Page 1

1 
___________________________________________________________________
To: Council
On: 23 October 2025
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Azets Report to those charged with governance - Renfrewshire Council 
Group Annual Accounts 2024/25
___________________________________________________________________
1. Summary
1.1 Each year the Council’s appointed external auditors carry out an audit of
the Council’s financial statements and provide an opinion as to whether
those statements provide a true and fair view of the financial position of the
Council, and its income and expenditure for the year; and also whether they
have been prepared in accordance with the Local Government (Scotland)
Act 1973. 
1.2 In accordance with International Auditing Standards (ISA260), the external
auditor, Azets, is obliged to report to those charged with the governance of
the organisation matters which have arisen in the course of the audit. 
1.3 The attached ISA260 report from Azets outlines their findings from the audit
of the 2024/25 the Renfrewshire Council Group accounts. 
1.4 Under the Local Authority Accounts (Scotland) Regulations 2014, the
Council must meet to consider the Annual Accounts and aim to approve
those accounts for signature no later than 30 September. 
1.5 Azets officers will attend the Council meeting to present their reports.
1.6 There were five material audit adjustments made to the annual accounts
over the course of the audit. The figures and details are listed on page 6 of
the Annual Audit Report, and can be explained as follows:
• Group pension asset restatement – the accounting requirement to cap
pension assets applied to the Council’s accounts had not been applied to

Page 2

2 
one of the entities consolidated into the Group Accounts, and this
affected both 2024/25 and 2023/24 figures;
• Unfunded pension liabilities restatement – this followed a review by the
Finance team of all unfunded pension benefits where the Council was
the employer;
• Holiday pay creditor restatement – the figure was uplifted by the increase
in NI that came into effect on 1 April 2025;
• Right Of Use assets restatement – the Clyde Valley Waste contract
model had not been updated for the impact of IFRS16 by the lead
authority in time for the publication of the Unaudited Accounts. 
1.7 Other minor and presentational changes were also agreed, along with the
disclosure changes outlined on page 78 of the Annual Audit Report.
1.8 One of these relates to a reclassification of assets from Council to the
relevant Common Good Funds. Members may recall that six assets are
listed on the published Register of Common Good Property as ‘Under
Investigation’. A legal opinion (King’s Counsel) has now been received and
the advice suggests that five assets should be classified under the
Common Good, as follows:
Property Common Good Fund
Ferguslie Gardens  Paisley
Dunn Square Paisley
Fountain Gardens Paisley
Brodie Park (including Braids Road Play Park) Paisley
Robertson Park  Renfrew 
1.9 Officers must now establish the property, financial and legal implications
arising from this change, with a report back to Members at a future meeting. 
_________________________________________________________________________________
2. Recommendations
2.1 Members are requested to consider the attached report from Azets.
___________________________________________________________________
Implications of the Report
1. Financial
The 2024/25 Annual Accounts demonstrate that the Council continues to
operate services within the resources available, and in line with the relevant
legislation.

Page 3

3 
2. HR & Organisational Development 
There are no direct implications arising from the recommendations in this
report.
3. Community/Council Planning 
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital
spend ensures that its facilities are fit
for purpose and safe for the
community, to maximise accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe
Council Plan
Reshaping our place, our
economy and our future
The Council’s revenue and capital
spend ensures that its facilities are fit
for purpose and safe for the
community, to maximise accessibility.
Building strong, safe and resilient
communities
Tackling inequality, ensuring
opportunities for all
Creating a sustainable
Renfrewshire for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good
financial management so that the
Council has resources now and in the
future for continued service delivery.
Working together to improve
outcomes 
4. Legal 
An audit opinion free from qualification demonstrates the Council’s
compliance with the statutory accounting requirements set out in the Local
Government (Scotland) Act 1973 and the Local Government in Scotland Act
2003.
5. Property/Assets
The property / asset implications of the Common Good opinion will be
established and reported back to a future Council meeting.
6. Information Technology 
There are no direct implications arising from the recommendations in this
report.
7. Equality & Human Rights 
There are no direct implications arising from the recommendations in this
report.
8. Health & Safety
There are no direct implications arising from the recommendations in this
report.

Page 4

4 
9. Procurement 
There are no direct implications arising from the recommendations in this
report.
10. Risk 
There are no direct implications arising from the recommendations in this
report.
11. Privacy Impact 
There are no direct implications arising from the recommendations in this
report.
12. Cosla Policy Position 
There are no direct implications arising from the recommendations in this
report.
13. Children’s Rights
There are no direct implications arising from the recommendations in this
report.
14. Climate Change
There are no direct implications arising from the recommendations in this
report.
___________________________________________________________________ 
Author: Christine McCourt, Head of Finance and Procurement
christine.mccourt@renfrewshire.gov.uk

Page 5

OFFICIAL 
Renfrewshire Council
2024/25 Annual Audit Report to the
Council and the Controller of Audit 
October 2025

Page 6

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
2
Table of Contents
Key messages 3
Introduction 14
Annual accounts audit 16
Wider Scope 41
Best Value 62
Appendices 66

Page 7

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
3
Key messages
This report concludes our audit of Renfrewshire Council (the
“Council”) for the year ended 31 March 2025. This section
summarises the key findings and conclusions from our audit.
Financial statements audit 
Under International Standards on Auditing (UK) and the Code of Audit Practice on
Local Authority Accounting in the United Kingdom 2024/25, we are required to report
whether, in our opinion:
• The financial statements give a true and fair view of the Council’s financial
position and income and expenditure for the period; and
• The Council’s financial statements have been properly prepared in accordance
with the Code of Practice on Local Authority Accounting in the UK 2024/25 (the
2024/25 Code), the requirements of the Local Government (Scotland) Act 1973,
The Local Authority Accounts (Scotland) Regulations 2014, and the Local
Government in Scotland Act 2003;. 
• The audited parts of the Remuneration Report have been properly prepared in
accordance with The Local Authority Accounts (Scotland) Regulations 2014;
• The information given in the Management Commentary is consistent with the
financial statements and that report has been prepared in accordance with
statutory guidance issued under the Local Government in Scotland Act 2003; and 
• The information given in the Annual Governance Statement is consistent with the
financial statements and that report has been prepared in accordance with the
Delivering Good Governance in Local Government: Framework (2016).

Page 8

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
4
Audit
opinion
The annual accounts are to be considered and approved by the full
Council on 23 October 2025.
We intend to report unqualified opinions within our independent
auditor’s report.
Our audit work is ongoing but there are currently no matters which
would require modification of our audit report, subject to the
outstanding matters detailed below: 
• Resolution of enquiries with management relating to: 
o Receipt of supporting evidence of contracts for payroll
samples 
• Completion of outstanding testing where evidence was
received during the drafting of this report: 
o Review of management responses in relation to audit
queries for Common good fund (Paisley & Renfrew)
o Review of accounting treatment for asset revaluation
movements
o Review of sample evidence relating to internal
recharges
o Receipt of pension fund assurance letter from
Strathclyde Pension Fund for Renfrewshire
Leisure Limited 
o Review of elimination of intercompany balances
and transactions for group accounts consolidation 
• At the completion stages of the audit, we are required to
undertake the following procedures: 
o Engagement manager and engagement lead review
of the file and evidence therein
o Receipt and review of the management
representation letter
o Review of the final amended statement of accounts
and annual report
o Response from management regarding subsequent
events up to the date of the opinion

Page 9

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
5
Audit
approach
Our audit approach has been based on gaining a thorough
understanding of the Council’s control environment and is risk
based. This included:
• an evaluation of the Council’s internal control environment,
including the IT systems and controls; and
• substantive testing on significant transactions and material
account balances, including the procedures outlined in this
report in relation to our key audit risks.
On receipt of the unaudited accounts we have amended our audit
approach as follows:
• to rebut the significant risk of fraud in non-pay expenditure
due to the fact that there is little incentive to manipulate
expenditure recognition and opportunities to manipulate
expenditure recognition are limited; 
• to increase risk of pay expenditure from low to medium as
we identified a control deficiency whereby no year-end
reconciliation was undertaken between the ledger and
payroll system for all payrolls, the control weakness
identified in the prior year remains open for the 2024/25
financial year.
Key audit
findings
The Council has administrative processes in place to prepare the
annual accounts and supporting working papers. We received the
working papers to support the annual accounts in a timely manner.  
Subject to the completion of outstanding work noted above, we
obtained adequate evidence in relation to the significant audit risks
identified in our audit plan.
Subject to the outstanding matters outlined on page 4-5 of this
report. The accounting policies used to prepare the financial
statements are considered appropriate. We are satisfied with the
appropriateness of the accounting estimates and judgements used
in the preparation of the financial statements. All material
disclosures required by relevant legislation and applicable
accounting standards have been made appropriately.

Page 10

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
6
Audit
adjustments
Five audit adjustments have been identified and made through the
course of the audit.  These were:
• Restatement of 2023/24 group figure due to overstatement
of pension asset of £31.788m and understatement of
unfunded pension liability of £0.501m; 
• Overstatement of the group’s pension asset of £41.941m
and understatement of unfunded pension liability of
£0.440m;
• Understatement of the Council’s unfunded pension liabilities
of £0.158m;
• Understatement of the holiday pay accrual of £0.425m;
• Understatement of Right Of Use assets of £0.544m, lease
liabilities of £0.815m, and CIES of £0.271m due to updated
waste disposal service concession model.
No unadjusted misstatements were identified within the financial
statements.
We also identified some disclosure and presentational adjustments
during our audit, which have been reflected in the final set of
financial statements.
Details of the adjusted misstatements and disclosure changes are
included at Appendix 2.
Accounting
systems
and internal
controls
We have applied a risk-based methodology to the audit. This
approach requires us to document, evaluate and assess the
Council’s processes and internal controls relating to the financial
reporting process. 
Our audit is not designed to test all internal controls or identify all
areas of control weakness. However, where, as part of our testing,
we identify any control weaknesses, we include these in this report.
We consider the control environment within the Council and the
Group to be satisfactory. 
One control weakness or deficiency was noted regarding no year-
end reconciliation in place between the ledger and payroll systems
to ensure that the figures in the financial statements reconcile to
the payroll system. We report this at Appendix 3.

Page 11

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
7
Wider scope audit 
Wider scope themes
Financial Management
Financial management
is concerned with
financial capacity, sound
budgetary processes
and whether the control
environment and
internal controls are
operating effectively.
Auditor judgement
No major weaknesses in arrangements but
scope for improvement exists 
Like all local authorities, financial management continues
to remain challenging in the current funding and post-
pandemic environment. 
The Council reported a small General Fund overspend of
approximately £0.1m for the year ending 31 March 2025,
driven primarily by inflationary pressures and increased
costs in various services, particularly within Environment,
Housing and Infrastructure services. The Council's
revised budget was £536.1m, with actual spend reaching
£536.2m. To manage the overspend, the Council applied
reserves from its Financial Sustainability Fund. 
Capital spending was within approved limits, however the
Council delivered £119.7m or c.63% of its initially
budgeted spend.  This is attributed to inflation and
contractor availability which affected the cost of projects
and progress in delivering planned projects. We
recommend that the capital budget setting process be
revisited to ensure future estimates better reflect
prevailing market conditions and delivery capacity.
Thistle Primary School (formerly Dargavel) new build, and
Park Mains High School extension were reported on
budget and on track to be completed in summer 2027. 
The Housing Revenue Account reported a break even
position and increased its reserves to £6.9m. Council tax
collection increased slightly from 94.3% to 94.5% and only
slightly below target of 95.0%. 
The Council maintains one of the lowest ratios of debt to
revenue spend amongst local authorities in Scotland. This
stood at 2.9% at the year end.

Page 12

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
8
The Council has adequate financial monitoring
arrangements in place and our audit has not identified any
significant weaknesses in financial controls. We do
however note that the capital planning process could be
improved. 
Financial
Sustainability
Financial sustainability
looks forward to the
medium and longer term
to consider whether the
Council is planning
effectively to continue to
deliver its services and
the way in which they
should be delivered.
Auditor judgement
Significant unmitigated risks affect
achievement of corporate objectives 
The Council approved its 2025/26 revenue budget at its
meeting in February 2025 together with 9.5% increase to
council tax and 5% increases to services fees and
charges.
Medium term financial sustainability remains challenging
as the Council is estimating a budget deficit of £49m for
the forecast period from 2025/26 and 2030/31 prior to any
decisions on council tax. If the council tax increases
between 5 and 6.5% are approved within this period the
gap reduces to £41m. Again, subject to Council approval
half of it would be covered by savings and half by utilising
financial sustainability reserve.
The Council has reported cost savings of c£190 m since
2011 and further savings will be increasingly difficult to
generated at this scale. The Council must now make
difficult decisions on spending priorities if it is to remain
financially sustainable. The application of reserves does
not provide a long term financially sustainable solution to
the Council’s current budget position and the Council is
developing savings options for members approval to be
considered.
The Council has an ambitious £580m capital programme
in place over the next five years for both housing and non-
housing programmes. Since the pandemic, a number of
factors have impacted the Council’s ability to fully deliver
its capital programme within the originally planned
timescales, including: the complexity of the works, the
cost of materials, supply chain issues and availability of
contractors. Given the scale of the Council’s ongoing

Page 13

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
9
capital programme delivery of this programme is likely to
remain a continuing area of challenge.
We note the detail of the Financial Outlook and Medium-
Term Financial Plan improved during the year, with more
detailed assumptions presented, together with proposed
savings and more detail discussing potential remediate
actions. 
Vision, Leadership
and Governance 
Vision, Leadership and
Governance is
concerned with the
effectiveness of scrutiny
and governance
arrangements,
leadership and decision
making, and transparent
reporting of financial
and performance
information.
Auditor judgement
Effective and appropriate arrangements are in
place 
The Council has a Corporate Plan which articulates the
Council’s vision, priorities and strategic objectives. The
Plan has five main strategic outcomes: Place, Economy,
Fair, Green and Living our values. 
The Council has taken a number of steps to improve its
governance and scrutiny arrangements over the year. It
has completed a self-assessment against CIPFA
guidance for local authority audit committees,
benchmarked its governance against practice in other
councils, established a cross-party working group to
review governance and scrutiny arrangements and
undertaken a review of risk management arrangements. 
The Council is undertaking a focused Leadership
Development Programme aimed at senior management
team.
The Council has appropriate risk management
arrangements in place.

Page 14

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
10
Use of Resources to
Improve Outcomes
Audited bodies need to
make best use of their
resources to meet
stated outcomes and
improvement objectives,
through effective
planning and working
with strategic partners
and communities. This
includes demonstrating
economy, efficiency,
and effectiveness
through the use of
financial and other
resources and reporting
performance against
outcomes.
Auditor judgement
No major weaknesses in arrangements but
scope for improvement exists 
Like all local authorities, the Council has been impacted
by a high inflation economy and a challenging local
government funding settlement which presents challenges
for financial and service sustainability.
The Council has generally good arrangements for
performance management and operates a layered
performance management framework aligned to its
strategic objectives. Performance reports are presented to
policy boards and published on the Council’s website
using a wide range of user friendly and easy to follow
presentations, dashboards and narrative. 
Out of the 21 Council Plan indicators with targets, 5
exceeded the target, 3 narrowly missed the target and
seven were behind the target. 
Compared to other councils Renfrewshire Council
achieves strong performance in homeless duty, delayed
discharges and conditions of its roads. Some
improvements are required in sickness absence levels
and customer satisfaction.

Page 15

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
11
Best Value 
Appointed auditors have a duty to be satisfied that local government bodies have
made proper arrangements to secure Best Value. 
Best Value report
The Controller of Audit prepared a Best Value report for Renfrewshire Council and
was considered by the Accounts Commission on 15 May 2025. Following this, the
Accounts Commission published their findings on 5 June 2025 and the report was
presented to the Council on 26 June 2025.  
The key messages were that: Renfrewshire Council has a strong commitment to
improving, including creating a positive culture, supporting its staff to develop as
leaders, and focusing on engaging with residents. It must now talk to them about
tough spending decisions that lie ahead.
More detailed summary is included in the body of this report.
Transformation Thematic review
We have considered the effectiveness of council transformation planning and
programme in accordance with the national thematic review programme set out by
Audit Scotland. Our key findings and conclusions are reported in a separate report to
the Council and summarised below.
Transformation: how
councils are
redesigning and
delivering more
efficient services to
achieve planned
outcomes 
Auditor judgement 
We have concluded that the Council has appropriate transformation plans in place
and is well-placed to deliver complex transformation and change programmes,
having successfully delivered a range of transformation programmes over the past
15 years and related savings of c.£190m. 
The governance arrangements to monitor and scrutinise the transformation
programmes are in place, supported by clear structures at Board and management
level. The links exist between the Council’s corporate objectives and the
transformation plans, however these could be presented more clearly to improve
clarity and to help measure the impact.
We noted the Council works effectively with partners, including other councils, third
and private sector to achieve its transformation objectives. The Council also engages
with vulnerable groups and considers impact of service delivery changes and
improvements that could be made to support those communities. The Council is

Page 16

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
12
meeting requirements of working with partners to develop a clear approach to
tackling digital exclusion. 
We recommended that monitoring arrangements should be supported by further
clarity in reporting to Leadership Board on timelines, costs, benefits and
measurement methods to support achieving the transformation objectives.

Page 17

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
13 
Definition
We use the following gradings to provide an overall assessment of the arrangements
in place as they relate to the wider scope and best vale areas. The text provides a
guide to the key criteria we use in the assessment, although not all of the criteria
may exist in every case. 
There is a fundamental absence or failure of arrangements
There is no evidence to support necessary improvement
Substantial unmitigated risks affect achievement of corporate
objectives.
Arrangements are inadequate or ineffective
Pace and depth of improvement is slow / needs to be
extended further
Significant unmitigated risks affect achievement of
corporate objectives
No major weaknesses in arrangements but scope for
improvement exists
Pace and depth of improvement are adequate
Risks exist to the achievement of operational objectives
Effective and appropriate arrangements are in place
Pace and depth of improvement are effective
Risks to the achievement of objectives are managed

Page 18

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
14
Introduction
Scope of audit
The annual external audit comprises the audit of the financial statements and the
wider-scope and Best Value audit responsibilities set out in the Code of Audit
Practice. Code of Audit Practice 2021 | Audit Scotland
We outlined the scope of our audit in our External Audit Plan, which we presented to
the Audit, Risk and Scrutiny Board at the outset of our audit. 
Responsibilities
The Council is responsible for preparing its annual accounts, including financial
statements which show a true and fair view, and for implementing appropriate
internal control systems. The weaknesses or risks identified in this report are only
those that have come to our attention during our normal audit work and may not be
all that exist. Communication in this report of matters arising from the audit or of risks
or weaknesses does not absolve management from its responsibility to address the
issues raised and to maintain an adequate system of control.
We do not accept any responsibility for any loss occasioned to any third party acting,
or refraining from acting on, the basis of the content of this report, as this report was
not prepared for, nor intended for, any other purpose.
We would like to thank all management and staff for their co-operation and
assistance during our audit.
Auditor independence
International Standards on Auditing in the UK (ISAs (UK)) require us to communicate
on a timely basis all facts and matters that may have a bearing on our
independence.
We confirm that we complied with the Financial Reporting Council’s (FRC) Ethical
Standard. In our professional judgement, we remained independent, and our
objectivity has not been compromised in any way.
We set out in Appendix 1 our assessment and confirmation of independence. 
Adding value
All of our clients quite rightly demand of us a positive contribution to meeting their
ever-changing business needs. We add value by being constructive and forward
looking, by identifying areas of improvement and by recommending and encouraging

Page 19

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
15
good practice. In this way we aim to promote improved standards of governance,
better management and decision making and more effective use of public money.
Any comments you may have on the service we provide would be greatly
appreciated. Comments can be reported directly to any member of your audit team.
Openness and transparency
This report will be published on Audit Scotland’s website www.audit-scotland.gov.uk.

Page 20

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
16
Annual accounts audit
The Council’s annual accounts are the principal means of
accounting for the stewardship of its resources and its
performance in the use of those resources. 
Our audit opinion
Opinion Basis for opinion Conclusions
Financial
statements
We conduct our audit in
accordance with applicable
law and International
Standards on Auditing.
Our findings / conclusions
to inform our opinion are
set out in this section of
our annual report.
The draft financial statements.
management commentary,
remuneration report and
corporate governance statement
were considered by the Council
and approved on 26 June 2025. 
Subject to the outstanding
matters outlined on page 4-5 of
this report, we anticipate issuing
unqualified audit opinions.
Pending completion of the work
set out earlier in this report there
are currently no matters which
would require modification of our
audit report.

Page 21

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
17
Opinion Basis for opinion Conclusions
Going concern
basis of
accounting
When assessing whether
the going concern basis of
accounting is appropriate,
the anticipated provision of
services is more relevant
to the assessment than the
continued existence of a
particular public body.
We assess whether there
are plans to discontinue or
privatise the Council’s
functions.
Our wider scope audit
work considers the
financial sustainability of
the Council.
Our understanding of the
legislative framework and
activities undertaken provides us
with sufficient assurance that the
Council and Group will have
continued provision of service for
at least 12 months from the
signing date. Our audit opinion is
therefore unqualified in this
respect.
Opinions
prescribed by the
Accounts
Commission:
Management
Commentary
Annual
Governance
Statement
Audited parts of
the
Remuneration
Report 
We plan and perform audit
procedures to gain
assurance that the
management commentary,
annual governance
statement and the audited
part of the remuneration
report are prepared in
accordance with:
statutory guidance issued
under the Local
Government in Scotland
Act 2003 (management
Commentary); 
the Delivering Good
Governance in Local
Government: Framework
(corporate governance
statement); and 
the Local Authority
Accounts (Scotland)
We have concluded that:
• the information given in the
management commentary is
consistent with the financial
statements and has been
prepared in accordance with
relevant statutory guidance;
• the information given in the
annual governance statement
is consistent with the financial
statements and has been
prepared in accordance with
relevant statutory guidance;
• the audited part of the
Remuneration Report has
been properly prepared in
accordance with The Local
Authority Accounts (Scotland)
Regulations 2014.

Page 22

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
18
Opinion Basis for opinion Conclusions
Regulations 2014
(remuneration report)
Matters reported
by exception
We are required to report
on whether:
• adequate accounting
records have not been
kept; or
• the financial statements
and the audited part of
the remuneration report
are not in agreement
with the accounting
records; or
• we have not received
all the information and
explanations we require
for our audit.
We have no matters to report. 
An overview of the scope of our audit
The scope of our audit was detailed in our External Audit Plan, which was presented
to the Audit, Risk and Scrutiny Board in March 2025. The Plan explained that we
follow a risk-based approach to our audit that reflects our overall assessment of the
relevant risks that apply to the Council. This ensures that our audit focuses on the
areas of highest risk (the significant risk areas). Planning is a continuous process,
and our audit plan is subject to review during the course of the audit to take account
of developments that arise.
We carried out a further review of our risk assessment following receipt of the
unaudited annual report and accounts. Our risk assessment was then updated as
follows:
• to rebut the significant risk of fraud in non-pay expenditure due to the fact that
there is little incentive to manipulate expenditure recognition and
opportunities to manipulate expenditure recognition are limited; 
• to increase risk of pay expenditure to medium as we identified a control
deficiency whereby no full year end reconciliation was undertaken between
the ledger and all payroll systems, the control weakness identified in the prior
year remains open for the 2024/25 financial year.

Page 23

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
19
In our audit, we test and examine information using sampling and other audit
techniques, to the extent we consider necessary to provide a reasonable basis for us
to draw conclusions. This includes:
• An evaluation of the Council’s internal control environment, including the IT
systems and controls; and
• Substantive testing on significant transactions and material account balances,
including procedures outlined in this report in relation to our key audit risks.
Quality indicators
We have applied a suite of quality indicators to assess the reliability of the Council’s
financial reporting and response to the audit.  
Metric Grading (Mature /
developing /
significant
improvement
required) 
Commentary 
Quality and timeliness of
draft financial
statements
Mature We received the unaudited
financial statements of a good
standard in line with our audit
timetable.
The unaudited financial
statements were delivered on
time with minor accuracy of
casting and cross-references.
We have identified minor
presentational issues that
management have agreed to
update.
Quality of working
papers provided and
adherence to timetable
Developing We received the majority of the
working papers of an adequate
standard in line with our audit
timetable. A smaller portion of
the working papers, however,
were provided after the agreed
deadline. 
The audit was able to start on
time as planned. However, some
of the key working papers were
difficult to follow, requiring
additional clarification and follow

Page 24

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
20
Metric Grading (Mature /
developing /
significant
improvement
required) 
Commentary 
up, which caused a slight delay
in the completion of the audit. 
In addition, responses to audit
follow-up requests and inquiries
were slower than agreed. 
Details of the recommendation is
included at Appendix 3.
Timing and quality of
key accounting
judgements
Mature Pending completion of our work
as set out on page 4-5, we did
not identify any issues with the
timing and quality of key
accounting judgements.
Access to finance team
and other key personnel
Mature/Developing We received full access to the
finance team and other key
personnel. Majority of audit
queries and requests were
responded to in a timely manner.
The Finance team and other key
personnel were available as
agreed. A meeting with
management’s experts (actuary
and valuer) were arranged in
advance and their engagement
was helpful to the audit.
However, some key personnel
outside of the Finance team were
not always able to promptly
respond to requests and
inquiries. 
Quality and timeliness of
the
Mature Pending completion of our work
as set out on page 4-5, we have
concluded that:

Page 25

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
21
Metric Grading (Mature /
developing /
significant
improvement
required) 
Commentary 
• audited parts of the
Remuneration
Report
• Management
Commentary
• Annual Governance
Statement
As well as the quality
and timeliness of
supporting working
papers for those
statements.
We did not identify any issues
with quality and timeliness of the
audited part of the Remuneration
Report, Management
Commentary and Annual
Governance Statement.
Volume and magnitude
of identified errors
Mature/Developing We identified five audit
adjustments and no unadjusted
misstatements in year.   
Significant risk areas and key audit matters
Significant risks are defined by auditing standards as risks that, in the judgement of
the auditor, require special audit consideration. In identifying risks, we consider the
nature of the risk, the potential magnitude of misstatement, and its likelihood.
Significant risks are those risks that have a higher risk of material misstatement.
Audit procedures were designed to mitigate these risks.
As required by the Code of Audit Practice and the planning guidance issued by Audit
Scotland, we consider the significant risks for the audit that had the greatest effect
on our audit strategy, the allocation of resources in the audit and directing the efforts
of the audit team (the ‘Key Audit Matters’), as detailed in the tables below. 
Our audit procedures relating to these matters were designed in the context of our
audit of the annual accounts as a whole, and not to express an opinion on individual
accounts or disclosures.
Our opinion on the annual accounts is not modified with respect to any of the risks
described below.
The table below summarises each significant risk.  Detail behind each risk and the
work undertaken is set out on the following pages.

Page 26

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
22
Council and the Group’s significant risks at the financial
statement level
These risks are considered to have a pervasive impact on the financial statements
as a whole and potentially affect many assertions for classes of transaction, account
balances and disclosures.
Risk area Management override of controls (the Council and the
Group)
Significant risk
description
Management is in a unique position to perpetrate fraud
because of their ability to manipulate accounting records
and prepare fraudulent financial statements by overriding
controls that otherwise appear to be operating effectively.
Although the level of risk of management override of
controls will vary from entity to entity, the risk is
nevertheless present in all entities. Due to the
unpredictable way in which such override could occur,
there is a significant risk of material misstatement due to
fraud in relation to estimates & significant judgements,
manual journals and one-off transactions outside the
ordinary course of the business. 
Risk of material misstatement: Very High 
How the scope of
our audit responded
to the significant
risk
Key judgement
There is the potential for management to use their
judgement to influence the financial statements as well as
the potential to override controls for specific transactions. 
Audit procedures
• Documented our understanding of the journals
posting process and evaluated the design
effectiveness of management controls over
journals.
• Analysed the journals listing and determining
criteria for selecting high risk and / or unusual
journals.
• Tested high risk and / or unusual journals posted
during the year and after the unaudited annual
accounts stage back to supporting documentation

Page 27

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
23
Risk area Management override of controls (the Council and the
Group)
for appropriateness, corroboration and to ensure
approval has been undertaken in line with the
Council’s journals policy.
• Gained an understanding of the accounting
estimates and critical judgements made by
management.  We challenged assumptions and
considered the reasonableness and indicators of
bias which could result in material misstatement
due to fraud.
• Evaluated the rationale for any changes in
accounting policies estimate or significant unusual
transactions.
Key observations
We did not identify any material indication of management
override of controls from our audit work. We did not
identify any material areas of bias in key judgements made
by management. Key judgements were consistent with
prior years. 
We identified that large batch journals with over 50 lines
require no system approval. We have therefore raised a
control recommendation relation to the authorisation and
review process of large journals. 
In addition, one payroll transaction from three payroll
transactions selected for testing was prepared and
authorised by the same individual. This payroll transaction
was for net pay of £8.8m. While this represents a
segregation of duties deficiency, our review did not identify
any fraudulent or unusual transactions as a result of this
control deficiency.
We have therefore raised a control recommendation
relation to secondary review to segregate the duties of
those preparing and authorising such transactions. Details
of the recommendations are outlined at Appendix 3.
These control findings did not lead to a material error in
our substantive testing of journals.

Page 28

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
24 
Council and the Group’s significant risks at the assertion level
for classes of transaction, account balances and disclosures 
Risk area Fraud in revenue recognition - Rebutted (The Council
and the Group) 
Significant risk
description
Material misstatement due to fraudulent financial reporting
relating to revenue recognition is a presumed risk in ISA
240 (The Auditor's Responsibilities Relating to Fraud in an
Audit of Financial Statements).  
The presumption is that the Council could adopt
accounting policies or recognise income in such a way as
to lead to a material misstatement in the reported financial
position. 
Given the financial pressures facing the public sector as a
whole, there is an inherent fraud risk associated with the
recording of income around the year end. 
However, we do not deem this risk to be present in all
revenue streams of the Council due to a lack of incentive
and opportunity to manipulate transactions. 
How the scope of
our audit responded
to the significant
risk
Key judgement
We have rebutted this risk as we have assessed there is
low incentive or opportunity to manipulate revenue
streams of the Council and Group.
We have performed standard audit procedures on these
material transactions and balances.
Key observations We have not identified any material issues in relation to
this risk. 
Risk area Fraud in non-pay expenditure – Rebutted (The Council
and the Group) 
Significant risk
description
We have also considered Practice Note 10, which
comments that for certain public bodies, the risk of

Page 29

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
25
Risk area Fraud in non-pay expenditure – Rebutted (The Council
and the Group) 
manipulating expenditure could exceed the risk of the
manipulation of revenue. We have therefore also
considered the risk of fraud in expenditure at the Council.
Practice Note 10: audit of Financial Statements of Public
Sector Bodies in the United Kingdom (PN10) states: “As
most public bodies are net spending bodies, then the risk
of material misstatement due to fraud related to
expenditure may be greater than the risk of material
misstatements due to fraud related to revenue
recognition".
How the scope of
our audit responded
to the significant
risk
Key judgement
Having considered the risk factors set out in ISA 240 and
the nature of the expenditure streams at the Council, we
have determined that the risk of fraud arising from
expenditure recognition can be rebutted, because:
• There is little incentive to manipulate expenditure
recognition; and
• Opportunities to manipulate expenditure recognition
are very limited.
We have performed standard audit procedures on these
material transactions and balances.
Key observations
At the planning stage of our audit we concluded that the
risk of fraud in expenditure recognition was present over
all non-pay expenditure streams. Upon receipt of the final
annual report and accounts we were able to rebut the risk
over expenditure
We have not identified any material issues in relation to
this risk.

Page 30

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
26
Key risk area Valuation of land and buildings and council dwellings
-key accounting estimate (The Council and the Group)
Significant risk
description
The Council held council dwellings with a net book value
of £800.387 m and land and buildings with a net book
value of £367.096 m at 31 March 2025. The Council
revalues land and buildings and council dwellings on a
five-year rolling basis. 
Council dwellings are valued by the internal valuer using
the beacon method which aggregates the vacant
possession value of each unit of housing stock based on
the value of a beacon or sample property. A full
revaluation exercise is completed every five years. In
interim years the values of beacon properties are updated
to reflect key factors including changes in rental prices.
Other land and buildings are held at current value and
revalued as part of the five-year rolling programme. In
addition, indices are applied to all assets held at
Depreciated Replacement Cost (DRC) to reflect market
changes within the year.
There is a significant degree of subjectivity in the
measurement and valuation of land, buildings and council
dwellings. This subjectivity and the material nature of the
Council’s asset base represents an increased risk of
misstatement in the financial statements.
There is a significant degree of subjectivity in the
measurement and valuation of property, plant and
equipment. This subjectivity and the material nature of the
Council’s asset base represents an increased risk of
misstatement in the annual accounts.
We undertook a pinpointing exercise to identify any
specific assets or asset types where the in-year valuation
movement fell outside of pinpointing thresholds. This
resulted in 6 assets being identified at an elevated risk
level for testing, with a further 5 items selected at random
at a low risk level  to obtain assurance over the remainder
of the population.
Inherent risk of material misstatement: Land &
buildings and council dwellings (valuation): High

Page 31

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
27
Key risk area Valuation of land and buildings and council dwellings
-key accounting estimate (The Council and the Group)
How the scope of
our audit responded
to the significant
risk
Key judgements
Councils are required to revalue property, plant and
equipment with sufficient regularity to ensure that the
carrying amount does not differ materially from the current
value at 31 March.
Audit procedures
• Evaluated management processes and
assumptions for the calculation of the estimates,
the instructions issued to their valuation experts
and the scope of their work.
• Evaluated the competence, capabilities and
objectivity of management’s valuation expert.
• Considered the basis on which the valuations were
carried out and challenging the key assumptions 
applied.
• Evaluated the reasonableness of the valuation
movements for assets revalued during the year,
with reference to market data. We considered that
an auditor’s expert was not required in order to
carry out our work.
• For unusual or unexpected valuation movements,
tested the information used by the valuer to ensure
it was complete and consistent with our
understanding.
• Ensured revaluations made during the year were
input correctly into the Council’s fixed asset register
and the accounting treatment within the financial
statements was correct.
• Evaluated the assumptions made by management
for any assets not revalued during the year and
how management are satisfied that these are not
materially different to the current value.

Page 32

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
28
Key risk area Valuation of land and buildings and council dwellings
-key accounting estimate (The Council and the Group)
Key observations
Pending completion of our work as set out on page 4-5:
On the basis of the work carried out as at the date of
writing this report, we have not identified any material
issues in relation to this risk. 
Key risk area Valuation of defined benefit pension asset -key
accounting estimate (The Council and the Group)
Significant risk
description
An actuarial estimate of the net defined pension
liability/asset is calculated on an annual basis under IAS 19
‘Employee Benefits’, and on a triennial funding basis, by an
independent firm of actuaries with specialist knowledge and
experience. The triennial estimates are based on the most
up to date membership data held by the pension fund and a
roll forward approach is used in intervening years, as
permitted by the Code. 
The calculations involve a number of key assumptions,
such as discount rates and inflation and local factors such
as mortality rates and expected pay rises. The estimates
are highly sensitive to changes in these assumptions (and
the calculation of any asset ceiling when determining the
value of a pension asset (where relevant)). ISAs (UK) 500
and 540 require us to undertake audit procedures on the
use of external experts (the actuary) and the methods,
assumptions and source data underlying the estimates.
This represents a key accounting estimate made by
management within the financial statements due to the size
of the values involves, the subjectivity of the measurement
and the sensitive nature of the estimate to changes in key
assumptions. We have therefore identified the valuation of
the net pension liability/asset as a significant risk. 
Inherent risk of material misstatement:
Pensions (valuation): High
How the scope of
our audit
Key judgements
A significant level of estimation is required in order to
determine the valuation of pension assets/liabilities. Small

Page 33

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
29
Key risk area Valuation of defined benefit pension asset -key
accounting estimate (The Council and the Group)
responded to the
significant risk
changes in the key assumptions (including discount rates,
inflation and mortality rates) can have a material impact on
the pension asset/liability. 
Audit procedures
• Evaluated managements processes for the
calculation of the estimate, the instructions issued to
management’s expert (the actuary) and the scope of
their work.
• Evaluated the competence, capabilities and
objectivity of the actuary.
• Assessed the controls in place to ensure that the
data provided to the actuary by the Council and their
pension fund was accurate and complete.
• Evaluated the methods, assumptions and source
data used by the actuary in their valuations, with the
support of an auditors’ expert.
• Evaluated whether any asset ceiling was
appropriately considered (if applicable) when
determining the value of any pension asset included
in the financial statements. 
• Assessed the impact of any significant differences
between the estimated gross asset valuations
included in the financial statements and the
Council’s share of the investment valuations in the
audited pension fund accounts.
• Ensured pension valuation movements for the year
and related disclosures have been correctly
reflected in the financial statements.
Key observations
Pending completion of our work as set out on page 4-5:
We have identified the Council’s adjustment as follows:
• Understatement of the Council’s unfunded pension
liabilities of £0.158m
We have identified material misstatements in relation to the
Group’s consolidated pension asset and liability as follows:

Page 34

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
30
Key risk area Valuation of defined benefit pension asset -key
accounting estimate (The Council and the Group)
• Restatement of group comparative figure due to
overstatement of pension asset of £31.788m and
understatement of unfunded pension liability of
£0.501m; 
• Overstatement of the group’s pension asset of
£41.941m and understatement of unfunded pension
liability of £0.440m; 
These adjustments arise from two technical accounting
requirements under the CIPFA code. 
Asset ceiling: 
OneRen’s (Council’s subsidiary) pension position was
reported as a net defined benefit asset. A net defined
benefit asset can be only recognised to the asset ceiling
cap which is the present value of any economic benefits
available in the form of refunds from the plan or reductions
in future contributions to the plan.
Initially, the pension asset was recognised in full in the
group accounts. Upon auditor’s inquiry and receiving the
actuarial calculation of the OneRen’s asset ceiling the value
of the pension asset was reduced to Nil for 2024/25 and for
the prior year.    
Unfunded pension liability: 
On post-employment benefits, unfunded obligations not
supported by plan assets must be fully recognised as
liabilities in the balance sheet. 
We have also identified disclosure changes as a result of a
revised actuarial report, which the Council commissioned
after reviewing all entity arrangements for unfunded
pension liabilities. 
The adjustments and disclosure changes are included at
Appendix 2. Management has agreed to correct the
misstatements and to make disclosure changes in the final
audited accounts. Pending completion of our work as set
out on page 4-5, there are no material adjustments and
findings identified.

Page 35

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
31
Key risk area Valuation of defined benefit pension asset -key
accounting estimate (The Council and the Group) 
Key risk area IFRS 16 implementation impact on PPP/PFI
arrangements
Significant risk
description
The adoption of IFRS 16 in local government accounts is
mandatory from 2024/25. While the leases in place at the
council are not material the new standard also applies to
service concession arrangements (PFI, PPP, NPD). The
council had over £107.5 m worth of assets financed through
PPP/PFI arrangements at 31 March 2024.
As a result of the implementation of IFRS 16, the
accounting treatment for indexation linked payments in
liabilities for service concession arrangements has
changed. 
Local authorities must remeasure if there is a change in
future lease payments resulting from a change in an index /
rate used to determine those payments and ensure that the
financial statements accurately reflect the impact of the
revised IFRS 16 accounting arrangements.
The implementation of the new requirements is complex
and could have material impact on the council financial
statements and therefore it increases the risk of
misstatement.
The implementation of the new requirements is complex
and could have material impact on the council financial
statements and therefore it increases the risk of
misstatement.
Inherent risk of material misstatement:
PPP liability (valuation): High
How the scope of
our audit
responded to the
significant risk
Key judgements
A high level of estimation is required in order to determine
the valuation of the PPP/PFI liabilities. The incorrect
interpretation and implementation of the new accounting
requirements will materially impact the valuation of PPP
Liabilities.

Page 36

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
32
Key risk area IFRS 16 implementation impact on PPP/PFI
arrangements 
Audit procedures
• Obtained the evidence of management consideration
of impact of IFRS 16 on its service concession
arrangements and assessing work to identify all
relevant contracts.
• Examined management’s work on application of the
new requirements, including indexation changes
impact, liability remeasurement and reflecting
changes in the financial statements in line with
accounting framework requirements. 
• Reviewed the council’s accounting policies for the
year ended 31 March 2025 to reflect the
requirements of the new accounting standard.
• Assessed the adequacy of disclosures regarding
service concession arrangements.
Key observations
Our work in this area has not identified any material errors
in relation to this risk. 
We identified a non-material adjustment as follows:
• Understatement of Right Of Use Asset of £0.544m,
lease liabilities of £0.815m, and CIES of £0.271m
due to update in waste disposal service concession
arrangement model made available to the Council
after publication of the Unaudited Accounts.
The adjustment is included at Appendix 2. 
Group and the Council materiality
Materiality is an expression of the relative significance of a matter in the context of
the financial statements as a whole. A matter is material if its omission or
misstatement would reasonably influence the decisions of an addressee of the
auditor’s report. The assessment of what is material is a matter of professional
judgement and is affected by our assessment of the risk profile the Council and the
needs of users. We review our assessment of materiality throughout the audit.

Page 37

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
33
Whilst our audit procedures are designed to identify misstatements which are
material to our audit opinion, we also report to the Council and management any
uncorrected misstatements of lower value errors to the extent that our audit identifies
these. 
Our initial assessment of materiality for the group financial statements was £17.90m
and the Council’s financial statements was £17.80m. On receipt of the unaudited
financial statements, we reassessed materiality and updated it to £19.60m for the
group financial statements and the Council’s financial statements was £19.50m. 
Based on our updated risk assessment we have determined that no specific
materiality levels needed to be set for this audit.
We consider that our updated assessment has remained appropriate throughout our
audit.

Page 38

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
34 
Group 
£m
Council
£m
Overall materiality for the financial statements 19.600 19.500
Performance materiality 14.700 14.625
Trivial threshold 0.980 0.975
Materiality
Our assessment is made with reference to the Group and
Council’s gross expenditure. We consider this to be the principal
consideration for the users of the annual accounts when
assessing financial performance of the Council and its group. 
Our assessment of materiality equates to approximately 2% of
gross expenditure as disclosed in the 2024/25 unaudited annual
accounts.
We perform audit procedures on all transactions, or groups of
transactions, and balances that exceed our materiality levels set.
We perform a greater level of testing on the areas deemed to be
at significant risk of material misstatement.
Performance
materiality
Performance materiality is the working level of materiality used
throughout the audit. We use performance materiality to
determine the nature, timing and extent of audit procedures
carried out. 
Performance materiality is set at a value less than overall
materiality for the financial statements as a whole to reduce to
an appropriately low level the probability that the aggregate of
the uncorrected and undetected misstatements exceed overall
materiality. 
We have set performance materiality at 75% of overall
materiality.
Trivial
misstatements
Trivial misstatements are matters that are clearly
inconsequential, whether taken individually or in aggregate and
whether judged by any quantitative or qualitative criteria. 
We have set the trivial threshold as 5% of overall materiality.

Page 39

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
35
Common Good Funds materiality 
Our initial assessment of the Paisley Common Good Fund, Johnstone Common
Good Fund, and Renfrew Common Good Fund materiality remained unchanged
from the planning stage.
We consider that our updated assessments have remained appropriate throughout
our audit. 
Overall
materiality 
(£)
Performance
materiality
(£)
Trivial
threshold
(£)
Paisley £191,000 £143,000 £9,600
Johnstone £1,560 £1,170 £100
Renfrew £1,085,000 £814,000 £54,000 
Overall materiality: our assessment is based on approximately 2% of net assets. We
consider this benchmark to be the principal consideration for the users of the
financial statements when assessing the performance of each fund.
Performance materiality: Using our professional judgement we have calculated
performance materiality at approximately 75% of overall materiality.
Trivial threshold: 5% of overall materiality for the financial statements.
Group audit
As Group auditor, under ISA (UK) 600 (Revised September 2022) we are required to
obtain sufficient appropriate audit evidence regarding the financial information of the
components and the consolidation process to express an opinion on whether the
group financial statements are prepared, in all material respects, in accordance with
the applicable financial reporting framework. 
Component Nature and
extent of
further audit
procedures
Level of response required
Renfrewshire Council Full Scope Full scope statutory audit, as
set out in this audit plan.

Page 40

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
36
Renfrewshire Leisure Ltd
(OneRen)
Specific
procedures
Specific procedures in
relation to pension
asset/liability.
Common Good Funds None No procedures planned.
Paisley Museum Reimagined Ltd None No procedures planned.
Park Lane Developments
(Renfrewshire) LLP
None No procedures planned. 
Coats Observatory Trust None No procedures planned. (*)
Strathclyde Partnership for
Transport
Specific
procedures
Specific procedure planned
in relation to investment
value reflected in council’s
accounts.  
Strathclyde Concessionary Travel
Scheme Joint Committee
None No procedures planned.
Renfrewshire Valuation Joint
Board
None No procedures planned. (*)
Renfrewshire Health and Social
Care Integration Joint Board
Specific
procedures
Specific procedures on
investment in associates
and JV.
AMIDS Renfrewshire LLP None No procedures planned. 
(*) We perform separate statutory audits of these accounts which are not related to
the group accounts audit.
Definitions:
Full Scope Design and perform further audit procedures on the entire financial
information of the component, beyond procedures completed to review the
consolidation. 
Specific Scope Design and perform further audit procedures on one or more
classes of transactions, account balances or disclosures, beyond procedures
completed to review the consolidation.

Page 41

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
37
None No further audit procedures required, beyond procedures completed to review
the consolidation.
We revisited our planning group scope assessment, following receipt of the
unaudited accounts and our assessment remained the same. 
As part of our audit, we reviewed the consolidation entries made within the group
accounts, confirmed those entries back to the financial statements of the group
bodies and evaluated any significant adjustments made to align the accounting
policies or the different year end dates. Overall, subject to completion of our work as
set out on page 4-5 we conclude that the results of the group bodies had been
appropriately consolidated into the Council’s audited group accounts.
Group adjustments
We identified adjustments and disclosure changes as a result of: 
• Restatement of group comparative figure due to overstatement of pension
asset of £31.788m and understatement of unfunded pension liability of
£0.501m; 
• Overstatement of the group’s pension asset of £41.941m and understatement
of unfunded pension liability of £0.440m;
These adjustments arise from two technical accounting requirements under the
CIPFA code. 
Asset ceiling: 
OneRen’s pension position was reported as a net defined benefit asset. A net
defined benefit asset can be only recognised to the asset ceiling cap which is the
present value of any economic benefits available in the form of refunds from the plan
or reductions in future contributions to the plan.
Initially, the pension asset was recognised in full in the group accounts. Upon
auditor’s inquiry and receiving the actuarial calculation of the OneRen’s asset ceiling
the value of the pension asset was reduced to Nil for 2024/25 and for the prior year.
Unfunded pension liability: 
On post-employment benefits, unfunded obligations not supported by plan assets
must be fully recognised as liabilities in the balance sheet. 
We have also identified disclosure changes for the Council as a result of a revised
actuarial report, which the Council commissioned after reviewing all entity
arrangements for unfunded pension liabilities. 
We have included the adjustments and disclosure changes at Appendix 2 and
Appendix 3.

Page 42

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
38
Other communications
Other areas of focus
Area of focus Audit findings and conclusion
Significant matters on which there
was disagreement with management
There were no significant matters on which
there was disagreement with
management.
Significant management judgements
which required additional audit work
and / or where there was
disagreement over the judgement
and / or where the judgement is
significant enough that we are
required to report it to those charged
with governance before they consider
their approval of the accounts
There were no other significant
management judgements which required
additional audit work, where there was
disagreement over the judgement or
where the judgement is significant enough
that requires reporting, in addition to those
reflected in this report.
Prior year adjustments identified There was one prior year adjustment
identified.
• Restatement of group comparative
figure due to overstatement of other
pension asset of £31.788m and
understatement of pension liability
of £0.440m
We have included the adjustments and
disclosure changes at Appendix 2 and
Appendix 3.
Concerns identified in the following:
• Consultation by management
with other accountants on
accounting or auditing matters
• Matters significant to the
oversight of the financial
reporting process
• Adjustments / transactions
identified as having been
made to meet an agreed
system position / target
No concerns were identified in relation to
these areas.

Page 43

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
39 
Accounting policies
The accounting policies used in preparing the financial statements are unchanged
from the previous year with the exception of adoption of IFRS16.
Our work included a review of the adequacy of disclosures in the financial
statements and consideration of the appropriateness of the accounting policies
adopted by the Council. 
The accounting policies, which are disclosed in the financial statements, are in line
with the CIPFA LASAAC Code of Audit Practice on Local Authority Accounting in the
UK (the ‘CIPFA Code’) 2024/25 and are considered appropriate.
Presentation and disclosures
There are no significant financial statements disclosures that we consider should be
brought to your attention.  All the disclosures required by relevant legislation and
applicable accounting standards have been made appropriately.
Key judgements and estimates
As part of the planning stages of the audit we identified all accounting estimates
made by management and determined which of those are key to the overall financial
statements.
Consideration was given to asset valuations, impairment, depreciation and
amortisation rates, provisions for legal obligations pension liabilities, and doubtful
debts, IFRS 16 implementation and accruals. Other than asset valuations, IFRS 16
implementation, and pension liabilities we have not determined the accounting
estimates to be significant. See the section above on “Significant risks at the
assertion level for classes of transaction, account balances and disclosures” for
detailed findings in relation to key accounting estimates.
We reviewed the key estimates and judgements that management made in respect
to the identified key accounting estimates for indication of bias and assessed
whether the judgements used by management are reasonable. Overall, we
concluded that those key accounting estimates were balanced and appropriate.
Fraud and suspected fraud
We have previously discussed the risk of fraud with management and the Audit, Risk
and Scrutiny Board. Internal Audit is providing regular updates to the Council on any
internal fraud related investigations. We have not been made aware of any additional
incidents in the period nor have any incidents come to our attention as a result of our
audit testing. 
Our work as auditor is not intended to identify any instances of fraud of a non-
material nature and should not be relied upon for this purpose.

Page 44

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
40
Non-compliance with laws and regulations
As part of our standard audit testing, we have reviewed the laws and regulations
impacting the Council. There are no indications from this work of any significant
incidences of non-compliance or material breaches of laws and regulations.
The Local Authority Accounts (Scotland) Regulations 2014
As part of our audit we reviewed the Council’s compliance with the Local Authority
Accounts (Scotland) Regulations 2014, in particular with respect to regulations 8 to
10  as they relate to the annual accounts. 
Overall, we concluded that appropriate arrangements were in place to comply with
these Regulations. 
Written representations
We requested written representations from management, and these are to be
approved at the same time as the financial statements are approved by the Audit,
Risk and Scrutiny Board, signed by the director of finance and resources, and will be
provided to us before we complete our audit and issue our auditor’s report. 
Related parties
We are not aware of any related party transactions which have not been disclosed.
Confirmations from third parties
We are awaiting receipt of the pension fund assurance letter in relation to OneRen
from the auditor of the Strathclyde Pension Fund.

Page 45

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
41
Wider Scope
Financial management
Our detailed findings on the Council’s financial management arrangements are set
out below. 
Financial performance 
The Council reported a small General Fund underspend of £0.1m at 31 March 2025.
The revised budget is £536.1m while the actual outturn was £536.2m. Additional
spend was incurred due to inflationary pressures during the year offset by additional
income from the higher bank interest rates on investments. 
The Council used its Financial Sustainability Fund (reserves) as planned to cover
shortfalls in the year end position and to achieve break-even and used £4.3 m of the
earmarked reserves of which £2.3 m was for recurring spend and £2 m was for non-
recurring spend. 
The statutory reserves were at £84m at the year end, a net decrease of £6.9m and in
relation to the capital investment programme and school ICT. The unallocated
reserves remained at a level just above £10m as per the council’s policy, however we
note that the levels of expenditure have been increasing over the years resulting in the
unallocated reserve to drop to just below 2% of the total spend. 
Capital spending of £28.1m for housing and £91.6 m for non-housing projects was
managed within the overall expenditure control limits approved by Council. Planned
spend was impacted by inflationary pressures and the availability of contractors. The
2024/25 capital plan has been adjusted accordingly and in effect in both categories of
spend the Council delivered c.63% of the initial planned budgets (£119.7m of £189m). 
In-year council tax collection performance for 2024/25 was 94.5% (94.3% in 2023/24),
and slightly below its target for the year of 95.0%. However, actual Council tax
revenues performed above expectation, returning an over recovery of £0.2m
compared to budget due to more prior year arrears being collected. 
Revenue performance against budget 
Staff costs for the year was £383.1m and is the largest expenditure item in the
accounts representing 38% of total spend. In 2024/25 a national pay settlement of
3.6% was agreed for local government workers and the Scottish Government provided
£2.6m of additional funding to the Council to cover part of this cost. 
The General Fund year end position included £3.8m overspend in Adult Services
(£0.8m overspend in 2023/24) which was mainly due to inflationary cost pressures.

Page 46

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
42
This decreased the reserves of the Renfrewshire Integration Joint Board (IJB)
operating these services and therefore had no impact on the Council’s reserves.
The Miscellaneous services underspend of £2.9m resulted mainly from an over-
recovery of investment interest income, due to interest rates being higher than
anticipated.
The overspend of £2.4m in Environment, Housing and Infrastructure services  is
connected to continued inflationary and cost pressures experienced by the service
over the last few years.
Exhibit 1 Performance against budget
Department Revised budget
£m
Actual
£m
Variance
£m
Chief Executive’s
Service
28.3 28.3 -
Children’s Services 256.9 257.7 (0.8)
Environment, Housing
and Infrastructure
68.2 70.7 (2.4)
Finance and
Resources
47.7 47.5 0.2
Miscellaneous
Services
28.1 25.2 2.9
Adult Services 106.8 106.8 -
Total Expenditure 536.1 536.2 (0.1)
Revenue support
grant
338.4 338.4 -
Council tax income  97.5 97.7 0.2
Non domestic rates
income
107.5 107.5 -
Total income and
funding
543.4 543.6 0.2
Net
expenditure/(income)
(7.3) (7.4) 0.1
Source: Renfrewshire council unaudited accounts 2024/25
Housing revenue account (HRA) 
The Housing Revenue Account (HRA) broke even at year-end and its reserves
increased to £6.9m (£6.2m in 2023/24). The remaining reserve level is considered a
prudent amount to mitigate the impact of any unforeseen risks and provide a buffer
against forecast and inflationary pressures. 
Capital expenditure

Page 47

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
43
Non-Housing Capital Budget Performance
In 2024/25, non-housing capital expenditure was £91.6 m against the initial budget of
£147.8m therefore the actual spend represented 62% of the budget, prior to any
rephasing and delays. The Council attributes the underspend was to inflationary
pressures and the availability of contractors.
The Council’s useable capital receipts reserve increased slightly to £8.2m. From this,
£2.8m was utilised to support current year investment, leaving a balance of £5.5m
that has been committed to support the ongoing investment programme in future
years. The expenditure stayed within the Council’s approved limits.
Housing Capital Budget Performance
Housing capital expenditure for 2024/25 was £28.1m against the initial budget of
£41.2m. This represents 69% utilisation of the initial budget. The Council attributes
the underspend was to inflationary pressures and the availability of contractors.
The actual levels of the initial budgets utilisation were below 70% in relation to initial
budgets for both housing and non-housing spend. In January 2025 the Council still
estimated the outturn on non-housing capital budget at  £130m which was
significantly above the actual outturn of £91.6m at 31 March 2025.This suggests that
the Council may benefit from refining its budget preparation approach to support the
development of more accurate and realistic estimates, alongside continued
enhancement of in-year monitoring processes. This in the context of long term
capital planning which assumes an ambitious capital investment of almost £580m
over 5 year period.
Dargavel Primary School and Park Mains High School progress
The schools were subject to a Controller of Audit s102 report and a follow up report
over the last two years and an interim update to the Council in May 2025 on the
Council’s approach to community engagement and culture change. The purpose of
the narrative below is to update on the progress of the schools’ capital projects.
Capital and revenue costs
The gross capital cost of building a new primary school has remained as last
reported and expected to be c.£82 m, with c.£18 m of contribution expected from the
developer, reducing to net capital cost of £64m. The gross cost is allocated as
follows:
• £45 m for new Dargavel Primary School (renamed to Thistle Primary
School)
• £37 m for the Park Mains High School extension.
The Council plans to borrow only for the Park Mains High School extension, and to
fund the build of the new Dargavel Primary School from the investment capital fund
(reserves). This fund has had reserves at £86m and is held by the Council to support

Page 48

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
44
the Council’s capital investment programme and to support the Council manage its
long-term debt position.
We previously reported on net running costs associated with operating the new and
expanded schools and totalling to net of c£1.6 m. When the £1.2m of the additional
borrowing interest cost is added that comes to a total of £2.8m. These costs are
early estimates and will likely start to be impacting the budget when the school is
built and full pupil roll is achieved, which is expected over the next 5-10 years. It is
currently estimated that the Council will require to budget for increased teaching
staffing costs of £0.2-0.3m in 2026/27; increasing incrementally in the following years
(more significantly in 2027/28 when the Thistle Primary School opens) up to the total
additional net cost estimate of £2.8m over a sustained period and into the next
decade. 
Projects progress
Progress on both schools’ projects is reported to the Education and Children’s
Services Policy Board as part of the regular Learning Estate Programme update. 
Thistle Primary School build is at a technical design stage and has the planning
permission granted with an intention of a contract recommendation for the first major
phase of the construction contract to be submitted to the relevant Board in
September 2025. This would allow start of the construction works towards the end of
2025. The project remains on track to complete in summer 2027.
Park Mains High School extension progressed with its design process and the next
steps are to add necessary technical detail to finalise it. The major planning
application has been also submitted with an expectation that the application will be
made to a relevant Board later in the year. The final contractor award is planned for
early 2026. The project remains on track to complete in summer 2027.
Treasury management
The Council actively manages treasury risks to minimise its exposure to financial
market volatility and protect funding for services. It follows CIPFA’s Code of Treasury
Management and has policies covering credit, liquidity, and market risks.
The Council approves a Treasury Management Strategy that outlines how to
manage risks related to financial instruments, including an Investment Strategy that
prioritises security and liquidity over yield, in line with Scottish Government guidance.
The strategy aims to balance risk with returns or costs. The strategy for 2024/25 was
approved by Council on 29 February 2024. Based on the Council’s planned
programme of investments and interest rate forecasts for the year, the Council’s
borrowing strategy was to firstly use internal cash balances to finance the Capital
Investment Programme. This approach was prudent as borrowing rates remained
high throughout the year.

Page 49

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
45
Overall, the Council’s total external borrowings decreased by £2.5m. The Council
has one of the lowest debt to revenue spend ratios in Scotland. The ratio at the end
of 2023/24 was 3.1%, falling to 2.9% at the end of 2024/25. The most recent national
benchmark data available confirms the average in Scotland at the end of 2023/24
was 5.8%.
Short term investments held by the Council decreased from £67.7m to £17.6m and
the movement related mainly to the Council exiting from any deposits with other local
authorities during the year. The decrease in investments is attributable to several
factors, including higher spending in the capital programme and Non-Domestic
Rates refunds following the retrospective revaluation of some accounts. The council
achieved a better rate of return on their investments when compared to the
benchmark due to several fixed-term deposits at a higher rate of interest which
continued beyond the bank rate interest rate reductions.
Systems of internal control
We have evaluated the Council’s key financial systems and internal financial controls
to ensure internal controls are operating effectively to safeguard public assets.
We did not identify any significant weaknesses in the Council’s accounting and
internal control systems during our audit. 
Prevention and detection of fraud and irregularity
The Council is responsible for establishing arrangements for the prevention and
detection of fraud, error and irregularities, bribery and corruption. 
We have reviewed the arrangements and concluded that there are appropriate
arrangements for the prevention and detection of fraud, error and irregularities.
National fraud initiative
The National Fraud Initiative (NFI) is a counter-fraud exercise co-ordinated by Audit
Scotland working together with a range of Scottish public bodies to identify fraud and
error.  
The National Fraud Initiative (NFI) is a counter-fraud exercise co-ordinated by Audit
Scotland working together with a range of Scottish public bodies to identify fraud and
error. The most recent NFI exercise commenced in 2024, with matches received for
investigation in early 2025. 
The Council engages well with the NFI exercise, and we have concluded that its
arrangements with respect to NFI are satisfactory. The Council uploaded all relevant
data for the 2024 NFI exercise by the timescale of 31 October 2024. The Council risk
assessed the matches and is progressing with investigations.

Page 50

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
46
Financial sustainability
Significant audit risk
Our audit plan identified a significant risk in relation to financial sustainability under
our wider scope responsibilities. We continue to recognise it as a significant risk and
so is the Council as this as one of its highest risks in the corporate risk register. 
Financial sustainability
The Council considers its medium-term financial planning through its Financial
Outlook and Medium-Term Financial Plan on a regular basis. In its latest report
presented to the full Council the expected cumulative budget gap prior to any
decisions on council tax would be £49m over the period between 2025/26 and
2030/31. The Council voted an increase of the council tax of 9.5% in March 2025
and increases of 5% for fees and charges which helped to reduce the gap for
2025/26. Assuming 5% to 6.5% council tax increases in that period the funding
gap reduces to £41m and would require the Council to achieve savings of c.£20m
and use the financial sustainability reserve of c£20m to achieve break even. This is
the target level of savings planned for the next three years, but the Council
anticipates that further savings will be required in order to reduce reliance on
reserves.  
The Council has a Financial Sustainability reserve of £21.2m which it plans to 
utilise over the coming years. Various commitments to utilise this reserve and a
reduction in employer pensions contributions of further £12m will grow that reserve
to an estimated £31m the following year. The pension contributions increase from
6.5% to 17.5% from April 2026 and no further savings are expected from this
source.
The Council maintains a policy to hold a minimum of £10m of unallocated reserves
(just over 2% of net expenditure) for unplanned or emergency purposes. This has
dropped below 2% due to the increasing annual spend, with the absolute reserve
value being constant over years.
The Council reviewed its budget planning assumptions to reflect the financial
challenges impacting on the external environment in which the Council operates.
The revised budget allocated for 2025/26 in February 2025 by the Scottish
Government provided funding of £461.8m for the Council, an increase of £16.9m
(3.8%) on the previous year allocation of £444.9m. The Council estimates that
after adjusting for new responsibilities, areas of growing responsibility and other
conditional aspects of the settlement, this provides a like-for-like comparison to
2024/25 where the Council’s underlying core grant has increased by £9.9m (2.3%). 
The Council highlights the fact that there is a timing disconnect between its ability
to develop and deliver recurring savings to match the spend pressures which are

Page 51

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
47
Financial sustainability
emerging, resulting in a growing recurring financial gap. There is an increasing risk
that the Council will require to utilise reserves over the medium term to achieve
financial balance.
In addition to the funding and council tax increase, other planning assumptions
included pay and contractual inflation cost pressures. The continuing and uncertain
impact of cost pressures on the Council’s finances and ability to deliver services in
a sustainable manner remains an ongoing challenge and risk. 
The medium-term financial challenge and financial gap is regularly considered by
the Council, and a further £7m of savings has been incorporated into the 2025/26
draft budget. This does still leave a gap over the medium term, which poses an
increasing risk to the Council’s delivery of services. 
Our detailed findings on the Council’s arrangements for achieving long term financial
sustainability are set out below.
2025/26 revenue budget 
The Council approved its 2025/26 revenue budget at a meeting in February 2025.
The Council voted a council tax increase of 9.5%, and an inflationary increase of 5%
to services fees and charges. The budget was updated as of May 2025 for the final
Scottish Government allocation and the above decisions. The Council estimates a
total spend of £592.6m and a break even position achieved by reserves utilisation of
£0.5m.
The projected outturn at June 2024/25 is a deficit of £1.9m against its total budget of
£579.7m. The main items driving the deficit are Education and Children’s Services
with £1m overspend and Finance, Resources & Customer Services overspend of
£0.7m, both associated with inflationary pressures.
What is excluded from the above position is the Adult Services deficit of £5.9m as
this is managed by a separate body (Renfrewshire IJB). 
There are a number of financial risk areas that provide a level of uncertainty as to the
final outturn:
• Employers’ national insurance contributions increased from April 2025 from
13.8% to 15% translating into additional cost of £6m for the Council, for which the
additional Scottish Government funding is expected to cover part of it i.e. £4.7m.
• The Council’s settlement figure includes a number of adjustments for new
spending burdens, responsibilities, and conditional funding totalling £20.5m,
linked primarily to the pass-through of funding to the Integration Joint Board; and

Page 52

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
48
the baselining of funding for the 2024/25 pay award and increases to teachers’
pension contributions.
• The Scottish Government also announced a Public Sector Pay Policy for the
medium term period 2025/26 to 2027/28. This indicates a 9% pay increase
covering this period, with flexibility for employers to configure three-year
proposals within this range. The budget assumed a 3% pay increase which the
Council has assessed as affordable. The actual pay award agreed for local
government workers (excluding teachers) was 4%. The teachers’ pay award is
still to be determined.  Despite current lower levels of inflation, pay expectations
are significantly above these levels (initial claims received average 6.5%), and
will therefore still present a testing environment in which to reach agreement.
• Given the very significant financial challenges and risks facing the Council over
the medium term, and in line with historic practice, general non-pay inflation is not
provided for in the 2025/26 budget. 
Medium term financial plan
The medium-term financial challenge and financial gap has been considered by the
Council numerous times as the budget gap poses an increasing risk to the Council’s
delivery of services over the medium-term. The Council will potentially move into a
position of using its reserves in the medium term to cover budget gaps but
recognises this is not sustainable. In the short term the 9.5% increase in council tax
for 2025/26 helped to close the budget gap, but further years will require either
continuing increases, savings or other income generation.
The current medium-term forecast is as follows:
Exhibit 2 Medium term financial plan
Item 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 
£m £m £m £m £m £m
Opening
budget gap
9.3 (2.6) 7.7 16.8 26.0 34.4
New
pressures
58.3 26.5 32.6 38.6 47.5 54.7
Savings (8.3) (1.4) (1.4) (1.5) (1.6) (1.7)
Increase in
SG revenue
grant
(41.9) (9.3) (5.8) (4.0) (4.0) (4.0)
Budget gap
prior to
8.0 15.8 25.4 33.1 41.9 49.0

Page 53

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
49
council tax
decisions
CT
increase 
(10.6) (8.0) (8.6) (7.1) (7.5) (8.0)
Remaining
budget gap
(2.6) 7.7 16.8 26.0 34.4 41.0
Source: Financial Outlook and Medium-Term Financial Plan at September 2025
It is clear from the above forecast that the Council will have to face difficult choices to
address this gap, however these will essentially be restricted to three main themes:
reduce planned spend ; generate savings to offset the forecast increase in cost; or
increase income. For context, to close the gap completely by increasing council tax
would require a 13.5% increase in 2026/27 (each 1% increase in council tax
generates c£1.1m). The most likely solution will be a combination of each of these.
The Council is aware that there would also be a short-term option of utilising reserve
balances to temporarily close the gap, however the underlying financial gap would
remain to be addressed on a recurring basis.
Key assumptions
The most recent medium-term plan contains a good level of detail and is based on a
number of assumptions and uncertainties, including:
• The Scottish Government revenue support grant is likely to incorporate only very
moderate increases over the next few years, giving no assurance that the local
government settlement in future years will reflect a sufficient degree of increase
to address core budget pressures.
• The current and forecast challenging financial position of Renfrewshire IJB, and
consequent potential impact on the Council financial position is an increasing
concern.
• Assumed moderate growth in revenue settlement over the medium term, with
additional slight improvement anticipated based on the relative population growth
of Renfrewshire. For context, the 2024 mid-year estimate for population in
Renfrewshire was published in late August and shows Renfrewshire’s population
has increased again and now stands at 189,170, an increase of 2,020 (1.1%) on
2023 and above the national rate of 0.7%. This is seen as a positive factor by the
Council as the area attracts new people, supporting economy, but on the other
hand can create other challenges for the ageing population, schools and local
services.
• The most recent local government pay settlement for non-teaching staff agreed
was 4% in 2025/26 and 3.5% in 2026/27. The pay settlement for teachers is
currently to be agreed for 2025/26 and while assumed at 3% it might be that it will
be agreed in line with 4% already agreed for non-teaching staff. The pay is the

Page 54

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
50
largest element of Council cost, so small movements will impact the total cost
(1% increase in total pay equals to almost c£3.8m increase in cost).
• The Council is facing further uncertainty and pressures on a few areas which will
depend on future confirmation: reduced class contact time for teachers (potential
cost of £3-4m per year), lifecycle maintenance and net zero will likely increase
the cost, and school transport cost has increased significantly in the recent years
indicating further increases possible.
• The IJB most recently reported a 2024/25 forecast year-end overspend position
of £6.2m, which is expected to be funded from IJB reserve balances. The total
gap for the year is expected to be at £33m, and is partly to be covered by
savings, additional SG contribution leaving a final gap of £10m to be covered by
utilisation of the existing reserves. This will however leave the IJB reserves
depleted, and Renfrewshire IJB will seek additional funds in the coming years
from NHS Greater Glasgow & Clyde and Renfrewshire Council.
The detail of the assumptions used in preparation of the medium term financial plan
is presented below:
Exhibit 3 Core medium term plan assumptions
Assumption 2026/27
%
2027/28
%
2028/29
%
2029/30
%
2030/31
%
Pay award 3.5 3.0 2.5 2.5 2.5
Non-pay
inflation
0 0 0 0 0
Contract
inflation
3.0 2.0 2.0 2.0 2.0
Revenue
grant
1.2 1.2 1.0 1.0 0
Council tax
(rate)
6.5 6.5 5.0 5.0 5.0
Council tax
(base)
1.2 0.9 0.9 0.8 0.8
Source: Financial Outlook and Medium-Term Financial Plan September 2025
Scottish Government indicated it is working on its financial forecasts going beyond
one year estimates and to be published together with the 2026/27 Scottish budget.
This would help councils in Scotland with their medium-term planning and introduce
an element of certainty into budget forecasts.
Cost improvement plans

Page 55

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
51
As a part of its transformation programmes the Council has achieved cumulative
savings of £190m since 2011/12. However, in each successive year it is increasingly
difficult to continue to generate savings at this scale. From an average saving of
£19.5m per annum in the period from 2011/12 to 2014/15, the average saving over
2022/23 to 2025/26 is £8.5m. 
Renfrewshire Council previously agreed an £8m departmental savings target each
year for three years from 2025/26. This scale of recurring savings is necessary to
ensure that the Council returns to a position of recurring financial balance over the
medium term.
The planned savings as well as the full-year impact of increased income from
interest on cash balances, and legacy Right for Renfrewshire and Financial
Sustainability workstreams, will provide £7.046 m of recurring support to the 2025/26
revenue budget position. 
For the next three years 2026/27- 2028/29 the Council is proposing setting savings
targets at £6.3m, £8.3m and £5.2m respectively and linked to transformation
programmes. Assuming approval of those targets by the Council and delivery of
those savings It is likely that the remaining funding gap of £19.8m over the three
years will be funded from the reserves. The estimates assume cost growth in the
next five years of the forecast and the means of closing the gap in the two final years
of this forecast are yet to be determined.   
Capital plans 
Scottish Government allocated £12.9m of the general capital grant to the Council for
2025/26 which is a 10.5% increase on prior year allocation. This finances a small
part of the council’s annual capital programme which adds up to a cumulative
amount of £578.6m over the next five years.
The Council has a number of medium and longer-term capital projects, financed
though borrowing, general capital grant, capital receipts and current revenue.  The
largest capital projects over the next 5 years includes the School Estate Programme,
Advanced Manufacturing Innovation District Scotland South project and Paisley
Museum. These projects are supported by asset lifecycle maintenance programmes.
Exhibit 4: Capital programme 
2025/26
(£m)
2026/27
(£m)
2027/28
(£m)
2028/29
(£m)
2029/30
(£m)
Total
(£m)
Non-
housing
129.0 102.6 27.2 13.7 13.7 286.2
Housing 61.3 67.6 67.7 42.5 53.3 292.4
Total 190.3 170.2 94.9 56.2 67.0 578.6

Page 56

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
52
Source: Capital programmes approved in February 2025
We note that the non-housing capital budget for 2025/26 was subject to significant
changes within the period since the budget approval. First, it was reduced to £105m
in May, then forecast increased to £118m in September 2025. The housing budget
reduced from £61.3m to £52.8m. We note a separate recommendation on the capital
budget preparation in the financial management section.  We recommend that the
capital budget setting process be revisited to ensure future estimates better reflect
prevailing market conditions and delivery capacity More detail is included in
Appendix 3.
The projected borrowing position for the next three years starting 2025/26 is £397m,
£465m and £524m. Borrowing is the key source of the capital programmes funding.
Since the pandemic, a number of factors have impacted the Council’s ability to fully
deliver its capital programme within the originally planned timescales. This was due
to a number of factors, including the complexity of works, cost of materials, supply
chain issues and availability of contractors. Given the scale of the Council’s ongoing
programme this is likely to remain a continuing area of challenge. 
Housing Revenue Account 
The Council plans to deliver total housing capital investment of £292.4m over the 5-
year period up to 2029/30. The Council expects that £34.5m of the total will be
financed from government grant.  The capital programme will deliver:
• £147.0m in planned investment programmes in existing housing stock,
• £31.8m in New Supply of housing stock out with the regeneration areas; and
• £113.6m included as part of the Regeneration and Renewal Plan including New
Supply within regeneration areas.
The HRA operates a rolling 30-year Business Plan model which is the standard
operating practice amongst local authorities and Registered Social Landlords. The
30-year basis of the model reflects the need for a long term planned approach to the
replacement of major items such as rewiring and central heating aligned to the
lifecycle of the element. 
Similar to non-housing construction, the sector is still experiencing the impact of
pandemic recovery, with the backlog of repairs to void properties influencing income
generation. The Council is focusing on the first phase of its capital programme to
deliver c.1,100 housing properties and to invest £30m in the existing high-rise
accommodation.  To ensure sufficient funding in the long term, an assumption of 1%
above CPI as an uplift to rents is assumed for every year across the 30-year plan.

Page 57

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
53
Vision, leadership and governance
Our detailed findings on the Council’s arrangements are set out below.
Vision
The Council approved its Council Plan in September 2022, articulating its vision,
priorities and strategic outcomes for the Council. The Council Plan strategic
outcomes are used to underpin the Council’s internal and external communication
and engagement and these align to their organisational values. The Plan has five
main strategic outcomes: Place, Economy, Fair, Green and Living our values.
The Council Plan was subject to a review in early 2024 and a refreshed plan with
refined priorities, actions and indicators was recently approved by the Leadership
Board in June 2024.
Corporate leadership team
The Council senior team consists of the Chief Executive, 3 Directors of departments
and 15 Heads of Service (along with the Chief Officer of the HSCP and Chief
Executive of partner organisation OneRen). 
Governance arrangements
The Council’s governance framework comprises the systems and processes, and
culture and values, by which the Council is directed and controlled and through
which it accounts to, engages with and leads the community. It enables the Council
to monitor the achievement of its strategic objectives set out in the Council plan. The
Council has approved and adopted a Local Code of Corporate Governance and
publishes information on how it complies with that Code. 
The Council has a number of Boards (Committees) with delegated authorities and
specific remits in place. The Audit, Scrutiny and Risk Board (ARSB) is chaired by an
independent member and comprises nine members from all political parties
represented on the Council. Its remit is to consider internal and external audit and
scrutiny reports, note Internal Audit and Counter Fraud performance, consider and
monitor progress reports against any action points raised by internal and external
auditors. The Board also has responsibility for considering the Council’s code of
corporate governance, approving the risk management policy and strategy and
reviewing the effectiveness of risk management arrangements. Other functions
include monitoring and reviewing service delivery performance, policies and
practices and to submit recommendations to the Council.
The Council’s governance arrangements have been substantially reviewed during
the year, including fully implementing the comprehensive assessment of the Audit,
Risk and Scrutiny Board arrangements against the CIPFA practical guidance for
Audit Committees which has made a positive impact on scrutiny arrangements. In

Page 58

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
54
addition the recommendation arising from the Council’s 11 comprehensive review of
its governance arrangements by the member led cross party working group, which
were reported to and approved by the Council on 29 February 2024 have been
actioned.
Leadership programme
The council introduced a Leadership Development Programme, consisting of 5
modules and developed by the Society of Local Authority Chief Executives
(SOLACE) based on their discussions with the key stakeholders within the council.
The programme was developed primarily due to changes within the Corporate
Management Team (CMT) membership, including the appointment of the Chief
Executive. Provision of further leadership training opportunities was identified
following the independent Dargavel review. This included Governance, Risk
Management, Leadership, Culture and Performance Management. 
Cohort 1 of this programme was delivered between October 2023 and February
2024 and delivered to up to 37 delegates, comprising CMT members and Chief
Officers. In general, the feedback from delegates has been positive in relation to the
effectiveness and impact of resilience, communication and governance, risk,
accountability modules. Other modules provided improved levels of knowledge to the
delegates. 
Following this, at the Chief Officers Team Away Day in September 2024 there was
also a discussion on the learning from the programme which linked to ongoing
personal development opportunities. The programme for cohorts 2 and 3 has now
been completed and an evaluation has been undertaken, which will inform plans for
future programmes. Additional deep-dive training took place for all key officers at a
variety of grades specifically on governance during 2023/24.
There is a programme of Chief Officer Team Away Days (4 are scheduled for this
year) and Our Leaders Forum, (aiming for 3 in person plus one additional virtual this
year) to support ongoing personal and professional development and maintain and
develop cross corporate networking and relationships which is seen as a key priority
in a new hybrid working environment. These sessions include external
speakers/experts .
Officers from the council’s People & OD team are currently undertaking a
benchmarking exercise across Scottish Local Authorities to explore other practices
and scope opportunities for potential collaborations in future. 
Risk Management 
Renfrewshire Council has a risk management framework in place formed over key
components and supported by a high-level combined risk management policy and
strategy ‘Risk Matters’, last revised in November 2023.
The strategic risk management objectives refer to:

Page 59

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
55
• Leadership and management;
• Policy and strategy;
• People;
• Partnership and resources;
• Processes;
• Risk handing and assurance; and
• Outcomes and delivery.
To support the implementation of ‘Risk Matters’ and the continuous improvement of
risk management practice within the council, a Strategic Risk Management
Development Plan is in place, outlining key actions that require to be completed over
the life cycle of Risk Matters.
Performance against these key actions is reported as follows:
• YEAR 1, 2024-25 Key performance figure - 100%, (12 of 12 actions) complete,
against an 85% in-year target.
• YEAR 2, 2025-26 10 of 10 actions in progress.
In 2024/25 Willis Towers Watson undertook an independent review of the Council’s
risk management arrangements and concluded that “Renfrewshire Council has a
well-established approach to risk management with many positive features,
especially in terms of strong governance and a positive cultural attitude towards risk
management at a corporate level.”
Updates on progress reports and monitoring of risks are reported to the ARSB on a
six-monthly basis. Each Council department has at least one representative on the
Corporate Risk Management Group (the Group). The Group now includes at least
one Head of Service for each department, and has overseen reporting of the
2023/24 strategic and corporate risk, monitoring progress on behalf of the Council.
Services have taken ownership of their risks with processes being followed for
reporting, and where necessary ‘escalation’ of significant risks to the strategic or
corporate registers. All service departments submitted their risk data on time for the
progress reports to the ARSB as planned.
Internal audit
The internal audit service operates in accordance with the Public Sector Internal
Audit Standards and reports to the Audit, Risk and Scrutiny Board. Internal audit
undertakes an annual programme of work, approved by the Board, based on a
strategic risk assessment. The Council’s Chief Auditor provides an independent
opinion on the adequacy and effectiveness of the governance framework, risk
management and internal control.

Page 60

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
56
To ensure the integrity of the internal audit function, the annual internal audit strategy
and plan is determined by the Chief Auditor in consultation with all service Directors
and their senior management teams.
The internal audit opinion for 2024/25 was that, subject to management addressing
the critical and important recommendations made and the limited assurance report
findings, it is considered that reasonable assurance can be placed upon the
adequacy and effectiveness of the Council’s internal control, risk management and
governance arrangements. This opinion is consistent with prior years.
Internal audit presented results of their activity for 2024/25; 93.6% of the internal
audit plan was completed against a target of 90%. The outstanding work is planned
to be completed in 2025/26.
We consider internal audit work during our risk assessment and on ongoing basis.
In line with the requirements of the Public Sector Internal Audit Standards (PSIAS)
the internal audit function was subject to an external assessment performed by an
internal auditor of another local authority. The external reviewer concluded in 2023
that Renfrewshire Council’s internal audit fully complies with PSIAS requirements.

Page 61

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
57
Use of resources to improve outcomes
Our detailed findings on the Council’s arrangements are set out below.
Performance management framework
The Council has a performance framework to measure against its 2022-27 Council
Plan objectives. A high level summary of the Framework is presented below: 
Source: The Council’s internal documentation
The framework assumes 6 monthly reporting to Leadership Board with performance
indicators against action progress grouped by Council Plan strategic outcomes.
These outcomes have also one cross-cutting theme – Improving outcomes for
children and families.
Service Improvement Plans (SIP) at each service level were also given a new format
to make them aligned with the above. The reporting is done on a 6 monthly basis to
relevant Boards including an annual outturn report. All performance indicators and
actions in the Council Plan Framework are included in SIPs.
The next stage of performance reporting is at operational level with a range of
service-specific performance reporting across Council to the appropriate Policy
Board, together with statutory performance reports.
The Chief Executive holds performance scrutiny meetings with each Directorate
team twice a year, and the council advised it is also planned to introduce a new
Performance Board which will drive further improvements to service level
performance from April 2025.

Page 62

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
58
Local Government Benchmark Framework (LGBF) is scrutinised by the Corporate
Management Team (CMT) with reports to the Audit, Risk and Scrutiny Board. The
CMT would also review a number of performance reports, scorecards, people
metrics and have ‘deep dives’ into specific areas on a quarterly basis.
These documents are then used to create public performance reporting in user
friendly formats, and by using interactive presentations, case studies and
dashboards. 
Service improvement and reporting 2024/25
We have considered how the Council demonstrates a trend of service improvement
in delivering their strategic priorities, as required by Audit Scotland’s planning
guidance for 2024/25. 
The Council Plan reports on 34 indicators, of which 21 have a target. In 2024/25, five
of the indicators met or exceeded their target, three narrowly missed the target, and
seven were behind target. There are six indicators for which 2024/25 data is not yet
available. 
Statutory performance information
The Accounts Commission has a statutory responsibility to define the performance
information that councils must publish. This responsibility links with the
Commission’s best value audit responsibilities. In turn, councils have their own
responsibilities, under their best value duty, to report performance to the public. The
Accounts Commission issued a revised Statutory Performance Information Direction
(‘2024 Direction’) in December 2024, which applies for the three-year period from 1
April 2025. The 2024 Direction requires a council will report information about its
performance in a way that enables that council, other councils, the Accounts
Commission, local residents and communities, and any other interested parties to
draw comparisons and make judgements in relation to: 
• that council’s performance over time, and
• the performance of different councils in a given period of time. 
The Council has made proper arrangements for preparing and publishing its
statutory performance information in accordance with the Direction. The information
reported on the Council’s website is the Council’s response to meeting the
requirements. 
Local Government Benchmarking Framework 
The most recent period available through LGBF is 2023/24  and demonstrates that
the overall performance improved in the majority of the areas as presented in the
exhibit below.

Page 63

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
59 
Exhibit 5 Performance overview 
Source: Local Government Benchmarking Framework website
The council’s overall performance is generally positive, with good progress being
made and sustained across the Council Plan priority areas. The council is
demonstrating improved or sustained performance across 52% of the 88 indicators
published to date.
Strong performance areas Areas for improvement
Completion of homeless duty - in
common with many other councils,
homeless applications continue to rise,
and housing services are under
considerable demand pressure in
Renfrewshire. The service continues to
exceed targets and averages around 21
weeks to complete a case.
A key area of focus is performance in
relation to issuing building warrants and
first reports.  Workforce measures have
been introduced to support capacity
issues, with further reviews of these
service areas planned during 2025 by
the new Performance Board. 
Renfrewshire is consistently one of the
best performing areas in relation to
delayed discharge – that is, minimising
the number of days a person spends in
hospital once they are fit to be
discharged.  
The proportion of the council’s
procurement spend with local
businesses is behind the national
average at 19.3% but has shown
improvements over the last few years. 
Local analysis indicates that a further
46% of council spend (taking total
spend to around two thirds) was made

Page 64

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
60
with local authorities in surrounding
local authorities reflecting strong local
and regional connectivity and
Renfrewshire’s tight geography. 
Number of invoices processed within 30
days. 
Sickness absence levels for non-
teaching staff remains a key area for
improvement and is being actively
targeted across service teams, which
has resulted in an improvement in
relative performance in 23/24
The council consistently outperforms
most other areas in terms of the
condition of its roads.  
Some of the customer satisfaction
measures included in the LGBF indicate
lower levels of satisfaction with selected
services than in other local authorities.
Like other local authorities, the council
has concerns around some of the
national survey approach, and has
commissioned an external firm to
conduct a resident survey which will
allow the council to assess this in more
depth and respond accordingly. 
The council’s employability programme
– INVEST – has had a great deal of
success in supporting people into
training, to achieve qualifications and to
find paid work.
The poverty-related attainment gap has
widened since the council first started
reporting on it in 2018/19.  As with all
other local authority areas, the Covid-19
pandemic had a significant impact on
attainment, and it has been well
documented that children and young
people experiencing deprivation were
disproportionately affected by the
disruption to learning.  Improvement can
be seen - in 2023/24, the gap narrowed
for both literacy and numeracy and has
now returned to broadly pre-pandemic
levels in relation to numeracy, in line
with the council’s family group
comparators for educational indicators,
albeit this remains above the national
average.  Literacy remains a core focus
for improvement.

Page 65

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
61
The council is in the top two quartiles for
11 out of the 18 educational indicators
available for 2023/24 and officers have
reiterated the strong ambition they have
to further improve educational
outcomes, using data to drive targeted
improvements in performance.
The percentage of leavers entering a
positive destination has increased to
97.1%. This is an increase over 5 years
and Renfrewshire is ahead of both the
virtual comparator and national figures.
Renfrewshire now has the 5th highest
leaver destination figure in Scotland. 
There has been a significant increase in
the proportion of S4 leavers going into
positive destinations. In 2023/24, this
was 98.49%, up from 91.79% in
2022/23 and 91.88% in 2021/22.
Nationally the Figure is 91.9%. 
Quick turnaround of housing benefit
applications and amendments
contributes to relieving financial
pressures that some of the most
vulnerable citizens may feel. 
Source:  An interim follow up audit report on the council’s approach to community
engagement and culture change April 2025.

Page 66

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
62
Best Value
Appointed auditors have a duty to be satisfied that local government bodies have
made proper arrangements to secure Best Value.  There are the following four
aspects to auditors’ work:
• Contributing to Controller of Audit reports.
• Thematic reviews; 
• Follow-up and risk-based work; 
• Service improvement and reporting. 
Contributing to Controller of Audit reports – Best Value report
The Controller of Audit reports to the Accounts Commission on each council’s
performance in meeting its Best Value duties at least once over the five-year audit
appointment. Auditors are required to include judgments on the pace and depth of
continuous improvement in the council as part of their wider scope work to contribute
to these reports. 
A Controller of Audit Best Value report for Renfrewshire Council has been prepared
by Audit Scotland and was considered by the Accounts Commission on 15 May
2025. Following this, the Accounts Commission published their findings on 5 June
2025 and the report was presented to the Council on 26 June 2025.  During 2024/25
we were working with the Controller of Audit to allow preparation and finalisation of
the Best Value report for the Council. This report is based on previous reporting on
the Council as prepared by Azets and the Controller of Audit. 
The report was largely positive and stated that Renfrewshire Council has a strong
commitment to improving, including creating a positive culture, supporting its staff to
develop as leaders, and focusing on engaging with residents. The report noted that
the Council must now talk to them about tough spending decisions that lie ahead.
It highlighted the Council’s commitment to leadership and creating a positive working
culture across services, welcomed positive response to the issues associated with
the Dargavel school, expressed interest in the Cultural Assurance Model, outlined
good examples of activities enabling and supporting community engagement. The
report also commented on prudent financials and financial sustainability, commented
on existence of the complex capital programme and member development in place,
it referred to the areas of strong performance (education). 
The report also contained some suggestions for further development and
improvement in relation to continuous improvement, the need to evidence continuing
engagement with community and how it then flows into decision making, policy

Page 67

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
63
development and service planning, it highlighted the financial gap and the role of the
transformation plan in closing it. It brought attention to the IJB financial situation
which will require difficult decisions and talked about areas of lower performance in
the health area.
Thematic review 
Auditors are required to report on Best Value or related themes prescribed by the
Accounts Commission. This year’s thematic review is on Transformation: how
councils are redesigning and delivering more efficient services to achieve planned
outcomes. We present the findings in a separate report with a summary set out
below:
To what extent does
the council have clear
plans for
transformation that
link to its priorities
and support long-term
financial
sustainability? 
Renfrewshire Council has had a corporate
transformation programme in place since 2009. These
have been overarching, transformative and adapted to
changing circumstances.
The most recent phase of the Council’s transformation
programme, Reshaping Renfrewshire, commenced in
early 2025 and continues this ambitious approach. The
Council is well-placed to deliver complex
transformation and change programmes, having
successfully delivered a range of transformation
programmes over the past 15 years. 
Over this past period the Council have achieved
£190m of savings and efficiencies through various
projects and debt smoothing.
The Council has outlined with appropriate detail its key
future transformation projects, the importance of
financial sustainability, and how these are to be
achieved in the medium term.
We are satisfied that links exist between the Council’s
corporate objectives and the transformation plans,
however these could be presented more clearly to
improve clarity and to help measure the impact.
To what extent do the
council’s programme
management
arrangements
facilitate effective
oversight of its
transformation plans?
The governance arrangements to monitor and
scrutinise the transformation programmes are in place
The Council operates the monitoring arrangements at
the Boards and management levels with a clear
structure of reporting in place.

Page 68

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
64 
This is supported at an operational level by the
existence of appropriate capacity and expertise at
Project Management Office function and by using
external specialist support where this is deemed more
effective.
Monitoring arrangements should be supported by
further clarity in reporting to Leadership Board on
timelines, costs, benefits and measurement methods to
support achieving the transformation objectives.
To what extent are
communities and
partners involved in
the development and
delivery of the
council’s plans for
transformation? 
Renfrewshire Council works effectively with partners,
including other councils, third and private sector to
achieve its transformation objectives.
There are good examples of working with communities
demonstrating the Council’s increased focus on the
needs of service users. 
Renfrewshire Council is meeting requirements of
working with partners to develop a clear approach to
tackling digital exclusion as part of their strategies and
plans, understanding digital exclusion locally, who is
affected and how.
The Council engages with vulnerable groups and
considers impact of service delivery changes and
improvements that could be made to support those
communities. 
To what extent has the
council considered the
impact of its
transformation
activity, including on
vulnerable or
protected groups? 
The Council have equality impact assessments which
are prepared for a range of projects, policy decisions
and service redesigns.
The approaches to measuring, monitoring and
reporting varies project to project depending on the
nature of the project, the benefits and the timescales in
which the benefits are seen. The arrangements are
appropriate at a project level. 
Community Benefits are built into contracts with third
party suppliers.

Page 69

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
65
Follow-up and risk-based work
Best Value report
Auditors are required to follow up Accounts Commission findings, Controller of Audit
recommendations and any outstanding improvement actions reported in Best Value
Assurance Reports and Annual Audit Reports. We are also required to have regard
to the seven Best Value themes when completing our wider scope work. The full
Best Value report was published in June 2025 and we will monitor Council’s
progress in considering its findings in the coming years.
An interim follow up audit report on the council’s approach to community
engagement and culture change
In April 2025 we presented an interim report on areas of interest to the Controller of
Audit linked to community engagement and the council’s culture.
Overall, we found that the council has made good progress in continuing to build its
existing approach to consultation and community engagement including a refresh of
the council’s overall approach, with appropriate arrangements established or in-place
to support effective governance and scrutiny of those revised arrangements.
The council is able to evidence a positive corporate culture and continues to take a
range of actions aimed at supporting and further developing a positive culture of
openness and transparency. 
The report had one recommendation in relation to transparency and openness in
decision making processes.  In response the council plans to review the existing
corporate guidance, board reporting arrangements and will benchmark with
approaches adopted by other Scottish local authorities to identify specific areas of
best practice and recommended improvement actions to be adopted into existing
arrangements. This action is due to be completed by 31 October 2025.
Service improvement and reporting 
We have considered this as part of our wider scope work within Vision, leadership
and governance and Use of resources sections of this report.

Page 70

Renfrewshire Council: 2024/25 Annual Audit Report to the Council and
the Controller of Audit 
66
Appendices 
Appendix 1: Responsibilities of the Council and the Auditor 67
Appendix 2: Audit adjustments 75
Appendix 3: Action plan 80
Appendix 4: Follow up of prior year recommendations 90

Page 71

67
Appendix 1: Responsibilities of the Council and the
Auditor
Responsibilities of the Council
The Council is required to make arrangements for the proper administration of its
financial affairs and to secure that one of its officers has responsibility for the
administration of those affairs. The Director of Finance and Resources has been
designated as that officer. The Director of Finance and Resources is responsible for
the preparation of the Council’s annual accounts in accordance with proper practices
as set out in the CIPFA/LASAAC Code of Practice on Local Authority Accounting in
the United Kingdom (the Code).
Area The Council’s responsibilities
Corporate
governance
The Council is responsible for establishing arrangements to ensure
the proper conduct of its affairs including the legality of activities and
transactions, and for monitoring the adequacy and effectiveness of
these arrangements. Those charged with governance should be
involved in monitoring these arrangements.
Financial
statements
and related
reports
The Council has responsibility for: 
• preparing financial statements which give a true and fair view
of the financial position of the Council and its group and their
expenditure and income, in accordance with the applicable
financial reporting framework and relevant legislation;
• maintaining accounting records and working papers that
have been prepared to an acceptable professional standard
and support the balances and transactions in its financial
statements and related disclosures;
• preparing and publishing, along with the financial
statements, an annual governance statement, management
commentary (or equivalent and a remuneration report that is
consistent with the disclosures made in the financial
statements and prepared in accordance with prescribed
requirements. The management commentary should be fair,
balanced and understandable and also address the longer-
term financial sustainability of the Council.
Management is responsible, with the oversight of those charged
with governance, for communicating relevant information to users
about the Council and its financial performance, including providing

Page 72

68
Area The Council’s responsibilities
adequate disclosures in accordance with the applicable financial
reporting framework. The relevant information should be
communicated clearly and concisely.
The Council is responsible for developing and implementing
effective systems of internal control as well as financial, operational
and compliance controls. These systems should support the
achievement of its objectives and safeguard and secure value for
money from the public funds at its disposal. The Council is also
responsible for establishing effective and appropriate internal audit
and risk-management functions.
Standards
of conduct
for
prevention
and
detection
of fraud
and error
The Council is responsible for establishing arrangements to prevent
and detect fraud, error and irregularities, bribery and corruption and
also to ensure that its affairs are managed in accordance with
proper standards of conduct.
Financial
position
The Council is responsible for putting in place proper arrangements
to ensure its financial position is soundly based having regard to:
• Such financial monitoring and reporting arrangements as
may be specified;
• Compliance with statutory financial requirements and
achievement of financial targets;
• Balances and reserves, including strategies about levels and
their future use;
• Plans to deal with uncertainty in the medium and long term;
and
• The impact of planned future policies and foreseeable
developments on the financial position.
Best Value
The Council has a specific responsibility to make arrangements to
secure Best Value. Best Value is defined as continuous
improvement in the performance of the body’s functions. In securing

Page 73

69
Area The Council’s responsibilities
Best Value, the local government body is required to maintain an
appropriate balance among:
• The quality of its performance of its functions
• The costs to the body of that performance
• The cost to persons of any service provided by it for them on
a wholly or partly rechargeable basis.
In maintaining the balance, the Council shall have regards to:
• Efficiency
• Effectiveness
• Economy
• The need to meet the equal opportunity requirements.
The Council should discharge its duties in a way which contributes
to the achievement of sustainable development.
In measuring the improvement of the performance of a local
government body’s functions for the purposes of this section, regard
shall be had to the extent to which the outcomes of that
performance have improved.
The Scottish Government’s Statutory Guidance on Best Value
(2020) requires bodies to demonstrate that they are delivering Best
Value in respect of seven themes:
1. Vision and leadership
2. Governance and accountability
3. Effective use of resources
4. Partnerships and collaborative working
5. Working with communities
6. Sustainability
7. Fairness and equality.
The Community Empowerment (Scotland) Act 2015 is designed to
help empower community bodies through the ownership or control
of land and buildings, and by strengthening their voices in decisions
about public services.

Page 74

70
Area The Council’s responsibilities
Specified audited bodies are required to prepare and publish
performance information in accordance with Directions issued by
the Accounts Commission.
Auditor responsibilities
Code of Audit Practice
The Code of Audit Practice (the Code) describes the high-level, principles-based
purpose and scope of public audit in Scotland.
The Code outlines the responsibilities of external auditors and it is a condition of our
appointment that we follow it.
Our responsibilities
Auditor responsibilities are derived from the Code, statute, International Standards
on Auditing (UK) and the Ethical Standard for auditors, other professional
requirements and best practice, and guidance from Audit Scotland. 
We are responsible for the audit of the accounts and the wider-scope responsibilities
explained below. We act independently in carrying out our role and in exercising
professional judgement. We report to the Council and others, including Audit
Scotland, on the results of our audit work.
Weaknesses or risks, including fraud and other irregularities, identified by auditors,
are only those which come to our attention during our normal audit work in
accordance with the Code and may not be all that exist.
Wider scope audit work
Reflecting the fact that public money is involved, public audit is planned and
undertaken from a wider perspective than in the private sector.
The wider scope audit specified by the Code broadens the audit of the accounts to
include additional aspects or risks in areas of financial management; financial
sustainability; vision, leadership and governance; and use of resources to improve
outcomes.

Page 75

71 
Financial management
Financial management means having sound budgetary
processes. Audited bodies require to understand the financial
environment and whether their internal controls are operating
effectively.
Auditor considerations
Auditors consider whether the body has effective arrangements
to secure sound financial management. This includes the
strength of the financial management culture, accountability,
and arrangements to prevent and detect fraud, error and other
irregularities. 
Financial sustainability
Financial sustainability means being able to meet the needs of
the present without compromising the ability of future
generations to meet their own needs.
Auditor considerations
Auditors consider the extent to which audited bodies show
regard to financial sustainability. They look ahead to the
medium term (two to five years) and longer term (over five
years) to consider whether the body is planning effectively so it
can continue to deliver services. 
Vision, leadership and governance
Audited bodies must have a clear vision and strategy and set
priorities for improvement within this vision and strategy. They
work together with partners and communities to improve
outcomes and foster a culture of innovation.
Auditor considerations
Auditors consider the clarity of plans to implement the vision,
strategy and priorities adopted by the leaders of the audited
body. Auditors also consider the effectiveness of governance
arrangements for delivery, including openness and
transparency of decision-making; robustness of scrutiny and
shared working arrangements; and reporting of decisions and
outcomes, and financial and performance information.

Page 76

72 
Use of resources to improve outcomes
Audited bodies need to make best use of their resources to
meet stated outcomes and improvement objectives, through
effective planning and working with strategic partners and
communities. This includes demonstrating economy, efficiency
and effectiveness through the use of financial and other
resources, and reporting performance against outcomes.
Auditor considerations
Auditors consider the clarity of arrangements in place to ensure
that resources are deployed to improve strategic outcomes,
meet the needs of service users taking account of inequalities,
and deliver continuous improvement in priority services. 
Best Value 
Appointed auditors have a duty to be satisfied that local government bodies have
made proper arrangements to secure best value. Our work in respect of the
Council’s best value arrangements has been integrated into our audit approach,
including our follow up on the Council’s Best Value Assurance Report and work on
the wider scope dimensions. 
Audit quality
The Auditor General and the Accounts Commission require assurance on the quality
of public audit in Scotland through comprehensive audit quality arrangements that
apply to all audit work and providers. These arrangements recognise the importance
of audit quality to the Auditor General and the Accounts Commission and provide
regular reporting on audit quality and performance.
Audit Scotland maintains and delivers an Audit Quality Framework.
The most recent audit quality report can be found at Quality of public audit in
Scotland: Annual report 2025.
Independence and ethics
The Ethical Standards and ISA (UK) 260 require us to report full and fair disclosure
of matters relating to our independence. In accordance with our profession’s ethical
requirements and further to our external audit plan issued confirming audit
arrangements we confirm that there are no further facts or matters that impact on our
integrity, objectivity and independence as auditors that we are required or wish to

Page 77

73
draw attention to. We consider an objective, reasonable and informed third party
would take the same view. 
We confirm that Azets Audit Services and the engagement team complied with the
FRC’s Ethical Standard. We confirm that all threats to our independence have been
properly addressed through appropriate safeguards and that we are independent
and able to express an objective opinion on the financial statements.
Non-audit services: There are no non-audit services provided to the Council.
Contingent fees: No contingent fee arrangements are in place for any services
provided.
Gifts and hospitality: We have not identified any gifts or hospitality provided to, or
received from, any member of the Council, senior management or staff.
Relationships: We have no other relationships with the Council, its directors, senior
managers and affiliates, and we are not aware of any former partners or staff being
employed, or holding discussions in anticipation of employment, as a director, or in a
senior management role covering financial, accounting or control related areas.
Our period of total uninterrupted appointment as at the end of 31 March 2025 was
three years.

Page 78

74
Audit fee
The total fees charged to the Council for the provision of services in 2024/25 were as
follows. Prior year charges are also shown for comparative purposes: 
2024/25
£
2023/24
£
Auditor remuneration 329,710 316,514
Pooled costs 7,530 10,490
Contribution to PABV costs 79,800 82,680
Sectoral cap adjustment 61,830 59,660
Extended Audit Procedures 8,584 -
Total audit fees 487,454 469,344

Page 79

75
Appendix 2: Audit adjustments 
We are required to inform the Council of any significant misstatements within the
financial statements presented for audit that have been discovered during the course
of our audit. The non-trivial misstatement discovered during the course of our audit
which have been adjusted for by management are summarised in the table below.
Adjusted misstatements
Details of the item corrected following discussions with management is as below.
No Detail CIES Balanc
e Sheet
Impact
on total
net
expendit
ure
Impact
on
usable
reserve
s
Impact on
unusable
reserves  
Dr /
(Cr)
£m
Dr / (Cr)
£m
Dr / (Cr)
£m
Dr / (Cr)
£m
Dr / (Cr)
£m
1. Restatement of group
comparative figure due
to overstatement of
other long-term asset
due to asset ceiling
cap of £31.788m and
understatement of
other long-term liability
due to unfunded
liability portion of
£0.501
Impact: Group
32.289 (32.289)   32.289
2. Overstatement of the
group’s other long-
term asset of
£41.941m due to asset
ceiling cap and
understatement of
other long-term liability
due to unfunded
liability portion of
£0.440
42.381 (42.381)   42.381

Page 80

76
No Detail CIES Balanc
e Sheet
Impact
on total
net
expendit
ure
Impact
on
usable
reserve
s
Impact on
unusable
reserves
Impact: Group
3. Understatement of the
Council’s other long-
term liabilities due to
updated version of the
IAS19 report
Impact: Council and
Group
0.158 (0.158)   0.158
4. Understatement of the
holiday pay accrual
Impact: Council and
Group
0.425 (0.425)   0.425
5. Understatement of
ROU and lease
liabilities due to update
in waste disposal
service concession
model
Impact: Council and
Group
0.271 (0.271) 0.271  0.271 
Council’s account Group’s account 
As at 31
March
2024
As at 31
March
2025
As at 31
March
2024
As at 31
March
2025
Total reserves per the unaudited
annual accounts
1,524.836 1,557.192 1,656.543 1,703.634
Net impact on the Council’s
reserves
increase/ (decrease) 
- (0.854) (32.289) (43.235)

Page 81

77
Total reserves per the audited
annual accounts
1,524.836 1,556.338 1,624.254 1,660.399

Page 82

78
Unadjusted misstatements
We identified no unadjusted misstatements during our audit.
Misclassification and disclosure changes
Our work included a review of the adequacy of disclosures in the financial
statements and consideration of the appropriateness of the accounting policies and
estimation techniques adopted by the Council. 
We identified a number of reclassification adjustments and some minor
presentational issues in the Council’s accounts, and these have all been amended
by management. Details of all disclosure changes amended by management
following discussions are as below.
No Detail
1. Disclosure changes in external audit costs of fee payable to be £0.487m.
2. Disclosures changes in note 23: nature and extent of risks arising from
financial instruments to update total investment portfolio by credit rating of
A+ to £2.465m. 
3. Disclosures changes in group accounting policies to update the number of
combining entities and to update combining entities subject to value added
tax. 
4. Updated Note 4: Expenditure and income analysed by nature to cast with the
CIES and to exclude internal recharge.
5. Pension liability disclosure after receiving the revised actuarial report. 
6. Disclosures changes in note 14: Capital expenditure and capital financing to
update commitments on capital contracts for non-housing projects from
£35.412m to £65.412m
7. Reclassification of fixed assets relating to Common Goods Fund of £1.090m;
8. Accumulated depreciation for nil net book value assets was adjusted in the
property, plant and equipment note to the accounts for £156.369m in
2024/25 and for £149.551m in 2023/24. This had no impact on the net book
value of assets in the balance sheet.
9. Minor presentational and disclosure issues.

Page 83

79
The audit team have raised minor and presentational issues with
management, and we recommend that this is updated. 
Overall other than the above detail, we found the disclosed accounting policies,
significant accounting estimates and the overall disclosures and presentation to be
appropriate.
Prior year unadjusted misstatements
There were no prior year unadjusted misstatements reported in the prior year audit.

Page 84

80
Appendix 3: Action plan
Our action plan details the weaknesses and opportunities for improvement that we
have identified during our 2024/25 audit.  The matters reported are limited to issues
we have identified during the course of our audit which we feel are of sufficient
importance to merit reporting to you under the auditing standards.
The recommendations are categorised into three risk ratings: 
Key:
1. Significant deficiency
2. Other deficiency
3. Other observation

Page 85

81
Financial statements action plan 
1. IT general controls  Other
observation
Observation
Our specialist Technology Risk team reviewed the design
and implementation of IT general controls in the key
systems impacting preparation of the financial statements
and identified a few areas for improvement in relation
password, active directory and undertaken testing of
incident management planning. (As this is a public report
and for reasons of IT/control sensitivity, we have provided
specific details to the Council separately).
Implication There is a risk of system issues adversely impacting the
control environment and/or financial statements.
Recommendation We recommend that the specific IT points identified are
addressed.
Management
response
A detailed management response has been completed.
The recommendation will be implemented during 2025/26
Responsible officer: Phil Feeney and Anne Marie Flavell
Implementation date: FY2025/26

Page 86

82
2. Unapproved posted journal Other
observation
Observation
We identified from our journals testing undertaken that
large batch journals with over 50 lines require no system
approval and therefore can be posted and approved by
individuals who hold relevant access. This is due to a
system issue where there are too many line items for
approval within the system. 
Management have mitigating controls in place to review
period end budgetary controls where any significant
variances against budget are investigated and followed up.
Implication
As these specific journals do not required approval, this
could mean that someone could post inappropriate or
fraudulent journals without review or authorisation.
As part of our testing of management override of controls
we have not identified any instances of inappropriate or
fraudulent journal postings during the financial year.
Recommendation
Management should strengthen controls over large batch
journals by introducing an independent approval
requirement (e.g., manual secondary review) before
posting.
Management
response
Work will be undertaken to assure that the batch process
is only used where necessary, and an internal policy will
be developed in the Finance team that outlines
guidance/recommended practice in relation to journal
operation and authorisation, and separation of duties.
Responsible officer: Head of Finance and Procurement
Implementation date: FY2025/26

Page 87

83
3. Payroll transaction approval Other
observation
Observation
For one of the payroll transactions, we noted that one
individual prepared the payroll run and also authorised
this. There was no additional review by another team
member.
Based on the journals selected for audit testing we did not
identify any instances of inappropriate journals being
posted to the finance system.
Implication There is a risk of inappropriate journals postings where
there is not a secondary review process of journals.
Recommendation
Management should strengthen controls over journals by
introducing an independent approval requirement (e.g.,
manual secondary review) before posting.
Management
response
Following an Internal Audit, the processes around payrun
operation and signing of the associated BACS payment
has been reviewed, with further separation of duties and
checks now in place. Alerts and processes within the ERP
system are already in place to mitigate any risk of
fraudulent bank account changes.
Responsible officer: Payroll Services Manager
Implementation date: 31 March 2026 
4. Common Good Funds - Property register Other
observation
Observation
At the time of producing the Unaudited Accounts, there
were still some assets under investigation as to whether
they belonged to the Common Good. This was highlighted
on the public asset register.  
Implication
There is a risk that misclassification of assets could lead to
inaccurate financial reporting and regulatory non-
compliance.

Page 88

84
4. Common Good Funds - Property register Other
observation
Recommendation
We recommend a decision is reached to determine
whether these are Common Good assets and if not,
update the Common Good Property register.
Management
response
It is the opinion of  King’s Counsel that six of the seven
properties under investigation are confirmed as Common
Good assets, and will be adjusted in the fixed asset
register. The Common Good Note in the audited accounts
2024/25 will be updated to reflect this change.
Responsible officer:  Corporate Finance Manager
Implementation date: FY 2025/26 
5. Common Good Funds – Rental arrangements review Other
observation
Observation
Renfrewshire Council administers the Common Good
Fund for Renfrew on its behalf. Not all rental properties
have their rental fees reviewed and updated on regular
basis. 
Implication The absence of documented regular rents reviews creates
uncertainty over the financial return to the fund.
Recommendation
While the Common Good Fund cannot enter into formal
lease agreements, the rents should be subject to periodic
review to confirm that they remain appropriate,
transparent, and provide a fair return to the fund. 
Management
response
Current arrangements between the Council and Common
Good Funds will be reviewed to assess the
appropriateness of any charges between these operations.
Responsible officer:  Principal Estates Surveyor
Implementation date: 30 June 2026

Page 89

85
6. Quality of working papers Other
observation
Observation
Our review of the working papers identified that some of
the documentation provided for audit was not always
presented in a clear or easily navigable format. To support
improvements in this area, we delivered a training session
this year and provided feedback and suggestions to the
finance team and other officers in advance of the audit. 
While progress has been made, further enhancements to
the clarity and structure of some of the working papers
below would help reduce the extent of follow-up queries,
thereby supporting a more efficient audit process. 
In particular, the reconciliation of the trial balance to the
accounts could be presented in a more structured format,
with manual adjustments more clearly identified and
supported by sufficient explanation and evidence.
Similarly, the debtor and creditor listings provided to audit
presented the opening balance plus movements however
per audit requirements we require a detailed breakdown of
all closing balances as at 31 March.
In addition, ongoing work on the reconciliation of revalued
and non-revalued assets to the fixed asset register took
longer than anticipated.
Implication
These issues can lead to delays in the audit process,
increase the risk of misstatements within the financial
statements, and reduce the efficiency of the overall audit
review.
Recommendation
We recommend that working papers be standardised and
presented with improved clarity. Reconciliations should
clearly identify manual adjustments, supported by
explanations and appropriate evidence. Debtor and
creditor listings should be reformatted to ensure all closing
balances are presented. In addition, reconciliations
between revalued and non-revalued assets and the fixed
asset register should be prepared in advance and shared
earlier in the audit cycle.

Page 90

86
6. Quality of working papers Other
observation
Management
response
As with all year-end processes, working papers are subject
to annual review to achieve continuous improvement.
Discussion will take place with Azets after the audit is
completed to discuss areas for particular attention in
relation to clarity and avoidance of follow-up work. 
Responsible officer:  Corporate Finance Manager
Implementation date: FY 2025/26 
7. Asset Classification Other
observation
Observation
As part of our audit procedures, we reviewed the Council’s
approach to the classification of components within
property, plant and equipment (PPE), specifically in
relation to council dwellings and schools. The Council
currently classifies certain components (such as kitchens,
heating systems, and other fixtures and fittings) under the
Vehicles, Plant, Furniture and Equipment (VPFE) asset
class.
While this treatment reflects management’s interpretation
of the applicable accounting standards, our view based on
IAS 16 and the CIPFA Code of Practice on Local Authority
Accounting is that such components form part of the
primary asset classes (i.e. “Council Dwellings” or “Other
Land and Buildings”) as they share the same nature and
use in the authority’s operations.
Implication The issue identified gives rise to an increased risk of
misstatement or classification error.

Page 91

87
7. Asset Classification Other
observation
Recommendation
We recommend that the Council reviews its classification
policy for asset components within council dwellings and
schools, with a view to either:
• Aligning the treatment to ensure that components
remain within the primary asset class, or
• Enhancing disclosures and policy documentation to
clearly explain the rationale for classifying
components separately.
Management
response
The Council’s current treatment of components aligns to
CIPFA Guidance (LAAP 86); however this will be
considered in advance of the 2026/27 year-end to ensure
clarity of reporting and best practice. 
Responsible officer:  Head of Finance and Procurement
Implementation date: FY 2025/26 
Wider scope action plan 
1. Appraisals and business cases reporting Other
observation
Observation
We found that officers and members work well together in
a constructive and appropriately challenging culture which
supports good overall decision making. Whilst there is
evidence of options appraisals and business cases being
reported to Board in relation to specific projects and
officers provided a range of information on project
management governance and processes ,our analysis of
Board and Committee papers indicates some scope for the
council to further develop how it presents options appraisal
and business case development in supporting effective
council decision making and achieving more transparency
and openness in decision making processes

Page 92

88
1. Appraisals and business cases reporting Other
observation
Implication There is a risk of system issues adversely impacting the
control environment and/or financial statements.
Recommendation
We recommend that the council considers how it presents
options to the members to improve decision making
effectiveness and openness.
Management
response
The council already makes extensive use of options
appraisal and business case development as part of major
investment projects and has an established business case
and options appraisal process as part of its corporate
project management framework to support the
development and delivery of projects across the council. 
It is proposed that officers will undertake a review of the
existing corporate guidance, board reporting arrangements
and will benchmark with approaches adopted by other
Scottish local authorities to identify specific areas of best
practice and recommended improvement actions to be
adopted into existing arrangements. 
Responsible officer: Director of Finance and Resources
Implementation date: 31 October 2025 
2. Capital budgeting and monitoring Other
observation
Observation
The actual levels of the initial budgets utilisation were
below 70% in relation to initial budgets for both housing
and non-housing spend. In January 2025 the Council still
estimated the outturn on non-housing capital budget at 
£130m which was significantly above the actual outturn of
£91.6m at 31 March 2025. This in the context of long term
capital planning which assumes an ambitious capital
investment of almost £580m over 5 year period.
Implication Over optimistic assumptions can lead to under delivery of
the capital programme.

Page 93

89
2. Capital budgeting and monitoring Other
observation
Recommendation
We recommend that the capital budget setting process be
revisited to ensure future estimates better reflect prevailing
market conditions and delivery capacity
Management
response
The Capital budget set for 2025/26 was adjusted at the
outset to account for some of the planning and delivery
reprofiling that generally occurs before a project is fully
procured. Future reporting and implementation of capital
budgets and associated planning will be reviewed for the
2026/27 estimates exercise.
Responsible officer:  Head of Finance and Procurement
Implementation date: FY 2026/27

Page 94

90
Appendix 4: Follow up of prior year recommendations
As part of our audit work we have followed up on control weaknesses and
recommendations either raised in last year’s Annual Audit Report or carried forward
from prior years. 
1.  Related party disclosures
Recommendation
The information held relating to member and officer
interests could be enhanced to ensure that all relevant
information is recorded to support the governance and
financial reporting requirements around the disclosure
of related parties. Processes and controls to consider
and identify relevant relationships and transactions that
require to be disclosed within the annual accounts
should be reviewed for appropriateness. 
Risk: There is a risk that the council fail to identify
related parties due to underlying documentation lacking
sufficient detail. 
The recommendation was that a review of controls and
processes around related parties is undertaken. This
will include the documentation of member and officer
interests as well as the processes in place to identify
the relevant disclosures for inclusion in the financial
statements.
Auditor assessment 
We have followed up this prior year recommendation as
part of the audit work performed in 2024/25 and are
satisfied the recommendation has been actioned by
management.
Status: Closed
Response: The Related Parties disclosure was
refreshed and significantly expanded in the 2024/25
accounts. 
Responsible officer: Head of Finance and
Procurement
Implementation date: Complete

Page 95

91 
2.  Financial strategy to support financial
sustainability
Recommendation
The Council faces continuing financial challenges
and significant uncertainty. 
It is anticipated that new financial flexibilities may
become available and the impact of these should be
assessed within the scope of the wider financial
strategy. 
Risk: There is a risk that decisions around financial
flexibilities, transformation and redesign of savings
are made without detailed financial impacts being
available to support the decision-making process. 
The recommendation was to develop a revised
financial strategy incorporating new or temporary
financial flexibilities and assess how the total
balances available are best utilised to support the
financial sustainability of the council over the medium
term. 
The Council will need to actively engage with local
and national partners to deliver the required level of
efficiencies and savings..
Auditor assessment
The Council increased the level of detail and
assumptions reported in its Financial Outlook and
Medium Term Strategy to include impact of
flexibilities and other key factors.
Status: Closed
Response:  The revised Financial Strategy was
developed. The next Financial Outlook incorporating
a medium-term financial strategy will be reported to
Council in September 2025. Members and officers
are continuing to work on proposals to mitigate
forecast budget gaps.
Responsible officer: Director of Finance and
Resources
Implementation date: Complete

Page 96

92
2. Dargavel school response
Recommendation
The Council has responded in a transparent and open
manner to issues raised through the Bowles Report. 
We welcome the creation of a detailed action plan
response to Bowles report recommendation and we
note the planned reviews of overall governance
arrangements and the specific review of the role the
Audit, Risk and Scrutiny Board should have going
forward.
The Council recognises that it faces an ongoing
challenge to build the trust and confidence of local
communities in its school estate decision making.  A
recent report to the Education, Children’s Services
Policy Board comments on the community negative
reaction to the Council’s decision on extending (rather
than replacing) an existing secondary school and
indicates that decisions on the future school estate will
remain a high profile area for the Council. 
Lack of clarity over the above points might lead to slow
pace of remediating issue or re-occurrence in the
future We recommend that the Council:
Performs a more comprehensive and continuous
assessment of future operating costs for planned new
school provision.
Consider whether any additional monitoring and
assessment arrangements for pupil educational
attainment may be required for pupils in the Bishopton
and Dargavel communities
Consider how it will evidence better joint working
between council departments in future projects
Remains open and measures its effectiveness in
rebuilding its relationship with the affected
communities.

Page 97

93
2. Dargavel school response
Auditor Assessment
The Council performed a number of actions in
response to s102 report, its follow up and our annual
audit reports. The Council continues to report on
financial impact if the schools cost in its regular
reporting to the relevant Board and to the Council
within its Financial Outlook and Medium Term
Strategy. We conclude that the above arrangements
are satisfactory.
Status: Complete
Response: There have been a number of update
report to the Audit, Risk and Scrutiny Board on the
actions related to the Bowles Review and subsequent
Accounts Commission s102 report. The Audit, Risk
and Scrutiny Board’s meeting on 4 November 2024
agreed that all relevant actions were either complete or
now incorporated into other reporting arrangements.
The Board agreed there would be no further specific
monitoring reports, but the Board will continue to
receive updates as appropriate through existing
monitoring arrangements, and the Board also will
receive update reports on major programme such as
the learning estate at appropriate reporting periods (so
as not to cut across reporting arrangements on this
programme through the Education and Children's
Service Policy Board). The Board will also maintain a
wider interest in the development of the learning estate
strategy, including estate planning, roll projections,
funding and other associated issues. 
Responsible officer: Chief Executive 
Implementation date: Complete

Page 98

94
3. Financial sustainability
Recommendation 
The medium term financial challenge and financial gap
has been considered by the Council numerous times, but
no clear options have been presented or decision have
been made as to how to address those challenges. The
Council now needs to make difficult spending priority
decisions to secure financial sustainability going forward.
This poses an increasing risk to the Council’s delivery of
services over the medium term and we would recommend
addressing as a priority.
To present the Council with a range of options and
services implications.
Auditor assessment
The updated Financial Outlook and Medium Term
Strategy increases the level of detail and we will continue
to review its next iterations to ensure the information
provided to members is appropriate.  
Status: Ongoing
Response: The Council’s senior management team
continues to identify options for further savings and
service transformation, for agreement by elected
members in setting future annual revenue budgets.
Responsible officer: Director of Finance & Resources
Implementation date: FY 25/26  
4. Cut off de minimis
Recommendation
The Council applies a ‘de minimis’ limit to determining
how it will process transactions into the correct financial
year. However, we identified that this threshold is not
formally set.
There could be inconsistent treatment of the transactions
with no formal limit set leading to misstatements.
To formalise arrangements around cut-off recording. 
Auditor assessment As part of our testing, we performed detailed cut-off
testing on both income and expenditure. Based on the

Page 99

95
4. Cut off de minimis
work performed, we did not identify any material
misstatements. The transaction tested were appropriately
recorded in the correct accounting period, and the cut off
applied was considered reasonable.  
Status: Complete
Response: Page 1 of the Service Year-end Guidance
document for 24/25 stated that all errors over £2,500
should be corrected into the appropriate financial year.
This figure is also quoted in the Prepayments section. 
Responsible officer: Head of Finance and Procurement 
Implementation date: 31 March 2025   
5. Payroll reconciliation
Recommendation
The Council has a number of payruns running at different
frequencies. However, there is no year-end reconciliation in
place between the ledger and payroll systems to ensure that
the figures in the financial statements reconcile to the
payroll system.
There is a risk that the ledger is not complete or accurate
when reflecting payroll figures and impacting on the
financial statements.
We recommend that the Council performs regular
reconciliation between the ledger and payroll.

Page 100

96
5. Payroll reconciliation
Status: Ongoing
Response: The Council’s payroll and ledger systems are
fully integrated in its ERP system, Business World. This
results in the risk of any disparity between the payrun
batches and the General Ledger transactions being very
low. However, officers recognise that testing this on an
annual basis would be beneficial for control assurance and
will undertake development of a process over 2024/25.
Work to progress this took place during the financial year
and a sample year-end reconciliation was produced to
provide this assurance. There is still some improvement
work on going to enhance the reporting and streamlining of
reconciliation work to enable this to be more frequent and
more efficient.
Responsible officer: Director of Finance and Resources
Implementation date: 31 March 2026   
6. Related parties
Recommendation
The Council should disclose intercompany transactions
between group entities in the related parties note.
There is a risk that the disclosure is not complete.
We recommend that the Council makes the relevant
disclosure in the 2024/25 financial statements.
Status: Closed
Response: The Related Parties Note was updated in the
2024/25 accounts for relevant group transactions. 
Responsible officer: Head of Finance and Procurement
Implementation date: 31 March 2025

Page 101

97
7. Performance information
Recommendation
The performance information reported on the Council’s
website is the Council’s response to meeting the
requirements. However, we note that a lot of the
information on this section of the Council website has not
been updated to the newest available. This includes
reporting against the council plan, service outturn reports, 
summarising findings in relation to BV work and progress
against those, including leadership work from last year.
We recommend the Council updates this section of their
website on regular and at least annual basis.
The Council’s performance section on the website has
been updated with most reports with a few update reports
from May and June 2024 board cycles requiring to be
updated
We recommend that the Council updates the information.
Status: Closed
All information continues to be updated on the webpage
through a dedicated "Our Performance" web page. We
have recently supplemented this with a new Best Value
page which provides links to external assessments of
performance. 
Responsible officer: Head of Policy and Partnerships
Implementation date: 30 September 2024

Page 102

98 
© Azets 2025. All rights reserved. Azets refers to Azets Audit Services Limited. Registered
in England & Wales Registered No. 09652677. VAT Registration No. 219 0608 22.
Registered to carry on audit work in the UK and regulated for a range of investment
business activities by the Institute of Chartered Accountants in England and Wales.

Page 103

My Ref: AMacA/CB
Your Ref: RENFC101-LOR-2425
Contact: Alastair MacArthur
Telephone Number: 0300 300 0285
Email: alastair.macarthur@renfrewshire.gov.uk 
Finance and Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley, PA1 1JB
www.renfrewshire.gov.uk 
Azets Audit Services
Quay 2
139 Fountainbridge
EH3 9QG
Dear Sirs 
Renfrewshire Council
Financial Statements for the year ended 31 March 2025 
This representation letter is provided in connection with the audit of the financial statements
of Renfrewshire Council (the ‘Council’) for the purpose of expressing an opinion on whether
the financial statements present a true and fair view, in all material respects, in accordance
with applicable law and UK adopted international accounting standards, as interpreted and
adapted by the Code of Practice on Local Authority Accounting in the United Kingdom
2024/25 (the 2024/25 Code). 
I confirm that to the best of my knowledge and belief, having made such inquiries as I
considered necessary for the purpose of appropriately informing myself: 
Financial Statements
i. I have fulfilled my responsibilities as Section 95 Officer for the preparation of the
Council’s financial statements in accordance with applicable law and UK adopted
international accounting standards, as interpreted and adapted by the Code of Practice
on Local Authority Accounting in the United Kingdom 2024/25 (the 2024/25 Code), for
being satisfied that they give a true and fair view and for making accurate
representations to you.
ii. I have complied with the requirements of all statutory directions affecting the Council
and these matters have been appropriately reflected and disclosed in the financial
statements.
iii. I have considered whether accounting transactions have complied with the
requirements of the Housing (Scotland) Act 1987 in respect of the Housing Revenue
Account.
iv. The financial statements are free of material misstatements, including omissions.

Page 104

My Ref: AMacA/CB
Your Ref: RENFC101-LOR-2425
Contact: Alastair MacArthur
Telephone Number: 0300 300 0285
Email: alastair.macarthur@renfrewshire.gov.uk 
Finance and Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley, PA1 1JB
www.renfrewshire.gov.uk 
v. I have reviewed and approved all audit adjustments made in the financial statements.
(See Appendix 2 of the Annual Audit Report for details of such audit adjustments).
vi. Prior year adjustments have been made to the financial statements where required
and these are appropriately disclosed in the financial statements. (See Appendix 2 of
the Annual Audit Report for details of such audit adjustments).
vii. I have reviewed and approved all disclosures made in the financial statements and I
am not aware of any other matters which require disclosure in order to comply with the
requirements of UK adopted international accounting standards, as interpreted and
adapted by the 2024/25 Code (A summary of the main disclosure changes is at
appendix 2 of the Annual Audit Report).
viii. No uncorrected misstatements were identified during the audit and the prior years. 
ix. The Council has complied with all aspects of contractual agreements that could have a
material effect on the financial statements in the event of non-compliance. There has
been no non-compliance with requirements of any regulatory authorities that could
have a material effect on the financial statements in the event of non-compliance.
x. I acknowledge my responsibility for the design, implementation and maintenance of
internal control to prevent and detect fraud and error, and I believe that I have
appropriately fulfilled these responsibilities.
xi. I am satisfied that the methods, data and significant assumptions used in making
accounting estimates, including those measured at fair value, are appropriate to
achieve recognition, measurement and disclosure that is reasonable in accordance
with the 2024/25 Code and adequately disclosed in the financial statements. Such
accounting estimates include valuation of the pension fund net liability and valuation of
council dwellings and other land and buildings. I am satisfied that the material
judgements used in the preparation of the financial statements are soundly based, in
accordance with the 2024/25 Code and adequately disclosed in the financial
statements. I understand my responsibilities include identifying and considering
alternative methods, assumptions or source data that would be equally valid under the
financial reporting framework, and why these alternatives were rejected in favour of the
estimate used. 
xii. I confirm that I am satisfied that the actuarial assumptions underlying the valuation of
pension scheme assets and liabilities for IAS19 Employee Benefits disclosures are
consistent with my knowledge. I confirm that all settlements and curtailments have
been identified and properly accounted for. I also confirm that all significant post-
employment benefits have been identified and properly accounted for.
xiii. The Council has satisfactory title to all assets disclosed in the accounts. The Council
has no plans or intentions that may materially alter the carrying value and, where

Page 105

My Ref: AMacA/CB
Your Ref: RENFC101-LOR-2425
Contact: Alastair MacArthur
Telephone Number: 0300 300 0285
Email: alastair.macarthur@renfrewshire.gov.uk 
Finance and Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley, PA1 1JB
www.renfrewshire.gov.uk 
relevant, the fair value measurements or classification of assets and liabilities as at 31
March 2025 reflected in the financial statements.
xiv. The Council has complied with all aspects of ring-fenced grants that could have a
material effect on the Council’s financial statements in the event of non-compliance.
xv. Except as disclosed in the financial statements:
a. there are no unrecorded liabilities, actual or contingent
b. none of the assets of the Council has been assigned, pledged or mortgaged
c. there are no material prior year charges or credits, nor exceptional or non-
recurring items requiring separate disclosure.
xvi. Related party relationships and transactions have been appropriately accounted for
and disclosed in accordance with the requirements of applicable law and accounting
standards.
xvii. All events subsequent to the date of the financial statements and which require
adjustment or disclosure have been adjusted or disclosed.
xviii. Actual or possible litigation and claims have been accounted for and disclosed in
accordance with the requirements of UK adopted international accounting standards,
as interpreted and adapted by the 2024/25 Code.
xix. Having assessed going concern,  I believe that the Council and Group’s financial
statements should be prepared on a going concern basis. I do not expect the Council
to demise in its current organisational form in the next twelve months; however, my
basis for going concern acknowledges that if that situation arose the services would be
transferred to another body.  I have not identified any material uncertainties relating to
going concern and believe that no further disclosures relating to the Council or Group’s
ability to continue as a going concern need to be made in the financial statements. 
Information Provided
xx. I have communicated to you all deficiencies in internal control of which management is
aware.
xxi. All transactions undertaken by the Council have been recorded in the accounting
records and are properly reflected in the financial statements.
xxii. I have disclosed to you the results of my assessment of the risk that the financial
statements may be materially misstated as a result of fraud.

Page 106

My Ref: AMacA/CB
Your Ref: RENFC101-LOR-2425
Contact: Alastair MacArthur
Telephone Number: 0300 300 0285
Email: alastair.macarthur@renfrewshire.gov.uk 
Finance and Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley, PA1 1JB
www.renfrewshire.gov.uk 
xxiii. I have disclosed to you all information in relation to known fraud or suspected fraud
that I am aware of and that affects the Council and involves:
a. management;
b. employees who have significant roles in internal control; or
c. others where the fraud could have a material effect on the financial
statements.
xxiv. I have disclosed to you all information in relation to instances of, or allegations of
fraud, or suspected fraud, affecting the financial statements communicated by
employees, former employees, analysts, regulators or others.
xxv. I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when
preparing financial statements.
xxvi. I have disclosed to you the identity of the Council’s related parties and all the related
party relationships and transactions of which I am aware.
xxvii. I have disclosed to you all known actual or possible litigation and claims whose effects
should be considered when preparing the financial statements.
xxviii. I have provided you with:
a. access to all information of which I am aware that is relevant to the preparation
of the Council’s financial statements such as accounting records, and all other
records requested;
b. additional information that you have requested from us for the purpose of your
audit; and
c. unrestricted access to persons within the Council (via remote arrangements
where necessary), from whom you determined it necessary to obtain audit
evidence. 
xxix. I acknowledge our legal responsibilities regarding disclosure of information to you as
auditors and confirm that so far as I am aware, there is no relevant audit information
needed by you in connection with preparing your audit report of which you are
unaware. I have taken all the steps that I ought to have taken in order to make myself
aware of any relevant audit information and to establish that you are aware of that
information.

Page 107

My Ref: AMacA/CB
Your Ref: RENFC101-LOR-2425
Contact: Alastair MacArthur
Telephone Number: 0300 300 0285
Email: alastair.macarthur@renfrewshire.gov.uk 
Finance and Resources
Director: Alastair MacArthur CPFA
Renfrewshire House, Cotton Street, Paisley, PA1 1JB
www.renfrewshire.gov.uk 
Management Commentary
xxx. The disclosures within the Management Commentary fairly reflect my understanding of
the Council’s financial and operating performance over the period covered by the
financial statements. 
Annual Governance Statement
xxxi. I am satisfied that the Annual Governance Statement fairly reflects the Council’s risk
assurance and governance framework and I confirm that I am not aware of any
significant risks or weaknesses in governance or internal control that are not disclosed
within the Statement. 
Remuneration Report
xxxii. I am satisfied that the disclosures within the Remuneration Report have been properly
prepared in accordance with The Local Authority Accounts (Scotland) Regulations
2014. 
Wider Scope
xxxiii. I have made you aware of any issues that could affect your Wider Scope reporting
responsibilities, including any external or internal reports which highlight weaknesses
in our arrangements for securing economy, efficiency and effectiveness in our use of
resources. 
Approval
The approval of this letter of representation was minuted by the Renfrewshire Council at its
meeting on 23 October 2025. 
Yours faithfully 
Signature: 
Name: Alastair MacArthur
Position: Director of Finance and Resources 
Date: 7 October 2025