Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
13/09/2023 
A hybrid meeting of the Environment, Infrastructure and Economic Development
Committee will be held in the Council Chamber on Wednesday, 20 September
2023 at 09:30. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Depute Provost Andrew Parrott  (Convener)
Bailie Mike Williamson  (Vice-Convener)
Councillor Keith Allan
Bailie Alasdair Bailey
Councillor Steven Carr
Councillor John Duff
Councillor Angus Forbes
Councillor Ken Harvey
Councillor Noah Khogali
Bailie Claire McLaren
Councillor Willie Robertson
Councillor Frank Smith
Councillor Colin Stewart
Councillor Richard Watters
Councillor Jack Welch
Page 1 of 118

Page 2

Page 2 of 118

Page 3

Environment, Infrastructure and Economic Development Committee 
Wednesday, 20 September 2023 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF ENVIRONMENT, INFRASTRUCTURE
AND ECONOMIC DEVELOPMENT COMMITTEE OF 31 MAY
2023 FOR APPROVAL
(copy herewith) 
5 - 10 
4 OUTSTANDING BUSINESS STATEMENT (OBS)
(copy herewith 23/256) 
11 - 12 
5 ROAD SAFETY PROJECT ASSESSMENT CRITERIA
Report by Head of Environmental & Consumer Services (copy
herewith 23/257) 
13 - 24 
6 PROPOSED 30MPH SPEED LIMITS
Report by Head of Environmental & Consumer Services (copy
herewith 23/258) 
25 - 50 
7 DEVELOPER CONTRIBUTIONS AND AFFORDABLE HOUSING
SUPPLEMENTARY GUIDANCE UPDATES
Report by Head of Planning & Development (copy herewith 23/259) 
51 - 118 
Page 3 of 118

Page 4

Page 4 of 118

Page 5

ENVIRONMENT, INFRASTRUCTURE AND ECONOMIC
DEVELOPMENT COMMITTEE 
Minute of hybrid meeting of the Environment, Infrastructure and Economic
Development Committee held in the Council Chambers on Wednesday 31 May 2023
at 9.30am. 
Present: Bailies A Bailey, C McLaren and M Williamson, Councillors K Allan, S Carr,
D Cuthbert (substituting for Councillor W Robertson), J Duff, A Forbes, K Harvey,
N Khogali, G Laing (substituting for Councillor R Watters), A Parrott, F Smith,
C Stewart, and J Welch. 
In Attendance: B Renton, Executive Director (Communities) (from Item 7 onwards),
D Littlejohn (Head of Planning and Development); M Butterworth (Head of
Environmental and Consumer Services); B Cargill, D McKeown, B Watt, J McCrone,
L Sumner, B Wilson, S Durning, S Coyle and K Walker (all Communities); A Taylor,
M Pasternak, and R Ramsay (all Corporate and Democratic Services). 
Apologies for Absence: W Robertson and R Watters. 
Councillor A Parrott, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
Councillor A Parrott welcomed everyone to the meeting.  Apologies for
absence and substitutions were noted as above. 
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interest made in terms of the Councillors’ Code
of Conduct. 
3. MINUTE OF MEETING OF ENVIRONMENT, INFRASTRUCTURE AND
ECONOMIC DEVELOPMENT COMMITTEE OF 29 MARCH 2023 
The minute of the meeting of the Environment, Infrastructure and Economic
Development Committee of 29 March 2023 was submitted and approved as a
correct record. 
4. OUTSTANDING BUSINESS STATEMENT 
Resolved:
The Outstanding Business Statement be noted and updated accordingly. 
5. DEVELOPER CONTRIBUTIONS AND AFFORDABLE HOUSING
SUPPLEMENTARY GUIDANCE UPDATES 
3
Page 5 of 118

Page 6

There was submitted a report by Head of Planning and Development (23/170)
presenting the proposed updates to the Developer Contributions and Affordable
Housing Supplementary Guidance (2020). 
Resolved:
(i) It be noted that the paper was discussed at and supported by the Affordable
Housing Member Officer Working Group at their recent meeting. 
(ii) The recommended updates to the Developer Contributions and Affordable
Housing Supplementary Guidance to initiate a period of public consultation in
June 2023; be approved.
(iii) A report be brought back to this Committee on the outcomes of proposed
public consultation, with any further changes to the Supplementary Guidance,
prior to submission to Scottish Ministers for adoption, be agreed. 
6. COMMUNITIES SERVICE ANNUAL PERFORMANCE REPORT 2022/23 
There was submitted a report by the Executive Director (Communities)
(23/168) presenting the Service Annual Performance Report 2022/23 for
Communities and detailing progress against targets and improvement actions over
the last year against the 2022/23 Service Business Management Improvement Plan.   
Resolved:
The Communities Service Annual Performance Report 2022/23, as detailed in
Appendix 1 to Report 23/168, specifically the areas which fall within the remit of the
Environment, Infrastructure and Economic Development Committee, be approved. 
7. SHORT-TERM LET CONTROL AREA: PROPOSALS FOR
CONSULTATION 
There was submitted a report by Head of Planning and Development (23/171)
seeking approval of (1) to consult on the principle of introducing a short-term let
control area for Highland Perthshire and part of Eastern Perthshire, and (2) of the
consultative draft non-statutory guidance on how planning applications for short term
lets will be assessed in Perth and Kinross. 
Motion (Councillor A Parrott and Bailie M Williamson) 
(i) The short term lets evidence paper as detailed in Appendix 1 of Report
23/171, be noted.
(ii) The public consultation on the principle of a short-term let control area
for Highland Perthshire and part of Eastern Perthshire, be approved.
(iii) The public consultation on proposed non-statutory planning guidance
on short-term lets as detailed in Appendix 2 or Report 23/171, be
approved. 
Amendment (Councillors A Forbes and D Cuthbert) 
This Committee acknowledges that there is a shortage of affordable housing
in Perth and Kinross, particularly in the Greater Perth Housing Market Area and in
rural areas and that the Council should seek to maximise the number of affordable
Page 6 of 118

Page 7

houses within the local authority area. However, the data contained within the
Committee Report on Short Term Let Control Zones is not sufficiently robust enough
at this time to evidence to the satisfaction of members that a Control Zone is
necessary or will have the desired effect in respect of increasing the availability of
affordable homes. On the contrary, a Control Zone may be detrimental to local
economies which are dependent on the tourist trade and result in an increase in
empty second homes.  Therefore, there is a need to establish clearer evidence of the
situation prior to making such a decision. 
Accurate data in relation to the number, type and location of short term let
accommodation within Perth and Kinross will be available for analysis following the
closing date for existing short term let businesses to register for a Short Term Let
Licence (1 October 2023).  After this date, the available data could be used to
accurately establish the correct number, type and location of short term let properties
within Perth and Kinross and better inform members of the exact situation before
deciding if and where Control Zones are required. 
Members would also like to see further details on the effectiveness of the
Control Zone in operation in the Highland Council area of Badenoch and Strathspey
prior to making a decision. 
This Committee therefore proposes:
1. That further analysis of the data on short term let properties is carried out
once the registration of existing properties is complete on 1 October 2023.
2. That officers liaise with their counterparts in Badenoch and Strathspey to
establish the impact of a Control Zone on a rural location and the lessons to
be learned from the experience.
3. That the Administration takes full advantage of the opportunities to build or
buy back affordable housing and ensures that use of its existing council
housing stock is maximised.
4. That an updated paper utilising the improved data on short term lets within
Perth and Kinross is brought back to this Committee in 9 months’ time. The
paper when it returns should contain the proposed questions which will form
the consultation. 
In terms of Standing Order 21.1 a roll call vote was taken. 
8 Members voted for the Motion as follows:
Bailies A Bailey, C McLaren and M Williamson, Councillors S Carr, K Harvey,
G Laing, A Parrott and J Welch 
7 Members voted for the Amendment as follows:
Councillors K Allan, D Cuthbert, J Duff, A Forbes, N Khogali, F Smith and
C Stewart 
Resolved: 
In accordance with the Motion. 
THERE FOLLOWED A SHORT RECESS AND THE MEETING RECONVENED AT
12.05
Page 7 of 118

Page 8

8. PERTH CITY OF LIGHT ACTION PLAN UPDATE 2023 
There was submitted a report by Head of Planning and Development (23/172)
(1) providing an update on the City of Light Action Plan; (2) reviewing the outputs
and outcome of the work undertaken to date, relative to the original objectives; and
(3) outlining works which have not yet been committed within the Framework
Contract linked to the current pause on spend on the Lighting Strategy capital
programme. 
Motion (Councillor A Parrott and Bailie M Williamson) 
(i) The contents of Report 23/172 and appendices which provide
information on the background to the City of Light Action Plan, outputs
and outcomes achieved, be noted.
(ii) The remaining proposed lighting at St John’s Kirk, City Gateways, Perth
Vennels and required maintenance costs which have yet to be
committed, be noted.
(iii) The remaining proposed projects be considered with any decision on
future spend being referred to the Finance and Resources Committee. 
Amendment (Councillors C Stewart and D Cuthbert) 
That this Committee cancels the remaining monies to be used for the
remaining proposed projects in the lighting programme. 
THERE FOLLOWED A 5 MINUTE RECESS AND THE MEETING RECONVENED
AT 12.42PM. 
In terms of Standing Order 21.1 a roll call vote was taken. 
12 Members voted for the Motion as follows:
Bailies McLaren and M Williamson, Councillors K Allan, S Carr, J Duff,
A Forbes, K Harvey, N Khogali, G Laing, A Parrott, F Smith and J Welch. 
3 Members voted for the Amendment as follows:
Bailie A Bailey, Councillors D Cuthbert and C Stewart 
Resolved:
In accordance with the Motion. 
9. PROPOSED 20MPH SPEED LIMITS 
Three was submitted a report by Head of Environmental and Consumer
Services (23/173) (1) summarising objections received on the proposed 20mph
speed limits for various towns and villages across the Perth and Kinross Council
area, and (2) recommending Committee set aside the objections and that the Order
be made as advertised. 
Resolved:
Page 8 of 118

Page 9

(i) The objections received, as detailed in Appendix 2 of Report 23/172, be set
aside.
(ii) The Orders to introduce the new 20mph Speed Limits as advertised, be
approved. 
~~~~~~~
Page 9 of 118

Page 10

Page 10 of 118

Page 11

ENVIRONMENT, INFRASTRUCTURE AND ECONOMIC DEVELOPMENT COMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(23/256) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action Due /
Complete
Action
Expected
11. 31 May 2023
Item 6
Communities
Service Annual
Performance Report
2022/23
Provide details on
customer satisfaction
rates with Libraries
and whether the rate
can be sustained or
improved upon.
Email provided
detailing 95%
satisfaction rate which
is above the Scottish
average, with
satisfaction levels
generally being around
this mark for the last
10 years.
Fiona Robertson COMPLETE 20 September
2023
12. 31 May 2023
Item 6
Communities
Service Annual
Performance Report
2022/23
Provide details on the
2022/23 target for in-
person and online use
of libraries.
Email provided
advising of slight error
in relevant section of
the APR (Page 15). 
The target for in-
person and online use
was 1,035,000 and
actual was 1,280,912. 
Target for 2023/24
taking 22/23
performance into
account is 1,400,000. 
Report was amended
to reflect this error. 
Fiona Roberson COMPLETE 20 September
2023
4
Page 11 of 118

Page 12

Page 12 of 118

Page 13

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure and Economic Development Committee 
20 September 2023 
ROAD SAFETY PROJECT ASSESSMENT CRITERIA 
Report by Head of Environmental & Consumer Services 
(Report No. 23/257) 
1. PURPOSE 
1.1 The purpose of this report is to advise members of a proposal to revise the
criteria for managing and prioritising potential road safety projects within the
Council’s Road Safety Database. 
2. RECOMMENDATIONS 
(ii) approves the process for all proposals from individuals for new potential
projects, as outlined within paragraph 4.10 of this report 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/ Main Issues 
• Section 5: Conclusion 
4. BACKGROUND/MAIN ISSUES 
4.1 Perth and Kinross Council’s road safety projects assessment criteria provides
an agreed method for prioritising traffic management and road safety projects.
This assessment criteria and the subsequent priority project list was approved
by Environment and Infrastructure Committee in March 2019 (Report No.
19/83 refers). As a result, all potential road safety schemes are assessed by
the Traffic & Network Team and, if considered appropriate, scored and
ranked. This allows them to be assessed against other projects to ensure
those schemes that offer the greatest benefit to local communities are
delivered first.  With each financial year, projects are assigned to the relevant
programme of works and budget, then installed as resources permit. 
2.1 It is recommended that the Committee: 
(i) approves the proposed change to the Council’s road safety projects
assessment criteria, which would include the direct input of Community
Councils, where they exist, and the introduction of an additional criteria
as outlined at paragraph 4.8 of this report; and 
5
Page 13 of 118

Page 14

4.2 The database, and priority list is authority wide. As such, while one ward may
have a larger number of road safety priorities, these are assessed and
considered alongside priorities identified across the whole of Perth and
Kinross. 
4.3 Local councils (as the Local Roads Authority) are the main delivery agent of
road safety projects. Local roads authorities have a statutory duty under the
Road Traffic Act (RTA 1998: Section 39) to keep a record of road traffic
collisions, investigate the contributory factors that led to the collisions and to
take steps both to reduce and prevent reoccurrence. National government has
also set a series of stringent road casualty reduction targets for local
authorities to achieve. 
4.4 As a result, the Council’s assessment criteria is weighted towards those sites
with a collision and casualty history, in a deliberate effort to reduce both the
number and the severity of road traffic collisions on the local road network.   
4.5 The list of proposed projects is based on a technical assessment of the road
usage and road environment. However, one of the key issues is that a number
of projects can receive the same score, as the current approved assessment
criteria does not take into account community concerns about perceived road
safety.  As a result, this can make it difficult for officers to establish which
projects, with the same score, are the most important for communities.   
4.6 In Spring 2022, the Traffic & Network Team began meeting with the Ward
Councillors on a three-month cycle to review the projects list, discuss
progress and identify local priorities.  These discussions have proved useful
as, at each meeting, progress on the selected projects is reviewed and, if
schemes have been completed, new priorities are identified. 
4.7 Although these ward meetings have been successful in determining local
priorities, and will continue in the future, there is an opportunity for further
community engagement.  For example, Community Councils (where they
exist) could also have a direct input into the identification of local priorities. In
some wards, the elected members already consult with the Community
Councils prior to the ward meetings. In others, on occasion, representatives
from the Community Councils have attended the ward meetings to feed
directly into the discussions.  In at least one ward, a road safety sub-group
exists, with a representative from each Community Council, which assist with
the projects list. The Kinross-shire Local Committee, which includes a
representative from each community council, has the responsibility to
determine local roads priorities and a local policy on road safety. 
4.8 In order to improve the current arrangements, it is recommended that projects
for each ward would be shared with the relevant Community Council, on an
annual basis, in advance of the new financial year for them to review and feed
back to officers. This would help ensure that the relative priority, as assessed
by the local community, of all projects is considered, as well as provide the
opportunity for low priority schemes to be removed from the list.  A scoring
system ranging from 1- 5, with 5 being the highest priority is proposed as
Page 14 of 118

Page 15

shown in Table A below. It is important to note that any input from Community
Councils would be for the purposes of differentiating between projects with the
same cost/benefit score only. It would not be a means by which lower ranked
projects could be prioritised over higher ranked projects and the cost benefit
ratio will continue to be used to rank road safety project priorities. This
additional approach has been added to the current assessment criteria for
illustration purposes and is set out at Appendix 1. Where there are no
community councils, the current process of only involving elected members
will continue. 
Table A – Road Safety Projects Database – extract
(with “illustrative” community scoring) 
Ranking
Ward
Budget
Description
Location
Road No.
Speed Limit
Collision
Casualties
Environment
Alignment
ST Plan
Sus Transport
Total
Cost
BCR
Community
Status
241 11 TRO
Waiting
restrictions
Goodlyburn Terrace, Perth off
Rannoch Road  30 0 0 2 0 1 2 5 2 2.50 5 G
241 11 TRO
Waiting
restrictions
Unity Tce between Albany Tce and
Unity Cres, Perth  30 0 0 2 0 1 2 5 2 2.50 4 G
241 11 TRO
Waiting
restrictions
Strathtay Road, Letham, Perth at
rear of properties  30 0 0 2 0 1 2 5 2 2.50 3 G
241 11 TRO
Waiting
restrictions
Wallace Crescent, Letham at
Wallace Court  30 0 0 3 0 1 1 5 2 2.50 2 G
241 11 TRO
Waiting
restrictions
Allison Crescent/Hulbert Court,
Tulloch, Perth  30 0 0 2 0 1 2 5 2 2.50 1 G 
Notes: 
These five projects in Ward 11 have different locations but similar road environments and links
to schools. Each scored five points on their site assessment, and each project will cost
approximately £2,000 to implement. As a result, they all have the same Benefit/Cost Ratio and
the same Ranking. 
The column on the right (green) shows that all can be delivered within the road boundary, as
part of the green/amber/red Status classification. The second column from the right (blue)
shows the Community priority that may be decided by the Community Council or, in the absence
of a Community Council, by the Ward Councillors. 
Even if there are more than five projects in a Ward with a similar Ranking, a maximum of five
project will be considered so there is a manageable timescale for delivery. 
4.9 In addition to the above, another issue that officers experience involves the
creation of new potential projects and priorities put forward by individual
members of the community.  Under the current arrangements, officers are
often unaware of the level of community support for the introduction of such
measures, or in fact whether there is community support.  This situation can
lead to projects being added unnecessarily to the current extensive list and
create abortive work by officers who commence a project and receive
negative feedback at the consultation stage.    
Page 15 of 118

Page 16

4.10 To address this matter, it is recommended that a proposer would contact the
Council’s Traffic and Network team with a potential scheme. If a proposal from
an individual has merit from a road safety perspective, then this will be
considered and prioritised by the elected members at the subsequent ward
meetings, as part of the regular road safety projects review process.  
5. CONCLUSIONS 
5.1  The quarterly meetings with local elected members to identify community road
safety project priorities and drive forward progress work well and should be
continued.   
5.2  The Road Safety Projects Database should be shared with the relevant
Community Councils (where they exist), annually, for them to review and feed
back to officers. As set out in paragraph 4.8 above, this addition to the current
criteria would be used solely as a means of differentiating between projects
with the same technical scoring, to try to establish local priorities. 
5.3  A “letter of indicative support” should be introduced as outlined above, to
ensure that there is sufficient local support and to avoid abortive work.   
Author
Name  Designation Contact Details
Daryl McKeown Road Safety Officer  01738 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities) 
8 March 2023 
APPENDIX 
• Appendix 1 - Assessment Criteria for Road Safety Requests (As agreed by E&I
Committee – 20 March 2019) – with Proposed Amendments (in italics) 
Page 16 of 118

Page 17

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes/No
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  Yes
Risk None
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1.  Strategic Implications 
Community Plan / Single Outcome Agreement 
1.1 The Perth and Kinross Community Planning Partnership (CPP) brings
together organisations to plan and deliver services for the people of Perth and
Kinross. Together the CPP has developed the Perth and Kinross Community
Plan which outlines the key things we think are important for Perth and
Kinross. 
(i) Reducing Poverty
(ii) Physical and Mental Wellbeing
(iii) Digital Participation
(iv) Learning and Development
(v) Employability 
1.2 It is considered that the actions contained within this report primarily
contribute to objective ii – Physical and Mental Wellbeing. 
Corporate Plan 
1.3 The Council’s Corporate Plan outlines five objectives. These objectives
provide a clear strategic direction, inform decisions at a corporate and service
level and shape resource allocation. It is considered that the actions contained
Page 17 of 118

Page 18

in the report make a contribution to all of the five objectives, which are set out
below.   
(i)   Children and young people grow up safe, respected, well-educated, and
confident in their ability to realise their full potential; 
(ii)  People and businesses are increasingly able to prosper in a local
economy which support low carbon ambitions and offers opportunities for
all; 
(iii) People can achieve their best physical and mental health and have access
to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially connected; 
(v)  Perth and Kinross is a safe and vibrant place, mitigating the impact of
climate and environmental change for this and future generations. 
2.  Resource Implications 
2.1 There are no financial implications from this report. Once schemes have been
assessed and ranked according to the assessment criteria and community
prioritisation, funding from both the future Capital and Revenue budgets will
have to be identified to enable implementation and ongoing maintenance. 
Workforce 
2.2  There are no workforce implications arising from this report. 
Asset Management (land, property, IT) 
2.3  There are no land and property, or information technology implications arising
from the contents of this report. 
3. Assessments 
Equality Impact Assessment 
1.1 An equality impact assessment needs to be carried out for functions, policies,
procedures or strategies in relation to race, gender and disability and other
relevant protected characteristics. This supports the Council’s legal
requirement to comply with the duty to assess and consult on relevant new
and existing policies. 
3.2  The function, policy, procedure or strategy presented in this report was
considered under the Corporate Equalities Impact Assessment process (EqIA)
with the following outcome: 
•  Assessed as relevant and the following positive outcomes are expected   
following implementation: 
•  The measures, for example improved crossing facilities, footways and
traffic calming features, will provide improved access for communities,
and will particularly improve travel opportunities for disabled people with
Page 18 of 118

Page 19

mobility issues, sight or hearing impairment, children, elderly people &
parent/carers walking with children in pushchairs/buggies. 
•  The measures will provide improvements for road users of all ages, but
particularly for children and elderly people. This will include facilities to
enable them to cross roads safely. 
•  The measures will also encourage children to walk or cycle to school, thus
bringing health benefits. 
•  The measures will provide opportunities for increased travel by foot and
cycle for all age groups. 
Strategic Environmental Assessment 
3.3  Strategic Environmental Assessment (SEA) is a legal requirement under the 
Environmental Assessment (Scotland) Act 2005 that applies to all qualifying
plans, programmes and strategies, including policies (PPS). 
3.4 The matters presented in this report were considered under the Environmental
Assessment (Scotland) Act 2005 and no further action is required as it does
not qualify as a PPS as defined by the Act and is therefore exempt. 
Sustainability 
3.5  Under the provisions of the Local Government in Scotland Act 2003, the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions. 
Legal and Governance 
3.6  Relevant Traffic Regulation Orders will be promoted in accordance with The
Local Authorities’ Traffic Orders (Procedure) (Scotland) Regulations 1999. 
Risk 
3.7  There are no significant risks associated with the implementation of this
project. 
4. Consultation 
4.1  The Head of Legal and Governance, the Head of Finance and Police Scotland 
have been consulted in the preparation of this report. 
4.2  As part of the scheme design, consultation will be carried out with the relevant
parties where appropriate, including the local elected members. 
5. Communication 
5.1  For some projects, approval will allow a start to be made to the formal
procedure to vary the Traffic Regulation Order (TRO). This procedure will
Page 19 of 118

Page 20

involve statutory consultation, preparation of a draft TRO and advertising in
the press. This will provide an opportunity for additional comments to be made
or objections to be raised. If objections are raised, these will be reported back
to Committee, with appropriate recommendations. 
2.  BACKGROUND PAPERS 
2.1  The following background papers, as defined by Section 50D of the Local
Government (Scotland) Act 1973 (and not containing confidential or exempt
information) were relied on to a material extent in preparing the above Report;
(list papers concerned): 
•  Report to Enterprise and Infrastructure Committee 20 March 2019 Road
Safety Projects Assessment Criteria (19/83). 
Page 20 of 118

Page 21

Appendix 1
9  
Assessment criteria for road safety requests (As agreed by E&I
Committee – 20 March 2019) – with Proposed Amendments (in italics) 
Each of the criteria will be assessed using a weighting system with a
higher number of points being assigned on the basis of severity or
presence of hazards   
Collisions   
The Council maintains a database containing all reported road traffic collisions
supplied by Police Scotland.  All road collision within the curtilage of each site,
or within 100m on adjoining roads, during the previous five calendar years will
be reviewed.  The base-line assessment period will be from 2013 to 2017.
After three years, the base-line will be updated and all collision and casualty
data reviewed and adjusted accordingly. Each collision is adjusted by severity
which is based on the highest category of casualty – 1 point for slight, 3 points
for serious and 5 points for fatal. Police Scotland does not provide reports on
damage-only incidents.  At sites where there is evidence of damage-only,
non-injury collisions on the ground, a value of 1 point will be added to the
Collision category in the assessment criteria. 
Casualties 
An assessment factor is included for road casualties based on severity – 1
point will be added to the Casualty category for each person slightly injured, 3
points for each person seriously injured and 5 points for each fatality. 
Perceived risk is not included in the assessment criteria as it is not
quantifiable. 
Road Environment 
The road environment is based on the activity around the site.  Assessment
factors are included for both physical layout and land use. Physical layout
includes features on the road network such as a junction or bridge, and
hazards adjacent to the public road such as a river or rock face.  Examples of
land use are housing, retail, commercial, industrial and community facilities
such as schools or public parks.  1 point will be given to the road environment
category for each environmental feature up to a maximum of 4 points. This is
to ensure that town centre locations with mixed-use are not over represented.   
Road Alignment 
Poor road alignment affects visibility splays, stopping sight distance and
vehicle speeds.  Assessment factors for the road alignment category include 1
point each for poor or limited horizontal and vertical alignment where crests or
bends affect the road layout.   
5
Page 21 of 118

Page 22

School Travel Plan 
All schools in Perth and Kinross are encouraged to produce a School Travel
Plan.  These plans record the various modes of transport to and from school,
and help to identify any limitations in the built environment, particularly for
vulnerable road users such as child pedestrians and cyclists.  Each scheme
will be allocated a score for connection to a school or campus – 1 point will be
given to the School Travel Plan category if the project links to a school and 2
points if the project is in the immediate vicinity of the school. 
Sustainable Transport 
Each project will be scored for a sustainable transport connection – 1 point
each will be given to the Sustainable Transport category if the scheme
provides a link for pedestrians, cyclists, car and bus or rail transport up to a
maximum of 4 points.   
Community Input 
Prior to the commencement of new financial year, Community Councils
(where they exist) will be provided with the Road Safety Projects database
and asked to prioritise individual projects within their Community Council area,
which have the same cost/benefit ratio, using a score of 1 to 5. (5 being the
highest).  This scoring will be used for the purposes of differentiating between
those projects with the same cost/benefit ratio and will inform officers and
councillors, which projects Community Councils consider more important
within the same cost/benefit ratio.  The scoring would not however affect the
cost/benefit ratio of any project or re-prioritise any project above any which
have a greater cost/benefit analysis.   
Cost 
The cost of the scheme to be constructed has a direct bearing on the viability
of the project.  With limited financial resources, cost must be a consideration
for all works.  Nonetheless, if need has been clearly established, cost should
not be a critical assessment criteria. 
It should be noted that for the purposes of the prioritisation, the cost is the
cost to PKC. Therefore, if a potential project was to be funded or partly funded
from elsewhere this may impact on the scheme’s priority by potentially raising
the Benefit Cost Ratio. 
Land Availability 
Land availability should not be an assessment criteria if need for the scheme
is identified.  Priority will be given to those sites where the works can be
accommodated within the existing road boundary and the scheme can be
delivered within an agreed timeframe.  Schemes where land is currently
available, and there are no anticipated site complications, will be marked in
green on the assessment table.  Sites where land is available but which
Page 22 of 118

Page 23

require additional construction work, such as retaining features or alterations
to services, will be shown in amber. 
Schemes which require additional land outside the road boundary will be
highlighted in red.  It will be necessary to negotiate land transfer before any of
these schemes can be constructed.  An estimated construction cost cannot be
entered against these projects until the amount of land required to complete
the scheme is calculated. 
Benefit Cost Ratio 
A Benefit Cost Ratio (BCR) will be used as an indicator to rank the overall
value for money of the proposed projects, by dividing the total benefits by the
estimated costs. 
Page 23 of 118

Page 24

Page 24 of 118

Page 25

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure and Economic Development Committee 
20 September 2023 
PROPOSED 30MPH SPEED LIMITS 
Report by Head of Environmental & Consumer Services 
(Report No. 23/258) 
1. PURPOSE 
1.1 The purpose of this report is to seek support to make a Traffic Regulation
Order, which covers a 30mph speed limit in Kinloch.  The Council has
received one objection regarding the proposed introduction of this speed limit.
The Committee is asked to set aside the objection and that the Order is made
as advertised. 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
i) sets aside the objection received and 
ii) proceeds to make the Order to introduce the new 30mph Speed Limit in
Kinloch as advertised. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/ Main Issues 
• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices 
4. BACKGROUND/MAIN ISSUES 
4.1 Officers recently undertook statutory consultation for Perth and Kinross
Council (Restricted Roads) (Variation) (No 38) Order 2023, covering a
number of sites.  There were no objections received for the majority of these
sites, therefore these have been progressed without delay. However, the
Traffic Regulation Order (TRO) wishes to promote a 30mph speed limit in
Kinloch, for which an objection was received, which therefore requires a
Committee decision. 
4.2 All the 20mph speed limits introduced under the Spaces for People initiative
have been assessed and, where appropriate, made permanent. However, at
some locations where a temporary 20mph speed limit was introduced, it was
not considered appropriate to make these locations permanent.  
6
Page 25 of 118

Page 26

4.3 As a result, it is therefore proposed to introduce 30mph speed limits at these
sites to improve compliance. Setting the speed limit unrealistically low has
resulted in poor compliance and increased demands on Police enforcement.
However, the speed limit can be reviewed should there be any future
changes. The temporary 20mph speed limit in Kinloch was one of the sites
with poor compliance. Given the road width, alignment and limited frontage
development at this location, officers do not believe that a permanent 20mph
speed limit is appropriate. 
4.4 This Traffic Regulation Order has been progressed in consultation with local
elected members, Community Councils and local residents.  The proposed
Variation Order and drawings are shown in Appendix 1. 
4.5 During the statutory advertisement period, one objection was received and 
this is listed in the table below.  This objection relates to Item 10 (Kinloch) in 
Appendix 1. 
Objections to the proposed 20 mph speed limit are as follows:
Name on file Reason for objection Response
(1) The objector does not agree
with raising the speed limit to
30mph in Kinloch. The
current limit is 20mph and
vehicles are still travelling too
fast for the road. The
objector would like more
traffic calming to be provided
in order to increase
compliance with the 20mph
speed limit. 
It is proposed to amend the speed
limit to 30mph to improve
compliance. Given the road width,
alignment and limited frontage
development at Kinloch, officers do
not believe that the 20mph speed
limit is the appropriate speed
restriction. Setting the speed limit
unrealistically low in Kinloch has led
to poor compliance. 
If there is further development in
Kinloch, the Council can review the
speed limit further. 
4.6 A copy of the full objection and response are contained in Appendix 2. 
4.7 Under the Local Authorities’ Traffic Orders (Procedure) (Scotland) Regulations
1999, local authorities are permitted to make a Traffic Regulation Order in
partial while deferring one or more items of the proposed Traffic Regulation
Order. 
4.8 Item 10 of the Order was the only location out of the 13 proposed that
received an objection. The Perth and Kinross Council (Restricted Roads)
(Variation) (No 38) Order 2023 has been made with Item 10 being deferred,
so that the objection can be considered at this Committee. 
Page 26 of 118

Page 27

5. PROPOSALS 
5.1 The proposed 30mph speed limit order and relevant drawings are shown in
Appendix 1 attached to this report. 
6. CONCLUSION 
6.1 This report proposes road safety improvements by way of a 30mph speed
limit in Kinloch. The report also highlights an objection received during the
advertising of the proposed 30mph speed limits and the response sent to the
objector to explain the reasons for the proposed Order. The report also
recommends that the objection is set aside and that the Order is promoted. 
Author
Name  Designation Contact Details
Brian Cargill Traffic and Network
Service Manager
01738 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton Executive Director
(Communities)
7 September 2023 
APPENDICES 
• Appendix 1 Drawings and Variation Order
• Appendix 2 Objections and Responses 
Page 27 of 118

Page 28

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes/No
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  Yes
Risk None
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1. Strategic Implications 
Community Plan/Single Outcome Agreement 
1.1 This report supports one of the priorities within the Community Plan 2022-27.  
(i) Mental and physical wellbeing. 
Corporate Plan 
1.2 This report supports the objectives within the draft new Corporate Plan:-  
(i) Children and young people grow up safe, respected, well-educated,  
and confident in their ability to realise their full potential; 
(ii) People and businesses are increasingly able to prosper in a local 
economy which support low carbon ambitions and offers opportunities  
for all; 
(iii) People can achieve their best physical and mental health and have 
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially    
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of  
climate and environmental change for this and future generations. 
Page 28 of 118

Page 29

2. Resource Implications 
Financial 
Capital 
2.1 There are no capital resource implications arising directly from the
recommendations in this report. 
Revenue 
2.2 The financial implications of advertising and implementing the new speed
limits are covered within existing Traffic and Network revenue budgets. 
Workforce 
2.3 There are no workforce implications arising from this report. 
Asset Management (land, property, IT) 
2.4 There are no land and property, or information technology implications arising
from the contents of this report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 This section should reflect that the proposals have been considered under the
Corporate Equalities Impact Assessment process (EqIA) with the following
outcome: 
(i) Assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 Strategic Environmental Assessment (SEA) is a legal requirement under the
Environmental Assessment (Scotland) Act 2005 that applies to all qualifying
plans, programmes and strategies, including policies (PPS). 
The proposals have been considered under the Act and no further action is
required as it does not qualify as a PPS as defined by the Act and is therefore
exempt. 
Page 29 of 118

Page 30

Sustainability 
3.4 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions. 
3.5  The proposals contained within the report are assessed to have a positive
impact on sustainability, particularly with regard to encouraging road safety.   
Legal and Governance 
3.6 The Order will be promoted in accordance with The Local Authorities’ Traffic
Orders (Procedure) (Scotland) Regulations 1999.   
Risk 
3.7 There are no significant risks associated with the implementation of this
project.   
4. Consultation 
4.1 The Head of Legal and Governance and the Head of Finance have been
consulted in the preparation of this report.   
4.2 Police Scotland, local Elected Members, residents and Community Councils
have also been consulted and support the proposals. 
5. Communication 
5.1 None. 
2. BACKGROUND PAPERS 
2.1 The following background papers, as defined by Section 50D of the Local  
Government (Scotland) Act 1973 (and not containing confidential or exempt
information) were relied on to a material extent in preparing the above Report: 
• Environment and Infrastructure Committee (Report 21/195)
• Environment, Infrastructure and Economic Development Committee
(Report 23/173) 
Page 30 of 118

Page 31

PERTH AND KINROSS COUNCIL
ROAD TRAFFIC REGULATION ACT 1984 
PERTH AND KINROSS COUNCIL (RESTRICTED ROADS)
(VARIATION) (NO 38) ORDER 202X 
Perth and Kinross Council in exercise of the powers conferred on them by Sections 84(1) and (2) and
Part IV of Schedule 9 to the Road Traffic Regulation Act 1984 (which Act of 1984 is hereinafter
referred to as “the Act”) and of all other powers enabling them in that behalf and after consultation
with the Chief Constable in accordance with Part III of Schedule 9 to the Act hereby make the following
Order:- 
1.   This Order may be cited as “Perth and Kinross Council (Restricted Roads) (Variation) (No 38)
Order 202X” and shall come into operation on the ……………………….. day of
………………….. Two thousand and twenty-…………… 
2.   The Perth and Kinross Council (Restricted Roads) Order 1998 is hereby varied and shall
henceforth have effect subject to the amendments thereto specified and described in the
Schedule hereto. 
SIGNED and the COMMON SEAL of the COUNCIL hereto AFFIXED at PERTH on the ………………..
day of …………………… TWO THOUSAND AND TWENTY- ……………………... 
………………………………………………
Legal Manager 
APPENDIX 1 6
Page 31 of 118

Page 32

PERTH AND KINROSS COUNCIL (RESTRICTED ROADS)
(VARIATION) (NO 38) ORDER 202X 
SCHEDULE 
The Schedule to the “Perth and Kinross Council (Restricted Roads) Order 1998” requires to be varied
as follows:- 
1. After PART I of the SCHEDULE, 4 ALYTH, insert the following:- 
“4A  AUCHMUIRBRIDGE  
A911 Glenrothes - Scotlandwell – Milnathort Road
From a point 230 metres or thereby northeastwards of its junction with the B922
southwestwards then northwestwards to a point 291 metres or thereby northwestwards
of its junction with the B922, a distance of 530 metres or thereby.”   
2. After PART I of the SCHEDULE, 7A BALLINTUIM, delete the existing and substitute with:-
“7A BALLINTUIM 
A924 – Pitlochry – Kirkmichael – Bridge of Cally Road
From a point 150 metres or thereby south of the extended southeast gable of the Old
Post Office House southeastwards to a point 30 metres or thereby southeastwards of
its junction with the private access to the property known as Rhiannan, a distance of
412 metres or thereby.” 
3. After PART I of the SCHEDULE, 15A BRIDGE OF CALLY, insert the following:- 
“15B  BUTTERSTONE 
A923 Dunkeld - Butterstone – Blairgowrie Road
From a point 92 metres or thereby westwards of its junction with the access road to the
property known as Benachally, to a point 67 metres or thereby eastwards of its junction
with the private access to the Buckny Burn Hydro Scheme, a distance of 268 metres
or thereby.”    
4. After PART I of the SCHEDULE, 17 CAPUTH, insert the following:- 
“17A  CARNBO 
A91 Milnathort – Tillicoutry – Stirling Road 
From a point 20 metres or thereby southwestwards of its junction with U221
northeastwards to a point 15 metres or thereby northeastwards of its junction with the
private access of the property known as Viewfield, a distance of 711 metres or thereby.” 
5. After PART I of the SCHEDULE, 19 COUPAR ANGUS, insert the following:- 
“19A  CRAIGEND
Kirkton of Mailer Road 
From its junction with A912 northwestwards to a point 78 metres or thereby
northwestwards of its junction with the private access to the property known as Kirkton
of Mailer Farm Cottages, a distance of 1338 metres or thereby.” 
6. After PART I of the SCHEDULE, 23A DRUM, insert the following:- 
“23B EASTER BALGEDIE 
A911 - Main Road 
From a point 100 metres or thereby northwestwards of its junction with the private
access road known as Access Road off A911 to rear of Balgedie House,
southeastwards to a point 70 metres or thereby, southeastwards of its junction with the
Private Access Road to the property known as Balneathal, a distance of 262 metres or
thereby.”   
7. After PART I of the SCHEDULE, 23A DRUM, insert the following:- 
Page 32 of 118

Page 33

“23C  FEARNAN 
A827 - Main Road 
From a point 43 metres or thereby westwards of its junction with the private property
known as Altbeag eastwards to a point 202 metres or thereby eastwards of its junction
with the C449 Main Road, a distance of 1671 metres or thereby.” 
8. After PART I of the SCHEDULE, 24 FORGANDENNY, insert the following:- 
“24A  FORNETH 
A923 – Main Road 
From a point 101 metres or thereby southeastwards of its junction with the private
access to the property known as 7 Williamson Cottage, northwestwards to a point 187
metres or thereby northwestwards of its junction with the private access road to the
private property known as Craigellachie, a distance of 430 metres or thereby.”   
9. After PART I of the SCHEDULE, 27 GLENFARG, delete the existing and substitute with:- 
“27  GLENFARG
(a) B996 Main Street
From a point 598 metres or thereby, southwards of its junction with Ladeside
northwards to a point 427 metres or thereby north of its junction with Greenbank
Road, a distance of 1295 metres or thereby. 
(b) C414 Glenfarg – Newhill Road
From a point 54 metres or threby southwest of its junction with Melville Terrace
westards for a distance of 92 metres or thereby. 
(c) C420 Glenfarg – Milnathort Road
(i) From a point 180 metres or thereby northwards of its junction with U66
Glendy Mill – Duncrievie Road northwards for a distance of 374 metres or
thereby; 
(ii) From a point 325 metres or thereby southwards of its junction with U66
Glendy Mill – Duncrievie Road southwards for a distance of 888 metres or
thereby; 
(iii) From a point 105 metres or thereby northwards of its junction with U228
Middleton – Bankhead Road southwards for a distance of 520 metres or
thereby. 
(d) C499 Newhill – Milnathort Road
From a point 193 metres or thereby northwards of its junction with U228
Middleton – Bankhead Road southwards then southwestwards for a distance of
376 metres or thereby. 
(e)  U228 Middleton – Bankhead Road
From its junction with C420 Glenfarg – Milnathort Road northwestwards to its
junction with C499 Glenfarg – Milnathort Road, a distance of 979 metres of
thereby. 
(f) U66 Newhill – Duncrievie Road
From a point 250 metres or thereby northeastwards from of its junction with C414
Glenfarg – Newhill Road eastwards then southeastwards to a point 40 metres
westwards of the junction with C420 Glenfarg – Milnathort Road, a distance of
904 metres or thereby.” 
10. After PART I of the SCHEDULE, 32 KILLIECRANKIE, insert the following:- 
“32A  KINLOCH
(a) A923 – Main Road
Page 33 of 118

Page 34

From a point 189 metres or thereby westwards of its junction with the private
access to the property known as Ardlinn, eastwards to a point 90 metres or
thereby, eastwards of its junction with C433 Place Road, a distance of 1122
metres or thereby. 
(b) U115 
From its junction with A923 Main Road northwestwards to a point 145 metres or
thereby northwestwards of its junction with the A923 Main Road, a distance of
145 metres or thereby. 
(c) C433 Place Road 
From its junction with A923 Main Road southwards to its junction with B947, a
distance of 926 metres or thereby.” 
11. At PART I of the SCHEDULE, 36 KIRKMICHAEL, delete the existing and substitute with:- 
“36  KIRKMICHAEL 
(a) A924 – Pitlochry – Kirkmichael – Bridge of Cally Road 
From a point 926 metres or thereby southeast of the junction of the Pitlochry –
Kirkmichael – Bridge of Cally with the bridge over the River Ardle northwestwards
for a distance of 1130 metres or thereby. 
(b) B950 Kirkmichael – A93 Road 
From its junction with the A924 Pitlochry – Kirkmichael – Bridge of Cally Road,
southeastwards for a distance of 384 metres or thereby.” 
12. After PART I of the SCHEDULE, 36 KIRKMICHAEL, insert the following:- 
“36A  LAWERS
A827 Logierait – Aberfeldy – Killin Road 
From a point 140 metres or thereby southwestwards of its junction with the private
access to the property known as Loch Tay View northwards to a point 61 metres or
thereby northeastwards of its junction with the private access road to the property
known as Machuin Farm, a distance of 931 metres or thereby.” 
13. After PART I of the SCHEDULE, 52 WOODSIDE/BURRELTON, insert the following:- 
“53  WESTER BALGEDIE
(a) A911 Milnathort – Scotlandwell – Glentrothes Road
From a point 157 metres or thereby westwards of its junction with Stan-Ma-Lane
eastwards then southeastwards to a point 25 metres or thereby southeastwards
of its junction with U243, a distance of 594 metres or thereby. 
(b) B919 Wester Balgedie – Glenfarg Road
From its junction with the A911 northwestwards to a point 200 metres or thereby
northwestwards of its junction with the A911, a distance of 200 metres or thereby. 
(c) Loch Leven Court
From its junction with Stan-Ma-Lane southwards for its entire length,a distance
of 44 metres or thereby. 
(d) Queens View
From its junction with Stan-Ma-Lane southwestwards for its entire length,a
distance of 123 metres or thereby. 
(e) Stan-Ma-Lane
From its junction with A911 southwards for its entire length,a distance of 77
metres or thereby.” 
Page 34 of 118

Page 35

Council reasons 
The Council wish to make permanent the 30mph speed limits introduced under the Council’s Spaces
for People project in the Perth and Kinross area for the safety of all road users. 
Page 35 of 118

Page 36

FB
Roadmans
Arnot Lint
Track
Drain
LB
Rowan Tree
145.2m
131.7m
Auchmuirbridge
Arnot
BridgendHeatherbank
109.9m
Cottage
Hillsdale
The Coach House
132.2m
123.8m
1
Ingleside House
Stone
Stone
Stone
Arnot Burn
Auchmuir
Cottages
Cottage
Stone
117.1m
Arnot Mill
House
114.6m
Cottages
Stone
Stone
Stone
109.7m
Auchmuir Bridge
GP
Ingleside Cottage
2
108.6m
116.7m
A 911
Stone
Stone
Stones
Enerly Burn
Auchmuirbridge
A3
Communities
NORTH
Executive Director - B.Renton BA Hons
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
30mph 2023
NTS
 
Proposed Traffic Regulation Order
Perth & Kinross Council (Restricted
Roads) (Variation) (No 38) Order 202x
Legal 1
Auchmuirbridge
 
(Ward 8)
MS
29/04/2023
MW
BW
01
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
Site Location
LEGEND:
Proposed 30mph Speed Limit
NORTH
Page 36 of 118

Page 37

Sinks
The Cottage
Issues
Red House
Rhiannan
El Sub Sta
Drain
School House
House
Sinks
Ballintuim
Pond
Tank
Caravan Park
Issues
Ballintuim
Issues
Hall
Issues
Sinks
The Gate House
Kirkview
Shingle
Sinks
Issues
Birklea
Ballintuim Farm
BALLINTUIM
River Ardle
River Ardle
River Ardle
A924
A3
NORTH
Executive Director - B.Renton BA Hons
NORTH
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable
you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third parties in any form.
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable
you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third parties in any form.
Site Location
Communities
30mph 2023
NTS
 
Proposed Traffic Regulation Order
Perth & Kinross Council (Restricted
Roads) (Variation) (No 38) Order 202x
Legal 13
A924 Ballintuim, Blairgowrie
(Ward 3)
MS
02/05/2023
CC
BW
13
LEGEND:
Proposed 30mph Speed Limit
Page 37 of 118

Page 38

A923
Ford
Playing Field
1
Issues
BUTTERSTONE
NORTH
Executive Director - B.Renton BA Hons
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the organisation that provided
you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
Communities
30mph 2023
NTS
 
Proposed Traffic Regulation Order
Perth & Kinross Council (Restricted
Roads) (Variation) (No 38) Order 202x
Legal 2
 
Butterstone
(Ward 5)
MS
29/04/2023
MW
BW
NORTH
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
Site Location
LEGEND:
Proposed 30mph Speed Limit
02
Page 38 of 118

Page 39

5
Tign an Allt
South Queich
House
Glenquie
Drain
A91
Trough
Tom Thumb
Track
LB
1
6
4
Wilbet
Townhead
Haugh
Croit Oran
Fraoch
Pavilion
The
Viewfield
1 West End
173.1m
Well
Hallhill
Cottage
161.5m
Rosebank
176.2m
Cottage
Machrie Cottage
School House
Shingle
BowlingGreen
Pow Burn
Track
4
A91
Larch
Pinewood
Honeysuckle Cottage
Shingle
PITCAIRNIE LANE
South Queich
Drain
Bridge Cottage
Track
Church Mouse
Cottage
Askival
Boorach Beg
Carnbo
Blairbeg
2 West End
Farmhouse
1
Ashfield
3
August House
FB
Tank
Grace
Drain
163.4m
South Queich
Well
Carnbo
A91
A91
A91
A3
Communities
NORTH
Executive Director - B.Renton BA Hons
NORTH
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
Site Location
LEGEND:
Proposed 30mph Speed Limit
30mph 2023
NTS
 
Proposed Traffic Regulation Order
Perth & Kinross Council (Restricted
Roads) (Variation) (No 38) Order 202x
Legal 3
 
Carnbo
(Ward 8)
MS
29/04/2023
MW
BW
03
Page 39 of 118

Page 40

Sinks
Plashburn
Issues
Path
Issues
Sinks
Moredun Elms
Auchraw
Craigend Cottages
Issues
32.3m
Air Shaft
21.0m
The Roundel
House
Kirkton of MaillerFarm Cottages
Kirkton of Mailler
Farm
6
Balcassie
Issues
Redcroft
FairfieldDungaval
Vermont
Stone
0.75
Issues
Issues
SB
A 
912
Track
Ruin
Priest's Croft
1
Track
The Orchard
2
38.4m
15.2m
Whinnyloan
Graveyard
41.8m
The Roundel
S Br
47.2m
1
47.2m
Sinks 35.7m
Hilton Junction
Craigend
15.8m
12.2m
Woodlands House
Track
Spring
MP
Farm Cottages
Kirkton of Mailler
5
SpringfieldCaiplie
Pilgrims Gate
Kirklands
Pond
Sinks
Issues
Monk Hill
FB
Lay-by
The Cottage
ETL
Old Hilton
Southbank
U55
KIRKTON OF MAILER ROAD
CRAIGEND
A3
Communities
NORTH
Executive Director - B.Renton BA Hons
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
30mph 2023
NTS
 
Proposed Traffic Regulation Order
Perth & Kinross Council (Restricted
Roads) (Variation) (No 38) Order 202x
Legal 4
U55 Kirkton of Mailer Road, Craigend
(Ward 9)
MS
29/04/2023
MW
BW
04
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
NORTH
LEGEND:
Proposed 30mph Speed Limit
Site Location
Page 40 of 118

Page 41

144.7m
A 
911
New Bungalow
159.5m
Sinks
Track
Track
DRYSIDE ROAD
Burnside House
Balgedie
146.7m
Sinks
150.3m
Easter
145.5m
Corrieway House
Track
148.5m
Colzie House
House
Balneathal
LB
146.5m
143.4m
Cottage
Issues
Balgedie
Well
Barley Riggs
Burnside
Lodge
Farm Cottage
Easter Balgedie
164.3m
Drovers Way
FarmHouse
Old
Pond
Balneathill
House
Dryside House
Drummond House
Easter BalgedieA 911
A 911
A3
Communities
NORTH
Executive Director - B.Renton BA Hons
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
30mph 2023
NTS
 
Proposed Traffic Regulation Order
Perth & Kinross Council (Restricted
Roads) (Variation) (No 38) Order 202x
Legal 5
Easter Balgedie
(Ward 8)
MS
29/04/2023
MW
BW
05
NORTH
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
Site Location
LEGEND:
Proposed 30mph Speed Limit
Page 41 of 118

Page 42

Boat
Track
Altbeag
Cattle Grid
Elm
Dam
Boreland Farm Cottage
Boreland
Maple Cottage
Heather Cottage
Timbers
Cup Marked Rocks
Drummond Hill
Tomdarroch
Fearnan Cottage
Tighna Choille
Tirnan Og
Wester Drummond
El Sub Sta
Log House
The
Robins Rye
Decronjer
7
Dunaird
Beulah
11
Stag
3
Ard
Birchwood
Cottage
Tigh-na-Clachan
Font
CREAGACH
The Old
Post
13
TIGH
NA
LOAN
Jetty
Hall
Trough
Hawthorn
Cottage
Tigh
Bruaich
Cattle
5
4
Cottage
1
Ealasaid
Track
DALCHIARAN
Fearnan
Oakbank
Briar Cottage
Cala Sona
Thistle
White Cottage
Dalmore
Drain
Ach na Creag
Briar Croft
My Ben
Cottage
Clach na Tuire
Rose Cottage
Creagan
Jetties
Kilcairon
Appin Villa
An Teallach
Croft an Ailein
1
Spreads
Mullach Beag
Tigh Na Drochaid
Play Area
1
Pond
Drummond
Moruisg
Shingle
Jetty
View
Issues
Boreland Farm
Drain
Grid
Clach-na-Cruich
Pond
Drain
Issues
Ciaran Cottage
Track
Slipways
Lea
Braeside
10
Issues
Rhiannon
6
Schiehallion
Am Fasgadh
Bracken
1
Cottage
Jetty
Grey
6
Alligan
Meall Daraich
Drain
LB
TAY
House
Croft Cottage
Silcroft
The Boat House
Cottage
L O C H   T a y
Boat House
Rye
Cottage
36
an Tuirc
Taigh Uilltanach
Beech
Bunkhouse
Cedar Cottage
FB Tigh air Bruachan
Linden
Fairwinds
Taigh
Lismore
Rock Cottage
Katie Howie's
Grassways
Lawers View
Office
SEALLADH
War Meml
Graveyard
Cattle
16
Pier View
17
The Croft
15
Grid
13
9
A 827
Letterellan
Springbank
Invertay
Fern
A827 MAIN ROAD
MS
Tom na Voulin
Cup Marked Stone
Honeyway
Workings
(dis)
Inglewood
Cottage
The Old Schoolhouse
Landing Stage
30
Landing Stage
Clach
FEARNAN
LOCH TAY
C449  
MAIN 
ROAD
C449  MAIN ROAD
A 827
A3
NORTH
Executive Director - B.Renton BA Hons
NORTH
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable
you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third parties in any form.
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
Site Location Communities
30mph 2023
NTS
 
Proposed Traffic Regulation Order
Perth & Kinross Council (Restricted
Roads) (Variation) (No 38) Order 202x
Legal 6
Fearnan
(Ward 4)
MS
29/04/2023
CL
BW
06
LEGEND:
Proposed 30mph Speed Limit
Page 42 of 118

Page 43

FB
Weir
Pond
Gaugerhall
Issues
66.1m
Burnside
Cottage
Drain
Sinks
Mill of Forneth
Sinks
Track
A923
Lunan Cottage
Aultmore
Lunan Burn
82.0m
Pond
Issues
Williamson
Cottage
FORNETH
7
CraigellachieA923
NORTH
Executive Director - B.Renton BA Hons
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
NORTH
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
Communities
Site Location
LEGEND:
Proposed 30mph Speed Limit
30mph 2023
NTS
 
Proposed Traffic Regulation Order
Perth & Kinross Council (Restricted
Roads) (Variation) (No 38) Order 202x
Legal 7
Forneth
(Ward 5)
MS
29/04/2023
CL
BW
07
Page 43 of 118

Page 44

Rowan
2
Robertsons
Cottage
Lyndhurst
Mast
Edenhead Cottage
Billrena
Weston Cott
17
Beechwood
Cottage
23
29
14
1
2
79
22
7
Braeriach
Larchgrove
BIRCH 
LANE
LADESIDE
146.3m
Rossdene
145.4m
Ochil
House
Courts
Craig Lomond
Allbro
Glenard
Laburnum
Cottage
Burnbank
Montaza
Bank
Glenview
Eden Mount
Car Park
DUNCRIEVIE 
ROAD
Cairn View
Woodbine
Cottage
Bramblebrae Quarry
B996
Sub Sta
Play Area
HILTON VIEW
Balancing
6
10
Bank
Cottage
12
11
14
Pond
Andamouca
Old 
Toll Cottage
Bon
Willowbank
Millruce
Bellview
Buildings
29
Works
Hawthorn 
Bank
Ashburn
Linnethy
Ardlui
5
10
4
1
17
1
20
8
21
15
4
2
8
5
15
Davaar
ASH GROVE
Cottage
Tennis
M 
90
Wallace Park
ELM
 
ROW
Broomhall
Shandea
Glenarn
Langfauld
(dis)
El Sub Sta
El
Gallow Hill
Robin
MAIN 
STREET
29
Path
Drain
Kinnaird
EDEN CRESCENT
17
B996
Glenfarg
M 
90
M 
90
Communities
NORTH
Executive Director - B.Renton BA Hons
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely
to enable you to respond to, or interact with, the organisation that provided you with the data. You are
not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
NORTH
Site Location
LEGEND:
Proposed 30mph Speed Limit
30mph 2023
NTS
 
Proposed Traffic Regulation Order
Perth & Kinross Council (Restricted
Roads) (Variation) (No 38) Order 202x
Legal 8
B996, Glenfarg
(Ward 8)
MS
29/04/2023
MW
BW
08
Page 44 of 118

Page 45

Track
Marlee House
Loch of Drumellie / Marlee Loch
Netherton of Kinloch
MARLEE LOCH
The Old Byre
Trenance 
Old School
Lochend Cottage
Spring
F8
Balcairn Farm Steading
Manloch
The Roundel
Balrigar
School House
Springfield House
Kinloch Hall
Wood Acre
Track
Track
Westview
Obelisk
Cottage
Kirkstyle
Path (um)
Church
Salem
Woodside
Cairn Laggan
Sinks
Boat House
Marlee House
Issues
Marlee Gardens
Marlee Home Farm
Marlee
Druidscroft
Tomb
11
Track
Loch of Drumellie 
/ Marlee Loch
PALACE 
RAOD
Southwood
Tank
Lochview
Mid Brae
Iona
Strawberryfield
Issues
LB
Manse
Pond
Ardlinn
Balcairn
Balcairn Farm
Kinloch
Rae Loch
Issues
Kinloch
Erisort
The Hoose
Easter Marlee
Willowburn Cottage
Boat House
Cistern
KINLOCH
MAIN ROAD
U115
PLACE
ROAD
A923
C433
Marlee Loch
Residents Association
B947
B947
A3
NORTH
Executive Director - B.Renton BA Hons
NORTH
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable
you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third parties in any form.
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable
you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third parties in any form.
Site Location
Communities
LEGEND:
Proposed 30mph Speed Limit
30mph 2023
NTS
 
Proposed Traffic Regulation Order
Perth & Kinross Council (Restricted
Roads) (Variation) (No 38) Order 202x
Legal 9
Kinloch, Blairgowrie
(Ward 3)
MS
29/04/2023
CL
BW
09
Page 45 of 118

Page 46

KIRKMICHAEL
B950
Croftmuir
Playing Field
Post Office
U93
A924
Memorial
Oakbank
Choc-sualtach
Laggon Fasgach
Croft of Dounie
A924
A3
NORTH
Executive Director - B.Renton BA Hons
NORTH
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable
you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third parties in any form.
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable
you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third parties in any form.
Site Location
Communities
LEGEND:
Proposed 30mph Speed Limit
30mph 2023
NTS
Proposed Traffic Regulation Order
Perth & Kinross Council (Restricted
Roads) (Variation) (No 38) Order 202x
Legal 10
A924 & B950 Kirkmichael, Blairgowrie
(Ward 3)
MS
29/04/2023
CC
BW
10
Page 46 of 118

Page 47

LAWERS
Ben Lawers Farm
A827
Ben Lawers House
Loch Tay View
Ben Lawers Hotel
Telephone Exchange
Lawers Outdoor Centre
Feletchers Croft
Waterfall House
Camereach
The Toll House
Lawers Mill
Smithy
Lower Duallin
Easter Croftintygan
LOCH TAY
A3
NORTH
Executive Director - B.Renton BA Hons
NORTH
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable
you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third parties in any form.
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable
you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to
copy, sub-licence, distribute or sell any of this data to third parties in any form.
Site Location
Communities
30mph 2023
NTS
Proposed Traffic Regulation Order
Perth & Kinross Council (Restricted
Roads) (Variation) (No 38) Order 202x
Legal 11
Lawers
(Ward 4)
MS
29/04/2023
CC
BW
11
LEGEND:
Proposed 30mph Speed Limit
Page 47 of 118

Page 48

Track
Tank
Carsehall
Issues
Levenbank
Cottage
Balgedie
1 to 12
The
148.1m
137.9m
Aonach
Benarty
Carlinmaggie
Pump House
Shelter
Balgedie Toll128.4m
Ashtrees
B 
919
A 911
Track
136.9m
Tank
B 
919
Kantama
Brooms
Sinks
LB
Cottage
169.6m
150.6m
(PH)
DRYSIDE 
Kinduli
Al-na-Craig
171.3m
Lochlands
The
Issues
Meadow
168.4m
LANE
Duneasbuig
Cottage
Pine
Carsehall Farm
144.2m
Mor Home Cottage
Leven
136.3m
Channel Farm
Broadwell
Lomond House
The
Levenview
Meikle
Bishopton
1
Wester Balgedie
133.4m
5
Cottage
Castleview
Tavern
A 911
LB
Roundyard
173.8m
171.6m
137.5m
Braemore
1
Langskaill
Glendaroch
4
Bramhope House
7
2
Glenhaven
Cnoc an Fraoich
6
8 5
4 5
Almondbank
3
6
2
163.1m
1
Stan-ma-lane
House
Spring
Balgedie Mews
Balgedie Court
Fernbrae
Boherduff
Pittendreich
Villa
1
Terrace
Wester Balgedie
2
1
2
Cottage
Rainbows
Drunzie
Drain
Glenlomond
Cottages
End
Cott
Iona Cottage
Farm
Hillside House
Langayre
Cabarfeidh
Levenbank
Gate Lodge
166.9m
Carsehall Cottage
Ashtrees Cottage
The Ross House
Cottage
Muir
Farm
Pittendreich
Garden
Lodge
Orchard
View
The
Croft
ESS
Track
6
QUEENS VIEW
Springfield Farm
Track
LOCHLEVEN COURT
STAN MA
Ivy
Farm
Sinks
Shanthi
Lomond
Track
Drain
Lime Trees House
Glenlomond House
Bishops
Court
Path 
(um
)
B 919
A 911
A 911
Glenlomond
ROAD 
U243Wester Balgedie
U243
Communities
NORTH
Executive Director - B.Renton BA Hons
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely
to enable you to respond to, or interact with, the organisation that provided you with the data. You are
not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
NORTH
30mph 2023
NTS
 
Proposed Traffic Regulation Order
Perth & Kinross Council (Restricted
Roads) (Variation) (No 38) Order 202x
Legal 12
Wester Balgedie & Glenlomond, Kinross
(Ward 8)
MS
29/04/2023
CL
BW
Site Location
LEGEND:
Proposed 30mph Speed Limit
© Crown copyright [and database rights] 2023 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form. 12
Page 48 of 118

Page 49

1
Blair Watt
From: Blair Watt
Sent: 13 July 2023 08:55
To: gilliankeracher@icloud.com
Cc: Bridget Mitchell; Daryl McKeown
Subject: RE: Restricted roads no 202X
Dear Gillian, 
Thank you for your comments regarding the proposed 30mph Speed Limit amendments in Kinloch and please accept
my sincere apologies for the delay in responding you. 
It is proposed to amend the speed limit to 30mph to improve compliance. Given the road width, alignment and the
limited frontage development at Kinloch, we do not believe that the 20mph is the most appropriate speed
restricƟons. Seƫng the speed limit unrealisƟcally low in Kinloch has led to poor compliance. If vehicle speeds come
down, or there is further development in Kinloch, we can consider lowering the speed limit further. 
Can you please confirm if you wish to withdraw or maintain your objecƟon to the Traffic RegulaƟon Order by Friday
21 July 2023 ? If you maintain your objecƟon, we are required to report to the appropriate Council CommiƩee to
seek a decision on how to proceed.   
If you require any further informaƟon, please don't hesitate to contact me. 
Kind Regards
Blair WaƩ | Project Officer
Road Safety | Traffic and Network | Housing and Environment Perth & Kinross Council, Pullar House, 35 Kinnoull
Street, Perth, PH1 5GD
Phone: 01738 476944 Mobile: 07827 357105 Email: bwaƩ@pkc.gov.uk 
-----Original Message-----
From: CDS Legal Sevices <LegalServices@pkc.gov.uk> 
Sent: Monday, June 12, 2023 11:08 AM
To: Blair WaƩ <BWaƩ@pkc.gov.uk>
Cc: Faye Wilson <FWilson@pkc.gov.uk>
Subject: FW: Restricted roads no 202X 
Hi Blair, this came into our generic email - I understand you would deal with these. 
Many thanks.
Fiona 
-----Original Message-----
From: Gillian Keracher <gilliankeracher@icloud.com> 
Sent: Monday, June 12, 2023 8:09 AM
To: CDS Legal Sevices <LegalServices@pkc.gov.uk>
Subject: Restricted roads no 202X 
CAUTION: This email originated from an external organisaƟon. Do not follow guidance, click links, or open
aƩachments unless you have verified the sender and know the content is safe. 
APPENDIX 2 6
Page 49 of 118

Page 50

2
As a resident of Marlee loch residenƟal park ,Kinloch, ( where there are over 100 elderly residents)I would like to
formally complain about the proposed 30 mph speed limit,, it’s at 20 mph just now and it does nothing to keep
vehicles from speeding ,, there is no path for pedestrians walking/cycling into town and only 2 buses per day ,, there
are many blind corners ,, it’s very dangerous and frightening even with the 20 limit because very few drivers sƟck to
it ,, if it was to rise to 30 then drivers will go even faster ,, I have had 2 of my cats run over on this road , 1 died and 1
had a leg amputated and I know I’m not the only person to lose a cat here,, I know of many others who don’t let
their cats out because of it, We want more traffic calming here not raised speed limits, many residents are
considering moving because of the dangerous road Regards Gillian Keracher
27 Marlee Gardens, Marlee loch residenƟal park,Kinloch, Blairgowrie ,PH106SD Sent from my iPhone
Page 50 of 118

Page 51

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure & Economic Development Committee 
20 September 2023 
DEVELOPER CONTRIBUTIONS AND AFFORDABLE HOUSING
SUPPLEMENTARY GUIDANCE UPDATES 
Report by Head of Planning and Development 
(Report No. 23/259) 
1. PURPOSE 
1.1 This report is presented to the Environment, Infrastructure & Economic
Development Committee, as agreed at its meeting on 31 May 2023 (Report
No. 23/170), to update on the proposed changes to the adopted Developer
Contributions and Affordable Housing Supplementary Guidance (DC&AH SG)
2020. 
1.2 At its meeting on the 31 May, the Committee approved the recommended
updates to the DC&AH SG (2020) and to initiate a period of public
consultation on those updates. This report provides a summary of the
responses collected from that consultation, and any further changes that have
been made to the DC&AH SG (2023) since it was last reported to Committee. 
1.3 The DC&AH SG is required to support Policy 5 (Infrastructure Contributions)
and Policy 20 (Affordable Housing) of the adopted Local Development Plan 2
(2019) (LDP2). The current iteration of the DC&AH SG was approved by the
Council’s Strategic Policy and Resources Committee on 29 January 2020
(Report No. 20/25), and subsequently approved by Scottish Ministers and
adopted as statutory supplementary guidance. 
1.4 A copy of the DC&AH SG (2023) document, including any changes made as a
result of feedback from the recent period of public consultation, is appended
to this report (Appendix 1). 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
i) notes the responses gathered from the period of public consultation
between 9 June 2023 to 4 August 2023 and any changes made to the
draft Supplementary Guidance as a result of comments received. 
ii) remits the Executive Director (Communities) to finalise the
Supplementary Guidance, and to submit to Scottish Ministers, and to
issue the adopted Supplementary Guidance following Ministerial
consideration. 
7
Page 51 of 118

Page 52

3 STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background
• Section 5: Public Consultation 
• Section 6: Conclusion 
• Appendices 
4. BACKGROUND 
4.1  The Developer Contributions and Affordable Housing Supplementary
Guidance (DC&AH SG) includes the legal and policy background for
developer contributions to mitigate the impact of consented new development,
and details the Council’s Affordable Housing requirement. It provides
guidance relating to developer contributions for Primary Education, the
Auchterarder A9 Junction Improvements, and Transport Infrastructure around
Perth. 
4.2 Developer contributions can either be physical delivery on site or through a
financial payment. Developer contributions will only be sought where they
meet the tests of Scottish Government Circular 3/2012: Planning Obligations
and Good Neighbour Agreements. In order to support the LDP2 policy
implementation, the Council developed this statutory Supplementary
Guidance which has been updated and was presented to the Committee on
31 May 2023 (Report No. 23/170 refers). 
4.3 The DC&AH SG (2023) will remain within the policy framework of the adopted
statutory Local Development Plan 2 (2019), with future policy changes being
considered as part of the Council’s development plan review for Local
Development Plan 3. 
5. PUBLIC CONSULTATION 
Summary 
5.1 Following Committee approval on 31 May 2023, an 8-week period of public
consultation was initiated on Friday 9 June, concluding on Friday 4 August. 
5.2 The consultation was hosted on the Consultation Hub online platform and was
promoted via the Council’s corporate social media accounts. Consultation
documents published online for interested stakeholders included: the draft
DC&AH SG (2023) documents, a summary of key changes, Strategic
Environmental Assessment (SEA) Screening documents, and links to other
relevant documents such as the adopted Supplementary Guidance, Local
Development Plan, and Local Housing Strategy. Hard copies of the draft
DC&AH SG (2023) and SEA Screening documents were also provided at
Pullar House reception; a requirement of the SEA Regulations. 
Page 52 of 118

Page 53

5.3 Feedback on the DC&AH SG (2023) was gathered using a questionnaire. A
copy of the Consultation Hub questionnaire is appended to this report
(Appendix 2).   
5.4 The Consultation Hub collected six responses. One further response was
submitted to officers via email, and this has been accepted. Responses were
submitted by: the development sector (4), community groups (2), and
anonymous (1). 
5.5 An overview of the public consultation process and responses were presented
to the Affordable Housing Member Officer Working Group (MOWG) on 14
August 2023.  The MOWG discussion has informed the amendments set out
below. 
5.6 The following section of the report considers the draft guidance, the
comments that were received through the public consultation, and the
changes made to the guidance, where considered appropriate. 
Summary of Responses 
5.7 A summary of the consultation comments, with officers’ responses, is
appended to this report (Appendix 3). Some themes raised in the consultation
comments are: 
• Primary Education: comment on existing 80% capacity trigger for
contributions,
• Transport: clarification on the new point regarding LDP2 Site MU70
Perth West (Paragraph 6.5),
• Transport: comment on general basis of the Transport Infrastructure
contribution requirement,
• Affordable Housing: availability and delivery, 
• Affordable Housing: comments in support of retaining the existing
credits system,
• Affordable Housing: comments regarding flexibility on the 25%
minimum provision requirement to respond to viability concerns and
local needs,
• General: comment suggesting better clarity on the intended adoption
process being undertaken by the Council, following the public
consultation.
Changes to Draft Guidance 
5.8 Officers have carefully considered the feedback received from the public
consultation and changes have been made to the draft Supplementary
Guidance document. Changes resulting from the consultation comments are
set out in full at Appendix 3 of this report. Other changes made to the
document by officers are highlighted as ‘tracked changes’ in Appendix 1, with
examples as follows.  
Page 53 of 118

Page 54

Part 1 – Developer Contributions 
5.8.1 This part of the Guidance is to be renamed “Part 1 – Policy Implementation
and Developer Contributions” to acknowledge the preliminary sections of the
document that apply to Part 1 and Part 2. 
Part 2 – Affordable Housing 
5.8.2 Deletion of the map of City Centre zone (Part 2 Paragraph 3.3) as this is already
shown at Appendix 4. 
5.8.3 In line with the existing process, text is added at paragraph 3.9.3 of the DC&AH
SG (2023) to reinstate guidance from the adopted DC&AH SG (2020) which
confirms that revised commuted sum rates will be published on the Perth and
Kinross Council website. 
Next Steps 
5.9 The next step in the process of adopting the Supplementary Guidance is to
submit the revised guidance to Scottish Ministers, which is necessary for the
guidance to retain its statutory status.  If approved, the proposed changes
would then take effect legally. 
5.10 Prior to its adoption, the DC&AH SG (2023) will be formatted in a style in
keeping with the Council’s other Supplementary Guidance documents for
publishing online. 
5.11 Officers in the project team will continue to engage with community groups,
the development sector, and other stakeholders through the preparation of
other key documents, policies, and strategies, such as the local development
plan review. 
6. CONCLUSION   
6.1 This report provides an overview of the recent public consultation on the draft
Developer Contributions and Affordable Housing Supplementary Guidance
(2023), and the outcomes of that consultation. 
6.2 As reported in May 2023, the guidance is to remain within the policy
framework of the adopted statutory Local Development Plan 2 (2019), with
future policy changes being considered as part of the Council’s development
plan review for Local Development Plan 3. 
6.3 It is recommended that the Committee agree the proposed guidance
(Appendix 1) and proceed to submission to Scottish Ministers. 
Page 54 of 118

Page 55

Author
Name  Designation Contact Details
Lucy Sumner  Development
Contributions
Officer
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities)
7 September 2023 
APPENDICES 
• Appendix 1 – Draft Developer Contributions and Affordable Housing
Supplementary Guidance (Parts 1 and 2)
• Appendix 2 – Copy of Consultation Hub questionnaire 
• Appendix 3 – Summary of comments and changes   
Page 55 of 118

Page 56

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce No
Asset Management (land, property, IST) No
Assessments  
Equality Impact Assessment No
Strategic Environmental Assessment No
Sustainability (community, economic, environmental) Yes
Legal and Governance  Yes
Risk No
Consultation 
Internal  Yes
External  Yes - required
Communication 
Communications Plan  No 
The Impact & Value Assessment (IVA) has been designed to screen every 
Council project, strategy or proposal against statutory and non-statutory 
environmental, social and economic requirements. It has replaced the 
previous existing Integrated Appraisal Toolkit (IAT). 
DC&AH SG 2023 Impact & Value Assessment Report 
DC&AH SG updates - Committee Annex Checklist
DC&AH SG updates - Impact Assessments
DC&AH SG updates - Strategic & Resource Implications 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This report supports the following priorities within the Community Plan 2022-
27:
(i) Mental and physical wellbeing
(ii) Skills, learning and development  
Page 56 of 118

Page 57

Corporate Plan 
1.2 This report supports the objectives within the draft new Corporate Plan:
(i) Children and young people grow up safe, respected, well-educated,  
and confident in their ability to realise their full potential; 
(ii) People and businesses are increasingly able to prosper in a local 
economy which support low carbon ambitions and offers opportunities  
for all; 
(iii) People can achieve their best physical and mental health and have 
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially    
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of 
climate and environmental change for this and future generations. 
2. Resource Implications 
Financial 
2.1 The subject of this report does not introduce new commitments for revenue or
capital funding. The subject of this report does not require revenue or capital
funding. Any income ingathered via payment of developer contributions and
affordable housing commuted sums is a financial consideration, however the
use of these funds is clearly defined in the relevant Local Development Plan
policies, in the supplementary guidance, and in legal agreements, where
applicable. 
2.2 The Head of Finance must be consulted on all proposals with financial
implications.  No report with such implications should be presented at a
meeting when this has not been done and it should be explicitly stated that
the Head of Finance has been consulted and has indicated agreement with
the proposals. 
Workforce 
2.3 There are no workforce implications resulting from this report. The Corporate
Human Resources Manager must be consulted on all proposals with
workforce implications.  No report with such implications should be presented
at a meeting when this has not been done and it should be explicitly stated
that the Corporate Human Resources Manager has been consulted, and has
indicated agreement with the proposals.  
Page 57 of 118

Page 58

Asset Management (land, property, IT) 
2.4 There are no asset management implications resulting from this report. The
Director (Environment) must be consulted on all proposals with land and
property implications.  No report with such implications should be presented at
a meeting when this has not been done and it should be explicitly stated that
the Director (Environment) has been consulted, and has indicated agreement
with the proposals. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. The proposals have been considered under the
Corporate Equalities Impact Assessment process (EqIA) and have been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment (SEA) 
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. A Screening Report has been provided to SEA Gateway. Having
consulted the three consultation authorities and having considered the criteria
set out in the Act, the Council considers that the Developer Contributions and
Affordable Housing Supplementary Guidance (2023) is unlikely to have
significant environmental effects. The relevant policy has been subject to
assessment through the SEA of the Local Development Plan 2 (2019) so
significant environmental effects as a result of the guidance that have not
already been assessed elsewhere are unlikely. The Council has therefore
determined that SEA is not required. 
230130 SEA screening DC&AH SG.docx 
Sustainability 
3.3 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
Page 58 of 118

Page 59

• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
The proposals have been assessed against the Council’s Principles for
Sustainable Development. 
Legal and Governance 
3.4 The Developer Contributions and Affordable Housing Supplementary
Guidance is in place to support the policies contained within Local
Development Plan 2 (2019), which forms part of the statutory development
plan set by Town and Country Planning (Scotland) Act 1997 (as amended). 
3.5 The Supplementary Guidance allows Perth and Kinross Council to enter into
legal agreements with applicants/developers to secure the future payment or
delivery of the types of contributions set out in the Guidance. It is important to
review and update the Supplementary Guidance to ensure legal agreements
reflect the appropriate level of and requirements for contributions. The Head
of Legal and Governance Services has been consulted on the implications
and terms of this report. 
3.6  The Head of Legal and Governance must be consulted on all proposals with
legal implications.  No report with such implications should be presented at a
meeting when this has not been done and it should be explicitly stated that
the Head of Legal and Governance has been consulted. 
Risk 
3.7 As the proposals outlined in this report represent an update to existing
guidance already adopted by the Council, risk has been deemed low.  There
is an element of reputational risk when conducting public consultation. The
proposals have been assessed for any implications within the corporate risk
management process, and also the controls required to mitigate those risks. 
4. Consultation 
Internal 
4.1 Officers from the following teams/ services have been consulted in the
preparation of this report: Legal and Governance, Education and Children’s
Services (Resources), Roads Infrastructure, Corporate and Democratic
Services (Accountancy), and Planning and Housing Strategy; Development
Plans, Housing Strategy and Transportation and Development. 
External 
4.2 This report acknowledges and summarises the responses received to the
recent public consultation which were received from external stakeholders. 
Page 59 of 118

Page 60

5. Communication 
5.1 The project team are contactable mainly via Teams (for internal stakeholders)
or email and telephone. Any enquiries relating to the DC&AH SG should be
directed to the project team in the first instance. 
5.2 The Council’s webpages for Developer Contributions and Affordable Housing 
have been updated since the public consultation closed advising stakeholders 
on the next steps of the adoption process. Further updates on progress will be 
published here, where necessary. 
2. BACKGROUND PAPERS 
2.1 This section should list the documents that have been relied on in preparing
the report, other than those committee reports already referenced within the
main body of the report.  All documents must be kept available by the author
for inspection by the public for four years from the date of the meeting at
which the report is presented. 
Page 60 of 118

Page 61

Draft Developer Contributions and
Affordable Housing Supplementary
Guidance (2023)
[Finalised Draft] 
Part 1: Policy Implementation and
Developer Contributions  
APPENDIX 1
7
Page 61 of 118

Page 62

2 
Contents 
1. Introduction 
2. Legal and policy background       3 
3. Implementation        4 
4. Primary Education Requirements       9 
5. Auchterarder A9 Junction Improvements     12 
6. Transport Infrastructure       13 
Contact information        26   
Appendices  
Appendix 1 - Education Requirements 18  
Appendix 2 - Auchterarder A9 Junction Improvements Area 20  
Appendix 3 - Transport Infrastructure Contribution Area 21  
Appendix 4 - Perth City Centre Zone 22  
Appendix 5 - Application of the Supplementary Guidance to  
Planning Applications             23
Appendix 6 - Gross Internal Area Definitions 25   
Please see ‘Part 2: Affordable Housing’ for further guidance on affordable housing
requirements. 
Page 62 of 118

Page 63

3 
1.  Introduction 
1.1 Across Scotland, local authorities are having difficulty maintaining and
developing infrastructure in order to keep up with the pressures of new
development. Additional funding sources beyond that of the local authority are
required to ensure that infrastructure constraints do not inhibit sustainable
economic growth. This has been a particular issue in Perth and Kinross where
the population grew by 5.3% in the period 2001- 2007. This growth is set to
continue with the National Records of Scotland (NRS) population projections
indicating that the Perth and Kinross population will increase by 4.5% (6,788
persons) for the period 2016-2026. This exceeds the national average of 3.2%
and is the eighth highest growth projection in Scotland. 
1.2 The increasing population has already placed heavy demands on public sector
services and infrastructure capacity. If the population is to rise as the NRS
projects, this will have an increasing impact on schools, community and leisure
facilities, transport infrastructure and health services. It is unlikely that the
growth projected for Perth and Kinross will be evenly spread across the Council
area, placing an even higher demand for services and infrastructure in some
already constrained areas. This will present significant challenges for the Perth
& Kinross Council (“the Council”) and its Community Planning partners. 
1.3 The sustainable development of Perth and Kinross requires the provision of
services in appropriate locations to meet the increasing needs of the expanding
population. As a result, new investment in infrastructure will be required to keep
pace with the increasing needs of an expanding population. Initial estimates
suggest that investment exceeding £300 million at current prices is required in
public sector infrastructure over the next 25 years in order to support this future
growth. Maintaining current assets already places a heavy burden on the
Council’s budgets, leaving limited resources for investment in increasing
infrastructure capacity. 
1.4 It is neither sustainable nor good planning to wait until capacity is used up and
then begin to recognise and address the problem. It will be necessary to
analyse current capacity and future demand making the solution the collective
responsibility of the Council and developers over the long term. This approach
is the most equitable, sharing the cost with all development which places new
demand on infrastructure capacity, rather than placing an uneconomic burden
on a limited number of developers in later years. 
1.5 With the population increase of Perth and Kinross driven by in-migration, largely
from other parts of the UK, a partnership approach is required between the
Council and developers to ensure infrastructure capacity is not to become a
major constraint on new development. 
1.6 Such partnerships have traditionally been facilitated through the use of Section
75 Planning Obligations which have become key mechanisms in the planning
system for addressing and for mitigating the impact of new development.
Although such obligations have been used to address specific issues arising
from individual applications, they can also be used as the vehicle for a
developer contribution policy which addresses the general issue of
infrastructural requirements and seeks to bring about a fairer sharing of
Formatted: Justified
Page 63 of 118

Page 64

4 
infrastructure costs. 
1.7 This Guidance concentrates on the delivery of developer contributions to
provide a means to secure contributions towards the provision of on-site
facilities necessary in the interests of comprehensive planning, and/or, the
provision, or improvement of, off-site facilities and infrastructure where existing
facilities or infrastructure will be placed under additional pressure. This
Guidance also provides advice and information on the application of the
affordable housing policy. 
1.8 This Guidance should be read in conjunction with Local Development Plan
Policy 5: Infrastructure Contributions and Policy 20: Affordable Housing. 
1.9 This dDraft Supplementary Guidance was approved by the Council’s
Environment, Infrastructure and Economic Development Committee for a period
of public consultation on 31 May 2023. Public consultation was carried out
between 9 June to 4 August 2023. It is proposed that, following that
consultation, it will be submitted to Scottish Ministers for consideration.
Following  consideration by Scottish Ministers, and the necessary adoption
procedures, the Supplementary Guidance will be adopted as statutory
supplementary guidance. 
2.  Legal and Policy Background 
2.1 The most widely used legislation for managing developer contributions is
Section 75 of the Town & Country Planning (Scotland) Act 1997 (as amended).
This section of the act states that: 
‘(1) A person may, in respect of land in the district of a planning authority-
(a) by agreement with that authority, or 
(b) unilaterally, 
Enter into an obligation (referred to in this section and in sections 75A to 75C
as a “planning obligation”) restricting or regulating the development or use of
the land, either permanently or during such period as may be specified in the
instrument by which the obligation is entered into (referred to in this section
and in those sections as the “relevant instrument”).’ 
2.2 The most recent Government advice on the use of Planning Obligations is
contained in Circular 3/2012: Planning Obligations and Good Neighbour
Agreements. Section 75 Planning Obligations enable local authorities to: 
● regulate the sequence of development proposals; 
● achieve off-site infrastructure provision; 
● control the use of land or the nature of an activity carried out thereon; 
● secure the provision of affordable housing; 
● obtain financial contributions towards services or facilities. 
2.3 In regard to financial contributions, Government advice states that: 
“… contributions towards public transport or community facilities may be
acceptable provided the requirements are directly related to the development
proposal and the need for them arises from its implementation.”
Formatted: Justified
Page 64 of 118

Page 65

5 
2.4 It is a legitimate planning objective to utilise Section 75 Planning Obligations to
achieve contributions towards the provision of services and facilities within
Perth and Kinross. However, current guidance makes it clear that Obligations
should only be sought where they are required to make a proposal acceptable
in land use planning terms and that the use of a planning condition is not
appropriate. Planning Conditions, including suspensive conditions, will be used
wherever possible. 
2.5 Planning Obligations will only be sought where they meet all of the tests of
Circular 3/2012: Planning Obligations and Good Neighbour Agreements: 
• necessary to make the proposed development acceptable in planning
terms;
• serve a planning purpose and, where it is possible to identify
infrastructure provision requirements in advance, should be relative to
development plans; 
• relate to the proposed development either as a direct consequence of
the development or arising from the cumulative impact of development
in the area; 
• fairly and reasonably relate in scale and kind to the proposed
development; 
• reasonable in all other respects. 
2.6 Affordable Housing 
2.7  The latest research by Perth & Kinross Council reinforces there is a continuing
need for affordable housing with significant and ongoing levels of unmet
affordable housing needs existing across Perth and Kinross, particularly in the
Greater Perth Housing Market Area (HMA). 
2.8  Affordable Housing guidance is now set out in Part 2 of this document, to be
read in conjunction with this Developer Contributions (Part 1) of the guidance. 
3.  Applying the Guidance 
3.1 The Supplementary Guidance is intended to provide developers in Perth and
Kinross with greater certainty of the contributions and affordable housing
requirement that will be sought in conjunction with planning applications. It will
also provide a more transparent, streamlined, practical, consistent, and
accountable approach to the negotiation of developer contributions and
affordable housing delivery. On a case by case, basis contributions may be
required from new development toward other areas of infrastructure, such as
green infrastructure or community facilities, not outlined in this Guidance. 
3.2 The following principles apply to the application of this Guidance: 
• The Guidance will be applied to sites identified in the adopted Local
Development Plan and planning applications; 
• The Guidance will not apply retrospectively to sites with full or ‘In Principle’
planning consent prior to each relevant section of the Guidance coming into
effect:; Affordable Housing (August 2005); Primary Education (May 2009);
Auchterarder A9 Junction (August 2009); Transport Infrastructure (April
2014);
Formatted: Justified
Page 65 of 118

Page 66

6 
• The Guidance will not be retrospectively applied to an application already
submitted prior to the Supplementary Guidance being adopted, unless
where:
(i) that would lead to an increased level in contributions being applied, or
(ii) a constraint has already been identified which may in the absence of this
Guidance have resulted in a recommendation of refusal. 
3.3 The Guidance will be applied to applications requiring the replacement or
refurbishment of a dwellinghouse in the following circumstances: 
• Where it has been vacant, and no Council Tax payments have been made
within the 7 year period prior to the registration of a planning application; 
• Where it is dilapidated or derelict and would need extensive work, requiring
planning consent, to become habitable. 
3.4 Non-residential buildings are considered to be ‘in use’ if Non-Domestic rates
have been paid in the 12 months prior to the submission of a planning
application. 
3.5 Where applications are submitted for the renewal of planning consent the
Guidance will be applied in accordance with Appendix 5. 
3.6 Where a new proposal replaces an existing development with planning consent
the assessment will normally be applied to the net additional development. If a
revised full planning application is submitted, or a full application which seeks to
alter the number of units specified in an ‘In Principle’ application which pre-
dated the Guidance, as defined in paragraph 3.2, if the application is for a
greater number of units then the Guidance will be applied to all net additional
units. If a revised full planning application is submitted which seeks to increase
the size of a non-residential use, the Guidance will apply to the additional Gross
Internal Area. Where an application is made to modify or discharge a planning
obligation or a Section 42 application to vary a condition, where the Core
Development remains unchanged then any revised Guidance introduced since
the original grant of planning consent will not normally be applied but each case
will be determined on its own merits.
3.7 The Guidance sets out a framework of standard charges and formulae which
form the basis for negotiating and securing Planning Obligations. However, in
the case of large and/or complex developments contributions may need to be
tailored to the particular scheme. This should make pre-application discussions
easier and speedier because developers will have greater certainty about how
much they will be expected to contribute. 
3.8 In the case of applications for ‘In Principle’ planning permission where the
development mix may not be known, a condition will be applied to any
permission indicating that this Supplementary Guidance will be applied at the
time of future applications. For larger proposals subject to a masterplan a
contribution requirement may be secured through a legal agreement at the ‘In
Principle’ stage to ensure certainty as the site progresses. 
3.9 Delayed payment of contributions and affordable housing may be secured
through a range of mechanisms as defined in Circular 3/2012 but will normally
Formatted: Justified
Page 66 of 118

Page 67

7 
be by means of a Section 75 Planning Obligation between the Council, the
landowner and any other relevant person(s). Such Planning Obligations will
need to be registered before planning permission can be issued. 
3.10 Where contributions and affordable housing commuted sums are to be paid
prior to planning consent being issued, this may remove the need for the use of
a Planning Obligation. Where a developer is unable to pay the contribution in
advance the Council will consider the phasing of the contribution with the
development. 
3.11  Where additional land is needed to facilitate infrastructure improvements, the
developer may be required to either provide land on site or sufficient funding to
acquire it. This may be offset against other developer contribution requirements. 
3.12 In some circumstances, the Council may be willing to accept off-site provision
on an alternative site. In such cases the details of both sites should be
submitted together in order that the overall merits of the scheme can be
assessed. The judgement as to whether off-site provision is acceptable will be
based on a number of factors including: the desire to achieve balanced
communities, the individual site circumstances in terms of location and
accessibility. 
3.13 In some cases, developers will provide the required infrastructure on the site
themselves instead of paying the required contributions sum to the Council. 
3.14 Implementing Infrastructure Capacity Improvements
Providing the necessary infrastructure may require the Council to work in
partnership with developers or upfront investment by the Council to be
recouped at a later date. For example, a single development that might trigger
the need for a new road junction may not in itself generate sufficient funds to
meet the full cost of any required work. As it is impossible to build half or part of
a junction, it is therefore likely that the Council would have to fund the work. It is
therefore appropriate for the Council to request payments from subsequent
developments benefitting from that investment until its costs have been
recovered. 
3.15  Development Viability
Developers are expected to take the requirement for developer contributions and
affordable housing into account in their financial appraisal prior to land deals and
commercial decisions being taken. It is acknowledged that, in some cases, there
may be abnormal development costs which were unknown at the time the site
was purchased. In such circumstances, where the developer can demonstrate
and clearly justify that there are exceptional costs, which render the
development of the site unviable as originally proposed it will be required to
demonstrate this to the Council’s satisfaction through the submission of a
‘Development Viability Assessment’. Only in very exceptional circumstances
where there are excessive, previously unknown, abnormal costs will it be likely
that the Council will agree to reduce or give exemption from the requirement to
developer contributions or affordable housing. As such, it is anticipated that the
submission of a Development Viability Assessment will be the exception rather
than the rule. Standard development costs such as demolition works, retaining
and ground works, landscaping, archaeological investigations, drainage works,
Formatted: Justified
Page 67 of 118

Page 68

8 
site purchase, site servicing and flood prevention works will not normally be
accepted as abnormal costs. Abnormal costs should be reflected in the purchase
price of land and in this respect, the developer will be asked to demonstrate that
abnormal costs were not known at the time the site was purchased. 
3.16 The Development Viability Assessment should be submitted at the earliest
opportunity. All Viability Assessments’ must be carried out by an independent
practitioner and suitably qualified chartered valuation surveyor at the
developers’ expense. 
A Viability Assessment must include, where applicable;
• Information of land values paid for the site or where no recent land
transaction has taken place the Market Value (with supporting evidence
and assumptions made);  
• Anticipated land sales values of sites to be sold on, such as medical
centre, elderly persons care homes etc. (i.e. Not residential sites);  
• Plans;  
• Schedules of housing mix (Market and Affordable) including type, size
and numbers. Gross/Net area schedule for build cost/value analysis; 
• Details of S.75 proposals and specifications, as appropriate; 
• Confirmation of S.75 assumptions and status of discussions with the
Council;
• Design and Access statement (if applicable and available);
• Detailed appraisal (current costs/values) and cash flow;  
• Explanation of financial assumptions; 
• Explanatory note on all appraisal assumptions; 
• QS’s detailed cost budget on externals, infrastructure and abnormals;  
• Build specification;  
• Detailed breakdown of end sales values for market residential elements
(with supporting evidence);  
• Programme (incl. construction and sales start/end for each phase);  
• Rents and yield assumptions for all commercial elements (with
supporting evidence);  
• Assumptions on all grant funding and (where appropriate) evidence of
transactions/negotiations with RSL’s;  
• Analysis of affordable housing provision and compatibility with prevailing
policy requirement 
Once a Development Viability Statement is received by the Council it will be
independently reviewed by the District Valuer Service (DVS) or an alternative
third party advisor agreed by, and acting on behalf of the Council. This will be
carried out at the developers expense with costs determined on an individual
basis. The requirement for independent verification of Viability Assessments will
only be removed where the time and cost associated with this process is
disproportionate to the amount of developer contributions required. Each case
will be determined by the Council on its own merits. The outcome of the Viability
Assessment review will not be binding on the Council but may inform any
recommendation to the Conveners of the relevant Committees and local area
Councillors. 
3.17 The sensitive nature of some financial information is acknowledged and
therefore where requested the content of the Assessment will remain
confidential between the applicant and named officials within the Council,
Page 68 of 118

Page 69

9 
independent assessor and the Convenors of the Relevant Committees. The
position regarding statements and the Freedom of Information (Scotland) Act
2002 means should they need to be available to the public, they will be
redacted with all figures and commercially sensitive wording blanked out. The
statements will then be presented to the developer for agreement, prior to being
made available for publicationon the Public Access portal on the Council
website. Only in very exceptional circumstances where there are excessive,
previously unknown, abnormal costs will it be likely that the Council will agree to
reduce or give exemption from the requirement to developer contributions or
affordable housing. As such, it is anticipated that the submission of a
Development Viability Statement will be the exception rather than the rule. 
3.18  Accountability
Contributions from individual sites will be accountable through separate
accounts and a public record will be kept to identify how each contribution is
spent. Contributions will be recorded by the applicant’s name, the site address
and planning application reference number to ensure the individual commuted
sums can be accounted for. Annually, a statement will be published on the
Council’s website with a summary of the total contributions received for each
area of the Guidance and what they have been spent on. Eligible costs for
expenditure will include funding for three Officer Posts to assist in the
implementation of the Developer Contributions and Affordable Housing policies.
Each account will be audited through the usual internal audit procedures. 
3.19 All accounts are ring fenced for meeting the particular infrastructure
requirement. Each section of this Guidance will set out the parameters for the
use of funds, identifying the type of use to be made and the geographical area
in which they can be spent. Where a contribution has been made developers
will be able to reclaim any money not invested in the infrastructure it was
required after the following time periods for date of payment to the Council: 
• Primary Education – 10 Years;  
• Auchterarder A9 Junction – No return of contributions; 
• Transport Infrastructure – 10 Years;  
Developers will have 12 months in which to reclaim any contribution. Where
contributions are returned, interest will be made payable at 0.25% below the
Bank of Scotland base rate. 
3.20  Phasing of Payments
Where a Planning Obligation is entered into, applicants have the option to
phase payments over the lifetime of a development. The Council will set out a
phasing schedule of contribution payments through the assessment of the
planning application which is to be used when completing legal Planning
Obligations. The acceptance of this phasing will speed up the completion of
Planning Obligations. It should be noted that developers are not bound by this
protocol, but where a bespoke agreement is required; discussions should be
entered into at the outset of the submission of a planning application so as not
to delay the processing of the Planning Obligation. Where a Planning Obligation
is entered into the contribution requirement will typically be index linked. 
4. Primary Education and New Housing Development 
4.1  Introduction
Page 69 of 118

Page 70

10 
The following Supplementary Guidance applies over the whole local authority
area of Perth and Kinross. 
4.2 This Guidance sets out the basis on which Perth & Kinross Council will seek to
secure contributions from developers of new homes towards the cost of meeting
primary education infrastructure improvements necessary as a consequence of
development. 
4.3 The NRS 2016 based population projections indicate that Perth and Kinross
has the eighth highest growth rate across all of Scotland. With a high proportion
of the existing primary school estate currently working at or near capacity,
projected school roll increases may result in the need to replace or expand
primary schools within Perth and Kinross in addition to the construction of a
number of additional primary schools in the Strategic Growth Areas. To ensure
that primary infrastructure capacity does not become a major constraint on new
development a partnership approach is required between the Council and
developers. 
4.4  Principles of the Guidance
The Guidance will be applied to new housing in areas where a primary school
capacity constraint has been identified. A capacity constraint is defined as
where a primary school has been operating at over 80% for 5 out of the
previous 7 years and is likely to be operating following completion of the
proposed development, extant planning permissions and Local Development
Plan allocations, at or above 100% of total capacity. Where the Council has
funded an increase in Primary School capacity to meet the needs of new
development contributions may be required from future development until a
proportionate cost of the school improvements is received. This position will be
reviewed annually. 
4.5 The following key principles will apply: 
• Proposed residential dwellings of two or more bedrooms, along with
consents for the change of use from or replacement of sheltered
accommodation, or for conversions from alternative uses to residential
where the units comprises two or more bedrooms, will make a full
contribution; 
• Proposed one bedroom apartments, where it is clear that no additional
rooms could be used as bedrooms, will not be required to pay a
contribution. A one bedroom apartment can consist of the following rooms,
sitting room, kitchen, bathroom, single bedroom; Proposed ancillary
accommodation linked to an existing dwellinghouse will not be required to
pay a contribution; 
• Proposed extension of a single bedroom dwelling to create residential units
of two or more bedrooms will not be required to make a contribution if the
existing dwelling has been occupied as a single bedroom dwelling for the 7
year period prior to the registration of a planning application. Where this 7
year exemption is not met then the contribution requirement will be
assessed on an individual basis; 
Formatted: Justified
Formatted: Justified
Page 70 of 118

Page 71

11 
• Affordable & Council housing will not be required to pay contributions.
Affordable Housing is as defined in section 7 of this Guidance; 
• Developments of 20 units or less in the Perth City Centre Zone as defined
in Appendix 4 will not be required to make a contribution. Where a
proposal is for 20+ units then the contribution requirement will be assessed
on an individual basis; 
• Applications for dwellings which are not likely to place an additional burden
on the existing schools, for example, student accommodation linked to a
College/University or holiday accommodation would not be expected to
make a contribution; 
• Sheltered housing may not be required to pay a contribution. The
proposed Use Class in line with the Town and Country Planning (Use
classes) (Scotland) Order 1997 will be used in the determination of the
requirement. Proposals which fall under Use Class 8: Residential
institutions will be exempt. Proposals which fall under Use Class 9:
Houses will be determined on an individual basis. 
4.6  Developers Funding
All developer contributions will be paid into a fund to facilitate the education
provision needs in Perth and Kinross. The costs of education provision vary
between each individual projects. There is a need to look at the school estate in
its totality, as a constraint within one primary school catchment area can, on
occasions, be resolved by either the creation of a new school elsewhere or the
expansion of an adjacent primary school. Where possible, contributions will be
invested within the relevant primary school’s catchment area (including
denominational schools where they exist). Where it is not possible to invest in
the same area, the Council reserves the right to invest the contributions
received within the corresponding secondary school catchment areas to help
alleviate the capacity issue. For the purpose of this Guidance, the four Perth
non-denominational secondary catchment areas will be treated as a single
catchment area. 
4.7 Applying the Guidance
Where a development proposal includes replacement or refurbishment of
existing houses, the education contributions Guidance may not apply to all
units. The test will be whether the proposal will effectively create additional
residential units which were not available as houses previously. The guidelines
are set out under paragraph 3.3. 
4.8 Where a dwellinghouse has been subject of change of use and consent is
sought to revert back to residential use a full contribution will be required. The
exception being, if the change of use from residential was implemented within
the 7 year period prior to the registration of a planning application to revert back
to residential use, in such cases a contribution will not be required. 
4.9 Determining Contribution Levels
In order to provide a clear picture of expectations and to ensure parity of
contribution across areas of need, it is considered that a formula based on the
average number of children per household and the average cost of creating
Formatted: Justified
Page 71 of 118

Page 72

12 
additional primary school capacity would be appropriate. This introduces both a
demographic and construction cost variable. The rate may be revised annually
to include indexation based on BCIS General Build Cost Index.
4.10 Appendix 1 sets out in which primary school catchments a contribution will be
required. This list will be revised annually. 
4.11 Developer Contribution Rates per Dwelling 
Type of Dwelling Contributions
1 Bedroom Dwellinghouse No Contributions Required
Sheltered Housing Determined on an Individual
Basis.
Affordable Housing No Contributions Required
2+ Bedroom Dwellinghouse £6,300 
4.12 Calculation of Contributions
• Cost per pupil - £23,334
• Pupil Product Ratio - 0.27 
• Total Contribution per House
• £23,334 X 0.27 = £6,300 
5. Auchterarder A9 Junction Improvements 
5.1  Introduction
The following Supplementary Guidance sets out the basis on which Perth &
Kinross Council will seek to ensure contributions from developments within the
Auchterarder and wider Strathearn housing market area towards meeting the
cost of delivering the A9 Junction Improvements that are required in the
interests of road safety. 
5.2 The aim of the Guidance is to release development within the Auchterarder
area which does not form part of the Auchterarder Expansion Development
Framework but has been restricted due to road safety constraints of the A9 at
Auchterarder. Those developments paying the contribution will subsequently
have their consents released enabling development to continue within the area. 
5.3 The area over which the protocol will apply has been identified in map form as
shown in Appendix 2: A9 Junction Supplementary Guidance Boundary. 
5.4 The basis of the boundary is to incorporate an area where development would
access the A9 using Loaninghead or Aberuthven junctions or both and would
subsequently benefit from the proposed junction improvements. Blackford and
Dunning are not included within the boundary area since they are primarily
accessed by other junctions. 
5.5 Principles of the Guidance
The following key principles will apply: 
• The contribution for a single dwelling will be £3,450; 
• A contribution will be sought from all residential developments within the
identified boundary of the wider Auchterarder area including single houses
Formatted: Justified
Page 72 of 118

Page 73

13 
with the exception of affordable housing. Affordable housing is as defined in
Part 2 of this Guidance;  
• The contributions for residential development will be calculated pro rata
according to the number of dwellings involved; 
• This Guidance will not apply to areas within the approved Auchterarder
Development Framework;  
• For non-residential developments within the identified boundary that have a
trip generation equal to or higher than a dwellinghouse, an assessment for
contributions will be made on a case-by-case basis. However where it is
considered the proposed development would reduce the need to travel e.g.
through the provision of local employment or services, the Guidance would
not apply;
• Out-with the identified boundary area, but within the Strathearn Housing
Market Area, a contribution would only be sought from developments that
require a Transport Assessment which identified that the development would
have an impact on the A9 junctions within the boundary area at
Auchterarder. 
5.6 Applying the Guidance
Where a development proposal includes replacement or refurbishment of
existing houses, the A9 Junction contributions Guidance may not apply to all
units. The test will be whether the proposal will effectively create additional
residential units which were not available as houses previously. The guidelines
are set out under paragraph 3.3. 
5.7  Major developments contrary to the Development Plan will be subject to
separate assessment against this Guidance on road safety grounds. 
5.8  Developer Contribution Calculation
The total cost of the project in accordance with 2007 figures is estimated at
£10.52m. Transport Scotland has contributed £1.4m towards the Loaninghead
junction improvements. The remaining £9.12m will be provided by the
Consortium delivering the Auchterarder Development Framework, gWest and
other developments impacting on these junctions. 
5.9 The contribution will be set at £3450/house. The basis of each contribution paid
would seek to be proportional to the impact the development would have on the
trunk road infrastructure. For non- residential development, the contribution will
be calculated on the basis of the impact of an equivalent number of residential
properties. 
6.  Transport Infrastructure   
6.1 The following Supplementary Guidance is about facilitating development. It sets
out the basis on which Perth and Kinross Council will seek contributions from
developments in and around Perth towards the cost of delivering the transport
infrastructure improvements which are required for the release of all
development sites and to support the growth of Perth and Kinross. 
6.2 The Council is seeking contributions from a package of measures which are
essential to support the delivery of the Local Development Plan (LDP). The
projected costs of the infrastructure have been estimated in line with industry
Formatted: Justified
Page 73 of 118

Page 74

14 
standards. The current working estimates are as follows: 
Element Cost £
Cross Tay Link Road (“CTLR”) £150.47m
A9/A85 Crieff Road junction
improvements
£49.4m
Total £199.8m 
Note: These are based on 2022 estimates 
6.3 Updated Traffic Modelling has been undertaken in 2018 which has identified that
50% of future traffic growth is associated with new development sites in the
LDP2. The contribution level is therefore calculated on the basis of 50% of the
total costs (£99.9m), the remainder (£99.9m) being sought through other
mechanisms. 
6.4 The Transport Infrastructure contributions collected through this mechanism will
only be used for the identified packages outlined in Paragraph 6.2. This
contribution shall be considered as being additional to any other cumulative or
site-specific transport contribution required in relation to the development.
Following appropriate assessment, proportionate contributions or mitigation will
be sought for work to the strategic transport network at the A9 Broxden junction.
Early discussions are recommended to establish specific requirements.
Proportionate contributions or mitigation may also be sought for rail
infrastructure, the Inveralmond junction or the Perth Park and Ride Schemes. 
6.5 Following appropriate assessment, proportionate contributions or mitigation will
be sought toward the infrastructure to be delivered by Perth & Kinross Council
at LDP2 Site MU70 (Perth West), including an A9 underpass to address site
severance. Early dDiscussions with the planning authority, prior to the
submission of any planning application, are strongly recommended to establish
specific requirements, and will apply to from landowners/ developers within
MU70. 
6.6 Principles of the Guidance
Subject to the exceptions set out in this policy, this Supplementary Guidance
applies to all development within the defined boundary identified in Appendix 3.
This is because the transport appraisal relating to this Guidance illustrates a link
between all development in the defined area and the impact which the defined
transport improvements seek to mitigate, as per the guidance in Circular
3/2012: Planning Obligations and Good Neighbour Agreements. The full
contribution level applies to all development within the identified Perth Core
Area which is defined by settlements in this area having more than a 19%
impact on the transport infrastructure. The reduced contribution level applies to
all development out-with the Perth Core Area which is defined by settlements in
this area having a 12% - 19% impact on the transport infrastructure. Out with
the defined boundaries no contributions will be required, except for
development for which a Transport Assessment is necessary and then identified
as having a significant direct impact on any element of the infrastructure
package (i.e. 12% or above). In such cases a higher contribution may be
applied.
Formatted: Justified
Formatted: Justified
Formatted: Justified
Formatted: Justified
Formatted: Justified
Page 74 of 118

Page 75

15 
6.7 Residential developments of 20 units or less in the Perth City Centre Zone, as
defined in Appendix 4 will not be required to make a contribution. Where a
proposal is for 20+ units, then the contribution requirement will be assessed on
an individual basis. 
6.8 In order to support the economic growth of Perth and Kinross, new employment
uses which fall under the Employment Land Use category of the Transport
Infrastructure section of this Guidance, and which are to be developed on
brownfield land, will not be required to make a contribution. New employment
uses on Greenfield land not cross subsidised by residential development will be
considered on an individual basis. This will take account of the potential impact
of the development and the extent to which the development directly benefits
from the improved infrastructure. Extension of existing non-retail businesses on
brownfield land will not be required to make a contribution. 
6.9 The Retail contribution rate will only be applied to the trading floorspace of new
or extension to existing retail developments. Non-trading and Back of House
functions space will be calculated on the employment use category. Vehicular
retail showrooms will be calculated based on the floorspace of proposed
buildings. 
6.10 Proposed buildings for agricultural use, such as cattle sheds and storage units
needed to operate the farm business, will generally not be required to make a
contribution. Office and Staff Buildings in association with agricultural use may
be required to contribute. 
6.10 Holiday accommodation including static caravan pitches and chalets will be
calculated against the Residential – Affordable contribution rate. Temporary
structures such as camping pods or touring caravan pitches will not be required
to make a contribution. 
6.11 Where a proposal supports specific Council objectives, such as regeneration or
significant economic benefit but where it would not be viable due to the
application of the Supplementary Guidance the Council may enter into
negotiations to reduce the contribution with each case assessed and
determined on its own merits. 
6.12 Proposals for a change of use to form residential including the subdivision of
existing residential property, but excluding agricultural buildings and ancillary
accommodation/ residential garages, will not normally be expected to provide a
contribution, unless they result in the creation of 5 or more residential units. 
6.13 In the event of a contribution of land towards the development of the CTLR, the
amount of contribution required under this mechanism may be revised. Each
application will be considered on its individual merits, taking into account factors
such as the value of the land, its condition and any remedial works required to
make it suitable for use. Land values will be assessed independently by the
District Valuation Service (or other mutually agreed appointee) with a joint brief
being agreed between the Council and the applicant. 
6.14 In circumstances where non-residential developments are proposed which
typically do not include built internal floorspace (for example quarries, outdoor
Formatted: Justified
Page 75 of 118

Page 76

16 
leisure operations etc.) but are judged through a Transport Assessment to have
a demonstratable impact on the transport network, the contribution level will be
calculated on an individual basis. 
6.15 How is the Contribution Calculated?
The transport contributions are calculated on the Gross Internal Area (GIA) of
new non-residential development or in the case of residential development the
total number of units proposed. Where replacement buildings are proposed,
(provided the building is in current use), the Trip Rate of the existing use will be
taken into account and the contribution reviewed accordingly on a case by case
basis. GIA includes everything within the external walls of the buildings (lifts,
stairwells and internal circulation areas). It does not include areas like external
balconies or the thickness of external walls. Appendix 6 sets out the GIA
definitions. 
6.16 Applicants for planning permission for non-residential buildings are advised to
provide the following information with each planning application: 
• Current GIA of buildings and their uses to be demolished (if any); 
• Proposed GIA of all buildings and their uses on site once the development
has been completed. 
6.17 Using this information, the Council calculates the net increase in GIA. This result
is multiplied by the appropriate contribution rate in £/m² to calculate the required
contribution level. 
6.18  Contribution Rates per Development
The contribution level will be reviewed within a 5 year period from adoption of
the Supplementary Guidance. Any review will take account of updated costs in
relation to the infrastructure projects such as land costs, detailed designs,
inflation and construction costs. The rates set out in this guidance may be
revised reviewed annually to account for these updated project costs and
implemented without further formality will be published on the PKC website. Any
revised contribution level will not be applied retrospectively to consented
planning permissions. 
6.19 Perth Core Area
The Perth Core Area includes the settlements of Perth, Scone, Almondbank, Bridge
of Earn, Oudenarde, Abernethy, Methven, Stanley, Luncarty, Balbeggie, Perth
Airport and also the land between these settlements surrounding the main transport
routes into Perth.
Commented [LS1]: Link to webpage to be inserted in final
document. https://www.pkc.gov.uk/ldp2developercontributions
Page 76 of 118

Page 77

17 
6.21 Full Contribution Area Rates 
6.22 Reduced Contribution Area Rates 
Land Use   CTLR     A9/A85   
   New Total   
Retail (m²)   £139   £46   £185  
Employment (m²)     £13   £4   £17  
Other Non-Residential (m²) £43   £14   £57  
Residential Open Market 
(per unit)
£3,288  £1,079  £4,367 
Residential Affordable 
(per unit)
£1,644  £540  £2,184 
Land Use   CTLR   
   A9/A85    New Total    
Retail (m²)   £104  £34  £138 
Employment (m²)     £10  £3  £13 
Other Non-Residential (m²)  £33  £11  £44 
Residential Open Market 
(per unit)
£2,466  £810  £3,276 
Residential Affordable 
(per unit)
£1,233  £405  £1,638 
Page 77 of 118

Page 78

Appendix 1 – Education Requirements 
Developer contributions requirements for individual schools
Version 5: 2023
Next Review: 2024 
To assist applicants with the preparation of development costs, the following schedule showing the school catchment areas where
contributions will be sought. 
This schedule is based on selected schools which have been operating at above 80% for 5 out of the previous 7 years and is likely
to be operating following completion of the proposed development, extant planning permissions and Local Development Plan
allocations, at or above 100% of total capacity. 
Where the Council has invested in Primary Schools to support future development a contribution will be sought from new
development within the relevant primary school catchment. Where investment has taken place this is identified below: 
Primary School School
Capacity
Capacity Issue  Investment action 
Auchterarder CS Cluster
Auchterarder 514 Yes Reconfiguration as required 
Blairgowrie High Cluster
Newhill 423 Yes Capacity required 
Breadalbane Academy Cluster 
N/A  N/A  N/A N/A 
Crieff High Cluster 
Crieff 466 Addressed by action New School built (2015) with capacity for expansion
Kinross High Cluster 
Kinross  566  Addressed by action New School built (2017)
Milnathort 257 Yes Capacity required 
Perth Academy Cluster
Robert Douglas Memorial 462 Yes Capacity required 
Page 78 of 118

Page 79

19 
Perth Grammar Cluster
Tulloch 434 Addressed by action New school built (2018)
Perth High Cluster
Abernethy 283 Addressed by action Extension to school built (2013)
Dunbarney 207 Yes Capacity required 
Errol 316 Addressed by action Extension to school built (2016)
Inchture 264 Addressed by action Extension to school built (2014)
Kinnoull 203 Addressed by action Extension to school built (2014)
Pitlochry High Cluster
N/A N/A N/A N/A
Bertha Park High Cluster
Note: Associated Primary Schools of Bertha Park High School are as follows and may be listed above within the existing Perth secondary
school cluster: Auchtergaven Primary School, Dunbarney Primary School, Forgandenny Primary School, Logiealmond Primary School,
Methven Primary School, Pitcairn Primary School, Ruthvenfield Primary School, Pupils resident in Oudenarde 
Page 79 of 118

Page 80

20 
Appendix 2 – A9 Junction Supplementary Guidance Boundary 
Page 80 of 118

Page 81

21 
Appendix 3 – Transport Infrastructure Contributions Area 
Page 81 of 118

Page 82

22 
Appendix 4 – Perth City Centre Zone 
Page 82 of 118

Page 83

23 
Appendix 5 – Application of the Supplementary Guidance to Planning Applications 
Page 83 of 118

Page 84

24 
Page 84 of 118

Page 85

25 
Appendix 6 – Gross Internal Area Definitions (GIA) 
Page 85 of 118

Page 86

26 
Contact information 
For further information on developer contributions and any enquiries regarding the guidance, please contact the Development Contributions
Officer at:
Email: TESDevelopmentContributions@pkc.gov.uk
Tel: 01738 475417
Page 86 of 118

Page 87

Draft Developer Contributions and
Affordable Housing Supplementary
Guidance (2023)
[Finalised Draft]
Part 2: Affordable Housing  
APPENDIX 1 7
Page 87 of 118

Page 88

2 
Contents 
1. What is affordable housing?       3 
2. Why do we need an affordable housing policy?    3 
3. Applying the policy: the sequential approach     3 
4. Funding mechanisms for delivery of affordable housing    7 
5. Types of affordable housing       8 
6. Delivery of affordable housing on development sites   9 
Contact information        13 
Please see ‘Part 1: Policy Implementation and Developer Contributions’ for further
guidance on developer contribution requirements. 
Page 88 of 118

Page 89

3 
1. What is ‘affordable housing’? 
1.1 National Planning Framework 4 2023 (NPF4) defines affordable housing as: 
“Good quality homes that are affordable to people on low incomes. This can include
social rented, mid-market rented, shared-ownership, shared-equity, housing sold at
discount (including plots for self-build), self-build plots and low-cost housing without
subsidy.” (Annex F, page 144) 
2. Why do we need an affordable housing policy? 
2.1 The Scottish Government’s Housing to 2040 sets out their ambition “for everyone to
have access to a warm, safe, affordable and energy efficient home that meets their
needs, in a community they feel part of and proud of”. This approach recognises the
need to provide a wide range of affordable homes, allowing people the choice of
lifestyle and home regardless of income. Scottish Government planning policy
supports this approach and NPF4 policy 16(e) states: 
“Development proposals for new homes will be supported where they make provision
for affordable homes to meet an identified need. Proposals for market homes will only
be supported where the contribution to the provision of affordable homes on a site will
be at least 25% of the total number of homes…” (page 63) 
2.2 Studies of housing need and affordable housing requirements are carried out across
the Perth and Kinross area as part of the preparation of the Housing Need and Demand
Assessment (HNDA). The HNDA gives long run estimates of housing need and
provides an evidence base for the Council’s Local Housing Strategy (LHS) and the
Local Development Plan (LDP). Further localised HNDAs have been undertaken by
the Communities Housing Trust in Aberfeldy, Dunkeld & Birnam, Comrie,. Mount Blair
and Pitlochry. These have been undertaken to gain a better understanding of the
impact that high market prices have in on houses in a rural setting.  
2.3 Policy 20 in the adopted Perth and Kinross Local Development Plan 2 2019 (LDP2)
identifies that 25% of the total number of housing units per housing site should be
provided as affordable. This approach is then guided using the LHS priorities, planning
policy, evidence from the HNDA and local housing lists. An analysis of this information
then supports the identification of type and tenure for a location based on local need
and demand.   
3. Applying the policy: the sequential approach 
3.1 LDP2 Policy 20 states: 
“Residential development, including conversions, consisting of five or more units
should include provision of an affordable housing contribution amounting to an
equivalent of 25% of the total number of units proposed. Wherever practical, the
affordable housing should be integrated with and indistinguishable from market
housing.  
If the provision of the affordable housing on-site is not possible following a viability
assessment, the Council will seek off-site provision. Failing that, and in appropriate
circumstances, a commuted sum will be required from developers.  
Formatted: Justified
Formatted: Justified, Indent: Left:  1.27 cm
Formatted: Justified
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Formatted: Justified
Formatted: Justified, Indent: Left:  1.27 cm
Page 89 of 118

Page 90

4 
The details of provision, including landlord, tenure, house size and type, will be a
matter for agreement between the developer and the Council and based upon local
housing need and individual site characteristics. The Council will consider innovative
and flexible approaches to the delivery of affordable housing and will take into account
considerations that might affect deliverability such as development viability and the
availability of funding.” (page 40) 
3.1 LDP2 Policy 20 sets the Council’s requirement for affordable housing when assessing
new development proposals. NPF4 (Policy 16) is also a relevant part of the statutory
development plan.
3.2 The Council’s preference is to locate affordable housing on site and as part of a mixed
development of private and affordable homes. There may be proposals for 100%
provision of affordable housing, and these will be acceptable as part of a wider mixed
community and where all other relevant LDP policies are met. 
3.3 Residential developments, including conversions, consisting of 5 or more units should
include provision of an affordable housing contribution amounting to an equivalent of
25% of the total number of units proposed, except where the LDP varies this quota on
an individual site basis, or sites of 20 units or less in the City Centre Zone (see map
below and Appendix 4 in Part 1 of this guidance). Whenever practical, the affordable
housing should be integrated with, and indistinguishable from the market housing. 
3.4 The Council’s sequential approach to the delivery of affordable housing requirements
is laid out in Table 1. The details of tenure, house size and type, will be a matter for
agreement between the developer and the Council and based upon local housing need
and individual site characteristics.  
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Commented [LS1]: Delete map
Formatted: Justified
Page 90 of 118

Page 91

5 
On site  Provision of Affordable housing on site;  
or 
Transfer of an area of serviced land on site to Council
/ Housing Association 
Off site  Provision of affordable housing off-site;  
or 
Transfer of an area of serviced land offsite to Council /
Housing Association
Commuted sums  Where it is not possible to achieve appropriate
affordable housing on site. 
Table 1: sequential approach 
3.5 On Site Provision  
3.5.1 On-site provision is the preferred option for all development proposals. Where
affordable housing is being provided on-site, the housing will either be built by or
transferred to a Housing Association or the Council, with the exception of: discounted
for sale, unsubsidised homes, private rented accommodation or discounted serviced
plots for self-build. 
3.5.2 Developers should enter early discussions with the Housing Strategy team (see
contact details on page 14), preferably before the submission of a planning application.
This will help to identify the following: 
• The type and size of affordable housing requirement to meet the needs in the
area.  
• The provider most appropriate to deliver the required mix of tenure.  
• Provide advice on how the Scottish Government subsidy funding requirements can
be met. 
3.5.3 Developers will be required to build an agreed number, type, and mix of affordable
housing units on site, including any required wheelchair housing (Housing for Varying
Needs standards) for subsidised rent or sale by the Housing Association or Council.
Where the affordable element is to be delivered by the developer, deadlines must be
set for the delivery of the affordable housing relative to the timescale of delivery of the
private housing. 
3.5.4 Alternatively, the land for the affordable housing element can be transferred to the
Council or Housing Association to develop. Developers will agree to transfer an area
of services land to a Housing Association or the Council for a valuation based on
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Formatted: Justified
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Page 91 of 118

Page 92

6 
affordable housing only (as agreed by the District Value or an agreed chartered
valuation surveyor). 
3.6 Off Site Provision 
3.6.1 Where on-site provision cannot be achieved; the Council may be willing to consider
the provision of affordable housing off-site or the transfer of an area of serviced land
off-site. This will depend on several factors such as the desire to achieve balanced
communities, the site circumstances (location and accessibility) and any difficulties
associated with its development. 
3.6.2 If the Council accepts the provision of affordable housing off-site the developer will be
required to build an agreed number, type and mix of affordable housing units on
another site within the area that is under their control for subsidised rent or sale either
for the Council or a Housing Association. Where the affordable element is to be
delivered by the developer a deadline will be set for the delivery of affordable housing
relative to the timescale of the private housing. The provision of affordable housing off-
site will be in addition to the affordable housing requirement relating to the alternative
site. 
3.7 Transfer of an area of serviced land off-site  
3.7.1 Alternatively, the land for the affordable housing element can be transferred to the
Council or a Housing Association for them to develop. Developers will agree to transfer
an area of serviced land for a valuation based on affordable housing only (as agreed
by the District Valuer or an agreed chartered valuation surveyor). 
3.8 Commuted Payments  
3.8.1 It is important to note that it will only be in limited circumstances that the Council will
accept the payment of a commuted sum in lieu of the provision of affordable housing
on or off-site. One of the primary obstacles to the delivery of affordable housing in
Perth and Kinross is the difficulty which Housing Association’s’ experience in being
able to compete with private developers to acquire land. This, coupled with the
importance of creating socially inclusive and mixed communities, means that the
Council will generally always seek the provision of affordable housing on-site or on an
alternative site within that housing market area. The payment of a commuted sum to
meet an affordable housing requirement will only be a final option offered to a
developer. 
3.8.2 Commuted sums may be acceptable only if there are no suitable sites brought forward
after following the sequential tests above or where there are restrictions to the
availability of public subsidy. A Viability Assessment will be required in all cases to
demonstrate why the development would not be financially viable with on-site
provision. Evidence of this should be provided in a Viability Statement providing
financial or planning justification as to why the development cannot incorporate
affordable homes. More details about undertaking this process, see Part 1 of this
document on How to undertake Development Viability Assessments.  
3.8.3 The instances where a commuted sum may be acceptable include: 
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Formatted: Justified
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Formatted: Justified
Page 92 of 118

Page 93

7 
• Where a development is in a remote rural setting or out with a settlement where it is
difficult to access services; 
• Where the scale of development results in sporadic units, creating affordability
difficulties for Housing Associations; 
• Where the number of units proposed are below the thresholds identified in the policy; 
• Where the Council’s Housing Service recommend that this is the most appropriate
form of contribution in considering the Council’s strategic housing priorities. 
3.8.4 These payments will be used to enable off-site provision to make an equal and
equivalent financial contribution to an affordable housing fund managed by the Council
which promotes the direct provision of affordable accommodation through the Council
or Housing Association on other sites. The commuted sum must be spent within the
local housing market area Income from this source will be identified in the Strategic
Housing Investment Plan (SHIP). 
3.9 Calculation of commuted sum 
3.9.1 Commuted sums will be calculated in line with national guidance PAN 2/2010
Affordable Housing Land Audits and Affordable Housing Supply Programme: process
and procedures MHDGN 2022/02, as well as guidance notes issued by the RICS and
in particular ‘Valuation of Land for Affordable Housing Scotland' GN100/2013 and GN
Valuation of Development Property October 2019. 
3.9.2 In line with Pan PAN 2/2010, paragraph 22, the valuation of commuted sum will be
determined independently by the District Valuer (DV). Research was commissioned
from the DV (19 January 2023) to determine at what level the commuted sum should
be set for each Housing Market Area in Perth and Kinross. On the basis of the
research, the commuted sums effective from 1st April 2023 are as follows: 
Housing 
Market Areas 
Plot Value per
Unit for Private
Sale 
Plot Value per
Unit for
Affordable
Housing 
Commuted Sum
per Unit 
Highland  £25,000  £1,000  £24,000 
Kinross  £25,000  £1,000  £24,000 
Perth  £36,000  £1,000  £35,000 
Strathearn  £28,500  £1,000  £27,500 
Strathmore  £21,500  £1,000  £20,500 
Table 2: Commuted sums requirement per HMA 
3.9.3 This table will be updated annually based on the procedure set out in 3.9.2 and
published on the Council’s website. 
3.9.4 Where an Affordable Housing commuted sum has been made developers will be able
to reclaim any money not invested in the infrastructure it was required after the
utilisation period of 5 years of the date of payment to the Council. Developers will have
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Formatted: Justified
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Formatted Table
Formatted: Indent: First line:  1.27 cm
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Commented [LS2]: Link to be added to final document 
https://www.pkc.gov.uk/ldp2developercontributions
Page 93 of 118

Page 94

8 
12 months from the date of the 5-year deadline in which to reclaim any contribution.
Where contributions are to be returned, interest will be made payable at 0.25% below
the Bank of Scotland base rate.
4. Funding mechanisms for delivery of affordable housing  
4.1 Most of the funding for affordable homes comes from the Scottish Government
Affordable Homes Supply Programme (AHSP). This is supplemented by council
funding (Council Tax second homes funds), commuted sums (in lieu of on-site
affordable provision) from developers, Prudential Borrowing (Councils) and Private
Finance borrowing (Registered Social Landlords). The plan for new housing is directed
by the Ccouncil’s Strategic Housing Investment Programme (SHIP).
4.2 The most common source of land for affordable homes comes from requirement in
LDP2 Policy 20 for developers to deliver 25% of their development proposals for
affordable homes. The land is transferred to the ownership of a Housing Association
partner or the Council to build a variety of affordable types and tenures. The tenures
are determined by need and demand in the local area. Less commonly, Council-
owned land is developed by the Council itself or made available to Housing
Associations to build affordable homes. Likewise, private developers may restructure
their land stocks and dispose of land to Housing Associations or the Council for
additional affordable housing.  
4.4 Affordable homes can also be delivered through the renovation or repurposing of
buildings using the same funding, including the Council buy-back scheme, returning
former Council homes to Council ownership. Increasingly buildings are being
repurposed and brownfield sites are being regenerated to create affordable homes that
meet higher energy efficient and quality standards.      
5. Types of affordable housing 
5.1 There are a range of affordable housing options on offer that people can access in
Perth & Kinross Council.  
5.2 Homes for Rent 
5.2.1 Social rent are homes generally provided by Housing Associations (RSLs) and Perth
& Kinross Council at affordable rents on a secure basis to those in housing need.
Homes are regulated by the Scottish Housing Regulator to ensure standards are high
and rents kept affordable.  
5.2.2 Mid-market rental good quality, affordable, private rented homes provided by Housing
Associations aimed at people on low or modest incomes that would n’ot be prioritised
for a socially rented home. Rents are lower than private market rent levels in the area.
Aimed at a wide range of demographics and needs. can Find a MMR home in Perth
and Kinross
5.3 Low-Cost Home Ownership   
5.3.1 Shared equity helps first -time buyers and priority groups on low to medium incomes
into home ownership.  There are currently two schemes. In both you the buyer holds
the majority share of the home and are responsible for the property. In the OMSE, the
Scottish Government holds the remaining share and is open to any house for sale. In
Formatted: Justified
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Formatted: Justified
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Formatted: Justified
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Formatted: Justified
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Page 94 of 118

Page 95

9 
the NSSE scheme, a Housing Association or cCouncil holds the remaining share and
is for new build housing. 
5.3.2 Shared Ownership provided by housing associations. It offers a route to
homeownership - if you'rebuyers unable to afford to purchase a property outright, you
can part-buy and part-rent your their home,. You can choose to buy at a 25%, 50% or
75% share in your their home and. You pay rent on the other share. you don’t buy, and
the rRent is usually set at an affordable level of 2.75%. 
5.3.3 Self and custom build housing are homes which are built or contracted by individuals
or groups of individuals for their own use. These homes offer a unique alternative to
standard market housing, bespoke to the needs of an individual, family or group, with
their input on design and features. The cCouncil may discount plots to make them
affordable. Can be particularly suitable in rural areas. 
5.3.4 Co-housing isdesigned to foster connection. Usually owner-occupied (can also be
mid-market rent). Physical spaces allow neighbours to easily interact with each other
around internal and external communal spaces with commonly provided guest
accommodation.  Collaborative decision-making on the design and use of the buildings
helps to develop relationships with neighbours and provides support networks which
can be particularly attractive to people later in life. 
5.3.5 Independent living aims to provide suitable options of accommodation for individuals
assessed as having care and support needs to live independently in the community.
This may include those with learning disabilities, autism, physical disabilities, mental
health and acquired brain injury. Independent living support is most commonly offered
through social rent but can be provided in all tenures, including self-build. 
6. Delivery of affordable housing on development sites 
6.1 Once development potential has been established and a site moves through the
planning process, there are several key areas to be considered when designing the
site.  
6.2 Integration and tenure blind design
Integration of affordable homes into any site should be key consideration from the
outset.  Affordable homes and market homes should be designed to create a sense of
place within a development rather than as separate communities. Affordable plot sizes
do not necessarily have to reflect their market equivalents, but they should be
integrated into a varied tenure that produces choice and an attractive streetscape. This
can be supported through the careful co-ordination of elements such as materials,
colour palettes, architectural details, and boundary treatments. Different types of
homes have sat adjacent to each other in the gradual development of urban areas,
and this helps to create diversity within communities.  
There are some factors that will help determine the site approach of affordable housing
integration:
• The proposal should reflect the Council’s commitment to supporting mixed and
inclusive communities in Perth & Kinross by delivering choice.
• There should no difference in the quality of the design of all homes on the site.
Formatted: Font: Not Bold
Formatted: Justified
Formatted: Justified, Indent: Left:  0 cm, Hanging:  1.27
cm
Formatted: Justified
Formatted: Justified, Indent: Left:  1.27 cm
Formatted: Justified
Page 95 of 118

Page 96

10 
• Consideration as to the mix of tenures within a site to provide choice and encourage
diverse communities.
• The inclusion of specialist provision requirements to support independent living and
that caters to all ages.
• Construction access and site management can also have an impact on the location of
affordable housing, as well as any ongoing property maintenance and management. 
6.3 Phasing 
Developing a larger site in phases of less than five units, specifically to avoid the
application of the affordable housing policy, will not be acceptable. It is recognised that
in some cases, a developer may have a valid reason for developing in small phases.
Any subsequent applications submitted for additional units which are clearly part of the
same development and resulting in the total number of units increasing to five or more
will have the affordable housing policy applied retrospectively. Developers wishing to
develop in small phases are encouraged to discuss this with the Council at the outset
to ensure that the affordable housing contribution can be properly planned. 
6.4 Densities 
A developer may seek to build less than five houses on a site which clearly has
capacity for a larger development meaning that the affordable housing policy will not
apply. It is recognised that in some locations lower density development is desirable
and, in such situations, the Council will take account of standard housing densities, the
location of the site, the character of the surrounding area, and the type of houses
proposed in determining whether the smaller number is acceptable. Where it is
considered acceptable, the guidance relating to phasing above, will also apply. 
6.5 Houses for private rent 
The Local Housing Strategy reports that letting agents and landlords in private renting
view the sector as having high levels of demand. As evidenced in the HNDA (2022),
Perth and Kinross Council has a higher percentage of households in the private rented
sector at 16% than the Scottish average at 12%. Whilst it is acknowledged that some
developers prefer to build to rent, it is considered that private housing for rent as an
affordable category is difficult to implement due to difficulties in ensuring that rents
remain at an affordable level i.e. a level which is comparable with Council and Housing
Association rent levels. In such cases, developers are encouraged to contact the
Housing Strategy team to discuss the available tenures of midmarket rent or
intermediate rent, and what the levels of rent currently are. Affordable housing
requirements relating to proposals for tied accommodation or properties built by private
estates for essential estate workers will be assessed on an individual basis.
6.6 Sheltered housing developments 
Open market sheltered housing schemes generally meet the requirements of the more
active elderly population and as such can be seen to be addressing general housing
needs, not affordable housing needs. The Council will continue to seek the provision
of a wide range of housing suitable for older people and recognise that it will not be
appropriate to require an affordable housing contribution from some types of specialist
accommodation, for example, care homes or other residential institution. However, in
the case of open market sheltered housing developments, these will be subject to the
affordable housing policy. Where sheltered units are to be provided as part of a mixed
Formatted: Justified, Indent: Left:  1.27 cm
Formatted: Justified
Formatted: Justified, Indent: Left:  1.27 cm
Formatted: Justified
Formatted: Justified, Indent: Left:  1.27 cm
Formatted: Justified
Page 96 of 118

Page 97

11 
development and will be available through a Housing Association or sold at an
affordable price, they may be considered as meeting the affordable requirement for
the development. 
6.7 The retention of houses as affordable 
The retention of houses as affordable in perpetuity will most easily be achieved
where a Housing Association is involved i.e. social rent or some form of shared
equity involving grant assistance from Scottish Government which allows for grant
funding to be returned to the Scottish Government should the house be sold within
a specified period. It is acknowledged it is harder to achieve affordability in perpetuity
in the case of discounted for sale, shared equity or unsubsidised houses. Houses
which fall into the unsubsidised low-cost housing for sale category are smaller less
expensive houses generally for entry level which are sold without any subsidy or
discount. These houses may be affordable simply due to their smaller size. PAN
2/2010 suggests that some form of legal agreement may be required to retain such
houses as affordable in perpetuity. However, it is considered that there will generally
always be a limit on what the resale price of such houses will be. If the Council are
satisfied that on resale such properties will remain at an affordable price – allowing
for inflation and taking into consideration the area in which the houses are – then it
is likely that, generally, it will not be necessary to impose a condition to maintain the
houses as affordable in perpetuity. In the case of subsidised low-cost housing sale
properties, either it is accepted that such houses will only be affordable to the first
household, or a burden, or condition (e.g. Deed of Condition attached to the
property’s Title Deeds) is put in place in the title deeds to maintain the houses as
affordable in perpetuity. The Council will consider applications containing subsidised
low-cost housing for sale on their individual merits. 
6.8 Affordable house prices 
Analysis was carried out using data from the Centre of Housing Market Analysis
(CHMA) documents1 and by using A Practitioners Guide – Housing Need and
Demands Assessment October 2018 data where a house is affordable to purchase if
its price does not exceed 3.6 times a household’s income. The Perth and Kinross area
has seen the largest increase in volume of house sales over the last 10 years of all
Tayside partner areas at 27.8%. The average house sale value in Perth and Kinross
has risen by 13% from 2009 to £199,463 in 2019. To improve accessibility to home
ownership, the table below shows the maximum sales prices applicable to the low-cost
housing for sale options potentially available to developers. Maximum prices for
houses to be purchased through the Shared Equity, subsidised and unsubsidised low-
cost housing for sale options: 
Formatted: Justified, Indent: Left:  1.27 cm
Formatted: Justified
Formatted: Justified, Indent: Left:  1.27 cm
Formatted: Justified
Page 97 of 118

Page 98

12 
Table 3: Price thresholds 
* The maximum based price threshold is calculated based on the Open Market Shared
Equity Scheme area-based limits for Perth and Kinross2 
6.9 Marketing and identification of priority client groups 
Where the affordable housing proposed is unsubsidised or subsidised low-cost
housing for sale, there will be further requirements in terms of the marketing of the
affordable housing and the identification of the priority client groups. Developers are
asked to contact the Housing Strategy team for further details on this. In general the
priority client group is taken to mean people on modest incomes (income threshold to
be assessed by Perth and Kinross Council), who are either first time buyers; or persons
who currently own their own home but require a new home following a significant
change in their household circumstances; or persons with a disability who own a house
which does not meet their particular needs; and who are in the following priority: 
• Council or Housing Association tenants who currently live in Perth & Kinross or; 
• Council or Housing Association waiting list applicants who have an established
local connection to Perth and Kinross and who have requested Perth and Kinross
as an area in which they wish to be houses; or 
• Residents of Perth and Kinross. 
The property must be the applicant’s permanent home and not used as a second home
or let out. The size of the property allocated should be appropriate to the size of the
household. Developers may be required to submit a marketing strategy to the Council
for approval as part of planning consent or Section 75 Agreement, the detail of which
will be defined, but will likely indicate the advertising, marketing periods and application
process for the relevant units. Prior to submitting a marketing strategy, developers are
urged to contact the Council’s Housing Strategy team to confirm the relevant time
periods and priority client groups etc. 
Maximum Price Threshold
Apartment Sizes  Price Threshold* 
2 (1 bed)  £95,000 
3 (2 bed)  £145,000 
4 (3 bed)  £200,000 
5 (4 bed)  £250,000 
6 (5 bed)  £310,000 
1   www.gov.scot/publications/centre-for-housing-market-analysis-list-of-guidance/
2   www.gov.scot/ publications/open-market-shared-equity-thresholds
Formatted Table
Formatted: Indent: First line:  1.27 cm
Formatted: Justified, Indent: Left:  1.27 cm
Formatted: Justified
Formatted: Justified, Indent: Left:  1.27 cm
Formatted: Justified
Formatted: Justified, Indent: Left:  1.27 cm
Page 98 of 118

Page 99

13 
Contact information 
For further information on affordable housing and any enquiries regarding the guidance,
please contact the Housing Strategy team at:
Email: AffordableHousing@pkc.gov.uk
Tel: 01738 476405 
Page 99 of 118

Page 100

Page 100 of 118

Page 101

Copy of Consultation Hub questionnaire 
Overview
The Developer Contributions and Affordable Housing Supplementary Guidance supports
Policy 5: Infrastructure Contributions and Policy 20: Affordable Housing in the Perth and
Kinross Local Development Plan 2 (2019). It includes the legal and policy background and
details the contribution requirements towards Primary Education, Auchterarder A9 Junction
Improvements and Transport Infrastructure. The Guidance also details the Council's
Affordable Housing requirement. 
The current version of the Supplementary Guidance was adopted on 29 January 2020 and,
to make sure it stays up to date, the Council has agreed that it should be reviewed. You can
read the draft guidance on both Developer Contributions and Affordable Housing Below as
well as a summary note of the key changes proposed. 
We are seeking your views here. Any comments and suggestions made during this
consultation period will be taken into account when preparing the finalised version of the
Supplementary Guidance. Once this finalised version has been considered and adopted by
the Council, it will replace the current version.  
Why your views matter
Developer Contributions and Affordable Housing are important for delivering sustainable,
resilient communities in Perth and Kinross. The Supplementary Guidance supports our
planning policies in the development management process, and it requires review in order to
keep it up to date with industry factors.
The Planning & Development Service of the Council are gathering your feedback on these
updates to understand the views of different stakeholders.
Please note that the scope of this update is within the existing policy framework of the
adopted Local Development Plan and does not include new policy proposals. This will be
reserved for the preparation of the Council’s next Local Development Plan. Opportunities for
engagement are published regularly and further information on the process is available on
our website, or you can Contact Us for more information. 
7
Page 101 of 118

Page 102

APPENDIX 2 Copy of Consultation Hub questionnaire (continued) 
1. How are you responding (please select all that apply)?
(Required) 
Resident of Perth & Kinross 
Business owner in Perth & Kinross 
Industry representative (developer/agent/etc) 
On behalf of a community group
If you are responding on behalf of an organisation or group please specify below: 
2. Is the updated layout and information in the Draft Developer Contribution (2023) clear? 
Yes 
Somewhat 
No
If "somewhat" or "no" please provide further information below: 
3. Is the updated layout and information in the Draft Affordable Housing Supplementary
Guidance (2023) clear? 
Yes 
Somewhat 
No
If "somewhat" or "no" please provide further information below: 
4. Is the updated layout and information in the summary of key changes clear? 
Yes 
Somewhat 
No
If "somewhat" or "no" please provide further information below:
Page 102 of 118

Page 103

APPENDIX 2 Copy of Consultation Hub questionnaire (continued) 
5. Do you agree with the updates the Council have proposed in the draft documents? 
Yes 
Somewhat 
No
If "somewhat" or "no" please provide further information below: 
6. Please use this space to provide any further comments on each section of the document:
6a Part 1: Developer Contributions - Applying the Guidance 
6b Part 1: Developer Contributions - Primary Education 
6c Part 1: Developer Contributions - Auchterarder A9 Junction Improvements 
6d Part 1: Developer Contributions - Transport Infrastructure 
6e Part 2: Affordable Housing 
[end of questionnaire]
Page 103 of 118

Page 104

Page 104 of 118

Page 105

1D==5AF ?: @D6<;7 7?>BD<C5C;?> 7?==9>CB
,;BC ?: &7A?>F=B%
7:J 7RUbVU\Ti :UfU\_`]U^d Jbecd
7> 7VV_bTQR\U >_ecY^W
7@I 7%@ IdU`XU^ BdT
89?I 8eY\TY^W 9_cd ?^V_b]QdY_^ IUbfYSU
<:99 <_cc_gQi Q^T :YcdbYSd 9_]]e^Ydi 9_e^SY\
=I8 =I 8b_g^ 9_^cdbeSdY_^ BdT
><I >_]Uc V_b IS_d\Q^T
B:F. FUbdX Q^T AY^b_cc B_SQ\ :UfU\_`]U^d F\Q^ . &.,-5'
B:F/ FUbdX Q^T AY^b_cc B_SQ\ :UfU\_`]U^d F\Q^ / &.,.3 J8:'
DF<0 DQdY_^Q\ F\Q^^Y^W <bQ]Ug_b[ 0 &.,./'
FA9 FUbdX Q^T AY^b_cc 9_e^SY\
H9B HYcd_\ 9_^ce\dY^W BY]YdUT
H?9I H_iQ\ ?^cdYdedU _V 9XQbdUbUT IebfUi_bc
IC; I]Q\\ Q^T CUTYe])cYjUT ;^dUb`bYcU
?ZXY]ZXYeVU eVie Z_UZTReVd _Vh `c R^V_UVU eVie
Appendix 3 7
Page 105 of 118

Page 106

9_]]U^d 9_]]U^d
`b_fYTUT Ri
9_e^SY\oc bUc`_^cU 9XQ^WU d_ RU ]QTU
FQbd - :UfU\_`Ub 9_^dbYRedY_^c6 WU^UbQ\
<Y^Tc -,)iUQb edY\YcQdY_^ `UbY_T V_b
S_^dbYRedY_^c &`bY]Qbi UTeSQdY_^(
dbQ^c`_bd Y^VbQcdbeSdebU'
e^QSSU`dQR\U k ceWWUcdc dXYc cX_e\T
RU 1 iUQbc d_ `Qcc 9YbSe\Qb /+.,-.
dUcdc*
><I KYV .-*jVRc feZ]ZdReZ`_ aVcZ`U W`c eY`dV
T`_ecZSfeZ`_ aRj^V_ed Zd R ]`_X*deR_UZ_X
V]V^V_e `W eYV GB: UVgV]`aVc
T`_ecZSfeZ`_d a`]ZTj R_U Zd _`e R _Vh
WVRefcV SVZ_X T`_df]eVU fa`_+ 8 .-*jVRc
aVcZ`U Zd Raac`acZReV XZgV_ eYV _RefcV `W
<UfTReZ`_ ac`[VTed R_U eYV WZ_R_TZ_X `W
eYV^+
GB: T`_dZUVcd eYV aVcZ`U `W .- jVRcd e`
SV Raac`acZReV) :ZcTf]Rc 0,/-./ U`Vd _`e
acVdTcZSV R_j daVTZWZT aVcZ`U W`c eYV
feZ]ZdReZ`_ `W T`_ecZSfeZ`_ aRj^V_ed+
D\ QVO[US
HUaeUcdc dXU -.)]_^dX `UbY_T d_
S\QY] e^c`U^d S_^dbYRedY_^c &Qd
,*.1$ RU\_g 8Q^[ _V ;^W\Q^T RQcU
bQdU' Yc TU\UdUT* HUS_fUbi cX_e\T RU
e^bUcdbYSdUT Q^T gYdX_ed S_cd*
H9B GB: T`_dZUVc Ze _VTVddRcj e` decfTefcV eYV
ac`TVdd `W eYV cVT`gVcj `W f_daV_e
UVgV]`aVc T`_ecZSfeZ`_d+ KYZd ac`TVdd Zd R
]`_X*deR_UZ_X V]V^V_e `W eYV GB:
UVgV]`aVc T`_ecZSfeZ`_d a`]ZTj R_U Zd _`e R
_Vh WVRefcV SVZ_X T`_df]eVU fa`_+
@_eVcVde Zd aRjRS]V Sj GB: `_ R_ f_daV_e
T`_ecZSfeZ`_+ KYZd Zd `W SV_VWZe e` eYV
`cZXZ_R] T`_ecZSfe`c R_U _`e R T`de+ =`c
T]RcZej) eYZd Zd 9R_\ `W JT`e]R_U SRdV cReV+
KYVdV cVT`gVcj RccR_XV^V_ed ac`gZUV
TVceRZ_ej e` S`eY GB: R_U Raa]ZTR_ed+
KYV RUgZTV `_ eYV cV]VgR_e feZ]ZdReZ`_
aVcZ`U R_U cVT`gVcj ac`TVdd Zd ac`gZUVU)
Z_ hcZeZ_X) `_ cVTVZae `W VRTY T`_ecZSfeZ`_
^RUV e` GB:) R_U Zd R]d` deReVU hZeYZ_
R_j JVTeZ`_ 42 8XcVV^V_e+
@_ RUUZeZ`_ e` eYV ViZdeZ_X ^VRdfcVd)
`WWZTVcd RXcVV eYRe RUUZeZ`_R] >fZUR_TV
D\ QVO[US
Page 106 of 118

Page 107

TR_ SV afS]ZdYVU `_ GB:od hVSdZeV e`
RddZde Raa]ZTR_ed hZeY eYRe ac`TVdd+
9_]]U^dc _^ FQbQWbQ`X /*. _V dXU
=eYTQ^SU( ^_dY^W dXQd dXU =eYTQ^SU
gY\\ ^_d RU Q``\YUT bUdb_c`USdYfU\i*
IeWWUcdc g_bTY^W Yc ^_d Y^)[UU`Y^W
gYdX 9YbSe\Qb /+.,-.( bUce\dY^W Y^ dXU
^UUT V_b I31Q Q``\YSQdY_^c Y^ _bTUb
d_ ]_TYVi S_^dbYRedY_^ \UfU\c*
7^_^i]_ec FWWZTVcd T`_dZUVc eYV daZcZe `W eYV
deReV^V_e Re GRcRXcRaY 0+/ _VTVddRcj Z_
`cUVc e` ac`gZUV TVceRZ_ej e` Raa]ZTR_ed
hYRe XfZUR_TV hZ]] Raa]j Re eYV a`Z_e `W
UVeVc^Z_ReZ`_ R_U Zed afca`dV Zd e` ac`eVTe
UVgV]`aVcd, Raa]ZTR_ed Wc`^ Z_TcVRdVd Z_
T`_ecZSfeZ`_ cReVd+
FWWZTVcd cVT`X_ZdV R_ R^V_U^V_e Zd
cVbfZcVU e` T]RcZWj eYZd+
FO_OU_O]V .)- OZS[RSR O` T\YY\d`5
.)- JVS T\YY\dW[U ]_W[QW]YS` O]]Ye
a\ aVS O]]YWQOaW\[ \T aVW` =bWRO[QS5
q JVS =bWRO[QS dWYY PS O]]YWSR a\
`WaS` WRS[aWTWSR W[ aVS OR\]aSR B\QOY
:ScSY\]ZS[a FYO[ O[R ]YO[[W[U
O]]YWQOaW\[`6
q JVS =bWRO[QS dWYY [\a O]]Ye
_Sa_\`]SQaWcSYe a\ `WaS` dWaV TbYY \_
i?[ F_W[QW]YSj ]YO[[W[U Q\[`S[a ]_W\_
a\ SOQV _SYScO[a `SQaW\[ \T aVS
=bWRO[QS Q\ZW[U W[a\ STTSQa5
7TT\_ROPYS >\b`W[U &7bUb`a -++0'6
F_WZO_e ;RbQOaW\[ &COe -++4'6
7bQVaS_O_RS_ 74 @b[QaW\[ &7bUb`a
-++4'6 J_O[`]\_a ?[T_O`a_bQab_S
&7]_WY -+,/')
q JVS =bWRO[QS dWYY [\a PS
_Sa_\`]SQaWcSYe O]]YWSR a\ O[
O]]YWQOaW\[ OY_SORe `bPZWaaSR ]_W\_
a\ aVS =bWRO[QS PSW[U OR\]aSR(
dVS_S5
&W' aVOa d\bYR YSOR a\ O[
W[Q_SO`SR YScSY W[
Q\[a_WPbaW\[` PSW[U
O]]YWSR( \_
&WW' O Q\[`a_OW[a VO` OY_SORe
PSS[ WRS[aWTWSR dVWQV
ZOe W[ aVS OP`S[QS \T
Page 107 of 118

Page 108

aVW` =bWRO[QS VOcS
_S`bYaSR W[ O
_SQ\ZZS[ROaW\[ \T
_STb`OY)
=YfUc `_cYdYfU S_]]U^d _^
FQbQWbQ`X /*. _V dXU =eYTQ^SU( dXQd
dXU =eYTQ^SU gY\\ ^_d RU Q``\YUT
bUdb_c`USdYfU\i*
><I 8d RS`gV 7` OP\cS
FQbd - :UfU\_`Ub 9_^dbYRedY_^c6 `bY]Qbi UTeSQdY_^
IeWWUcdc dXQd S_^dbYRedY_^c cX_e\T
_^\i RU bUaeYbUT gXUbU Q cSX__\ XQc
bUQSXUT -,,$ SQ`QSYdi( gYdX
S_W^YcQ^SU gXUbU cSX__\ b_\\c QbU Qd
SQ`QSYdi TeU d_ _dXUb YTU^dYVYUT
TUfU\_`]U^d* JXYc bUce\dc Y^ nQSdYfUo
TUfU\_`]U^dc RUY^W `U^Q\YcUT
gXUbU Q cSX__\ Yc ^_d QSdeQ\\i Qd
SQ`QSYdi*
><I KYZd Zd R ]`_X*deR_UZ_X V]V^V_e `W eYV GB:
UVgV]`aVc T`_ecZSfeZ`_d a`]ZTj R_U Zd _`e R
_Vh WVRefcV SVZ_X T`_df]eVU fa`_+ KYZd Zd
UVV^VU _VTVddRcj W`c GB:od <UfTReZ`_ %
:YZ]UcV_od JVcgZTVd ^R_RXV^V_e `W eYV
dTY``] VdeReV+
FWWZTVcd cVT`X_ZdV eYRe a]R__Z_X RfeY`cZeZVd
RTc`dd JT`e]R_U cVWVcV_TV UZWWVcV_e
TRaRTZej R_U hZ]] SV UVaV_UV_e `_ VRTY
]`TR] RfeY`cZejod `aVcReZ`_R] cVbfZcV^V_ed+
KYV >fZUR_TV cVT`X_ZdVd eYV _VVU W`c
W`chRcU a]R__Z_X 'GRcRXcRaY .+1(6
l@e Zd _VZeYVc dfdeRZ_RS]V _`c X``U a]R__Z_X
e` hRZe f_eZ] TRaRTZej Zd fdVU fa R_U eYV_
SVXZ_ e` cVT`X_ZdV R_U RUUcVdd eYV
ac`S]V^+ @e hZ]] SV _VTVddRcj e` R_R]jdV
TfccV_e TRaRTZej R_U WfefcV UV^R_U
^R\Z_X eYV d`]feZ`_ eYV T`]]VTeZgV
cVda`_dZSZ]Zej `W eYV :`f_TZ] R_U
UVgV]`aVcd `gVc eYV ]`_X eVc^+ KYZd
Raac`RTY Zd eYV ^`de VbfZeRS]V) dYRcZ_X
eYV T`de hZeY R]] UVgV]`a^V_e hYZTY a]RTVd
_Vh UV^R_U `_ Z_WcRdecfTefcV TRaRTZej)
cReYVc eYR_ a]RTZ_X R_ f_VT`_`^ZT SfcUV_
D\ QVO[US
Page 108 of 118

Page 109

`_ R ]Z^ZeVU _f^SVc `W UVgV]`aVcd Z_ ]ReVc
jVRcd+m
:_Uc ^_d QWbUU gYdX ecU _V dXU 89?I
=U^UbQ\ 8eY\TY^W 9_cd ?^TUh TeU d_
bU\UfQ^SU( f_\QdY\Ydi( Q^T \QS[ _V
dbQ^c`QbU^Si &bUaeYbUc ceRcSbY`dY_^
VUU d_ H?9I' Q^T ceWWUcdc dXQd dXU
HUdQY\ FbYSU ?^TUh cX_e\T RU ecUT
Y^cdUQT*
IeWWUcdc dXQd Y^TUhQdY_^ cX_e\T ^_d
RU Q``\YUT d_ UfUbi S_^dbYRedY_^( Q^T
^_d ecUT V_b `bUfY_ec\i S_]]YddUT
`Qi]U^dc _b ReY\T S_^dbQSdc*
><I KYZd Zd R ]`_X*deR_UZ_X V]V^V_e `W eYV GB:
UVgV]`aVc T`_ecZSfeZ`_d a`]ZTj R_U Zd _`e R
_Vh WVRefcV SVZ_X T`_df]eVU fa`_+
KYV 9:@J Z_UVi Zd R ncVR] eZ^VocVT`cU `W
eYV T`_decfTeZ`_ ^Rc\Ve Re R_j ^`_eY]j
Z_eVcgR]+ :`_ecZSfeZ`_d RcV ]Z_\VU e` eYV
UV]ZgVcj `W Z_WcRdecfTefcV) eYVcVW`cV fdZ_X
eYV 9:@J Z_UVi cVW]VTed eYV T`_decfTeZ`_
T`ded `W eYVdV h`c\d+ NYVcVRd eYV LB
>`gVc_^V_e UVWZ_Vd IG@ Rd6 lR_ RgVcRXV
^VRdfcV `W TYR_XV Z_ eYV acZTVd `W X``Ud
R_U dVcgZTVd S`fXYe W`c eYV afca`dV `W
T`_df^aeZ`_ Sj eYV gRde ^R[`cZej `W
Y`fdVY`]Ud Z_ eYV LBm+ KYV LB
>`gVc_^V_e R]d` R__`f_TVU Z_ /-/- eYRe
IG@ hZ]] SV cVW`c^VU Sj /-0- R_U hZ]] SV
cVa]RTVU Sj eYV :`_df^Vc GcZTV @_UVi+
NYVcV eYVcV RcV R_j RTTVddZSZ]Zej ZddfVd
hZeY 9:@J Z_UVi WZXfcVd Z_ TR]Tf]ReZ_X
T`_ecZSfeZ`_ aRj^V_ed) GB: TR_ RddZde+
D\ QVO[US
FQbd - :UfU\_`Ub 9_^dbYRedY_^c6 dbQ^c`_bd Y^VbQcdbeSdebU
9_]]U^d bUWQbTY^W Y^cUbdY_^ Qd
FQbQWbQ`X 2*16 cUU[c S\QbYdi dXQd dXYc
Yc ^_d Q``\YSQR\U d_ TUfU\_`Ubc
_edgYdX IYdU CK3, FUbdX MUcd*
7@I :`_WZc^ eYRe eYV cVbfZcV^V_e cV]ReVd `_]j
e` C;G/ JZeV DL4-+
K]ROaS d\_RW[U5
g<\YY\dW[U O]]_\]_WOaS
O``S``ZS[a( ]_\]\_aW\[OaS
Q\[a_WPbaW\[` \_ ZWaWUOaW\[ dWYY PS
`\bUVa a\dO_R aVS W[T_O`a_bQab_S a\
PS RSYWcS_SR Pe FS_aV $ AW[_\``
9\b[QWY Oa B:F- IWaS CK2+ &FS_aV
MS`a'( W[QYbRW[U O[ 74 b[RS_]O``
Page 109 of 118

Page 110

a\ ORR_S`` `WaS `ScS_O[QS) ;O_Ye
RW`Qb``W\[` O_S _SQ\ZZS[RSR a\
S`aOPYW`V `]SQWTWQ _S^bW_SZS[a`(
O[R dWYY O]]Ye a\ YO[R\d[S_`*
RScSY\]S_` dWaVW[ aVS IWaS CK2+
O_SO)h
ISS PSY\d)
GeUbYUc gXUdXUb dXUbU QbU
dY]UcSQ\Uc Q^T V_b]Qd V_b
nQ``b_`bYQdU QccUcc]U^do bUaeYbUT(
gYdX bUWQbTc d_ dXU Y^cUbdY_^ Qd
FQbQWbQ`X 2*1*
><I KYV h`cUZ_X Z_dVceVU Re GRcRXcRaY 3+2
RUgZdVd eYRe VRc]j UZdTfddZ`_d RcV
cVT`^^V_UVU e` VdeRS]ZdY eYV daVTZWZT
cVbfZcV^V_ed Wc`^ ac`a`dR]d hZeYZ_ eYV
DL4- RcVR+
KYV a]R__Z_X RfeY`cZej dec`_X]j RUg`TReVd
W`c acV*Raa]ZTReZ`_ RUgZTV, UZdTfddZ`_d
Wc`^ Raa]ZTR_ed+ @e Zd Z_eV_UVU eYRe
a`eV_eZR] Raa]ZTR_ed hZ]] eR\V RTT`f_e `W eYV
>fZUR_TV hYV_ acVaRcZ_X eYVZc ac`a`dR]d
R_U dVV\ RUgZTV `_ eYZd a`Z_e) acZ`c e` eYV
dfS^ZddZ`_ `W R_j a]R__Z_X Raa]ZTReZ`_+
<b_aVS_ b]ROaS a\ d\_RW[U5
g<\YY\dW[U O]]_\]_WOaS
O``S``ZS[a( ]_\]\_aW\[OaS
Q\[a_WPbaW\[` \_ ZWaWUOaW\[ dWYY PS
`\bUVa a\dO_R aVS W[T_O`a_bQab_S a\
PS RSYWcS_SR Pe FS_aV $ AW[_\``
9\b[QWY Oa B:F- IWaS CK2+ &FS_aV
MS`a'( W[QYbRW[U O[ 74 b[RS_]O``
a\ ORR_S`` `WaS `ScS_O[QS)
:W`Qb``W\[` dWaV aVS ]YO[[W[U
ObaV\_Wae( ]_W\_ a\ aVS `bPZW``W\[
\T O[e ]YO[[W[U O]]YWQOaW\[( O_S
`a_\[UYe _SQ\ZZS[RSR a\ S`aOPYW`V
`]SQWTWQ _S^bW_SZS[a`( O[R dWYY
_SYOaS a\ YO[R\d[S_`* RScSY\]S_`
dWaVW[ aVS IWaS CK2+ O_SO)h
HUVUbc d_ Y^cUbdY_^ Qd FQbQWbQ`X 2*1
Q^T bUaeUcdc dXQd dXU =eYTQ^SU
TbQgc _ed dXQd dXU `b_`_bdY_^QdU
S_^dbYRedY_^ Yc d_gQbTc dXU Ve\\
cS_`U( U\U]U^dc Q^T S_cd _V dXYc
Y^VbQcdbeSdebU*
H9B KYV ac`a`dVU Z_dVceZ`_ Re GRcRXcRaY 3+2
R]ZX_d hZeY C;G/ JZeV DL4- dZeV
cVbfZcV^V_ed R_U eYV ac`a`dVU h`cUZ_X Zd
T`_dZdeV_e hZeY eY`dV cVbfZcV^V_ed+ KYZd
V_dfcVd ac`a`dVU Z_WcRdecfTefcV Re eYV dZeV
cVWVcV_TVU Z_ eYV >fZUR_TV Zd T`_dZdeV_e
hZeY C;G/+
D\ QVO[US
Page 110 of 118

Page 111

IeWWUcdc dXQd S_^dbYRedY_^ bQdUc
XQfU ^_d RUU^ QTUaeQdU\i ZecdYVYUT*
><I KYV KcR_da`ce @_WcRdecfTefcV UVgV]`aVc
T`_ecZSfeZ`_ hRd Z^a]V^V_eVU Sj GB: Z_
/-.1+
KcR_da`ce @_WcRdecfTefcV T`_ecZSfeZ`_d dVe
`fe Z_ dVTeZ`_ 3 `W eYV >fZUR_TV cV]ReV e`
eYV GVceY KcR_da`ce =fefcVd ac`[VTed) R]d`
ZUV_eZWZVU Z_ eYV RU`aeVU Jfaa]V^V_eRcj
>fZUR_TV+ E` TYR_XV Zd ac`a`dVU e` eYV
SRdZd `W eYRe T`_ecZSfeZ`_) `_]j R_ faUReV
e` cVW]VTe Z_TcVRdVU ac`[VTe T`ded dZ_TV eYV
]Rde T`ded Wc`^ /-.5,/-+
NZeY cVXRcUd e` eYV afca`dV `W eYZd
T`_ecZSfeZ`_) eYVdV Z_WcRdecfTefcV ac`[VTed
YRgV SVV_ UVV^VU _VTVddRcj Z_ `cUVc e`
RTT`^^`UReV _Vh UVgV]`a^V_e Z_ GVceY)
R_U eYV dfcc`f_UZ_X RcVR) R_U e` dfaa`ce
eYV ]`TR] UVgV]`a^V_e a]R_7 R
UVgV]`a^V_e V^SRcX` hRd VdeRS]ZdYVU
f_eZ] eYV :c`dd KRj CZ_\ I`RU 'GYRdV / `W
GVceY KcR_da`ce =fefcVd( hRd T`^^ZeeVU+
KYV UVgV]`aVc T`_ecZSfeZ`_ cReVd YRgV
SVV_ TR]Tf]ReVU `_ eYV SRdZd `W eY`dV e`eR]
ac`[VTe T`ded R_U eYV ^`UV]]Z_X `W ecRWWZT
Xc`heY Z_ eYRe RcVR e` VdeRS]ZdY R cV]VgR_e
ac`a`ceZ`_ReV T`_ecZSfeZ`_ Wc`^
UVgV]`a^V_e Z_ eYV RcVR+
D\ QVO[US
9_]]U^d bUWQbTY^W Y^cUbdY_^ Qd
FQbQWbQ`X 2*-46 cdQdUc dXQd e`TQdUc
d_ dXU =eYTQ^SU ]ecd RU S_^ce\dUT
_^*
><I KYV ac`a`dVU TYR_XV hZeYZ_ eYV UcRWe
>fZUR_TV hZ]] V_RS]V GB: e` fa]ZWe eYV
T`_ecZSfeZ`_ cReVd Z_ ]Z_V hZeY eY`dV ac`[VTe
T`ded) hYZTY RcV afS]ZdYVU R_U cVa`ceVU
afS]ZT]j Sj GB:) R_U Zd ]Z^ZeVU e` eY`dV
ac`[VTed R]cVRUj ZUV_eZWZVU+
KYV ac`TVdd `W W`c^R]]j cVa`ceZ_X)
T`_df]eZ_X) R_U afS]ZdYZ_X R_ faUReVU
7ZS[RZS[a a\ FO_OU_O]V 1),35
gfJVS _OaS` `Sa \ba W[ aVW`
UbWRO[QS ZOe PS _ScWSdSR O[[bOYYe
a\ OQQ\b[a T\_ b]ROaSR ]_\XSQa
Q\`a` O[R dWYY PS ]bPYW`VSR \[ aVS
FA9 dSP`WaS)h
Page 111 of 118

Page 112

Jfaa]V^V_eRcj >fZUR_TV U`Tf^V_e W`c
c`feZ_V fa]ZWe `W VdeRS]ZdYVU T`_ecZSfeZ`_d Zd
ViTVddZgV hYVcV eYV ^VeY`U`]`Xj W`c
TR]Tf]ReZ_X eYV T`_ecZSfeZ`_ cReV cV^RZ_d
f_TYR_XVU+
@e Zd ac`a`dVU eYRe T`_ecZSfeZ`_ cReVd eYRe
cVbfZcV e` SV c`feZ_V]j faUReVU) f_UVc eYV
dT`aV `W eYV >fZUR_TV) hZ]] SV afS]ZdYVU
`_ eYV GB: hVSdZeV Rd R_ R_TZ]]Rcj
faUReV) cReYVc eYR_ R TYR_XV e` eYV
RU`aeVU Jfaa]V^V_eRcj >fZUR_TV
U`Tf^V_e ZedV]W+ 8aa]ZTR_ed, UVgV]`aVcd hZ]]
SV RUgZdVU Rd e` hYV_ eY`dV cVgZdVU cReVd
hZ]] SVT`^V VWWVTeZgV+
9_]]U^dc dXQd dbQ^c`_bd _R\YWQdY_^c
cX_e\T RU VQYb Q^T `b_`_bdY_^QdU*
JbQ^c`_bd cX_e\T ^_d RU S_^cYTUbUT
cU`QbQdU d_ _dXUb S_^dbYRedY_^c Red
Y^S\eTUT Qc Q gX_\U d_ U^cebU
TUfU\_`]U^d fYQRY\Ydi*
><I KcR_da`ce @_WcRdecfTefcV UVgV]`aVc
T`_ecZSfeZ`_d dVe `fe Z_ dVTeZ`_ 3 `W eYV
>fZUR_TV cV]ReV e` eYV daVTZWZT ac`[VTed
ZUV_eZWZVU Z_ eYV >fZUR_TV Rd aRce `W eYV
GVceY KcR_da`ce =fefcVd Z^ac`gV^V_ed+
KY`dV T`_ecZSfeZ`_d hZ]] `_]j SV d`fXYe
Wc`^ bfR]ZWjZ_X UVgV]`a^V_e hZeYZ_ eYV
ZUV_eZWZVU RcVR+
JZeV*daVTZWZT ecR_da`ce ^ZeZXReZ`_ ^Rj SV
cVbfZcVU VZeYVc Z_ RUUZeZ`_ `c) `c Z_deVRU `W)
eYV T`_ecZSfeZ`_ cVbfZcV^V_ed `W dVTeZ`_ 3
`W eYV >fZUR_TV R_U hZ]] SV T`_dZUVcVU `_
R TRdV*Sj*TRdV SRdZd7 VRc]j acV*Raa]ZTReZ`_
RUgZTV Sj a`eV_eZR] Raa]ZTR_ed Zd eYVcVW`cV
RUgZdVU Z_ `cUVc e` VdeRS]ZdY a`eV_eZR]
cVbfZcV^V_ed `W UVgV]`a^V_e ac`a`dR]d+
D\ QVO[US
=U^UbQ\ ce``_bd6 Red bUaeUcdc
S_^cYTUbQdY_^ Y^d_ Uh`Q^cY_^ _V
TUVY^UT S_^dbYRedY_^c QbUQ d_ ce``_bd
<:99 KcR_da`ce @_WcRdecfTefcV UVgV]`aVc
T`_ecZSfeZ`_d dVe `fe Z_ dVTeZ`_ 3 `W eYV
>fZUR_TV cV]ReV e` eYV daVTZWZT ac`[VTed
D\ QVO[US
Page 112 of 118

Page 113

bebQ\ S_]]e^YdYUc Qc Q bUce\d _V
]QZ_b TUfU\_`]U^dc Q^T d_ebYcd
QSS_]]_TQdY_^*
ZUV_eZWZVU Z_ eYV >fZUR_TV Rd aRce `W eYV
GVceY KcR_da`ce =fefcVd Z^ac`gV^V_ed+ @e
h`f]U _`e SV Raac`acZReV e` fdV eYVdV
T`_ecZSfeZ`_d W`c `eYVc ^ZeZXReZ`_) `c e`
VieV_U eYZd k`_V e` dReZdWj R dVaRcReV
cVbfZcV^V_e+
KYV T`_TVc_d cRZdVU Z_ eYVdV T`^^V_ed
YRgV SVV_ _`eVU Sj `WWZTVcd+ :fccV_e]j) eYV
UcRWe >fZUR_TV SVZ_X T`_df]eVU fa`_
cVacVdV_ed R_ faUReV e` eYV RU`aeVU
>fZUR_TV) R_U _Vh, RUUZeZ`_R] UVgV]`aVc
T`_ecZSfeZ`_ cVbfZcV^V_ed RcV _`e
ac`a`dVU+
GB: RcV TfccV_e]j f_UVceR\Z_X R cVgZVh `W
eYV C;G+ :`^^f_Zej WVVUSRT\) Rd hV]] Rd
Z_WcRdecfTefcV RfUZed) hZ]] dfaa`ce eYRe
cVgZVh Z_ eYV acVaRcReZ`_ `W C;G0
'VdeZ^ReVU W`c RU`aeZ`_ Z_ /-/4( R_U _Vh
T`_ecZSfeZ`_ cVbfZcV^V_ed) hYVcV [fdeZWZVU)
hZ]] SV T`_dZUVcVU Rd aRce `W eYRe ac`TVdd+
FQbd .7VV_bTQR\U >_ecY^W6 WU^UbQ\
Ie``_bdc Q bQ^WU _V QVV_bTQR\U
X_ecY^W di`U Q``b_QSXUc d_ TU\YfUbi(
ceSX Qc cU\V+ Secd_] ReY\T Q^T S_)
X_ecY^W*
H9B E`eVU D\ QVO[US
HUS_]]U^Tc DF<0 F_\YSi -3 Yc
RUddUb bUV\USdUT Y^ dXU =eYTQ^SU( gYdX
bUWQbTc d_ ndYUTo UcdQdU X_ecY^W Y^
bebQ\ QbUQc*
H9B E`eVU+ KZVU VdeReV Y`fdZ_X Zd
cVT`^^V_UVU W`c RddVdd^V_e `_ R_
Z_UZgZUfR] SRdZd Z_ eYV >fZUR_TV+ EG=1
G`]ZTj .4 Z_eV_Ud e` V_T`fcRXV) ac`^`eV)
R_U WRTZ]ZeReV eYV UV]ZgVcj `W ^`cV YZXY
bfR]Zej) RWW`cURS]V R_U dfdeRZ_RS]V cfcR]
Y`^Vd Z_ eYV cZXYe ]`TReZ`_d+
D\ QVO[US
Page 113 of 118

Page 114

=U^UbQ\ ^QbbQdYfU QR_ed dXU
U^WQWU]U^d _V dXU TUfU\_`]U^d
cUSd_b gYdXY^ `\Q^^Y^W Q^T X_ecY^W
S_^ce\dQdY_^c Y^ FUbdX Q^T AY^b_cc*
><I E`eVU D\ QVO[US
D_dUc dXU Y]`_bdQ^SU Y^ dXU b_\U _V
9_]]e^Ydi :UfU\_`]U^d Jbecdc Y^
dXU TU\YfUbi _V QVV_bTQR\U X_ecY^W
gYdX cdbQdUWYS `b_ZUSdc( gXYSX Yc
gU\S_]UT Qc dXU TbQVd =eYTQ^SU Yc
VY^Q\YcUT*
H9B E`eVU D\ QVO[US
GeUbYUc dXU bUVUbU^SU d_ DF<0 Q^T
\QS[ _V bUVUbU^SU V\UhYRY\Ydi _V dXU
.1$ QVV_bTQR\U X_ecY^W bUaeYbU]U^d
d_ bUV\USd fYQRY\Ydi* 9_^S\eTUc dXQd
B:F. F_\YSi ., Q^T dXU TbQVd
=eYTQ^SU QbU S_^dbQbi d_ DF<0*
><I EG=1 G`]ZTj .3 deReVd eYRe ac`a`dR]d W`c
^Rc\Ve Y`^Vd hZ]] `_]j SV dfaa`ceVU
hYVcV eYV T`_ecZSfeZ`_ e` eYV ac`gZdZ`_ `W
RWW`cURS]V Y`^Vd `_ R dZeV hZ]] SV Re ]VRde
/2$ `W eYV e`eR] _f^SVc `W Y`^Vd) R_U
X`Vd `_ e` ]Zde a`eV_eZR] ViTVaeZ`_d) hYVcV
[fdeZWZVU) Rd _`eVU Z_ eYV T`^^V_e+
KYV UcRWe >fZUR_TV cV^RZ_d eYRe /2$ Zd
GB:od ^Z_Z^f^ ViaVTeReZ`_ W`c RWW`cURS]V
Y`fdZ_X cVbfZcV^V_ed) Rd Zd eYV SRdZd `W
RU`aeVU C;G/ G`]ZTj /-+
G`]ZTj /- R]d` deReVd eYRe leYV :`f_TZ] hZ]]
T`_dZUVc Z__`gReZgV R_U W]ViZS]V
Raac`RTYVd e` eYV UV]ZgVcj `W RWW`cURS]V
Y`fdZ_X R_U hZ]] eR\V Z_e` RTT`f_e
T`_dZUVcReZ`_d eYRe ^ZXYe RWWVTe
UV]ZgVcRSZ]Zej dfTY Rd UVgV]`a^V_e gZRSZ]Zej
R_U eYV RgRZ]RSZ]Zej `W Wf_UZ_Xm+
FWWZTVcd T`_dZUVc eYRe eYZd a`]ZTj a`dZeZ`_
dfaa`ced eYV RZ^d `W EG=1 G`]ZTj .3)
hYZ]de cVW]VTeZ_X ]`TR] _VVUd Z_ GB:+
=]ViZSZ]Zej hZ]] SV ac`gZUVU hYVcV gZRSZ]Zej
F_\]\`SR b]ROaS) :SYSaS O[R
_S]YOQS FO_OU_O]V .), \T aVS R_OTa
=bWRO[QS5
gB:F- F\YWQe -+ `Sa` aVS 9\b[QWYj`
_S^bW_SZS[a T\_ OTT\_ROPYS V\b`W[U
dVS[ O``S``W[U [Sd RScSY\]ZS[a
]_\]\`OY`) DF</ &F\YWQe ,1' W` OY`\
O _SYScO[a ]O_a \T aVS `aOaba\_e
RScSY\]ZS[a ]YO[)h
Page 114 of 118

Page 115

ZddfVd TR_ SV RUVbfReV]j UV^`_decReVU)
`_ R TRdV*Sj*TRdV SRdZd+
EG=1 ^R\Vd ac`gZdZ`_ W`c C;Gd e` dVe
UZWWVcV_e aVcTV_eRXV a`]ZTZVd hYVcV
[fdeZWZVU+ KYZd hZ]] SV T`_dZUVcVU Z_ eYV
acVaRcReZ`_ `W C;G0+
HUaeUcdc dXQd FA9 Y^SbUQcU dXU
QVV_bTQR\U X_ecY^W `b_fYcY_^
`UbSU^dQWU V_b ^Ug X_]U* HQdY_^Q\U
Yc RQcUT _^ _dXUb \_SQ\ QedX_bYdi
Q``b_QSXUc Q^T Uh`\QY^c IdYb\Y^W
Q^T <YVU 9_e^SY\ `_\YSi Y^ TUdQY\*
Fb_fYTUc ^QbbQdYfU _^ \_SQ\ S_^dUhd
_V QVV_bTQRY\Ydi Q^T QfQY\QRY\Ydi _V
QVV_bTQR\U X_ecY^W Y^7RUbVU\Ti(
Y^S\eTY^W US_^_]YS Y]`QSdc Q^T
S_]]e^Ydi VUUTRQS[*
7:J KYV UcRWe >fZUR_TV cV^RZ_d eYRe /2$ Zd
GB:od ^Z_Z^f^ ViaVTeReZ`_ W`c RWW`cURS]V
Y`fdZ_X cVbfZcV^V_ed) Rd Zd eYV SRdZd `W
RU`aeVU C;G/ G`]ZTj /-+
FWWZTVcd T`_dZUVc eYRe eYZd a`]ZTj a`dZeZ`_
dfaa`ced eYV RZ^d `W EG=1 G`]ZTj .3)
hYZ]de cVW]VTeZ_X ]`TR] _VVUd Z_ GB:+ G`]ZTj
Vg`]feZ`_ W`c RWW`cURS]V Y`fdZ_X Zd SVZ_X
T`_dZUVcVU Rd GB: f_UVceR\Vd Zed cVgZVh
`W C;G/+
D\ QVO[US
FQbd .7VV_bTQR\U >_ecY^W6 ncUaeU^dYQ\ Q``b_QSXo
D_dUc dXU =eYTQ^SU XQc RUU^
bUcdbeSdebUT Q^T e`TQdUT*
><I E`eVU D\ QVO[US
9_]]U^d bUWQbTY^W FQbQWbQ`X 3*.0
&TU\UdY_^ _V VYbcd Re\\Ud `_Y^d6 lNYVcV
eYVcV Zd R YZXY T`_TV_ecReZ`_ `W
RWW`cURS]V Y`fdZ_X Z_ eYV RcVR R_U
eYV ac`gZdZ`_ `W R T`^^feVU df^
h`f]U YV]a RTYZVgV ^`cV SR]R_TVU
T`^^f_ZeZVd V]dVhYVcV Z_ eYV
Y`fdZ_X ^Rc\Vem' k T_Uc ^_d QWbUU
gYdX TU\UdY_^*
><I E`eVU+ FWWZTVcd T`_dZUVc eYRe eYV a`Z_e)
W`c^Vc]j Z_T]fUVU Re GRcRXcRaY 4+/1)
T`_W]ZTed hZeY eYV daZcZe `W C;G/ G`]ZTj /-
R_U eYV ndVbfV_eZR] Raac`RTYoW`c
RWW`cURS]V Y`fdZ_X UV]ZgVcj Z_ eYV
Jfaa]V^V_eRcj >fZUR_TV+
GB: cVbfZcVd `_*dZeV UV]ZgVcj) `c 'hYVcV
[fdeZWZVU( `WW*dZeV UV]ZgVcj) eYV_ R_U `_]j
hYVcV eY`dV `aeZ`_d TR__`e SV dReZdWZVU) R
T`^^feVU df^ hZ]] SV T`_dZUVcVU+ =fceYVc
V^aYRdZd R_U T]RcZej `_ eYZd ac`TVdd YRd
SVV_ UVV^VU _VTVddRcj Rd R cVdf]e `W
D\ QVO[US
Page 115 of 118

Page 116

ViaVcZV_TV Z_ eYV Raa]ZTReZ`_ `W eYV G`]ZTj
R_U >fZUR_TV R_U eYV a`Z_e W`c^Vc]j
Z_T]fUVU Re GRcRXcRaY 4+/1 cVacVdV_eVU
R^SZXfZej+
NYVcV eYVcV RcV gZRSZ]Zej T`_TVc_d hZeY
ac`a`dVU UVgV]`a^V_e eYV_ eYVdV hZ]] SV
T`_dZUVcVU `_ R TRdV Sj TRdV SRdZd+ GcV*
Raa]ZTReZ`_ RUgZTV `_ a`eV_eZR]
UVgV]`a^V_e ac`a`dR]d Zd R]hRjd RUgZdVU
e` VdeRS]ZdY hYRe ac`gZdZ`_ hZ]] SV
_VTVddRcj+
D_dUc TYcQ``_Y^d]U^d Qd QSSU`dQ^SU
_V S_]]edUT ce]c _fUb _^)cYdU
TU\YfUbi Y^ dXU \_SQ\ QbUQ*
<:99 E`eVU+ KYV faUReVd e` eYV >fZUR_TV
Z_eV_U e` YZXY]ZXYe GB:od acVWVcV_TV W`c
`_*dZeV UV]ZgVcj Rd aRce `W eYV ndVbfV_eZR]
Raac`RTYo+
D\ QVO[US
FQbd .7VV_bTQR\U >_ecY^W6 SbUTYd cicdU]
Idb_^W\i _RZUSdc d_ dXU `b_`_cUT
bU]_fQ\ _V dXU FA9oc SbUTYd cicdU]
V_b 7>* <_\\_gY^W bUQc_^c `b_fYTUT6
7> SbUTYdc U^S_ebQWU UVVUSdYfU+ UQb\i
TU\YfUbi _V 7>*
7> SbUTYdc ]_bU bU\YQR\U dXQ^
`Qi]U^d _V S_]]edUT ce]c*
7> SbUTYdc edY\YcUT Ri \_SQ\ Q^T
IC;c* LQbY_ec US_^_]YS RU^UVYdc
`b_fYTUT \_SQ\ IC;c* FA9 cX_e\T
ce``_bd IC;c*
IeSSUccVe\ UhQ]`\U SYdUT _V 7>
TU\YfUbi Qd =eY\Td_g^*
FA9 XQc TYcSbUdY_^ d_ TUS\Y^U7>
SbUTYdc _^ cYdU)Ri)cYdU RQcYc(
dXUbUV_bU TYcQWbUUc gYdX bU]_fQ\ _V
dXU cicdU]*
7@I KYV Raac`gVU C`TR] ?`fdZ_X JecReVXj
/-//*/-/4 dVed `fe e` UV]ZgVc n^`cV
Y`fdZ_X Z_ ]ZgVRS]V R_U dfdeRZ_RS]V a]RTVd
hYZTY RcV hV]] UVdZX_VU) dRWV R_U
T`__VTeVU+++Z_ efc_ cVUfTZ_X Z_VbfR]Zej R_U
UZdTcZ^Z_ReZ`_o+
KYV dVbfV_eZR] Raac`RTY e` UV]ZgVcj hZeY
acVWVcV_TV W`c `_*dZeV RWW`cURS]V Y`fdZ_X
ac`gZdZ`_ Rd ^fTY Rd acRTeZTRS]V Zd eYV
SVde hRj e` RTYZVgV eYZd+
KYV 8WW`cURS]V ?`fdZ_X :cVUZed JjdeV^
cVUfTVU eYV VieV_e `W `_*dZeV ac`gZdZ`_ `W
RWW`cURS]V Y`fdZ_X hZeYZ_ ^Rc\Ve Y`fdZ_X
UVgV]`a^V_ed+ @e Zd Raac`acZReV e` hZ_U Ze
U`h_ e` RTYZVgV eYV RZ^d `W eYV TfccV_e
C?J+ KYZd Zd R]d` R]ZX_VU hZeY EG=1 R_U
Zed `feT`^Vd) Z_T]fUZ_X eYV ac`gZdZ`_ `W
D\ QVO[US
Page 116 of 118

Page 117

HU]_fQ\ _V dXU7> SbUTYd S_^V\YSdc
gYdX dXU c`YbYd _V B_SQ\ :UfU\_`]U^d
F\Q^ . &.,-5' F_\YSi .,67VV_bTQR\U
>_ecY^W*
]R_U Z_ eYV cZXYe ]`TReZ`_d e` RTT`^^`UReV
WfefcV _VVU R_U UV^R_U W`c _Vh Y`^Vd)
dfaa`ceVU Sj Raac`acZReV Z_WcRdecfTefcV+
FWWZTVcd T`_dZUVcVU eYV aVcTVZgVU SV_VWZed
acVdV_eVU Sj eYV 8WW`cURS]V ?`fdZ_X
:cVUZe JjdeV^ Z_T]fUVU Z_ eYV RU`aeVU
>fZUR_TV) Rd hV]] Rd acRTeZTR] ViaVcZV_TV
`W eYV djdeV^ dZ_TV Zed Z^a]V^V_eReZ`_+
KYZd Raac`RTY R]]`hVU Y`fdVSfZ]UVcd e`
Xc`fa dZeVd) ac`gZUVU eYV `gVcR]] /2$
RWW`cURS]V Y`fdZ_X cVbfZcV^V_e hRd
f]eZ^ReV]j ^Ve RTc`dd R _f^SVc `W dZeVd+
?`hVgVc) Ze YRd _`e SVV_ hV]] feZ]ZdVU R_U
YRd ac`gV_ UZWWZTf]e e` Z^a]V^V_e R_U
^`_Ze`c+
KYV SV_VWZed Z_ eVc^d `W WRdeVc UV]ZgVcj R_U
dfaa`ce W`c ]`TR] JD<d RcV _`eVU Sfe RcV
_` ]`_XVc T`_dZUVcVU e` `fehVZXY eYV
^VUZf^ R_U ]`_X*eVc^ UZdSV_VWZed Z_ eVc^d
`W ac`gZUZ_X RWW`cURS]V Y`fdZ_X Z_ eYV cZXYe
]`TReZ`_d+ 8_j T`_WZc^VU :cVUZed TfccV_e]j
RXcVVU hZeY UVgV]`aVcd hZ]] T`_eZ_fV e` SV
gR]ZU f_eZ] eYVZc ViaZcj UReVd) Sfe _` WfceYVc
:cVUZed dYR]] SV RhRcUVU+
:_Uc ^_d ce``_bd dXU bU]_fQ\ _V dXU
7> SbUTYd cicdU]* JXU cicdU] Q\\_gc
V\UhYRY\Ydi Y^ TU\YfUbY^W cYdUc Y^ TYVVYSe\d
VY^Q^SYQ\ dY]Uc( V_b UhQ]`\U TebY^W
dXU \Qcd bUSUccY_^( Q^T d_ ]UUd7>
^UUT*
><I 8d RS`gV D\ QVO[US
:_Uc ^_d QWbUU gYdX `b_`_cUT
bU]_fQ\ _V 7> SbUTYd cicdU]*
9_^cYTUbc dXU SbUTYd cicdU]
=I8 8d RS`gV D\ QVO[US
Page 117 of 118

Page 118

U^XQ^SUc dXU TU\YfUbi _V7>* IUdc
_ed ^QbbQdYfU _V RU^UVYdc `b_fYTUT d_
dXU US_^_]i Qc Q \_SQ\ RecY^Ucc
Q^T U]`\_iUb*
D_dUc dXU SbUTYd cicdU] XQc RUU^
UVVUSdYfU Y^ bebQ\ QbUQc( Q^T bUaeUcdc
Yd RU bUdQY^UT*
H9B 8d RS`gV D\ QVO[US
EdXUb 9_]]U^dc
=U^UbQ\ ce``_bd 7@I E`eVU D\ QVO[US
9_^SUb^c _fUb Uh`\Q^QdY_^ _V dXU
S_^ce\dQdY_^ `b_SUcc Q^T X_g `eR\YS
S_^ce\dQdY_^ bUc`_^cUc gY\\ RU
S_^cYTUbUT Ri dXU 9_e^SY\*
><I KYV cVa`ce e` <_gZc`_^V_e) @_WcRdecfTefcV
R_U <T`_`^ZT ;VgV]`a^V_e :`^^ZeeVV
'0.de DRj /-/0 IVa`ce E`+ /0,.4- deReVU
eYRe6
l=`]]`hZ_X eYV aVcZ`U `W afS]ZT
T`_df]eReZ`_) eYV cVda`_dVd hZ]] SV T`]]ReVU
R_U cVgZVhVU Sj eYV ac`[VTe eVR^+ KYV
faUReVU >fZUR_TV hZ]] eYV_ SV Sc`fXYe
SRT\ e` :`^^ZeeVV W`c Raac`gR] acZ`c e`
dfS^ZddZ`_ e` JT`eeZdY DZ_ZdeVcd W`c W`c^R]
RU`aeZ`_m+
FWWZTVcd RTTVae eYV ac`TVdd T`f]U SV
^RaaVU ^`cV T]VRc]j W`c deR\VY`]UVcdo
RhRcV_Vdd R_U Via]RZ_ Y`h GB: RcV
T`_dZUVcZ_X T`_df]eReZ`_ cVda`_dVd Z_ eYV
RU`aeZ`_ ac`TVdd+
D\aS T\_ Tbab_S Q\[`bYaOaW\[
=U^UbQ\\i ce``_bdc `XQcY^W _V
S_^dbYRedY_^c `Qi]U^dc Q^T
Y^f_\fU]U^d _V FA9 Y^ TU\YfUbY^W
Y^VbQcdbeSdebU*
H9B E`eVU D\ QVO[US
Page 118 of 118