Page 1

PERTH AND KINROSS COUNCIL 
Environment, infrastructure & Economic Development Committee 
31 May 2023 
DEVELOPER CONTRIBUTIONS AND AFFORDABLE HOUSING
SUPPLEMENTARY GUIDANCE UPDATES 
Report by Head of Planning and Development 
(Report No. 23/170) 
1. PURPOSE
1.1 This report presents proposed updates to the Developer Contributions and
Affordable Housing Supplementary Guidance (2020) (DC&AH SG). 
1.2 The DC&AH SG is required to support Policy 5 (Infrastructure Contributions)
and Policy 20 (Affordable Housing) of the adopted Local Development Plan 2
(2019) (LDP2). The DC&AH SG was approved by the Council’s Strategic
Policy and Resources Committee on 29 January 2020 (Report No. 20/25),
and subsequently approved by Scottish Ministers and adopted as statutory
supplementary guidance. 
1.3 There is a need to update various aspects of the guidance as a monitoring
action; and importantly to revise contribution rates in line with construction
inflation. The updates that are proposed for the DC&AH SG shall remain
within the existing policy framework of the adopted LDP2, and this is
important. New contributions methodologies are therefore not currently being
proposed for inclusion. 
1.4 A copy of the draft guidance document is appended to this report (Appendix
1). 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
i) notes that the paper was discussed and supported by the Affordable
Housing Member Officer Working Group 
ii) approves the recommended updates to the Developer Contributions and
Affordable Housing Supplementary Guidance to initiate a period of public
consultation in June 2023; 
(iii) agrees to a report made back to this Committee on the outcomes of
proposed public consultation, with any further changes to the
Supplementary Guidance, prior to submission to Scottish Ministers for
adoption.

Page 2

3. STRUCTURE OF REPORT
3.1 This report is structured over the following sections: 
• Section 4: Background/ Main Issues 
• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1  The Developer Contributions and Affordable Housing Supplementary
Guidance (2020) (DC&AH SG) includes the legal and policy background for
developer contributions to mitigate the impact of consented new development
and details the Council’s Affordable Housing requirement. It provides
guidance relating to developer contributions for Primary Education, the
Auchterarder A9 Junction Improvements, and Transport Infrastructure around
Perth. 
4.2 Developer contributions can either be physical delivery on site or through a
financial payment. Developer contributions will only be sought where they
meet the tests of Scottish Government Circular 3/2012: Planning Obligations
and Good Neighbour Agreements. In order to support the LDP2 policy
implementation, the Council developed this statutory Supplementary
Guidance which is now being reviewed and is the subject of this report. The
following is an example of how a development proposal may be assessed for
developer contributions and affordable housing. 
Table 1: Example of developer contribution calculation 
Proposed
Development 
Affordable Housing  Primary  
Education*  
Transport
Infrastructure*  
Provision Location
8
dwellinghouses
Minimum 2
units: to be
determined
preferably
onsite but
offsite if
deemed
desirable
Onsite 6 dwellings  6 dwellings at full
rate, 2 dwellings at
reduced rate
Offsite/
Commuted
Sum
8 dwellings  8 dwellings at full
rate  
* Assumes the proposed development is in a location which qualifies for
assessment of these developer contributions. 
Notes: Affordable housing commuted sums are in place only to facilitate the
delivery of affordable housing, in lieu of onsite delivery. Where required, primary
education and/or transport infrastructure contributions would therefore still
apply.

Page 3

4.3 The current version of the DC&AH SG was approved by the Council’s
Strategic Policy and Resources Committee on 29 January 2020 (Report No.
20/25) and it is the view of officers that there is a now a need to update the
guidance, particularly to reflect construction inflation. 
4.4 The project team working on the updates to the DC&AH SG comprises
officers from the Development Plans and Housing Strategy teams within
Planning & Development.   
4.5 The paper was discussed and supported by the Council’s Affordable Housing
Member Officer Working Group. 
4.6 Subject to Committee approval, the intention is to undertake public
consultation prior to submitting the revised guidance to Scottish Ministers for
approval, which is necessary in order to retain ‘statutory’ status.  If approved,
the proposed changes would then take effect legally. 
4.7 In summary, the key modifications to the current adopted Developer
Contributions and Affordable Housing Supplementary Guidance being
proposed are: 
• Presentation of the guidance document in two sections: Developer
Contributions and Affordable Housing
• Relevant updates to the Affordable Housing section, as listed from section
5.6 of this report
• Revised Affordable Housing Commuted Sum rates, Primary Education,
and Transport Infrastructure rates in line with inflation/ project costs
• Provision to allow for the Primary Education and Transport Infrastructure
rates to be revised routinely in line with inflation/ project costs without the
need for further formality
• Updated Appendix 1 of the existing guidance, detailing the list of relevant
primary schools
• Rewording of “Principles of guidance” section of the existing document
relating to Auchterarder A9 Junction Improvements
• Insertion of paragraph in the Transport Infrastructure section of the
guidance, relating to Site MU70 (Perth West) infrastructure costs. 
5. PROPOSALS
5.1 Best value is continuous improvement in the performance of the local
authority’s functions. This review ensures the Developer Contributions and
Affordable Housing Supplementary Guidance (2020) (DC&AH SG) remains
up-to-date and secures best value. 
Affordable Housing 
5.2 The proposed DC&AH SG update was discussed at a meeting of the
Affordable Housing Member Officer Working Group. Feedback relating to the
implementation of the Affordable Housing policy and supplementary guidance,

Page 4

received from officers and Elected Members, has been used to inform the
updates to the DC&AH SG. 
5.3 One area of feedback focused on opportunities to more effectively highlight
the Affordable Housing guidance, when used by officers and customers of the
planning service.  Therefore, the first key update to the DC&AH SG is the
physical presentation of the document. Presently, both sections (Developer
Contributions and Affordable Housing) are contained within the same
document. It is now proposed that the DC&AH SG will be published in two
sections (‘Part 1: Developer Contributions’ and ‘Part 2: Affordable Housing’) in
order to improve the accessibility of the guidance on Affordable Housing and
emphasise the purpose of the guidance in its own right; not as a subsection of
Developer Contributions. 
5.4 The DC&AH SG provides information on the delivery of the affordable housing
obligation as set out in LDP2 Policy 20: Affordable Housing.  With growing
focus on how to deliver a wider range of affordable homes as directed by the
recently approved Local Housing Strategy 2022-27 (LHS), a review of the
guidance has been undertaken to reflect current Scottish Government policy,
including National Planning Framework 4 (NPF4), which became effective
from 13 February 2023, and now forms part of the statutory development
plan. Findings from the Housing Needs and Demands Assessment (HNDA),
which informs the LHS, were reported to the Council’s Housing and Social
Wellbeing Committee on 15 March 2023 (Report No. 23/82). 
5.5 A greater emphasis is now placed on the sequential approach for the delivery
of affordable housing. This, in turn, aims to remove the perception that the
affordable housing obligation can automatically be met through a financial
commitment rather than onsite provision. It will clarify what type of provision is
best suited to a particular development proposal in order to meet policy
requirements. These changes will help implement Local Housing Strategy
actions to support an increase in overall new build affordable housing
delivery, including rural sites. 
5.6 The following changes are proposed to the affordable housing guidance.
Please also refer to Appendix 1, Part 2, of this report: 
5.6.1 The guidance has been restructured and updated in terms of its references to
Scottish Government and PKC policies. This aims to create a more fluid
document that provides an overview of what affordable housing is and how
the policy should be implemented.   
5.6.2 The section of the existing DC&AH SG relating to the ‘Affordable Housing
Credit System’ has been removed. This approach allowed housebuilders to
group sites, provided the overall 25% affordable housing requirement was
ultimately met across a number of sites. However, it has not been well utilised
and has proven difficult to implement and monitor. It was also found to
undermine the sequential approach to the delivery of affordable housing. Any
confirmed Credits currently agreed with developers will continue to be valid
until their expiry dates, but no further Credits shall be awarded.

Page 5

5.6.3 Part 2, page 7, includes the circumstances in which payment of a commuted
sum may be acceptable in lieu of on-site delivery; the point relating to high
concentrations of existing affordable housing has been deleted from this list. 
5.6.4 Insertion of section (Part 2, page 8, of the draft guidance) highlighting the five-
year utilisation period for commuted sum payments, moved from ‘Part 1’. 
5.6.5 The calculation of commuted sums has been reviewed by the District Valuer
as of January 2023 to reflect the most recent plot values by Housing Market
Area (Part 2, page 8 of the draft guidance). The guidance currently allows for
commuted sum rates to be routinely updated to reflect inflation and housing
markets without further formality. As advised on the Council’s website, the
revised commuted sum rates were effective from 01 April 2023 and are now
applied to planning applications validated from that date. The updated DC&AH
SG document will contain those latest rates. 
5.6.6 A section has been added on the ‘tenure blind’ approach to provide  more
clarity on what this means for a development (Part 2, page 10, of the draft
guidance). The aim of this section is to ensure that affordable housing is
considered at the very beginning of the design process andcomplements the
market housing, contributing to a mixed community and integration within the
development.   
5.6.7 The percentage in terms of households living in private rental accommodation
has been updated to reflect the most current national  data  (Part 2, page 11,
of the draft guidance). 
5.6.8 The average house prices for the PKC area have been updated to reflect the
most recent averages and highlight the significant increase in house sale
value compared to other Tayside partners (Part 2, page 12, of the draft
guidance). 
Primary Education 
5.7 The main update to the Primary Education section of the DC&AH SG is the 
uplift in the contribution rate, presently £5,164. This rate is applied to new 
Open Market dwellinghouses proposed within primary school catchments that
demonstrate a ‘capacity issue’. A capacity issue is defined in the guidance as
being “where a primary school has been operating at over 80% for 5 out of the
previous 7 years and is likely to be operating following completion of the
proposed development, extant planning permissions and Local Development
Plan allocations, at or above 100% of total capacity”. It is proposed that, to
better reflect current industry costs, Building Cost Information Service (BCIS)
General Build Cost Indexation will be applied for the period since the rate was
previously approved by the Council (January 2020) as follows:

Page 6

Table 2: Change in Primary Education contribution rate
Primary Education
Contribution
Current (2020)
Rate
Proposed (2023)
Rate
Difference
Per Open Market
Dwelling
£5,164 £6,300 +£1,136 
5.8 The list of schools that qualify as having a capacity issue, contained within
Part 1, Appendix 1, of the DC&AH SG is also updated in consultation with
Education & Children’s Services. The guidance currently includes provision to
allow this update to be made annually without the need for further formal
procedure. It is proposed that similar provision be included in the updated
guidance to allow the contribution rate to also be refreshed in a similar way to
include any uplift resulting from inflation without need for further formal
procedure. 
Auchterarder A9 Junction Improvements 
5.9  The Auchterarder A9 Junction Improvements section of the DC&AH SG sets
out the basis in which Perth & Kinross Council will seek to ensure
contributions from developments within the Auchterarder and wider Strathearn
housing market area towards meeting the cost of delivering the A9 Junction
Improvements that are required in the interests of road safety. The zone for
which these contributions are sought is shown in Part 1, Appendix 2, of the
draft guidance. 
5.10 The circumstances in which a development proposal is assessed for a
contribution requirement is set out from Part 1, page 12, of the draft guidance.
It is proposed that the wording is amended for non-residential development
proposals. Presently, the guidance will only be applied to proposals that
require a Transport Assessment. The proposed change in wording will enable
non-residential development proposals that result in an increased trip
generation equal to or higher than a dwellinghouse to be considered on a
case-by-case basis. 
Transport Infrastructure 
5.11 The Transport Infrastructure section of Part 1 of the draft guidance sets out
the basis in which Perth and Kinross Council will seek contributions from
developments in and around Perth towards the cost of delivering the transport
infrastructure improvements which are required for the release of all
development sites and to support the growth of Perth and Kinross. The
(a / b) x c
‘a’ means the Index for the month March 2023, the month which precedes the
date of this report (440.0)
‘b’ means the Index for the month of January 2020, the month in which the
DC&AH SG was approved (359.8)
‘c’ means the sum to be indexed (£5,164)
1.22 x £5,164 = £6,300

Page 7

Council seeks contributions for the Perth Transport Futures projects A9/A85
Crieff Road junction improvements and the Cross Tay Link Road (CTLR). The
developer contribution rates are calculated on the basis of these project costs.
Revised project costs for the CTLR were reported to Finance & Resources
Committee on 07 September 2022 at a sum of £150,469,000. This updated
project cost will now form the basis of the Transport Infrastructure contribution
rates. 
5.12 Traffic modelling undertaken for the preparation of LDP2 identified that 50% of
future traffic growth is associated with new development sites contained in the
LDP. The contribution level is therefore calculated on the basis of 50% of the
total project costs (identified above) and the remainder being sought through
other mechanisms. The ‘Full’ Contribution Area rate applies to all
development which is defined by settlements in this area having more than a
19% impact on the transport infrastructure. The ‘Reduced’ Contribution Area
rate applies to development in this area having a 12%-19% impact on the
transport infrastructure. The ‘Full’ and ‘Reduced’ Areas are shown on the map
at Appendix 3 of the guidance. Only the contribution rates, as a result of
updated project costs, is proposed for change. The contribution areas will
remain as existing. 
5.13 It is proposed that, as with 5.8 of this report with regards to primary education,
similar provision be included in the revised guidance to allow the transport
contribution rate to be updated on the basis of reported project costs in a
similar way, as required, without need for further formal procedure. 
5.14 The updated contribution rates are as follows, with comparative change from
the current adopted rate. All sums are rounded to the nearest whole pound.: 
Table 3: Full Contribution Area 
Land Use  CTLR   A9/A85   New Total   Current Total Change
Retail (m²)  £139  £46  £185  £154  +£31
Employment  (
m²) 
£13  £4  £17  £14  +£3
Other Non-
Residential (m
²)
£43  £14  £57  £48 +£9
Residential
Open Market 
(per unit)
£3,288 £1,079 £4,367 £3,657  +£710
Residential
Affordable 
(per unit)
£1,644 £540 £2,184 £1,828 +£356

Page 8

Table 4: Reduced Contribution Area 
Land Use  CTLR   A9/A85   New Total   Current Total Change
Retail (m²)  £104 £34 £138 £115 +£23
Employment  (m²)  £10 £3 £13 £10 +£3 
Other Non-
Residential (m²)
£33 £11 £44 £35 +£9 
Residential Open
Market 
(per unit)
£2,466 £810 £3,276 £2,742 +£534 
Residential
Affordable 
(per unit)
£1,233 £405 £1,638 £1,370 +£268 
5.15 Insertion of a new paragraph is also proposed in this section of the guidance
relating to LDP2 Site MU70 (Perth West). The following shall be inserted in Part
1, page 14, of the draft guidance after paragraph 6.4: 
“Following appropriate assessment, proportionate contributions or mitigation
will be sought toward the infrastructure to be delivered at LDP2 Site MU70
(Perth West), including an A9 underpass to address site severance. Early
discussions are recommended to establish specific requirements from
landowners/developers within MU70.” 
Next Steps 
5.16 The proposed next stage for the DC&AH SG is a period of statutory public
consultation, following the presentation of this report, from June 2023. This
will be carried out via online consultation, using Consultation Hub. It is
anticipated that, as the consultation will coincide with the summer holiday
period, the consultation will run for a minimum of 8 weeks. Corporate social
media channels will also be used to promote the consultation as appropriate. 
5.17 Following the period of public consultation, the responses will be collated and
reviewed by the project team. The updated guidance will then be brought
back to Committee for approval prior to submission to Scottish Ministers for
formal adoption. 
CONCLUSION 
6.1 This report provides an overview of the key updates and clarifications being
made to the currently adopted Developer Contributions and Affordable
Housing Supplementary Guidance. 
6.2 The guidance is to remain within the policy framework of the adopted statutory
Local Development Plan 2 (2019), with future policy changes being

Page 9

considered as part of the Council’s development plan review for “Local
Development Plan 3”. 
6.3 It is recommended that the Committee agree these proposed changes and
approve the draft DC&AH SG (Appendix 1 of this report) as the basis for a
period of public consultation. 
Author
Name  Designation Contact Details
Lucy Sumner  Development
Contributions
Officer
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities)
23 May 2023
APPENDICES 
• Appendix 1 – Draft Developer Contributions and Affordable Housing
Supplementary Guidance (Parts 1 and 2)

Page 10

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce No
Asset Management (land, property, IST) No
Assessments  
Equality Impact Assessment No
Strategic Environmental Assessment No
Sustainability (community, economic, environmental) Yes
Legal and Governance  Yes
Risk No
Consultation 
Internal  Yes
External  Yes - required
Communication 
Communications Plan  No 
The Impact & Value Assessment (IVA) has been designed to screen every 
Council project, strategy or proposal against statutory and non-statutory 
environmental, social and economic requirements. It has replaced the 
previous existing Integrated Appraisal Toolkit (IAT). 
DC&AH SG updates - Committee Annex Checklist
DC&AH SG updates - Impact Assessments
DC&AH SG updates - Strategic & Resource Implications 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This report supports the following priorities within the Community Plan 2022-
27:
(i) Mental and physical wellbeing
(ii) Skills, learning and development

Page 11

Corporate Plan 
1.2 This report supports the objectives within the draft new Corporate Plan:
(i) Children and young people grow up safe, respected, well-educated,  
and confident in their ability to realise their full potential; 
(ii) People and businesses are increasingly able to prosper in a local 
economy which support low carbon ambitions and offers opportunities  
for all; 
(iii) People can achieve their best physical and mental health and have 
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially    
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of 
climate and environmental change for this and future generations. 
2. Resource Implications 
Financial 
2.1 The subject of this report does not introduce new commitments for revenue or
capital funding. The subject of this report does not require revenue or capital
funding. Any income ingathered via payment of developer contributions and
affordable housing commuted sums is a financial consideration, however the
use of these funds are clearly defined in the relevant Local Development Plan
policies, in the supplementary guidance, and in legal agreements, where
applicable. 
2.2 The Head of Finance must be consulted on all proposals with financial
implications.  No report with such implications should be presented at a
meeting when this has not been done and it should be explicitly stated that
the Head of Finance has been consulted, and has indicated agreement with
the proposals. 
Workforce 
2.3 There are no workforce implications resulting from this report. The Corporate
Human Resources Manager must be consulted on all proposals with
workforce implications.  No report with such implications should be presented
at a meeting when this has not been done and it should be explicitly stated
that the Corporate Human Resources Manager has been consulted, and has
indicated agreement with the proposals. 
Asset Management (land, property, IT) 
2.4 There are no asset management implications resulting from this report. The
Director (Environment) must be consulted on all proposals with land and
property implications.  No report with such implications should be presented at
a meeting when this has not been done and it should be explicitly stated that

Page 12

the Director (Environment) has been consulted, and has indicated agreement
with the proposals. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. The proposals have been considered under the
Corporate Equalities Impact Assessment process (EqIA) and have been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment (SEA) 
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. A Screening Report has been provided to SEA Gateway. It is
anticipated that an SEA will not be required. 
230130 SEA screening DC&AH SG.docx 
Sustainability 
3.3 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
The proposals have been assessed against the Council’s Principles for
Sustainable Development. 
Legal and Governance 
3.4 The Developer Contributions and Affordable Housing Supplementary
Guidance is in place to support the policies contained within Local
Development Plan 2 (2019), which forms part of the statutory development
plan set by Town and Country Planning (Scotland) Act 1997 (as amended).

Page 13

3.5 The Supplementary Guidance allows Perth and Kinross Council to enter into
legal agreements with applicants/developers to secure the future payment or
delivery of the types of contributions set out in the Guidance. It is important to
review and update the Supplementary Guidance to ensure legal agreements
reflect the appropriate level of and requirements for contributions. The Head
of Legal and Governance Services has been consulted on the implications
and terms of this report. 
3.6  The Head of Legal and Governance must be consulted on all proposals with
legal implications.  No report with such implications should be presented at a
meeting when this has not been done and it should be explicitly stated that
the Head of Legal and Governance has been consulted. 
Risk 
3.7 As the proposals outlined in this report represent an update to existing
guidance already adopted by the Council, risk has been deemed low.  There
is an element of reputational risk when conducting public consultation. The
proposals have been assessed for any implications within the corporate risk
management process, and also the controls required to mitigate those risks. 
4. Consultation 
Internal 
4.1 Officers from the following teams/ services have been consulted in the
preparation of this report: Legal and Governance, Education and Children’s
Services (Recources), Roads Infrastructure, Corporate and Democratic
Services (Accountancy), and Planning and Housing Strategy; Development
Plans, Housing Strategy and Transportation and Development. 
External 
4.2 This section should detail who has been consulted outwith the Council in the
development of the proposals and the preparation of the report, and also the
views of the consultees. 
5. Communication 
5.1 A period of public consultation will be required as part of this proposal which
will be undertaken via Consultation Hub. The project team will be contactable
mainly via Teams (for internal stakeholders) or email and telephone.
Corporate social media channels may be utilised to promote the public
consultation, any enquiries would be directed to the project team.

Page 14

2. BACKGROUND PAPERS 
2.1 This section should list the documents that have been relied on in preparing
the report, other than those committee reports already referenced within the
main body of the report.  All documents must be kept available by the author
for inspection by the public for four years from the date of the meeting at
which the report is presented.