Perth City of Light
Updated Information
May 2023

Page 2

2 
Contents 
Background and Context ......................................................................................................................... 3
Budgetary information ............................................................................................................................ 5
Economic Impact ..................................................................................................................................... 7
Evaluation of Longer Term/permanent works........................................................................................ 9
Reach, engagement, and impact of the Light Action Plan .................................................................... 14
Cost of running lighting ......................................................................................................................... 21
Summary of Benefits of the Project ...................................................................................................... 23
Projects completed or in construction phase ....................................................................................... 27
Works Issued with expected completion in 2023/24 ........................................................................... 43
Design Briefs Still to be issued: ............................................................................................................. 49
Appendix A:  Riverside Lights 2018 Evaluation ..................................................................................... 56

Page 3

3 
Background and Context 
In 2016 Perth and Kinross Council launched an ambitious vision for the City placing culture at the
centre of economic redevelopment activity and making best use of new technologies in lighting to
make visual and visitor experience improvements to the City whilst improving the sustainability of
the lighting infrastructure.   
The plan delivered conceptual designs and outline proposals to provide a consistent series of lighting
initiatives to create unique, vibrant, and attractive evening scene to aid in delivering Perth’s
ambition to become a leading European small city. In addition to delivering an enhanced residential
and visitor experience the proposals are designed to help deliver a more sustainable and connected
Perth. 
Lighting can be crucial to support a transition from functional interventions focused on public safety,
such as temporary wider walkways and bike lanes, into something that is part of a longer-term
recovery plan that supports the night-time economies by unlocking outdoor social spaces for night-
time use and events, improving night-time journeys, etc. 
Lighting can play a pivotal role in revitalising high streets and town centers by enhancing the
attractiveness of the environment, improving perceptions of safety, and ultimately increasing
footfall, dwell time and spend. 
Lighting interventions can quickly create performance space, for community and professional use;
facilitating the human connections that build community resilience. In the long term, they can
develop through considered design into permanent facilities promoting sustained economic and
social benefits in the daytime and after dusk. 
As well as installing feature and architectural lighting which have to date illuminated the likes of
Perth Bridge and St Pauls Square within the lighting plan the use of forms of lighting or lighting
structures to create cultural attractions that aim to stimulate, raise social interaction and activity are
a core delivery requirement. 
To that end the plan was further developed with a view to create a permanent night-time light art
trail making Perth the first UK to city to have this as a cultural attraction. 
Light Festivals and shows are incredibly popular, seen not only by the delivery of our own Norie
Miller Light Nights but the likes of the Enchanted Forest in Pitlochry, Spectra in Aberdeen, Lumiere in
Durham & London, Light Up the Northeast etc where visitor numbers and desire to attend are
always incredibly high and prove hugely popular and increase visitor spend to the area. 
They do however have large production costs and a limited period of time of impact whereas a
permanent trail can be viewed year-round and create a visitor draw; with some installations also
being effective during the day. 
In order to create a permanent light trail, in 2019 the first of a series of proposed light art
installations was installed in Mill Street Perth.  Further proposed commissions were subsequently
delayed due to the pandemic however the second installation was completed in October 2022 with
one further commission is due for installation April 2023 and two further installations programmed
and commissioned for later in 2023.

Page 4

4 
Other works in progress (outwith cultural lighting commissions) include Lower City Mills,
Skinnergate, South Inch, Perth Theatre, Perth Art Gallery (building lighting) & Perth Museum. 
Notes
£500k was vired in 2018 from the original £5m Light Action Plan budget directly to Property to meet
the costs of external lighting of the new Perth Museum and surrounding public realm for that
project. £65k was also vired to Property to support wider works to the regeneration of St. Pauls
Square in 2018 leaving a total budget of £4.435m.
The Officer involved in the programme took over the Creative Exchange project in Feb 2019 to see it
through to its completion and official opening in Feb 2020 and as such was unable to deliver the full
expected level of works within City of Light Action Plan that year.
Similarly, having been re-tasked in April 2020 for the authorities Covid 19 resilience in PPE and
Foodhub Operations and then finally the delivery of the Perth Vaccination Clinic in Bells Sports
Center the officer was effectively, for a period of two years, focused on the operations and only able
to pick up occasional work from the project(s) - As well as being periods on inactively from
contractors’ ability to work due to covid regulations and illness. 
As a result of above works are considered to be around 1.5/2 years behind the initial target for full
completion of the project however the bespoke Framework contract that was developed has
allowed the flexibility of timeline around progressing certain schemes at certain times in order to
deal with the likes of planning consents and establishing agreements with Stakeholders such as
Structures, Greenspace, Street Lighting, 3rd Party organisations, public and private building owners
and as such has enabled space and time naturally within the contract to deal with the unforeseen
events around the Pandemic.

Page 5

5 
Budgetary information 
As shown in the table below, the costs of works for the Lighting Action Plan carried out to 31st
March 2023 and budgets committed to St Paul’s and the Perth Museum project, total £3.253m of
the £5m budget, leaving a total budget for future works of £1.747m. Contracted works to the value
of £0.963m are planned for financial year 23/24 which leaves £0.784m of budget for future planned
works which have at this time not been legally committed. 
The budget reported to the Finance & Resources Committee on 26th April 2023 (Report No. 23/121)
for 22/23 through to 24/25 totalled £2.752m (22/23 £0.875m, 23/24 £1.200m and 24/25 £0.677m).
The final outturn for project costs for 22/23 was £1.005m (unaudited) leaving a total budget for
23/24 and 24/25 of £1.747m. 
Costs of works
to 31.3.2023
Contracted
works/In progress
Works/Costs
not
committed
Totals
Perth Bridge £337,000   £337,000
Queens Bridge  £70,000  £70,000
Norie Miller £347,000   £347,000
St. Matthews £61,000   £61,000
Lower City Mills (city centre) £16,000 £134,000  £150,000
Perth Art Gallery £15,000 £125,000  £140,000
Perth Theatre £5,000 £116,000  £121,000
Perth Concert Hall (city centre) £99,000 £41,000  £140,000
Sherriff Court £42,000   £42,000
St. Pauls £166,000   £166,000
Library  £72,000   £72,000
St Johns Kirk   £120,000 £120,000
Aberfeldy/Pitlochry £72,000 £12,000  £84,000
Gateways (x3)   £450,000 £450,000
Fergusson Gallery (city centre) £155,000   £155,000
Winter Animals (city centre) £115,000 £35,000  £150,000
North Inch (City Centre) £85,000   £85,000
South Inch (city centre) £127,000 £83,000  £210,000
Mill street - Projection Installation £100,000   £100,000
Guard Vennel (vennels) £78,000 £50,000  £128,000
Cutlog Vennel - Nathan Coley (vennels) £120,000   £120,000
Skinnergate (vennels) £35,000 £45,000  £80,000
High Street Columns (city centre) £37,000 £120,000  £157,000
Vennels - Kirk Close/Watergate/Oliphants/Baxter’s etc £50,000 £43,500 £129,000 £222,500
Various City Centre interventions/Design
fees/equipment etc £223,000   £223,000
Wellmeadow/Scone  £14,000   £14,000
High Street Perthshire Women Mural   £8,500  £8,500

Page 6

6 
Maintenance Stock Inventory  £50,000   £50,000
Maintenance of Assets/Lighting   £85,000 £85,000
3rd Party Design Fees/Reports £28,000   £28,000
Project Support Costs £239,000 £80,000  £319,000
SUBTOTAL £2,688,000 £963,000 £784,000 £4,435,000
Perth Museum (Budget transferred to overall project) £500,000   £500,000
St Pauls Sq. (Budget transferred to overall project) £65,000   £65,000
TOTALS £3,253,000 £963,000 £784,000 £5,000,000 
Projects completed or in construction phase are:
Perth Bridge – Completed July 2019        
Norie Miller/Rodney Parks – Completed Nov 2019     
Meander Light Art Installation – Completed Nov 2019     
St Matthew’s Church – Completed June 2019      
Aberfeldy Square – Completed March 2020      
St Pauls Church – Completed June 2021       
North inch Lighting – Completed Nov 2020     
Pitlochry & Aberfeldy War memorials - Completed Oct 2020    
Various City Centre interventions/Design fees/equipment etc   
Vennels - Kirk Close/Watergate/Oliphants/Baxter’s etc     
Perth Sherriff Courthouse – Completed Apr 2022    
Cutlog Vennel – Nathan Coley – Completed Oct 2022      
Perth Concert Hall – Completed Dec 2022     
Perth Library Stage 1 – Completed Dec 2022      
Winter Animals year 1 – Completed Nov 2022       
Fergusson Gallery – Completed Feb 2022      
Guard Vennel – Completed April 2023    
Skinnergate – Completed May 2023    
South Inch – Due to be completed end May 2023 
Works Issued with expected completion in 2023/24
Perth Art Gallery Light Commission & Building - Oct 2023/Feb 2024   
Queens Bridge – Oct 2023        
Aberfeldy Stage 2 - Aug 2023        
High Street Columns Commission - Nov 2023      
Perth Theatre - Aug 2023/Jan 2024
Winter Animals Year 2 – Nov 2023       
Lower City Mills  - 2024 (dependent on other building works)           
Design/Work Briefs not issued:     
Gateway Entries  
St Johns Kirk         
City Vennels (Kirk Close/Watergate/Oliphants/Baxter’s etc)   
Maintenance of Lighting Assets

Page 7

7 
Economic Impact 
As per the Impact Analysis April 2017 a clear approach to lighting is crucial to the performance of the
city’s evening economy, specifically its population-driven industries. 
These industries mainly include consumer services businesses in the areas of retail, entertainment,
hospitality, and tourism.
By encouraging an increased length of visit and by attracting more visitors to the city, the lighting
strategy will contribute to businesses with an opportunity to capture a greater proportion of
expenditure from a larger expenditure pool.
57% of residents surveyed in retail studies indicate they have never visited Perth City Centre after
6pm, this imbalance and underutilised resource is highlighted in additional expenditure of up to circa
£140M that is currently being untapped from resident expenditure.
Lighting is also an area of intervention that provides cost-effective solutions that can ensure a quick
win for authorities and developers looking to make improvements. 
Over the years, more and more local governments have hosted light festivals to support the local
economy, particularly during seasonal slumps and the winter periods, promoting the night-time
economy on a temporary basis. These events are particularly relevant in towns with a developed or
developing tourist industry. Evidence has shown light festivals are a cost-effective mechanism
(relative to the return on investment) to attract significant increase in visitors, particularly out of
town visitors, and increase revenue generated for local businesses.
Riverside Night Lights 
As part of the plan for Perth a lighting event was held at Norie-Miller Park (now known as Perth
Riverside Night Lights) in Perth over 18 nights through to February 14th, 2017, to provide both the
public and visitors with an exciting example of future lighting projects for the city. 
The event has been a major success with visitor numbers of over 51,000, far exceeding the original
estimations. The event was repeated in 2018 over 19 nights with numbers more than 53,000
attending, and just under 60,000 in 2019 over a 16-night run cementing the event in Perth & Kinross
Winter Festival Calendar. 
It returned in 2020 just before the pandemic but running a shortened period of nine nights but still
with numbers in excess of 4000 per night on average.
While the event is delivered through the Winter Festival programme the City of Light Action Plan has
provided permanent lighting infrastructure throughout the park, with a view to making the area
more attractive to visitors year-round and in the evening. In addition, the likes of projectors
purchased thought the project have been able to be used on site to provide more content and
remove revenue pressures for delivery of the event.
In 2018 an evaluation of the event was undertaken looking at the economic Impact from visitors to
the lighting event for the local economy the evaluation of which is included as an appendix at the
end of this report.
In summary the economic impact of Riverside Nights was estimated at £744,510.33 when
transformed into net spending.

Page 8

8 
£356,566.05 was estimated to have been generated by visitors from non-Perth & Kinross Council
post codes.
£387,944.28 was estimated to have been generated from visitors from within Perth & Kinross post
codes.
Including the 1.25 sub-regional multiplier it was estimated the total net worth of the event to be
£930,637.91.
Light Festivals General
Other lighting events around the UK and the world have similar levels of return from evaluation with
their visitors.
Collated figures have demonstrated SPECTRA, Aberdeen’s festival of light, which runs over 4 days
had had over £700,000 impact to the local economy in 2017 with footfall levels increasing year on
year before and after Covid restrictions.
Figures published by Aberdeen City Council demonstrate the value the event adds to the local
economy. The 2017 event had an estimated output £685,872, which includes £403,454 of visitor
spend and additional investment to the city as a result of the festival taking place. Over and above
this figure an additional £314,453 was brought to the local economy through the spend by residents
while attending the festival.
2022 and the post-pandemic restrictions saw Bristol host the return of the Bristol Light Festival and
the highly anticipated return of the event had incredibly positive results.
The findings of an independent financial and visitor analysis report confirmed that the six-day event
of stunning light installations attracted 170,000 visitors to the city and brought an additional spend
of £3.4m into city centre businesses as a direct result of the event.
Durham Lumiere the best known of UK light events is always popular, the 2019 event - the 10th
anniversary - saw the festival pass the one million visitor’s mark. The 2019 exhibits received around
165,000 visitors, and 240,000 visitors went to see Durham Lumiere in 2017.
The evaluation of the 2018 festival demonstrated a significant boost to the economy, with a figure of
£9.5m of economic benefits, according to the event organisers.
Copenhagen Light Festival is Europe’s most popular an annual light festival that transforms the quiet
and cold winter darkness into a unique celebration of light art, lighting design and illumination in the
center of Copenhagen. 
In three weeks of February the festival presents a wide range of light-based works – such as
sculpture, installation, projection mapping, event and illumination created by both established and
upcoming light artists, lighting designers, students and organizations and attracted over 500k visitors
in 2021
What makes the Copenhagen festival different is that it already has a portfolio of permanent light
and light art installations (around 25) which the light event utilises to builds upon to create the
largest European Light event however the permanent installations provider that constant visitor
attraction year on year and outwith the light festival period.

Page 9

9 
Evaluation of Longer Term/permanent works 
An event/festival offers a unique way to engage with visitors and account for numbers.
It is obviously more difficult to gauge the impact of permanent installations in that they are not
within the confines of a specific event space and outwith standard street counters we have no way
to physically measure people’s movements throughout the City Centre (although this is being
investigated by using phone tracking via Bluetooth to show accurate evaluation).
There are also issues now with measuring year ‘v’ year movements due to two years of covid
restrictions skewing figures with people unable to visit places, businesses being closed etc.
We can however look at the impact of longer-term installations carried out elsewhere prior to the
pandemic to see how these drive footfall.
York
York took the decision in 2017 to expand their winter illumination so that they were in operation
from early November to the end of February, extending the traditional Christmas lighting period by
some 10 weeks to drive numbers to the city especially with a view to the evening economy and
darker nights of winter.
This was hailed a resounding success and helped drive visits to the city during the off-peak tourism
season.  Visits to attractions and hotel occupancy levels were all up over the period and the lighting
proved popular with both visitors and residents alike.
From November to December there was a 13.2% increase in rail journeys to the city (19 November –
23 December).  At the same time footfall into the city was up by 1.3% year on year, bucking the
national trend, and coach bookings were up by 8%.
Visits to attractions were 5% higher year on year with those attractions with Christmas events and
exhibitions benefitting the most from these extra visitors.  
York Business Improvement District (BID) and Make It York, the city’s Destination Management 
Sally Greenaway, Head of Visit York, a part of Make It York, said: “The winter months are a vital time
of year for local businesses and the tourism industry, and we’re delighted the winter lighting scheme
has been so popular.  Now that the festive season is behind us it is crucial York continues to attract
visits during the traditionally quieter months and the Winter Lights scheme has added a new
dimension, drawing in shoppers and visitors to enjoy the city lit up by night.”
Copenhagen & Others 
As mentioned previously Copenhagen hosts Europe’s largest Light festival but this was created on
the backdrop of other permanent installed works in the City, in total around 25 light art and public
realm creative lighting initiative. Similar styles of delivery are found in San Francisco and London
City.
https://copenhagenlightfestival.org/permanent-installations/
https://www.sftravel.com/article/installations-see-illuminate-sf-light-art-trail
https://canarywharf.com/the-estate/art-culture/art-on-the-estate/

Page 10

10 
Consideration in Perth
What this demonstrates is an appetite for visitors to not only attend light festivals but when a
sufficient amount of permanent light art/creative light installations are delivered this creates a trail
that is a year-round attraction, persuading desire to visit and to be around the installations in the
evening – in our case the City Centre. 
While some installations are complete (which have had significant coverage through media and
socials individually) and would be considered marketable as ‘Creative Lighting’ schemes in those at
Perth Bridge, St. Pauls & Fergusson Gallery, and ‘Light Art Installations’ in Cutlog vennel and Burts
Close these alone would not be considered enough to market Perth with a ‘permanent light art trial’.
Until we have completed at least the four other installations that are currently underway and due
for completion over the next 10 months in Guard vennel, High Street, the Art Gallery & Skinnergate
it would be ineffectual to start marketing them as a whole offer.
Without around 10-12 pieces we would be selling short the unique offer of what we are now
producing in the formation of the UKs only permanent City Centre Light Art Trail. 
Additional Winter Lighting Offer
On top of the permanent installations and a cultural Light Art Trail the start of the formation of a
‘winter light trail’ around the City Centre with non-permanent pieces over the extended winter
period was installed as part of the Winter festival offer near the end of November last year.
Winter Light trails are incredibly popular where they have been introduced, the likes of London,
York, Bournemouth and indeed Perth Australia all have some sort of winter light trails.
The Christmas Lights Trail in Perth Australia which uses various light displays and projections, some
of which are Christmas themed, are placed in and around the Perth central business district in
Western Australia.
The event first occurred in 2017, in which there were 16 displays located around the city centre. 
In 2019, there were 27 displays, including a new, smaller trail at Claisebrook Cove in East Perth. The
event brought in approximately 333,000 visitors to the City of Perth.
In 2020, there was another new trail, this time in West Perth. There were 30 displays in total
attracting nearly 400,000 people. It was recognised at the Western Australian Tourism Awards in
2021 where the 2020 event received gold in the Major Events and Festivals category. 
Perth Wildlife Light Trail
The ‘Perth Wildlife Light Trail’ in Perth ran from November until late January & provided further
enhancement and offer to the City Centre and again provides a different winter offer to other cities
in Scotland.
The bespoke designs were produced as a modern take on festive lighting and play on one of
Perthshire biggest assets in wildlife consisting of a King Salmon, Stag, Otter, and Unicorn as the first
part of this concept.

Page 11

11 
Owing to their being insufficient time prior to the delivery of the first four pieces last year to inspect
the suitability of the manufactures work and tight time scale for the delivery we did not market the
animals prior to their installation as we did not want risk the works either not landing in time or the
works not being to the standard desired.
However, we can now be assured of the level of work and effect of the pieces as well as monitoring
through socials the way they have been well received by the public and we can move forward to
promotion of the pieces to a wider audience as part of the 23/24 Winter festival.
The plan is to introduce more installations year on year (The two pieces being designed for 23/24 are
Osprey and Red Squirrel) to create a larger winter trail around the city centre businesses to increase
footfall to locations and provide that differing offer to the likes of Edinburgh and Glasgow. 
The actual light animals have already attracted interest in rental of pieces outwith the Perth Winter
Festival period from operators owing to the ‘non- Christmas’ theme which allows lots of possibilities
of use. 
Perth Australia Christmas Trail Map

Page 12

12 
Hospitality, Night-time businesses 
There has been significant impact to the hospitality industry since February 2020 with the pandemic,
the cost-of-living crises and rising energy costs. 
Recent BBC analysis found in December 2022, 320 businesses in the food service industry – including
restaurants, pubs, cafes, and catering firms, were forced to initiate corporate insolvency procedures.
An increase of 41 per cent compared to the same month in 2019.
Across the sector, UK Hospitality figures suggest almost 5000 venues closed permanently last year –
with three quarters of these failing in the last six months of 2022. That equates to a contraction of
around 5 per cent. Around nine out of 10 are independent venues, and the current tight margins and
economic situation means that multi-site operator or medium sized businesses can’t take the sites
over.
Following two years of Covid restrictions, the knock-on impacts of the war in Ukraine have been one
crisis too many for an already beleaguered sector. Major hikes in food prices are just part of the
cost-price inflation for the sector – currently running at 18 per cent, double what it was at the start
of 2022, and forecast to rise to about 20 per cent by April. Energy prices also continue to rise with
many businesses having seen fuel costs double or even triple. 
The current crisis means that businesses would have to take 120 per cent of 2019 revenue just to
stand still. Half of the sector is operating at or below break-even and a third have no reserves to rely
on. Where businesses are not at breaking point, they are struggling to find staff and labour shortages
in the sector are around 9 per cent. Footfall, meanwhile, is down due to pressures on household
budgets – and with one in five people saying they plan to go out less to make ends meet, the outlook
for 2023 is bleak.
While the lighting strategy for Perth is not something that can cure the problem it does go some way
to trying to create an offer in the City Center in the evening which outwith The Concert Hall, Theatre,
Cinema, restaurants, and bars there is little else to try and entice visitors to town out of ‘high street’
trading hours.
Even when the new museum is opened in 2024 it is unlikely to be open in the evening expect on
specific exhibitions launches. It is therefore vital that Perth attempts to find offers that do not exist
elsewhere and the lighting strategy is one of those areas that can provide that. 
Post Pandemic 
ARUP created a paper in September 2020 specifically looking at the importance of light within post
pandemic recovery
Noting that our night-time trends will likely change; perhaps altering our habitual social timings as
businesses increase flexible working practices, or home workers join colleagues later in the evening
to socialise. 
We may need incentivising to leave our homes and spend money after dusk. People will need to
perceive a safe journey into town and feel welcome and secure when they arrive. Then, they will feel
comfortable to dwell and support night-time economies. Lighting is a highly effective tool when
combined with urban policy and benefits diverse stakeholders, but it is often overlooked.

Page 13

13 
Once shops and offices close for the evening, levels of activity in urban centres drop. However, 50%
of modern life takes place after dark. We must rethink the value of urban lighting beyond just a
functional add-on for safety or beautification and recognise it as an opportunity and fundamental
solution to improve town revenues and the quality of life for our citizens.
https://www.arup.com/perspectives/publications/promotional-materials/section/the-role-of-
lighting-in-supporting-town-centre-regeneration-and-economic-recovery

Page 14

14 
Reach, engagement, and impact of the Light Action Plan 
The Light Action Plan has shown to have reach in terms of awareness online in the City of Perth in
being able to show the city illuminated in various ways such as in respect for Remembrance Day,
acknowledgement of cultural events, symbolic holidays which impact on residents, visitors, and
those beyond and allow the City to be part of occasions thereby increasing knowledge of the City
Worldwide.
Press and Television coverage in propelling Perth into the spotlight has been delivered through a
number of the installations. 
Nathan Coley (an artists shortlisted for Turner Prize and recognised as one of the highest profile light
artists) and the installation in Cutlog vennel received national TV and media coverage as well as
being picked up as far away as Canada and US. The work is the artists only permanent ‘public realm’
piece in Scotland and only one of two in the whole of UK. 
Kelsey Montagues Wing mural in Mill Street received international coverage being her first
permanent piece in the UK getting significant traction through social media channels with the artist
having over 150k followers including significant high profile international stars.
The art commission for Perth Art Gallery in 2023/24 will receive significant media coverage UK wide
with Chila Burnham being made an MBE and now one of the UK highest regarded artists since
original commission was started. With similar style works having been displayed at The TATE, this
will be her only permanent outdoor works worldwide.  Similarly, Elisa Arteso who is undertaking the
Guard Vennel Installation has been included in the world’s top 40 Women Light Artists so is now of
high prominence.
As well as attracting focus nationally and regionally on installation ‘Meander’, the large projected
work in Mill Street, allows adaption and as such has allowed the authority to utilise the site for the
likes of promotion of The Solheim Cup, to recognise the NHS/Key workers, VE Day 75, Pride events
and The Big Big Art Project which was a two-week takeover every year which allows all PKC primary
schools to display images and animations over that period. 
Other works such as Paula Thompsons glass finial columns installation due 23/24 in the High Street
creates a direct link to one of Perth largest key industries of the past in highlighting Pullars Dye
works, a significant business not only to the past of local residents but internationally known. This
Installation on the High Street will also bridge the cultural quarter of Mill Street to the new Museum
at the former City Hall. 
The illumination of Perth Bridge (Smeaton’s Bridge) since July 2019 and St. Pauls Square since June
2021 have allowed Perth to join a list of world-famous structures and buildings around the World
such as Empire State Building, Sydney opera House, London Eye & Edinburgh Castle in using colour
illumination in marking and acknowledging key dates throughout the year. 
At present we have in excess of 70 requests from charities, organisations, and PKC Equalities Team
for requests for the lights to be set to a specific colour(s) and dedicated in tribute to an
achievement, remembrance or acknowledgement of an official day or recognition. 
These include marking and showing support Ukraine and those affected, Remembrance, Baby Loss
Awareness week, Cancer Awareness days, Perthshire Pride, Mental Health Days, Diwali, National
Holidays, Polish Independence, St. Andrews Day and Burns night to name but a few.

Page 15

15 
Social media outreach from PKC for illumination of the likes of Perth Bridge, St. Pauls, St Mathews
etc have one of our highest responses and engagements for posts being in their tens of thousands
with large volumes of shares, comments, and interactions. 
Similarly posts shared on Perth City and Towns and PKC Place development also have high activity
and by linking to intranational dates of illumination of structures are shared worldwide and only help
to raise the profile of the City. 
Posts are tagged and re-shared by the charities, organisations and partners forwarding them onto
audiences who may have little awareness of Perth and thus creating a bridge to this gap.

Page 16

16 
Cutlog Vennel – Nathan Coley Installtion, Selction of Media and Social Impacts

Page 17

17 
Mill Street – Meander – Social Media and local community engagement

Page 18

18 
Perth Bridge – Examples of Social Media and local community engagement

Page 19

19 
St. Pauls – Examples of use/engagement

Page 20

20 
Example of Facebook Reach for St. Pauls/Bridge Lighting (single posts) 
(Above taken from PKC Place Development Facebook) 
(Above provided by PKC Comms Facebook)

Page 21

21 
Cost of running lighting 
The cost-of-living crises and increases in energy costs throughout 2022 have raised questions on the
cost of running the architectural lighting however the lighting installed is highly cost effective and
runs on a very low kw output.
Taking the example of Perth Bridge (as the largest lighting installation) below gives the current
running costs for information.
Street Lighting have confirmed current costs for energy for lighting runs at 18.6p (per kWh)
The Bridge has 86 LED lanterns on it that run at maximum total power wattage of 50 or 0.05KW
RGBW lights generally generate colours/white from say anything from ¼ to ¾ of the lights on the
fixture at any one time - so they rarely run-on full power consumption however the below costs have
been calculated on the full power wattage to avoid any dubiety.
The lights run on average each year at 5.33 hours a day, operating from sunset to midnight. This
takes in account of a full year where say lights are only on for 2 hours in June but 9 hours in
December. 
The cost of one 50 light watt fixture is calculated below:

Page 22

22 
This equates to costs for the Bridge lighting of either:
 5p per fixture per day or
 £4.30 per day for all 86 fixtures or
 £18.25 per fixture per year or
 £1,569.50 per year for all fixtures
(all above based on maximum wattage)
Essentially the 86 bridge lights are the equivalent of running 2 x 2kw heaters in a house (although
the lighting unit price is cheaper than domestic prices)
Street lighting mentioned in December last year they expect the until price to increase at some point
next year by about 10p a unit so that would increase pricing to 28.6p which would take the daily cost
over £6.55 per day (again however it should be less as we don’t run full power consumption)
As a footnote it should be noted the new LED lighting on the bridge equated to what would be
around a £1800 per annum saving on energy costs from what the previous lighting on the bridge
would cost to run (albeit the lighting was turned off in early 2019 as half the fixtures were not
operational at that point)

Page 23

23 
Summary of Benefits of the Project 
While not exhaustive a number of benefits and risks have been identified and highlighted with
regards moving into the final 1-2 years of the delivery of the programme.
Benefit  Organisational Impact and/or Service Impact and/or Impact on Asset
Condition 
Benefit 1 Help to deliver one of the principal objectives of Perth & Kinross Council to
provide a safe, secure and welcoming environment for its citizens and
visitors.
Benefit 2 Improved retail trade and the night time economy by encouraging citizens
and visitors to remain in the city in the evening. Stimulate exposure and
growth in evening/night-time economy of the city.
Benefit 3 Provide facilities to assist in the Council’s objectives in delivering the
national and local outcomes as part of the Single Outcome Agreement.
Benefit 4 Improved well-being and enhanced quality of life for city residents by
improved safety, reduced crime and vandalism, and increased offerings for
enjoyment.
Benefit 5 Highlights unique qualities of the city; and provides a stimulus for a more
cosmopolitan, vibrant and interesting city.
Benefit 6 The city can be made more legible and easier for people to use after dark,
thus encouraging more people to use the city at night and also to walk or
use public transport at night thus reducing car reliance.
Benefit 7 Uplift in local property values in the long term due to the factors above.
Benefit 8 Supporting the overall Placemaking Strategies in development of key
programmes such as Tay Street, The Golden route, South Street etc.
Benefit 9 Enabling existing staffing positions over the period to undertake the works
required for implementing the Plan.
Benefit 10 Support local talent in providing platforms for interest, engagement and
opportunities to individuals, businesses and employers through the offers
of the programme. 
Benefit 11 Help to aid in the overall recovery plan of the City following Covid 19 in
not only stimulating artistic and lighting opportunities but in showcasing
an offer in the public realm that can be enjoyed by everyone in a safe
environment and encouraging people to the city centre. 
Benefit 12 Perth is the only City in Scotland looking to offer an enhanced permanent
night-time offer through the Light Action Plan.

Page 24

24 
More so now than ever as part of the recovery of the city with more UK
based visitors likely than overseas over the coming years the City requires
a number of unique offerings that cannot be realised elsewhere. 
If we are to continue to aspire to be one of the best small cities in Europe
we need, for once, to be at the front of something in our offer and have
something that other places do not. We have with this project something
which offers that USP and something which can help to drive Perth as a
viable destination not just for day visitors but for overnight and longer
stays.
Benefit 13 Through illumination The City of Perth can show itself to a worldwide
audience through social media in acknowledgement of cultural events,
symbolic holidays, awareness campaigns etc. At present about 70 key
events each year are recognised such as VE Day, World Aids Day, Pride,
Diwali, EID, Cancer awareness, Baby Loss Awareness etc. Each event
allows Perth to upload images of illuminated sites and show case not only
our support but increase awareness of Perth as a place and its offering
ultimately with the aim of increasing connections and tourism
Benefit 14 Low running costs with limited impact on revenue. The installation at St.
Matthews for instance costs only £105 for the entire year to run or 29p
per day.
The installation on Perth Bridge saves the authority around £1.8k per year 
Benefit 15 The works carried out to date on the likes of Perth Bridge and St.
Matthews as well as works to St. Pauls help as part of the overall
regeneration of Perth. The lighting serves not only to showcase these
structures in a vibrant yet tasteful way in the evening but enhance the
feeling of the environment around them.   
Benefit 16 The Lighting programme being set up as a Framework has allowed to react
to events which without would not be the case otherwise. The illumination
of a section of North Inch to complete a walking route would not have
been achievable through the Street Lighting budget however the lighting
plan was able to pick this up as the works fell within its remits. Similarly
requests delivered in Pitlochry and Aberfeldy would not have been carried
out without the support of this programme.

Page 25

25 
Risks of discontinuing programme 
This City of Light Action Plan was developed and approved in 2017 to aid with the deliverables within
the Perth City Plan (2015-2035) By concluding the programme in advance this puts parts of the
delivery of the plan at risk.
Further the Lighting budget along with other Placemaking schemes was used towards the overall
matched funding proposals for the Community Links Plus proposals and with the level of
commitment still under review from Sustrans the element from the Lighting programme may still
need to be required to deliver that scheme and indeed any future ones.
While not exhaustive a number of risks have been identified should there be a view to potentially
discontinuing the programme which shown below:
Risk  Risk organisationally and overall by terminating programme in advance of
conclusion.
Risk 1 The City of Light project has not been imagined to date, the illumination of
a number of keys sites in town does not constitute sufficient exposure or
interest in or away from the region in increasing the night-time economy,
this can only be delivered when a large amount of the plan has been
completed in making Perth a destination worthy in terms of visiting for the
installations.
Risk 2 While work to date has had a positive effect and enhanced the City Centre,
without several key sites being delivered and crucially those of the overall 
Placemaking Programme, as well as the likes of the night time illuminated
trail through the Vennels, City Centre lighting and/or the ‘Seasonal offer
lighting’ we will not be able to tap into the underused expenditure from
both residents and non-residents for the evening economy.
Risk 3 The lighting budget forms part of the overall City Placemaking strategies
such as the St. Pauls renovation, without the realisation of the funding
from this budget the lighting for this scheme would not have been realised
and further pressures to that budget would have been encountered. 
Similarly, The Light action plans plays a role in other key projects being
realised such as Tay Street, The Vennels, The Golden Route and South
Street. 
Risk 4 Risk to other programmes or departments such as property/streetlighting
for funding the delivery of lighting as part of works such as works to Perth
Museum, Perth Theatre, Lower City Mills and new Perth Museum
Surrounds. 
The enhanced Lighting to Peth Bridge in 2019 was never under
consideration from Property or Street Lighting due to their budget
constraints. The Lighting at the time was in disrepair, well past lifespan
and had to be switched off for safety reasons. Had the City of Light Plan
never been realised this icon of Perth architecture would be sitting left in
the dark causing issues of H&S to users and the environment.

Page 26

26 
Risk 5 Risk to ongoing and future matched funding programmes such as Dunkeld
Road corridor/CLP Bids.
Risk 6 Fundamentally the Framework was committed by PKC to the value of
£4.5m. As such this should be contractually honoured notwithstanding the
residual risk of litigation.
The Framework was not set up as a vehicle to renege on the contract in
the future but to allow flexibility to PKC in the knowledge that it would be
impossible to put the various different projects of the Light Action Plan
into specific timelines due to the co-dependency’s of other departments
and viability of assets due to other works as well as differing time required
to acquire leaseholds/legal agreements with a large amount of different
bodies.
In addition, it was set up as a framework to allow increased spend in the
future on the basis of other funding being achieved not to see it
decreased.
Risk 7 Reputational risk to PKC for reneging on an ongoing contract.
Risk 8 The contractors have entered into the contract in good faith and have lost
the ability to tender for other works due to commitment to honouring
works via the Framework. Again, residual risk of litigation due to loss of
earnings.
Risk 9 Risk not only to the employees of the three contractors directly involved
within the Framework but also to their businesses and partners as a whole
as a result of loss of revenue/income from contract. Again, residual risk of
litigation due to loss of income.
Risk 10 PKC officer’s role was agreed and financed on approval of the Project.  
Risk 11 Failure to develop and progress deliverables both within the Perth City
Plan (2015-2035) and City of Light Action Plan.
Risk 12 Reduces the Councils ability to meet National and Local Single Outcome
Agreement.

Page 27

27 
Projects completed or in construction phase 
Perth Bridge – Completed July 2019 
Works were completed 10 days ahead of schedule on 21st August 2019 despite some adverse
conditions throughout the installation.
The works involved the removal of the architectural lighting on the north facing elevation of the
bridge, which had been in place for almost 30 years, was well beyond its intended lifecycle and in a
state of repair that required it to be replaced. 
They have been replaced by more energy efficient LED lighting which greatly reduces the previous
power consumption and running costs of the Bridge. The light fixtures are full RGBW control which
allows the council to acknowledge when appropriate awareness campaigns and events in aiding with
the animation of the city centre which has proved very popular and well received by residents and
visitors.

Page 28

28
Norie Miller/Rodney Parks – Completed Nov 2019    
The first location for lighting installations - Norie Miller and Rodney Gardens were both seen as an
enhancement of the park and overall area but also to allow a location for long term on site testing
for the suitability & capability of products that were/and are to due be used throughout the full City
of Light Action Plan project.

Page 29

29 
Meander Light Art Installation – Completed Nov 2019     
Commissioned in 2019 after an open call in 2018 Meander is a projection installation which
celebrates the River Tay by environmental artist Elizabeth Ogilvie. 
The hour+ long film uses imagery from the Tay and bringing the river back into the heart of the city. 
The three projectors used for the installation have been used for ‘two-week takeovers’ of the
permanent installation to show visual works by Perthshire Primary schools as well as promoting
events in the city and recognising key dates/events such as Thanks to Key Workers, Pride, VE Day &
the St. Johnstone Cup wins. 
Owners signature on legal docs was finally attained in April 2020 for installation of sculptural
element however the pandemic meant this could not be installed.
Further the Owner has now applied for new entrances which will mean a slight change to deign will
be required prior to install

Page 30

30
St Matthew’s Church – Completed June 2019      
Seen as one of the key architectural building within Perth, St. Matthews Church was seen as integral
to the development of the City’s Lighting Strategy – Agreements with church as to functioning,
control and ownership of the equipment were drawn up in legal documents where the asset would
be owned & maintained by PKC.

Page 31

31
Aberfeldy Square – Completed March 2020      
Works within Aberfeldy Square were completed in February 2020 however as the lights were
commissioned in March these were only checked in September due to travel restrictions and lighter
summer months. 
The removal of the tree lighting (due to the smaller trees installed by Greenspace) mean that some
new lighting for the square needs to be considered to increase lighting levels in some areas of the
square – works should still fall within original cost estimates. 
Aberfeldy & Pitlochry War Memorials - Following years of requests for illumination of these war
memorials specifically around Remembrance these two monuments were installed and activated
late 2020

Page 32

32
St Pauls Church – Completed June 2021       
As well as ability to hold events St. Pauls Sq. consists of a main projected wall which has been
utilised to promote awareness but also showcase art – This can be by basic photographic imagery or
by animation. The redevelopment and lighting have reinvigorated this area.

Page 33

33 
North inch Lighting – Completed Nov 2020       
Given events of 2020 and the increased use of parks and open spaces, as well as requests from
various groups and users over the past couple of years a section of lighting was installed that was
‘missing’ to finalise the connection from the North Inch to Tay Street and to help users to feel safer
within the park throughout the darker nights of the year. 
The section of lighting installed is from the area of footpath within North Inch from the junction of
Rose terrace running adjacent to Atholl Street through to the North Inch connection under
Smeaton’s Bridge covering a length of approx. 380m in total. 
As well as functional street lighting the works also see various memorials and sculptures within the
section illuminated.

Page 34

34
Perth Sherriff Courthouse – Completed Apr 2022     
One of Perth’s landmark buildings has been illuminated for the first time in decades this year.
Perth Sheriff Court will join other lighting projects such as Perth Bridge and St Matthew’s Church in
being lit up at night to highlight the stunning architecture along Tay Street. It is situated on one of
the major routes through Perth overlooking the River Tay to the East and is a significant piece of
early 19th century civic architecture. It is illuminated as part of the City of Light Action plan in
partnership with Scottish Courts.
The Action Plan is developing and significantly enhancing feature and decorative lighting in Perth
replacing the large, outdated lamps with modern LED fixtures offers Improved Environmental
Performance with a 60% to 70% improvement in energy efficiency, longer lifespan of products and
greater reliability.

Page 35

35
Cutlog Vennel – Nathan Coley – Completed Oct 2022      £105k
Installation of light art text installation by renowned and Tuner Prize nominated artist Nathan Coley
– ‘World Without – World Within’ is situated on two aspects of Perth Theatre and one on the
tenement close to entrance of the High Street. 
Taking the form of one of Coley’s signature illuminated text sculptures, the artwork is installed in
Cutlog Vennel - a city centre pedestrian laneway between High Street and Mill Street, Perth,
Scotland.
Referencing the title of a short publication by the pioneering urban planner Sir Patrick Geddes (who
attended Perth Academy), the phrase echoes Geddes aim ‘to see life whole’ and to achieve a better
understanding of human beings in the natural, built, and social environment.
The artwork evokes questions of private and public life, internal and external thoughts, and notions
of work and play

Page 36

36
Perth Concert Hall – Completed Dec 2022      
Dating back over 18 years the existing lighting around the exterior of Perth Concert hall had started
to fail as its lifespan has exceed. Also made from older SON lighting technology the lighting has been
superseded by newer more efficient, cheaper to run and sustainable LED products – Installed late
Nov 22 the new lighting has full colour control to enable to respond to lighting requests and tie in
with events externally and internally.

Page 37

37 
Perth Library  – Completed Dec 2022     
Works to enhance the area around the library, car parks etc with modern led fittings as well as on
building lighting are being phased with the first phase installed and completed Dec 22

Page 38

38
Winter Animals – Completed Nov 2022       
Devised to enhance and increase the period of Winter Festival from November to end January the
Perth Winter Animal Trail was introduced last year and proved highly popular through both
engagement online and note of frequent photography of users especially around Perth Concert Hall
and Theatre. The bespoke designs which play on one of Perthshire biggest assets in Wildlife create a
new modern take on festive lighting.
The plan would be to introduce more installations in future years to create a trail surrounding the
city centre businesses to increase footfall to locations/provide a differing offer to the likes of
Edinburgh and Glasgow.  There has been interest in rental of pieces out with the Perth Winter
Festival period from operators and use at other events owing to the ‘non- Christmas’ theme allows
lots of possibilities of use. The two pieces commissioned for 23/24 are Osprey and Red Squirrel.

Page 39

39
Fergusson Gallery – Completed Feb 2023     
All works have now been complete to both the on building and off building lighting and
commissioning of install due to be undertaken later this month. Lighting/projections will see
this building animated and able to reflect its new use as the photographic collection of
Culture PKC

Page 40

40 
South Inch – Due to be completed Late May 2023       
Designed to make the park more accessible, increase safety following concerns raised, allow the likes
of running groups new routes at dark etc, and hopefully encourage more footfall to/from town from
the likes of Craigie by foot/bike the scheme has installed new sections of lighting along the diagonal
path network.  
It has taken a considerable amount of time to get approval from Flooding/Reservoir Engineers about
bringing new power to site and ducting routes for the lighting in respect of the embankments etc
with the location used as a flooding plane, however we gained that approval last year through
proposals which will not interfere with any flooding measures. We have also concluded discussions
with stakeholders such as Greenspace and Street Lighting and started installation in February 2023  
Due to the considerable length of ducting (around 2km) and requirement of new power provision
from SSEN as the existing power does not have sufficient end supply works were expected to take
around 8 weeks. While the columns and majority of the cabling have been installed works are
expected to be complete end May 2023 owing to delay in getting SSEN connection for new supply to
site.

Page 41

41 
Skinnergate – Completed May 2023 
The original string lighting which had been installed for over 7 years (prior to the start of the lighting
plan) and had fallen into disrepair and subsequently was removed Jan 23. 
Owners and Businesses had been written to around a new scheme to look at any objections/level of
support.  Approval following redesign of some fixing location were gained and works started early
May and were completed within a two-week period. Some additional work will be carried out to
enhance the work but falls within original budget.

Page 42

42 
Guard Vennel – Completed April 2023     
Another commission that has been taken forward from the Lighting Strategy is with artist Elisa
Atereso. Other works/artists had works considered for this wall however following consultation with
Eight Investment (Building owners) it was agreed to take forward Elisa's works.
Elisa is one of the most highly regarded Light Artists within the UK and has works on display in
London, Manchester and York as well as exhibiting internationally.
The work used a casting process (where light is directed through cutting in metals and forms light
shadows) While the work is now installed, and some press has been issued the official launch will be
held back until Autumn to coincide with darker nights returning.

Page 43

43 
Works Issued with expected completion in 2023/24 
Perth Art Gallery Light Commission & Building - Nov 2023/Feb 2024   
Chila Kumari Singh Burman MBE is a British artist, celebrated for her feminist practice which
examines representation, gender and cultural identity. She works across a wide range of mediums
including lighting, printmaking, drawing, painting, installation and film. 
A significant figure in the Black British Art movement of the 1980s, Burman remains one of the first
British Asian female artists to have a monograph written about her work; Lynda Nead's Chila Kumari
Burman: Beyond Two Cultures (1995). 
In 2018, she received an honorary doctorate from University of the Arts London for her impact and
recognised legacy as an international artist. In 2020 she was invited into the Art Workers' Guild as a
Brother and in 2022, Burman was appointed a Member of the Order of the British Empire (MBE) in
the Queen's Birthday Honours for services to visual art. 
Commissioned to undertake an installation similar to that once shown on the TATE Britain Chila’s
work would be a permanent installation and as well as refocusing Perth Museum and Art Gallery to
Perth Art gallery alone the works form an another very important installation as part of the City of
Light Plan to create permanent outdoor Light Art trail in Perth making it a UK First. 
Installation is expected late 2023/early 2024

Page 44

44 
Queens Bridge - Oct 2023         
Queens Bridge has been a challenging Lighting project. With Structures not looking to add extra
weight to the bridge and their being too small and elevation (bridge arch) to hit with remote lighting
a number of different modes of illumination were considered 
A basic projection map test in Oct 2022 took a single laser projector which was able to cover around
half the bridge, some imagery is shown below. 
Basic projection mapping delivered results above expectation, installation of works can be carried
out off bridge and at a far reduced cost of on bridge lighting as well as having huge adaptability in
what is being projected (tie into events/promotion etc)

Page 45

45 
High Street Columns Commission – Nov 2023       
Having spent significant time within the archive departments of AK Bell Library and 
Perth Museum and Art Gallery researching weaving and dyeing companies in Perth the artist Paula
Thomson was inspired by the processes involved in both the creation of textiles and the subsequent
surface decoration. Inspired by the story of Pullars and looking to combine the tradition of dyeing
and weaving with the potentials that modern materials and techniques can have to present them in
a unique and contemporary way. 
Set on a bespoke column in toughened glass or UPVc Panels the illuminated fins would be a modern
take on a tapestry telling the story techniques of Pullars. Branching what once dominated Mill Street
this installation proposed for the High Street highlights it place in Perth’s history and bridges other
stories within the new Perth Museum to open in 2024. 
Paula's Design proposal was the open commissions chosen submission and design proposals are
currently with Engineers who are evaluating requirements around loadings/footings as well as the
bespoke column manufacture, installation is expected late 2023

Page 46

46 
Perth Theatre – May 2023/Jan 2024

Page 47

47 
Lower City Mills  2024 (dependent on other building works) 
To coincide with large scale renovation works to Lower City Mills we are looking to enhance the
lighting to the main Lower City Mills building but also of the surrounding area (West Mill
Street/Mercure Hotel and car parks surrounding) this will be with a variety of grazing lighting fixtures
and heritage style lanterns & projection mapping to Mill Street Elevation.  LBC & Planning consents
are required for approval prior to commencement. 
Initial Remote Light Testing ‘washed out’ the
building – compare difference of stone above and
right (remote lighting in red – White on building to
the right) as a result on building graze lighting
(similar to that at St. Pauls is being sought via LBC)
Heritage fixture 2
nd
right
Basic Projection testing (not mapped) above Below
main elevation lighting proposal drawing

Page 48

48 
Winter Animals Year 2
Devised to enhance and increase the period of Winter Festival from November to end January the
Perth Winter Animal Trail was introduced last year and proved highly popular through both
engagement online and note of frequent photography of users especially around Perth Concert Hall
and Theatre. The bespoke designs which play on one of Perthshire biggest assets in Wildlife create a
new modern take on festive lighting.
The two pieces commissioned for 23/24 are Osprey and Red Squirrel.

Page 49

49 
Design Briefs Still to be issued:  
St. Johns Kirk        
Owing to works currently ongoing with Perth Museum design development of lighting on/around
the Kirk was paused to take account of the ongoing disruption.  However as the project is now
coming to close and the lighting (as with the Concert Hall) is now out of date and failing and as a
result robust modern LED lighting is now being in place around Perth Museum we would look to
progress with these works in 2024. 
Historic lighting
pictures do not
reflect current
lighting levels –
Most fixtures are
now outdated,
using more energy
than required and
not sustainable

Page 50

50 
City Vennels (Vennels excluding Cutlog, Guard & Burt’s Close) – Images For illustration only

Page 51

51

Page 52

52 
City Centre Streets (Excluding work and other briefs issued to date) Images for illustration only

Page 53

53

Page 54

54 
Gateways – Images for illustration only

Page 55

55

Page 56

56 
Appendix A:  Riverside Lights 2018 Evaluation 
Perth Riverside 
Night Lights 2018
Evaluation

Page 57

57 
Executive summary 
Perth Riverside Light Nights 2018 was the 2nd year of operation of the event which concluded Perth’s
Winter Festival Programme.
53,518 visitors were recorded as attending the event which ran from Saturday 27th January to
Wednesday 14th February.
The Social Media reach for Perth Light Nights at 14th February 2018 was 2,125,276 across Facebook,
Twitter, Instagram with Light Nights content with 285,876 engagements (13.45%).
Surveys of visitors were conducted with the following key highlights:
 63% of visitors were adults with 37% children.
 72% of visitors were shown to come from Perthshire.
 71% of users would not have come into Perth had Light Nights not been on.
 95% of visitors rated Perth Light nights as Very Good or Excellent.
 48% of visitors said they had dinner in town.

Page 58

58 
Introduction & Background
Perth Riverside Night Lights completed its 2nd year run as an annual event bringing to an end the
Perth and Kinross Winter Festival. The event was organised and financed by Perth and Kinross
Council’s Economic and Planning Development Units.
The event will took place at Norie Miller Park, within the City of Perth located between Perth Bridge
and Queens Bridge, opposite Tay Street in Perth City Centre. Location Plan as shown in Appendix A.
As with the 2017 event the thematic illumination of Norie Miller Park formed dazzling light displays
and transformed the banks of the River Tay into a magical wonderland. 
The overall event was enhanced with various theme nights throughout providing visitors with a
unforgettable experience.  The themes were supported by live events and performances using the
likes of actors, dancers, musicians and music, acrobats, and street entertainers.
In its inaugural year in 2017 the event was a major success with visitor numbers of 50,947
throughout its duration, far exceeding the original estimations.
The 2018 event brought an increase in visitor numbers of 53,518
The event ran from Saturday 27th January through to Wednesday 14th February, 5-10pm daily. 
An analysis of footfall and dates for the respective themes are as follows:  
Dates Theme Nights Footfall
27th - 28th Jan Burns 2 nights 5852
30th - 31st Jan  Superhero 2 nights 8352
2nd - 3rd Feb Bright Light 2 nights 5199
4th - 5th Feb Wonderland 2 nights 5630
6th - 7th Feb Yellow Brick Road 2 nights 5010
10th - 11th Feb Chinese New Year 2 nights 13411
13th & 14th Feb Valentines 2 nights 4631
Various Music & Light 5 nights  5433  
Total 53518 
On non-event nights the production consisted of lighting supplemented by music played through
the audio system on site.
21CC were appointed as the winning bidder to supply the lighting event production for the event.
21CC were also the lighting event producers for the 2017 event.

Page 59

59 
Promotion & Reach
The total reach at 14th February 2018 was 2,125,276 across Facebook, Twitter, Instagram with Light
Nights content with 285,876 engagements (13.45%).
Event attendance via Facebook was up 81% from 4,223 in 2017 to 7,658 in 2018. From the
advertising it is shown that 38% of people were from Perth, 27.8% from Dundee, 11.8%
Crieff/Pitlochry/Dunkeld and 8.1% from Aberdeen.
The Riverside Light Nights page on the website had over 33,000 page views. Top traffic sources were
Google (46.6%), Facebook (30.8%), Direct (8.5% including internal PKC server (6.2%).
Top locations for web traffic were Perth (34.4%), London (16.1% - likely to be more than just
London), Dundee (13.2%), Edinburgh (7.1%), Glasgow (5.6%)
A media event held on Friday 26th January between 6-8pm to showcase the site prior to start, local
press and other media sources including key bloggers and social media users.
Surveys conducted of visitors found that the following channels shown in the chart below led to
awareness of the event:

Page 60

60 
Evaluation of Survey Data
Two surveys were conducted with visitors to Riverside Light Night. The first survey was conducted
with visitors specifically in relation to the ‘Burns Night Weekend’. The second survey as issued in
respect of the event as a whole. Where questions were duplicated the following shows a
combination of the results. Other questions that were not repeated but which were useful in context
of this report are shown to provide as further information. The total number of responses to the
surveys was 704.
A selection of some of the comments received from visitors is shown in Appendix B.
Audience Profile: 
Visitor Geographical Locations 
The above graph shows the percentage of locations of visitors to the event, 26% of users as shown
to have come from outwith Perth & Kinross postcodes.

Page 61

61 
Breakdown of Audience Attending 
Respondents were asked what was the breakdown of their group was in relation to Adult & Child.
63% of visitors were shown as adults and 37% as children. This equates to 33,705 adults with 19,795
children.
Visitor Audience Profile 
The majority of attendees, 56%, are shown as attending as a family group with 26% attending with a
partner and 14% with friends.

Page 62

62 
Visitor Audience Profile 
Visitors were asked if they had stayed overnight when attending Light Nights, 15% had indicated that
they had stayed overnight although this is reduced to 6.9% of users who paid stay in Perth.
Visitor Experience

Page 63

63 
Visitors were asked if they would have come into Perth of that evening had Perth Light Nights NOT
been on. 71% or respondents said they would not have come into Perth. 
Visitor Experience 
95% of visitors rated Perth Light nights as Very Good or Excellent.

Page 64

64 
Visitor Experience 
48% of respondents listed going for dinner which was an increase from 33% the previous year. 4% for lunch is
identical to 2017. 18% listed shopping which was an increase from 8% the previous year. 50% of the
respondents within ‘other’ noted that they did nothing else while being in for Perth Light Nights.

Page 65

65 
Riverside Light Nights 2018 survey results to Economic Impact:
Of those surveyed 63% are shown as adults in attendance, 37% as children.
53,500 visitors total (subtracting children @37%) = 33,705 adults attending
Overnight Accommodation Visitor Spend
49/704 visitors stayed overnight = 6.9% of those questioned.
Total spend = £4110/49 = £83.88 per person.
6.9% of 33,705 = 2326 total overnight visitors for event.
2326 x £83.88 = £195,104.88 total spend on accommodation.
It is unknown exactly how many visitors stayed over specifically for light nights. A figure of 29% has been
shown overall for all visitors who would have come to Perth irrespective of Light Nights being on however for
the purpose of this report it is recommended to increase this percentage to 60%* and any future assessments
to be re-worded to gain a better evaluation of the results. (*in line with deadweight and displacement figures)
Food & Drink Spend
£0.00   87 visitors = £0.00 
£1.00-£9.99   265 visitors = £516.75 (£1.95 average per visitor)
£10.00 - £24.99  204 visitors = £2990.64  (£14.66 average per visitor)
£25.00 - £49.99  118 visitors = £3034.96 (£25.72 average per visitor)
£50.00 - £99.99  20 visitors = £1500  (£75.00 average per visitor)
£100+   10 visitors = £1000 (£100 average per visitor)
Total   £9042.35/ 704 (total questioned) = £12.84 average per visitor
33,705 adults x £12.84 = £432,772.20 total spend on food & drink. 
Shopping Spend
£0.00   388 visitors = £0.00
£1.00-£9.99   32 visitors = £158.08 (£4.94 average per visitor)
£10.00 - £24.99  126 visitors = £2085.30  (£16.55 average per visitor)
£25.00 - £49.99  118 visitors = £4301.10 (£36.45 average per visitor)
£50.00 - £99.99  35 visitors = £1750 (£50.00 average per visitor)
£100+   5 visitors = £500 (£100 average per visitor)
Total   £8794.48 / 704 (total questioned) = £12.49 average per visitor
33,705 adults x £12.49 = £420,975.45 total spend on shopping
Travel Spend
£0.00   260 visitors = £0.00
£1.00-£9.99   267 visitors = £1054.65 (£3.95 average per visitor)
£10.00 - £24.99  127 visitors = £1739.90 (£13.70 average per visitor)

Page 66

66 
£25.00 - £49.99  40 visitors = £1090 (£27.25 average per visitor)
£50.00 - £99.99  9 visitors = £600 (£50.00 average per visitor)
£100+   1 visitors = £100 (£100 average per visitor)
Total   £4584.55 / 704 (total questioned) = £6.51 average per visitor
33,705 adults x £6.51 = £219,419.55 total spend on travel.
Entertainment Spend
£0.00   477 visitors = £0.00
£1.00-£9.99   78 visitors = £397.02 (£5.09 average per visitor)
£10.00 - £24.99  107 visitors = £1500.14  (£14.02 average per visitor)
£25.00 - £49.99  40 visitors = £1123.60 (£28.09 average per visitor)
£50.00 - £99.99  1 visitor = £50  (£50.00 average per visitor)
£100+   1 visitor = £100  (£100 average per visitor)
Total   £3170.76 / 704 (total questioned) = £4.50 average per visitor
33,705 adults x £4.50 = £151,672.50 total spend on entertainment.
Other Spend (Only asked in one Questionnaire so results adjusted to reflect)
£0.00   164 visitors = £0.00
£1.00-£9.99   43 visitors = £171.14 (£3.98 average per visitor)
£10.00 - £24.99  17 visitors = £250.41  (£14.73 average per visitor)
£25.00 - £49.99  8 visitors = £235.04 (£29.38 average per visitor)
£50.00 - £99.99  3 visitors = £150.00 (£50.00 average per visitor)
£100+   3 visitors = £300.00 (£100 average per visitor)
Total   £1106.59 / 238 (total questioned) = £4.65 average per visitor
33,705 adults x £4.65 = £156,728.25 total spend on other. 
Gross Economic impact based on spending profile £1,576,672.83
The gross visitor expenditure needs to be transformed into net spending i.e., only the spending which is
additional – brought about by the event itself, on top of the expenditure which would have taken place in
Perth anyway. This takes into account reductions in gross expenditure (deadweight and displacement along
with increases through multiplier effects.

Page 67

67 
Deadweight¹ is defined as the proportion of total outcomes that would have been secured anyway without the
intervention in question. Riverside Nights was a free event, suggesting that at least some of the spending
would have happened anyway in the course of people being in Perth on a ‘normal’ day. However, Riverside
Light Nights would have likely encouraged them to spend longer going around Perth, and encouraged more
expenditure on, for example, food and drink outside normal food shopping than would have been the case, in
particular in relation to the evening economy. Balancing these divergent tendencies suggests a figure of
around 40% - near the average – is appropriate. 
Displacement² is the proportion of total outcomes that are reduced elsewhere in the target area typically
among other businesses – i.e., ‘cannibalising’ of spending elsewhere in Perth, rather than being additional in
the true sense. 
The multiplier³ represents the extent to which £1 of spending generates further economic benefits as it
circulates in the local economy – i.e., the ‘knock-on’ effects whereby, for example, 20% of an employee’s
wages would be spent locally, of which a further 20% of those employees’ wages would be spent locally and so
on... This figure is taken to be 1.25 for a sub-regional multiplier. 
Spend Area % visitors Gross Spend
% reduction
for non
event stays*
Deadweight
Loss
Displacement
Loss
Spend
Reduction Total Net Spend
Accommodation 100% £195,104.88 60% £117,062.93 £78,041.95
Food & Drink £432,772.20
Perthshire Residents 72% £311,595.98 39.5% 21.5% £190,073.55 £121,522.43
Visitors outwith Perthshire 28% £87,246.88 £87,246.88
Shopping £420,975.45
Perthshire Residents 72% £303,102.32 39.5% 21.5% £184,892.42 £118,209.91
Visitors outwith Perthshire 28% £84,868.65 £84,868.65
Travel £219,419.55
Perthshire Residents 72% £157,982.08 39.5% 21.5% £96,369.07 £61,613.01
Visitors outwith Perthshire 28% £44,234.98 £44,234.98
Entertainment £151,672.50
Perthshire Residents 72% £109,204.20 39.5% 21.5% £66,614.56 £42,589.64
Visitors outwith Perthshire 28% £30,577.18 £30,577.18
Other £156,728.25
Perthshire Residents 72% £112,844.34 39.5% 21.5% £68,835.05 £44,009.29
Visitors outwith Perthshire 28% £31,596.42 £31,596.42
Total (s) £1,576,672.83 £723,847.57 £744,510.33
£356,566.05
£387,944.28
£744,510.33
£930,637.91
* A 60% reduction to accommodation spend has been allocated as exact users staying specifically for Light Nights is unknown from data
Perth Riverside Lights 2018
1.25 multiplier for further economic benefit as money circulates local economy
Economic impact of net spend from visitors outwith PKC boundary
Economic impact of net spend from visitors in PKC boundary
Total Economic impact of net spend

Page 68

68 
In summary the economic impact of Riverside Nights is estimated at £744,510.33 when transformed
into net spending. 
£356,566.05 is estimated to have been generated by visitors from non-Perth & Kinross Council post
codes.
£387,944.28 is estimated to have been generated from visitors from within Perth & Kinross post
codes.
Including the 1.25 sub-regional multiplier it is estimated the total net worth of the event to be
£930,637.91.
Reference
¹ BIS OCCASIONAL PAPER NO. 1 Research to improve the assessment of additionality (page 14. Table 3.1:
Deadweight at the sub regional level)
² BIS OCCASIONAL PAPER NO. 1 Research to improve the assessment of additionality (page 18. Table 4.1:
Displacement at the sub regional level)
³ BIS OCCASIONAL PAPER NO. 1 Research to improve the assessment of additionality (page 27. Table 7.1:
Displacement at the sub regional level)
The value of this study is that it presents evidence from many studies and quotes average or typical values for
each estimate and does so at a sub-regional scale.

Page 69

69 
Visitor Comments:
We Travelled to Perth 3 times to visit the light nights with Friends and family. Love visiting and hope
it continues next year.
Absolutely amazing. My little one loved it so much, as did we! We attended the superhero theme,
and went round it twice we found it so good. Tonight we are attending the yellow brick road, as it's
my little boy’s favourite film & I’m sure we will enjoy this just as much! Thank you so much for
providing this free entertainment, great for the community!
This is a great attraction and brings many visitors into the city centre. The different themes ensure
we will return again.
This was a great experience and so well organised. Great to spend time with family without the usual
expense. More of these events would be welcomed in more cities. Well done to everyone involved in
bringing these nights together. 
I thought it was a fantastic event that is great for kids and adults. It was also nice to go somewhere
that allows dogs as well as we get put off to going to things as we don’t want to leave our dog for to
long on her own  
Brilliant event highly recommend and much better than Enchanted Forest as theme changes and
easier to Access with being in Perth definitely a family fun outing that caters for all ages.
The event was great and as a local resident it is great to see families coming out with Perth to this
and spending money in our area. I recommended this to friends in fife and a good number of them
came through and loved it! The themes are great and a few additional ones to last year which has
been fab! 
Brilliant. Suitable for every age. Every member of staff we came across was happy and helpful. We've
been to two themes so far and both amazing. One was raining v heavily and we honestly didn't
notice as having so much fun. Really well thought of and brilliant for Perth.
I went with my husband to the Alice in Wonderland theme & thoroughly enjoyed. I'm so glad Perth is
finally doing something (anything!) to get people back into the town - I hope visitors to the city will
come back when the light show finishes for other attractions
Had a fantastic night and it's amazing that it is free! Have actually been through twice already and
am so impressed with the differences and the detail each time! Have recommended to so many
people! Only wish Dundee did something similar!
Thank you to everyone who played a part in organising this wonderful event.
The lights were amazing and the staff/performers were great at interacting with the public.

Page 70

70 
We thought it was even better this year than last year. The sheer variety was amazing! Loved in
particular the characters, the face painting, the live band and poets, the food and drink stalls, the
photo booth
Was really good event again. So much more than last year. We tried to do it all but missed a couple.
So there was something for everyone. Loved the photo booth again this year. The live band one
valentines was excellent. It's a good event to get people out of their houses for fresh air and exercise
on the cold winters night. Something similar but less work would be great for the end of the year as it
gets people out and it's for your health and wellbeing. 
Not a sympathy vote but recently having going through a separation, it was so nice to bring my girls
out to this in the evenings as a distraction and to also see their faces light up. My eldest is so keen to
see every theme so we are eager to do so and will definitely make that effort. The joy when they see
the characters and they were completely mesmerised during the wonderland tea party performance.
It's so magical and they even just loved watching the lights "touching the clouds" so every little
detail, no matter how small was actually appealing to them. The yellow brick road encouraged us to
go home and watch the movie together all snuggled up. My youngest had never seen it before and
now I have to put it on all the time so it's nice to introduce classics to them. Thank you for providing
these experiences which allow us to go out at night as our little family and bring home lovely
memories. 
Amazing displays and at a time when usually nothing happens. Definitely cheers up our cold winter
months
Enjoyed visit. Live in Perth city centre so only a walk across the bridge but worthwhile as viewed it
over the river each night. Hope to go along for the Chinese New Year event.
Absolutely fantastic event put on, safely routed, friendly staff and good selection of food/drink stalls
Thought it very well done and happily come back next year even happy pay a donation next time
Absolutely fantastic, next time we would plan an evening to include shopping and a meal.
Perth has pulled out all the stops for this event over winter.. it gets families friends etc. together. It's
a great event and should continue to carry on.
This event was absolutely amazing. The superheroes night will stay in my 7 year olds memories
forever. Mine also , the whole event was such good fun and I hope we can have it again next year .
Thank you
A wonderful event. I love that the theme changes every few nights so there is something for everyone
to enjoy.
A truly fantastic evening. Was so lovely to see & follow the parade this evening before we reached
the riverside walk. Kids were totally mesmerised by it all. Thank you to everyone who had put this on.