgetDeficit/(Surplus) 605 604 9,371 (18,418)
NetExpenditure 506,410
PlusCouncilTaxandNDRmovements(inFundingIncomeabove) 13,150
BaseBudget2024/25perTable4 519,560
RENFREWSHIRECOUNCIL
PROVISIONALRESOURCEALLOCATIONSTATEMENT
(subjecttoamendmentforanybudgetproposalsapprovedbyCouncil)
2023/24
Page 27 of 192

Page 34

Page 28 of 192

Page 35

RENFREWSHIRECOUNCIL PAPER1
SUMMARYOF2024/25REVENUEESTIMATES
ADULTSERVICES
AnalysisofChangebetween2023/24and2024/25 £
2023/24Estimates 94,137,995
AdjustmenttoCurrentYearEstimates
SettlementAdjustments:
SocialCareLivingWage2023/24 3,035,000
SocialCareLivingWage2024/25 7,657,000
FreePersonalandNursingcare 234,000
10,926,000
UnavoidablePressures:
Fullyearimpactof2023/24paysettlement 1,426,000
1,426,000
2024/25Estimates(beforeCouncildecisions) 106,489,995
Page 29 of 192

Page 36

RENFREWSHIRECOUNCIL PAPER1
SUMMARYOF2024/25REVENUEESTIMATES
CHIEFEXECUTIVESERVICES
AnalysisofChangebetween2023/24and2024/25 £
2023/24Estimates 11,185,539
AdjustmenttoCurrentYearEstimates
UnavoidablePressures:
DigitalOfficesubscriptionincrease(COSLA) 16,000
16,000
Transfers(to)/fromotherServices:
ClimateChangeOfficerintobasebudget 62,500
CommunicationsBusinessPartnerFinanceandResources/Corporate 64,380
CommunicationsBusinessPartnerEnvironment,HousingandInfrastructure 169,420
CommunicationsBusinessPartnerChildren'sServices 64,380
360,680
ProposedSavings:
RightforRenfrewshire (232,000)
EconomicDevelopmentͲgrantsubstitution (750,000)
(982,000)
2024/25Estimates(beforeCouncildecisions) 10,580,219
Page 30 of 192

Page 37

RENFREWSHIRECOUNCIL PAPER1
SUMMARYOF2024/25REVENUEESTIMATES
LEISURESERVICES
AnalysisofChangebetween2023/24and2024/25 £
2023/24Estimates 12,629,559
AdjustmenttoCurrentYearEstimates
UnavoidablePressures:
Fullyearimpactof2023/24paysettlement 613,000
613,000
2024/25Estimates(beforeCouncildecisions) 13,242,559
Page 31 of 192

Page 38

RENFREWSHIRECOUNCIL PAPER1
SUMMARYOF2024/25REVENUEESTIMATES
CHILDREN'SSERVICES
AnalysisofChangebetween2023/24and2024/25 £
2023/24Estimates 248,981,605
AdjustmenttoCurrentYearEstimates
SettlementAdjustments:
WholeFamilyWellbeingFund 23,000
PupilEquityFund 11,000
34,000
UnavoidablePressures:
AnnualContractualPPPContractIndexationAdjustment 1,000,000
Externalsecurecare/residentialplacements 3,000,000
ASNTransportcontractualincrease 750,000
NationalRateFosteringandKinship 720,000
MainstreamTransportcontractualincrease 650,000
EarlyYearsProviderRates 400,000
6,520,000
Transfers(to)/fromotherServices:
CommunicationsBusinessPartnertoChiefExecutiveServices (64,380)
(64,380)
ProposedSavings:
FinancialSustainabilityWorkstreams (1,640,000)
(1,640,000)
2024/25Estimates(beforeCouncildecisions) 253,831,225
Page 32 of 192

Page 39

RENFREWSHIRECOUNCIL PAPER1
SUMMARYOF2024/25REVENUEESTIMATES
ENVIRONMENT,HOUSINGANDINFRASTRUCTURE
AnalysisofChangebetween2023/24and2024/25 £
2023/24Estimates 57,122,794
AdjustmenttoCurrentYearEstimates
SettlementAdjustments:
FreeSchoolMealsP6Ͳ7 154,000
154,000
UnavoidablePressures:
SoftFMincomebasebudgetadjustment 900,000
TreeManagementTeam 650,000
CarParkingincome(netofanticipatedincome) 500,000
Foodcostsinflation 500,000
SchoolMealincomebasebudgetadjustmentpostͲexpansion 400,000
ContractPriceIncreaseforWasteDisposal 216,000
MemorialHeadstoneSafety 170,000
Streetlightingcontractualinflation 170,000
SoftFMstaffforDargavelandParkMains 110,000
Onlinecashlessschoolssystem(ParentPay) 103,100
H&SHAVMonitoring 38,500
3,757,600
Transfers(to)/fromotherServices:
CommunicationsBusinessPartnertoChiefExecutiveServices (169,420)
(169,420)
ProposedSavings:
RightforRenfrewshire (1,058,000)
FinancialSustainabilityWorkstreams (883,000)
(1,941,000)
2024/25Estimates(beforeCouncildecisions) 58,923,974
Page 33 of 192

Page 40

RENFREWSHIRECOUNCIL PAPER1
SUMMARYOF2024/25REVENUEESTIMATES
STRATHCLYDEPASSENGERTRANSPORT
AnalysisofChangebetween2023/24and2024/25 £
2023/24Estimates 3,237,698
AdjustmenttoCurrentYearEstimates
Ͳ
2024/25Estimates(beforeCouncildecisions) 3,237,698
Page 34 of 192

Page 41

RENFREWSHIRECOUNCIL PAPER1
SUMMARYOF2024/25REVENUEESTIMATES
FINANCEANDRESOURCES
AnalysisofChangebetween2023/24and2024/25 £
2023/24Estimates 41,767,116
AdjustmenttoCurrentYearEstimates
SettlementAdjustments:
DiscretionaryHousingPaymentsinitialgrantallocation 2,435,000
2,435,000
UnavoidablePressures:
ProgrammeManagementUnitstaffing 249,900
ICTcontractrenewalsandCyberSecurity 128,800
Externalauditfeesincrease 24,270
402,970
Transfers(to)/fromotherServices:
Insurancepremiumcostincrease 213,000
CommunicationsBusinessPartnertoChiefExecutiveServices (42,920)
170,080
ProposedSavings:
RightforRenfrewshire (287,000)
(287,000)
2024/25Estimates(beforeCouncildecisions) 44,488,166
Page 35 of 192

Page 42

RENFREWSHIRECOUNCIL PAPER1
SUMMARYOF2024/25REVENUEESTIMATES
RENFREWSHIREVALUATIONJOINTBOARD
AnalysisofChangebetween2023/24and2024/25 £
2023/24Estimates 1,657,150
AdjustmenttoCurrentYearEstimates
SettlementAdjustments:
IncreaseinBarclayrequisitiontoRVJB 8,000
8,000
2024/25Estimates(beforeCouncildecisions) 1,665,150
Page 36 of 192

Page 43

RENFREWSHIRECOUNCIL PAPER1
SUMMARYOF2024/25REVENUEESTIMATES
MISCELLANEOUSSERVICES
AnalysisofChangebetween2023/24and2024/25 £
2023/24Estimates 22,646,874
AdjustmenttoCurrentYearEstimates
SettlementAdjustments:
EarlyYearsProviderRate 564,000
564,000
UnavoidablePressures:
Utilitycostinflation 1,000,000
1,000,000
Transfers(to)/fromotherServices:
CommunicationsBusinessPartnertoChiefExecutiveServices (21,460)
ClimateChangeOfficerintobasebudget (62,500)
InsurancepremiumupliftstoFinanceandResources (213,000)
NDRDiscretionaryRelieftoNDRAccount (300,000)
CouncilTaxReductiontoCouncilTaxAccount (14,000,000)
(14,596,960)
ProposedSavings/PriorYearDecisions:
EmployerPensionContributionsrecurring (2,285,252)
GeneralFeesandChargesUplift(5%) (279,000)
RemovalofoneͲoffcostforMod (300,000)
(2,864,252)
2024/25Estimates(beforeCouncildecisions) 6,749,662
Page 37 of 192

Page 44

RENFREWSHIRECOUNCIL PAPER1
SUMMARYOF2024/25REVENUEESTIMATES
LOANSFUND
AnalysisofChangebetween2023/24and2024/25 £
2023/24Estimates 5,976,176
AdjustmenttoCurrentYearEstimates
StrategicInvestments:
LoanChargesrebuild 500,000
LoanChargesͲCityDeal 600,000
LoanChargesͲLevellingUpmatchfunding 125,000
1,225,000
2024/25Estimates(beforeCouncildecisions) 7,201,176
Page 38 of 192

Page 45

RENFREWSHIRECOUNCIL PAPER1
SUMMARYOF2024/25REVENUEESTIMATES
FUNDINGINCOME
AnalysisofChangebetween2023/24and2024/25 £
2023/24Estimates (498,737,809)
AdjustmenttoCurrentYearEstimates
SettlementAdjustments
GRGIncrease (32,608,630)
SpecificGrantTeacherNumbers* (4,801,000)
CouncilTaxbasegrowth (1,830,185) (39,239,815)
TransfersfromOtherServices
NDRDiscretionaryRelieffromMiscellaneous 300,000
CouncilTaxReductionfromMiscellaneous 14,000,000
14,300,000
ProposedSavings:
CouncilTaxReductionbasebudgetadjustment (500,000)
CouncilTaxbasebudgetadjustment (500,000)
CouncilTaxonSecondHomes (150,000) (1,150,000)
2024/25Estimates(beforeCouncildecisions) (524,827,624)
Page 39 of 192

Page 46

Page 40 of 192

Page 47

___________________________________________________________________
To: Council
On: 29 February 2024
___________________________________________________________________
Report by: Director of Finance & Resources
___________________________________________________________________
Heading: Non-Housing Capital Investment Programme, Prudential Framework
and Treasury Management Strategy, and Capital Strategy 2024/25 –
2028/29
___________________________________________________________________
1. Summary
1.1. This report details the planned Non-Housing Capital Investment Programme
for projects across all service areas of the Council, except Council Housing.
Funding available to support this investment includes prudential borrowing
and capital grant, as well as contributions from revenue, partners and
external funding bodies.
1.2. The draft Scottish Government budget for 2024/25 was published on 19
December 2023, with a provisional local government finance settlement
outlined in Finance Circular 08/2023, published on 21 December 2023. The
General Capital Grant for Renfrewshire Council in 2024/25 indicated in the
circular is £11.639m, which includes Play Park Renewal grant funding of
£0.462m. This represents a 3.4% reduction from the 2023/24 level of
£12.044m. The Specific Capital Grant of £0.809m for Cycling Walking and
Safer Streets has increased marginally (2.9%) from £0.786m last year.
1.3. The level of general capital grant allocated to local government in the draft
Scottish Budget for 2024/25 (£535m) represents a like-for-like reduction of
6.1% from the 2023/24 allocation. In the context of this funding environment,
the scope for any investment in assets, including lifecycle maintenance, is
significantly reduced, unless other sources of funding can be accessed
including, for example, realised capital receipts, sustainable prudential
borrowing funded by recurring revenue savings, or external grant funding.
The £535m general capital grant for Scotland includes £43m for the
expansion of Free School Meals that has not yet been distributed.
Item 4
Page 41 of 192

Page 48

1.4. There is likely to be limited opportunity for generating capital receipts as a
source of income to the capital plan, suggesting potentially a greater reliance
on borrowing as the main source of capital funding outwith the capital grant
settlement. Increased borrowing, however, will result in revenue pressures at
a time when the revenue fund is also severely constrained.
1.5. It should be noted that the capital plan outlined in this report extends beyond
2024/25, yet no capital grant from 2025/26 onward has been confirmed;
therefore an estimated annual general capital grant level of £11.150m and
specific grant level of £0.800m have been assumed for future years.
Approved programmes already in place that are funded by other
arrangements, e.g. prudential borrowing or specific funding related to the
City Deal, are also included. It should be further noted that this approach
does not preclude the Council from taking further investment decisions as
part of the budget process where separate funding arrangements are
established. 
1.6. A number of proposed changes to the funding of the Cultural and Heritage
Infrastructure programme are outlined at section 4. The recommendations,
as well as the Capital Plan presented in appendices 1 and 2, reflect these
proposals.
1.7. The Prudential Code and Treasury Management Code both play a key role
in capital finance within local authorities; they require the Council to set
Prudential and Treasury Management indicators for the following three years
to ensure that the Council’s capital investment plans are affordable, prudent
and sustainable. The Treasury Management Code further requires the
Council to approve, annually in advance, a strategy for its treasury
management activities, while the Prudential Code also requires full Council
approval of the Capital Strategy, setting out the long-term context within
which capital investment decisions are made to improve capital, revenue and
balance sheet planning. 
1.8. Details of the proposed Prudential Indicators and Treasury Management
Strategy are attached at Appendix 3; and the proposed Capital Strategy is
attached at Appendix 4. 
__________________________________________________________________ 
2. Recommendations
2.1 It is recommended that Council: 
(a) Approves the Capital Investment Programme covering the period up to
2028/29, as summarised in Table 2 of this report and detailed in
Appendices 1 and 2 attached;
Page 42 of 192

Page 49

(b) Notes the level of capital grant available in 2024/25 and also that
estimates of general and specific grant have been included within the
planned programme beyond this financial year, in the absence of
formal confirmation;
(c) Notes the level of uncommitted capital receipts included in the plan,
incorporated as a Strategic Asset Management Fund of £2m;
(d) Delegates authority to the relevant Heads of Service in consultation
with the Director of Finance and Resources to adjust, where
appropriate, resources across individual components of the lifecycle
maintenance, cultural infrastructure, roads and structures, and schools
investment programmes respectively; 
(e) Approves the proposals outlined in section 4 of this report in order to
support delivery of the Cultural and Heritage Infrastructure Programme;
(f) Approves the Prudential Indicators set out in Appendix 3 to this report,
subject to any required adjustments arising from decisions taken by the
Council in relation to the capital and revenue budget reports being
presented to this Council meeting;
(g) Approves the Treasury Management Strategy Statement 2024/25,
including the treasury management indicators, set out in Appendix 3 to
this report; and
(h) Approves the Capital Strategy set out in Appendix 4 to this report. 
3. Overview of Capital Resources and Proposed Programme
3.1 The update to the capital programme outlined in this report focuses on the
2024/25 financial year and includes:
• Confirmation of the roll forward of projects already approved as part of
the existing Capital Investment Plan, including major projects already
underway as part of the existing investment programme;
• This includes £45m for a new build primary in the Dargavel area, and
£30m for an extension to Park Mains High School (supported by an
assumed £15m contribution from BAE Systems), as approved by the
Council in September 2023. Officers are currently developing the next
iteration of the school estate investment plan and longer term strategic
estate requirements, based on updated condition survey work which
has been undertaken over recent months. Future investment plans will
require to be considered based on available capital resource and the
Council’s capacity for further borrowing to support capital investment,
acknowledging that the two projects mentioned above will be prioritised
over other estate requirements; 
Page 43 of 192

Page 50

• In line with the Council’s agreed medium-term financial planning
principles, the General Capital Grant for 2024/25 is directed firstly to
maintain the delivery of the Council’s rolling lifecycle maintenance
programmes across the Council’s key asset classes as follows: 
o lifecycle maintenance programme for the Council’s property
portfolio (£3m);
o maintaining an annual replacement programme for the Council’s
vehicle fleet (£2.1m);
o maintenance programmes for the Council’s transport infrastructure
covering roads & footpaths (£4m), bridges and streetlighting/traffic
lights (£0.9m);
o maintenance and refresh of the Council’s ICT estate (£0.6m)
o renewal of play parks in line with confirmed funding (£0.46m)
o maintaining delivery of the Private Sector Housing programme
(£0.6m).
• Specific Capital Grant for 2024/25 is for the following purposes:
o Cycling, Walking and Safer Streets (£0.809m). 
3.2 Table 1 and Table 2 below provide a high level summary of the current
resources and investment programmes over this period with full details
outlined in Appendices 1 and 2. 
Table 1: Resource Availability 2024/25 - 2026/27 
2024/25 2025/26 2026/27 2025/26 2026/27
£000s £000s £000s £000s £000s
Prudential Borrowing 95,006 87,780 15,400 400 400
Total Borrowing 95,006 87,780 15,400 400 400
Specific Grants  3,028 800 800 800 800
General Capital Grant 11,177 11,150 11,150 11,150 11,150
General Capital Grant ‐ Renewal of
Play Parks 462 768 0 0 0
BAE contribution (Park Mains) 5,000 5,000 5,000 0 0
City Deal Grant 0 44,542 51,154 43,362 0
Usable Capital Receipts (previously
committed) 24,600 768 0 0 0
Usable Capital Receipts 2,250 150 0 0 0
Capital Funded from Current
Revenue (CFCR) 6,300 0 0 0 0
Total Resource Availability 147,823 150,958 83,504 55,712 12,350 
Page 44 of 192

Page 51

Table 2: Programme 2024/25 - 2028/29 
2024/25 2025/26 2026/27 2027/28 2028/29
£000s £000s £000s £000s £000s
Major Programmes          
Schools Estate Programme 55,493 77,850 20,000 0 0
Schools Transformation & ICT 400 400 400 400 400
Lagoon Internal Play Centre 1,000 0 0 0 0
City Deal Projects 21,356 44,592 51,154 43,362 0
AMIDS South 24,690 13,308 0 0 0
Paisley Cultural Facilities 2,057 0 0 0 0
RCGF PACE Theatre 210 0 0 0 0
Paisley Museum 13,527 0 0 0 0
Heritage Venues & Town Centre
Infrastructure 3,393 0 0 0 0
Town Centre Capital Regeneration 314 1,800 0 0 0
Place Based Fund 2,219 0 0 0 0
Strategic Asset Management Fund 2,000 0 0 0 0
Asset Lifecycle Maintenance
Programmes          
General ICT Replacement 600 600 400 400 400
Buildings Capital Lifecycle 8,837 3,100 3,400 3,200 3,200
Retail Improvement Fund 200 0 0 0 0
Private Sector Housing Grant
(PSHG) 644 600 600 600 600
Vehicle Replacement 2,303 2,100 2,000 2,000 2,000
Roads & Footpaths 4,000 4,000 4,000 4,200 4,200
Cycling, Walking and Safer Streets  809 800 800 800 800
Active Travel Transformation Fund 620 0 0 0 0
Renewal of Play Parks 1,580 768 0 0 0
Bridges 377 250 250 250 250
Improvements to Outdoor Access
and Play Areas 81 0 0 0 0
Lighting columns and traffic signals 500 500 500 500 500
Parks Improvement Programme 28 0 0 0 0
Underwood Depot Upgrades 250 150 0 0 0
Nature Restoration Fund 335 140 0 0 0
Total Planned Spend 147,823 150,958 83,504 55,712 12,350 
Page 45 of 192

Page 52

4. Cultural and Heritage Infrastructure Programme
4.1 The Council has been undertaking an ambitious programme of investment in
its cultural and heritage assets. As reported to the Economy and
Regeneration Policy Board on 23 January 2024, construction and
refurbishment works in historic buildings are intrinsically subject to a higher
degree of cost volatility due to the nature of the works and the fact that the
complexity and detail of the works required are in many instances not fully
known until the works are in progress and the building condition is fully
understood. 
4.2 The existing capital budgets for those works in progress – Paisley Town Hall,
Paisley Museum and Paisley Arts Centre – are under considerable pressure
due to these issues and also due to the extended timescales of the works,
which were severely affected by the pandemic closedown and subsequent
modified working practice period. Council agreed in June 2023 to pause
elements of the wider cultural venues and town centre infrastructure
programme in order to release funding towards those projects whose budgets
are under pressure. 
4.3 It is further proposed to largely pause the £2.3m planned investment at Abbey
Close public realm, with £2m being reallocated within the Capital Plan
proposed here to Paisley Arts Centre (£0.700m) and Paisley Museum
(£1.300m), where there are significant cost pressures due to delays in, and
the complexity of, the work involved in refurbishing historic buildings. As these
projects come to a close, this indicative allocation across the two projects may
require adjustment; therefore it is proposed that the Council agrees to
delegate authority to the Director of Finance and Resources to flexibly utilise
this £2m resource between these two projects as required. The balance of
funding remaining with the Abbey Close project will be utilised in a modified
project scope aimed to refurbish and repair the existing public realm features.
4.4 When the original cultural investment programme was agreed, this included
the provision of revenue resource to support the borrowing involved to fund
the capital works. Owing to the delays experienced on the projects, it is
possible now for this revenue funding, which has accumulated in the current
and prior financial years, to be released from the investment capital fund.  It is
proposed that £5.3m of this reserve funding is now drawn down to support the
Paisley Museum Reimagined project, which has been impacted by historic
maintenance issues, meaning more extensive work than was originally
anticipated has been necessary. This is reflected as Capital Funded from
Current Revenue (CFCR) in the proposed Capital Plan in appendices 1 and 2. 
Page 46 of 192

Page 53

4.5 In order to secure financial closure of the Paisley Town Hall project, it is also
proposed that  the Development Contribution – Paisley Town Centre
earmarked reserve of £1.056m is utilised to fully fund the project.  This would
result in this legacy earmarked reserve being reduced to nil in closing the
2023/24 financial year.
5. Lifecycle Maintenance of Existing Assets
5.1 The Council has committed to a financial planning principle that capital grant
resources are directed in the first instance to support lifecycle maintenance
programmes to protect the Council’s existing assets and infrastructure. Annual
lifecycle investment across the Council’s key asset classes during 2024/25 is
included within the capital programme detailed in Appendix 2. 
Property Lifecycle Maintenance 
5.2 The Council’s property portfolio was predominantly built prior to statutory and
Health & Safety legislation and guidance, and as such the current identified
priorities focus primarily on undertaking investment to improve health and
safety standards, compliance with statutory duties and improving energy
efficiency across the property portfolio. The amount of funding available to
undertake component replacement and major maintenance remains very
constrained and it is increasingly difficult to maintain the condition of the
current estate. The Council will need to consider the future size of the property
estate in terms of the affordability of maintenance obligations. 
5.3 It is recognised that a sufficient degree of flexibility in the management of the
lifecycle maintenance fund is required to address changing priorities that may
emerge. It is therefore proposed that the Head of Facilities and Property
Services, in consultation with the Director of Finance and Resources, is
delegated authority to adjust the allocation of resources within this proposed
programme, with appropriate reporting to the Finance and Resources Policy
Board. There is a carry forward of prior year funding as well as an allocation of
£3m of General Capital Grant reflected in the 2024/25 budget. 
Roads and Footpaths
5.4 The Council approved a large-scale Roads and Footways investment
programme in 2019, of which 2023/24 was the final year. This report
recommends that £4m of General Capital Grant is allocated to Roads and
Footways in 2024/25 and, similar to property lifecycle maintenance, it is
proposed that the Head of Climate, Public Protection and Roads, in
consultation with the Director of Finance and Resources, is delegated
authority to adjust the allocation of resources within this programme.  
Page 47 of 192

Page 54

Streetlighting, Bridges and Other Road Structures
5.5 In order to maintain the overall condition of street lighting columns, bridges
and structures, an allocation of £0.877m of General Capital Grant for the
rolling replacement programme is proposed for 2024/25. 
Vehicle and Plant Replacement Strategy 
5.6 The Council has invested significant capital resources in recent years to
support a vehicle replacement strategy. Continued investment is required in
order to sustain planned vehicle replacement cycles and maintain the ability of
the existing vehicle and plant fleet to meet the needs of services and mitigate
against increased revenue pressures arising from additional maintenance and
temporary hire costs due to increased vehicle failure rates. This will include a
fundamental review of the Building Services fleet. It is proposed that £2.100m
of the General Capital Grant is allocated for this purpose in 2024/25.  
Private Sector Housing Grant (PSHG)
5.7 The PSHG is utilised to support a range of support programmes for private
sector housing owners and is funded through a mix of revenue and capital
funding. A priority component of this programme has been to support owner
occupiers in meeting the costs of common works being delivered in mixed
tenure blocks. This is a key enabler with regards the implementation of the
housing regeneration programme. It is proposed to maintain the grant
allocation at £0.600m in 2024/25.
6. Prudential Framework for Capital Finance and Treasury Management
Strategy Statement 2024/25
6.1 The Local Government in Scotland Act 2003 and supporting regulations
require local authorities to have regard to the following codes of practice
issued by the Chartered Institute of Public Finance and Accountancy (CIPFA):
• The Prudential Code for Capital Finance in Local Authorities (“the
Prudential Code”);
• Treasury Management in the Public Services Code of Practice and
Cross-Sectoral Guidance Notes (“the Treasury Management Code”).
6.2 The Prudential Code and Treasury Management Code play a key role in
capital finance in local authorities. Local authorities determine their own
programmes for capital investment in assets that are central to the delivery of
services. The Prudential Code and Treasury Management Code were
developed to support local authorities in taking decisions relevant to their
capital investment plans.
6.3 Their key objectives are to ensure that:
• capital expenditure plans and investment plans are affordable and
proportionate;
Page 48 of 192

Page 55

• all external borrowing and other long-term liabilities are within prudent
and sustainable levels;
• the risks associated with investments for commercial purposes are
proportionate to their financial capacity; and
• treasury management decisions are taken in accordance with good
professional practice.
6.4 The Prudential Code and the Treasury Management Code require the Council
to set prudential and treasury management indicators for the following three
years to ensure that the Council’s capital investment plans are affordable,
proportionate, prudent and sustainable.
6.5 In addition, the Treasury Management Code further requires the Council to
approve, annually in advance, a strategy for its treasury management
activities. This strategy sets out the Council’s policies and plans for the year
ahead in relation to the management of cashflows, money market and capital
market transactions (including borrowing and investing), the effective control
of the risks associated with those activities and the pursuit of optimum
performance consistent with those risks.
6.6 Attached at Appendix 3 to this report are full details of the Council’s Prudential
Indicators and Treasury Management Strategy Statement for 2024/25, based
on the details outlined in this report. 
7. Capital Strategy
7.1 The Capital Strategy provides an overview of how capital expenditure, capital
financing, and treasury management activities contribute to the provision of
public services in local government, along with an overview of how associated
risk is managed, and implications for future financial sustainability. 
7.2 Development, and full Council approval, of the Capital Strategy is a
requirement of the Prudential Code, with the intention that the strategy sets
out the long-term context within which capital investment decisions are made,
and to improve capital, revenue and balance sheet planning.
7.3 The Capital Strategy is attached at Appendix 4 to this report.
8. Equalities
8.1 Where the Council is making decisions in relation to its spending priorities, it is
obliged to comply with the public sector equality duty set out in the Equalities
Act 2010. This means that the Council must have due regard to the need to:
• Eliminate unlawful discrimination, harassment and victimisation and
other prohibited conduct;
Page 49 of 192

Page 56

• Advance equality of opportunity between people who share a relevant
characteristic and those who do not; and
• Foster good relations between people who share a protected
characteristic and those who do not.
8.2 To meet this requirement, where necessary the Council must assess the
impact of applying a new policy or decision against these three needs, and at
the point of decision-making, elected members must have sufficient
information available to assess that impact. Members, in considering their
capital investment proposals prior to presentation at the Council meeting, are
therefore encouraged to seek advice from Directors on the equality
implications of each proposal.
___________________________________________________________________
Implications of the Report
1. Financial: the Capital Plan outlines the planned investments in council
assets over a five-year period; along with associated funding sources. The
Capital Plan, Prudential Framework, Treasury Management Strategy and
Capital Strategy ensure that investment in council assets is undertaken in a
prudent and financially sustainable fashion, is consistent with the Council’s
priorities and agreed financial planning principles, and is affordable for the
Council now and in future years. The General Capital Grant confirmed for
2024/25 is £11.639m, including £0.462m for Renewal of Play Parks.
2. HR & Organisational Development: none arising directly from this report.
3. Community/Council Planning: the investments outlined in these reports
contribute to all strategic themes within the Council Plan objectives; their
delivery will ensure that the Council’s assets and infrastructure are fit for
purpose and provide the people of Renfrewshire with access to facilities that
improve their environment and opportunities, while ensuring the Council is
financially sustainable by applying prudential rules.
4. Legal: the Local Government in Scotland Act 2003 and supporting
regulations require local authorities to have regard to the Prudential Code for
Capital Finance in Local Authorities, and the Treasury Management in the
Public Services Code of Practice and Cross-Sectoral Guidance Notes, both
issued by the Chartered Institute of Public Finance and Accountancy.
5. Property/Assets: the Capital Plan outlines significant investment in Council
assets and infrastructure over the medium term in order to ensure they
remain fit for purpose and support efficient service delivery.
6. Information Technology: the Capital Plan outlines investment in ICT assets
that will ensure the Council continues to have access to secure, efficient ICT
services. 
Page 50 of 192

Page 57

7. Equality & Human Rights: where the Council is making decisions in
relation to its spending priorities, it is obliged to comply with the public sector
equality duty set out in the Equalities Act 2010. 
8. Health & Safety: the Capital Plan outlines investment in Council assets and
facilities to ensure they remain safe and accessible in line with statutory
obligations. 
9. Procurement: the Capital Plan outlines significant investment in Council
assets which will conform to all relevant contract standing orders and
procurement legislation.
10. Risk: investment in Council assets ensures they remain fit for purpose and
meet all statutory requirements in terms of accessibility, sustainability and
safety.
11. Privacy Impact: none arising directly from this report.  
12. Cosla Policy Position: none arising directly from this report. 
13. Climate Risk: investment in Council assets improves energy efficiency,
reducing the Council’s carbon footprint and helping it achieve its Net Zero by
2030 target.
_____________________________________________________________ 
Author:           Alastair MacArthur, Director of Finance & Resources 
List of Appendices to this report: 
Appendix 1 Summary of Capital Income and Expenditure 2024/25 to 2028/29
Appendix 2 Capital Investment Programme 2024/25 to 2028/29
Appendix 3 Prudential Framework and Treasury Management Strategy
Statement 2024/25
Appendix 4 Capital Strategy 2024/25 to 2026/27
Page 51 of 192

Page 58

Page 52 of 192

Page 59

Appendix 1
2024/25 – 2028/29 Capital Investment Programme (NB: 2024/25 includes some carried forward budgets from earlier years).
General Services Capital Programme 2024/25 2025/26 2026/27 2027/28 2028/29
£000s £000s £000s £000s £000s
Schools and Early Years Investment 55,893 78,250 20,400 400 400
Leisure Estate 1,000 0 0 0 0
Environment and Infrastructure 10,883 8,708 7,550 7,750 7,750
Economic Development 21,720 1,800 0 0 0
City Deal 46,046 57,900 51,154 43,362 0
Corporate Projects 11,637 3,700 3,800 3,600 3,600
Private Sector Housing Grant 644 600 600 600 600
Total General Services Programme 147,823 150,958 83,504 55,712 12,350 
Capital Resources £000s £000s £000s £000s £000s
Prudential Borrowing 95,006 87,780 15,400 400 400
Total Borrowing 95,006 87,780 15,400 400 400
Specific Grant (CWSS) 3,028 800 800 800 800
General Capital Grant 11,177 11,150 11,150 11,150 11,150
General Capital Grant - Renewal of Play Parks 462 768 0 0 0
BAE contribution (Park Mains) 5,000 5,000 5,000 0 0
City Deal Grant 0 44,542 51,154 43,362 0
Usable Capital Receipts - Committed 24,600 768 0 0 0
Usable Capital Receipts - Uncommitted 2,250 150 0 0 0
Capital Funded from Current Revenue (CFCR) 6,300 0 0 0 0
Total Resource Availability 147,823 150,958 83,504 55,712 12,350
Page 53 of 192

Page 60

Page 54 of 192

Page 61

Appendix 2 
2024/25 – 2028/29 Capital Investment Programme by Project 
Schools and Early Years Investment 2024/25 2025/26 2026/27 2027/28 2028/29
£000s £000s £000s £000s £000s
Paisley Grammar New Campus 34,631 33,850 0 0 0
Dargavel New Build 10,000 25,000 10,000 0 0
Thorn Primary New Build 5,737 4,000 0 0 0
Park Mains Extension 5,125 15,000 10,000 0 0
Total Schools Investment Programme 55,493 77,850 20,000 0 0
Other Programmes          
Technology Replacement Strategy ICT 400 400 400 400 400
Total 55,893 78,250 20,400 400 400      
Leisure Estate 2024/25 2025/26 2026/27 2027/28 2028/29
£000s £000s £000s £000s £000s
Lagoon Internal Play Centre 1,000 0 0 0 0
Total 1,000 0 0 0 0 
Page 55 of 192

Page 62

Environment and Infrastructure 2024/25 2025/26 2026/27 2027/28 2028/29
£000s £000s £000s £000s £000s
Programme Funded By Specific Grant          
Cycling, Walking & Safer Streets (CWSS) 809 800 800 800 800
Total Programme Funded By Specific Consent 809 800 800 800 800
Asset Lifecycle Maintenance Programmes          
Vehicle Replacement Programme 2,303 2,100 2,000 2,000 2,000
Bridge Assessment/Strengthening 377 250 250 250 250
Roads/Footways Upgrade Programme 4,000 4,000 4,000 4,200 4,200
Lighting Columns Replacement 500 500 500 500 500
Active Travel Transformation Fund (Motion) 620 0 0 0 0
Other Major Programmes          
Parks Improvement Programme 28 0 0 0 0
Improvements To Outdoor Access And Play Area 81 0 0 0 0
Underwood Depot Upgrades 250 150 0 0 0
Nature Restoration Fund 335 140 0 0 0
Renewal of Play Parks 1,580 768 0 0 0
Total 10,883 8,708 7,550 7,750 7,750 
Page 56 of 192

Page 63

Economic Development 2024/25 2025/26 2026/27 2027/28 2028/29
£000s £000s £000s £000s £000s
Paisley Venue and Town Centre Infrastructure          
Paisley Town Centre Infrastructure 3,393 0 0 0 0
Paisley Arts Centre Redevelopment 741 0 0 0 0
Paisley Town Hall Redevelopment 1,250 0 0 0 0
Paisley Museum 13,527 0 0 0 0
Town Centre Regeneration 314 1,800 0 0 0
Place Based Fund 2,219 0 0 0 0
Paisley Learning and Cultural Hub 66 0 0 0 0
RCGF PACE Theatre 210 0 0 0 0
Total 21,720 1,800 0 0 0 
City Deal 2024/25 2025/26 2026/27 2027/28 2028/29
£000s £000s £000s £000s £000s
City Deal          
Glasgow Airport Investment Area 2,065 0 0 0 0
Clyde Waterfront & Renfrew Riverside 19,291 50 0 0 0
Airport Access 0 44,542 51,154 43,362 0
Total City Deal 21,356 44,592 51,154 43,362 0
City Deal Related Programmes          
AMIDS South 24,690 13,308 0 0 0
Total 46,046 57,900 51,154 43,362 0 
Page 57 of 192

Page 64

Corporate Projects 2024/25 2025/26 2026/27 2027/28 2028/29
£000s £000s £000s £000s £000s
ICT Programme          
ICT Infrastructure Maintenance and Renewal Programme 600 600 400 400 400
Other Corporate Programmes          
Strategic Asset Management Fund 2,000 0 0 0 0
Lifecycle Capital Maintenance (LCM) Fund 8,837 3,100 3,400 3,200 3,200
Retail Improvement Fund 200 0 0 0 0
Total 11,637 3,700 3,800 3,600 3,600 
Page 58 of 192

Page 65

APPENDIX 3 - Prudential Framework for Capital Finance 2024 to 2027 and
Treasury Management Strategy Statement 2024/25
1. Summary
1.1 The Local Government in Scotland Act 2003 and supporting regulations require local
authorities to have regard to the following codes of practice issued by the Chartered
Institute of Public Finance and Accountancy (CIPFA):
• The Prudential Code for Capital Finance in Local Authorities (“the Prudential
Code”);
• Treasury Management in the Public Services: Code of Practice and Cross-Sectoral
Guidance Notes (“the Treasury Management Code”). 
1.2 The Prudential Code and the Treasury Management Code require the Council to set
prudential and treasury management indicators for the following three years to ensure
that the Council’s capital investment plans are affordable, prudent and sustainable.
1.3 The Treasury Management Code further requires the Council to approve, annually in
advance, a strategy for its treasury management activities. This strategy (from section
8 onwards) sets out the Council’s policies and plans for the year ahead in relation to the
management of cashflows; money market and capital market transactions, including
borrowing and investing; the effective control of the risks associated with those
activities; and the pursuit of optimum performance consistent with those risks.
1.4 CIPFA published updated Prudential and Treasury Management Codes on 20
December 2021 which have been fully implemented by the Council.
2. Prudential framework for capital finance: Purpose, governance and
affordability considerations
2.1 The Prudential Code plays a key role in capital finance in local authorities, who
determine their own programmes for capital investment in fixed assets. The Prudential
Code was developed by the Chartered Institute of Public Finance and Accountancy
(CIPFA) as a professional code of practice to support local authorities in taking
decisions relevant to their capital investment plans.
2.2 The key objectives of the Prudential Code are to ensure that:
• capital investment plans are affordable and proportionate;
• all external borrowing and other long-term liabilities are within prudent and
sustainable levels;
• the risks associated with investments for service and commercial purposes are
proportionate to their financial capacity;
• treasury management and other investment decisions are taken in accordance with
professional good practice; and
• the Council is accountable, by providing a clear and transparent framework.
Page 59 of 192

Page 66

2.3 To demonstrate that local authorities have fulfilled these objectives, the Prudential Code
sets out key indicators that must be used and the factors that must be taken into
account. The Prudential Code does not suggest indicative limits or ratios; these are for
the Council to set itself.
2.4 The indicators required by the Prudential Code are designed to support and record local
decision-making. They are not designed to be comparative performance indicators, and
the use of them in this way would be likely to be misleading. In particular, local
authorities have widely different debt positions and these differences are likely to
increase over time as the result of the exercise of local choices. The system is
specifically designed to support such local decision-making in a manner that is publicly
accountable.
2.5 The Prudential Code sets out a clear governance procedure for the setting and revising
of prudential indicators. This will be done by the same body that takes the decisions for
the Council’s budget, i.e. full Council. The Chief Finance Officer is responsible for
ensuring that all matters required to be taken into account are reported to the decision-
making body for consideration and for establishing procedures to monitor performance.
2.6 Prudential indicators for previous years are taken directly from the Council’s Annual
Accounts. If any item within the Accounts that is relied upon for a prudential indicator is
the subject of audit qualification, this must be highlighted when the prudential indicators
are set out or revised. No such qualification has been stated.
2.7 The Local Government in Scotland Act 2003 refers to affordability. The Council must
consider the affordability of its capital investment during all the years in which it will
have a financial impact on the Council. In doing so, the Council needs to pay due
regard to risk and uncertainty. Risk analysis and risk management strategies should be
taken into account. The Prudential Code also requires local authorities to have regard
to wider management processes (option appraisal, asset management planning,
strategic planning and achievability) in accordance with good professional practice.
2.8 The fundamental objective in the consideration of the affordability of the Council’s
capital plans is to ensure that the total capital investment of the Council remains within
sustainable limits, and in particular to consider its impact on the Revenue budget of the
Council. Affordability is ultimately determined by judgement about acceptable levels of
Council Tax or, in the case of the Housing Revenue Account, acceptable rent levels.
2.9 In considering the affordability of its capital plans, the Council is required to consider all
of the resources currently available to it and those expected in future years, together
with the totality of its capital plans, revenue income and revenue expenditure forecasts
for the forthcoming years. The Council is also required to consider known significant
variations beyond this timeframe. This requires the development of a three-year
revenue forecast, and a rolling five-year capital investment plan. 
Page 60 of 192

Page 67

2.10 Prudential indicators in respect of external debt must be set and revised taking into
account their affordability. It is through this means that the objectives of sustainability
and prudence are addressed year-on-year.
2.11 It is also prudent that treasury management is carried out in accordance with good
professional practice. The Prudential Code requires compliance with the Treasury
Management Code.
2.12 A soundly formulated capital programme must be driven by the desire to provide high
quality, value-for-money public services. The Prudential Code recognises that in making
its capital investment decisions the Council must have explicit regard to option
appraisal, asset management planning, strategic planning for the Council and
achievability of the forward plan.
2.13 The Prudential Code does not specify how the Council should have regard to these
factors. All of them represent elements of good practice for which guidance has already
been provided by CIPFA and other authoritative sources. The Prudential Code instead
concentrates on the means by which the Council will demonstrate that its proposals are
affordable, prudent and sustainable.
2.14 The Prudential Code promotes transparency in decision-making by using information
contained within the Council’s Annual Accounts and by having definitions for prudential
indicators that are consistent with the definitions used within the Accounts.
3. Prudential framework for capital finance: Prudential indicators for
capital expenditure
3.1 Capital expenditure
Capital expenditure is defined in the CIPFA Code of Practice on Local Authority
Accounting in the United Kingdom 2024/25 and must be consistent with financial
reporting standards for accounting purposes. In addition, under the Local Government
in Scotland Act 2003, local authorities have a duty to observe proper accounting
practices.
3.2 Under section 35(1) of the Local Government in Scotland Act 2003, it is the duty of the
Council to determine and keep under review the maximum amount it can afford to
allocate to capital expenditure.
3.3 The Council is required to make estimates of the capital expenditure it plans to incur for
the forthcoming financial year and at least the following two years, and to keep these
estimates under review. Separate estimates should be made for the Housing Revenue
Account (“Housing”) and for General Fund (“Non-housing”) services. Details of the
planned investment programmes for Housing and Non-housing services are presented
in this report and take account of the capital resources that will be made available to the
Council from the Scottish Government through the local government settlement
2024/25.
Page 61 of 192

Page 68

3.4 In addition to the approved capital investment plans, there may be projects that emerge
throughout the year that can take advantage of the opportunities arising from the
flexibility offered by the Prudential Code and as a consequence the capital expenditure
totals may change. Any required changes to the prudential indicators arising from new
projects will be considered as part of regular reports presented to Policy Boards or to
the Council. It is recommended that the Council approves the following as the indicator
for capital expenditure for the next five financial years:  
Estimated Capital Expenditure 2024/25 2025/26 2026/27
£000 £000 £000
Non-Housing 147,823 150,958 83,504
Housing 41,236 77,701 62,009
Total 189,059 228,659 145,513 
3.5 The capital investment plans are to be funded from various sources, such as general
and specific capital grants, contributions from revenue resources and secured capital
receipts, as well as long-term borrowing. Owing to risks inherent in the disposal of
surplus land, and in line with practice adopted in previous years, there is no reliance on
the funding of the capital investment plans from unrealised capital receipts.
3.6 After the year-end, the actual capital expenditure incurred during the financial year will
be reported for Housing and for Non-housing. These figures will be included in the
Council’s Annual Accounts, along with explanations of significant variations from
expectations. The actual capital expenditure incurred in 2022/23 was £119.061m.
3.7 Capital Financing Requirement (CFR)
Local authorities have access to a number of ways of financing traditionally procured
capital investment. This does not refer to the payment of cash, but the funding sources
that are applied to ensure that the underlying amount arising from capital plans is
absolutely in place, whether at the point of spend or over the longer term. Some
available financing options involve resourcing the investment at the time that it is
incurred. These are:
• the application of usable capital receipts;
• a direct charge to the revenue budget;
• the application of capital grants;
• up-front contributions from project partners. 
3.8 Capital expenditure that is not financed by one of the above methods will increase what
is known as the Capital Financing Requirement (CFR) of the Council. It has often been
referred to as capital expenditure financed by borrowing; however this is incorrect, as
borrowing provides cash, not the asset, since borrowing has to be repaid. Also, the term
borrowing in this context does not necessarily imply external debt since, in accordance
with best professional practice, the Council has an integrated Treasury Management
Strategy and therefore does not associate borrowing with particular items or types of
Page 62 of 192

Page 69

expenditure. The Council will at any point in time have a number of cashflows, both
positive and negative, and will be managing its position in terms of its borrowing and
investments in accordance with its Treasury Management Strategy.
3.9 In measuring external debt, as detailed in section 4, the Prudential Code encompasses
all borrowing, whether for a capital or for a revenue purpose. In day-to-day cash
management, no distinction is made between ‘revenue cash’ and ‘capital cash’.
External borrowing arises as a consequence of all financial transactions of the Council
and not simply those arising from capital spending. In contrast, the CFR reflects the
Council’s underlying need to borrow for a capital purpose.
3.10 The Council is required to make reasonable estimates of its CFR at the end of the
forthcoming financial year and the two subsequent years, showing figures for Housing
and Non-housing separately, and keep this under review. 
3.11 The CFR will increase whenever capital expenditure is incurred. If this capital
expenditure is resourced immediately, through usable capital receipts, direct financing
from revenue or application of capital grants/contributions, then the CFR will reduce at
the same time that the capital expenditure is incurred, resulting in no net increase to the
CFR. The CFR also will be reduced by charges to the revenue account in respect of
past capital expenditure, or where the Council may initiate voluntary early charges to
revenue as part of longer term financial planning decisions. 
3.12 Where capital expenditure is not resourced immediately, this will result in a net increase
to the CFR that represents an increase in the underlying need to borrow for a capital
purpose. This will be the case whether or not external borrowing actually occurs.
3.13 It is recommended that the Council approves the following as the indicator for the CFR
at the end of each of the next three financial years: 
3.14 After the year-end, the actual CFR as at 31 March will be calculated for Housing and for
Non-housing and these figures will be included in the Council’s Annual Accounts, with
explanations for significant variations from expectations. At 31 March 2023 the Capital
Financing Requirement was £442.065m. 
3.15 Statutory repayment of loans fund advances     
The Council is required to set out its policy for the statutory repayment of loans fund
advances prior to the start of the financial year. This ensures that the Council makes a
prudent annual provision to pay off an element of loans fund advances accumulated
Capital Financing Requirement 2024/25 2025/26 2026/27
£m £m £m
Non-Housing 458.111  540.766  550.557 
Housing 136.630  186.995  231.040 
Total  594.741  727.761  781.597 
Page 63 of 192

Page 70

from previous financial years. For all new loans fund advances, the policy for repayment
is as follows. 
Asset Life Method: 
Loans fund advances are repaid with reference to the life of an asset, using an average
life of 40 years for General Fund assets and 30 years for HRA assets. There are
exceptions to this, such as assets constructed under City Deal arrangements, which
have differing asset lives, and loans fund repayments are therefore proposed over 50-
60 years for those.
The annuity rate applied to current loans fund repayments has also been revised and is
based on an annuity rate of 6.00% and similar average life periods to those referred to
above. This is considered to be a prudent approach to ensure the loans fund
repayments continue for a period that is reasonably in line with that over which the
asset provides benefits to the Council.
4. Prudential framework for capital finance: Prudential indicators for
external debt
4.1 External debt is referred to as the sum of external borrowing and other long-term
liabilities, such as finance leases. The prudential indicators for external debt must be
set and revised taking into account their affordability. It is through this means that that
the objective of ensuring that external debt is kept within sustainable prudent limits is
addressed year on year.
4.2 External debt indicators are at two levels: an Operational Boundary and an Authorised
Limit. Both of these must be consistent with the Council’s plans for capital expenditure
and financing and with its Treasury Management Statement and Practices.
4.3 Operational Boundary
This is the focus of day-to-day treasury management activity within the Council and is
an estimate of the most likely, but not worst case, scenario in terms of cashflow. Risk
analysis and risk management strategies are taken into account, as are plans for capital
expenditure, estimates of the CFR and estimates of cashflow requirements for all
purposes. It is possible that this boundary could be breached occasionally and this
should not be regarded as significant. However, a sustained or regular trend of such
would be significant and require investigation and action.
4.4 The Council is required to set for the forthcoming financial year and the following two
years an Operational Boundary for its total external debt (gross of investments),
identifying separately borrowing from other long-term liabilities. It is recommended that
the Council approves the following as the indicator for the Operational Boundary over
the three-year period 2024/25 through 2026/27:   
Page 64 of 192

Page 71

Operational Boundary 2024/25 2025/26 2026/27
£m £m £m
Borrowing  500.832  635.729  691.646 
Other long-term liabilities 93.909  92.032  89.951 
Total  594.741  727.761  781.597 
4.5 Authorised Limit
This is based on the same assumptions as the Operational Boundary, with sufficient
headroom to allow for unusual or exceptional cash movements. This headroom ensures 
sufficient capacity to allow for cashflow management without breaching the limit.
4.6 The Authorised Limit will be reviewed on an annual basis and any changes require to
be approved by Council.
4.7 The Council is required to set for the next three financial years an authorised limit for its
total external debt (gross of investments), identifying separately any borrowing from
other long-term liabilities. It is recommended that the Council approves the following as
the indicator for the authorised limit over the three-year period 2024/25 to 2026/27:  
4.8 After the year-end, the balance of actual external debt as at 31 March will be calculated
and reported to Council, with borrowing and other long-term liabilities being shown
separately.
4.9 The Council’s actual external debt at 31 March 2023 was £374.8m of which £277.3m
related to borrowing and £97.5m to outstanding obligations on finance leases and
guarantees.
4.10 The actual external debt is not directly comparable to the Authorised Limit nor to the
Operational Boundary since the actual external debt reflects the position at a point in
time. In addition, the indicators are set based on the Council’s potential external
borrowing requirements for capital investment purposes. However, as part of the
ongoing Treasury Management Strategy, the Council may utilise internal borrowing
where it is deemed appropriate to avoid unnecessary exposure to interest rate risk. The
adoption of this strategy results in the Council’s net external borrowing being lower than
the CFR. The projected external debt compared to the estimated CFR for the three-year
period 2024/25 through 2026/27 is detailed at section 10.4.
4.11 A new international accounting standard “IFRS 16: Leases” was announced in
December 2018 by CIPFA/LASAAC. The practical effect of adopting this is that any
Authorised Limit 2024/25 2025/26 2026/27
£m £m £m
Borrowing  525.874  667.515  726.228 
Other long-term liabilities 93.909  92.032  89.951 
Total  619.783  759.547  816.179 
Page 65 of 192

Page 72

contract the Council has signed that provides the right to rent or lease exclusive use of
an asset, such as property or vehicles, will be recognised as an asset on the Council’s
balance sheet with a corresponding debt liability recognised at the present value of the
future lease payments. 
4.12 This liability will be treated as additional borrowing, therefore increasing the Capital
Finance Requirement and other associated Prudential Indicators such as the
Operational Boundary and Authorised Limit. CIPFA/LASAAC has now confirmed that
mandatory implementation of the accounting standard IFRS 16 Leases is deferred until
1 April 2024. 
5. Prudential framework for capital finance: Prudential indicator for
treasury management
5.1 The prudential indicator in respect of treasury management is that the Council has
adopted the CIPFA Treasury Management in the Public Services: Code of Practice and
Cross-Sectoral Guidance Notes (“the Treasury Management Code”). This requires that
the annual Treasury Management Strategy Statement is approved by Council, along
with treasury limits for the three-year period 2024/25 to 2026/27.
5.2 In adopting the Treasury Management Code, the aim is to ensure that treasury
management is driven by a clear and integrated Treasury Management Strategy and a
recognition of the existing structure of the Council’s borrowing and investment
portfolios. The primary policy objectives of the Council’s investment activities are the
security and liquidity of funds, and the avoidance of exposure of public funds to
unnecessary or unquantified risk. The Council should consider the return on its
investments; however, this should not be at the expense of security and liquidity. It is
therefore important that the Council adopts an appropriate approach to risk
management with regard to its investment activities. 
5.3 Borrowing more than, or in advance of, the Council’s need purely to profit from the
investment of the extra sums borrowed should not be undertaken. In those
circumstances where borrowing is taken in advance of need, the security of such funds
must be ensured and consideration should be given as to whether value-for-money can
be demonstrated. These principles should be borne in mind when investments are
made, particularly for the medium to long term.
5.4 The Treasury Management Code requires that the Council approves, annually in
advance, a strategy for its treasury management activities. The Treasury Management
Strategy for 2024/25 is set out in this report from section 8 onward.
6. Prudential framework for capital finance: Prudential indicators for
prudence
6.1 It is possible that, while a council’s financial strategy may be affordable in the short
term, it is imprudent and unsustainable in the medium term because it would, if
pursued, be dependent on the use of borrowing to fund revenue expenditure. For this
Page 66 of 192

Page 73

reason the Prudential Code makes it necessary, if a financial strategy is to be prudent,
that it is one in which medium-term net borrowing is only to be used for capital
purposes.
6.2 In the Prudential Code, this requirement must be demonstrated through a comparison
of net borrowing with the CFR. Except in the short term, net external borrowing should
not exceed the total CFR in the previous year, plus the estimate of any additional CFRs
for the current and next two financial years.
6.3 The projected CFR at 31 March 2027 is £782m (section 3.13). Net external borrowing
should not exceed this level and the projected Operational Boundary at 31 March 2027
is £782m (section 4.4). The Council had no difficulty in meeting this requirement at
31 March 2023 and no difficulties are anticipated in meeting it in the future.
6.4 In addition, ensuring that treasury management is carried out in accordance with good
professional practice is an essential feature of prudence. The treasury management
indicators required by the Treasury Management Code are designed to help
demonstrate prudence. The prudential indicator is that the Council has adopted
CIPFA’s Treasury Management Code. 
7. Prudential framework for capital finance: Prudential indicators for
affordability
7.1 A key measure of affordability is the incremental impact of investment decisions on
Council Tax or housing rents. Estimates of the ratio of financing costs to net revenue
stream provide an indication of how much of the Council’s revenue budget is committed
to the repayment of debt. The estimated ratios for the next three financial years are: 
Non-housing estimates for 2025 to 2027 are currently based on the 2024/25 settlement figures because the current
spending review does not extend beyond this year.
7.2 Financing costs include the interest payable with respect to borrowing, interest payable
on finance leases, interest and investment income, loans fund and finance lease
principal repayments and gains/losses on the repurchase or early settlement of
borrowing.
7.3 Revenue streams relate either to the amounts received in terms of government grant
and local taxpayers for Non-housing, or to the amounts received from tenants in respect
of housing rents for Housing.
Ratio of financing costs to net
revenue stream (estimated)
2024/25 2025/26 2026/27
% % %
Non-Housing 3.47% 4.00% 4.39%
Housing 28.59% 28.54% 24.80%        
Page 67 of 192

Page 74

7.4 The estimate of the incremental impact of the capital investment proposals outlined in
this report for Non-housing services and as outlined in the Housing Capital Investment
Plan for Housing services are: 
7.5 The impact on Band D Council Tax is nil due to the fact that the financing costs
resulting from any additional capital expenditure and related borrowing will be funded
from government grant support and savings in other areas of expenditure. 
8. Treasury Management Strategy Statement and the Prudential Code
8.1 In order to comply with the treasury management requirements of the Prudential Code,
local authorities are required to adopt the Treasury Management Code.
8.2 This report covers the requirements of the latest (December 2021) version of the
Treasury Management Code, including the treasury management indicators as defined
therein, and the requirements of the Local Government Investments (Scotland)
Regulations 2010 with regards consent from Scottish Ministers in respect of local
authority investments. 
8.3 The Council’s Treasury Management Strategy Statement for 2024/25 is set out here
at sections 8 to 12, and constitutes the Council’s annual strategy and plan in relation to
its treasury management activities, as defined by the 2021 version of the Treasury
Management Code.
9. Treasury Management Strategy Statement: Objectives and
responsibility for decision-making
9.1 The overall objectives of the Council’s treasury management strategy are:
For borrowings:
• to minimise the revenue costs of borrowing;
• to manage the borrowing repayment profile;
• to assess interest rate movements and borrow accordingly;
• to monitor and review the level of variable rate loans held in order to take
advantage of interest rate movements; and
• to reschedule borrowing to improve the Council’s repayment profile or to reduce the
revenue costs of borrowing.
Impact of capital investment
decisions on:
2024/25 2025/26 2026/27      
Band D Council Tax £0.00  £0.00  £0.00 
Weekly Housing Rents £0.69  £2.04  £3.26 
Page 68 of 192

Page 75

For temporary investments:
• to protect the capital security and liquidity of the invested funds; and
• to obtain an acceptable market rate of return subject to protecting capital security
and liquidity of invested funds. 
These objectives are set within the context of the Council’s overarching objective in
relation to treasury management activities: the effective management and control of
risk.
9.2 The Council has a contract with Link Asset Services Limited (“Link”) for the provision of
treasury management consultancy services. It is recognised that there is value in
employing such external service providers in order to acquire access to specialist skills
and resources; however, responsibility for treasury management decisions remains with
Renfrewshire Council at all times and undue reliance is not placed upon our external
service providers.
9.3 The proposed Treasury Management Strategy for 2024/25 is based on a view of
interest rates, supplemented by market forecasts provided by Link, and covers the
following aspects of the treasury management function:
• treasury limits in force that limit the treasury risk and activities of the Council;
• prudential and treasury management indicators;
• the current treasury position;
• the identified borrowing requirement;
• prospects for interest rates;
• the borrowing strategy;
• policy on borrowing in advance of need;
• debt rescheduling;
• the investment strategy;
• creditworthiness policy; and
• policy on use of external service providers. 
Page 69 of 192

Page 76

10. Treasury Management Strategy Statement: Borrowing strategy
10.1 Current external borrowing position
The Council’s external borrowing position as at 2 February 2024 was as follows:
External borrowing position
As at 31 March 2023 As at 2 February 2024 Change
in-year
£m
average
interest
rate £m
average
interest
rate £m
Long-term borrowings          
PWLB:  fixed rate 224.427 3.80% 223.592 3.79% (0.835)
PWLB:  variable rate 0.000 0.00% 0.000 0.00% 0.000
Market loans 52.916 4.70% 46.766 4.70% (6.150)
Total long-term borrowings 277.343 3.97% 270.358 3.94% (6.985)
Total short-term borrowings 0.000 0.00% 0.000 0.00% 0.000
Total of all external
borrowings 277.343 3.97% 270.358 3.94% (6.985) 
10.2 To date there has been no new borrowing via the Public Works Loan Board (PWLB) in
2023/24. 
10.3 Additional temporary borrowing of £10m was taken on via the local authority market
early in 2023/24, all of which has now been repaid.
10.4 Projected Borrowing Position 
The Council’s anticipated borrowing position for 2024/25 and the two subsequent
financial years is summarised in the following table. This shows the projected external
debt compared to the estimated Capital Financing Requirement (the underlying need to
borrow for a capital purpose) at the end of each of the next three financial years.
Estimated Borrowing Position 2024/25 2025/26 2026/27
£m £m £m
Borrowing  381 511 567
Other long-term liabilities 94 92 90
Total External Debt 475 603 657
Capital Financing Requirement 595 728 782
Under Borrowing 120 125 125 
10.5 Several of the prudential indicators are designed to ensure that the Council carries out
its treasury management activities within well-defined limits. One of these indicators
shows that gross external debt does not, except in the short-term, exceed the total of
the Capital Financing Requirement in 2023/24, and the estimated additional Capital
Financing Requirement for 2024/25 and the two subsequent financial years. This allows
some flexibility for limited early borrowing for future years, but ensures that borrowing is
not taken to fund revenue expenditure.
Page 70 of 192

Page 77

10.6 The Council has complied with this prudential indicator during 2023/24 and it is
envisaged this will remain the position moving forward over the forthcoming three-year
period. As detailed in the table above, it is anticipated that the borrowing strategy will
continue to progress based on using internal borrowing where possible over the
medium term to mitigate both interest rate risk exposure for the Council and also risks
associated with maintaining adequate capacity with appropriate investment
counterparties. 
Some shorter-term borrowing may be required to fund the City Deal projects, however.
This is required because the grant income for City Deal is phased over a 20-year period
from 2015/16, while the project expenditure is incurred from 2015/16 to 2025/26. The
requirement for borrowing to cover this period in advance of grant receipt is continually
monitored and refined as projects are delivered, and this requirement is incorporated
into the Council’s overall borrowing forecast.
10.7 Liability Benchmark Indicator 
A new treasury prudential indicator introduced as part of the Treasury Management
Code 2021 is the Liability Benchmark (LB). The Council is required to estimate and
measure the LB for the next three financial years, as a minimum. CIPFA recommends
that the LB is produced for at least 10 years and should ideally cover the full debt
maturity period of the Council. 
There are four components to the LB:
• Existing loan debt outstanding: the Council’s existing loans that are still
outstanding for future years;
• Loans CFR: this is calculated in accordance to the Capital Finance Requirement
definition in the Prudential Code described in 3.7, excluding other liabilities; 
• Net Loans Requirement: this will show the Council’s gross loan debt less treasury
management investments projected into the future, and is based on approved net
capital expenditure and planned loans fund principal repayments;
• Liability Benchmark: this equals the net loans requirement plus any short-term
liquidity requirements.
The Loans CFR is only allowed to reflect capital expenditure and loan fund repayments
approved by Council, therefore only for net capital expenditure up to 2028/29. As the
debt maturity profile extends well beyond this period, the usefulness of the liability
benchmark as a prudential indicator is diminished beyond 10 years. Therefore, the
liability benchmark is shown below for the 10-year period that CIPFA recommends,
rather than for the full debt maturity period.
The LB shown in the graph below is the total of PWLB and Market Loans for 2024/25
and for most of 2025/26. The LB is currently forecast to cross over current borrowing
levels around this period largely as a result of the increase in the Capital Finance
Requirement in 3.13. The LB peaks around 2028/29 and starts to reduce thereafter,
Page 71 of 192

Page 78

illustrating that the borrowing may only be required in the medium term rather than over
a long period. 
10.8 Interest Rate Forecast
As part of Link’s treasury management consultancy service to the Council, assistance is
provided in preparing a forecast of short-term and longer-term fixed interest rates.
Current interest rate forecasts for the official bank rate paid on commercial bank
reserves (the “Bank Rate”) and for PWLB borrowings rates are based on the Certainty
Rate (the standard rate minus 20 bps), which has been accessible to the Council since
1 November 2012.
10.9 The central forecast is that the Monetary Policy Committee (MPC) will continue to hold
interest rates as they are and will not move to reduce them until a more decisive drop in
CPI and core inflation occurs.  On this basis it is anticipated that the Bank of England
may begin to reduce interest rates in the second half of 2024.
10.10 However, there is a high level of uncertainty over the timing of these forecasts as it
involves a lot of judgement over the best time to start reducing rates. Doing so too early
could lead to an increase in inflationary pressures, but delaying this action could
prolong any downturn or recession.
Interest rate
forecast
Mar
2024
Jun
2024
Sep
2024
Dec
2024
Mar
2025
Mar
2026
Mar
2027
Bank Rate 5.25% 5.25% 4.75% 4.25% 3.75% 3.00% 3.00% 
£0
£100,000
£200,000
£300,000
£400,000
£500,000
£600,000
£700,000
£800,000
2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
Total Am
ount (£'000)
Liability Benchmark
PWLB Loans Market Loans (excl LOBO loans)
Existing Loan Debt Outstanding Net Loans Requirement (forecast net loan debt)
Loans CFR Liability Benchmark (Gross Loans Requirement)
Page 72 of 192

Page 79

The CPI measure of inflation fell consistently throughout 2023 until a small increase
from 3.9% in November to 4.0% in December. CPI and may rise further still in January
2024; however, it is anticipated that this will be followed by subsequent declines in the
three months thereafter. If this does not transpire, it is likely that the Bank of England
will hold off on any interest rate reductions until a downward trend in rates continues
once again.
10.11 Forecasts for PWLB rates 
The yield curve movements have become less volatile of late and PWLB 5 to 50 years
Certainty Rates are, generally in the range of 4.5% to 5.2%; this is compares to rates
between 4.2% and 4.6% twelve months ago.
Interest rate
forecast
Mar
2024
Jun
2024
Sep
2024
Dec
2024
Mar
2025
Mar
2026
Mar
2027
5-year loans 4.50% 4.40% 4.30% 4.20% 4.10% 3.60% 3.50%
10-year loans 4.70% 4.50% 4.40% 4.30% 4.20% 3.80% 3.70%
25-year loans 5.20% 5.10% 4.90% 4.80% 4.60% 4.20% 4.10%
50-year loans 5.00% 4.90% 4.70% 4.60% 4.40% 4.00% 3.90% 
10.12 Borrowing Decisions
The main borrowing decisions to be made for 2024/25 are:
• when to borrow;
• for how long to borrow; and
• whether to borrow externally or to use cash balances. 
10.13 The Capital Investment Programme indicates that the Council may need to borrow up to
£116m, either to fund new capital expenditure during 2024/25, or to replace loans due
to mature that year. It should be noted, however, that consideration is given to the
extent to which external borrowing is actually required, as detailed below.
10.14 The Council’s borrowing strategy will give consideration to new borrowing in the
following order of priority:
(i) The cheapest borrowing is currently internal borrowing, accessed by running down
cash balances. However, where long-term borrowing rates are forecast to
increase at a later date, consideration will also be given to locking in lower rates
by borrowing earlier. The investment rate of return is also a deciding factor here;
(ii) PWLB borrowing for a term of less than 10 years, potentially covering only the
period where there is a need for cash. This offers a range of options for new
borrowing which will spread debt maturity away from a concentration at longer-
dated time periods;
(iii) Short-dated borrowing from non-PWLB sources;
(iv) Long-term borrowing arranged in advance in order to achieve certainty on future
borrowing costs and reduce exposure to interest rate risk;
Page 73 of 192

Page 80

(v) Long-term fixed rate market loans at rates significantly below PWLB rates for the
equivalent maturity period (where available), with due regard to maintaining an
appropriate balance between PWLB and market debt in the debt portfolio. 
10.15 Sensitivity of the interest rate forecast
Council officers, in conjunction with the Council’s treasury advisers, will continually
monitor both the prevailing interest rates and the market forecasts, and will respond
appropriately to material changes in interest rate forecasts, for example:
• If it was felt that there was a significant risk of a sharp fall in long- and short-term
interest rates than that currently forecast, then long-term borrowings would be
postponed, with focus shifting to consideration of short-term borrowing to meet the
Council’s need along with any opportunities for rescheduling;
• If it was felt that there was a significant risk of a much sharper rise in long- and
short-term interest rates than that currently forecast, then the portfolio position will
be reappraised with a possible move to take on required borrowing whilst interest
rates were still relatively low. 
10.16 The forecast debt maturity profile at 31 March 2024 per the graph below shows the
amount of debt maturing in future years. The Council has less than 15% of its total
borrowings redeeming in any one of the next 25 years, with one year beyond this period
having a repayment just below 15% (14.88% in 2048/49). This will be monitored and
likely rescheduled well in advance of this date to ensure there is no risk that it rises
above 15%. This is well within the Council’s treasury indicators for debt maturity and
therefore gives the Council the flexibility needed to structure new borrowing in a manner
that minimises debt interest costs. 
Page 74 of 192

Page 81

10.17 Since the Council has a capital investment plan covering the period to 2028/29 and
detailed investment and borrowing analyses, advantage can be taken of opportunities
that may arise to minimise interest rate risk. The Council will not borrow more than or
earlier than required, with the primary intention to profit from the investment return of
the extra sums borrowed. Pre-borrowing of this nature will only be taken for risk
management reasons and subject to sound justification. The timing of any new
borrowing of this nature will take into account the management of liquidity and
counterparty risk and also the projected movement in interest rates.
10.18 Caution will continue to be exercised and the Director of Finance and Resources will
monitor the interest rate market. Should long-term rates start to rise or fall sharply, the
debt portfolio position will be reappraised and appropriate action taken.
10.19 Debt Rescheduling opportunities
The purpose of debt rescheduling is to reorganise existing borrowings in such a way as
to amend the repayment profile of the borrowing portfolio, or to secure interest rate
savings.
10.20 As short-term borrowing rates will be considerably cheaper than longer-term rates,
there may be potential opportunities to generate savings by switching from long-term
debt to short-term debt. However, such potential savings will be considered in the light
of their short-term nature and risks associated with potential longer-term costs of
refinancing those short-term loans once they mature.
10.21 Consideration will also be given to the potential for making savings by running down
investment balances to repay debt prematurely, as short-term rates on investments are
likely to be lower than rates paid on current debt.
11. Treasury Management Strategy Statement: Annual Investment
Strategy
11.1 Investment Policy
In carrying out investment activities, the Council has regard to the Local Government
Investment (Scotland) Regulations 2010, the accompanying Scottish Government
Finance Circular 5/2010, the 2021 Treasury Management Code, and the CIPFA
Treasury Management Guidance Notes 2021.
11.2  The Council’s investment priorities are:
• the security of capital; and
• the liquidity of its investments. 
11.3 The Council will also aim to achieve the optimum return on its investments
commensurate with proper levels of security and liquidity. The risk appetite of the
Council is low-to-medium, with absolute priority given to the security of its investments.
In the current economic climate, it is considered appropriate to keep investments short-
Page 75 of 192

Page 82

term to cover cashflow needs. However, where appropriate, the Council will also
consider the value available in periods up to 24 months with high credit rated financial
institutions, as well as wider range fund options. 
11.4 The borrowing of monies purely to invest or on-lend to make a return is prohibited and
the Council will not engage in such activity.
11.5 In the current economic climate, it is considered appropriate to maintain a degree of
liquidity to cover cash flow needs but also consider investments for periods up to 12
months with high credit rated institutions, whilst investment rates remain elevated, as
well as a wider range of fund options.
11.6 Investment instruments identified for use in the financial year are listed in Annex A, and
counterparty limits will be set as defined within the Council’s Treasury Management
Practices (TMPs) documentation.
11.7 External Investment Position
The Council’s external investment position as at 2 February 2024 was as follows:
External investment
position
As at 31 March 2023 As at 2 February 2024 Change
in-year
£m
average
interest
rate £m
average
interest
rate £m
Temporary investments 172.741 3.05% 131.162 5.33% (41.579) 
The decrease in the Council’s short-term, or temporary investments during the period
reflects increased spending predominantly due to the capital programme, particularly
the maturity of high value culture and heritage projects, such as Paisley Town Hall. 
11.8 The average rate of interest received on the Council’s temporary deposits has
increased by over 2%. The increase reflects that more recent temporary deposits
secured by the Council have been at higher rates than some of the longer-term deals
secured at relatively low rates that have now matured. The Bank of England’s decision
to continue to increase the base rate during 2023 led to increased investment returns.
The Council will continue to monitor future rate movements and when appropriate will
lock into longer term temporary deposit deals with counterparties of particularly high
creditworthiness, securing a higher overall rate of return across the portfolio without
compromising the security of investments.
11.9 Creditworthiness Policy
In order to maintain an approved list of counterparties (institutions with which the
Council will invest funds), the Council applies the creditworthiness service provided the
Council’s treasury advisers and are based on the credit ratings from the three major
credit rating agencies: Fitch, Moody’s and Standard & Poor’s. The Council understands
that credit ratings are a good, but not perfect, predictor of investment default. Full
Page 76 of 192

Page 83

regard will therefore be given to other available information on the credit quality of the
organisations in which it invests, including:
• credit default swap (CDS) spreads, to give early warning of likely changes in credit
ratings;
• financial statements;
• sovereign ratings, to select counterparties from only the most creditworthy
countries;
• credit ratings relevant to the specific investment or class of investment, where
available; and
• the financial press. 
11.10 This modelling approach combines credit ratings, credit watches and credit outlooks in
a weighted scoring system which is then combined with an overlay of CDS spreads for
which the end product is a series of colour-coded bands indicating the relative
creditworthiness of counterparties.  These colour codes are used by the Council to
determine the suggested duration for investments, and are shown in Annex B.  
11.11 The approved list of counterparties (Annex B) also defines a maximum limit on the
aggregate value of deposits placed with each counterparty. The purpose of this is to
ensure that the Council does not deposit an excessive proportion of its funds with any
single institution. The counterparty limit for each bank and building society has been set
at 10% and the limits for Money Market Funds and enhanced cash funds has been set
at 10% of the total cash balances held by the Council at the time the investment is
made. Some institutions have a lower % limit depending on their credit rating.
This approach allows the Council to meet its cashflow management objectives whilst
appropriately spreading investment risk over a range of counterparties and underlying
investment instruments. The limits will be continually reviewed for appropriateness
throughout 2024/25.
11.12 All credit ratings are monitored daily. Link alerts the Council to rating changes made by
any of the three rating agencies and, should a downgrade result in the counterparty or
investment scheme no longer meeting the Council’s minimum criteria, its further use as
a new investment will be withdrawn immediately.
11.13 Sole reliance is not placed on the use of this external service: the Council will make its
own judgement based on the adviser’s suggestions, but will also use market data and
market information, the quality financial press, information on government support for
banks and the credit ratings of that government support.
11.14 The City Deal project requires the Council to make payments in Euros during 2024/25.
This will involve holding balances in Euros in order to meet these payments. The
Creditworthiness Policy for holding Euros will be the same as outlined from 11.9 to
11.13. 
Page 77 of 192

Page 84

Investment Decisions
11.15 The current forecasts from Link (see point 10.9 above) indicate that the Bank Rate is
likely to remain stable in the first half and gradually reducing from the second half of
2024 over a number of years. 
11.16 Investments will be made with reference to core balance and cashflow requirements
and the outlook for short-term interest rates (i.e. for investments up to 12 months).
Greater returns are usually achievable by investing for longer periods. While most cash
balances are required in order to manage variations in cashflow, careful consideration
is given to investing identified cash sums for longer periods, where appropriate.
11.17 The majority of the Council’s temporary cash balance is currently invested in short-term
deposits with other local authorities, along with investments in Money Market Funds
and short-term deposits with banks. The Council will continue to invest with these
institutions; however, if attractive rates become available with counterparties of
particularly high creditworthiness, making longer-term deals worthwhile and within the
risk parameters set by the Council, then longer-term investments will be considered.
11.18 Investment decisions will require to take account for balances held in Euros as per
paragraph 11.14. The Council will closely monitor exchange rate movements and may
use risk management tools or instruments available, such as a forward contract or
advance purchase of foreign currency to hold in an account until such time as required;
always providing that these measures are used only for the prudent management of the
Council’s financial affairs and not for any speculative purpose.
Investment Performance
11.19 The Council will use an investment benchmark to assess the investment performance
of its investment portfolio based on the 7-day compounded SONIA rate. 
11.20 SONIA (Sterling Overnight Index Average) is a single rate published each day by the
Bank of England, reflecting overnight rates paid on eligible sterling denominated
deposit transactions conducted the previous day. 
11.21 It should be noted that, given the current rising interest rate environment, this measure
will present higher investment rates than those currently experienced by the Council,
since many of the Council’s current investments would have commenced some months
ago, before the Bank Rate increased. This deviation should reduce over time, however;
the Council’s average investment term is currently 230 days as at 2 February 2024.
Page 78 of 192

Page 85

12. Treasury Management Strategy Statement: treasury management
indicators
12.1 The Guidance Notes for Local Authorities that accompany the CIPFA Treasury
Management Code specify four treasury management indicators covered by the
Prudential Code: 
(i) authorised limit for external debt; 
(ii) operational boundary for external debt; and 
(iii) liability benchmark
Details of these indicators can be found in sections 4 and 10 of this Appendix.
12.2 The Guidance Notes for Local Authorities that accompany the Treasury Management
Code specify an additional treasury management indicator: the maturity structure of
borrowing.
12.3 Maturity Structure of Borrowing
The Council is required to set, for the forthcoming financial year, both upper and lower
limits with respect to the maturity structure of its borrowing. This is to ensure that the
Council is not exposed to large concentrations of debt maturing in a single year that
require to be replaced when interest rates could be unfavourable. It is recommended
that the Council approves the following limit as the Maturity Structure of Borrowing
indicator for the forthcoming financial year: 
Maturity structure of borrowing 2024/25
lower limit upper limit
under 12 months 0% 15%
12 months and within 24 months 0% 15%
24 months and within 5 years 0% 45%
5 years and within 10 years 0% 50%
10 years and above 0% 100%  
Page 79 of 192

Page 86

Page 80 of 192

Page 87

Annex A: Permitted Investments
The Council approves the forms of investment instrument for use as permitted investments as set out in tables 1, 2 and 3. Please also refer to
section 11 above.
A.1 Table 1 lists the permitted investments of a cash-type nature, available for use by the Council’s in-house Treasury Management team:
Permitted
Investments
Table 1
Description / Objectives Minimum
Credit
Criteria
Liquidity
Risk
Market
Risk
Maximum
Share of
Total
Investments
Maximum
Maturity
Period
Debt Management
Account
Deposit Facility
(DMADF)
Offers the lowest risk form of investment available to local authorities as
it is effectively an investment placed with central government. It is also
easy to use because it is a deposit account and avoids the complications
of buying and holding UK Government-issued treasury bills or gilts. As it
is low risk it also earns low rates of interest and is useful where there
may be a short-term priority to avoid credit risk. The longest term deposit
that can be made with the DMADF is six months.
Not
applicable
Term No 100% 2 years
Longer-term
deposits
with local authorities
Similar to term deposits with other local authorities (below) except that
deposits are placed for longer periods: between 2 and 5 years. For
longer term deposits, the decision to include any given local authority on
the counterparty list will be based on the outcome of due diligence
undertaken on that local authority by the Council’s treasury advisers.
Similar to term deposits with local authorities, no more than £10m can
be placed with any one institution or group.
Per
approved
counterparty
list
Term No 20% 10 years
Call accounts and
notice accounts with
banks and
building societies
Offer access to recalling cash deposited over short call periods (call
account periods vary from short-term such as 7 days, but can extend to
32- and 95-day notice periods). This generally means accepting a lower
rate of interest than that which could be earned from the same institution
by making a term deposit. However, call accounts can offer interest
rates two to three times more than term deposits in the DMADF. A
certain level of call account use is highly desirable to ensure that the
Council has ready access to cash when required.
Per
approved
counterparty
list
Instant /
notice
period
No 100% Up to
100
days
Term deposits
with banks and
building societies
Includes callable deposits, whereby the principal deposited is protected
and earns a fixed rate of interest but can be terminated early at the
bank’s discretion.
Per
approved
counterparty
list
Term No 100% Per
approved
counterparty
list
Page 81 of 192

Page 88

Permitted
Investments
Table 1
Description / Objectives Minimum
Credit
Criteria
Liquidity
Risk
Market
Risk
Maximum
Share of
Total
Investments
Maximum
Maturity
Period
Term deposits
with local authorities
The most widely used form of investment used by local authorities, it
offers a much higher rate of return than the DMADF (dependent on the
deposit term) and, now that measures have been put in place to avoid
any over-reliance on credit ratings, there is greater confidence that the
residual risks around using local authorities, banks and building societies
are at a low, reasonable and acceptable level.
The Council ensures diversification of its portfolio of deposits by having
no more than 10%* (£20m for other Scottish local authorities and £15m
for other local authorities) of the total portfolio placed with any one
institution or group. Longer-term deposits offer an opportunity to
increase investment returns by locking into relatively high interest rates
ahead of an expected fall in rates. Longer-term rates can also offer good
value when the markets incorrectly assess the speed and timing of
interest rate increases.
Offers flexibility and a higher level of earnings than the DMADF;
however, once a longer-term investment is made, cash is ‘locked in’ and
cannot be accessed until the maturity date. 
Not
applicable
Term No 100% 2 years
Treasury bills Short-term bills (up to 12 months) issued by the Government and so
backed by the sovereign rating of the UK. The yield is higher than the
rate of interest paid by the DMADF and another advantage is that they
can be sold if there is a need for access to cash at any point in time.
However, there is a spread between purchase and sale prices, so early
sales could incur a net cost during the period of ownership.
UK
sovereign
rating
T+1 Yes 75% 1 year
Certificates of
deposit issued by
banks and building
societies
Shorter term securities issued by deposit taking institutions (mainly
financial institutions). They are negotiable instruments, so can be sold
ahead of maturity and also purchased after they have been issued. This
liquidity can come at a price, where the yield could be marginally less
than placing a deposit with the same bank as the issuing bank.
Per
approved
counterparty
list
T+1 Yes 10% Per
approved
counterparty
list
Page 82 of 192

Page 89

Permitted
Investments
Table 1
Description / Objectives Minimum
Credit
Criteria
Liquidity
Risk
Market
Risk
Maximum
Share of
Total
Investments
Maximum
Maturity
Period
UK Government gilts Longer-term debt issuance by the UK Government, backed by the
sovereign rating of the UK. The yield is higher than the rate of interest
paid by the DMADF and they can be sold if there is a need for access to
cash at any point in time. However, there is a spread between purchase
and sale prices, so early sales may incur a net cost. Market movements
that occur between purchase and sale may also have an adverse impact
on proceeds. An advantage over Treasury bills is that they generally
offer higher yields the longer it is to maturity (for most periods) if the
yield curve is positive.
UK
sovereign
rating
T+1 Yes 75% 2 years
Money Market
Funds (MMFs)
By definition, MMFs are AAA-rated (the highest security rating available)
and widely diversified, using many forms of money market securities
including types that the Council does not have the expertise or risk
appetite to hold directly. However, due to the high level of expertise of
the fund managers and the significant amounts of funds invested in
MMFs, and the fact that the weighted average maturity (WAM) cannot
exceed 60 days, MMFs offer a combination of high security, instant
access to funds, high diversification and good rates of return compared
to equivalent instant access facilities. Particularly advantageous in a
falling interest rate environment as their 60-day WAM means they have
locked-in investments earning higher rates of interest than available in
the market. MMFs also help an organisation diversify its own portfolio,
for example a £2m investment placed directly with a specific bank is a
100% risk exposure to that specific bank, whereas £2m invested in an
MMF may result in only 1% being invested with a specific bank. MMFs
offer an effective way of minimising risk exposure, while still getting
better rates of return than available through the DMADF.
Long-term
AAA
volatility
rating
Instant No 75% Not
applicable
Ultra-short dated
bond funds
Similar to MMFs, these can still be AAA-rated, but have variable net
asset values (VNAV) as opposed to a traditional MMF which has a
Constant Net Asset Value (CNAV). They aim to achieve a higher yield
and to do this either take more credit risk or invest for longer terms, so
they are more volatile. Can have WAMs and Weighted Average Lives
(WALs) of 90–365 days or longer. Investment in these funds would only
be undertaken in the event funds could be “locked out” for a minimum of
3-6 months in order to mitigate short-term fund value fluctuations.
Bond fund
rating
T+1 to
T+5
Yes 75% Not
applicable
Page 83 of 192

Page 90

Permitted
Investments
Table 1
Description / Objectives Minimum
Credit
Criteria
Liquidity
Risk
Market
Risk
Maximum
Share of
Total
Investments
Maximum
Maturity
Period
Pooled funds other
than money market /
ultra-short dated
bond funds
Shares or units in diversified investment vehicles covering property,
bond and equity investments. Pooled funds whose value changes with
market prices and/or that have a notice period will be used for longer
investment periods. MMFs are included in Table 1, but the Council,
given the extent of its long-term investment balances, may use this
vehicle to diversify an agreed proportion (capped at a maximum of 25%
of total investment balances) of its investment balances into longer term
assets (property, bonds and equity) utilising pooled funds.
Pooled funds have the advantage of providing wide diversification of
investment risks, including credit risk and interest rate risk, coupled with
the services of a professional fund manager in return for a fee. Property,
bond and equity funds offer enhanced returns over the longer term, but
their prices are more volatile in the short term, leading to the risk that
they could be sold at below their purchase price. This risk is mitigated by
only placing cash that is available for 3-5 years into more volatile funds.
The Council’s officers in conjunction with its treasury advisers have
determined that a proportion of the Council’s investments have and will
remain available for longer term investment in the future. The funds
selected will be subject to further scrutiny and suitability, drawing on the
experience and advice of the Council’s treasury advisers.
Long-term
AAA volatility
rating
Various Yes 20% Not
applicable
* In recognition of the restricted number of approved counterparties that now meet our more stringent lending criteria, there is an added degree of flexibility introduced to the maximum deposit
level. The deposit level with any one institution can now extend to a maximum of 15%, where the element which exceeds the 10% threshold is deposited on the basis of a call account deposit
with the institution.
Other types of investment instrument available to the Council:
(i) Forward foreign exchange contracts and options: These are only utilised in order to manage specific known exchange rate risks and not
for speculative purposes. A forward contract may be entered into in order to hedge against exchange rate risk where the amount and
date of a payment in a foreign currency is known in advance. An option is a premium paid product which gives the right, but not the
obligation, to purchase a pre agreed EUR amount, at a pre agreed rate and date.
(ii) Operational bank accounts: The Council may incur operational exposures, for example though current accounts, collection accounts and
merchant acquiring services, with its main operational bank (Clydesdale) with credit ratings of BBB+. These are not classed as
investments, but are still subject to the risk of a bank bail-in, and balances will normally be kept below £100,000 however, for short
periods normally over public holidays this balance may be higher with the approval of the Director of Finance and Resources.
Page 84 of 192

Page 91

A.2 Table 2 lists the permitted investments of a cash-type nature, available for use by the investment managers of the
Council’s Insurance Fund:
Permitted Investments
Table 2
Minimum Credit Criteria Liquidity Risk Market Risk Maximum Share of
Total Investments
Maximum Maturity
Period
Equities Delegated to investment managers Term Yes‡ 33% ±10% Not applicable
Fixed-interest securities Delegated to investment managers Term Yes‡ 33% ±10% Not applicable
Other assets Delegated to investment managers Term Yes‡ 33% ±10% Not applicable
‡  Market risk is mitigated since investment managers have been instructed to maintain low volatility by investing in a diversified portfolio which incorporates (i) a broad spread of equities, both
directly and indirectly (through pooled funds), and (ii) a proportion of fixed-interest securities and cash.
A.3 Table 3 lists the permitted investments of a non-cash nature available for use by the Council:
Permitted Investments
Table 3
Treasury Risks Mitigating Controls Maximum Share of Total
Investments
Share holdings, unit holdings and
bond holdings, including those in a
local authority-owned company
Service investments that may
exhibit market risk; likely to be
highly illiquid
Each equity investment requires Member approval and
each application will be supported by the service rationale
behind the investment and the likelihood of loss
Policy driven, managing all
associated risks; authorised
limit and operational
boundary apply
Loans to a local authority-owned
company or other entity formed by
a local authority to deliver services
Service investments either at
market rates of interest or below
(soft loans); may exhibit credit
risk; likely to be highly illiquid
Each loan to a local authority company requires Member
approval and each application will be supported by the
service rationale behind the loan and the likelihood of full or
partial default
Policy driven, managing all
associated risks; authorised
limit and operational
boundary apply
Loans made to third parties,
including soft loans (for example,
employee loans)
Service investments either at
market rates of interest or below
(soft loans); may exhibit credit
risk; likely to be highly illiquid
Each third party loan (or tranche of loans) requires Member
approval and each application will be supported by the
service rationale behind the loan and the likelihood of full or
partial default
Policy driven, managing all
associated risks; authorised
limit and operational
boundary apply
Page 85 of 192

Page 92

Permitted Investments
Table 3
Treasury Risks Mitigating Controls Maximum Share of Total
Investments
Investment property Non-service properties which are
being held pending disposal or for
a longer-term rental income
stream; these are highly illiquid
assets with high risk to value
Property holding will be revalued regularly and reported at
appropriate periodic intervals for a property investment
portfolio in respect of rental levels; in terms of surplus
assets held for disposal, the Council has an active surplus
property disposal strategy which ensures a coordinated and
managed approach is adopted to the disposal of such sites
in a way which is reflective of current and future anticipated
market conditions, seeks to maximise market interest in site
disposals and secures best value for the Council
Policy driven, managing all
associated risks; authorised
limit and operational
boundary apply 
A.3 Treasury risks
All investment instruments listed in Tables 1 and 2 above are subject to the following risks and their mitigating controls:
Treasury Risk Description Mitigating Controls
Credit and
counterparty risk:
The risk of failure by a counterparty (bank or building society) to
meet its contractual obligations to the Council, particularly as a
result of the counterparty’s diminished creditworthiness, and the
resulting detrimental effect on the Council’s capital or current
(revenue) resources. There are no counterparties where this risk is
zero although AAA-rated organisations have a very high level of
creditworthiness.
The Council has set minimum credit criteria to determine which
counterparties and countries are of sufficiently high creditworthiness to
enable investments to be made safely.
Liquidity risk: The risk that cash will not be available when it is needed. While it
could be said that all counterparties are subject to at least a very
small level of liquidity risk, as credit risk can never be zero, in this
document liquidity risk has been treated as whether or not instant
access to cash can be obtained from each form of investment
instrument.
The Council has a cashflow forecasting model to enable it to determine the
duration for which individual investments can be made, and how much can
be invested.
Page 86 of 192

Page 93

Treasury Risk Description Mitigating Controls
Interest rate risk: The risk that fluctuations in the levels of interest rates create an
unexpected or unbudgeted burden on the organisation’s finances,
against which the organisation has failed to protect itself
adequately. The Council has set limits for its fixed and variable rate
exposure in its treasury indicators as detailed in this report.
The Council manages this risk by having a view of the future course of
interest rates and formulating a treasury management strategy accordingly.
The strategy aims to maximise investment earnings consistent with control of
risk and minimise expenditure on interest costs on borrowing.
Legal and
regulatory risk:
The risk that the Council, or an organisation with which it is dealing
in its treasury management activities, fails to act in accordance with
its legal powers or regulatory requirements, and that the Council
suffers losses accordingly.
The Council will not undertake any form of investing until it has ensured that
it has all necessary powers to do so. The Council will ensure that it complies
with all applicable regulations in carrying out its treasury management
operations.
Exchange rate
risk:
The risk that fluctuations in foreign exchange rates create an
unexpected or unbudgeted burden on the Council’s finances,
against which it has failed to protect itself adequately.
The Council will closely monitor exchange rate movements and may use risk
management tools or instruments available, such as a forward contract or
advance purchase of foreign currency to hold in an account until such time
as required; always providing that these measures are used only for the
prudent management of the Council’s financial affairs and not for any
speculative purpose.
Market risk: The risk that, through adverse market fluctuations, the value of
investments may decline over a given time period simply because
of economic changes or other events that impact large portions of
the market.
Asset allocation and diversification can protect against market risk because
different portions of the market tend to underperform at different time times.
The Director of Finance and Resources has the authority to invest the funds
of the Insurance Fund in such investments, securities or property as deemed
fit. The Director and officers rely on professional investment managers
(currently Aberdeen Standard Capital) for the day-to-day management of the
assets of the Council’s Insurance Fund. The investment managers are
responsible for the allocation of assets between types of investments and
the selection of individual stocks within each type of investment. The
investment fund’s principal objective is achieving moderate capital growth in
combination with low volatility to mitigate the impact of market risk. To
achieve this, the investment managers operate within predefined asset
allocation limits, as outlined in Table 2 above.
Page 87 of 192

Page 94

Page 88 of 192

Page 95

Annex B: Renfrewshire Council Counterparty List
Counterparty Country of
Domicile
%
Limit
£M
Limit
Max Investment
period
UNITED KINGDOM:  BANKS        
Virgin Money (Clydesdale Bank) GB 10% 20.0 100 days
Bank of Scotland PLC (RFB) GB 10% 20.0 6 months
Barclays Bank UK PLC (RFB) GB 10% 20.0 6 months
Goldman Sachs International Bank GB 10% 20.0 6 months
Handelsbanken PLC GB 10% 20.0 12 months
HSBC Bank PLC (RFB) GB 10% 20.0 12 months
Royal Bank of Scotland PLC GB 10% 20.0 12 months
Santander UK PLC GB 10% 20.0 6 months
SMBC Bank International PLC GB 10% 20.0 6 months
Standard Chartered Bank (includes sustainable) GB 10% 20.0 6 months
UNITED KINGDOM:  BUILDING SOCIETIES        
Coventry Building Society GB 5% 10.0 6 months
Leeds Building Society GB 5% 10.0 100 days
Nationwide Building Society GB 5% 10.0 6 months
Skipton Building Society GB 5% 10.0 6 months
Yorkshire Building Society GB 5% 10.0 100 days
UNITED KINGDOM:  OTHER INSTITUTIONS        
UK Local Authorities           GB 100% 100% 2 YEARS
UK Government                    GB 100% 100% 50 years
COMMONWEALTH OF AUSTRALIA AU      
Australia and New Zealand Banking Group AU 10% 20.0 12 months
Commonwealth Bank of Australia AU 10% 20.0 12 months
National Australia Bank Ltd AU 10% 20.0 12 months
Westpac Banking Corporation AU 10% 20.0 12 months
GOVERNMENT OF CANADA CA      
Bank of Montreal CA 10% 20.0 12 months
Bank of Nova Scotia CA 10% 20.0 12 months
Canadian Imperial Bank of Commerce CA 10% 20.0 12 months
National Bank of Canada CA 10% 20.0 12 months
Royal Bank of Canada CA 10% 20.0 12 months
Toronto-Dominion Bank CA 10% 20.0 12 months
FEDERAL REPUBLIC OF GERMANY DE      
Bayerische Landesbank DE 10% 20.0 6 months
Landesbank Hessen-Thueringen Girozentrale DE 10% 20.0 12 months
KINGDOM OF THE NETHERLANDS NE      
Cooperatieve Rabobank UA NE 10% 20.0 12 months 
Page 89 of 192

Page 96

Counterparty Country of
Domicile
%
Limit
£M
Limit
Max Investment
period
MONEY MARKET FUNDS        
Aberdeen Euro Fund Income Class J3 LUX 10% 20.0 Call
Aberdeen Sterling Fund Income Class L1 LUX 10% 20.0 Call
BlackRock ICS Euro Liquidity Fund IR 10% 20.0 Call
BlackRock ICS Sterling Liquidity Fund IR 10% 20.0 Call
CCLA - Investment Management Ltd (Sterling) GB 5% 10.0 Call
Federated Short-Term Euro Prime Fund GB 10% 20.0 Call
Federated Short-Term Sterling Prime Fund GB 10% 20.0 Call
Deutsche Managed Euro Fund IR 10% 20.0 Call
Deutsche Managed Sterling Fund IR 10% 20.0 Call
Goldman Sachs Euro Liquid Reserves IR 10% 20.0 Call
Goldman Sachs Sterling Liquid Reserves IR 10% 20.0 Call
Insight Liquidity Funds PLC - EUR Liquidity Fund IR 10% 20.0 Call
Insight Liquidity Funds PLC - GBP Liquidity Fund IR 10% 20.0 Call
Royal London Sterling Liquidity Fund (Sterling) GB 10% 20.0 Call
ULTRA SHORT DATED FUNDS        
Aberdeen Short Duration Sterling Funds Class K1 LUX 5% 10.0 Call + 3 
Page 90 of 192

Page 97

Appendix 4: Capital Strategy 2024 to 2027 
1 Introduction ..................................................................................................................... 1
2 Purpose and Aims ........................................................................................................... 1
3 Overview ......................................................................................................................... 2
4 Capital Expenditure and Financing ................................................................................. 2
5 Asset management ......................................................................................................... 5
6 Treasury management .................................................................................................... 5
7 Commercial activities ...................................................................................................... 6
8 Other long term liabilities ................................................................................................. 6
9 Governance .................................................................................................................... 7
10 Knowledge and skills ....................................................................................................... 7 
1 Introduction
1.1 This Capital Strategy report gives an overview of how capital expenditure, capital
financing and treasury management activity contribute to the provision of public
services in local government, along with an overview of how associated risk is managed
and sustainability implications for the future.
1.2 Decisions made now on capital and treasury management will have financial
consequences for the Council for many years to come. They are therefore subject to
both a national regulatory framework and to local policy framework, summarised in this
report.
2 Purpose and Aims
2.1 Following consultation, the Chartered Institute of Public Finance and Accountancy
(CIPFA) published an updated version of the Prudential Code for Capital Finance in
Local Authorities (“the Prudential Code”) in December 2021.
2.2 The key objectives of the Prudential Code are to ensure, within a clear framework, that;
• capital expenditure plans and investment plans are affordable and proportionate;
• all external borrowing and other long-term liabilities are within prudent and
sustainable levels;
• the risks associated with investments for commercial purposes are proportionate to
their financial capacity; and
• treasury management decisions are taken in accordance with good professional
practice. 
Page 91 of 192

Page 98

2.3 In keeping with the objectives above, the purpose of this Capital Strategy is to
demonstrate that the Council takes capital investment decisions in line with service
objectives that properly take account of value for money, prudence, sustainability and
affordability, setting out the context in which capital expenditure, capital financing and
treasury decisions are being made, and has given due consideration to risk.
3 Overview
3.1 An understanding of what constitutes capital expenditure and how it is financed is
fundamental to realising the benefits and mitigating the risks to the Council under the
prudential framework.
3.2 Capital expenditure is the investment in new or existing assets, such as property or
vehicles, that will generate economic benefits or service improvements that will be
realised by the Council for a period of more than one year. 
3.3 All capital expenditure must be financed, either from external sources (government
grants and other contributions), internal sources (current revenue and capital receipts)
or debt (borrowing and leasing).
3.4 Financing capital expenditure through debt offers the opportunity to spread the cost
over future revenues through loan fund repayments. However, due to the interest
payments associated with debt, the total cost is usually higher than other methods of
capital financing. Therefore, careful planning and monitoring procedures must be in
place to ensure capital investment decisions offer value for money and are affordable
and sustainable for current and future revenue budgets.
4 Capital Expenditure and Financing
4.1 The Council is legally obliged to determine the maximum it may allocate to capital
expenditure, in line with statutory guidance. The planned limits are shown in the table
below. The Housing Revenue Account (HRA) is a ring-fenced account, which ensures
that council housing does not subsidise, or is not itself subsidised by, other local
services. HRA capital expenditure is therefore recorded and reported separately.  
Estimated Capital Expenditure 2024/25 2025/26 2026/27
£000s £000s £000s
Non-Housing 147,823 150,958 83,504
Housing 41,236 77,701 62,009
Total Resource Availability 189,059 228,659 145,513 
4.2 The Council Plan "Creating a fairer Renfrewshire built on innovation, wellbeing and
opportunity" was agreed in September 2022 and outlines five strategic priorities for the
Council over the period to 2027. The Council Plan provides a “golden thread” that
ensures these priorities translate into specific spend programmes. 
Page 92 of 192

Page 99

4.3 The Plan contains an over-arching theme of “improving outcomes for children and
families”. Every one of the five strategic priorities should directly contribute to this
outcome and demonstrate that services are working together to get it right for children,
families and communities.
4.4 Below is a summary of the five strategic themes from the Council Plan, and some
related projects within the Capital Plan 2024 to 2027: 
Place – working together to enhance wellbeing across communi�es
£19.2m investment in cultural and economic infrastructure, in particular completing the
transformation of Paisley Museum.
£4.3m investment in regeneration through a mixture of projects leading to
transformative investments which will drive economic activities and re-purpose town
centres to become more diverse, successful and sustainable.
£34.7m of improvements in infrastructure within Renfrewshire improving roads, traffic
management, bridges and street lighting and £21.7m investment in property lifecycle
maintenance.
Economy – building an inclusive, green and resilient economy
Con�nued investment in comple�ng the City Deal projects which will lead to total spend
of £198.5m on infrastructure in Renfrewshire, transla�ng into an improved local
economy and improved connec�vity.
Fair – nurturing bright, happy and healthy futures for all
A schools investment programme totalling £155.3m, including part-funding under the
Scottish Government Learning Estate Investment Programme that will lead to a new
build community campus at Renfrew Road, Paisley to replace Paisley Grammar school
and new build projects for the Dargavel area. 
£1m investment for an internal play centre at the Lagoon allowing access for all
youngsters to explore, play and learn in a safe and exciting environment.
Green – leading Renfrewshire to Net Zero
Investment in parks, play areas, outdoor access and nature restoration of £3.5m
Living our values – making a difference together
£2.4m investment in new ICT equipment and software to improve council services 
4.5 A full copy of the Council Plan is available on the Council’s website by following 
Your Council > Information, performance and statistics > Plans, policies and strategies.
Renfrewshire Council Plan.
Page 93 of 192

Page 100

4.6 As stated in 3.3, all capital expenditure must be financed either from external sources,
internal sources or through borrowing. The planned financing of the above expenditure
is shown on the table below:  
2024/25 2025/26 2026/27
£000s £000s £000s
Prudential Borrowing 95,006 87,780 15,400
Total Borrowing 95,006 87,780 15,400
Specific Grant 3,028 800 800
General Capital Grant 11,177 11,150 11,150
General Capital Grant – Renewal of Play Parks 462 768 0
BAE contribution (Park Mains) 5,000 5,000 5,000
City Deal Grant 0 44,542 51,154
Usable Capital Receipts 33,150 918 0
Total Resource Availability 147,823 150,958 83,504 
4.7 Debt is only a temporary source of finance, since loans and leases must be repaid, and
it is replaced over time by other financing, usually from revenue, which is known as
loans fund repayments.
4.8 The Council’s cumulative outstanding amount of debt finance that will be charged to
future revenue budgets is measured by the Capital Financing Requirement (CFR). The
CFR increases with new debt-funded capital expenditure and reduces with loans fund
repayments; capital receipts can also be used to reduce the CFR. Based on the above
figures for expenditure and financing, the Council’s estimated CFR is as follows:
Capital Financing Requirement  2024/25 2025/26 2026/27
£000s £000s £000s
Non-Housing 458,111 540,766 550,557
Housing 136,630 186,995 231,040
Total  594,741 727,761 781,597 
4.9 The loans fund repayments, combined with interest payable on loans, forms the total
charge to revenue, known as financing costs. An estimate of the total financing costs as
a percentage of net revenue (the amount funded from Council Tax, government grants,
business rates, or rental income in the HRA), is shown in the table below.
Ratio of financing Costs to net revenue stream
(estimated)
2024/25 2025/26 2026/27
% % %
Non-Housing 3.47% 4.00% 4.39%
Housing 28.59% 28.54% 24.80%
Total     
Page 94 of 192

Page 101

5 Asset management
5.1 The Council’s Corporate Asset Strategy (CAS) sets out a high-level framework for the
management for all the Council’s Assets. It guides the development and upkeep of
strategies and plans for all classifications of assets. The strategy states an overall
principle that all assets are owned corporately by the Council, and their management is
co‐ordinated across the organisation to maximise the benefits for Renfrewshire, as well
as to support the achievement of the vision for the area and the Council’s key
objectives.
5.2 The Council is conducting a Strategic Property Review  as part of its work around
financial sustainability. The objective of this review is to assess the optimum size and
shape of the Council’s property estate, reducing its carbon footprint and using buildings
more efficiently to provide its services the findings of which will inform future capital
plans. 
6 Treasury management
6.1 Treasury management is concerned with keeping sufficient, but not excessive, cash
balances to meet the Council’s spending requirements, whilst managing the risks
involved. Surplus cash is invested until required, while temporary cash shortages will be
met by borrowing. 
6.2 The Council’s Treasury Management Strategy Statement (TMSS) contains objectives
for borrowing and investments, with the overarching objective in relation to treasury
management activities being effective management and control of risk. The full TMSS
can be found within Appendix 4 of this report.
6.3 The main objectives of borrowing are to achieve a low, but certain cost of finance, while
retaining flexibility should plans change in the future. Statutory guidance states that
debt should remain below the CFR, except in the short-term. As can be seen from the
table below, the Council expects to comply with this during 2024-27.
Estimated Borrowing Position 2024/25 2025/26 2026/27
£m £m £m
Borrowing  381 511 567
Other long-term liabilities 94 92 90
Total External Debt 475 603 657
Capital Financing Requirement 595 728 782
Under Borrowing 120 125 125 
6.4 The Council is required to set an Operational Boundary for external debt. This is an
estimate of the maximum external debt of the Council according to the probable events
contained in the Council plans, budgets and strategies. Sustained or regular borrowing
above the Operational Boundary would be a significant matter, requiring investigation
and action.
Page 95 of 192

Page 102

6.5 The Authorised Limit for external debt is based on the same assumptions as those used
to calculate the Operational Boundary; however, it is higher to allow sufficient headroom
for unusual or exceptional cash requirements. The Authorised Limit reflects a level of
borrowing that could be afforded in the short-term, but that would not be sustainable in
the long-term. The Operational Boundary and Authorised Limits are as follows:
Limits on External Debt 2024/25 2025/26 2026/27
£m £m £m
Operational Boundary 595 728 782
Authorised Limit 620 760 816 
6.6 Treasury investment requirements arise due to cashflow timings, i.e. receiving cash
before it is due to be paid out again at a later date. The main objectives of treasury
investments are to obtain an acceptable market rate of return, subject to protecting
capital security and liquidity of invested funds. The focus is therefore on minimising risk
rather than maximising returns.
7 Commercial activities
7.1 These are investments made outside the normal treasury management activity, such as
property investments, with the sole objective of making a financial surplus. The Council
has no such investments at this time.
8 Other long term liabilities
8.1 In addition to the borrowing detailed in 6.3 above, the Council is party to a Public
Private Partnership for the provision and maintenance of educational and other
facilities, including a Residual Waste facility. The Council also has finance lease
agreements for a number of vehicles, for which the outstanding finance lease obligation
at 31 March 2024 will be £0.037m.
8.2 The Local Government Pension Scheme in Scotland (LGPS) is a funded, defined
benefit, statutory occupational pension scheme. For Renfrewshire Council, the regional
pension fund is the Strathclyde Pension Fund. As a funded scheme, the Council and its
employees pay contributions into the fund, calculated at a level intended to balance the
scheme’s pension liabilities with the scheme’s investment assets. Following an
assessment by Strathclyde Pension Fund’s actuaries, Hymans Robertson, the value of
the Council’s share of the net pension asset at 31 March 2023 was estimated at £434m.
The surplus position was restricted in the annual accounts by an asset cap owing to
accounting regulations, and this adjusted value was reported as £175.9m.
8.3 Provisions are made when an event has taken place that gives the Council a legal or
constructive obligation that will probably require a settlement, usually in cash, but can
be other economic or service benefits. At 31 March 2023 the Council had set aside
long-term provisions of £4.9m related to holiday pay compensation and insurance
claims. The long-term provisions will be reviewed for the 2023/24 Annual Accounts.
Page 96 of 192

Page 103

9 Governance
9.1 Capital Programmes: Potential capital projects will be assessed for strategic fit,
achievability, affordability, practicality, revenue impact and non-monetary impacts such
as future economic growth, environmental or social well-being.
9.2 Once the capital projects have been considered, the Capital Plan is approved annually
by the full Council, setting out the funding available, means of financing and Prudential
Indicators. No capital expenditure can be authorised unless it has been provided for in
the approved capital plan or is within an officer’s delegated authority. The Financial
Regulations set out the framework for transferring money between budgets. 
9.3 Capital budget monitoring reports from the Director of Finance and Resources are
considered by the relevant Policy Board and include explanations for any significant
variances from budget targets. Policy Boards will consider and approve any actions
required to bring financial performance within approved limits.
9.4 Each capital programme is assigned a responsible officer who will approve and monitor
expenditure. They receive support from a variety of sources, for example, to receive
capital budget reports; to ensure that the expenditure complies with the statutory
definition of capital; that any external contracts agreed comply with the Standing Orders
of the Council; or to obtain any advice on legal matters.
9.5 Treasury Management: Decisions on treasury management investment and borrowing
are made daily and are therefore delegated to the Director of Finance and Resources
and relevant staff, who must act within the parameters set out in the Treasury
Management Strategy approved annually by full Council. A mid-year review of treasury
management activity is presented each year to the Finance, Resources and Customer
Services Policy Board, with a full year review reported to Council.
9.6 Commercial Activities: Property investments would be classified as capital
expenditure and therefore included as part of the capital plan. Any commercial
investment decisions would be made by the Council in line with its Financial
Regulations and Standing Orders. 
10 Knowledge and skills
10.1 The Council employs professionally qualified and experienced staff with responsibility
for making capital expenditure, borrowing and investment decisions, and ensures that
its qualified staff meet their continuous professional development requirements. 
10.2 Council staff knowledge and experience is supplemented by the use of external
advisors and consultants that are specialists in their field. The Council currently has a
contract with Link Asset Services for the provision of treasury management consultancy
services. This approach is more cost effective than employing such staff directly and
ensures that the Council has access to knowledge and skills commensurate with its risk
appetite.
Page 97 of 192

Page 104

Page 98 of 192

Page 105

PROCEDURE TO BE FOLLOWED AT THE  
MEETING OF RENFREWSHIRE COUNCIL  
TO BE HELD ON 29 FEBRUARY 2024  
DURING CONSIDERATION OF ITEM 5 CONCERNING  
THE HOUSING REVENUE ACOUNT BUDGET, RENT LEVELS  
2024/2025 AND HOUSING CAPITAL INVESTMENT PLAN  
2024/2025-2028/2029  
The purpose of this note is to give Members advance notice of the procedure which Provost
Cameron has agreed should be followed at the Meeting of the Council on 29 February 2024
viz: 
 
1. The Convener of the Communities and Housing Policy Board (the Convener) will make her
budget statement for financial year 2024/2025 and move as appropriate. She will then
speak to the principal points of her proposals. The motion will require to be seconded. 
2. For the purposes of the subsequent discussion and voting, the Convener's proposals will be
taken as one motion. 
3. An opportunity will then be given to the Leaders of the opposition groups and any other  
Members to move, and to have duly seconded, comprehensive amendments to the motion
(i.e. taking together budget proposals, the rent levels and the capital investment plans). 
4. The motion and any amendments will require to be produced in writing and a copy given to
each of the Members present prior to being spoken to at the meeting. Provost Cameron
may then adjourn the meeting for 20 minutes to allow Members to consider the terms of the
motion by the administration and any amendments by the opposition groups or other
Members.  Corporate Meeting Rooms have been arranged for the adjournment as follows: 
Administration – Corporate Meeting Room 2, Labour - Corporate Meeting Room 1,
Conservative – Corporate Meeting Room 3.  The other Members will be able to remain in
the Chambers.
5. There shall be no formal restriction upon the length of time given to the Convener and the
Leaders of the opposition groups and other Members to move their respective budget
statements and speak in support of the principal points of their proposals. However, Provost
Cameron shall have the power to require any person speaking to limit their speech in order
to facilitate the conduct of the meeting. 
6. Provost Cameron will then invite other Members to take part in the debate. 
7. The debate will conclude with Provost Cameron giving the Convener an opportunity to
reply. 
8. A vote or votes will then be taken in accordance with the provisions of standing orders.  
Item 5
Page 99 of 192

Page 106

Page 100 of 192

Page 107

___________________________________________________________________ 
To: Council 
On: 29 February 2024
___________________________________________________________________ 
Report by: Director of Environment, Housing & Infrastructure and Director of
Finance & Resources
___________________________________________________________________ 
Heading: Housing Revenue Account Budget & Rent Levels 2024/25 and
Housing Capital Investment Plan 2024/25 to 2028/29
___________________________________________________________________ 
1. Summary 
1.1 This report details the proposed Housing Revenue Account (HRA) budget for
financial year 2024/25 and sets out the information which allows consideration
of rent levels for 2024/25.   
1.2 The report highlights the impact of economic pressures on the HRA and sets
out the range of operational pressures that have emerged, and the
adjustments to budgets and resources required to deal with these pressures. 
1.3 The report also provides members with results from the consultation process
with tenants, regarding the annual rent setting process. The consultation
process asked five key questions regarding the priorities that tenants have
identified previously as to whether they felt these were still very important,
important, or not important. The consultation also asked whether these are
still the right priorities with only 2.9% of respondents disagreeing. 
1.4 The majority of tenants (78.2%) support a 6.0% rent increase in 2024/25 , with
a £2m shortfall to be met over the next four years, as opposed to an
immediate 7.7% increase in 2024/25 with a reduced overall shortfall of
£0.500m to be met over the next three years (21.8% support). 
1.5 The report also details the Housing Capital Investment Plan for 2024/25 to
2028/29, which will deliver a total investment of £281m in the Council’s
housing stock over the 5-year period. It is anticipated that this level of
investment will attract £35m of government grant for new builds and this
results in a net capital programme amounting to just over £246m. 
Page 101 of 192

Page 108

1.6 In setting the 2024/25 HRA budget, members may wish to consider the
medium and longer-term financial context for the HRA and note the planning
assumption of CPI+1% rent increases in future years as well as considering
the ongoing risks and challenges outlined in this report. 
___________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Council: 
(i) considers the report and approves an average weekly rent increase of
£5.45, which equates to 6.0% for all house rents and lock-ups, and
requires £0.500m of recurring budget savings in 2024/25; 
(ii) notes the findings of the recent Tenant Consultation exercise; 
(iii) approves the Housing Revenue Account Budget for financial year
2024/25 as detailed in Appendix 2; 
(iv) approves the Housing Capital Investment Plan 2024/25 to 2028/29 as
detailed in Appendix 3 of the report; and 
(v) notes the continuing requirement to achieve best value in the
commissioning of works by having an optimum workflow over the 5 years
of the investment plan and authorises the Director of Environment,
Housing and Infrastructure to liaise with the Director of Finance and
Resources to re-profile the capital programme and available resources,
as necessary, in line with the appropriate limits established under the
Council’s capital prudential framework arrangements.
___________________________________________________________________ 
3. Background and Medium-Term Financial Context 
3.1. The HRA operates a rolling 30-year Business Plan model, which is the
standard operating practice amongst local authorities and Registered Social
Landlords. The 30-year basis of the model reflects the need for a long-term
planned approach to the replacement of major items such as rewiring, central
heating, etc., aligned to the lifecycles of these elements. 
3.2. The model ensures that planned rental income from the estimated 11,731
average number of lettable properties in 2024/25 is sufficient over the term of
the plan to cover debt and servicing capital expenditure, including significant
investment and regeneration initiatives, together with funding the annual costs
of maintaining the housing stock and all HRA annual operating costs including
staffing. 
3.3. The Business Plan model is reviewed to take account of the adjusted base
budget position from the previous year and to update any key assumptions,
economic factors and known or emerging risks. This review process allows
consideration to be given to the setting of rent levels for the forthcoming and
future financial years through effective scenario planning.
Page 102 of 192

Page 109

3.4. The 30-year Business Plan model currently assumes 6.7% CPI (Consumer
Price Index model) for the 2024/25 financial year, as in previous years this
reflected the rate in September of the current financial year. The Business
Plan assumes that CPI is on a decreasing trend until reaching the Bank of
England’s 2.0% target by 2026/27. 
3.5. Different levels of inflation have been applied to the main cost drivers for
2024/25 to reflect the expected impact more accurately on Renfrewshire’s
cost base. This is reviewed annually across the cost drivers to reflect the
actual levels of inflation impacting on the base costs. Over the longer term,
cost increases revert to the assumed CPI forecasts noted in 3.4. 
3.6. Tenants and social landlords are facing some of the most challenging
economic times in recent memory. The Covid-19 pandemic, Brexit and the
war in Ukraine continue to have a significant impact on national and global
economies. This created a cost-of-living crisis that again continues to cause
significant hardship for many social housing tenants, including some of the
most vulnerable people in society. 
3.7. In 2023/24 (current year) the HRA continues to experience impacts relating to
recovery from the pandemic. The backlog of repairs to void properties
continues to have a negative impact on rental income and council tax liability
through increased void periods. This reflects the operational capacity of
Building Services and other contractors to expand to deliver the increased
levels of workload. Fluctuating resource levels in construction trades continue
to affect construction output levels in both the public and private sector. 
3.8. Members will recall that following a strategic review of the HRA it was
determined that there was capacity in the HRA to fund an additional £100m
investment and regeneration programme over the next decade. Council
approved the proposals to take forward this first phase of investment, focusing
on eight areas and around 1,100 council properties. Members will also recall
that the plan also includes over £30m of investment required in high-rise
accommodation. The cost of repayment on borrowing to deliver this ambition
has increased because of the cost-of-living crisis and current economic
climate with high interest rates. To ensure sufficient funding in the long term,
an assumption of 1% above CPI as an uplift to rents is assumed for every
year across the 30-year plan. 
3.9. If a tenant is in receipt of benefits covering housing costs, they will likely be
mitigated from any increased costs. Renfrewshire has close to 75% of tenants
in receipt of some form of support for their housing costs. A rent increase
would result in some tenants receiving more Housing Benefit and some
existing non-claimants becoming entitled to Housing Benefit. However, unless
their circumstances change, most tenants will be liable for the same
contribution towards their rent, with Housing Benefit making up the difference.
The tenancy support fund established last year to provide additional support
to tenants in financial hardship remains within the proposed 2024/25 budget. 
Page 103 of 192

Page 110

4. HRA Budget Planning Assumptions for 2024/25 
4.1. The rental income generated by the HRA must support service delivery, the
costs of appropriately maintaining the housing stock, and the loan debt related
costs to service the capital investment required in HRA assets. 
4.2. The proposed budget adjustments for 2024/25 are shown across the high
level HRA categories in summary form on Appendix 1 and analysed into the
Policy Board revenue monitoring format in Appendix 2. To supplement the
information contained in these appendices, additional contextual commentary
is provided below, and this can be read in conjunction with Appendices 1 and
2. 
4.3 Revenue Expenditure 
4.3.1  Supervision and Management includes the operational inflation and additional
costs covering areas such as pay increases for housing staff, energy costs
and insurance costs which, in 2024/25 are all higher than the expectations
forecast for the 2023/24 rent increase level. The removal of a recurring
pension saving of £0.168m and the temporary removal of pension budget of
£1.029m, which will require to be reinstated in 2026/27, partially offset the
pressures on these costs in-year. Additional budget is also required for
council tax, reflecting the continuing void pressures. The overall combined
impact of these pressures and additional investment is an increased net
budget requirement of £0.897m for 2024/25. 
4.3.2 Housing Repairs and Maintenance is an area of budget that has been under
considerable pressure due to both cost increases and post pandemic
recovery demands. This includes pressures such as rising material, fuel, and
labour prices to repair, maintain, and improve tenants’ homes. These
pressures are partially offset in-year due to the temporary removal of pension
budget £0.641m in Building Services, £0.551m of which will require to be
reinstated in 2026/27. The budget has increased overall by £3.090m to take
account of the very real and significant challenges around increasing costs. 
4.3.3 The new grounds and estates maintenance standards, introduced in recent
years are now fully implemented. An additional £0.030m has been added to
the budget to cover the increased costs of waste disposal. 
4.3.4 The void rent loss movement of £0.106m reflects an increase to the expected
void rent loss projections based on the current operational pressures within
the sector and the revised income collection levels. In terms of void rent loss,
this reflects the same targeted performance as the 2023/24 budget. 
4.3.5 The bad debt provision has been increased by £0.104m, continuing to reflect
the uncertain economic position and cost-of-living crisis faced by tenants and
the associated risk in relation to increasing levels of bad debt. This budget
continues to include funding to provide support to tenants in financial
hardship, as approved last year. In terms of bad debt levels, this reflects the
same target as the 2023/24 budget. 
Page 104 of 192

Page 111

4.3.6 The net financing costs Loan charges budget has reduced by £1.525m, and
the Contribution to Capital Programme line has increased by £0.345m. The
net £1.180m reduction is used as a mitigation for the overall rent increase
required in 2024/25. This is through a reduction in loan charges, increased
anticipated interest income, and contributions to the Capital Programme.
While this will mitigate the rent increase in 2024/25, it increases borrowing
requirements, which consequentially increase interest payments in the long
term. This is therefore a short-term solution to mitigate the rent increase for
2024/25 and, as set out in paragraph 3.8 of this report,  these short-term
measures will require above-CPI rent increases in future years to uplift the
budget to fund the current investment programme. 
4.4 Revenue Income 
4.4.1 The gross increase in Rental income (£3.075m), reflects the 6.0% increase on
both house and lock-up rents. The stock movement assumptions are based
on regeneration, demolition, and investment plans, reflected in the income
assumptions. 
4.4.2 In relation to lock-up rents, the average charge per lock-up is currently £21.84
per month and the 6.0% increase represents an average of £1.31 increase
per month. 
4.4.3 Other income increases by (£0.056m), reflecting minor adjustments, mainly
for recovery of staffing related costs managed within the revenue expenditure
budget but recovered by income. No other income price increases are
assumed at present for increased recoveries from tenants or owners via
increased service charges, however recharge models will be reviewed to
ensure the fair recovery of increasing costs in the long term. 
4.4.4 To mitigate the impact on rent increases in 2024/25 it is proposed to use
(£0.692m) of current reserves as a one-off measure. This will reduce the level
of contingency held to £4.529m within the HRA to meet future and unforeseen
cost pressures, including the ICT system replacement, and it is deemed that
this revised level of reserves remains prudent. In the short term, however, a
further £0.500m has been allocated from reserves in 2024/25, which requires
to be reinstated once the recurring savings included within the overall rent
proposals are achieved. 
4.4.5 As noted above and in order to facilitate the proposed rent increase for
2024/25, a recurring saving of £0.500m requires to be identified during
2024/25 to allow the long-term viability of the business plan to be maintained.
In the longer term and based on existing planning assumptions, this could
equate to a £2.000m cumulative budget deficit over the next four years. The
recurring £0.500m deficit in 2024/25 will require to be met from a combination
of service re-designs including the repairs and maintenance service and void
property management as well as a review of service charge levels. In the
longer term as well as these areas higher levels of rental increases could be
required to meet the long term needs of the business plan. 
Page 105 of 192

Page 112

5. Tenant Consultation for 2024/25 Rent Increase 
5.1  Renfrewshire Council has a statutory duty to consult tenants before increasing
rents. To help inform the decision on rents for 2024/25, consultation was
undertaken during December 2023 and January 2024 involving discussion
with tenant representatives as the annual Council Wide Forum, an online
survey of Council tenants, and a telephone survey of Council tenants. 
5.2  Around 1,440 tenants took part in the consultation. Of this, 600 tenants were
asked their views by a telephone survey, with a further 840 participating
online. The results of the consultations were broadly similar regardless of the
method of consultation, with 78.2% favouring a rent increase of 6.0%. 
What level of rent increase 
would you support? 
Proposed Rent Increase  Survey Responses 
7.7%  21.8% 
6.0%  78.2% 
5.3 The online consultation process asked five key questions regarding the
priorities that tenants identified previously, as to whether they felt they were
still Very Important, Important, or Not Important. Around 840 tenants were
consulted, and the response is summarised in the table below.  
Priority 
Very
Important Important
Not
Important
Improve the energy efficiency of existing
Council homes.
63.3% 28.8% 7.9%
More money for improvements to existing
housing towards things like new roofs,
kitchens, bathrooms etc.
60.3% 33.1% 6.6%
Deliver more newbuild Council homes. 47.7% 32.3% 20.0%
Improving the letting standard for empty
homes.
43.7% 40.2% 16.1%
Improvements to bin stores, paths,
communal areas, and open spaces.
35.5% 46.8% 17.7% 
5.4 The telephone consultation asked if the tenants agreed that the priorities
remained the correct ones to follow, and the response is summarised in the
table below.  
Are these priorities still the 
right ones? 
Yes  Unsure  No 
91.2%  5.9%  2.9% 
5.5 Improving the energy efficiency of Council housing was most likely to be “Very
Important” to tenants (63.3%). This was followed by more money for
improvements to the existing housing, with 60.3% of tenants stating this is
Very Important. Lower priority for tenants was improvements to bin stores,
communal areas, and open spaces, with only 35.5% of tenants stating this
was Very Important.    
Page 106 of 192

Page 113

5.6 The proposed rent increase of 6.0% in 2024/25 will require recurring savings
in future years, or above-inflation annual rent increases to allow the high level
of planned investment to continue across the 30-year plan, and to continue to
focus on this over the next 5 years to deliver improvements to energy
efficiency and the delivery of the housing regeneration programme. 
6.   Housing Capital Investment Plan – 2024/25 to 2028/29 
6.1 Overview 
6.1.1 The proposed Housing Capital Investment Plan for the 5-year period from
2024/25 to 2028/29 is attached at Appendix 3. The gross value over the 5-
year period in the councils housing stock is £281.286m. It is anticipated that
this level of investment will attract £35.255m of government grant for new
builds, etc., and this results in a net capital programme to be funded of
£246.031m. The programme includes allowances for new build homes,
related Scottish Government grants, regeneration and renewal, and the
planned investment programmes required to ensure council house stock is
maintained at the appropriate standards. 
6.1.2 The planned net capital investment for each year is as follows: 
Financial Year Gross 
£m
Income 
£m
Net 
£m
2024/25 41.236 (5.898) 35.338
2025/26 77.701 (13.752) 63.949
2026/27 62.009 (4.522) 57.487
2027/28 62.165 (7.007) 55.158
2028/29 38.175 (4.076) 34.099
5-Year Total 281.286 (35.255) 246.031 
The plan will be reviewed on an annual basis, incorporating an ongoing
assessment of risk. 
6.1.3 Authority is granted to the Director of Environment, Housing and Infrastructure
in consultation with the Director of Finance and Resources, to flexibly manage
the capital investment programme as necessary to ensure optimum use of
resources within the approved limits of prudential borrowing. It is proposed
that this delegation remains in place over the life of the new 5-year plan
detailed in Appendix 3.  
Page 107 of 192

Page 114

6.1.4 The table below sets out the proposed composition of the plan for 2024/25
and how it will be funded. 
Financial Year 2024/25 Expenditure
£m
Income 
£m
Net 
£m
Planned Investment Programmes  20.835 0.000 20.835
Regeneration and New Build, etc.  20.401 0.000 20.401
Government New Build Grant  0.000 (5.898) (5.898)
Other Income 0.000 (0.450) (0.450)
CFCR 0.000 (4.269) (4.269)
Prudential Borrowing 0.000 (30.619) (30.619)
Total 41.236 (41.236) 0.000 
6.2 Planned Investment Programmes 
6.2.1 Since achieving compliance with the Scottish Housing Quality Standard
(SHQS) in April 2015, there has been an ongoing requirement to ensure that
housing stock continues to be maintained at least at this standard. With
Electrical Installation Condition Reports (EICR) and updated smoke and heat
detector standards now included within the assessment of SHQS, this led to a
reduction in the Council’s SHQS compliance. Continuing difficulties with
gaining access to approximately 8% of housing stock is still impacting the
compliance rate but processes are in place to address this. Additional
contracts have also been put in place to ensure that full compliance is
achieved in 2024/25. 
6.2.2 The capital programme for 2024/25 to 2028/29 as per the attached Appendix
3 will deliver a total of £140.065m in planned investment programmes in
existing housing stock, £33.661m in New Supply of housing stock outwith the
regeneration areas and a further £107.560m included as part of the
Regeneration and Renewal Plan including New Supply within regeneration
areas. The capital programme for the same period will attract £35.255m of
income from government grants. 
6.2.3 The Council is required to ensure that the HRA has capacity to deliver on
regulatory requirements and standards, including ensuring that properties
meet requirements such as SHQS and EESSH. At March 2023, 85.07% of
Council housing stock was compliant with the EESSH1 target (after applying
allowable exemptions). 
6.2.4 The Scottish Government had introduced a higher EESSH2 standard to be
met by 2032, however, this has been suspended and the review of 2023
introduced the Social Housing Net Zero Standard (SHNZS). The SHNZS
proposes the replacement of EPC targets with a minimum heat demand target
for homes to achieve and the replacement of heating systems with clean
heating alternatives. The standard aligns with net zero requirements and fuel
poverty targets. The SHNZS is currently out for consultation, and final agreed
targets for heat demand level and backstop dates for clean heating will come
into force in 2025. 
Page 108 of 192

Page 115

This standard will impact on the asset management strategy post 2025,
however current retrofit projects will be in line with expected standards.  
6.2.5 The capital investment programme has an allowance of £28.473m for the
investment requirements in all high-rise properties over the next five years,
including cladding, roofing, window and door replacements, foyer
improvements and lift refurbishments. 
6.2.6 There will continue to be a programme of heating renewals in 2024/25 and
also a programme of kitchen, bathroom, and rewiring combinations, with
works recommencing in tenanted properties that will supplement those works
currently being carried out in properties which are void. 
6.2.7 The main categories of planned investment programmes are: 
 External improvements, which include renewal of roofs, rainwater goods
and external fabric;
 Internal improvements, which include replacing or upgrading kitchens,
bathrooms, electrical wiring, and heating systems;
 Multi storey flat and sheltered housing improvements;
 Other investment including disabled adaptations, asbestos removal,
rotworks and the delivery of the final stages of the investment relating to
smoke, heat, and carbon monoxide detectors. 
6.2.8 The main elements of the planned investment programme for next year will
include the following: 
2024/25 Planned Improvements Number of Properties
External fabric upgrading 700
Kitchen, bathroom, and rewiring replacement 220
Heating renewals 300 
6.3 New Build and Regeneration 
6.3.1 The Housing Led Regeneration and Renewal Plan covering eight
communities across Renfrewshire was approved by the Communities,
Housing and Planning Policy Board on 18 January 2022. The Capital
Investment Plan outlines the anticipated timetable for this significant
regeneration programme for the next five years. 
6.3.2  In addition to the Regeneration and Renewal Plan, the Capital Investment
Plan continues to include provision for investment in building new Council
Housing. Four newbuild projects have been successfully delivered  – at
Johnstone Castle and Auchengreoch Road, Johnstone, Bishopton and
Ferguslie Park, delivering over 300 new build Council homes for social rent.  
Page 109 of 192

Page 116

6.3.3 As part of the Housing-Led Regeneration and Renewal Programme, tenders
were issued for the main contractors for new build housing proposed for the
Howwood Road Area (70 units) and at Ferguslie/Broomlands (18 units).
Preferred bidders have been identified for each project and subject to a
suitable offer of Scottish Government Affordable Housing Grant funding, it is
anticipated that the formal contract award will be issued by March. 
6.3.4 Over and above the Housing-Led Regeneration and Renewal Programme, a
tender was issued for the main contractor for the development of 60 new build
Council homes in Gallowhill. A preferred bidder has been identified for each
project and subject to a suitable offer of Scottish Government Affordable
Housing Grant funding, it is anticipated that the formal contract award will be
issued by March. 
6.3.5 A design feasibility study has been completed for Foxbar Rivers with a tender
to be issued for main contractor to be issued following completion of site
investigations. It is anticipated that a further 48 newbuild homes could be
delivered on this site. 
6.3.6 The Strategic Housing Investment Plan 2024-29 approved by the
Communities and Housing Policy Board on 31 October 2023, includes
provision for Scottish Government grant funding for Council new build
projects. 
6.3.7 The new build grant benchmark rate for local authorities is a 3-person
equivalent benchmark of £71,500 per unit. The new build specification has
been updated to include the quality measures required to maximise grant
claims where possible (silver level as a minimum, balconies to flatted
developments, space for home working / study, digital enablement, fire
suppression and zero emission heating). These additional measures will incur
higher capital costs but will also attract additional grant funding over and
above the 3-person equivalent benchmark rate to assist the ongoing delivery
of energy efficient affordable new build Council homes for tenants. 
6.3.8 It should be noted that higher capital costs result in an increase to the funding
gap between new build housing project costs and the level of grant subsidy
available to the Council, resulting in increased cost pressures on the HRA in
order to continue to support new build housing projects. It is hoped that
inflation stabilising, together with industry-wide adoption of the new measures,
will lead to a reduction in capital costs over time. 
6.3.9 The draft budget published by the Scottish Government in December 2023 for
financial year 2024/25 outlines a decrease of £196.1m (26%) in comparison to
the 2023/24 Affordable Housing Supply Programme budget of £751.945m
across Scotland. This reduction may have an adverse impact on the
timescales of delivery by the Council and other Registered Social Landlords
who have new build projects identified within the Strategic Housing
Investment Plan 2024-29. 
___________________________________________________________________ 
Page 110 of 192

Page 117

Implications of the Report 
1. Financial – The report and appendices detail the proposed HRA budget and
average weekly rent increase for 2024/25 and the Housing Capital Investment
Plan for 2024/25 to 2028/29. 
2. HR & Organisational Development – None arising directly from this report. 
3. Community/Council Planning   
 Our Renfrewshire is well – enabling communities to have their voices
heard and influence the places and services that affect them by
consulting tenants on the proposed changes to rents for 2024/25.
 Building strong, safe and resilient communities - continuing housing
regeneration programmes across Renfrewshire to create sustainable
communities.
 Tackling inequality, ensuring opportunities for all - improving and
maintaining housing conditions for the benefit of tenants and providing
assistance to tenants to mitigate the impacts of any Welfare Reform
changes.
 Creating a sustainable Renfrewshire for all to enjoy – accessing
supplementary external funding where available to support the
achievement of the minimum energy rating under the Energy Efficiency
Standard for Social Housing.
 Working together to improve outcomes – consulting tenants on the
proposed changes to rents for 2024/25 and involving tenant
representatives in the specification and monitoring of the investment
programme. 
4. Legal – The council is required to set an HRA budget for 2024/25 and agree
any rent changes for notification to tenants. The Council must give tenants at
least 28 days’ notification in advance of any changes. 
5. Property/Assets – The report proposes the Housing Capital Investment Plan
for 2024/25 to 2028/29. 
6. Information Technology – None arising directly from this report. 
7. Equality & Human Rights - Where the Council is making decisions in relation
to its spending priorities, it is obliged to comply with the public sector equality
duty set out in the Equalities Act 2010.
Page 111 of 192

Page 118

8. Health & Safety – The Capital Plan outlines investment in Council assets and
facilities to ensure they remain safe and accessible in line with statutory
obligations. 
9. Procurement – The proposed Capital Investment Plan for 2024/25 to 2028/29
will include procurement of contracts. 
10. Risk – The HRA Business Plan remains subject to a number of risks and
economic factors such as interest rates and inflation. While these risks are
reviewed as part of the HRA business planning process, a high level of
uncertainty remains relating to external economic factors. 
11. Privacy Impact – None arising directly from this report. 
12. Cosla Policy Position – Not applicable. 
13. Climate Risk - Investment in Council assets improves energy efficiency,
reducing the Council’s carbon footprint and helping it achieve its Net Zero by
2030 target.
___________________________________________________________________ 
List of Background Papers 
Housing Revenue Account Budget & Rent Levels 2023/24 and Housing Capital
Investment Plan 2023/24 to 2027/28, 2 March 2023. 
___________________________________________________________________
Author:  Gordon McNeil, Director of Environment, Housing and Infrastructure
Page 112 of 192

Page 119

Housing Revenue Budget – 2023/24 to 2024/25 Appendix 1
Revised Proposed
Annual Budget Annual Budget
2023/2024 2024/25 Movement
£m £m £m
Expenditure
Supervision and Management 17.575 18.472 0.897
Housing Repairs and Maintenance 15.892 18.982 3.090
Grounds and Estates Maintenance 2.535 2.565 0.030
Void Rents 2.220 2.326 0.106
Bad Debt Provision 2.042 2.146 0.104
Financing Costs (Loan Charges) 15.165 13.640 (1.525)
Contribution to Capital Programme 3.924 4.269 0.345
Total Expenditure 59.353 62.400 3.047
Income
Rental Income (54.655) (57.730) (3.075)
Other Income (3.422) (3.478) (0.056)
Use of B/F Reserves (1.276) (1.192) 0.084
Total Income (59.353) (62.400) (3.047)
Net 0.000 0.000 0.000
Page 113 of 192

Page 120

Page 114 of 192

Page 121

Appendix 2
Subjective Summary
Revised Annual
Budget
2023/24
Proposed
Annual Budget
2024/25
Budget
Adjustments
2024/25
Explanation of Movement
Employees 11,097,983 11,121,812 23,830 Includes pay award for 2023/24 to reflect the agreed settlement and estimated 2024/25 pay award
amounting to £1.221m; the removal of a recurring pension saving of £0.168m; and the temporary removal of
employer pension contributions of £1.029m, which will require to be reinstated in 2026/27.
Premises Related 20,288,290 23,477,665 3,189,375 This includes an additional £3.159m for Repairs & Maintenance; an additional £0.030m for Estate
Management; £0.225m for fuel inflation; £0.435m on insurance; and net reduction of movements in other
minor budgets of £0.019m. The temporary removal of employer pension contributions reduces the recharge
from Building Services  by £0.641m, which will require to be reinstated in 2026/27.
Transport Related 102,500 53,431 (49,069) Reduction in budget to reflect current demand for fleet and mileage.
Supplies and Services 732,817 909,217 176,400 This reflects inflationary pressures and additional costs mainly on ICT, Communication and external services
including legal costs £0.176m.
Third Party Payments 49,000 585,934 536,934 This reflects the cost of apprenticeship funding for Building Services.
Transfer Payments 5,675,242 6,029,019 353,777 The bad debt budget has been increased by £0.098m (net) from last year in line with  the anticipated
increase in rental income. An allocation from this budget remains to be utilised for the tenant support fund.
An increase in the void rent loss budget of £0.106m reflects increased rent levels and continuing service
pressures. An additional £0.022m is also allocated for Council Tax payments linked to the anticipated level of
voids. A further £0.070m has been allocated to continue youth employment and training initiatives. The
remaining £0.058m reflects the inflationary impact of contracts with third sector providers.
Support Services 2,492,400 2,456,181 (36,219) This reflects minor inflationary pressures, offset by a reduced support services recharge.
Depreciation and
Impairment Losses
19,089,000 17,909,000 (1,180,000) The net reduction in the capital financing budget reflects the realignment of this budget to mitigate rent
increases in 2024/25, and to reflect the revised borrowing requirements associated with planned
investment.
GROSS EXPENDITURE 59,527,232 62,542,260 3,015,028
Income (59,527,232) (62,542,259) (3,015,028) The gross increase in income due to the rent increase budgeted is £3.075m. The drawdown from reserves
reflects a reduced level of drawdown of £0.584m from the previous year. This movement is however
partially offset by the targeted £0.500m saving that requires to be delivered in 2024/25 allocated from
reserves at present. The balance in the movement of £0.024m reflects the net minor movements in other
income recoveries.
NET EXPENDITURE 0 0 0
Housing Revenue Account - 2024/25 Budget
Page 115 of 192

Page 122

Housing Capital Investment Plan - 2024-25 - 2028-29 Appendix 3
2024-25 2025-26 2026-27 2027-28 2028-29 5 Year Totals
£m £m £m £m £m £m
Internal Investment 4,920 7,120 3,610 3,610 4,502 23,762
External Improvements 10,200 14,200 13,200 13,325 10,900 61,825
Multi Storey Flats Improvements 500 6,500 9,500 11,500 473 28,473
Sheltered Housing Improvements 600 725 500 500 473 2,798
Professional Fees 1,900 1,925 1,950 1,975 2,363 10,113
Others e.g. Adapts, Rotworks & Asbestos 2,715 2,715 2,615 2,315 2,734 13,094
Regeneration and Renewal Investment Programme 18,161 31,658 15,071 25,940 16,730 107,560
New Supply Programme Excluding Regeneration Projects 2,240 12,858 15,563 3,000 0 33,661
Capital Expenditure Total 41,236 77,701 62,009 62,165 38,175 281,286
Government Funding -5,898 -13,752 -4,522 -7,007 -4,076 -35,255
Net Housing Investment Expenditure 35,338 63,949 57,487 55,158 34,099 246,031
Expenditure Category
Page 116 of 192

Page 123

___________________________________________________________________
To: Council
On: 29th February 2024
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Accounts Commission Section 102 Report (S.102) – School
Accommodation for Dargavel Village
___________________________________________________________________
1.  Summary 
1.1 At a meeting on 11th January 2024, the Accounts Commission was
presented with a statutory S.102 report, as circulated to Councillors on
5th January 2024 (see Appendix 1), by the Controller of Audit on School
Accommodation for Dargavel. It is a statutory requirement for a S.102
report to be reported to the full Council to allow consideration of the
findings and recommendations from the Accounts Commission and to
agree any subsequent action by the Council. 
1.2 As outlined in their report, the Accounts Commission agreed to make
findings and associated recommendations in response to the Controller
of Audit’s statutory report, is seeking additional information and
assurance in relation to several areas and in this context has requested
a further report back from the Controller no later than June 2024. They
have also reserved open the right to hold a hearing if they deem it
required. 
1.3 Attached at Appendix 2 is the proposed response and actions to the
Commission’s findings and recommendations for elected members
consideration and approval. 
Item 6
Page 117 of 192

Page 124

2.  Recommendations 
2.1 It is recommended that members: -
•  note and accept the Accounts Commissions findings and
recommendations;
•  agree the response and actions outlined in Appendix 2 of this report
and that monitoring of those actions will be incorporated into the
overall Bowles report response monitoring arrangements that are
reported to each cycle of the Audit Risk and Scrutiny Board;
•  note that a follow-up report from the Controller of Audit will be made
to the Accounts Commission by June 2024 which will be subject to
appropriate reporting through the Council’s governance process at
that time. 
3. Background 
3.1 Following presentation of the Council’s 2022/23 Annual Audit Report for
from Azets, the appointed auditor, considered by the Council’s Audit,
Risk and Scrutiny Board (ARSB) on 6 November 2023 and by the full
Council on 16 November 2023, the auditor issued an unmodified opinion
on the council’s 2022/23 annual accounts. Within that report, the auditor
provided significant coverage of the Dargavel situation, including: - 
• findings from the independent report commissioned by the Council
and which reported in June 2024 (“The Bowles Report”), 
• the subsequent actions the Council has been progressing since that
time, 
• that the council has appropriate governance arrangements in place
with improvements over the years in member and officer
relationships and effective leadership overall and were satisfied
through their detailed audit work that the Council had demonstrated
that the governance failings identified by the Bowles report were
limited to the historic handling of Dargavel, 
• that they had no highlighted concerns over the wider organisational
culture in the Council or in its approach to managing major capital
programmes but did identify that the role of the Audit, Risk and
Scrutiny Board in ensuring effective scrutiny is not sufficiently clear
and the Council has recognised this and is already significantly
progressed with a review of the Audit Risk and Scrutiny Board. 
• the overall progress being achieved to resolve the educational
capacity challenges as a result of the historic errors made by the
Council, highlighting that the Council continues to have significant
challenges to rebuild the trust of communities affected by the failings
Page 118 of 192

Page 125

and that the Council and communities will be feeling the impact of
this for some time to come. 
3.2 The Controller of Audit decided to use the reporting powers available to
her under s102 (1) of the Local Government (Scotland) Act 1973 to bring
this issue, and the action the Council is now taking in response to the
Bowles report, to the attention of the Accounts Commission. Following
presentation of the report to the Commission, the Commission has
endorsed the Controller of Audit’s report on school accommodation for
Dargavel village. 
3.3 On receipt and following consideration of a Controller of Audit report, the
Commission may do, in any order, all or any of the following, or none of
them:  
• direct the Controller of Audit to carry out further investigations 
• hold a hearing 
• state its findings. 
3.4 In this case, the Commission has set out their findings in their report,
alongside several issues on which they require further, urgent,
investigation. The Commission has requested that the Controller
updates the Commission no later than June 2024, using her powers
under Section 102 of the Local Government (Scotland) Act 1973 on
progress on the issues raised in their findings, and earlier if she deems
necessary. The Commission has also reserved the right at this stage to
hold a hearing if they deem it necessary. 
3.5 The Commission have also confirmed that they intend to bring forward
Renfrewshire Council’s Best Value report from 2027 to later this year, or
at the latest in early 2025. 
3.6 While the Council was commended for its decision to instruct an
independent review of the issues surrounding the Dargavel Primary
School, and for its acceptance in full of the recommendations in the
Bowles report, the Commission has indicated concern that significant
risks remain in relation to actions the Council is taking in response to the
acknowledged failings. 
3.7 Throughout their findings the Commission has outlined
recommendations to secure further information and assurance to
address their concerns. The Commission has noted the Council’s
acceptance in full of the Bowles report recommendations and its apology
to the local community. They also recognise that the Council has
developed a specific communication and engagement strategy for
Dargavel. However, as has been recognised by the Council and
highlighted by the Controller in her report, the Commission agrees that
the Council faces a significant challenge to rebuild the trust and
confidence of local communities. 
Page 119 of 192

Page 126

3.8 The Commission has required the Controller to report back to them by
June 2024 on any issues raised in the report that she thinks appropriate,
but also to seek specific further information and updates from the council
regarding: 
• the Council’s review of its approach to community engagement, 
• the Council’s approach to consultation on the additional primary
school at Dargavel, and other decisions on the school estate, 
• the Council’s work on understanding the wider service impacts on
the failings regarding school capacity, 
• the Council’s reviews of scrutiny and risk management, and its
leadership development programme, and 
• the process followed and factors taken into account by the Council
in considering disciplinary action against senior staff, and its
approach and policy on performance management and
accountability. 
3.9 Detailed in Appendix 2 to this report, is a proposed response and
associated actions to the findings and recommendations set out by the
Commission for elected members consideration. 
3.10 Subject to consideration and approval by elected members, it would be
proposed that these actions are incorporated into the existing action plan
being progressed by officers in response to the Bowles report for
monitoring purposes and will in line with the existing approach be
reported to each cycle of the Audit Risk and Scrutiny Board. Further, and
in line with statutory requirements under the 2003 Act, this proposed
response and actions if approved by Council will be formally shared and
communicated to the Account Commission following this meeting. 
_________________________________________________________
Implications of the Report
1. Financial  - there are no direct financial implications arising from this
report. Any costs associated with delivering the proposed actions will
be contained within existing resources. 
2. HR & Organisational Development - none 
3. Community/Council Planning – none  
4. Legal – the statutory report issued by the Controller of Audit and
subsequent findings issued by the Accounts Commission have been
issued under S.102  and S.3 of the Local Government (Scotland ) Act
1973 and 2003 respectively. 
Page 120 of 192

Page 127

5. Property/Assets – none 
6. Information Technology – none 
7. Equality & Human Rights - The Recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report as it is for
noting only and sets out the detail of an external investigation.   If
required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website.  (Report author to arrange this). 
8. Health & Safety - none 
9. Procurement – none 
10. Risk - none 
11. Privacy Impact - none 
12. Cosla Policy Position – none.
_________________________________________________________
List of Background Papers 
Dargavel Primary – Independent Review – Council June 2023 
Azets Report to those charged with governance - Renfrewshire Council Group
Annual Accounts 2022/23 – Audit Risk and Scrutiny Board November 2023 
Annual Audit Report 2022/23 Renfrewshire Council Group – November 2023 
Author:          Alan Russell 
Chief Executive 
alan.russell@renfrewshire.gov.uk 
Page 121 of 192

Page 128

Page 122 of 192

Page 129

Prepared by the Controller of Audit
January 2024
The 2022/23 audit
of Renfrewshire
Council
School accommodation for Dargavel Village
Appendix 1
Page 123 of 192

Page 130

The 2022/23 audit of Renfrewshire Council: School accommodation for Dargavel Village | 2
Contents 
Commission findings 3
Introduction 7
Dargavel School – Timeline of key events 9
Independent examiner’s report – the ‘Bowles report’ 11
The council’s response 14
Conclusions 19
Page 124 of 192

Page 131

Commission findings | 3 
Commission findings 
1.  The Commission endorses the Controller of Audit’s report on school
accommodation for Dargavel village. We also acknowledge the work of David
Bowles in carrying out his independent review.
2.  On receipt of a Controller of Audit report, the Commission may do, in any
order, all or any of the following, or none of them:
• direct the Controller of Audit to carry out further investigations
• hold a hearing
• state its findings.
3.  In this case, the Commission has given serious consideration to the full use
of the powers available to us. In this report, we set out our findings, alongside a
number of issues on which we require further, urgent, investigation. 
4.  We request that the Controller updates the Commission no later than June
2024, using her powers under Section 102 of the Local Government (Scotland)
Act 1973 on progress on the issues raised in our findings, and earlier if she
deems necessary.
5.  We also intend to bring forward Renfrewshire Council’s Best Value report
from 2027 to later this year, or at the latest in early 2025.
6.  The Commission reserves the right to hold a public hearing on this and
related matters if we are not satisfied with the updates we receive on the
council’s progress.
7.  While the council is to be commended for its decision to instruct an
independent review of the issues surrounding the Dargavel Primary School, and
for its acceptance in full of the recommendations in the Bowles report, the
Commission is concerned that significant risks remain in relation to actions the
council is taking in response to the acknowledged failings. Our findings are
structured around the themes we explored in our public meeting on 11 January
2024. Throughout our findings we seek assurance and further information to
address our concerns. 
Community and other engagement 
8.  We note the council’s acceptance in full of the Bowles report
recommendations and its apology to the local community. We also recognise
that the council has developed a specific communication and engagement
strategy for Dargavel. However, we agree with the Controller that the council
faces a significant challenge to rebuild the trust and confidence of local
communities.
Page 125 of 192

Page 132

Commission findings | 4 
9.  While it has taken action, the council is yet to assess how effective its
engagement strategy has been to date. The council must, as a matter of
urgency, conduct a robust and transparent assessment of the effectiveness of
its community engagement and then move swiftly to implement any
improvements needed. The Commission asks the Controller to update us on
this by June 2024, or earlier if progress is not at the pace we expect.
10.  The Commission is particularly concerned by the council’s failure both to
transparently consider alternative options in relation to expanding secondary
school capacity in the area, and to consult or engage appropriately with the
community, whom their decision directly affects. 
11.  We note that the new primary school is subject to a full public consultation.
We expect the council to engage meaningfully with the community on this issue,
and other decisions on the school estate. Again, we ask that the Controller
monitors this situation, and reports to us in June 2024 on progress and earlier if
necessary.
Learning lessons and building capacity 
12.  We note from the Controller’s report that learning the lessons from these
issues continues to feature prominently in council meetings. 
13.  While the council’s initial response to the Bowles report was high level, we
are assured by the Controller that its action plan in response is now sufficiently
detailed and includes SMART objectives. It will be important that this action plan
is well-managed by senior officers and closely scrutinised by elected members
of the council. 
14.  We note that the council has also commissioned Edge Analytics, who we
are reassured are experts in this field, to advise on future school capacity
issues. However, there are still significant uncertainties relating to the capacity
needed in the long term, and to the completion of the two building projects – the
new primary school and the secondary school extension. We therefore request
that these matters are closely monitored in the annual audit work, and the
Controller uses her powers to report any slippage or other issues to us if
necessary.
Impact on service provision 
15.  We note that the council has assessed that currently there has been no
detriment to either teaching delivery or pupil education in the Dargavel and
Bishopton areas from the interim measures introduced. We consider it critical
that the council reports the results of these assessments publicly, regularly and
in an accessible way, to maintain and rebuild community confidence. 
16.  The Commission is also concerned at the possible wider impacts of the
council’s failings regarding the estimation of pupil numbers and whether this has
had any impact on services provided by the council in the Dargavel area. We
request that the Controller seeks further information on these issues so that we
can understand the work that the council has done to understand these
impacts. 
Page 126 of 192

Page 133

Commission findings | 5 
Financial management and consequences 
17.  The financial impact of these failings on the council is significant. The
council capped the risk and contributions from BAE Systems under the Section
75 agreement, and as a direct result faces estimated net additional capital costs
of £60 million, to be met by borrowing. This is a substantial sum of public
money. The council needs to clarify the opportunity costs of this in terms of its
overall capital programme. The council projects that it will have a revenue
budget deficit of up to £50 million by 2026/27 and will need to make difficult
decisions on prioritising its spending, compounded by the financial
consequences of this issue.
18.  The council has recently negotiated a transfer of land from BAE for the
construction of a new primary school. The Controller’s report indicates that this
was in exchange for amendments to the extent and composition of the housing
units for which planning permission has been granted. Given the reported
determination of BAE to fully protect their commercial interests in the
development, and the absence of alternative solutions for the council, it will be
important to ensure and demonstrate that this exchange represents Best Value
for the public purse. 
Council leadership, governance and culture
19.  We note that the council’s auditors have concluded that, overall, the council
has appropriate governance arrangements in place and that member and officer
relations have improved over the years. The council’s action plan will be hugely
important in further embedding improvements in this area. In particular, the
following elements must be progressed urgently and transparently:
• the council’s review of its scrutiny arrangements against CIPFA good
practice guidelines
• the council’s review of its approach to risk management
• the council’s leadership development programme for officers.
20.  To be satisfied of progress in these areas, the Commission requires the
Controller to request further information from the council on the scope and
timing of these actions, and report back to the Commission in the update
requested for June 2024, or earlier if she thinks necessary. We also expect
these issues to be covered in the accelerated Best Value report.
21.  The Commission is also concerned about the culture of the council and
whether it has truly learned the lessons it needs to. We expect organisational
culture to be an area of focus in the accelerated Best Value report. In particular,
we request an update on whether the culture of the organisation is appropriately
open and transparent and encourages continuous improvement, effective joint-
working between officers and members, effective scrutiny and challenge
(especially by elected members), and engagement and discussion with
stakeholders. In addition, we request an assessment of whether it has the right
skills in the right places to deliver on its responsibilities, and whether issues are
escalated to the right level.
Page 127 of 192

Page 134

Commission findings | 6 
22.  Finally, the Commission notes that the auditor has concluded that the
council has obtained appropriate external legal advice and determined there is
no potential for any form of action against former senior employees involved in
the Dargavel School decision-making. In addition, no disciplinary action has
been taken against any senior officer involved in decision-making relevant to
the Section 75 approval process for the Dargavel Village development. 
23.  The Commission accepts that these are management issues. However, we
request that the Controller asks the council for further information on the
process followed and factors taken into account by the council in considering
disciplinary action against staff involved. In addition, and looking forward, the
Commission asks for information on the council’s approach to performance
management and its current policy on disciplinary action, so we can be assured
that appropriate arrangements are in place to ensure that staff have the
necessary skills and that senior officers are properly accountable for their areas
of responsibility.
Summary of requests for further information and work required
24.  The Commission requires the Controller to report back to us by June 2024
on any issues raised in this report that she thinks appropriate, but also to seek
specific further information and updates from the council regarding:
• the council’s review of its approach to community engagement
• its approach to consultation on the additional primary school at
Dargavel, and other decisions on the school estate
• the council’s work on understanding the wider service impacts on the
failings regarding school capacity
• the council’s reviews of scrutiny and risk management, and its
leadership development programme
• the process followed and factors taken into account by the council in
considering disciplinary action against senior staff, and its approach and
policy on performance management and accountability. 
Page 128 of 192

Page 135

Introduction | 7 
Introduction 
1.  The Code of Audit Practice requires auditors to produce an annual report
summarising the significant matters arising from their work at the conclusion of
each year's audit. For local authorities, these reports are addressed to elected
members and the Controller of Audit.
2.  I have reviewed the 2022/23 Annual Audit Report for Renfrewshire Council
(the council) from Azets, the appointed auditor. The auditor’s Annual Audit
Report was considered by the council’s Audit, Risk and Scrutiny Board (ARSB)
on 6 November 2023 and by the full council on 16 November 2023. The report
has also been published on Audit Scotland’s website. The auditor issued an
unmodified opinion on the council’s 2022/23 annual accounts.
3.  In June 2023, the council received the findings of an independent report (the
Bowles report) that highlighted significant failings of leadership, oversight and
risk management in relation to the provision of school accommodation for
Dargavel Village. The consequences of this for both the community and the
council are far reaching and a significant cause for concern. The council has
developed an action plan to respond to the issues identified and is, and must
continue, to work hard to rebuild the trust of the communities affected and
demonstrate that lessons have been learnt. 
4.  I have therefore decided to use the reporting powers available to me under
s102 (1) of the Local Government (Scotland) Act 1973 to bring this issue, and
the action the council is now taking in response to the Bowles report, to the
Commission’s attention. 
Background
5.  The development of the new village of Dargavel, in Renfrewshire, is a large
and complex project, which has evolved into one of the largest housing
developments in Scotland. The land at Dargavel Village is being developed by
BAE Systems who were initially granted planning permission for the
development of a maximum of 2,500 houses in 2009. This was increased,
through a range of further planning applications between 2014 and 2018, most
notably by 1,350 as part of two major additional applications in 2018. The
council in 2023 formally acknowledged that the historically consented planning
permission was for 4,322 units on the Dargavel site.
6.  It is common practice for local authorities, when considering planning
permission for new housing developments, to enter into an agreement with the
developers to contribute to the additional public costs associated with delivery
of any new housing development, including costs associated with schools,
health, roads and other infrastructure. These legally binding agreements are
made under Section 75 of the Town and Country Planning (Scotland) Act 1997. 
A new primary school (Dargavel Primary) was built by BAE systems in Dargavel
Page 129 of 192

Page 136

Introduction | 8 
Village as part of a Section 75 agreement with BAE systems. It opened in
January 2022 with an expected capacity for 430 pupils. 
7.  In May 2022, as part of the 2022/23 intake, council officers recognised that
they had substantially underestimated the demand for primary school places in
Dargavel Village. At the same time the council recognised that the demand for
secondary education was also likely to have been significantly underestimated.
8.  Following analysis over the summer period to quantify and understand both
the scale and time critical nature of the problem, a special meeting of the
council's Education and Children Services Policy Board was held in November
2022. The main purpose of the meeting was to discuss Dargavel Primary
School capacity. It was reported that the current school roll was 463. The
council projected a potential school roll of up to 620 pupils by August 2023 and
705 pupils by August 2024. The board concluded that the existing school
capacity would be materially insufficient to meet the future demand profile of the
catchment area. 
9.  Additional work by the council to create a robust long-term estimate of pupil
numbers (further confirmed by more detailed projections from the council’s
consultants, Edge Analytics) identified a need for a core primary school capacity
of 1,130 pupils and high likelihood of breaching the existing 430 capacity in the
2023/24 school intake requiring circa 60 per cent more pupil spaces.
10.  The Education and Children Services Policy Board has approved planning
for an additional primary school in Dargavel and an extension to Park Mains
High School. The council had planned an extension to Park Mains High School
as part of its Section 75 agreement with BAE Systems in 2018 and confirmed
the size of that extension in its 2023 agreement. The Bowles report highlights
that the council’s failure to appreciate the risks that they were taking in the
original contract they negotiated, which allowed BAE to cap their contributions1
means that it is the council that will need to meet the additional costs over and
above this cap associated with increasing capacity. 
1 BAE Systems have contributed the primary school at Dargavel Village and land for the building
of a second primary school. The have capped their contributions for secondary school capacity
to 200 pupil places.
Page 130 of 192

Page 137

Dargavel School – Timeline of key events | 9 
Dargavel School – Timeline of
key events 
Date Event
2006 The original masterplan application for the Dargavel development is
submitted by BAE Systems
Aug 2009 Outline planning consent approved
2009 Section 75 agreement signed between the council and BAE
Systems for 2,500 houses and 340 primary school pupils spaces 
2013 Dargavel Village construction commences
Sep 2014 Concerns expressed as to the size of the planned school by the
community council
Apr 2016 The council updates the school capacity requirement to 430 places
for extending Dargavel Village development to 3,850 homes
Jan 2017-
2021
Community concerns over low school capacity continue to be raised
Oct 2018 Section 75 Agreement signed. Planning consent for 3,850 houses
granted by the council. BAE Systems formally obligated to build
Dargavel Primary School with capacity for 430 pupils
2020 Dargavel Primary School construction commences
Jan 2022 Dargavel Primary School opens
May 2022 During the 2022/23 intake, the council becomes aware that pupil
admissions are higher than expected 
Nov 2022 The council appoints Edge Analytics to provide support for school
capacity estimates 
Dec 2022 The council’s chief executive appoints Mr David Bowles to undertake
an independent review of Dargavel Primary School capacity issues 
Mar 2023 The EPCB approve planning for an additional school in Dargavel
with a minimum capacity for 700
Page 131 of 192

Page 138

Dargavel School – Timeline of key events | 10 
May 2023 Updated projections recommend additional primary school capacity
requirement of 800
The ECPB approves an extension to Park Mains High School to
create capacity for an additional 400 secondary school places
Jun 2023 ‘The Bowles report’ is published and presented to the full council. 
The council accepts all recommendations in full
Aug 2023 The council instals six modular classrooms in Dargavel school as an
interim capacity solution
Sep 2023 The council secures a land transfer from BAE systems to build a
new primary school and, in exchange, the council clarifies that a
maximum of 4,322 homes are consented to be delivered as a part of
Dargavel Masterplan.
Page 132 of 192

Page 139

Independent examiner’s report – the ‘Bowles report’ | 11 
Independent examiner’s report –
the ‘Bowles report’ 
11.  Following the special meeting of the council’s Education and Children
Services Policy Board in November 2022, the council gave authority to the chief
executive to establish an independent assessment of the circumstances which
led to the significant error in school capacity planning for Dargavel School.
David Bowles, a former local government director and chief executive, was
appointed directly by the chief executive following a search for suitable
candidates for the role supported by SOLACE. 
12.  The overriding conclusion of the report was that:
‘…the council was completely unaware of, and therefore unprepared for, the
impact that a development such as Dargavel would have upon the education
service.’
13.  The report further concluded that:
‘Regardless of considerable uncertainty of estimating pupil need 20 years
ahead, before detailed consents had been given and the housing mix known,
the council allowed BAE to cap its contributions in both agreements, leaving all
of the risk with the council. It is difficult to see how both of these agreements,
involving potentially millions of pounds of investment in primary and secondary
education, could have been handled in a more incompetent manner.’
14.  The ‘Bowles report’ was published and presented at the June 2023 full
council meeting and identified the following key factors (with summarised
extracts) which contributed to the Dargavel School outcomes:
• A failure of leadership in the education service. Senior education
management were both incompetent and not sufficiently engaged in the
project.
• Limited corporate oversight of the project. There is no evidence of
corporate intervention to provide internal support or seek external
advice.
• Lack of clarity about the size of the development. Different parts of
the council have been working on different housing numbers and BAE
have quoted different numbers.
• A complete and repeated failure to test data for reasonableness.
The council had numerous opportunities to test data for reasonableness
and it failed to do so.
Page 133 of 192

Page 140

Independent examiner’s report – the ‘Bowles report’ | 12 
• Ignoring conflicting data. There are frequent instances of conflicting
data being disregarded.
• Not either understanding or planning to manage the risk
associated with large developments. The lack of understanding of
(estimation) risks can be highlighted by the inept decision of the council
to reduce the size of the Dargavel School site.
• Focussing on capacity problems at Bishopton Primary School. At
no time did officers question why there was a ‘spike’ in children from the
Dargavel development being admitted to Bishopton school.
• Ignoring emerging problems when agreeing to a 2-form entry
primary school in 2018, which increased the capacity of the
planned Dargavel school by about 100 places. There was ample
evidence the council had seriously underestimated primary school
demand before the original planning application in 2018.
• A failure to recognise the growing school capacity problem until
May 2022. The (school place demand) error was so obvious it is difficult
to see how it remained undetected for six years.
• A failure to take any concerns expressed by others seriously. The
response by council officers to numerous examples of concerns being
expressed by a range of stakeholders showed professional arrogance. 
15.  The Bowles report recommended that the council:
• Builds a more robust model of primary school need for Dargavel.
The council should update and refine the existing model of pupil
numbers and the potential range of demand and continue to work with
experts in this area. It should also review the mix of housing approvals
and extend the time period of the forecasts for primary to assess
whether there is likely to be a peak in demand or just a plateau then a
decline.
• Reconsider catchment areas. The earlier decision on catchment
areas was made on the assumption the developer would be meeting all
of the costs of primary education, without needing to use the surplus
capacity at Bishopton. That is no longer the case. In its future plans the
council should reconsider how surplus capacity at Bishopton can be
used effectively.
• Produce robust supplementary guidance on developer
contributions. The council should be clear about who has
responsibility for this area of work and ensure they have the appropriate
skills available to them, either internally or externally. The council
should review how data flows between planning and education and that
they both understand its import.
• Seek to work co-operatively with BAE. Unless the council and BAE
can work together to resolve the current problems, BAE may face
Page 134 of 192

Page 141

Independent examiner’s report – the ‘Bowles report’ | 13 
accusations, whether founded or not and regardless of council
incompetence, that it has financially benefitted at the expense of council
taxpayers.
• Corporate working and organisational culture. The council needs to
consider a significant change programme, not just on the of issue of
corporate working and personal responsibility, but also its
organisational culture and values. It needs plans to build a stronger
organisation where constructive challenge is welcomed and there is a
clarity of what is expected of all of those in a leadership role.
• Risk management. The council needs to review how it both identifies
risk and manages it. The identified risk in council documents related to
delivering the school on time, not that the size of the school may prove
to be inadequate. The failure to identify that risk has had two
consequences; first the council has been slow to react to the increase in
pupil numbers and second the council did not negotiate with BAE, with
that risk in mind.   
• Involvement of members. While protecting the integrity of the planning
process, the council needs to ensure the appropriate involvement of
members in such developments.
• Public confidence. The council should work in an open and
transparent manner in the resolution of these issues and particularly
with the residents of Dargavel, who have legitimate concerns about the
implications for their children, during both their primary and secondary
education.
Source: Dargavel Primary – Independent External Review, The Bowles report 
Page 135 of 192

Page 142

The council’s response | 14 
The council’s response 
16.  The council accepted in full the recommendations of the Bowles report at its
meeting of 22 June 2023 and apologised to the local community for the
significant errors made. Since then, it has supplemented its initial response with
a more detailed action plan, however it is clear that the implications of this issue
will be felt for some time to come. The council is, and must continue to, working
hard to rebuild the trust of the affected communities and demonstrate that it has
learnt lessons. The council’s progress in implementing agreed actions is
monitored by the Audit, Risk and Scrutiny Board. 
17.  The council has engaged external consultants, Edge Analytics, to provide
expert support in estimating demand for places across its school estate and has
taken forward an analysis of how other local authorities manage developer
contributions ahead of the development of updated guidance.
Addressing capacity issues in the short term
18.  The council have implemented transitional arrangements to address
immediate capacity issues in Dargavel Primary School. These interim measures
have included the creation of new modular classrooms and the utilisation of
available capacity in the neighbouring Bishopton School. The council has
assessed, with the support of external consultants, that these interim measures
will be sufficient to accommodate primary and secondary school demand until
the anticipated new schools are developed by August 2027, but this will require
to be kept under careful review. 
19.  The council assesses the impact of these transitional arrangements on the
standard of teaching delivery and pupil attainment as part of its regular
monitoring arrangements. At this stage, the council assesses that, while there
has been some disruption, there has been no detriment to either teaching
delivery or pupil education in the Dargavel and Bishopton areas.
20.  The council will continue to monitor the quality of educational delivery and
measures of pupil attainment closely through its existing quality monitoring
arrangements. It is critical that the council ensures that it robustly assesses
educational impacts and continues to report publicly on this to maintain
community confidence. 
Addressing capacity issues in the medium term
21.  The council had limited options for addressing the medium-term primary
school capacity issues it faced in Dargavel Village given the size of the capacity
shortfall (around 800 places) which meant that extension of the existing site was
not an option, and the surrounding land is owned by BAE systems. 
Page 136 of 192

Page 143

The council’s response | 15 
22.  As a result, the council entered into negotiations with BAE Systems to
explore options for addressing the education needs of the Dargavel community. 
These negotiations resulted in an agreement with BAE Systems to transfer a
parcel of land to the council for £1 in August 2023 that could enable the building
of an additional new primary school within Dargavel village. This final decision
on the building of a new school will be subject to a full statutory consultation
process in due course.
23.  Section 75 agreements often require developers to include affordable
housing and housing available for the social rented sector as part of the
planning permission process. In reaching agreement with BAE Systems to
transfer the land that could accommodate the construction of an additional
primary school, the council also formally acknowledged that the historically
consented planning permission was for 4,322 units on the Dargavel site and
agreed to reduce the affordable housing requirement at stage 2 of the
development. Consequently, there will now be 243 social rented units as
opposed to 336 as part of the overall development. Equally though, the revised
agreement anticipates that there will be circa 1,271 lower market sector units
against the earlier obligation to build 681 units.
24.  The council recognised that the Dargavel Village development would also
create an increased demand for secondary school places. The council worked
with Edge Analytics to develop an estimate of the impact of this increased
demand on secondary school capacity and provision across the whole school
estate. The council concluded at a meeting of the Education and Children’s
Services Policy Board on 18 May 2023 to continue with plans to extend the
existing Park Mains High School at an estimated cost of £30 million to provide
an additional 400 secondary school places required. 
25.  The council did not present any formal options appraisal on provision of
secondary school places in its public report to support its decision-making, but
had considered an alternative solution and informally estimated that the cost of
building a new secondary school in Dargavel/Bishopton (an alternative favoured
by some community groups) at around £90 million. The adoption of this new
build option would also create surplus capacity of 40 to 60 per cent within the
existing Park Mains High School and result in significant additional net annual
revenue costs. The council subsequently communicated and explained the
rationale and data underlying its decision to the Park Mains Liaison Group and
other community group meetings.
Financial impact
26.  The council currently estimates that it will require £75 million of new capital
investment to create the required capacity to fully meet the primary and
secondary education needs of the Dargavel and Bishopton communities. The
council and the housing developer have agreed that the housing developer
(BAE systems) has fulfilled its obligations under the Section 75 agreement in
relation to the provision of primary school capacity.
27.  BAE systems have capped its contributions for secondary school places to
200 pupils meaning they are still required to meet almost 50 per cent of the
costs of the proposed 409 pupil place extension to Park Mains High School. 
Page 137 of 192

Page 144

The council’s response | 16 
28.  The estimated net additional costs of £60 million must therefore be met by
the council. The council plans to fund these capital costs from borrowing, and
estimates it will add around £4 million to the council’s annual revenue budget.
Council debt is normally written down over the estimated lifetime of the asset
which is currently an average of 40 years for the Renfrewshire school estate.
29.  The council estimates that the net revenue cost of running the new primary
school when it becomes operational in August 2027 will be around £0.5 million
per year, as additional running costs will largely be offset by increased grant
funding provided through the overall Scottish Government grant distribution
process. The council has not yet included an estimate for the net running costs
of the Park Mains High School extension.
30.  In context, the council is already facing a significant financial challenge and
recently updated its Medium-Term Financial Plan to include the additional £4.5
million borrowing and operating costs identified above. The council is now
projecting a budget deficit of up to £50 million by 2026/27 and will have to make
difficult decisions on spending priorities in the near future.
Community engagement
31.  The council recognises that it faces a significant challenge to rebuild the
trust and confidence of local communities. A recent report to the Education and
Children’s Services Policy Board notes the desire of the community to better
understand the rationale for the council’s decision to extend (rather than
replace) an existing secondary school serving the Dargavel and Bishopton
areas. It is critical that the council proactively engages the local community in its
school estate decision-making. 
32.  In October 2022, the council introduced a specific Dargavel communication
and engagement strategy which included the creation of a dedicated mailbox for
the community to ask questions and raise concerns and the development of a
regular community newsletter. The council’s senior team have also attended a
number of public meetings with residents of the Dargavel and Bishopton
communities and attended Community Council and Parent Council meetings.
The council also created the Park Mains Liaison Group which is attended by
senior council members and representatives from the local community.
33.  The council has used these forums to communicate, explain and engage
with local communities on its plans to address school capacity issues in
Dargavel and Bishopton and to address any local concerns. It is important that
the council robustly assesses the effectiveness of its community engagement to
understand how best to continue its efforts. The council has not yet undertaken
any formal assessment of its arrangements.
Governance
34.  The findings of the Bowles report, although restricted to the historical
handling of the Dargavel Development, raises a legitimate line of concern in
relation to the effectiveness of the council’s governance arrangements,
particularly in relation to corporate working and organisational culture, effective
risk management and member involvement in decision-making on major
Page 138 of 192

Page 145

The council’s response | 17 
projects. I have sought to understand the extent to which these issues are also
representative of the council’s overall governance and decision-making
arrangements. 
35.  The council’s auditors have concluded, overall, that the council has
appropriate governance arrangements in place with improvements over the
years in member and officer relationships and effective leadership overall. The
auditors have not highlighted any concerns over the wider organisational culture
or in its approach to managing major capital programmes but have identified
that the role of the Audit, Risk and Scrutiny Board in ensuring effective scrutiny
is not sufficiently clear. 
36.  In response to both the Bowles report and the auditors recommendations,
the council have committed to review their overall governance and scrutiny
arrangements as part of a wider review of corporate governance. The council
will also undertake a review of the effectiveness of its Audit, Risk and Scrutiny
Board against CIPFA good practise guidelines.  
37.  The council has also committed to review its approach to risk management
across all council projects. The council has also committed to delivering a
comprehensive leadership development programme for all chief officers and
senior managers and has committed to evaluate this programme before rolling it
out to the next management cohort. The council understands it must progress
these actions in order to assure itself and others that its governance and
scrutiny arrangements are robust and that it is able to demonstrate a strong
organisational culture.  
38.  Learning the lessons from the school capacity issues in the Bishopton and
Dargavel communities continues to feature prominently in council meetings.
The audit team have observed an appropriate level of involvement of members
at the Education and Children Services Policy Board who scrutinise the delivery
of education across the council. The council recently adopted a Strategic
Learning Estate Work Programme, which brings together officers from different
departments to oversee educational estate delivery and ensure joint working
going forward.
39.  The council did not include a formal options appraisal in the report on the
provision of secondary school places to support its decision-making on the
extension of Park Mains High School in May 2023. The council also did not
articulate in that report why it felt an options appraisal was not required or how it
planned to engage with local communities on the underlying data and rationale
that supported the decision. While this approach is consistent, in specific
circumstances, with Scottish Government guidance on managing consulting on
changes to the school estate and education provision, it remains a significant
omission in the decision-making process. The council should have been more
open and transparent on the range of available options in relation to the school
estate, the process through which views could be heard and the basis on which
any future decisions would be taken.
40.  Finally, the auditor has concluded that the council has obtained appropriate
external legal advice and determined there is no potential for any form of action
against former senior employees involved in the Dargavel School decision-
Page 139 of 192

Page 146

The council’s response | 18 
making. No disciplinary action has been taken against any senior officer
involved in decision-making relevant to the Section 75 approval process for the
Dargavel Village development.
Page 140 of 192

Page 147

Conclusions | 19 
Conclusions 
41.  The Bowles report highlights significant historic failings in leadership and
risk management and a disregard of concerns expressed by the local
community. I note the council’s acceptance in full of the Bowles report
recommendations and their apology to the local community. The council has
developed an action plan setting out its response to the issues identified, and
the council must work hard to rebuild trust and respond to the issues identified. 
42.  Progress against this action plan will be reported to the council’s Audit, Risk
and Scrutiny Board. The council has committed to review its overall governance
and scrutiny arrangements, including the effectiveness of its Audit, Risk and
Scrutiny arrangements against CIPFA good practise guidelines. It must
progress this in order to assure itself, and others, that its governance and
scrutiny arrangements are robust.
43.  The council should have explained its decision-making process more clearly
and transparently when finalising its decision to extend Park Mains High School.
It is essential that the council is open and transparent on the range of available
options in relation to the school estate, the process through which stakeholder
views can be heard and the basis on which future decisions will be taken.
44.  The council has now engaged expert consultants to advise on school
capacity requirements and has developed plans for a new primary school and
extension to the existing high school. These significant school infrastructure
projects are not expected to be completed until August 2027 and will require
strong governance arrangements to ensure they are completed on time and
budget and meet the educational needs of the local community. I will continue to
monitor the council’s progress in managing these projects.
45.  The council has not yet reached the stage of engaging with contractors to
build the new Dargavel Primary School and the proposed extension to Park
Mains High School but has estimated costs of £75 million, with £60 million of
these costs due to be met by the council. These costs will add over £4.5 million2
to the council’s annual revenue budget and add to the already significant
financial challenge faced by the council. The council needs to make some
difficult spending priority decisions going forward. 
46.  While the council has assessed that the short-term transition arrangements
have caused no detriment to either teaching delivery or pupil education, this is
an issue they will need to monitor closely and report on publicly. The council
faces a significant challenge to rebuild trust and confidence with the affected 
2 The council has yet to include an estimate for the additional annual running costs for the
proposed Park Mains High School extension in its medium-term financial plan.
Page 141 of 192

Page 148

Conclusions | 20 
local communities and must take steps to assess the effectiveness of its
community engagement programme. 
47.  The council’s appointed auditors will continue to monitor and report on
progress in addressing the recommendations contained within the Bowles
report through the annual audit process. The council has taken steps to respond
to the recommendations of the independent Bowles report but there is still more
to be done. Both the community and council will be dealing with the
consequences of this error for some time.
Page 142 of 192

Page 149

Conclusions | 21  
The 2022/23 audit of Renfrewshire Council
School accommodation for Dargavel Village 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh  EH3 9DN
Phone: 0131 625 1500  Email: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk
ISBN 978 1 915839 31 2
AS.4.0 
Page 143 of 192

Page 150

Page 144 of 192

Page 151

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
Community and other engagement 
The council must, as a matter of urgency, conduct a robust
and transparent assessment of the effectiveness of its
community engagement and then move swiftly to
implement any improvements needed. 
A full update of all completed and planned communication
and engagement activity since late 2022 as at end February
2022 will be provided to the External Audit team. 
The Consultation Institute – a recognised sector leading best
practice Institute promoting high-quality cross sector public
and stakeholder consultation standards – has been
commissioned to conduct a robust and independent review
of the council’s engagement strategy and activities. 
This will include assessment of the engagement strategy; the
variety of mechanisms implemented from October 2022 to
communicate and engage with the local community and the
effectiveness of activity. This will include qualitative
feedback from the community.
The commission will also extend to providing advice and
quality assurance on the statutory consultation
arrangements on the proposal for a new primary school in
Dargavel, its proposed site and catchment arrangements. 
This independent assessment process will be robust and
significant and carried out over several months. It is expected
to take until into June to fully complete all planned activities 
February 2024  Head of
Communications
and Marketing 
Page 145 of 192

Page 152

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
and provide a full evaluation report, albeit any key emerging
findings, learning and recommendations for improvement
identified as the evaluation progresses will be actioned as
soon as possible and shared on an ongoing basis with the
local audit team ahead of the planned report to the
Commission in June. 
The output of this commission and all associated
recommendations will assist in informing the design of future
engagement and consultation activity both within the
education estate but also across future consultation and
engagement activity associated with service / policy change
etc which the Council will be increasingly required to
consider moving forward as part of addressing its financial
sustainability challenges. 
February –
June 2024 
Head of
Communications
and Marketing
The Commission is particularly concerned by the council’s
failure both to transparently consider alternative options
in relation to expanding secondary school capacity in the
area, and to consult or engage appropriately with the
community, whom their decision directly affects. 
It is accepted that the report to the Education and Children’s
Services Policy Board in May 2023 could have articulated the
reasons why no other options to address secondary school
capacity beyond an extension to Park Mains High School
were deemed viable for detailed consideration.  
Additionally, although engagement in relation to updated
school projections and developing plans for a larger
extension to PMHS were shared and discussed with the
PMHS parent council prior to the May report, plans to expand
this engagement process to a wider group to encapsulate all
feeder primaries following the board meeting could have   
Page 146 of 192

Page 153

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
been outlined in the report and or considered earlier in the
process.   
Council officers have since May 2023 been progressing
positive and ongoing community engagement in relation to
the Park Mains extension, principally through the Park Mains
Liaison Group which was established to provide a single
engagement forum with representatives from the Parent
Councils of Park Mains High School and all associated feeder
primaries. 
This engagement process has shared and explained detailed
pupil projection data, the underlying rationale for the
proposed extension decision as well as listening and
responding to concerns and or requests for further
information from the wider parent and carer community.
This included sharing detailed information on an option
promoted by some community representative from Dargavel
and Bishopton for a new secondary school for Dargavel,
Bishopton and Langbank.  As reported through the Education
and Children’s Services Policy Board in August 2023, such an
option had significant negative implications from a financial,
educational, value for money and school estate perspective
that discounted it as a credible option for detailed
consideration. 
The Park Mains Liaison Group is proving to be a highly
valuable engagement forum, providing a single route of
engagement across the wider community as well as a key
route to assist the Council to disseminate consistent key 
This
engagement
activity will
remain
ongoing as
part of the
PMHS
extension
project
through to
August 2027
and beyond
recognising
the long-term
monitoring of
school roll
projections at
the high
school. 
Director of
Children’s Services 
Page 147 of 192

Page 154

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
messages and information updates across communities
through trusted Parent Council communication channels.
This engagement approach will inform how non statutory
and informal engagement in relation to potential school
estate changes and long-term strategic learning estate work
may be taken forward in the future by the Council. 
Additionally, high levels of positive engagement are being
secured as part of the space planning process for the new
extension, supporting active parental and carer participation
and influence in the design process of the new extension and
wider changes to the school that are planned to be delivered.
This is increasingly building a positive community
commitment and level of direct participation in the delivery
of the school extension and improvement project. 
The review of the Council’s engagement strategy as referred
to above will include a qualitative assessment of the
effectiveness of the Park Mains Liaison Group. 
Lastly, work is being progressed by officers to research how
other councils have approached school extension projects,
where a statutory consultation process is not required. The
objective of this work is to inform the design of a framework
to inform any future approach to early informal engagement
that can be adopted by the Council in relation to school
estate considerations or changes.   
Page 148 of 192

Page 155

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility 
Desk top work completed to date has identified a mixed
picture with several councils having adopted a similar
approach to that employed by the Council for the PMHS
extension. However, there are some examples of the use of
published options appraisals as part of Council reports and
identified examples of planned informal engagement
strategies deployed as part of long-term strategic school
estate planning which provide some good practice
approaches for reference. 
These individual elements of good practice that are evident
across other councils can be collectively brought together
and used to inform and guide the development of a proposed
framework for use by the Council in its future strategic school
estate planning programme (where appropriate this will pay
due regard to the Scottish Government guidance on informal
engagement that may occur prior to a statutory consultation
process). 
In completing this work consideration will be given to sharing
the output across the local authority sector given what
appears to be a level of mixed and inconsistent approaches
deployed across the country. 
August 2024  Director of
Children’s Services 
Page 149 of 192

Page 156

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
We note that the new primary school is subject to a full
public consultation. 
We expect the council to engage meaningfully with the
community on this issue, and other decisions on the school
estate. 
Again, we ask that the Controller monitors this situation,
and reports to us in June 2024 on progress and earlier if
necessary. 
The Education and Children’s Services Policy board approved
the planned consultation programme in January with a
report on the outcome of the consultation planned to be
brought back to Policy Board in May. 
A full programme of planned consultation and engagement
activity has been developed with input from the Institute of
Consultation to bring to the design process experience of
recognised best practice deployed across the UK. 
Full details of the planned consultation process and activity
will be provided to the external auditors as well as the
opportunity to observe any of the planned information
events and or formal consultation meetings. 
The approach specifically developed for this consultation
process as well as the evaluation of its effectiveness will be
used to inform a best practice approach for use in any future
statutory and non-statutory school consultation processes as
well as wider consultation and engagement activities the
Council may undertake in relation to any future service or
policy changes.   
Consultation
process has
commenced
and will fully
complete with
a report to the
Education and
Children’s
Services Policy
Board in May
2024 
Director of
Children’s Services
Page 150 of 192

Page 157

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
Learning lessons and building capacity 
While the council’s initial response to the Bowles report
was high level, we are assured by the Controller that its
action plan in response is now sufficiently detailed and
includes SMART objectives 
It will be important that this action plan is well-managed
by senior officers and closely scrutinised by elected
members of the council. 
The action plan is regularly monitored by senior officers
through existing officer governance arrangements in relation
to Dargavel with an update on progress reported to each
cycle of the Audit Risk and Scrutiny Board and updates will be
shared with the external auditors on an ongoing basis.
Ongoing Director of Finance
and Resources
However, there are still significant uncertainties relating to 
• the capacity needed in the long term, and 
• to the completion of the two building projects –
the new primary school and the secondary school
extension. 
We therefore request that these matters are closely
monitored in the annual audit work, and the Controller
uses her powers to report any slippage or other issues to
us if necessary. 
Managing the Risk of Future Capacity Uncertainty 
The inherent uncertainty in relation to long term (15 year)
pupil growth projections has been widely reported by the
Council over the past year as an ongoing risk through both
formal board reports, as well as engagement and
communications with communities and in sharing data and
reports with the external auditors. This is particularly
recognised by the Council in the context of Dargavel Village
having approximately 10 years of development still to deliver
before achieving completion. It has also been trailed that the
Council’s projection work to date with Edge Analytics has
identified an expectation of a peak in demand to be reached
which will then fall to a stabilised long-term level of demand
– a similar pattern of demand growth has been evidenced
across other similar long term community growth areas in
the UK.     
Page 151 of 192

Page 158

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
The Council has heavily trailed the need to regularly monitor
actual pupil numbers and update long term projections on a
regular basis over coming years as a key response to being
able to pro-actively manage this risk moving forward. 
This monitoring process will be key to assess the extent to
which actual demand and revised projections is or is not
tracking against the current projections that have informed
the planned capacity levels that will be delivered by the
current learning estate interventions and provide early
indication of any risk of material deviation. The planned
annual monitoring and updating approach that will be
deployed over coming years will be shared with the External
Auditors. 
Long term projection work completed to date has already
modelled a range of potential demand scenarios for the
primary sector and identified an expected peak of demand in
2033/34. Options that can be considered for deployment in
future years to manage upper demand scenarios that would
be exceed the planned capacity being delivered for primary
sector education within Dargavel village, have already been
identified and reported through the Education and Children’s
Services Policy Board in November and shared with
community representatives. 
Should the monitoring arrangements over the coming years
highlight projection of sustained demand trending towards
the upper demand scenarios, an appraisal will be required to
assess which of the options is most appropriate for 
March 2024  Director of
Children’s Services 
Page 152 of 192

Page 159

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
consideration to be deployed to meet the scale and nature of
the additional future demand. This process will include early
community engagement with school communities and will
require timely assessment and associated decision making to
allow planned delivery of any additional intervention well
ahead of the developing need. 
In relation to the secondary sector, the impact of higher
demand scenarios will take longer to emerge (mid to late
2030s) and similarly it has been well trailed in Council reports
and with the community that long term monitoring and
projection modelling may identify the need to consider
options at an appropriate future point in time in respect to
any further intervention and or decisions in relation to
secondary sector provision across West Renfrewshire.   
Similarly, the long-term monitoring arrangements will
facilitate early identification of such risks and will support
early engagement with the appropriate primary and
secondary schools that may be impacted by any future school
estate changes. 
Delivery of New School Facilities 
It has been recognised by the Council that as a result of the
very late identification of the significant under-capacity
problems within both the primary and secondary sectors
serving Dargavel, the Council has since late 2023 been
operating within a highly compressed non-typical timeline to
undertake all the associated capacity planning, land   
Page 153 of 192

Page 160

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
assembly, community engagement, statutory consultation,
space planning, procurement arrangements before moving
into project delivery in order to achieve operational delivery
of the new facilities by August 2027. 
In broad terms, the Council is seeking to achieve all that is
associated with the long-term strategic planning,
engagement, consultation and operational delivery of a new
school and major extension of a secondary school in a 4 ½
year period, when such an end-to-end process would
normally run over a much longer period – a timeline of
around 6-8 year would not be an untypical period of
timeframe. Consequently, the Council is parallel running
several activities that would in most circumstances be
delivered in a broadly consecutive manner. 
The Council has established governance, programming, and
resource arrangements in place to support the delivery of the
new primary school and secondary school extension over the
remaining 3 ½ year period through to the operational target
date of August 2007. 
To date the external auditors have not undertaken any
detailed scrutiny of the delivery programme or the
arrangements in place. To provide assurance officers will
provide a full overview of the current arrangements for the
external auditors for their review and will support whatever
audit work is required to allow them to assess the Council’s
current approach. 
March 2024  Director of
Children’s Services
Page 154 of 192

Page 161

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
Impact on service provision 
We note that the council has assessed that currently there
has been no detriment to either teaching delivery or pupil
education in the Dargavel and Bishopton areas from the
interim measures introduced. 
We consider it critical that the council reports the results
of these assessments publicly, regularly and in an
accessible way, to maintain and rebuild community
confidence. 
Renfrewshire Council has a robust Quality Assurance
framework involving regular meetings with Education
Managers and school staff and planned school visits which
focus in on the national quality assurance indicators
(reviews). 
DPS had a visit in January as part of this process where key
strengths under the national Quality Assurance indicators
from How Good is Our School were evaluated, self-
improvement and self-evaluation and Learning, Teaching and
Assessment and a report was produced. In addition,
Bishopton primary School and Park Mains High School were
both recently inspected by HMI, receiving very positive
reports. 
Further, every school submits a school improvement plan
and a school improvement report (published on website) and
their evaluations under the 4 key Quality Indicators (QIs) of
their performance, based on data gathered through self-
evaluation, HMI visits, internal visits and stakeholder input is
submitted to Children’s Services in April. 
These are shared with the parent councils and will also be
published on the school website as part of the self-evaluation
process. This is in line with Education Scotland guidelines, the
National Improvement Framework and statutory
requirements. 
Ongoing as
part of the
Service’s
Quality
Assurance
Framework 
Director of
Children’s Services 
Page 155 of 192

Page 162

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
The opportunity will be taken through the wider engagement
channels established with the Dargavel, Bishopton and wider
PMHS communities to sign post and raise awareness of
parents and carers to this information to provide an ongoing
understanding and reassurance in respect to the school
evaluation arrangements and outputs. 
Ongoing and
will be
incorporated
into parent
and school
newsletters at
appropriate
points. 
Head of Marketing
and
Communications 
The Commission is also concerned at the possible wider
impacts of the council’s failings regarding the estimation of
pupil numbers and whether this has had any impact on
services provided by the council in the Dargavel area. 
We request that the Controller seeks further information
on these issues so that we can understand the work that
the council has done to understand these impacts. 
The Council has considered a range of service provision and
other issues for Dargavel Village in addition to addressing
both primary and school provision. This has included the
following which will be shared with the external audit team
as part of their audit work: 
Leisure provision – the new primary school is planned to
incorporate a full-sized floodlight synthetic pitch with
associated changing facilities appropriate for community use
recognising the removal of similar facilities through the
history of the S.75 process since 2009, and the growing scale
and demand for such facilities from children, youth and
ultimately adult football within Dargavel and Bishopton
which is expected to expand further as Dargavel develops.
This facility will complement the resurfacing and
improvement of two floodlight synthetic pitches at PMHS
which will also serve the area as well as working with the
local Community Trust to progress their sport provision
ambitions within Bishopton. Beyond organised football, it
would be expected that this facility would be capable of
In line with
requests
emerging from
defined audit
programme to
be set by Azets
Chief Executive
Page 156 of 192

Page 163

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
supporting a range of potential community uses in the
future. 
Community Facilities & planned play and recreation space –
a key part of the planned design ethos of the new primary
school is to create maximum flexibility to support delivery of
a community asset that will be able to offer facilities for a
wide range of community uses for all ages outwith school
hours. This was identified through the space planning
engagement stage and will address the failure to incorporate
wider community use into the design of the existing Dargavel
Primary School. This also recognises the future demand for
such facilities as the development progresses and will
provide useful insight for the Council as to how community
use can be more effectively incorporated into the design of a
new school and position such new facilities as attractive
community hubs for active use beyond the school day. 
A review of planned play and recreation spaces within the
masterplan / S.75 Leisure Strategy was also undertaken –
although there have been issues identified with the scale and
quality of play equipment provided to date at individual
designated play park areas that has been raised with BAE
Systems, the overall scale of provision was not influenced by
the Council’s calculations of school roll projection. 
Transport and travel infrastructure and bus service provision
– the Council has commissioned an external review of active
travel and traffic modelling as part of planning for a second
school within the masterplan area. A range of
Page 157 of 192

Page 164

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
recommendations for consideration in relation to the
masterplan infrastructure have been made and which will be
progressed in discussion with BAE systems to enhance and
improve the opportunity for active travel.  
In addition, detailed engagement has been undertaken with
the Community to adapt proposals to utilise a financial
contribution from the S.75 to establish a bus service, partly
reflecting consideration of the anticipated number young
people that will emerge from the development and the range
of facilities they would most likely wish to travel to by public
transport. 
Support to schools – arrangements to provide appropriate
enhancement to management support to the school
recognising the additional demand being placed on the
school management teams were put in place early in the
process. Moving forward, normal arrangements to assess
and align both central support services to school as well as
school management teams as school rolls expand will be
undertaken in years to come. 
By way of example, there is a CAMHS officer who works as
the link for Children’s Services and who is currently working
with a group of schools in Linwood as part of a pilot to assess
demand and how that is being met. The next cluster
identified to receive this additional support will be Park
Mains and we are working closely with Educational
Psychologists and Family Wellbeing teams to ensure that, if
Page 158 of 192

Page 165

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
there is an increase in expected demand, that this is being
met and indeed planned for as the school roll expands over
future years. Education Managers are monitoring and
working closely with the school and the CAMHS officer will
provide us with the data. 
NHS facilities and services – engagement has taken place
with IJB/HSCP colleagues as the Dargavel review unfolded. In
terms of data, pupil projection data relies on NHS data
flowing to support the pupil projection modelling – pupil data
does not conversely inform or influence NHS data and
planning and therefore there was no identified risk to any
under sizing of NHS planning as a consequence of pupil
projection errors by the Council. IJB/HSCP colleagues have
however considered the issue of planning for uncertainty in
respect population growth at Dargavel in terms planning the
design and delivery of the new health facility which will be
future proofed for potential future extension if required. 
Financial management and consequences 
The financial impact of these failings on the council is
significant. The council capped the risk and contributions
from BAE Systems under the Section 75 agreement, and as
a direct result faces estimated net additional capital costs
of £60 million, to be met by borrowing. This is a substantial
sum of public money. The council needs to clarify the
opportunity costs of this in terms of its overall capital
programme. The council projects that it will have a revenue
budget deficit of up to £50 million by 2026/27 and will
The Council will be required to manage the financial impact
of the unplanned delivery of a new primary school and larger
extension at PMHS through the delivery of its wider financial
strategy and any opportunity costs articulated as part of
developing and delivering that strategy. 
Will be
considered in
February 2024
as part of the
Council’s
annual budget
considerations
and updated
Director of Finance
and Resources 
Page 159 of 192

Page 166

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
need to make difficult decisions on prioritising its spending,
compounded by the financial consequences of this issue 
The council has recently negotiated a transfer of land from
BAE for the construction of a new primary school. The
Controller’s report indicates that this was in exchange for
amendments to the extent and composition of the housing
units for which planning permission has been granted. 
Given the reported determination of BAE to fully protect
their commercial interests in the development, and the
absence of alternative solutions for the council, it will be
important to ensure and demonstrate that this exchange
represents Best Value for the public purse. 
The financial and wider factors considered by officers as part
of the negotiation process with BAE systems to secure the
associated land agreement and adjustments to the S.75
agreement will be set out in detail and shared with the
External Auditors and will be reported through updates to
the Audit Risk and Scrutiny Board and subsequently. 
financial
strategy. 
March 2024 
Head of Economy
and Development 
Council leadership, governance, and culture 
The council’s action plan will be hugely important in
further embedding improvements in this area. In
particular, the following elements must be progressed
urgently and transparently: 
• the council’s review of its scrutiny arrangements against
CIPFA good practice guidelines 
• the council’s review of its approach to risk management 
Officers will provide the current scope and timings of the
associated actions and current progress in relation to each
action being progressed through the Council’s existing action
plan to the Audit Risk and Scrutiny Board and where required
will also be reported through any other appropriate
governance route within the Council. 
February 2024
and ongoing in
relation to the
outcomes
associated
with each
action.
Director of Finance
& Resources
Page 160 of 192

Page 167

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
• the council’s leadership development programme for
officers. 
To be satisfied of progress in these areas, the Commission
requires the Controller to request further information from
the council on the scope and timing of these actions, and
report back to the Commission in the update requested for
June 2024, or earlier if she thinks necessary. 
We also expect these issues to be covered in the
accelerated Best Value report.
The Commission is also concerned about the culture of the
council and whether it has truly learned the lessons it
needs to. 
We expect organisational culture to be an area of focus in
the accelerated Best Value report. 
In particular, we request an update on whether the 
• culture of the organisation is appropriately open
and transparent, 
• encourages continuous improvement, 
• effective joint working between officers and
members, effective scrutiny and challenge
(especially by elected members), and 
• engagement and discussion with stakeholders. 
The council’s auditors concluded that the council has
appropriate governance arrangements in place with
improvements over the years in member and officer
relationships and effective leadership overall and were
satisfied through their detailed audit work that the Council
had demonstrated that the governance failings identified by
the Bowles report were limited to the historic handling of
Dargavel. 
The auditors did not highlight any concerns over the wider
organisational culture in the Council or in its approach to
managing major capital programmes but did identify that the
role of the Audit, Risk and Scrutiny Board in ensuring
effective scrutiny is not sufficiently clear and the Council has
recognised this and is already significantly progressed with a
review of the Audit Risk and Scrutiny Board and the outcome
of this review will be shared with the local audit team.    
Page 161 of 192

Page 168

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility 
In addition, we request an assessment of 
• whether it has the right skills in the right places to
deliver on its responsibilities, and 
• whether issues are escalated to the right level. 
Despite the finding of the Council’s auditors, the Commission
has expressed concern in relation to the Council’s culture and
have sought further assurances in relation to a wide range of
organisational issues. 
It is expected that the assessment of such issues will form
part of the planned Best Value Audit process and subject to
confirmation of the planned detailed best value audit
programme, Council officers will provide all the necessary
support, assistance and information to allow the audit team
to appropriately assess all key areas of interest. 
Subject to
confirmation
of the planned
best value
audit
programme
and approach 
Chief Executive 
Finally, the Commission notes that the auditor has
concluded that the council has obtained appropriate
external legal advice and determined there is no potential
for any form of action against former senior employees
involved in the Dargavel School decision-making. 
In addition, no disciplinary action has been taken against
any senior officer involved in decision-making relevant to
the Section 75 approval process for the Dargavel Village
development. 
The Commission accepts that these are management
issues. 
However, we request that the Controller asks the council
for further information on the process followed and 
No senior officers involved in the Dargavel S.75 decision
making process and identified in the Bowles Report remain
employed by the Council or remained employed at the time
of the Bowles report publication. In this context no senior
officer could be subject to any form of internal Council
disciplinary investigation or action. 
Full details of the process of consideration and legal advice
that was sought regard to any other form of external legal
action will be shared with the local external audit team as
requested by the Commission. 
Equally, arrangements will be made to provide the external
audit team with the Council’s disciplinary policy and
procedures as well as the overall approach to performance
management across the Council and support any further 
March 2024 
March 2024 
Head of Corporate
Governance 
Head of Policy and
Partnerships and
Head of HR & OD
Page 162 of 192

Page 169

APPENDIX 2
Council Response and Planned Actions 
Accounts Commission Finding  Council Response and Actions  Timeline  Responsibility
factors taken into account by the council in considering
disciplinary action against staff involved. 
In addition, and looking forward, the Commission asks for
information on 
• the council’s approach to performance
management and 
• its current policy on disciplinary action, 
so we can be assured that appropriate arrangements are in
place to ensure that staff have the necessary skills and that
senior officers are properly accountable for their areas of
responsibility. 
request that may emerge from their planned audit work in
this regard. 
Page 163 of 192

Page 170

Page 164 of 192

Page 171

To: Council 
On: 29 February 2024 
Report by: Director of Finance and Resources 
Heading: Cross Party Working Group: Review of Governance Arrangements 
1. Summary 
1.1 At the Council’s Meeting of 22 June 2023 the Council noted the content of
the Independent External Review Report (“the Bowles Report”) and further
noted the Chief Executive’s response to the findings and recommendations
of the Report. 
1.2 Council further agreed that a cross-party body to discuss and review existing
governance arrangements of Renfrewshire Council should be convened,
and that authority would be delegated to the Head of Corporate Governance
to make the arrangements for the cross-party body. 
1.3 A Cross Party Working Group (“the Group”) was subsequently convened.
The Group set its own agenda and reviewed and examined all areas of
interest to it. The Group also invited officers to address them on key areas.
The findings and outcomes of their review are set out within the body of this
report. 
2. Recommendations
Council is asked to: 
2.1 Note the work of the Cross Party Working Group and the findings of their
review; 
2.2 Approve the actions set out in the Report; 
2.3 Approve the revised Protocol for Relationships between Political Groups,
Elected Members and Officers as set out in Appendix 1 to this report.
___________________________________________________________________ 
Item 7
Page 165 of 192

Page 172

3.0 Background 
3.1 At the Council’s Meeting of 22 June 2023 the Council noted the content of the
Bowles Report and further noted the Chief Executive’s response to the
findings and recommendations of the Report. Council agreed that a cross-
party body would be established to discuss and review existing governance
arrangements of Renfrewshire Council should be convened. The Head of
Corporate Governance received delegated authority to make the
arrangements for the cross-party body. 
3.2 The Head of Corporate Governance proposed to each of the political group
leaders and to the independent Members that a Cross Party Working Group
be established with one Member from each political group and one
independent Member. This was to ensure genuine cross-party representation
and balance. This proposal was agreed and each political groups nominated
one Member. The Group Members appointed by each party were Councillor
Nicolson (SNP), Councillor Clark (Labour), Councillor Leishman
(Conservative) and Councillor Hannigan (Liberal Democrats). Councillor
Devine was nominated by the three independent Members. 
3.3 The Head of Corporate Governance further proposed that at the initial
meeting the Group should discuss the specific findings the Bowles Report on
the question of governance, and that the Members of the Group would then
agree what areas of interest that Members would wish to cover as part of the
review. Again, this approach was agreed. 
3.4 At the initial meeting of the Group the Members agreed that the focus of the
group would be on a number of key areas: 
a) A review of the Bowles Report findings
b) An examination of the Council’s Scheme of Delegations including the
terms of reference of the Council’s boards, and the powers of officers. This
was to include the Protocol for Relationships between Political Groups,
Elected Members and Officers
c) The culture and capacity of management within the Council
d) Planning and s75 Agreements  
Each of these areas were considered by the Group and their findings and
proposed outcomes and actions are set out below. 
4.0 Bowles Report Findings 
4.1 The Group noted that the Bowles Report specifically mentioned the word
“governance” on only three occasions. None of these were in a context of a
finding by Mr Bowles of a failure of corporate governance. What the Report
found was a failure of management oversight and reporting. It was clear that
senior officers within the Education and Planning Services did not adequately
supervise and scrutinise the work of staff. They did not escalate key decisions
through established structures within the Council including the Corporate
Management Team or to Elected Members. 
Page 166 of 192

Page 173

4.2 The Group noted the references in the Bowles Report to “professional
arrogance” by those senior officers in the handling of queries and concerns
from local residents and Elected Members. Those Members of the Group who
were Elected Members during the period in question stated that they
recognised this description of the officers involved. Members should be
entitled to rely on the advice received from officers and to have their concerns
addressed when they raised them. It was clear that those concerns were
brushed aside. Their view was that Members had been failed by those
officers. This contrasted with the Members of the Group who were first
elected in May 2022. They found the description within the Bowles Report at
odds with their experience of Council officers. 
4.3 However, Members did not wish the focus of the work of the Group to be a
historical re-examination of the matters in relation to the Dargavel
development that had been examined in great detail by the Bowles Report.
The Council had accepted the findings of the Bowles Report in full. The Group
also noted that the report by the Council’s External Auditors confirmed that
the Council had demonstrated that the Bowles Report findings were limited to
the Dargavel School project and that the Council had appropriate governance
arrangements for managing major investment programmes such as its City
Deal Programme and Community Investment Programme. The Group
therefore agreed that their focus should be on the current and future position
in the Council and assurance that they agreed with the view reached by the
Council’s External Auditors. 
4.4 Accordingly the Group thought it was important that they reviewed the
Council’s Scheme of Delegations with a particular focus on powers delegated
to officers and the terms of reference of the Council’s boards. The Board also
wished to be addressed by the Chief Executive of the Council on the
structures in place in respect of major capital projects, and on the existing
capacity and culture among the Council’s management structures. The Group
had particular concerns around the Planning function and wished to be
addressed on that. 
4.5 It was therefore agreed that a session would be held focussing on the key
governance documents of the Council, and thereafter further sessions would
be held with the Chief Executive and the Head of Economy & Development
Services. 
5.0 Review of the Council’s Governance Documents 
5.1 The Members of the Groups were supplied with copies of the Council’s
Scheme of Delegated Functions which sets out the specific functions of the
Council delegated to individual officers. It also establishes the terms of
reference of each of the Council’s boards. 
5.2 Members were also supplied with the Protocol for Relationships between
Political Groups, Elected Members and Officers. This document sets out in
detail the responsibilities and entitlements of Members and Political Groups,
and how Members and Officers should relate to each other. Members were
asked to provide any feedback they or their political groups had on the
content of the Scheme of Delegated Functions and Protocol. 
Page 167 of 192

Page 174

5.3 The Group then undertook a detailed session looking at both the Scheme of
Delegated Functions and Protocol. In respect of the Scheme of Delegated
Functions the Group firstly considered the terms of reference of the boards.
The Group noted that changes to the terms of reference were entirely a
matter for full Council to set and could be subject to change by the Council at
any time. They agreed that the current boards and their remits were
appropriate. The Group felt that the current main policy boards provided a
forum for open and transparent decision making and gave a platform for
detailed and robust scrutiny by Elected Members. 
5.4  However, the Group noted the comments made by the Council’s external
Auditors on the role of the Audit, Risk and Scrutiny Board in respect of
scrutiny of the Council’s action plan following the Bowles Report. The Group
thought it had been entirely appropriate for the Bowles Report itself to be
presented to the full Council giving all Elected Members the opportunity of
considering and commenting on its findings. The Group did feel that it was
now appropriate that the Audit, Risk and Scrutiny Board should be the forum
for further scrutiny of the delivery of the action plan, particularly given the non-
political nature of that Board. 
5.5 The Group considered that the current terms of reference of the Audit, Risk
and Scrutiny Board were appropriate. The Group did feel that the focus of the
Board’s annual audit plan required some examination, with some of the
matters considered in recent years by the Board perhaps not having been of a
significant nature. The Group felt that the Board should refocus on areas of
significance to the Council’s risk register, financial challenges and major
capital projects. The Group also suggested that additional support to the
Board, perhaps through external independent membership, particularly from a
finance/accounts background, may be appropriate. However, they noted that
the Board was currently undertaking a self-assessment with reference to the
most recent CIPFA guidance on the operation of audit committees. The
Group therefore agreed it was important to allow the Board to conclude that
process and make its own appropriate recommendations to the Council rather
than the Group make specific recommendations at this time. 
5.6  In respect of the delegations to officers, the Group noted these were kept
under regular review with the most recent changes having been made in June
2023. The Group agreed the authority given to officers was appropriate and
no changes were proposed to current delegations. 
5.7  However, the Group did wish assurance that officers fully understood the
limits of their delegations and the need to seek Member approval, whether at
Council or at a board, where no delegation was in place. 
5.8 The Group also sought assurance that officers understood that boards could
not delegate powers to officers. While the Group agreed that it was
appropriate that board reports would set out specific powers sought by
officers to allow them to implement specific actions approved boards, such
powers only took effect when the minutes of those boards were approved by
Council. 
5.9  It was therefore agreed that refresher training for management teams across
all of the Council’s directorates on the operation of delegated authority should
be implemented. 
Page 168 of 192

Page 175

5.10 With regard to the Protocol for Relationships between Political Groups,
Elected Members and Officers, the Group noted that the content of the
Protocol had not been reviewed since 2014. While the view of the Group was
that the content was appropriate, it was felt that the content should be
considered again by Members and that it be refreshed. The Group also
thought that the awareness of the Protocol among Members and Officers was
not as high as it should be. 
5.11 It was therefore agreed that refresher training for management teams across
all of the Council’s directorates on the operation of Protocol should be
implemented. It was also agreed that the content of the Protocol should be
refreshed. Members are therefore asked to agree the contents of the revised
Protocol that appears as Appendix 1 to this report. 
5.12 The Group also considered the Information Bulletin. The Group noted that the
purpose of the Bulletin was to provide Members with a concise summary of
significant decisions and action taken by officers in the exercise of their
delegated powers, and to provide details of issues which do not require a
decision. The Group agreed that the Bulletin was accordingly an important
document, but that it did not have a profile that accorded with that importance.
Therefore steps were required to elevate the awareness of the Bulletin. 
Actions: 
a) Refresher training for management teams across all of the Council’s
directorates on the operation of delegated authority should be
implemented.
b) Refresher training for management teams across all of the Council’s
directorates on the operation of the Protocol for Relationships between
Political Groups, Elected Members and Officers should be implemented.
c) The content of the Protocol for Relationships between Political Groups,
Elected Members and Officers be refreshed.
d) That the Bulletin be issued with the minutes of each Council and board
meeting for the meetings of Full Council. 
6.0 Culture and Capacity of Management Within the Council 
6.1 The Group met with the Council’s Chief Executive. They sought assurance
from the Council’s Chief Executive.  He advised the Group on the overall
corporate governance arrangements for the Council. There were a wide-
ranging set of arrangements to support the running of the Council. These
were reassessed each year by Internal Audit and reported through the Audit
Risk and Scrutiny Board. He highlighted the External Auditors’ report to the
Council for the year. He noted that the Council’s external audit arrangements
have never flagged any material issues with governance arrangements in the
Council and that the Group could take reassurance from this latest external
assessment of the Council. However, he recognised that there are always
opportunities to improve and strengthen governance arrangements. 
6.2 With regards to the governance of major capital projects and programmes the
Chief Executive set out how the Council manages major programmes now. 
The Group were addressed in detail on the differing levels of governance and
internal control exercised on how major capital and programmes operated.  
There was a commitment to undertake health checks on all these major
Page 169 of 192

Page 176

projects and once completed they would be shared with Members through
appropriate board reporting. The Chief Executive advised that this has been a
helpful process for the relevant management teams to take those major
programmes through a health check. It had identified some small areas for
improvement such as how regularly were reports going to boards. He thought
a greater consistency on that would be of benefit to Members and Officers
alike. 
6.3 The Chief Executive took the Group through the governance structure for the
City Deal and Infrastructure programme as an example of the structures in
place. That illustrated the complexity of that programme and provided the
Group with the scale of the officer programme governance arrangements in
place. He advised that the internal governance arrangements are strong,
highly collaborative and recognise the scale and complexity of these major
programmes. He advised there are a significant number of capital projects
running concurrently at the same time with a highly complex set of
arrangements supported by key officers such as the Programme Director
(City Deal & Infrastructure) and the Strategic Programme Manager. The team
are also supported by multi-discipline officers, all embedded within the team
so that the team is enabled to run all of these projects. Each project is
supported by its own technical project manager who runs the project.  This
reflects a significant investment to deliver a complex set of capital projects. 
6.4 In terms of corporate oversight, externally the City Deal project feeds into the
Glasgow Region governance arrangements.  Internally the Infrastructure
Programme Board meets every 6 weeks and is chaired by the Chief
Executive and attended by a wide range of senior officers including a majority
of the members of the Council’s Central Management Team. Accordingly, a
significant cross section of senior officers are managing the delivery of this
major project and ensuring corporate oversight. The Group noted the
significant contrast with the historic position regarding the Dargavel
development where it was acknowledged that there was very little corporate
oversight. 
6.5  The Group noted that the City Deal project has been running for about 10
years and that it has on average reported to board around twice a year.
However, the Chief Executive acknowledged that the pattern of reporting has
been driven by the requirement for decisions by board. He agreed that
Members should be more regularly updated on major projects even where
board decisions were not required. The Group agreed that this example of the
level of internal governance implemented in the Council’s major programmes
and projects provided suitable reassurance to them. In addition, the Group
agreed that going forward, there should be at least two reports per year going
to board from these major projects and programmes. 
6.6 While the Group also thought that while the current internal management
arrangements were entirely appropriate, a greater visibility of the officers who
were involved would be of benefit to Elected Members. It was therefore
agreed that board reports as set out at para 6.5 above, should also include a
note of the project groups involved. 
6.7 While recognising the enhanced levels of internal governance in place, the
Group also sought assurance from the Chief Executive on whether he thought
an error such as that which occurred in respect of the Dargavel development
could occur now.  The Chief Executive advised that one of the key issues Page 170 of 192

Page 177

identified as part of the Bowles Report was that just because a group is
established it does not mean that it will provide assurance; if that group does
not operate effectively, it will serve no purpose. Therefore, the objective of the
health check process currently being undertaken was to give Elected
Members the reassurance that the governance in place now was appropriate.
Moreover, the Chief Executive highlighted that where the Council identifies
the need for specialised support, we go outwith the organisation to secure
that specialist expertise. This was a major failing with Dargavel where there
was no understanding that officers lacked the necessary skills to complete the
work they were undertaking. 
6.8 The Group sought reassurance that officers were working together
collaboratively and that there was an appropriate culture across the Council’s
management with learning and training across the Council. The Group
identified the challenges posed by the financial position faced by the Council
and the rationalisation within management. The Chief Executive advised there
was a good understanding of how the Council has changed at officer level. 
His view was that the level of collaborative and corporate working has never
been better, and his experience was that this has not always been the case to
the same degree. The agenda being managed by the Council is of such a
scale there is no way it could be advanced without officers working in a highly
collaborative and supportive manner. He believed the Council now had a
highly developed culture of support.  Notwithstanding this, he recognised
there has been a significant turnover of senior officers and managers.
Therefore, he had identified the need to refresh training and development for
officers, particularly those in new roles. He advised the Group on the
programme of training and development happening across the management
tiers which is not just about competence, but the need to help reinforce the
right culture in the organisation on how we work collectively. He advised on
the modules being undertaken; Effective Communication, Strategic Project
Management and Managing Change Governance, Risk Management and
Financial Accountability, Creating Team Values/Key Leadership Skills and
setting the culture and values in how we work.  He advised that this would be
followed up in the New Year with more detailed training regarding the Protocol
for Relationships between Political Groups, Elected Members and Officers,
the Scheme of Delegated Functions, the Council’s financial regulations and
contract standing orders etc. 
6.9 The Chief Executive advised the Group that the culture within officers is 
strong, with good collaboration and corporate working. This was how he 
worked and how he expected people to work within the Council. He believed 
the Council has the right officers with the right values, and a real supportive 
corporate culture and a collective sense of responsibility to deliver for the 
Council exists. 
6.10 The Group noted that the training programme instigated by the Chief
Executive was part of the agreed action plan to be considered by the Audit,
Risk and Scrutiny Board. The progress of that training programme, and an
assessment of the outcomes would be report to that Board. 
Page 171 of 192

Page 178

6.11 The Group identified that one issue faced by Elected Members arising from
the turnover of Senior Officers and other senior managers, and also through
service reorganisation, was that Members were not always aware who the
responsible officers were for certain services. It was therefore agreed that a
structure chart should be circulated to all Elected Members and that this
should be regularly updated.   
Actions:
a) A health check of all major projects will be completed and reported
through the Audit, Risk and Scrutiny Board
b) All major projects and programmes will report to the appropriate board at
least twice a year.
c) Any such reports will include a note of all project groups involved.
d) The outcome of the management training programme will be reported to
the Audit, Risk and Scrutiny Board.
e) A structure chart for all Council directorates should be prepared and
circulated to all Elected Members. This should be regularly updated and
recirculated as necessary. 
7.0 Planning and s75 Agreements 
7.1 The Group met with the Head of Economy & Development Services to
consider how the Planning process operated within the Council and to
consider areas for improvement. 
7.2 The Group first considered where decisions on planning applications lay
within the Council. They noted the agreed levels of authority to the full
Council, the Planning and Climate Change Policy Board and the delegations
to officers. Having assessed those, the Group were of the view that the
decision making did lie at the correct levels within the Council. 
7.3  However, the group were of the view that s75 Agreements and the negotiation
of developer contributions were an area of particular concern. The Head of
Economy & Development Services agreed with that view, and he advised the
Group that this was an area that he and the Chief Executive had identified
required to be addressed prior to the issue with Dargavel being identified. 
However, clearly resolving the situation in Dargavel had then become the
priority. Accordingly, he had only recently recommenced work on a new
developers’ contribution policy for the Council. He was clear that there had
been a historical disconnect between the Planning Team and Childrens’
Services. Both services were now working well together to ensure that the
review of the School Learning Estate Strategy and the Council’s Local
Development Plan were both linked. 
7.4 In respect of the new developers’ contribution policy the Head of Economy &
Development Services advised an update report would be going to the 23
January meeting of the Planning and Climate Change Policy Board. He
advised the Group on the broad outline of the matters that were being
assessed in respect of that new policy. The Group agreed that it was
appropriate for the policy development to run through that Board. 
Page 172 of 192

Page 179

7.5 The Group advised the Head of Economy & Development Services that they
were concerned as to how the negotiation of s75 Agreements were
conducted. The Group agreed that the current process where the report in
respect of a planning application would set out what areas the officers thought
would be appropriate to cover in a s75 Agreement functioned well. However,
their concern was around what happened subsequently if the officers could
not reach an agreement with a developer within those parameters. The Head
of Economy & Development Services agreed that officers’ delegations to
negotiate the terms of the s75 Agreement were limited to the parameters
agreed by Members. If officers could not reach agreement on substantive
matters, then that should be reported back Members. 
7.6 Further the Head of Economy & Development Services agreed that more
could be done to keep Members sighted on how specific s75 Agreements had
or were progressing. Currently there was little or no feedback to Members on
specific agreements. It was therefore agreed that a new Chief Planning
Officer report would be brought to the Planning and Climate Change Policy
Board at least twice a year, or where any situations as set out in section 7.5
above arise. This would keep Members of the Board up to date on the
progress of s75 agreements, including the delivery of any contributions
secured under them. It was understood that this could not be a mechanism to
reopen a planning application, but it was important for officer accountability
and authority. 
Actions:
a) That a Chief Planning Officer report brought to the Planning and Climate
Change Policy Board at least twice a year advising on the position in
respect of s75 Agreements, or where officers cannot not reach agreement
on substantive matters in a specific s75 Agreement negotiation. 
Implications of the Report 
1. Financial – none 
2. HR & Organisational Development – none 
3. Community/Council Planning – none 
4. Legal – none 
5. Property/Assets – none 
6. Information Technology – none 
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement
of individuals’ human rights have been identified arising from the
recommendations contained in the report. If required following
implementation, the actual impact of the recommendations and the mitigating
actions will be reviewed and monitored, and the results of the assessment will
be published on the Council’s website. (Report author to arrange this). 
Page 173 of 192

Page 180

8. Health & Safety – none 
9. Procurement – none 
10. Risk – none 
11. Privacy Impact – none 
12. CoSLA Policy Position – none 
13. Climate change - none 
List of Background Papers 
None 
Author: Mark Conaghan
Head of Corporate Governance
0300 300 0287
mark.conaghan@renfrewshire.gov.uk 
Page 174 of 192

Page 181

Page 1 of 13   
Renfrewshire Council 
Protocol for Relationships
between Political Groups, Elected
Members and Officers
Page 175 of 192

Page 182

Page 2 of 13   
Table of Contents 
Page 
1. Introduction 3
2. Members and Officers 3
3. Officer Advice to Party Groups 3
4. Support Services to Members and Party Groups 4
5. Members’ Access to Information and to Council Documents 4
6. Relationships between Officers and Conveners 5
7. Correspondence 6
8. Meetings of the Council and Boards 6
9. Responsibilities of Elected Members 7
10. Responsibilities of Political Groups 8
11. Constituency Matters 8
12. Dealing with Individual Constituent’s Cases 9
13. Dealing with Ward Issues 10
14. Dealing with Local Organisations 10
15. Rights of Elected Members 10
16. Rights of Political Groups 11
17. Rights of Political Group Leaders 12
Revision History 13 
Page 176 of 192

Page 183

Page 3 of 13   
1 Introduction 
• The purpose of this protocol is to guide Members and officers of the Council
in their relations with one another; to develop co-operative relationships
between Members; assist with ward management; and to provide a
framework within which members of political groups within the Council
are able to operate individually and collectively. 
• The protocol is informed by the Councillors’ Code of Conduct (the Code)
which provides that Members must respect all other Members and all Council
employees and the role they play, treating them with courtesy at all times. In
addition, the Code requires Members to follow the Protocol for Relations
between Councillors and Employees which forms Annex A to the Code. The
principles of the Code and this protocol should be applied to your informal
dealings with the Council’s employees, party political groups and others no
less scrupulously than at formal meetings of the Council and its Boards. The
protocol also reflects the Code of Conduct for Employees. 
• In agreeing this protocol, political groups will seek to ensure that individual
members of the Group will comply with its provisions. Where a breach of the
protocol occurs, or in the case of a dispute between Elected Members,
the political group shall attempt to address the matter with the member or
members concerned and take such measures as it considers appropriate
to prevent a recurrence. Political groups should also consider how they
may wish to address complaints regarding alleged breaches of the Code
with a view to reaching a satisfactory resolution of the complaint that would
prevent a referral to the Standards Commission. 
2 Members and Officers 
• In line with the Code, it is important that Members and officers have a
mutual trust and respect, with neither taking unfair advantage of their
position. 
3 Officer Advice to Party Groups 
• Members of local authorities are organised, generally, into party groups, and
it is common for these groups to consider matters of Council business
before the matters are considered by the relevant Council decision-making
body. Party groups may ask officers to support and contribute to these
discussions. 
• The support provided by officers can take many forms, ranging from a briefing
meeting with a convener before a Board meeting to a presentation to a full
party group meeting. Officer support is likely to be in most demand from
whichever party group is in control of the Council, but it is available to all party
groups. 
• People involved in this process must understand certain points, including the
following.
Page 177 of 192

Page 184

Page 4 of 13   
• Officers must just provide information and advice in relation to matters
of council business. Officers must not be involved in advising on matters
of party business. Officers are not expected to be present at meetings,
or parts of meetings, when matters of party business are discussed. 
• Party group meetings are part of the process for making Council
decisions, but they cannot make decisions on behalf of the Council.
Conclusions reached at these meetings are not Council decisions. 
• Where officers provide information and advice to a party group meeting
in relation to a matter of Council business, this does not replace all
information and advice the relevant Board may need when the matter
in question is considered. 
• Officers who are involved in providing information and advice to a party
group meeting, which includes people who are not members of the Council,
need to take special care. These people will not have to follow the Code (in
particular, the conditions concerning declaring interests and confidentiality),
and for this and other reasons officers may not be able to provide the same
level of information and advice as they would to a Member-only meeting. 
• Officers must respect the confidentiality of any party group discussions at
which they are present, and must not pass on details of any discussion to
another party group. 
• Any cases of difficulty or uncertainty in this area should be raised with the
chief executive who will discuss them with the relevant group leader or
leaders. 
4 Support Services to Members and Party Groups 
• The only way officers can legally provide support services (for example,
stationery, typing, printing, photocopying, transport and so on) to Members
is to help them in their role as Members of the Council. These support
services must only be used on Council business. They should never be
used in connection with party political or campaigning activity or for private
purposes. However, the Code recognises that there may be occasional
personal use of Council-provided facilities and indicates that when permitted
by the Council’s policies incidental personal use of Council facilities is
permissible provided that this is authorised by the Council. Paragraphs 3.24
and 3.25 of the Code deals with the use of Council facilities. 
5 Members’ Access to Information and to Council Documents 
• Members are free to ask any Council service for any information; explanation
and advice (about that service’s functions) that they may reasonably need
to help them in their role as Members of the Council. 
Page 178 of 192

Page 185

Page 5 of 13   
This can range from asking for general information about some aspect of
a service’s activities to asking for specific information on behalf of a
constituent. Members can access personal information on behalf of
constituents and do not need a signed mandate to do so, although UK
GDPR and Data Protection Act 2018 may prevent Members from
accessing information about third parties they are not acting for. 
• Members have the option to request information specifically in terms of
the Freedom of Information (Scotland) Act 2002. Members have the same
legal right to access information held by the Council as the general public
under the 2002 Act. However, Members should be aware of the statutory
timescales for making the information requested available (20 working days). 
• Members have a legal right to inspect any Council document which contains
material related to any business which is going to be discussed at a Council
or Board meeting. This right applies no matter whether the Member is a
member of the Board concerned or not, and covers reports which are
going to be presented at the meeting, and any relevant background papers.
This right does not necessarily apply to documents relating to certain items.
The items in question are those which contain exempt information relating to: 
• employees;
• people who use council property;
• people applying for grants and other services;
• caring for children;
• contract and industrial relations negotiations; and
• advice from council and criminal investigations. 
• These exemptions are listed in the Local Government (Scotland) Act 1973
(as amended). The Freedom of Information (Scotland) Act 2002 does not
replace the 1973 Act. However, many of these exemptions will now have
to go through a ‘public interest’ test. This means that there may be limited
circumstances where an exempt item needs to be released under the 2002
Act. 
• Finally, any Council information provided to a member, including anyone’s
personal information, must only be used by the member for the purpose
for which it was provided. Personal information should only be used for
authorised purposes, which means that Members must be careful about how
they handle this.  Each individual member has responsibilities as a Controller
to process personal information fairly and lawfully.  The importance of all
confidential information which we provide to our Members is emphasised in
the Code at paragraphs 3.21-3.23. 
6 Relationships between Officers and Conveners 
• It is clearly important that there should be a close working relationship
between the convener of a Board and the chief officer and other senior officers
of any service which reports to that Board. However, these relationships
should never be allowed to become so close, or appear to be so close, as to
bring into question officers’ ability to deal with other Members and other party
groups fairly.
Page 179 of 192

Page 186

Page 6 of 13   
• While the convener of a Board will regularly be consulted as part of the
process of drawing up the agenda for a future meeting, it must be recognised
that in some situations a chief officer will have a duty to present a report on
a particular matter. Similarly, a chief officer will always be fully responsible
for the contents of any report presented in his or her name. Any issues
arising between a convener and a chief officer in this area should be referred
to the Chief Executive. 
• In relation to action between meetings, it is important to remember that
the law only allows for decisions to be made by a board or an officer. The
law does not allow a convener or any other single member to make
decisions. When decisions are made to take action between meetings, it is
the officer, rather than the convener, who takes the action and is responsible
for it. 
• Officers within a service must answer to their chief officer. While officers
should always try to help a convener (or indeed any Member), they must
not go beyond whatever authority they have been given by their chief officer
or by the Council’s scheme of delegation. 
7 Correspondence 
• Correspondence between an individual Member and an officer should not
normally be sent to any other, unless specifically authorised by the Member
or authorised by implication by the original correspondence being copied to
the member or otherwise. If it is necessary to send a copy of the
correspondence to another Member, this should be made clear to the original
Member. In the copying of any correspondence the officer concerned must
have particular regard to the issue of confidentiality and ensure that the
confidentiality of the Member or any other party is preserved. 
8 Meetings of the Council and Boards 
The procedures for meetings of the Council and its Boards are governed by the
Procedural Standing Orders. As well as procedural matters, the standing orders
also include a number of matters regarding the conduct of Members such as
how to declare an interest and the consequences of disregarding the authority of
the chairperson. Members should also follow the following basic rules of good
conduct: 
• During all meetings of the Council and its Boards, Members should
address their fellow Members by their title of ‘Councillor’ and their surname. 
• Members must never use offensive or inappropriate language, and should
treat their fellow Members and officers with respect. 
• Members who want to leave a meeting (other than for ‘comfort breaks’ or after
they have declared an interest) must tell the chair before they leave the
meeting.
Page 180 of 192

Page 187

Page 7 of 13   
• Any Member who wants more information about the Board reports should
contact the relevant director prior to the meeting. 
• While it is expected that the clerk and the convener will work closely together,
it is important to understand that the clerk’s job is to serve all Members and
not just the convener. The clerk must be, and be seen to be, impartial in his
or her dealings with the Board. It is important that conveners do not ask
clerks to behave in any way that might jeopardise this impartiality. The clerk
should never be asked to comment on matters of policy. 
• At meetings, if a rule in standing orders is open to more than one
interpretation, the clerk should state that, in his or her opinion that is the case,
but should not be called upon to recommend which interpretation the
convener should favour. 
• No clerk should be asked how to circumvent the procedures set down
in standing orders. 
9 Responsibilities of Elected Members 
Members have the responsibility: 
• To uphold the general principles enshrined in the Code. 
• To treat each other and all employees of the Council with respect and dignity. 
• To respect the authority of the Chair at any meeting of the Council or
its Boards and comply with his or her rulings. 
• To respect the confidentiality of information which has not been made public,
not to breach any such confidences and to adhere to any embargoed
agreements or confidential or sensitive issues. 
• To respect the limitations on the disclosure of information because of the
requirement of client confidentiality placed on some employees of the Council. 
• To participate in training and other development events organised on their
behalf by the Council. 
• Not to raise matters relating to the conduct or capability of employees
in public. 
• When performing the duties of the convener or chairing a Board or other
meeting to apply all Standing Orders impartially and to refrain from actions
or statements that might bring their impartiality into question.
Page 181 of 192

Page 188

Page 8 of 13   
10 Responsibilities of Political Groups 
• Political Groups have the responsibility not to require individual Members
to vote on party lines in respect of decisions where group decision-making
would be unlawful, contrary to the Code or against any Council approved
guidance; in particular on planning applications, specific regulatory matters,
employment issues affecting individuals, all matters coming before the Audit,
Risk and Scrutiny Board or any matter which requires to be determined on
the basis of evidence given to or the findings of a forum on which Members
serve. 
11 Constituency Matters 
• All Elected Members within each multi-member ward have a duty to be
accessible to their constituents and to represent their interests
conscientiously. 
• The wishes of constituents in respect of confidentiality of their enquiry
are to be respected. 
• All Elected Members have equal formal and legal status. 
• Each ward is represented by 3 or 4 Members. No Elected Member should
identify his/herself as the sole representative for a ward. 
• In general an Elected Member should not deal with a matter relating to
a constituent or constituency issue outwith his/her own ward, although
there may be circumstances when this is relevant, for example, an area
wide or policy issue. 
• Members within each multi-member ward are all of equal status and each
represents the whole of their ward. Members must not describe themselves
as representing (or having a particular interest in) only part of the ward
for which they were elected. 
• Members should not claim to be the sole Member for their ward. 
• Members will be provided with standard Council stationery based on a
template approved by the Director of Finance & Resources including letter
headed paper, compliment slips and business cards. Separate stationery
will be provided for use by the Provost as the Council’s civic head. 
• Members’ details and also contact details will be provided through a number
of sources including the Council’s website and the list of Elected Members. 
 It is recognised that there are many ways in which constituents may make
contact with Members e.g. at surgeries, via email, on social media etc.
However, it is important that rules are set for calls directly to the Council.
Members of the public calling the Council to find out who their local Member
is will normally telephone the customer contact centre or the members’
services section. Staff receiving a call will advise enquirers of the names of
all the Members for a particular ward and will offer to provide contact details
Page 182 of 192

Page 189

Page 9 of 13  
for all or, if requested, a specific member.  Members’ details will be provided
in alphabetical order by surname. 
• Members of the public calling for a particular Member will be put through only
to the Member concerned. If the Member is unavailable the person calling
will be given the option of leaving a message. Only if the caller asks will the
call be transferred to another Member. 
12 Dealing with Individual Constituent’s Cases 
• The basic principle is that the interests and wishes of the constituent are
the primary consideration. 
• An individual constituent has the right to approach any of the elected
members representing his/her ward.  A constituent may approach a
particular elected member on the basis of location, political party or some
other basis - the choice is entirely up to the individual constituent. 
• Members dealing with constituents may be given personal information and
must ensure that such information is handled sensitively and securely.
Further advice on this is contained in the Good Practice Note – Advice for
the elected and prospective members of local authorities issued by the
Information Commissioner’s Office (www.ico.gov.uk). 
• In the event of a Member receiving inappropriate, persistent, unreasonable
or vexatious enquiries from a constituent by whatever means, the Member
may decide to restrict further contact to written communication or terminate
contact. Further advice on individual cases can be obtained, if required, from
the Head of Corporate Governance. 
• Members must not notify other Members representing the ward of enquiries
which they receive from constituents, or copy constituents’ correspondence
to them, without the consent of the constituent concerned, as that would
breach the confidential nature of the relationship between constituent and
Elected Member. Members should be sure that they have a constituent’s
consent to the use or transfer of his/her personal information in dealing with
a case. It may be that for a particular case or circumstance a Member wishes
to ensure that he/she has written consent. 
• All Members within a particular ward may agree amongst themselves to
allocate responsibilities on the basis of subject matter. That would always be
subject to the right of an individual constituent to expect a Member of their
choice within their ward to progress a particular enquiry. 
• A Member may suggest that a constituent refer a specific enquiry to another
Elected Member. Such a referral should only be made with the consent of the
constituent who may request that the enquiry be dealt with by the Member
of their choice.
Page 183 of 192

Page 190

Page 11 of 13 
• Members may be approached by a constituent in relation to dealings with
another statutory body such as the health board or Scottish Water. Each of
these other statutory bodies is likely to have their own arrangements for
progressing enquiries and dealing with complaints. Details of the relevant
contact points will be provided to each Member. 
13 Dealing with Ward Issues 
• Any Member is entitled to take an interest in or take up a matter affecting the
ward for which they were elected. Members are likely to have a greater
impact where they work collectively for a common cause, as their constituents
would expect them to. That may not be possible in some instances because
of perfectly legitimate political differences but Members may wish to contact
one another, as a matter of courtesy, where they are involved or planning to
become involved in a major local issue. Any exchange of information must
comply with the data protection legislation and, in particular, Members should
ensure that any constituent’s personal details are not normally shared, in
order to safeguard the constituent’s right to privacy. 
• When an officer writes to residents regarding matters of general concern in an
area, all ward Members will be sent copies of the correspondence, e.g. traffic
calming measures, bin collection cycles, etc. When a Member has been
involved in a private matter affecting one household then the relevant officer
should keep the Member informed of significant developments until the matter
is concluded. 
• Where an officer is calling a meeting with ward Members to discuss a ward
issue which is of a non-personal nature, the officer will invite all ward Members
to allow them to be briefed on the issue. 
14 Dealing with Local Organisations 
• Boundaries of local organisations, including community councils, are unlikely
to be coterminous with multi-member ward boundaries. Some organisations
will straddle two or more of the multi-member wards and this is certainly
the case with community councils. It is therefore likely that Members will
receive cross boundary enquiries. These enquiries may require to be dealt
with in conjunction with Member(s) from another ward(s). However, as with
enquiries from individual constituents, information concerning cross-
boundary enquiries should only be shared if the express approval is given
by the organisation concerned (unless the information is of a general
nature), who may request that the enquiry be dealt with only by the
Member(s) of their choice. 
15 Rights of Elected Members 
Members have a right  to be  consulted by officers  on  specific matters  of
interest to them as local Member, for example: 
Page 184 of 192

Page 191

Page 12 of 13 
• Whenever a public meeting is organised by the Council to consider local
issues, all Members representing the wards affected must be invited to
attend. Similarly, whenever the Council undertakes any form of consultative
exercise on a local issue the local Members must be notified and, where
appropriate, the views of the Member should be requested; 
• Members must be consulted on all significant new projects and initiatives
in their ward at the planning stage in order that their views may be taken
into account. 
• Members must be advised of any major work being undertaken by the
Council in their ward, or where it is known, by any other statutory
undertaker, e.g., Scottish Water, which is likely to inconvenience the public
for any significant length of time. 
• Subject to any requirements imposed on the Council by law, Members must
be consulted on any other issues which are likely to be of substantial or
significant interest to the local community in their ward. 
• Members have the right and as a matter of courtesy to be informed of visits
to their ward by Ministers of the Scottish Government or UK Parliament
where the visit is in connection with one of the Council’s responsibilities. 
• Any Elected Members in whose ward an official opening of Council
premises is to take place should be invited to attend the opening. 
• Members have the right to receive induction training, and to the continuing
development of their skills as a member. Members should seek to identify
their development needs through an Individual Development Plan (IDP).
Councillors have the right to access online training resources delivered
through the National Elected Members Portal and i-Learn to develop their
skills as a Member. 
• Subject to any decisions by the Council on the services to be provided to the
office bearers of the Council or otherwise, members have the right to parity
of service from the Council and its employees. 
• Members who are not members of political groups have the right to be
consulted on matters that are sent to all political groups for consultation and
to be advised of information that is being communicated to all political
groups. 
16 Rights of Political Groups 
Political Groups have the right to 
• Be notified of any major policy initiatives by the Scottish Government or the
United Kingdom government.
Page 185 of 192

Page 192

Page 13 of 13 
• Receive and be timeously consulted on major consultation papers by the
Scottish Government or the United Kingdom government. 
• Appropriate cross party representation at civic events (including the
official openings of buildings) organised by the Council. 
17 Rights of Political Group Leaders 
• Political Group Leaders have the right to be informed/consulted in confidence
by the Provost, Leader of the Administration and/or the Chief Executive
on major or sensitive issues which might impact on the Council’s interests or
the Council’s good name. Political Group Leaders must respect the
confidence of such information. 
18 Advice 
Further advice on the operation of the protocol can be obtained, if required, from
the Head of Corporate Governance. 
Page 186 of 192

Page 193

Page 14 of 13 
Revision History 
Version Meeting Date Document
0.1 Council 2/10/97 Member/Officer
Protocol
0.2 General Management 15/12/04 Member/Officer
Protocol
0.3 General Management 10/8/05 Member/Officer
Protocol
0.1 Council 28/6/07 Elected Member
Protocol
0.2 General Management &
Finance
14/1/09 Elected Member
Protocol
0.1 Council 28/6/07 Inter Party Protocol
0.2 General Management &
Finance
14/1/09 Inter Party Protocol
0.1 General Management &
Finance
12/11/14 Member/Officer,
Elected Member, and
Interparty
Protocol
(combined)
0.2 Council 29/02/24 Protocol for Relationships
between Political Groups,
Elected Members and
Officers 
Page 187 of 192

Page 194

Page 188 of 192

Page 195

To: Council 
On: 29 February 2024 
Report by: Director of Finance and Resources 
Heading: Governance Arrangements 
1. Summary 
1.1 The report seeks approval from Council in respect of the appointment of the
Council’s representatives on the Board of the Park Lane Developments
(Renfrewshire) LLP. 
1.2 The report sets out changes to Board memberships proposed by the Labour
Group, and a consequential change to the Depute Convener of the Audit,
Risk and Scrutiny Board. 
1.3 The report also sets out a change to the Children and Young People’s
Champion proposed by the SNP Group. 
1.4 Finally, the report sets out proposed amendments to the Scheme of
Delegations in respect of decisions on major events to be marked by the
flying of flags from Council buildings, and by the lighting of Council
buildings/property. 
2. Recommendations 
Council is asked to: 
2.1 Approve the appointment of Gordon McNeil and Louise Feely as directors of
the Park Lane Developments (Renfrewshire) LLP. 
2.2 Agree that Councillor Smith replaces Councillor Montgomery on the Audit,
Risk and Scrutiny Board; 
2.3 Agree that Councillor Montgomery replaces Councillor Smith on the
Infrastructure, Land and Environment Policy Board; and
Item 8
Page 189 of 192

Page 196

2.4 Agree that Councillor McDonald be appointed Depute Convener of the Audit,
Risk and Scrutiny Board. 
2.5 Agree that Councillor MacFarlane replace Councillor Campbell as the
Children and Young People’s Champion. 
2.6 Approve the changes to the Scheme of Delegated Functions as set out in
section 4 of this report. 
3. Background – Changes to Council Appointees and Board Memberships 
3.1 At the Council’s Meeting of 17 December 2009, in respect of the development
of the former Arnotts site in Paisley, it was agreed that Mary Crearie, the
Council’s then Director of Housing and Property Services would be appointed
as one of the Council’s representatives on the Board of the Park Lane
Developments (Renfrewshire) LLP. At the Council’s meeting of 28 February
2013 it was agreed that Fraser Carlin, the Council’s then Head of Planning &
Development would be appointed as another representative on the same
Board. Given that Mary Crearie and Fraser Carlin have both left their
employment with the Council, it is appropriate that the Council appoint two
new representatives on the Board. It is proposed that Gordon McNeil, Director
of Environment, Housing and Infrastructure and Louise Feely, Head of
Housing Services, be appointed as the required replacements on the Board.
3.2 The Labour Group has intimated that it wishes to replace Councillor
Montgomery on the Audit, Risk and Scrutiny Board with Councillor Smith and
replace Councillor Smith on the Infrastructure, Land and Environment Policy
Board with Councillor Montgomery.
3.3 Councillor Montgomery is currently the Depute Convener of the Audit, Risk
and Scrutiny Board. The Labour Group has proposed that Councillor
McDonald be appointed as the new Depute Convener of that Board.
3.4 SNP Group has intimated that it wishes Councillor MacFarlane to replace
Councillor Campbell as the Children and Young People’s Champion. 
4. Amendment to Scheme of Delegated Functions 
4.1 At the Council’s meeting of 28 April 2022, the Council agreed a new
delegation to the Director of Environment, Housing & Infrastructure to
determine, in written consultation with the Heads of Corporate Governance
and Facilities & Property Services, the Provost and political group leaders,
which major events deserving of recognition in respect of which flags are to
be flown from Council buildings. 
Page 190 of 192

Page 197

4.2 The first request to exercise this delegation was received by the Council
recently. In considering the said request it was noted that the delegation did
not involve any consultation with any of the independent Members.
Accordingly, it is now proposed that the delegation be amended to include
such a reference as follows:
“To determine, in written consultation with the Heads of Corporate
Governance and Facilities & Property Services, the Provost, political group
leaders and independent Members, which major events are deserving of
recognition in respect of which flags are to be flown from Council buildings.” 
4.3 In reviewing this delegation, it was also noted that there is currently no
delegation to determine any requests in respect of the lighting up of Council
buildings and property. It is therefore proposed that Section 5D of the Scheme
of Delegations be amended to include a new delegation to the Director of
Environment, Housing & Infrastructure as follows:
“5. To determine, in written consultation with the Heads of Corporate
Governance and Facilities & Property Services, the Provost, political group
leaders and independent Members, which major events are deserving of
recognition by way of the lighting up of Council buildings and property.”
And that the remaining paragraphs are renumbered accordingly.   
Implications of the Report 
1. Financial – none 
2. HR & Organisational Development – none 
3. Community/Council Planning – none 
4. Legal – none 
5. Property/Assets – none 
6. Information Technology – none 
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement
of individuals’ human rights have been identified arising from the
recommendations contained in the report as it deals with Member
appointments to Boards. 
If required following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the results of
the assessment will be published on the Council’s website. (Report author to
arrange this). 
Page 191 of 192

Page 198

8. Health & Safety – none 
9. Procurement – none 
10. Risk – none 
11. Privacy Impact – none 
12. CoSLA Policy Position – none 
13. Climate change - none 
List of Background Papers 
None 
Author: Mark Conaghan
Head of Corporate Governance
0300 300 0287
mark.conaghan@renfrewshire.gov.uk