Agenda Document Pack - Environment, Infrastructure and Economic Development Committee - 31/05/2023

Perth and Kinross Council · 31 May 2023
Back to Environment, Infrastructure and Economic Development Committee — 31 May 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
24/05/2023 
A hybrid meeting of the Environment, Infrastructure and Economic Development
Committee will be held in the Council Chamber on Wednesday, 31 May 2023 at
09:30. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Depute Provost Andrew Parrott  (Convener)
Bailie Mike Williamson  (Vice-Convener)
Councillor Keith Allan
Bailie Alasdair Bailey
Councillor Steven Carr
Councillor John Duff
Councillor Angus Forbes
Councillor Ken Harvey
Councillor Noah Khogali
Bailie Claire McLaren
Councillor Willie Robertson
Councillor Frank Smith
Councillor Colin Stewart
Councillor Richard Watters
Councillor Jack Welch
Page 1 of 222

Page 2

Page 2 of 222

Page 3

Environment, Infrastructure and Economic Development Committee 
Wednesday, 31 May 2023 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF ENVIRONMENT, INFRASTRUCTURE
AND ECONOMIC DEVELOPMENT COMMITTEE OF 29 MARCH
2023 FOR APPROVAL
(copy herewith) 
5 - 8 
4 OUTSTANDING BUSINESS STATEMENT (OBS)
(copy herewith 23/169) 
9 - 10 
5 DEVELOPER CONTRIBUTIONS AND AFFORDABLE HOUSING
SUPPLEMENTARY GUIDANCE UPDATES
Report by Head of Planning and Development (copy herewith
23/170) 
11 - 64 
6 COMMUNITIES SERVICE ANNUAL PERFORMANCE REPORT
2022/23
Report by Executive Director (Communities) (copy herewith 23/168) 
65 - 102 
7 SHORT TERM LET CONTROL AREA : PROPOSALS FOR
CONSULTATION
Report by Head of Planning and Development (copy herewith
23/171) 
103 - 142 
8 PERTH CITY OF LIGHT ACTION PLAN UPDATE 2023
Report by Head of Planning and Development (copy herewith
23/172) 
143 - 222 
Page 3 of 222

Page 4

Page 4 of 222

Page 5

ENVIRONMENT, INFRASTRUCTURE AND ECONOMIC
DEVELOPMENT COMMITTEE 
Minute of hybrid meeting of the Environment, Infrastructure and Economic
Development Committee held in the Council Chambers on Wednesday 29 March
2023 at 9.30am. 
Present: Bailies A Bailey, C McLaren and M Williamson, Councillors K Allan, S Carr,
J Duff (from Item 4 onwards), S Donaldson (substituting for Councillor K Harvey),
A Forbes, N Khogali, I Massie (substituting for Councillor R Watters), A Parrott,
W Robertson, F Smith, C Stewart, and J Welch. 
In Attendance: B Renton, Executive Director (Communities); D Littlejohn,
M Butterworth, S Best, B Cargill, C Leishman, J Watson, E Williamson, R Wills,
B Wilson (from Item 4 onwards) (all Communities); S Hendry, A Taylor, M Pasternak
and R Ramsay (all Corporate and Democratic Services). 
Apologies for Absence: Councillors K Harvey and R Watters. 
Councillor A Parrott, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
Councillor A Parrott welcomed everyone to the meeting.  Apologies for
absence and substitutions were noted as above. 
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interest made in terms of the Councillors’ Code
of Conduct. 
3. MINUTE OF PREVIOUS MEETINGS 
(i) Minute of Meeting of the Environment, Infrastructure and
Economic Development Committee of 16 November 2022 
The minute of the meeting of the Environment, Infrastructure and
Economic Development Committee of 16 November 2022 was
submitted and approved as a correct record. 
(ii) Minute of Special Meeting of the Environment, Infrastructure and
Economic Development Committee of 6 March 2023 
The minute of the special meeting of the Environment, Infrastructure
and Economic Development Committee of 6 March 2023 was
submitted, approved as a correct record and authorised for signature.  
3
Page 5 of 222

Page 6

4. MOTION 
Re-Assessment of Conservation Areas in Perth and Kinross 
Motion (Councillors N Khogali and A Forbes) 
To move that the Environment, Infrastructure and Economic Development
Committee be asked to consider the issue of Conservation Areas and commit
the Council to an ongoing re-assessment of these areas in Perth and Kinross,
with a recommendation from this Committee that there be a minimum of 4
reviews per year and using an approach that both protects areas of historical
and architectural significance, but is also fit for purpose in line with Council
commitments regarding Climate Change and Sustainability. 
To acknowledge that local authorities are unable to amend regulations
regarding what development is permitted within a Conservation Area without
planning permission and ask the Convener of this Committee to write to the
relevant Scottish Government minister requesting that a review into permitted
development rights within Conservation Areas is undertaken with the utmost
urgency. 
Resolved:
In accordance with the Motion. 
4. OUTSTANDING BUSINESS STATEMENTS (OBS) 
Resolved:
The Outstanding Business Statement be noted and updated accordingly. 
5. ACTIVE TRAVEL STRATEGY - CYCLING, WALKING AND SAFER
ROUTES (CWSR) PROJECTS 2023/24 
There was submitted a report by Head of Environmental and Consumer
Services (23/103) (1) detailing the Cycling, Walking and Safer Routes (CWSR)
projects implemented in 2022/23, and (2) seeking approval of the proposed list of
Cycling, Walking and Safer Routes projects for 2023/24. 
Resolved:
(i) The schemes implemented from the Cycling, Walking and Safer Routes Grant
Funding in 2022/23 as detailed at Appendix 1 of Report 23/103, be noted
(ii) The list of works for Cycling, Walking and Safer Routes projects for the
financial year 2023/24 as detailed in Appendix 2 of Report 23/103, be
approved. 
7. GYPSY/TRAVELLER SITES STANDARDS GUIDANCE NOTE 
There was submitted a report by Head of Planning and Development (23/104)
(1) summarising the background and development of non-statutory planning
guidance and the comments received during the formal consultation carried out in
Page 6 of 222

Page 7

2022; and (2) seeking approval to finalise and adopt the guidance to support the
Local Development Plan (adopted November 2019) as non-statutory guidance. 
Resolved: 
The Gypsy/Traveller Site Standards Guidance Note to support the
implementation of Policy 21 of the Local Development Plan, be approved. 
THERE FOLLOWED A SHORT RECESS AND THE MEETING RECONVENED AT
11.04AM. 
8. MOBILITY STRATEGY MAIN ISSUES REPORT 
There was submitted a report by Head of Planning and Development (23/105)
seeking approval of the Mobility Strategy Main Issues Report for use towards early-
stage consultation. 
Resolved:
(i) The contents of the Mobility Strategy Main Issues Report as detailed in
Appendix 1 to Report 23/105, along with the Mobility Strategy project plan, be
approved.
(ii) It be noted that feedback from the Main Issues Report and Big Place
Conversation will be collated, summarised, and presented within the draft
Mobility Strategy for approval in 2024. 
9. WASTE MANAGEMENT PLAN 2010-2025 - PROGRESS REPORT 
There was submitted a report by Head of Environmental and Consumer
Services (23/106) (1) providing an update on progress with the Perth and Kinross
Council Waste Management Action Plan and giving an overview of the national
policy and legislative position; and (2) seeking approval of six new actions (115-120). 
Resolved:
(i) The annual update on progress on the Waste Management Action Plan, be
scrutinised 
(ii) The six new actions (115-120) as detailed in Appendix 1 to Report 23/106, be
approved
(iii) It be noted that the current Waste Management Plan will be reviewed in
2023/24 as per action 116. 
~~~~~~~
Page 7 of 222

Page 8

Page 8 of 222

Page 9

ENVIRONMENT, INFRASTRUCTURE AND ECONOMIC DEVELOPMENT COMMITTEE
OUTSTANDING BUSINESS STATEMENT (OBS) 
(23/168) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action Due /
Complete
Action
Expected
9. 29 March
2023
Item 8 
Mobility Strategy
Main Issues Report
Provide Members with
further information on
the current situation
with regards the bus
service in Invergowrie. 
Comprehensive update
provided to Local
Members at a Road
Safety Projects
Meeting on 11 April
advising that work was
continuing with the
TRO for waiting
restrictions at the
Dargie Road/Noble
Avenue junction. 
Where removing the
on-street parking
would provide
additional road space
so the bus operators
could negotiate the
bend and service the
residential streets, as
well as being able to
travel along Noble
Avenue towards
Station Road and the
train station.
Brian Cargill COMPLETE 31 May 2023
4
Page 9 of 222

Page 10

No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action Due /
Complete
Action
Expected
10. 29 March
2023
Item 9
Waste Management
Plan 2010-2025
A Briefing Note be
issued to Members on
the Deposit Return
Scheme detailing any
engagement that has
been carried out with
local businesses. 
Verbal update to be
provided to Committee
on 31 May 2023.
Mark Butterworth NOT
COMPLETE
31 May 2023
Page 10 of 222

Page 11

PERTH AND KINROSS COUNCIL 
Environment, infrastructure & Economic Development Committee 
31 May 2023 
DEVELOPER CONTRIBUTIONS AND AFFORDABLE HOUSING
SUPPLEMENTARY GUIDANCE UPDATES 
Report by Head of Planning and Development 
(Report No. 23/170) 
1. PURPOSE
1.1 This report presents proposed updates to the Developer Contributions and
Affordable Housing Supplementary Guidance (2020) (DC&AH SG). 
1.2 The DC&AH SG is required to support Policy 5 (Infrastructure Contributions)
and Policy 20 (Affordable Housing) of the adopted Local Development Plan 2
(2019) (LDP2). The DC&AH SG was approved by the Council’s Strategic
Policy and Resources Committee on 29 January 2020 (Report No. 20/25),
and subsequently approved by Scottish Ministers and adopted as statutory
supplementary guidance. 
1.3 There is a need to update various aspects of the guidance as a monitoring
action; and importantly to revise contribution rates in line with construction
inflation. The updates that are proposed for the DC&AH SG shall remain
within the existing policy framework of the adopted LDP2, and this is
important. New contributions methodologies are therefore not currently being
proposed for inclusion. 
1.4 A copy of the draft guidance document is appended to this report (Appendix
1). 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
i) notes that the paper was discussed and supported by the Affordable
Housing Member Officer Working Group 
ii) approves the recommended updates to the Developer Contributions and
Affordable Housing Supplementary Guidance to initiate a period of public
consultation in June 2023; 
(iii) agrees to a report made back to this Committee on the outcomes of
proposed public consultation, with any further changes to the
Supplementary Guidance, prior to submission to Scottish Ministers for
adoption.
5
Page 11 of 222

Page 12

3. STRUCTURE OF REPORT
3.1 This report is structured over the following sections: 
• Section 4: Background/ Main Issues 
• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1  The Developer Contributions and Affordable Housing Supplementary
Guidance (2020) (DC&AH SG) includes the legal and policy background for
developer contributions to mitigate the impact of consented new development
and details the Council’s Affordable Housing requirement. It provides
guidance relating to developer contributions for Primary Education, the
Auchterarder A9 Junction Improvements, and Transport Infrastructure around
Perth. 
4.2 Developer contributions can either be physical delivery on site or through a
financial payment. Developer contributions will only be sought where they
meet the tests of Scottish Government Circular 3/2012: Planning Obligations
and Good Neighbour Agreements. In order to support the LDP2 policy
implementation, the Council developed this statutory Supplementary
Guidance which is now being reviewed and is the subject of this report. The
following is an example of how a development proposal may be assessed for
developer contributions and affordable housing. 
Table 1: Example of developer contribution calculation 
Proposed
Development 
Affordable Housing  Primary  
Education*  
Transport
Infrastructure*  
Provision Location
8
dwellinghouses
Minimum 2
units: to be
determined
preferably
onsite but
offsite if
deemed
desirable
Onsite 6 dwellings  6 dwellings at full
rate, 2 dwellings at
reduced rate
Offsite/
Commuted
Sum
8 dwellings  8 dwellings at full
rate  
* Assumes the proposed development is in a location which qualifies for
assessment of these developer contributions. 
Notes: Affordable housing commuted sums are in place only to facilitate the
delivery of affordable housing, in lieu of onsite delivery. Where required, primary
education and/or transport infrastructure contributions would therefore still
apply. 
Page 12 of 222

Page 13

4.3 The current version of the DC&AH SG was approved by the Council’s
Strategic Policy and Resources Committee on 29 January 2020 (Report No.
20/25) and it is the view of officers that there is a now a need to update the
guidance, particularly to reflect construction inflation. 
4.4 The project team working on the updates to the DC&AH SG comprises
officers from the Development Plans and Housing Strategy teams within
Planning & Development.   
4.5 The paper was discussed and supported by the Council’s Affordable Housing
Member Officer Working Group. 
4.6 Subject to Committee approval, the intention is to undertake public
consultation prior to submitting the revised guidance to Scottish Ministers for
approval, which is necessary in order to retain ‘statutory’ status.  If approved,
the proposed changes would then take effect legally. 
4.7 In summary, the key modifications to the current adopted Developer
Contributions and Affordable Housing Supplementary Guidance being
proposed are: 
• Presentation of the guidance document in two sections: Developer
Contributions and Affordable Housing
• Relevant updates to the Affordable Housing section, as listed from section
5.6 of this report
• Revised Affordable Housing Commuted Sum rates, Primary Education,
and Transport Infrastructure rates in line with inflation/ project costs
• Provision to allow for the Primary Education and Transport Infrastructure
rates to be revised routinely in line with inflation/ project costs without the
need for further formality
• Updated Appendix 1 of the existing guidance, detailing the list of relevant
primary schools
• Rewording of “Principles of guidance” section of the existing document
relating to Auchterarder A9 Junction Improvements
• Insertion of paragraph in the Transport Infrastructure section of the
guidance, relating to Site MU70 (Perth West) infrastructure costs. 
5. PROPOSALS
5.1 Best value is continuous improvement in the performance of the local
authority’s functions. This review ensures the Developer Contributions and
Affordable Housing Supplementary Guidance (2020) (DC&AH SG) remains
up-to-date and secures best value. 
Affordable Housing 
5.2 The proposed DC&AH SG update was discussed at a meeting of the
Affordable Housing Member Officer Working Group. Feedback relating to the
implementation of the Affordable Housing policy and supplementary guidance,
Page 13 of 222

Page 14

received from officers and Elected Members, has been used to inform the
updates to the DC&AH SG. 
5.3 One area of feedback focused on opportunities to more effectively highlight
the Affordable Housing guidance, when used by officers and customers of the
planning service.  Therefore, the first key update to the DC&AH SG is the
physical presentation of the document. Presently, both sections (Developer
Contributions and Affordable Housing) are contained within the same
document. It is now proposed that the DC&AH SG will be published in two
sections (‘Part 1: Developer Contributions’ and ‘Part 2: Affordable Housing’) in
order to improve the accessibility of the guidance on Affordable Housing and
emphasise the purpose of the guidance in its own right; not as a subsection of
Developer Contributions. 
5.4 The DC&AH SG provides information on the delivery of the affordable housing
obligation as set out in LDP2 Policy 20: Affordable Housing.  With growing
focus on how to deliver a wider range of affordable homes as directed by the
recently approved Local Housing Strategy 2022-27 (LHS), a review of the
guidance has been undertaken to reflect current Scottish Government policy,
including National Planning Framework 4 (NPF4), which became effective
from 13 February 2023, and now forms part of the statutory development
plan. Findings from the Housing Needs and Demands Assessment (HNDA),
which informs the LHS, were reported to the Council’s Housing and Social
Wellbeing Committee on 15 March 2023 (Report No. 23/82). 
5.5 A greater emphasis is now placed on the sequential approach for the delivery
of affordable housing. This, in turn, aims to remove the perception that the
affordable housing obligation can automatically be met through a financial
commitment rather than onsite provision. It will clarify what type of provision is
best suited to a particular development proposal in order to meet policy
requirements. These changes will help implement Local Housing Strategy
actions to support an increase in overall new build affordable housing
delivery, including rural sites. 
5.6 The following changes are proposed to the affordable housing guidance.
Please also refer to Appendix 1, Part 2, of this report: 
5.6.1 The guidance has been restructured and updated in terms of its references to
Scottish Government and PKC policies. This aims to create a more fluid
document that provides an overview of what affordable housing is and how
the policy should be implemented.   
5.6.2 The section of the existing DC&AH SG relating to the ‘Affordable Housing
Credit System’ has been removed. This approach allowed housebuilders to
group sites, provided the overall 25% affordable housing requirement was
ultimately met across a number of sites. However, it has not been well utilised
and has proven difficult to implement and monitor. It was also found to
undermine the sequential approach to the delivery of affordable housing. Any
confirmed Credits currently agreed with developers will continue to be valid
until their expiry dates, but no further Credits shall be awarded.  
Page 14 of 222

Page 15

5.6.3 Part 2, page 7, includes the circumstances in which payment of a commuted
sum may be acceptable in lieu of on-site delivery; the point relating to high
concentrations of existing affordable housing has been deleted from this list. 
5.6.4 Insertion of section (Part 2, page 8, of the draft guidance) highlighting the five-
year utilisation period for commuted sum payments, moved from ‘Part 1’. 
5.6.5 The calculation of commuted sums has been reviewed by the District Valuer
as of January 2023 to reflect the most recent plot values by Housing Market
Area (Part 2, page 8 of the draft guidance). The guidance currently allows for
commuted sum rates to be routinely updated to reflect inflation and housing
markets without further formality. As advised on the Council’s website, the
revised commuted sum rates were effective from 01 April 2023 and are now
applied to planning applications validated from that date. The updated DC&AH
SG document will contain those latest rates. 
5.6.6 A section has been added on the ‘tenure blind’ approach to provide  more
clarity on what this means for a development (Part 2, page 10, of the draft
guidance). The aim of this section is to ensure that affordable housing is
considered at the very beginning of the design process andcomplements the
market housing, contributing to a mixed community and integration within the
development.   
5.6.7 The percentage in terms of households living in private rental accommodation
has been updated to reflect the most current national  data  (Part 2, page 11,
of the draft guidance). 
5.6.8 The average house prices for the PKC area have been updated to reflect the
most recent averages and highlight the significant increase in house sale
value compared to other Tayside partners (Part 2, page 12, of the draft
guidance). 
Primary Education 
5.7 The main update to the Primary Education section of the DC&AH SG is the 
uplift in the contribution rate, presently £5,164. This rate is applied to new 
Open Market dwellinghouses proposed within primary school catchments that
demonstrate a ‘capacity issue’. A capacity issue is defined in the guidance as
being “where a primary school has been operating at over 80% for 5 out of the
previous 7 years and is likely to be operating following completion of the
proposed development, extant planning permissions and Local Development
Plan allocations, at or above 100% of total capacity”. It is proposed that, to
better reflect current industry costs, Building Cost Information Service (BCIS)
General Build Cost Indexation will be applied for the period since the rate was
previously approved by the Council (January 2020) as follows: 
Page 15 of 222

Page 16

Table 2: Change in Primary Education contribution rate
Primary Education
Contribution
Current (2020)
Rate
Proposed (2023)
Rate
Difference
Per Open Market
Dwelling
£5,164 £6,300 +£1,136 
5.8 The list of schools that qualify as having a capacity issue, contained within
Part 1, Appendix 1, of the DC&AH SG is also updated in consultation with
Education & Children’s Services. The guidance currently includes provision to
allow this update to be made annually without the need for further formal
procedure. It is proposed that similar provision be included in the updated
guidance to allow the contribution rate to also be refreshed in a similar way to
include any uplift resulting from inflation without need for further formal
procedure. 
Auchterarder A9 Junction Improvements 
5.9  The Auchterarder A9 Junction Improvements section of the DC&AH SG sets
out the basis in which Perth & Kinross Council will seek to ensure
contributions from developments within the Auchterarder and wider Strathearn
housing market area towards meeting the cost of delivering the A9 Junction
Improvements that are required in the interests of road safety. The zone for
which these contributions are sought is shown in Part 1, Appendix 2, of the
draft guidance. 
5.10 The circumstances in which a development proposal is assessed for a
contribution requirement is set out from Part 1, page 12, of the draft guidance.
It is proposed that the wording is amended for non-residential development
proposals. Presently, the guidance will only be applied to proposals that
require a Transport Assessment. The proposed change in wording will enable
non-residential development proposals that result in an increased trip
generation equal to or higher than a dwellinghouse to be considered on a
case-by-case basis. 
Transport Infrastructure 
5.11 The Transport Infrastructure section of Part 1 of the draft guidance sets out
the basis in which Perth and Kinross Council will seek contributions from
developments in and around Perth towards the cost of delivering the transport
infrastructure improvements which are required for the release of all
development sites and to support the growth of Perth and Kinross. The
(a / b) x c
‘a’ means the Index for the month March 2023, the month which precedes the
date of this report (440.0)
‘b’ means the Index for the month of January 2020, the month in which the
DC&AH SG was approved (359.8)
‘c’ means the sum to be indexed (£5,164)
1.22 x £5,164 = £6,300 
Page 16 of 222

Page 17

Council seeks contributions for the Perth Transport Futures projects A9/A85
Crieff Road junction improvements and the Cross Tay Link Road (CTLR). The
developer contribution rates are calculated on the basis of these project costs.
Revised project costs for the CTLR were reported to Finance & Resources
Committee on 07 September 2022 at a sum of £150,469,000. This updated
project cost will now form the basis of the Transport Infrastructure contribution
rates. 
5.12 Traffic modelling undertaken for the preparation of LDP2 identified that 50% of
future traffic growth is associated with new development sites contained in the
LDP. The contribution level is therefore calculated on the basis of 50% of the
total project costs (identified above) and the remainder being sought through
other mechanisms. The ‘Full’ Contribution Area rate applies to all
development which is defined by settlements in this area having more than a
19% impact on the transport infrastructure. The ‘Reduced’ Contribution Area
rate applies to development in this area having a 12%-19% impact on the
transport infrastructure. The ‘Full’ and ‘Reduced’ Areas are shown on the map
at Appendix 3 of the guidance. Only the contribution rates, as a result of
updated project costs, is proposed for change. The contribution areas will
remain as existing. 
5.13 It is proposed that, as with 5.8 of this report with regards to primary education,
similar provision be included in the revised guidance to allow the transport
contribution rate to be updated on the basis of reported project costs in a
similar way, as required, without need for further formal procedure. 
5.14 The updated contribution rates are as follows, with comparative change from
the current adopted rate. All sums are rounded to the nearest whole pound.: 
Table 3: Full Contribution Area 
Land Use  CTLR   A9/A85   New Total   Current Total Change
Retail (m²)  £139  £46  £185  £154  +£31
Employment  (
m²) 
£13  £4  £17  £14  +£3
Other Non-
Residential (m
²)
£43  £14  £57  £48 +£9
Residential
Open Market 
(per unit)
£3,288 £1,079 £4,367 £3,657  +£710
Residential
Affordable 
(per unit)
£1,644 £540 £2,184 £1,828 +£356 
Page 17 of 222

Page 18

Table 4: Reduced Contribution Area 
Land Use  CTLR   A9/A85   New Total   Current Total Change
Retail (m²)  £104 £34 £138 £115 +£23
Employment  (m²)  £10 £3 £13 £10 +£3 
Other Non-
Residential (m²)
£33 £11 £44 £35 +£9 
Residential Open
Market 
(per unit)
£2,466 £810 £3,276 £2,742 +£534 
Residential
Affordable 
(per unit)
£1,233 £405 £1,638 £1,370 +£268 
5.15 Insertion of a new paragraph is also proposed in this section of the guidance
relating to LDP2 Site MU70 (Perth West). The following shall be inserted in Part
1, page 14, of the draft guidance after paragraph 6.4: 
“Following appropriate assessment, proportionate contributions or mitigation
will be sought toward the infrastructure to be delivered at LDP2 Site MU70
(Perth West), including an A9 underpass to address site severance. Early
discussions are recommended to establish specific requirements from
landowners/developers within MU70.” 
Next Steps 
5.16 The proposed next stage for the DC&AH SG is a period of statutory public
consultation, following the presentation of this report, from June 2023. This
will be carried out via online consultation, using Consultation Hub. It is
anticipated that, as the consultation will coincide with the summer holiday
period, the consultation will run for a minimum of 8 weeks. Corporate social
media channels will also be used to promote the consultation as appropriate. 
5.17 Following the period of public consultation, the responses will be collated and
reviewed by the project team. The updated guidance will then be brought
back to Committee for approval prior to submission to Scottish Ministers for
formal adoption. 
CONCLUSION 
6.1 This report provides an overview of the key updates and clarifications being
made to the currently adopted Developer Contributions and Affordable
Housing Supplementary Guidance. 
6.2 The guidance is to remain within the policy framework of the adopted statutory
Local Development Plan 2 (2019), with future policy changes being
Page 18 of 222

Page 19

considered as part of the Council’s development plan review for “Local
Development Plan 3”. 
6.3 It is recommended that the Committee agree these proposed changes and
approve the draft DC&AH SG (Appendix 1 of this report) as the basis for a
period of public consultation. 
Author
Name  Designation Contact Details
Lucy Sumner  Development
Contributions
Officer
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities)
23 May 2023
APPENDICES 
• Appendix 1 – Draft Developer Contributions and Affordable Housing
Supplementary Guidance (Parts 1 and 2) 
Page 19 of 222

Page 20

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce No
Asset Management (land, property, IST) No
Assessments  
Equality Impact Assessment No
Strategic Environmental Assessment No
Sustainability (community, economic, environmental) Yes
Legal and Governance  Yes
Risk No
Consultation 
Internal  Yes
External  Yes - required
Communication 
Communications Plan  No 
The Impact & Value Assessment (IVA) has been designed to screen every 
Council project, strategy or proposal against statutory and non-statutory 
environmental, social and economic requirements. It has replaced the 
previous existing Integrated Appraisal Toolkit (IAT). 
DC&AH SG updates - Committee Annex Checklist
DC&AH SG updates - Impact Assessments
DC&AH SG updates - Strategic & Resource Implications 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This report supports the following priorities within the Community Plan 2022-
27:
(i) Mental and physical wellbeing
(ii) Skills, learning and development  
Page 20 of 222

Page 21

Corporate Plan 
1.2 This report supports the objectives within the draft new Corporate Plan:
(i) Children and young people grow up safe, respected, well-educated,  
and confident in their ability to realise their full potential; 
(ii) People and businesses are increasingly able to prosper in a local 
economy which support low carbon ambitions and offers opportunities  
for all; 
(iii) People can achieve their best physical and mental health and have 
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially    
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of 
climate and environmental change for this and future generations. 
2. Resource Implications 
Financial 
2.1 The subject of this report does not introduce new commitments for revenue or
capital funding. The subject of this report does not require revenue or capital
funding. Any income ingathered via payment of developer contributions and
affordable housing commuted sums is a financial consideration, however the
use of these funds are clearly defined in the relevant Local Development Plan
policies, in the supplementary guidance, and in legal agreements, where
applicable. 
2.2 The Head of Finance must be consulted on all proposals with financial
implications.  No report with such implications should be presented at a
meeting when this has not been done and it should be explicitly stated that
the Head of Finance has been consulted, and has indicated agreement with
the proposals. 
Workforce 
2.3 There are no workforce implications resulting from this report. The Corporate
Human Resources Manager must be consulted on all proposals with
workforce implications.  No report with such implications should be presented
at a meeting when this has not been done and it should be explicitly stated
that the Corporate Human Resources Manager has been consulted, and has
indicated agreement with the proposals. 
Asset Management (land, property, IT) 
2.4 There are no asset management implications resulting from this report. The
Director (Environment) must be consulted on all proposals with land and
property implications.  No report with such implications should be presented at
a meeting when this has not been done and it should be explicitly stated that
Page 21 of 222

Page 22

the Director (Environment) has been consulted, and has indicated agreement
with the proposals. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. The proposals have been considered under the
Corporate Equalities Impact Assessment process (EqIA) and have been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment (SEA) 
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. A Screening Report has been provided to SEA Gateway. It is
anticipated that an SEA will not be required. 
230130 SEA screening DC&AH SG.docx 
Sustainability 
3.3 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
The proposals have been assessed against the Council’s Principles for
Sustainable Development. 
Legal and Governance 
3.4 The Developer Contributions and Affordable Housing Supplementary
Guidance is in place to support the policies contained within Local
Development Plan 2 (2019), which forms part of the statutory development
plan set by Town and Country Planning (Scotland) Act 1997 (as amended). 
Page 22 of 222

Page 23

3.5 The Supplementary Guidance allows Perth and Kinross Council to enter into
legal agreements with applicants/developers to secure the future payment or
delivery of the types of contributions set out in the Guidance. It is important to
review and update the Supplementary Guidance to ensure legal agreements
reflect the appropriate level of and requirements for contributions. The Head
of Legal and Governance Services has been consulted on the implications
and terms of this report. 
3.6  The Head of Legal and Governance must be consulted on all proposals with
legal implications.  No report with such implications should be presented at a
meeting when this has not been done and it should be explicitly stated that
the Head of Legal and Governance has been consulted. 
Risk 
3.7 As the proposals outlined in this report represent an update to existing
guidance already adopted by the Council, risk has been deemed low.  There
is an element of reputational risk when conducting public consultation. The
proposals have been assessed for any implications within the corporate risk
management process, and also the controls required to mitigate those risks. 
4. Consultation 
Internal 
4.1 Officers from the following teams/ services have been consulted in the
preparation of this report: Legal and Governance, Education and Children’s
Services (Recources), Roads Infrastructure, Corporate and Democratic
Services (Accountancy), and Planning and Housing Strategy; Development
Plans, Housing Strategy and Transportation and Development. 
External 
4.2 This section should detail who has been consulted outwith the Council in the
development of the proposals and the preparation of the report, and also the
views of the consultees. 
5. Communication 
5.1 A period of public consultation will be required as part of this proposal which
will be undertaken via Consultation Hub. The project team will be contactable
mainly via Teams (for internal stakeholders) or email and telephone.
Corporate social media channels may be utilised to promote the public
consultation, any enquiries would be directed to the project team. 
Page 23 of 222

Page 24

2. BACKGROUND PAPERS 
2.1 This section should list the documents that have been relied on in preparing
the report, other than those committee reports already referenced within the
main body of the report.  All documents must be kept available by the author
for inspection by the public for four years from the date of the meeting at
which the report is presented. 
Page 24 of 222

Page 25

Draft Developer Contributions and
Affordable Housing Supplementary
Guidance (2023) 
Part 1: Developer Contributions  
5
Page 25 of 222

Page 26

2 
Contents 
1. Introduction 
2. Legal and policy background       3 
3. Implementation        4 
4. Primary Education Requirements       9 
5. Auchterarder A9 Junction Improvements     12 
6. Transport Infrastructure       13 
Contact information        26   
Appendices  
Appendix 1 - Education Requirements 18  
Appendix 2 - Auchterarder A9 Junction Improvements Area 20  
Appendix 3 - Transport Infrastructure Contribution Area 21  
Appendix 4 - Perth City Centre Zone 22  
Appendix 5 - Application of the Supplementary Guidance to  
Planning Applications             23
Appendix 6 - Gross Internal Area Definitions 25   
Please see ‘Part 2: Affordable Housing’ for further guidance on affordable housing
requirements. 
Page 26 of 222

Page 27

3 
1.  Introduction 
1.1 Across Scotland, local authorities are having difficulty maintaining and
developing infrastructure in order to keep up with the pressures of new
development. Additional funding sources beyond that of the local authority are
required to ensure that infrastructure constraints do not inhibit sustainable
economic growth. This has been a particular issue in Perth and Kinross where
the population grew by 5.3% in the period 2001- 2007. This growth is set to
continue with the National Records of Scotland (NRS) population projections
indicating that the Perth and Kinross population will increase by 4.5% (6,788
persons) for the period 2016-2026. This exceeds the national average of 3.2%
and is the eighth highest growth projection in Scotland. 
1.2 The increasing population has already placed heavy demands on public sector
services and infrastructure capacity. If the population is to rise as the NRS
projects, this will have an increasing impact on schools, community and leisure
facilities, transport infrastructure and health services. It is unlikely that the
growth projected for Perth and Kinross will be evenly spread across the Council
area, placing an even higher demand for services and infrastructure in some
already constrained areas. This will present significant challenges for the Perth
& Kinross Council (“the Council”) and its Community Planning partners. 
1.3 The sustainable development of Perth and Kinross requires the provision of
services in appropriate locations to meet the increasing needs of the expanding
population. As a result, new investment in infrastructure will be required to keep
pace with the increasing needs of an expanding population. Initial estimates
suggest that investment exceeding £300 million at current prices is required in
public sector infrastructure over the next 25 years in order to support this future
growth. Maintaining current assets already places a heavy burden on the
Council’s budgets, leaving limited resources for investment in increasing
infrastructure capacity. 
1.4 It is neither sustainable nor good planning to wait until capacity is used up and
then begin to recognise and address the problem. It will be necessary to
analyse current capacity and future demand making the solution the collective
responsibility of the Council and developers over the long term. This approach
is the most equitable, sharing the cost with all development which places new
demand on infrastructure capacity, rather than placing an uneconomic burden
on a limited number of developers in later years. 
1.5 With the population increase of Perth and Kinross driven by in-migration, largely
from other parts of the UK, a partnership approach is required between the
Council and developers to ensure infrastructure capacity is not to become a
major constraint on new development. 
1.6 Such partnerships have traditionally been facilitated through the use of Section
75 Planning Obligations which have become key mechanisms in the planning
system for addressing and for mitigating the impact of new development.
Although such obligations have been used to address specific issues arising
from individual applications, they can also be used as the vehicle for a
developer contribution policy which addresses the general issue of
infrastructural requirements and seeks to bring about a fairer sharing of
Page 27 of 222

Page 28

4 
infrastructure costs. 
1.7 This Guidance concentrates on the delivery of developer contributions to
provide a means to secure contributions towards the provision of on-site
facilities necessary in the interests of comprehensive planning, and/or, the
provision, or improvement of, off-site facilities and infrastructure where existing
facilities or infrastructure will be placed under additional pressure. This
Guidance also provides advice and information on the application of the
affordable housing policy. 
1.8 This Guidance should be read in conjunction with Local Development Plan
Policy 5: Infrastructure Contributions and Policy 20: Affordable Housing. 
1.9 This draft Supplementary Guidance was approved by the Council’s
Environment, Infrastructure and Economic Development Committee for a period
of public consultation on 31 May 2023. It is proposed that, following that
consultation, it will be submitted to Scottish Ministers for consideration.
Following the necessary adoption procedures, the Supplementary Guidance will
be adopted as statutory supplementary guidance. 
2.  Legal and Policy Background 
2.1 The most widely used legislation for managing developer contributions is
Section 75 of the Town & Country Planning (Scotland) Act 1997 (as amended).
This section of the act states that: 
‘(1) A person may, in respect of land in the district of a planning authority-
(a) by agreement with that authority, or 
(b) unilaterally, 
Enter into an obligation (referred to in this section and in sections 75A to 75C
as a “planning obligation”) restricting or regulating the development or use of
the land, either permanently or during such period as may be specified in the
instrument by which the obligation is entered into (referred to in this section
and in those sections as the “relevant instrument”).’ 
2.2 The most recent Government advice on the use of Planning Obligations is
contained in Circular 3/2012: Planning Obligations and Good Neighbour
Agreements. Section 75 Planning Obligations enable local authorities to: 
● regulate the sequence of development proposals; 
● achieve off-site infrastructure provision; 
● control the use of land or the nature of an activity carried out thereon; 
● secure the provision of affordable housing; 
● obtain financial contributions towards services or facilities. 
2.3 In regard to financial contributions, Government advice states that: 
“… contributions towards public transport or community facilities may be
acceptable provided the requirements are directly related to the development
proposal and the need for them arises from its implementation.” 
2.4 It is a legitimate planning objective to utilise Section 75 Planning Obligations to
achieve contributions towards the provision of services and facilities within
Page 28 of 222

Page 29

5 
Perth and Kinross. However, current guidance makes it clear that Obligations
should only be sought where they are required to make a proposal acceptable
in land use planning terms and that the use of a planning condition is not
appropriate. Planning Conditions, including suspensive conditions, will be used
wherever possible. 
2.5 Planning Obligations will only be sought where they meet all of the tests of
Circular 3/2012: Planning Obligations and Good Neighbour Agreements: 
• necessary to make the proposed development acceptable in planning
terms;
• serve a planning purpose and, where it is possible to identify
infrastructure provision requirements in advance, should be relative to
development plans; 
• relate to the proposed development either as a direct consequence of
the development or arising from the cumulative impact of development
in the area; 
• fairly and reasonably relate in scale and kind to the proposed
development; 
• reasonable in all other respects. 
2.6 Affordable Housing 
2.7  The latest research by Perth & Kinross Council reinforces there is a continuing
need for affordable housing with significant and ongoing levels of unmet
affordable housing needs existing across Perth and Kinross, particularly in the
Greater Perth Housing Market Area (HMA). 
2.8  Affordable Housing guidance is now set out in Part 2 of this document, to be
read in conjunction with this Developer Contributions (Part 1) guidance. 
3.  Applying the Guidance 
3.1 The Supplementary Guidance is intended to provide developers in Perth and
Kinross with greater certainty of the contributions and affordable housing
requirement that will be sought in conjunction with planning applications. It will
also provide a more transparent, streamlined, practical, consistent, and
accountable approach to the negotiation of developer contributions and
affordable housing delivery. On a case by case, basis contributions may be
required from new development toward other areas of infrastructure, such as
green infrastructure or community facilities, not outlined in this Guidance. 
3.2 The following principles apply to the application of this Guidance: 
• The Guidance will be applied to sites identified in the adopted Local
Development Plan and planning applications; 
• The Guidance will not apply retrospectively to sites with full or ‘In Principle’
planning consent prior to each relevant section of the Guidance coming into
effect; 
• Affordable Housing - August 2005; 
• Primary Education - May 2009; 
• Auchterarder A9 Junction - August 2009; 
• Transport Infrastructure - April 2014; 
• The Guidance will not be retrospectively applied to an application already
Page 29 of 222

Page 30

6 
submitted prior to the Supplementary Guidance being adopted unless a
constraint has already been identified which may in the absence of this
Guidance have resulted in a recommendation of refusal. 
3.3 The Guidance will be applied to applications requiring the replacement or
refurbishment of a dwellinghouse in the following circumstances: 
• Where it has been vacant, and no Council Tax payments have been made
within the 7 year period prior to the registration of a planning application; 
• Where it is dilapidated or derelict and would need extensive work, requiring
planning consent, to become habitable. 
3.4 Non-residential buildings are considered to be ‘in use’ if Non-Domestic rates
have been paid in the 12 months prior to the submission of a planning
application. 
3.5 Where applications are submitted for the renewal of planning consent the
Guidance will be applied in accordance with Appendix 5. 
3.6 Where a new proposal replaces an existing development with planning consent
the assessment will normally be applied to the net additional development. If a
revised full planning application is submitted, or a full application which seeks to
alter the number of units specified in an ‘In Principle’ application which pre-
dated the Guidance, as defined in paragraph 3.2, if the application is for a
greater number of units then the Guidance will be applied to all net additional
units. If a revised full planning application is submitted which seeks to increase
the size of a non-residential use, the Guidance will apply to the additional Gross
Internal Area. Where an application is made to modify or discharge a planning
obligation or a Section 42 application to vary a condition, where the Core
Development remains unchanged then any revised Guidance introduced since
the original grant of planning consent will not normally be applied but each case
will be determined on its own merits. 
3.7 The Guidance sets out a framework of standard charges and formulae which
form the basis for negotiating and securing Planning Obligations. However, in
the case of large and/or complex developments contributions may need to be
tailored to the particular scheme. This should make pre-application discussions
easier and speedier because developers will have greater certainty about how
much they will be expected to contribute. 
3.8 In the case of applications for ‘In Principle’ planning permission where the
development mix may not be known, a condition will be applied to any
permission indicating that this Supplementary Guidance will be applied at the
time of future applications. For larger proposals subject to a masterplan a
contribution requirement may be secured through a legal agreement at the ‘In
Principle’ stage to ensure certainty as the site progresses. 
3.9 Delayed payment of contributions and affordable housing may be secured
through a range of mechanisms as defined in Circular 3/2012 but will normally
be by means of a Section 75 Planning Obligation between the Council, the
landowner and any other relevant person(s). Such Planning Obligations will
need to be registered before planning permission can be issued. 
Page 30 of 222

Page 31

7 
3.10 Where contributions and affordable housing commuted sums are to be paid
prior to planning consent being issued, this may remove the need for the use of
a Planning Obligation. Where a developer is unable to pay the contribution in
advance the Council will consider the phasing of the contribution with the
development. 
3.11  Where additional land is needed to facilitate infrastructure improvements, the
developer may be required to either provide land on site or sufficient funding to
acquire it. This may be offset against other developer contribution requirements. 
3.12 In some circumstances, the Council may be willing to accept off-site provision
on an alternative site. In such cases the details of both sites should be
submitted together in order that the overall merits of the scheme can be
assessed. The judgement as to whether off-site provision is acceptable will be
based on a number of factors including: the desire to achieve balanced
communities, the individual site circumstances in terms of location and
accessibility. 
3.13 In some cases, developers will provide the required infrastructure on the site
themselves instead of paying the required contributions sum to the Council. 
3.14 Implementing Infrastructure Capacity Improvements
Providing the necessary infrastructure may require the Council to work in
partnership with developers or upfront investment by the Council to be
recouped at a later date. For example, a single development that might trigger
the need for a new road junction may not in itself generate sufficient funds to
meet the full cost of any required work. As it is impossible to build half or part of
a junction, it is therefore likely that the Council would have to fund the work. It is
therefore appropriate for the Council to request payments from subsequent
developments benefitting from that investment until its costs have been
recovered. 
3.15  Development Viability
Developers are expected to take the requirement for developer contributions and
affordable housing into account in their financial appraisal prior to land deals and
commercial decisions being taken. It is acknowledged that, in some cases, there
may be abnormal development costs which were unknown at the time the site
was purchased. In such circumstances, where the developer can demonstrate
and clearly justify that there are exceptional costs, which render the
development of the site unviable as originally proposed it will be required to
demonstrate this to the Council’s satisfaction through the submission of a
‘Development Viability Assessment’. Only in very exceptional circumstances
where there are excessive, previously unknown, abnormal costs will it be likely
that the Council will agree to reduce or give exemption from the requirement to
developer contributions or affordable housing. As such, it is anticipated that the
submission of a Development Viability Assessment will be the exception rather
than the rule. Standard development costs such as demolition works, retaining
and ground works, landscaping, archaeological investigations, drainage works,
site purchase, site servicing and flood prevention works will not normally be
accepted as abnormal costs. Abnormal costs should be reflected in the purchase
price of land and in this respect, the developer will be asked to demonstrate that
abnormal costs were not known at the time the site was purchased.
Page 31 of 222

Page 32

8 
3.16 The Development Viability Assessment should be submitted at the earliest
opportunity. All Viability Assessments’ must be carried out by an independent
practitioner and suitably qualified chartered valuation surveyor at the
developers’ expense. 
A Viability Assessment must include, where applicable;
• Information of land values paid for the site or where no recent land
transaction has taken place the Market Value (with supporting evidence
and assumptions made);  
• Anticipated land sales values of sites to be sold on, such as medical
centre, elderly persons care homes etc. (i.e. Not residential sites);  
• Plans;  
• Schedules of housing mix (Market and Affordable) including type, size
and numbers. Gross/Net area schedule for build cost/value analysis; 
• Details of S.75 proposals and specifications, as appropriate; 
• Confirmation of S.75 assumptions and status of discussions with the
Council;
• Design and Access statement (if applicable and available);
• Detailed appraisal (current costs/values) and cash flow;  
• Explanation of financial assumptions; 
• Explanatory note on all appraisal assumptions; 
• QS’s detailed cost budget on externals, infrastructure and abnormals;  
• Build specification;  
• Detailed breakdown of end sales values for market residential elements
(with supporting evidence);  
• Programme (incl. construction and sales start/end for each phase);  
• Rents and yield assumptions for all commercial elements (with
supporting evidence);  
• Assumptions on all grant funding and (where appropriate) evidence of
transactions/negotiations with RSL’s;  
• Analysis of affordable housing provision and compatibility with prevailing
policy requirement 
Once a Development Viability Statement is received by the Council it will be
independently reviewed by the District Valuer Service (DVS) or an alternative
third party advisor agreed by, and acting on behalf of the Council. This will be
carried out at the developers expense with costs determined on an individual
basis. The requirement for independent verification of Viability Assessments will
only be removed where the time and cost associated with this process is
disproportionate to the amount of developer contributions required. Each case
will be determined by the Council on its own merits. The outcome of the Viability
Assessment review will not be binding on the Council but may inform any
recommendation to the Conveners of the relevant Committees and local area
Councillors. 
3.17 The sensitive nature of some financial information is acknowledged and
therefore where requested the content of the Assessment will remain
confidential between the applicant and named officials within the Council,
independent assessor and the Convenors of the Relevant Committees. The
position regarding statements and the Freedom of Information (Scotland) Act
2002 means should they need to be available to the public, they will be
redacted with all figures and commercially sensitive wording blanked out. The
Page 32 of 222

Page 33

9 
statements will then be presented to the developer for agreement, prior to being
made available for publicationon the Public Access portal on the Council
website. Only in very exceptional circumstances where there are excessive,
previously unknown, abnormal costs will it be likely that the Council will agree to
reduce or give exemption from the requirement to developer contributions or
affordable housing. As such, it is anticipated that the submission of a
Development Viability Statement will be the exception rather than the rule. 
3.18  Accountability
Contributions from individual sites will be accountable through separate
accounts and a public record will be kept to identify how each contribution is
spent. Contributions will be recorded by the applicant’s name, the site address
and planning application reference number to ensure the individual commuted
sums can be accounted for. Annually, a statement will be published on the
Council’s website with a summary of the total contributions received for each
area of the Guidance and what they have been spent on. Eligible costs for
expenditure will include funding for three Officer Posts to assist in the
implementation of the Developer Contributions and Affordable Housing policies.
Each account will be audited through the usual internal audit procedures. 
3.19 All accounts are ring fenced for meeting the particular infrastructure
requirement. Each section of this Guidance will set out the parameters for the
use of funds, identifying the type of use to be made and the geographical area
in which they can be spent. Where a contribution has been made developers
will be able to reclaim any money not invested in the infrastructure it was
required after the following time periods for date of payment to the Council: 
• Primary Education – 10 Years;  
• Auchterarder A9 Junction – No return of contributions; 
• Transport Infrastructure – 10 Years;  
Developers will have 12 months in which to reclaim any contribution. Where
contributions are returned, interest will be made payable at 0.25% below the
Bank of Scotland base rate. 
3.20  Phasing of Payments
Where a Planning Obligation is entered into, applicants have the option to
phase payments over the lifetime of a development. The Council will set out a
phasing schedule of contribution payments through the assessment of the
planning application which is to be used when completing legal Planning
Obligations. The acceptance of this phasing will speed up the completion of
Planning Obligations. It should be noted that developers are not bound by this
protocol, but where a bespoke agreement is required; discussions should be
entered into at the outset of the submission of a planning application so as not
to delay the processing of the Planning Obligation. Where a Planning Obligation
is entered into the contribution requirement will typically be index linked. 
4. Primary Education and New Housing Development 
4.1  Introduction
The following Supplementary Guidance applies over the whole local authority
area of Perth and Kinross. 
4.2 This Guidance sets out the basis on which Perth & Kinross Council will seek to
Page 33 of 222

Page 34

10 
secure contributions from developers of new homes towards the cost of meeting
primary education infrastructure improvements necessary as a consequence of
development. 
4.3 The NRS 2016 based population projections indicate that Perth and Kinross
has the eighth highest growth rate across all of Scotland. With a high proportion
of the existing primary school estate currently working at or near capacity,
projected school roll increases may result in the need to replace or expand
primary schools within Perth and Kinross in addition to the construction of a
number of additional primary schools in the Strategic Growth Areas. To ensure
that primary infrastructure capacity does not become a major constraint on new
development a partnership approach is required between the Council and
developers. 
4.4  Principles of the Guidance
The Guidance will be applied to new housing in areas where a primary school
capacity constraint has been identified. A capacity constraint is defined as
where a primary school has been operating at over 80% for 5 out of the
previous 7 years and is likely to be operating following completion of the
proposed development, extant planning permissions and Local Development
Plan allocations, at or above 100% of total capacity. Where the Council has
funded an increase in Primary School capacity to meet the needs of new
development contributions may be required from future development until a
proportionate cost of the school improvements is received. This position will be
reviewed annually. 
4.5 The following key principles will apply: 
• Proposed residential dwellings of two or more bedrooms, along with
consents for the change of use from or replacement of sheltered
accommodation, or for conversions from alternative uses to residential
where the units comprises two or more bedrooms, will make a full
contribution; 
• Proposed one bedroom apartments, where it is clear that no additional
rooms could be used as bedrooms, will not be required to pay a
contribution. A one bedroom apartment can consist of the following rooms,
sitting room, kitchen, bathroom, single bedroom; Proposed ancillary
accommodation linked to an existing dwellinghouse will not be required to
pay a contribution; 
• Proposed extension of a single bedroom dwelling to create residential units
of two or more bedrooms will not be required to make a contribution if the
existing dwelling has been occupied as a single bedroom dwelling for the 7
year period prior to the registration of a planning application. Where this 7
year exemption is not met then the contribution requirement will be
assessed on an individual basis; 
• Affordable & Council housing will not be required to pay contributions.
Affordable Housing is as defined in section 7 of this Guidance; 
• Developments of 20 units or less in the Perth City Centre Zone as defined
Page 34 of 222

Page 35

11 
in Appendix 4 will not be required to make a contribution. Where a
proposal is for 20+ units then the contribution requirement will be assessed
on an individual basis; 
• Applications for dwellings which are not likely to place an additional burden
on the existing schools, for example, student accommodation linked to a
College/University or holiday accommodation would not be expected to
make a contribution; 
• Sheltered housing may not be required to pay a contribution. The
proposed Use Class in line with the Town and Country Planning (Use
classes) (Scotland) Order 1997 will be used in the determination of the
requirement. Proposals which fall under Use Class 8: Residential
institutions will be exempt. Proposals which fall under Use Class 9:
Houses will be determined on an individual basis. 
4.6  Developers Funding
All developer contributions will be paid into a fund to facilitate the education
provision needs in Perth and Kinross. The costs of education provision vary
between each individual projects. There is a need to look at the school estate in
its totality, as a constraint within one primary school catchment area can, on
occasions, be resolved by either the creation of a new school elsewhere or the
expansion of an adjacent primary school. Where possible, contributions will be
invested within the relevant primary school’s catchment area (including
denominational schools where they exist). Where it is not possible to invest in
the same area, the Council reserves the right to invest the contributions
received within the corresponding secondary school catchment areas to help
alleviate the capacity issue. For the purpose of this Guidance, the four Perth
non-denominational secondary catchment areas will be treated as a single
catchment area. 
4.7 Applying the Guidance
Where a development proposal includes replacement or refurbishment of
existing houses, the education contributions Guidance may not apply to all
units. The test will be whether the proposal will effectively create additional
residential units which were not available as houses previously. The guidelines
are set out under paragraph 3.3. 
4.8 Where a dwellinghouse has been subject of change of use and consent is
sought to revert back to residential use a full contribution will be required. The
exception being, if the change of use from residential was implemented within
the 7 year period prior to the registration of a planning application to revert back
to residential use, in such cases a contribution will not be required. 
4.9 Determining Contribution Levels
In order to provide a clear picture of expectations and to ensure parity of
contribution across areas of need, it is considered that a formula based on the
average number of children per household and the average cost of creating
additional primary school capacity would be appropriate. This introduces both a
demographic and construction cost variable. The rate may be revised annually
to include indexation based on BCIS General Build Cost Index.
4.10 Appendix 1 sets out in which primary school catchments a contribution will be
Page 35 of 222

Page 36

12 
required. This list will be revised annually. 
4.11 Developer Contribution Rates per Dwelling 
Type of Dwelling Contributions
1 Bedroom Dwellinghouse No Contributions Required
Sheltered Housing Determined on an Individual
Basis.
Affordable Housing No Contributions Required
2+ Bedroom Dwellinghouse £6,300 
4.12 Calculation of Contributions
• Cost per pupil - £23,334
• Pupil Product Ratio - 0.27 
• Total Contribution per House
• £23,334 X 0.27 = £6,300 
5. Auchterarder A9 Junction Improvements 
5.1  Introduction
The following Supplementary Guidance sets out the basis on which Perth &
Kinross Council will seek to ensure contributions from developments within the
Auchterarder and wider Strathearn housing market area towards meeting the
cost of delivering the A9 Junction Improvements that are required in the
interests of road safety. 
5.2 The aim of the Guidance is to release development within the Auchterarder
area which does not form part of the Auchterarder Expansion Development
Framework but has been restricted due to road safety constraints of the A9 at
Auchterarder. Those developments paying the contribution will subsequently
have their consents released enabling development to continue within the area. 
5.3 The area over which the protocol will apply has been identified in map form as
shown in Appendix 2: A9 Junction Supplementary Guidance Boundary. 
5.4 The basis of the boundary is to incorporate an area where development would
access the A9 using Loaninghead or Aberuthven junctions or both and would
subsequently benefit from the proposed junction improvements. Blackford and
Dunning are not included within the boundary area since they are primarily
accessed by other junctions. 
5.5 Principles of the Guidance
The following key principles will apply: 
• The contribution for a single dwelling will be £3450; 
• A contribution will be sought from all residential developments within the
identified boundary of the wider Auchterarder area including single houses
with the exception of affordable housing. Affordable housing is as defined in
Part 2 of this Guidance;  
• The contributions for residential development will be calculated pro rata
according to the number of dwellings involved; 
• This Guidance will not apply to areas within the approved Auchterarder
Page 36 of 222

Page 37

13 
Development Framework;  
• For non-residential developments within the identified boundary that have a
trip generation equal to or higher than a dwellinghouse, an assessment for
contributions will be made on a case-by-case basis. However where it is
considered the proposed development would reduce the need to travel e.g.
through the provision of local employment or services, the Guidance would
not apply;
• Out-with the identified boundary area, but within the Strathearn Housing
Market Area, a contribution would only be sought from developments that
require a Transport Assessment which identified that the development would
have an impact on the A9 junctions within the boundary area at
Auchterarder. 
5.6 Applying the Guidance
Where a development proposal includes replacement or refurbishment of
existing houses, the A9 Junction contributions Guidance may not apply to all
units. The test will be whether the proposal will effectively create additional
residential units which were not available as houses previously. The guidelines
are set out under paragraph 3.3. 
5.7  Major developments contrary to the Development Plan will be subject to
separate assessment against this Guidance on road safety grounds. 
5.8  Developer Contribution Calculation
The total cost of the project in accordance with 2007 figures is estimated at
£10.52m. Transport Scotland has contributed £1.4m towards the Loaninghead
junction improvements. The remaining £9.12m will be provided by the
Consortium delivering the Auchterarder Development Framework, gWest and
other developments impacting on these junctions. 
5.9 The contribution will be set at £3450/house. The basis of each contribution paid
would seek to be proportional to the impact the development would have on the
trunk road infrastructure. For non- residential development, the contribution will
be calculated on the basis of the impact of an equivalent number of residential
properties. 
6.  Transport Infrastructure   
6.1 The following Supplementary Guidance is about facilitating development. It sets
out the basis on which Perth and Kinross Council will seek contributions from
developments in and around Perth towards the cost of delivering the transport
infrastructure improvements which are required for the release of all
development sites and to support the growth of Perth and Kinross. 
6.2 The Council is seeking contributions from a package of measures which are
essential to support the delivery of the Local Development Plan (LDP). The
projected costs of the infrastructure have been estimated in line with industry
standards. The current working estimates are as follows: 
Element Cost £
Page 37 of 222

Page 38

14 
Cross Tay Link Road (“CTLR”) £150.47m
A9/A85 Crieff Road junction
improvements
£49.4m
Total £199.8m 
Note: These are based on 2022 estimates 
6.3 Updated Traffic Modelling has been undertaken in 2018 which has identified that
50% of future traffic growth is associated with new development sites in the
LDP2. The contribution level is therefore calculated on the basis of 50% of the
total costs (£99.9m), the remainder (£99.9m) being sought through other
mechanisms. 
6.4 The Transport Infrastructure contributions collected through this mechanism will
only be used for the identified packages outlined in Paragraph 6.2. This
contribution shall be considered as being additional to any other cumulative or
site-specific transport contribution required in relation to the development.
Following appropriate assessment, proportionate contributions or mitigation will
be sought for work to the strategic transport network at the A9 Broxden junction.
Early discussions are recommended to establish specific requirements.
Proportionate contributions or mitigation may also be sought for rail
infrastructure, the Inveralmond junction or the Perth Park and Ride Schemes. 
6.5 Following appropriate assessment, proportionate contributions or mitigation will
be sought toward the infrastructure to be delivered by Perth & Kinross Council
at LDP2 Site MU70 (Perth West), including an A9 underpass to address site
severance. Early discussions are recommended to establish specific
requirements from landowners/developers within MU70. 
6.6 Principles of the Guidance
Subject to the exceptions set out in this policy, this Supplementary Guidance
applies to all development within the defined boundary identified in Appendix 3.
This is because the transport appraisal relating to this Guidance illustrates a link
between all development in the defined area and the impact which the defined
transport improvements seek to mitigate, as per the guidance in Circular
3/2012: Planning Obligations and Good Neighbour Agreements. The full
contribution level applies to all development within the identified Perth Core
Area which is defined by settlements in this area having more than a 19%
impact on the transport infrastructure. The reduced contribution level applies to
all development out-with the Perth Core Area which is defined by settlements in
this area having a 12% - 19% impact on the transport infrastructure. Out with
the defined boundaries no contributions will be required, except for
development for which a Transport Assessment is necessary and then identified
as having a significant direct impact on any element of the infrastructure
package (i.e. 12% or above). In such cases a higher contribution may be
applied. 
6.7 Residential developments of 20 units or less in the Perth City Centre Zone, as
defined in Appendix 4 will not be required to make a contribution. Where a
proposal is for 20+ units, then the contribution requirement will be assessed on
an individual basis. 
6.8 In order to support the economic growth of Perth and Kinross, new employment
Page 38 of 222

Page 39

15 
uses which fall under the Employment Land Use category of the Transport
Infrastructure section of this Guidance, and which are to be developed on
brownfield land, will not be required to make a contribution. New employment
uses on Greenfield land not cross subsidised by residential development will be
considered on an individual basis. This will take account of the potential impact
of the development and the extent to which the development directly benefits
from the improved infrastructure. Extension of existing non-retail businesses on
brownfield land will not be required to make a contribution. 
6.9 The Retail contribution rate will only be applied to the trading floorspace of new
or extension to existing retail developments. Non-trading and Back of House
functions space will be calculated on the employment use category. Vehicular
retail showrooms will be calculated based on the floorspace of proposed
buildings. 
6.10 Proposed buildings for agricultural use, such as cattle sheds and storage units
needed to operate the farm business, will generally not be required to make a
contribution. Office and Staff Buildings in association with agricultural use may
be required to contribute. 
6.10 Holiday accommodation including static caravan pitches and chalets will be
calculated against the Residential – Affordable contribution rate. Temporary
structures such as camping pods or touring caravan pitches will not be required
to make a contribution. 
6.11 Where a proposal supports specific Council objectives, such as regeneration or
significant economic benefit but where it would not be viable due to the
application of the Supplementary Guidance the Council may enter into
negotiations to reduce the contribution with each case assessed and
determined on its own merits. 
6.12 Proposals for a change of use to form residential including the subdivision of
existing residential property, but excluding agricultural buildings and ancillary
accommodation/ residential garages, will not normally be expected to provide a
contribution, unless they result in the creation of 5 or more residential units. 
6.13 In the event of a contribution of land towards the development of the CTLR, the
amount of contribution required under this mechanism may be revised. Each
application will be considered on its individual merits, taking into account factors
such as the value of the land, its condition and any remedial works required to
make it suitable for use. Land values will be assessed independently by the
District Valuation Service (or other mutually agreed appointee) with a joint brief
being agreed between the Council and the applicant. 
6.14 In circumstances where non-residential developments are proposed which
typically do not include built internal floorspace (for example quarries, outdoor
leisure operations etc.) but are judged through a Transport Assessment to have
a demonstratable impact on the transport network, the contribution level will be
calculated on an individual basis. 
6.15 How is the Contribution Calculated?
Page 39 of 222

Page 40

16 
The transport contributions are calculated on the Gross Internal Area (GIA) of
new non-residential development or in the case of residential development the
total number of units proposed. Where replacement buildings are proposed,
(provided the building is in current use), the Trip Rate of the existing use will be
taken into account and the contribution reviewed accordingly on a case by case
basis. GIA includes everything within the external walls of the buildings (lifts,
stairwells and internal circulation areas). It does not include areas like external
balconies or the thickness of external walls. Appendix 6 sets out the GIA
definitions. 
6.16 Applicants for planning permission for non-residential buildings are advised to
provide the following information with each planning application: 
• Current GIA of buildings and their uses to be demolished (if any); 
• Proposed GIA of all buildings and their uses on site once the development
has been completed. 
6.17 Using this information, the Council calculates the net increase in GIA. This result
is multiplied by the appropriate contribution rate in £/m² to calculate the required
contribution level. 
6.18  Contribution Rates per Development
The contribution level will be reviewed within a 5 year period from adoption of
the Supplementary Guidance. Any review will take account of updated costs in
relation to the infrastructure projects such as land costs, detailed designs,
inflation and construction costs. The rates set out in this guidance may be
revised to account for these updated costs and implemented without further
formality. Any revised contribution level will not be applied retrospectively to
consented planning permissions. 
6.19 Perth Core Area
The Perth Core Area includes the settlements of Perth, Scone, Almondbank, Bridge
of Earn, Oudenarde, Abernethy, Methven, Stanley, Luncarty, Balbeggie, Perth
Airport and also the land between these settlements surrounding the main transport
routes into Perth. 
6.21 Full Contribution Area Rates 
Land Use   CTLR     A9/A85   
   New Total   
Retail (m²)   £139   £46   £185  
Employment (m²)     £13   £4   £17  
Other Non-Residential (m²) £43   £14   £57  
Residential Open Market 
(per unit)
£3,288  £1,079  £4,367 
Residential Affordable 
(per unit)
£1,644  £540  £2,184 
Page 40 of 222

Page 41

17 
6.22 Reduced Contribution Area Rates 
Land Use   CTLR   
   A9/A85    New Total    
Retail (m²)   £104  £34  £138 
Employment (m²)     £10  £3  £13 
Other Non-Residential (m²)  £33  £11  £44 
Residential Open Market 
(per unit)
£2,466  £810  £3,276 
Residential Affordable 
(per unit)
£1,233  £405  £1,638 
Page 41 of 222

Page 42

Appendix 1 – Education Requirements 
Developer contributions requirements for individual schools
Version 5: 2023
Next Review: 2024 
To assist applicants with the preparation of development costs, the following schedule showing the school catchment areas where
contributions will be sought. 
This schedule is based on selected schools which have been operating at above 80% for 5 out of the previous 7 years and is likely
to be operating following completion of the proposed development, extant planning permissions and Local Development Plan
allocations, at or above 100% of total capacity. 
Where the Council has invested in Primary Schools to support future development a contribution will be sought from new
development within the relevant primary school catchment. Where investment has taken place this is identified below: 
Primary School School
Capacity
Capacity Issue  Investment action 
Auchterarder CS Cluster
Auchterarder 514 Yes Reconfiguration as required 
Blairgowrie High Cluster
Newhill 423 Yes Capacity required 
Breadalbane Academy Cluster 
N/A  N/A  N/A N/A 
Crieff High Cluster 
Crieff 466 Addressed by action New School built (2015) with capacity for expansion
Kinross High Cluster 
Kinross  566  Addressed by action New School built (2017)
Milnathort 257 Yes Capacity required 
Perth Academy Cluster
Robert Douglas Memorial 462 Yes Capacity required 
Page 42 of 222

Page 43

19 
Perth Grammar Cluster
Tulloch 434 Addressed by action New school built (2018)
Perth High Cluster
Abernethy 283 Addressed by action Extension to school built (2013)
Dunbarney 207 Yes Capacity required 
Errol 316 Addressed by action Extension to school built (2016)
Inchture 264 Addressed by action Extension to school built (2014)
Kinnoull 203 Addressed by action Extension to school built (2014)
Pitlochry High Cluster
N/A N/A N/A N/A
Bertha Park High Cluster
Note: Associated Primary Schools of Bertha Park High School are as follows and may be listed above within the existing Perth secondary
school cluster: Auchtergaven Primary School, Dunbarney Primary School, Forgandenny Primary School, Logiealmond Primary School,
Methven Primary School, Pitcairn Primary School, Ruthvenfield Primary School, Pupils resident in Oudenarde 
Page 43 of 222

Page 44

20 
Appendix 2 – A9 Junction Supplementary Guidance Boundary 
Page 44 of 222

Page 45

21 
Appendix 3 – Transport Infrastructure Contributions Area 
Page 45 of 222

Page 46

22 
Appendix 4 – Perth City Centre Zone 
Page 46 of 222

Page 47

23 
Appendix 5 – Application of the Supplementary Guidance to Planning Applications 
Page 47 of 222

Page 48

24 
Page 48 of 222

Page 49

25 
Appendix 6 – Gross Internal Area Definitions (GIA) 
Page 49 of 222

Page 50

26 
Contact information 
For further information on developer contributions and any enquiries regarding the guidance, please contact the Development Contributions
Officer at:
Email: TESDevelopmentContributions@pkc.gov.uk
Tel: 01738 475417 
Page 50 of 222

Page 51

Draft Developer Contributions and
Affordable Housing Supplementary
Guidance (2023) 
Part 2: Affordable Housing  
5
Page 51 of 222

Page 52

2 
Contents 
1. What is affordable housing?       3 
2. Why do we need an affordable housing policy?    3 
3. Applying the policy: the sequential approach     3 
4. Funding mechanisms for delivery of affordable housing    7 
5. Types of affordable housing       8 
6. Delivery of affordable housing on development sites   9 
Contact information        13 
Please see ‘Part 1: Developer Contributions’ for further guidance on developer
contribution requirements. 
Page 52 of 222

Page 53

3 
1. What is ‘affordable housing’? 
1.1 National Planning Framework 4 2023 (NPF4) defines affordable housing as: 
“Good quality homes that are affordable to people on low incomes. This can include social
rented, mid-market rented, shared-ownership, shared-equity, housing sold at discount
(including plots for self-build), self-build plots and low-cost housing without subsidy.” (Annex
F, page 144) 
2. Why do we need an affordable housing policy? 
2.1 The Scottish Government’s Housing to 2040 sets out their ambition “for everyone to
have access to a warm, safe, affordable and energy efficient home that meets their needs, in
a community they feel part of and proud of”. This approach recognises the need to provide a
wide range of affordable homes, allowing people the choice of lifestyle and home regardless
of income. Scottish Government planning policy supports this approach and NPF4 policy
16(e) states: 
“Development proposals for new homes will be supported where they make provision for
affordable homes to meet an identified need. Proposals for market homes will only be
supported where the contribution to the provision of affordable homes on a site will be at
least 25% of the total number of homes…” (page 63) 
2.2 Studies of housing need and affordable housing requirements are carried out across the
Perth and Kinross area as part of the preparation of the Housing Need and Demand
Assessment (HNDA). The HNDA gives long run estimates of housing need and provides an
evidence base for the Council’s Local Housing Strategy (LHS) and the Local Development
Plan (LDP). Further localised HNDAs have been undertaken by the Communities Housing
Trust in Aberfeldy, Dunkeld & Birnam, Comrie. Mount Blair and Pitlochry. These have been
undertaken to gain a better understanding of the impact that high market prices have in on
houses in a rural setting.  
2.3 Policy 20 in the adopted Perth and Kinross Local Development Plan 2 2019 (LDP2)
identifies that 25% of the total number of housing units per housing site should be provided
as affordable. This approach is then guided using the LHS priorities, planning policy,
evidence from the HNDA and local housing lists. An analysis of this information then
supports the identification of type and tenure for a location based on local need and
demand.   
3. Applying the policy: the sequential approach 
3.1 LDP2 Policy 20 states: 
“Residential development, including conversions, consisting of five or more units should
include provision of an affordable housing contribution amounting to an equivalent of 25% of
the total number of units proposed. Wherever practical, the affordable housing should be
integrated with and indistinguishable from market housing.  
If the provision of the affordable housing on-site is not possible following a viability
assessment, the Council will seek off-site provision. Failing that, and in appropriate
circumstances, a commuted sum will be required from developers.  
Page 53 of 222

Page 54

4 
The details of provision, including landlord, tenure, house size and type, will be a matter for
agreement between the developer and the Council and based upon local housing need and
individual site characteristics. The Council will consider innovative and flexible approaches to
the delivery of affordable housing and will take into account considerations that might affect
deliverability such as development viability and the availability of funding.” (page 40) 
3.2 The Council’s preference is to locate affordable housing on site and as part of a mixed
development of private and affordable homes. There may be proposals for 100% provision
of affordable housing, and these will be acceptable as part of a wider mixed community and
where all other relevant LDP policies are met. 
3.3 Residential developments, including conversions, consisting of 5 or more units should
include provision of an affordable housing contribution amounting to an equivalent of 25% of
the total number of units proposed, except where the LDP varies this quota on an individual
site basis, or sites of 20 units or less in the City Centre Zone (see map below and Appendix
4 in Part 1 of this guidance). Whenever practical, the affordable housing should be
integrated with, and indistinguishable from the market housing. 
3.4 The Council’s sequential approach to the delivery of affordable housing requirements is
laid out in Table 1. The details of tenure, house size and type, will be a matter for agreement
between the developer and the Council and based upon local housing need and individual
site characteristics.   
Page 54 of 222

Page 55

5 
On site  Provision of Affordable housing on site;  
or 
Transfer of an area of serviced land on site to Council
/ Housing Association  
Off site  Provision of affordable housing off-site;  
or 
Transfer of an area of serviced land offsite to Council /
Housing Association 
Commuted sums  Where it is not possible to achieve appropriate
affordable housing on site. 
Table 1: sequential approach 
3.5 On Site Provision  
3.5.1 On-site provision is the preferred option for all development proposals. Where
affordable housing is being provided on-site, the housing will either be built by or transferred
to a Housing Association or the Council, with the exception of: discounted for sale,
unsubsidised homes, private rented accommodation or discounted serviced plots for self-
build. 
3.5.2 Developers should enter early discussions with the Housing Strategy team, preferably
before the submission of a planning application. This will help to identify the following: 
• The type and size of affordable housing requirement to meet the needs in the area.  
• The provider most appropriate to deliver the required mix of tenure.  
• Provide advice on how the Scottish Government subsidy funding requirements can
be met. 
3.5.3 Developers will be required to build an agreed number, type, and mix of affordable
housing units on site, including any required wheelchair housing (Housing for Varying Needs
standards) for subsidised rent or sale by the Housing Association or Council. Where the
affordable element is to be delivered by the developer, deadlines must be set for the delivery
of the affordable housing relative to the timescale of delivery of the private housing. 
3.5.4 Alternatively, the land for the affordable housing element can be transferred to the
Council or Housing Association to develop. Developers will agree to transfer an area of
services land to a Housing Association or the Council for a valuation based on affordable
housing only (as agreed by the District Value or an agreed chartered valuation surveyor). 
3.6 Off Site Provision 
3.6.1 Where on-site provision cannot be achieved; the Council may be willing to consider the
provision of affordable housing off-site or the transfer of an area of serviced land off-site.
This will depend on several factors such as the desire to achieve balanced communities, the
Page 55 of 222

Page 56

6 
site circumstances (location and accessibility) and any difficulties associated with its
development. 
3.6.2 If the Council accepts the provision of affordable housing off-site the developer will be
required to build an agreed number, type and mix of affordable housing units on another site
within the area that is under their control for subsidised rent or sale either for the Council or a
Housing Association. Where the affordable element is to be delivered by the developer a
deadline will be set for the delivery of affordable housing relative to the timescale of the
private housing. The provision of affordable housing off-site will be in addition to the
affordable housing requirement relating to the alternative site. 
3.7 Transfer of an area of serviced land off-site  
3.7.1 Alternatively, the land for the affordable housing element can be transferred to the
Council or a Housing Association for them to develop. Developers will agree to transfer an
area of serviced land for a valuation based on affordable housing only (as agreed by the
District Valuer or an agreed chartered valuation surveyor). 
3.8 Commuted Payments  
3.8.1 It is important to note that it will only be in limited circumstances that the Council will
accept the payment of a commuted sum in lieu of the provision of affordable housing on or
off-site. One of the primary obstacles to the delivery of affordable housing in Perth and
Kinross is the difficulty which Housing Association’s experience in being able to compete
with private developers to acquire land. This, coupled with the importance of creating socially
inclusive and mixed communities, means that the Council will generally always seek the
provision of affordable housing on-site or on an alternative site within that housing market
area. The payment of a commuted sum to meet an affordable housing requirement will only
be a final option offered to a developer. 
3.8.2 Commuted sums may be acceptable only if there are no suitable sites brought forward
after following the sequential tests above or where there are restrictions to the availability of
public subsidy. A Viability Assessment will be required in all cases to demonstrate why the
development would not be financially viable with on-site provision. Evidence of this should
be provided in a Viability Statement providing financial or planning justification as to why the
development cannot incorporate affordable homes. More details about undertaking this
process, see Part 1 of this document on How to undertake Development Viability
Assessments.  
3.8.3 The instances where a commuted sum may be acceptable include: 
• Where a development is in a remote rural setting or out with a settlement where it is
difficult to access services; 
• Where the scale of development results in sporadic units, creating affordability
difficulties for Housing Associations; 
• Where the number of units proposed are below the thresholds identified in the
policy; 
• Where the Council’s Housing Service recommend that this is the most appropriate
form of contribution in considering the Council’s strategic housing priorities. 
Page 56 of 222

Page 57

7 
3.8.4 These payments will be used to enable off-site provision to make an equal and
equivalent financial contribution to an affordable housing fund managed by the Council
which promotes the direct provision of affordable accommodation through the Council or
Housing Association on other sites. The commuted sum must be spent within the local
housing market area Income from this source will be identified in the Strategic Housing
Investment Plan (SHIP). 
3.9 Calculation of commuted sum 
3.9.1 Commuted sums will be calculated in line with national guidance PAN 2/2010
Affordable Housing Land Audits and Affordable Housing Supply Programme: process and
procedures MHDGN 2022/02, as well as guidance notes issued by the RICS and in
particular ‘Valuation of Land for Affordable Housing Scotland' GN100/2013 and GN
Valuation of Development Property October 2019. 
3.9.2 In line with Pan 2/2010, paragraph 22, the valuation of commuted sum will be
determined independently by the District Valuer (DV). Research was commissioned from the
DV (19 January 2023) to determine at what level the commuted sum should be set for each
Housing Market Area in Perth and Kinross. On the basis of the research, the commuted
sums effective from 1st April 2023 are as follows: 
Housing 
Market Areas 
Plot Value per
Unit for Private
Sale 
Plot Value per
Unit for
Affordable
Housing 
Commuted Sum
per Unit 
Highland  £25,000  £1,000  £24,000 
Kinross  £25,000  £1,000  £24,000 
Perth  £36,000  £1,000  £35,000 
Strathearn  £28,500  £1,000  £27,500 
Strathmore  £21,500  £1,000  £20,500 
Table 2: Commuted sums requirement per HMA 
3.9.3 This table will be updated annually based on the procedure set out in 3.9.2. 
3.9.4 Where an Affordable Housing commuted sum has been made developers will be able
to reclaim any money not invested in the infrastructure it was required after the utilisation
period of 5 years of the date of payment to the Council. Developers will have 12 months from
the date of the 5-year deadline in which to reclaim any contribution. Where contributions are
to be returned, interest will be made payable at 0.25% below the Bank of Scotland base rate.
4. Funding mechanisms for delivery of affordable housing  
4.1 Most of the funding for affordable homes comes from the Scottish Government
Affordable Homes Supply Programme (AHSP). This is supplemented by council funding
(Council Tax second homes funds), commuted sums (in lieu of on-site affordable provision)
from developers, Prudential Borrowing (Councils) and Private Finance borrowing
(Registered Social Landlords). The plan for new housing is directed by the council’s
Strategic Housing Investment Programme (SHIP).
Page 57 of 222

Page 58

8 
4.2 The most common source of land for affordable homes comes from requirement in LDP2
Policy 20 for developers to deliver 25% of their development proposals for affordable homes.
The land is transferred to the ownership of a Housing Association partner or the Council to
build a variety of affordable types and tenures. The tenures are determined by need and
demand in the local area.  Less commonly, Council-owned land is developed by the Council
itself or made available to Housing Associations to build affordable homes. Likewise, private
developers may restructure their land stocks and dispose of land to Housing Associations or
the Council for additional affordable housing.  
4.4 Affordable homes can also be delivered through the renovation or repurposing of
buildings using the same funding, including the Council buy-back scheme, returning former
Council homes to Council ownership. Increasingly buildings are being repurposed and
brownfield sites are being regenerated to create affordable homes that meet higher energy
efficient and quality standards.        
5. Types of affordable housing 
5.1 There are a range of affordable housing options on offer that people can access in Perth
& Kinross Council.  
5.2 Homes for Rent 
5.2.1 Social rent are homes generally provided by Housing Associations (RSLs) and Perth
& Kinross Council at affordable rents on a secure basis to those in housing need. Homes are
regulated by the Scottish Housing Regulator to ensure standards are high and rents kept
affordable.  
5.2.2 Mid-market rental good quality, affordable, private rented homes provided by Housing
Associations aimed at people on low or modest incomes that wouldn’t be prioritised for a
socially rented home. Rents are lower than private market rent levels in the area. Aimed at a
wide range of demographics and needs can Find a MMR home in Perth and Kinross 
5.3 Low-Cost Home Ownership   
5.3.1 Shared equity helps first time buyers and priority groups on low to medium incomes
into home ownership.  There are currently two schemes. In both you hold the majority share
of the home and are responsible for the property. In the OMSE, the Scottish Government
holds the remaining share and is open to any house for sale. In the NSSE scheme, a
housing association or council holds the remaining share and is for new build housing. 
5.3.2 Shared Ownership provided by housing associations. It offers a route to
homeownership - if you're unable to afford to purchase a property outright, you can part-buy
and part-rent your home. You can choose to buy a 25%, 50% or 75% share in your home.
You pay rent on the share you don’t buy, and the rent is usually set at an affordable level of
2.75%. 
5.3.3 Self and custom build housing are homes which are built or contracted by
individuals or groups of individuals for their own use. These homes offer a unique alternative
to standard market housing, bespoke to the needs of an individual, family or group, with their
input on design and features. The council may discount plots to make them affordable. Can
be particularly suitable in rural areas. 
5.3.4 Co-housing is designed to foster connection. Usually owner-occupied (can also be
mid-market rent). Physical spaces allow neighbours to easily interact with each other around
Page 58 of 222

Page 59

9 
internal and external communal spaces with commonly provided guest
accommodation.  Collaborative decision-making on the design and use of the buildings helps
to develop relationships with neighbours and provides support networks which can be
particularly attractive to people later in life. 
5.3.5 Independent living aims to provide suitable options of accommodation for individuals
assessed as having care and support needs to live independently in the community. This
may include those with learning disabilities, autism, physical disabilities, mental health and
acquired brain injury. Independent living support is most commonly offered through social
rent but can be provided in all tenures, including self-build. 
6. Delivery of affordable housing on development sites 
6.1 Once development potential has been established and a site moves through the
planning process, there are several key areas to be considered when designing the site.  
6.2 Integration and tenure blind design
Integration of affordable homes into any site should be key consideration from the outset. 
Affordable homes and market homes should be designed to create a sense of place within a
development rather than as separate communities. Affordable plot sizes do not necessarily
have to reflect their market equivalents, but they should be integrated into a varied tenure
that produces choice and an attractive streetscape. This can be supported through the
careful co-ordination of elements such as materials, colour palettes, architectural details, and
boundary treatments. Different types of homes have sat adjacent to each other in the
gradual development of urban areas, and this helps to create diversity within communities.  
There are some factors that will help determine the site approach of affordable housing
integration:
• The proposal should reflect the Council’s commitment to supporting mixed and
inclusive communities in Perth & Kinross by delivering choice.
• There should no difference in the quality of the design of all homes on the site.
• Consideration as to the mix of tenures within a site to provide choice and encourage
diverse communities.
• The inclusion of specialist provision requirements to support independent living and
that caters to all ages.
• Construction access and site management can also have an impact on the location
of affordable housing, as well as any ongoing property maintenance and
management. 
6.3 Phasing 
Developing a larger site in phases of less than five units, specifically to avoid the application
of the affordable housing policy, will not be acceptable. It is recognised that in some cases, a
developer may have a valid reason for developing in small phases. Any subsequent
applications submitted for additional units which are clearly part of the same development
and resulting in the total number of units increasing to five or more will have the affordable
housing policy applied retrospectively. Developers wishing to develop in small phases are
encouraged to discuss this with the Council at the outset to ensure that the affordable
housing contribution can be properly planned. 
Page 59 of 222

Page 60

10 
6.4 Densities 
A developer may seek to build less than five houses on a site which clearly has capacity for
a larger development meaning that the affordable housing policy will not apply. It is
recognised that in some locations lower density development is desirable and, in such
situations, the Council will take account of standard housing densities, the location of the
site, the character of the surrounding area, and the type of houses proposed in determining
whether the smaller number is acceptable. Where it is considered acceptable, the guidance
relating to phasing above, will also apply. 
6.5 Houses for private rent 
The Local Housing Strategy reports that letting agents and landlords in private renting view
the sector as having high levels of demand. As evidenced in the HNDA (2022), Perth and
Kinross Council has a higher percentage of households in the private rented sector at 16%
than the Scottish average at 12%. Whilst it is acknowledged that some developers prefer to
build to rent, it is considered that private housing for rent as an affordable category is difficult
to implement due to difficulties in ensuring that rents remain at an affordable level i.e. a level
which is comparable with Council and Housing Association rent levels. In such cases,
developers are encouraged to contact the Housing Strategy team to discuss the available
tenures of midmarket rent or intermediate rent, and what the levels of rent currently are.
Affordable housing requirements relating to proposals for tied accommodation or properties
built by private estates for essential estate workers will be assessed on an individual basis.
6.6 Sheltered housing developments 
Open market sheltered housing schemes generally meet the requirements of the more
active elderly population and as such can be seen to be addressing general housing needs,
not affordable housing needs. The Council will continue to seek the provision of a wide
range of housing suitable for older people and recognise that it will not be appropriate to
require an affordable housing contribution from some types of specialist accommodation, for
example, care homes or other residential institution. However, in the case of open market
sheltered housing developments, these will be subject to the affordable housing policy.
Where sheltered units are to be provided as part of a mixed development and will be
available through a Housing Association or sold at an affordable price, they may be
considered as meeting the affordable requirement for the development. 
6.7 The retention of houses as affordable 
The retention of houses as affordable in perpetuity will most easily be achieved where a
Housing Association is involved i.e. social rent or some form of shared equity involving
grant assistance from Scottish Government which allows for grant funding to be returned
to the Scottish Government should the house be sold within a specified period. It is
acknowledged it is harder to achieve affordability in perpetuity in the case of discounted
for sale, shared equity or unsubsidised houses. Houses which fall into the unsubsidised
low-cost housing for sale category are smaller less expensive houses generally for entry
level which are sold without any subsidy or discount. These houses may be affordable
simply due to their smaller size. PAN 2/2010 suggests that some form of legal agreement
may be required to retain such houses as affordable in perpetuity. However, it is
considered that there will generally always be a limit on what the resale price of such
houses will be. If the Council are satisfied that on resale such properties will remain at an
affordable price – allowing for inflation and taking into consideration the area in which the
houses are – then it is likely that, generally, it will not be necessary to impose a condition
to maintain the houses as affordable in perpetuity. In the case of subsidised low-cost
Page 60 of 222

Page 61

11 
housing sale properties, either it is accepted that such houses will only be affordable to
the first household, or a burden, or condition (e.g. Deed of Condition attached to the
property’s Title Deeds) is put in place in the title deeds to maintain the houses as
affordable in perpetuity. The Council will consider applications containing subsidised low-
cost housing for sale on their individual merits. 
6.8 Affordable house prices 
Analysis was carried out using data from the Centre of Housing Market Analysis (CHMA)
documents1 and by using A Practitioners Guide – Housing Need and Demands Assessment
October 2018 data where a house is affordable to purchase if its price does not exceed 3.6
times a household’s income. The Perth and Kinross area has seen the largest increase in
volume of house sales over the last 10 years of all Tayside partner areas at 27.8%. The
average house sale value in Perth and Kinross has risen by 13% from 2009 to £199,463 in
2019. To improve accessibility to home ownership, the table below shows the maximum
sales prices applicable to the low-cost housing for sale options potentially available to
developers. Maximum prices for houses to be purchased through the Shared Equity,
subsidised and unsubsidised low-cost housing for sale options: 
Maximum Price Threshold
Apartment Sizes  Price Threshold* 
2 (1 bed)  £95,000 
3 (2 bed)  £145,000 
4 (3 bed)  £200,000 
5 (4 bed)  £250,000 
6 (5 bed)  £310,000 
Table 3: Price thresholds 
* The maximum based price threshold is calculated based on the Open Market Shared
Equity Scheme area-based limits for Perth and Kinross2 
   
1   www.gov.scot/publications/centre-for-housing-market-analysis-list-of-guidance/
2   www.gov.scot/ publications/open-market-shared-equity-thresholds 
Page 61 of 222

Page 62

12 
6.9 Marketing and identification of priority client groups 
Where the affordable housing proposed is unsubsidised or subsidised low-cost housing for
sale, there will be further requirements in terms of the marketing of the affordable housing
and the identification of the priority client groups. Developers are asked to contact the
Housing Strategy team for further details on this. In general the priority client group is taken
to mean people on modest incomes (income threshold to be assessed by Perth and Kinross
Council), who are either first time buyers; or persons who currently own their own home but
require a new home following a significant change in their household circumstances; or
persons with a disability who own a house which does not meet their particular needs; and
who are in the following priority: 
• Council or Housing Association tenants who currently live in Perth & Kinross or; 
• Council or Housing Association waiting list applicants who have an established local
connection to Perth and Kinross and who have requested Perth and Kinross as an
area in which they wish to be houses; or 
• Residents of Perth and Kinross. 
The property must be the applicant’s permanent home and not used as a second home or let
out. The size of the property allocated should be appropriate to the size of the household.
Developers may be required to submit a marketing strategy to the Council for approval as
part of planning consent or Section 75 Agreement, the detail of which will be defined, but will
likely indicate the advertising, marketing periods and application process for the relevant
units. Prior to submitting a marketing strategy, developers are urged to contact the Council’s
Housing Strategy team to confirm the relevant time periods and priority client groups etc. 
Page 62 of 222

Page 63

13 
Contact information 
For further information on affordable housing and any enquiries regarding the guidance,
please contact the Housing Strategy team at:
Email: AffordableHousing@pkc.gov.uk
Tel: 01738 476405 
Page 63 of 222

Page 64

Page 64 of 222

Page 65

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure and Economic Development Committee – 31 May 2023
Climate Change and Sustainability Committee – 31 May 2023
Scrutiny and Performance Committee – 7 June 2023
Housing and Social Wellbeing Committee – 21 June 2023 
COMMUNITIES SERVICE ANNUAL PERFORMANCE REPORT 2022/23 
Report by the Executive Director, Communities
(Report No. 23/168) 
1. PURPOSE 
1.1 This report presents the Service Annual Performance Report 2022/23 for
Communities.  It details progress against targets and improvement actions
over the last year against the 2022/23 Service Business Management
Improvement Plan. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Environment, Infrastructure and Economic
Development Committee: 
• approves the Communities Service Annual Performance Report 2022/23 for
the areas which fall within their remit. 
2.2 It is recommended that the Climate Change and Sustainability Committee:
• approves the Communities Service Annual Performance Report 2022/23 for
the areas which fall within their remit. 
2.3 It is recommended that the Scrutiny and Performance Committee:
• scrutinises and comments as appropriate on the Communities Service
Annual Performance Report 2022/23. 
2.4 It is recommended that the Housing and Social Wellbeing Committee:
• approves the Communities Service Annual Performance Report 2022/23
for the areas which fall within their remit. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4:  Background
• Section 5: Proposals
• Section 6: Further Considerations
• Appendices 
6
Page 65 of 222

Page 66

4. BACKGROUND 
4.1 In previous years, Council Services have produced a Joint Service Business
Management and Improvement Plan (BMIP) and Annual Performance Report
(APR) on an annual basis.  This year, however, as we transition to new
performance reporting and strategic planning arrangements, we are
presenting a Service Annual Performance report on its own. Detail on
improvement actions will follow later in the year through the Corporate Annual
Performance Report and Delivery and Improvement Plan.   
4.2 During the course of 2022/23, organisational changes were undertaken which
moved the responsibility for key actions such as anti-poverty into the Chief
Executive’s Service.  However, rather than create another Annual
Performance Report for these, updates on performance are still included
within the APR for Communities, given that was where the actions were
originally proposed. 
5. PROPOSALS 
5.1 The report includes performance summaries and end of year data, where
currently available. Where relevant benchmarking data, self evaluation,
inspection and audit results have been included.   
5.2 Future reporting will be aligned to our new Corporate Plan, which was
approved by Council on 21 December 2022, and covers the period from
2022/23 to 2027/28.   
5.3 The Council is continuing to roll out a new performance management software
system in 2023, which will change the way in which performance information
is managed and presented. 
5.4 Strategic planning and performance reporting arrangements are being
reviewed across the Council, taking into account revisions to key strategic
documents and new performance management software.  For 2023, planned
improvement activity will be outlined within a Corporate Annual Performance
Report and Delivery and Improvement Plan. This will be reported to Scrutiny
and Performance Committee and then Council in September and October
respectively. 
5.5 Key Highlights 
• We support business to grow and attract investment and higher value jobs
into Perth & Kinross as outlined within the Economic Wellbeing Plan.  We
have supported the deployment and use of the digital fibre network to
support business innovation and growth. (Environment, Infrastructure and
Economic Development Committee) 
• We continue to deliver the Climate Change Strategy for Perth and Kinross,
which sets out our plans and actions to lower our carbon usage and meet
our obligations on upcoming regulatory requirements – with a particular
Page 66 of 222

Page 67

focus on transport and food this year.  The Strategy and the establishment
of the Climate Commission ensure that we are acting now to protect the
environment for future generations. (Climate Change and Sustainability
Committee) 
• We have worked with other services and partners to mitigate the impact of
the cost-of-living crisis on our residents, including preventing
homelessness wherever possible.  We have played a key role in helping to
protect people from escalating costs, and as you can read in this report,
we have already started a wide range of work to support people who are
finding themselves in financial difficulty. (Housing and Social Wellbeing
Committee) 
• We have worked with partners to develop a new Town Centre Action Plan
for Coupar Angus to address the priority issues including, health and
wellbeing, poverty, social isolation and employability. (Housing and Social
Wellbeing Committee) 
• We continue with major key infrastructure to support the local economy
including the Cross Tay Link Road which is due for completion in 2025 and
the redevelopment of the Perth City Hall as a cultural attraction due to be
opened in 2024.  (Environment, Infrastructure and Economic Development
Committee) 
6. FURTHER CONSIDERATIONS 
6.1 This report provides a high level summary on the delivery of actions approved
within the previous Communities Business Management and Improvement
Plan. 
Authors
Name Designation Contact Details
Connor Wilson Performance and Business
Support Manager
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved
Name Designation Date
Barbara Renton Executive Director (Communities) 19 May 2023 
APPENDIX 1 
• Communities Service Annual Performance Report 2022/23 
Page 67 of 222

Page 68

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  None
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment None
Strategic Environmental Assessment None
Sustainability (community, economic, environmental) None
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications  
Community Plan / Corporate Plan 
1.1 This report supports the delivery of the Strategic Objectives within Perth and
Kinross Community Plan (Local Outcomes Improvement Plan) 2017-2027 and
Corporate Plan 2018-2022. 
2. Resource Implications 
Financial 
2.1 There are no financial implications arising from this report. 
Workforce 
2.2 There are no workforce implications arising from this report. 
Asset Management (land, property, IT) 
2.3 There are no asset management implications arising from this report. 
Page 68 of 222

Page 69

3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.   
3.2 This report has been considered under the Corporate Equalities Impact
Assessment process (EqIA) with the following outcome: 
(i) Assessed as not relevant for the purposes of EqIA 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals.  no further action is required as it does not qualify as a PPS as
defined by the Act and is therefore exempt. 
Sustainability 
3.4 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.5 The information contained within this report has been considered under the
Act. However, no action is required as the Act does not apply to the matters
presented in this report. 
Legal and Governance 
3.6 Not applicable. 
Risk 
3.7 Not applicable. 
Page 69 of 222

Page 70

4. Consultation 
Internal 
4.1 The Communities Senior Management Team were consulted during the
preparation of this report. 
External 
4.2 Not applicable. 
5. Communication 
5.1 Not applicable. 
2. BACKGROUND PAPERS 
2.1 The background papers referred to within the report are: 
• Communities Business Management Improvement Plan 2022/23 and
Annual Performance Report 2021/22 
Page 70 of 222

Page 71

Appendix 1
6
Page 71 of 222

Page 72

Contents Page
Introduction 
Service Annual Performance Report 2022-23 
Performance Summary
• Giving every child the best start in life and developing educated,
responsible, and informed citizens 
• Promoting a prosperous, sustainable, and in inclusive economy 
• Supporting people to live independent, healthy, and active lives 
• Creating a safe and sustainable place for future generations 
Key Performance Indicators 
Glossary of Terms 
2
4
7
9
13 
17 
31 
Page 72 of 222

Page 73

Page | 2 
INTRODUCTION  
We are pleased to present the Annual Performance Report 2022/23
for Communities. As you would expect, the last 12 months have
again been challenging for our Service as we continued to respond
to the cost-of-living crisis and recovered from the huge disruption
caused by Covid-19. 
As we emerge from the pandemic, we have found ourselves
presented with a new set of equally challenging circumstances. The
significant rise in the cost-of-living affects everyone in Perth and
Kinross but in particular by the most vulnerable people in our
communities. We have played a key role in helping to protect
people from escalating costs, and as you can read in this report, we
have already started a wide range of work to support people who
are finding themselves in financial hardship. 
We allocated £171,000 of Warm Spaces funding, provided by the
Council, for 85 groups across Perth and Kinross, these have offered
a range of welcoming and supportive venues for people to make
use of throughout the winter. 
Our Housing Service has worked with Perth Citizens Advice Bureau
to provide financial assistance to 926 of our tenants who found
themselves in financial hardship, minimising the impact of the cost-
of-living crisis on these people and their families. 
We have continued to co-ordinate the response to child poverty
across Perth and Kinross through our Local Child Poverty Action
Plan. This highlights the major partnership effort across Perth and
Kinross to help and support families facing poverty. Our Anti-
Poverty Task Force was set up following Council approval in
September 2022 and comprises of members from the Third Sector,
Police Scotland, NHS Tayside, elected members, the Chief
Executive and Senior Officers. 
Through the Scottish Government Parental Employment Support
Fund (PESF), we have also created a small team to support
parents into work, and with support if they are currently in low paid
employment. 
The Cross Tay Link Road (CTLR) is the central element of the
Perth Transport Futures Project and is the biggest infrastructure
project ever undertaken by Perth & Kinross Council. The Cross Tay
Link Road will address the long-term transportation needs of the
area, promote economic growth and address issues of congestion
and pollution in Perth city centre. The project will facilitate
investment of £174 million in new commercial space in the area and
bring the prospect of more than 5,000 new jobs to the area. Phase
2 of the project is already underway, including the new 3-span
bridge across the River Tay, and is due to be completed in 2025. In
addition, there are a number of community benefits in place, with a
range of activities already undertaken.
Council approved our Physical Activity and Sports Strategy in
December 2022, and the one-year Action Plan focuses on
increasing participation in physical activity and sport to help the
positive mental and physical wellbeing of residents of Perth and
Kinross. 
Page 73 of 222

Page 74

Page | 3 
Perth & Kinross Council was one of the first local authorities in
Scotland to support the Scottish Government’s declaration of a
Climate Emergency. The Service plays a lead role in supporting the
Council’s climate change strategy. We produced our first annual
report to Council in September 2022, and it was noted that there
has been significant progress across the eight climate action
themes. This includes the establishment of a Climate Change
Commission which has 25% of its membership made up of young
people. We have expanded the range of energy advice services
available to residents through our partners Save Cash and Reduce
Fuel (SCARF) and also completed the Electric A9 Project. The
Council is already investing resources in its revenue and capital
budgets to adapt its estate to meet the demands of the climate
change agenda. 
All local authorities will continue to face financial challenges in the
future, and so one of our priorities will be to grow collaborative
working opportunities with other Councils and partners to unlock
efficiencies, share best practice and allow us to offer services to our
communities that could otherwise be unachievable in the current
financial climate. The Service will continue to play a key role in
taking this agenda forward.
Despite the major challenges ahead, we continue to look to the
future, confident that our dedicated and skilled staff will continue to
offer high-quality services that will make Perth and Kinross the best
place it can be within the resources at our disposal. 
Page 74 of 222

Page 75

Page | 4 
GIVING EVERY CHILD THE BEST START IN LIFE AND
DEVELOPING EDUCATED, RESPONSIBLE, AND
INFORMED CITIZENS 
Performance Summary for 2022-23 
The cumulative impact of our work during the year has been significant. We
have worked to mitigate the impacts of Child Poverty on our children and
their families. This has included working across the organisation and with
our community partners to provide opportunities to develop skills, maximise
income and employment opportunities. This is further supported by the
principles and ethos of the Perth & Kinross Offer which has our
communities at the heart. 
Update on Priority Actions 2022-23
Work with other services and partners to mitigate the impact of the
cost-of-living crisis on our residents, including preventing
homelessness wherever possible. This will include narrow
inequalities gaps and demonstrate a consistent and systematic
approach to prevention, early intervention, and fairness
(Housing & Social Wellbeing Committee)
A partnership approach involving Perth and Kinross Council (PKC)'s
employability and welfare rights teams, Perth Citizens Advice Bureau
(CAB), other third sector and community-based organisations, and private
sector employers has resulted in the delivery of employability skills training
and support packages, incentivised work placements, employment support
including access to childcare, housing, and income maximisation. In
addition, an Anti-Poverty Task Force has been set up involving PKC, third
and private sector partners to champion the reduction of poverty and
associated stigma in Perth and Kinross.
Increased focus on supporting parents into work to lift families out of
poverty by removing the barriers to employment and maximising income for
struggling families. This approach has resulted in 
• 817 people receiving employability support, and 290 finding or
sustaining employment as a result.
• The delivery of 6394 childcare places across the public and third
sector. 
• Securing client financial gain of £5.3m by promoting income
maximisation and cash first approaches.
Members of the Task Force also expanded the use of the Perth Gift Card
to Local Supermarkets allowing those eligible the same choice and access
to food without stigma in line with the Cash First principles.
Since its introduction in April 2018, the Housing Service has spent over
£950k and supported 1,725 council tenants through the Tenancy
Sustainment Fund. This has helped tenants keep their home and better
deal with the cost-of-living pressures. Through the Think Yes budget of
£30k, frontline housing staff have been empowered to respond quickly and
effectively to support 167 tenants who faced a situation which could impact
on their ability to keep their tenancy. 
A dedicated financial hardship project with CAB has supported 926 tenants
in financial difficulties or facing financial hardship to access specialist
money advice and to minimise the impact of the cost of living and prevent
some from losing their home. 
The Rattray Community Group was formed as a small post-covid recovery
initiative project that encouraged community members to get together in a
safe environment after the long months of social isolation due to
Lockdown. 
Page 75 of 222

Page 76

Page | 5 
Support and assistance through SCARF have helped 495 households and
residents be better informed about energy efficiency measures and
provided support to help reduce in reducing their energy bills. 
We have maintained our rents at affordable levels, 9% lower than
neighbouring authorities and 23% lower than local Housing Associations.
This ensures that 85% of residents can afford the rent based on their
income, without taking into account any housing benefit they may receive.   
We are recognised as sector leading in supporting tenants against mould
and damp which has become an issue nationwide due to the cost-of-living
crisis. 
Taking forward the actions within our Local Child Poverty Action
Plan 
(Housing and Social Wellbeing Committee) 
An anti-poverty task force has been set up following Council approval in
September 2022 and has a remit to champion the reduction in poverty
levels and associated stigma in Perth and Kinross. The task force
comprises of members from the third sector, local business, Police
Scotland, NHS Tayside, elected members, the Chief Executive and Senior
Council Officers. 
To date, there have been a number of actions including the mapping of
poverty across Perth and Kinross landscape, development of a
communications plan, and building relationships to improve collaboration
with CAB, Welfare Rights and the third sector. 
Moving forward, the task force will influence across all sectors and
communities to drive activity to address challenges highlighted within the
agreed key themes and focus on employability based on clear actions. 
Through the Scottish Government Parental Employment Support Fund
(PESF), we have created a small team of 2 key workers to support parents
into work and with progression if they are currently in low paid
employment. We provide support with training, skills and job search, and
signpost clients to other relevant support including childcare, housing, and
welfare rights. 
We have supported 78 clients who are seeking work, and 30 who are
currently in work, with 10 receiving our new Elev8 training grant. Parents
can also access other programmes and funding including Skills academies
and the Skills Passport. 
Delivering on the actions within our Rapid Rehousing Transition
Plan to ensure our continued success in tackling homelessness
(Housing and Social Wellbeing Committee)
2022/23 presented challenging conditions for delivering homelessness
services. There was a 21% increase in all homeless presentations. This
was due to the demand associated with post-pandemic conditions, cost of
living pressures and a reduction in housing supply with less new-build
completions and significantly reduced turnover of existing stock. However,
despite the ongoing challenges:
• Through Home First, we have minimised the number of children living in
temporary accommodation and continue to be one of the leading
authorities in Scotland in this area.
• We have minimised the impact of the increase in homeless
presentations on the average duration of homelessness through the
continued use of targeted prevention measures.
• To support households to quickly move into their new homes, we
increased our starter and furniture packs, spending around £50,000 of
our allocation of Scottish Government Rapid Rehousing Transition Plan
(RRTP) funding to provide essential goods.
Page 76 of 222

Page 77

Page | 6 
• Through our ‘Property Ready’ and ‘Prevention’ Funds, we assisted
around 300 people with essential goods to enable them to successfully
move into their new home. 
We launched a new self-serve, online Housing Options service, making it
easier for people to access a range of housing options. 
Void management including the allocation, preparation and relet of our
housing stock is a cross service process. To improve our performance and
ensure applicants and tenants are rehoused quickly, we have introduced a
project planning approach for each individual void property. 
Tackle inequalities in Coupar Angus. The Community Planning
Partnership (CPP) identified Coupar Angus as a pilot for new ways
of working which addressed inequalities in the town. (Additional
focus area)
(Housing and Social Wellbeing Committee) 
We worked with Community Planning Partners and commissioned Iconic
Consulting to develop a new Town Centre Action Plan for Coupar Angus to
address priority issues including health and wellbeing, poverty, social
isolation, and employability. We also supported Forward Coupar Angus to
stabilise its governance and financial position and secure/protect
community assets for the future. 
Through the Place Based Investment Fund, we have supported the
creation of the new Strathmore Community Hub which is proving to be a
popular asset for the local community. Since opening in September 2022, it
has already hosted over 90 events, with over 300 hours of bookings
secured, including weekly soup lunches and a community fridge. 
Provide adult learning opportunities to increase employability and
participation (Additional focus area)
(Housing and Social Wellbeing Committee) 
Culture and Communities service and the Adult Learning Partnership
engaged with 569 learners from April – December 2022, including refugees
and people seeking asylum and those experiencing substance misuse or
mental health issues. 
Thematic Review of Community Learning and Development by
Education Scotland
(Housing and Social Wellbeing Committee) 
In Spring 2022, Education Scotland conducted a thematic review of the role
played by Community Learning and Development (CLD) in Perth and
Kinross to support post-Covid recovery in communities and how
partnership practice was evolving in response. 
The review highlighted significant strengths in relation to supporting/
growing volunteer capacity, continued through the PKC Volunteer
Upskilling Fund which enabled volunteers and community groups to access
a wide range of training opportunities. 
An area highlighted for improvement was our approach to volunteering.  As
such, we have progressed this and are currently working on developing a
consistent approach to volunteering across Perth and Kinross Council.
Page 77 of 222

Page 78

Page | 7 
PROMOTING A PROSPEROUS, SUSTAINABLE, AND IN
INCLUSIVE ECONOMY 
Performance Summary for 2022-23
The impact of our work during 2022/23 has been to sustain businesses and
communities through the provision of timely, comprehensive advice,
guidance, and financial support by mitigating as far as possible the
continuing impacts of the pandemic, addressing the equalities gap,
maximising income, and keeping rents affordable in order to support both
individuals and the local economy. 
Update on Priority Actions 2022-23
Support business to grow and attract investment and higher value
jobs into Perth & Kinross as outlined within the Economic
Wellbeing Plan
(Environment, Infrastructure & Economic Development Committee) 
We developed the Outline Business Case for Perth Eco-Innovation Park at
Perth West to attract Scottish and UK Government’s funding and lever
private investment. The Project aims to support place based and business
innovation within the Clean Growth sector to create higher value jobs. The
Project is part of Tay Cities Clean Growth cluster initiative. Council has
approved funding of £10 million towards the cost of delivering enabling
works for Phase 1 of the Perth Eco Innovation Park. 
We supported the deployment and use of digital fibre network to support
business innovation and growth. 
We have also worked with the Business Gateway contractor, Elevator, to
deliver a series of business accelerators with a focus on sustainable growth
and resilience, “Winter Warmers” and “Build, Run, Scale,” and “Big Ideas,”
a programme of entrepreneurial challenges in conjunction with Perth
College UHI. We delivered financial assistance schemes to businesses
including the Market Development Grant aimed at internationalising
businesses, the Micro Enterprise Fund, the Green Capital Recovery Fund,
and Business Crowdfunder.
Ensuring delivery of key infrastructure projects to support the local
economy including the Cross Tay Link Road and the
redevelopment of Perth City Hall as a cultural attraction
(Environment, Infrastructure & Economic Development Committee) 
Stage One of the Cross Tay Road Link (CTLR) was successfully completed
in September 2022, enabling Stage Two of the contract to proceed. Works
are progressing well with completion estimated at Spring 2025 as per the
current programme. A programme of community benefits is also in place
with a significant number of activities already undertaken. 
The Broxden – Low Carbon Transport Hub project started on site at the
Broxden Park & Ride site in October 2022. Once fully completed there will
be 41 EV charging spaces available offering a mix of charging speeds to
suit the diverse usage patterns of EV users. The EV chargers will be
supported by on-site solar renewable energy generation and battery
system, managed, and controlled by a smart energy management system
to provide a sustainable EV charging hub that will reduce carbon emissions
and energy costs for the council. 
We continued to deliver the new Perth Museum project scheduled to open
in spring 2024. 
The long-term vision for active travel is to make walking or cycling the most
popular choice for shorter everyday journeys, by making it safer, easier,
and available to everyone. During 2022/23 we invested £1,012,000 in
Page 78 of 222

Page 79

Page | 8 
active travel infrastructure to encourage residents and visitors to walk and
cycle in Perth and Kinross. 
Scotland’s Road Safety Framework to 2030 sets out a long-term vision for
road safety where there are zero fatalities and injuries on Scotland’s roads.
During 2022/23 we invested over £200,000 in Vehicle Activated Signs to
encourage drivers to reduce their speed on the roads in Perth and Kinross.
Through additional Council investment the road condition continues to
improve year on year. Since 2019, 159km of road is in a better condition
than previously, a net improvement of 6.4%. 
A particular focus on city and town regeneration as well as
employability and skills to support income equality
(Environment, Infrastructure & Economic Development Committee) 
36 grants were approved for city and town centre retail/hospitality premises
improvements through the Open for Business Fund, typically for façade
enhancements. Additionally, 13 projects were approved through the Adapt
Your Property Fund to repurpose vacant premises into other commercial or
residential use, and the Vacant Property Feasibility Fund has provided
support to 20 projects. 
Through the Scottish Government funded Place Based Improvement
Programme grant support was approved for Civic Space at Ropemakers’
Close in Perth, Rannoch Hub, River Tay Way hub at Aberfeldy, demolition
of the Clachan and Quality Café in Perth. Ongoing support is being
provided to the Tayside YMCA for the Y Centre regeneration project
including management of Regeneration Capital Grant Fund (RCGF)
funding, additional Council revenue funding and sourcing of further funding
support to bridge the remaining shortfall. 
The Vacant Property Team were able to support the £1.5m project for 23-
31 South Methven Street which has brought approximately 900m2 of
disused commercial space back into use, whilst directly creating 32 high
skilled jobs.
Employability & Skills Actions delivered include: 
• Employer Recruitment Incentives – creating 86 jobs (over last 2 years
136 places created with nearly 80% of individuals moving into
permanent employment).
• 38 Long term unemployed clients supported into 6 month paid work
placements.
• Created an £800K Employability Challenge Fund – 8 projects delivering
across a wide range of skills initiatives and employability support.
• A pilot CodeClan Youth Academy in March 2023 – supported 6 young
people to develop coding and software development skills. 
We co-ordinated the delivery of the Volunteer Upskilling Fund, enabling
593 volunteers to access training and learning to build their individual and
groups’ capacity. 
We worked in partnership with Jupiter Artland to regenerate a city centre
space that was visited by 8000 people over 10 weeks, including 425 school
children who were given the opportunity to follow a creative career path.
Page 79 of 222

Page 80

Page | 9 
SUPPORTING PEOPLE TO LIVE INDEPENDENT,
HEALTHY AND ACTIVE LIVES
Performance Summary for 2022-23
We have supported people to live independent healthy lives by working
together with our partners and communities across a range of activities to
improve and prioritise what matters most to our communities. We continue
to minimise the impact and stigma of homelessness as well as listening to
seldom heard voices to inform how we develop and improve our services. 
Update on Priority Actions 2022-23
Work with other services and partners to mitigate the impact of the
cost-of-living crisis on our residents, including preventing
homelessness wherever possible
(Housing & Social Wellbeing Committee) 
We have continued to support people from Ukraine to settle into
accommodation and people seeking asylum. To date:
• We continue to work with our communities to welcome over 450
people from Ukraine.
• 116 children have enrolled in our local schools and English for
Speakers of Other Languages (ESOL) provision has been expanded to
provide additional capacity to meet growing demand.
We continue to work with the third sector and community groups to provide
support to 109 people seeking asylum. 
A dedicated Central Arrears Team was formed in March 2023 to take a
person-centred approach to supporting tenants in financial difficulties. The
Team will not solely pursue or clear arrears, but to work with the tenant to
look at all the ways to maximise their finances and ensure they are getting
all the support they require to help them sustain their tenancy.
Delivering the good food strategy to support the activities involved
in producing, processing, transporting and consuming food
(Housing & Social Wellbeing Committee) 
In Spring 2022, our Good Food Partnership achieved Sustainable Food
Places membership and a funding application for a Sustainable Food
Places Coordinator Grant was successful.  In February 2023, a regional
meeting was held to advance the opportunities to collaborate on Good
Food across the Tayside region. 
Work will take place throughout 2023 in conjunction with communities and
partners to developing a vision and scope for the Good Food Strategy &
Action Plan including a Good Food Charter for Perth & Kinross. 
Increasing the quality and quantity of affordable houses and
housing options in both urban and rural areas
(Housing & Social Wellbeing Committee) 
We delivered 203 affordable homes within Perth and Kinross during
2022/23. Of these: 
• 130 Social Rent (Council and Housing Association) 
• 49 Mid-Market Rent (MMR) 
• 24 Low-Cost Home Ownership (LCHO) 
We met our Local Housing Strategy (LHS) target of 200 Affordable Homes
this year. Over the past 5 years, 1,185 affordable homes have been
delivered in Perth and Kinross.
Through the Empty Homes Initiative, 32 properties were assessed and
grant funding of over £208,000 was provided.  This resulted in 18 long-term
empty properties being brought back into use as affordable housing with
the rent fixed at the Local Housing Allowance rate for 5 years as part of the
Page 80 of 222

Page 81

Page | 10 
grant conditions.  These properties have been let to people who may
otherwise be reliant on social housing including two families fleeing the
conflict in Ukraine.  We also rehoused 158 households through the Rent
Bond Guarantee Scheme (RBGS) by providing a Bond Guarantee in lieu of
a deposit and therefore removing one of the key barriers to entry to the
private-rented sector. 
Revise our Local Housing Strategy in line with the key national
priorities within Housing to 2040
(Housing & Social Wellbeing Committee) 
Through close partnership working and consultation with local and national
housing stakeholders, communities and partner organisations over the last
two years, the Local Housing Strategy has been revised, updated, and
approved by Committee on 15 March 2023. Work to progress the key
outcomes of the strategy are currently being monitored through a local
multi-agency delivery group. 
Work in partnership with the Health & Social Care Partnership to
progress actions within the Housing Contribution Statement and
Local Housing Strategy to provide appropriate models of
accommodation and support
(Housing & Social Wellbeing Committee) 
Our successful Independent Living Panel ensures people with particular
housing and support needs have their needs assessed through a multi-
agency approach. The right solutions enable them to live independently
within their own community. The panel also ensures that future 
accommodation needs are factored into the Strategic Housing Investment
Plan. 
A range of independent living accommodation projects were progressed for
people with particular housing and support needs. A further two projects
have completed, providing 12 units of bespoke accommodation with
communal facilities in Rattray. 
Through our Older Persons Wellbeing Project, older people living in the
community are provided with tailored support to help address issues such
as loneliness and isolation and support to access events and activities
within our sheltered housing complexes. Work is underway to expand the
Project to other areas of Perth and Kinross. 
Support the health and wellbeing of our residents by developing
our new Sport and Activity Strategy, and our commissioning
arrangements with Live Active Leisure (LAL) and with the Health
and Social Care Partnership with a focus on wider wellbeing and
tackling health inequalities
(Housing & Social Wellbeing Committee) 
Following extensive community consultation, a new Physical Activity and
Sports Strategy produced, and draft approved by Full Council Dec 2022.
This strategy and 1 year action plan focuses on increasing participation in
physical activity and sport to support positive mental and physical
wellbeing. Final approval of the Strategy will be sought from Council in May
2023.
Children and young people who play outdoors often have better social
networks, are more confident and are more involved in their local
communities. During 2022/23 over £350k was invested in 3 upgrades of
playparks and designs and consultation were under way for a further four
upgrades with joint funding from community groups, the Council, and
Scottish Government.  The Council manages 146 play parks throughout
Perth and Kinross and has a 15-year rolling refurbishment plan working in
Page 81 of 222

Page 82

Page | 11 
partnership with communities wherever possible to develop the designs
and raise funding
Food Inspections and sample visits
(Housing & Social Wellbeing Committee) 
Officers conducted food law inspections to ensure that Perthshire food
businesses handle, store and produce food hygienically and in line with
National Food Law. Inspections also cover compliance with labelling,
presentation, composition of food and the provision of correct allergen
information to customers and an opportunity to provide advice and support
to businesses.
During 2022/23, the Food Team conducted 1,059 inspections, visits, and
sample visits to food establishments in Perth and Kinross. An audit of our
processes was undertaken by Food Standards Scotland which identified
that these are undertaken to a high standard. 
Page 82 of 222

Page 83

Page | 12 
CREATING A SAFE AND SUSTAINABLE PLACE FOR
FUTURE GENERATIONS 
Performance Summary for 2022-23 
The development of our Climate Change strategy and action plan together
with the establishment of our Commission ensures that we are acting now
to protect our environment for future generations. This strategy brings
together several service areas to ensure that, as a Communities Service,
we can influence and deliver on our contribution to mitigate the impact of
climate change such as more walking and cycling friendly routes and
worked to reduce, reuse, and recycle more of our waste. 
This year has seen more engagement with communities providing funding,
assets, and practical support to develop stronger communities and support
the Perth and Kinross Offer. 
Update on Priority Actions 2022-23
Continue to deliver the Climate Change Strategy for Perth and
Kinross, which sets out our plans and actions to lower our carbon
usage and meet our obligations on upcoming regulatory
requirements
(Climate Change and Sustainability Committee) 
We improved our Climate Change governance by creating the Climate
Change and Sustainability Committee and the Climate Change
Commission with over 25% membership of the latter being by young
people. 
We engaged widely with residents, communities, young people/schools,
and businesses and launched a dedicated website that is a one-stop shop
for climate change information. This has already received over 14,000
views as well as launching dedicated social media channels; Perth and
Kinross Youth Climate Conference in November 2022, was a first step in
meaningfully engaging with school pupils. Successful engagement with
large employers Scottish and Southern Energy (SSE), Aviva, Stagecoach,
Highland Spring and Binn Group has identified key areas of collaboration
(transport, energy, waste, skills, and jobs). 
Through continued delivery of Flood Risk Management Cycle 1 projects,
we are reducing the flood risk to our communities and infrastructure, a new
bridge scour assessment programme has started, focused on helping to
proactively reduce the risk of future bridge damage and the associated
impact to our communities. 
During 2022/23, the Heat Energy Advice Team (HEAT), in partnership with
SCARF received 1,104 enquiries, carried out 246 home visits and 752
telephone consultations. As a result of these contacts, residents and
tenants were provided with information on ways to save money on fuel bills
and advice on how to reduce their carbon footprint. 
Good progress is being made to ensure the Council remains on track to
ensure all council properties meet an EPC (Energy Performance
Certificates) Band D or higher by 2025. Out of the total housing stock, only
500 properties require some work to meet this standard. 
Funding of £4M was secured from the Scottish Government to replace the
existing chalets with new energy efficient chalets at Double Dykes. 
Developing a mobility strategy
(Environment, Infrastructure & Economic Development Committee)
Page 83 of 222

Page 84

Page | 13 
Mobility Strategy project commenced in 2022. First formal stage, the Main
Issues Report, was approved at Committee in March 2023. 
Developing an electric vehicle strategy
(Climate Change and Sustainability Committee) 
The Electric A9 Project has been completed in partnership working with
Transport Scotland to provide a strategic corridor of rapid electric vehicle
(EV) chargers. This was designed to give a 20% increase in public EV
charger capacity, which will help give drivers the confidence/impetus to
transition to electric vehicle EVs. These have been strategically placed in
communities near the A9 to help boost trade and footfall within these
areas. 
Consultancy study for EV charging strategy commenced in late 2022. This
is due to complete in April 2023, subject to Transport Scotland and Scottish
Futures Trust response. 
Enhancing our waste management arrangements
(Environment, Infrastructure & Economic Development Committee)
(Climate Change and Sustainability Committee) 
The Council successfully secured £2.72m of capital investment from the
Scottish Government Recycling Improvement Fund (RIF) in 2022. This
funding ensures that the Council delivers a more equitable service for
residents and that our kerbside recycling service is compliant with the
Scottish Charter for Household Recycling. It will also have the following
benefits: 
• increase the quantity of recyclable material captured which increases
recycling rate, reduces waste arisings, and contributes to the net zero
agenda by reducing carbon emissions through capturing food and
plastics 
• increased participation in recycling and positive behavioural change by
residents 
• improvement in recycling material quality (by moving a to twin stream
service where card/paper are separated from other materials) 
The first project, using RIF, was successfully rolled out in November 2022
when dry mixed recycling and food waste communal bins were installed at
Perth city centre residual waste bin hubs. This has provided a recycling
service to over 1000 households which have never previously had access
to recycling services. 
Since summer 2020, the ‘Stick to the Six’ Campaign has proven successful
by bringing the contamination rate down from 28.52% at its peak in
November 2020 to an average of 19.38% in 2022. 
The Stick to the Six campaign was nationally recognised and awarded
silver at the APSE (Association for Public Service Excellence) Striving for
Excellence Awards in the waste and recycling category in May 2022. 
Improving our biodiversity approaches
(Climate Change and Sustainability Committee) 
We supported actions to improve our biodiversity through Tayside Local
Biodiversity Action plan and other initiatives e.g., Perthshire Nature
Restoration Fund. successful outcomes from the Nature Restoration Fund
– Year 1 both across the Council Estate and within communities including
the Kinross Raingarden Project, which won the Construction Industry
Research and Information (CIRIA) award for ‘Best Community Sustainable
Drainage (SuDS) project’. Blairgowrie is Scotland’s First Biodiversity Town. 
Page 84 of 222

Page 85

Page | 14 
To tackle the twin challenge of biodiversity loss and climate change, we
have undertaken changes in our grassland management.  The biodiversity
monitoring demonstrated that both approaches produced enhanced
biodiversity results. The consultation with the community was positive for
the majority of responses: 73.8% were in favour of the proposals.  The next
step is to seek committee approval to extend the areas of “No mow” and 
areas managed for biodiversity and to investigate how we can make this an
environmentally and financially sustainable method of managing our
greenspaces. 
Inspection of Perth Crematorium by the Federation of Burial and
Crematorium Authorities
(Environment, Infrastructure & Economic Development Committee) 
An inspection of Perth Crematorium was carried out by the Federation of
Burial and Crematorium Authorities (FBCA) in June 2022 which received a
compliance score of 98.4% which is higher than the industry average of
96%. 
The inspection highlighted strengths in all areas including the grounds,
premises and facilities, service, staff, and administration. 
Page 85 of 222

Page 86

Page | 15 
KEY PERFORMANCE INDICATORS 
GIVING EVERY CHILD THE BEST START IN LIFE & DEVELOPING, RESPONSIBLE AND INFORMED CITIZENS
Culture & Communities 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
Percentage of residents satisfied with local libraries 
(Environment, Infrastructure & Economic Development Committee)
78% Not Collected
Due to Covid 95%  82%
Number of library visits, in person and online  
(Environment, Infrastructure & Economic Development Committee)
3,469,000 1,062,804 1,280,912 350,000
Comments on Performance for 2022-23 and Target
There has been a 91.7% increase in library footfall this year when compared to the previous year 2021/22. This shows the sign of a strong recovery.  This picture is
mirrored across many library authorities in Scotland as people have changed habits or seek their reading material and information elsewhere. The satisfaction levels with
the library visits has increased by 17% since 2020/21. 
Numbers of adult learners supported to improve their employability or digital skills
(this includes commissioned services via the Adult Learning Partnership) 
(Environment, Infrastructure & Economic Development Committee)
110 279 780 350
Comments on Performance for 2022-23 and Target
As of December 2022, there were 780 adult learners supported to improve their employability or digital skills. This is significantly higher than the previous two years
combined, largely due to the limitations in place during the pandemic. 
Housing 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
Number of families presenting as homeless 
(Housing and Social Wellbeing Committee)                   83  107  141
Regulatory guidance
advises the setting of
Page 86 of 222

Page 87

Page | 16 
targets would not be
appropriate
Number of overcrowded households 
(Housing and Social Wellbeing Committee)  116  117  123  110
Comments on Performance for 2022-23 and Target
The total of 141 presentations from families in 2022/23 is an increase in presentations of 32% compared to the previous year. It should be noted that presentations from
families in particular were suppressed during the pandemic and cost of living pressures are contributing to an increase in relationship breakdowns. Our Housing Support
Service aims to prevent homelessness through the provision of person-centred housing support. 
The number of overcrowded households between 2020/21 and 2022/23 has remained fairly static. Monitoring arrangements are in place, and we make every effort to
reduce overcrowding. Specific factors, including property types and areas of choice impacts on the allocations process.  In turn, overcrowding can only be reduced when
there is appropriate housing available to allocate.
There is no national average available for this indicator. 
PROMOTING A PROSPEROUS, INCLUSIVE AND SUSTAINABLE ECONOMY
Housing 
Page 87 of 222

Page 88

Page | 17 
Planning & Development 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
Economic impact of events supported by the Council 
(Environment, Infrastructure & Economic Development Committee) 
Awaiting year end data 
0 0 N/A £14m
Number of new businesses started up with support from Business Gateway 
(Environment, Infrastructure & Economic Development Committee) 
267 220 250 300
No. of businesses supported by a growth programme 
(Environment, Infrastructure & Economic Development Committee) 
33 37 18
(Jan 23) 
60 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
Gross arrears as a % of gross rent due for the reporting year 
(Housing and Social Wellbeing Committee) 10.75% 10.69% 11.45%  8.4%
Rent collected as a % of the total rent due in the reporting year 
(Housing and Social Wellbeing Committee)  96.91% 99.08% 98.6%  98.9%
Comments on Performance for 2022-23 and Target
Rent arrears are continuing to rise in Perth and Kinross and this trend is reflected nationally. The Scottish local authority average for this indicator was 8.67% in 2021/22. 
We continue to monitor each of our locality offices performance to ensure that the collection rate is maximised and to identify any requirement for changes in practice or
resources across our four geographical localities. As a result of this close monitoring, we are piloting a centralised arrears team to focus on arrears and to provide tailored
support and assistance to tenants, in partnership with locality teams. 
The Scottish local authority average for this indicator was 98.6% in 2021/22 for rent collection, national data for 2022/23 is not yet available.
Page 88 of 222

Page 89

Page | 18 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
Area of available Serviced business land (Ha) 
(Environment, Infrastructure & Economic Development Committee) 
32.05 37.9  N/A 14.9
Comments on Performance for 2022-23 and Target
Although events resumed post Covid the sector was still responding to the impact of restrictions with a number of traditionally recurring events not proceeding in 2022.
Events supported in 22/23 included activities to mark the Platinum Jubilee and Winter Festival.  The Royal National Mod generated an estimated economic impact of £1.8
million but it has not been possible to determine an overall impact figure for 22/23. 
Although the start up target for Perth & Kinross has not been met P&K does have the highest number of the three Tayside local authorities. The Business Gateway contract
was retendered by Dundee City Council on behalf of the three Tayside councils in late 2022 for the period from 1 April 2023 to March 2025. It is intended that UK Shared
Prosperity Fund allocations will be used to expand the BG service provision over this time in the same was as ERDF funding was and with particular reference to enhanced
expert help and community outreach.  Support for start up micro enterprises / self employed individuals and social enterprises in rural Perth & Kinross is also provided by
Growbiz which was supported financially by the Council in 22/23 to expand its provision. 
We commissioned an Employment Land and Property market study to inform our Employment Land Strategy which was completed in June 2022. The findings of this study
were used to develop the future Perth and Kinross Local Development Plan and the Council’s Property Investment Strategy. 
Note: Data for 2023 will not be available until September 2023 after land audit has been completed.
Perth City Centre Footfall (Nos) % above the national level
(Environment, Infrastructure & Economic Development Committee) 
16.4% -10.2% -4.5% 4%
% of vacant retail units in Perth City Centre 
(Environment, Infrastructure & Economic Development Committee) 
11.7% 9.9%  10.5% 8.2% 
Comments on Performance for 2022-23 and Target
Page 89 of 222

Page 90

Page | 19 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
The city centre footfall in Perth has improved during 2022/23 with a year-to-date figure of 653,217 visitors which is up 5.3% on the previous year. Improvements are
ongoing to ensure the city centre footfall captured is reflective and new counters are being installed in May at the City Hall and near Costa Café. These areas are where the
highest footfall occurs on the City Centre. 
The % of vacant retail units increased compared to the previous year and is below set target for 2022/23. 
During 2022-23 the Council continued to provide further support to retail and other businesses through a range of measures including business advice, destination
promotion via improvement to the Perth city website, media, and digital channels: employment and business support; digital incentives and platforms providing current
market/consumer intelligence.
% of working age population unemployed, based on the claimant count 
(Environment, Infrastructure & Economic Development Committee) 
4.6% 2.7% 2.3% 1.0%
No. of unemployed people supported into work as a result of Employability
programmes supported by the Housing & Environment service 
(Environment, Infrastructure & Economic Development Committee) 
246 290 N/A 500
Comments on Performance for 2022-23 and Target
The % of working age population unemployed has reduced since 2020/21, the 2022-23 figure is above our set target but below the Scottish Local Authority Average of
3.2%.
In 2022/23, the Skills and Employment Initiatives team have delivered an enhanced menu of service offers to unemployed residents and local businesses. With emphasis
placed on new job creation, there has been impetus for micro and small businesses to create brand new roles for our unemployed clients. In addition to this we have
enhanced our skills intervention offerings. This means that unemployed people and/or those seeking self-employment have greater access to support funds to enhance
their skillset/qualifications to aid progression.
In 2022/23 we developed a Local Employability Partnership Delivery Plan focussing on key improvements in delivery and partnership working. We have also launched an
Employability Challenge Fund to provide access to the Scottish Government NOLB (No One Left Behind) funding to a wider range of partners including the voluntary
sector. Note: Data for unemployed people supported into work is not yet available.  Source for data is taken from the SLAED return, due date July 2023.  
Page 90 of 222

Page 91

Page | 20 
Culture & Communities
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
Percentage of residents satisfied with local museums and galleries 
(Environment, Infrastructure & Economic Development Committee)  74% N/A 95% 80%
Number of visits to museums that are funded, or part funded, by the council 
(Environment, Infrastructure & Economic Development Committee)  108,777  258,884  291,628 200,000
Comments on Performance for 2022-23 and Target
The total year’s footfall is down by 24.1% compared to 2019-2020 (pre - COVID). Direct comparisons are not like for like on the full year due to changes in opening hours
and a closure of galleries and exhibitions at the end of December ’22 for refurbishment and building works to transform the venue into the new Perth Art Gallery, opening
again later in 2023. Alyth Museum was redeveloped for the summer season as the Cateran Eco-museum Hub and attracted 1080 visitors, a 20% increase over the 2019
figure. Perth Museum and Art Gallery (PMAG) was used in October during the National Mod in Perth, with PMAG being used as the BBC studio for the event. The annual
target has been achieved and there has been a 9.5% increase in online visits compared to 2021-2022. 
SUPPORTING PEOPLE TO LIVE INDEPENDENT, HEALTHY AND ACTIVE LIVES
Housing
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
% of residential and business premises with access to Next generation broadband 
(Environment, Infrastructure & Economic Development Committee) 86.2% 86.3% 88.3%  100%
Comments on Performance for 2022-23 and Target  
The percentage of residential and business properties with access to superfast broadband (>30mbps) has increased by 2% during 2022/23 (88.3%). Whilst this is below
the national average of 95.4%, the rurality of Perth and Kinross does impact on the performance. 96.51% of all homes and business premises in Perth and Kinross have
access to partial or full fibre broadband as of March 2023. 
Page 91 of 222

Page 92

Page | 21 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
Number of housing options interviews completed 
(Housing and Social Wellbeing Committee)  2,297 2,214 2,663 Regulatory guidance advises
the setting of targets would
not be appropriate
Number of households presenting as homeless 
(Housing and Social Wellbeing Committee)  670 610 737 Regulatory guidance advises
the setting of targets would
not be appropriate
Number of applicants assessed as homeless 
(Housing and Social Wellbeing Committee)  550 520 566 Regulatory guidance advises
the setting of targets would
not be appropriate
Comments on Performance for 2022-23 and Target
There has been an increase of 449 housing options interviews completed (20%).
The number of households presenting as homeless increased by 21% compared to the previous year. This follows several years of consecutive reductions in homeless
presentations. The number of applicants assessed as homeless has remained stable with the increase being linked to the overall increase in presentations. In the 3rd and
4th quarters of 2022/23, we increased the proportion of allocations to homeless applicants in response to the increased demand and reduced supply of permanent
accommodation. 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
Number of people who slept rough the night before their homeless application 
(Housing and Social Wellbeing Committee)  24 36 39 Regulatory guidance advises
the setting of targets would
not be appropriate
Average days in temporary accommodation (All types) 
(Housing and Social Wellbeing Committee)  79 51 62 75
% of allocations to homeless households in permanent settled accommodation 
(Housing and Social Wellbeing Committee)  46% 35% 43%  50%
Comments on Performance for 2022-23 and Target
Page 92 of 222

Page 93

Page | 22 
During 2022/23, the average number of days in temporary accommodation has increased compared to the previous year. This is partly due to the supply and demand
pressures associated with an increase in presentations and a reduction in vacancies and partly due to a small number of complex cases and the reduced throughput of
available properties. 
The target for the proportion of allocations to homeless applicants is ‘indicative.’ The Home First model is designed to be flexible to respond to changes in demand and
supply. The 43% allocations figure reflects the reduction in the number of homeless people waiting for an offer of housing rather than a failure to meet a target. In the 3rd
and 4th quarters of 2022/23, we increased the proportion of allocations to homeless applicants in response to the increased demand and reduced supply of permanent
accommodation. 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
% of tenants satisfied with the overall service provided 
(Housing and Social Wellbeing Committee)  82.9% 82.2% 78.4% 95%
% of tenants satisfied with opportunities given to them to participate in the landlord's
decision making (Housing and Social Wellbeing Committee)  75.40% 76.3% 72.0% 99%  
Page 93 of 222

Page 94

Page | 23 
Culture & Communities
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
Numbers of community groups supported to increase their capacity 
(Environment, Infrastructure & Economic Development Committee)  270 236 343 270
Comments on Performance for 2022-23 and Target 
This figure includes support for groups to apply for Community Investment Funding, food insecurity funding and developing community action plans.  For 22/23, additional
funding was available for volunteer upskilling and warm spaces, increasing the number of groups the service worked with. 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2022/23 2022/23 2022/23
Comments on Performance for 2022-23 and Target
There has been a decline in tenant satisfaction in the past two financial years. Landlords are required to carry out satisfaction surveys every three years, and the Scottish
Housing Regulator has noted that the pandemic played a part in the reduction of the satisfaction levels nationally in 2021/22. Between June 22 and March 23, we
conducted 1,190 satisfaction surveys using face-to-face and telephone methodology. We are continuing to conduct monthly surveys in 2023/24 to gain useful feedback
from tenants around what matters to them and how we shape our service in the future. 
Local Authority Average for satisfaction with the overall service 2021/22 was 82.2%
Local authority average for satisfaction with opportunities to participate 2021/22 was 79.3%
Average time (in days) taken to complete approved applications for medical adaptations
in the reporting year 
(Housing and Social Wellbeing Committee) 
44.72 40.58 57.42 55
Comments on Performance for 2022-23 and Target
The average time taken to complete medical adaptations has increased from 40.58 days in 2021/22 to 57.42 days in 2022/23. The increase is due to a waiting list that was
carried forward from 2021/22. A review of the procedures has been undertaken in order to improve performance. 
The Scottish average for this indicator is 53.6 days for 2021/22
Page 94 of 222

Page 95

Page | 24 
Indicator
(Data covering to year end unless otherwise stated)
Performance  Target
2020/21  2021/22 2022/23 2022/23
Percentage of residents satisfied with local leisure facilities  
(Environment, Infrastructure & Economic Development Committee) 
74%  Not collected due
to Covid
58% 70%
Number of attendances to pools, indoor and outdoor sport, and leisure facilities 
(Environment, Infrastructure & Economic Development Committee)  63,000 555,188  1,059,466 875,000
Comments on Performance for 2022-23 and Target
Activities include an uplift in swimming at Perth Leisure Pool, due to the Olympia Pool in Dundee being closed throughout the year, accounting for approx. 7% impact on
total customer generated income. Fitness Membership is continuing to slowly increase with total membership numbers at the end of March increasing to 3,709.
Most venues have returned to be fully operational and attendance levels are sitting at approx. 87% of pre-covid levels. The industry average sits approx. 80-90%, so this is
a positive position to report upon. 
Regarding the decrease in satisfaction levels, customer surveys have shown issues with cleanliness, particularly in Perth Leisure Pool, which is mainly due to the older age
of the building, and general wear and tear, which is causing an appearance of uncleanliness. The surveys have also shown customer dissatisfaction with the amount of
parking available at Bells Sport Centre. The options to resolve this issue have been restrictive however Live Active Leisure have removed some grass areas to increase the
number of spaces slightly. Additional bike racks have also been added to encourage cycling as a mode of transport to the centre. 
CREATING A SAFE AND SUSTAINABLE PLACE FOR FUTURE GENERATIONS
Environment
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
Municipal waste collected that is recycled or composted (%) 
(Environment, Infrastructure & Economic Development Committee)  47.4% 46.9 47.2
(Apr to Dec 22
unvalidated)
65%
Emissions from council properties (tonnes CO2) (Environment, Infrastructure &
Economic Development Committee)  10,119 10,751 9,224 13,000
Vacant residential / commercial premises brought back into use  93 134 66 135
Page 95 of 222

Page 96

Page | 25 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
(Environment, Infrastructure & Economic Development Committee) 
Comments on Performance for 2022-23 and Target
There has been a slight increase in the percentage of waste that is recycled, however, the latest 2022/23 figure is below the target of 65%
Emissions reduced due to extension of Building Management System (BMS) controls to further sites and upgrades of existing heating controls, amendment to heating
calendar, energy efficiency measures/works, data monitoring and associated energy management, a reduction in the conversion factor for electricity and generally mild
weather.
Throughout 2022/23 the Vacant Property Team operated with a reduced capacity. This directly correlated to a reduced ability to be proactive in vacant property work which
in turn has resulted in a reduced number of vacant premises brought back into use compared to previous years and the target of 135. Going forward the capacity in the
team has been restored which should result in targets being achieved in future years. 
Housing
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
No of new publicly available social housing units including buy backs, conversions,
and empty homes conversions 
(Housing and Social Wellbeing Committee) 
246 310 203  200
Comments on Performance for 2022-23 and Target  
The number of new publicly available social housing units increased from 246 in 2020/21 to 310 in 2021/22. We delivered 203 affordable homes within Perth and Kinross
during 2022/23. Of these: 
• 130 Social Rent (Council and Housing Association) 
• 49 Mid-Market Rent (MMR) 
• 24 Low-Cost Home Ownership (LCHO) 
Overall % of new tenancies sustained for more than a year 
(Housing and Social Wellbeing Committee) 86% 87.4% 93.79% 91%
Page 96 of 222

Page 97

Page | 26 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23 
Comments on Performance for 2022-23 and Target
We have continued to focus on tenancy sustainment during 2022/23 which has resulted in improved performance in line with our target. The national average for this figure
in 2021/22 was 91%.
Average length of time taken (hours) to complete emergency repairs 
(Housing and Social Wellbeing Committee)  2.76 2.97 4.0 4.0
% Tenants satisfied with the repairs service 
(Housing and Social Wellbeing Committee)  97.5% 98.8% 97.5% 94% 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
Comments on Performance for 2022-23 and Target
Emergency repairs performance is currently in-line with our BMIP target of 4 hours. This figure is therefore likely to improve as this information when year-end information
is received, and the final figure will be reported in our ARC return. In comparison during 21/22 our emergency repairs performance was 2.97 hours and 2.76 in 20/21. Since
the pandemic, the industry has struggled with delays and cost increases for some building materials and a reduction nationally in skilled trades leading to difficulties in filling
vacancies. These issues have affected our inhouse trades team and our external contractors.  
Despite delays in the completion of some repairs as a result of national delays, cost increases for some materials and a reduction in skilled trades personnel, satisfaction
with repairs service delivery has remained high at 97.5% and is comparable to recent years). We have continued our efforts to encourage the online reporting of repairs
and have increased our online guidance videos for minor common repairs. In general, we have also increased communications with tenants using our email response and
social media to update customers on performance and service delivery updates.
Average calendar days to re-let properties 
(Housing and Social Wellbeing Committee) 32.8 44.6 42.81  29
% of rent due in the year that was lost due to voids                                         
(Housing and Social Wellbeing Committee) 1.11% 1.33% 1.06%  0.9%
Comments on Performance for 2022-23 and Target
Page 97 of 222

Page 98

Page | 27 
Performance in re-letting properties has improved compared to the previous year, despite a reduction on performance nationally. Local Authority average in 2021/22 to re-
let properties was 59.4 days. 
Factors impacting performance in the past year have included the national shortage of skilled tradesmen and issues with utilities companies which has been raised
nationally. We now have a service level agreement which commenced in February 2023 and should help with improving void turnaround times. 
During 2022/23, we also improved our performance in relation to % of rent lost due to voids. The national average for the % of rent lost due to voids in 2021/22 was 1.6%.
% of properties meeting the EESSH (Energy Efficiency Standard for Housing)
(Housing and Social Wellbeing Committee) 
82.2% 82.0% N/A 100%
Comments on Performance for 2022-23 and Target
During 2022/ 23, we focused on addressing the SHQS failures in relation to EESSH by making improvements mainly through our ‘energy efficiency’ programme and
‘heating/insulation’ programme. Note: Data will be available mid-May 2023.  
Page 98 of 222

Page 99

Page | 28 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
% of ASB (Anti-Social Behaviour) complaints resolved within locally agreed targets  
(Housing and Social Wellbeing Committee)
Year-end data available 16th April - NM
95.9% 89.2% 81%  90%
Comments on Performance for 2022-23 and Target
The % of ASB complaints resolved within locally agreed targets has reduced compared to the previous year and below target.  This is due to the nature and complexity of
some cases. Work has been undertaken with the locality teams to improve performance and meet the target of 90% in future reports.   
Culture & Communities 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
Number of community groups supported in the asset transfer process 
(Environment, Infrastructure & Economic Development Committee)  5 7 26 10
Number of groups receiving Community Investment funding 
(Environment, Infrastructure & Economic Development Committee)  0 141 85 N/A
Numbers of Participation Requests 
(Environment, Infrastructure & Economic Development Committee)  1 0 0  N/A
Comments on Performance for 2022-23 and Target
The council has supported 26 community groups in 22/23, who have enquired about Community Asset Transfer (CAT), by sharing relevant information that the council
holds in relation to assets being enquired about and provided with a single point of contact to work with. This has built the relationship between the council and the groups,
which has then allowed for continued dialogue and shared process updates, as well as discussing whether a CAT is right for the group at this time. As a result of our
partnership work, at least 9 of the 26 groups are currently live cases at the end of 22/23 and support will continue to be provided to these groups into financial year 23/24. 
During 2022/23, 85 Community Groups and Organisations successfully applied to the Community Investment Fund (CIF) and is lower than the 2021/22 figure. In 2022/23,
CIF only ran once as opposed to twice in 21/22; therefore, the total number of applications was down on the previous year. In 2022/23, Community Groups also had the
opportunity to apply to other grant schemes, such as the Cost-of-Living Fund, which supported Community Groups and Organisations to set up and run Community based
Warm Spaces and give out Warm packs to those in need in their community. The Cost-of-Living Fund may have impacted on the number of CIF applications received by
the closing date. 
Page 99 of 222

Page 100

Page | 29 
Indicator
(Data covering to year end unless otherwise stated)
Performance Target
2020/21 2021/22 2022/23 2022/23
In 2022/23, we received no Participation Requests. This situation is not unique to Perth and Kinross, as other local authorities also report low numbers. In recognition of
this, Part 3 of the Community Empowerment Act 2015 is being reviewed first as part of a broader Community Empowerment Act review by the Scottish Government. The
Scottish Community Development Centre (SCDC) has formed a working group to lead this review with relevant authorities, and Perth and Kinross Council is represented in
this working group. 
Following Information will not be available 
Indicator Indicator will be available
Area of available Serviced business land (Ha)  September 23 after land audit 
% of properties meeting the EESSH  Available May 2023 (this is included in the
Annual Return on the Charter and
requires external validation) 
No. of unemployed people supported into work as a result of
Employability programmes supported by the Housing & Environment
service 
Available July 2023 – SLAED
Page 100 of 222

Page 101

Page | 30 
GLOSSARY OF TERMS
APSE Association for Public Service Excellence
BMS Business Management System
CAB Citizens Advice Bureau
CAT Community Asset Transfer
CIF Community Investment Fund
CIRIA Construction Industry Research and Information
CLD Community Learning and Development
CPP Community Planning Partnership
CTLR Cross Tay Link Road
DWP Department for Work and Pensions
EPC Energy Performance Certificate 
ESOL English for Speakers of Other Languages 
EESSH Energy Efficiency Standard for Social Housing
EV Electric Vehicle 
FBCA Federation of Burial and Crematorium Authorities
FfF Futures for Families
HEAT Home Energy Advice Team
LAL Live Active Leisure
LCHO Low-Cost Home Ownership
LHEES Local Heat Energy Efficiency Strategy 
MMR Mid-Market Rent
PESF Parental Employment Support Fund
PMAG Perth Museum and Art Gallery
RCGF Regeneration Capital Grant Fund
RIF Scottish Government Recycling Improvement Fund
RRTP Rapid Rehousing Transition Plan
SCARF Save Cash and Raise Fuel
SCDC Scottish Community Development Centre
SSE Scottish and Southern Energy
SuDS Best Community Sustainable Drainage
UKSPF UK Shared Prosperity Fund
Page 101 of 222

Page 102

Page 102 of 222

Page 103

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure and Economic Development Committee 
31 May 2023 
SHORT-TERM LET CONTROL AREA: PROPOSALS FOR CONSULTATION 
Report by Head of Planning and Development
(Report No. 23/171) 
1. PURPOSE 
1.1 To seek approval to consult on the principle of introducing a short-term let
control area for Highland Perthshire and part of Eastern Perthshire, and to
seek approval of consultative draft non-statutory guidance on how planning
applications for short term lets will be assessed in Perth and Kinross. 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
• notes the short term lets evidence paper (Appendix 1)
• approves public consultation on the principle of a short-term let control
area for Highland Perthshire and part of Eastern Perthshire; and
• approves public consultation on proposed non-statutory planning
guidance on short-term lets (Appendix 2). 
3.  STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background
• Section 5: Context
• Section 6: Evidence and Key Considerations
• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices 
4. BACKGROUND 
Perth & Kinross Corporate Plan 2022-2027 
4.1 The Corporate Plan’s vision is for a ‘Perth and Kinross where everyone can
live life well, free from poverty and inequality’. Priorities are: 
• Tackling poverty 
• In partnership with communities
• Physical and mental well-being
7
Page 103 of 222

Page 104

• Children and young people
• Tackling climate change
• Vulnerable people
• Stronger and greener economy 
4.2 Access to quality, affordable housing is closely linked to addressing poverty,
as housing costs are the main household expenditure for lower income
households.  Increased competition in the residential market including
competition from buyers for second homes and short-term lets operating as a
business, can impact on availability and affordability of homes.  Affordable
housing is becoming an issue for rural business where businesses have cited
a lack of local homes for staff as a limiting factor to expansion (Housing
Needs Assessments).  The same issue is also experienced by public sector
services, particularly in education, NHS, social care and the fire service. 
4.3 However, short-term lets are also an important part of the visitor economy,
encouraging spend locally. The proposals contained in this paper are
therefore focussed on controlling the supply of properties being used for short-
term let in some parts of the Council area rather than stopping it.    
Short-term lets issue 
4.4 It should be noted that definitions for many of the terms used below are 
provided as part of appendix 2.     
4.5 Some communities, as indicated in paragraph 4.6 below, are becoming
increasingly concerned that the increase in short-term lets over recent years is
impacting on the availability and affordability of housing locally, and is having
a secondary impact on jobs, services and business opportunity. 
4.6 Communities have referred to second homes and short-term lets as an issue
in several Local Housing Needs Assessments have been conducted recently
at the request of the communities, namely: 
• Pitlochry
• Dunkeld and Birnam – PH8 area
• Aberfeldy, Weem, Strathtay, Grandtully, Logierait and Ballinluig
• Mount Blair Community Council area
• Comrie Community Council area 
These community views are supported by the evidence gathered by officers
for this report (appendix 1). 
4.7 There are two property types contributing to short-term lets; short-term lets
run solely as a business and casual short-term let (for less than 70 nights per
annum) that normally operate as private second homes. Currently there are
no powers for councils to disincentivise private second home ownership
beyond the Land and Buildings Transactions Tax on additional properties and
the removal of second homes council tax discount in 2017.  This could change
from April 2024, because of a new proposal from the Scottish Government to
Page 104 of 222

Page 105

give local authorities powers to charge a council tax premium on second
homes, should councils wish to do so.   
4.8 Planning legislation at present requires owners to seek planning permission
where the change of use of a residential property (dwelling house) to a short
term let is considered to be a material change of use.  The challenge is that
this decision is largely a matter for the individual owner, unless the Council as
Planning Authority is alerted.  It should also be noted that if the change of use
occurred more than 10 years ago, it is exempt from enforcement action and
therefore is deemed to have planning consent. 
4.9 Should a short-term let control area be introduced, all changes of use from
residential property to short-term let which occur after the designation of the
control area will be deemed as material, regardless of the circumstances, and
will require planning permission. 
5. CONTEXT 
Short-term Lets Licensing Scheme 
5.1 The Scottish Government introduced a new mandatory licensing scheme for
short-term lets in Scotland which opened for applications by new hosts on 1
October 2022. All existing short-term let hosts must apply for a licence by 1
October 2023, and all short-term lets must be licenced by 1 July 2024. As part
of the licence application, short-term let hosts are required to have planning
permission in place where there is a material change of use.  Where a Control
Area is in place, all uses of residential properties for short-term let will be
deemed a material change of use. 
Town and Country Planning (Short-term Let Control Areas) (Scotland)
Regulations 2021 and Planning Circular 01/2023: Short-term Lets and
Planning 
5.2 Section 26B of the Town and Country Planning (Scotland) Act 1997, as
amended by the Planning (Scotland) Act 2019, came into force alongside the
Control Area Regulations in April 2021. This gives planning authorities the
option of designating all or part of their area as a short-term let control area for
one or more of the following policy objectives: 
• to allow consideration of impacts on the availability of residential
housing to allow consideration of impacts on the character or amenity
of a neighbourhood to allow consideration of impacts on different types
of building. 
5.3 The newly revised Circular which supports the regulatory framework  indicates
factors that Planning Authorities may wish to consider when assessing the
need for a control area. Of relevance to Perth and Kinross, as evidenced in
appendix 1, are: 
Page 105 of 222

Page 106

• a lack of affordable and appropriate housing for local residents,
perhaps indicated by a high share of sale volumes to, and high prices
paid by, non-residents; and 
• a detrimental impact on local amenity, with some businesses, schools
or other services that serve, and are reliant on, permanent residents
closing or relocating. 
5.4 Seeking to manage short-term lets through the planning system has
limitations and risks including: 
• the scope of the short-term let regulations is, by definition, restricted to
short-term lets and may not impact on the numbers of second homes,
empty homes or purpose-built holiday accommodation;
• short-term lets contribute to the operation of the tourism industry, which
is a significant economic driver in some parts of Perth & Kinross and is
a sector which is still recovering from the Covid pandemic; and
• a control area may not result in the release of significant numbers of
residential properties back onto the market, as there is no guarantee
that any short-term lets which are refused planning permission will not
simply revert to being a second home. 
5.5 These limitations are explored in more detail in section 6 below. 
Approval of Perth & Kinross Local Housing Strategy 2022-27 
5.6 The Local Housing Strategy (LHS) was approved on 15th March 2023 (report
No 23/82). Full details of the LHS can be found on the Council’s website.   
5.7 The LHS Action Plan gave an initial response to the short-term lets issue
leading up to this report. Action 1.7 seeks that planning policy is developed
through Local Development Plan 3 where appropriate for short-term let control
areas by:
• completing a feasibility study in relation to short-term let control
areas; 
• carrying out community consultation; and
• developing and implementing local development plan policy if /
where appropriate for short-term let control areas. 
National Planning Framework 4 
5.8 National Planning Framework 4 (NPF4) became part of the statutory
development plan on 13 Feb 2023. NPF4 seeks to encourage, promote and
facilitate sustainable tourism and directs local authorities to identify those
areas where existing tourism provision is having adverse impact. Policy 30:
Tourism sets out the factors to be taken into account in assessing proposals
for tourism related developments which includes: the contribution to the local
economy; impact on the surrounding area; and impacts on communities e.g.
by hindering the provision of homes for local people. Specific mention is also
made in Policy 30: Tourism to short-term lets. NPF4 is clear that proposals for
Page 106 of 222

Page 107

the reuse of existing buildings for short term lets will not be supported where
the proposal will result in: 
i. an unacceptable impact on local amenity or the character of a
neighbourhood or area; or
ii. the loss of residential accommodation where such loss is not
outweighed by demonstrable local economic benefits. 
Perth & Kinross Local Development Plan 
5.9 There is no specific policy within the existing Local Development Plan 2
(LDP2) which seeks to manage the change of use of residential properties to
short-term lets. NPF4 Policy 30 will therefore the part of the statutory
development used to assess the principle of such changes of use in planning
applications until Local Development Plan 3 (LDP3) is in place.  In the
meantime, the appended non-statutory planning guidance has been drafted to
help businesses and residents understand how planning applications will be
assessed in Perth & Kinross.   
5.10 Using the planning system to manage short term lets will not necessarily
directly increase the supply of affordable housing in the relevant areas.  There
is also a need to increase supply of new build affordable housing.  LDP2
identifies land to meet the assessed needs and demand for affordable and
market housing in each of the area’s housing market areas. Looking ahead to
the next Plan, and in the context of the new policy framework set out in NPF4,
there is significant potential for LDP3 to further support increasing the supply
of affordable houses, for example: 
• policy provision for allowing affordable houses (up to 50 homes) on
non-allocated sites where this is part of a local authority supported
affordable housing plan;
• support for proposals which improve affordability and choice and which
address identified gaps in provision; 
• scope for increasing the affordable contribution where a higher
contribution is justified by evidence of need;
• specifically in rural areas, support for taking into account identified local
housing needs (including affordable housing); and
• increased support for new homes in remote rural areas. 
6. EVIDENCE AND KEY CONSIDERATIONS 
6.1 A Short-term Lets Evidence Paper (Appendix 1) has been prepared to take
forward LHS Action 1.7 and to provide a basis for defining a potential short-
term let control area. This identifies secondary lettings, second homes and
empty homes and seeks to understand whether a short-term let control area
could be an effective contributor to more homes in pressured areas. Early
engagement with communities for the LHS 2022-2027 identified affordability
and availability of housing as the top concern in Perth and Kinross. In rural
areas, short-term lets and second homes were identified as a contributing
factor.
Page 107 of 222

Page 108

6.2 As highlighted in the Evidence Paper, until all short-term lets are registered
through the licensing scheme, pre-existing information on self-catering and
second homes were used as proxy datasets which contribute to secondary
lets (the letting of a non-principal residence). Analysis indicates that Highland
Perthshire and northern areas of the Eastern Perthshire area have a relatively
high concentration of both self-catering and second homes. These areas
coincide with the communities that have been identifying pressure on housing,
business opportunity and service provision in combination with falling school
rolls as evidenced both in the Housing Needs Assessments and through
community engagement. Analysis demonstrates that the pressure threshold of
‘Potential Housing Stock’ which is being used as self-catering and second
homes combined is 10%. Appendix 3 outlines the areas above the 10% figure
spatially. 
6.3 The full details of how this analysis was undertaken is in the Evidence Paper.
The analysis will be updated once the extent of licences and licensing
applications is available.  This will be after the deadline for licence
applications closes on 1st October 2023. This refined analysis will verify the
proxy data used in the analysis and indicate whether the short-term lets
licensing scheme has had an impact on the number of short-term lets.   
Balance of sustainable tourism and housing supply 
6.4 It is essential that any control area policy framework balances the positive
contribution of short-term lets to the tourism sector and local economies,
particularly in some rural parts of Perth and Kinross, against the potential
adverse impacts on the character and amenity of areas and the impact of
further reducing the supply of permanent housing. It is acknowledged that
there is a balance to be struck within some communities between those who
rely on an income from their short-term let, and those who are concerned that
more residential properties should be retained as permanent homes for local
people. 
6.5 A control area will not operate as a complete ban on short-term lets, rather as
a means of limiting new permissions to those where the loss of the residential
property is outweighed by the economic benefit to the local community as
required by NPF4. 
As highlighted above at 5.4, a short-term let control area cannot control
second homes which are equally prevalent in some areas, and which often
make much less of a contribution to the local economy than short-term lets
occupied by visitors to the area. The introduction of a control area will also
have no effect on the numbers of purpose-built self-catering units which are
being operated as short-term lets, given that these will already have planning
permission. 
6.6 The pre Covid growth target for tourism in Perth & Kinross had originally been
3% per annum in the value of overnight stays, on the baseline year of 2018.
Page 108 of 222

Page 109

This was revised, however, with the ambition of restoring the value of tourism
to pre Covid 2019 levels by 2025.   
The latest available research (2021) indicates that the tourism economy has
not recovered from the impact of the covid pandemic as yet and is still
vulnerable to the new challenges of the cost-of-living crisis at the Perth &
Kinross level. 
‘By 2019, the annual value of tourism activity since 2010 had reached a total
of £668m. Tourism activity and related spend in Perth & Kinross was
substantially affected by Covid-19, but is recovering (+43% since 2020), whilst
still remaining down (-44%) on 2019 pre-Covid levels’
(Source: Perth & Kinross Council STEAM Tourism Economic Impacts 2021
Year in Review p.4). 
6.7 The growth in the short-term let sector in Scotland is indicative of the
diversification of the accommodation sector away from traditional
accommodation types (hotels, B&B etc). This has had the effect of
lengthening the tourism season by accommodating shorter breaks in the ‘off-
season’ for domestic and younger customers, and longer ‘tours of Scotland’
for international visitors (Visit Scotland, Key Facts on Tourism 2019). 
6.8 In terms of accommodation trends, non-serviced accommodation had made a
relatively better recovery compared with serviced accommodation but was still
down by 36% on visitor numbers with the economic impact down 29%
compared with 2019 (Source: Perth & Kinross Council STEAM Tourism
Economic Impacts 2021 Year in Review, p.6). 
6.9 As registration for short-term lets licences has not yet closed, it is unclear
what impact the introduction of the licensing scheme has had on businesses
and the numbers of short-term lets in Perth & Kinross. There is potential
scope for the additional requirement for a planning application for all changes
of use to short-term let, as would be required within a control area, to have a
further impact. 
Experience in other local authority areas 
6.10 To date, the City of Edinburgh and Highland Councils have each designated a
short-term let control area. The entire City of Edinburgh Council area has
been designated although this is currently the subject of a judicial review by
the Court of Session.  In the Highland Council area one ward is designated,
Badenoch & Strathspey, which is co-terminus with the Highland ward in Perth
and Kinross. 
Planning applications for short-term lets in Perth & Kinross 
6.11 The Council’s Development Management webpages give guidance to
applicants when planning permission is needed for a change of use to a short-
term let.  Table 1, indicates the number of applications received. As with the
Page 109 of 222

Page 110

licensing scheme, applications for planning permission are currently being
monitored for trends.   
Table 1: Number of Short-term let planning applications up to April 2023. 
7. PROPOSALS 
Short-term let control area 
7.1 Committee members are requested to consider the following 3 options for the
control of short-term lets: 
• Option 1 – Rely solely on the existing legislation and policy framework
(Circular, licencing scheme, and NPF4).
• Option 2 – Introduce non-statutory planning guidance to assist with the
interpretation of the existing legislation and policy framework but
without designating a control area.
• Option 3 – Introduce a short-term let control area for the Highland and
part of the Eastern Perthshire areas together with non-statutory
planning guidance to inform decisions on planning applications both
within and outwith the control area.  
7.2 With regard to options 1 and 2, NPF4 policy 30, as indicated earlier, includes
specific reference to short-term lets. This requires planning authorities to take
into account the impact on amenity and character should they become aware
through an application or enforcement action.  The second consideration is
the loss of the property as a residential property. A limitation is that, again,
only those proposals which are considered to be a material change of use
require planning permission.  This in turn means that the impact on the loss of
the property as a residential property cannot be taken into account. 
7.3 The advantage of introducing a control area as set out in option 3 means that
all proposals for the change of use from a residential property to a short-term
let within that control area will require planning permission. 
Recommended option: Option 3 
7.4 The multiple benefits of the short-term let sector to the tourism industry are
acknowledged. The Evidence Paper, however, indicates that there are
Wards with
applications
Approved 
Applications
Refused 
Applications
Certificate
of
Lawfulness 
Awaiting
Decision
Ward 2 
Strathmore
5  N/A N/A N/A
Ward 3 
Blairgowrie
8  N/A 1  N/A
Ward 4 -
Highland 
14  N/A 5  8 
Ward 5 -
Strathtay
9  1  2  4 
Page 110 of 222

Page 111

significant concentrations of self-catering lets and second homes (both of
which contribute to the short-term let figures) in Highland Perthshire and parts
of Eastern Perthshire. The introduction of a short-term let control area for this
particular geographical area is therefore considered appropriate as one of a
range of measures to help address the shortage of housing, in particular
affordable housing. For clarification, control area designation will not mean an
automatic refusal for all changes of use to short-term let. However, it will allow
full account to be taken of the potential impact of the loss of residential
accommodation and residential amenity in every case; as well as a
presumption against some specific types of proposal. 
Non-statutory planning guidance 
7.5 It is considered that additional planning guidance is needed to support the
introduction of a short-term let control area and to help inform planning
decisions across the wider Council area until LDP3 is in place. As there is no
policy basis in LDP2 specifically on the control of short-term lets, any such
guidance can only be non-statutory. 
7.6 Parts of both Perth & Kinross and Highland Council areas fall within the
Cairngorms National Park. The short term let issue has been discussed with
the Park Authority and it was noted that policy alignment with Highland
Council where possible would be beneficial. 
7.7 It is proposed to consult on planning guidance (Appendix 2) to assist in the
assessment of planning applications for the change of use of a residential
property to a short-term let. The proposed planning guidance sets out the
circumstances under which the change of use to a short-term let will be
supported including, in simplified terms: 
• where local economic benefit (as required by NPF4) can be demonstrated.
• where a long-term empty property will be brought back into active use
• where the short-term let is part of a diversification scheme for a business
within the same landholding
• where the short-term let has been established for at least 10 years 
• where the property has its own door to the street or garden, to reduce
impact on amenity of neighbouring residents.
Consultation 
7.8 It is proposed to consult on the principle of designating a short-term let control
area for Highland Perthshire and part of Eastern Perthshire as defined in
Figure 1. Comments will also be sought on the draft planning guidance.
Comments will be collected through the Consultation Hub for an 8-week
period from 2nd June - 28th  July.  Responses will be analysed and reported
back to Committee after the summer recess. 
7.9 Should the Committee be minded to proceed to formal designation of a
control area, in line with the Control Area Regulations, the Council must: 
Page 111 of 222

Page 112

• publish notice of the proposal to designate a control area submit the
proposal to the Scottish Ministers and obtain their approval;
• subject to Ministerial approval, give notice of the designation, setting
out the area to be covered and the date on which the control area will
come into effect. 
7.10 Consultation will be open to the general public across the whole of Perth and
Kinross and will include stakeholder groups such as: 
• Community Councils;
• the Association of Scotland’s Self-Caterers; 
• Community development trusts of Aberfeldy, Dunkeld, Birnam &
District Community, Comrie, Mount Blair, Kinloch Rannoch, and
Pitlochry.
• local tourism associations in particular those within the potential control
area – The Atholl Glens, Dunkeld & Birnam Tourist Association,
Glenshee and Strathardle Tourist Association, Pitlochry Partnership,
Rannoch & Tummel Tourist Association, and Visit Aberfeldy; and
• neighbouring planning authorities including the Cairngorms National
Park Authority and the Loch Lomond & the Trossachs National Park
Authority. 
8. CONCLUSION 
8.1 Affordability and availability of housing is a known pressure particularly in rural
areas of Perth and Kinross. Some communities have expressed concern over
the levels of short-term lets and the potential impacts on the local business as
well as housing pressure, and evidence would support their concerns. 
8.2 Legislation now provides the Council an opportunity to control the number and
suitability of new short-term lets through a short-term let control area in those
parts of the Council area where a need can be demonstrated. The wider
economic consequences and implications, however, must also be carefully
considered, noting that while short-term lets are responsible for part of the
housing pressure, second homes are also a significant factor for which there
is no scope to control at this point.   
8.3 Officers believe there is sufficient evidence to support the potential
designation of a control area under the Town and Country Planning (Short-
term Let Control Areas) (Scotland) Regulations 2021 and with Committee
approval, this will be tested through consultation. Draft non-statutory planning
guidance on how planning applications for short term-lets will be assessed will
also be consulted on. 
Page 112 of 222

Page 113

Authors
Name  Designation Contact Details
Stephanie Durning 
Katrina Walker 
Planning and Policy
Officer, Housing
Strategy Team 
Planning Officer,
Development Plans
Team 
(01738) 475000
ComCommitteeReports@pkc.gov.uk   
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities) 
23 May 2023 
APPENDICES 
• Appendix 1 – Short-term Lets Evidence Paper
• Appendix 2 – Non-Statutory Planning Guidance on the Change of Use of a
Residential property to Short-term Let, Consultative Draft 
Page 113 of 222

Page 114

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  None
Workforce Yes
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment 
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) 
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1. Strategic Implications 
SHORT-TERM LET CONTROL AREA_ PROPOSALS FOR CONSULTATION
- Committee Annex Checklist 
Community Plan/Single Outcome Agreement 
1.1 This report supports the priority within the Community Plan 2022-27 to reduce
poverty by recognising the need to consider the impact short-term lets can
have on the availability of affordable housing. 
SHORT-TERM LET CONTROL AREA_ PROPOSALS FOR CONSULTATION
- Strategic & Resource Implications (1).docx  
Corporate Plan 
1.2 This report supports the objectives within the Corporate Plan 2022-2027 to
tackle poverty by recognising the need to consider the impact short-term lets
can have on the availability of affordable housing. 
2. Resource Implications 
Financial 
2.1 n/a. 
Page 114 of 222

Page 115

Workforce 
2.2 The introduction of a Short Term Let Control Area would result in additional
planning applications being received by the Council. This will have an
associated increase in workload pressures. The Planning service will monitor
and manage any increase, and at this time it is not anticipated that more
staffing will be required. 
Asset Management (land, property, IT) 
2.3 n/a. 
3. Assessments – Highlighted sections to be updated once the new IVA
process has been completed 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. Final STLCA EFIA.pdf 
This section should reflect that the proposals have been considered under the
Corporate Equalities Impact Assessment process (EqIA) with the following
outcome: 
(i) Assessed as not relevant for the purposes of EqIA
(ii) Assessed as relevant and actions taken to reduce or remove the
following negative impacts:  (add summary points only here)
(iii) Assessed as relevant and the following positive outcomes expected
following implementation:  (The proposal has the potential to have 
positive impact by increasing the number of homes in the Short-term
lets by with potential small impact on affordability. ). 
Strategic Environmental Assessment 
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.3 Proposals have been considered under the Act and pre-screening has
identified that the PPS will have no or minimal environmental effects, it is
therefore exempt and the SEA Gateway has been notified. The reason(s) for
concluding that the PPS will have no or minimal environmental effects is that
the planning guidance will be non-statutory and sit within the framework of the
National Planning Framework 4 which has undergone full SEA. 
Page 115 of 222

Page 116

Sustainability 
3.4 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
This section should reflect the steps that have been taken to assess the
proposals against the Council’s Principles for Sustainable Development. Click
here for further guidance. 
Legal and Governance 
3.5 If the Council decides to proceed to the formal designation of a control area
then input will be sought from Legal Services. 
Risk 
3.6 n/a. 
SHORT-TERM LET CONTROL AREA_ PROPOSALS FOR CONSULTATION
- Impact Assessments.docx 
4. Consultation 
Internal 
4.1 Advice and views have been sought from colleagues in Development
Management and the Communities – Place Development Team in the
preparation of this report. 
External 
4.2 Initial discussions have been undertaken with neighbouring local authorities –
Highland Council and the Cairngorms National Park Authority.  
Page 116 of 222

Page 117

5. Communication 
5.1 Consultation on the principle of designating a short-term let control area, and
on the proposed planning guidance will be open to the general public across
the whole of Perth & Kinross via consultation hub. It will also be particularly
targeted at: 
• community groups;
• community development and housing trusts
• the Association of Scotland’s Self-Caterers;
• local tourism associations in particular those within the potential control
area; and
• neighbouring local authorities. 
2. BACKGROUND PAPERS 
2.1 The following documents were referred to or relied upon in preparing this
report: 
• Perth & Kinross Local Housing Strategy 2022-27
• Town and Country Planning (Short-term Let Control Areas) (Scotland)
Regulations 2021
• Planning Circular 01/2023: Short-term Lets and Planning
• National Planning Framework 4
• Perth & Kinross Local Development Plan 2
• Perth & Kinross Council STEAM Tourism Economic Impacts 2021 Year
in Review
• Visit Scotland, Key Facts on Tourism 2019
• Highland Council draft non-statutory short term secondary letting
planning policy 
Page 117 of 222

Page 118

Page 118 of 222

Page 119

1 
Appendix 1  
Short-Term Lets Evidence Paper      April 2022 
Contents
Introduction ........................................................................................................................... 1
Methodology ......................................................................................................................... 1
Results Summary .................................................................................................................. 3
Affordability of Housing ......................................................................................................... 4
Short-term Lets ..................................................................................................................... 5
Highland Perthshire Housing Market Area ......................................................................... 9
Housing Needs Assessments ............................................................................................. 11
Strathearn Housing market area ...................................................................................... 13
Recommendation ............................................................................................................ 15
Conclusion .......................................................................................................................... 15
Reference List ..................................................................................................................... 16 
Introduction 
Early engagement for the 2022-2027 Local Housing Strategy indicated availability
and affordability of housing as a top concern of Perth and Kinross residents.  The
growth of Short-term lets in recent years was highlighted as a contributing factor. 
Community groups in places where tourism is a significant part of the economy, were
also feeding back to the council that the lack of affordable housing was impacting on
the ability of people to find suitable homes locally particularly affecting young and
older people, as their needs changed.  Likewise, businesses and services were
finding that the lack of available housing was impacting their ability to recruit staff to
expand or provide services in the communities where it is needed.  Among the
reasons given, were rising house prices caused by competition from short-term lets
business operators and second home buyers.   
As a result, the Local Housing Strategy 2022-2027 embedded an action to
understand the level of short-term lets, and impact on communities and, whether
new planning legislation (Short-Term Let Control Areas, Scotland, 2021) could be
effective in balancing the local economic benefits to using residential homes for
tourism accommodation and providing enough homes for local need. 
Methodology 
Research undertaken in Badenoch and Strathspey Ward for Highland Council for
their own evidence paper was taken as a starting point for informative data analysis.
The data used was expanded or excluded as appropriate to the Perth and Kinross
data. 
7
Page 119 of 222

Page 120

2 
The approach was taken to create a complete geographic picture by analysing the
whole of Perth and Kinross at postcode district level, allowing for reasonable detail
and avoiding data gaps between settlements. This also allowed for analysis at
various geographic scales, for the period 2017-2021. 
In order to assess the number of ‘short-term lets’, proxy data had to be used as until
the Short-Term Lets Licensing legislation (2022) was established, this was not a data
category within the council. The proxies of ‘self-catering units’ and ‘second homes’
were analysed as reliable datasets contributing to secondary lets. A secondary let is
a dwelling that is not a primary residence, that is let to guests and is the only type of
short-term letting that affected by the control area legislation. 
The registration of existing Short-Term Lets under the licensing scheme was
extended until October 2023. This evidence paper will be updated once the full
licencing information is available after October 2023. 
The key indicator metric was ‘ % of total potential housing stock being used as
second homes and self-catering units’ and was defined by Highland Council.
‘Potential’ because not all self-catering units could be used as permanent dwellings
as the category includes, temporary dwellings such as lodges, bothys, yurts etc.
Although a source of potential short-term lets, many second homes would be used
for private purposes. This figure is an indicator of the percentage of housing that is
being used as holiday accommodation (second homes and self-catering).   
The metric of % total potential housing being used as holiday accommodation in
Badenoch and Strathspey was 17.11%. This figure includes self-catering units that
would not be suitable as residential dwellings (e.g. lodges) so will be inflated but
does not include the number of second homes that are casually let, contributing
towards ‘short-term lets.’ 
The Housing Waiting list data could not be used due to the way the data is collected,
providing inflated figures over multiple postcodes and therefore not informative.
Homes for Private rent could only provide a current snapshot and be useful in
determining the percentage of the housing market in this tenure in each postcode
district. 
School rolls were examined to gain insight into potential impact on demographic
trends. 
In addition in 2022, Local Housing Needs assessments were being completed by the
Community Housing Trust in 5 communities, supported by Perth and Kinross
Council. These were used to direct more detailed analysis, at the sub-postcode level
where necessary. 
The data glossary provides more information on each data set illustrated in the
evidence tables throughout the document. 
Page 120 of 222

Page 121

3 
Data Glossary 
Table 1. Data glossary 
Results Summary 
• The proxy data of ‘self-catering units and second homes’ were used as robust
‘short-term let’ data was not a classification until the Short-term licensing
scheme (2022).
• The data analysis demonstrates that the number of self-catering units through
the period 2017-2021 grew significantly (25%) across all areas of Perth and
Kinross and is higher at 3% than the Scottish figure of 1.2% of total housing
stock (Reference 1). 
• Generally, the recent growth in self-catering units has brought the figures into
alignment with existing numbers of second homes which has shown more
steady growth.
• Second homes in the Perth & Kinross are still growing at 1% in contrary to the
Scottish average decreasing rate of -6.9% (Reference 2)
• Self-catering accommodation will make a greater contribution to the local
economy than second homes.
• A key metric of the analysis was the ‘total potential housing stock being used
as self-catering and second homes’. 
• Highland Council in their similar analysis for Badenoch and Strathspey found
that 17.11% of the total potential housing stock was being used as self-
catering and second homes (Reference 5)
• The data for Perth and Kinross signified that the lower figure of total
percentage housing stock being used as self-catering and second homes of
10% was indicative of an impact threshold.
• At 2021 levels, the number of homes that could be recovered from a short-
control area would be significantly less than 634 (8.3%). The estimate for this
Self Catering Units (SCUs) Registered as businesses.
Second Homes Included in Council tax figures and pay full council tax (no surcharges)
Total Second homes & SCU Indicators contributing to short-term lets
Council Tax Listings (includes
2nd homes) All dwellings including second homes
Potential Total Housing Stock The total of residential homes, second homes and self catering units.
% of potential Housing Stock
used as second homes & SCU
Short Terms Lets on AirBNB Surveyed Jan'22. Apprx. Figure of secondary accom.
Private Lets The number of properties registered as a private let.
House Completions (inc.
small site ave.) Total house completions over the period. Change = % of Ctax list.
Affordable Completions
House completions in the 'affordable category' . Total over period. Change = % of
Ctax list
Purpose built SCUs (Approved
applications)
Empty Homes (>6mths) Short term empty home
Unoccupied Homes (<6mths) Long term empty home. Surcharge payable
School Roll (all)
The proportion of all dwellings that are let for self catering & second homes. Includes
purpose built accomodation that may not be suitable for residential homes.
Therefore an over estimate.
The number of approved applications for purpose built Self catering. Could be an
overestimate. Total over the period
Includes schools of the relevant catchment area.
Page 121 of 222

Page 122

4 
will be refined by the data from the Licensing scheme register, after October
2023. 
• The areas affected by the 10% threshold include the whole of the Highland
Perthshire Market Area and the northern part of Eastern Housing Market
Area, north of The Bridge of Cally where the total percentage housing stock
being used as self-catering and second homes was quantified as 16.3%.
• This area includes parts of the Cairngorm National Park and lies adjacent to
the Badenoch and Strathspey Ward in Highland Council. 
• The postcode districts of Comrie and Ardvorlich (PH6/part FK19) are close to
the impact threshold at 8.1% and as such should be monitored.   
Affordability of Housing
The 2022 Housing Need and Demand Assessment indicates that the average Perth
and Kinross House Price in 2020-21 was £224,480, 15% above the Scottish
average, of £194,100 (Reference 2). Table 2 outlines the income multipliers needed
to achieve house purchases as an illustrator of poor affordability. Market Rents are
the similar with 45% of households finding them unaffordable. Young people are at
further disadvantage as 1 in 2 households cannot afford the market entry point.
These 2020 figures demonstrate that affordability is a Perth and Kinross wide issue
and especially in rural areas. 
Table 2:  CHIMA data tool 2019/20 affordability for Perth & Kinross using Scot Gov
methodology for market entry Reference 3:  PKC LHS Briefing 1 (2022) Slide 9.
There is concern that changes in the Private Rental Sector to improve energy
efficiency and improve tenants’ rights may cause this sector to contract, releasing
more housing into sales and potentially increasing short-term lets. In areas with
higher proportion of private rental properties, these measures could impact the
availability of more affordable and mid-market housing options.
The LHS has a number of actions aimed at alleviating affordable housing pressure
including target of provision of an urban-rural split that matches population, for
affordable homes. The Council also supports rural communities to access the Rural
Housing Fund to support affordable and community led housing. Actions that aim to
increase the number of affordable homes are:- 
• LHS Action Plan 1.1 Achieve an average of 210 affordable housing
completions annually and maintain 53%/47%, urban/rural split. 
• LHS Action Plan 1.2 Develop an Empty Homes Action Plan – to bring empty
homes back into use. 
Page 122 of 222

Page 123

5 
• LHS Action Plan 1.4 Seek opportunities to deliver a wider range of housing
options in rural areas : 
o Rural areas- work in partnership with private estates, land owners,
developers, funders and local communities. 
o Undertake a targeted Housing Needs Assessments Programme
(HNAP) in rural settlements where tackling a lack of AH has been
identified as a priority in Community Action Plans (CAPs) 
o Work in partnership with rural housing specialists to enable Community
Development Trusts to secure subsidy from Scottish Land Fund (SLF)
and Rural Housing Fund (RHF), private and other funding sources to
develop community-led housing 
o Aim to deliver, via a community-led approach, up to 100 new affordable
homes of various types and tenures that reflect HNAP outputs, to be
delivered to Design Guide Standard over the period of the strategy
Short-term Lets 
Collection of data at a postcode district level between 2017-2022 allowed a detailed
summary of Perth and Kinross as a whole, comparison with national trends and the
similar analysis by Highland council. 
The key indicator of the potential housing stock, utilised for second homes and self-
catering units in Badenoch and Strathspey was 17.77%, compared to the Perth and
Kinross figure of 2.9%. In contrast to the Scottish decline in second homes of 6.9%,
Perth and Kinross showed growth over the period of 1.1%. Meanwhile short-term lets
have increased by 25% compared with 12.16% in the Badenoch and Strathspey
ward. 
Page 123 of 222

Page 124

6 
Table 3. Perth and Kinross analysis 
Key Points 
• Across the whole of Perth and Kinross, the impact of self-catering units and second homes on the total potential housing
stock is 2.9%. 
• Significant growth in self-catering units at 25% over the 5-year period bringing the figure close to the number of second
homes. 
• 72% of newly registered self-catering units could come from purpose built self-catering units applications.
• Overall impact a of self-catering is low at 1.4% of total potential housing stock.
• Growth of council tax dwellings of 2.9% over the period, more than second homes, far less that self-catering numbers.
• Contrary to the Scottish average of a reduction in second homes of 6.9% (Scot gov 2019), in Perth in Kinross the trend is a
slight growth of 1.1%. 
• School rolls have increased very slightly overall at 1%.
P & K total 2017 2018 2019 2020 2021 change % change
% of
Total Hsg
Stock
(2021)
P&K
Change
over
Period
Badenoc
h &
Strathspe
y Change
Highland
Wide
change % Scotland
Self Catering Units (SCUs) 843 896 987 1015 1054 211 25.0% 1.4% 25.0% 12.16% 38%
Second Homes 1120 1187 1136 1118 1132 12 1.1% 1.5% 1.1% -8.13% 2.24% -6.9%
Total Second homes & SCU 1963 2083 2123 2133 2186 223 11.4% 2.9% 11.4% 1.6% 8.55%
Council Tax Listings (includes 2nd 71646 72247 72917 73700 74264 2618 3.5% 98.6% 3.5% 1.65% 2.98%
Potential Total Housing Stock 72489 73143 73904 74715 75318 2829 3.8% 100% 3.8% 2.5% 3.66%
% of potential Housing Stock used
as second homes & SCU 3% 3% 3% 3% 3% 0.2% 2.9% 0.2% 17.11%
Short Terms Lets on AirBNB 1014 1014 1.3% 3.63%
Private Lets 11083 14.7%
House Completions (inc. small site ave.) 586 578 776 895 673 +3508 4.9% 4.7% 4.9% 37.25%
Affordable Completions 123 144 302 153 232 +954 1.3% 1.3% 1.3%
Purpose built SCUs (Approved 5 23 20 46 57 +151 17.9% 0.2% 17.9%
Long-term Empty Homes 1290 1368 1308 1653 1310 20 0.2% 1.7% 0.8% 36.09% 37.25%
Unoccupied Homes (<6mths) 1422 1463 1543 1295 1393 -29 -9.7% 1.8% -9.7%
School Roll (all) 17958 18006 17399 18197 18139 181 1% 1% -2.51% 0.5%
Page 124 of 222

Page 125

7 
Analysis of postcode district allowed the metric of potential housing being used as
self-catering and second homes to be mapped for each. Figure 1 illustrates the
relatively higher percentages in areas where tourism is a significant part of the
economy. 
Map of Key Indicator 
Figure 1. Key Indicator: Impact on Potential Housing Stock 
The areas with higher than 10% lie within Highland Perthshire Market Area and the
Mount Blair Community Council Area. The map above illustrates the extent of the
Housing Market Areas and includes part of the Cairngorms National Park in the
northern extents of both market areas. 
Page 125 of 222

Page 126

8 
The Perth and Kinross housing market areas are defined below. 
Figure 2. PKC Housing Market Areas 
Housing market areas are defined through specific analysis of housing patterns to
identify relevant boundaries rather than arbitrary governance boundaries. They are
used to study the housing market for the Housing Needs and Demand Assessment. 
Figure 3. National Parks within PKC boundary 
The Cairngorm National Park lies within the northern boundary of the council
boundary and the Loch Lomond and the Trossachs National Park is within the
western boundary.
Page 126 of 222

Page 127

9 
Highland Perthshire Housing Market Area 
The postcode districts analysis indicated that the Highland Perthshire Housing
Market Area was showing an overall impact of 15.6% with potentially between 11%
and 38.4% in individual postcode districts being used as second homes and self-
catering units (Table 4). All districts demonstrated the trend of growing short-term
lets over the period, levelling up to existing second homes numbers, and falling
school rolls which may be partly explained by the availability of housing for use as
permanent homes and at an affordable level for people working in the area. 
Table 4. Highland Perthshire Market Area 
The district with the highest potential figure was PH17 Kinloch Rannoch outlined
below. Qualitative evidence was collected that services were being impacted by
availability of housing in this area. 
Highland Perthshire FK21,
PH8, PH9, PH15, PH16, PH17,
PH18 2017 2018 2019 2020 2021 change % change
% of Total
Hsg Stock
2021
Self Catering Units (SCUs) 480 515 542 536 562 82 17.1% 7.9%
Second Homes 525 553 534 521 545 20 3.8% 7.7%
Total Second homes & SCU 1005 1068 1076 1057 1107 102 10.1% 15.6%
Council Tax Listings (includes
2nd homes) 6468 6481 6508 6525 6534 66 1.0% 92.1%
Potential Total Housing Stock 6948 6996 7050 7061 7096 148 2.1% 100%
% of potential Housing Stock
used as second homes & SCU 14.5% 15.3% 15.3% 15.0% 15.6% 1.1% 15.6%
Short Terms Lets on AirBNB *secondary 512 7.2%
Private Lets only live data 1668 23.5%
House Completions (inc. small site ave.) 28.6 28.6 52.6 31.6 55.6 +197 3.0% 2.8%
Affordable Completions 0 0 24 0 12 +36 0.6% 0.5%
Purpose built SCUs (Approved
applications) 2 8 7 29 34 +80 16.7% 1.1%
Empty Homes (>6mths) data not available 0.8%
Unoccupied Homes (<6mths) data not available -9.7%
School Roll (secondary) 558 531 541 534 539 -19 -3%
School Roll (primary) 684 661 620 634 606 -78 -11%
Page 127 of 222

Page 128

10 
Table 5. PH17 (Kinloch Rannoch area) 
Key Points
• Significant recent growth in self-catering of 33% reflected in potential housing
stock being used as Self-Catering units of 38%, the highest of all areas.
• None of this has been due to purpose-built applications in the period so many
of these could be residential conversions to short-term letting and is reflected
in the decrease in council tax listings. 
• Reporting of issues housing essential workers to PKC.
• School roll is declining but the levels are not significant.
• Included in Highland Perthshire analysis
The lowest percentage housing stock being used as second homes and self-catering
units in the Highland Perthshire Market area was PH8 Dunkeld and Birnam, table 6
below. There is qualitative evidence that there are negative impacts on affordability
and availability of housing to support business and services and quality of living even
at this lower percentage of 11%. The Housing Needs Assessment identifies the need
to reduce competition in the housing market from short-term lets with 87 households
looking to move into or within the area in the next 5 years (CHT,2022, PH8
Community Housing Needs Survey). 
PH17 Kinloch Rannoch 2017 2018 2019 2020 2021 change % change
% of Total
Hsg Stock
2021
Self Catering Units (SCUs) 21 21 23 20 28 7 33.3% 17.1%
Second Homes 34 34 35 34 35 1 2.9% 21.3%
Total Second homes & SCU 55 55 58 54 63 8 14.5% 38.4%
Council Tax Listings (includes
2nd homes) 142 143 140 143 136 -6 -4.2% 82.9%
Potential Total Housing Stock 163 164 163 163 164 1 0.6% 100%
% of potential Housing Stock
used as second homes & SCU 34% 34% 36% 33% 38% 4.7% 38.4%
Short Terms Lets on AirBNB 16 9.8% 9.8%
Private Lets 17 10.4%
House Completions (inc. small site ave.) 0 0 0 0 0 +0 0% 0.0%
Affordable Completions 0.7 0.7 0.7 0.7 0.7 +3 2.3% 2.0%
Purpose built SCUs (Approved
applications) 0 0 0 0 0 +0 0% 0.0%
Empty Homes (>6mths)
Unoccupied Homes (<6mths)
School Roll (secondary) 122 112 115 104 117 -5 -4%
School Roll (primary) 17 15 18 19 17 0 0%
Page 128 of 222

Page 129

11 
Table 6. PH8 Dunkeld and Birnam Area 
Key points
• Fairly significant recent growth in the self-catering numbers at 11.6%
• Stable second home numbers and comparable with self-catering numbers
over the period. 
• Evidence of transference of residential homes and second homes into self-
catering.
• Overall impact of holiday accommodation on potential total housing stock is
11%
• House completions show small growth at 2% of total potential housing stock
with no affordable house provision. Dunkeld has no sites identified for housing
in the current LDP
• Higher than average Private letting at 20% compared with the Perth and
Kinross average of 14%
• School roll has significant decrease of the primary roll of 20% over the period.
Could indicate a significant impact on viability of community. 
• Comparing with similar areas, Dunkeld may have had a longer standing
problem with lower levels of recent self-catering growth.
• Included in Highland Perthshire analysis
Housing Needs Assessments
The Housing Needs Assessments (HNAs) of Pitlochry; Dunkeld and Birnam – PH8
area; Aberfeldy, Weem, Strathtay, Grandtully, Logierait and Ballinluig; Comrie
Community Council area and Mount Blair Community Council and also fed into the
analysis. The surveys indicated that the lack of affordable housing was impacting the
ability of business to expand, recruit and retain staff.  The HNAs did not stipulate if
some of the businesses were operating in the short-term lets sector thus it is not
always clear whether this business feedback would be in support of controls
numbers of short-term lets as part of the solution to the availability of affordable
housing. 
PH8 Dunkeld and Birnam 2017 2018 2019 2020 2021 change % change
% of Total
Hsg Stock
2021
Self Catering Units (SCUs) 59 59 61 64 66 7 11.9% 5.7%
Second Homes 60 65 65 60 60 0 0.0% 5.2%
Total Second homes & SCU 119 124 126 124 126 7 5.9% 10.9%
Council Tax Listings (includes 2nd homes) 1085 1090 1090 1085 1088 3 0.3% 94%
Potential Total Housing Stock 1144 1149 1151 1149 1154 10 0.9% 100%
10% 11% 11% 11% 11% 1% 11.0%
Short Terms Lets on AirBNB 47 4.1%
Private Lets 234 20.3%
House Completions (inc. small site ave.) 6.2 4.2 4.2 4.2 4.2 +23 2% 2.0%
Affordable Completions 0 0 0 0 0 +0 0% 0.0%
Purpose built SCUs (Approved applications) 0 0 0 3 0 +3 5% 0.3%
Empty Homes (>6mths)
Unoccupied Homes (<6mths)
School Roll (secondary) 436 419 426 430 422 -14 -3%
School Roll (primary) 153 159 146 136 123 -30 -20%
% of potential Housing Stock used as second
homes & SCU
Page 129 of 222

Page 130

12 
The Blairgowrie postcode district of PH10 did not identify a significant level of impact
from self-catering and second homes, due to the dominance of Blairgowrie and
Rattray in the figures (Table 7). However, the Mount Blair Housing Needs
assessment provided detailed numbers of a concentration of second homes and
short-term lets in their community council area, that was not reflected in the postcode
district level analysis. This directed a deeper analysis of individual postcodes
confirming the concentration of self-catering and short-term lets in the area north of
The Bridge of Cally, amounting to a potential 24% impact level on the housing stock
(Table 8). 
Table 7. PH8 Blairgowrie including Mount Blair Area  
Key Points
• Increases in self-catering unit numbers of 37.2% are not reflected in a
significant change of dwellings to holiday accommodation in the postcode
district at 3.9% impact of total housing stock.
• Decrease in the numbers of second homes.
• House completions seem to be translating into homes, reflected in the
growing council tax list. 
PH10 Blairgowrie 2017 2018 2019 2020 2021 change % change
% of Total Hsg
Stock 2021
Self Catering Units (SCUs) 78 83 92 99 107 29 37.2% 1.8%
Second Homes 126 130 120 118 120 -6 -4.8% 2.1%
Total Second homes & SCU 204 213 212 217 227 23 11.3% 3.9%
Council Tax Listings (includes 2nd homes) 5464 5510 5584 5694 5739 275 5.0% 98.2%
Potential Total Housing Stock 5542 5593 5676 5793 5846 304 5.5% 100%
% of potential Housing Stock used as
second homes & SCU 3.7% 3.8% 3.7% 3.7% 3.9% 0.2% 3.9%
Short Terms Lets on AirBNB 143 2.4%
Private Lets 731 12.5%
House Completions (inc. small site ave.) 63 30 62 95 15 +265 4.8% 4.5%
Affordable Completions 38 13 72 24 0 +412 7.5% 7.0%
Purpose built SCUs (Approved applications) 1 10 2 1 21 +35 44.9% 0.6%
Empty Homes (>6mths)
Unoccupied Homes (<6mths)
School Roll (secondary) 721 719 719 766 801 80 11%
School Roll (primary) 885 881 921 913 886 1 0%
Page 130 of 222

Page 131

13 
Table 8.  Mount Blair Community Council Area 
Key Points
• The area reflects the postcodes to the north of Bridge of Cally 
• It was not necessary to conduct a temporal analysis as the HNAs had
provided long standing figures that correlated with the 2021 snapshot. 
• The secondary school roll is less informative due to the dominance of the
towns in the figures however the primary school roll suggests a relevant
negative impact. 
Strathearn Housing market area
The postcode district of PH6 in table 9, was combined with the partial postcode
district of FK19, and showed levels of potential housing stock impact at 8.1%; high in
comparison to the adjacent districts in the Strathearn Housing Market Area (Table
10). The growth in self-catering units has been less than Highland Perthshire, at
14.3%. 
The number of second homes almost a third lower than self-catering units within the
postcode district, differing to the Highland Perthshire trend. The data suggests the
possible transfer of second homes into the self-catering; potentially a positive
economic benefit by comparison. As such this postcode district has not been
included in the area of negative potential impact. 
However, the Housing Need Assessment for the town of Comrie identifies concern
by residents of negative impact of ‘short-term lets’ thus it is recommended that these
postcode districts be monitored and views sought in any public consultation. 
Mount Blair Community Council Area 2017 2018 2019 2020 2021 change % change
% of
Total Hsg
Stock
2021
Self Catering Units (SCUs) 72 12.5%
Second Homes 69 12.0%
Total Second homes & SCU 141 24.5%
Council Tax Listings
(includes 2nd homes) 504 87.5%
Potential Total Housing Stock 576 100%% of potential Housing Stock
used as second homes &
SCU 24.5% 24.5%
Short Terms Lets on AirBNB 143 24.8%
Private Lets 113 19.6%
House Completions (inc. small site ave.) 0 0 0 0 0 +0 0%
Affordable Completions 0 0 0 0 0 +0 0%
Purpose built SCUs (Approved
applications) 1 4 0 0 8 +13 2%
Empty Homes (>6mths)
Unoccupied Homes (<6mths)
School Roll (secondary) 721 719 719 766 801 80 11%
School Roll (primary) 59 57 67 69 54 -5 -8%
Page 131 of 222

Page 132

14 
Table 9. PH6, Comrie district 
Key Points
• The sample size of FK19 was too small to be meaningful so combined with
PH6 adjacent postcode district
• In combination, the numbers of second homes and self-catering units are
elevated to some areas where nearing the threshold, The rise in new build
completions is not reflected in the council tax list which may account for some
of the rise in self-catering units.
• Primary school rolls are falling which may partly be indictive of changing
demographics. 
• The area is close to the defined threshold 
Table 10. Strathearn Housing Market Area  
PH6/FK19 Comrie NB: Contains all PH6
data but only PKC  FK19 data 2017 2018 2019 2020 2021 change % change
% of Total
Hsg Stock
2021
Self Catering Units (SCUs) 42 41 44 51 48 6 14.3% 3.4%
Second Homes 67 73 71 69 66 -1 -1.5% 4.7%
Total Second homes & SCU 109 114 115 120 114 5 4.6% 8.1%
Council Tax Listings (includes 2nd
homes) 1363 1369 1368 1358 1364 1 0.1% 96.6%
Potential Total Housing Stock 1472 1483 1483 1478 1412 -60 -4.1% 100%
% of potential Housing Stock used as
second homes & SCU 7.4% 7.7% 7.8% 8.1% 8.1% 1% 8.1%
Short Terms Lets on AirBNB 48 3.4%
Private Lets 154 10.9%
House Completions (inc. small site ave.) 1.5 2.5 1.5 1.5 8.5 +16 1.1% 1.1%
Affordable Completions 0 0 0 0 0 +0 0% 0%
Purpose built SCUs (Approved applications) 0 0 0 3 0 +3 7.1% 0.2%
Empty Homes (>6mths)
Unoccupied Homes (<6mths)
School Roll (secondary) 571 582 581 588 605 34 6%
School Roll (primary) 159 154 147 142 136 -23 -14%
STRATHEARN PH3,4,5,6,7, FK15 2017 2018 2019 2020 2021 change % change
% of 2021
Total Hsg
Stock
Self Catering Units (SCUs) 112 120 134 143 142 30 26.8% 1.5%
Second Homes 110 118 131 140 138 28 25.5% 1.4%
Total Second homes & SCU 222 238 265 283 280 58 26.1% 2.9%
Council Tax Listings (includes 2nd
homes) 9193 9289 9372 9443 9527 334 3.6% 98.5%
Potential Total Housing Stock 9305 9409 9506 9586 9669 364 3.9% 100%
% of potential Housing Stock used as
second homes & SCU 2% 3% 3% 3% 3% 1% 1.0% 3.0%
Short Terms Lets on AirBNB 193 5.2%
Private Lets 1381 14.3%
House Completions (inc. small site ave.) 98.2 89.2 77.2 133.2 104.2 +502 5.5% 5.2%
Affordable Completions 0 0 0 13 41 +54 0.6% 0.6%
Purpose built SCUs (Approved applications) 0 0 2 3 1 +6 5.4% 0.1%
Empty Homes (>6mths) data not available
Unoccupied Homes (<6mths) data not available
School Roll (secondary) 1065 1091 1111 1147 1178 113 11%
School Roll (primary) 1143 1079 1077 1256 1252 109 10%
Page 132 of 222

Page 133

15 
Recommendation 
For the purposes of defining the potential extent of a Short Term Let Control Area,
an impact threshold of 10% was identified as an appropriate indicator of where
impact was significant, relative to postcodes districts with lower impacts.  Postcode
districts above 10%, (identified in the Highland Perthshire Housing Market Area and
Mount Blair Community) were analysed as a whole illustrated in table 11, below.   
Table 11. Proposed Short-Term Let Control Area (STLCA)  
The STLCA as a whole, shows an impact of self-catering and second homes of
16.3% and resulting potential impact on primary school roles, reflected in the total fall
of 1%. Notably the impact indicator of 16.3% is fairly similar to the Badenoch and
Strathspey indicator of 17.77%.  The number of short-term lets that would be
returned to permanent residential homes through a Short-Term Let Control Area is
unknown and will emerge during the planning certificate of lawfulness process.
Conclusion
This paper has assessed the numbers of potential short-term lets using proxy data
and used qualitative data to understand in which communities there are concerns of
excessive competition with commercial tourist accommodation in the local housing
markets. It is recommended that the threshold of 10% is a potential indicator of the
pressure threshold. A short-term let control area would potentially require up to 600
Certificate of Lawfulness or planning applications to be made and will represent a
burden on the business operators as well as the council but would offer clarity in the
planning system for business operators. 
The return of properties to permanent residential dwellings will be significantly less
than the 8% potential lets identified in this study, due to self-catering units already
with planning permission, and will depend on the operation of the policy framework
to support planning decisions. More concrete data should be available from October
2023 once the registration of existing lets is complete under the Short-term Lets
Licence scheme and it is intended that the study will be updated at that time to
STLCA 2021 change % change
% of Total
Hsg Stock
2021
P&K
Change
over
Period
Badenoch
&
Strathspey
Change
Self Catering Units (SCUs) 634 8.3% 25.0% 12.16%
Second Homes 614 8.0% 1.1% -8.13%
Total Second homes & SCU 1248 16.3% 11.4% 2%
Council Tax Listings (includes 2nd homes) 7038 91.7% 3.5% 1.65%
Potential Total Housing Stock 7672 100% 3.8% 3%
% of potential Housing Stock used as second homes & SCU 16.3% 16.3% 0.2%
Short Terms Lets on AirBNB 655 9% 3.63%
Private Lets 1781 23%
House Completions (inc. small site ave.) 55.6 +197 2.6% 0.0%
Affordable Completions 12 +36 0.5% 1.3%
Purpose built SCUs (Approved applications) 42 +93 1.2% 0.0%
Empty Homes (>6mths) 0.8% 36.09%
Unoccupied Homes (<6mths) -9.7%
School Roll (secondary) 1340 61 5%
School Roll (primary) 1492 -77 -5%
Total          
1%
Total                
-1%
Total             
-2.51%
Page 133 of 222

Page 134

16 
inform future decisions. However, this study indicates that the case can be made for
a Short Term Let Control Area in the areas outlined in Figure 1. 
Reference List
1. Scottish Government (2019) Research into the impact of short-term lets on 
communities across Scotland Short-term lets - impact on communities: research -
gov.scot (www.gov.scot)
2. Arneil Johnson (2022) PKC Draft Housing Needs and Demand Assessment 
Arneil Johnson (2022) PKC LHS Briefing Slides 3. 
3. Arneil Johnson (2022) PKC Tayside Briefing Slide Tayside Housing Needs and
Demand 
4. Communities Housing Trust (2022) PH8 Community Housing Needs Survey
5. Highland Council (2022) Committee Report for the Economy and Infrastructure,
Committee 2nd December 2022. 
Page 134 of 222

Page 135

Appendix 2 
CHANGE OF USE OF RESIDENTIAL
PROPERTY TO SHORT-TERM LET 
NON-STATUTORY PLANNING GUIDANCE 
CONSULTATIVE DRAFT 
7
Page 135 of 222

Page 136

Introduction 
The Council is aware that communities are becoming increasingly concerned that
the increase in short-term lets over recent years is impacting on the availability and
affordability of housing locally, and is having a secondary impact on jobs, services
and business opportunity. 
Whilst the short-term letting of a residential property can bring economic benefits
both to the host and the local area, this must be balanced against the impact the loss
of that residential property has on the availability of housing for local people, and in
particular access to affordable housing. 
There is no specific policy basis in the current Perth & Kinross Local Development
Plan 2 (LDP2) for the control of short-term lets. This planning guidance has therefore
been prepared to assist in the assessment of planning applications for the change of
use of a residential property to a short-term let and would be applied across Perth
and Kinross 
National Planning Framework 4 (NPF4) sets out the policy framework for assessing
planning applications: 
Policy 30 Tourism e) Development proposals for the reuse of existing buildings
for short term holiday letting will not be supported where the proposal will result
in: 
I. An unacceptable impact on local amenity or the character of a
neighbourhood or area; or
II. The loss of residential accommodation where such loss is not outweighed
by demonstrable local economic benefits. 
This planning guidance sets out the circumstances under which the change of use to
a short-term let will be supported, including where local economic benefit (as
required by NPF4) can be demonstrated. 
Not all changes of use will require planning permission. More guidance on this can
be found on the Council’s website: www.pkc.gov.uk/shorttermletsandplanning 
Consultation 
We would welcome comments on this planning guidance by Friday 18 August 2023. 
You can submit your comments via the Council’s Consultation Hub:
https://consult.pkc.gov.uk/ 
Following the consultation period, the guidance will be finalised and reported back to
Committee for approval. 
Page 136 of 222

Page 137

Definitions and Exclusions 
The focus of this planning guidance is Material Change of Use of dwellings and
Short-Term Lets; defined in planning legislation as: 
Material change of use of land or buildings is included within the definition of
development even if there are no physical alterations to the land or building.
Planning permission is always required for a material change of use. A change from
a flat to a short-term let is always considered to be a material change of use
requiring planning permission. For residential property, the significance of the
change must be considered. There are a number of factors which may affect the
Council's consideration of whether the change of use is a material change of use.
Factors include a change to local amenity or the character of a neighbourhood or
area, safety and impact on immediate neighbours. 
Short-term let is defined as being provided in the Town and Country Planning
(Short-term Let Control Areas) (Scotland) Regulations 2021 where all of the following
criteria are met- 
(a)sleeping accommodation is provided to one or more persons for one or
more nights for commercial consideration,
(b)no person to whom sleeping accommodation is provided is an immediate
family member of the person by whom the accommodation is being provided,
(c)the accommodation is not provided for the principal purpose of facilitating
the provision of work or services to the person by whom the accommodation
is being provided or to another member of that person’s household,
(d)the accommodation is not provided by an employer to an employee in
terms of a contract of employment or for the better performance of the
employee’s duties, and
(e)the accommodation is not excluded accommodation. 
The regulations make a number of exclusions from the definition of a short-term let
including:
• Hotels
• Boarding houses
• Guest houses 
The above are therefore not included within the scope of this Guidance. 
Whilst B&Bs are not specifically mentioned, the Town and Country Planning (Use
Classes) (Scotland) Order 1997 classifies these as ‘houses’. Any residential property
being used as a B&B within the definition of ‘Class 9. Houses’ is therefore also
excluded from the scope of this Guidance: 
‘Use as a bed and breakfast establishment or guesthouse, where at any one
time not more than 2 bedrooms are, or in the case of premises having less
than 4 bedrooms 1 bedroom is, used for that purpose’
Page 137 of 222

Page 138

Town and Country Planning (Use Classes) (Scotland) Order 1997 Class 9. Houses 
For clarity other related definitions are: 
Dwellinghouse or residential property is as defined in Planning Circular 10/2009:
Planning Enforcement as ‘An independent dwelling (with its own front door, kitchen
and bathroom) being accommodation which ordinarily affords the facilities required
for day-to-day private domestic existence such as a house, flat, cottage’. 
Secondary let - means the letting of a property where the host or operator does not
normally live. The planning guidance cannot apply to Home-letting or Home-sharing
(see below). 
Home-letting - Defined in the short-term let licensing legislation means using all or
part of your own home for short-term lets whilst you are absent, for example, whilst
you are on holiday. 
Home-sharing - Using all or part of your own home for short-term lets, whilst you
are there. 
Private Residential Tenancies are excluded under Section 26B(3) of the 1997 Act
as they are not considered secondary accommodation because they are the
principal home of the tenant. 
Draft Guidance 
Planning permission will not be granted if the proposal results in the loss of a
residential property to the short-term let sector unless at least one of the following
criteria are met: 
1. The proposal is for the extensive refurbishment of a long-term empty
residential property which will bring the building back into active use; 
2. The proposal relates to a residential property with four or more bedrooms as
this stock is considered less significant in terms of housing needs
assessments; 
3. It can be demonstrated that the residential property has been operating as a
short-term let for more than 10 years and is therefore exempt from planning
enforcement action; 
4. It can be demonstrated that the proposal for the change of use to short-term
let is part of a diversification scheme to support an existing Perth and Kinross
business within the same landholding.   
Page 138 of 222

Page 139

In all cases properties must have their own door to the street to reduce the risk of
adverse impact on the amenity of neighbouring residents. Proposals must also
comply with all relevant LDP2 policies, in particular Policy 1 Placemaking:
Development must contribute positively to the quality of the surrounding built and
natural environment. 
Within a short-term let control area all new proposals for the change of use of a
residential property to a short-term let will require planning permission. This
requirement only applies to proposals submitted after the designation of the control
area. Any short-term let which was operating lawfully within the control area prior to
its designation will not be required to apply for planning permission retrospectively.
Lawfully means any short-term let which either had planning permission or was not a
material change of use and therefore did not require planning permission. For the
avoidance of any doubt, a material change of use to short-term let either within or
outwith a control area, before or after the designation of a control area, will require
planning permission. More guidance on this can be found on the Council’s website
at: www.pkc.gov/shorttermletsandplanning 
Page 139 of 222

Page 140

Page 140 of 222

Page 141

Appendix 3
Proposed Short-Term Let Control Area 16.05.2023
1
Figure 1: Perth & Kinross Council area showing postcode areas and the percentage of Total Potential Housing
stock which are being used as self-catering and second homes combined.
Principal Settlements
7
Page 141 of 222

Page 142

Page 142 of 222

Page 143

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure & Economic Development Committee 
31 May 2023 
PERTH CITY OF LIGHT ACTION PLAN UPDATE 2023 
Report by Head of Planning & Development
(Report No. 23/172) 
1. PURPOSE 
1.1 This report updates the Committee on the City of Light Action Plan which was
approved in 2016 and initial works commenced in 2017. The report reviews
the outputs and outcome of the work undertaken to date, relative to the
original objectives, and outlines works which have not yet been committed
within the Framework Contract linked to the current pause on spend on the
Lighting Strategy capital programme. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
• notes the content of this report and appendices which provide the
Committee with information on the background to the City of Light Action
Plan, outputs and outcomes achieved and 
• notes remaining proposed lighting at St John’s Kirk, City Gateways,
Perth Vennels and required maintenance costs which have yet to be
committed
• considers the remaining proposed projects and refers any decision on
future spend to Finance and Resources Committee.
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues 
• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices
4. BACKGROUND / MAIN ISSUES 
4.1 In 2016, Perth and Kinross Council launched an ambitious vision for the City
of Perth – the City of Light as part of the private and public sector led Perth
City Plan (2015-2035) aiming to support growth of the city and its economy.
The Perth City Plan developed via the Perth City Development Board, was
8
Page 143 of 222

Page 144

approved by the Council in February 2016 (Report 16/71 refers) 1.  The of
life. The Plan promotes cultural regeneration as a critical part of economic
development activity involving both the development of new cultural assets
and  in lighting, improved sustainability, and use of lighting infrastructure
to animate the city, improve the visitor experience, support the hospitality
sector and evening economy.   
4.2 The subsequently commissioned City of Light Action Plan2 outlined objectives
to inform the development of lighting projects and prioritisation of investment: 
• support development of the evening economy.
• provide opportunities for businesses to benefit from enhanced turnover
through increased visitation.
• develop innovative approaches to lighting design which deliver safety
and assists with orientation for both pedestrians and road users.
• prioritise lighting designs that will reduce energy use, cost, and
minimise light pollution.
• develop and augment Perth’s character. 
4.3 The Action Plan provided more detail on potential lighting projects and costs
based on these objectives.  It also included a methodology of procuring
design linked with investment in low carbon street lighting, enhanced use of
lighting infrastructure for digital use and interaction, and lighting projections. 
4.4 At the Council meeting on 22 June 2016, capital funding of £8.9 million was
allocated to placemaking and £5 million to the lighting strategy (Report
No.16/277 refers) 3 to support both the City Plan and the City of Light Action
Plan. 
4.5 The resources for projects within the Placemaking and Lighting capital
programmes were agreed at the Strategic Policy and Resources Committee in
April 2017 (Report No.17/153 refers) 4 
4.6 Following approval of funding, a new Framework to deliver the City of Light
Action Plan was set up through Public Contracts Scotland following
discussions with procurement, legal and other internal stakeholders. The
Framework sought to award a competent, qualified, and experienced
Architectural/ Lighting Designer, either through one company or a
collaboration of companies, who could be used to develop plans proposed
within the City of Light Action Plan from design to installation and
commissioning. 
4.7 The Framework was established to allow the Council flexibility in delivering
different projects in the Action Plan.  This was due to the co-dependency with
the delivery of other related capital investment in the public realm and
buildings, as well as time to acquire leaseholds/legal agreements with
different owners where required. The implementation programme was in effect
paused for an 18-month period as a result of restrictions/capacity during the
Page 144 of 222

Page 145

pandemic, however design and purchase of equipment continued to be
progressed. 
4.8 Expenditure has been regularly monitored and reported as part of the capital
budget reporting process, albeit without full detail of the lighting project
designs. 
4.9 Placemaking and lighting resources within both capital programmes were
aligned and moved to the cultural investment programme to consolidate
resources and accelerate investment in the surrounding public realm, routes
linking cultural venues and creative lighting. This increased the capacity for
the integration and development of public art with enhanced use of
surrounding space and routes, for events and markets, along with the
improvement and animation of adjacent buildings. 
4.10 From the original £5m Light Action Plan budget, £500k was wired in 2018 to
meet the costs of external lighting of Perth Museum and surrounding public
realm (SP&R Report No. 18/285 para 3.3.3 refers). In 2018 £65k was also
vired to support wider works to the regeneration of St. Paul’s Square.   
4.11 By the end of the financial year 22/23 total project spend, including the
virements to other projects, was £3.253m. A further £963k of agreed and
committed works are currently underway for delivery in 2023/24. These were
committed before the freeze on the capital programme agreed at Finance and
Resources Committee on 30 November 2022, and the continued freeze for
the Lighting Strategy agreed as part of the capital budget setting in March
2023.  Full details of all projects are identified in the Appendix. This leaves a
balance of £784k for works which have been identified but not yet committed.   
4.12 The impact of lighting projects implemented to date has generated some of
the highest levels of local engagement through social media and achieved
global international reach and recognition because of renowned international
lighting artists involved in installation and lighting projection content. Equally,
business benefits in driving footfall to the city centre have been assessed and
quantified as part of lighting events indicating growth in visits, dwell time and
expenditure in hospitality businesses in the winter months. It is acknowledged,
however, that there is strong opinion that lighting investment should not be a
priority in the current economic climate because of cost and environmental
considerations. To allow objective consideration of these issues, local
benefits, and those from established lighting investment in national and
international comparators are highlighted in the Appendix along with details of
relatively low operational and running costs from technological improvements
in lighting projects which have been implemented. 
4.13 It should also be noted that the implementation of lighting projects is linked
with wider place-based investment plans. The Sustrans Community Links Plus
programme, applied for in 2019, to deliver the Perth People Place (PPP)
project, is now progressing to design stage.  This includes resources of
£11.083m from eligible projects identified in the Placemaking and Lighting
capital programmes to use as match funding towards construction costs. 
Page 145 of 222

Page 146

4.14 Funding through Transport Scotland is currently being investigated to
ascertain if the PPP project can be financially assisted as it offers 100%
contribution towards construction costs.  This would negate the need for
match funding. 
4.15 Should the funding through Transport Scotland be secured, then this may
remove the reliance on Sustrans match funding.  It could create opportunities
to lever further funding from Creative and/or Event Scotland or business
sponsorship to sustain further investment in lighting as part of capital project
delivery. 
4.16 The programme for lighting projects is formalised around one year in advance
to allow design and equipment to be ordered via the Framework to ensure the
spend can be met that following year. At present, the majority of spend for
2023/24 is committed, in line with the agreed freeze on spend in this area.
However, we require at this point to be commissioning the remaining planned
projects that would finalise spend for 2023/24 and those that would be due to
be delivered in the final year 24/25 to complete the Plan. 
4.17 The Appendix covers full context, budgetary information, economic impact,
evaluation, reach and impact, costs of running lighting, summary of benefits,
projects completed/ in progress and due to be completed this year. 
5. PROPOSALS 
5.1 Investment in lighting to aid the regeneration and repurposing of city and town
centres to complement cultural investment and animate the city at night
remain important.  This is with particular reference to encouraging increased
use and extending dwell time to sustain the evening economy and hospitality
sector, given the impacts of two years of Covid restrictions, the knock-on
impacts of the war in Ukraine and cost of living crisis. Those places with good
food and drink offers and an experience that welcome and excite customers
and visitors are those that are most likely to be able to sustain activity and
support future growth. 
5.2 As well as installing feature and architectural lighting, the use of forms of
lighting or lighting structures to create cultural attractions that aim to stimulate,
raise social interaction and activity are a core delivery requirement with a view
to the creation of a permanent night-time light art trail. This would make Perth
the first UK to city to have this as a cultural attraction within its city centre. 
5.3 Several installations are complete (which have had significant coverage
through media) and would be considered marketable as ‘Creative Lighting’
schemes including those at Perth Bridge, St. Paul’s & Fergusson Gallery, and
‘Light Art Installations’ in Cutlog Vennel and Burt’s Close. However, officers
consider that these alone would not be considered enough to market Perth
with a ‘permanent light art trail.’ 
Page 146 of 222

Page 147

5.4 Once we have completed other Light Art installations that are currently
underway and due for installation over the next 10 months in Guard Vennel,
High Street, the Art Gallery & Skinnergate, awareness of the trail would be
promoted through online channels and an app and marketing and promotion
with VisitScotland. This will promote not only lighting works but other cultural
attractions in the city, particularly the opening of Perth Museum. 
5.5 The remaining uncommitted works, costed at £784k from the original allocated
budget take the City of Light Project as a whole to its completion are for;
Gateway features, planned at Dunkeld Road, Glasgow Road, Dundee Road
and within the City Centre as part of works to The Golden Route (£450k).
Upgraded and enhanced architectural lighting at St. Johns Kirk (£120k). Light
art installations within City Vennels, planned at Oliphants, Baxter’s Close,
Watergate & Fleshers (£129k) and £85k funding set aside to cover
maintenance of the lighting asset. Programme completion would allow a
comprehensive lighting experience to be promoted to sustain and support
growth of the evening economy. 
5.6 The Committee is asked to consider these remaining works and refer any
views back to the Finance and Resources Committee for decision. Officers
will continue to seek to secure alternative resources to sustain activity and
complete the works which have yet to be committed to through: 
(i) integration of funding for lighting within existing capital programme and
revenue capital grant fund allocations for improvements in city and town
centres and 
(ii)  business sponsorship and external funding bids to Creative and/or Event
Scotland.
6. CONCLUSION   
6.1 Perth was originally the only city in Scotland looking to support the evening
economy through an enhanced permanent night-time offer through lighting
investment, although recently Aberdeen and Dundee have committed spend
in these areas. 
6.2 Further investment in lighting will encourage residents and visitors to visit the
city in the evening and support development of the night-time economy. 
6.3 Lighting is shown to improve well-being and enhance the quality of life for city
residents by improved safety, reduced crime and vandalism. Lighting
enhances the visitor experience and highlights the unique qualities of the city;
helping to create a more cosmopolitan, vibrant, and interesting city. 
6.4 As part of the recovery of the city, with resident and tourism volume and value
still not back to pre-pandemic levels, officers consider that the city requires an
offer that sustains existing business and supports growth. In that respect
officers consider a proactive approach to investment is needed to encourage
increased use of the city centre as a place for social interaction, greater dwell
time in the evening and increased use by visitors and locals alike. 
Page 147 of 222

Page 148

6.5 A comprehensive, sustainable well-lit city with creative and architectural
lighting would have a USP and would complement the wider investment in
cultural attractions and help to develop Perth as a more appealing destination
not just for day visitors but for overnight and longer stays. The progress and
benefits of current work implemented through the City of Light Action Plan
should be noted and efforts made to sustain activity through consideration of
funding for previously agreed work via the capital programme and/or
integration within agreed capital projects, revenue capital grant assistance,
business sponsorship and external funding support. 
6.6 At a time when the High Street and city centre is facing significant challenges
and change, completion of proposed lighting investment delivers a
comprehensive and unique offer for Perth and, in particular, supports the
development of the night-time economy. 
Author
Name  Designation Contact Details
Alan Farnington  City Development
Project Officer
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities) 
22 May 2023 
APPENDICES 
• Appendix 1 – Perth City of Light Updated Information May 2023 
REFERENCES/REPORTS 
1 Report 16/71 (The Perth City Plan 2015-2035)
2 City of Light Action Plan 
3 Report 16/277
4 Report 17/371  
Perth City Plan Edition 3 (2019-2040)
Page 148 of 222

Page 149

Page 149 of 222

Page 150

ANNEX
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment n/a
Strategic Environmental Assessment n/a
Sustainability (community, economic, environmental) n/a
Legal and Governance  n/a
Risk Yes
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This report supports priorities within the Community Plan 2022-27. 
(i) Reducing Poverty (including child poverty, fuel poverty and food poverty)
(ii) Mental and physical wellbeing
(iii) Digital participation
(iv) Skills, learning and development
(v) Employability 
Corporate Plan 
1.2 This report supports the objectives within the draft new Corporate Plan: - 
(i) Children and young people grow up safe, respected, well-educated,  
and confident in their ability to realise their full potential; 
(ii) People and businesses are increasingly able to prosper in a local 
economy which support low carbon ambitions and offers opportunities  
for all; 
(iii) People can achieve their best physical and mental health and have 
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital, and socially 
connected. 
Page 150 of 222

Page 151

(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of  
climate and environmental change for this and future generations.
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than 
those reported within the body of the main report. 
Workforce 
2.2 There are no workforce implications as a result of this report. 
Asset Management (land, property, IT) 
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.   
3.2 The information contained within this report has been considered under the 
Corporate Equalities Impact Assessment process (EqIA) and has been 
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 However, no action is required as the Act does not apply to the matters 
presented in this report.  This is because the Committee are requested to note 
the contents of the report only and the Committee are not being requested to 
approve, adopt, or agree to an action or to set the framework for future 
decisions. 
Sustainability 
3.5 The proposals have been considered under the provisions of the Local
Government in Scotland Act 2003 and the Climate Change (Scotland) Act
2009 using the Integrated Appraisal Toolkit and will contribute to the
sustainable development of Perth and Kinross where it supports promotion of.  
Page 151 of 222

Page 152

Legal and Governance 
3.6 No issues as the proposals use established contract measures. 
Risk 
3.7 Risks and the controls required to mitigate any risks will be reported through
the Council’s risk management process where the Council is the lead on
individual projects. 
4. Consultation 
Internal 
4.1 The Head of Legal and Governance and Head of Finance were consulted in
preparation on reports that lead to City of Light Action Plan funding. 
External 
4.2 Initial proposals were considered and supported as part of the consultation
with the public and businesses on the Perth City Plan. 
5. Communication 
5.1 Communications promoting opportunities for participation will be undertaken
via PKC and Perth City Centre Management media channels. 
2. BACKGROUND PAPERS 
2.1 Papers are linked within the body of the main report. 
Page 152 of 222

Page 153

Perth City of Light
Updated Information
May 2023 
8
Page 153 of 222

Page 154

2 
Contents 
Background and Context ......................................................................................................................... 3
Budgetary information ............................................................................................................................ 5
Economic Impact ..................................................................................................................................... 7
Evaluation of Longer Term/permanent works........................................................................................ 9
Reach, engagement, and impact of the Light Action Plan .................................................................... 14
Cost of running lighting ......................................................................................................................... 21
Summary of Benefits of the Project ...................................................................................................... 23
Projects completed or in construction phase ....................................................................................... 27
Works Issued with expected completion in 2023/24 ........................................................................... 43
Design Briefs Still to be issued: ............................................................................................................. 49
Appendix A:  Riverside Lights 2018 Evaluation ..................................................................................... 56 
Page 154 of 222

Page 155

3 
Background and Context 
In 2016 Perth and Kinross Council launched an ambitious vision for the City placing culture at the
centre of economic redevelopment activity and making best use of new technologies in lighting to
make visual and visitor experience improvements to the City whilst improving the sustainability of
the lighting infrastructure.   
The plan delivered conceptual designs and outline proposals to provide a consistent series of lighting
initiatives to create unique, vibrant, and attractive evening scene to aid in delivering Perth’s
ambition to become a leading European small city. In addition to delivering an enhanced residential
and visitor experience the proposals are designed to help deliver a more sustainable and connected
Perth. 
Lighting can be crucial to support a transition from functional interventions focused on public safety,
such as temporary wider walkways and bike lanes, into something that is part of a longer-term
recovery plan that supports the night-time economies by unlocking outdoor social spaces for night-
time use and events, improving night-time journeys, etc. 
Lighting can play a pivotal role in revitalising high streets and town centers by enhancing the
attractiveness of the environment, improving perceptions of safety, and ultimately increasing
footfall, dwell time and spend. 
Lighting interventions can quickly create performance space, for community and professional use;
facilitating the human connections that build community resilience. In the long term, they can
develop through considered design into permanent facilities promoting sustained economic and
social benefits in the daytime and after dusk. 
As well as installing feature and architectural lighting which have to date illuminated the likes of
Perth Bridge and St Pauls Square within the lighting plan the use of forms of lighting or lighting
structures to create cultural attractions that aim to stimulate, raise social interaction and activity are
a core delivery requirement. 
To that end the plan was further developed with a view to create a permanent night-time light art
trail making Perth the first UK to city to have this as a cultural attraction. 
Light Festivals and shows are incredibly popular, seen not only by the delivery of our own Norie
Miller Light Nights but the likes of the Enchanted Forest in Pitlochry, Spectra in Aberdeen, Lumiere in
Durham & London, Light Up the Northeast etc where visitor numbers and desire to attend are
always incredibly high and prove hugely popular and increase visitor spend to the area. 
They do however have large production costs and a limited period of time of impact whereas a
permanent trail can be viewed year-round and create a visitor draw; with some installations also
being effective during the day. 
In order to create a permanent light trail, in 2019 the first of a series of proposed light art
installations was installed in Mill Street Perth.  Further proposed commissions were subsequently
delayed due to the pandemic however the second installation was completed in October 2022 with
one further commission is due for installation April 2023 and two further installations programmed
and commissioned for later in 2023. 
Page 155 of 222

Page 156

4 
Other works in progress (outwith cultural lighting commissions) include Lower City Mills,
Skinnergate, South Inch, Perth Theatre, Perth Art Gallery (building lighting) & Perth Museum. 
Notes
£500k was vired in 2018 from the original £5m Light Action Plan budget directly to Property to meet
the costs of external lighting of the new Perth Museum and surrounding public realm for that
project. £65k was also vired to Property to support wider works to the regeneration of St. Pauls
Square in 2018 leaving a total budget of £4.435m.
The Officer involved in the programme took over the Creative Exchange project in Feb 2019 to see it
through to its completion and official opening in Feb 2020 and as such was unable to deliver the full
expected level of works within City of Light Action Plan that year.
Similarly, having been re-tasked in April 2020 for the authorities Covid 19 resilience in PPE and
Foodhub Operations and then finally the delivery of the Perth Vaccination Clinic in Bells Sports
Center the officer was effectively, for a period of two years, focused on the operations and only able
to pick up occasional work from the project(s) - As well as being periods on inactively from
contractors’ ability to work due to covid regulations and illness. 
As a result of above works are considered to be around 1.5/2 years behind the initial target for full
completion of the project however the bespoke Framework contract that was developed has
allowed the flexibility of timeline around progressing certain schemes at certain times in order to
deal with the likes of planning consents and establishing agreements with Stakeholders such as
Structures, Greenspace, Street Lighting, 3rd Party organisations, public and private building owners
and as such has enabled space and time naturally within the contract to deal with the unforeseen
events around the Pandemic. 
Page 156 of 222

Page 157

5 
Budgetary information 
As shown in the table below, the costs of works for the Lighting Action Plan carried out to 31st
March 2023 and budgets committed to St Paul’s and the Perth Museum project, total £3.253m of
the £5m budget, leaving a total budget for future works of £1.747m. Contracted works to the value
of £0.963m are planned for financial year 23/24 which leaves £0.784m of budget for future planned
works which have at this time not been legally committed. 
The budget reported to the Finance & Resources Committee on 26th April 2023 (Report No. 23/121)
for 22/23 through to 24/25 totalled £2.752m (22/23 £0.875m, 23/24 £1.200m and 24/25 £0.677m).
The final outturn for project costs for 22/23 was £1.005m (unaudited) leaving a total budget for
23/24 and 24/25 of £1.747m. 
Costs of works
to 31.3.2023
Contracted
works/In progress
Works/Costs
not
committed
Totals
Perth Bridge £337,000   £337,000
Queens Bridge  £70,000  £70,000
Norie Miller £347,000   £347,000
St. Matthews £61,000   £61,000
Lower City Mills (city centre) £16,000 £134,000  £150,000
Perth Art Gallery £15,000 £125,000  £140,000
Perth Theatre £5,000 £116,000  £121,000
Perth Concert Hall (city centre) £99,000 £41,000  £140,000
Sherriff Court £42,000   £42,000
St. Pauls £166,000   £166,000
Library  £72,000   £72,000
St Johns Kirk   £120,000 £120,000
Aberfeldy/Pitlochry £72,000 £12,000  £84,000
Gateways (x3)   £450,000 £450,000
Fergusson Gallery (city centre) £155,000   £155,000
Winter Animals (city centre) £115,000 £35,000  £150,000
North Inch (City Centre) £85,000   £85,000
South Inch (city centre) £127,000 £83,000  £210,000
Mill street - Projection Installation £100,000   £100,000
Guard Vennel (vennels) £78,000 £50,000  £128,000
Cutlog Vennel - Nathan Coley (vennels) £120,000   £120,000
Skinnergate (vennels) £35,000 £45,000  £80,000
High Street Columns (city centre) £37,000 £120,000  £157,000
Vennels - Kirk Close/Watergate/Oliphants/Baxter’s etc £50,000 £43,500 £129,000 £222,500
Various City Centre interventions/Design
fees/equipment etc £223,000   £223,000
Wellmeadow/Scone  £14,000   £14,000
High Street Perthshire Women Mural   £8,500  £8,500
Page 157 of 222

Page 158

6 
Maintenance Stock Inventory  £50,000   £50,000
Maintenance of Assets/Lighting   £85,000 £85,000
3rd Party Design Fees/Reports £28,000   £28,000
Project Support Costs £239,000 £80,000  £319,000
SUBTOTAL £2,688,000 £963,000 £784,000 £4,435,000
Perth Museum (Budget transferred to overall project) £500,000   £500,000
St Pauls Sq. (Budget transferred to overall project) £65,000   £65,000
TOTALS £3,253,000 £963,000 £784,000 £5,000,000 
Projects completed or in construction phase are:
Perth Bridge – Completed July 2019        
Norie Miller/Rodney Parks – Completed Nov 2019     
Meander Light Art Installation – Completed Nov 2019     
St Matthew’s Church – Completed June 2019      
Aberfeldy Square – Completed March 2020      
St Pauls Church – Completed June 2021       
North inch Lighting – Completed Nov 2020     
Pitlochry & Aberfeldy War memorials - Completed Oct 2020    
Various City Centre interventions/Design fees/equipment etc   
Vennels - Kirk Close/Watergate/Oliphants/Baxter’s etc     
Perth Sherriff Courthouse – Completed Apr 2022    
Cutlog Vennel – Nathan Coley – Completed Oct 2022      
Perth Concert Hall – Completed Dec 2022     
Perth Library Stage 1 – Completed Dec 2022      
Winter Animals year 1 – Completed Nov 2022       
Fergusson Gallery – Completed Feb 2022      
Guard Vennel – Completed April 2023    
Skinnergate – Completed May 2023    
South Inch – Due to be completed end May 2023 
Works Issued with expected completion in 2023/24
Perth Art Gallery Light Commission & Building - Oct 2023/Feb 2024   
Queens Bridge – Oct 2023        
Aberfeldy Stage 2 - Aug 2023        
High Street Columns Commission - Nov 2023      
Perth Theatre - Aug 2023/Jan 2024
Winter Animals Year 2 – Nov 2023       
Lower City Mills  - 2024 (dependent on other building works)           
Design/Work Briefs not issued:     
Gateway Entries  
St Johns Kirk         
City Vennels (Kirk Close/Watergate/Oliphants/Baxter’s etc)   
Maintenance of Lighting Assets  
Page 158 of 222

Page 159

7 
Economic Impact 
As per the Impact Analysis April 2017 a clear approach to lighting is crucial to the performance of the
city’s evening economy, specifically its population-driven industries. 
These industries mainly include consumer services businesses in the areas of retail, entertainment,
hospitality, and tourism.
By encouraging an increased length of visit and by attracting more visitors to the city, the lighting
strategy will contribute to businesses with an opportunity to capture a greater proportion of
expenditure from a larger expenditure pool.
57% of residents surveyed in retail studies indicate they have never visited Perth City Centre after
6pm, this imbalance and underutilised resource is highlighted in additional expenditure of up to circa
£140M that is currently being untapped from resident expenditure.
Lighting is also an area of intervention that provides cost-effective solutions that can ensure a quick
win for authorities and developers looking to make improvements. 
Over the years, more and more local governments have hosted light festivals to support the local
economy, particularly during seasonal slumps and the winter periods, promoting the night-time
economy on a temporary basis. These events are particularly relevant in towns with a developed or
developing tourist industry. Evidence has shown light festivals are a cost-effective mechanism
(relative to the return on investment) to attract significant increase in visitors, particularly out of
town visitors, and increase revenue generated for local businesses.
Riverside Night Lights 
As part of the plan for Perth a lighting event was held at Norie-Miller Park (now known as Perth
Riverside Night Lights) in Perth over 18 nights through to February 14th, 2017, to provide both the
public and visitors with an exciting example of future lighting projects for the city. 
The event has been a major success with visitor numbers of over 51,000, far exceeding the original
estimations. The event was repeated in 2018 over 19 nights with numbers more than 53,000
attending, and just under 60,000 in 2019 over a 16-night run cementing the event in Perth & Kinross
Winter Festival Calendar. 
It returned in 2020 just before the pandemic but running a shortened period of nine nights but still
with numbers in excess of 4000 per night on average.
While the event is delivered through the Winter Festival programme the City of Light Action Plan has
provided permanent lighting infrastructure throughout the park, with a view to making the area
more attractive to visitors year-round and in the evening. In addition, the likes of projectors
purchased thought the project have been able to be used on site to provide more content and
remove revenue pressures for delivery of the event.
In 2018 an evaluation of the event was undertaken looking at the economic Impact from visitors to
the lighting event for the local economy the evaluation of which is included as an appendix at the
end of this report.
In summary the economic impact of Riverside Nights was estimated at £744,510.33 when
transformed into net spending. 
Page 159 of 222

Page 160

8 
£356,566.05 was estimated to have been generated by visitors from non-Perth & Kinross Council
post codes.
£387,944.28 was estimated to have been generated from visitors from within Perth & Kinross post
codes.
Including the 1.25 sub-regional multiplier it was estimated the total net worth of the event to be
£930,637.91.
Light Festivals General
Other lighting events around the UK and the world have similar levels of return from evaluation with
their visitors.
Collated figures have demonstrated SPECTRA, Aberdeen’s festival of light, which runs over 4 days
had had over £700,000 impact to the local economy in 2017 with footfall levels increasing year on
year before and after Covid restrictions.
Figures published by Aberdeen City Council demonstrate the value the event adds to the local
economy. The 2017 event had an estimated output £685,872, which includes £403,454 of visitor
spend and additional investment to the city as a result of the festival taking place. Over and above
this figure an additional £314,453 was brought to the local economy through the spend by residents
while attending the festival.
2022 and the post-pandemic restrictions saw Bristol host the return of the Bristol Light Festival and
the highly anticipated return of the event had incredibly positive results.
The findings of an independent financial and visitor analysis report confirmed that the six-day event
of stunning light installations attracted 170,000 visitors to the city and brought an additional spend
of £3.4m into city centre businesses as a direct result of the event.
Durham Lumiere the best known of UK light events is always popular, the 2019 event - the 10th
anniversary - saw the festival pass the one million visitor’s mark. The 2019 exhibits received around
165,000 visitors, and 240,000 visitors went to see Durham Lumiere in 2017.
The evaluation of the 2018 festival demonstrated a significant boost to the economy, with a figure of
£9.5m of economic benefits, according to the event organisers.
Copenhagen Light Festival is Europe’s most popular an annual light festival that transforms the quiet
and cold winter darkness into a unique celebration of light art, lighting design and illumination in the
center of Copenhagen. 
In three weeks of February the festival presents a wide range of light-based works – such as
sculpture, installation, projection mapping, event and illumination created by both established and
upcoming light artists, lighting designers, students and organizations and attracted over 500k visitors
in 2021
What makes the Copenhagen festival different is that it already has a portfolio of permanent light
and light art installations (around 25) which the light event utilises to builds upon to create the
largest European Light event however the permanent installations provider that constant visitor
attraction year on year and outwith the light festival period. 
Page 160 of 222

Page 161

9 
Evaluation of Longer Term/permanent works 
An event/festival offers a unique way to engage with visitors and account for numbers.
It is obviously more difficult to gauge the impact of permanent installations in that they are not
within the confines of a specific event space and outwith standard street counters we have no way
to physically measure people’s movements throughout the City Centre (although this is being
investigated by using phone tracking via Bluetooth to show accurate evaluation).
There are also issues now with measuring year ‘v’ year movements due to two years of covid
restrictions skewing figures with people unable to visit places, businesses being closed etc.
We can however look at the impact of longer-term installations carried out elsewhere prior to the
pandemic to see how these drive footfall.
York
York took the decision in 2017 to expand their winter illumination so that they were in operation
from early November to the end of February, extending the traditional Christmas lighting period by
some 10 weeks to drive numbers to the city especially with a view to the evening economy and
darker nights of winter.
This was hailed a resounding success and helped drive visits to the city during the off-peak tourism
season.  Visits to attractions and hotel occupancy levels were all up over the period and the lighting
proved popular with both visitors and residents alike.
From November to December there was a 13.2% increase in rail journeys to the city (19 November –
23 December).  At the same time footfall into the city was up by 1.3% year on year, bucking the
national trend, and coach bookings were up by 8%.
Visits to attractions were 5% higher year on year with those attractions with Christmas events and
exhibitions benefitting the most from these extra visitors.  
York Business Improvement District (BID) and Make It York, the city’s Destination Management 
Sally Greenaway, Head of Visit York, a part of Make It York, said: “The winter months are a vital time
of year for local businesses and the tourism industry, and we’re delighted the winter lighting scheme
has been so popular.  Now that the festive season is behind us it is crucial York continues to attract
visits during the traditionally quieter months and the Winter Lights scheme has added a new
dimension, drawing in shoppers and visitors to enjoy the city lit up by night.”
Copenhagen & Others 
As mentioned previously Copenhagen hosts Europe’s largest Light festival but this was created on
the backdrop of other permanent installed works in the City, in total around 25 light art and public
realm creative lighting initiative. Similar styles of delivery are found in San Francisco and London
City.
https://copenhagenlightfestival.org/permanent-installations/
https://www.sftravel.com/article/installations-see-illuminate-sf-light-art-trail
https://canarywharf.com/the-estate/art-culture/art-on-the-estate/
Page 161 of 222

Page 162

10 
Consideration in Perth
What this demonstrates is an appetite for visitors to not only attend light festivals but when a
sufficient amount of permanent light art/creative light installations are delivered this creates a trail
that is a year-round attraction, persuading desire to visit and to be around the installations in the
evening – in our case the City Centre. 
While some installations are complete (which have had significant coverage through media and
socials individually) and would be considered marketable as ‘Creative Lighting’ schemes in those at
Perth Bridge, St. Pauls & Fergusson Gallery, and ‘Light Art Installations’ in Cutlog vennel and Burts
Close these alone would not be considered enough to market Perth with a ‘permanent light art trial’.
Until we have completed at least the four other installations that are currently underway and due
for completion over the next 10 months in Guard vennel, High Street, the Art Gallery & Skinnergate
it would be ineffectual to start marketing them as a whole offer.
Without around 10-12 pieces we would be selling short the unique offer of what we are now
producing in the formation of the UKs only permanent City Centre Light Art Trail. 
Additional Winter Lighting Offer
On top of the permanent installations and a cultural Light Art Trail the start of the formation of a
‘winter light trail’ around the City Centre with non-permanent pieces over the extended winter
period was installed as part of the Winter festival offer near the end of November last year.
Winter Light trails are incredibly popular where they have been introduced, the likes of London,
York, Bournemouth and indeed Perth Australia all have some sort of winter light trails.
The Christmas Lights Trail in Perth Australia which uses various light displays and projections, some
of which are Christmas themed, are placed in and around the Perth central business district in
Western Australia.
The event first occurred in 2017, in which there were 16 displays located around the city centre. 
In 2019, there were 27 displays, including a new, smaller trail at Claisebrook Cove in East Perth. The
event brought in approximately 333,000 visitors to the City of Perth.
In 2020, there was another new trail, this time in West Perth. There were 30 displays in total
attracting nearly 400,000 people. It was recognised at the Western Australian Tourism Awards in
2021 where the 2020 event received gold in the Major Events and Festivals category. 
Perth Wildlife Light Trail
The ‘Perth Wildlife Light Trail’ in Perth ran from November until late January & provided further
enhancement and offer to the City Centre and again provides a different winter offer to other cities
in Scotland.
The bespoke designs were produced as a modern take on festive lighting and play on one of
Perthshire biggest assets in wildlife consisting of a King Salmon, Stag, Otter, and Unicorn as the first
part of this concept.
Page 162 of 222

Page 163

11 
Owing to their being insufficient time prior to the delivery of the first four pieces last year to inspect
the suitability of the manufactures work and tight time scale for the delivery we did not market the
animals prior to their installation as we did not want risk the works either not landing in time or the
works not being to the standard desired.
However, we can now be assured of the level of work and effect of the pieces as well as monitoring
through socials the way they have been well received by the public and we can move forward to
promotion of the pieces to a wider audience as part of the 23/24 Winter festival.
The plan is to introduce more installations year on year (The two pieces being designed for 23/24 are
Osprey and Red Squirrel) to create a larger winter trail around the city centre businesses to increase
footfall to locations and provide that differing offer to the likes of Edinburgh and Glasgow. 
The actual light animals have already attracted interest in rental of pieces outwith the Perth Winter
Festival period from operators owing to the ‘non- Christmas’ theme which allows lots of possibilities
of use. 
Perth Australia Christmas Trail Map
Page 163 of 222

Page 164

12 
Hospitality, Night-time businesses 
There has been significant impact to the hospitality industry since February 2020 with the pandemic,
the cost-of-living crises and rising energy costs. 
Recent BBC analysis found in December 2022, 320 businesses in the food service industry – including
restaurants, pubs, cafes, and catering firms, were forced to initiate corporate insolvency procedures.
An increase of 41 per cent compared to the same month in 2019.
Across the sector, UK Hospitality figures suggest almost 5000 venues closed permanently last year –
with three quarters of these failing in the last six months of 2022. That equates to a contraction of
around 5 per cent. Around nine out of 10 are independent venues, and the current tight margins and
economic situation means that multi-site operator or medium sized businesses can’t take the sites
over.
Following two years of Covid restrictions, the knock-on impacts of the war in Ukraine have been one
crisis too many for an already beleaguered sector. Major hikes in food prices are just part of the
cost-price inflation for the sector – currently running at 18 per cent, double what it was at the start
of 2022, and forecast to rise to about 20 per cent by April. Energy prices also continue to rise with
many businesses having seen fuel costs double or even triple. 
The current crisis means that businesses would have to take 120 per cent of 2019 revenue just to
stand still. Half of the sector is operating at or below break-even and a third have no reserves to rely
on. Where businesses are not at breaking point, they are struggling to find staff and labour shortages
in the sector are around 9 per cent. Footfall, meanwhile, is down due to pressures on household
budgets – and with one in five people saying they plan to go out less to make ends meet, the outlook
for 2023 is bleak.
While the lighting strategy for Perth is not something that can cure the problem it does go some way
to trying to create an offer in the City Center in the evening which outwith The Concert Hall, Theatre,
Cinema, restaurants, and bars there is little else to try and entice visitors to town out of ‘high street’
trading hours.
Even when the new museum is opened in 2024 it is unlikely to be open in the evening expect on
specific exhibitions launches. It is therefore vital that Perth attempts to find offers that do not exist
elsewhere and the lighting strategy is one of those areas that can provide that. 
Post Pandemic 
ARUP created a paper in September 2020 specifically looking at the importance of light within post
pandemic recovery
Noting that our night-time trends will likely change; perhaps altering our habitual social timings as
businesses increase flexible working practices, or home workers join colleagues later in the evening
to socialise. 
We may need incentivising to leave our homes and spend money after dusk. People will need to
perceive a safe journey into town and feel welcome and secure when they arrive. Then, they will feel
comfortable to dwell and support night-time economies. Lighting is a highly effective tool when
combined with urban policy and benefits diverse stakeholders, but it is often overlooked. 
Page 164 of 222

Page 165

13 
Once shops and offices close for the evening, levels of activity in urban centres drop. However, 50%
of modern life takes place after dark. We must rethink the value of urban lighting beyond just a
functional add-on for safety or beautification and recognise it as an opportunity and fundamental
solution to improve town revenues and the quality of life for our citizens.
https://www.arup.com/perspectives/publications/promotional-materials/section/the-role-of-
lighting-in-supporting-town-centre-regeneration-and-economic-recovery 
Page 165 of 222

Page 166

14 
Reach, engagement, and impact of the Light Action Plan 
The Light Action Plan has shown to have reach in terms of awareness online in the City of Perth in
being able to show the city illuminated in various ways such as in respect for Remembrance Day,
acknowledgement of cultural events, symbolic holidays which impact on residents, visitors, and
those beyond and allow the City to be part of occasions thereby increasing knowledge of the City
Worldwide.
Press and Television coverage in propelling Perth into the spotlight has been delivered through a
number of the installations. 
Nathan Coley (an artists shortlisted for Turner Prize and recognised as one of the highest profile light
artists) and the installation in Cutlog vennel received national TV and media coverage as well as
being picked up as far away as Canada and US. The work is the artists only permanent ‘public realm’
piece in Scotland and only one of two in the whole of UK. 
Kelsey Montagues Wing mural in Mill Street received international coverage being her first
permanent piece in the UK getting significant traction through social media channels with the artist
having over 150k followers including significant high profile international stars.
The art commission for Perth Art Gallery in 2023/24 will receive significant media coverage UK wide
with Chila Burnham being made an MBE and now one of the UK highest regarded artists since
original commission was started. With similar style works having been displayed at The TATE, this
will be her only permanent outdoor works worldwide.  Similarly, Elisa Arteso who is undertaking the
Guard Vennel Installation has been included in the world’s top 40 Women Light Artists so is now of
high prominence.
As well as attracting focus nationally and regionally on installation ‘Meander’, the large projected
work in Mill Street, allows adaption and as such has allowed the authority to utilise the site for the
likes of promotion of The Solheim Cup, to recognise the NHS/Key workers, VE Day 75, Pride events
and The Big Big Art Project which was a two-week takeover every year which allows all PKC primary
schools to display images and animations over that period. 
Other works such as Paula Thompsons glass finial columns installation due 23/24 in the High Street
creates a direct link to one of Perth largest key industries of the past in highlighting Pullars Dye
works, a significant business not only to the past of local residents but internationally known. This
Installation on the High Street will also bridge the cultural quarter of Mill Street to the new Museum
at the former City Hall. 
The illumination of Perth Bridge (Smeaton’s Bridge) since July 2019 and St. Pauls Square since June
2021 have allowed Perth to join a list of world-famous structures and buildings around the World
such as Empire State Building, Sydney opera House, London Eye & Edinburgh Castle in using colour
illumination in marking and acknowledging key dates throughout the year. 
At present we have in excess of 70 requests from charities, organisations, and PKC Equalities Team
for requests for the lights to be set to a specific colour(s) and dedicated in tribute to an
achievement, remembrance or acknowledgement of an official day or recognition. 
These include marking and showing support Ukraine and those affected, Remembrance, Baby Loss
Awareness week, Cancer Awareness days, Perthshire Pride, Mental Health Days, Diwali, National
Holidays, Polish Independence, St. Andrews Day and Burns night to name but a few.
Page 166 of 222

Page 167

15 
Social media outreach from PKC for illumination of the likes of Perth Bridge, St. Pauls, St Mathews
etc have one of our highest responses and engagements for posts being in their tens of thousands
with large volumes of shares, comments, and interactions. 
Similarly posts shared on Perth City and Towns and PKC Place development also have high activity
and by linking to intranational dates of illumination of structures are shared worldwide and only help
to raise the profile of the City. 
Posts are tagged and re-shared by the charities, organisations and partners forwarding them onto
audiences who may have little awareness of Perth and thus creating a bridge to this gap. 
Page 167 of 222

Page 168

16 
Cutlog Vennel – Nathan Coley Installtion, Selction of Media and Social Impacts 
Page 168 of 222

Page 169

17 
Mill Street – Meander – Social Media and local community engagement 
Page 169 of 222

Page 170

18 
Perth Bridge – Examples of Social Media and local community engagement 
Page 170 of 222

Page 171

19 
St. Pauls – Examples of use/engagement 
Page 171 of 222

Page 172

20 
Example of Facebook Reach for St. Pauls/Bridge Lighting (single posts) 
(Above taken from PKC Place Development Facebook) 
(Above provided by PKC Comms Facebook)
Page 172 of 222

Page 173

21 
Cost of running lighting 
The cost-of-living crises and increases in energy costs throughout 2022 have raised questions on the
cost of running the architectural lighting however the lighting installed is highly cost effective and
runs on a very low kw output.
Taking the example of Perth Bridge (as the largest lighting installation) below gives the current
running costs for information.
Street Lighting have confirmed current costs for energy for lighting runs at 18.6p (per kWh)
The Bridge has 86 LED lanterns on it that run at maximum total power wattage of 50 or 0.05KW
RGBW lights generally generate colours/white from say anything from ¼ to ¾ of the lights on the
fixture at any one time - so they rarely run-on full power consumption however the below costs have
been calculated on the full power wattage to avoid any dubiety.
The lights run on average each year at 5.33 hours a day, operating from sunset to midnight. This
takes in account of a full year where say lights are only on for 2 hours in June but 9 hours in
December. 
The cost of one 50 light watt fixture is calculated below: 
Page 173 of 222

Page 174

22 
This equates to costs for the Bridge lighting of either:
 5p per fixture per day or
 £4.30 per day for all 86 fixtures or
 £18.25 per fixture per year or
 £1,569.50 per year for all fixtures
(all above based on maximum wattage)
Essentially the 86 bridge lights are the equivalent of running 2 x 2kw heaters in a house (although
the lighting unit price is cheaper than domestic prices)
Street lighting mentioned in December last year they expect the until price to increase at some point
next year by about 10p a unit so that would increase pricing to 28.6p which would take the daily cost
over £6.55 per day (again however it should be less as we don’t run full power consumption)
As a footnote it should be noted the new LED lighting on the bridge equated to what would be
around a £1800 per annum saving on energy costs from what the previous lighting on the bridge
would cost to run (albeit the lighting was turned off in early 2019 as half the fixtures were not
operational at that point) 
Page 174 of 222

Page 175

23 
Summary of Benefits of the Project 
While not exhaustive a number of benefits and risks have been identified and highlighted with
regards moving into the final 1-2 years of the delivery of the programme.
Benefit  Organisational Impact and/or Service Impact and/or Impact on Asset
Condition 
Benefit 1 Help to deliver one of the principal objectives of Perth & Kinross Council to
provide a safe, secure and welcoming environment for its citizens and
visitors.
Benefit 2 Improved retail trade and the night time economy by encouraging citizens
and visitors to remain in the city in the evening. Stimulate exposure and
growth in evening/night-time economy of the city.
Benefit 3 Provide facilities to assist in the Council’s objectives in delivering the
national and local outcomes as part of the Single Outcome Agreement.
Benefit 4 Improved well-being and enhanced quality of life for city residents by
improved safety, reduced crime and vandalism, and increased offerings for
enjoyment.
Benefit 5 Highlights unique qualities of the city; and provides a stimulus for a more
cosmopolitan, vibrant and interesting city.
Benefit 6 The city can be made more legible and easier for people to use after dark,
thus encouraging more people to use the city at night and also to walk or
use public transport at night thus reducing car reliance.
Benefit 7 Uplift in local property values in the long term due to the factors above.
Benefit 8 Supporting the overall Placemaking Strategies in development of key
programmes such as Tay Street, The Golden route, South Street etc.
Benefit 9 Enabling existing staffing positions over the period to undertake the works
required for implementing the Plan.
Benefit 10 Support local talent in providing platforms for interest, engagement and
opportunities to individuals, businesses and employers through the offers
of the programme. 
Benefit 11 Help to aid in the overall recovery plan of the City following Covid 19 in
not only stimulating artistic and lighting opportunities but in showcasing
an offer in the public realm that can be enjoyed by everyone in a safe
environment and encouraging people to the city centre. 
Benefit 12 Perth is the only City in Scotland looking to offer an enhanced permanent
night-time offer through the Light Action Plan. 
Page 175 of 222

Page 176

24 
More so now than ever as part of the recovery of the city with more UK
based visitors likely than overseas over the coming years the City requires
a number of unique offerings that cannot be realised elsewhere. 
If we are to continue to aspire to be one of the best small cities in Europe
we need, for once, to be at the front of something in our offer and have
something that other places do not. We have with this project something
which offers that USP and something which can help to drive Perth as a
viable destination not just for day visitors but for overnight and longer
stays.
Benefit 13 Through illumination The City of Perth can show itself to a worldwide
audience through social media in acknowledgement of cultural events,
symbolic holidays, awareness campaigns etc. At present about 70 key
events each year are recognised such as VE Day, World Aids Day, Pride,
Diwali, EID, Cancer awareness, Baby Loss Awareness etc. Each event
allows Perth to upload images of illuminated sites and show case not only
our support but increase awareness of Perth as a place and its offering
ultimately with the aim of increasing connections and tourism
Benefit 14 Low running costs with limited impact on revenue. The installation at St.
Matthews for instance costs only £105 for the entire year to run or 29p
per day.
The installation on Perth Bridge saves the authority around £1.8k per year 
Benefit 15 The works carried out to date on the likes of Perth Bridge and St.
Matthews as well as works to St. Pauls help as part of the overall
regeneration of Perth. The lighting serves not only to showcase these
structures in a vibrant yet tasteful way in the evening but enhance the
feeling of the environment around them.   
Benefit 16 The Lighting programme being set up as a Framework has allowed to react
to events which without would not be the case otherwise. The illumination
of a section of North Inch to complete a walking route would not have
been achievable through the Street Lighting budget however the lighting
plan was able to pick this up as the works fell within its remits. Similarly
requests delivered in Pitlochry and Aberfeldy would not have been carried
out without the support of this programme. 
Page 176 of 222

Page 177

25 
Risks of discontinuing programme 
This City of Light Action Plan was developed and approved in 2017 to aid with the deliverables within
the Perth City Plan (2015-2035) By concluding the programme in advance this puts parts of the
delivery of the plan at risk.
Further the Lighting budget along with other Placemaking schemes was used towards the overall
matched funding proposals for the Community Links Plus proposals and with the level of
commitment still under review from Sustrans the element from the Lighting programme may still
need to be required to deliver that scheme and indeed any future ones.
While not exhaustive a number of risks have been identified should there be a view to potentially
discontinuing the programme which shown below:
Risk  Risk organisationally and overall by terminating programme in advance of
conclusion.
Risk 1 The City of Light project has not been imagined to date, the illumination of
a number of keys sites in town does not constitute sufficient exposure or
interest in or away from the region in increasing the night-time economy,
this can only be delivered when a large amount of the plan has been
completed in making Perth a destination worthy in terms of visiting for the
installations.
Risk 2 While work to date has had a positive effect and enhanced the City Centre,
without several key sites being delivered and crucially those of the overall 
Placemaking Programme, as well as the likes of the night time illuminated
trail through the Vennels, City Centre lighting and/or the ‘Seasonal offer
lighting’ we will not be able to tap into the underused expenditure from
both residents and non-residents for the evening economy.
Risk 3 The lighting budget forms part of the overall City Placemaking strategies
such as the St. Pauls renovation, without the realisation of the funding
from this budget the lighting for this scheme would not have been realised
and further pressures to that budget would have been encountered. 
Similarly, The Light action plans plays a role in other key projects being
realised such as Tay Street, The Vennels, The Golden Route and South
Street. 
Risk 4 Risk to other programmes or departments such as property/streetlighting
for funding the delivery of lighting as part of works such as works to Perth
Museum, Perth Theatre, Lower City Mills and new Perth Museum
Surrounds. 
The enhanced Lighting to Peth Bridge in 2019 was never under
consideration from Property or Street Lighting due to their budget
constraints. The Lighting at the time was in disrepair, well past lifespan
and had to be switched off for safety reasons. Had the City of Light Plan
never been realised this icon of Perth architecture would be sitting left in
the dark causing issues of H&S to users and the environment.   
Page 177 of 222

Page 178

26 
Risk 5 Risk to ongoing and future matched funding programmes such as Dunkeld
Road corridor/CLP Bids.
Risk 6 Fundamentally the Framework was committed by PKC to the value of
£4.5m. As such this should be contractually honoured notwithstanding the
residual risk of litigation.
The Framework was not set up as a vehicle to renege on the contract in
the future but to allow flexibility to PKC in the knowledge that it would be
impossible to put the various different projects of the Light Action Plan
into specific timelines due to the co-dependency’s of other departments
and viability of assets due to other works as well as differing time required
to acquire leaseholds/legal agreements with a large amount of different
bodies.
In addition, it was set up as a framework to allow increased spend in the
future on the basis of other funding being achieved not to see it
decreased.
Risk 7 Reputational risk to PKC for reneging on an ongoing contract.
Risk 8 The contractors have entered into the contract in good faith and have lost
the ability to tender for other works due to commitment to honouring
works via the Framework. Again, residual risk of litigation due to loss of
earnings.
Risk 9 Risk not only to the employees of the three contractors directly involved
within the Framework but also to their businesses and partners as a whole
as a result of loss of revenue/income from contract. Again, residual risk of
litigation due to loss of income.
Risk 10 PKC officer’s role was agreed and financed on approval of the Project.  
Risk 11 Failure to develop and progress deliverables both within the Perth City
Plan (2015-2035) and City of Light Action Plan.
Risk 12 Reduces the Councils ability to meet National and Local Single Outcome
Agreement. 
Page 178 of 222

Page 179

27 
Projects completed or in construction phase 
Perth Bridge – Completed July 2019 
Works were completed 10 days ahead of schedule on 21st August 2019 despite some adverse
conditions throughout the installation.
The works involved the removal of the architectural lighting on the north facing elevation of the
bridge, which had been in place for almost 30 years, was well beyond its intended lifecycle and in a
state of repair that required it to be replaced. 
They have been replaced by more energy efficient LED lighting which greatly reduces the previous
power consumption and running costs of the Bridge. The light fixtures are full RGBW control which
allows the council to acknowledge when appropriate awareness campaigns and events in aiding with
the animation of the city centre which has proved very popular and well received by residents and
visitors.     
Page 179 of 222

Page 180

28
Norie Miller/Rodney Parks – Completed Nov 2019    
The first location for lighting installations - Norie Miller and Rodney Gardens were both seen as an
enhancement of the park and overall area but also to allow a location for long term on site testing
for the suitability & capability of products that were/and are to due be used throughout the full City
of Light Action Plan project.
Page 180 of 222

Page 181

29 
Meander Light Art Installation – Completed Nov 2019     
Commissioned in 2019 after an open call in 2018 Meander is a projection installation which
celebrates the River Tay by environmental artist Elizabeth Ogilvie. 
The hour+ long film uses imagery from the Tay and bringing the river back into the heart of the city. 
The three projectors used for the installation have been used for ‘two-week takeovers’ of the
permanent installation to show visual works by Perthshire Primary schools as well as promoting
events in the city and recognising key dates/events such as Thanks to Key Workers, Pride, VE Day &
the St. Johnstone Cup wins. 
Owners signature on legal docs was finally attained in April 2020 for installation of sculptural
element however the pandemic meant this could not be installed.
Further the Owner has now applied for new entrances which will mean a slight change to deign will
be required prior to install 
Page 181 of 222

Page 182

30
St Matthew’s Church – Completed June 2019      
Seen as one of the key architectural building within Perth, St. Matthews Church was seen as integral
to the development of the City’s Lighting Strategy – Agreements with church as to functioning,
control and ownership of the equipment were drawn up in legal documents where the asset would
be owned & maintained by PKC.
Page 182 of 222

Page 183

31
Aberfeldy Square – Completed March 2020      
Works within Aberfeldy Square were completed in February 2020 however as the lights were
commissioned in March these were only checked in September due to travel restrictions and lighter
summer months. 
The removal of the tree lighting (due to the smaller trees installed by Greenspace) mean that some
new lighting for the square needs to be considered to increase lighting levels in some areas of the
square – works should still fall within original cost estimates. 
Aberfeldy & Pitlochry War Memorials - Following years of requests for illumination of these war
memorials specifically around Remembrance these two monuments were installed and activated
late 2020
Page 183 of 222

Page 184

32
St Pauls Church – Completed June 2021       
As well as ability to hold events St. Pauls Sq. consists of a main projected wall which has been
utilised to promote awareness but also showcase art – This can be by basic photographic imagery or
by animation. The redevelopment and lighting have reinvigorated this area.
Page 184 of 222

Page 185

33 
North inch Lighting – Completed Nov 2020       
Given events of 2020 and the increased use of parks and open spaces, as well as requests from
various groups and users over the past couple of years a section of lighting was installed that was
‘missing’ to finalise the connection from the North Inch to Tay Street and to help users to feel safer
within the park throughout the darker nights of the year. 
The section of lighting installed is from the area of footpath within North Inch from the junction of
Rose terrace running adjacent to Atholl Street through to the North Inch connection under
Smeaton’s Bridge covering a length of approx. 380m in total. 
As well as functional street lighting the works also see various memorials and sculptures within the
section illuminated. 
Page 185 of 222

Page 186

34
Perth Sherriff Courthouse – Completed Apr 2022     
One of Perth’s landmark buildings has been illuminated for the first time in decades this year.
Perth Sheriff Court will join other lighting projects such as Perth Bridge and St Matthew’s Church in
being lit up at night to highlight the stunning architecture along Tay Street. It is situated on one of
the major routes through Perth overlooking the River Tay to the East and is a significant piece of
early 19th century civic architecture. It is illuminated as part of the City of Light Action plan in
partnership with Scottish Courts.
The Action Plan is developing and significantly enhancing feature and decorative lighting in Perth
replacing the large, outdated lamps with modern LED fixtures offers Improved Environmental
Performance with a 60% to 70% improvement in energy efficiency, longer lifespan of products and
greater reliability.
Page 186 of 222

Page 187

35
Cutlog Vennel – Nathan Coley – Completed Oct 2022      £105k
Installation of light art text installation by renowned and Tuner Prize nominated artist Nathan Coley
– ‘World Without – World Within’ is situated on two aspects of Perth Theatre and one on the
tenement close to entrance of the High Street. 
Taking the form of one of Coley’s signature illuminated text sculptures, the artwork is installed in
Cutlog Vennel - a city centre pedestrian laneway between High Street and Mill Street, Perth,
Scotland.
Referencing the title of a short publication by the pioneering urban planner Sir Patrick Geddes (who
attended Perth Academy), the phrase echoes Geddes aim ‘to see life whole’ and to achieve a better
understanding of human beings in the natural, built, and social environment.
The artwork evokes questions of private and public life, internal and external thoughts, and notions
of work and play
Page 187 of 222

Page 188

36
Perth Concert Hall – Completed Dec 2022      
Dating back over 18 years the existing lighting around the exterior of Perth Concert hall had started
to fail as its lifespan has exceed. Also made from older SON lighting technology the lighting has been
superseded by newer more efficient, cheaper to run and sustainable LED products – Installed late
Nov 22 the new lighting has full colour control to enable to respond to lighting requests and tie in
with events externally and internally.
Page 188 of 222

Page 189

37 
Perth Library  – Completed Dec 2022     
Works to enhance the area around the library, car parks etc with modern led fittings as well as on
building lighting are being phased with the first phase installed and completed Dec 22 
Page 189 of 222

Page 190

38
Winter Animals – Completed Nov 2022       
Devised to enhance and increase the period of Winter Festival from November to end January the
Perth Winter Animal Trail was introduced last year and proved highly popular through both
engagement online and note of frequent photography of users especially around Perth Concert Hall
and Theatre. The bespoke designs which play on one of Perthshire biggest assets in Wildlife create a
new modern take on festive lighting.
The plan would be to introduce more installations in future years to create a trail surrounding the
city centre businesses to increase footfall to locations/provide a differing offer to the likes of
Edinburgh and Glasgow.  There has been interest in rental of pieces out with the Perth Winter
Festival period from operators and use at other events owing to the ‘non- Christmas’ theme allows
lots of possibilities of use. The two pieces commissioned for 23/24 are Osprey and Red Squirrel.
Page 190 of 222

Page 191

39
Fergusson Gallery – Completed Feb 2023     
All works have now been complete to both the on building and off building lighting and
commissioning of install due to be undertaken later this month. Lighting/projections will see
this building animated and able to reflect its new use as the photographic collection of
Culture PKC
Page 191 of 222

Page 192

40 
South Inch – Due to be completed Late May 2023       
Designed to make the park more accessible, increase safety following concerns raised, allow the likes
of running groups new routes at dark etc, and hopefully encourage more footfall to/from town from
the likes of Craigie by foot/bike the scheme has installed new sections of lighting along the diagonal
path network.  
It has taken a considerable amount of time to get approval from Flooding/Reservoir Engineers about
bringing new power to site and ducting routes for the lighting in respect of the embankments etc
with the location used as a flooding plane, however we gained that approval last year through
proposals which will not interfere with any flooding measures. We have also concluded discussions
with stakeholders such as Greenspace and Street Lighting and started installation in February 2023  
Due to the considerable length of ducting (around 2km) and requirement of new power provision
from SSEN as the existing power does not have sufficient end supply works were expected to take
around 8 weeks. While the columns and majority of the cabling have been installed works are
expected to be complete end May 2023 owing to delay in getting SSEN connection for new supply to
site. 
Page 192 of 222

Page 193

41 
Skinnergate – Completed May 2023 
The original string lighting which had been installed for over 7 years (prior to the start of the lighting
plan) and had fallen into disrepair and subsequently was removed Jan 23. 
Owners and Businesses had been written to around a new scheme to look at any objections/level of
support.  Approval following redesign of some fixing location were gained and works started early
May and were completed within a two-week period. Some additional work will be carried out to
enhance the work but falls within original budget.       
Page 193 of 222

Page 194

42 
Guard Vennel – Completed April 2023     
Another commission that has been taken forward from the Lighting Strategy is with artist Elisa
Atereso. Other works/artists had works considered for this wall however following consultation with
Eight Investment (Building owners) it was agreed to take forward Elisa's works.
Elisa is one of the most highly regarded Light Artists within the UK and has works on display in
London, Manchester and York as well as exhibiting internationally.
The work used a casting process (where light is directed through cutting in metals and forms light
shadows) While the work is now installed, and some press has been issued the official launch will be
held back until Autumn to coincide with darker nights returning. 
Page 194 of 222

Page 195

43 
Works Issued with expected completion in 2023/24 
Perth Art Gallery Light Commission & Building - Nov 2023/Feb 2024   
Chila Kumari Singh Burman MBE is a British artist, celebrated for her feminist practice which
examines representation, gender and cultural identity. She works across a wide range of mediums
including lighting, printmaking, drawing, painting, installation and film. 
A significant figure in the Black British Art movement of the 1980s, Burman remains one of the first
British Asian female artists to have a monograph written about her work; Lynda Nead's Chila Kumari
Burman: Beyond Two Cultures (1995). 
In 2018, she received an honorary doctorate from University of the Arts London for her impact and
recognised legacy as an international artist. In 2020 she was invited into the Art Workers' Guild as a
Brother and in 2022, Burman was appointed a Member of the Order of the British Empire (MBE) in
the Queen's Birthday Honours for services to visual art. 
Commissioned to undertake an installation similar to that once shown on the TATE Britain Chila’s
work would be a permanent installation and as well as refocusing Perth Museum and Art Gallery to
Perth Art gallery alone the works form an another very important installation as part of the City of
Light Plan to create permanent outdoor Light Art trail in Perth making it a UK First. 
Installation is expected late 2023/early 2024 
Page 195 of 222

Page 196

44 
Queens Bridge - Oct 2023         
Queens Bridge has been a challenging Lighting project. With Structures not looking to add extra
weight to the bridge and their being too small and elevation (bridge arch) to hit with remote lighting
a number of different modes of illumination were considered 
A basic projection map test in Oct 2022 took a single laser projector which was able to cover around
half the bridge, some imagery is shown below. 
Basic projection mapping delivered results above expectation, installation of works can be carried
out off bridge and at a far reduced cost of on bridge lighting as well as having huge adaptability in
what is being projected (tie into events/promotion etc) 
Page 196 of 222

Page 197

45 
High Street Columns Commission – Nov 2023       
Having spent significant time within the archive departments of AK Bell Library and 
Perth Museum and Art Gallery researching weaving and dyeing companies in Perth the artist Paula
Thomson was inspired by the processes involved in both the creation of textiles and the subsequent
surface decoration. Inspired by the story of Pullars and looking to combine the tradition of dyeing
and weaving with the potentials that modern materials and techniques can have to present them in
a unique and contemporary way. 
Set on a bespoke column in toughened glass or UPVc Panels the illuminated fins would be a modern
take on a tapestry telling the story techniques of Pullars. Branching what once dominated Mill Street
this installation proposed for the High Street highlights it place in Perth’s history and bridges other
stories within the new Perth Museum to open in 2024. 
Paula's Design proposal was the open commissions chosen submission and design proposals are
currently with Engineers who are evaluating requirements around loadings/footings as well as the
bespoke column manufacture, installation is expected late 2023 
Page 197 of 222

Page 198

46 
Perth Theatre – May 2023/Jan 2024       
Page 198 of 222

Page 199

47 
Lower City Mills  2024 (dependent on other building works) 
To coincide with large scale renovation works to Lower City Mills we are looking to enhance the
lighting to the main Lower City Mills building but also of the surrounding area (West Mill
Street/Mercure Hotel and car parks surrounding) this will be with a variety of grazing lighting fixtures
and heritage style lanterns & projection mapping to Mill Street Elevation.  LBC & Planning consents
are required for approval prior to commencement. 
Initial Remote Light Testing ‘washed out’ the
building – compare difference of stone above and
right (remote lighting in red – White on building to
the right) as a result on building graze lighting
(similar to that at St. Pauls is being sought via LBC)
Heritage fixture 2
nd
right
Basic Projection testing (not mapped) above Below
main elevation lighting proposal drawing
Page 199 of 222

Page 200

48 
Winter Animals Year 2
Devised to enhance and increase the period of Winter Festival from November to end January the
Perth Winter Animal Trail was introduced last year and proved highly popular through both
engagement online and note of frequent photography of users especially around Perth Concert Hall
and Theatre. The bespoke designs which play on one of Perthshire biggest assets in Wildlife create a
new modern take on festive lighting.
The two pieces commissioned for 23/24 are Osprey and Red Squirrel. 
Page 200 of 222

Page 201

49 
Design Briefs Still to be issued:  
St. Johns Kirk        
Owing to works currently ongoing with Perth Museum design development of lighting on/around
the Kirk was paused to take account of the ongoing disruption.  However as the project is now
coming to close and the lighting (as with the Concert Hall) is now out of date and failing and as a
result robust modern LED lighting is now being in place around Perth Museum we would look to
progress with these works in 2024. 
Historic lighting
pictures do not
reflect current
lighting levels –
Most fixtures are
now outdated,
using more energy
than required and
not sustainable  
Page 201 of 222

Page 202

50 
City Vennels (Vennels excluding Cutlog, Guard & Burt’s Close) – Images For illustration only 
Page 202 of 222

Page 203

51 
Page 203 of 222

Page 204

52 
City Centre Streets (Excluding work and other briefs issued to date) Images for illustration only 
Page 204 of 222

Page 205

53 
Page 205 of 222

Page 206

54 
Gateways – Images for illustration only 
Page 206 of 222

Page 207

55 
Page 207 of 222

Page 208

56 
Appendix A:  Riverside Lights 2018 Evaluation 
Perth Riverside 
Night Lights 2018
Evaluation 
Page 208 of 222

Page 209

57 
Executive summary 
Perth Riverside Light Nights 2018 was the 2nd year of operation of the event which concluded Perth’s
Winter Festival Programme.
53,518 visitors were recorded as attending the event which ran from Saturday 27th January to
Wednesday 14th February.
The Social Media reach for Perth Light Nights at 14th February 2018 was 2,125,276 across Facebook,
Twitter, Instagram with Light Nights content with 285,876 engagements (13.45%).
Surveys of visitors were conducted with the following key highlights:
 63% of visitors were adults with 37% children.
 72% of visitors were shown to come from Perthshire.
 71% of users would not have come into Perth had Light Nights not been on.
 95% of visitors rated Perth Light nights as Very Good or Excellent.
 48% of visitors said they had dinner in town. 
Page 209 of 222

Page 210

58 
Introduction & Background
Perth Riverside Night Lights completed its 2nd year run as an annual event bringing to an end the
Perth and Kinross Winter Festival. The event was organised and financed by Perth and Kinross
Council’s Economic and Planning Development Units.
The event will took place at Norie Miller Park, within the City of Perth located between Perth Bridge
and Queens Bridge, opposite Tay Street in Perth City Centre. Location Plan as shown in Appendix A.
As with the 2017 event the thematic illumination of Norie Miller Park formed dazzling light displays
and transformed the banks of the River Tay into a magical wonderland. 
The overall event was enhanced with various theme nights throughout providing visitors with a
unforgettable experience.  The themes were supported by live events and performances using the
likes of actors, dancers, musicians and music, acrobats, and street entertainers.
In its inaugural year in 2017 the event was a major success with visitor numbers of 50,947
throughout its duration, far exceeding the original estimations.
The 2018 event brought an increase in visitor numbers of 53,518
The event ran from Saturday 27th January through to Wednesday 14th February, 5-10pm daily. 
An analysis of footfall and dates for the respective themes are as follows:  
Dates Theme Nights Footfall
27th - 28th Jan Burns 2 nights 5852
30th - 31st Jan  Superhero 2 nights 8352
2nd - 3rd Feb Bright Light 2 nights 5199
4th - 5th Feb Wonderland 2 nights 5630
6th - 7th Feb Yellow Brick Road 2 nights 5010
10th - 11th Feb Chinese New Year 2 nights 13411
13th & 14th Feb Valentines 2 nights 4631
Various Music & Light 5 nights  5433  
Total 53518 
On non-event nights the production consisted of lighting supplemented by music played through
the audio system on site.
21CC were appointed as the winning bidder to supply the lighting event production for the event.
21CC were also the lighting event producers for the 2017 event. 
Page 210 of 222

Page 211

59 
Promotion & Reach
The total reach at 14th February 2018 was 2,125,276 across Facebook, Twitter, Instagram with Light
Nights content with 285,876 engagements (13.45%).
Event attendance via Facebook was up 81% from 4,223 in 2017 to 7,658 in 2018. From the
advertising it is shown that 38% of people were from Perth, 27.8% from Dundee, 11.8%
Crieff/Pitlochry/Dunkeld and 8.1% from Aberdeen.
The Riverside Light Nights page on the website had over 33,000 page views. Top traffic sources were
Google (46.6%), Facebook (30.8%), Direct (8.5% including internal PKC server (6.2%).
Top locations for web traffic were Perth (34.4%), London (16.1% - likely to be more than just
London), Dundee (13.2%), Edinburgh (7.1%), Glasgow (5.6%)
A media event held on Friday 26th January between 6-8pm to showcase the site prior to start, local
press and other media sources including key bloggers and social media users.
Surveys conducted of visitors found that the following channels shown in the chart below led to
awareness of the event: 
Page 211 of 222

Page 212

60 
Evaluation of Survey Data
Two surveys were conducted with visitors to Riverside Light Night. The first survey was conducted
with visitors specifically in relation to the ‘Burns Night Weekend’. The second survey as issued in
respect of the event as a whole. Where questions were duplicated the following shows a
combination of the results. Other questions that were not repeated but which were useful in context
of this report are shown to provide as further information. The total number of responses to the
surveys was 704.
A selection of some of the comments received from visitors is shown in Appendix B.
Audience Profile: 
Visitor Geographical Locations 
The above graph shows the percentage of locations of visitors to the event, 26% of users as shown
to have come from outwith Perth & Kinross postcodes. 
Page 212 of 222

Page 213

61 
Breakdown of Audience Attending 
Respondents were asked what was the breakdown of their group was in relation to Adult & Child.
63% of visitors were shown as adults and 37% as children. This equates to 33,705 adults with 19,795
children.
Visitor Audience Profile 
The majority of attendees, 56%, are shown as attending as a family group with 26% attending with a
partner and 14% with friends. 
Page 213 of 222

Page 214

62 
Visitor Audience Profile 
Visitors were asked if they had stayed overnight when attending Light Nights, 15% had indicated that
they had stayed overnight although this is reduced to 6.9% of users who paid stay in Perth.
Visitor Experience
Page 214 of 222

Page 215

63 
Visitors were asked if they would have come into Perth of that evening had Perth Light Nights NOT
been on. 71% or respondents said they would not have come into Perth. 
Visitor Experience 
95% of visitors rated Perth Light nights as Very Good or Excellent.
Page 215 of 222

Page 216

64 
Visitor Experience 
48% of respondents listed going for dinner which was an increase from 33% the previous year. 4% for lunch is
identical to 2017. 18% listed shopping which was an increase from 8% the previous year. 50% of the
respondents within ‘other’ noted that they did nothing else while being in for Perth Light Nights. 
Page 216 of 222

Page 217

65 
Riverside Light Nights 2018 survey results to Economic Impact:
Of those surveyed 63% are shown as adults in attendance, 37% as children.
53,500 visitors total (subtracting children @37%) = 33,705 adults attending
Overnight Accommodation Visitor Spend
49/704 visitors stayed overnight = 6.9% of those questioned.
Total spend = £4110/49 = £83.88 per person.
6.9% of 33,705 = 2326 total overnight visitors for event.
2326 x £83.88 = £195,104.88 total spend on accommodation.
It is unknown exactly how many visitors stayed over specifically for light nights. A figure of 29% has been
shown overall for all visitors who would have come to Perth irrespective of Light Nights being on however for
the purpose of this report it is recommended to increase this percentage to 60%* and any future assessments
to be re-worded to gain a better evaluation of the results. (*in line with deadweight and displacement figures)
Food & Drink Spend
£0.00   87 visitors = £0.00 
£1.00-£9.99   265 visitors = £516.75 (£1.95 average per visitor)
£10.00 - £24.99  204 visitors = £2990.64  (£14.66 average per visitor)
£25.00 - £49.99  118 visitors = £3034.96 (£25.72 average per visitor)
£50.00 - £99.99  20 visitors = £1500  (£75.00 average per visitor)
£100+   10 visitors = £1000 (£100 average per visitor)
Total   £9042.35/ 704 (total questioned) = £12.84 average per visitor
33,705 adults x £12.84 = £432,772.20 total spend on food & drink. 
Shopping Spend
£0.00   388 visitors = £0.00
£1.00-£9.99   32 visitors = £158.08 (£4.94 average per visitor)
£10.00 - £24.99  126 visitors = £2085.30  (£16.55 average per visitor)
£25.00 - £49.99  118 visitors = £4301.10 (£36.45 average per visitor)
£50.00 - £99.99  35 visitors = £1750 (£50.00 average per visitor)
£100+   5 visitors = £500 (£100 average per visitor)
Total   £8794.48 / 704 (total questioned) = £12.49 average per visitor
33,705 adults x £12.49 = £420,975.45 total spend on shopping
Travel Spend
£0.00   260 visitors = £0.00
£1.00-£9.99   267 visitors = £1054.65 (£3.95 average per visitor)
£10.00 - £24.99  127 visitors = £1739.90 (£13.70 average per visitor)
Page 217 of 222

Page 218

66 
£25.00 - £49.99  40 visitors = £1090 (£27.25 average per visitor)
£50.00 - £99.99  9 visitors = £600 (£50.00 average per visitor)
£100+   1 visitors = £100 (£100 average per visitor)
Total   £4584.55 / 704 (total questioned) = £6.51 average per visitor
33,705 adults x £6.51 = £219,419.55 total spend on travel.
Entertainment Spend
£0.00   477 visitors = £0.00
£1.00-£9.99   78 visitors = £397.02 (£5.09 average per visitor)
£10.00 - £24.99  107 visitors = £1500.14  (£14.02 average per visitor)
£25.00 - £49.99  40 visitors = £1123.60 (£28.09 average per visitor)
£50.00 - £99.99  1 visitor = £50  (£50.00 average per visitor)
£100+   1 visitor = £100  (£100 average per visitor)
Total   £3170.76 / 704 (total questioned) = £4.50 average per visitor
33,705 adults x £4.50 = £151,672.50 total spend on entertainment.
Other Spend (Only asked in one Questionnaire so results adjusted to reflect)
£0.00   164 visitors = £0.00
£1.00-£9.99   43 visitors = £171.14 (£3.98 average per visitor)
£10.00 - £24.99  17 visitors = £250.41  (£14.73 average per visitor)
£25.00 - £49.99  8 visitors = £235.04 (£29.38 average per visitor)
£50.00 - £99.99  3 visitors = £150.00 (£50.00 average per visitor)
£100+   3 visitors = £300.00 (£100 average per visitor)
Total   £1106.59 / 238 (total questioned) = £4.65 average per visitor
33,705 adults x £4.65 = £156,728.25 total spend on other. 
Gross Economic impact based on spending profile £1,576,672.83
The gross visitor expenditure needs to be transformed into net spending i.e., only the spending which is
additional – brought about by the event itself, on top of the expenditure which would have taken place in
Perth anyway. This takes into account reductions in gross expenditure (deadweight and displacement along
with increases through multiplier effects. 
Page 218 of 222

Page 219

67 
Deadweight¹ is defined as the proportion of total outcomes that would have been secured anyway without the
intervention in question. Riverside Nights was a free event, suggesting that at least some of the spending
would have happened anyway in the course of people being in Perth on a ‘normal’ day. However, Riverside
Light Nights would have likely encouraged them to spend longer going around Perth, and encouraged more
expenditure on, for example, food and drink outside normal food shopping than would have been the case, in
particular in relation to the evening economy. Balancing these divergent tendencies suggests a figure of
around 40% - near the average – is appropriate. 
Displacement² is the proportion of total outcomes that are reduced elsewhere in the target area typically
among other businesses – i.e., ‘cannibalising’ of spending elsewhere in Perth, rather than being additional in
the true sense. 
The multiplier³ represents the extent to which £1 of spending generates further economic benefits as it
circulates in the local economy – i.e., the ‘knock-on’ effects whereby, for example, 20% of an employee’s
wages would be spent locally, of which a further 20% of those employees’ wages would be spent locally and so
on... This figure is taken to be 1.25 for a sub-regional multiplier. 
Spend Area % visitors Gross Spend
% reduction
for non
event stays*
Deadweight
Loss
Displacement
Loss
Spend
Reduction Total Net Spend
Accommodation 100% £195,104.88 60% £117,062.93 £78,041.95
Food & Drink £432,772.20
Perthshire Residents 72% £311,595.98 39.5% 21.5% £190,073.55 £121,522.43
Visitors outwith Perthshire 28% £87,246.88 £87,246.88
Shopping £420,975.45
Perthshire Residents 72% £303,102.32 39.5% 21.5% £184,892.42 £118,209.91
Visitors outwith Perthshire 28% £84,868.65 £84,868.65
Travel £219,419.55
Perthshire Residents 72% £157,982.08 39.5% 21.5% £96,369.07 £61,613.01
Visitors outwith Perthshire 28% £44,234.98 £44,234.98
Entertainment £151,672.50
Perthshire Residents 72% £109,204.20 39.5% 21.5% £66,614.56 £42,589.64
Visitors outwith Perthshire 28% £30,577.18 £30,577.18
Other £156,728.25
Perthshire Residents 72% £112,844.34 39.5% 21.5% £68,835.05 £44,009.29
Visitors outwith Perthshire 28% £31,596.42 £31,596.42
Total (s) £1,576,672.83 £723,847.57 £744,510.33
£356,566.05
£387,944.28
£744,510.33
£930,637.91
* A 60% reduction to accommodation spend has been allocated as exact users staying specifically for Light Nights is unknown from data
Perth Riverside Lights 2018
1.25 multiplier for further economic benefit as money circulates local economy
Economic impact of net spend from visitors outwith PKC boundary
Economic impact of net spend from visitors in PKC boundary
Total Economic impact of net spend
Page 219 of 222

Page 220

68 
In summary the economic impact of Riverside Nights is estimated at £744,510.33 when transformed
into net spending. 
£356,566.05 is estimated to have been generated by visitors from non-Perth & Kinross Council post
codes.
£387,944.28 is estimated to have been generated from visitors from within Perth & Kinross post
codes.
Including the 1.25 sub-regional multiplier it is estimated the total net worth of the event to be
£930,637.91.
Reference
¹ BIS OCCASIONAL PAPER NO. 1 Research to improve the assessment of additionality (page 14. Table 3.1:
Deadweight at the sub regional level)
² BIS OCCASIONAL PAPER NO. 1 Research to improve the assessment of additionality (page 18. Table 4.1:
Displacement at the sub regional level)
³ BIS OCCASIONAL PAPER NO. 1 Research to improve the assessment of additionality (page 27. Table 7.1:
Displacement at the sub regional level)
The value of this study is that it presents evidence from many studies and quotes average or typical values for
each estimate and does so at a sub-regional scale. 
Page 220 of 222

Page 221

69 
Visitor Comments:
We Travelled to Perth 3 times to visit the light nights with Friends and family. Love visiting and hope
it continues next year.
Absolutely amazing. My little one loved it so much, as did we! We attended the superhero theme,
and went round it twice we found it so good. Tonight we are attending the yellow brick road, as it's
my little boy’s favourite film & I’m sure we will enjoy this just as much! Thank you so much for
providing this free entertainment, great for the community!
This is a great attraction and brings many visitors into the city centre. The different themes ensure
we will return again.
This was a great experience and so well organised. Great to spend time with family without the usual
expense. More of these events would be welcomed in more cities. Well done to everyone involved in
bringing these nights together. 
I thought it was a fantastic event that is great for kids and adults. It was also nice to go somewhere
that allows dogs as well as we get put off to going to things as we don’t want to leave our dog for to
long on her own  
Brilliant event highly recommend and much better than Enchanted Forest as theme changes and
easier to Access with being in Perth definitely a family fun outing that caters for all ages.
The event was great and as a local resident it is great to see families coming out with Perth to this
and spending money in our area. I recommended this to friends in fife and a good number of them
came through and loved it! The themes are great and a few additional ones to last year which has
been fab! 
Brilliant. Suitable for every age. Every member of staff we came across was happy and helpful. We've
been to two themes so far and both amazing. One was raining v heavily and we honestly didn't
notice as having so much fun. Really well thought of and brilliant for Perth.
I went with my husband to the Alice in Wonderland theme & thoroughly enjoyed. I'm so glad Perth is
finally doing something (anything!) to get people back into the town - I hope visitors to the city will
come back when the light show finishes for other attractions
Had a fantastic night and it's amazing that it is free! Have actually been through twice already and
am so impressed with the differences and the detail each time! Have recommended to so many
people! Only wish Dundee did something similar!
Thank you to everyone who played a part in organising this wonderful event.
The lights were amazing and the staff/performers were great at interacting with the public.
Page 221 of 222

Page 222

70 
We thought it was even better this year than last year. The sheer variety was amazing! Loved in
particular the characters, the face painting, the live band and poets, the food and drink stalls, the
photo booth
Was really good event again. So much more than last year. We tried to do it all but missed a couple.
So there was something for everyone. Loved the photo booth again this year. The live band one
valentines was excellent. It's a good event to get people out of their houses for fresh air and exercise
on the cold winters night. Something similar but less work would be great for the end of the year as it
gets people out and it's for your health and wellbeing. 
Not a sympathy vote but recently having going through a separation, it was so nice to bring my girls
out to this in the evenings as a distraction and to also see their faces light up. My eldest is so keen to
see every theme so we are eager to do so and will definitely make that effort. The joy when they see
the characters and they were completely mesmerised during the wonderland tea party performance.
It's so magical and they even just loved watching the lights "touching the clouds" so every little
detail, no matter how small was actually appealing to them. The yellow brick road encouraged us to
go home and watch the movie together all snuggled up. My youngest had never seen it before and
now I have to put it on all the time so it's nice to introduce classics to them. Thank you for providing
these experiences which allow us to go out at night as our little family and bring home lovely
memories. 
Amazing displays and at a time when usually nothing happens. Definitely cheers up our cold winter
months
Enjoyed visit. Live in Perth city centre so only a walk across the bridge but worthwhile as viewed it
over the river each night. Hope to go along for the Chinese New Year event.
Absolutely fantastic event put on, safely routed, friendly staff and good selection of food/drink stalls
Thought it very well done and happily come back next year even happy pay a donation next time
Absolutely fantastic, next time we would plan an evening to include shopping and a meal.
Perth has pulled out all the stops for this event over winter.. it gets families friends etc. together. It's
a great event and should continue to carry on.
This event was absolutely amazing. The superheroes night will stay in my 7 year olds memories
forever. Mine also , the whole event was such good fun and I hope we can have it again next year .
Thank you
A wonderful event. I love that the theme changes every few nights so there is something for everyone
to enjoy.
A truly fantastic evening. Was so lovely to see & follow the parade this evening before we reached
the riverside walk. Kids were totally mesmerised by it all. Thank you to everyone who had put this on. 
Page 222 of 222