Notice of Meeting and Agenda
Council 
Date Time Venue
Thursday, 12 December
2024
09:30 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN               
Membership 
Provost Lorraine Cameron (Convener):    Councillor Iain Nicolson (Leader):   Councillor Cathy
McEwan (Depute Convener):   Councillor Jacqueline Cameron (Depute Leader):    
Councillor Jennifer Adam:  Councillor Fiona Airlie-Nicolson:  Councillor Alison  Ann-Dowling: 
Councillor Stephen Burns:  Councillor Michelle Campbell:  Councillor Graeme Clark:  Councillor
Carolann Davidson:  Councillor Eddie Devine:  Councillor Andy Doig:  Councillor Audrey Doig: 
Councillor Chris Gilmour:  Councillor Edward Grady:  Councillor Gillian Graham:  Councillor Neill
Graham:  Councillor John Gray:  Councillor Anne Hannigan:  Councillor John Hood:  Councillor
Lisa-Marie Hughes:  Councillor Robert Innes:  Councillor Alec Leishman:  Councillor Bruce
MacFarlane:  Councillor James MacLaren:  Councillor Kenny MacLaren:  Councillor Mags
MacLaren:  Councillor Colin McCulloch:  Councillor Janis McDonald:  Councillor David
McGonigle:  Councillor Jamie McGuire:  Councillor Marie McGurk:  Councillor Iain McMillan: 
Councillor John McNaughtan:  Councillor Kevin Montgomery:  Councillor Sam Mullin:  Councillor
Will Mylet:  Councillor Jim Paterson:  Councillor Emma Rodden:  Councillor John Shaw: 
Councillor Ben Smith:  Councillor Andy Steel:   
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting.
MARK CONAGHAN
Head of Corporate Governance

Page 2

05/12/2024 
Further Information
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior to the
meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk 
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers.  However, it is a
hybrid meeting and arrangements have been made for members to join the meeting remotely
should they wish. 
Webcasting of Council Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Provost will confirm if all or part of the meeting is being
filmed.  Generally the public seating areas will not be filmed.  The cameras focus on the main
participants.  If you have any queries regarding this please contact Committee Services on
democratic-services@renfrewshire.gov.uk. 
To find the webcast please navigate to: https://renfrewshire.public-i.tv/core/portal/home  and
select the meeting from the calendar.

Page 3

05/12/2024 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest
Members are asked to declare an interest in any item(s) on the agenda
and to provide a brief explanation of the nature of the interest. 
1 Minutes of Meetings of Council, Boards and Panels
Council, 26 September 2024
Special Council, 26 September 2024
Special Regulatory Functions Board, 10 October 2024
Placing Requests and Exclusions Appeals Panel, 21 October 2024
Special Audit, Risk and Scrutiny Board, 22 October 2024
Cross Party Sounding Board, 23 October 2024
Special Council, 24 October 2024
Communities and Housing Policy Board, 29 October 2024
Regulatory Functions Board, 30 October 2024
Education and Children’s Services Policy Board, 31 October 2024
Audit, Risk and Scrutiny Board, 4 November 2024
Economy and Regeneration Policy Board, 5 November 2024
Planning and Climate Change Policy Board, 5 November 2024
Infrastructure, Land and Environment Policy Board, 6 November 2024
Petitions Board, 11 November 2024
Regulatory Functions Board, 14 November 2024
Local Review Body, 19 November 2024
Finance, Resources & Customer Services Policy Board, 21 November
2024
Special Infrastructure, Land and Environment Policy Board, 22
November 2024
Special Planning and Climate Change Policy Board, 3 December 2024
Leadership Board, 4 December 2024 (copy to follow) 
2 Provost's Update
Hear from the Provost 
3 Treasury Management and Prudential Indicators Mid-year
Review 2024/25
Report by Director of Finance & Resources 
1 - 18 
4 General Fund Financial Update
Report by Director of Finance & Resources       
19 - 28

Page 4

05/12/2024 
5 Neighbour Disputes
Report by Lead Officer 
29 - 40 
6 Governance Report
Report by Director of Finance & Resources 
41 - 44 
7 Notice of Motion 1 by Councillors Paterson and Innes
"Two-Child Benefit Cap 
Council agrees to write to the Chancellor of the Exchequer and the
Department of Work and Pensions Secretary asking them to commit to
phasing out the Two-Child Benefit Cap within the current parliamentary
term, recognising the urgency of reversing its damaging effects on
families and children. Requests that they produce a clear roadmap for
how and when this will be achieved and work with the Scottish
Government and child poverty organisations to implement a more
humane and fair welfare system, one that prioritises the welfare of all
children, regardless of family size or circumstance." 
8 Notice of Motion 2 by Councillors Innes and Airlie-
Nicolson
“Victims of Facial Scarring 
Council believes that everyone who is inflicted with a facial scar due to
an assault should be supported as a victim of an extremely traumatic
experience. 
Council recognises that victims of permanent facial scarring suffer
difficult and life-long trauma. 
Further, people with facial scarring due to knife attacks or ‘slashing’
suffer stigma and can be vilified in social and professional life due to
their scarring. 
Council agrees that specialist support should be available for a victim
from the earliest possible point and throughout any point in a victim’s life
when they may feel they need it. 
Council believes this is the best approach to ensure victims are
supported with their trauma, to reduce stigma and to ensure the best
possible chances of rehabilitation. 
Council acknowledges that this support does not exist for those who
need it and agrees to work with partners, charities, and organisations to
further explore ways to ensure this support is in place for victims of facial
scarring.”

Page 5

05/12/2024 
9 Notice of Motion 3 by Councillors Andy Doig and Hood
"Better Prostate Cancer Screening for Men  
Renfrewshire Council commends the bravery of leading Scottish sports
personality, Sir Chris Hoy, in speaking out about his own personal battle
with prostate cancer, articulating how he has coped with those
challenges, and encouraging others to do the same. 
Council further supports the efforts of charities such as Prostate Cancer
UK to raise awareness of the fact that prostate cancer is one of the
biggest killers of men, commends their educational campaigns about the
risk factors and symptoms of prostate cancer, and their robust advocacy
for further research on the causes of prostate cancer. 
Council agrees with Prostate Cancer UK that current NHS guidance on
prostate screening is outdated, recognizes the limitations of the PSA
test, and therefore resolves to write to the Cabinet Secretary for Health
and Social Care advising that NHS Scotland provide prostate cancer
screening for all men over 45 years who have a family history of the
disease.” 
10  Notice of Motion 4 by Councillors Andy Doig and Hood
"LED Headlights on Cars and Review of the Law 
Renfrewshire Council recognises the importance of ensuring the safety
of all road users and pedestrians, and notes growing public concern
over the adverse and inappropriate use of LED headlights on cars which
are a risk to road safety. 
Council believes in the promotion of education for car vehicle users
around correct operations of the headlights to minimise glare,
acknowledges the need for new regulations to address the adverse
effects of LED headlight glare, and therefore agrees to write to the UK
Secretary of State for Transport, and the Scottish Cabinet Secretary for
Transport, calling for a strategy to: 
1. Task the relevant regulatory authorities to conduct a comprehensive
review of current standards related to car lighting, with a specific focus
on mitigating LED headlight glare. 
2. Consult with car manufacturers to develop and implement updated
regulations that effectively reduce the negative impact of LED headlight
glare without compromising vehicle safety or performance. 
3. Establish a timeline for the implementation of revised standards,
ensuring a reasonable transition period for car manufacturers to adapt to
the new regulations. 
4. Encourage public awareness campaigns to educate drivers on the
proper use and adjustment of LED headlights to minimize glare.

Page 6

05/12/2024 
5. Consider penalties for non-compliance with the revised regulations to
incentivize car manufacturers to adhere to the new standards." 
11  Notice of Motion 5 by Councillors Ann-Dowling and G
Graham
"Corseford College 
Corseford College is Scotland’s only further education college for young
people with complex needs. The college opened in 2022 as part of a
two-year pilot programme funded by Scottish Government, extended for
a further year in 2024-25. Specialist further education college provision
is a proven and successful model in England and Wales. 
Now in its third and potentially final year unless long term funding is
secured, Corseford College supports students with the delivery of
education, physical therapies and life-skills development from its base in
Inchinnan in Renfrewshire. 
Corseford College offers post-school education to young people in
Renfrewshire and beyond for young people aged between 18-25 whose
needs cannot be met in a mainstream college. It is delivering lifelong
learning opportunities while supporting these young people to develop
life skills and ways to live a more independent life in the future. 
Council agrees to write to the Scottish Government requesting that it
ensures a sustainable future for the college; to recognise the critical role
the college plays by providing the necessary funding to ensure that no
young person with complex needs in Scotland is left without a positive
destination after school. 
Council asks the Scottish Government to recognise the college as a
fundable body by the Scottish Funding Council or for funding to be
secured on a long-term basis from other Scottish Government
departmental budgets." 
12  Notice of Motion 6 by Councillors Ann-Dowling and
McMillan
"Linwood War Memorial 
Linwood is the only large population centre in Renfrewshire without a
permanent war memorial for local people to pay their respects on
Remembrance Sunday. 
Instead, the people of Linwood have to organise Remembrance and
Armistice Day services at a temporary site at a metal railing in the town.
These efforts are led by local volunteers and the Linwood War Memorial
Association, who have made extensive efforts to fundraise to erect a war
memorial for Linwood. 
Council agrees that it is unacceptable that Linwood is the only large
village or town in Renfrewshire that doesn’t have a permanent

Page 7

05/12/2024 
monument to the men and women who were born in, lived in and
worked in Linwood, who fell in war and conflict. 
Council agrees to contribute £0.075m to the Linwood War Memorial
Association once their community asset transfer transaction is
concluded, as a donation towards the costs of erecting a permanent war
memorial in Linwood."   
13  Notice of Motion 7 by Councillors McMillan and Davidson
"Ward 36 at the RAH 
Council is opposed to any plans to close Ward 36 at the RAH. 
Council therefore agrees to write to the Scottish Health Secretary to ask
for any closure proposals to be axed and ward 36 to remain open." 
14  Notice of Motion 8 by Councillors MacFarlane and
Nicolson
"Renfrewshire Council demands that the Labour UK Government
should fully reimburse the over £500m costs of employer National
Insurance contributions to the public and third sectors in Scotland as a
result of the UK Autumn Statement, and that this should include full
reimbursement to Renfrewshire Council and our partners. Council
further recognises that if the Chancellor does not fully reimburse these
costs that it will have a detrimental impact on the wide range of services
the people of Renfrewshire rely upon." 
15  Notice of Motion 9 by Councillors McMillan and Clark
"IJB Budget 
Council notes that the IJB meeting to be held on the 13th December is
facing some difficult decisions in order to achieve a balanced budget. 
Council is concerned about potential service cuts having a detrimental
impact on some of the most vulnerable people and their families in
Renfrewshire. 
Council therefore agrees to write to the Scottish Government, First
Minister, Finance Minister and the Health Secretary to: raise
Renfrewshire Council concerns about the impact any significant
reduction in service levels or removal of health and social care services
will have on the people of Renfrewshire; and to ask what steps the
Scottish Government is taking to ensure the health and social care
needs of the people of Renfrewshire continue to be met in the face of
IJB budget constraints. 
Finally, Council agrees that IJB’s need to work for the residents and
service users of Renfrewshire."

Page 8

05/12/2024 
16 Notice of Motion 10 by Councillors Clark and Smith
"Police Provision in Paisley 
Renfrewshire Council notes Police Scotland‘s wish to close Paisley’s Mill
Street Police Station. 
Council believes that in Scotland’s largest town it is imperative that
Police Scotland maintain their current policing provision including 24/7
public counter access and CID. 
Council requests that the closure of Paisley’s Mill Street Police Station
should be fully dependent on Police Scotland obtaining or leasing
alternative premises that fully meet with a like-for-like provision of
existing services or indeed improve them." 
EXCLUSION OF PRESS AND PUBLIC
The Board may by resolution exclude the press and public from the
meeting during consideration of the following item of business as it
is likely, in view of the nature of the business to be transacted, that
if members of the press and public are present, there could be
disclosure to them of exempt information as defined in paragraphs
6 & 9 of Part I of Schedule 7A of the Local Government (Scotland)
Act, 1973. 
17  GAIA Contracts Update
Exempt joint report by the Chief Executive and Director of Finance &
Resources.

Page 9

1 
___________________________________________________________________
To:  Council 
On:  12 December 2024
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Treasury Management and Prudential Indicators Mid-Year Review
2024/25
___________________________________________________________________
1. Summary
1.1 This mid-year report has been prepared in compliance with the Chartered
Institute of Public Finance and Accountancy’s (CIPFA) Treasury
Management in the Public Services Code of Practice on Treasury
Management 2021. The report covers the following for 2024/25 to date:
• a review of the Treasury Management Strategy Statement 2024/25,
incorporating the annual investment strategy;
• a review of the Council’s borrowing and investments;
• a review of compliance with treasury management and prudential
indicators;
• an economic update and interest rate forecast.
___________________________________________________________________
2. Recommendations
2.1 It is recommended that Members: 
a) Note the treasury management activity for the period 1iApril 2024 to 11
October 2024 (reporting period 7); 
b) Approve the ‘Probable’ prudential indicators for capital expenditure as
detailed in Section 7 of the report. 
Item 3
Page 1 of 44

Page 10

2 
3. Treasury Management Strategy Statement and Annual Investment
Strategy Update
3.1 The Treasury Management Strategy Statement for 2024/25 was approved
by Council on 29 February 2024. It incorporates the Annual Investment
Strategy, which sets out the Council’s investment priorities as follows:
• the security of capital; and
• the liquidity of its investments.
3.2 The Council also aims to achieve the best return on its investments, along
with the proper levels of security and liquidity.  
3.3 Investments and borrowing between 1 April to 11 October 2024 were in line
with the approved strategy, and there have been no changes to the policies
set out in the Treasury Management Strategy Statement 2024/25.  
3.4 In the current economic climate, it is considered appropriate to keep
investments short-term to cover cashflow needs, but also to seek improved
returns in periods up to 12 months with high credit-rated financial institutions. 
The following sections in this report provide an update in light of the current
economic position and any budgetary changes already approved. 
4. Review of borrowing and investments over the period 1 April 2024 to 11
October 2024
4.2 The Council’s net borrowing position is calculated as total borrowing minus
total investments. At 11 October 2024, this figure was a net borrowing
position of £151.9m (see Appendix 1).
4.3 During the period 1 April to 11 October 2024, the Council’s total external
borrowing decreased only marginally, from £290.3m to £289.6m.
4.4 In the same period, short-term investments have increased from £99.2m to
£137.7m, primarily due to the front-loading of revenue support grant and
other sources of income, such as Council Tax payments.
4.5 The Director of Finance and Resources confirms that, during the period 1
April to 11 October 2024, the approved limits set out within the annual
investment strategy sections of the Treasury Management Strategy
Statement 2024/25 were complied with, and the Council only invested with
institutions listed in its approved lending list.  Similarly, only permitted
investment vehicles were used, mainly fixed-term deposits with banks, other
local authorities, the UK governments deposit facility (DMADF), call accounts
and money market funds.
4.6 In accordance with CIPFA’s Treasury Management in the Public Services
Code of Practice, it is the Council’s priority to ensure security of capital and
Page 2 of 44

Page 11

3 
liquidity, and to obtain an appropriate level of return that is consistent with
the Council’s risk appetite. 
4.7 As shown by the interest rate forecasts in Appendix 3, rates peaked at
5.25% and dropped to 5.00% in August 2024 (then 4.75% in November) and
may be subject to a further cut before the end of 2024/25.  
4.8 The table below shows the average interest rate achieved by the Council on
its investments during the period 1 April 2024 to 11 October 2024. The table
also shows for comparison the benchmark comparator SONIA (the Sterling
Overnight Index Average), which is administered by the Bank of England
and reflects bank and building societies’ actual overnight funding rates in
Sterling.  The Council’s average return currently exceeds the benchmark and
the current bank rate, due to some fixed-term deposits that were agreed
when rates were higher.  As the older deals mature; however, the Council’s
average rate of return will decrease to be more in line with the bank rate. 
4.9 Opportunities for debt rescheduling (where high rate loans are repaid and
lower rate loans taken out instead) are limited in the current economic
climate and this is not expected to change over the short term. However,
officers continue to liaise with the Council’s treasury advisors to monitor this. 
5. Review of compliance with Treasury Management indicators
for 2024/25
5.1. During the period 1 April 2024 to 11 October 2024, the Council complied with
the approved treasury management indicators as set out in the Treasury
Management Strategy Statement 2024/25. These indicators relate to:
• interest rate exposure: the upper limit on the proportion of
investments held with fixed interest rates and the upper limit on the
proportion of investments held with variable interest rates;
• the maturity structure of borrowing: the lower and upper limits on
the proportion of investments that fall into each maturity band. 
6. Foreign Exchange Deposits
As part of the contractual agreement for the Clyde Waterfront and Renfrew
Riverside City Deal project, the Council is required to make a proportion of
supplier payments in Euros over the duration of the project. The Council
Interest rates
achieved
Average
value of
investments
Average
rate of
return
Benchmark
return
(SONIA)
Internally managed
investments £132.4m 5.26% 5.11%
Page 3 of 44

Page 12

4 
continues to mitigate exchange rate risk through approved tools, such as
advance purchase; always providing that these tools are used for risk
mitigation and not speculative purposes. 
7. Review of Prudential Indicators for Capital Expenditure
7.1. The Local Government in Scotland Act 2003 and supporting regulations
require local authorities to have regard to the Prudential Code for Capital
Finance in Local Authorities (“the Prudential Code”). 
7.2. The Prudential Code 2021 introduced a change to reporting and monitoring
and recommended that from 2023/24 a regular (at least quarterly) update is
provided to members noting the current forecasts for prudential indicators
compared to those approved at the start of the financial year. 
7.3. The result of this change is that Prudential Indicator reporting now forms part
of the Revenue and Capital Budget Monitoring – Council Overview, reported
each cycle to the Finance, Resources and Customer Services Policy Board,
with this mid-year update reporting to full Council. 
7.4. The Council set its prudential indicators for 2024/25 on 29 February 2024.
The purpose of this section is to consider the indicators as they stand at 11
October 2024, approximately halfway through the financial year, and revise
them where appropriate. All indicators for the current year and the following
two years are summarised in Appendix 2. 
Capital Expenditure Indicators 
7.5. The Council is required to make estimates of the capital expenditure it plans
to incur for the forthcoming financial year and at least the following two
years. Separate estimates should be made for Housing and Non-Housing
services. 
The Capital Investment Programmes for both Housing and Non-Housing
were approved by Council on 29 February 2024, and the resulting indicators
were updated to reflect the approved programme, incorporating the
decisions taken by the Council at the budget meeting. 
7.6. Council approved the following as an indicator for Capital Expenditure. The
limit is based on the resources available to fund the capital programmes,
split between Housing and Non-Housing Services, excluding the Public
Sector Housing Grant, as this is not considered to be capital spend for the
Council. 
Page 4 of 44

Page 13

5 
Capital
Expenditure
2024/25 2024/25 2024/25 2024/25
Approved Probable
Outturn
Movement Actual
spend at
11 October
£m £m £m £m
Non-Housing 147.179 107.209 -39.970 37.969
Housing 41.236 30.769 -10.467 12.790
Total 188.415 134.978 -50.437 50.759 
The decrease of £39.970m in the planned Non-Housing capital expenditure
during 2024/25 is mainly attributable to:
• changes in the cashflow profile of a number of capital investment
programmes, resulting in a net adjustment of (£75.647m) from 2024/25
into 2025/26 and future years, as reported to relevant policy boards;
• carry forward of programmed expenditure from 2023/24 to 2024/25
totalling £26.151m; and
• the addition of £9.526m largely relating to increased budget for Paisley
Grammar Community Campus approved by Council on 9 May 2024.
The decrease of £10.467m in the planned Housing capital expenditure
during 2024/25 arises from changes in cashflow profile of a number of
programmes, particularly within regeneration, resulting in a net adjustment of
£10.467m from 2024/25 into 2025/26, as reported to the Communities and
Housing Policy Board. 
Capital Financing Requirement Indicator 
7.7. The Council has available to it a number of ways of financing capital
investment. The term ‘financing’ does not refer to the payment of cash, but
the resources that are applied to ensure that any underlying capital spend is
funded absolutely, whether at the point of spend or over the longer term. A
number of financing options involve resourcing the investment at the time
that it is incurred. These are:
• the application of useable capital receipts;
• a direct charge to revenue for capital expenditure;
• the application of capital grants; or
• upfront contributions from project partners. 
Any capital expenditure not financed at the outset by one of these methods
will increase the Capital Financing Requirement (CFR) of the Council. 
Page 5 of 44

Page 14

6 
The revised projected Capital Financing Requirement for 2024/25, based
on the position at 11 October 2024 is noted in the table below. 
Capital Financing
Requirement
2024/25
Approved Probable Movement
£m £m £m   
Non-Housing 458 462 4
Housing 137 130 -7
Total 595 592 -3 
The increase of £4m in probable Capital Financing Requirement at 31 March
2025 for Non-Housing services arises from the reduced capital expenditure
forecast to the end of 2024/25 described in 7.6 largely offset by related grant
payments (City Deal) now expected to be received in 2025/26, and an
increase in other long-term liabilities anticipated due to the adoption of IFRS
16, explained further in section 7.9. 
The decrease of £7m in the probable Capital Financing Requirement at 31
March 2025 for Housing services arises from the reduced capital
expenditure forecast to the end of 2024/25 described in 7.6, partly offset by
the reprofiling of expected grant payments from the Scottish Government for
Council House New Build into 2025/26. 
External Debt Indicators 
7.8. External debt indicators are set at two levels: an Operational Boundary and
an Authorised Limit. Both of these need to be consistent with the Council’s
plans for capital expenditure and financing and with its Treasury
Management policy statement and practices. 
Operational Boundary: This is the focus of day-to-day treasury
management activity within the Council and is an estimate of the most likely,
but not worst case, scenario in terms of cashflow. Risk analysis and risk
management strategies have been taken into account, as have plans for
capital expenditure, estimates of the Capital Financing Requirement and
estimates of cashflow requirements for all purposes. It is possible that this
boundary is breached occasionally and this would not be regarded as
significant. However, a sustained or regular trend of such would be
significant, and require investigation and action. 
The Operational Boundary is split between external borrowing and other
long-term liabilities. 
Page 6 of 44

Page 15

7 
Operational Boundary for
external debt 2024/25
Approved  Probable Movement
£m £m £m
Borrowing 501 498 -3
Other long-term liabilities 94 94 0
Total 595 592 -3 
The decrease in the Operational Boundary of £3m is directly related to the
decrease in the Capital Financing Requirement Indicator described in 7.7. 
Authorised Limit: This is based on the same assumptions as the
Operational Boundary, with additional headroom to allow for both planned
and exceptional cashflow requirements, without breaching the limit. It is split
between external borrowing and other long-term liabilities. 
Authorised Limit for external
debt 2024/25
Approved  Probable Movement
£m £m £m
Borrowing 526 523 -3
Other long-term liabilities 94 94 0
Total 620 617 -3 
The decrease of £3m is related to the Operational Boundary reduction as
outlined in 7.7.   
7.9. In December 2018, the CIPFA/LASAAC Local Authority Accounting Board
confirmed that from 1 April 2020 the CIPFA Code of Practice on Local
Authority Accounting would be adopting the accounting standard IFRS 16: 
Leases. After consultation, in April 2022 the deadline for implementation of
IFRS 16 was deferred until 1 April 2024 due to significant delays resulting
from the pandemic. 
The practical effect of adopting IFRS 16 is that any contract the Council has
signed that provides the right to rent or lease exclusive use of an asset, such
as property or vehicles, could potentially require to be recognised as an
asset on the Council’s balance sheet, with a corresponding debt liability
recognised at the present value of the future lease payments. 
This liability will be treated as additional borrowing, therefore increasing the
Capital Financing Requirement and other associated Prudential Indicators.
An initial estimate of the impact of this change has been factored into the
probable Prudential Indicators following the Council’s adoption of IFRS 16 in
the current year. 
___________________________________________________________________ 
Page 7 of 44

Page 16

8 
Implications of the Report 
1. Financial 
As described in the report; the Treasury Management Strategy Statement,
treasury management and prudential indicators all assist in providing
assurance that the Council’s treasury management activities and longer term
spending plans are affordable, prudent and sustainable. 
2. HR & Organisational Development
There are no direct implications arising from the recommendations in this
report. 
3. Community/Council Planning 
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe
Council Plan
Reshaping our place, our
economy and our future The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Building strong, safe and
resilient communities
Tackling inequality, ensuring
opportunities for all
Creating a sustainable
Renfrewshire for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good
financial management so that the Council
has resources now and in the future for
continued service delivery.
Working together to improve
outcomes 
4. Legal 
There are no direct implications arising from the recommendations in this
report. 
5. Property/Assets
The capital expenditure noted in this report will result in lifecycle
maintenance improvements to existing properties and replacement of ICT,
infrastructure, and plant and equipment. 
Page 8 of 44

Page 17

9 
6. Information Technology 
There are no direct implications arising from the recommendations in this
report. 
7. Equality & Human Rights 
While new areas of spend may impact on particular groups, any such impact
would be assessed prior to the spend being incurred, therefore there are no
direct implications arising from the recommendations in this report. 
8. Health & Safety 
There are no direct implications arising from the recommendations in this
report. 
9. Procurement 
While Procurement is an important consideration prior to the Council
incurring any revenue or capital spend, there are no direct implications
arising from the recommendations in this report. 
10. Risk
The Treasury Management Strategy Statement, treasury management and
prudential indicators provide a framework for the Council’s treasury activities,
the effective control of risks associated with those activities, and the pursuit
of optimum performance in line with those risks. 
This report demonstrates that the treasury management activities carried out
during the period 1 April 2024 to 11 October 2024 have been consistent with
the Treasury Management Strategy Statement 2024/25, and have complied
with the treasury management indicators set out in the approved Treasury
Management Strategy Statement. 
11. Privacy Impact 
There are no direct implications arising from the recommendations in this
report. 
12. Children’s Rights  
There are no direct implications arising from the recommendations in this
report. 
13. Climate Change
The Council aims to reduce its carbon and other emissions to net zero by
2030, however there are no direct implications arising from the
recommendations in this report. 
Page 9 of 44

Page 18

10 
14. Cosla Policy Position - N/A
_________________________________________________________ 
List of Background Papers: Prudential Framework and Treasury Management
Strategy, Council, 29 February 2024. 
Author: Alastair MacArthur, Director of Finance and Resources 
Page 10 of 44

Page 19

11 
Appendix 1: Borrowing Position as at 11 October 2024 
Balance at 1
April 2024
New
Borrowing in
2024/25
Cash
Movements 
Balance at 11
October 2024
Long-term borrowing        
PWLB – fixed rate 243,592,325.83 0  (762,933.13) 242,829,392.70
Market loans 46,766,000.00 0      0    46,766,000.00
Total long-term borrowing 290,358,325.83 0 (762,933.13) 289,595,392.70
Investments        
Fixed term deposits 67,754,630.14 0    (47,754,630.14) 20,000,000.00
Call accounts 9,360,212.15 0    7,608,787.85 16,969,000.00
UK Government DMADF 0  0   47,610,000.00 47,610,000.00
Money market funds 20,100,762.43 0    33,028,237.57 53,129,000.00
Total investments 97,215,604.72 0    40,492,395.28 137,708,000.00          
Net borrowing 193,142,721.11 0 (41,255,328.41) 151,887,392.70  
Page 11 of 44

Page 20

Page 12 of 44

Page 21

12 
Appendix 2: Prudential and Treasury Indicators as at 11 October 2024 
2024/25
Estimate
2024/25
Probable
2025/26
Estimate
2026/27
Estimate
Operational boundary for external debt  £595m   £592m   £728m   £782m 
Authorised limit for external debt  £620m   £617m   £760m   £816m 
External debt*  £475m   £355m  £603m   £657m 
Upper limit for fixed interest rate exposure
(borrowing) 
expressed as percentage of total net outstanding
principal
100% 84% 100% 100%
Upper limit for variable interest rate exposure
(borrowing)
expressed as percentage of total net outstanding
principal
25% 16% 25% 25%  
New Borrowing in 2024/25 Total of all Borrowing 
Maturity structure of fixed rate borrowing Value Maturity
structure Upper limit As at 11
October 2024
Under 12 months 0  0% 15% 0.00%
More than 12 months and within 24 months  0  0% 15% 1.73%
More than 24 months and within 5 years  0  0% 45% 1.73%
More than 5 years and within 10 years  0  0% 50% 0.01%
10 years and above 0 0% 100% 96.53% 
* The Probable figure here represents the actual level of debt at 11 October 2024 and includes finance lease and service concession liabilities,
in line with the Authorised Limit and Operational Boundary values.
Page 13 of 44

Page 22

Page 14 of 44

Page 23

13 
Appendix 3: Economic Update and Interest Rate Forecast
1. Economic update (Link Group) 
1.1. The first half of 2024/25 saw: 
• GDP growth remaining broadly constant in July following downwardly
revised Q2 figures (0.5% quarter over quarter);
• A further easing in wage growth as the headline 3-month year on year
average rate (including bonuses) fell from 4.6% in June to 4.0% in July;
• CPI inflation hitting its target in June before edging above it to 2.2% in
July and August;
• Core CPI inflation increasing from 3.3% in July to 3.6% in August;
• The Bank of England initiating its easing cycle by lowering interest
rates from 5.25% to 5.0% in August (cutting again in November to
4.75%);
• 10-year gilt yields falling to 4.0% in September. 
2. Interest Rate Forecast (Link Group) 
2.1. The Council has appointed Link Group as its treasury advisors and part of
their service is to assist the Council to formulate a view on interest rates. The
PWLB rate forecasts below are based on the Certainty Rate (the standard
rate minus 20 bps) which has been accessible to most authorities since 1st
November 2012. 
2.2. The latest forecast on 11 November sets out a view that short, medium and
long-dated interest rates remain elevated but will begin to drop slightly over
the next two years. 
2.3. Our PWLB rate forecasts below are based on the Certainty Rate (the
standard rate minus 20 bps, calculated as gilts plus 80bps) which has been
accessible to most authorities since 1 November 2012.
Page 15 of 44

Page 24

Page 16 of 44

Page 25

14 
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
Interest rate forecast
bank rate 5 yr PWLB 10 yr PWLB 25 yr PWLB 50 yr PWLB
Page 17 of 44

Page 26

Page 18 of 44

Page 27

___________________________________________________________________
To: Council
On: 12 December 2024
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: General Fund Financial Update
___________________________________________________________________
1. Summary
1.1 Successive financial update reports to the Council have highlighted the
ongoing and increasingly challenging financial and economic
environment the Council is facing. This report seeks to update
Members on the impact of the UK Government Autumn Statement on
30 October 2024. 
1.2 The draft Scottish Budget was announced on 4 December 2024.
However, details of the local government grant settlement are not
expected to be with officers until 12 December 2024. The draft Budget
is expected to be subject to ongoing clarification between COSLA and
the Scottish Government, therefore a full update on the implications of
the Budget for the Council’s financial position will be provided to a
future Council meeting.  
___________________________________________________________________ 
2. Recommendations
2.1 Note the details of the UK Government Autumn Statement outlined in
the report;
2.2 Note the update provided in relation to the current financial year, and
current financial risks;
Item 4
Page 19 of 44

Page 28

2.3 Approve the recommended adjustments to the capital plan outlined in
section 6. 
3. UK Government Autumn Statement
3.1 The main event which provides context for the current and future
economic outlook was the UK Government Autumn Budget which was
published on 30 October, accompanied by economic and fiscal forecast
updates from the Office of Budget Responsibility (OBR). 
3.2 The main policy objectives set out by the Chancellor in the Autumn
Budget were to promote economic growth, and invest in the NHS. To
this end the Chancellor announced policies that increase spending by
almost £70 billion over the next five years. Around half is expected to
be funded by increased taxation. The OBR has indicated that while
these budget policies will boost productivity in the short-term, the scale
of the combined impact on GDP after 5 years is negligible. 
3.3 In terms of inflation, the UK budget policies announced in the Autumn
Statement are expected to increase CPI inflation by around 0.5% at
peak, meaning that CPI is forecast to rise to 2.6% in 2025 before
gradually falling back to target.
3.4 The chart below shows total actual and forecast spending on revenue
(RDEL) and capital (CDEL) following the budget policy
announcements. 
3.5 While from the funding announced there is an increase in public
spending suggested in the short term, it should be noted that in future
years the Budget suggested that spending growth would be broadly in
line with that announced in the Spring Budget, as detailed in the chart
below. The Spending Review – set to be published by the UK
Government originally in Spring 2025, but now pushed back to Summer
Page 20 of 44

Page 29

2025 – will provide further detail on spending plans over the medium
term.   
3.6 As part of the taxation measures, the Chancellor announced an
increase in National Insurance contributions (NIC) for employers,
raising the rate of contribution from 13.8% to 15% and dropping the
threshold at which NIC is paid from £9,100 to £5,000. 
3.7 This is estimated to cost Renfrewshire Council General Services over
£6 million in 2025/26. The UK Government has advised that
compensatory funding will be provided to ‘shield’ the public sector from
the additional cost of this change; however, this has yet to be formally
confirmed. It is likely however, that the compensatory funding received
in Scotland will be insufficient to meet the actual costs. This is because
the public sector is proportionally larger in Scotland (and better paid)
than in England and Wales, therefore assuming the allocation of
compensatory funding is based on Barnett principles, the allocation to
Scotland would be insufficient. The UK Treasury has recently informed
the Scottish Government the allocation would be £295–330 million; well
below the Scottish Government’s initial estimate of £500 million.
3.8 It should be noted that there are likely to be indirect costs associated
with this NIC change, with contractors and other suppliers passing on
this cost through higher prices. This is currently estimated to be c2.5%
above usual inflationary increases, and will predominantly impact on
construction and maintenance programmes; and commissioned
childcare and social care provision.
3.9 Turning to impact on the Scottish Budget, there will be additional
funding for the Scottish Government through the Barnett formula of
Page 21 of 44

Page 30

£1.5 billion in 2024/25, and £3.4 billion (£2.8 billion revenue and £0.6
billion capital) for 2025/26. The main measures generating revenue
consequentials for Scotland in 2025/26 are:
• Additional funding for the NHS in England in 2025/26, which
generates £1.6 billion; 
• Investment in Education and skills, including new foundation
apprenticeships and relaunching Lifelong Learning Entitlement, as
well as schools funding, which generates £0.5 billion; 
• Real-terms increase in settlements for local government in England,
generating £0.3 billion. 
While the Scottish Government is free to spend this money where it
chooses, it is likely that health-related consequentials will be ring-
fenced for the NHS in Scotland based on the pattern of pervious similar
decisions taken by the Scottish Government. 
3.10 Members should be aware that there is no requirement for the Scottish
Government to pass through any local government related
consequentials to councils in Scotland. In the event that these
consequentials are passed through to local government, it may be the
case that the Scottish Government would mandate – as has been the
case in previous years – that funding growth is passed directly to health
and social care partnerships; or funding may come with additional new
obligations in terms of local government delivery of Scottish
Government priorities.
4 2024/25 Financial Position
4.1 Members are aware the recent very high levels of inflation experienced
in the economy over the past few years have driven cost increases that
are impacting on families and household finances, as well as the
Council and associated bodies, community organisations and
businesses. While the outlook for inflation has eased significantly since
its peak of 11% in 2022, the most recent CPI figure of 2.3% indicates
an upturn, indeed the OBR suggests it will rise again to around 2.6%
before returning to its target 2.0% in 2025. It should be noted that the
legacy of the very high rates recently experienced is still being felt, with
many contracts continuing to be the subject of high and increasing
prices.  And of course lower inflation does not mean a reduction in cost
– simply that the rate of increase in costs in slowing.
4.2 As has been previously reported, the Council continues to face cost
pressures in other areas – residential care, transportation and diesel
Page 22 of 44

Page 31

costs. Vehicle parts costs are increasingly an issue, while building and
construction cost pressures remain an ongoing concern. 
4.3  The Council Overview finance report to the recent Finance, Resources
and Customer Services Policy Board outlined a 2024/25 projected
overspend (excluding the overspend projected in adult social care) of
£0.1 million. High levels of inflation and other cost pressures are
mitigated by an expected increase in investment income in the current
year, given prevailing high rates of interest. This projection is exclusive
of a number of other risks, as follows:
• The 2024/25 pay award has been agreed for teaching staff at 4.27%,
with a quantum of funding of £29m confirmed by the Scottish
Government. The distribution of this across councils has yet to be
confirmed, so there is a risk that the Council, having budgeted 3%,
may incur costs in excess of distributed funding.
• An increase in employer pension contributions for teachers that
came into effect from 1 April 2024 is expected to be fully funded by
the Scottish Government. Again, the quantum of funding has been
indicated, but distribution to Renfrewshire Council is not yet
confirmed. The cost of the increased rate for the Council is c£3.0m
per year.
• The Council budgeted in 2024/25 for receipt in full of the £4.8m
funding associated with teacher numbers. The Council has not (in
line with every other council in Scotland) accepted the terms of the
specific grant funding, therefore there remains a risk this funding will
not be received.
• The projection does not include any variance relating to the
collection of Council Tax. Current forecasts suggest collection rates
are holding up in line with budget, however this will continue to be
closely monitored for the remainder of the financial year. 
5 Renfrewshire Health and Social Care Partnership
5.1 The Council Overview finance report to the recent Finance, Resources
and Customer Services Policy Board also outlined a 2024/25 projected
overspend in adult social care of £6.7m, slightly less than the planned
overspend anticipated when the 2024/25 budget was set. 
5.2 At the September meeting of the Renfrewshire Health and Social Care
Integration Joint Board (IJB), members were advised of the combined
position of health and social care spending pressures, noting that the
current overall estimated recurring funding gap for 2024/25 is £10.7m.
Page 23 of 44

Page 32

This is forecast to increase to £22.9m in 2025/26, rising to £34.9m in
2026/27. 
5.3 The current balance of IJB unallocated reserves is £10.1m. As noted in
the report, should the IJB be unable to agree a balanced budget for
future years, the Integration Scheme states that the IJB would be
required to seek additional funding from its Partner Bodies. In the
absence of significant savings proposals being agreed, IJB reserve
balances are expected to be insufficient to cover the 2025/26 projected
funding gap.  
6 Capital Plan 2024/25
6.1 The Council has an ambitious capital programme, incorporating the
delivery of significant investment in cultural venues and wider
infrastructure linked to City Deal projects and Levelling Up Funding; as
well as major improvement and expansion projects in the school estate.
6.2 Within this overall programme, the Council has been undertaking an
ambitious programme of investment in its cultural and heritage assets.
As reported to the Economy and Regeneration Policy Board on 5
November 2024, construction and refurbishment works in historic
buildings are intrinsically subject to a higher degree of cost volatility due
to the nature of the works and the fact that the complexity and detail of
the works required are in many instances not fully known until the
works are in progress and the building condition is fully understood.
6.3 Paisley Museum Reimagined will be a world-class destination telling
the inspirational stories of Paisley’s people and pattern and showcasing
its internationally significant collections. This project includes repairing
and renovating all buildings on the museum campus delivering a 20%
increase in the overall usable area. The construction also includes a
new extension housing a visitor reception and café, the installation of
new mechanical, electrical and plant systems, as well as the
introduction of a public courtyard. Importantly, this work enables an
increase in the interpretation of the collections and number of objects
on display, with a strong focus on digital interpretation.
6.4 The project consists of three key phases – Main Contract dealing with
construction, followed by Exhibition Fitout to prepare the infrastructure
for the display systems, completed by Object Install. Once the main
contract is complete, this will allow the second and third stages of the
project (exhibition fitout and object install) to be completed. A revised
programme to completion of Phase 1 was received from the Main
Page 24 of 44

Page 33

Contractor, Kier Construction Ltd in October 2024. They are currently
reporting progress against construction programme forecasting contract
completion in July 2025. This completion date is well beyond the initial
estimated completion when the project commenced, due to the
complexity of the works, as well as the project being significantly
impacted by the pandemic construction shut down, subsequent
restricted working conditions, and labour and materials shortages in the
period following the pandemic – all of which resulted in extreme levels
of construction cost inflation which is only recently beginning to
moderate.  
6.5 As is expected in a heritage building such as the museum, coupled with
many decades of underinvestment and lack of maintenance, a
significant level of inherent building defects were planned for an
informed by a range of survey work as part of planning for the project.
Notwithstanding such preparatory survey work and planning, as the
construction project has progressed many issues have been
significantly worse than anticipated and a range of unforeseen defects
have also been uncovered. Such issues have involved major areas of
the building structure including rotted roof joists, dry rot, wet rot,
asbestos, extensive plasterwork repairs that have hampered and
delayed progress on site, historic drainage failures and for which Keir
have been entitled under the contract to additional extensions of time to
remedy and complete the project. In addition to costs associated with
providing Keir with approved contractual extension of time to complete
the project, the cost to remedy such issues have been greater than
anticipated based in early survey work or were unforeseen costs at the
outset of the project and which cumulatively have cost more than the
general risk contingency for the project. This is further compounded by
other contractor issues and delays to progress on site. The OneRen
PMR project team including external Project Managers are working with
Kier to establish mitigation measures to try to accelerate this
anticipated completion date by including suggested improvements to
resource and sequencing of works. However, there have been
substantial delays and additional unanticipated works experienced in
the project, which have led to significant entitlement of claims for
additional costs from the main contractor. These claims continue to be
worked through with support from the Council’s technical advisers, and
while the Council views elements of the overall claims to be a
contractor risk, there remains a possibility that should the claims be
adjudicated, that the Council could be found liable in part which would
result in additional cost.
Page 25 of 44

Page 34

6.6 In February 2024, recognising the additional costs which were
expected to be incurred in undertaking the works outlined above,
Council agreed to increase the capital budget for the project by £6.6
million through the reallocation of funding set aside for public realm
works in Paisley town centre and the release of funding from the
investment capital fund. Council also agreed in June 2023 that within
the wider programme of resource agreed by Council in September
2017 to invest in cultural venues and town centre infrastructure that
those elements of the programme not in progress (predominantly the
town centre public realm improvements) would be paused in order to
release resource within this programme to those projects which were
experiencing cost pressures. There remains a balance of £3.5 million
within these wider workstreams which has been paused, and it is
planned that this balance is reallocated to the Paisley Museum Project.
6.7 Due to the delay in the museum becoming operational, the revenue
resource which the Council has allocated within the loans fund to fund
the borrowing costs associated with the project over 2023/24, 2024/25
and 2025/26 could also be utilised to provide a CFCR contribution to
the project totalling an estimated £6.0 million. It is further recommended
that £3 million of unallocated capital receipts also be ringfenced to
support the completion of the project and allow for a risk contingency
allowance. Should this funding not be required then it would be
returned to the capital receipts reserve for reallocation to other Council
investment priorities. 
6.8 The net additional funding outlined above totals £12.5 million and it is
recommended that the capital plan is adjusted to reflect this position.
This proposed approach to funding adjustment mitigates any impact on
any other aspects of the Council’s overall capital programme and does
not increase the overall borrowing associated with the project, ensuring
the long term revenue impact of completing the project remains within
planned limits. Members should remain aware that there remains 12-18
months of works to be completed in the project and while a significant
contingency risk allowance has been factored into the proposed
increased allocation outlined above, further cost increases cannot at
this stage be ruled out.
___________________________________________________________________
Implications of the Report
1. Financial - the report highlights the impact of the UK Government’s
Autumn Budget, and notes the short and medium term financial
challenges facing the Council. The report also outlines proposed
Page 26 of 44

Page 35

amendments to the capital plan to reflect anticipated increased costs in
relation to the paisley Museum Reimagined project.   
2. HR & Organisational Development - none arising directly from this
report. 
3. Community/Council Planning – the Council requires to remain
financially sustainable in order to deliver on its priorities as outlined in
the Council and Community Plans; and these revised Plans will in turn
require to inform the financial strategy. 
4. Legal – none arising directly from this report. 
5. Property/Assets - none arising directly from this report. 
6. Information Technology - none arising directly from this report.
7. Equality & Human Rights - none arising directly from the
recommendations in this report. 
8. Health & Safety - none arising directly from this report.
9. Procurement – none arising directly from this report.
10. Risk - as outlined in the report, the Council’s financial risk exposure
over the medium term remains high. The report also outlines increasing
financial risks for the Renfrewshire IJB as well as the impact of this on
the Council. The proposed amended funding for the Paisley Museum
Reimagined project includes a contingency risk allowance.
11. Privacy Impact – none arising directly from this report. 
12.  Children’s Rights – none arising directly from this report.
13. Climate Risk – none arising directly from this report.
14. Cosla Policy Position – none arising directly from this report.
___________________________________________________________________ 
Author:           Alastair MacArthur, Director of Finance & Resources 
Page 27 of 44

Page 36

Page 28 of 44

Page 37

___________________________________________________________________
To:  Council 
On:  12 December 2024
___________________________________________________________________
Report by: Lead Officer on behalf of the Audit, Risk and Scrutiny Board
___________________________________________________________________
Heading: Neighbour Disputes
___________________________________________________________________    
1. Summary 
1.1 At the meeting on 22nd August 2022, members of the Audit, Risk and Scrutiny Board
agreed an annual programme of activity for the Board for 2022/23. This included a
review into neighbour disputes in Renfrewshire as part of the programme of activity. 
1.2 Over a period of months and as part of the annual programme, reports have been
presented to the Board by the Lead Officer on the subject of neighbour disputes in its
widest sense, including antisocial behaviour. 
1.3 In undertaking this review, the Lead Officer interviewed Elected Members, key
Council officers involved in different aspects of neighbour disputes and antisocial
behaviour, local Housing Associations, Police Scotland and 17 other Scottish Local
Authorities, as well as speaking to residents with lived experience of neighbour
disputes and antisocial behaviour. 
1.4 This report describes the purpose and scope of the review, including summaries of
information reported to each Board meeting, the key findings and concludes with the
recommendations, which can be found in Section 12. 
1.5 The review has provided assurance to the Audit, Risk and Scrutiny Board. The Board
agreed the final report at its 23rd September 2024 meeting.
___________________________________________________________________
2.  Recommendations 
2.1 Members are asked to:
• note the findings and approve the recommendations within this report
___________________________________________________________________     
3.  Background 
3.1 There is no single agreed definition for what constitutes a neighbour dispute. For the
purposes of the review, the definition used is a “disagreement between neighbours
that causes stress or friction”. A range of neighbour disputes may not reach a
Item 5
Page 29 of 44

Page 38

threshold where they would be dealt with through antisocial behaviour legislation,
such as disputes over communal areas, misuse of bins or storage of waste, parking,
high hedges and boundary disputes. 
3.2  In some instances of neighbour disputes a statutory nuisance may occur, when the
activity of an individual or business on their own premises unreasonably detracts
from another’s enjoyment of their property or causes a risk to public health. This can
include noise, artificial light, odour, keeping of animals and accumulation of waste.
3.3  Some neighbour disputes can be classified as antisocial behaviour as defined in the
Antisocial Behaviour (Scotland) Act 2004, whereby a person acts “in a manner that
causes or is likely to cause alarm or distress; or pursues a course of conduct that
causes or is likely to cause alarm or distress to at least one person who is not of the
same household as them”. 
3.4  The Antisocial Behaviour (Scotland) Act 2004 requires all local authorities to
publish a strategy jointly with the Chief Constable of Police Scotland for their
Council area. Renfrewshire Council approved a new Anti-Social Behaviour Strategy
2022-25 in March 2022, setting out how the Council and its key Community Safety
partners will address antisocial behaviour in Renfrewshire. 
4.  Purpose and Scope of the Review 
4.1 At the Audit, Risk and Scrutiny Board in August 2022 it was agreed that the review of
neighbour disputes be looked at in the widest sense and should also include
antisocial behaviour. It was agreed that the purpose of the investigation into
neighbour disputes would be fourfold: 
1. Try to establish the scale and nature of neighbour disputes in
Renfrewshire,
2. Set out the current arrangements and approaches the Council and other
stakeholders have for responding to neighbour disputes,
3. Review the current disposals/actions that are available to the Council and
others to resolve neighbour disputes, and
4. Identify any other approaches, policy changes or mitigating actions that
could be available to the Council within existing resources. 
4.2 Following the initial report to the Audit, Risk and Scrutiny Board in March 2023, there
was a change in Lead Officer. This change in Lead Officer impacted the original
timescales of the review. 
5.  Antisocial Behaviour National Review 
5.1  During this local review for the Audit, Risk and Scrutiny Board, the Scottish
Government Review on Antisocial Behaviour was published (7th November 2023).
The national review advocates a refreshed, long-term approach to antisocial
behaviour, with a more preventative and supportive focus in preventing antisocial
behaviour from occurring in the first place. 
5.2  There is recognition of the age of the antisocial behaviour legislation and societal
changes over the past 20 years. The national review recommended an independently
chaired group of experts, including statutory, non-statutory and voluntary service
providers and key community representatives, to develop a long-term framework for
addressing antisocial behaviour with a strong focus on steps that can be taken to
prevent antisocial behaviour in the first place as well as considering the effectiveness
of current approaches to tackling antisocial behaviour that does occur.
Page 30 of 44

Page 39

5.3  Further consideration as part of the national refresh may also include:    
- the definition of antisocial behaviour    
- legislation and guidance    
- increased powers 
- reporting, including support and outcomes    
- general approach, including partnership working and public information    
- person-centred and trauma-informed approaches 
6.  The Scale of Neighbour Disputes within Renfrewshire 
6.1  Within Renfrewshire, there is no single source of data relating to neighbour disputes.
Data for the initial stage of the review was drawn from public and voluntary services
who have a responsibility relating to neighbour disputes, including Citizen’s Advice
Bureau, the Council and Police Scotland.   
6.2  It is acknowledged there will be additional neighbour disputes which services remain
unaware of. Also, there may be overlap across datasets, e.g. cases where the Police
respond initially then Community Safety or Housing investigate more fully and record. 
6.3  Analysis showed that, with the exception of domestic noise complaints reported to
the Council, there has been a sustained increase in the number of
incidents/complaints of neighbour disputes in Renfrewshire over the last 3-4 years.
This aligned with the national picture, based on responses from 17 other Scottish
Local Authorities. 
6.4  Renfrewshire Council Officers (as well as other Local Authorities, Housing
Associations and Police Scotland) reported that changes in levels and nature of
disputes was found to be initially due to the pandemic and lockdown, with people at
home more. This links with a clash of lifestyles, which was reported as a major factor
in neighbour disputes, and noise complaints, including situations such as different
working patterns, where one party may leave early for work, or return late at night. 
7.  Domestic CCTV 
7.1 An area of growth in neighbour disputes relates to the use of domestic CCTV
systems, including smart doorbells, fitted by individuals in their homes. 
7.2 The data protection regulator is the Information Commissioner. Privacy concerns
about the use of devices (including individuals involved in a neighbour dispute over
domestic CCTV) should be raised with the Information Commissioner’s Office (ICO). 
7.3 The Council’s powers in relation to domestic CCTV are limited to its installation by
Council tenants. Under the tenancy agreement, tenants should not make any
changes to fixtures and fittings in and around their home until they have received
written permission from the Council. Although permission may be needed for the
erection of CCTV cameras, the Council’s remit does not extend to approving or
policing the processing of personal data by private individuals and the Council does
not have any enforcement powers in relation to privacy infringement. 
8.  Review of Processes Across Scottish Local Authorities 
General Neighbour Disputes Findings
8.1 Contact was made with the other 31 Scottish Local Authorities and a range of local
Housing Associations, with questions on neighbour disputes and anti-social
Page 31 of 44

Page 40

behaviour. 17 local authorities responded (55%) and 3 local housing associations. A
Renfrewshire Local Authority Liaison Officer representative from Police Scotland also
assisted the review on processes within Renfrewshire. 
8.2 There are differences across the 32 local authorities in how neighbour disputes are
dealt with. Renfrewshire Council support and respond to all tenures. This is not the
case across Scotland. Some local authorities will support and respond to all tenures;
others would support and respond to Council Housing tenants only (where they have
Housing stock) and signpost other tenures to alternative organisations; and others
support and respond to all social housing tenants only. 
8.3 The most common sources of neighbour disputes were similar across all local
authorities and housing associations – relating to noise, waste (misuse of bins,
including not putting out for collection, using bins belonging to others and placement
of bins when out for collection) and issues relating to gardens and communal spaces. 
Mediation and Conflict Resolution
8.4 Mediation is a recognised early intervention tool to help neighbours resolve
difficulties, with around 90% success rate1 for sustainable outcomes, i.e. did not have
to contact the local authorities again. 
8.5 Again, there were differences in provision of service – some Local Authorities
(including Renfrewshire Council) provide mediation free of charge to all tenures.
Others charge for non-Council Housing tenants, including charging Registered Social
Landlords who refer to the service. The remainder either provided no service or
would signpost to mediation services offered by SACRO (a Scottish community
justice organisation) at the residents’ cost. 
Trauma Informed and Responsive Services
8.6 Being a victim of neighbour nuisance or anti-social behaviour can have a huge
impact on people’s lives and affect mental health and wellbeing. It is key to ensure
that support is available for those suffering from unreasonable behaviour. The need
to support those perpetrating anti-social behaviour to change behaviours was also
raised. Reasons behind this behaviour can be complex – the behaviour can be driven
by trauma as well as triggering a trauma response in those that it is affecting. 
8.7 Renfrewshire Council has recognised the importance of trauma informed and
responsive services, and training has been rolled out across Housing Services and
Community Safety teams due to the front-facing nature of their roles. 
Noise Monitoring
8.8 Noise nuisance was reported as one of the top complaints of neighbour disputes
and/or anti-social behaviour across local authorities and housing associations. 
8.9 When noise issue is persistent over time, residents are encouraged to keep a diary of
dates and times of noise disturbance. MATRON (or similar) formal noise recording
systems may then be used to gain corroboration for difficult to prove noise nuisance
cases, with the system being installed in the house of the complainer to monitor
noise levels and used to take further action against perpetrators where appropriate. 
8.10 In addition to formal noise recording systems, a number of local authorities use a
‘noise app’. Renfrewshire Council is exploring this option, which enables residents to
submit noise complaints via mobile devices as it is happening without the need for a
formal recording system to be installed in the property, enabling local authorities to
identify areas of need for MATRON system to be installed. 
1 Figures provided via the Antisocial Behaviour Officers’ Forum (ASBOF) 
Page 32 of 44

Page 41

Multi-Agency Meetings
8.11 All local authorities who responded hold multi-agency meetings – with key
organisations including Police Scotland, Scottish Fire and Rescue Service, Housing
Associations and other local partners such as those involved in mental health support
services and addiction services. The aim is to ensure early intervention and a
coordinated partnership approach to ensure solutions are delivered effectively and
efficiently and with knowledge sharing and input across organisations. 
8.12 The frequency of these scheduled multi-agency meetings varied across local
authorities. Renfrewshire’s model involves daily tasking meetings, whereas some
local authorities met with partner agencies every other day, or every 3 days. 
8.13 Renfrewshire has established a Community Safety Partnership Hub consisting of
statutory, voluntary and community organisations based on the MARAC model (multi-
agency risk assessment conference). This approach is recognised as best practice
and combines a broad range of services to support communities through targeting
anti-social behaviour, its causes and effects and ensures a robust approach to
tackling public protection issues affecting residents in Renfrewshire. 
9.  Legislation and Regulatory Processes 
9.1 Across local authorities different teams are involved with different aspects of
neighbour disputes and antisocial behaviour. This is true of Renfrewshire Council,
whereby specific teams deal with different aspects of neighbour disputes and
antisocial behaviour, dependent on the legislation it falls under and/or potential
actions – between Housing Services, Community Safety and/or Environmental
Health teams. 
9.2 There is a close working relationship between the teams, as well as with the Multi
Agency Community Safety Partnership Hub to ensure patterns are picked up and
responses can be targeted where needed. 
9.3 Actions taken in all cases must be proportionate to the incident and complaints are
classified using 4 key categories. The category the incident falls under will determine
the process followed and the legislation that is applied: 
Category Definition Example
A Serious antisocial behaviour Drug dealing, hate crime, violence
B Antisocial behaviour Frequent disturbances, excessive noise
C Nuisance Cases Vandalism, infrequent disturbances and
private ownership
D
Estate management as a
result of either complaints
or observations
Dispute over communal areas, including
cleaning close; use of drying green; dog
fouling; misuse of bins or storage of waste 
Housing Services Processes & Legislation: Neighbour Disputes & Antisocial
Behaviour
9.4 Renfrewshire Council’s Housing Service follows a set of procedural steps in
proportion to the incident in question. This ranges from visits to both parties;
mediation referrals; support agency referrals; and verbal and written warnings, up to
reducing tenancy rights and eviction in the most serious cases. 
9.5 Most cases are resolved in the early steps of the process, through the early
intervention measures of visits and warnings. For more persistent or serious cases of
nuisance and antisocial behaviour, social landlords, including Renfrewshire Council,
have two main levers that can be used:  
Page 33 of 44

Page 42

1. The Housing (Scotland) Act 2001: the key statutory guidance aimed at
social landlords, including allowing landlords to issue Short Scottish Secure
Tenancies (SSSTs) to address antisocial behaviour and Streamlined
Evictions where there has been a recent criminal conviction punishable by
imprisonment for tenancy related antisocial or criminal behaviour within the
previous 12 months.
2. Tenancy Agreements: set out the legal rights and responsibilities of both
the tenant and the landlord, including levels of behaviour expected from
tenants, members of their household and visitors to their home. 
9.6 Renfrewshire Council’s tenancy agreements make it clear that breaches as a result
of antisocial behaviour may result in legal action to evict, or a reduction in tenancy
rights. A reduction in tenant’s rights is a result of converting a tenancy from a Scottish
Secure Tenancy (whereby tenants have the right to stay in the home for as long as
they wish provided they do not breach the terms of the tenancy) to a Short Scottish
Secure Tenancy (SSST), where tenants only have security for the specified period of
the tenancy (a minimum of 6 months, up to 12 months) because of particular
circumstances, including antisocial behaviour. Tenants must then comply with
specified conditions in order to retain the tenancy. 
9.7 At the end of the specified term of a SSST conversion due to antisocial behaviour, if
issues have been resolved and no further action is required/taken the tenancy
converts automatically back to a Scottish Secure Tenancy again. 
9.8 Following a request, an order for eviction may be granted by the Sheriff Court under
Section 14 of the Housing (Scotland) Act 2001 on any of the grounds within Section 2
of the Act, which includes antisocial behaviour in relation to an action or course of
conduct that causes or is likely to cause alarm, distress, nuisance or annoyance. 
9.9 Local authorities have a statutory duty to rehouse and eviction is a last resort. There
are often more complex needs, and cross-agency working is key to ensure access to
services and support, and to prevent people from falling through the gaps in services. 
Environmental Health: Key Processes and Legislation
9.10 In cases of statutory nuisance (which can include issues with noise, accumulations of
waste, artificial light), procedural steps are followed ranging from visits to the source
of the issue, mediation referrals and verbal and written warnings, to issuing
abatement notices and Fixed Penalty Notices. 
9.11 Most cases are resolved in the early steps of the process without the need for further
escalation. For the more persistent or serious cases of statutory nuisance the main
levers that can be used by the Council are:  
1. The Environmental Protection Act 1990: provisions within Section 79 of
the Environmental Protection Act 1990 set out what can and can’t be dealt
with as statutory nuisance.
2. Abatement Notice: a legal document that imposes specific requirements
on the recipient with timescales, to abate the nuisance or mitigate to a point
that it is no longer causing a nuisance, including noise abatement. 
3. Fixed Penalty Notice: before a Fixed Penalty Notice is issued under the
Environmental Protection Act, an Abatement Notice must have been served.
The Abatement Notice must have expired without the problem being resolved
and there must be a further breach of the Abatement Notice before a Fixed
Penalty Notice can be served. These are generally used for low level
nuisances. 
Page 34 of 44

Page 43

Community Safety Team: Key Processes and Legislation
9.12 The Community Safety Team and multi-agency partners within the Community
Safety Partnership deal with antisocial behaviour. 
9.13 Most complaints are resolved in the earlier stages of the process through early
intervention measures and cross-service working in the Council and in the
Community Safety Hub. For persistent antisocial behaviour the main levers are:  
1. The Antisocial Behaviour (Scotland) Act 2004: the Act makes provision
in connection with antisocial behaviour to deal with people who cause alarm,
distress or annoyance to members of the public. The Act also gives powers to
address neighbour noise issues, such as from parties and loud music which
causes undue nuisance.
2. Interim Antisocial Behaviour Orders: allow the Sheriff Courts to grant an
order to provide more immediate protection from antisocial behaviour prior to
a full court hearing (around 6 weeks).
3. Antisocial Behaviour Orders (ASBOs): preventative orders intended to
protect people in the community affected by antisocial behaviour from further
acts or conduct that would cause them alarm or distress. ASBOs are court
orders which prohibit, either indefinitely or for a specified period of time, the
individual from doing anything described in the order. An ASBO is made in
the civil court, however, breach of an order is a criminal offence. 
9.14 While registered social landlords, including Renfrewshire Council’s Housing Service,
may seek antisocial behaviour orders or even eviction as a last resort, they have no
powers to evict private tenants and/or owner occupiers. However, other services
within the Council and Police Scotland may have some powers that can be used to
influence people to modify their behaviour depending on the nature and severity of
the complaint, e.g. a private landlord who fails the ‘fit and proper’ test by not dealing
with antisocial behaviour of tenants could have their landlord registration revoked
under Section 8 of the Antisocial Behaviour (Scotland) Act 2004. 
10.  Current Estate Management Initiatives and the Estate Management Workshop
10.1 The Council’s approach to estate management and community safety is underpinned
by the strategic outcomes in the Renfrewshire Council Plan 2022-2027. A key
strategic outcome is Place and working together to enhance wellbeing across
communities. 
10.2 The review initially focused on Category B and C antisocial behaviour and neighbour
nuisance complaints. In the course of the review, and in particular speaking with
those with lived experience of neighbour nuisance and antisocial behaviour, the
opportunity for an additional focus on Category D incidents (classed as estate
management) emerged. 
Current Estate Management Initiatives
10.3 There are a large number of examples of good practice being delivered by the
Council across estate management and community safety. Examples include: 
- the Neighbourhood Environmental Trainee Team (NETT): made up of a
Supervisor and a number of trainees seeking employment (aged 16-65) who carry
out work 1 day per week in each of the 4 Housing Neighbourhoods, with a particular
focus on known ‘hot spots’.
- Renfrewshire Council’s Tenant Satisfaction Survey: carried out every 2 years,
this is a valuable measure of success (although responses are from Council tenants
only, not all tenures) that can be used to compare results of initiatives in future years.
- Moorpark Regeneration Project: Neighbourhood Services team, in collaboration
with Housing Services, carried out a targeted intervention in the Moorpark area,
Page 35 of 44

Page 44

focusing on environmental maintenance tasks. This provided a model for similar
interventions across Renfrewshire, with lessons learned and best practices
developed being integrated into the Council’s broader environmental management
strategies, helping to ensure sustained improvements in other communities.
- Cross-Service Collaboration: regular meetings to discuss Neighbourhood
Operations, providing Housing Services, Neighbourhood Services, Public Protection
and Waste Services a platform for continuous dialogue, allowing emerging issues to
be addressed promptly and adapting strategies as needed.
- Team Up 2 Clean Up: an exemplar Council and community partnership working to
create a brighter, more attractive Renfrewshire through community initiatives
including community litter picks and Take the Lead campaign (an initiative to
encourage responsible dog ownership and working together to reduce dog fouling
and anti-social behaviour across Renfrewshire).
- Grass Cutting and Grounds Maintenance: Renfrewshire Council has a 14 day
grass cutting and grounds maintenance cycle between April and October and tackle
a different area of Renfrewshire each day, maintaining open spaces, school playing
fields, public parks, sports pitches and cemeteries as well as grass cutting and hedge
cutting for some residents and Council Housing tenants who require garden
assistance or have common maintenance areas. 
- Data Sharing and Continuous Improvement: between all key Services to support
ongoing development and refinement of maintenance programmes, ensuring
operations are responsive to the needs of the community and allows immediate
concerns to be addressed, but also to shape future work within the 4 Housing
Neighbourhood areas, contributing to long-term improvements. 
10.4 Alongside acknowledging the good practice and high quality services that are
delivered daily, a key action in the Council Plan 2022-2027 is around ensuring we
understand our service delivery, potential gaps in our approaches and have plans for
improvement through ongoing self-assessment. 
10.5 A workshop was held in August 2024, with key internal stakeholders represented
from Housing Services; Environmental Health; Tasking and Development;
Neighbourhood Services; Waste Services; and Procurement. Key areas discussed
included individual and communal gardens and hedges, waste (including misuse of
bins, storage of waste), communal areas and general nuisance, such as dog fouling
and dog barking. 
10.6 The workshop was extremely positive, with officers highlighting opportunities for
improved flow of information and working collaboratively to identify: 
- existing good practice across a range of neighbourhood initiatives 
- opportunities for improvement   
- potential approaches and targeting of activity within existing resources 
10.7 The key actions proposed by the group to be considered for further exploration are
set out below. These proposed actions would require to be fully costed, with robust
business case development. Viable proposals with impacts or changes in budget or
policy would then be taken to the appropriate Board(s) for approval:
-  Housing Services to work together with Neighbourhood Services on work
programming to identify an optimum service delivery model that meets the needs of
both Services. This includes reviewing the deployment of existing resources to
consider a dedicated team to work across properties and grounds related to Council
Housing for grass cutting and cyclical maintenance, including winter works
programming, and coordination ahead of recruitment to ensure sufficient resourcing. 
- explore the potential expansion of the Neighbourhood Environmental Trainee Team
alongside additional potential training opportunities.  
- Procurement, Neighbourhood Services, Housing Services and Environmental
Health to review the Council Wide Specialist Cleaning, Clearing and Ad Hoc Services
Page 36 of 44

Page 45

framework, to explore the specification of this contract and identify opportunities to
optimise service delivery. 
11.  Key Findings of the Review 
11.1 Overall Approach: Renfrewshire Council’s processes and partnership working when
dealing with neighbour disputes and antisocial behaviour are of a high standard
across all key areas. This has been assessed based on benchmarking taking into
account research and interviews with other local authorities, local Housing
Associations and Police Scotland. Processes are clear; assistance is available to all
tenures; Renfrewshire Council provides services which are not consistently provided
across all local authorities; and trauma informed training has been rolled out to
frontline staff to assist when dealing with those impacted by neighbour disputes
and/or antisocial behaviour, as well as dealing with those who may be perpetrating
the behaviour. 
11.2 Early Intervention: The majority of complaints received by staff are resolved at an
early stage and do not escalate to formal stages. All organisations interviewed as
part of the review agreed that preventative work, community relations and early
intervention are key to resolve issues and prevent potential future escalation. 
11.3 Estate Management: Interviews with other local authorities and also with residents
with lived experience of neighbour disputes and antisocial behaviour, highlighted
issues related with estate management as a common source of neighbour disputes.
Issues, including storage of waste, misuse of bins, dog fouling and communal spaces
can be a source of initial tension which, if not captured early, have the potential to
cause neighbour relationships to break down and/or lead to disputes escalating. The
Estate Management workshop highlighted a range of good practice examples that
are already being undertaken collaboratively with regards to estate management,
with some additional opportunities to share knowledge between Services operating
within Estates being considered in scheduling and deployment to streamline and
enhance activity. 
11.4 Communication: 
1. early intervention includes a need for cases to be reported as early as possible.
Information to members of the public around how to report issues, with the options
available to different tenures was believed to be key. Clear advice on how to make a
complaint and who should be contacted can avoid delays in the early stages of the
process, improving the process for the complainer. 
2. it is important to manage expectations and be clear on when the Council can and
can’t take action. It can be frustrating for the complainer if their complaint doesn’t
meet the threshold for further action (or if corroboration can’t be secured).
Communication should include ensuring complainers are aware of potential next
steps or alternative options (e.g. civil action) and any cost implications this may have.
3. for complaints where investigations/follow up action is being taken, keeping
complainers informed is key at all stages of the process. Gathering evidence can be
a painstaking and time consuming process and when regular updates are not given,
it can lead to frustration on the part of the complainer and a feeling that they are not
being listened to or their case is not being dealt with, when this is not the case.
4. staff turnover is unavoidable but can be a source of uncertainty for those whose
home lives and/or mental health are being impacted by antisocial behaviour and/or
neighbour disputes. Handovers, including informing complainers of any changes to
case officers or impacts to timescales, helps to maintain strong relationships.   
Page 37 of 44

Page 46

11.5 Partnership Working: 
1. Partnership working is key to tackling anti-social behaviour. The importance of
cross-agency collaboration in understanding and responding to incidents of anti-
social behaviour was highlighted by all organisations and a whole system approach
with partnership solutions was agreed to be the most effective way of preventing and
addressing antisocial behaviour. 
2. Renfrewshire’s Community Safety Hub model is seen as best practice due to the
joined up working of services collectively address the widespread issues that need to
be taken account of in a holistic way to address antisocial behaviour. This
collaborative approach has a preventative focus alongside support for victims, but
also includes support for those involved in antisocial behaviour, including ensuring
access to recovery services and mental health support services where needed. 
11.6 Complex Root Causes: many organisations highlighted mental health being
impacted by the pandemic and further exacerbated by the cost of living crisis. They
are seeing a rise in complex cases, particularly in relation to mental health and
addiction. Cross-agency working is pivotal to ensure access to services and support,
and prevent people from falling through the gaps in services. Trauma informed
training to frontline staff at Renfrewshire Council has been well received and of great
value to assist officers in their roles, and cases of increasing complexities. 
11.7 Current Legislation: there was consensus when speaking with Local Authorities
and other key stakeholders and organisations that community safety has changed
over the last ten years and that there may be areas of legislation that could be
strengthened to assist frontline staff in their roles. 
12.  Recommendations 
12.1 Overall Approach: the Council has been engaged in the process of the national
refresh to prevent and tackle antisocial behaviour, and it is recommended that this
continues through all channels to influence improved outcomes; improved resources
and tools for dealing with neighbour disputes and antisocial behaviour; and
identification of potential improvements to legislation that could enhance the work
undertaken at a local level. It should be noted that once these national outcomes are
determined, a local refresh of processes and/or training may be required. 
12.2 Estate Management: It is recommended that the following actions are undertaken
as a result of cross-departmental discussions. These proposed actions would require
to be fully costed, with robust business case development. Viable proposals with
impacts or changes in budget or policy would then be taken to the appropriate
Board(s) for approval:
• a collaborative approach to identify an optimum service delivery model to meet
the needs of Neighbourhood Services and Housing Services, including exploring
allocation of a Housing-specific resource for grass cutting and cyclical
maintenance and maintenance of void properties.
• exploration of delivery models which could enable the expansion of grass cutting
service provision for Council Housing tenants who are unable to maintain a
garden.
• exploration of the expansion of the Neighbourhood Environmental Trainee Team
to support the Council alongside additional potential training opportunities.
• Cross-Service review of the Council Wide Specialist Cleaning, Clearing and Ad
Hoc Service framework, exploring impacts on internal capacity, resourcing and
cost/saving implications of delivery of these work packages to current Service
Level Agreements (SLAs) and opportunities to optimise service delivery. 
Page 38 of 44

Page 47

12.3 Training and Development around Complex Root Causes: It is recommended
that trauma informed training is extended to include Environmental Health Officers (in
addition to Housing Officers and the Community Safety team), as EHOs are
experiencing an increase in complex cases and instances where mental health is a
factor in behaviours and/or responses. Refresher training for all Officers is also
recommended on a set rolling programme, from a staff development point of view as
well as a strategic point of view as principles are transferable and can be applied in a
range of community settings. 
12.4 Additional Tools and Technology: It is recommended that Services continue to
explore additional tools to assist reporting, including the use of digital technology that
may be available to increase options for reporting. 
12.5 Communication: It is recommended that the Service:
- carries out a review of correspondence letters issued at each stage of the process
from a trauma-informed perspective to align with findings of the benefits of this
approach highlighted as part of the enhanced training from Officers, as well as
findings from across other areas of the Council. 
- carries out a refresh of the website content to ensure that it is as informative and
accessible as possible. This includes encouraging early reporting through clearly
identified channels to assist early interventions; signposting to agencies and support;
inclusive and clear language; and information to assist understanding of where follow
up action can and can’t be taken by the Council and partner organisations to ensure
clarity for those seeking advice online. This should include promotion of availability of
guidance in different languages to ensure access for all within our multi-lingual
communities. 
- continues to recognise the need for traditional methods of reporting and
communication and the need for services to be promoted through non-digital means,
e.g. how to report issues and support that is available, including mediation and victim
support to assist early intervention and encourage early reporting through tenant
newsletters, community newsletters, posters in community spaces, libraries, etc. This
aligns with recent findings in the Tenant Satisfaction Survey which found that just
over a third of Council tenants did not use the internet and should include promotion
of availability of guidance in different languages to ensure access for all within our
multi-lingual communities. 
12.6 As this report does not propose any policy or service change, no equality and human
rights impact assessments are required at this time. However, if any change to policy
or service position were to be proposed, then full equality and human rights
assessments would be required and assessment made in line with the Council’s
Fairer Scotland Duty by the service responsible.
Page 39 of 44

Page 48

Implications of the Report 
1. Financial - None directly arising from this report.  
2. HR & Organisational Development - None directly arising from this report. 
3. Community/Council Planning - None directly arising from this report.   
4. Legal - None directly arising from this report. 
5. Property/Assets – None directly arising from this report. 
6. Information Technology – None directly arising from this report. 
7. Equality and Human Rights - The Recommendations contained within this report
have not been assessed in relation to their impact on equalities and human rights- as
the paper sets out the scope for a review process rather than proposing any changes
to services. If any change to policy or service position were to be considered in
future, a full equality and human rights impact assessment will be undertaken.     
8. Health and Safety - None directly arising from this report. 
9.  Procurement - None directly arising from this report. 
10. Risk - None directly arising from this report. 
11.  Privacy Impact - None directly arising from this report. 
12. Climate Risk - None directly arising from this report. 
13. Children’s Rights - None directly arising from this report. 
14. COSLA Policy Position - No impacts directly arising from this report.
___________________________________________________________________ 
List of Background Papers: 
Audit, Risk and Scrutiny Board Annual Programme
Neighbour Disputes Paper - Audit, Risk and Scrutiny Board, January 2023
Neighbour Disputes Paper - Audit, Risk and Scrutiny Board, March 2023
Neighbour Disputes Paper - Audit, Risk and Scrutiny Board, January 2024
Neighbour Disputes Paper - Audit, Risk and Scrutiny Board, March 2024
Neighbour Disputes Paper - Audit, Risk and Scrutiny Board, May 2024
Neighbour Disputes Paper - Audit, Risk and Scrutiny Board, September 2024 
The foregoing background papers will be retained within Chief Executive’s Service for
inspection by the public for the prescribed period of four years from the date of the meeting.
The contact officer within the Service is the Climate Emergency Lead Officer, Roz Smith,
who can be contacted at roz.smith@renfrewshire.gov.uk   
Author:   Roz Smith, Climate Emergency Lead Officer, Chief Executive’s Service 
Page 40 of 44

Page 49

___________________________________________________________________
To: Council
On: 12 December 2024
___________________________________________________________________
Report by: Director of Finance & Resources
___________________________________________________________________
Heading: Governance Report
___________________________________________________________________ 
1. Summary 
1.1 The timetable of Council and Board meetings was agreed at the meeting of
Council held on 9 May 2024.  This report suggests an amendment to the date
of the meeting of the Leadership Board due to be held on 30 April 2025. 
1.2 The Labour Group has set out a number of changes to their representation on
various Boards and outside bodies. These proposed changes are detailed in
Section 3.2 of this report. 
1.3 In terms of the Scheme of Delegated Functions, the Council has a reserved
power to determine which major events are deserving of recognition by way of
the lighting up of Council buildings and property. Paragraph 3.3 of this report
details a request received to light up Bascule Bridge, Renfrew between 19 –
25 December 2024. 
1.4 At its meeting on 5 November 2024, the Planning and Climate Change Policy
Board, in respect of the preparation of the new Local Development Plan
(LDP3), agreed that that a Member/Officer Working Group be established to
allow Elected Members to consider evidence ahead of its submission to Full
Council. Council is now asked to agree to delegate to the Head of Economy &
Development authority to make the necessary arrangements for the
establishment and meetings of the Working Group. 
Item 6
Page 41 of 44

Page 50

_________________________________________________________________
2. Recommendations 
2.1 That the meeting of the Leadership Board which has been timetabled to be
held on 30 April 2025 now be held on 23 April 2025; 
2.2     That Councillor G Graham replace Councillor Gilmour on the Audit, Risk &
Scrutiny Board; 
2.3     That Councillor G Graham replace Councillor Montgomery on the
Infrastructure, Land and Environment Policy Board; 
2.4 That Councillor Montgomery replace Councillor G Graham on the Leadership
Board; 
2.5 That Councillor McDonald replace Councillor G Graham on OneRen; and 
2.6 That Councillor Ann-Dowling replace Councillor Mullin on the Glasgow Airport
FlightPath Fund. 
2.7 That consideration be given to the request to light up the Bascule Bridge
either blue or green from 19 to 25 December 2024. 
2.8 That authority be delegated to the Head of Economy & Development to make
the necessary arrangements for the establishment and meetings of a
Members/Officers Working Group to consider Local Development Plan
evidence ahead of the submission of the LDP3 Evidence Report to Council. 
3. Background 
3.1 The timetable of Council and Board meetings was agreed at the meeting of
Council held on 9 May 2024.  It has become apparent when reviewing the
meeting schedule for 2025 that a meeting for the Leadership Board has been
programmed to be held on 30 April 2025, the day before the meeting of
Council to be held on 1 May. With the agreement of the Convener of the
Board, Councillor Nicolson, it is proposed that the meeting of the Leadership
Board now be held on 23 April 2025.   
3.2 The Labour Group has proposed that Councillor G Graham replace Councillor
Gilmour on the Audit, Risk & Scrutiny Board; that Councillor G Graham
replace Councillor Montgomery on the Infrastructure, Land and Environment
Policy Board; that Councillor Montgomery replace Councillor G Graham on
the Leadership Board; that Councillor McDonald replace Councillor G Graham
on OneRen; and that Councillor Ann-Dowling replace Councillor Mullin on the
Glasgow Airport FlightPath Fund. 
Page 42 of 44

Page 51

3.3 Brightest Star is a local charity established to raise awareness and funds to
help people save children's lives and to support families who have lost a child.
A local parent founded Brightest Star following the loss of her young son,
Jack, on 19 December 2012.  Jack would have celebrated his 18th Birthday
on 25 December 2024 and a request has been received to light Bascule
Bridge, Renfrew either blue or green between 19 - 25 December to support
Jack’s parents at this poignant time. 
3.4 At its meeting on 5 November 2024, the Planning and Climate Change Policy
Board, in respect of the preparation of the new Local Development Plan
(LDP3), agreed that that a Member/Officer Working Group be established to
allow Elected Members to consider evidence ahead of its submission to Full
Council. The Board agreed that the Group will have member representation in
broad proportion to the overall Board political party representation, with the
Board Convenor being asked to extend his role to also cover the chairing of
the Working Group. It was also agreed that officers would develop further
details and report them to the Board. Council is now asked to agree to
delegate to the Head of Economy & Development authority to make the
necessary arrangements for the establishment and meetings of the Working
Group. 
___________________________________________________________________
Implications of the Report 
1. Financial – The costs of lighting the bridge will be met from existing
budgets.   
2. HR & Organisational Development – none. 
3. Community/Council Planning –  none.  
4. Legal – as set out in the report 
5. Property/Assets – none. 
6. Information Technology – none. 
7. Equality & Human Rights 
The Recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report.  If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website. 
8. Health & Safety – none. 
Page 43 of 44

Page 52

9. Procurement – none. 
10. Risk – none. 
11. Privacy Impact - none 
12. Climate Risk - none 
13. Cosla Policy Position – none. 
14. Children’s Rights – none
_________________________________________________________ 
List of Background Papers: 
___________________________________________________________________ 
Author:         Dave Low  
Democratic Services/Election Manager 
0141 487 1118 
david.low@renfrewshire.gov.uk
Page 44 of 44