Agenda Document Pack - Environment, Infrastructure and Economic Development Committee - 01/11/2023

Perth and Kinross Council · 1 November 2023
Back to Environment, Infrastructure and Economic Development Committee — 1 November 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
25/10/2023 
A hybrid meeting of the Environment, Infrastructure and Economic Development
Committee will be held in the Council Chamber on Wednesday, 01 November
2023 at 09:30. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Depute Provost Andrew Parrott  (Convener)
Bailie Mike Williamson  (Vice-Convener)
Councillor Hugh Anderson
Bailie Alasdair Bailey
Councillor Steven Carr
Councillor John Duff
Councillor Angus Forbes
Councillor Ken Harvey
Councillor Noah Khogali
Bailie Claire McLaren
Councillor Willie Robertson
Councillor Frank Smith
Councillor Colin Stewart
Councillor Richard Watters
Councillor Jack Welch
Page 1 of 148

Page 2

Page 2 of 148

Page 3

Environment, Infrastructure and Economic Development Committee 
Wednesday, 01 November 2023 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF ENVIRONMENT, INFRASTRUCTURE
AND ECONOMIC DEVELOPMENT COMMITTEE OF 20
SEPTEMBER 2023 FOR APPROVAL
(copy herewith) 
5 - 6 
4 OUTSTANDING BUSINESS STATEMENT (OBS)
(copy herewith 23/287) 
7 - 8 
5 PERTH AND KINROSS LOCAL DEVELOPMENT PLAN (LDP3)
DEVELOPMENT PLAN SCHEME
Report by Head of Planning and Development (copy herewith
23/288) 
9 - 34 
6 SHORT TERM LET NON-STATUTORY PLANNING GUIDANCE
Report by Head of Planning and Development (copy herewith
23/289) 
35 - 78 
7 AUCHTERARDER COMMUNITY FACILITIES FUND
Report by Head of Planning and Development (copy herewith
23/290) 
79 - 104 
8 POLICY AND LEVEL OF SERVICE FOR WINTER 2023/24
Report by Head of Environment and Consumer Services (copy
herewith 23/291) 
105 - 128 
9 PERTH MUSEUM - KEY MILESTONES TO OPENING AND
OPENING PROGRAMME
Report by Head of Culture and Communities Services (copy
herewith23/292) 
129 - 136
Page 3 of 148

Page 4

10  PERTH AND KINROSS OUTDOOR ACCESS FORUM ANNUAL
REPORT 2022-23
Report by Head of Environmental and Consumer Services (copy
herewith 23/293) 
137 - 148 
Page 4 of 148

Page 5

ENVIRONMENT, INFRASTRUCTURE AND ECONOMIC
DEVELOPMENT COMMITTEE 
Minute of hybrid meeting of the Environment, Infrastructure and Economic
Development Committee held in the Council Chambers on Wednesday 20
September 2023 at 9.30am. 
Present: Bailies A Bailey and C McLaren; Councillors K Allan, B Brawn (substituting
for Councillor N Khogali), S Carr, J Duff, A Forbes, K Harvey, I Massie (substituting
for Bailie M Williamson), A Parrott, W Robertson, F Smith, C Stewart, R Watters and
J Welch. 
In Attendance: B Renton, Executive Director (Communities), M Butterworth,
B Cargill, D McKeown, B Watt, L Sumner and B Wilson (for Item 7 only) (all
Communities); A Taylor, S Hendry, R Ramsay and M Pasternak (all Corporate &
Democratic Services). 
Apologies for Absence: Councillor N Khogali and Bailie M Williamson. 
Councillor A Parrott, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
Councillor A Parrott welcomed everyone to the meeting.  Apologies for
absence and substitutions were noted as above. 
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interest made in terms of the Councillors’ Code
of Conduct. 
3. MINUTE OF MEETING OF ENVIRONMENT, INFRASTRUCTURE AND
ECONOMIC DEVELOPMENT COMMITTEE OF 31 MAY 2023 
The minute of the meeting of the Environment, Infrastructure and Economic
Development Committee of 31 May 2023 was submitted and approved as a correct
record. 
4. OUTSTANDING BUSINESS STATEMENT 
Resolved:
The Outstanding Business Statement was noted, and it was agreed to remove
the completed actions. 
5. ROAD SAFETY PROJECT ASSESSMENT CRITERIA 
There was submitted a report by Head of Environmental and Consumer
Services (23/257) advising of a proposal to revise the criteria for managing and
prioritising potential road safety projects within the Council’s Road Safety Database.
3
Page 5 of 148

Page 6

Resolved:
(i) The proposed change to the Council’s road safety projects assessment
criteria, which would include the direct input of Community Councils, where
they exist, and the introduction of an additional criteria as outlined in
paragraph 4.8 of Report 23/257, be approved.
(ii) The process for all proposals from individuals for new potential projects, as
outlined in paragraph 4.10 of Report 23/257, be approved. 
6. PROPOSED 30MPH SPEED LIMITS 
There was submitted a report by Head of Environmental and Consumer
Services (23/258) (1) seeking support to make a Traffic Regulation Order covering a
30mph speed limit in Kinloch; and (2) asking that the objection received against the
proposed introduction of the speed limit be set aside. 
Resolved:
(i) The objection received, as detailed in Appendix 2 of Report 23/258, be set
aside.
(ii) The Order to introduce the new 30mph Speed Limit in Kinloch as advertised,
be approved. 
7. DEVELOPER CONTRIBUTIONS AND AFFORDABLE HOUSING
SUPPLEMENTARY GUIDANCE UPDATES 
There was submitted a report by Head of Planning and Development (23/259)
(1) updating on the proposed changes to the adopted Developer Contributions and
Affordable Housing Supplementary Guidance (DC&AH SG) 2020; (2) providing a
summary of the responses received following the public consultation exercise; and
(3) providing details of further changes that have been made to the DC&AH SG
(2023) since it was last reported to Committee on 31 May 2023. 
Resolved:
(i) The responses gathered from the period of public consultation between 9
June 2023 to 4 August 2023 and any changes made to the draft
Supplementary Guidance as a result of comments received, as detailed in
Appendix 3 to Report 23/259, be noted:
(ii) The Executive Director (Communities) finalise the Supplementary Guidance
and submit this to Scottish Ministers for consideration.
(iii) The Executive Director (Communities) issue the adopted Supplementary
Guidance, following Ministerial consideration. 
~~~~~~~
Page 6 of 148

Page 7

ENVIRONMENT, INFRASTRUCTURE AND ECONOMIC DEVELOPMENT COMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No. 23/287) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action Due /
Complete
Action
Expected
13. 20 September
2023
Item 5
Road Safety Project
Assessment Criteria
Provide clarity to
Bailie Bailey and
Members on the
mitigations to the
CTLR traffic on the
A924 and through the
Sidlaw Hills in Ward 1
specifically in regard
to the Planning
Condition put on the
Planning Application. 
Comprehensive email
providing full details
sent to Bailie Bailey on
18 October 2023. 
Subsequently copied
to all Committee
Members for their
information on 26
October 2023. 
Brian Cargill COMPLETE 1 November
2023
4
Page 7 of 148

Page 8

Page 8 of 148

Page 9

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure and Economic Development Committee 
1 November 2023 
PERTH AND KINROSS LOCAL DEVELOPMENT PLAN (LDP3)
DEVELOPMENT PLAN SCHEME 
Head of Planning & Development 
(Report No. 23/288) 
1. PURPOSE 
1.1 This report seeks approval for the update of the statutory Development Plan
Scheme (DPS) relating to the preparation of the next Perth and Kinross Local
Development Plan (LDP3). The last update was approved by the
Environment, Infrastructure and Economic Development Committee on 16
November 2022 (report 22/278 refers). It was agreed that an annual progress
report be submitted to committee detailing any changes to the Development
Plan Scheme. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
i) agrees the proposed Perth & Kinross Council Development Plan Scheme and
authorises the Executive Director (Communities) to submit the Scheme to the
Scottish Ministers; 
(ii) remits the Head of Planning & Development to submit an annual progress
report to the Environment, Infrastructure and Economic Development
Committee detailing any changes to the Development Plan Scheme. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues 
• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices 
5
Page 9 of 148

Page 10

4. BACKGROUND / MAIN ISSUES 
4.1  The Scottish Government is working to implement the significant changes the
Planning (Scotland) Act 2019 made to the development planning system in
Scotland. Those changes have been slower to come into effect due to the
pandemic. This has delayed the publication of the National Planning
Framework 4 (NPF4) and the secondary regulations needed to enact parts of
the Planning Act. This, in turn, has had an impact on the LDP3 preparation
timetable as explained further in paragraph 5.3. 
4.2  NPF4 was adopted and published by the Scottish Government in February
2023. It now forms part of the statutory development plan and is used to
determine planning applications. As NPF4 is the newer planning policy
document, it takes precedence over the Local Development Plan (LDP) and
has greater weight in the decision-making process. In the event of any
incompatibility between a provision of NPF4 and a provision of a local
development plan, whichever of them is the later in date is to prevail. NPF4
sets out requirements for LDPs and also includes policy wording. Future LDPs
will have the opportunity to include policy wording which can focus on adding
detail not provided by NPF4, or where national policy does not reflect local
circumstances and local variation is therefore considered appropriate.
Examples of local policy wording could include setting out expectations of
future development in particular locations (linked to development briefs or
masterplans), details of required developer contributions, or design policies
that reflect the local context, materials and vernacular style. Work is ongoing
to fully assess and understand what the implications of NPF4 are for LDP3. 
4.3  The Development Planning Regulations came into force on 19 May 2023. The
regulations support a new way of preparing LDPs that will result in new style
plans that manage the use of land in the long term public interest. The LDP
guidance which supports the regulations was also published in May 2023. The
LDP guidance is a key document as it sets out how Local Authorities should
undertake the process of preparing LDPs and what should be included in
them. 
4.4 The Play Sufficiency Assessment (PSA) Regulations also came into force on
19 May 2023. The regulations set out the provisions relating to the new duty
contained in the Planning Act which requires planning authorities to assess
the sufficiency of play opportunities for children in their area. The Scottish
Government is still to publish PSA guidance to support the regulations, no
date has been given. The PSA has to be completed in time for it to be
included in the Evidence Report. The Regulations state what is required, and
work is already underway in this respect.  As such, it is not anticipated that
any further delay to the PSA guidance will adversely affect preparation of the
Local Development Plan. 
Page 10 of 148

Page 11

5. PROPOSALS 
Development Plan Scheme (DPS) 
5.1 The Planning Authority is required to prepare a Development Plan Scheme
(DPS) which provides an outline for the preparation of the LDP, as well as
detailing the Council’s commitment to consultation and engagement. The DPS
is updated at least annually. It is part of the wider project management of the
LDP3 preparation process, as it helps measure performance and informs
people of progress. 
5.2 The Development Plan Scheme in Appendix 1 sets out an update on progress
towards LDP3. It details what has been achieved so far and what is
programmed for the following years. It also includes a Participation Statement
which sets out the “when, who, how and why” of consultation/engagement at
each stage of the Plan preparation. 
5.3 The previous report to this Committee advised that the timetable for preparing
LDP3 was based on the assumption that the finalised regulations and
guidance were to be received before the end of 2022. However, as noted
above in paragraph 4.3, these were not received until May 2023. The DPS
timetable has been updated to take account of the revised publication of
NPF4 and secondary regulations and guidance for the LDP and PSA. As
outlined above, these are key documents required to inform preparation of
LDP3 and bring with them a significant number of new requirements for the
development planning process.  As a result, it is proposed to submit the
Evidence Report for assessment (‘Gate Check’) 3 months later than the
previous DPS stated. That is now proposed for September 2024, rather than
June 2024 as previously outlined. Publication of the adopted LDP3 remains
the same as previously stated at late 2027. 
Page 11 of 148

Page 12

Progress to date 
5.4  As part of the evidence gathering work, a significant programme of
engagement “The Big Place Conversation” was undertaken from January to
August 2023. The engagement took a number of forms including drop in
sessions, online engagement, surveys and a rolling programme of face-to-
face sessions across localities using the Place Standard tool. A total of 118
events were held and 1500 people got involved including local communities,
Community Councils and Partnerships, businesses, older people, school
pupils, youth groups, care experienced young people, gypsy travellers,
disabled and LGBTQ+ groups. A short video show casing this work has been
submitted for consideration at the Scottish Planning Innovation Awards
https://youtu.be/iwGLKpNfPWM. 
5.5 Internal awareness raising was also undertaken, with colleagues from
Community Planning & Policy and the Health and Social Care Partnership
being involved in workshops on how to use the Place Standard tool to engage
communities. The Big Place Conversation events were co-ordinated with
other engagement activities, including the proposed Mobility Strategy, and the
information gathered is being shared across Council services. It supports the
Community Plan and the Corporate Plan and, in doing so, assists
communities wishing to prepare their own Local Place Plans. 
5.6 In addition to the Big Place Conversation, other areas of evidence gathering
have been progressed to support the preparation of the Local Development
Plan, including: housing needs and demands, retail space, employment land
requirements, play sufficiency assessment and open space audit. Alongside
this, the Strategic Environmental Assessment (SEA) Baseline Report has
been finalised and the Scoping Report is currently being progressed. 
6. CONCLUSION   
6.1 The Development Plan Scheme has been drafted to update the Committee on
the preparation of the new Perth and Kinross Local Development Plan. It
revises the proposed timetable previously proposed in 2022 and sets out a
participation statement outlining the key stages of plan preparation and when
engagement is planned to take place.  
Page 12 of 148

Page 13

Author
Name  Designation Contact Details
Brenda Murray  Development Plan
Team Leader
(Planning & Housing
Strategy
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
David Littlejohn  Head of Planning &
Development 
23 October 2023 
APPENDICES 
• Appendix 1 – Perth & Kinross Development Plan Scheme 2022 
Page 13 of 148

Page 14

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  None
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  No
External  No
Communication 
Communications Plan  None 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 The Development Plan Scheme contributes to the following Perth & Kinross
Community Plan / Single Outcome Agreement priorities: 
(ii) Developing educated, responsible and informed citizens
(iii) Promoting a prosperous, inclusive and sustainable economy
(iv) Supporting people to lead independent, healthy and active lives
(v) Creating a safe and sustainable place for future generations 
Corporate Plan 
1.2 The Development Plan contributes to the achievement of the following
Council’s Corporate Plan Priorities: 
(ii) Developing educated, responsible and informed citizens; 
(iii) Promoting a prosperous, inclusive and sustainable economy; 
(iv) Supporting people to lead independent, healthy and active lives; and 
(v) Creating a safe and sustainable place for future generations. 
Page 14 of 148

Page 15

2. Resource Implications 
Financial 
2.1 None. 
Workforce 
2.2 None. 
Asset Management (land, property, IT) 
2.3 None. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.   
3.2 The Development Plan Scheme was considered under the Council’s
Integrated Appraisal Toolkit. No impacts on equality were identified and so a
full Equality Impact Assessment was not required. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The matters presented in this report were considered under the Environmental
Assessment (Scotland) Act 2005 and in relation to the Local Development
Plan, referred to in the Development Plan Scheme, further action is required. 
3.5 Due to the nature of the plan there are likely to be significant environmental
effects, as a consequence, an environmental assessment of the Local
Development Plan is compulsory under the Act. The Local Development Plan
is considered to be a ‘qualifying’ plan under the Act so it does not require
screening. 
3.6 The next stage is to prepare a scoping report as part of the Local
Development plan process. This will determine the scope of the environmental
assessment and will be submitted to the Consultation Authorities for
comment. 
Page 15 of 148

Page 16

Sustainability 
3.7 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.8 The Development Plan Scheme was considered under the Council’s
Integrated Appraisal Toolkit. The Development Plan Scheme is a vehicle for
establishing the LDP process and as such no impacts on sustainability will
arise from the Programme itself. 
Legal and Governance 
3.9 None. 
Risk 
3.10 None. 
4. Consultation 
Internal 
4.1 We have consulted with colleagues in Community Planning & Policy and the
Housing and Social Care Partnership in the development of the proposals and
they agree that using the Place Standard tool to engage with communities on
a locality basis is appropriate. 
External 
4.2 None. 
5. Communication 
5.1 None. 
Page 16 of 148

Page 17

2. BACKGROUND PAPERS 
2.1 The following background papers were referred to during the preparation of
this report: 
• Perth & Kinross Council Local Development Plan 2
• www.gov.scot/policies/planning-architecture/reforming-planning-
system/ 
Page 17 of 148

Page 18

Page 18 of 148

Page 19

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023Programme for Local Development Plan 3: November 2023
Perth and Kinross
DEVELOPMENT PLAN SCHEME
5
Page 19 of 148

Page 20

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023 1
OVERVIEW
Development Plan Scheme
The Development Plan Scheme is a statement setting out Perth & Kinross Council’s timetable for the preparation of the next development
plan.  Under statutory guidance, all planning authorities are required to publish annually a Development Plan Scheme.  The Development Plan
Scheme will set out to include:
• an explanation of what the Local Development Plan is;
• a timetable for the preparation of the next plan, Local Development Plan 3;
• community engagement in the planning process and how relevant stakeholders, including residents of Perth and Kinross, can get involved.
Page 20 of 148

Page 21

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023 2
Local Development Plan
The Scottish Government requires every planning authority to prepare development plans for their area. The Development Plan is at the heart of
the planning system setting out policies and proposals to guide the development, management and use of land.  The Plan sets out a vision and
a framework for future development; addressing needs and opportunities in relation to housing, economy, infrastructure, community facilities,
safeguarding environmental and landscape assets, the emerging needs of climate change and achieving well designed places for the residents,
communities and businesses of Perth and Kinross. To support the preparation of the next Local Development Plan, there are a range of other
plans and strategies that interlink with the LDP.
The Development Plan
National Planning Framework 4
+
Local Development Plan
Planning Guidance
Regional Spatial Strategy
Community Plan &Corporate Plan
National PlanningFramework (NPF)
Government advice & strategies
Climate Change Strategy &
Action Plan
Mobility Strategy
Perth City Plan
Strategies including
Forest & Woodland, Open
Space, Food Growing
Tayside Local Biodiversity
Action Plan
Local Housing Strategy Local Place Plans
Page 21 of 148

Page 22

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023 3
National Planning Framework 4
(NPF4)
National Planning Framework 4 was adopted in February 2023
and forms part of the Development Plan. It covers the period
from its adoption to 2045 with 10 year reviews. It is a long-
term strategy that plans for development and investment in
infrastructure; and identifies national developments and other
strategically important opportunities in Scotland. The NPF
contains both spatial and thematic planning policies and sets
out the national policy position for land use planning. It will be
used to determine planning applications.
The New Plan: LDP3
Alongside National Planning Framework 4, the Local
Development Plan (LDP3) will be the main document which
will influence future built development in Perth & Kinross.
As NPF4 contains planning policy, new LDPs will be place-
based documents with emphasis on maps, site briefs and
masterplans, with minimal policy wording. The policies and
proposals within the LDP are to be focused on places and
locations, while National Planning Framework 4 will provide
overarching thematic policies for decision making.
LDP3 Process
The Planning (Scotland) Act 2019 has introduced a number of
changes to the key steps for preparing a Local Development
Plan. Preparation of a new-style LDP will include:
• Evidence gathering and early community and stakeholder
engagement leading to an Evidence Report.
• Submission of the Evidence Report to Scottish Ministers for an
independent Gate Check.
• Collaborative plan preparation, leading to publication of the
Proposed Plan for consultation.
• Submission of the Proposed Plan to Scottish Ministers for an
independent examination of outstanding issues.
• Adoption of the Local Development Plan
Supporting assessments
There are several assessments that must be undertaken to
support the preparation of a new Local Development Plan. They
are an integral part of the plan-making process and should
inform, and be informed by, the plan as it is being prepared.
These include:
•  Strategic Environmental Assessment (SEA)
•  Public Sector Equality Duty Assessment
•  Fairer Scotland Duty Assessment
•  Habitats Regulations Appraisal
Page 22 of 148

Page 23

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023 4
The New Plan: LDP3
New Development Plan Regulations and Guidance were issued by the Scottish
Government and came into force in May 2023. These support a change in
approach to the preparation of LDPs and bring with them a significant number
of new requirements for the development planning process. Publication
of these was later than planned and has resulted in a change to the LDP3
timeline with the Evidence Report now programmed to be submitted for Gate
Check in September 2024 rather than June 2024 as indicated in the previous
Development Plan Scheme. The adoption date, whilst not exact, remains likely
to be late 2027.
All planning authorities have five years from the regulations coming into
force to replace their current Local Development Plan with a new style Local
Development Plan. This means the Council must prepare and adopt LDP3 by no
later than May 2028.
Development Plan Schemes must specify the numbered Quarter (Q) and the
year in which the planning authority expects to publish certain elements of the
Local Development Plan process. This applies to the following stages:
Publish Evidence Report    Q2 2024 (July - September 2024)
Publish Proposed Plan    Q4 2026 (January - March 2026)
Send Proposed Plan to Scottish Ministers  Q2 2026 (July - September 2026)
Adopt LDP3      Q3 2027 (October - December 2027)
Note: for the above table, a Quarter refers to a three-month period of each
financial year which runs from April to March.
Quarter 1 is April to the end of June;
Quarter 2 is July to the end of September;
Quarter 3 is October to the end of December; and
Quarter 4 is January to end of March.
LDP3 Timeline
2022 2023 2024 2025 2026 2027
Evidence Gathering
Early Engagement
Collation and Submission of Evidence Report
Evidence Report Gatecheck
Collaborative Preparation of Proposed Plan
Proposed Plan Consultation
Proposed Plan Examination
Adoption of LDP3
A detailed timeline outlining the Local Development Plan’s key
stages and the types of engagement to take place is provided
in the Participation Statement.
Page 23 of 148

Page 24

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023 5
Participation Statement
The Planning (Scotland) Act 2019 places an increased
emphasis on up-front engagement.  This means that
consultation needs to be comprehensive, co-ordinated and
collaborative. The engagement programme outlined supports
the Community Plan and the Corporate Plan and, in doing so,
assists communities wishing to prepare their own Local Place
Plans.
LDP3 will be a key tool alongside other strategies such as the Local
Housing Strategy and Mobility Strategy for delivering places where
everyone can live life well.
The Participation Statement sets out when engagement is to take
place, with whom and the likely form it will take. The experience of
preparing previous LDPs has helped us learn how to improve the
way we include the public and reach a wide range of people.
Page 24 of 148

Page 25

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023 6
Consultation Commitment Statement             
The LDP3 engagement and evidence building process will be:
Relevant Discussions will be relevant to each group or stakeholder, including both settlement development
and policies and the methods that are used to carry out those discussions. 
Inclusive To shape places that work for all we will proactively seek the views of all people, especially those
with specific needs and those whose views are seldom heard; identify and overcome barriers to
engagement and invest in the promotion of the benefits of engaging.
Informed Discussions will be informed by evidence already available including data gathering and prior
consultations to ensure contributions have a greater impact and are more efficient
Co-ordinated A joined up approach with the rest of Council and Council strategies, will deliver greater efficiency,
and help avoid consultation fatigue. Information fed back to other departments will also help deliver
their priorities
Collaborative Co-designing consultation and supporting community partners to carry out their own engagement
work will ensure the greatest reach and response working
Transparent Ongoing communication and feedback between the team and stakeholders, communities and
partners will support better outcomes and promote acceptance of outcomes.
Accessible Engagement events and materials for the general public must be accessible to all wherever
possible, and tailored arrangements made where this is not possible.
Page 25 of 148

Page 26

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023 7
Participation Statement
Who will be consulted?
When preparing the Local Development Plan, our approach to
engagement and consultation will be based on a collaborative
approach, including (but not exclusively) representatives of the
following:
• Community Development Trusts
• Communities of Interest
• Landowners and Developers 
• Businesses and business groups
• Locality Partnerships
• Tertiary students
• Older people
• Communities wishing to prepare Local Place Plans
Key agencies:
• NatureScot
• SEPA
• Scottish Water
• Scottish Enterprise
• TACTRAN
• NHS Tayside
• Historic Environment Scotland
• Scottish Forestry
• Transport Scotland
Community Planning Partners:
• Jobcentre Plus
• NHS Tayside
• Perth & Kinross Association of Voluntary Services (PKAVS)
• Perth College
• Police Scotland
• Scottish Enterprise
• Scottish Fire & Rescue Service
• Skills Development Scotland
Where not already specified, we will seek the views of
representatives of the following particular groups of people:
• children and young people
• disabled people
• Gypsies and Travellers
• Community Councils
Page 26 of 148

Page 27

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023 8
Prepare Evidence Report (commenced 2022 and ongoing through to early 2024)
Identification of groups and stakeholders to be proactively engaged Early 2022
Discussion with community partners and community councils on best consultation methods Early 2022
Co-ordination with other PKC departments on delivery of engagement, including those that may not
need targeting at this early stage due to recent or existing work
Mid 2022
Co-ordination with other PKC departments, community councils and community development trusts
to secure way forward for Local Place Plans
Late 2022
Launch of online area wide place feedback platform on consultation hub December 2022
Publicity and media support for upcoming engagement activities and throughout January-August 2023
Exploration of issues of importance with communities of place and community councils through
Place Standard and settlement audits including  tailored discussions reflecting both policies and
place such as affordable housing or natural space needs
January-August 2023
General opportunities for the public (including landowners and developers) for discussions on policy
and place such as the online place standard or surveys on consultation hub
January-August 2023
Local Place Plan invitation October 2023
When will they be consulted?
The following section provides a detailed timeline for LDP3, outlining the key stages of preparation and when engagement is planned to
take place. It may be revised in future Development Plan Schemes subject to the release of updated Scottish Government Guidance and the
timescales of stages outwith the control of Perth & Kinross Council.
Page 27 of 148

Page 28

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023 9
Prepare Evidence Report (continued)
Assisting Community Councils and community partners to support the delivery of inclusive
engagement to support LDP work and feeding into Local Place Plans
January 2023-June 2024
Targeted discussions online and in person around policy with specified communities of interest or
with specific (land use) need
January-December 2023
Sharing and co-ordination of information wth other servcies and strategies including Perth People
Place and Mobility Strategy
Late 2023
Targeted discussions with communities of interest or need about the places they live to support the
wider public consultation
January-December 2023
Discussion with key agencies and PKC stakeholders on data gathered to date and future plans that
may affect policies or place including capacity of education, health, water etc.
Late 2023-June 2024
Evidence Report checked for compatibility with any Local Place Plans; and evidence shared with
communities to inform LPPs
Late 2023-June 2024
Highland and Strathtay
Kinross-shire, Almond & Earn
Eastern Perthshire
Perth City Jan - Mar
Strathearn and Strathallan
Mar - May
Apr - Jun
May - Jul
Jul - Aug
The Big Place
Conversation 2023
Page 28 of 148

Page 29

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023 10
Collation of information and analysis of data and consultation exercises to inform identification of
sites at the next stage
October 2023-June 2024
Consultation on SEA Baseline Report September 2024
Collation, publication and submission of the Evidence Report September 2024
Collation and Submission of Evidence Report for Gate Check (late 2024)
Page 29 of 148

Page 30

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023 11
Collaborative Preparation of Proposed Plan (late 2024 to early 2026)
Following gatecheck of the Evidence Report, should any additional consultation be required by the
Reporter this will be carried out and the final Evidence Report resubmitted
Late 2024
Policy options relevant to each group or stakeholder discussed to find a preferred way forward or
options
Late 2024
Specific policy and place ideas, including those in Local Place Plans, explored with communities and
discussed with developer and landowner groups and contacts
Late 2024
Place proposals analysed (draft SEA and HRA) and comments sought from specific groups previously
engaged with, community councils and public at large on preferred options
Early 2025
Policy and site preferences discussed with key agencies and PKC stakeholders Early 2025
All consultation and evidence analysed, outstanding issues resolved with stakeholders and
incorporated into the Proposed Plan
Late 2025
Proposed Plan drafted and submitted to Council Early 2026
Page 30 of 148

Page 31

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023 12
Proposed Plan Consultation (early to mid 2026)
Proposed Plan is published alongside HRA and SEA and general consultation Early 2026
Evidence Report updated to show how the evidence has shaped the Plan Early 2026
Public events to publicise the Proposed Plan and invite comments Early-Mid 2026
Evidence is shared with communities preparing Local Place Plans Early 2026
Page 31 of 148

Page 32

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2023 13
Examination of Proposed Plan (late 2026)
Prepare examination papers Late 2026
Proposed Plan with any modifications submitted to Scottish Ministers together with a summary of
unresoved issues
Late 2026-early 2027
Modify Proposed Plan (mid 2027)
Make requisite modifications to Proposed Plan on receipt of examination report Mid 2027
Adopt Local Development Plan (mid-late 2027)
Pubish adopted Local Development Plan Mid 2027
Publish post-adoption statement Late 2027
Adopt and publish the Delivery Programme Late 2027
Page 32 of 148

Page 33

14
All Council Services can offer a telephone translation
facility.
If you or someone you know would like a copy of this
document in another language or format, (on occasion,
only a summary of the document will be provided in
translation), this can be arranged by contacting the
Customer Service Centre on 01738 475000.
You can also send us a text message on 07824 498145.
For key updates on the preparation of LDP3 please email
developmentplan@pkc.gov.uk
and ask to be added onto our database.
www.pkc.gov.uk (PKC Design Team - 2020167)
Page 33 of 148

Page 34

Page 34 of 148

Page 35

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure and Economic Development Committee 
1 November 2023 
SHORT-TERM LET NON-STATUTORY PLANNING GUIDANCE 
Report by Head of Planning and Development
(Report No. 23/289) 
1. PURPOSE 
1.1 To seek approval of the finalised non-statutory planning guidance relating to
the change of use of residential properties to short-term lets. 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
• approves finalised non-statutory planning guidance on short-term lets
(Appendix 2)
• notes that a paper relating to the introduction of a short term let control area
will be brought forward in early 2024. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background
• Section 5: Consultation findings
• Section 6: Planning applications - update
• Section 7: Finalised guidance
• Section 8: Next steps
• Section 9: Conclusion
• Appendices 
4. BACKGROUND 
4.1 In May 2023 (report no. 23/171 refers) the Committee was requested to
approve public consultation on: 
• the principle of a short-term let planning control area for Highland
Perthshire and part of Eastern Perthshire; and 
• proposed non-statutory planning guidance for short-term lets. 
4.2 A report on the principle of establishing a Short-Term Let Control Area will be
presented to the Committee early in 2024. This timeframe will allow for the
Short-Term Lets Evidence Paper (Report No. 23/171 Appendix 1 refers) to be
updated following analysis of both consultation responses and licensing
6
Page 35 of 148

Page 36

applications received by the deadline of 1 October 2023 agreed by the
Scottish Parliament.  It is important that any potential planning policy change
is well-evidenced, and the licensing scheme data provide a finer-grained
analysis than the work to date on second home ownership and advertising on
booking platforms.   
4.3 Meantime, current planning regulations continue to apply. Planning
permission is required where a change of use from residential occupation to
short-term let is deemed to be a material change or, in the case of flats, where
planning permission is always required.  The introduction of the licensing
scheme (The Civic Government (Scotland) Act 1982 (Licensing of Short-term
Lets) Order 2022 (legislation.gov.uk) has led to some confusion about the
additional need for planning permission in some circumstances. Therefore, it
is considered helpful to both applicants and planning officers to proceed to
introduce Perth and Kinross specific guidance to assist with planning
application assessment and determination.   
5. CONSULTATION FINDINGS 
5.1 The public consultation on the proposed non-statutory planning guidance ran
from 2 June to 18 August 2023. It attracted 334 responses of which
approximately two thirds came from residents and one third from those with a
business interest. Several organisations also responded, and these are listed
at Appendix 1. 
5.2 Appendix 1 details the consultation responses. Summary findings for each of
the scenarios consulted on are provided below. 
5.3 1 – The proposal is for the extensive refurbishment of a long term empty
residential property which will bring the building back into active use. 
Table 1. Breakdown of responses to criterion 1 respondent group 
One of the key reasons for disagreeing was that the emphasis should be on
reusing existing buildings for long term let or permanent homes instead of
short-term lets.  
Response  Residents  Business owners
(including those who
are also residents) 
Organisations / groups 
Agree / strongly
agree 
53%  47%  36% 
Disagree / strongly
disagree 
28%  32%  50% 
Neither agree nor
disagree / don’t know
/ no comment 
19%  21%  14% 
Page 36 of 148

Page 37

5.4 2 – The proposal relates to a residential property with four or more
bedrooms as this stock is considered less significant in terms of
housing needs assessments. 
Table 2. Breakdown of responses to criterion 2 respondent group 
The level of agreement on this criterion between residents and businesses
were around the same. A key question raised by both sectors was why less
emphasis should be placed on the retention of larger properties. 
5.5 3 – It can be demonstrated that the residential property has been
operating as a short term let for more than 10 years and it therefore
exempt from planning enforcement action. 
Table 3. Breakdown of responses to criterion 3 respondent group 
Many of the comments related to whether it should be a longer or shorter time
period, however, a key point is that it duplicates planning law so does not
need to be included in guidance. This is discussed further at paragraph 7.3
below. 
Response  Residents  Business owners
(including
those who are
also
residents) 
Organisations /
groups 
Agree / strongly agree  32%  33%  50% 
Disagree / strongly
disagree 
39%  38%  36% 
Neither agree nor
disagree / don’t
know / no
comment 
29%  29%  14% 
Response  Residents  Business owners
(including
those who are
also residents) 
Organisations /
groups 
Agree / strongly
agree 
38%  52%  36% 
Disagree / strongly
disagree 
45%  40%  36% 
Neither agree nor
disagree /
don’t know / no
comment 
17%  8%  28% 
Page 37 of 148

Page 38

5.6 4 – It can be demonstrated that the proposal for the change of use to
short term let is part of a diversification scheme to support an existing
Perth & Kinross business within the same landholding.  
Response  Residents  Business owners
(including
those who are
also residents) 
Organisations /
groups 
Agree / strongly agree  36%  41%  43% 
Disagree / strongly
disagree 
28%  19%  28.5% 
Neither agree nor
disagree / don’t
know / no
comment 
36%  40%  28.5% 
Table 4. Breakdown of responses to criterion 4 respondent group 
A significant number of respondents did not comment or gave a neutral
response. This is perhaps indicative of a need for more clarity on this criterion
and this is discussed at paragraph 7.6 below. Approximately twice as many
business respondents agreed with this criterion than disagreed. Resident
respondents were more evenly split. 
5.7 5 – In all cases properties must have their own door to the street to
reduce the risk of adverse impact on the amenity of neighbouring
residents. 
Table 5. Breakdown of responses to criterion 5 respondent group 
This proposal has the biggest divide in opinion between residents and
business owners. Over half of resident respondents agreed largely on the
grounds that it would help protect amenity, safety, privacy and quality of life
for permanent residents. By contrast, nearly half of business respondents
disagreed with a key concern being that this discriminates against flat owners. 
Response  Residents  Business owners
(including those who
are also residents) 
Organisations /
groups 
Agree / strongly agree  53%  27.5%  43% 
Disagree / strongly
disagree 
23%  45%  36% 
Neither agree nor
disagree / don’t know /
no comment 
24%  27.5%  21% 
Page 38 of 148

Page 39

Other matters 
5.8 A significant number of additional comments were given with arguments for
and against the need for control over short-term lets. These are set out in
Appendix 1 and include comments for control such as: “it is unfair that
workers and locals are being priced out of the market by short-term lets”. 
Comments against control include: “restricting short-term lets will not increase
the supply of affordable housing and that efforts to increase housing provision
for local residents should not be at the expense of the tourism industry.” 
6. PLANNING APPLICATIONS - UPDATE 
6.1 Report 23/171 (paragraph 6.11) set out the number of short-term let planning
applications for change of use which had been received up to April 2023.
Table 6 provides an updated position as of 2 October 2023. 
Table 6: Number of planning applications for change of use of a residential
property to short-term let. April - October 2023 
Wards with
planning
applications
Approved 
Applications
Refused 
Applications
Certificate of
Lawfulness 
Awaiting
Decision
Ward 2 
Strathmore
0 0 0 1
Ward 3 
Blairgowrie
4 0 2 2
Ward 4 
Highland 
7 7 2 9 
Ward 5 
Strathtay
2 1 1 4
Ward 6 
Strathearn
6 0 1 5
Ward 7  
Strathallan
5 0 0 2
Ward 8 
Kinross-shire
3 0 0 1
Ward 9 
Almond & Earn
0 0 0 1
Ward 10 
Perth City South
1 1 0 0
Ward 11 
Perth City North
2 0 0 0
Ward 12 
Perth City Centre
11 4 1 6 
TOTALS  41  13  7  31
Page 39 of 148

Page 40

6.2 As of 2 October 2023, there has been one appeal against the refusal of
planning permission which was dismissed by the Scottish Government
Planning and Environmental Appeals Division (DPEA). 2 appeals have been
made to the Local Review Body with the outcomes pending. 
7. FINALISED GUIDANCE 
7.1 NPF4 became part of the statutory development plan on 13 Feb 2023 and
makes specific mention of short-term lets in Policy 30 Tourism. There is no
specific policy within the adopted Local Development Plan (LDP) relating to
short-term lets. As such, the NPF4 policy will be used to assess the principle
of such changes of use in planning applications until such time as the LDP is
reviewed. To assist the determination of planning applications in the interim, it
is considered that additional planning guidance is needed. Any such guidance
can only be non-statutory. The full revision of the guidance can be found at
Appendix 2. 
7.2 No consensus emerged through the consultation on any part of the proposed
planning guidance. This was to be expected given the varying interests
involved in this issue. Two substantial changes have been made in finalising
the guidance and these are set out below. In addition, further clarity or
explanation has been provided where appropriate, but no completely new
issues have been introduced. 
7.3 Firstly, it was pointed out in consultation responses that it is not appropriate to
include in the guidance that which is already enshrined in planning law.
Therefore, the process by which short-term let owners can apply for a
Certificate of Lawful Use or Development, where they have been operating
continuously for more than 10 years, is now included as a statement of fact
rather than as a means of assessing planning applications. 
7.4 Secondly, the format of the guidance has been reworked to tie more directly
the issues considered through the consultation with the policy framework in
NPF4. The resulting changes are set out in paragraphs 7.5 and 7.6 below. 
7.5 NPF4 Policy 30 e) criterion i) does not support a change of use to short-term
let where the proposals will result in an unacceptable impact on local amenity
or the character of a neighbourhood or area.  The amended draft guidance
includes shared access, property size and refurbishment as factors to be
considered by planning officers. Specifically on shared access, a tiered
approach is now proposed which seeks to recognise that the impact of
properties being used for short-term let will differ depending on other existing
uses within the area. For example, the impact of a short-term let off a shared
access within a predominantly residential area will be potentially greater than
for example in a town or city centre where there is a mix of other uses which
could already impact significantly on residential amenity. 
Page 40 of 148

Page 41

7.6 NPF4 Policy 30 e) criterion ii) does not support a change of use to short-term
let where the proposals will result in the loss of residential accommodation
where such loss is not outweighed by demonstrable local economic benefits. 
All short-term lets have the potential to provide benefits to the local economy
through visitor spend and the provision of services e.g. cleaning, laundry,
property maintenance etc. There is, however, a need to balance this in areas
where short-term lets are resulting in an unsustainable loss of residential
accommodation. To address concerns raised through the consultation, cross-
reference is now made in the guidance to existing development plan policies
on rural business to ensure that the impacts of any diversification proposals
are fully assessed. 
8. NEXT STEPS 
8.1 If the Committee is minded to approve the guidance, the finalised version will
be published on the Local Development Plan – Supplementary Guidance web
page.  A further report on the principle and evidence for designating a Short-
Term Let Control Area will be presented to the Committee early in 2024. 
9. CONCLUSION 
9.1 Additional planning guidance is needed to assist in interpreting the national
policy framework, as set out in NPF4, for a Perth & Kinross context. This non-
statutory guidance will assist in the assessment of planning applications for
the change of use to short-term let until superseded by specific policies and
proposals in the next Local Development Plan. 
Page 41 of 148

Page 42

Authors
Name  Designation Contact Details
Stephanie Durning 
Katrina Walker 
Planning and Policy
Officer, Housing
Strategy Team 
Planning Officer,
Development Plans
Team
01738 475000
ComCommitteeReports@pkc.gov.uk   
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities)
23 October 2023 
APPENDICES 
• Appendix 1 – Summary of results of the consultation on consultative draft
planning guidance
• Appendix 2 – Non-Statutory Planning Guidance on the Change of Use of a
Residential Property to Short-term Let, Final version 
Page 42 of 148

Page 43

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  None
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment None
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) None
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  Yes 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This report supports the priority within the Community Plan 2022-27by
recognising the need to balance local economic growth with the impact short-
term lets can have on the availability of affordable housing. 
Corporate Plan 
1.2 This report supports the objectives within the Corporate Plan 2022-2027by
recognising the need to balance local economic growth with the impact short-
term lets can have on the availability of affordable housing. 
2. Resource Implications 
Financial 
2.1 N/A. 
Workforce 
2.2 N/A. 
Page 43 of 148

Page 44

Asset Management (land, property, IT) 
2.3 N/A. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
The proposals have been considered under the Corporate Equalities Impact
Assessment process (EqIA) with the following outcome: 
(i) Assessed as not relevant for the purposes of EqIA 
Strategic Environmental Assessment 
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.3 Proposals have been considered under the Act and pre-screening has
identified that the PPS will have no or minimal environmental effects, it is
therefore exempt and the SEA Gateway has been notified. The reason(s) for
concluding that the PPS will have no or minimal environmental effects is that
the planning guidance will be non-statutory and sit within the framework of the
National Planning Framework 4 which has undergone full SEA. 
Sustainability 
3.4 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
The proposals have been against the Council’s Principles for Sustainable
Development through the Impact and Value Assessment process. 
Legal and Governance 
3.5 N/A.
Page 44 of 148

Page 45

Risk 
3.6 N/A. 
4. Consultation 
Internal 
4.1 Advice and views have been sought from colleagues in Development
Management and the Economic Development Team in the preparation of this
report. 
External 
4.2 N/A. 
5. Communication 
5.1 Consultation on the proposed planning guidance was open to the general
public across the whole of Perth & Kinross via consultation hub. 
2. BACKGROUND PAPERS 
2.1 The following documents were referred to or relied upon in preparing this
report: 
• National Planning Framework 4
• Perth & Kinross Local Development Plan 2 
Page 45 of 148

Page 46

Page 46 of 148

Page 47

Appendix 1 
SHORT-TERM LET DRAFT NON-STATUTORY GUIDANCE
SUMMARY OF CONSULTATION RESPONSES 
Acronyms used in this appendix 
CLUD Certificate of Lawful Use or Development
CPO Compulsory Purchase Orders
HNA Housing Needs Assessment
LDP Perth & Kinross Local Development Plan
PKC Perth & Kinross Council
P&K Perth & Kinross
NPF National Planning Framework
STL Short-term let 
List of tables 
Table 1 – Breakdown of responses by respondent sector
Table 2 – List of organisation / group respondents
Table 3 – (for each criterion) Breakdown of responses by level of agreement of responses by respondent group
Table 4 – (for each criterion) Summary of key points by respondent group and level of agreement
Table 5 – General comments on STL controls
Table 6 – Additional suggestions / comments
Table 7 – General comments on consultation / process  
6
Page 47 of 148

Page 48

Table 1
Resident 224 67%
Resident and business owner 46 29%
Business owner 49
On behalf of organisation / group 14 4%
Not stated 1 
100% TOTAL 334 
Table 2
• Aberfeldy Community Council
• Aberfeldy Development Trust
• Airbnb
• Association of Scotland's Self-Caterers
• Conservative Group on Perth and Kinross Council
• Federation of Small Businesses
• Glenlyon and Loch Tay Community Council
• Glenshee & Strathardle Tourist Association
• Rannoch Community Trust
• Ristol Consulting Ltd representing estates who provide STL
accommodation in Highland Perthshire
• Scottish Conservative Group on Perth and Kinross Council
• West Carse Community Council 
• Response on behalf of 12 residents
• Response on behalf of 30 residents 
The responses set out in the tables below are grouped by the criteria set out in the draft planning guidance and by respondent sector i.e.
resident, business owner (including those who are also residents), or organisation / group. 
Page 48 of 148

Page 49

1 – The proposal is for the extensive refurbishment of a long term empty residential property which will bring the building back into
active use 
Table 3
Response Residents Business owners
(including those who
are also residents)
Organisations /
groups
Agree / strongly agree 53% 47% 36%
Disagree / strongly
disagree
28% 32% 50%
Neither agree nor
disagree / don’t know
/ no comment
19% 21% 14% 
Table 4
Response Respondent
Residents Business owners (including those
who are also residents
Organisations /
groups
Agree / strongly
agree
• Agree with the principle of reusing empty
buildings
• Assists the local economy
• Private owners should be left to do what
they want with their building – not
everyone wants to be a landlord for long-
term lets
• Improves the area
• Provides additional accommodation so
isn’t directly affecting housing availability
• Agree with the principle of reusing
empty buildings
• Allows owners to recoup investment
in a property / area
• Equal to a new business start up
• Helps create additional capacity
• Improves amenity
• Assists the local economy
• Agree with the
principle of reusing
empty buildings
• Better refurbish an
existing building
than take a site for
new build
Disagree /
strongly disagree
• Community should be helped to buy such
property instead
• Council should refurbish for affordable
housing or help fund individuals to
renovate
• Should be for long-term let or sale
instead of STL
• Could discourage estates and
landowners handing such buildings
over to communities or individual
owners
• Potential for
negative impact on
existing residents
e.g. amenity
• Should instead be
sold or let for
Page 49 of 148

Page 50

Response Respondent
Residents Business owners (including those
who are also residents
Organisations /
groups
• Owners of long-term empty properties
should be obliged to sell to the Council or
upgrade for long-term let
• Priority should be for full time residential –
sale or long-term let
• Depends on need for housing vs need for
STLs
• Should only be allowed for a limit time
before use is reassessed
• Demand for STL means empty properties
aren’t affordable for locals
• Risk owners will leave property empty so
can use this criterion
• Council should not interfere with private
property
• Should be no more changes of use of
residential to STL
• Real issue is lack of affordable housing
• Criterion not relevant – some locations are
not good for holidays
• State of the property shouldn’t matter
• Potential for negative impact on
existing residents e.g. increased
traffic
• Young people should be incentivised
to take on property instead
• Expensive so will only be viable in
prime tourism locations
• Risk owners will leave property
empty so can use this criterion
• Not sufficient as a reason
• Council should not interfere with
private property
• NPF includes policy on STLs so
guidance not required
housing – unless it
can be proven
they’re not needed
• Too restrictive
• Should instead
target empty homes
Neither agree nor
disagree / don’t
know
• Community groups / local families should
be given opportunity buy such buildings
first
• Better to refurbish for long-term let or sale
• Only where the property has failed to sell
• Must depend on location and need
• Should instead be on a case-by-case
basis
• Doesn’t contribute to housing stock
• Depends on many other factors
• Should instead home people on
housing list
• There should be no barriers to
someone establishing a STL
business unless there is over-
provision in the area 
Page 50 of 148

Page 51

Response Respondent
Residents Business owners (including those
who are also residents
Organisations /
groups
• Should not preclude other types of
property from also being STLs
Other comments • Need to be clear on terms • Need to be clear on terms 
PKC Officer comments
A proportion of respondents in all respondent sectors agreed with the overall principle of reusing empty buildings but there was also agreement
from respondents in all sectors that sale or long-term let of such properties should be prioritised over STLs. 
Rather than this being a specific criterion it is proposed in the finalised guidance to instead tie this more closely to the policy framework set out
in NPF4. 
NPF Policy 30: Tourism, part e) criterion i) does not support a change of use to short-term let where the proposals will result in an unacceptable
impact on local amenity or the character of a neighbourhood or area. It is therefore proposed to include refurbishment as a consideration to be
taken into account under this NPF criterion as follows: 
• Is the proposal for the extensive refurbishment of a long-term empty property which will improve the area by bringing the building back
into active use?  
Page 51 of 148

Page 52

2 – The proposal relates to a residential property with four or more bedrooms as this stock is considered less significant in terms of
housing needs assessments 
Table 3
Response Residents Business owners
(including those who
are also residents)
Organisations /
groups
Agree / strongly agree 32% 33% 50%
Disagree / strongly
disagree
39% 38% 36%
Neither agree nor
disagree / don’t know
/ no comment
29% 29% 14% 
Table 4
Response Respondent
Residents Business owners (including those who
are also residents
Organisations / groups
Agree / strongly
agree
• Demand is generally for
smaller properties
• This size of property unlikely
to be classed as affordable 
• 4+ bedroom properties less
sought after in some areas
• Private owners are not responsible for
the shortage of long-term let properties
• This size of property unlikely to be
classed as affordable or suitable for
first time buyers
• Majority of STL market is not taking
rental property from first time buyers /
renters
• Need for this size is different to the
need for affordable housing
• STLs this size usually party houses
which cause disturbance to neighbours
• Smaller properties more desirable for
permanent housing so should be
restricted for STL
• Larger properties are harder to let
• There is already a shortage of
smaller properties in Perth and this
will get worse without control of
STLs
• This size of property likely to be too
big for most local needs
• Number of bedrooms not necessarily
related to value of the property 
Page 52 of 148

Page 53

Response Respondent
Residents Business owners (including those who
are also residents
Organisations / groups
Disagree /
strongly disagree
• Need larger houses for
families and people
homeworking
• Should be no limit on size –
need for all size of property
for homes
• Need may be less significant
but larger properties are
more scarce
• Larger properties could be
subdivided for long-term let
• Should be for sale or long-
term let instead of STL
• Less attractive as a STL
• Unfair to smaller STL
operators
• It is the larger houses which
cause most difficulties for
residents
• Should be decided on case-
by-case basis
• Arbitrary threshold
• Large STLs contribute to the
local economy
• Should be trying to attract
large families to rural
locations to rejuvenate
communities
• Arbitrary and generalised assumption –
doesn’t take into account varying
occupancy needs e.g. homeworking,
assisted living
• Should be decided on case-by-case
basis
• Larger houses would enable families to
stay in the area they work
• Will keep the price of these properties
high
• Unfair to smaller STL operators
• Any property size may be required for
different sized families
• All options for affordable housing
should be considered first
• Will encourage ‘party houses’ – should
instead restrict properties by
description e.g. flats, shared access
etc.
• Much of the demand is for smaller
STLs
• NPF includes policy on STLs so
guidance not required
• Larger properties should be
subdivided for long-term let
• Larger STL properties should only
be allowed in rural areas as they can
have an adverse impact on amenity
in urban areas
• Should instead be sold or let for
housing unless it can be proven
they’re not needed
• Guidance should be limited to
planning matters only 
Neither agree
nor disagree /
don’t know
• Should be decided on case-
by-case basis
• Should be decided on case-by-case
basis 
• Larger properties could be subdivided 
Page 53 of 148

Page 54

Response Respondent
Residents Business owners (including those who
are also residents
Organisations / groups
• Households may need to
upsize as they grow
• Acceptable where this size
does not match housing
demands
• Larger properties could be
subdivided
• Assumes less market for family sized
housing but real issue is lack of
childcare
• There should be no barriers to
someone establishing a STL business
unless there is over-provision in the
area 
PKC Officer comments
Similar issues were raised by respondents in the different respondent sectors both by those who agreed and who disagreed. Many respondents
questioned why there was deemed to be less of a need for larger properties and that this could negatively impact on families in particular. 
Whilst Local HNAs showed less of a need for the largest properties it is proposed that, rather than this being a specific criterion in the finalised
guidance, the issue of property size will instead be tied more closely to the policy framework set out in NPF4. 
NPF Policy 30: Tourism, part e) criterion i) does not support a change of use to short-term let where the proposals will result in an unacceptable
impact on local amenity or the character of a neighbourhood or area. Respondents in all sectors raised the concern of larger properties
becoming ‘party houses’ for groups or multiple families which increases the risk of disruption for residents. It is therefore proposed to include
property size as a consideration to be taken into account under this NPF criterion as follows: 
• Does the proposal relate to a residential property with four or more bedrooms, and can it be demonstrated that there will be no adverse
impact on local amenity from noise or disturbance if the let is occupied by a group or more than one family? 
Page 54 of 148

Page 55

3 – It can be demonstrated that the residential property has been operating as a short-term let for more than 10 years and is therefore
exempt from planning enforcement action 
Table 3
Response Residents Business owners
(including those who
are also residents)
Organisations /
groups
Agree / strongly agree 38% 52% 36%
Disagree / strongly
disagree
45% 40% 36%
Neither agree nor
disagree / don’t know
/ no comment
17% 8% 28% 
Table 4
Response Respondent
Residents Business owners (including those who
are also residents
Organisations / groups
Agree / strongly
agree
• In line with existing planning law
• Protects existing long-established
businesses
•  If STL has been operating for 10+
years then there can be few issues
• Providing property doesn’t change
ownership
• Providing there has been no history
of complaints
• If STL has been operating for 10+
years then it cannot reasonably have
contributed to housing shortfalls
identified more recently
• In line with existing planning law
• Protects existing long-established
businesses
• Housing need wasn’t as bad over 10
years ago
• long established STLs are not the
problem rather the growth in second
homes, retirees and people moving in
from cities who can now home work
• Unreasonable to stop a business which
has been operating for 10+ years 
• In line with existing planning
law 
Disagree /
strongly
disagree
• Will take more houses out of the
system
• Should be a shorter timeframe e.g. 5
years more realistic for existing
• Shouldn’t be applied
retrospectively 
Page 55 of 148

Page 56

Response Respondent
Residents Business owners (including those who
are also residents
Organisations / groups
• All existing businesses should have
to apply for planning permission
(perhaps with a grace period)
• All STLs should be treated equally
• Just because it is been a STL
doesn’t mean it can’t be a home
• Should depend on individual
circumstances – properties should
be looked at on their merits
• Too long a timeframe
• STLs are often smaller properties
which would suit first time buyer or
downsizers which would free up
larger properties
• Priority should be to enable a better
supply of affordable houses for sale
or long-term let
• Will negatively impact on rural
homeowners looking to create an
income
• There should be no exemptions
• Arbitrary time limit
• Operating a STL for 10 years
shouldn’t make it lawful
• Existing STLs should be justified
against other criteria e.g need,
location, size
• Number of STLs needs to be
reduced
• Doesn’t allow for small businesses
to start up
business which has invested in early
start up and growth
• Should be a shorter timeframe
• The problem of lack of housing has
been going on for years and operators
should not be exempt when they have
contributed to the problem
• Arbitrary time limit
• Some STLs operating for <10 years
may be more desirable as STLs
• Should be a shorter timeframe to impact
on less existing operators
• What happens if there have been
breaks in the STL?
• Operating a STL for 10 years shouldn’t
make it lawful
• Should be assessed on a case-by-case
basis
• Should use more intelligent parameters
e.g. no. nights booked / available p/a
• All operators should be treated the
same
• Shouldn’t be included as it’s planning
law
• Distinction is discrimination as tenants
duration can change between short and
long term let depending on their
circumstances 
• There are already too many
STLs affecting availability of
housing
• Existing residents having to
live with noise from STLs
• STLs in towns should not be
allowed
• STLs taking up houses
which could be given to a
household in need
• STLs in operation 20+ years
should be allowed
• All properties should be sold
or let for housing unless it
can be proven they’re not
needed
Page 56 of 148

Page 57

Response Respondent
Residents Business owners (including those who
are also residents
Organisations / groups
Neither agree
nor disagree /
don’t know
• Probably sensible to stop further de-
population
• Depends on the suitability of the
property
• Better to encourage owners to rent
their properties for long-term let
• Should not preclude other type of
property being suitable for STL
• Unfair – all STLs should be treated
the same
• There should be no barriers to someone
establishing a STL business unless
there is over-provision in the area 
PKC Officer comments
Many of the comments related to whether it should be a longer or shorter time period. The 10-year period was chosen as after this point owners
can apply for a CLUD which exempts them from enforcement action. The key point raised in the consultation, however, was that it is not
appropriate to include in the guidance that which is already enshrined in planning law, in this case, through the CLUD process. The process by
which short-term let owners can apply for a CLUD where they have been operating continuously for more than 10 years is now included as a
statement of fact in the guidance rather than as a specific criterion for assessing planning applications.  
Page 57 of 148

Page 58

4 – It can be demonstrated that the proposal for the change of use to short term let is part of a diversification scheme to support an
existing Perth and Kinross business within the same landholding 
Table 3
Response Residents Business owners
(including those who
are also residents)
Organisations /
groups
Agree / strongly agree 36% 41% 43%
Disagree / strongly
disagree
28% 19% 28.5%
Neither agree nor
disagree / don’t know /
no comment
36% 40% 28.5% 
Table 4
Response Respondent
Residents Business owners (including those who
are also residents
Organisations / groups
Agree /
strongly agree
• Will increase employment
• Might help empty buildings to be utilised
• Provides a necessary income stream
• Diversification, especially in farming,
should be supported
• As long as it supports affordable housing
• Good for existing or new businesses to
be able to stay and bring more people
into the area whilst providing a service
and supporting other local services /
could provide staff accommodation
• Diversification, especially in farming,
should be supported – allows flexibility
• Businesses should be able to expand to
meet demand – growth fundamental to a
thriving community
• Reasonable providing the business
supports local suppliers and net zero
• Essential part of Scottish
agritourism
• Provide support to other
businesses e.g. local
suppliers 
Disagree /
strongly
disagree
• Risk this could be abused
• Preferential treatment for landowners –
everyone should be treated the same
• Housing should always come first
• Not if the property is already long-term
occupied
• Could have detrimental
impact on landscape
• All properties should be
sold or let for housing
Page 58 of 148

Page 59

Response Respondent
Residents Business owners (including those who
are also residents
Organisations / groups
• Diversification is long-term so properties
should be for long-term let
• No need to keep allowing diversification
for STL
• Risk this could allow rural properties to
become unavailable for long-term let
resulting in homelessness for an existing
long-term tenant – many estates renting
previously tenanted properties as STLs
• Priority should be for long-term lets
• Should have to evidence why STL
• Diversification not a sufficient reason –
wider implications of a change of use
must be considered
• More thought should be given to the
landscape capacity and environmental
impact of more development
• Favours existing businesses over new
entrants
• Council should CPO such properties for
affordable housing
• Too much emphasis on tourism – what
about supporting other small businesses 
• Must reduce STLs as quickly as possible
• Preferential treatment and limits
competition – all businesses should be
treated the same
• Only where there is evidence the
property is not suitable for affordable
housing
• Should be expanded to where the STL is
within the curtilage of the owners home
• Should be up to the owner to decide
• NPF includes policy on STLs so
guidance not required
unless it can be proven
they’re not needed
• Diversification should be
supported but Council
should not discriminate
against one sector 
Neither agree
nor disagree /
don’t know
• Should only apply to existing properties
not new build 
• Should be on a case-by-case basis
• Should be for worker accommodation not
holidays
• Diversification shouldn’t reduce housing
stock for permanent residents
• Risk it will be used as a loophole
• Could help renovation of old buildings
• There should be no barriers to someone
establishing a STL business unless there
is over-provision in the area
• Not for the Council to decide what is a
valid business proposal
• Should only be in rural
areas, not within the
towns
Page 59 of 148

Page 60

Response Respondent
Residents Business owners (including those who
are also residents
Organisations / groups
• Acceptable if new build in addition to
existing permanent home
• Businesses should be encouraged to
provide accommodation for employees
too
• Should not preclude other types of
property for STL
• Some diversification schemes never get
off the ground 
PKC Officer comments
A significant number of respondents did not comment or gave a neutral response. This is perhaps indicative of a need for more clarity on this
criterion. Rather than this being a specific criterion it is therefore proposed in the finalised guidance to instead tie this more closely to the policy
framework set out in NPF4. 
NPF Policy 30 e) criterion ii) does not support a change of use to short-term let where the proposals will result in the loss of residential
accommodation where such loss is not outweighed by demonstrable local economic benefits.  All short-term lets have the potential to provide
benefits to the local economy through visitor spend and the provision of services e.g. cleaning, laundry, property maintenance etc. There is,
however, a need to balance this in areas where short-term lets are resulting in an unsustainable loss of residential accommodation. It is
therefore proposed to include cross-reference to existing LDP2 policies on rural business as a consideration to be taken into account under this
NPF criterion to ensure that the impacts of any diversification proposals are fully assessed: 
• Can it be demonstrated that the proposal for the change of use to short-term let is part of a diversification scheme to support an existing
Perth & Kinross rural business in line with NPF4 Policy 29: Rural Development and Local Development Plan policy 8: Rural Business
and Diversification?  
Page 60 of 148

Page 61

5 – In all cases properties must have their own door to the street to reduce the risk of adverse impact on the amenity of neighbouring
residents 
Table 3
Response Residents Business owners
(including those who
are also residents)
Organisations /
groups
Agree / strongly agree 53% 27.5% 43%
Disagree / strongly
disagree
23% 45% 36%
Neither agree nor
disagree / don’t know
/ no comment
24% 27.5% 21% 
Table 4
Response Respondent
Residents Business owners (including those
who are also residents
Organisations / groups
Agree /
strongly agree
• Security issue with STLs in shared
access blocks / using communal
spaces – residents shouldn’t have to
share these with strangers 
• Would help prevent anti-social
behaviour, disruption and potential
conflict with existing residents
• Fair to existing residents – quality of
life, physical and mental wellbeing,
privacy of residents should come first
• Shouldn’t be allowed STL where this
impacts on neighbours
• Impacts on sense of community –
visitors have no vested interest in the
area
• Security issue with STLs in shared
access blocks / using communal
spaces especially for families with
children
• Adverse impacts have to be
balanced against need to provide
tourist accommodation
• Could mean less impact on residents
but would depend on layout and use
of neighbouring properties
• Would help protect existing residents
e.g. with medical ailments
• Adverse impacts on amenity – noise
disturbance, litter etc unfair on
residents 
• Existing residents have to put up
with disturbance and noise from
STLs – often no noise insulation
• Security issue with STLs in
shared access blocks
• Loss of amenity for existing
residents
• Each application should be
assessed on its own merits 
Page 61 of 148

Page 62

Response Respondent
Residents Business owners (including those
who are also residents
Organisations / groups
• Some STL occupiers inconsiderate to
existing residents with little control by
landlords
• Flatted properties should not be STLs
• Remoteness of landlord an issue
Disagree /
strongly
disagree
• Depends on the property – proper
enforcement on anti-social behaviour
laws would solve the problem
• Existing residents should have a say
in the decision-making
• No difference to number of times
going in and out between STL guest
and permanent residents
• Noise not just an issue at the door
• Parking is a problem too
• Each application should be assessed
on its own merits – semi-detached
and detached properties that are built
very close together could also
adversely impact on amenity for
residents
• Practicalities of some existing
buildings would make this impossible
• Would mean STL operators would
move to buying properties with their
own door impacting on availability of
those properties
• Most anti-social behaviour comes
from local residents not tourists
• Maybe important for city tenements
but not rural areas
• Discriminates against flat owners
• Each application should be assessed
on its own merits – unfair to treat
well run STLs in same way as those
which are poorly run
• Too prescriptive
• Presumptuous to assume all tourists
are trouble-makers – this is not the
correct way to control anti-social
behaviour
• Often STLs are used by contractors
and working people and they
shouldn’t be limited to properties with
their own door
• Residents no more likely to be
disturbed by STLs than occupants
with short assured tenancies or
existing residents – responsible STL
owners should have house rules
• Not in business interest to allow
unruly behaviour – majority of guests
do not impact on neighbouring
residents and many businesses work
hard to ensure this is the case
• Each application should be
assessed on its own merits –
other legislation coupled with the
licencing scheme will enable
Council to deal with anti-social
behaviour
• No published evidence or
justification for this criterion
• Unfair assumptions being made
about those who use STLs
• Concerns licencing and not
planning policy and should
therefore be removed from
guidance 
Page 62 of 148

Page 63

Response Respondent
Residents Business owners (including those
who are also residents
Organisations / groups
• Mandating noise management
measures better way of avoiding
adverse STL neighbour impacts
• Unnecessary and unfair
• Residents no more likely to be
disturbed by STLs than long-term
tenants
• Ruled unlawful elsewhere
• Preference is for self-contained
properties which will nearly all be in
rural areas so criterion is pointless
• Would adversely impact on Perth city
centre – needs people and life in it
• Criterion inhibits the more affordable
and sought-after STL properties
which could damage tourism and
impact on local business
• Highland Perthshire cannot afford to
lose tourism income
• Anti-social behaviour could be
controlled with extra licence
conditions
• Smaller STLs unlikely to cause
issues e.g. hen / stag parties
• Limiting STLs in this way will
adversely impact Perth centre
• Relevant for Edinburgh but not
Highland Perthshire
• Too many different types of
accommodation and this criterion
does not necessarily address
neighbours concerns
• Will have a negative impact on Perth
city centre where some properties
are attractive for STL but not to
residents
• Criterion may be unlawful
• STLs operators undertake to be
responsible and neighbourly as part
of the licencing process
• Communal spaces require to be
shared
• If STL hosts can demonstrate
effective practices and management
they will benefit the local economy
• STLs have less impact than long-
term lets as they are only there a
short time
• Impossible to enforce depending on
architecture of property
Page 63 of 148

Page 64

Response Respondent
Residents Business owners (including those
who are also residents
Organisations / groups
Neither agree
nor disagree /
don’t know
• Most holiday properties have their
own front door
• Fine if whole block is STL but could
be friction if there is a mix
• Residents can be bad neighbours too
• May be more efficient to fine owners
if regular unruly behaviour
• Depends on how well the house / flat
is designed
• May be exceptions to consider
individual cases
• Appear to exclude shared stairs?
• Would depend on individual
circumstances – shouldn’t be a
blanket rule
• Problems in Edinburgh do not exist in
other areas
• Not important
• Each application should be assessed
on its own merits depending on
circumstances and location –
buildings need to be better managed
• Should not apply to flats let out to
students during term time
• Should be a strike system in place
so disturbances can affect whether
STL is allowed 
Other
comments 
• “Door” is confusing – should be
access? 
PKC Officer comments
This propsal has the biggest divide in opinion between residents and business owners in terms of percentage split although the issues raised,
both in agreement and disagreement, are similar across the sectors. Respondents in all sectors recommended that each application should
instead be treated on its own merits. 
Rather than this being a specific criterion it is proposed in the finalised guidance to instead tie this more closely to the policy framework set out
in NPF4. 
Page 64 of 148

Page 65

NPF Policy 30: Tourism, part e) criterion i) does not support a change of use to short-term let where the proposals will result in an unacceptable
impact on local amenity or the character of a neighbourhood or area. It is therefore proposed to include shared access as a consideration to be
taken into account under this NPF criterion. 
A tiered approach is now proposed which seeks to recognise that the impact of properties being used as short-term lets will differ depending on
the existing uses within the area. For example, the impact of a short-term let off a shared access within a predominantly residential area will
potentially be greater than in a town / city centre or other area where there is a mix of other uses which could already impact significantly on
residential amenity. The following consideration is therefore proposed under this NPF criterion: 
• Where is the proposal located? Is it: 
o Within the city centre or a town centre (as identified in the LDP2) where there is no adverse impact on amenity or character of the
area? 
o Within a settlement boundary (as identified in the LDP2) and located in an area where there is a mix of other uses which could
already affect residential amenity? 
o Within a predominantly residential area and there could be adverse impact on amenity for existing residents, particularly in blocks
with shared / communal entry? 
Page 65 of 148

Page 66

General comments on STL controls 
The open question drew a lot of comments, some relating specifically to support or otherwise for additional controls through a STL Control
Area, but others relating more generally to the overall need to manage STL numbers in Perth & Kinross irrespective of any control area. 
Table 5
STLs in P&K should be managed / controlled / restricted /
reduced because:
STLs in P&K should not be managed / controlled / restricted /
reduced because:
• Workers and locals (especially young people starting out
and families) are priced out of the area with prices pushed
up by people purchasing to STL 
• Unfair that local people – especially adult children – are
having to move away from their communities in order to
live, controlling STL numbers would make it fairer
• Increased travel from people having to live further away
from where they work because they can’t access housing
has an environmental impact
• Without locals and homes for workers, there isn't enough
staff to service the tourist industry or carry out essential
tasks / services e.g. care services which will ultimately
increase costs to the Council, or allow businesses to
expand, alternatively they have to pay higher wages for
workers to travel
• An excess of STLs adversely affects keeping a sense of
community / fragments the community for those
surrounded by STLs
• Tourism is important but shouldn’t be at the expense of
those of live, work and contribute to the local economy all
year round and the longer-term sustainability of
communities
• There are enough hotels, B&Bs and caravan parks in
Highland Perthshire to accommodate short term stays
• Businesses have to apply to change a use and so should
STLs 
• Restricting STLs will not increase supply of affordable housing
and should not be blamed for the lack of affordable housing –
PKC should make more land available to enable more
affordable houses to built instead / people would prefer modern
homes which are well insulted and easy to heat rather than
older buildings which most self-catering units are in Highland
Perthshire / other factors also cause problems e.g. lack of
affordable childcare, poor transport links etc.
• STLs provide temporary accommodation for workers as well as
holiday-makers e.g. contractors, hospitality workers
• STLs encourages tourism all year round
• STLs provide employment and bring in revenue to the wider
community – they support local businesses e.g. cleaning and
laundry, property management, gardening and property
maintenance, which could be irreparably damaged by a lack of
tourist spending - Highland Perthshire cannot afford to lose so
much tourism income / loss of tourism-related jobs
• Many STLs would not be affordable to buy or rent due to their
size or location / reducing STLs won’t drop property prices
enough to make them affordable – they are more likely to be
bought by retiring home owners
• The Council should not interfere with the market / private
property / people trying to run a business
• More should be done to address housing provision for local
residents but not at the expense of the tourism industry of which
STLs are a vital part
Page 66 of 148

Page 67

STLs in P&K should be managed / controlled / restricted /
reduced because:
STLs in P&K should not be managed / controlled / restricted /
reduced because:
• There is already extensive anti-social legislation which could
and should be used – pubs and 24hour shops create noise /
disturbance too
• Reducing supply will push up holiday accommodation prices /
STLs provide less expensive accommodation for those who
can’t afford hotels or want more freedom
• There is no benefit it forcing second home owners who STL part
time to instead leave their property vacant
• Properties in the city centre may not be attractive for long term
residents or landlords (current interest rates making it not worth
buying to let) but are attractive for STLs
• Cannot increase visitor numbers in Perth City if lose STL holiday
accommodation 
PKC Officer comments
The NPF is part of the statutory development plan and already sets the policy context for STLs with a general presumption against the reuse of
existing buildings for STLs. Given there is not a specific policy in LDP2 the Council has to use the policy framework set out in the NPF until
such time as the LDP is reviewed. The proposed guidance simply seeks to provide more information on the circumstances under which the
Council may support an application for the change of use of an existing dwellinghouse to a STL within the policy framework set out in the NPF. 
Page 67 of 148

Page 68

Additional suggestions / comments 
Table 6
Respondent comments PKC Officer comments 
• Various suggestions on taxing STLs – taxed more heavily than principal homes; bed tax for no.
nights STL is let; review of when STLs pay business rates rather than council tax e.g. small
business rate relief
• Incentives should be offered / made easier for owners to bring smaller STL properties / second
homes back into longer term residential use – regulation makes it harder / less attractive for
owners to long term let – not a level playing field
• Second homes are as much / more of a problem but the guidance doesn’t impact on these /
targets the wrong type of property use
• Second homes which are only used for STL part of the year should also be included as an
exception as these will never be available as a primary residence and so provides economic
benefits without impacting on the housing supply
• Unintended consequence of controlling STLs may be an increase in second homes as no
guarantee owners will sell
• The cost for planning permission is too high and the process too complex
• Should instead target empty homes
• There should be no exemptions and neighbours must be consulted on STL applications
• There should be enough purpose-built holiday accommodation to keep STLs out of the local
housing market
• Limiting STLs will damage the area’s position as a tourism destination and will have knock on
effects on other local businesses too
Outwith scope of planning guidance
which simply seeks to provide more
information on the circumstances
under which the Council may support
an application for the change of use of
an existing dwellinghouse to a STL
within the policy framework set out in
the NPF
• Each area should have a maximum quota of properties that can be turned into short term lets
informed by local housing requirements
• Shouldn’t be a blanket application of the guidance as there are different concentrations of STLs
in different areas and different types / sizes of STL
• Criteria list is too narrow and restrictive – there should be no barriers to anyone wishing to
establish a STL business
• Agree with criteria but list should not be exhaustive, and the emphasis of the policy should
change from negative to positive
Outwith scope of current planning
guidance which has been prepared to
assist in the application of the policy
framework set out in the NPF. These
issues can, however, be considered
through preparation of policy
framework in next LDP
Page 68 of 148

Page 69

Respondent comments PKC Officer comments 
• Distinction between STLs owners who live outwith PKC where the rental income is most likely
spent elsewhere, and local owners who are more likely to spend the income locally and provide
closer supervision
• Planning permission should not be required for STL accommodation which is part of or within
the curtilage of a permanent resident’s principal home
• The default position should be that properties are available for long term let or sale to residents
and it should be incumbent on those proposing short term lets to prove they are not needed
• Individual flats within a residential block should not be permitted to operate as STL due to the
adverse impact on existing residents
• NPF policy 30 e) requirements are subjective and it is not clear what measurable criteria will be
used to make decisions
The guidance has been prepared to
assist in the application of the policy
framework set out in the NPF.
• The new guidance should not apply retrospectively to existing owners only to new or where
there is a change of ownership 
• Most STL properties are converted commercial properties e.g. farm steadings, purpose-built
lodges / pods etc which are not suitable for long term letting and already have planning
permission so should be supported
• Traditional B&Bs / renting out rooms / home sharing should not be impacted by the guidance
The guidance clarifies the position in
relation to planning permission
• Risk that a presumption in favour of granting planning permission in certain circumstances
could override other important considerations
All planning applications will be
assessed against the full suite of
relevant LDP policies
• There’s a need for liaison with Cairngorms National Park Authority Liaison has been undertaken 
Page 69 of 148

Page 70

General comments on consultation / process 
Table 7
Respondent comments PKC Officer comments 
• There’s little in the way of any hard evidence to support the alleged impact of STLs on
loss of housing stock or house prices
• Need to focus on empirical data and engage with all sides
• Insufficient / flawed data 
• All evidence and data should be reissued after the licencing scheme deadline has passed
The STLs Evidence Paper will be updated to
inform the recommendation on a STL
Control Area to a future Committee.
• Misleading data on position in other Council areas – Edinburgh and Highland The previous Committee report presented
the information that was available at the time
of preparing the report
• No guidance needed because NPF already has a policy on short term lets – guidance can
only be non-statutory and therefore questionable what weight it can be given and if it is
incompatible with the NPF then it cannot be given any weight at all 
• Guidance is disproportionate, over-reaching and over-laps with licensing – it is not fit for
purpose and will be subject to legal challenge
The non-statutory guidance has been
prepared to provide more information on the
circumstances under which the Council may
support an application for the change of use
of an existing dwellinghouse to a STL within
the policy framework set out in the NPF.
• Need for clearer wording on what is excluded from needing planning permission
• Unclear whether guidance applies only with control area or whole of PKC
• Committee report refers to 5 criteria not 4
• Irrelevant to ask public opinion on something which is established in planning law (CLUD)
Clarified in guidance
• Questions unclear
• Some of the questionnaire is badly written – it is unclear what agree or disagree refers to
• Consultation was not communicated in a timely manner – should be extended / redone
over the winter months as many people may have missed it over the summer
• Unreasonable to expect the public to comment on the basis of inadequate and confusing
data, and confusing policy wording
• Consultation hub does not allow documents to be attached which limits the ability to
provide an effective response
• No formal correspondence from PKC despite being identified as a stakeholder group
Feedback is welcomed and will help improve
future consultations
Page 70 of 148

Page 71

Respondent comments PKC Officer comments 
• Unclear whether those granted a STL licence will then have to apply for planning
permission before they can operate
Information on the licencing and planning
permission processes is on the Council
website 
www.pkc.gov.uk/shorttermlets  
www.pkc.gov.uk/shorttermletsandplanning 
Page 71 of 148

Page 72

Page 72 of 148

Page 73

1 
Appendix 2 
CHANGE OF USE OF RESIDENTIAL  
PROPERTY TO SHORT-TERM LET 
FINALISED
NON-STATUTORY PLANNING GUIDANCE 
November 2023
6
Page 73 of 148

Page 74

2 
Introduction 
Tourism is a major economic driver in Perth & Kinross, and short-term lets are an
important part of the visitor economy. The Council is, however, aware that some
communities are becoming increasingly concerned that the increase in short-term
lets over recent years is impacting on the availability and affordability of housing
locally, and is having a secondary impact on jobs, services and business growth. 
The short-term letting of a residential property can bring economic benefits both to
the host and the local area. This must, however, be balanced against the impact the
loss of that residential property has on the availability of housing for local people,
affordable housing in particular, and the potential for adverse impacts on residential
amenity where an increasing proportion of the housing stock becomes short-term
lets. 
The Council wishes to support a sustainable visitor economy and therefore
recognises the importance of addressing the short-term let issue whilst also
encouraging the development of appropriately located hotels, guest houses and
bespoke self-catering units that do not erode local housing availability. 
Page 74 of 148

Page 75

3 
Definitions and Exclusions 
The focus of this planning guidance is the material change of use of dwellings to
short-term lets. 
The material change of use of land or buildings is included within the definition of
development even if there are no physical alterations to the land or building.
Planning permission is always required for a material change of use. A change from
a flat to a short-term let is always considered to be a material change of use
requiring planning permission. For residential property, the significance of the
change must be considered. There are several factors which may affect the
Council's consideration of whether the proposed change is a material change of use.
Factors include an impact on local amenity or the character of a neighbourhood or
area, safety, and impact on immediate neighbours. 
Short-term let is defined in the Town and Country Planning  (Short-term Let Control
Areas) (Scotland) Regulations 2021 where all the following criteria are met: 
a) “sleeping accommodation is provided to one or more persons for one or more
nights for commercial consideration, 
b) no person to whom sleeping accommodation is provided is an immediate
family member of the person by whom the accommodation is being provided, 
c) the accommodation is not provided for the principal purpose of facilitating the
provision of work or services to the person by whom the accommodation is
being provided or to another member of that person’s household, 
d) the accommodation is not provided by an employer to an employee in terms
of a contract of employment or for the better performance of the employee’s
duties, and 
e) the accommodation is not excluded accommodation.” 
The Regulations make several exclusions from the definition of a short-term let
including hotels, boarding houses, guest houses and hostels. These are therefore
not included within the scope of this Guidance. 
While B&Bs are not specifically mentioned, the Town and Country Planning (Use 
Classes) (Scotland) Order 1997 classifies these as ‘houses’: 
“Use as a bed and breakfast establishment or guesthouse, where at any one
time not more than 2 bedrooms are, or in the case of premises having less
than 4 bedrooms 1 bedroom is, used for that purpose” 
Any residential property being used as a B&B within the definition of ‘Class 9:
Houses’ is therefore not included within the scope of this Planning Guidance. 
Page 75 of 148

Page 76

4 
For clarity other related definitions are: 
Dwellinghouse or residential property is defined as an independent dwelling (with
its own front door, kitchen and bathroom) being accommodation which ordinarily
affords the facilities required for day-to-day private domestic existence such as a
house, flat, cottage. 
Secondary let - means the letting of a property where the host or operator does not
normally live. The planning guidance cannot apply to Home-letting or Home-sharing
(see below). 
Home-letting - Defined in the short-term let licensing legislation means using all or
part of your own home for short-term lets whilst you are absent, for example, whilst
you are on holiday. Not included within the scope of this guidance. 
Home-sharing - Using all or part of your own home for short-term lets, whilst you
are there. Not included within the scope of this guidance. 
Private Residential Tenancies are excluded under Section 26B(3) of the 1997 Act
as they are not considered secondary accommodation because they are the
principal home of the tenant. 
Summary 
The following are not within the scope of this planning guidance: 
• Hotels, boarding houses, guest houses or hostels1
• B&Bs
• Home-letting
• Home-sharing, e.g. renting out a room in your house
• Private Residential Tenancies
• Short-term lets which have already been granted planning permission 
There may, however, be a need to obtain a short-term let licence. More guidance on
this can be found on the Council’s website: www.pkc.gov.uk/shorttermlets 
1 Which are within the definition Class 7 Hotels and hostels of the Town and Country Planning (Use Classes)
(Scotland) Order 1997
Page 76 of 148

Page 77

5 
Guidance 
There is no specific policy in the current Perth and Kinross Local Development Plan
2 (LDP2) for the control of short-term lets. In terms of the Development Plan, the
policy framework for assessing planning applications is therefore set out in the
National Planning Framework 4 (NPF4), Policy 30: Tourism. 
This planning guidance has been prepared to assist in the application of the policy
framework set out in NPF4 and in the assessment of planning applications for the
change of use of a residential property to a short-term let. The guidance applies
across Perth and Kinross. 
As indicated above, not all changes of use will require planning permission. More
guidance on this can be found on the Council’s website:
www.pkc.gov.uk/shorttermletsandplanning 
If the residential property has been operating continuously as a short-term let for
more than 10 years owners are eligible to apply for a Certificate of Lawful Use or
Development (CLUD) which, if granted, would mean the use would be exempt from
planning enforcement action. 
If the use is not eligible for a CLUD and planning permission is required, the proposal
must comply with NPF 4 Policy 30 e): 
Development proposals for the reuse of existing buildings for short term
holiday letting will not be supported where the proposal will result in: 
(i) An unacceptable impact on local amenity or the character of a
neighbourhood or area (considerations 1-4) 
OR 
(ii) The loss of residential accommodation where such loss is not
outweighed by demonstrable local economic benefits (considerations 5-6) 
Considerations 
1. Where is the proposal located? Is it: 
• Within the city centre or a town centre (as identified in the LDP2) where
there is no adverse impact on amenity or character of the area? 
• Within a settlement boundary (as identified in the LDP2) and located in an
area where there is a mix of other uses which could already affect
residential amenity? 
Page 77 of 148

Page 78

6 
• Within a predominantly residential area and there could be adverse impact
on amenity for existing residents, particularly in blocks with shared /
communal entry? 
2. Does the proposal relate to a residential property with four or more bedrooms,
and will there be no adverse impact on local amenity from noise or
disturbance if the let is occupied by a group or more than one family? 
3. Is the proposal for the extensive refurbishment of a long-term empty property
which will improve the area by bringing the building back into active use? 
4. Will there be no unacceptable impact from the proposal on local amenity or
the character of the area? 
5. Is the proposal part of a diversification scheme to support an existing Perth &
Kinross rural business in line with NPF4 Policy 29: Rural Development and
Local Development Plan policy 8: Rural Business and Diversification? 
6. Is there anything which demonstrates that the loss of the residential
accommodation will be outweighed by the benefits of the proposal to the local
economy? 
Proposals must also comply with all relevant LDP2 policies, in particular Policy 1
Placemaking: Development must contribute positively to the quality of the
surrounding built and natural environment. 
Short-Term Let Control Area 
If any part of the Perth & Kinross Council area is designated as a Short-Term Let
Control Area at any point in the future, all new proposals for the change of use of a
residential property to a short-term let submitted after designation of the said Control
Area will require planning permission. 
Any short-term let that was operating lawfully within a Control Area prior to its
designation will not be required to apply for planning permission retrospectively.
Lawfully means any short-term let which either has planning permission or was
operating in a manner that was not a material change of use and therefore did not
require planning permission. 
Page 78 of 148

Page 79

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure and Economic Development Committee 
1 November 2023 
AUCHTERARDER COMMUNITY FACILITIES FUND 
Report by Head of Planning and Development 
(Report No. 23/290) 
1. PURPOSE 
1.1 This report seeks the determination of an application for funding from
Auchterarder Community Sport and Recreation for a contribution of £50,000
towards the installation of a pump track in Auchterarder Public Park on
Western Road, Auchterarder. The application meets the Fund’s criteria. 
1.2 The Community Facilities Fund receives its income solely in the form of 
developer contributions based on the sales of new houses, and funding can
only be allocated to projects where sufficient developer contributions have
already been collected. 
1.3 The views of local elected members and the Community Council have been
sought, and these must be taken into account when determining this
application. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
• considers and determines this grant request, in principle, of £50,000 by
Auchterarder Community Sports and Recreation, as a contribution towards
the project to install a Pump Track at Auchterarder Public Park on Western
Road, Auchterarder 
• notes that grant payment can only be made subject to money actually being
available within the fund at a future point; along with the submission of a
project plan showing finalised costs and a payment schedule. 
• agrees that any award should be conditional on planning permission being
granted. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues 
• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices
7
Page 79 of 148

Page 80

4. BACKGROUND / MAIN ISSUES 
4.1 The Auchterarder Expansion Development Framework was published in
February 2008, and was adopted by the Enterprise and Infrastructure
Committee (Report No. 14/370 refers) as Supplementary Guidance to the
Local Development Plan in September 2014. 
4.2 That document set the framework for subsequent planning applications and
defined the infrastructure requirements associated with this major expansion
to the settlement. It has been acknowledged that the identified scale of
development will have an impact on the level of existing service provided by
community facilities. To mitigate this impact as the development progresses,
one of the measures included in the Framework is a contribution of £1,000 per
open market housing unit to be made to the Council by the developers up to a
maximum of 600 units, towards an Auchterarder Community Facilities Fund. 
4.3 In line with the Section 75 Legal Agreements attached to the permitted
developments, the fund will be used for the sole purpose of providing
Community Facilities, the meaning of which is set out in the agreements as: 
“…such public facilities within the settlement boundary of Auchterarder, the
provision of which the Council, at its sole discretion, believes would improve
the amenity of the public realm, including without prejudice to the foregoing
generality, car parking facilities, a public hall, adaption of existing school
changing room facilities to permit access to the pitches forming part of the
Sports Facilities, a public library, new or enhanced public transport services,
improvements to the core path network and recycling facilities.” 
4.4 It is intended that the Fund be spent over the lifetime of the development as
demand on community facilities increases. It is also intended that the Fund be
used to support a range of projects that will benefit the community in
Auchterarder. 
4.5 Procedures for recording contributions received; distributing contributions
towards the provision of community facilities; and reporting these details in an
open and accountable way were agreed by the Enterprise and Infrastructure
Committee (Report No. 16/375 refers). These procedures include reports on
funding received and allocated, and procedures for the allocation of funding.
Requests for funding up to £50,000 are delegated to the Executive Director
(Communities). Where the amount sought exceeds £50,000, this needs to be
referred to the Environment and Infrastructure Committee. The procedures
also include provision where future contributions to the fund may be ring-
fenced for projects, in addition to what has already been provided through the
Fund. 
Page 80 of 148

Page 81

4.6 Although this application may appear to fall within the £50,000 threshold for
delegation, the Committee should note that the installation of the pump track
is the second phase of a larger redevelopment proposal for the Auchterarder
Public Park that has previously been awarded support from the Auchterarder
Community Facilities Fund. As a result, due to the cumulative level of funding
requested, a committee decision is required. 
5. PROPOSALS 
5.1 The Committee is asked to consider and determine an application for funding
from Auchterarder Community Sports and Recreation, a Scottish Charitable
Incorporated Organisation (SCIO SC048490). The applicant lists its three
main purposes as: to maintain and widen participation in sport and active
recreation at all levels in Auchterarder; to develop and support local people to
improve and strengthen local sports clubs and organisations involved in
sporting or physical activities and widen opportunities to participate; and to
develop and provide access to quality places where the community can get
involved in sport and active recreation. 
5.2 The application is for a sum of £50,000, sought as a contribution towards a
project to install a pump track in Auchterarder Public Park on Western Road,
Auchterarder. 
5.3 Phase 1 of the redevelopment of the park was partly supported by an award
of £100,000 from the Community Facilities Fund on 18 August 2021 (report
21/124 refers), development of which is complete. This application represents
a second phase of works to provide a cycling pump track. Appendix 1 includes
a copy of the application form and a location plan. 
5.4 The project to provide the pump track (as part of the overall redevelopment of
the park) would include: 
• removal of existing surfaces
• drainage and resurfacing works
• provision of 115m length cycle pump track with 40m split line and skills
area (option 3 in appendix 1); and
• improvements to access to the pump track 
5.5 The purpose of the project would be to support the existing community’s
needs and meet demand from the new housing developments at the
Auchterarder Development Framework sites. It is also anticipated by the
applicant that it will attract visitors and enthusiasts from the cycling community
to Auchterarder. The development of the pump track would also facilitate
coaching by volunteers to raise skills levels. 
5.6 The applicant makes a link between the proposed redevelopment of the park,
the first phase of which is complete, and improvements to physical and mental
wellbeing. The increase in number and frequency of visits to the park would
promote opportunities for outdoor interactions where people are likely to meet
informally, which will help build a strong community around the park. This will
Page 81 of 148

Page 82

help integrate the new housing areas with the existing town and will lead to
higher levels of community wellbeing. In time, the applicant envisages that the
park will act as a community hub, an area for the community to gather and
where a programme of activities and informal recreation opportunities will be
offered. 
5.7 The applicant links the greater park redevelopment project to increased use of
the adjoining Provost Walk core path as an informal recreation resource
accessed from the park. This path was recently upgraded as part of a
community-led project coordinated by the Perth & Kinross Countryside Trust.
This included a substantial award of £150,000 paid in two stages in March
2017 and November 2018 from this fund (report 18/367 refers), amongst other
funding sources, and the upgraded path connects the park to the wider path
network serving several housing areas in the south of the town. 
5.8 The applicant reports strong community support including from the Friends of
St Margaret’s. 
5.9 The application form states that the estimated construction cost for the pump
track would be £195,414 and will be subject to a tendering process. Planning
permission for the larger project to redevelop the park was originally granted
on 11 March 2021 (planning permission reference 20/01646/FLL) and
included proposals for a pump track. However, it is noted that the location
plan accompanying this funding application relocates the Pump Track area
proposed in the planning application to land south of the existing football pitch.
This is outwith the area covered by the original planning permission but still
within the Auchterarder Public Park. Although unlikely to affect consideration
of this funding application, a fresh planning application for development of the
pump track at the new location will therefore be required. Should funding be
awarded, it should be conditional on planning permission being obtained. 
5.10 An indicative plan for the park’s redevelopment is included at Appendix 1
showing the projected costs. Should an award be made, it is recommended
that it also be subject to submission of an updated project plan in due course
showing finalised costs and identifying when the sum requested would be
required over the course of the project. 
5.11 In terms of financial support from other sources, the applicant has confirmed
funding of £2,550 of its own, and has received or made one-off applications to
the following other funding bodies:  
Page 82 of 148

Page 83

Funding Body or Fund Name Amount Status
Auchterarder Community Facilities Fund £50,000 Approval sought in
this report
Sportscotland in partnership with
Scottish Cycling
£50,000 Application approved
The Gannochy Trust £50,000 Application approved
Friends of St Margaret’s £12,500 Application approved
Auchterarder & District Community Trust £12,500 Application approved
Sponsorship £4,500 Secured 
Consultation 
5.12 In terms of consultation carried out on the application, the views of the
Auchterarder and District Community Council and the local elected members
were sought, in line with the Fund’s operating procedures. These views
require to be taken into account when determining this application. 
5.13 The Auchterarder and District Community Council were consulted but a
response has not been received to date. Views were also sought from the
three local elected members for the ward. Two of the local elected members
advised that they are also are a member of this committee and therefore
wished to reserve their position on the application. 
Assessment 
5.14 Based on the information provided by the applicant, the project meets the fund
criteria regarding the provision of community facilities. The four criteria are: 
1. Projects should be located within the settlement boundary of
Auchterarder as defined by the adopted Local Development Plan.
Projects which start within the boundary but extend outwith, such as core
path improvements, would be acceptable; 
2. Projects should be linked to mitigating the impact of the new housing
within the scope of the Auchterarder Development Framework on the
public realm or facilities; 
3. Projects should improve the amenity of the public realm or facilities and
should consider a range of funding streams in addition to the Community
Facilities Fund to ensure maximum value. Money cannot be used for
projects which are already fully funded from other sources. Projects
being brought forward with contributions from other funding streams will
be able to access gap funding from the Community Facilities Fund; 
Page 83 of 148

Page 84

4. Projects should identify any ongoing maintenance or eventual costs and
demonstrate that this can be secured through existing or future budgets. 
5.15 The park is wholly within the settlement boundary and is near to several
residential areas in Auchterarder, including one of the three Auchterarder
Development Framework sites at Townhead. The Provost Walk core path
adjoins the park. 
5.16 There is sufficient link between the project – which aims to improve facilities in
an existing park by constructing an outdoor cycle pump track – and the need
to provide additional community facilities in the town to mitigate the impact of
the new housing. 
5.17 The project improves the amenity of the public realm as it is an integral part of
a greater project to improve the park and provide new facilities for the public.
There is evidence of other funding streams for the project. 
5.18 The ongoing maintenance of the facility is not discussed in the application for
funding, which is solely for construction costs. However, the cycle pump track
forms part of a larger project to improve and maintain the park and the
maintenance of this pump track would be incorporated into the maintenance
of the wider park. This application seeks additional funding for its construction
only. 
Availability of Funding 
5.19 In terms of the fund balance, there is currently £41,043 in the account. The
Council has received contributions totalling £ 443,920 of which £402,877 has
already been allocated and paid to projects, including the sum of £100,000
already paid to the Auchterarder Community Sport and Recreation Group,
representing the award previously approved by this Committee (Report No.
21/124 refers). 
5.20 Predictions on future contributions are based on the level of contributions to
date, along with an estimate of the rate of open market completions at the
remaining three development sites. For this year and coming years, officers
anticipate an income of approximately £ 23,000 per annum. This is based on
estimated house sales and an assumption that house building at the three
development sites proceeds with annual contributions made to the Fund from
the respective developers. Contributions to the Fund from some of the
remaining 129 open market units at Castlemains and Kirkton are anticipated
to become due in the next three years. Contributions from the remainder of
the Townhead site (the final 63 open market units), are expected in the long
term, and are therefore not available during the timeframe of this application.  
Page 84 of 148

Page 85

5.21 The following table sets out the fund’s anticipated income for this year
and the following two years. 
2023-24 2024-25 2025-26
Balance brought forward 41,043 64,043 87,043    
Income   
Future contributions
(estimated)
23,000 23,000 23,000    
Balance carried forward 64,043 87,043 110,043 
5.22 The Community Facilities Fund receives its income solely in the form of
developer contributions based on the sales of new houses and funding can
only be allocated to projects where sufficient developer contributions have
already been made. 
5.23 The rate at which those contributions are received into the account depends
on the rate at which housebuilding continues at the three framework sites. If
future contributions are not received as quickly as forecast, for example if the
rate of housebuilding is not as forecast, there is no financial risk to the Council
in forward committing grant aid. This is because whilst future contributions to
the fund may be ring-fenced for projects, disbursements from the fund
cannot be made until sufficient funds have been accrued in the account. 
6. CONCLUSION   
6.1 As the project meets the Fund’s criteria, the Committee is required to
determine this application taking into account the views of the consultees,
given the level of funding requested, and also having regard the level of
available funds in the account. 
Page 85 of 148

Page 86

Author
Name  Designation Contact Details
Alasdair Finlayson  Planning Officer 01738 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities)
23 October 2023 
APPENDICES 
• Appendix 1 – Application form and supporting information. 
Page 86 of 148

Page 87

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment None
Strategic Environmental Assessment None
Sustainability (community, economic, environmental) None
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  None 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This report supports all of the priorities within the Community Plan 2022-27. 
(i) Reducing Poverty (including child poverty, fuel poverty and food poverty)
(ii) Mental and physical wellbeing
(iii) Digital participation
(iv) Skills, learning and development
(v) Employability 
Corporate Plan 
1.2 This report supports the objectives within the draft new Corporate Plan:- 
(i) Children and young people grow up safe, respected, well-educated,  
and confident in their ability to realise their full potential; 
(ii) People and businesses are increasingly able to prosper in a local 
economy which support low carbon ambitions and offers opportunities  
for all; 
(iii) People can achieve their best physical and mental health and have 
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially    
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of 
climate and environmental change for this and future generations.
Page 87 of 148

Page 88

2. Resource Implications 
Financial 
2.1 The Head of Finance must be consulted on all proposals with financial
implications. No report with such implications should be presented at a
meeting when this has not been done and it should be explicitly stated that
the Head of Finance has been consulted and has indicated agreement with
the proposals. 
2.2 This section should state the specific amount of revenue and capital funding
required in the current financial year and the full year effect of any future
funding and how that will be met. Detail should be provided of where the
financial provision has been made e.g. the Revenue Budget / Capital
Programme or a special monies allocation. 
2.3 All reports should contain clear and unambiguous financial information.  It
could also be helpful to provide an outline of the budget or overall investment
in this area of activity. 
Workforce 
2.4 There are no workforce implications. 
Asset Management (land, property, IT) 
2.5 There are no land, property or information technology implications. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. 
3.2 The proposals have been considered under the Corporate Equalities Impact
Assessment process (EqIA) with the following outcome: 
(i) Assessed as not relevant for the purposes of EqIA 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
Page 88 of 148

Page 89

3.4 The proposals have been considered under the Act and no further action is
required as it does not qualify as a PPS as defined by the Act and is therefore
exempt. 
Sustainability   
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.6 The report does not have a direct impact on sustainability or climate change
as it provides detail of an application for funding. 
Legal and Governance 
3.7 No legal and governance implications are identified. 
Risk 
3.8 This report provides details of an application for funding received in respect of
the Auchterarder Community Facilities Fund. There is no significant risk to the
Council. The source of funding has been identified through a Section 75 legal
agreement and the Council decides how such funding will be distributed to
identified projects. There are minor risks that the lack of fund collection does
not allow suitable projects to be supported, or that funds collected are not
used within five years and are returned. 
4. Consultation 
Internal 
4.1 The views of the Local Elected Members and the Convener of the
Environment, Infrastructure and Economic Development Committee were
sought, in line with the Fund’s operating procedures. All three Local Elected
Members responded to express support for the application. In line with
practice, the Convener wished to reserve his views, noting that the
application would in time come before this committee for determination. 
External 
4.2 The views of the Auchterarder and District Community Council were sought,
in line with the Fund’s operating procedures. The Community Council did not
respond within the initial timescale and this is being followed-up.
Page 89 of 148

Page 90

5. Communication 
5.1 This report provides details of an application for funding received in respect of
the Auchterarder Community Facilities Fund. The target audience for this
report is therefore the fund contributors (the developers of the Auchterarder
Framework Sites) in respect of reporting their financial contributions, and the
potential recipient of funding (Auchterarder Community Sports and
Recreation). 
5.2 While no specific communications are required to target the key audiences of
this report, the report may be of interest to other community groups in
Auchterarder that may be considering funding applications of their own. It may
also have wider public interest in terms of how contributions to the fund are
collected and used. The Council’s website includes an information page to
raise awareness of the fund and how to make an application to the fund. 
2. BACKGROUND PAPERS 
2.1 This section should list the documents that have been relied on in preparing
the report, other than those committee reports already referenced within the
main body of the report.  All documents must be kept available by the author
for inspection by the public for four years from the date of the meeting at
which the report is presented. 
2.2 Auchterarder Expansion Townhead and North East Development Framework
March 2008 
Page 90 of 148

Page 91

APPLICATIONS FOR FUNDING FROM THE AUCHTERARDER
COMMUNITY FACILITIES FUND 
GUIDANCE NOTES FOR APPLICANTS AND APPLICATIONS FORM  
7
Page 91 of 148

Page 92

2 
BACKGROUND 
The Auchterarder Development Framework will deliver 800 dwellinghouses within
Auchterarder. The identified level of development will have an impact on the level of existing
services provision provided by community facilities. To mitigate this impact as the
development progresses a contribution of £1,000 per unit will be made up to a total
£600,000. This money will be used by the Council over the lifetime of the development to
improve the wider realm or facilities as the demand on these increases. The Auchterarder
Community Facilities Fund will be available for use on projects being promoted by Council
Services and voluntary/community organisations which improve the amenity of the public
realm or facilities within the settlement boundary of Auchterarder. 
GUIDANCE NOTES 
The Council will consider all applications for funding in line with the essential criteria. Where
it is agreed the proposal would support community projects and meet the essential criteria
the Executive Director (Environment) can approve the transfer of contributions up to a
maximum of £50,000 per project. Applications for funding for more than £50,000 per project
will require Committee approval. Where Committee approval is required this may take up to
4 months, dependant on the Committee cycle. 
All contributions received will be spent on projects which improve the amenity of the public
realm or facilities within the settlement boundary of Auchterarder. These include, but not
exclusively, car parking facilities, public hall improvements, adaption of existing school
changing facilities to permit access to pitches forming part of the new Sports Facilities, a
public library, new or enhanced public transport services, improvements to the core path
network and recycling facilities. This range of community improvements forms the basis of
the criteria against which applications for funding from the fund will be assessed. 
The funding will not be received by the Council as a lump sum, but will be based upon the
sales of each new dwelling within the Development Framework; therefore funds will only be
allocated to projects where they have already been collected. The funding will not be used to
fund a single large project, but will be spread across a range of projects. A report providing
details of funding received and allocated will be published annually in April. 
Who can apply? 
The Auchterarder Community Fund is available for use on projects being promoted by
Council Services and voluntary/community organisations. The definition of a
voluntary/community organisation is a body which is led by volunteers, is non-profit
distribution, legally independent of the state, and is dedicated to a public good. The funding
criteria contained in this guide apply to all local voluntary/community and national voluntary
organisations and umbrella organisations requesting financial support from the Auchterarder
Community Fund. Applicant organisations would have to demonstrate that they are open to
all regardless of religion, race, gender or disability. 
Specific Notes: 
 Religious organisations: religious organisations will be considered, if they meet the
standard conditions, on the basis that the programme offered is sufficiently general in
nature to be applicable to a wide cross-section of the population of regular and
sufficient duration (eg weekly for 2 hours, 36 weeks per year).
Page 92 of 148

Page 93

3
 Uniformed organisations: Uniformed organisations can apply where there is provision
within a written constitution for equal access and opportunity for individuals as
appropriate to the nature of the organisation.
 National organisations: National organisations will be considered, if they are able to
identify defined local activities to the reasonable satisfaction of the Council. 
Criteria For Assessing Applications For Funding 
Applications for funding should meet the following criteria: 
1. Projects should be located within the settlement boundary of Auchterarder as defined
by the adopted Local Development Plan. Projects which start within the boundary but
extend out with, such as core path improvements, would be acceptable; 
2. Projects should be linked to mitigating the impact of the new housing within the
scope of the Auchterarder Development Framework on the public realm or facilities; 
3. Projects should improve the amenity of the public realm or facilities and should
consider a range of funding streams in addition to the Community Facilities Fund to
ensure maximum value. Money cannot be used for projects which are already fully
funded from other sources. Projects being brought forward with contributions from
other funding streams will be able to access gap funding from the Community
Facilities Fund. 
4. Projects should identify any ongoing maintenance or eventual replacement costs and
demonstrate that this can be secured through existing or future budgets.  
Page 93 of 148

Page 94

4
APPLICATION FOR FUNDING
In order to minimise delays in processing your application please complete all sections as
fully as possible. Plans and or information can be attached in support of the application form. 
Name of applicant(s) (to whom funding would be payable) 
Project address/location (please attach a location plan) 
Project proposal overview 
Project output (What is the project seeking to achieve?) 
Amount of funding requested 
Details of what the funding will be spent on 
Summary of any other funding sources which will be used in addition to requested funding 
Date by which receipt of funding is preferred 
(Applicants will be advised of the timescale for payment of funding and the documentary
evidence which will be required once the application has been assessed) 
Page 94 of 148

Page 95

5
Applications for less than £50,000 will normally be decided within 6 weeks but if an earlier
decision is required please indicate the date below. Applications for more than £50,000 will
require Committee approval which may take up to 4 months. 
For all applications a location plan of the project site should be submitted with the
application. 
Applications should be preferably be submitted by email to the Developer Negotiator at
TESDevelopmentContributions@pkc.gov.uk 
A paper copy of the application together with the accompanying location plan should be sent
for the attention of the Developer Negotiator to:  
Strategy & Policy Planning
Perth & Kinross Council
Pullar House
35 Kinnoull Street 
Perth, Ph1 5GD 
Page 95 of 148

Page 96

6 
Auchterarder Community Facilities Fund
Contributions collected and held by the Environment Service: Planning. 
Details recorded on database
The database can be found at the following Link:
www.pkc.gov.uk/developercontributions  
Auchterarder Community Facilities Fund application form submitted by
Council Services or voluntary/community organisations to the Developer
Negotiator
TESDevelopmentContributions@pkc.gov.uk
Request for funding assessed against criteria and agreed with appropriate
services/cc/elected members etc?
Where Criteria Met
and under £50,000
Where Criteria Met and
over £50,000
Where Criteria not
met
Internal assessment form          
completed by Environment        
Service: Planning for authorisation
by Executive Director
(Environment)
Committee Report Produced by
Environment Service: Planning for
authorisation by Enterprise and
Infrastructure Committee
Application Refused
Grant Approval
Payment Transferred/Database updated by the Developer Negotiator 
Invoice for Funding Submitted upon Commencement of Project
Page 96 of 148

Page 97

Page 97 of 148

Page 98

Auchterarder Pump Track and Mountain Bike Skills’ Area
Project Costings Update, June 2023 
Following an on-line consultation on Friday 2nd June 2023, attended by representatives from
Auchterarder Community Sports & Recreation (ACSR), an ACSR ‘Technical Sub-Group and
Velosolutions UK and Ireland, it was agreed to fully investigate the possibility of amending the initially
proposed design options for the new Pump Track to be located in Auchterarder Public Park. 
The discussions at this meeting were built upon the previously agreed material change in plans – the
Pump Track was re-located to a more beneficial location within the park and the budget for the project
(including the Mountain Bike Skills’ Area) was increased and the Pump Track length was increased
from the originally planned 80m.  The following information was received from Velosolutions UK and
Ireland on Friday 9th June 2023: 
From: Edd Wright | Velosolutions <edd.wright@velosolutions.com> 
Sent: Friday, June 9, 2023 4:58 PM
To: Tim Hart Tim@acsr.org.uk
Subject: Auchterarder Cost Updates 
Hi Tim, 
As discussed, please see the attached 3 options for the new pump track site. Skills area remains as per original tender. 
Option 1
115m Length Pump Track
Skills Area
Total Project Cost (Incl. VAT) £161,567.06 
Option 2
115m Length Pump Track with 16m split line
Skills Area
Total Project Cost (Incl. VAT) £178,098.26 
Option 3
115m Length Pump Track with 40m split line
Skills Area
Total Project Cost (Incl. VAT) £195,414.26 
Good luck with your bids for funding.
Thanks,
Edd 
EDD WRIGHT
Design Manager, Velosolutions UK and Ireland
+44 (0)7837 956618 | edd.wright@velosolutions.com
Unit 2 Brewery Court • North Street • Bristol • BS3 1JS
velosolutions.com | pumptrack.com | pumpforpeace.com |
pumptrackworldchampionships.com
While option 1 (below) is deliverable and would provide an adequate user experience, it was agreed
by all that a tweak to this design could provide a much-enhanced user experience and would enable
the possibility of a volunteer-led coaching programme to be established too.   
Page 98 of 148

Page 99

Option 2 (below) and option 3 (below) show two different methods of incorporating a ‘split-line’ on
the back straight – with one-line providing a much more advanced sequence of features.   
ACSR and the ACSR ‘Technical Sub-Group’ are keen to provide the absolute best facility possible – and
now aim to seek funding to enable option 3 (below) to become a reality. 
Page 99 of 148

Page 100

Auchterarder Pump Track and Mountain Bike Skills’ Area
Option 1 
Page 100 of 148

Page 101

Auchterarder Pump Track and Mountain Bike Skills’ Area
Option 2
Page 101 of 148

Page 102

Auchterarder Pump Track and Mountain Bike Skills’ Area
Option 3
Page 102 of 148

Page 103

Auchterarder Pump Track
Funding Update, 2 October 2023 
Funder Award Level
Auchterarder & District Community Trust £12,500.00
Friends of St Margarets £12,500.00
Local Community (Crowdfunding) £1,913.79
Local Community (Bike Extravaganza Activities) £636.25
Sponsorship £4,500.00
sportscotland £50,000.00
The Gannochy Trust £50,000.00
Total £132,050.04 
Page 103 of 148

Page 104

Page 104 of 148

Page 105

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure and Economic Development 
1 November 2023 
POLICY AND LEVEL OF SERVICE FOR WINTER 2023/2024 
Report by Head of Environment and Consumer Services
(Report No. 23/291) 
1. PURPOSE 
1.1 This report describes the winter season experienced in 2022/2023 and
proposes a level of service for the 2023/24 winter season period, the aim
being to permit winter weather to be treated and assist the safe movement of
pedestrians and vehicles across the Council area. 
1.2 The Winter Maintenance Policy is designed to deal with a typical winter and
the level of service complies with the recommendations laid down in Code of
Practice 'Well-managed highway infrastructure' (the code).  The code refers to
practical guidance by the National Winter Service Research Group (NWSRG). 
1.3 Severe snow events may restrict movement during periods when demand
exceeds the available resources.  Teams will continue to focus their efforts on
priority routes whilst continually reviewing conditions and routes to ensure
optimal efficiency. However, often during these severe events the Council
cannot meet the public’s expectations. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Environment, Infrastructure and Economic
Development Committee: 
• notes that changes to last year’s policy and level of service for winter are
shown in italics 
• approves the level of service for the gritting and snow clearing of roads and
footways in Perth and Kinross for the forthcoming winter period, using plant
and labour resources of Tayside Contracts, other Council Services and
private contractors as required 
• notes that officers are continuing to examine resource requirements to
support year round resilience, recognising changing weather patterns  
8
Page 105 of 148

Page 106

3. STRUCTURE OF REPORT 
3.1  This report is structured over the following sections: 
• Section 4: Background  
• Section 5: Proposals 
• Section 6: Conclusion  
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1 Within Perth and Kinross, there are a number of winter service arrangements
for our public roads.  Around 910km of the Council’s 2,500km road network is
designated as a high priority for winter service.  These priority routes receive
precautionary treatment that aims to keep them generally ice-free, although
this can never be guaranteed. 
4.2 The Council also provides a high level of service on priority footways in busy
urban areas.  Lower levels of treatment are provided on the remainder of the
carriageway and footway network, as and when required, during normal
working hours. However, it is not possible to treat every road and footway,
particularly during severe weather events.  Very low priority carriageways and
footways are normally not treated, unless hard packed snow or ice threatens
to prevent access for essential services. 
4.3 In periods of prolonged severe weather, resources are targeted towards
keeping the strategic road and footways network open.  As a result, it can be
a considerable time (in some cases several days) before lower priority routes
are reached.  In cases where repeated treatment of the primary network is
disadvantaging other users and where there is minimal risk in deviating from
the priority treatment, officers will direct resources to these other areas. The
availability of operatives also impacts on the level of cover that can be
provided for footway treatment. 
4.4 The Scottish Government is responsible for the winter service on the 250 km
of trunk road network within Perth and Kinross covering the M90, A90 and A9
between Broxden and Keir Roundabout. This  is managed by Amey (since
August 2022). The A9 north of Broxden and A85 has been managed by BEAR
(Scotland) Ltd for many years. 
4.5 Experience of recent winters has shown that the level of service as set out in
this Policy is generally achievable, although public expectation is significantly
higher in severe snow and ice events than can reasonably be delivered.  This
is particularly the case on the lower priority roads and footways.   
Page 106 of 148

Page 107

4.6 Winter seasons are always unpredictable. 2022/23 was what can be
described as a “fairly typical winter” with regular afternoon/evening treatments
to prevent ice forming overnight, followed by morning treatment where wet
weather had washed the salt off and thus required retreatment. A feature of
winter 2022/23, however, was that significant activity was compressed into
December/January. The pushing back of the winter cover start date and
reduced period of nightshift cover correlate with this period of increased
activity. This is explained further in para 4.8. 
4.7 Tayside Contracts provide the labour to drive all carriageway gritters.  Last
year, the national shortage of HGV/LGV drivers, along with general
challenges in attracting and retaining staff, directly impacted available driver
numbers. Three of the four nightshift routes were staffed by driver hire.
However, this proved less reliable than staffing routes with employed staff and
required regular late volunteer replacements to ensure service delivery.  This
matter has been resolved for 2023/24 and is discussed further at para 5.5.
below. 
4.8  Planned activity is based on forecast road surface temperatures rather than
air temperatures as reported in news forecasts.  Operationally, marginally
fewer actions were carried out compared to the previous winter but still sit
around the 6 year average, hence deemed a typical winter. The period of
nightshift cover in place resulted in very similar levels of treatment required,
thus justifying compressing the period the nightshift was available.  Table 1
Operational Activity Statistics details activity over last winter compared to
previous years, highlighting:   
• there was a requirement to plough snow from the network for 15 days, this
is twice what was required in 2021/22 but half of 2020/21. This
demonstrates the unpredictable weather patterns officers and drivers need
to be ready to react to.
• 15,776 tonnes of salt were spread, an increase of 898 tonnes on the
previous winter. This is as a result of increased snow days, where activity
levels and thus salt outputs increase. 
4.9 With over 1,600 grit bins, keeping them fully stocked when demand is high is
challenging.  Last winter, 3rd party contractors assisted in stocking grit bins in
advance of winter and replenishing during the season.  As it was a relatively
mild season, self-help was not exhaustive and, as such requests could
broadly be kept up with. Grit bins are stocked with a mix of salt/sand with sand
usage down on previous years. 
4.10 Although a typical winter season, the £3.865m budget was exceeded, out-
turning at £4.623m.  The balance of cost is funded from Council reserves. The
budget for the current winter programme (2023/24) has been increased to
£4.128m, although it is recognised that, as in previous years, the outturn
position will depend on the extent of the winter weather. This increased
budget allocation includes £50,000 to enable the Council to be more agile and
responsive to move resources around localities to address specific need.  This
£50,000 allocation has been used to ensure we have trailers available to
Page 107 of 148

Page 108

move footway tractors around and will fund the additional cost of doing so,
along with staffing the additional use of this equipment. 
4.11 At the end of each winter, a review of operations is undertaken with
stakeholder consultation to identify areas of good practice, challenges faced,
capacity and resource issues and improvements or adjustments to future
plans.  Changing weather patterns, resources and personnel constraints
mean that the winter service needs to be agile and flexible to respond
effectively.  In addition, reflecting those changing weather patterns across the
year, officers are continuing to examine resource requirements to support
year round resilience.  
4.12 These management reviews seek to provide an acceptable level of service
whilst minimising costs, complying with working time directives and managing
the work/life balance for personnel.  As part of the review, community councils
were contacted and invited to provide feedback on the 2022/2023 service to
inform improvements or adjustments for the current year.  As it was not a
severe winter season, minimal feedback was received. In addition, all elected
members were invited to a presentation on 29 June 2023 to discuss winter
service delivery considering statutory requirements and limitations (resource
and financial). Feedback was that, although elected members were broadly
happy with the service, there is a desire for officers to be permitted to be more
flexible/agile without compromising their/the Council’s liability. Officers were
also remitted to review footway route coverage within Perth City to facilitate
the treatment of the paths across North/South Inch to reflect the higher footfall
these paths have.  These footway links are now included in the route
coverage. 
4.13 The Council have 8 weather stations, 2 carriageway sensors and 9 camera
sites (3 sites have dual directional cameras) placed strategically across the
network.  The station data and images are shared with neighbouring
authorities & BEAR Scotland, with their information reciprocally shared with
Perth and Kinross.  The camera images are also available on the Council
website alongside a community camera at Spittal of Glenshee (which the
Council helped fund) and Braemar. The Council would welcome discussions
with other community groups around installing additional cameras and sharing
the costs/images. This infrastructure is maintained, and information retrieved /
interpretated by Vaisala. The weather forecast contract for the winter of
2023/24 will again be provided by MetDesk Weather Services with the
contract having been extended for an additional year. Both contracts are
administered by Dundee City Council Procurement on behalf of seven
councils working collaboratively to achieve economies of scale. Two
additional sensors are being installed in advance of the winter season at B827
Dalginross and A923 Butterstone to give winter controllers better coverage of
the Council area and reduce the need to drive to these areas to establish
conditions. 
4.14 For winter 2022/23, the Council spread rock salt only on carriageways to
mitigate increased costs of marine salt. A minimal quantity was stored
outside, with a mid season restock, as there was a risk of the salt exceeding
Page 108 of 148

Page 109

permissible moisture content levels, forming lumps and bridging in the gritters
affecting its spread rate. Despite a wet winter, this was not experienced and
no issues were encountered in spreading salt on the network. 
4.15 Residents in Glen Quaich received a plough and gritter to enable self help
treatment from Amulree to The Garrows (last property before going over the
hill).  Due to delivery delays, this was received late in the season giving little
opportunity to monitor its effectiveness. Council officers will, in conjunction
with residents, monitor effectiveness through a full season to establish
opportunities to roll out further, if interested parties come forward. 
4.16 Amey are based within the Ruthvenfield and Kinross depots to enable them to
serve the trunk road network. This has enabled an element of cost share to
both parties as follows: 
• depot rental contribution offsetting winter operating costs
• shared equipment for loading gritters
• large brine tank installed by Amey but available for Council use
• shared use of salt dome with common salt stock and ability to
replenish from shared sources
• shared costs for management/movement of salt stock 
• shared use of Tayside Contracts weighbridge in Ruthvenfield and
Amey in Kinross later in the season 
Discussions have taken place and whilst there is no opportunity to combine
gritting routes/vehicles, agreement on boundary and network interfaces will
ensure continuity of treatment for the travelling public. 
Table 1 – Operational Activity Statistics
Action 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
Category 1 pre gritting  46 70 33 56 53 47 40
Category 1 Morning De
Ice or Snow Clearing  
71 108 53 66 66 76 70
Treatment on night shift
routes
63 91 55 82 61 58 61
Number of snow days
(>50% of network)
29 35 7 10 37 8 15
Treatment on Cat 2
network 
24 56 28 20 44 31 30
Treatment on Cat 3
network
5 12 3 1 17 6 3
Treatment on footway
network
11 50 19 12 38 25 23
Salt used (t) 13,301 30,632 12,191 18,681 24,158 14,868 15,766
Grit Sand used (t) 965 3,322 675 875 3,412 750 621
Red/Orange Alert in
operation (days)
2 19 0 2 35 11 14 
5. PROPOSALS 
5.1 Cover commenced on 16 October 2023 and runs until 14 April 2024. Appendix
1 details the phased resources available and the times that the agreed level of
service will be provided if treatment is required.  However, in periods of
Page 109 of 148

Page 110

prolonged severe weather, this level of service is often not achievable due to a
requirement to ensure that operatives are given adequate (statutory) rest
breaks and do not exceed driver hours. 
5.2 Over weekends and public holidays, a driver cohort that can treat only the
Category 1 road and footway network is available. This is because we need
the entire workforce to widely treat the lower categories, and to do this 7 days
a week would prevent road workers getting adequate (statutory) breaks. 
5.3 A reduced level of staff and vehicles are available during the lead in and lead
out periods reflecting weather patterns and thus need. In circumstances when
unseasonal weather is forecast/experienced, volunteers are sought to support
any response and to work outwith normal hours. Resourcing reduced
staffing/vehicles during these periods assists in containing costs. However,
this presents capacity risks when adverse weather is encountered. 
5.4 In severe weather conditions, the higher priority routes may have to be treated
several times before resources can be diverted to lower usage roads.
Treatment may be restricted to clearing only the carriageway, or one footway,
to ensure resources can be utilised as widely as possible across communities.
Additionally, this Policy permits deviations from re-treating the primary
network where there is minimal risk in doing so and a wider benefit to
communities by treating other routes. 
5.5 Tayside Contracts provide the labour to drive all carriageway gritters. Over the
last two years, they have trained 8 HGV/LGV drivers to address this shortage
and for winter 2023/24 will return to staffing all carriageway gritters. The
labour force remains under establishment, however, leaving gaps in footway
rotas which will be covered by a combination of PKC waste and greenspace
operatives and the sub-contract supply chain.   
5.6 Target Completion Time - during the main cover period the target completion
time for routine morning de-icing of Category 1 carriageways is 07:30 (09:00
on Sundays and nationally recognised public holidays).  The treatment time in
severe weather conditions will be longer. When snow falls it can take twice as
long to complete treatment, as vehicles need to travel more slowly, and
ploughing is required in both directions. With the exception of the four
nightshift routes, which operate during the main standby period, no treatment
will routinely extend beyond 21:00 (see Appendix 2a): 
• Category 1 priority roads will be treated seven days per week as
detailed above.
• Category 2 roads will be treated five days per week (Monday to Friday)
as resources permit between 08:00 – 15.00.
• Category 3 routes comprise of roads which are not normally treated,
except in prolonged ice or snow conditions and only when resources
become available. Each treatment route will be arranged so that the
most important parts are treated first, whilst taking account of
operational efficiency.
Page 110 of 148

Page 111

5.7 Footways receive treatment according to their usage and importance in the
public road network (see Appendix 2a). Based on this assessment: 
• Category 1 priority footways will be treated seven days per week within
the main winter period, with extended hours on weekdays if an alert is
called. No footway treatment will be carried out on Christmas Day and
New Year’s Day as (in general) shops are not open on those days. 
• In periods of daily repeat treatment officer discretion will be applied to
treating the side of a footway “not normally treated” as described in 5.4
above. Consideration will also be given to rotation of treatment across
settlements to ensure fair coverage eg where a footway tractor treats
several villages it will reverse the order day by day to widen route
coverage whilst not compromising category 1 route safety. 
• Category 2 footway routes will be treated five days per week (Monday
to Friday) as resources permit between 08:00 – 15.00.
• Category 3 routes comprise of footways which are not normally treated,
except in prolonged ice or snow conditions and only when resources
become available. 
5.8   Situations occur which need restrictions on hours, routes, and the
employment of contractors etc. to be relaxed, to deal more effectively with the
emergency.  This is allowed for and controlled by a system of ‘Alerts’.  In
serious situations, either an Orange or Red Alert can be authorised by the
Road Maintenance Partnership Manager, to allow working arrangements out
with the ‘normal’ policy such as employing 3rd parties to work on clearing/lifting
snow or exceeding driver hours to deal with un-forecast situations.   
5.9 Last winter season saw 15,766 tonnes of salt spread. Salt stocks have been
replenished and sit at 15,612 tonnes mid-September, with 10,000 tonnes
under cover, and a mid-season restock is in place for January 2024, if
required. Tayside Contracts has again, at the Council’s request,re-stocked
with a majority of rock salt to mitigate cost increases of marine salt. Marine
salt will continue to be used in footway tractors, as it is finer and flows through
the smaller spinner mechanism better and manufactures brine. 
5.10 The Council currently provides in excess of 1,600 grit bins, reflecting our
approach to encourage self-help and the policy not to treat some minor roads
routinely. Any request for additional grit bins may require relocation of grit bins
known to have minimal usage. Grit bins are generally only provided on steep
gradients, tight bends, and steps or in some particular cases where there is a
specific community need. The routinely available resources to service and
replenish these containers is at capacity and 3rd party contractors will again be
used to assist replenishing these. Additionally, bulk bags of salt are available
should communities request a quick supplementary supply. Push along
barrows are also available for community groups/individuals to assist in
treating areas the Council does not routinely get to.  
Page 111 of 148

Page 112

5.11  Voluntary arrangements are in place with 68 farmers to whom the Council
supplies snow ploughs, which they fit to their own vehicles to clear snow on
specified lengths of public road, and their own private roads. Farmers provide
an invaluable additional resource and the farmers included on this agreement
cover around 300km of road, just under 8% of the overall Council road
network. 
5.12 In addition, last season, 32 of these farmers were available to be employed in
severe conditions to undertake snow clearing of additional lengths of road.
These farmers are called on for Orange Alerts and provide a much
appreciated and important service. Officers are in the process of checking
insurances and licenses for those farmers interested in participating this
winter. 
5.13  There is a national desire to move people away from cars to other forms of 
active travel such as buses, bicycles, and walking. The Council’s approach
and programme to achieve this will impact on winter service delivery as
different types and numbers of vehicles/drivers will be required. The approach
will also likely be different across urban and rural locations. Consideration of
requirements and funding implications for winter service should be included by
designers when developing these active travel plans. 
6. CONCLUSION   
6.1 Based on previous successful service delivery, it is concluded that the winter
maintenance service should be delivered as outlined in this report. 
6.2 The Executive Director (Communities) is authorised to make arrangements
out with the policy and level of service in exceptional conditions such as snow
and flooding emergencies 
6.3 The winter maintenance budget, (£4.128m) is also used to fund other
weather-related emergencies, such as works to mitigate immediate risk of
flooding to properties/roads and wind damage, directly affecting free
movement across the network.  
Page 112 of 148

Page 113

Author
Name  Designation Contact Details
Stuart D’All Road Maintenance
Partnership Manager
(01738) 475000
ComCommiteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton Executive Director
(Communities
23 October 2023 
APPENDICES
• Appendix 1 – Period of Cover
• Appendix 2a – Level of Service & Priority Systems (Carriageways)
• Appendix 2b -  Level of Service & Priority Systems (Footways) 
• Appendix 3 – Category 1A Carriageway Snow Routes 
Page 113 of 148

Page 114

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk Yes
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1. Strategic Implications  
Community Plan / Single Outcome Agreement 
1.1 The winter maintenance service is provided to ensure that transport links
essential to economic and social activity can continue to be used safely
throughout most of the winter. However, it is not the intention and is not
possible to keep all roads free from ice and snow at all times. 
1.2 The Council’s policy is set out in Report 96/180 “Summary of Council Policies
for Roads and Transport” approved by the Roads and Transport Committee
on 24 April 1996: (Art. 63/96). It is deemed that this policy is still relevant. 
1.3 Policy 5 of the above report - The Council will operate a priority system of
winter maintenance which will, as far as reasonably practicable, permit the
safe movement of vehicular and pedestrian traffic on the more important parts
of the road and footway network, taking into account the finance which has
been made available. The priority system will be applied uniformly and will, as
far as possible, contain costs to an acceptable level. 
Page 114 of 148

Page 115

1.4 The objective of this policy is to enable the Council to comply with its statutory
duty as set out in Section 34 of the Roads (Scotland) Act 1984 which states:
“A roads authority shall take such steps as they consider reasonable to
prevent snow and ice endangering the safe passage of pedestrians and
vehicles over public roads.” The policy allows the Council to meet its statutory
obligations by providing the most effective winter maintenance service it can
within the constraints of its finite resources. During severe weather, the
Council will endeavour to keep delays to a reasonable minimum. 
Corporate Plan 
1.5 The Council’s Corporate Plan for Securing the Future 2018 and Beyond lays
out five Objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  This report
impacts on the following:- 
i) Promoting a prosperous, inclusive and sustainable economy
ii) Supporting people to lead and independent, healthy and active life
iii) Creating a safe and sustainable place for future generations 
2. Resource Implications 
Financial 
2.1 The following table illustrates the pattern of expenditure in recent years. 
2.2 The actual expenditure on the Winter Service will be dependent upon the
severity of the weather throughout the winter and other emergencies
throughout the year and will be closely monitored and reported regularly to the
Strategic Policy & Resources Committee. 
Year  Budget  Standing
Charges
Operating
Costs
Outturn Cost
2016/17 £3.617m £2.148 £1.223 £3.371m
2017/18 £3.717m £2.185m £2.857m £5.042m
2018/19 £3.714m £1.738m £1.833m £3.571m
2019/20 £3.714m £1.436m £2.885m £4.321m
2020/21 £3.714m £1.683m £3.091m £4.774m
2021/22 £3.810m £1.600m £2.435m £4.035m
2022/23 £3.865m £1.528m £3.095m £4.623m
Mean    £4.246m
Page 115 of 148

Page 116

2.3 The costs of providing a winter service is split into two distinct areas:
• Standing Charges – these are the costs involved in having specialised
plant, depots, hired plant and standby personnel etc in place to provide
the service. These are effectively “up front” costs incurred irrespective
of weather conditions.
• Operating costs – cover the cost of fuel, routine repairs, salt, grit sand
and the actual cost of paying staff and operatives to provide the
service. 
2.4 As detailed in the table in paragraph 2.1 the average outturn cost over the
past seven years is £4.246M which exceeds the budget figure.  Last winter,
which is considered to have been a typical winter is the third highest cost in
last 7 years.  Four of the last seven years out-turn costs exceed the current
budget and the Council will undoubtedly need to continue to utilise reserve
funds to meet the full cost of the Winter Service. 
2.5 The Council have this year set a budget for £4.128m for winter 2023– 24 and
this report is brought it to committee to advise of preparations/arrangements
for the winter season. It is recognised that in these fiscally challenging times
the Council financial position may change requiring a subsequent alteration in
the levels of service delivery to match the available budget. 
2.6 The Council will continue to implement operational and efficiencies savings to
mitigate costs but as winter is unpredictable the cost will vary. 
Workforce 
2.7 The staff and the operatives of Tayside Contracts and the Council Services
who provide the service, have demonstrated over the life of the Council, that
they have the experience, flexibility, and expertise to effectively tackle the
worst of winter weather, although public expectation will exceed the ambitions
of what officers can realistically achieve. 
3. Assessments 
Equality Impact Assessment 
3.1 An equality impact assessment has been completed with the following
outcomes for functions, policies, procedures, or strategies in relation to race,
gender and disability and other relevant protected characteristics. This
supports the Council’s legal requirement to comply with the duty to assess
and consult on relevant new and existing policies. 
Page 116 of 148

Page 117

3.2 The function, policy, procedure, or strategy presented in this report was
considered under the Corporate Equalities Impact Assessment process
(EqIA) with the following outcome: 
(i) Assessed as relevant and actions taken to reduce or remove the
following negative impacts: 
• There are finite resources which limit the amount of treatment
which can be carried out.
(ii)  Assessed as relevant and the following positive outcomes expected 
following implementation. 
(iii) The Winter Manual will have a list of priorities for snow clearing. It will
include also include giving priority to clearing bus stops disabled
parking bays and pedestrian crossing points (both designated
pedestrian facilities, and at road junctions) to assist pedestrians, to
complete the link between cleared footways and carriageways.  
(iv) Publicity information on the Winter Service via, local media and
www.pkc.gov.uk will recommend that members of the community
should look out for vulnerable community members and see if they can
provide any assistance to them. It will also emphasise that the Council
needs the assistance and support of as many members of the
community as possible in order to restore the roads and footways to a
safe condition. 
Strategic Environmental Assessment 
3.3 Strategic Environmental Assessment (SEA) is a legal requirement under the
Environmental Assessment (Scotland) Act 2005 that applies to all qualifying
plans, programmes, and strategies, including policies (PPS). 
3.4 The matters presented in this report were considered under the
Environmental Assessment (Scotland) Act 2005 and pre-screening has
identified that the PPS will have no or minimal environmental effects. It is
therefore exempt, and the SEA Gateway has been notified.   
3.5 The reasons for concluding that the PPS will have no or minimal
environmental effects is that over the years the roadside verges have already
been impacted and have adapted, resulting in vegetation, particularly grass,
which is tolerant to the salt. It is not anticipated that there will be any long-
term, frequent, permanent, or cumulative environmental effects, or impacts on
areas of high biodiversity or cultural heritage value, as a result of the policy. 
Page 117 of 148

Page 118

Sustainability 
3.6 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.7 Perth and Kinross Council also has the following mitigation measures in place
to ensure there is minimal environmental effect as a result of the Winter
Service Policy including: 
• Salt Management – gritters are calibrated and data from IEWS system
and the specialist weather forecast enables treatment to be targeted at
the areas that require it.
• The majority of the salt storage is in buildings or covered in tarpaulins
in locations which have been approved by SEPA, thus helping to
prevent leaching into the ground.
• Discharge of surface water from new developments addresses the
potential environmental effects to prevent pollution.
• The Winter Service is reviewed on an annual basis to take account of
changing climatic factors and planning for extreme weather events.
Risk 
3.8 The Council as Roads Authority have a statutory duty as set out in Section 34
of the Roads (Scotland) Act 1984 which states: “A roads authority shall take
such steps as they consider reasonable to prevent snow and ice endangering
the safe passage of pedestrians and vehicles over public roads.” 
3.9 This policy allows the Council to meet its statutory obligations and minimise
exposure to risk by providing the most effective winter maintenance service it
can within the constraints of its finite resources. During severe weather, the
Council will endeavour to keep delays to a reasonable minimum. 
4. Consultation 
Internal 
4.1 As in previous years Elected Members are given the opportunity throughout
the winter, and in a presentation in June 2023, to become involved in
agreeing the route categories with the Roads Maintenance Partnership. The
policy also allows unadopted roads with an important community use to be
included within the categorisation and is not restricted to adopted roads. 
Page 118 of 148

Page 119

4.2 As local circumstances, and travel patterns change, winter maintenance
categories are subject to change and Elected Members have a role in
identifying and agreeing such changes. However, the resources available to
carry out winter maintenance are finite, so if the relative priority of a road or
footway is to be raised then that of another road or footway within a particular
Ward must be reduced. 
4.3 The Council will always receive complaints about the winter maintenance
service due to high public expectations, limited available resources and the
vagaries of the weather. A distinction has to be made between complaints
related to proven failures to meet the approved level of service and
complaints regarding the actual level of service. 
4.4 At the end of the 2022 - 23 winter comments on the winter service provision
were invited from Community Councils.Very few responses were received,
due to the typical winter weather not impacting travel. Those responses that
were received were generally complimentary comments.   
5. Communication 
5.1 Communication will take place in due course and the policy and level of
service, along with specific detail on gritting routes and times will be made
available on the Council website. Ongoing winter action and road conditions
will be made available via Council facebook and twitter. 
2. BACKGROUND PAPERS 
2.1 Well Managed Highway Infrastructure 2016 
2.2 Road (Scotland) Act 1984 
Page 119 of 148

Page 120

Page 120 of 148

Page 121

Appendix 1 
PERIODS OF COVER    2023 - 2024                                                     
Instructions on reporting times for Nightshift crews Sunday to Friday, early start crews
Monday to Friday and standby crews 7 days per week, will be issued by Roads
Maintenance Partnership Staff the previous day. 
Period  Standby vehicles
available            
(All changes take
place at 12
noon) 
South  North  Total   
Perth  Kinross  Crieff  Blairgowrie  Aberfeldy   
16 October
–  29 October
2023 
3  1  1  3  3   11 
Lead in period –
limited vehicles
on reduced cover,
while aiming to
remain as flexible
as possible to
respond
30 Oct 2023 
– 3 March 
2024 
6    2  3    6  5   22 
Main standby
period – full
cover  
26 Nov 2023
– 25 Feb
2024 
5 plus
1n/shift 
1 plus 1
n/shift 
2 plus 1
n/shift 
5 plus 1
n/shift  5   22 
Main standby
period – full cover
incl. nightshifts 
26 Feb 2024 
– 3 March 
2024 
6    2  3    6  5   22 
Main standby
period – full
cover  
4
March  2024
– 24 March 
2024 
3  1  1  3  3   11 
Lead out period -
limited vehicles
on reduced
cover , while
aiming to  remain
as flexible as
possible to
respond
25 March
2024 – 
14 April 
2024 
0  1  1  1  1   4  Required roads
treated 
During all periods the road condition weather forecast is monitored and daily action plan
devised. 
During lead in/lead out periods it is not possible to treat all parts of the network and so
available resources will be deployed to best effect in relation to weather conditions being
experienced. 
8
Page 121 of 148

Page 122

Page 122 of 148

Page 123

Appendix 2a 
WINTER MAINTENANCE- LEVEL OF SERVICE & PRIORITY SYSTEMS 2023 – 2024
(CARRIAGEWAYS) 
Category 
Nightshift
routes 
Definition 
The most important strategic
routes.   City routes plus
early morning bus service
routes in the Perth area.
The A93 South of
Blairgowrie, the A94
between Meigle and Perth
and the A923 between
Blairgowrie and Tullybaccart.
Kinross area A class road
and Crieff / Auchterarder
areas A class roads. 
Routes (examples) 
A class roads network
and early morning bus
routes in the Perth
area Important road
links in Kinorss, Crieff,
Blairgowrie and
Highland Perthshire
areas
Length
(km)
Indicative
Only 
320
estimate 
Hours of Cover 
Commence Friday
night 23:30 - 08:00
through December,
January and
February.
As per category 1a
route cover times
outwith this period 
Service Provided 
In ice and snow conditions
or pre-salted when ice or
snow is forecast and roads
are not dry.
1a Other strategic routes
carrying large volumes of
traffic and connecting main
centres of population outwith
the Perth area
A977,  A91, A913,
A926,
A827 Aberfeldy –
Ballinluig
A822 Crieff –
Greenloaning
A924 through Pitlochry 
220
Until 21:00 all days.
In the full cover
period, complete
morning de-icing by
07:30
(09:00 on Sundays
and nationally
recognised public
holidays)
In ice and snow conditions
or pre-salted when ice or
snow is forecast and roads
are not dry.
1b Other strategic routes
connecting larger
communities and other main
rural roads. Roads leading to
important or sensitive
locations such as hospitals
or fire stations.*
A93 Blairgowrie –
Glenshee
A923 Blairgowrie -
Dunkeld
A827 Aberfeldy - Killin
A822 Crieff - Dunkeld
A823 (part), A824
(part), A912 
B996,
B9097,B9099,B996
etc. 
370
estimate
Until 21:00 all days.
In the full cover
period, complete
morning de-icing by
07:30
(09:00 on Sundays
and nationally
recognised public
holidays) ** 
In ice and snow conditions
or pre-salted when ice or
snow is forecast and roads
are not dry. 
In severe snow conditions,
Category 1b routes will be
treated after Category 1a
2  More minor rural roads
serving small settlements or
a significant number of rural
properties.  Secondary
distributor/local roads in
settlements.  Other urban or
rural roads with special
difficulties such as steep
gradients.*  
1310
08:00-15:00 Monday
–Friday
Excluding public
holidays
In ice and snow conditions
only, no pre-salting
3 Rural roads serving no or
small numbers of isolated
properties.  Local access
roads in settlements within
easy reach of local
distributor roads.
This will include most
residential streets with
only local traffic 
210  Not applicable
Not normally treated
unless there is hard,
packed rutted snow on
these roads with road
surface temperatures
below zero and treatment
of all other categories has
been completed
4 Rural public roads serving
no habitation which because
of their altitude, alignment
and width cannot reasonably
and safely be treated using
normal winter maintenance
plant.
Private (unadopted) roads
which is not the
responsibility of a Council
service and which are not
considered to have a wider
community use.
U159 Kenmore –
Garrows (Kenmore
Hill).
U161 Bridge of Balgie
– A827 at Loch Tay. 
8
14 
Not treated Not treated.
Service Bus routes have been included as far as practicable with available resources in categories 1a , 1b & 2 to ensure their comprehensive
coverage.
Coverage through to 21:00 not always possible due to operational driver hours requiring to be contained within a 11 hour statutory maximum 
8
Page 123 of 148

Page 124

Page 124 of 148

Page 125

Appendix 2b 
WINTER MAINTENANCE - LEVEL OF SERVICE & PRIORITY SYSTEMS 2023– 2024 (FOOTWAYS)         
Category
Descriptions
Examples Length
(km) 
Hours of Cover
Service Provided
Response
Time
Target
Treatment
Times
(Priority
Routes)
Target
Post
Gritting /
Snow
Clearance
Time
1 Main shopping areas, main
arterial footways,
busy feeder footways and
footways leading to community
centres and centres of
employment.
Perth,
Aberfeldy,
Auchterarder,
Blairgowrie,
Crieff,  Kinross,
Pitlochry, Alyth,
Bridge of Earn,
Coupar Angus,
Dunked,
Luncarty,
Milnathort and
Scone. 
N/A 
0630-1500 Mon-Sat 0800-1500 Sun and
nationally recognised public holidays 
In snow and ice conditions  1 hour  N/A  6 hours
2 As above plus Other footways
with significant usage.
As above plus
Abernethy,
Aberuthven,
Almondbank, 
Balbeggie,
Bankfoot,
Blackford,
Braco,
Burrelton
Caputh,
Comrie,
Glencarse,.
Glenfarg,
Inchture, 
Longforgan,
Methven,
Muthill,
Powmill,
Meigle, Stanley 
N/A  08:00-15:00 Monday -Friday  In snow and ice conditions  As soon as
possible after
Cat 1 routes
have been
completed 
N/A  N/A 
8
Page 125 of 148

Page 126

APPENDIX 2b (contd.) 
WINTER MAINTENANCE - LEVEL OF SERVICE & PRIORITY SYSTEMS 2023 – 2024  (FOOTWAYS)         
Category
Descriptions
Examples Length
(km) 
Hours of Cover
Service Provided
Response
Time
Target
Treatment
Times
(Priority
Routes)
Target
Post
Gritting /
Snow
Clearance
Time
3 Less well used footways and
footways where a feasible
alternative route exists 
N/A  08:00-15:00 Monday - Friday
Not normally treated.  Only treated in prolonged snow and ice
conditions if time and resources permit, and after successful
treatment of higher priorities 
N/A  N/A  N/A 
4
Footways which are not the
responsibility of a Council
Service, which are not
considered to be important in the
footway network, or have a
suitable alternative route treated  
N/A  N/A  Not treated  N/A  N/A  N/A 
Lower priority routes will only be treated once the higher priority routes have been treated unless operational factors such as efficient route planning dictate otherwise. Officers
will rotate the order of settlements treated by a single resource to ensure fair coverage and in prolonged severe conditions may deviate from retreating category 1 routes when
considered safe and where a wider community benefit can be achieved by doing so. 
There will be no footway treatment on either 25th December or 1st January. 
Footway cover is only provided out of normal hours during the main winter period. During lead in/lead out periods it is not possible to treat any footway out of hours and so
available resources will be deployed during the working day to best effect in relation to weather conditions being experienced. 
Page 126 of 148

Page 127

Appendix 3 
CATEGORY 1A CARRIAGEWAY SNOW ROUTES FOR PERIODS OF SEVERE
WEATHER 
Route   Description 
A822   Crieff to Greenloaning 
A823   Auchterarder to Junction with A822 
A824   Auchterarder to Aberuthven 
A827   Aberfeldy to Ballinluig 
A91   Yetts o' Muckart to Strathmiglo (through Kinross) 
A911   Kinross to Fife Boundary at Auchmuirbridge 
A912   Edinburgh Road, Perth to Fife Boundary 
A913   Aberargie to Newburgh 
A923   Blairgowrie to Angus Boundary near Lundie 
A924   Through centre of Pitlochry 
A926   Blairgowrie to Angus Boundary near Craigton 
A93    From A94 junction in Perth to Blairgowrie 
A94   Perth Bridge to Angus Boundary near Meigle 
A977   Kinross to Blairingone 
B954   Alyth to Angus Boundary near Newtyle 
B996   Kinross to Fife Boundary 
The following roads in Perth City - A93 Glasgow Road - Broxden to Caledonian
Road York Place, County Place, South Street, Queens Bridge. A85 Dundee Road -
from Toll House, Dundee Road, Gowrie Street, Perth Bridge to Charlotte Street A85
Barrack St and Dunkeld Road to Crieff Road A85 Crieff Road - Dunkeld Road to
Newhouse Road Roundabout. A912 Dunkeld Road - Crieff Road to Inveralmond
Roundabout A989 Tay Street, Marshall Place, Kings Place, Leonard Street,
Caledonian Road, Atholl Street, Charlotte Street Newhouse Road, Burghmuir Road,
Jeanfield Road, Long Causeway Manse Road, Hatton Road, Corsie Hill Road,
Muirhall Road, Lochie Brae. 
8
Page 127 of 148

Page 128

Page 128 of 148

Page 129

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure and Economic Development Committee 
1 November 2023 
PERTH MUSEUM: KEY MILESTONES TO OPENING & OPENING PROGRAMME 
Head of Culture & Communities Services
(Report No. 23/292) 
1. PURPOSE 
1.1 This report briefs the Committee on preparations for the opening of Perth
Museum at the end of March 2024. It gives an overview of key workstreams
including the opening programme, key expenditure and governance
arrangements in place from now until the Museum is fully complete. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
• notes progress towards the opening of Perth Museum and the revised
governance arrangements in place for this final phase
• asks officers to bring an update in autumn 2024 on the economic,
community and tourism impact of the opening programme. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background
• Section 5: Summary of key workstreams and governance        
arrangements  
• Section 7: Conclusion 
4. BACKGROUND 
4.1 In June 2016, the Council approved capital expenditure to the Perth Cultural
Transformation Programme following detailed appraisal of the visitor market
for Perth. This money was for a variety of projects which aimed to strengthen
the cultural tourism offer in Perth. £20M was allocated towards a new cultural
attraction capable of bringing an additional 100,000+ visitors annually to the
city and a bid for the Stone of Destiny, also known as the Stone of Scone, to
move to Perth, close to its place of origin. A site options appraisal
recommended the former Perth City Hall for redevelopment to become this
new attraction. Perth Museum is 3,200 square metres of which 500sqm are
dedicated to temporary displays enabling major loan exhibitions to tour to
Perth. Tay Cities Growth Deal funding of £10M was secured for the Perth
9
Page 129 of 148

Page 130

Museum project in November 2018. In December 2020, the First Minister
confirmed to the Scottish Parliament that the Stone of Destiny would move to
Perth for display in the new Museum. 
4.2 Construction of Perth Museum started in March 2021 and concluded in
August 2023 with progress reported via regular capital monitoring reports to
Finance and Resources Committee. The construction phase was delivered on
time and to the total approved budget of £27.2M. The focus is now on
completing internal fit-out, visitor marketing and promotion, and
planning/delivering the opening programme. 
4.3 Expenditure for these workstreams is being met through the additional £0.5M
annual revenue approved by the Council in February 2017 for development
and operating costs relating to Perth Museum. In addition, £130,000 of
funding was secured from Creative Scotland, which is ringfenced for public
programme costs. Key expenditure headings are as follows: 
• operational fit-out and related costs including facilities management staff
• collections management, conservation costs
• exhibition and interpretation costs, including cost of loans, transport,
insurance and development of interpretation content 
• marketing and promotion costs 
• opening programme costs including artist/producer fees 
4.4 Tay Cities Deal capital expenditure is monitored and reported through the
TCD Programme Management Office. It is also reported to the TCD Joint
Committee. 
5. SUMMARY OF KEY WORKSTREAMS 
Building commissioning/fit out 
5.1 The interpretation theme of the Museum is ‘Ancient Roots’ and how Perth as
the original capital of Scotland shaped its early story as a new nation, with the
Stone of Destiny as central to ideas of both Scottish and British national
identity. Subsequent displays, several of which have been co-produced with
our communities, tell later historical stories including the impact of the
Jacobite Risings and the Clearances in Perth and Kinross, the rise of local
industry and the development of Highland tourism. The displays also explore
Perthshire Gaelic culture, the impact of slavery and colonialism on how we
interpret our heritage today, and other key issues.   
5.2 Installation of museum displays is underway led by Culture Perth and Kinross,
the Council’s delivery partner which will operate Perth Museum. The Perth
and Kinross Council Museum collections, which have National Recognition
Status, are central to the displays, some of which are being shown for the first
time in many years. Significant conservation and research have been carried
out to support this. 
Page 130 of 148

Page 131

5.3 The Museum café operator is currently being procured through the public
procurement process with the successful operator expected to be confirmed
by the end of 2023 and on site by early 2024. The café fit-out is complete. 
Marketing and promotion 
5.4 The Perth Museum branding, developed by Scottish company Tangent, was
soft launched in May 2023 together with the new Perth Museum website.
Further content was added to the website in late August.
(www.perthmuseum.co.uk) The branding appeared on street advertising from
July 2023 to September 2023 across Perth City Centre. 
5.5 Posters are being used to promote the Museum across Council and Culture
Perth and Kinross venues. Paid advertising spaces in Visit Scotland centres in
Pitlochry and Perth is also being used. 
5.6 Promotion of the museum and brand has also appeared in Scotland
Magazine, (readership 100,000 UK wide, 12-month coverage) alongside an
article on the Stone and Museum. 
5.7 Adverts for the museum have also been placed at Real Time Passenger
Information boards (bus stops). The Customer Information Point at Perth
Railway Station, at the entrance to the railway platforms, now includes
information on the Museum which will be updated regularly. 
5.8  Teams within Perth and Kinross Council have been working together and with
professional artists to make Perth city centre look more appealing and to
promote the new museum by undertaking different window dressings which
advertise elements of Perth Museum and help prevent fly posting in empty
shops. We are working with letting agents to remove the ‘To Let’ signs on the
high street and replace them with QR codes which will give potential retailers
the relevant information. 
Brand Visibility 
5.9 External banners were installed to the exterior of Perth Museum in October. 
5.10 Conversations are ongoing to create advertising at Clear Channel advertising
sites (local digital sites) as well as sites managed by Global Media (for pre-
launch and post-launch, including billboards in and around Perth and Dundee,
central belt and Scotrail in carriage sites). 
5.11 Visitor market promotion with the travel trade has been underway since
January. 
5.12 Culture Perth and Kinross and Perth and Kinross Council have been jointly
leading on the travel trade development, attending national events to promote
the city and the museum, presenting at events for trade and developing rate
sheets and product information. 
Page 131 of 148

Page 132

5.13 Staff have attended six events in 2023 with seven more planned this year and
a further four scheduled for 2024 so far. So far, three tour operators have
confirmed that Perth Museum will be on their schedules for next year. This is
a positive sign, as often companies will want to experience the whole offer
before they decide to include it on a schedule. 
5.14 Familiarisation trips are a key part of the travel trade development and involve
key personnel from travel organisations coming to the area to experience the
product. To date, two have been hosted so far and have two more scheduled
for 2023. More are expected in 2024 when visitors can go into the completed
museum. 
5.15 The Council is also in the process of reapplying for Coach Friendly status, first
achieved in 2015. 
5.16 Tickets for admission to the Stone of Destiny display (which is free but
ticketed for capacity reasons) and the opening temporary exhibition will be
available from January 2024.  This will be via the Perthshire Box Office online
portal operated by Perth Theatre and Concert Hall, with Culture Perth and
Kinross and other local cultural organisations as partners.   
Opening programme 
5.17 The opening programme for Perth Museum is currently scheduled for 29-31
March, which is the Spring Bank Holiday weekend. Discussions are ongoing
with key project stakeholders including the UK and Scottish Government and
others on detailed timing and content of the formal and ceremonial aspects.
More details on these will be announced in due course.  The title of the
opening exhibition will be announced in January 2024.  The opening
programme will include specially commissioned theatre and dance, a family
programme and local talent showcases. Familiarisation visits for local
hospitality providers and previews for community groups involved in the
Museum development will take place in the week prior to opening. Outreach
and school engagement programmes have been underway since spring 2023. 
5.18 Impact of the opening programme will be measured in terms of Museum and
wider city centre footfall, Museum visitor spend and wider estimated Gross
Value Added (GVA). Culture Perth and Kinross has developed evaluation
tools for the Museum experience covering visitor facilities (catering, retail,
customer welcome etc) and learning/engagement activities. These are in line
with existing tools in use by CPK across its venues and services. CPK will
employ external support to ensure robust evaluation is completed. 
Page 132 of 148

Page 133

Governance 
5.19 Delivery of the museum project is managed by a senior officer group drawn
from the Council and Culture Perth and Kinross and reporting through the
Senior Responsible Owner (SRO) to the Perth Museum Project Board,
chaired by the Leader of the Council. It includes officers from Regulatory
Services for the events planning/public safety aspects of the opening, and
economic development for the visitor tourism marketing and promotion
aspects. 
5.20 The Project Board will meet in mid-November 2023, February 2024 and May
2024 to oversee project completion. The Board will also receive
recommendations from the SRO on post-project evaluation including
achievement of visitor targets and the economic, community and tourism
impact of the opening weekend. It is recommended that this is brought to this
Committee in autumn 2024. 
5.21 Arrangements for the move of the Stone of Destiny/Stone of Scone are being
made in liaison with Historic Environment Scotland, which oversees care and
conservation matters, and the Secretary to the Commissioners for the
Safeguarding of the Regalia, who advise His Majesty the King on all matters
relating to the Stone. 
6. CONCLUSION 
6.1 The Perth Museum project is approaching completion on time for the planned
public opening at the end of March 2024. A number of workstreams are in
place for this final stage of work with appropriate governance, monitoring and
reporting arrangements in place. 
Author
Name  Designation Contact Details
Fiona Robertson  Head of Culture and
Community Services 
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities)
23 October 2023 
Page 133 of 148

Page 134

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Local Outcomes Improvement Plan Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment None
Strategic Environmental Assessment None
Sustainability (community, economic, environmental) None
Legal and Governance  None
Risk Yes
Consultation 
Internal  None
External  None
Communication 
Communications Plan  Yes 
1. Strategic Implications  
Local Outcomes Improvement Plan 
1.1 The work of the Kinross-shire Local Committee impacts on the following
aspects of the Local Outcomes Improvement Plan 
(i) Poverty and cost of living
(ii) Mental and physical wellbeing
(iii) Digital participation 
(iv) Skills, learning and development
(v) Employability 
Corporate Plan 
1.2 Perth Museum impacts on the following priorities withing the Council’s
Corporate Plan:  
(iii) Promoting a prosperous, inclusive and sustainable economy; 
Page 134 of 148

Page 135

2. Resource Implications 
Financial 
2.1 There are financial implications to this report set out in para 4.3.
Workforce 
2.2 There are no workforce implications to this report. 
Asset Management (land, property, IT) 
2.3 A lease for Perth Museum is being prepared with appropriate consultation
factored in as the former Perth City Hall is a Common Good property. 
3. Assessments 
3.1 The report has been considered under the Corporate Equalities Impact
Assessment process (EqIA) with the following outcome: 
(i) Assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.3 The report has been considered under the Act and, no action is required as
the Act does not apply to the matters presented in this report.  This is because
the Committee are requested to note the contents of the report only and the
Committee are not being requested to approve, adopt or agree to an action or
to set the framework for future decisions. 
Sustainability 
3.4 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
Page 135 of 148

Page 136

3.5 The report does not contain any proposals that will impact on the Council’s
Principles for Sustainable Development. 
Legal and Governance 
3.6 None. 
Risk 
3.7 A risk profile for the opening programme is being prepared by the Perth
Museum Senior Officer Group. 
4. Consultation 
Internal 
4.1 Communities SMT, the Corporate Communications Manager and the
Regulatory Services Manager have been consulted in the preparation of this
report. 
External 
4.2 The Chief Executive of Culture Perth and Kinross has been consulted in the
preparation of this report. 
5. Communication 
5.1 A Communications Plan is in place for Perth Museum, overseen by the Senior
Officer Group. 
2. BACKGROUND PAPERS 
2.1 No background papers were relied on in preparing this report. 
Page 136 of 148

Page 137

PERTH AND KINROSS COUNCIL 
Environment Infrastructure and Economic Development Committee 
1 November 2023 
PERTH AND KINROSS OUTDOOR ACCESS FORUM 
ANNUAL REPORT 2022-23 
Report by Head of Environmental & Consumer Services
(Report No. 23/293) 
1. PURPOSE 
1.1 This report summarises the activities and progress of the Perth and Kinross
Outdoor Access Forum over the last year and makes recommendations in
terms of appointments moving forward. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee:  
• confirms the re-appointment of three existing members for a period of four
years
• notes that the remaining members are retained in their appointments for at
least a further year as set out in Appendix 1
• delegates to the Executive Director (Communities) the fulfilment of any casual
vacancy arising in this period through recruitment by Forum members, as
detailed within the Forum’s Terms of Reference
• notes the activities and progress of the Perth and Kinross Outdoor Access
Forum from September 2022, along with the ongoing commitment to
maximise effective partnership working to make the best of the exceptional
landscapes, paths networks and access rights for all within Perth & Kinross.
3. STRUCTURE OF REPORT  
3.1 This report is structured over the following sections: 
• Section 4: Background  
• Section 5: Proposals 
• Section 6: Conclusion  
• Appendices 
4. BACKGROUND / MAIN ISSUES  
4.1 This report follows on from the previous report (Report No. 22/226 refers) to
the Environment and Infrastructure Committee on 21 September 2022. 
10
Page 137 of 148

Page 138

4.2 Part 1 of the Land Reform (Scotland) Act 2003 requires local authorities to set
up at least one local Access Forum and to appoint members to it. The Act
states that the functions of a Forum are to advise the local authority and any
other person or body consulting the forum on matters having to do with: 
• the exercise of access rights 
• the existence and delineation of rights of way 
• the drawing up and adoption of a plan for a system of core paths. 
• the offer of assistance in disputes about access rights etc. 
4.3 In their statutory role as advisors to the Council, the Forum act as a “critical
friend” on public access matters. As such, there are occasionally issues the
Council may not be able to agree with the Forum on or fully meet their
expectations. 
4.4 The Perth and Kinross Outdoor Access Forum (the Forum) has capacity for
sixteen members. Twelve members are voluntary and represent the interests
of landowners/managers, the community and recreation equally. These
members are elected at an open meeting and their appointments confirmed
by the Environment, Infrastructure and Economic Development Committee.
The remaining members represent agencies and other bodies and are invited
onto the Forum and appointed by the Committee. The list of members and
prospective members is shown in Appendix 1. 
4.5 At its meeting on 24 November 2022, Nick Cole was re-elected in the role of
convenor. Four ordinary meetings took place, and the Exemptions and
Obstructions Subgroup met on four occasions to assist officers to prioritise
and resolve obstructions to public access. 
4.6 Two workshops were undertaken as follows: 
• Obstructions Criteria – new provisional points-based system for
prioritising obstructions to access agreed and in use, subject to review
• Development Management and path diversions – see point 4.12 below. 
4.7 The Annual General Meeting (AGM) was held on 27 April 2023 at the North
Inch Community Campus and online. In each group category, members stood
down to vacate seats for the election but were re-elected to their positions.
These new appointments are subject to the approval of the Environment,
Infrastructure and Economic Development Committee: 
• In the Recreation Group, Anne Macintyre was re-elected.
• In the Communities Group, Jennifer Herd was re-elected.
• In the Land Manager’s Group, Sandy Simpson was re-elected.
• Also in terms of the Agencies and Other Bodies, there is no change
with Councillor John Duff continuing in his role. 
4.8 The Forum will fill any casual vacancies which may arise as per their Terms of
Reference. 
Page 138 of 148

Page 139

4.9 A prospective new member was approached to fill the vacancy in the land
manager group, but unfortunately this did not come to fruition and the post
remains vacant. 
4.10 The Forum’s objection to the core path diversion orders required for the Cross
Tay Link Road (CTLR) was considered at the Hearing in April 2022, as noted
in report 22/226. However, on the advice of the Reporter, the Scottish
Government confirmed the diversion orders without modification in September
2022.  
4.11 In 2021, the Forum established a subgroup to respond to consultations on
forestry proposals. New forestry, associated deer fencing and timber
operations can have significant impacts on public access. During 2022-23, the
Forum have responded to several such consultations. Given the short
timescales required, the Forum agreed Terms of Reference with the subgroup
to give them delegated powers to respond on behalf of the Forum. 
4.12 There have been some ongoing concerns about the nature and volume of
some of the engagement between the Forum and Council and a proactive
approach to this has been taken.  A workshop between members of the
Forum and officers from the Council’s Planning and Legal services took place
in September 2023, hosted by Community Greenspace. This was very useful
in building a better understanding of the roles, processes, capacity and the
people involved for dealing with access issues.  This will be followed up with a
protocol which will cover the key activities and communication between the
Council and Forum. 
4.13 In relation to the draft protocol, discussions have also been held with the
Forum about the level of support provided by the Council for the Forum. 
Whilst the Council have a duty to establish a local Access Forum as set out in
para 4.2 above, there is no statutory requirement to organise their meetings or
provide administrative support.  The Council have supported the Forum since
its inception in 2004. However, the resources available to do this have
declined significantly, most notably the withdrawal of corporate meeting and
administrative support in 2012.  Since then, officers from the Community
Greenspace service have tried to fill the gap but there has also been a
reduction in resources available for access activities. 
4.14 Given that the Council’s primary responsibility is to focus available staff
resources on upholding access rights and the technical expertise required for
that, discussions have been held with the Forum. This is to establish how best
to use both the limited Council officer time available and where to target
limited financial resources.  Council Officers have drafted a suggested
protocol which has been shared with the Forum. Further negotiations are
required to agree a sustainable basis for the Forum and Council going
forward. The protocol, which covers areas such as provision of meeting
venues, administrative support for these meetings, mileage and out of pocket
expenses such as printing, will be helpful in that regard.   
Page 139 of 148

Page 140

5. PROPOSALS 
5.1  It is proposed that the appointments of existing members are confirmed as
members of the Forum (Appendix 1) and that any casual vacancy arising is
filled by the Forum as detailed in its Terms of Reference. 
5.2 It is also proposed to continue to seek ways to work with the Forum to
maximise the effective use of our collective resources.  This is to make the
best of the exceptional landscapes, paths networks and access rights for all
within Perth & Kinross. 
6. CONCLUSION   
6.1 The Council’s Community Greenspace team manages the statutory functions
in relation to the Land Reform (Scotland) Act 2003 and values the partnership
relationship with the Forum and the advice it has to offer. There is a wide
range of activities undertaken in relation to the management of core paths and
access rights more generally. Opportunities to involve the Forum in these,
with their agreement, will continue to be sought. 
Author
Name  Designation Contact Details
Dave Stubbs  Greenspace
Coordinator -
Communities
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Chief Executive
(Communities)
23 October 2023 
APPENDICES 
• Appendix 1 – Candidates for Reappointment to the Forum 
Page 140 of 148

Page 141

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  No
Workforce No
Asset Management (land, property, IST) No
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  No
Risk No
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 The proposals in this report align primarily with the delivery of the Perth and
Kinross Community Plan/Single Outcome Agreement in terms of the following
priorities: 
(iv) Supporting people to lead independent, healthy and active lives
(v) Creating a safe and sustainable place for future generations 
Corporate Plan 
1.2 The proposals in this report align primarily with the achievement of the
following Council Corporate Plan Priorities:  
(iv) Supporting people to lead independent, healthy and active lives; and 
(v) Creating a safe and sustainable place for future generations. 
2. Resource Implications 
Financial 
2.1 There are no resource implications arising directly from the recommendations
in this report.
Page 141 of 148

Page 142

Workforce 
2.2 There are no workforce implications arising directly from the
recommendations in this report. 
Asset Management (land, property, IT) 
2.3 There are no direct asset management issues with this report although the
Forum is a key organisation in assisting the Council with the management of
Core Paths and Rights of Way networks. 
2.4 There are no information technology implications arising from this report. 
3. Assessments 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. The proposals have been considered under the
Corporate Equalities Impact Assessment process (EqIA) with the following
outcome: 
(i) Assessed as not relevant for the purposes of EqIA
Strategic Environmental Assessment 
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. The proposals have been considered under the Act and no further
action is required as it does not qualify as a PPS as defined by the Act and is
therefore exempt. 
Sustainability 
3.3 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
Page 142 of 148

Page 143

3.4 There are no direct impacts on sustainable development as a result of these
proposals but securing the public access to the great outdoors contributes to
the economic, social and environmental well-being of the area. 
Legal and Governance 
3.5 There are no legal implications from this report. 
Risk 
3.6 There are no risks arising from this report as the subject matter and
procedures referred to are well established and on-going. 
4. Consultation 
Internal 
4.1 The Head of Legal and Governance has been consulted on the content of this
report. 
External 
4.2 The Perth and Kinross Outdoor Access Forum has been consulted on the
proposals and in the preparation of the report. 
5. Communication 
5.1 There are established regular meetings and communications between the
Council and Perth and Kinross Outdoor Access Forum. 
2. BACKGROUND PAPERS 
2.1 No background papers have been relied on in preparing the report, other than
those committee reports already referenced within the main body of the
report.
Page 143 of 148

Page 144

Page 144 of 148

Page 145

APPENDIX 1
CANDIDATES FOR APPOINTMENT OR REAPPOINTMENT TO THE FORUM 
Members elected 27 April 2023 recommended for immediate re-appointment. 
Recreation Group 
Name Organisation/ Interest Geographical knowledge/ 
home area 
Notes/ profession
Mary Conacher
Member since 2004
Re-elected 2022 
Scottish Canoe Association
(SCA), Women’s Rural Institute,
Royal Tay Yacht Club 
Highland/Alyth Former SCA Access volunteer/retired
watersports instructor
Karen Inkster
Member since 2017
Re-elected 2021 
British Horse Society, Scottish
Rights of Way and Access Society
(Scotways) 
Perth Area 20 + years in the outdoor industry. 
Hillwalker, climber, horse rider and
mountain biker.
John Andrews
Member since 2009
Re-elected 2021 
Ramblers, Scotways, Scottish
Wildlife Trust, Luncarty Redgorton
& Moneydie Community Council,
National Trust for Scotland
Perth Area/Luncarty Former member of County Access
Liaison Committee – retired.
Anne Macintyre
Co-opted 2019
Elected 2023
(subject to
confirmation) 
Portmoak Paths Group Kinross-shire Broad outdoor interests. Practical
involvement through Portmoak Paths
Group. 
10
Page 145 of 148

Page 146

Community Group 
Name Organisation/ Interest Geographical Knowledge/
home area
Notes/Profession
Nick Cole
Member since 2004
Re-elected 2021
Strathmore and the Glens Rural
Partnership. Meigle Community
Trust.  Next Steps & Stride for Life
Walking Groups. 
Highland & Lowlands/
Meigle
Electronic Systems Engineer, is now
a private consultant & runs an outdoor
training business. Involved in local
groups inc. BRAN & the Blairgowrie &
District Next Steps walking group.  He
also represents Local Access Forums
on the National Access Forum.  
Jennifer Herd
Member since 2015
Re-elected 2023
(subject to
confirmation) 
Member of British Horse Society,
Strathearn Rural + Riders Access
Group
Highland and East
Perthshire. Perth area
Broad experience particularly in
negotiating equestrian access and
representing the interests of horse
riders. She is also a keen mountain
biker and walker.
Joyce Carnegie
Elected 2022 
Comrie Millennium Footpath
Association 
Strathearn Wide range of community interests
inc SWI. Farming background 
Sarah Walker
Co-opted 2021 
Kinglands Hall, Soroptimist
International, Cornhill MacMillan,
British Horse Society & ByCycle
Perth area 25 years local knowledge through
work with a variety of voluntary
organisations.
Page 146 of 148

Page 147

Landowner/Manager Group 
Name Organisation/ Interest Geographical Knowledge/
home area
Notes/Profession
Councillor Hugh
Anderson
Member since 2004
Re-elected 2022 
Scottish Rights of Way & Access
Society. 
Perth & Surrounding
area/Scone
Land & River Management. Retired 
Estate Factor. Newly elected
Councillor (2022) 
Sandy Simpson
Member since 2005
Re-elected 2023
(subject to
confirmation) 
Royal Highland Educational Trust,
Rural Services Scotland, 
Perth and Kinross Agricultural
Forum
Perth Area Farm Manager 
Interested in all environmental issues.
Mark Thomson
Elected 2022 
National Farmer’s Union, Scotland
(former chair West Fife & Kinross)
Kinross Farmer
Woodland, arable & livestock
Vacant 
Page 147 of 148

Page 148

Agencies & Other Bodies 
These members are not elected but have been invited to sit on the Forum by the Council. 
Member Represents Job Title Office Base/other interests
Councillor John Duff
Appointed 2022 
Perth & Kinross Council  Councillor Ward 4
Highland 
Ward Councillor.  Leader of the
opposition. Retired Police
Superintendent. 
Mike Strachan
Member since 2007
Scottish Forestry Operations &
Development Officer 
Scottish Forestry, Upper Battleby.
Extensive forestry experience and
involvement in Big Tree Country
Keith Robertson
Member since 2021 
Centre for Inclusive Living Perth and
Kinross 
Member Auchterarder. Extensive experience
of inclusive access design
Vacant   
Page 148 of 148