Agenda Document Pack - Environment, Infrastructure and Economic Development Committee - 16/11/2022

Perth and Kinross Council · 16 November 2022
Back to Environment, Infrastructure and Economic Development Committee — 16 November 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
09/11/2022 
A hybrid meeting of the Environment, Infrastructure and Economic Development
Committee will be held in the Council Chamber on Wednesday, 16 November 2022
at 14:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive      
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Andrew Parrott  (Convener)
Bailie Mike Williamson  (Vice-Convener)
Councillor Keith Allan
Bailie Alasdair Bailey
Councillor Steven Carr
Councillor John Duff
Councillor Angus Forbes
Councillor Ken Harvey
Councillor Noah Khogali
Bailie Claire McLaren
Councillor Willie Robertson
Councillor Frank Smith
Councillor Colin Stewart
Councillor Richard Watters
Councillor Jack Welch 
Page 1 of 54

Page 2

Page 2 of 54

Page 3

Environment, Infrastructure and Economic Development Committee 
Wednesday, 16 November 2022 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE OF
CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF ENVIRONMENT, INFRASTRUCTURE
AND ECONOMIC DEVELOPMENT COMMITTEE OF 21
SEPTEMBER 2022 FOR APPROVAL
(copy herewith) 
5 - 8 
4 OUTSTANDING BUSINESS STATEMENTS (OBS)
(copy herewith 22/277) 
9 - 10 
5 PERTH AND KINROSS LOCAL DEVELOPMENT PLAN (LDP3)
DEVELOPMENT PLAN SCHEME
Report by Head of Planning and Development (copy herewith
22/278) 
11 - 30 
6 MOBILE TELECOMMUNICATIONS POLICY STATEMENT
Report by Head of Planning and Development (copy herewith
22/279) 
31 - 54 
IT IS RECOMMENDED THAT THE PUBLIC AND PRESS SHOULD BE EXCLUDED
DURING CONSIDERATION OF THE FOLLOWING ITEM(S) IN ORDER TO AVOID
THE DISCLOSURE OF INFORMATION WHICH IS EXEMPT IN TERMS OF
SCHEDULE 7A TO THE LOCAL GOVERNMENT (SCOTLAND) ACT 1973 
P1  MULTI-USE PATH BETWEEN STANLEY AND LUNCARTY PATH
ORDERS
• Exempt Reason 6 - Information relating to the financial or
business affairs of any particular person (other than the
authority). 
Page 3 of 54

Page 4

Page 4 of 54

Page 5

ENVIRONMENT, INFRASTRUCTURE AND ECONOMIC
DEVELOPMENT COMMITTEE 
Minute of hybrid meeting of the Environment, Infrastructure and Economic
Development Committee held in the Council Chambers on 21 September 2022 at
10.00am. 
Present: Bailies A Bailey and M Williamson, Councillors K Allan, S Carr, J Duff,
A Forbes, K Harvey, N Khogali, C McLaren, A Parrott, W Robertson, F Smith,
C Stewart, G Stewart (substituting for Councillor J Welch) and R Watters. 
In Attendance: B Renton, Executive Director (Communities); F Crofts, Head of
Communities Business and Resources, M Butterworth, Head of Environmental and
Consumer Services; S D’All, D Stubbs, K Doherty, A Graham, P Dickson and
A Clegg (all Communities); and S Hendry, A Taylor, A Brown and M Pasternak (all
Corporate and Democratic Services). 
Apology: Councillor J Welch 
Councillor A Parrott, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
Councillor A Parrott welcomed everyone to the meeting and an apology was
noted above. 
2. DECLARATIONS OF INTEREST 
In terms of the Councillors’ Code of Conduct, Councillor R Watters declared a
non-financial interest in Item P1 on the agenda. 
3. MINUTE OF PREVIOUS MEETING 
The minute of the meeting of the Environment and Infrastructure Committee of
29 June 2022 was submitted and approved as a correct record. 
4. OUTSTANDING BUSINESS STATEMENTS (OBS) 
Resolved: 
The Outstanding Business Statement be noted. 
5. POLICY AND LEVEL OF SERVICE FOR WINTER 2022/23 
There was submitted a report by the Head of Environmental and Consumer
Services (22/224) (1) providing details of the winter season experienced in
2021/2022; and (2) proposing a level of service for the 2022/23 winter season period
with the aim being to permit winter weather to be treated to assist the safe movement
of pedestrians and vehicles across the Council area. 
3
Page 5 of 54

Page 6

Resolved:
(i) The changes to last year’s policy and level of service for winter, as shown in
italics throughout the report, be noted.
(ii) The level of service for the gritting and snow clearing of roads and footways in
Perth and Kinross for the forthcoming winter period, using plant and labour
resources of Tayside Contracts, other Council Services and private
contractors as required, be approved. 
6. UPDATE AND PROPOSALS FOR THE SCOTTISH GOVERNMENT PLACE
BASED INVESTMENT PROGRAMME 
There was submitted a report by the Head of Planning and Development
(22/225) providing an update on progress with projects allocated funding from the
Place Based Investment Programme and recommending further projects to receive
funding from the Programme allocation. 
Resolved:
(i) The progress being made on delivery of the already approved Place Based
Investment Programme funded projects allocated funding during 2021/22, be
noted.
(ii) The allocation of funding available via the Place Based Investment
Programme 2022/23 for the projects detailed in Section 5.3 of Report 22/225,
be approved.
(iii) The proposal to introduce an open application process for future years
allocation of Place Based Investment Programme funding to link with other
national and local funding to maximise efficient use of resources and
investment support, be noted. 
7. PERTH AND KINROSS OUTDOOR ACCESS FORUM ANNUAL REPORT
2021-22 
There was submitted a report by the Head of Environmental and Consumer
Services (22/226) summarising the activities and progress of the Perth and Kinross
Outdoor Access Forum over the last year; and recommending the appointment of
three new members to the Forum. 
Resolved:
(i) The appointment of three new members and the re-appointment of two
members for a period of four years, be approved, along with those members
to be retained in their appointments for at least a further year as outlined in
Appendix 1 to Report 22/226.
(ii) The Executive Director (Communities) be delegated to fill any casual 
vacancies arising in this period through recruitment by Forum members as 
detailed within the Forum’s Term of Reference. 
(iii) The activities and progress of the Perth and Kinross Outdoor Access Forum 
from October 2021 and the ongoing commitment to maximise effective 
partnership working to make the best of the exceptional landscapes, paths 
networks and access rights for all within Perth and Kinross, be noted. 
Page 6 of 54

Page 7

IT WAS AGREED THAT THE PUBLIC AND PRESS SHOULD BE EXCLUDED
DURING CONSIDERATION OF THE FOLLOWING ITEM IN ORDER TO AVOID
THE DISCLOSURE OF INFORMATION WHICH IS EXEMPT IN TERMS OF
SCHEDULE 7A TO THE LOCAL GOVERNMENT (SCOTLAND) ACT 1973. 
FOLLOWING A SHORT ADJOURNMENT, THE COMMITTEE RECONVENED. 
P1. MULTI-USE PATH BETWEEN STANLEY AND LUNCARTY PATH ORDERS 
The Convener advised that following discussion it was agreed that this item
would be deferred to the next meeting of the Committee scheduled to be held on
16 November 2022. 
~~~~~~~ 
Page 7 of 54

Page 8

Page 8 of 54

Page 9

ENVIRONMENT, INFRASTRUCTURE AND ECONOMIC DEVELOPMENT COMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(22/277) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action Due /
Complete
Action
Expected
5. 21 September
2022
Item 5
Policy and Level of
Service for Winter
2022/23
Provide members
with details on the
costings of the
summer delivery rate
and in-season
delivery rate for rock
salt. 
Information circulated to
Members via Elected
Member Briefing Note
037-22 on 28
September 2022.
Stuart D’All COMPLETE 16 November
2022
6. 21 September
2022
Item 5
Policy and Level of
Service for Winter
2022/23
Provide members
with further details
on the coverage
across the P&K
area of the
community hand
gritters. 
Information circulated to
Members via Elected
Member Briefing Note
037-22 on 28
September 2022.
Stuart D’All COMPLETE 16 November
2022
7. 21 September
2022
Item 5
Policy and Level of
Service for Winter
2022/23
Provide further
information on how
the collaborative
work between
Amey and Tayside
Contracts is
progressing.
Information circulated to
Members via Elected
Member Briefing Note
037-22 on 28
September 2022.
Barbara Renton /
Stuart D’All
COMPLETE 16 November
2022
4
Page 9 of 54

Page 10

Page 10 of 54

Page 11

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure and Economic Development Committee 
16 November 2022 
PERTH AND KINROSS LOCAL DEVELOPMENT PLAN (LDP3)
DEVELOPMENT PLAN SCHEME 
Head of Planning & Development 
(Report No. 22/278) 
1. PURPOSE 
1.1 This report seeks approval for the update of the statutory Development Plan
Scheme (DPS) relating to the preparation of the next Perth and Kinross Local
Development Plan (LDP3). The last update was approved by the Strategic
Policy and Resources Committee on 24 November 2021. It was agreed that
an annual progress report be submitted to committee detailing any changes to
the Development Plan Scheme. 
2. RECOMMENDATIONS 
2.1  It is recommended that the Committee: 
i) agrees the proposed Perth & Kinross Council Development Plan Scheme
and authorises the Executive Director (Communities) to submit the
Scheme to the Scottish Ministers;
ii) remits the Head of Planning & Development to submit an annual progress
report to this Committee, detailing any changes to the Development Plan
Scheme. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues 
• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1  The current Perth and Kinross Local Development Plan was adopted on 29
November 2019 (Report No.19/275 refers) and sets out the strategy to guide
future land use and development within Perth & Kinross for a 10-year period
up to 2029. It was prepared under the Planning (Scotland) Act 2006, section
16 of which requires Planning Authorities to prepare and update Local
Development Plans (LDP) for their area at intervals of no more than 5 years.
The Council should therefore be looking to adopt a new LDP by 2024.
5
Page 11 of 54

Page 12

4.2  In working towards this timescale, preparation of the next LDP commenced in
early 2021.  The Planning (Scotland) Act 2019 introduced a new approach to
Local Development Plans within the context of a statutory National Planning
Framework. Therefore, Local Development Plans will now be reviewed,
prepared and adopted under the new system. However, all the necessary
procedures and processes to be followed are not yet in place resulting,
unavoidably, in some delay. The Scottish Government has advised that the
Development Plan Regulations and Guidance will be published later in 2022,
providing the detail on what is required for the new Evidence Report, the first
stage in the preparation of LDP3. 
4.3  The Scottish Government acknowledges that transitioning to the new planning
system will have implications for LDP timescales. As such, it envisages that
every Planning Authority in Scotland will have a new style local development
plan in place within 5 years of the regulations coming into force. On this basis,
and assuming the regulations are shortly published, a new LDP should be in
place by autumn 2027. This is still within the 10-year lifespan of LDP2, and it
should be noted that new Local Development Plans will require to be formally
reviewed no more than every 10 years. 
5. PROPOSALS 
Development Plan Scheme 
5.1  The Planning Authority is required to prepare a Development Plan Scheme
which provides an outline for the preparation of the LDP, as well as detailing
the Council’s commitment to consultation and engagement. 
5.2  The Development Plan Scheme in Appendix 1 sets out an update on progress
towards LDP3. It details what has been achieved so far and what is
programmed for the following years. It also includes a Participation Statement
which sets out the “when, who, how and why” of consultation/engagement at
each stage of the Plan preparation. 
5.3  The Planning System in Scotland has been under review since 2015. In June
2019, the Planning (Scotland) Act 2019 was passed by the Scottish
Parliament to determine the future structure for modernising the planning
system. The new system requires preparation of an Evidence Report which is
to be submitted to the Department of Environment and Appeals for a review
and assessment exercise known as a ‘gate-check.’ The new system also
places greater focus on public participation with the objective of providing
greater transparency and community involvement in the development of
strategy. 
Page 12 of 54

Page 13

5.4  Draft development planning regulations and guidance were produced in
December 2021 and have enabled the Council to begin to organise the
evidence gathering process. However, as mentioned above, the finalised
regulations and guidance are required to confirm that the approach taken and
evidence being gathered are appropriate and sufficient. The timetable from
the Development Plan Scheme included below has been prepared on the
assumption that the finalised regulations and guidance will be received before
the end of 2022. The timetable will be reviewed annually as part of the
Development Plan Scheme update and accelerated if circumstances allow. 
What happens next? 
5.5  Alongside the evidence gathering work, the Strategic Environmental
Assessment (SEA) Baseline Report is currently being drafted, along with a
Communication Strategy which aims to focus on meeting the new
engagement requirements set out in the Act. A proposed programme for
engagement has been developed to seek the views of the public, including the
views of disabled persons, Gypsies & Travellers, and children and young
Page 13 of 54

Page 14

people. This is set out in detail in the Development Plan Scheme and includes
both online engagement and a rolling programme of locality engagement to be
undertaken using the Place Standard tool from January to August 2023. 
Internal awareness raising has also been undertaken, with colleagues from
Community Planning & Policy and the Health and Social Care Partnership
being involved in workshops on how to use the Place Standard tool to engage
communities. The aim is to co-ordinate with other engagement activities
wherever possible, for example the proposed Mobility Strategy, and share the
information gathered across Council Services. The consultation outlined
supports the PK Offer and the draft Community Plan and, in doing so, assists
communities wishing to prepare their own Local Place Plans. LDP3 is a key
tool alongside other strategies such as the Local Housing Strategy and
Mobility Strategy to delivering great places for people to live and work. 
6. CONCLUSION   
6.1 The Development Plan Scheme has been drafted to update the Committee on
the preparation of the new Perth and Kinross Local Development Plan. It
revises the proposed timetable previously proposed in 2021, and provides
more clarity on public participation in the LDP process. 
Author
Name  Designation Contact Details
Brenda Murray  Development Plan
Team Leader
(Planning & Housing
Strategy
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities) 
7 November 2022 
APPENDICES 
• Appendix 1 – Perth & Kinross Development Plan Scheme 2022 
Page 14 of 54

Page 15

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  None
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  No
External  No
Communication 
Communications Plan  None 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 The Development Plan Scheme contributes to the following Perth & Kinross
Community Plan / Single Outcome Agreement priorities: 
(ii) Developing educated, responsible and informed citizens
(iii) Promoting a prosperous, inclusive and sustainable economy
(iv) Supporting people to lead independent, healthy and active lives
(v) Creating a safe and sustainable place for future generations 
Corporate Plan 
1.2 The Development Plan contributes to the achievement of the following
Council’s Corporate Plan Priorities: 
(ii) Developing educated, responsible and informed citizens; 
(iii) Promoting a prosperous, inclusive and sustainable economy; 
(iv) Supporting people to lead independent, healthy and active lives; and 
(v) Creating a safe and sustainable place for future generations. 
Page 15 of 54

Page 16

2. Resource Implications 
Financial 
2.1 None. 
Workforce 
2.2 None. 
Asset Management (land, property, IT) 
2.3 None. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.   
3.2 The Development Plan Scheme was considered under the Council’s
Integrated Appraisal Toolkit. No impacts on equality were identified and so a
full Equality Impact Assessment was not required. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The matters presented in this report were considered under the Environmental
Assessment (Scotland) Act 2005 and in relation to the Local Development
Plan, referred to in the Development Plan Scheme, further action is required. 
3.5 Due to the nature of the plan there are likely to be significant environmental
effects, as a consequence, an environmental assessment of the Local
Development Plan is compulsory under the Act. The Local Development Plan
is considered to be a ‘qualifying’ plan under the Act so it does not require
screening. 
3.6 The next stage is to prepare a scoping report as part of the Local
Development plan process. This will determine the scope of the environmental
assessment and will be submitted to the Consultation Authorities for
comment. 
Page 16 of 54

Page 17

Sustainability 
3.7 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.8 The Development Plan Scheme was considered under the Council’s
Integrated Appraisal Toolkit. The Development Plan Scheme is a vehicle for
establishing the LDP process and as such no impacts on sustainability will
arise from the Programme itself. 
Legal and Governance 
3.9 None. 
Risk 
3.10 None. 
4. Consultation 
Internal 
4.1 We have consulted with colleagues in Community Planning & Policy and the
Health and Social Care Partnership in the development of the proposals. Both
agree that using the Place Standard tool to engage with communities on a
locality basis is appropriate. 
External 
4.2 None. 
5. Communication 
5.1 None. 
2. BACKGROUND PAPERS 
2.1 The following background papers were referred to during the preparation of
this report: 
• Perth & Kinross Council Local Development Plan 2
• www.gov.scot/policies/planning-architecture/reforming-planning-
system/
Page 17 of 54

Page 18

Page 18 of 54

Page 19

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2020Programme for Local Development Plan 3: November 2022
Perth and Kinross
DEVELOPMENT PLAN SCHEME
5
Page 19 of 54

Page 20

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2022 1
OVERVIEW
Development Plan Scheme
The Development Plan Scheme is a statement setting out Perth & Kinross Council’s timetable for the preparation of the next development
plan.  Under statutory guidance, all planning authorities are required to publish annually a Development Plan Scheme.  The Development Plan
Scheme will set out to include:
• an explanation of what the Local Development Plan is;
• a timetable for the preparation of the next plan, Local Development Plan 3;
• community engagement in the planning process and how relevant stakeholders, including residents of Perth and Kinross, can get involved.
Page 20 of 54

Page 21

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2022 2
Local Development Plan
The Scottish Government requires every planning authority to prepare development plans for their area. The Development Plan is at the heart of the planning
system setting out policies and proposals to guide the development, management and use of land.  The Plan sets out a vision and a framework for future
development; addressing needs and opportunities in relation to housing, economy, infrastructure, community facilities, safeguarding environmental and
landscape assets, the emerging needs of climate change and achieving well designed places for the residents, communities and businesses of Perth and
Kinross. To support the preparation of the next Local Development Plan, there are a range of other plans and strategies that interlink with the LDP.
The Development Plan
National Planning Framework 4
+
Local Development Plan
Planning Guidance
Regional Spatial Strategy
Community Plan  & Corporate Plan
National PlanningFramework (NPF)
Government advice & strategies
Climate Change Strategy & Action
Plan
Mobility Strategy
Perth City Plan
Strategies including Forest & Wood-
land, Open Space, Food Growing
Tayside Local Biodiversity
Action Plan
Local Housing Strategy Local Place Plans
Page 21 of 54

Page 22

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2022 3
LDP3 Timeline
2022 2023 2024 2025 2026 2027
Evidence Gathering
Early Engagement
Collation and Submission of Evidence Report
Evidence Report Gatecheck
Collaborative Preparation of Proposed Plan
Proposed Plan Consultation
Proposed Plan Examination
Adoption of LDP3
The New Plan: LDP3
The Local Development Plan 2019 (LDP2) provides an overarching strategy
for land use and development up to 2029. It is the key document used when
determining planning applications in Perth and Kinross. LDP2 was prepared
under the Planning (Scotland) Act 2006 which requires planning authorities
to prepare and update Local Development Plans for their area at intervals of
no more than 5 years.
The Planning (Scotland) Act 2019 places an increased emphasis on up
front engagement. New LDPs will now be refreshed every 10 years.
This means that consultation needs to be comprehensive, co-ordinated
and collaborative. The consultation outlined supports the PKOffer and
Community Plan and in doing so assists communities wishing to prepare
their own Local Place Plans. LDP3 is a key tool alongside other strategies
such as the Local Housing Strategy and Mobility Strategy to delivering great
places for people to live and work.
Although the adoption of LDP2 was in November 2019, the Council are
currently awaiting the publication of the final Development Plan Regulations
and Guidance by the Scottish Government. The draft Regulations and
Guidance released in December 2021 indicate a change in approach to that
anticipated in the Development Plan Scheme of 2021. Detailed policy and
site development and consultation will now take place after the Evidence
Report and as preparation for the Proposed Plan.  The adoption date, whilst
uncertain, is likely to be summer 2027.
The Scottish Government acknowledges that transitioning to the new
planning system will have implications for LDP timescales and envisages
that every planning authority in Scotland will have a ‘new style’ local
development plan in place within 5 years of the development plan
regulations coming into force, i.e. autumn 2027.
LDP3 Timeline
Page 22 of 54

Page 23

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2022 4
Participation Statement
Who will be consulted?
Under the new Planning Act, the engagement and consultation
of LDP3 will be based on a collaborative approach, including
(but not exclusively) with the following partners:
• Community Councils & Community Development Trusts  
• Communities of Interest
• Landowners & Developers 
• Businesses and business groups
• Locality Partnerships
• Children & young people
• Tertiary students
• Disabled
• Elderly
• Gypsy/Travellers
• Communities wishing to prepare Local Place Plans
Key agencies:
• NatureScot
• SEPA
• Historic Environment Scotland
• NHS Tayside
• Scottish Forestry
• Scottish Water
• Transport Scotland
Community Planning Partners:
• Jobcentre Plus
• NHS Tayside
• Perth & Kinross Association of Voluntary Services (PKAVS)
• Perth College
• Police Scotland
• Scottish Enterprise
• Scottish Fire & Rescue Service
• Skills Development Scotland
Council Services:
• Transport Planning & Development
• Housing Strategy
• Environmental Health
• Greenspace
• Health & Social Care
• Equalities
• Education and Children’s Services
• Enterprise and Investment
• Community Development Workers
Seldom Heard (where not already listed)
• Minority groups
• Areas of deprivation
Page 23 of 54

Page 24

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2022 5
Early data gathering started in 2021 and ongoing 2022
Development of Settlement Audits to support LPP & LDP3.
Evidence Report Data overview of requirements.
SEA Baseline Information to develop key environmental indicators.
Housing Needs and Demand Assessment addressing specific groups required by legislation.
Collation of other consultation results including community action plans and early site submissions.
Identification of groups and stakeholders to be proactively engaged.
Discussion with community partners and community councils on best consultation methods.
Co-ordination with other PKC departments on delivery of engagement, including those that may not need targeting at this early
stage due to recent or existing work.
Co-ordination with other PKC departments, community councils and community development trusts to secure way forward for
Local Place Plans.
Discussion with key agencies and PKC stakeholders on data gathered to date and future plans that may affect policies or place
including capacity of education, health, water etc.
Collation of existing feedback on LDP2 policies and place from practice, national strategies and prior consultations.
Launch of online area wide place feedback platform on consultation hub
Local Place Plan invitation
When will they be consulted?
The following section provides an indicative timeline for our engagement based on information from the Scottish Government that we have
received so far:
Page 24 of 54

Page 25

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2022 6
Place and policy discussions to inform Evidence Report in 2023-2024
Publicity and media support for upcoming engagement activities and throughout.
Exploration of issues of importance with communities of place and community councils through Place Standard and settlement audits including 
tailored discussions reflecting both policies and place such as affordable housing or natural space needs.
General opportunities for the public (including landowners and developers) for discussions on policy and place such as the online
place standard or surveys on consultation hub.
Assisting Community Councils and community partners to support the delivery of inclusive engagement to support LDP work and
feeding into Local Place Plans.
Targeted discussions online and in person around policy with specified communities of interest or with specific (land use) need.
Sharing and co-ordination of information wth other servcies and strategies including Perth People Place and Mobility Strategy
Targeted discussions with communities of interest or need about the places they live to support the wider public consultation.
Collation of information and analysis of data and consultation exercises to inform identification of sites at the next stage.
Evidence Report checked for compatibility with any recent or updated Local Place Plans; and evidence shared with communities to inform LPPs
Consultation on SEA Baseline Report
Collation and submission of the Evidence Report
Page 25 of 54

Page 26

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2022 7
Preparation of Proposed Plan in 2024-2025
Following gatecheck of the Evidence Report any additional consultation required by the Examiner will be carried out and the final Evidence
Report resubmitted.
Policy options relevant to each group or stakeholder discussed to find a preferred way forward or options.
Specific policy and place ideas, including those in Local Place Plans, explored with communities and discussed with developer and landowner
groups and contacts.
Place proposals analysed (draft SEA and HRA) and comments sought from specific groups previously engaged with, community
councils and public at large on preferred options.
Policy and site preferences discussed with key agencies and PKC stakeholders.
All consultation and evidence analysed and any outstanding issues resolved with stakeholders and incorporated into the Proposed Plan.
Proposed Plan drafted and submitted to Council.
Highland and Strathtay
Task 3
Kinross-shire, Almond & Earn
East Perthshire
Perth City Jan - Mar
Strathearn and Strathallan
Mar - May
Apr - Jun
May - Jul
Jul - Aug
The Big Place
Conversation 2023
Page 26 of 54

Page 27

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2022 8
Consultation on Proposed Plan in 2026
Proposed Plan is published alongside HRA and SEA and general consultation.
Evidence Report updated to show how the evidence has shaped the Plan.
Public events to publicise the Plan and invite comments.
Evidence is shared with communities preparing Local Place Plans.
Proposed Plan with any modifications and comments reported to Council and submitted for Examination
Page 27 of 54

Page 28

Perth and Kinross DEVELOPMENT PLAN SCHEME November 2022 9
Consultation Commitment Statement             
The LDP3 engagement and evidence building process will be:
Relevant Discussions will be relevant to each group or stakeholder, including both settlement development
and policies and the methods that are used to carry out those discussions. 
Inclusive To shape places that work for all we will proactively seek the views of all people, especially those
with specific needs and those that we do not normally reach; identify and overcome barriers to
engagement and invest in the promotion of the benefits of engaging.
Informed Discussions will be informed by evidence already available including data gathering and prior
consultations to ensure contributions have a greater impact and are more efficient
Co-ordinated A joined up approach with the rest of Council and Council strategies, will deliver greater efficiency,
and help avoid consultation fatigue. Information fed back to other departments will also help deliver
their priorities
Collaborative Co-designing consultation and supporting community partners to carry out their own engagement
work will ensure the greatest reach and response working
Transparent Ongoing communication and feedback between the team and stakeholders, communities and
partners will support better outcomes and promote acceptance of outcomes.
Accessible Engagement events and materials for the general public must be accessible to all wherever
possible, and tailored arrangements made where this is not possible.
Page 28 of 54

Page 29

10
All Council Services can offer a telephone translation
facility.
If you or someone you know would like a copy of this doc-
ument in another language or format, (on occasion, only
a summary of the document will be provided in transla-
tion), this can be arranged by contacting the Customer
Service Centre on 01738 475000.
You can also send us a text message on 07824 498145.
For key updates on the preparation of LDP3 please email
developmentplan@pkc.gov.uk
and ask to be added onto our database.
www.pkc.gov.uk (PKC Design Team - 2020167)
Page 29 of 54

Page 30

Page 30 of 54

Page 31

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure and Economic Development Committee
16 November 2022
MOBILE TELECOMMUNICATIONS POLICY STATEMENT
Report by Head of Planning and Development
(Report No. 22/279)
1. PURPOSE 
1.1 To update the Committee on the development of mobile phone networks in
the UK and the implications for Perth and Kinross. The paper presents a
policy statement on telecommunications which, it is proposed, should be
adopted to guide the Council’s support for mobile network deployment, in
what will be an intensive period of activity over the coming few years.  
2. RECOMMENDATIONS 
2.1   It is recommended that the Committee: 
(i) approves the Mobile Telecommunications Policy Statement for Perth &
Kinross
(ii) notes there will be a Single Point of Contact on telecommunications with the
responsibility to liaise with Scottish Government, Scottish Futures Trust,
Scotland’s 5G Centre and Mobile Network Operators, to be identified by the
Head of Planning and Development. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues  
• Section 5: Proposals  
• Section 6: Conclusion  
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1 Digital connectivity has risen in importance following the Covid-19 pandemic
and will undoubtedly underpin the success of local economies in the future.
Councils have an influence on how mobile networks get built, from a planning,
strategic economic and digital development perspective. Mobile networks are
considered essential national infrastructure but are ultimately delivered locally
with the help of local councils. Mobile Network Operators (MNOs), national
and local government working together is essential if 4G and 5G connectivity
is to be available to as many people and businesses as possible.
6
Page 31 of 54

Page 32

4.2 The Council has a further vested interest in boosting digital connectivity,
because the more people are online, the easier it is to deliver services online.
The fixed line digital connectivity has been boosted in recent years thanks to
the Digital Scotland Superfast Broadband (DSSB) programme, now being
taken forward through the Reaching 100% (R100) programme.  However,
Perth & Kinross superfast broadband connectivity still only reaches 87.9% of
premises. The recent Local Full Fibre Network project, supported by UK
Government and Tay Cities Deal, has seen 136 of the Council’s buildings
connected last year to gigabit capable broadband speeds. 
4.3 Mobile network connectivity is less developed, however, with almost one fifth
of Scotland’s land mass not having 4G coverage from any operator.  Within
Highland Perthshire, there are numerous ‘partial not-spots’ and some ‘total
not-spots’ for mobile network coverage.  This impacts upon quality of life for
residents but also impacts on council service delivery – such as our
Countryside Rangers seeking to manage rural visitor sites; the delivery of
rural public transport services; and, increasingly, the delivery of digital health
and social care services in the form of virtual consultations and remote
monitoring of patients. These, and other services, can be transformed, and
costs reduced through digitalisation, but only if connectivity is improved. 
4.4 The Council’s telecommunications policy dates back to November 2001
(Report No. 01/758 refers). It was developed at a time when mobile telephone
ownership and usage was still low and smart phones were not available (the
first iPhone came out in 2007).  Now 92% of the UK mobile users have a
smart phone, rising to 96% of 16-24-year-olds (Uswitch mobile phone
statistics, 2022) and nearly half the population say they use smart phones
more now than before the pandemic.   
4.5 In 2001, the Committee was informed of the need to update the
telecommunications policy, first set in 1997, which – at that time - restricted
installation of telecommunications masts on Council properties primarily due
to health concerns.  The Committee agreed to remove the then moratorium on
siting of equipment but to continue to take a precautionary approach.  This
was essentially avoiding properties in continuous educational, public or staff
use, and extending to power and signal cables where they served telecoms’
developments adjacent to excepted Council properties. 
4.6 There are now potentially more than 20 more mast (or so called ‘macro’) sites
to be deployed over coming years under the Shared Rural Network in Perth &
Kinross - which is a UK Government initiative to improve 4G coverage in rural
areas - and private MNO investment. Together, these amount to over £1bn of
investment split equally between private and public funding. The Electronic
Communications Code (ECC) also came into force in December 2017 and this
now requires the Council’s telecommunications policy to be reviewed and
updated. The Code brings a significant change to the law in this area, allowing
for the siting of masts and associated infrastructure under permitted
development. 
Page 32 of 54

Page 33

4.7 Linked to this, the Scottish Government is keen to improve the mobile network
infrastructure and is in the process of working with operators to deploy further
masts across Scotland through the 4G Infill Programme (4GIP). It is also
supporting Scottish Futures Trust who have developed a suite of guidance
and tools to help local authorities with the lease and charging agreements
around the siting of telecoms equipment. The Council has participated in this
‘Infralink’ initiative and helped develop these tools which are now available for
all local authorities to use. A further UK Government supported ‘Infralink
Exchange’ initiative looking at the use of council street furniture for small cells
is currently underway involving all Tay Cities local authorities. 
Mobile Network Technology 
4.8 Mobile communications technology has developed through several
generations (the ‘G’s’) and there are now many 2G, 3G and 4G base stations
installed throughout the UK, providing services to users of mobile phones and
other devices. A fifth generation of the technology (5G) is now well developed
and reflects the latest evolution in mobile communications technology which
will soon move to 6G. 
4.9 Base stations are stationary radio transmitters with antennae mounted on
freestanding masts or on buildings. The largest base stations provide the main
infrastructure for networks and may be up to several kilometres apart.
Antennae tend to be mounted at sufficient height to give them a clear view
over the surrounding geographical area. Smaller base stations tend to be
mounted nearer to ground level and provide additional radio capacity where
there are a high number of users, such as in cities and towns. 
4.10 The radio waves transmitted by base stations are radiofrequency
electromagnetic fields (EMFs), a form of non-ionising radiation, and have
frequencies in the microwave region of the electromagnetic spectrum. More
recently, the masts or macro sites have been supported by ‘micro’ sites such
as ‘small cells’. Telecommunications providers are set to make heavy use of
small cell technology to roll out 5G coverage, particularly in urban areas. 
4.11 Small cells make use of low-power, short-range wireless transmission
systems that cover small geographical areas or small proximity indoor and
outdoor spaces. Small cells have all the same characteristics as base stations
that have been used by telecom companies for years. However, they are
uniquely capable of handling high data rates for mobile broadband and
consumers and, for IoT, high densities of low-speed, low-power devices. 
Health effects 
4.12 Mobile network base stations transmit and receive radio waves to connect the
users of mobile phones and other devices to mobile communications
networks. The strength of the radio waves from base station antennae
reduces rapidly with increasing distance and the levels at locations where the
public can be exposed tend to be small. 
Page 33 of 54

Page 34

4.13 The health effects of exposure to radio waves have been researched
extensively over several decades and has addressed concerns about rapidly
proliferating mobile communications technologies from around the year 2000.
Independent expert groups in the UK, and at international levels, have
examined the accumulated body of research evidence. Their conclusions
support the view that health effects are unlikely to occur if exposures are
below international guideline levels. The consensus appears to be that it is
unlikely that mobile phones or base stations increase the risk of health
problems, although there is still some uncertainty about the potential for risks
from long-term use over decades. The UK Health Security Agency (UKHSA)
continues to monitor the health-related evidence applicable to radio waves,
including in relation to base stations, and is committed to updating its advice
as required. 
4.14 The Council continues to follow the guidance from the International
Commission on Non-Ionizing Radiation Protection (ICNIRP) in the
accompanying Mobile Telecommunications Policy Statement (Appendix 1). 
The Electronic Communications Code 
4.15 The legal framework underpinning rights to install and maintain electronic
communications infrastructure on private and public land is contained in the
Electronic Communications Code (ECC), which is part of the Communications
Act 2003. A Telecommunications Code was first enacted in the UK in the
Telecommunications Act 1984. In 2003, the Code was extended to cover all
electronic communications and the Digital Economy Act 2017 introduced an
entirely new code – the ECC - on 28 November 2017. The Digital Government
(Scottish Bodies) Regulations 2022 added Scottish Bodies to the schedules of
the Digital Economy Act 2017. The reforms made to the Code in 2017 were
intended to support faster and easier deployment, as well as encouraging
industry investment in digital networks. These changes strived to balance the
need for digital infrastructure with the rights and interests of landowners and
other site providers. The UK Government has been keen to keep the Code
updated so that the potential economic and social benefits of fast and reliable
connectivity can be realised. 
4.16 The Council must comply with the new Code which requires public (and
private) authorities to work with the telecommunications industry in the
deployment of telecommunication infrastructure, equipment and services. This
does not affect statutory and legislative processes in relation to planning, road
safety and closures. OFCOM still enquire, investigate and legislate on safety
standards in relation to utilities, including mobile telecommunications. The
Council is still consulted on all proposed new mast sites and has already
received several as part of the Shared Rural Network deployment of new
masts.  
Page 34 of 54

Page 35

5. PROPOSALS 
Council Mobile Telecommunications Policy Statement 
5.1 An updated Mobile Telecommunications Policy Statement is needed to align
the Council with current national telecommunications policy in the light of the
ECC and an anticipated intensive period of activities over the coming few
years. The Statement continues to be mindful of unintended locational
consequences for residents, landowners, landscape, townscape and public
health, whilst adopting a constructive approach to the siting of telecoms masts
to support digital infrastructure. There will be a significant number of new
masts being erected over the next few years across the Council area due to
the Shared Rural Network and there will also be new applications for 5G
masts. A planning application for a 20m mast on Dunkeld Road, Perth, was
refused by Committee in December 2021 on grounds of visual impact. A
subsequent appeal was also dismissed by a Scottish Government Reporter.   
5.2 Current mast sites on Perth and Kinross land – five in total - are leased to
telecoms operators and are at varying stages in terms of the lease
agreements.  Often when the lease agreement is due for renewal or
renegotiation, the Council will employ a land agent with specialisms in
telecommunications equipment to act for it so that the best return can be
achieved. These are paid for by the industry but increasingly – because of the
ECC and because of the Councils involvement in Infralink – this role is
becoming less important as the income generated from these leases
diminishes, because as mast sites and coverage proliferates, rental income
also diminishes.   
5.3 Whilst the Council recognises that mobile connectivity and fixed fibre
connectivity are equally important, it is the case that mobile connectivity has
received much less profile nationally and locally. There is an opportunity now,
with the Shared Rural Network impacting on Perth & Kinross, that building
mobile networks should be a key priority in the digital infrastructure strategy
for the region.  This will require a partnership between MNOs and the Council
working together to ensure 4G and 5G connectivity is to be available to as
many people and businesses as possible. 
5.4 The Mobile Telecommunications Policy Statement to update the policy that
was set in 2001 relating to siting equipment near Council buildings is attached
as Appendix 1. It is wider in scope (not confined to telecoms on Council
buildings) and more pro-active in encouraging new telecommunications masts
and equipment across Perth & Kinross. However, it recommends that the
Council should still seek to avoid educational, public or staff use premises
where there may be public concerns.  It should also continue to minimise the
impact on the landscape of masts though the planning process. 
Page 35 of 54

Page 36

5.5 Appropriate Local Development Plan policies will be considered and consulted
upon to ensure they reflect both the need to roll out mobile networks
alongside fixed fibre networks, while protecting amenity. Operationally, an
officer Single Point of Contact for MNOs will be identified to facilitate the roll
out of the private and publicly funded parts of the Shared Rural Network in
Perth & Kinross and to coordinate the involvement of services in enabling this. 
6. CONCLUSIONS 
6.1 Councils are instrumental in delivering both fixed fibre and mobile networks,
through granting planning permission, ensuring future development is planned
with mobile connectivity in mind, or providing their public assets to host mobile
equipment. How local authorities interpret planning and street works
regulation, and how they design local economic strategies, have a bearing on
how efficiently mobile infrastructure can be deployed. In short, councils
influence the speed and cost of mobile infrastructure being built. Mobile
networks are increasingly a key priority in the digital infrastructure strategy for
the area, as the Council enables more services to be accessed online from
wherever you are and to promote economic development in all areas.  This
requires partnership between MNOs and the Council working together so that
4G and 5G connectivity is available to as many people and businesses as
possible. 
6.2 Councils need to think about their future mobile connectivity needs in the
same way that they think about other types of essential economic
infrastructure like roads, housing, utilities and even fibre broadband.
Improvements to mobile technology often move faster than councils can
update their local development plan policies. Mobile connectivity has become
so vital to everyday life that residents and businesses need to have access to
the best possible mobile connectivity now and in the future.  The Council’s
own LDP policy on telecommunications is proactive and up-to-date and will be
reviewed again in due course. Meanwhile, the Mobile Telecommunications
Policy Statement will put in place a supportive statement for the Council to the
telecommunications industry that the Council wishes to see improved
connectivity in the area and is willing to work with the industry, national
government and agencies such as SFT through the Infralink initiative to
achieve this. 
6.3 With the Policy Statement in place and the areas that it identifies for action -
the Council will be pro-active and supportive in developing digital connectivity,
working with the mobile industry to enable the roll out of networks that are
now essential to life in our rural areas. However, the Council will still place
health concerns as a priority and will seek to avoid educational, public or staff
use premises and consider all applications for equipment in relation to
environmental and health issues to ally public concerns and minimise the
impact on the landscape of masts though the planning process. 
Page 36 of 54

Page 37

Authors
Name  Designation Contact Details
Graham Pinfield 
Serge Merone
Team Leader Smart Perth &
Kinross 
Climate Change and Smart
Investment Manager 
(01738) 475000
ComCommitteeReports@pkc.gov.uk   
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities) 
7 November 2022 
APPENDIX 1 – Mobile Connectivity Policy 
Page 37 of 54

Page 38

ANNEX
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2018 – 2023 lays out five outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
(i) Giving every child the best start in life;
(ii) Developing educated, responsible and informed citizens;
(iii) Promoting a prosperous, inclusive and sustainable economy;
(iv) Supporting people to lead independent, healthy and active lives; and
(v) Creating a safe and sustainable place for future generations. 
1.2 This report relates to all of these objectives. 
2.  Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported above. 
Workforce
Page 38 of 54

Page 39

2.2 There are no direct workforce implications arising from this report other than
those reported above. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported above. 
3. Assessments 
Equality Impact Assessment 
3.1. Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2. The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
Internal 
4.1 The Executive Directors and Chief Operating Officer have been consulted in
the preparation of this report. In addition, Planning, Estates and Corporate
Page 39 of 54

Page 40

Property Asset Management have also been consulted and comments
received and incorporated.   
2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
Page 40 of 54

Page 41

1 
Appendix 1
PERTH AND KINROSS COUNCIL 
MOBILE TELECOMMUNICATIONS POLICY STATEMENT
November 2022
pkc.gov.uk 
6
Page 41 of 54

Page 42

2 
Contents
INTRODUCTION ........................................................................................................................................................... 3
NATIONAL AND LOCAL POLICY CONTEXT .................................................................................................................... 3
Current Council Policy on Telecommunications Equipment on Council Premises ..................................................... 4
The Electronic Communications Code (ECC) ............................................................................................................... 5
Council land use planning policy ................................................................................................................................. 5
Economic Benefits ....................................................................................................................................................... 6
Health Considerations ................................................................................................................................................. 7
EXISTING MAST SITES ON PERTH & KINROSS LAND OR BUILDINGS ........................................................................... 8
THE UK SHARED RURAL NETWORK (SRN) ................................................................................................................... 8
THE SCOTTISH FUTURES TRUST ‘INFRALINK’ PROJECT AND ‘INFRALINK EXCHANGE’ ................................................ 9
USE OF COUNCIL BUILDINGS AND ASSETS ................................................................................................................10
IMPLEMENTING TELECOMMUNICATIONS IN PERTH & KINROSS .............................................................................11 
Page 42 of 54

Page 43

3 
INTRODUCTION
Mobile phone connectivity is now an essential part of everyday life for individuals, communities and
businesses across Perth & Kinross and across the UK. It allows us to do many things such as online
shopping, communicating with family and friends, manage our businesses online, access Council
services, book doctor appointments or do online banking wherever we are in the world. 
The Council has increased the offering of services online for residents and local businesses through
https://my.pkc.gov.uk/ and increasingly people use their mobile phones to access these and a variety of
other services. Furthermore, the wider rollout of next generation of mobile technology - 5G - beyond the
cities will bring faster speeds, less latency and more bandwidth so that people will be able to do more
online so the need for digital connectivity will be in greater demand. 
Both UK and Scottish Governments have updated their guidance on the deployment of digital
infrastructure and local authorities are encouraged to consider the wider social and economic benefits for
bringing connectivity to an area. The aim is to ensure people can access better broadband and mobile
connectivity easily across a wide area and this will be crucial to the UK’s economic recovery.
This policy document updates and broadens the Council’s policy on telecommunications set by the
Council over 20 years ago. It covers national policy in terms of the relatively recent Electronic
Communications Code (ECC) and changes favouring the presumption of approval for telecommunications
masts and associated permitted development rights in planning. It also reviews the existing
telecommunications masts on Council owned land and the associated lease agreements. 
It also outlines the proposals for new 4G masts in Perth & Kinross proposed under the UK Shared Rural
Network (SRN) project. Finally, it covers the Councils involvement in the Scottish Futures Trust ‘Infralink’
project and the UK Government DCMS supported Digital Connectivity Infrastructure Accelerator (DCIA) -
the so called ‘Infralink Exchange’ project - on use of council assets for telecommunications infrastructure
and the arrangements the Council needs to put in place to support the roll out of mobile networks both in
terms of ‘macro’ sites i.e., masts and ‘micro’ sites i.e., small cells mounted on buildings and street
furniture.
This marks an approach to telecommunications for the Council that is positive and proactive in
encouraging better digital connectivity in Perth & Kinross whilst still being mindful of concerns over the
siting of telecommunications equipment for environment and health reasons.  Overall, the Council
recognises the benefits that enhanced connectivity it will bring to residents and businesses in the area to
improve quality of life, deliver better services, promote economic prosperity, and avoid digital exclusion
especially in our rural communities. 
NATIONAL AND LOCAL POLICY CONTEXT 
Mobile and fixed fibre connectivity will underpin the success of all local economies in the future. The UK
Government is committed to providing 85% full fibre coverage by 2025 and wants to see the majority of
the UK covered by 5G networks by 2027. About 9% of the UK still has no access to 4G networks from any
providers, although a higher figure in Scotland where its nearer 19% because of the more rural terrain.
The Council is improving the fibre connectivity across Perth & Kinross by supporting UK and Scottish
Government broadband interventions and has built a full-fibre network (i.e. Fibre optic cable direct to the
home) to most of the Councils buildings.  The development of mobile networks however has received
Page 43 of 54

Page 44

4 
much less attention; although the Council can have a big influence on how mobile networks get built, from
both a planning and strategic economic development perspective. 
Mobile networks are an essential national infrastructure but are ultimately delivered locally: Mobile
Network Operators (MNOs) and local government working together are essential if 4G and 5G
connectivity is to be available to as many people and businesses as possible, with all the benefits that this
can bring especially to rural populations. Following the pandemic, with many more people and businesses
now working from home, digital connectivity is essential to home and family life and to build thriving
businesses.
Current Council Policy on Telecommunications Equipment on Council Premises
The Councils current telecommunications policy was approved in November 2001 (Strategic Policy &
Resources Committee 21 November 2001 – Policy and Telecommunications Equipment on Council
Premises Report No. 01/758) however the Electronic Communications Code (the Code), which came into
force across the UK in December 2017 now necessitates that this policy should be reviewed and updated,
as it brings a significant change to the law in this area, allowing for the siting of masts and associated
infrastructure under permitted development, except in specially designated areas. 
The 2001 Council policy updated the policy originally set in 1997 which then restricted installation of
telecommunications masts on Council properties due primarily to health concerns.  The Committee agreed
in 2001 however to remove the moratorium on siting of equipment but to continue to take a precautionary
approach essentially avoiding properties in continuous educational, public or staff use, and extending to
power and signal cables where they served telecoms developments adjacent to excepted Council
properties.
It should be noted that the 2001 Council policy related specifically to the siting of telecommunications
equipment on land owned by the Council or adjacent to Council premises however this new policy is
concerned about the overall deployment of telecommunications equipment across Perth & Kinross in
terms of masts on land and small cells on buildings or street furniture.
Twenty years ago, there were only a few telecoms masts in Perth & Kinross – one on the Canal St car
park and one at Callerfountain Hill in Perth. There are now five existing mast sites on Council owned land
for which the Council receives a rental income, and many other masts on private land owned and
operated by the four main Mobile Network Operators (MNOs) or their partner companies such as Arquiva
and Wireless Infrastructure Group that operate many mast sites for the operators.
There are potentially up to thirty masts to be deployed over the coming years in Perth and Kinross as part
of industry and UK Government funded upgrades to existing Mobile Network Operator (MNO) sites to
alleviate ‘partial not-spot’ (PNS) areas that only receive coverage from at least one but not all operators
and ‘total not-spot’ (TNS) areas where there is no coverage at all form any operator. 
The UK Shared Rural Network, which is a UK Government initiative to improve 4G coverage in rural areas
is planning on around 17 new mast sites in Perth & Kinross for TNS areas.  There are also another five
masts being built as part of the UK Home Office Emergency Services Network (ESN) Extended Area
Service which is available only to the emergency services.  The remainder are MNO funded masts for
PNS areas. The mobile industry is looking to increase coverage and capacity of the 4G roll-out and it is
likely that the pace of 5G roll-out will then accelerate over coming years.
Page 44 of 54

Page 45

5 
In addition, the Scottish Government is keen to support telecommunications in terms of improving the
mobile network infrastructure and is in the process of working with operators to deploy further masts
across Scotland through the 4G Infill Programme. It is also supporting Scottish Futures Trust (SFT) who
have developed a suite of guidance and tools through the ‘Infralink’ project, to help local authorities with
the lease and charging agreements around the siting of telecoms equipment. The Council has participated
in this Infralink initiative and have helped develop these tools and is now working with SFT and the other
Tay Cities local authorities on a DCMS funded pilot - ‘Infralink Exchange’ - part of Digital Connectivity
Infrastructure Accelerator (DCIA) looking at mobile network deployment via buildings and street furniture.
The Electronic Communications Code (ECC)
The legal framework underpinning rights to install and maintain electronic communications infrastructure
on private and public land is contained in the Electronic Communications Code (ECC) which is part of the
Communications Act 2003. The Telecommunications Code was first enacted in the Telecommunications
Act 1984. In 2003 the Code was extended to cover all electronic communications and the Digital Economy
Act 2017 introduced an entirely new code on 28th November 2017. 
The reforms made to the Code in 2017 were intended to support faster and easier deployment, as well as
encouraging industry investment in digital networks. These changes strived to balance the need for digital
infrastructure with the rights and interests of landowners and other site providers. The UK Government
has been keen to keep the Code updated, so that the potential economic and social benefits of fast and
reliable connectivity can be realised. The Digital Government (Scottish Bodies) Regulations 2022 added
Scottish Bodies to the schedules of the Digital Economy Act 2017.
Though it is relatively new, the ECC is a powerful instrument for telecommunication providers in that they
can acquire ‘code rights’ i.e., the right to access land for the purpose of installing and maintaining
equipment. Operators can acquire code rights by serving a notice on the landowner; similarly, landowners
can serve notices on operators enforcing removal of the equipment, in certain circumstances. Failing
agreement in either case, the parties can apply to the Lands Tribunal in Scotland for a decision.
The Council must comply with the new Code which requires public (and private) authorities to work with
the telecommunications industry in the deployment of telecommunication infrastructure, equipment, and
services. This does not affect statutory and legislative processes in relation to planning, road safety and
closures. OFCOM still enquire, investigate, and legislate on safety standards in relation to utilities,
including mobile telecommunications.
It is part of this new policy that the Council will seek to work cooperatively with telecommunications
operators to find the best and most appropriate sites for equipment through dialogue and pre-application
discussions.
Council land use planning policy
In terms of planning policy, the Local Development Plan (2019) Policy 59 on Digital Infrastructure sets out
a supportive framework, particularly for mobile communications infrastructure, and for rural areas:
The Council will support development that provides digital and mobile communications
infrastructure to homes and businesses and improves quality of life for residents and workers
provided the environmental impacts on the natural and built environment are minimised. The Plan
Page 45 of 54

Page 46

6 
is particularly supportive of the expansion of broadband and mobile communications services in rural
areas. 
It does however stipulate some requirements for these developments: 
The siting and design of communication infrastructure should consider all the following series of
options when selecting sites: (a) installation of smallest suitable equipment; (b)
concealing/disguising masts, antennas, equipment houses; (c) site/mast sharing; (d) installation on
existing building and structures; and (e) installation of ground-based masts.  
Planning applications for communications infrastructure should address the following matters: (a)
an explanation of how the proposed equipment fits into the wider network; (b) a description of the
siting options (primarily for new sites) and design options which satisfy operational requirements,
alternatives considered, and the reasons for the chosen solution; (c) details of the design, including
height, materials and all components of the proposal; (d) details of any proposed landscaping and
screen planting, where appropriate.
These policies clearly relate most closely to ’macro’ sites i.e., masts rather than ‘micro’ sites e.g.,
antennae on buildings or small cells attached to streetlights which may be more important in urban areas
for ‘densification’ of mobile networks.
In terms of national planning policy, the Scottish Government’s 2021 update to Circular 2/2015 widens the
scope of permitted development rights in respect of development by Electronic Communications Code
Operators. Permitted development is work that can be carried out without the need for a full formal
application for planning permission. A prior notification is required whereby operators will advise the Local
Authority of their intention to undertake such works and the Council has 28 days to comment. It varies
limits on mast sizes, antennae sizes and numbers, and introduces new provisions for small cell systems,
equipment housing cabinets, and other apparatus and equipment. This applies nationally and is aimed at
bringing more of the type of development ECC Operators would like to do within the category of ‘Permitted
Development, for example, no need for planning application provided it is within the provisions of the
specification set out in the Circular. 
The Council will review and update its policies in the Local Development Plan at its next review and
ensure that policies and land designations reflect the need to roll out mobile networks both in terms of
macro and micro sites.  
Economic Benefits
There has never been a greater dependency on digital technology in human history than now. The
pandemic meant that digital technologies have allowed economic activity to continue, enabling new ways
to deliver education and healthcare, and allowing workers to work at home and businesses to maintain
productivity. With half of the world’s population using mobile internet, mobile technology has played a
critical role in this. As such, governments across the globe are increasingly relying on mobile and digital
technologies as a vital tool for short-term recovery, as well as for longer-term economic growth and job
creation. 
In this context, it is necessary for places such as Perth & Kinross to consider the role mobile and digital
technologies can have on economic growth as 4G roll out completes and 5G begins to enable a new wave
of economic transformation and as efforts to achieve universal internet access gather pace, especially
Page 46 of 54

Page 47

7 
with the full rollout of 4G across the UK.  Mobile technology has had a significant impact during the last
two decades, a period which covers most of the rollout of three generations of mobile technology across
the world and this will only continue.
Health Considerations 
Mobile operators in the UK design and build their masts, rooftop antennas and other installations to be
compliant with the exposure guidelines in the UK that have been developed by the International
Commission on Non-Ionizing Radiation Protection (ICNIRP). These guidelines were prepared following a
comprehensive assessment of all the peer-reviewed scientific literature, including thermal and non-thermal
effects. The guidelines are based on evaluations of biological effects that have been established to have
health consequences. 
The policy set in November 2001 sought a review of the policy approved by the then Property and
Information Technology Sub-Committee in 1997 which restricted the deployment of telecoms masts due to
the then health concerns. At that time the Council resolved to continue to take the precautionary approach
adopted in 1997, essentially avoiding properties in continuous educational, public or staff use, and
extending to power and signal cables where they served telecoms developments adjacent to excepted
Council properties.
The report in 2001 acknowledged that since 1997 mobile phone use had expanded to 70% of the
population and this was creating a demand for more mast sites. The report also reported that the then
Independent Expert Group on Mobile Phones had concluded that there was no general risk to health for
those living near to mast sites however it still urged a precautionary approach.  
The report also outlined the positive benefits of mobile networks to business and to the Council who then
becoming a major user of mobile phones. In addition, it outlined the potential revenue benefits to the
Council of leasing sites for masts. It is now necessary for the Council to align itself with national policy and
adopt a more positive approach to the siting of telecoms masts, whilst continuing to be mindful of impacts
on the landscape and local communities.
The World Health Organization (WHO) recommends that countries adopt the ICNIRP guidelines. The
WHO states that the main conclusion from its reviews is that electromagnetic fields (EMF) exposures
below the limits recommended in the ICNIRP guidelines do not appear to have any known consequence
on health. In the UK, Ofcom produced a report in March 2021 that tested two 5G sites in Scotland and
showed the masts were all well within levels defined by ICNIRP1. As part of the process for obtaining
planning consent for new 4G and 5G sites and upgrades, each operator will continue to confirm
compliance with ICNIRP guidelines. 
The Council should continue to exercise a precautionary approach to siting of telecommunications
equipment in close juxtaposition to schools, sheltered housing, council offices or other public premises but
both the technology and our understanding of the health effects of the technology have progressed
significantly since 2001.  So – whilst caution is still needed – the health effects to the public appear to be
minimal according to the international and national agencies though research is continuing. 
1 Summary of results - EMF measurements near 5G mobile phone base stations (ofcom.org.uk)
Page 47 of 54

Page 48

8 
EXISTING MAST SITES ON PERTH & KINROSS LAND OR BUILDINGS
Current mast sites on Perth and Kinross land are five in total. These sites are leased to telecoms
operators and are at varying stages in terms of the lease agreements.  Often when the lease agreement is
due for renewal or renegotiation the Council will employ a land agent with specialisms in
telecommunications equipment to act for it so that the best return can be achieved. 
Because of the ECC operators of these sites will seek to vary existing agreements to reflect the provisions
of the Code including access, and rights to upgrade and share the apparatus. The trend recently has been
for operators to only propose a modest rent for these sites which will impact upon the Councils revenue
stream – although in return the area and communities will be getting better mobile connectivity. Courts will
be able to impose code agreements on the landowners, and to vary existing agreements, in order to align
them with the new code.
The Council will most likely need to accept a reduced revenue income from operators because of the ECC
and the proliferation of masts. Also as part of the SFT Infralink project – a set of tools has been developed
including lease agreements and a market oriented rate card for anticipated revenue return from the lease
of sites whether rural or urban.
THE UK SHARED RURAL NETWORK (SRN)
The Shared Rural Network (SRN) forms part of the wider mobile telecoms industry roll out of mobile
networks and will help deliver reliable mobile broadband to 95% of the UK, addressing the digital divide by
improving 4G coverage in the areas that need it most. Through the programme, UK’s four mobile network
operators (MNOs) – EE, Telefónica UK (O2), Three and Vodafone expect to provide coverage to an
additional 280,000 premises and for people in cars on an additional 16,000km of the UK’s roads and
improve geographic coverage to Areas of Natural Beauty, National Parks and other scenic areas
benefitting millions of visitors every year.
Individually, each operator will reach 90% geographic coverage, which will result in 84% of the UK having
4G coverage from all four operators, increasing choice and boosting productivity in rural areas. In
Scotland, the SRN will see 4G coverage from all four operators rise to a minimum of 74%, up from 42% in
2020. In Perth & Kinross itself it is expected that coverage from all MNOs will increase from 48% to 75%
and from at least one MNO will rise from 76% to 91%. 
Progress against these targets will be measured by Ofcom. These improvements to mobile coverage will
allow rural businesses to prosper and rural communities to thrive. Businesses will benefit from increased
ease of navigation, improvements in marketing and access to documents. Visitors to remote areas of the
UK will have better access to online information, boosting the UK’s and the Perth & Kinross tourism
industry.
The SRN programme will transform 4G coverage without duplicating infrastructure, minimising the impact
on our landscape.  Reaching 95% coverage will require improvements in coverage in:
• Partial Not Spots (PNS) – Through increased sharing of infrastructure between operators, each
operator will extend its coverage footprint to 88% of the UK’s landmass. This will in turn increase
consumer choice. The Mobile Operators will be responsible for delivering this programme of work
and will be investing over £532m. Coverage in Perth & Kinross will rise in these areas so there will
be at least 91% coverage from at least one operator. 
Page 48 of 54

Page 49

9 
• Total Not Spots (TNS) and Extended Area Service (EAS) – By building new infrastructure in
areas where there is currently no coverage and by upgrading the EAS network, they will take
coverage from all operators to at least 90% of the UK landmass, meaning that 95% of UK
landmass will have coverage from at least one operator. Coverage in Perth & Kinross will rise to
91% from at least one operator. This is funded by the UK Government. 
Perth and Kinross is planned to have around 12 new privately funded mast sites for the PNS sites and
around 15 publicly funded ones for the TNS sites.  Perth & Kinross is one of the major beneficiaries of the
SRN project because of the rurality of the area and the number of total not-spots and partial not-spots.
The industry funded sites are being discussed with Cornerstone (who work on behalf of O2, Vodaphone
and Three) and cover areas of Highland Perthshire out to Loch Rannoch that have been notorious mobile
‘not-spots’ in the past, but also areas around Kenmore and out towards Stirling Council boundary.  EE are
not participating in this consortium but are continuing to develop their rural network independently.
These new masts and base stations will be constructed over the next 12—18 months, and the Council will
manage the planning process and consider the many technical elements, such as siting/height/design that
will need to be considered to deliver the infrastructure that will be needed to improve coverage in Perth
and Kinross. The benefits of sharing sites will be that it is possible to maximise service provision and
minimise environmental impact by minimising mast numbers.
Over time, existing 4G sites serving populated areas are likely to be upgraded to 5G. Timescales will
depend on multiple factors. If the Council wishes to benefit from future 5G technology and the benefits for
residents and businesses that it will bring, the Council will need to support updating and adding 4G
network sites.
In urban parts of our area, mobile deployment activity will be focused on re-engineering existing sites to
enhance performance (capacity and speed) to prepare for 5G. A few new sites may be required but
applications and investment from telecoms operators will likely be directed at upgrades to existing sites. In
rural areas there will be more focus on finding and building new sites to address the PNS and TNS
coverage areas. The upgrade of existing network sites in rural, less populated areas will be lower priority,
and take longer to roll out.
A future 5G network will therefore be deployed over time by a managed programme of upgrades
systematically working through all existing MNO mast sites. New PNS/TNS sites will be added in remote
rural areas. In future years, however small cells (much smaller devices fixed to lamp posts and other
street furniture) will be added in urban areas of highest demand but could also be deployed in rural areas
where there is a particular use being planned.
THE SCOTTISH FUTURES TRUST ‘INFRALINK’ PROJECT AND ‘INFRALINK EXCHANGE’
The Council is a member of the ‘Infralink’ programme which is led by Scottish Futures Trust (SFT) and
funded by the Scottish Government. It has been established in the recognition that the current process for
local authorities and the mobile telecoms sector in deploying masts and small cells is complex and
resource intensive. It aims to engage with public sector property owners and telecoms providers to
improve mobile connectivity by taking a national approach to streamlining and simplifying the network roll-
out process.
Page 49 of 54

Page 50

10 
There is an Infralink portal with access to tools and supporting documentation making the process of
identifying and agreeing land and buildings that can be leased to host digital infrastructure much easier. 
There are four main benefits offered through the Infralink project that are Electronic Communications Code
and State Aid compliant:
• a national asset register
• standardised lease agreement
• payment guidance framework
• free access to experienced technical resource
Infralink draws from existing local level projects such as West Midlands 5G Infrastructure Accelerator and
Glasgow City Council’s Digital Interface and Telecoms Unit. These experiences show that if the process is
made simpler and more transparent this can lead to mobile network operators being attracted to work more
closely with a local authority, leading to the sharing of deployment plans, additional investment, and
improved connectivity. The tools will also help with stretched resources by making the offering of the Local
Authority clear up-front and removing some of the repetitive elements of the process.
More recently the SFT and the Tay Cities local authorities together with a consortium of other public and
industry bodies were successful in becoming a Digital Connectivity Infrastructure Accelerator (DCIA). This
‘Infralink Exchange’ programme funded by the UK Government explores the challenges of using publicly
owned land, buildings and street furniture to support digital infrastructure and roll out of advanced wireless
connectivity. The focus is on: 
• Accelerating deployment of digital infrastructure by improving the ability to access and acquire sites.
• Building evidence to understand the benefits and feasibility of using street furniture to host multiple
technologies. 
A platform is currently built and is being opened to the telecoms operators market so that all the Councils
assets in terms of buildings and street furniture can be viewed.
USE OF COUNCIL BUILDINGS AND ASSETS
Proposals for the installation of telecommunications equipment are often in the form of masts on land, but
increasingly buildings, roofs, streetlights and street furniture and other assets are being requested. This can
include cabinet boxes, wireless and satellite dishes, or ‘small cells’ which are cellular radio access nodes.
Erecting masts, antennae or other such structures will need to comply with national planning policy Circular
2/2015 and the LDP policy.  However, much of this equipment is increasingly small and can be hidden from
view. 
The Council has been supportive of the expansion of telecommunications networks where correctly sited,
including the use of Wi-Fi and cellular communications equipment on its land, buildings and other assets. 
However, the Council will want to keep the numbers of radio and telecommunications mast installations to
a reasonable level by using existing masts, buildings and other structures and sympathetically designing
and appropriately camouflaging equipment where possible.
The Council does not have a standard ‘site-share’ agreement for the use of its assets but the Infralink project
mentioned above provides both land and buildings based standard documents that will be utilised for this
purpose. 
Page 50 of 54

Page 51

11 
IMPLEMENTING TELECOMMUNICATIONS IN PERTH & KINROSS
Councils are instrumental in delivering both fixed fibre and mobile networks, through granting planning
permission, ensuring future development is planned with mobile connectivity in mind, or providing their
public assets to host mobile equipment. How local authorities interpret planning laws and street works rules,
and how they design local economic strategies has a bearing on how efficiently mobile infrastructure can
be deployed. In short, Councils influence the speed and cost of mobile infrastructure being built. Mobile
networks should be a key priority in the digital infrastructure strategy for the area.  This will require a
partnership between MNOs and the Council. MNOs and local government working together is essential if
4G and 5G connectivity is to be available to as many people and businesses as possible.
There is guidance available to Councils from the mobile network operators in how to support the roll out of
mobile networks2. It is the view of the MNOs that councils should think about their future mobile connectivity
needs in the same way that they think about other types of essential economic infrastructure like roads,
housing, utilities and even fibre broadband. Improvements to mobile technology often move faster than
councils can update their local development plan policies. Some current Local Plans in the UK were
published before 4G technology was even launched but mobile connectivity has become so vital now that
residents and businesses have to have access to the best possible mobile connectivity in the future.  The
Councils own LDP policy on telecommunications is proactive and up-to-date but will be reviewed again in
due course. 
The Council will continue to be mindful of unintended locational consequences for residents, landowners,
landscape, townscape and public health, whilst adopting a constructive approach to the siting of telecoms
masts to support digital infrastructure. The Council can be pro-active and supportive in developing digital
connectivity, working with the mobile industry to enable the roll out of networks that are now essential to life
in our rural areas. However, the Council can still seek to avoid educational, public or staff use premises
where there may be public concerns and it should also continue to minimise the impact on the landscape
of masts though the planning process.
The Council will therefore put greater emphasis on mobile connectivity by implementing the following
policies:
• Assets and Leases:  The Councils assets are potential locations for mobile infrastructure. Using
public buildings, structures, and open land to install mobile infrastructure has supported
widespread improvements to connectivity. The charge for use of these assets should be set on
the basis set out in the Electronic Communications Code and will be guided by the template lease
agreements and payment guidance from the SFT Infralink and Infralink Exchange projects. The
Council will prioritise the development of coverage over revenue returns from leases in the
knowledge that these will diminish as a result of the ECC. Within this context leases will be agreed
whilst being mindful always of health and environmental concerns.
The Council will seek to record, manage its land, buildings, streetlights and other assets
and make these available to MNOs - subject to planning, health and related considerations
being satisfied - and lease sites using template agreements provided by Scottish Futures
Trust Infralink project.
• Digital infrastructure:  The Council will learn lessons from the rollout of fixed fibre broadband
particularly the recent full fibre broadband roll-out in Perth and wider Perth & Kinross. Full fibre
provides the backhaul for 4G and 5G services and so the footprint now provided for fibre gigabit 
2 Councils and Connectivity 2: How prepared is local government for the future of mobile? May 2019 also Mobile UK
Local Authority Toolkit. 5G and Health > Local Authority Toolkit (mobileuk.org) 
Page 51 of 54

Page 52

12 
connectivity gives a greater opportunity to develop mobile connectivity. The Tay Cities are
currently developing a strategy for digital infrastructure across the area.
The Council will seek to develop mobile, wireless and fixed fibre networks and services in
tandem, building towards world class digital connectivity for the regions residents and
businesses.
• Collaboration with industry:  Collaboration with the mobile network industry is vital to get the
connectivity that the area needs. Working across Tay Cities and with SFT, the Council will
participate in regular catch-up meetings and roundtables, which support a collaborative approach
between the mobile industry and local government and business.
• The Council will continue to participate with Tay Cities local authorities, SFT (Infralink),
Scotland 5G Centre, Scottish Government and others in improving links with mobile
operators to improve mobile connectivity in the area.
• Shared Rural Network:  Over the next few years Perth & Kinross will see greatly enhanced mobile
connectivity through the development of masts as part of the part UK Government supported
Shared Rural Network. It will be important for the Council to engage with MNOs and their agents
and representative bodies to enable the rapid and seamless development of new mast sites in the
area subject to environmental and health issues being satisfied.
• The Council will engage fully with the Shared Rural network initiative and – through
dialogue and pre-application discussions – seek to enable the smooth development of new
mast sites within the context of planning policy and development management procedures.
• Health impacts:  The Council will always assess any telecommunications development with
respect to potential health risks and will have regard to exposure guidelines in the UK that have
been developed by the International Commission on Non-Ionizing Radiation Protection (ICNIRP).
These guidelines were prepared following a comprehensive assessment of all the peer-reviewed
scientific literature, including thermal and non-thermal effects. The guidelines are based on
evaluations of biological effects that have been established to have health consequences.
• The Council will have regard to potential health effects of telecommunications installations
and will continue to exercise a precautionary approach to siting of telecommunications
equipment in close juxtaposition to schools, sheltered housing, council offices or other
public premises.
• Planning and Economic Development:  There is a need to embed pro-active mobile connectivity
policies in the Local Development Plan at next review and in plans for local economic
development. The development of mobile infrastructure should be a key part of the vision for any
local or regional economic strategy. 
The Council will review and update its land use development plans and other policies to
ensure that they reflect a positive and proactive approach to digital infrastructure.
• Development Management:  The Council will operate a proactive and encouraging approach to
mobile connectivity whilst ensuring that health, landscape and environmental considerations are
all properly considered in the planning process. The Council will seek to consider digital
connectivity as a key consideration in the planning phase of new developments. Any development,
from upgrades to the road network to new housing developments, should consider connectivity
requirements prior to construction beginning, not after construction is complete. There should be
a principal of ‘dig-once’ in any new development so where services are being laid fibre can be laid
and other telecoms equipment installed.
Page 52 of 54

Page 53

13 
The Council will ensure that new mobile masts and related developments comply with all
planning, health, landscape, and environmental considerations whilst ensuring that
coverage is improved across Perth and Kinross.
• Single Point of Contact: The Council will designate a Single Point of Contact (SPOC) with the
responsibility to liaise with MNOs reporting into a corporate group on digital connectivity. This role
will aim to make better use of mobile/ digital technology and align competing interests.
The Council will designate a Single Point of Contact (SPOC) with the responsibility to liaise
with Scottish Government, SFT, Scotland’s 5G Centre and MNOs reporting into corporate
groups on Smart Perth & Kinross and Digital Transformation. 
Page 53 of 54

Page 54

Page 54 of 54