Appendix 2b 
WINTER MAINTENANCE - LEVEL OF SERVICE & PRIORITY SYSTEMS 2023– 2024 (FOOTWAYS)         
Category
Descriptions
Examples Length
(km) 
Hours of Cover
Service Provided
Response
Time
Target
Treatment
Times
(Priority
Routes)
Target
Post
Gritting /
Snow
Clearance
Time
1 Main shopping areas, main
arterial footways,
busy feeder footways and
footways leading to community
centres and centres of
employment.
Perth,
Aberfeldy,
Auchterarder,
Blairgowrie,
Crieff,  Kinross,
Pitlochry, Alyth,
Bridge of Earn,
Coupar Angus,
Dunked,
Luncarty,
Milnathort and
Scone. 
N/A 
0630-1500 Mon-Sat 0800-1500 Sun and
nationally recognised public holidays 
In snow and ice conditions  1 hour  N/A  6 hours
2 As above plus Other footways
with significant usage.
As above plus
Abernethy,
Aberuthven,
Almondbank, 
Balbeggie,
Bankfoot,
Blackford,
Braco,
Burrelton
Caputh,
Comrie,
Glencarse,.
Glenfarg,
Inchture, 
Longforgan,
Methven,
Muthill,
Powmill,
Meigle, Stanley 
N/A  08:00-15:00 Monday -Friday  In snow and ice conditions  As soon as
possible after
Cat 1 routes
have been
completed 
N/A  N/A

Page 2

APPENDIX 2b (contd.) 
WINTER MAINTENANCE - LEVEL OF SERVICE & PRIORITY SYSTEMS 2023 – 2024  (FOOTWAYS)         
Category
Descriptions
Examples Length
(km) 
Hours of Cover
Service Provided
Response
Time
Target
Treatment
Times
(Priority
Routes)
Target
Post
Gritting /
Snow
Clearance
Time
3 Less well used footways and
footways where a feasible
alternative route exists 
N/A  08:00-15:00 Monday - Friday
Not normally treated.  Only treated in prolonged snow and ice
conditions if time and resources permit, and after successful
treatment of higher priorities 
N/A  N/A  N/A 
4
Footways which are not the
responsibility of a Council
Service, which are not
considered to be important in the
footway network, or have a
suitable alternative route treated  
N/A  N/A  Not treated  N/A  N/A  N/A 
Lower priority routes will only be treated once the higher priority routes have been treated unless operational factors such as efficient route planning dictate otherwise. Officers
will rotate the order of settlements treated by a single resource to ensure fair coverage and in prolonged severe conditions may deviate from retreating category 1 routes when
considered safe and where a wider community benefit can be achieved by doing so. 
There will be no footway treatment on either 25th December or 1st January. 
Footway cover is only provided out of normal hours during the main winter period. During lead in/lead out periods it is not possible to treat any footway out of hours and so
available resources will be deployed during the working day to best effect in relation to weather conditions being experienced.