Agenda Document Pack - Environment, Infrastructure and Economic Development Committee - 21/09/2022

Perth and Kinross Council · 21 September 2022
Back to Environment, Infrastructure and Economic Development Committee — 21 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
14/09/2022 
A hybrid meeting of the Environment, Infrastructure and Economic Development
Committee will be held in the Council Chamber on Wednesday, 21 September 2022
at 10:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive      
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Andrew Parrott  (Convener)
Bailie Mike Williamson  (Vice-Convener)
Councillor Keith Allan
Bailie Alasdair Bailey
Councillor Steven Carr
Councillor John Duff
Councillor Angus Forbes
Councillor Ken Harvey
Councillor Noah Khogali
Bailie Claire McLaren
Councillor Willie Robertson
Councillor Frank Smith
Councillor Colin Stewart
Councillor Richard Watters
Councillor Jack Welch
Page 1 of 58

Page 2

Page 2 of 58

Page 3

Page 3 of 58

Page 4

Environment, Infrastructure and Economic Development Committee 
Wednesday, 21 September 2022 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE OF
CONDUCT. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF ENVIRONMENT, INFRASTRUCTURE
AND ECONOMIC DEVELOPMENT COMMITTEE OF 29 JUNE
2022 FOR APPROVAL
(copy herewith) 
7 - 8 
4 OUTSTANDING BUSINESS STATEMENTS (OBS)
(copy herewith 22/223) 
9 - 10 
5 POLICY AND LEVEL OF SERVICE FOR WINTER 2022/23
Report by Head of Environmental and Consumer Services (copy
herewith 22/224) 
11 - 32 
6 UPDATE ON PROPOSALS FOR THE SCOTTISH GOVERNMENT
PLACE-BASED INVESTMENT PROGRAMME
Report by Head of Planning and Development (copy herewith
22/225) 
33 - 46 
7 PERTH AND KINROSS OUTDOOR ACCESS FORUM ANNUAL
REPORT 2021-22
Report by Head of Environmental and Consumer Services (copy
herewith 22/226) 
47 - 58 
IT IS RECOMMENDED THAT THE PUBLIC AND PRESS SHOULD BE EXCLUDED
DURING CONSIDERATION OF THE FOLLOWING ITEM(S) IN ORDER TO AVOID
THE DISCLOSURE OF INFORMATION WHICH IS EXEMPT IN TERMS OF
SCHEDULE 7A TO THE LOCAL GOVERNMENT (SCOTLAND) ACT 1973 
P1  MULTI-USE PATH BETWEEN STANLEY AND LUNCARTY PATH
ORDERS
• Exempt Reason 6 - Information relating to the financial or
business affairs of any particular person (other than the
authority). 
Page 4 of 58

Page 5

Page 5 of 58

Page 6

Page 6 of 58

Page 7

ENVIRONMENT, INFRASTRUCTURE AND ECONOMIC
DEVELOPMENT COMMITTEE 
Minute of hybrid meeting of the Environment, Infrastructure and Economic
Development Committee held in the Chambers on 29 June 2022 at 10.00am. 
Present: Bailie A Bailey, Councillors K Allan, S Carr, E Drysdale (substituting for
Councillor J Welch), J Duff, A Forbes, K Harvey, N Khogali, C McLaren, A Parrott,
W Robertson, F Smith, C Stewart, R Watters and M Williamson. 
In Attendance: B Renton, Executive Director (Communities); C Mailer, Depute
Director (Communities); D Littlejohn, Head of Planning & Development,
M Butterworth, Head of Environmental and Consumer Services; F Robertson, Head
of Culture & Communities Services, S D’All, B Cargill, R Lyle, C Hendry, N Taylor
(Communities); and S Hendry, K Molley, A Brown and M Pasternak, J Guild,
B Parker (Corporate and Democratic Services). 
Apology: Councillor J Welch 
Councillor A Parrott, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
Councillor A Parrott welcomed everyone to the meeting and an apology was
noted above. 
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interest made in terms of the Councillors’ Code
of Conduct. 
3. MINUTE OF PREVIOUS MEETING 
The minute of the meeting of the Environment and Infrastructure Committee of
14 March 2022 was submitted and approved as a correct record. 
4. COMMUNITIES JOINT BUSINESS MANAGEMENT AND IMPROVEMENT
PLAN 2022/23 AND SERVICE ANNUAL PERFORMANCE REPORT 2021/22 
There was submitted a report by Head of Business and Resources (22/149)
(1) detailing progress against targets and improvement actions over the last year;
and (2) setting out priority focus areas for the coming year to support delivery of the
Council’s strategic objectives and outcomes. 
Resolved:
(i) The Communities Joint Business Management Improvement Plan 2022/23
and Annual Performance Reports 2021/22 for the areas which fall within their
remit, be approved.
3
Page 7 of 58

Page 8

(ii) The comments from the Scrutiny and Performance Committee on the format
of future Business Management and Improvement Plans and Annual
Performance Reports, be noted. 
5. THE ROYAL NATIONAL MÒD 2022 
There was submitted a report by Head of Culture and Communities Service
(22/150) updating the Committee on the extensive planning underway for The Royal
National Mòd 2022, anticipated outcomes of the event and the financial implications
of hosting the event. 
Resolved:
(i) The resourcing and delivery arrangements for Mòd Pheairt 2022, be noted
(ii) It be requested that a further report be brought back to Committee on the
impact on Mòd Pheairt in due course.   
Page 8 of 58

Page 9

ENVIRONMENT, INFRASTRUCTURE AND ECONOMIC DEVELOPMENT COMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(22/223) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action 
due
Action
Expected
1. 29 June 2022.
Item 4.
Communities Joint
Business
Management and
Improvement Plan
2022/23 and
Service Annual
Performance
Report 2021/22
P37- Provide members
with data on the usage of
free public WIFI in
Kinross, Pitlochry and
Alyth. Also, to provide
members with an update
on timescales of
installing Town Centre
Wi-Fi. 
TBC  David Littlejohn TBC 21
September
2022
2. 29 June 2022
item 4. 
Communities Joint
Business
Management and
Improvement Plan
2022/23 and
Service Annual
Performance
Report 2021/22
P23 – Provide members
with data on the
effectiveness of the
noise application.  
TBC Clare Mailer TBC 21
September
2022
3.  29 June 2022.
Item 4. 
Communities Joint
Business
Management and
Improvement Plan
2022/23 and
Service Annual
Performance
Report 2021/22
P6 – Provide members
with data on the up take
and usage of free bus
passes. 
TBC Barbara Renton TBC 21
September
2022
4
Page 9 of 58

Page 10

No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action 
due
Action
Expected
4.  29 June 2022.
Item 5. 
The Royal
National Mod
Provide members with
information on the
number of schools which
teach Gaelic as a
language choice across
Perth and Kinross. 
TBC Fiona Robertson TBC 21
September
2022 
Page 10 of 58

Page 11

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure and Economic Development 
21 September 2022 
POLICY AND LEVEL OF SERVICE FOR WINTER 2022/2023 
Report by Head of Environment and Consumer Services
(Report No. 22/224) 
1. PURPOSE
1.1 This report describes the winter season experienced in 2021/2022 and
proposes a level of service for the 2022/23 winter season period, the aim
being to permit winter weather to be treated and assist the safe movement of
pedestrians and vehicles across the Council area. 
1.2 The Winter Maintenance Policy is designed to deal with a typical winter and
the level of service complies with the recommendations laid down in Code of
Practice 'Well-managed highway infrastructure' (the code).  The code refers to
practical guidance by the National Winter Service Research Group (NWSRG). 
1.3 Severe snow events may restrict movement during periods when demand
exceeds the available resources.  Teams will continue to focus their efforts on
priority routes whilst continually reviewing conditions and routes to ensure
optimal efficiency. However, often during these severe events the Council can
not meet the public’s expectations. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Environment, Infrastructure and Economic
Development Committee: 
notes that changes to last year’s policy and level of service for winter are
shown in italics 
approves the level of service for the gritting and snow clearing of roads and
footways in Perth and Kinross for the forthcoming winter period, using plant
and labour resources of Tayside Contracts, other Council Services and
private contractors as required. 
5
Page 11 of 58

Page 12

3. STRUCTURE OF REPORT 
a. This report is structured over the following sections: 
• Section 4: Background  
• Section 5: Proposals 
• Section 6: Conclusion  
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1 Within Perth and Kinross, there are a number of winter service arrangements
for our public roads.  Around 910km of the Council’s 2,500km road network is
designated as a high priority for winter service.  These priority routes receive
precautionary treatment that aims to keep them generally ice-free, although
this can never be guaranteed. 
4.2 The Council also provides a high level of service on priority footways in busy
urban areas.  Lower levels of treatment are provided on the remainder of the
carriageway and footway network, as and when required, during normal
working hours. However, it is not possible to treat every road and footway,
particularly during severe weather events.  Very low priority carriageways and
footways are normally not treated, unless hard packed snow or ice threatens
to prevent access for essential services. 
4.3      In periods of prolonged severe weather, resources are targeted towards
keeping the strategic road and footways network open.  As a result, it can be
a considerable time (in some cases several days) before lower priority routes
are reached.  The availability of operatives also impacts on the level of cover
that can be provided for footway treatment. 
4.4 The Scottish Government is responsible for the winter service on the 250 km
of trunk road network within Perth and Kinross covering the M90 & A90 which
was awarded to Operating Company – Amey, to manage from August 2022.
The A9 and A85 has been managed by the Operating Company - BEAR
(Scotland) Ltd for many years but the section of A9 from Keir Roundabout to
Broxden is also now the responsibility of Amey. 
4.5 Experience of recent winters has shown that the level of service as set out in
this Policy is generally achievable, although public expectation is significantly
higher in severe snow and ice events than can reasonably be delivered.  This
is particularly the case on the lower priority roads and footways.   
4.6 Winter seasons are always unpredictable. 2021/22 was what can be
described as a “typical winter” with regular afternoon/evening treatments to
prevent ice forming overnight, followed by morning checks and treatment
where wet weather had washed the salt off and thus required retreatment. 
Page 12 of 58

Page 13

4.7  Planned activity is based on forecast road surface temperatures rather than
air temperatures as reported in news forecasts.  Operationally, fewer actions
were carried out compared to the previous winter and sits around the 6 year
average, hence deemed a typical winter.  The reduced period of nightshift
cover put in place compared to previous seasons still required broadly similar
levels of treatment, thus justifying compressing the period the nightshift was
available.  Table 1 Operational Activity Statistics details activity over last
winter compared to previous years, highlighting:   
• there was only a requirement to plough snow from the network for 8 days
(measured as treatment across 50% of the network)
• 14,868 tonnes of salt were spread, a decrease of 9,290 tonnes the previous
winter.  
4.8 With over 1,600 grit bins, keeping them fully stocked when demand is high is
challenging.  Last winter, 3rd party contractors assisted in stocking grit bins in
advance of winter and replenishing during the season.  As it was a relatively
mild season, self-help was not exhaustive and, as such requests could
broadly be kept up with.  Moving forward, officers are investigating the
introduction of QR codes, which would provide residents with a quick and
easy way of informing the Council of the need to re-stock an empty grit bin,
although it is unlikely that this new facility will be introduced for the coming
winter. 
4.9 Although a typical winter season, £3.810m budget was exceeded, out-turning
at £4.035m indicating that the budget is inadequate for the service required. 
The balance of cost is funded from Council reserves. The budget for the
current winter programme (2022/23) has been increased to £3.865m,
although it is recognised that, as in previous years, the outturn position will
depend on the extent of the winter weather. 
4.10 At the end of each winter, a review of operations is undertaken with
stakeholder consultation to identify areas of good practice, challenges faced,
capacity and resource issues and improvements or adjustments to future
plans.  Changing weather patterns, resources and personnel constraints
mean that the winter service needs to be agile and flexible to respond
effectively.   
4.11 These management reviews seek to provide an acceptable level of service
whilst minimising costs, complying with working time directives and managing
the work/life balance for personnel.  As part of the review all elected members
and Community Councils were contacted and invited to provide feedback on
the 2021/2022 service to inform improvements or adjustments for the current
year.  As it was not a severe winter season, minimal feedback was received. 
Page 13 of 58

Page 14

4.12 The Council have 8 weather stations, 2 carriageway sensors and 9 camera
sites (3 sites have dual directional cameras) placed strategically across the
network.  The station data and images are shared with neighbouring
authorities & BEAR Scotland, with their information reciprocally shared with
Perth and Kinross.  The camera images are also available on the Council
website alongside a community camera at Spittal of Glenshee (which the
Council helped fund) and Braemar. The Council would welcome discussions
with other community groups around installing additional cameras and sharing
the costs/images. This infrastructure is maintained, and information retrieved /
interpolated by Vaisala. The weather forecast contract for the winter of
2022/23 will again be provided by MetDesk Weather Services.  Both contracts
are administered by Tayside Procurement Consortium on behalf of seven
councils working collaboratively to achieve economies of scale. 
Table 1 – Operational Activity Statistics
Action 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
Category 1 pre gritting  46 46 70 33 56 53 47
Category 1 Morning
De Ice or Snow
Clearing  
80 71 108 53 66 66 76
Treatment on night
shift routes
82 63 91 55 82 61 58
Number of snow days
(>50% of network)
37 29 35 7 10 37 8
Treatment on Cat 2
network 
34 24 56 28 20 44 31
Treatment on Cat 3
network
7 5 12 3 1 17 6
Treatment on footway
network
23 11 50 19 12 38 25
Salt used (t) 21,300 13,301 30,632 12,191 18,681 24,158 14,868
Grit Sand used (t) 466 965 3,322 675 875 3,412 750
Red/Orange Alert in
operation (days)
3 2 19 0 2 35 11 
5. PROPOSALS 
5.1 Cover will commence on 17 October 2022 and run until 2 April 2023.
Appendix 1 details the phased resources available and the times that the
agreed level of service will be provided, if treatment is required.  However, in
periods of prolonged severe weather, this level of service is often not
achievable due to a requirement to ensure that  operatives are given adequate
(statutory) rest breaks and do not exceed driver hours. 
5.2 Over weekends and public holidays, a driver cohort that can treat only the
Category 1 road and footway network is available.  This is because we need
the entire workforce to widely treat the lower categories, and to do this 7 days
a week would prevent road workers getting adequate (statutory) breaks. 
Page 14 of 58

Page 15

5.3 A reduced level of staff and vehicles are available during the lead in and lead
out periods reflecting weather patterns.  In circumstances when unseasonal
weather is forecast/experienced, volunteers are sought to support any
response and work outwith normal hours. Resourcing reduced
staffing/vehicles during these periods assists in containing costs. However,
this presents capacity risks when adverse weather is encountered. 
5.4 In severe weather conditions, the higher priority routes may have to be treated
several times before resources can be diverted to lower usage roads.
Treatment may be restricted to clearing only the carriageway, or one footway,
to ensure resources are utilised as widely  as possible across communities. 
5.5 Tayside Contracts provide the labour to drive all carriageway gritters.  The
national shortage of HGV/LGV drivers continues along with general
challenges in attracting and retaining staff.  This has directly impacted
available driver numbers and various initiatives are being pursued, including
utilising the sub-contract supply chain, to fill “gaps” in the driver rotas.   
5.6 Target Completion Time - during the main cover period the target completion
time for routine morning de-icing of Category 1 carriageways is 07:30 (09:00
on Sundays and nationally recognised public holidays).  The treatment time in
severe weather conditions will be longer.  When snow falls it can take twice as
long to complete treatment, as vehicles need to travel more slowly and
ploughing is required in both directions.  With the exception of the four
nightshift routes, which operate during the main standby period, no treatment
will routinely extend beyond 21:00 (see Appendix 2a): 
• Category 1 priority roads will be treated seven days per week as
detailed above.
• Category 2 roads will be treated five days per week (Monday to Friday)
as resources permit between 08:00 – 15.00.
• Category 3 routes comprise of roads which are not normally treated,
except in prolonged ice or snow conditions and only when resources
become available.  Each treatment route will be arranged so that the
most important parts are treated first, whilst taking account of
operational efficiency. 
5.7 Footways receive treatment according to their usage and importance in the
public road network (see Appendix 2a). Based on this assessment: 
• Category 1 priority footways will be treated seven days per week within
the main winter period, with extended hours on weekdays if an alert is
called.  No footway treatment will be carried out on Christmas Day and
New Year’s Day as (in general) shops are not open on those days.
However as Christmas Day/New Year’s Day both fall on a Sunday, it is
intended to use staff rotas for the public holidays of Monday 26t and
Tuesday 27 December and Monday 2 and Tuesday 3 January 2023 to
prevent three consecutive days in each week without footway
treatment. 
Page 15 of 58

Page 16

• In periods of daily repeat treatment officer discretion will be applied to
treating the side of a footway “not normally treated”.  Consideration will
also be given to rotation of treatment across settlements to ensure fair
coverage.  This flexibility will widen route coverage whilst not
compromising category 1 route safety. 
• Category 2 footway routes will be treated five days per week (Monday
to Friday) as resources permit between 08:00 – 15.00.
• Category 3 routes comprise of footways which are not normally treated,
except in prolonged ice or snow conditions and only when resources
become available. 
5.8   Situations occur which need restrictions on hours, routes, and the
employment of contractors etc. to be relaxed, to deal more effectively with the
emergency.  This is allowed for and controlled by a system of ‘Alerts’.  In
serious situations, either an Orange or Red Alert can be authorised by the
Road Maintenance Partnership Manager, to allow working arrangements out
with the ‘normal’ policy such as employing 3rd parties to work on clearing/lifting
snow or exceeding driver hours to deal with un-forecast situations.   
5.9 Last winter season saw 14,868 tonnes of salt spread, leaving a holding in the
salt domes of ~6000 tonne.  As the price for marine salt has again increased
considerably this year (on top of increases for winter 2021/22) due to shipping
costs, we are using an increased quantity of rock salt this season. Marine salt
will still be used in footway ploughs.  It is anticipated that the move to rock salt
will result in a net saving to the Council, however this will be dependent on
weather conditions and the number of any resulting re-applications.   
5.10 The Council currently provides in excess of 1,600 grit bins, reflecting our
approach to encourage self-help and the policy not to treat some minor roads
routinely.  Any request for additional grit bins may require relocation of grit
bins with minimal usage.  Grit bins are generally only provided on steep
gradients, tight bends, and steps or in some special cases where there is a
specific community need. The routinely available resources to service and
replenish these containers is at capacity and 3rd party contractors will again be
used to assist replenishing these.  Additionally bulk bags of salt are available
should communities request a quick supplementary supply.  Additional push
along barrows are also available for community groups/individuals to assist in
treating areas the Council does not routinely get to. 
5.11 Discussions have taken place with residents in Glen Quaich who have
indicated a willingness to plough and grit part of the road from Amulree to The
Garrows (last property before going over the hill).  The Council will, via
Tayside Contracts, provide snow plough blades, a trailing gritting attachment
and salt to enable them to achieve this.  Council officers will, in conjunction
with residents, monitor effectiveness so this can be rolled out further, if
interested parties come forward. 
5.12  Voluntary arrangements are in place with 68 farmers to whom the Council
supplies snow ploughs, which they fit to their own vehicles to clear snow on
specified lengths of public road, and their own private roads.  Farmers provide
Page 16 of 58

Page 17

an invaluable additional resource and following a reduction in 2020/21,
additional efforts were made by officers to support and encourage farmers to
complete the application process for 2021/22 resulting in around 20 coming
back on board supported by 6 new ones. The farmers included on this
agreement cover around 300km of road, just under 8% of the overall Council
road network. 
5.13 In addition, 32 of these farmers have indicated that they are available to be
employed in severe conditions to undertake snow clearing of additional
lengths of road.  These farmers are called on for Orange Alerts.  Again, these
farmers provide a much appreciated and important service. 
5.14  There is a national desire to move people away from cars to other forms of 
active travel such as buses, bicycles and walking.  The Council’s approach
and programme to achieve this will impact on winter service delivery as
different types and numbers of vehicles/drivers will be required.  The
approach will also likely be different across urban and rural locations.
Consideration of requirements and funding implications for winter service
should be included when developing these active travel plans. 
6. CONCLUSION   
6.1 Based on previous successful service delivery, it is concluded that the winter
maintenance service should be delivered as outlined in this report. 
6.2 The Executive Director (Communities) is authorised to make arrangements
out with the policy and level of service in exceptional conditions such as snow
and flooding emergencies 
6.3 The winter maintenance budget, (£3.865m) is also used to fund other
weather-related emergencies, such as works to mitigate immediate risk of
flooding to properties/roads and wind damage, directly affecting free
movement across the network. 
Author
Name  Designation Contact Details
Stuart D’All Road Maintenance
Partnership Manager
(01738) 475000
ComCommiteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton Executive Director
(Communities)
12 September 2022 
APPENDICES
• Appendix 1 – Period of Cover
• Appendix 2a – Level of Service & Priority Systems (Carriageways)
• Appendix 2b -  Level of Service & Priority Systems (Footways)
• Appendix 3 – Category 1A Carriageway Snow Routes
Page 17 of 58

Page 18

Page 18 of 58

Page 19

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk Yes
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1. Strategic Implications  
Community Plan / Single Outcome Agreement 
1.1 The winter maintenance service is provided to ensure that transport links
essential to economic and social activity can continue to be used safely
throughout most of the winter. However, it is not the intention and is not
possible to keep all roads free from ice and snow at all times. 
1.2 The Council’s policy is set out in Report 96/180 “Summary of Council Policies
for Roads and Transport” approved by the Roads and Transport Committee
on 24 April 1996: (Art. 63/96). It is deemed that this policy is still relevant. 
1.3 Policy 5 of the above report - The Council will operate a priority system of
winter maintenance which will, as far as reasonably practicable, permit the
safe movement of vehicular and pedestrian traffic on the more important parts
of the road and footway network, taking into account the finance which has
been made available. The priority system will be applied uniformly and will, as
far as possible, contain costs to an acceptable level. 
1.4 The objective of this policy is to enable the Council to comply with its statutory
duty as set out in Section 34 of the Roads (Scotland) Act 1984 which states:
“A roads authority shall take such steps as they consider reasonable to
prevent snow and ice endangering the safe passage of pedestrians and
vehicles over public roads.” The policy allows the Council to meet its statutory
obligations by providing the most effective winter maintenance service it can
Page 19 of 58

Page 20

within the constraints of its finite resources. During severe weather, the
Council will endeavour to keep delays to a reasonable minimum. 
Corporate Plan 
1.5 The Council’s Corporate Plan for Securing the Future 2018 and Beyond lays
out five Objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  This report
impacts on the following:- 
i) Promoting a prosperous, inclusive and sustainable economy
ii) Supporting people to lead and independent, healthy and active life
iii) Creating a safe and sustainable place for future generations 
2. Resource Implications 
Financial 
2.1 The following table illustrates the pattern of expenditure in recent years. 
2.2 The actual expenditure on the Winter Service will be dependent upon the
severity of the weather throughout the winter and other emergencies
throughout the year and will be closely monitored and reported regularly to the
Strategic Policy & Resources Committee. 
2.3 The costs of providing a winter service is split into two distinct areas:
• Standing Charges – these are the costs involved in having specialised
plant, depots, hired plant and standby personnel etc in place to provide
the service. These  are effectively “up front” costs incurred irrespective
of weather conditions.
• Operating costs – cover the cost of fuel, routine repairs, salt, grit sand
and the actual cost of paying staff and operatives to provide the
service. 
2.4 As detailed in the table in paragraph 2.1 the average outturn cost over the
past seven years is £4.110M which exceeds the budget figure.  Last winter,
which is considered to have been a typical winter is still fifth highest cost in
last 10 years.  Six of the last ten years out-turn costs exceed the current
Year  Budget  Standing
Charges
Operating
Costs
Outturn Cost
2015/16 £3.617m £2.088m £1.568m £3.656m
2016/17 £3.617m £2.148 £1.223 £3.371m
2017/18 £3.717m £2.185m £2.857m £5.042m
2018/19 £3.714m £1.738m £1.833m £3.571m
2019/20 £3.714m £1.436m £2.885m £4.321m
2020/21 £3.714m £1.683m £3.091m £4.774m
2021/22 £3.810m £1.600m £2.435m £4.035m
Mean    £4.110m
Page 20 of 58

Page 21

budget and the Council will undoubtedly need to continue to utilise reserve
funds to meet the full cost of the Winter Service. 
2.5 The Council have this year set a budget for £3.865m for winter 2022– 2023
and this report is brought it to committee to enable preparations to begin for
the winter season.  It is recognised that in these continuing unprecedented
times the Council financial position may change requiring a subsequent
alteration in the levels of service delivery to match the available budget. 
2.6 The Council will continue to implement operational and efficiencies savings to
mitigate costs but as winter is unpredictable the cost will vary. 
Workforce 
2.7 The staff and the operatives of Tayside Contracts and the Council Services
who provide the service, have demonstrated over the life of the Council, that
they have the experience, flexibility and expertise to effectively tackle the
worst of winter weather, although public expectation will exceed the ambitions
of what officers can realistically achieve. As stated in the report market forces
for HGV/LGV drivers and staff in general, present a challenge in attracting
and retaining staff. Rotas will be populated with employed staff and measures
taken to fill required roles. 
3. Assessments 
Equality Impact Assessment 
3.1 An equality impact assessment has been completed with the following
outcomes for functions, policies, procedures or strategies in relation to race,
gender and disability and other relevant protected characteristics.  This
supports the Council’s legal requirement to comply with the duty to assess
and consult on relevant new and existing policies.
3.2 The function, policy, procedure or strategy presented in this report was
considered under the Corporate Equalities Impact Assessment process
(EqIA) with the following outcome: 
(i) Assessed as relevant and actions taken to reduce or remove the
following negative impacts: 
• There are finite resources which limit the amount of treatment
which can be carried out.
(ii)  Assessed as relevant and the following positive outcomes expected 
following implementation. 
(iii) The Winter Manual will have a list of priorities for snow clearing. It will
include also include giving priority to clearing bus stops disabled
parking bays and pedestrian crossing points (both designated
pedestrian facilities, and at road junctions) to assist pedestrians, to
complete the link between cleared footways and carriageways.  
Page 21 of 58

Page 22

(iv) Publicity information on the Winter Service via, local media and
www.pkc.gov.uk will recommend that members of the community
should look out for vulnerable community members and see if they can
provide any assistance to them. It will also emphasise that the Council
needs the assistance and support of as many members of the
community as possible in order to restore the roads and footways to a
safe condition. 
Strategic Environmental Assessment 
3.3 Strategic Environmental Assessment (SEA) is a legal requirement under the
Environmental Assessment (Scotland) Act 2005 that applies to all qualifying
plans, programmes and strategies, including policies (PPS). 
3.4 The matters presented in this report were considered under the
Environmental Assessment (Scotland) Act 2005 and pre-screening has
identified that the PPS will have no or minimal environmental effects. It is
therefore exempt and the SEA Gateway has been notified.   
3.5 The reasons for concluding that the PPS will have no or minimal
environmental effects is that over the years the roadside verges have already
been impacted and have adapted, resulting in vegetation, particularly grass,
which is tolerant to the salt.  It is not anticipated that there will be any long-
term, frequent, permanent or cumulative environmental effects, or impacts on
areas of high biodiversity or cultural heritage value, as a result of the policy. 
Sustainability 
3.6 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.7 Perth and Kinross Council also has the following mitigation measures in place
to ensure there is minimal environmental effect as a result of the Winter
Service Policy including: 
• Salt Management – gritters are calibrated and data from IEWS system
and the specialist weather forecast enables treatment to be targeted at
the areas that require it.
• The majority of the salt storage is in buildings or covered in tarpaulins
in locations which have been approved by SEPA, thus helping to
prevent leaching into the ground.
• Discharge of surface water from new developments addresses the
potential environmental effects to prevent pollution.
• The Winter Service is reviewed on an annual basis to take account of
changing climatic factors and planning for extreme weather events.  
Page 22 of 58

Page 23

Risk 
3.8 The Council as Roads Authority have a statutory duty as set out in Section 34
of the Roads (Scotland) Act 1984 which states: “A roads authority shall take
such steps as they consider reasonable to prevent snow and ice endangering
the safe passage of pedestrians and vehicles over public roads.” 
3.9 This policy allows the Council to meet its statutory obligations and minimise
exposure to risk by providing the most effective winter maintenance service it
can within the constraints of its finite resources. During severe weather, the
Council will endeavour to keep delays to a reasonable minimum. 
4. Consultation 
Internal 
4.1 As in previous years Elected Members are given the opportunity throughout
the winter and in April 2022 to become involved in agreeing the route
categories with the Roads Maintenance Partnership. The policy also allows
unadopted roads with an important community use to be included within the
categorisation and is not restricted to adopted roads. 
4.2 As local circumstances, and travel patterns change, winter maintenance
categories are subject to change and Elected Members have a role in
identifying and agreeing such changes. However the resources available to
carry out winter maintenance are finite, so if the relative priority of a road or
footway is to be raised then that of another road or footway within a particular
Ward must be reduced. 
4.3 The Council will always receive complaints about the winter maintenance
service due to high public expectations, limited available resources and the
vagaries of the weather. A distinction has to be made between complaints
related to proven failures to meet the approved level of service and
complaints regarding the actual level of service. 
4.4 At the end of the 2021 - 2022 winter comments on the winter service provision
were invited from Elected Members and from Community Councils. Very few
responses were received, due to the relatively benign winter weather not
impacting travel.  Those responses that were received were generally 
complimentary comments. 
5. Communication 
5.1 Communication will take place in due course and the policy and level of
service, along with specific detail on gritting routes and times will be made
available on the Council website. Ongoing winter action and road conditions
will be made available via Council facebook and twitter. 
Page 23 of 58

Page 24

2. BACKGROUND PAPERS 
2.1 Well Managed Highway Infrastructure 2016 
2.2 Road (Scotland) Act 1984 
Page 24 of 58

Page 25

Appendix 1
PERIODS OF COVER    2022 - 2023
Instructions on reporting times for Nightshift crews Sunday to Friday, early start crews
Monday to Friday and standby crews 7 days per week, will be issued by Roads
Maintenance Partnership Staff the previous day.
Period Standby
vehicles
available
(All changes
take place at
12 noon)
Total
Lead in period –
limited vehicles
on reduced cover
During all periods the road condition weather forecast is monitored and daily action plan devised.
During lead in/lead out periods it is not possible to treat all parts of the network and so available resources will be
deployed to best effect in relation to weather conditions being experienced
South North
Perth Kinross Crieff Blairgowrie Aberfeldy
17
October –
30
October
2022
3 1 1 3 3 11
31 Oct
2022
– 5
March
2023
6 2 3 6 5 22 Main standby
period – full cover
25 Nov
2022 –
24 Feb
2023
5 plus
1n/shift
1 plus 1
n/shift
2 plus 1
n/shift
5 plus 1
n/shift 5 22
Main standby
period – full cover
incl. nightshifts
25 Feb
2023
– 5
March
2023
6 2 3 6 5 22 Main standby
period – full cover
6 March
2023 –
26 March
2023
3 1 1 3 3 11
Lead out period -
limited vehicles
on reduced cover
27 March
2023 –
16 April
2023
0 1 1 1 1 4 Required roads
treated
5
Page 25 of 58

Page 26

Page 26 of 58

Page 27

APPENDIX 2a
WINTER MAINTENANCE- LEVEL OF SERVICE & PRIORITY SYSTEMS 2022 – 2023
(CARRIAGEWAYS)
Category
Nightshift
routes
Definition
The most important strategic
routes.   City routes plus
early morning bus service
routes in the Perth area.
The A93 South of
Blairgowrie, the A94
between Meigle and Perth
and the A923 between
Blairgowrie and Tullybaccart.
Kinross area A class road
and Crieff / Auchterarder
areas A class roads.
Routes (examples)
A class roads network
and early morning bus
routes in the Perth
area Important road
links in Kinorss, Crieff,
Blairgowrie and
Highland Perthshire
areas
Length
(km)
Indicative
Only
320
estimate
Hours of Cover
Commence Friday
night 23:30 - 08:00
through December,
January and
February.
As per category 1a
route cover times
outwith this period
Service Provided
In ice and snow conditions
or pre-salted when ice or
snow is forecast and roads
are not dry.
1a Other strategic routes
carrying large volumes of
traffic and connecting main
centres of population outwith
the Perth area
A977,  A91, A913,
A926,
A827 Aberfeldy –
Ballinluig
A822 Crieff –
Greenloaning
A924 through Pitlochry
220
Until 21:00 all days.
In the full cover
period, complete
morning de-icing by
07:30
(09:00 on Sundays
and nationally
recognised public
holidays)
In ice and snow conditions
or pre-salted when ice or
snow is forecast and roads
are not dry.
1b Other strategic routes
connecting larger
communities and other main
rural roads. Roads leading to
important or sensitive
locations such as hospitals
or fire stations.*
A93 Blairgowrie –
Glenshee
A923 Blairgowrie -
Dunkeld
A827 Aberfeldy - Killin
A822 Crieff - Dunkeld
A823 (part), A824
(part), A912
B996,
B9097,B9099,B996
etc.
370
estimate
Until 21:00 all days.
In the full cover
period, complete
morning de-icing by
07:30
(09:00 on Sundays
and nationally
recognised public
holidays) **
In ice and snow conditions
or pre-salted when ice or
snow is forecast and roads
are not dry.
In severe snow conditions,
Category 1b routes will be
treated after Category 1a
2 More minor rural roads
serving small settlements or
a significant number of rural
properties.  Secondary
distributor/local roads in
settlements.  Other urban or
rural roads with special
difficulties such as steep
gradients.*
1310
08:00-15:00 Monday
–Friday
Excluding public
holidays
In ice and snow conditions
only, no pre-salting
3 Rural roads serving no or
small numbers of isolated
properties.  Local access
roads in settlements within
easy reach of local
distributor roads.
This will include most
residential streets with
only local traffic
210 Not applicable
Not normally treated
unless there is hard,
packed rutted snow on
these roads with road
surface temperatures
below zero and treatment
of all other categories has
been completed
4 Rural public roads serving
no habitation which because
of their altitude, alignment
and width cannot reasonably
and safely be treated using
normal winter maintenance
plant.
Private (unadopted) roads
which is not the
responsibility of a Council
service and which are not
considered to have a wider
community use.
U159 Kenmore –
Garrows (Kenmore
Hill).
U161 Bridge of Balgie
– A827 at Loch Tay.
8
14
Not treated Not treated.
Service Bus routes have been included as far as practicable with available resources in categories 1a , 1b & 2 to ensure their comprehensive
coverage.
Coverage through to 21:00 not always possible due to operational driver hours requiring to be contained within a 11 hour statutory maximum
5
Page 27 of 58

Page 28

Page 28 of 58

Page 29

APPENDIX 2b
WINTER MAINTENANCE - LEVEL OF SERVICE & PRIORITY SYSTEMS 2022– 2023 (FOOTWAYS)
Category
Descriptions
Examples Length
(km)
Hours of Cover
Service Provided
Response
Time
Target
Treatment
Times
(Priority
Routes)
Target
Post
Gritting /
Snow
Clearance
Time
1 Main shopping areas, main
arterial footways,
busy feeder footways and
footways leading to community
centres and centres of
employment.
Perth,
Aberfeldy,
Auchterarder,
Blairgowrie,
Crieff,  Kinross,
Pitlochry, Alyth,
Bridge of Earn,
Coupar Angus,
Dunked,
Luncarty,
Milnathort and
Scone.
N/A
0630-1500 Mon-Sat 0800-1500 Sun and
nationally recognised public holidays
In snow and ice conditions 1 hour N/A 6 hours
2 As above plus Other footways
with significant usage.
As above plus
Abernethy,
Aberuthven,
Almondbank,
Balbeggie,
Bankfoot,
Blackford,
Braco,
Burrelton
Caputh,
Comrie,
Glencarse,.
Glenfarg,
Inchture,
Longforgan,
Methven,
Muthill,
Powmill,
Meigle, Stanley
N/A 08:00-15:00 Monday -Friday In snow and ice conditions As soon as
possible after
Cat 1 routes
have been
completed
N/A N/A
Lower priority routes will only be treated once the higher priority routes have been treated unless operational factors such as efficient route planning dictate otherwise.
No footway treatment on either 25th December or 1st January .
Footway cover is only provided out of normal hours during the main winter period. During lead in/lead out periods it is not possible to treat any footway out of hours and so available
resources will be deployed during the working day to best effect in relation to weather conditions being experienced
5
Page 29 of 58

Page 30

APPENDIX 2b (contd.)
WINTER MAINTENANCE - LEVEL OF SERVICE & PRIORITY SYSTEMS 2022 – 2023 (FOOTWAYS)
Category
Descriptions
Examples Length
(km)
Hours of Cover
Service Provided
Response
Time
Target
Treatment
Times
(Priority
Routes)
Target
Post
Gritting /
Snow
Clearance
Time
3 Less well used footways and
footways where a feasible
alternative route exists
N/A 08:00-15:00 Monday - Friday
Not normally treated.  Only treated in prolonged snow and ice
conditions if time and resources permit, and after successful
treatment of higher priorities
N/A N/A N/A
4
Footways which are not the
responsibility of a Council
Service, which are not
considered to be important in the
footway network, or have a
suitable alternative route treated
N/A N/A Not treated N/A N/A N/A
Lower priority routes will only be treated once the higher priority routes have been treated unless operational factors such as efficient route planning dictate otherwise.
No footway treatment on either 25th December or 1st January .
Footway cover is only provided out of normal hours during the main winter period. During lead in/lead out periods it is not possible to treat any footway out of hours and so
available resources will be deployed during the working day to best effect in relation to weather conditions being experienced
Page 30 of 58

Page 31

APPENDIX 3 
CATEGORY 1A CARRIAGEWAY SNOW ROUTES FOR PERIODS OF SEVERE
WEATHER 
Route   Description 
A822   Crieff to Greenloaning 
A823   Auchterarder to Junction with A822 
A824   Auchterarder to Aberuthven 
A827   Aberfeldy to Ballinluig 
A91   Yetts o' Muckart to Strathmiglo (through Kinross) 
A911   Kinross to Fife Boundary at Auchmuirbridge 
A912   Edinburgh Road, Perth to Fife Boundary 
A913   Aberargie to Newburgh 
A923   Blairgowrie to Angus Boundary near Lundie 
A924   Through centre of Pitlochry 
A926   Blairgowrie to Angus Boundary near Craigton 
A93   From A94 junction in Perth to Blairgowrie 
A94   Perth Bridge to Angus Boundary near Meigle 
A977   Kinross to Blairingone 
B954   Alyth to Angus Boundary near Newtyle 
B996   Kinross to Fife Boundary 
The following roads in Perth City - A93 Glasgow Road - Broxden to Caledonian Road York
Place, County Place, South Street, Queens Bridge. A85 Dundee Road - from Toll House,
Dundee Road, Gowrie Street, Perth Bridge to Charlotte Street A85 Barrack St and Dunkeld
Road to Crieff Road A85 Crieff Road - Dunkeld Road to Newhouse Road Roundabout. A912
Dunkeld Road - Crieff Road to Inveralmond Roundabout A989 Tay Street, Marshall Place,
Kings Place, Leonard Street, Caledonian Road, Atholl Street, Charlotte Street Newhouse
Road, Burghmuir Road, Jeanfield Road, Long Causeway Manse Road, Hatton Road, Corsie
Hill Road, Muirhall Road, Lochie Brae
5
Page 31 of 58

Page 32

Page 32 of 58

Page 33

PERTH AND KINROSS COUNCIL 
Environment, Infrastructure & Economic Development Committee 
21 September 2022 
UPDATE AND PROPOSALS FOR THE SCOTTISH GOVERNMENT PLACE
BASED INVESTMENT PROGRAMME 
Report by Head of Planning and Development
(Report No. 22/225) 
1. PURPOSE 
1.1 This report provides an update on progress with projects allocated funding
from the Place Based Investment Programme and recommends further
projects to receive funding from the Programme allocation. 
2.  RECOMMENDATIONS 
2.1 It is recommended that Council: 
I. notes the progress being made on delivery of the already approved
Place Based Investment Programme funded projects allocated funding
during 2021/22. 
II. approves the allocation of funding available via the Place Based
Investment Programme 2022/23 to the following projects:
a. Rannoch Hub. Kinloch Rannoch
b. Aberfeldy Tourism Infrastructure
c. Self-Catering Accommodation, Cultybraggan Camp, Comrie
d. PLUS Perth, Civic Space, Ropemakers Close, Perth
e. Clachan and Quality Café, Perth 
III. notes the proposal to introduce an open application process for future
years allocation of Place Based Investment Programme funding. This
is to link with other national and local funding to maximise efficient use
of resources and investment support. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues 
• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices 
6
Page 33 of 58

Page 34

4. BACKGROUND / MAIN ISSUES 
4.1 Prior to its replacement by the Place Based Investment Fund Programme, the
Scottish Government allocated Perth and Kinross Council £2.697M from the
Town Centre Fund. Following discussion by members, the Strategic Policy
and Resources Committee initially awarded funding to 5 projects in June 2019
(Report No 19/127 refers): 
• Strathmore Community Hub (£150K) 
• Coupar Angus Cycle Hub (£50K)
• Connecting Loch Leven with Kinross Town Centre (£800K) 
• Drummond Arms, Crieff (£600K) 
• Events Space, Pitlochry (£383K). 
4.2 An Executive Sub-Committee of the Strategic Policy and Resources
Committee on 23 October 2020 (Report No 20/204 refers) subsequently
agreed to: 
• de-commit funding from the Coupar Angus Cycling Hub due to the project
not proceeding
• provide an additional allocation of £487K to the Strathmore Community
Hub 
• provide an additional £20K to the Kinross/Loch Leven project 
• allocate £25K to the YMCA Perth Y Centre project 
• allocate £200K to the Local Full Fibre Network project 
• make further efforts to bring forward a viable project in Pitlochry as the
original idea did not generate widespread community support. 
4.3 Despite efforts to progress a project in Pitlochry, a further report was brought
back to the Strategic Policy and Resource Committee on 25 November 2020
(Report No 20/227 refers) to re-allocate resources from Pitlochry with
additional, and remaining, Town Centre Fund funding to the following projects: 
• Crieff Hotel arts hub (£100K) 
• Strathearn Hotel demolition and site clearance (£265K) 
• Town Wi-Fi Schemes (£50K) 
4.4 Meantime, the Place Based Investment Fund Programme (PBIP) was
launched in September 2020 as a replacement of the Town Centre Fund, with
the grant offer and objectives received on 10 May 2021.The main objectives
of the PBIP are to: 
• align place-based initiatives and establish a coherent local framework to
implement the Place Principle 
• support place policy ambitions such as town centre revitalisation,
community led regeneration, 20-minute neighbourhoods and Community
Wealth Building 
• ensure that all place-based investments are shaped by the needs and
aspirations of local communities 
Page 34 of 58

Page 35

• accelerate ambitions for net zero carbon, wellbeing, and inclusive
economic development, tackling inequality and disadvantage, and
community involvement. 
4.5 These criteria align with the Council’s own priorities to reduce poverty and
inequality, promote sustainable growth and development collaboratively,
consistent with the principles of the Perth and Kinross Offer. 
4.6 The Programme is to be achieved by investing in projects focussed on: 
• rural places with smaller populations, dependent on larger geographical
areas for support, for example: 
o small towns with a limited range of non-specialised facilities
o villages with very limited, or non-existent, access to facilities.
• urban places with sizeable populations, for example: 
o regional centres with extensive provision supporting a wide
geographical area 
o larger towns with a comprehensive range of dedicated services and
facilities 
o individual neighbourhoods with limited access to relevant local
provision.  
4.7 The available funds to Perth and Kinross were allocated as follows: 
Year LA Allocation £M Perth & Kinross Share £M
2021/22 38 1.265
2022/23 33 1.098
2023/24 23 0.766
2024/25 23 0.766
2025/26 23 0.766
TOTALS £140M Est £4.661M 
4.8 The PBIP grant can be claimed for eligible capital expenditure incurred by
local authorities or third parties. The grant is for expenditure additional to that
which is already, or would otherwise, be allocated to the budget of each
financial year and should not substitute for existing spend. The grant may also
be used to fund third party capital expenditure either directly, or through the
provision of grants to third parties (public sector bodies, private sector bodies
or individuals). The grant must be committed in the financial year it applies to.
For the financial year of 2022/23, it is expected that expenditure will be
undertaken or at least work, or contracts signed or commenced, by 31 March
2023. This is a challenging timescale for capital projects. 
4.9  Following discussion by members, the Strategic Policy and Resources
Committee of 1 September 2021 (Report No 21/149 refers) awarded £1.265m
PBIP funding to five existing Town Centre Funded projects which had
identified additional funding needs to ensure they could be fully completed. In
addition, they also allocated funding to the Council supported Letham Hub
Page 35 of 58

Page 36

project which had identified a funding gap, but which was due to start on site
in December 2021. 
• Strathmore Community Hub - £125,000 
• Town Wi-Fi - £30,000 
• Kinross Loch Leven Car Park - £35,000 
• Drummond Arms - £140,000 
• Crieff Hotel Community Arts Space - £200,000 
• Letham Hub - £735,000 
4.10 Due to the risk of having to return unspent money to the Scottish Government
because of planning and procurement issues, it was agreed during March
2022 to decommit the funding to the Crieff Hotel. This was undertaken
following consultation with the three Strathearn Ward Elected Members, with
agreement for the funding already committed to a project in the ward to be re-
allocated to the Drummond Arms project, which was able to commit further
essential works before the end of March. 
4.11 Following the replacement of the Town Centre Fund, the Scottish Government
currently operates four funds that support place-based regeneration and
economic development:  
• The long-established Regeneration Capital Grant Fund is a competitive
fund that provides significant funding for capital projects led or sponsored
by local authorities and targeted at the most deprived urban and rural areas
across Scotland. 
• The Vacant and Derelict Land Investment Programme is a competitive fund
that operates from 2021-26. It provides significant funding for capital
projects which seek to tackle persistent vacant and derelict land through
low carbon, community-led, place-based approaches. 
• The third fund is the Place Based Investment Fund Programme which
operates from 2021-2026, replacing the one off 2018 Town Centre Fund. 
• The fourth fund is Rural Community Led Local Development Fund which
builds on the legacy of LEADER. This fund aims to test new approaches to
delivering community-led local development through place-based
partnerships.  Projects supported by this funding must advance equality,
inclusion, and diversity. 
4.12  There are further opportunities to align funding and maximise resource
support for projects with:  
• National Lottery Fund
• Tay Cities
• Capital programme
• Revenue capital grant support for property via Vacant Property/ Adapt Your
Property/Open for Business/ Housing Grants
• Environmental Challenge Fund
• Community Investment Fund, Participatory Budgeting
▪ City Heritage Fund.
Page 36 of 58

Page 37

4.13 There are potentially some opportunities for further alignment of funding to
projects between these Scottish Government, national charities, and local
grant schemes with UK Government grant schemes:  
• The UK Shared Prosperity Fund provides revenue and capital funding and
is available from 2022-2025. During the 3-year period, Perth and Kinross
has an allocation of £4.736m. The primary aim of the fund is to empower
local leaders and communities to deliver locally identified priorities across 3
themes: Community and Place; Supporting Local Business; and People
and Skills. Additional resources of £988k are allocated to support numeracy
training via the Multiply programme. Agreement on priorities for initial, high
level allocations and capacity to align with other funding through an open
challenge fund applications process have been agreed and is awaiting a
response from UK Government.
• The UK Government also operates the competitive Levelling Up Fund
(LUF). This is a capital fund which aims to tackle economic differences and
drive prosperity through town centre and high street regeneration, local
transport projects, and cultural and heritage assets. A bid of 10M has been
submitted for Perth West. The UK LUF runs for four years from 2020-2025
with no commitment to continue beyond this period. 
4.14  A workshop for all elected members was held on 12 January 2022 to advise
on key criteria in relation to the allocation of funding based on previous
awards for the use of the remaining Place Based Investment Programme
funding. It was advised that critical issues to consider in the allocation of
resources for future years to meet core criteria and objectives: 
• alignment with community needs and priorities
• geographical spread
• deliverability
• previous support
• scale of projects and social, economic, and environmental benefits
• targeting resources to assist investment in areas of greatest socio-
economic need
• maximising funding support and leverage through match funding from
other national and local place-based investment and grants 
4.15 It was noted that community and business engagement along with the co-
design of outcome focussed projects, in line with the principles of the Perth &
Kinross Offer, were being progressed in a variety of ways.  These include the
Economic Wellbeing Plan, Tourism Infrastructure Strategy and Action Plan,
Locality Outcome and Acton Plans, Community Action Plans, area housing
and greenspace participation frameworks. 
4.16  Five projects have now been assessed and identified as priorities for
investment against key criteria and are proposed for Place Based Investment
Fund Programme 2022/23 funding.  These priorities are primarily because of
community and business support, immediate need for funding to augment
other funding and deliverability within the timescale.
Page 37 of 58

Page 38

5. PROPOSALS 
5.1 The table below provides an update on progress and spend relating to
previously approved Town Centre Fund and PBIP funded projects indicating
positive progress in all projects. The Drummond Arms is awaiting drawdown
of funding for completed works. The Letham Hub has to date utilised previous
resource allocations via RCGF (Regeneration Capital Grant Fund) funding,
but it is anticipated the Place Based Investment Fund Programme allocation
for 2021/2022 will be drawn down in October 2022. 
5.2 Allocations from UK SPF for 2022/23 and future years are being decided by a
political process with the UK Government. The projects which have potential
alignment with the fund have submitted Expressions of Interest to be included
in the funding ask of UKSPF (UK Shared Prosperity Fund) for 2022/23. In
both cases noted below, it would be preferrable to fund solely from PBIF to
enable the projects to commence with certainty, securing their overall funding
packages. This would also extend the potential leverage of UKSPF and other
funds to maximise the potential economic, social, and environmental impact. 
Page 38 of 58

Page 39

Town Centre Fund & PBIF Approved Projects - Spend to date              
Total
Grant
Award
TCF grant Total TCF 
spend
% TCF
spend to
date
PBIP grant
Total
PBIP
spend
% PBIP
spend to
date
Drummond
Arms, Crieff 940,000 600,000 600,000 100 340,000 163,192 48
Strathmore
Community
Hub 762,000 637,000 637,000 100 125,000 125,000 100
Loch Leven Car
Park 855,000 820,000 820,000 100 35,000 34,291 98
Perth Y Centre 25,000 25,000 25,000 100      
Crieff
Hotel/Creative
Crieff 100,000 100,000 100,000 100      
WiFi projects -
Comrie, Scone,
Kinross, Alyth,
Coupar Angus
80,000 50,000 50,000 100 30,000 27,988 93
Strathearn
Hotel, Crieff 265,000 265,000 252,000 95 0    
LFFN
broadband
project 200,000 200,000 200,000 100 0    
Letham Hub,
Perth 735,000       735,000 0 0
TOTAL  3,962,000 2,697,000 2,684,000  1,265,000 350,471 
Page 39 of 58

Page 40

5.3 The table below proposes projects where this year’s PBIP funding could be
allocated and notes opportunities for potential alignment with UKSPF funding
on the basis of current needs and requests for assistance: 
PROJECT PBIP FUNDING UKSPF potential
alignment
Rannoch Hub  £308k Yes
Aberfeldy Tourism Infrastructure  £275k Yes
Self-Catering Accommodation,
Cultybraggan Camp
£25k 
PLUS, Perth Civic Space,
Ropemakers Close
£20k 
Clachan and Quality Café  £470k 
TOTAL 1,098 
Rannoch Hub, Kinloch Rannoch 
5.4  Rannoch Community Trust are transforming the former Outdoor Centre in
Kinloch Rannoch into an exciting multi-use venue to serve at the heart of the
Rannoch Community. The building will be turned into a Community Hub and
social enterprise café/bar to provide free business and leisure facilities to the
socially isolated, remote community. It will be a self-sustaining community
owned initiative developing community wealth through creating local
employment and volunteering opportunities, whilst catering to the needs of
locals and visitors to the area. 
5.5 Estimated project costs are £830k. The project has secured funding from the
Scottish Land Fund and UK Community Ownership Fund as well as several
other external grant funders. The project requires funding of £308k to enable
project commencement in 2022/23. 
Aberfeldy Tourism Infrastructure, Aberfeldy 
5.6 Perth & Kinross Council, in partnership with Perth & Kinross Countryside
Trust, are creating the first in a series of low carbon, active travel and
outdoors leisure hubs created to support the River Tay Way. The hubs will be
accessible by all abilities and are designed to improve overall visitor
experience for residents, communities & leisure visitors. The first Hub will be
at Aberfeldy and will include the development of new toilet facilities open year-
round for the benefit and comfort of walking, cycling, wheeling, horse riding
and water sports visitors on the long-distance active travel route. The
Aberfeldy hub will also include waste disposal facilities for motorhome users
touring the area. The facility will be managed daily by the onsite outdoor
provider, creating local jobs, and supporting an established local business.
Through providing nodal facilities on the long-distance route, the project seeks
to ensure that the local community feels the economic benefits of tourism
whilst the impacts are mitigated.
Page 40 of 58

Page 41

5.7 Estimated project costs are £512k. The project has already secured £235k 
through the Rural Tourism Infrastructure Fund. The project requires funding of 
£275k to enable the project to commence in 2022/23. 
Self-Catering Accommodation, Cultybraggan Camp, Comrie 
5.8 Comrie Development Trust’s project to develop four former POW Nissan huts
will create four additional self-catering visitor accommodation units at the
community owned Cultybraggan Camp. The project will enable more visitors
to stay in the Comrie area.  This will support the local economy and build
community wealth through contributing to the financial sustainability of Comrie
Development Trust to undertake local initiatives. 
5.9 Project estimated costs are £50,000 with £25,000 already secured from the 
Trust core funds. A contribution from PBIP of £25,000 would     
allow project commencement and completion during 2022/23. 
PLUS Perth, Civic Space, Ropemakers Close, Perth 
5.10 Local mental health and wellbeing charity PLUS Perth are creating an indoor
Civic Space within the city centre which will be open daily for local people
interested in art, film, music, dance, and other sociable pursuits. They have
recently taken ownership of the disused public toilet building in Ropemakers
Close and propose to renovate it. This will bring the building back into use and
improve the immediate surroundings - aligning with and delivering positive
impact towards the broader vennel improvement proposals throughout the
city. The project will tackle inequalities through creating cultural opportunities
and indirectly address antisocial behaviour, which will support the immediate
economy. 
5.11 Project estimated costs are £40,000 with £20,000 already secured from the
charity's core funding. A contribution from PBIP of £20,000 would allow project
commencement and completion in 2022/23. 
Clachan and Quality Café, Perth 
5.12 Dangerous buildings notices have been issued for the Clachan and Quality
Café in Perth, which require the owners to begin demolition by October 2022.
If this work is not done by the owners, statutory demolition and acquisition
powers are proposed to be used to ensure the essential works are undertaken
and a charging order placed on the properties. 
5.13 The initial estimated demolition and acquisition costs were £350k but these
are likely to increase, due to construction inflation and additional landscaping
costs, to around £500k.   
Page 41 of 58

Page 42

5.14 The eyesore building is having a damaging effect to the economic wellbeing of
surrounding businesses and creates a negative perception of the City Centre.
The site has limited development potential and assessment suggests there is
no commercially viable solution and public intervention is required. Estimated
costs and values also suggest that cost recovery will be challenging but may
assist negotiations on acquisition   The medium-term aspiration for the cleared
site will be to deliver public benefit through creation of greenspace or
potentially a mobility hub. 
5.15 Should the owners begin demolition by October 2022, the Council will not be
required to undertake the work. In this instance, reallocation of the proposed
funding to a project which meets the grant criteria of PBIP and can commence
in 2022/23 would be required. 
Future Years 
5.16 It is our intention to create a single application process which will be
developed to simplify the funding application process for community
organisations to apply for PBIP funding along with other national and local
Council funding.  This will bring together both revenue funding for project
development and project funding for viable projects.  This will create a more
robust project pipeline and maximising use of resources to support project
delivery. This will bring together both revenue funding for project development
and project funding for viable projects creating a more robust project pipeline
and maximise use of resources to support project delivery. This single
application process will be in place from April 2023. 
5.17 In some instances, it may be more appropriate for the Council itself to develop
and deliver capital projects supported by the wider community. For example,
the Council has given a commitment to deliver a project in Pitlochry at Atholl
Road in future years. Revenue support is required in the first instance to
develop designs and fully define project costs and funding requirements,
through collaboration with both the community and private landowners in line
with the Pitlochry Community Action Plan. 
5.18 The proposed process is aligned with the Perth & Kinross Offer to encourage
co-creation and co-design with communities to support project feasibility and
the development of a project pipeline.   
6. CONCLUSIONS 
6.1  The report summarises the satisfactory progress being made in the delivery of
previous Town Centre Fund / Place Based Investment Programme funded
projects and proposes five new projects to be funded from the Place Based
Investment Programme 2022/23 allocation. Each of the five new projects has
community support, has been identified as a priority for investment, meets the
criteria of the Place Based Investment Programme and can be progressed in
the current financial year should funding be allocated. 
Page 42 of 58

Page 43

Author
Name  Designation Contact Details
Karlene Doherty  Vacant Property
Development Officer
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities) 
12 September 2022 
APPENDICES 
None 
Page 43 of 58

Page 44

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce N/A
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  Yes
Risk Yes
Consultation 
Internal  Yes
External  N/A
Communication 
Communications Plan  Yes 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 The proposals within the report will support the delivery of the Perth and
Kinross Community Plan in terms of the following priorities: - 
(iii) Promoting a prosperous, inclusive, and sustainable economy 
(v) Creating a safe and sustainable place for future generations. 
Corporate Plan 
1.2 The proposals within the report will support the delivery of the following
Council’s Corporate Plan priorities: - 
(iii) Promoting a prosperous, inclusive, and sustainable economy. 
(v) Creating a safe and sustainable place for future generations. 
2. Resource Implications 
Financial 
2.1 The Head of Finance has been consulted on the proposals and has indicated
agreement with the proposals. 
Page 44 of 58

Page 45

2.2  These proposals will be funded from a grant received from the Scottish
Government and as such should have no direct impact on our existing Capital
or Revenue budgets. 
Workforce 
2.3 There are no project specific workforce implications arising from this report. 
Asset Management (land, property, IT) 
2.4 N/A. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.
3.2 The proposals have been considered under the Corporate Equalities
Impact Assessment process (EqIA) with the following outcome: (i) Assessed
as not relevant for the purposes of EqIA. 
3.2 The proposals have been considered under the Corporate Equalities Impact
Assessment process (EqIA) with the following outcome: 
(i) Assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4  The proposals have been considered under the Act and no further action is
required as it does not qualify as a PPS as defined by the Act and is therefore
exempt. 
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets.
Page 45 of 58

Page 46

• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.6 The proposals have been assessed against the Council’s Principles for
Sustainable Development and it is considered that all the proposals outlined
would support the achievement of sustainable development. 
Legal and Governance 
3.7 The Head of Legal and Governance Services has been consulted on the
report and has indicated agreement with the proposals. 
Risk 
3.8 The key risks associated with the proposals presented in the report relate to
our, and our delivery partners, abilities to implement approved projects within
the timescales required. If we are unable to do this, our grant funding will have
to be returned to the Scottish Government under the conditions of the grant
offer. 
4. Consultation 
Internal 
4.1 The Chief Operating Officer, the Head of Finance, and the Head of Legal and
Governance have been consulted in the preparation of this report. 
External 
4.2 No external parties have been consulted in the preparation of this report. 
5. Communication 
5.1 The agreed proposals will be communicated to all appropriate parties
including external organisations receiving Place Based Investment
Programme grant awards. 
2. BACKGROUND PAPERS 
Report No. 19/127 
Report No. 20/204 
Report No. 20/227
Report No. 21/149 
Page 46 of 58

Page 47

PERTH AND KINROSS COUNCIL 
Environment Infrastructure and Economic Development Committee 
21 September 2022 
PERTH AND KINROSS OUTDOOR ACCESS FORUM 
ANNUAL REPORT 2021-22 
Report by Head of Environmental & Consumer Services
(Report No. 22/226) 
1. PURPOSE
1.1 This report summarises the activities and progress of the Perth and Kinross
Outdoor Access Forum over the last year and recommends the
appointment of three new members to the Forum. 
2. RECOMMENDATIONS
2.1  It is recommended that the Committee:  
(i) confirms 
• the appointment of three new members onto the Forum for a period of
four years
• the re-appointment of two existing members for a period of four years
(having already served a previous term of four years)
•  to confirm that the remaining members are retained in their
appointments for at least a further year as recommended in Appendix
1.
(ii) delegates to the Executive Director (Communities) the fulfilment of any
casual vacancy arising in this period through recruitment by Forum
members, as detailed within the Forum’s Term of Reference.
(iii) notes the activities and progress of the Perth and Kinross Outdoor
Access Forum from October 2021 along with the ongoing commitment to
maximise effective partnership working to make the best of the
exceptional landscapes, paths networks and access rights for all within
Perth & Kinross. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background  
• Section 5: Proposals 
• Section 6: Conclusion  
• Appendices 
7
Page 47 of 58

Page 48

4. BACKGROUND / MAIN ISSUES  
4.1 This report follows on from the previous report (Report No. 21/197 refers) to
the Environment and Infrastructure Committee on 27 October 2021. 
4.2 Part 1 of the Land Reform (Scotland) Act 2003 requires local authorities to set
up at least one local Access Forum and to appoint members to it. The Act
states that the functions of a Forum are to advise the local authority and any
other person or body consulting the forum on matters having to do with: 
• the exercise of access rights 
• the existence and delineation of rights of way 
• the drawing up and adoption of a plan for a system of core paths. 
• the offer of assistance in disputes about access rights etc. 
4.3 In their statutory role as advisors to the Council, the Forum act as a “critical
friend” on public access matters. As such, there are occasionally issues the
Council may not be able to agree with the Forum on or fully meet their
expectations. 
4.4 The Perth and Kinross Outdoor Access Forum (the Forum) has sixteen
members. Twelve members are voluntary and represent the interests of
landowners/managers, the community and recreation equally. These
members are elected at an open meeting and their appointments confirmed
by the Environment, Infrastructure and Economic Development Committee.
The remaining members represent agencies and other bodies and are invited
onto the Forum and appointed by the Committee. The list of members and
prospective members is shown in Appendix 1. 
4.5 At its meeting on 11 November 2021, Nick Cole was re-elected in the role of
convenor. Four ordinary meetings took place, and the Exemptions and
Obstructions Subgroup met on 3 occasions to assist officers to prioritise and
resolve obstructions to public access. One meeting took place, hosted by a
local elected member, to explore the merits of setting up a Highland
Perthshire Working Group under the umbrella of the Forum. Additionally,
members attended presentations on the wider remit of Community
Greenspace and revised criteria for prioritising obstructions to access. Whilst
broadly welcomed, further work on those criteria is ongoing, with Greenspace
officers with a view to reaching an agreed position. 
4.6 In addition to obstructions, the Forum have raised concerns about the
processes used to divert paths through or around development sites. The
mechanisms provided through the Planning and Land Reform Acts, in terms
of some public access issues, are not especially clear or complimentary.  A
working group from Development Management, Legal Services and
Community Greenspace within the Council has been set up to try to address
this as best we can and we will keep the Forum updated on progress. 
Page 48 of 58

Page 49

4.7 The Annual General Meeting (AGM) and open meeting was held on 9 June
2022 at the North Inch Community Campus and online. In each group
category, members stood down to vacate seats for the election. The proposed
changes set out below are those which are subject to approval of the
Environment, Infrastructure and Economic Development Committee: 
• In the Recreation Group, Mary Conacher was re-elected.
• In the Communities Group, Annie Benson stood down and Joyce
Carnegie was elected in her place.
• In the Land Manager’s Group, Andrew Thompson stood down, Mark
Thomson was elected in his place, and Councillor Hugh Anderson was
re-elected.
• In terms of the Agencies and Other Bodies, Councillor Frank Smith
stood down as the Council’s representative, to be replaced by
Councillor John Duff. 
4.8 The Forum will fill any casual vacancies which may arise as per their Terms of
Reference. 
4.9 The contribution of members who are stepping down should be noted. This
was expressed as thanks to Councillor Frank Smith and special thanks
extended to Andrew Thompson and Annie Benson who have served on the
Forum for a number of years. 
4.10 The Forum maintained its objection, along with others, to one of the core path
diversion orders required for the Cross Tay Link Road (CTLR). Those
objections were aired at the Hearing 26-27 April and are still under
consideration by the Scottish Government. 
4.11 In 2021, the Forum established a new subgroup to respond to consultations
on forestry proposals. New forestry, associated deer fencing and timber
operations can have significant impacts on public access. The Forum have
responded to a number of these during the year and raised more general
issues arising from this casework with the National Access Forum and through
Scottish Forestry. 
4.12 The Visitor Management Group consulted the Forum on the roads orders
made for the rural clearways now in force in Highland Perthshire and other
visitor hotspots. Whilst not objecting to the clearways, the Forum asked that
further work is done with landowners to provide adequate off-road parking to
accommodate demand in these areas. 
5. PROPOSALS 
5.1  It is proposed that the appointments of new and existing members are
confirmed as members of the Forum (Appendix 1) and that any casual
vacancy arising is filled by the Forum as detailed in its Terms of Reference. 
Page 49 of 58

Page 50

5.2 It is also proposed to continue to seek ways to work with the Forum to
maximise the effective use of our collective resources.  This is to make the
best of the exceptional landscapes, paths networks and access rights for all
within Perth & Kinross. 
6. CONCLUSION   
6.1 The Council’s Community Greenspace team manages the statutory functions
in relation to the Land Reform (Scotland) Act 2003 and values the partnership
relationship with the Forum and the advice  it has to offer. There is a wide
range of activities undertaken in relation to the management of core paths and
access rights more generally. Opportunities to involve the Forum in these,
with their agreement, will continue to be sought. 
Author
Name  Designation Contact Details
Dave Stubbs  Greenspace
Coordinator -
Communities
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities)
12 September 2022 
APPENDICES 
• Appendix 1 – Candidates for Appointment and Reappointment to the Forum 
Page 50 of 58

Page 51

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  No
Workforce No
Asset Management (land, property, IST) No
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  No
Risk No
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 The proposals in this report align primarily with the delivery of the Perth and
Kinross Community Plan/Single Outcome Agreement in terms of the following
priorities: 
(iv) Supporting people to lead independent, healthy and active lives
(v) Creating a safe and sustainable place for future generations 
Corporate Plan 
1.2 The proposals in this report align primarily with the achievement of the
following Council Corporate Plan Priorities:  
(iv) Supporting people to lead independent, healthy and active lives; and 
(v) Creating a safe and sustainable place for future generations. 
2. Resource Implications 
Financial 
2.1 There are no resource implications arising directly from the recommendations
in this report.
Page 51 of 58

Page 52

Workforce 
2.2 There are no workforce implications arising directly from the
recommendations in this report. 
Asset Management (land, property, IT) 
2.3 There are no direct asset management issues with this report although the
Forum is a key organisation in assisting the Council with the management of
Core Paths and Rights of Way networks. 
2.4 There are no information technology implications arising from this report. 
3. Assessments 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. The proposals have been considered under the
Corporate Equalities Impact Assessment process (EqIA) with the following
outcome: 
(i) Assessed as not relevant for the purposes of EqIA
Strategic Environmental Assessment 
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. The proposals have been considered under the Act and no further
action is required as it does not qualify as a PPS as defined by the Act and is
therefore exempt. 
Sustainability 
3.3 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
Page 52 of 58

Page 53

3.4 There are no direct impacts on sustainable development as a result of these
proposals but securing the public access to the great outdoors contributes to
the economic, social and environmental well-being of the area. 
Legal and Governance 
3.5 There are no legal implications from this report. 
Risk 
3.6 There are no risks arising from this report as the subject matter and
procedures referred to are well established and on-going. 
4. Consultation 
Internal 
4.1 The Head of Legal and Governance has been consulted on the content of this
report. 
External 
4.2 The Perth and Kinross Outdoor Access Forum has been consulted on the
proposals and in the preparation of the report. 
5. Communication 
5.1 There are established regular meetings and communications between the
Council and Perth and Kinross Outdoor Access Forum. 
2. BACKGROUND PAPERS 
2.1 No background papers have been relied on in preparing the report, other than
those committee reports already referenced within the main body of the
report. 
Page 53 of 58

Page 54

Page 54 of 58

Page 55

APPENDIX 1
CANDIDATES FOR APPOINTMENT OR REAPPOINTMENT TO THE FORUM
New members elected 9th June recommended for immediate appointment. Existing members who are recommended for
reappointment for at least a further year
Recreation Group
Name Organisation/ Interest Geographical knowledge/
home area
Notes/ profession
Mary Conacher
Member since 2004
Re-elected 2022
(subject to
confirmation)
Scottish Canoe Association
(SCA), Women’s Rural Institute,
Royal Tay Yacht Club
Highland/Alyth Former SCA Access volunteer/retired
watersports instructor
Karen Inkster
Member since 2017
Re-elected 2021
British Horse Society, Scottish
Rights of Way and Access Society
(Scotways)
Perth Area 20 + years in the outdoor industry. 
Hillwalker, climber, horserider and
mountain biker.
John Andrews
Member since 2009
Re-elected 2021
Ramblers, Scotways, Scottish
Wildlife Trust, Luncarty Redgorton
& Moneydie Community Council,
National Trust Scotland
Perth Area/Luncarty Former member of County Access
Liaison Committee – retired.
Anne Macintyre
Co-opted 2019
Portmoak Paths Group Kinross-shire Broad outdoor interests. Practical
involvement through Portmoak Paths
Group.
7
Page 55 of 58

Page 56

Community Group
Name Organisation/ Interest Geographical Knowledge/
home area
Notes/Profession
Nick Cole
Member since 2004
Re-elected 2021
Strathmore and the Glens Rural
Partnership. Meigle Community
Trust.  Next Steps & Stride for Life
Walking Groups. 
Highland & Lowlands/
Meigle
Electronic Systems Engineer, is now
a private consultant & runs an outdoor
training business. Involved in local
groups inc. BRAN & the Blairgowrie &
District Next Steps walking group.  He
also represents Local Access Forums
on the National Access Forum.
Jennifer Herd
Elected 2019
Member of British Horse Society,
Strathearn Rural + Riders Access
Group
Highland and East
Perthshire. Perth area
Broad experience particularly in
negotiating equestrian access and
representing the interests of horse
riders. She is also a keen mountain
biker and walker.
Joyce Carnegie
Elected 2022
(subject to
confirmation)
Comrie Millennium Footpath
Association 
Strathearn Wide range of community interests
inc SWI. Farming background
Sarah Walker
Co-opted 2021
Kinglands Hall, Soroptimist
International, Cornhill MacMillan,
British Horse Society & ByCycle
Perth area 25 years local knowledge through
work with a variety of voluntary
organisations.
Page 56 of 58

Page 57

Landowner/Manager Group
Name Organisation/ Interest Geographical Knowledge/
home area
Notes/Profession
Councillor Hugh
Anderson
Member since 2004
Re-elected 2022
(subject to
confirmation)
Scottish Rights of Way & Access
Society. 
Perth & Surrounding
area/Scone
Land & River Management. Retired 
Estate Factor. Newly elected
Councillor (2022) 
Sandy Simpson
Member since 2005
Re-elected 2017 
Royal Highland Educational Trust,
Rural Services Scotland, 
Perth and Kinross Agricultural
Forum
Perth Area Farm Manager 
Interested in all environmental issues.
Mark Thomson
Elected 2022
(subject to
confirmation)
National Farmer’s Union, Scotland
(former chair West Fife & Kinross)
Kinross Farmer
Woodland, arable & livestock
Vacant
Page 57 of 58

Page 58

Agencies & Other Bodies
These members are not elected but have been invited to sit on the Forum by the Council. 
Member Represents Job Title Office Base/other interests
Councillor John Duff
(to be appointed 2022)
Perth & Kinross Council  Councillor Ward 4
Highland
Ward Councillor.  Leader of the
opposition. Retired Police
Superintendent.
Mike Strachan
Member since 2007
Scottish Forestry Operations &
Development Officer
Scottish Forestry, Upper Battleby.
Extensive forestry experience and
involvement in Big Tree Country
Keith Robertson
Member since 2021
Centre for Inclusive Living Perth and
Kinross
Member Auchterarder. Extensive experience
of inclusive access design
Vacant
Page 58 of 58