Agenda Document Pack - Scrutiny and Performance Committee - 31/01/2024

Perth and Kinross Council · 31 January 2024
Back to Scrutiny and Performance Committee — 31 January 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
24/01/2024 
A hybrid meeting of the Scrutiny and Performance Committee will be held in the
Council Chamber on Wednesday, 31 January 2024 at 09:30. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Colin Stewart  (Convener)
Bailie Alasdair Bailey  (Vice-Convener)
Councillor Keith Allan
Councillor Steven Carr
Councillor Angus Forbes
Councillor Michelle Frampton
Councillor Ian Massie
Councillor Willie Robertson
Councillor Caroline Shiers
Councillor Frank Smith
Councillor Jack Welch
Page 1 of 96

Page 2

Page 2 of 96

Page 3

Scrutiny and Performance Committee 
Wednesday, 31 January 2024 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTES   
3(i)  MINUTE OF SPECIAL MEETING OF SCRUTINY AND
PERFORMANCE COMMITTEE OF 22 NOVEMBER 2023 FOR
APPROVAL
(copy to follow) 
3(ii)  MINUTE OF  MEETING OF SCRUTINY AND PERFORMANCE
COMMITTEE OF 11 DECEMBER 2023 FOR APPROVAL
(copy herewith) 
5 - 10 
4 OUTSTANDING BUSINESS STATEMENT (OBS)
(copy herewith 24/43) 
11 - 12 
5 UPDATE BY ARM'S LENGTH EXTERNAL ORGANISATIONS   
(i)  PERTH THEATRE AND CONCERT HALL   
(ii)  LIVE ACTIVE LEISURE LTD   
(iii)  CULTURE PERTH & KINROSS   
6 DRAFT CORPORATE DELIVERY AND IMPROVEMENT PLAN
2024/25
Report by Chief Executive (copy herewith 24/44) 
13 - 50
Page 3 of 96

Page 4

7  REVIEW OF EXTREME WEATHER EVENTS IN PERTH AND
KINROSS OCTOBER 2023
Report by Chief Executive (copy herewith 24/45) 
51 - 60 
8 PERTH AND KINROSS HEALTH & SOCIAL CARE
PARTNERSHIP (HSCP) CLINICAL AND CARE GOVERNANCE
ASSURANCE REPORT
Report by Chief Officer, Health and Social Care Partnership (copy
herewith 24/46) 
61 - 96 
Page 4 of 96

Page 5

SCRUTINY AND PERFORMANCE COMMITTEE 
Minute of hybrid meeting of the Scrutiny and Performance Committee held in the
Council Chambers, 2 High Street, Perth, on Monday 11 December 2023 at 14.30pm. 
Present: Councillor C Stewart, Bailie A Bailey, Councillors K Allan, S Carr, Depute
Provost A Parrott (substituting for Councillor E Drysdale), N Freshwater (substituting for
Councillor C Shiers), A Forbes, I Massie, W Robertson, F Smith, and J Welch. 
In Attendance: B Renton (Executive Director, Communities); L Simpson, Strategic Lead
– Legal and Governance; D Littlejohn, Strategic Lead- Economy, Development and
Planning; B Wilson and K Smith (Communities); B Atkinson, G Doogan, R Drummond,
H Robertson, and D Macluskey (all Education and Children’s Services); J Mayglothling,
K Molley, A Brown, and M Pasternak (all Corporate and Democratic Services). 
Apology: Councillors E Drysdale and C Shiers 
Councillor C Stewart, Convener, Presiding. 
The Convener led discussion on Items 1- 5 & 8-9 and the Vice-Convener led discussion
on items 6- 7. 
1. WELCOME AND APOLOGIES 
The Convener welcomed all those present to the meeting and apologies were
noted above. 
2. DECLARATIONS OF INTEREST 
No declarations of interest were made in terms of the Councillors’ Code of
Conduct. 
3. MINUTES 
3(i) MINUTE OF MEETING OF THE SCRUTINY AND PERFORMANCE
COMMITTEE OF 13 SEPTEMBER 2023 
The minute of meeting of the Scrutiny and Performance Committee of 13
September 2023 was submitted and approved as a correct record. 
3(ii) MINUTE OF SPECIAL MEETING OF SCRUTINY AND PERFORMANCE
COMMITTEE OF 22 NOVEMBER 2023 
The minute of special meeting of the Scrutiny and Performance Committee of 22
November 2023 was submitted and approved as a correct record.  
3(ii)
Page 5 of 96

Page 6

4. OUTSTANDING BUSINESS STATEMENT 
Resolved: 
The status of actions in the Outstanding Business Statement, be noted and
completed actions removed accordingly. 
5. PLANNING PERFORMANCE FRAMEWORK 12 (2022-23) 
There was submitted a report by Strategic Lead – Economy, Development and
Planning (23/369) providing an overview of performance statistics and evidence of
continuous improvement for the Planning Service (PPF 12). 
In response to a question from Depute Provost A Parrot regarding the age profile
of the planning workforce, D Littlejohn confirmed that the recruitment and retention of
professionals had been a challenge across services in Local Authorities. D Littlejohn
advised that work had been underway at a national level with a look at introducing a
modern apprentice scheme for Planners and post graduate opportunities into the
planning profession. Work had also been underway with local secondary schools to
promote and interest young people in planning. 
In response to a question from Councillor A Forbes regarding consultation and
engagement with communities regarding the Big Place Conversation events, B Wilson
advised that there had been a mixture of events consisting of informal drop-in sessions,
more detailed workshops, in person events and digital sessions. B Wilson confirmed
that attendance rates were mixed, and some areas received a better turnout than
others but overall, the events were a success in engaging with communities.  B Wilson
confirmed that data of the Big Place Conversation events would be shared, and findings
would be assessed to see what worked well and what could be tweaked for the next
round of engagement with communities. 
In response to a question from the Convener regarding the Planning Users
Forum, B Wilson advised that the Planning Users Forum consists of agents who submit
smaller applications on a regular basis and Community Councils who are engaged and
respond to local applications. B Wilson confirmed that even though there had been
some overlap with the House Builders Forum, the two Forums have been kept separate
due to the different scales in development and to allow for more productive discussions.
B Wilson added that work had also been underway to arrange focus sessions on road
construction consent processes and validation workshops for regular agents. 
Resolved:
(i) The appended Planning Performance Framework, be noted.
(ii) Suggestions in relation to service improvements to be included in PPF13, or its
successor, be considered. 
6. COUNCIL COMPLAINTS PERFORMANCE REPORT FOR 2022-23   
There was submitted a report by Strategic Lead - Legal and Governance
(23/370) providing assurance that the Council has an adequate and effective
Complaints Handling Procedure (CHP) in place, and; (2) advising the Committee of
Page 6 of 96

Page 7

work undertaken to improve our performance in relation to the Council’s handling of
complaints. 
In response to a question from Councillor A Forbes regarding the increasing
number of complaints in Perth and Kinross Council and are there sufficient staffing
resources in place, J Mayglothling confirmed that other Local Authorities and the
Ombudsman have noted an increase in complaints. J Mayglothling added that through
the Transformation Programme work had been underway to look at how complaints
could be addressed differently by concentrating resources for investigations through a
central team which would allow for more coverage and help reduce any gaps in the
process. 
In resposne to a question from Councillor K Allan regarding a breakdown in
complaint figures to see if there are any trends in certain areas, J Mayglothling advised
that Services with face-to-face interactions receive more complaints than other areas. 
L Simpson further explained that many complaints reflect dissatisfaction with a decision
or outcome as opposed to a service or process failure. She confirmed that complaints
are monitored within Services and the Corporate Team to reduce the number of repeat
complaints. The Vice-Convener requested for the breakdown in the 2022-23 complaint
figures to be shared with members following the meeting. 
In response to a question from Depute Provost A Parrott regarding the number
of complaints prior to the pandemic, L Simpson confirmed that work had been
undertaken prior to the pandemic to help services properly identify communications
which should be classed and managed as a complaint, which resulted in a steady
increase in numbers. L Simpson added the figures for 2020 and 2021 were artificially
depressed as a consequence of responding to the COVID-19 pandemic, explaining that
for parts of the period, essential only were operating and that complaints were not being
processed.  J Mayglothling added that figures have now settled back to pre-Covid
levels.. 
The Convener asked for a briefing note to be shared with Elected Members
regarding the number of complaint cases investigated by the SPSO when data has
become available to allow for better scrutiny and an increased level of assurance that
the correct measures are in place. 
Resolved:
(i) The contents of Report 23/370, be considered.
(ii) It be noted that the performance of the Complaints Handling Procedure to
continue to be monitored and reviewed throughout the year. 
7. PUPIL EQUITY FUNDING UPDATE 2023 
There was submitted a report by Executive Director (Education and Children’s
Services) (23/281) (1) providing an update on progress made in Perth and Kinross to
close the poverty-related attainment gap through the use of Pupil Equity Funding (PEF)
and; (2) outlining the range of PEF measures implemented to improve performance and
monitor progress of improvements. 
In response to a question from Councillor K Allan regarding the increase in
number of interventions recorded, D Macluskey advised that through the development
Page 7 of 96

Page 8

of the tracking tool, impacts can now be measured more accurately which has shown
positive results. 
In response to a question from Councillor A Forbes regarding attendance in
schools, D Macluskey advised that work had been undertaken to revise the Council’s
Attendance Framework to include a staged intervention approach. D Macluskey
confirmed that an Attendance Forum had also been arranged for 15 January 2024 with
two follow up events to collate data on attendance and look to reduce any gaps in
current processes. In response to a follow up question from Councillor A Forbes, D
Macluskey advised that early indications in Term 1 had shown improvements in
attendance in schools across Perth and Kinross, however, certain sectors and certain
year groups are more impacted than others. Education and Children’s Services
continue to monitor levels of attendance throughout schools and attendance continues
to be a key action area in Perth and Kinross Council’s Education Improvement Plan and
Raising Attainment Strategy. 
In response to a question from Bailie A Bailey regarding the decrease in
attendance levels prior to Covid pandemic, D Macluskey confirmed that the trend in
results prior to the pandemic were due to the development in tools to measure
attendance of certain groups and analyse the root causes of poor levels of attendance.
D Macluskey added that attendance had been a concern nationally for several years,
but attendance issues had increased due to impacts of the pandemic.   
In response to another question from Bailie A Bailey regarding the Interventions
Mapping Tool, D Macluskey advised that the Mapping Tool had been developed by
Perth and Kinross Officers with support from the Scottish Government Attainment
Adviser. D Macluskey added that the Interventions Mapping Tool had been identified as
National Best Practice and had been shared on several Forums with colleagues in
other Local Authorities. 
Members thanked Education and Children’s Services for their positive work in
utilising the Pupil Equity Funding. 
Resolved: 
The contents of the Report 23/281, be scrutinised. 
8. RAISING ATTAINMENT UPDATE 
There was submitted a report by Executive Director (Education and Children’s
Services) (23/280) providing an update to progress on the Education and Children’s
Services Raising Attainment Strategy 2020-202 and specifically providing information
on a range of performance measures across the National Improvement Framework
(NIF) for education priorities. 
In response to a question from Councillor K Allan regarding the overall decline in
performance of developmental milestones, G Doogan advised there had been several
steps taken to support children as they enter Primary 1. G Doogan added that specific
work had been undertaken with a focus on language and speech by employing
additional staff and offering further training to support children in Primary 1. G Doogan
added that motor skills are also being addressed by encouraging learning through play
in classrooms and by making adaptations to the school curriculum. G Doogan
Page 8 of 96

Page 9

confirmed that the 9 developmental milestones continue to be monitored and assessed.
In response to a supplementary question from Councillor K Allan, G Doogan advised
that teachers are trained to offer appropriate support and differentiated learning for
children who don’t have any early learning and childcare experience before starting
Primary School. 
In response to a question from the Convener regarding the table on ‘Nat 5,
Higher and AH Pass rates (A to C) PKC, National and Comparator Authorities’ and if the
Advanced Higher results should be a concern, D Macluskey confirmed that Perth and
Kinross Council had received more D awards than previous years but work had been
underway with schools to ensure that results do not become a pattern. 
Resolved: 
The contents of the Report 23/280, be scrutinised. 
THERE FOLLOWED A SHORT RECESS AND THE MEETING RECONVENED AT
15.55. 
9. PERTH AND KINROSS CHILD PROTECTION COMMITTEE STANDARDS
AND QUALITY REPORT 2022/2023 
There was submitted a report by Chief Social Work Officer (23/371) providing an
overview of the key activities and work of the CPC partners to protect children and
young people from harm, abuse and exploitation; (2) describing the CPC’s
achievements, key strengths and areas for improvement, and; (3) including an update
on the CPC’s new Improvement Plan, confirming that the CPC continues to focus on
learning and improvement, and has in place, a comprehensive programme of
improvement work for 2023 and beyond. 
In response to a question from Councillor W Robertson regarding work
undertaken with all members of a family when difficulties are discovered, B Atkinson
referred to Family Group Decision Making, supported by Social Workers and which
would allow for interested parties within the family to provide positive contributions.
H Robertson added that addressing the volume of referrals can be timely due to limited
resources and the amount of information that must be gathered and assessed on the
individual child and their family circumstances. H Robertson confirmed that the Service
work through the GIRFEC agenda to ensure that children are safe and protected in a
healthy environment.   
In response to a question from Councillor S Carr regarding support offered to
families seeking asylum or for those whose first language may not be English, H
Robertson confirmed that accommodation for the unaccompanied asylum-seeking
children had been a success and specific support had also been provided to Ukrainian
children and their parents living in Perth and Kinross. There had been no child
protection issues identified. H Robertson added that for families whose first language
may not be English, carers are recruited from different cultural backgrounds for children
who may need to be removed from their family of origin.  Issues with translation
continue to be monitored carefully. 
Page 9 of 96

Page 10

In response to a question from Bailie A Bailey regarding further information on
the work undertaken in relation to unborn child cases and if there are any gaps in
current processes, B Atkinson advised that an Unborn Baby Protocol had been
developed and underpinned by multi-agency training to try and ensure that those who
come across a pregnant vulnerable woman know how to make a referral. B Atkinson
added that work had been underway to assess how cases could be handled more
efficiently and training continues to be provided and guidance updated as appropriate.
R Drummond added that within NHS Tayside, anti-natal and post-natal services are
very alert to vulnerable pregnant young women and ongoing work continues to raise
awareness of the Unborn Baby Protocol.   
Resolved:
The Perth and Kinross CPC Standards and Quality Report 2022/2023 (Appendix
1) and the contents of the Perth and Kinross CPC Improvement Plan 1 April
2023 – 31 July 2026 (Update) (Appendix 2) of Report 23/371, be scrutinised. 
The Convener referred to H Robertson and R Drummond’s last meeting of the
Scrutiny and Performance Committee. Members thanked them for their contributions
over the years and wished them well for the future. 
~~~~~~ 
Page 10 of 96

Page 11

SCRUTINY AND PERFORMANCE COMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No. 24/43) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action 
due
Action
Expected
14. 26 April 2023 
Item 7
Perth and Kinross
Health and Social
Care Partnership
(HSCP) Clinical and
Care Governance
Assurance Report 
A briefing session to be
arranged for all
members on how the
Health and Social Care
Partnership Operates
A briefing session was
held on 17 January
2024. 
COMPLETED 
Jacquie
Pepper/Lisa
Simpson 
31 January
2024 
31 January
2024 
15. February 2023  Scrutiny Review
Topics 
Progress with
discussions on
Additional Support
Needs Provision in Perth
and Kinross 
Elected Member Briefing
Session was held on 27
November 2023. 
Further meeting is
arranged with the
Convener/Vice-
Convener and lead
officers. 
NOT COMPLETED 
Education and
Children’s
Services/ Legal
and
Governance
Services 
TBC  TBC
29. 11 December
2023
Item 6
Council Complaints
Performance Report
for 2022-23 
A breakdown in the 2022-
23 complaint figures to be
shared with members. 
Email response was
issued to members. 
COMPLETED 
Joy
Mayglothling 
31 January
2024
31 January
2024 
4
Page 11 of 96

Page 12

Page 12 of 96

Page 13

Perth And Kinross Council 
Scrutiny & Performance Committee 
31 January 2024 
DRAFT CORPORATE DELIVERY AND IMPROVEMENT PLAN 2024/25 
Report by the Chief Executive
(Report No. 24/44)  
1.  PURPOSE 
1.1 This report presents the draft Corporate Delivery and Improvement Plan 
(CDIP) for 2024/25 for consideration, with updated baseline data where this
has become available since the plan was presented to Council.  
1.2  The draft CDIP was considered by Council on Wednesday 4 October 2023
(Report 23/266) alongside the Medium-Term Financial Plan to strengthen the
alignment between the priorities set in our Corporate Plan, improvement
activity, and budget and resource allocation. Council agreed that the Scrutiny
and Performance Committee should be remitted to consider the draft CDIP
and make recommendations or comments relating to the improvement
actions and targets before the final 2024/25 CDIP is brought back to Council
following its budget meeting.
2.  RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
• considers the draft CDIP and available baseline measures and
recommends to Council: 
▪ any changes or additional targets or improvement actions for
inclusion
▪ any targets to be removed
▪ any additional considerations for baseline data to be established 
3.  STRUCTURE OF REPORT 
3.1  This report is structured over the following sections: 
• Section 4:   Background 
• Section 5:  Summary Information 
• Appendix 1:  Draft Corporate Delivery and Improvement Plan 2024/25 
6
Page 13 of 96

Page 14

4.  BACKGROUND 
4.1 The Corporate Delivery and Improvement Plan (CDIP) is a new element of
the Council’s strategic planning and performance framework. Introduced for
2024/25 as part of new performance reporting and strategic planning
arrangements, it complements the Annual Performance Report approved by
Council in August 2023 (Report No. 23/234) by setting out key proposed
improvement activity for the 2024/25 year.  
4.2  This replaces the service-by-service approach to identifying improvements
which was previously in place through Business Management and
Improvement Plans with an organisation-wide approach to planning and
performance. By bringing the final CDIP for approval at the start of the
financial year it also means Council will have sight of in-year improvement
activity at the start of the new financial year, rather than at the end of the
first quarter, or sometimes later, as was the case with the previous
approach.   
4.3  The CDIP is intended to be read alongside the Annual Performance
Report for 2022/23. It details improvement activity intended to address areas
for development, identified in the Annual Performance Report (APR), and
evidences our duty to deliver Best Value. The APR acts as our annual look
back at how we have delivered on the priorities of the Corporate Plan, while
the CDIP is our look forward to what we will focus on doing in 2024/225 to
achieve the priorities of the Corporate Plan. 
4.4  Linking improvement activity to previous performance and aligning this to the
delivery of the Corporate Plan are key to maintaining a robust and effective
performance management framework. This is critical to the success of the
Council in delivering and improving outcomes for individuals and our
communities. 
5.  SUMMARY INFORMATION   
5.1  The draft Corporate Delivery and Improvement Plan for 2024/25 sets out key
strategic improvement activities which officers have identified to address
previous performance or introduce new activity which will contribute to the
delivery of the Council’s key priorities. It does not represent all of the work
which is ongoing to meet our statutory duties or to maintain existing areas
which are performing well. Given the scope of the Council’s responsibilities
these would be too much to contain in any one single document, but the
impact of this ‘business as usual’ work is demonstrated through the
performance measures agreed as part of the Corporate Plan. 
5.2  The proposed improvement activity identified within the draft CDIP has been
developed with service leads by cross-referencing the Corporate Plan
priorities with areas for improvement identified in the Annual Performance
Report for 2022/23 and our supplementary report on performance aligned to
Page 14 of 96

Page 15

the Best Value themes. It also includes areas for improvement, where they
link to delivery of our Corporate Plan priorities, which have been identified
through customer feedback, self-evaluation, benchmarking, and other
strategic documents. 
5.3  Of the 65 measures, 32 are existing measures and now include baseline data,
30 are new measures with baselines yet to be established, and 3 will have
baselines set once the relevant strategies are in place. 
5.4  The final CDIP will be brought back to Council for approval after the final
2024/25 budget is set next year. This will enable any adjustments required
following the budget and in line with Elected Member feedback to ensure
improvement activity is aligned with the funded priorities set by Council. 
Authors 
Name  Designation  Contact Details 
Louisa Dott Corporate Performance
Team Leader 
LJDott@pkc.gov.uk 
Approved 
Name  Designation  Date 
Greg Boland Strategic Lead – Strategic
Planning, People and
Performance
8 January 2024  
APPENDICES 
Appendix 1 - Draft Corporate Delivery and Improvement Plan 2024/25 
Page 15 of 96

Page 16

ANNEX 
1.  IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications  Yes / None 
Community Plan / Single Outcome Agreement   None 
Corporate Plan   Yes 
Resource Implications    
Financial   None 
Workforce  None 
Asset Management (land, property, IST)  None 
Assessments    
Equality Impact Assessment  None 
Strategic Environmental Assessment  None 
Sustainability (community, economic, environmental)  None 
Legal and Governance   None 
Risk  None 
Consultation   
Internal   Yes 
External   None 
Communication   
Communications Plan   None 
1.  Strategic Implications 
Community Plan / Corporate Plan    
1.1  This report sets out improvement activity to be undertaken to support the
delivery of the Council Corporate Plan 2022-27. 
2.  Resource Implications 
Financial    
2.1  There are no financial implications arising from this report.   
Workforce 
2.2  There are no workforce implications arising from this report. 
Asset Management (land, property, IT) 
2.3  There are no asset management implications arising from this report. 
Page 16 of 96

Page 17

3.  Assessments 
Equality Impact Assessment    
3.1  Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.   
3.2  This report has been considered under the Corporate Equalities Impact
Assessment process (EqIA) with the following outcome: 
(i)  Assessed as not relevant for the purposes of EqIA 
Strategic Environmental Assessment   
3.3  The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. no further action is required as it does not qualify as a PPS as
defined by the Act and is therefore exempt. 
Sustainability   
3.4  Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act:    
• in the way best calculated to delivery of the Act’s emissions reduction
targets; 
• in the way best calculated to deliver any statutory adaptation
programmes; and 
• in a way that it considers most sustainable. 
3.5 The information contained within this report has been considered under the
Act. However, no action is required as the Act does not apply to the matters
presented in this report. 
Legal and Governance 
3.6 Not applicable. 
Risk 
3.7 Not applicable. 
Page 17 of 96

Page 18

4.  Consultation 
Internal 
4.1  The Executive Leadership Team, Service Senior Management Teams and the
Performance, Planning and Risk Group were consulted during the preparation
of this report. 
External    
4.2  Not applicable. 
5. Communication 
5.1  Not applicable. 
2.  BACKGROUND PAPERS 
2.1  None. 
Page 18 of 96

Page 19

Draft Corporate Delivery and Improvement Plan 2024/25
1
Appendix 1
IOD 
Draft Corporate Delivery and 
Improvement Plan 2024/25 
A Perth and Kinross where everyone can live life
well, free from poverty and inequalities.
6
Page 19 of 96

Page 20

Draft Corporate Delivery and Improvement Plan 2024/25
2
Contents
Introduction .......................................................................................................................................................................................................... 3
Improvement activity: Tackling poverty ............................................................................................................................................................... 4
Improvement activity: Tackling climate change and supporting sustainable places .............................................................................................. 7
Improvement activity: Developing a resilient, stronger and greener local economy ............................................................................................ 11
Improvement activity: Enabling our children and young people to achieve their full potential ............................................................................. 15
Improvement activity: Protecting and caring for our most vulnerable people ...................................................................................................... 21
Improvement activity: Supporting and promoting physical and mental wellbeing ................................................................................................ 25
Improvement activity: Working in partnership with communities ......................................................................................................................... 27 
Page 20 of 96

Page 21

Draft Corporate Delivery and Improvement Plan 2024/25
3
Introduction
Welcome to our draft Corporate Delivery and Improvement Plan
(CDIP) for 2024/25. 
This is a new element of the Council’s strategic planning and
performance framework. Introduced this year as part of new
performance reporting and strategic planning arrangements, it
complements the Annual Performance Report by setting out key
proposed improvement activity for the year ahead at an
organisational level. Together the CDIP and the APR demonstrate
how we are delivering on the commitments we set out in our
Corporate Plan to work towards our vision of:
a Perth and Kinross where everyone can live life well, free from
poverty and inequalities.
This draft Corporate Delivery and Improvement Plan sets out
proposed activities within the 2024/25 year of the Corporate Plan
cycle to work towards this vision. The proposed strategic
improvements included within this plan are for areas where
performance reporting shows more attention is needed, or where
new activities to support the delivery of our priorities have been
identified through customer feedback, self-evaluation,
benchmarking and other strategic reports.
Where our performance reporting shows that we are doing well and
that current approaches are achieving or exceeding targets we are
not proposing additional improvement activity. This work will
continue where it is necessary to maintain performance. As will the
large volumes of business-as-usual activity which ensure the
effective delivery of our statutory duties and local commitments. 
Similarly, previously identified supporting improvements and
transformation and change activities - such as consolidation work
and our new strategic operating model for the organisation - which
will help us deliver the Corporate Plan priorities, are not detailed
here. This work is ongoing, and progress will continue to be
monitored and reported through agreed Transformation and
Change governance arrangements.
We will continue to report back on ongoing and improvement
activity through the Annual Performance Report and have updated
the performance targets for 2023/24 and future years against each
of the performance indicators within our corporate plan.
Elected members will be invited to provide comment and feedback
on the areas of activity in this draft Corporate Delivery and
Improvement Plan through a range of opportunities during the
2024/25 budget setting cycle. Alongside this we will gather public
feedback through our annual budget priorities consultation. Once
the final budget for 2024/25 has been set in early 2024, an updated
Corporate Delivery and Improvement Plan based upon the agreed
and funded improvement areas will be reported back to Council for
final approval.
Councillor Grant Laing,  Thomas Glen,
Council Leader   Chief Executive
Page 21 of 96

Page 22

Draft Corporate Delivery and Improvement Plan 2024/25
4
Improvement activity: Tackling poverty 
Corporate Priority
Action
What
improvements do
we want to
achieve?
How will we make
these improvements?
How will we
know if we
have been
successful?                     
Baseline Data Strategic
Lead Target date Linked
strategy/plan
Prevent and
mitigate the
impacts of poverty
for children living
in Perth and
Kinross 
A co-ordinated and
collaborative
approach with
partners and
communities to
mitigate the impact
of poverty.
During 2023/24 we are
developing an
overarching poverty
strategy for Perth and
Kinross. Key strategic
actions for 2024/25 to
prevent and mitigate the
impacts of poverty for
children living in Perth
and Kinross will be
established as part of
that strategy.
Performance
measures will
be agreed as
part of the
Poverty
Strategy.
To be agreed as
part of the Poverty
Strategy.
Strategic
Planning,
People &
Performance
March 2026 Poverty Strategy
(in development)
Local Child
Poverty Action
Report 2022/23
and Local Child
Poverty Action
Plan 2023/24
Ensuring that costs
of participation in
school activities
are minimised or
mitigated to reduce
the impact this has
on the outgoings of
Increasing uptake of
free school meals for
eligible children. 
A 5% increase
in uptake of
free school
meals
compared to
previous year. 
2022/23:
Primary: 65% 
Secondary: 43%           
Education &
Learning 
March 2025 Poverty Strategy
(in development)
Local Child
Poverty Action
Report 2022/23
and Local Child
Page 22 of 96

Page 23

Draft Corporate Delivery and Improvement Plan 2024/25
5
Corporate Priority
Action
What
improvements do
we want to
achieve?
How will we make
these improvements?
How will we
know if we
have been
successful?                     
Baseline Data Strategic
Lead Target date Linked
strategy/plan
families in or at
risk of poverty.
Reduce the cost of the
school day. 
Increasing uptake of the
National Entitlement
Card for free bus travel
to reduce travel costs.
Schools will be
using the Cost
of the School
Day toolkit and
action plans
will be in place. 
A 5% increase
in uptake of the
National
Entitlement
Card amongst
under-22s.
Data from 2024/25
will be used to
establish a baseline
for this measure as
it is new. A Short
Life Working Group
has been
established to
facilitate rollout, and
to support schools
in creating and
delivering actions
plans. 
2022/23: 12,257
Under 22’s with a
National Entitlement
Card. 
Customer &
Digital
Services
Poverty Action
Plan 2023/24
Mitigate cost of
living pressures for
households
Reduce
dependency on
foodbanks. 
Develop cash first
partnerships with the
third sector in localities
to allow support to be
Foodbanks
reporting
Data from 2024/25
will be used to
establish a baseline
Strategic
Planning,
March 2026 Poverty Strategy
(in development)
Page 23 of 96

Page 24

Draft Corporate Delivery and Improvement Plan 2024/25
6
Corporate Priority
Action
What
improvements do
we want to
achieve?
How will we make
these improvements?
How will we
know if we
have been
successful?                     
Baseline Data Strategic
Lead Target date Linked
strategy/plan
experiencing and at
risk of poverty
provided to those in
need in a way that is
easily accessible within
their local communities.
reduction in
demand. 
Number of
established
cash first
partnerships. 
for this measure as
it is new. 
Data from 2024/25
will be used to
establish a baseline
for this measure as
it is new.
People &
Performance 
Page 24 of 96

Page 25

Draft Corporate Delivery and Improvement Plan 2024/25
7
Improvement activity: Tackling climate change and
supporting sustainable places 
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful?                              
Baseline Data Strategic Lead Target date Linked
strategy/plan
Supporting the
prioritisation of
sustainable,
cleaner, and
greener transport
Develop a
long-term
sustainable
strategy for
increasing and
maintaining the
electric vehicle
charging
network in
Perth and
Kinross.
During 2023/24 we are
developing an electric
vehicle strategy for Perth
and Kinross. Key
strategic actions for
2024/25 to develop the
electric vehicle charging
network in Perth and
Kinross will be
established as part of
that strategy.
Performance
measures will be
established as
part of the
electric vehicle
strategy.
To be agreed as part of
the EV Strategy.
Economy,
Development &
Planning
March 2025 
Ensure we
have a cleaner
and greener
Council fleet.
Develop an electric
vehicle transition plan for
moving council vehicles
from diesel/petrol to
electric or other zero
direct carbon fuel
technologies.
Increase in
number of council
vehicles with
electric or other
zero direct
carbon fuel
technologies. 
2020/21: 23         
2021/22: 23
2022/23: 17    
Environment &
Infrastructure
April 2024 
Page 25 of 96

Page 26

Draft Corporate Delivery and Improvement Plan 2024/25
8
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful?                              
Baseline Data Strategic Lead Target date Linked
strategy/plan
Integrate
active travel
options into the
development
of large
infrastructure
schemes.
By delivering active
travel measures as part
of the Cross Tay Link
Road, including new and
improved paths,
controlled crossing
facilities, bus stop
provisions, a green
bridge and a park and
choose facility.
Monitoring usage
of active travel
measures
resulting in a
20% reduction of
vehicle
kilometres. 
2019 Transport
Scotland Active travel
measures:
Walking: 22%
Driving: 53%
Passenger: 13%
Cycling: 1%
Bus: 8% 
Taxi: 1%
Rail: 1%
Other: 1% 
Total number of vehicle
kilometres in P&K in
2019 was 12,547km
per person per year. 
Economy,
Development &
Planning
March 2025 Local
Development
Plan 2
Mobility
Strategy (in
development)
Perth
Transport
Futures
Improve the energy
efficiency of our
buildings, and
encourage our
partners and
private
householders to
consider
improvements
Improved
energy
efficiency and
reduction in
carbon
emissions in
the Council
estate.
During 2023/24 we are
developing a Local Heat
and Energy Efficiency
Strategy (LHEES). Key
strategic actions for
2024/25 to improve
energy efficiency and
reduce carbon
emissions in domestic
properties across Perth
Performance
measures to be
established in the
LHEES.
To be agreed as part of
LHEES.
Environment &
Infrastructure 
March 2025 Climate
Change
Strategy
LHEES (in
development)
Page 26 of 96

Page 27

Draft Corporate Delivery and Improvement Plan 2024/25
9
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful?                              
Baseline Data Strategic Lead Target date Linked
strategy/plan
and Kinross will be
established as part of
this strategy.
Key strategic actions for
2024/25 to be set as part
of the domestic/non-
domestic
decarbonisation plan
being developed in
2023/24. 
Property
Services
To conserve and
enhance the
biodiversity of our
natural
environment
Increase
provision of
biodiversity
sites.
Developing a long-term
plan for managed
grassland areas.
Delivery of UK Shared
Prosperity Fund funded
Biodiversity Towns and
Villages Project and the
Greening Industrial
Estates Project. 
Making provisions for
biodiversity within the
Cross Tay Link Road
Volume of uncut
areas are
increased.
Increase in
number of
biodiversity
interventions. 
Increases in
observed
biodiversity
TBC 
2022/23 – 64
biodiversity
interventions
completed (305 agreed
actions for the period of
2016-2026 in 2022/23
21% (64) of this was
completed).
Data from 2024/25 will
be used to establish a
baseline for this
Environment &
Infrastructure 
Economy,
Development &
Planning
March 2025 Climate
Change
Strategy
Tayside
Biodiversity
Action Plan
Page 27 of 96

Page 28

Draft Corporate Delivery and Improvement Plan 2024/25
10 
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful?                              
Baseline Data Strategic Lead Target date Linked
strategy/plan
project, i.e., green bridge
and wetland area.
markers (insects,
animals, and
wildflowers).
measure as it is new.
(Measures have not yet
been implemented i.e.,
green bridge and
wetland area).
To adapt to and
mitigate the impact
of climate changes
on the way we
operate
Reduce carbon
emissions
caused by
traffic in Perth
city centre.
Delivery of Cross Tay
Link Road to divert traffic
away from the city
centre.
Preparing for phase 4 of
Perth Transport Futures
by scoping investment
activity in active
travel/public transport.
Air quality and
traffic modelling.
Data from 2024/25 will
be used to establish a
baseline for this
measure as it is new
(project is not yet
completed)
Economy,
Development &
Planning
March 2025 Local
Development
Plan 2
Perth
Transport
Futures
Air Quality
Action Plan 
Page 28 of 96

Page 29

Draft Corporate Delivery and Improvement Plan 2024/25
11 
Improvement activity: Developing a resilient, stronger
and greener local economy
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful?                                       
Baseline Data Strategic Lead Target date Linked
strategy/plan
Support and
promote business
growth and
investment
Unlock new
investment and
housing land to
support
business
growth.
Commence Perth West
Eco Innovation Park. 
Level of business
interest in Perth
West (by leasing
or buying land) 
Data from 2024/25 will
be used to establish a
baseline for this
measure as it is new.  
Economy,
Development &
Planning
March 2025 
Make Perth a
more
competitive
inward
investment
destination.
Developing and
improving the Invest in
Perth information and
advice website.
Working closely with
business gateway and
key businesses and key
sector representatives.
Increased levels
of interest and
awareness in
inward
investment
opportunities in
Perth 
Data from 2024/25 will
be used to establish a
baseline for this
measure as it is new
(New Business Enquiry
Management System
from 2024). 
Economy,
Development &
Planning
March 2025 
Page 29 of 96

Page 30

Draft Corporate Delivery and Improvement Plan 2024/25
12 
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful?                                       
Baseline Data Strategic Lead Target date Linked
strategy/plan
Increased
number of
businesses in
the creative
industry.
Renewed focus on the
Visitor, Cultural and
Creative Economy, as a
result of greater
collaboration through
the new strategic
operating model.
Demand for
business space
for creative
industries will
increase. 
Data from 2024/25 will
be used to establish a
baseline for this
measure as it is new
(New Cultural Database
in progress for 2024)
Economy,
Development &
Planning
March 2025 
Invest in
innovative green
power and smart
technology
solutions
Have a Smart
Energy
Programme
supported by
public and
private
investment.
Develop a pipeline of
smart energy projects. 
Develop a decision
toolkit to develop
business cases for
investment.
Increased
investment in
smart energy
projects (Number
of strategic cases
approved for
delivery which
include financial
investment). 
Increase in
number of
registered
businesses in
energy.
Data from 2024/25 will
be used to establish a
baseline for this
measure as it is new. 
2020/21: 140                
2021/22: 140               
2022/23: 145
Economy,
Development &
Planning
March 2025 
Page 30 of 96

Page 31

Draft Corporate Delivery and Improvement Plan 2024/25
13 
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful?                                       
Baseline Data Strategic Lead Target date Linked
strategy/plan
Promote what our
city and towns
have to offer to
businesses,
investors and
tourists
More people to
choose Perth
and Kinross as
a destination
for holidays
and day trips.
Increased promotion of
consumer and visitor
offer via Perth City and
Perth and Kinross
Towns website and
social media channels.
Deliver national and
international tourism
campaigns with
VisitScotland.
Attend or be
represented at national
and regional travel trade
events.
Increased
consumer and
visitor
expenditure,
dwell time and
overnight stays 
Direct tourism
expenditure 2022:
£463.48 million 
Average length of stay
(staying visitors) 
2022: 3.1 days 
Economic impact of
tourism 2022: £646.50
Economy,
Development &
Planning
March 2025 Culture
Strategy
2023-2028 
Support people
into work and
encourage
business to access
initiatives to create
new opportunities
Further
enhance our
employability
outreach
capacity,
supporting
individuals in
community
settings.
Review and increase
the number of
employability outreach
locations and frequency.
Increased
numbers of
individuals
supported in
targeted
locations and
overall increase
in number of 
Number of people
supported in outreach
locations: 
2022/23: 215 
Economy,
Development &
Planning
March 2025 Economic
Wellbeing
Plan 2020-
2028 
Page 31 of 96

Page 32

Draft Corporate Delivery and Improvement Plan 2024/25
14 
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful?                                       
Baseline Data Strategic Lead Target date Linked
strategy/plan
people
supported.
Remove
barriers to
employment
for parents.
Improving access and
availability of registered
quality childcare.                                           
Launch a pilot of
community
childminding.
Use the Parental
Employment Support
Fund to connect
childcare, employability,
and transport.
Increased
number of
registered
childcare
providers. 
Feedback from
pilot.
Increase in
priority groups
supported into
employment.
Work is underway to
develop meaningful
measures for this area
and will be baselined in
2024/25.
Data from 2024/25 will
be used to establish a
baseline for this
measure as it is new.
Parents provided with
employability support: 
2022/23: 57 
Parents supported into
employment: 
2022/23: 12 
Economy,
Development &
Planning 
Education &
Learning
March 2025 Local Child
Poverty
Action Report 
Page 32 of 96

Page 33

Draft Corporate Delivery and Improvement Plan 2024/25
15 
Improvement activity: Enabling our children and young
people to achieve their full potential
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful? 
Baseline Data
Strategic
Lead Target date Linked
strategy/plan
Ensure inclusive
and quality
education for all
and promote
lifelong learning
Attainment at
key milestones
is raised for all
children and
young people.
Using health and
wellbeing census data to
inform school level
improvement plans.
Implementation of the
Literacy, Numeracy and
Learning and Teaching
Frameworks 2-18
through a programme of
professional learning.
PKC attainment
for each of the
indicators within
the Corporate
Plan will increase
to at least target
levels. 
% of children meeting
expected developmental
milestones when
entering primary school: 
2020/21: 82%                     
2021/22: 82%                     
2022/23: 81% 
% Primary School pupils
(P1, P4 & P7 combined)
achieving expected
levels in literacy and
numeracy (average): 
2020/21: 74%                     
2021/22: 78%                     
2022/23: 78%   
Proportion of school
leavers attaining 1 or
more passes at SCQF
Level 5: 
Education &
Learning
Feb 2026
(due to
timing of
publication
of data for
2024/25)
Raising
Attainment
Strategy 2020-
2023  
Education
Service
Improvement
Plan 2023-24 
Page 33 of 96

Page 34

Draft Corporate Delivery and Improvement Plan 2024/25
16 
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful? 
Baseline Data
Strategic
Lead Target date Linked
strategy/plan
20/21: 89%                         
21/22: 89%                         
22/23: Feb 24 
Proportion of school
leavers attaining 1 or
more passes at SCQF
Level 6: 
20/21: 71%                         
21/22: 66%                         
22/23: Feb 24
Increase the
number of
young people
going into
positive
destinations
such as work
experience,
further
education,
volunteering
and
employment.
By placing an
Employability Youth
Worker in each locality
to liaise with schools.
Early intervention
approach in school and
delivery of employability
programmes.
Increase in
participation
measure of
school leavers
entering positive
destinations.
Proportion of 16–19-
year-olds participating in
learning training or work
(%): 
20/21: 94%                         
21/22: 94%                         
22/23: 95%
Education &
Learning
March 2025 
Page 34 of 96

Page 35

Draft Corporate Delivery and Improvement Plan 2024/25
17 
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful? 
Baseline Data
Strategic
Lead Target date Linked
strategy/plan 
A school
atmosphere
conducive to
learning and
personal
development,
where children
and young
people feel
safe, secure,
listened to and
have their
views taken
into account on
issues that
affect them.
Implementation of the
updated Anti-Bullying
Strategy. 
Key strategic actions for
2024/25 will be
established in the
updated Anti-Bullying
Strategy.
Schools will have
robust
procedures to
reduce bullying in
line with
improving
relationships.
Reported
incidences of
bullying in
schools. 
Increase in
wellbeing
measures
recorded at
school and Local
Authority level.
Next academic year will
see the launch and
implementation of the
Anti-Bullying Strategy
and Operational
Guidance with related
professional learning. 
Work is underway to
facilitate consistent
collation across all
schools to reflect the
impact of the Anti-
Bullying Strategy more
accurately.  Baseline to
be established 2024/25.
Local authority wide
measures are being
developed. Data from
2024/25 will be used to
establish a baseline for
this measure.
Education &
Learning
March 2025 
Page 35 of 96

Page 36

Draft Corporate Delivery and Improvement Plan 2024/25
18 
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful? 
Baseline Data
Strategic
Lead Target date Linked
strategy/plan
Reduce the
poverty-related
attainment gap
Improved
understanding
of causes of
attainment gap
so that
effective
interventions
can be
identified and
implemented.
Review and refresh the
PKC interventions toolkit
to address the needs of
key priority groups.
All schools will
plan, record and
track pupil
progress via the
Closing the Gap
tool. 
A reduction in the
poverty-related
attainment gap,
particularly for
those most
deprived and in
key priority
groups.
Percentage gap
between SIMD 1 and
SIMD 5 for school
leavers attaining 1 or
more passes at SCQF
Level 5:
20/21: 28% 
21/22: 24% 
22/23: Feb 24   
Percentage gap
between SIMD 1 and
SIMD 5 for school
leavers attaining 1 or
more passes at SCQF
Level 6:
20/21: 41% 
21/22: 35% 
22/23: Feb 24
Education &
Learning
February
2026 (due
to timing of
publication)
Raising
Attainment
Strategy 2020-
2023  
Ensure that Looked
After Children and
children with
additional support
needs achieve
comparable
outcomes
Improve
support to
children and
young people
with additional
support needs
Through the Additional
Support for Learning
Transformation
Programme.
Maintain or
reduce placement
within
independent
schools.
Total Tariff Points
for school leavers
Data for this measure is
currently being
gathered. Baseline to be
established 2024/25. 
Data from 2024/25 will
be used to establish a
Education &
Learning
March 2025 Raising
Attainment
Strategy 2020-
2023   
Page 36 of 96

Page 37

Draft Corporate Delivery and Improvement Plan 2024/25
19 
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful? 
Baseline Data
Strategic
Lead Target date Linked
strategy/plan
to realise their
potential.
with additional
support needs,
including those
who are care
experienced.
Proportion of
school leavers
with additional
support needs,
including those
who are care
experienced, in
positive
destinations.
baseline for this
measure. 
Data from 2024/25 will
be used to establish a
baseline for this
measure. 
ASN
Transformation
Programme
Increase in
community
placements for
children and
young people
responding to
immediate
need.
Increase the recruitment
and range of community
placement providers.
Support more kinship
carers.
Reduction in use
of residential
placements.
Increase in
available
community
placement
providers.
Feedback from
children and
2020/21: 4% (12)
2021/22: 6% (18)
2022/23: 6% (15) 
This measure is being
developed. Data from
2024/25 will be used to
establish a baseline. 
Children,
Families &
Justice
March 2025 
Page 37 of 96

Page 38

Draft Corporate Delivery and Improvement Plan 2024/25
20 
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we make
these improvements?
How will we
know if we have
been
successful? 
Baseline Data
Strategic
Lead Target date Linked
strategy/plan
young people
placed with
community
providers or in
kinship care
placements.
Data from 2024/25 will
be used to establish a
baseline for this
measure as it is new. 
Page 38 of 96

Page 39

Draft Corporate Delivery and Improvement Plan 2024/25
21 
Improvement activity: Protecting and caring for our most
vulnerable people
Corporate Priority
Action
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if
we have been
successful?                         
Baseline Data Strategic
Lead
Target
date Linked strategy/plan
Ensure we quickly
identify children,
young people and
adults at risk of
harm and abuse
and take the
necessary actions
to keep them safe
Take a trauma-
informed approach
to interviewing
children for evidence
to inform ongoing
care and protection
planning.
Implement the
Scottish Child
Interview Model.
Number of interviews
which have been carried
out using the Scottish
Child Interview Model. 
Quality of evidence
gathered and suitability
for use in ongoing care
and protection planning.
Data from 2024/25
will be used to
establish a
baseline for this
measure as it is
new.
Data from 2024/25
will be used to
establish a
baseline for this
measure as it is
new.
Children,
Families &
Justice
March
2025 
Ensure that people
get the right care,
accommodation
and support where
Enhance our
housing support offer
by implementing an
Intensive Housing
Support Service for
Commission a
third sector
provider to
deliver intensive
housing support.
Repeat homelessness
presentations will be
minimised and tenancy
sustainment for
previously homeless 
2019/20: 25
2020/21: 30
2021/22: 15     
2022/23: 5    
Housing &
Communities
March
2025
Local Housing
Strategy 2022-2027 
Page 39 of 96

Page 40

Draft Corporate Delivery and Improvement Plan 2024/25
22 
Corporate Priority
Action
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if
we have been
successful?                         
Baseline Data Strategic
Lead
Target
date Linked strategy/plan
and when they
need it
people with complex
needs.
people with complex
needs will increase.
Feedback from people
with complex needs will
be positive with better
outcomes being
reached. 
Data from 2024/25
will be used to
establish a
baseline for this
measure as it is
new.
Rapid Rehousing
Transition Plan (Home
First) 2019-2024 
Maintain sibling
relationships for care
experienced children
to deliver on the
principles of The
Promise.
Ensure children
and young
people are
listened to and
helped to have a
say through
Family Group
Decision-Making
and access to
Independent
Advocacy.
Create Lifelong
Links plans for
every care
experienced
child,
incorporating
Feedback from care
experienced young
people.
Data from 2024/25
will be used to
establish a
baseline for this
measure as it is
new. 
Children,
Families &
Justice
March
2025
Perth and Kinross
Corporate Parenting
Plan 2021-2024 
Page 40 of 96

Page 41

Draft Corporate Delivery and Improvement Plan 2024/25
23 
Corporate Priority
Action
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if
we have been
successful?                         
Baseline Data Strategic
Lead
Target
date Linked strategy/plan
links with
brothers and
sisters, where
relevant and
where the young
person wishes
this.
Prepare for the
establishment of
the National Care
Service and
continue to strive
for excellent health
and social care
outcomes for the
people of Perth
and Kinross
In June 2023, the
Scottish Parliament
extended the
deadline for the
completion of Stage
1 of the National
Care Service
(Scotland) Bill to
January 2024. It was
then announced in
July 2023 that
accountability for the
National Care
Service would be
shared between the
Scottish
Government, NHS
and local authorities.
As part of this the
latter will continue to
We will continue
to monitor
national
developments
and consider
activity as
required.     
Page 41 of 96

Page 42

Draft Corporate Delivery and Improvement Plan 2024/25
24 
Corporate Priority
Action
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if
we have been
successful?                         
Baseline Data Strategic
Lead
Target
date Linked strategy/plan
employ staff and be
responsible for
assets such as
buildings. 
Page 42 of 96

Page 43

Draft Corporate Delivery and Improvement Plan 2024/25
25 
Improvement activity: Supporting and promoting
physical and mental wellbeing
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we
make these
improvements?
How will we
know if we
have been
successful?                                            
Baseline Data Strategic Lead Target
date
Linked
strategy/plan
Improve health
and wellbeing in
Perth and
Kinross by
increasing overall
participation in
sport and
physical activity
and promoting
the wellbeing
benefits of time
spent in our
natural
surroundings
Increase uptake
of sport and
physical
activities.
Work with key
partners to
develop
programmes
which optimise
opportunities for
physical activity.
Social
prescribers
encouraging the
use of outdoor
activities. 
Numbers of
participants
have
increased. 
Reduction in
health and
social care
issues related
to inactivity.
2019/20: 1.258M                       
2020/21: 63K                            
2021/22: 546K                          
2022/23: 1.002M 
Data from 2024/25 will be
used to establish a baseline
for this measure as it is new. 
Economy,
Development &
Planning 
Health and
Social Care
Partnership 
March
2025
Physical Activity
and Sports
Strategy 2023-
2028 
Health and Social
Care Strategic
Commissioning
Plan 
Page 43 of 96

Page 44

Draft Corporate Delivery and Improvement Plan 2024/25
26 
Corporate Priority
Action
What
improvements
do we want to
achieve?
How will we
make these
improvements?
How will we
know if we
have been
successful?                                            
Baseline Data Strategic Lead Target
date
Linked
strategy/plan
Work with
schools and
sport groups to
increase the
number of
opportunities for
children and
young people to
take part in
physical activity.
Education and
Learning 
Improve health
and wellbeing in
Perth and
Kinross by
ensuring that
people have
access to
wellbeing support
when they need it
Reduce waiting
times for people
to access Mental
Health Services.
Redesigning
specialist
community
mental health
services across
Tayside.
Increase access
to preventative
and community
support.
Reduction in
waiting lists
(numbers and
time). 
Waiting times for people to
access Mental Health
Services (weeks) 
2021/22: 33 weeks                    
2022/23: 36 weeks
Health and
Social Care
Partnership
March
2025
Community
Mental Health
and Wellbeing
Services
Strategic Delivery
Plan 
Page 44 of 96

Page 45

Draft Corporate Delivery and Improvement Plan 2024/25
27 
Improvement activity: Working in partnership with
communities
Corporate
Priority Action
What
improvements
do we want to
achieve?
How will we
make these
improvements?
How will we know
if we have been
successful?                        
Baseline Data Strategic Lead Target
date
Linked
strategy/plan
Establish
locality
multidisciplinary
teams working
with our
community
planning
partners and
residents to
identify and
address local
solutions to
local needs
Deliver a clear,
consistent, and
joined up
approach to
supporting
communities and
households with
the help and
support they
need to mitigate
and move
beyond poverty.
Develop multi-
disciplinary
locality working 
focussed on
locally identified
needs. 
Feedback from
communities and
staff on the
effectiveness of the
multi-disciplinary
team approach.
Strengthened
partnerships within
localities with case
studies to evidence.
Baseline qualitive data
and feedback will be 
established in 2024/25. 
Data from 2024/25 will
be used to establish a
baseline for this
measure as it is new. 
Strategic Planning,
People &
Performance
March
2025
Local Child
Poverty Action
Report 
Transformation
& Change
Strategy 2022-
2027 
Increase the
supply and
availability of
rural housing
Provide more
affordable homes
to support
liveable and
Deliver PKC’s
affordable
housing
programme of
Maintain 53% / 47%
split across urban
and rural areas. 
2020/21: Total 109
homes                         
(71 buybacks/empty
homes; 26 new rural
homes (68%) and 12
Economy,
Development &
Planning
2027 Local Housing
Strategy 2022-
2027 
Page 45 of 96

Page 46

Draft Corporate Delivery and Improvement Plan 2024/25
28 
Corporate
Priority Action
What
improvements
do we want to
achieve?
How will we
make these
improvements?
How will we know
if we have been
successful?                        
Baseline Data Strategic Lead Target
date
Linked
strategy/plan
sustainable
communities. 
1,050 over the
next 5 years 
Achieve an average
of 210 affordable
housing completions
each year.
new urban homes
(32%))
2021/22: Total 422
homes                       
(39 buybacks/empty
homes; 198 new rural
homes (52%) and 185
new urban homes
(48%))
22/23: Total 242 homes
(54 buybacks/empty
homes; 145 new rural
homes (77%) and 43
new urban homes (23%) 
2019/20: 250                      
2020/21: 246                      
2021/22: 310                      
2022/23: 203
Page 46 of 96

Page 47

Draft Corporate Delivery and Improvement Plan 2024/25
29 
Corporate
Priority Action
What
improvements
do we want to
achieve?
How will we
make these
improvements?
How will we know
if we have been
successful?                        
Baseline Data Strategic Lead Target
date
Linked
strategy/plan
Develop and
expand our
approach to
working with
communities to
identify local
actions and
priorities and
deliver on these
together
Supporting
community
groups to
manage local
assets, such as
community halls.
Support
community
groups to
develop
Community Asset
Transfer (CAT)
plans.
Carry out
engagement
activity to
promote
Community Asset
Transfer as an
option.
Increase in number
of Community Asset
Transfers. 
Increase in
community groups
applying for
community asset
opportunities.
2019/20: 11                        
2020/21: 5                          
2021/22: 7                          
2022/23: 26 
2019/20: 11                        
2020/21: 5                          
2021/22: 7                          
2022/23: 26
Housing &
Communities
March
2025
Property Asset
Management
Plan
Community
Asset Transfer 
Expand and
improve formal
community
engagement
structures, i.e.,
development
Local Action
Plans.
Implement
recommendations
and actions from
review of current
local decision-
making
committees and
create new
structures where
appropriate.
Increased in
engagement with
community
members through
new structures.
Feedback from
communities about
impact of new local
Data from 2024/25 will
be used to establish a
baseline for this
measure as it is new. 
Data from 2024/25 will
be used to establish a
baseline for this
measure as it is new.
Housing &
Communities
March
2025 
Page 47 of 96

Page 48

Draft Corporate Delivery and Improvement Plan 2024/25
30 
Corporate
Priority Action
What
improvements
do we want to
achieve?
How will we
make these
improvements?
How will we know
if we have been
successful?                        
Baseline Data Strategic Lead Target
date
Linked
strategy/plan
decision-making
committees. 
Increased
engagement and
applications from
communities to
the 
Community
Investment Fund
grants
programme. 
Review
application and
assessment
process.
Further strategic
improvements will
be identified
through
evaluation of the
2023/24
Community
Investment Fund
programme.
Increase in the
number of
successful
applications.
Increase in the
number of
people/communities
benefitting from a
CIF funded project.
2021/22: 141
applications across 2
rounds                
2022/23: 85 applications
In 21/22 CIF benefitted
36,115 people.
Housing &
Communities
March
2025 
Deliver our
internal cultural
change
programme
ensuring all
staff contribute
to our
An empowered
and skilled
workforce who
are confident in
engaging with
resident and
communities and
Delivery of action
within the
Employee
Engagement and
Cultural Change
Programme.
Feedback from our
workforce,
managers, and
community
members. 
Data from 2024/25 will
be used to establish a
baseline for this
measure as it is new. 
Strategic Planning,
People &
Performance
March
2025
Employee
Engagement
Plan 2023
Page 48 of 96

Page 49

Draft Corporate Delivery and Improvement Plan 2024/25
31 
Corporate
Priority Action
What
improvements
do we want to
achieve?
How will we
make these
improvements?
How will we know
if we have been
successful?                        
Baseline Data Strategic Lead Target
date
Linked
strategy/plan
commitment to
engage with and
be accessible
and responsive
to our residents
and
communities
demonstrate the
organisational
values and
expected
behaviours at all
times.
Learning and
development
opportunities for
staff on
community
engagement and
participation.
Number of
participants in
leaning and
development
opportunities.
Reduction in
complaints relating
to behaviours or
actions contrary to
our organisational
values and
behaviours.
2021: 2,517                       
2022: 928                           
2023: 1,190                  
(up to 13/12/2023) 
Data from 2024/25 will
be used to establish a
baseline for this
measure as it is new. 
Page 49 of 96

Page 50

Page 50 of 96

Page 51

Perth And Kinross Council 
Scrutiny & Performance Committee 
31 January 2024 
REVIEW OF EXTREME WEATHER EVENTS IN PERTH AND KINROSS IN
OCTOBER 2023 
Report by the Chief Executive 
(Report No. 24/45) 
1. PURPOSE 
1.1 This report is to allow completion of the consideration of the report presented
to Sctuiny and Performance Committee on 22 November 2023 22 November
2023 (Report No 23/232 refers). 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
• considers the findings of this review into the Council’s preparedness,
response and recovery activity during each of the three October weather
events from Section 7 onwards 
• considers the updated improvement actions identified within the report
and makes recommendations for any further areas of improvement
(Appendix 1). 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background   
• Appendices 
4. BACKGROUND 
4.1 This report is a follow-up to the previous report to the Scrutiny and
Performance Committee which was discussed at the meeting of 22 November
2023 (Report No 23/232 refers). Link to meeting of 22 November 2023 
4.2 At that meeting, the Committee discussed the arrangements in place over the
weekend of 6-8 October 2023.  However, there was insufficient time to
address the remainder of the report which covered the two other severe
weather events (18-21 October and 27-29 October 2023). As such, the
Committee agreed to defer the remainder of the report to this meeting.   
7
Page 51 of 96

Page 52

4.3 In addition, further actions were agreed by the Committee for the improvement
plan.  These are shown within the updated plan, along with progress to date
on all identified actions. (Appendix 1).
4.4 The new actions for inclusion within the improvement plan are: 
• appropriate allocation of the approved funding to communities to support
resilience in terms of both training and equipment
• this  review to include a clearer and better tested ‘plan B’ for when
something does go wrong with a piece of infrastructure
• develop a protocol to share vulnerable people lists during emergencies 
• Invite representatives from SEPA, SSE and SW to attend a future
Scrutiny and Performance Committee 
4.5 All actions within the plan, including the additional ones agreed by this
Committee are being actioned by officers in line with the timescales identified
for completion. 
Authors
Name  Designation Contact Details
Mark Butterworth 
Fraser Crofts 
Head of
Environmental &
Consumer Services 
Strategic Lead –
Environment &
Infrastructure
ComCommitteeReports@pkc.gov.uk
01738 475000
Approved 
Name Designation Date
Thomas Glen  Chief Executive 
APPENDICES 
• Appendix 1 –  Updated Improvement Plan 
Page 52 of 96

Page 53

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment None
Strategic Environmental Assessment None
Sustainability (community, economic, environmental) None
Legal and Governance  Yes
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications  
Corporate Plan 
1.1 This report supports the following objectives within the Corporate Plan:- 
• tackling climate change and supporting sustainable places
• developing a resilient, stronger and greener local economy
• protecting and caring for our most vulnerable people
• working in partnership with communities 
2. Resource Implications 
Financial 
2.1 The Council incurred a number of additional costs in response to the winter
flooding events, mainly in the form of officer time, over time and call out
allowance. The Council also incurred costs as a result of, for example of the
damage to the Glen Lyon road. 
2.2 The recommendations in this report could have financial implications,
however the exact extent of these cannot be quantified until a more detailed
analysis is undertaken. 
Page 53 of 96

Page 54

Workforce 
2.3 The recommendations in this report could have implications for Council officers,
and those within the Roads Maintenance Partnership, however the exact extent
of these cannot be quantified until a more detailed analysis is undertaken. 
Asset Management (land, property, IT) 
2.4 None. 
3. Assessments 
3.1 The Impact and Value Assessment Tool has been completed for this paper,
with the following findings: 
3.2 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. 
(i) Assessed as not relevant for the purposes of EqIA 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 However, no action is required as the Act does not apply to the matters
presented in this report. This is because the Committee are requested to note
the contents of the report only and the Committee are not being requested to
approve, adopt or agree to an action or to set the framework for future
decisions. 
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
Page 54 of 96

Page 55

Legal and Governance 
3.6 Officers from Legal and Governance have been consulted in the preparation
of this report. 
Risk 
3.7 Not applicable. 
4. Consultation 
Internal 
4.1 Officers from a number of services involved in the preparedness, response
and communications with regard to the recent extreme weather events have
contributed to this drafting of this report. 
External 
4.2 None. 
5. Communication 
5.1 Not applicable. 
2. BACKGROUND PAPERS 
2.1 Perth Flood Scheme Operating Manual 
Page 55 of 96

Page 56

Page 56 of 96

Page 57

Appendix 1
0L JN Improvement plan
Theme Ref. no. Activity Responsible Officer Timescale Comments
Notifications and
preparedness
1 Report to EI&ED on resource
requirements to support year-round
resilience.
Strategic Lead –
Environment &
Infrastructure
No later than
June 2024
Proposal being developed.
Various options being considered
and costed, in conjunction with
other inter-related actions
below.   
2 Officers to review and put in place
new minimum staffing/standby-levels
at command and operational levels to
ensure resources are available to
successfully co-ordinate and deploy
all flood defence measures within
timescales set within the to be
revised protocols (action 8 refers).
Roads Maintenance
Partnership Manager
By June 2024 As above, various options being
considered and costed, in
conjunction with other inter-
related actions.  Consideration
also being given to changing the
flood gate closure procedure,
and triggers
Incident Management,
Resourcing and
Response
3 Undertake further training in terms of
emergency planning across the wider
leadership team to ensure resilience
to deal with incidents
Strategic Lead –
Strategic Planning,
Policy & Resources 
By March
2024
Arrangements are being put in
place to provide both external
and internal training/awareness
sessions.  Currently liaising with
colleagues in Local Resilience
Partnership (LRP) regarding
further training for gold and
silver command officers. Crisis
management training being
investigated for all new Gold
Commanders 
4 The Council’s Out of Hours Standby
arrangements be reviewed to include
exploring the opportunities for
Strategic Lead –
Environment &
Infrastructure
By March
2024
To be undertaken in conjunction
with actions 2 and 7. Internal
discussions on-going regarding
7
Page 57 of 96

Page 58

expanding the remit of staff from
other Council services.
what resources are currently
available across PKC and how
these can better
support/increase any response
to an emergency. 
5 Continue to work with current
Community Resilience Groups and
build on the success of these models,
reflecting that public agencies
including the Council are unable to
respond to all impacts across the
authority 
Strategic Lead –
Housing &
Communities
This is an
ongoing
action, which
is monitored
within the
service. 
Work has commenced to
develop a marketing campaign
to promote the creation of CRGs,
and the support available from
PKC.  For example, a meeting is
being held in Invergowrie in
January 2024.   A CRG Seminar is
to be arranged in Perth for
March 2024. 
New
action
Appropriate allocation of the
approved funding to communities to
support resilience in terms of both
training and equipment
(Scrutiny and Performance
Committee action)
Service Manager –
Community Resilience
and Emergency
Planning
By June 2024
Ongoing
As above. 
6 Review how the logging and sharing
of information between partner
agencies is undertaken, building upon
the conversations which have taken
place to date with SSE and SEPA
Strategic Lead –
Environment &
Infrastructure
By March
2024
Discussions have taken place
with SEPA and agreement
reached on new way forward,
and new operational protocols
have been agreed, which will
provide for better
communication and clarity. This
has now been used across a
number of weather events.
Page 58 of 96

Page 59

SEPA to update their guidance
and copy to PKC for agreement. 
7 Undertake a review of the handling of
calls to the Out of Hours contact
centre, as well as a further review of
the Council’s out of hours customer
contact arrangements
Strategic Lead –
Environment &
Infrastructure 
Strategic Lead –
Customer & Digital
Services
By March
2024
Proposal being developed.
Various options being considered
and costed, in conjunction with
action 4 above.   
8 Review the Perth Flood Scheme Gate
Closure Operational Procedure
document with SEPA
Strategic Lead –
Environment &
Infrastructure
By June 2024 Various options being
considered, in conjunction with
action 2 above, to increase
resilience and community
reassurance whilst minimising
the need for additional stand-by
resources.  Gate closure triggers
being reviewed 
New
action
This review to include a clearer and
better tested ‘plan B’ for when
something does go wrong with a piece
of infrastructure
(Scrutiny and Performance Committee
action)
Strategic Lead –
Environment &
Infrastructure
By June 2024 Plan being developed which
creates less reliance on the use
of heavy equipment and the use
of alternative protection
measures. In progress, being led
by RMP manager and TC Head of
Operations. 
New
action
Develop a protocol to share
vulnerable people lists during
emergencies 
(Scrutiny and Performance Committee
action)
Service Manager –
Community Resilience
and Emergency
Planning
By June 2024 Officers are liaising with
colleagues in SSEN and the NHS
regarding the sharing of relevant
information.  The key issue being
data protection and GDPR. 
Page 59 of 96

Page 60

Impact and Recovery 9 Review of welfare response protocols
and engagement with those directly
impacted, including follow up with
affected individuals in Perth City and
Invergowrie.
Head of Environmental
& Consumer Services 
Senior Service Manager
Housing 
By 23
December
2023
A welfare response protocol has
been developed and was put in
place, which worked well during
the flooding event at the end of
December 2023. 
10 Establish formal feedback
mechanisms from community
resilience groups to take on board
learning and develop future response
arrangements
Strategic Lead –
Housing &
Communities
By March
2024
Feedback mechanisms are
currently in place, although a
formal debrief process/procotol
will be produced by officers.   
New
action
Invite representatives from SEPA, SSE
and SW to attend a future Scrutiny
and Performance Committee 
(Scrutiny and Performance Committee
action) 
Chief Executive By June 2024 The Executive Director
(Communities) is in contact with
partners about the available
committee dates. 
Page 60 of 96

Page 61

Perth And Kinross Council 
Scrutiny and Performance Committee 
31 January 2024 
PERTH AND KINROSS HEALTH & SOCIAL CARE PARTNERSHIP (HSCP)
CLINICAL AND CARE GOVERNANCE ASSURANCE REPORT 
Jacquie Pepper, Chief Officer, Perth and Kinross HSCP
(Report No. 24/46) 
1. PURPOSE OF REPORT 
1.1 The purpose of this report is to provide assurance to Perth & Kinross Council’s
Scrutiny and Performance Committee on the Clinical Care and Professional
Governance of the Perth and Kinross HSCP. 
2. REPORT SUMMARY 
2.1  Situation 
This report is being brought to the meeting to provide assurance on the clinical and
care governance activities and arrangements across the Partnership as outlined in
the Getting It Right for Everyone (GIRFE) Framework in accordance with the
Partnership integration scheme. Clinical Governance is a statutory requirement to
report on, at Board level, from Scottish Government as per NHS MEL (1998) 75.   
The Scrutiny and Performance Committee is being asked to provide their view on
the level of assurance this report provides and therefore the level of assurance
regards clinical and care governance within the Partnership.  The timescale for the
data within this report is from 1st July 2023 to 31 October 2023. 
As Lead Officer for Perth and Kinross HSCP I would suggest that the level of
assurance provided is: Reasonable Assurance. 
2.2 Background 
The role of the Perth and Kinross HSCP Governance forum is to provide assurance
to the Perth and Kinross HSCP Integration Joint Board (IJB), NHS Tayside Board
(through the Care Governance Committee) and Perth and Kinross Council (through
the Scrutiny and Performance Committee), that there are effective and embedded
systems for Clinical, Care and Professional Governance in all services within Perth
and Kinross HSCP. 
The GIRFE Framework is an agreed tool used by all three HSCPs to ensure
consistency of approach between Local Authorities, Tayside NHS Board and the
IJBs for the three HSCPs; quality assurance is assessed against an agreed,
prioritised common data set for each of the governance domains as detailed below. 
A GIRFE Steering Group continues to meet, with representatives from each of the
8
Page 61 of 96

Page 62

three Partnerships and part of its remit is to support additional common assurance
measures and this template.
The six domains continue to evolve over time and must be adaptable and
responsive to the changes in legislation and external support and monitoring.  The
domains reflect the principles set out in the Health and Social Care Standards, My
support, My life; Scottish Government, 2018 and the Quality-of-Care Approach, HIS
and Care Inspectorate, September 2018. The domains are: 
Information Governance
Professional Regulation and Workforce Development
Patient/Service user/Carer and Staff Safety
Patient/Service user/Carer and Staff Experience
Quality and effectiveness of care
Promotion of Equality and Social Justice 
2.3 Assessment 
2.3.1 Exceptions 
A risk has been identified and recently added to DATIX regarding the ageing
decontamination equipment at Broxden Dental Centre, and the resultant risk of failure. 
The current washers and disinfectors at Broxden Dental Centre were brought into
service some time ago, and are now reaching end of life.  The equipment also serves
as a contingency for CSSD at Ninewells, as part of a reciprocal arrangement. 
There is a risk of equipment failure, resulting in the service being unable to provide
dental care to patients.  In the event of a failure, securing spare parts may also be
challenging due to the age of the equipment. 
The Public Dental service will complete and submit a capital equipment replacement
plan, which, if accepted and progressed, would result in replacement equipment being
installed.  This equipment would also be easier to service due to accessibility of spare
parts. 
Preventative planned maintenance is ongoing by estates engineers, and there are
daily checks made by staff.  A reciprocal arrangement is in place with CSSD at
Ninewells regarding use of equipment at either site in the event of disruption. 
The service intends to submit a capital replacement plan in the near future. 
Home Office Controlled Drug Licence is outstanding for The Bella Centre. 
The Bella Centre is a recently opened Community Custody Unit and houses low
supervision women and young people.  The Prison Healthcare service (hosted in P&K
HSCP) provide healthcare to the population of the Centre.  Due to a processing delay,
the Controlled Drug licenses for HMP Perth, HMP Castle Huntly and The Bella Centre
lapsed.  Licences for HMP Perth and HMP Castle Huntly have since been
successfully renewed. 
Page 62 of 96

Page 63

Due to a processing delay, the Controlled Drug licence is outstanding for The Bella
Centre.  The majority of patients at the Centre are prescribed medication via “named
patient”, so no stock is required to be held at the Centre.   
2.3.2 Clinical and Care Risk Management 
The risk registers for Health and for Adult Social Work and Social Care are
discussed monthly at the P&K HSCP Care & Professional Governance Forum.   
Managers of red risks provide a written update at every meeting, and managers of
amber risks are asked for update at every other meeting. 
This supports assurances that the relevant risks are being regularly monitored;
what measures are in place to minimise the risk; what alternative mitigations plans
and actions are in place to minimise the risk; that where the risk affects, or is
impacted by, other parts of the health or social care system, or indeed other
agency, we are assured that they are fully informed and engaged in the process.   
The controls listed under each risk are the cumulative efforts being made to mitigate
the risk. 
P&K HSCP health red risks as at 15th Nov 2023: 
DatixRef
Risk
Exposure –
No controls
Current Risk Exposure Rating Planned
Risk
Exposure
Risk
Trend
(↑/→/↓) Please include data from previous four reporting periods
Dec 2022 April 2023 Aug 2023 Nov 2023 
L C RER L C RER L C RER L C RER L C RER L C RER 
829 4 5 20 4 5 20 4 5 20 4 5 20 4 5 20 2 5 10 →
982 5 4 20 5 4 20 5 4 20 5 4 20 5 4 20 2 4 8 →
701 5 3 15
* 3 3 9 5 4 20 5 4 20 5 4 20 1 4 4 →
1321 5 4 20 - - - - - - 5 4 20 5 4 20 2 4 8 → 
L = Likelihood   C = Consequence  RER = Risk Exposure Rating 
* The current risk score is higher than the inherent score due to exacerbations of the risk by further
staffing challenges.  
Page 63 of 96

Page 64

P&K HSCP Adult Social Work & Social Care red risks as at 15th Nov 2023: 
Risk
Risk
Exposure –
No controls
Current Risk Exposure Rating Risk
Trend
(↑/→/↓) Please include data from previous four reporting periods
Dec 2022 April 2023 Jul 2023 Nov 2023 
L C RER L C RER L C RER L C RER L C RER 
1 4 5 20 - - - 4 5 20 4 5 20 4 5 20 →
2 4 5 20 1 3 3 4 5 20 4 5 20 4 5 20 → 
Health Risk 829 - Challenges in relation to accommodation for clinical and non-
clinical staff across P&K 
Accommodation walkrounds have been completed across Health & Social care
sites with a view to mapping sites to accommodate future teams. 
A short life working group has been recommenced with NHST support service and
Estates in order to review the accommodation needs for CCATS, IDART, Urgent
Care and Community AHP's.  A consultation paper to be completed in relation to
engaging with staff re: accommodation moves.  Paper to be written to describe the
options going forward (option appraisal) in conjunction with NHST estates and
support services. 
Smartsheet is being used to capture the current situation at each site where
accommodation required review, and supporting SBAR’s being used. 
Health Risk 982 - Mental Health Medical Workforce in P&K HSCP 
A meeting has taken place to discuss medical workforce.  Current redesign of
inpatient services and CMHT is progressing, and this will include medical workforce
as well as other professionals in future design. 
Services remain reliant on locum agencies to fill consultant psychiatry gaps and
regularly advertising substantive positions, but to no avail. 
Nursing workforce situation has improved recently in terms of recruitment.  There
continue to be challenges with Medical and AHP recruitment however. 
Health Risk 701 - Mental Health Waiting Times within the Prison Healthcare Service 
Two additional nurses have been recruited, and start dates are awaited. Mental
Health ANP recruitment is also underway.  The service has also been seeking
agency nursing staff to reduce the time spent by the team administering
medication. 
Page 64 of 96

Page 65

It is anticipated that the listening service will be able to support appointments
categorised as green.  It is also noted that staffing levels within the Mental Health team
are beginning to improve. 
Health Risk 1321 - Inadequate environment for the Perth City CCATS service 
This risk was added in April 2023, as in relation to the current CCATS service which
is located within Beechgrove House, Perth.  A recent Infection Prevention and
Control team visit to the site found numerous environmental Infection Control
concerns.  A site visit has taken place from the current cleaning contractor, soft
facilities and PKC estates to explore gaps and potential solutions within current
provision.  There is in place a Short Life Working Group regarding accommodation
across P&K HSCP, and the CCATS service in Perth City is part of this working
group.
CCATS continue to undertake risk mitigation such as additional cleaning and
handwashing.  Property application for CCATS submitted to short life working group. 
Adult Social Work and Social Care Risk 1 – Lack of Care at Home capacity,
especially around rural P&K. 
Care at Home Transformation group and workstreams are in action.  HART continue
to be in a +3 position each month with domestic recruitment.  Overseas recruitment
pilot in progress with aim for 4-5 staff in place for 1st cohort by Dec 23 and a second
cohort by March 24.
Automated scheduling went live 20 September. HART and Living Well Rotas being
reviewed.  PinPoint system being investigated to support easier access to unmet
need across all internal and external providers.  Alliance contracting with
independent sector progressing. 
Adult Social Work and Social Care Risk 2 – Lack of OT capacity 
There are currently 1.5  North OTs out to advert, as well as one admin advert.  The
service is no currently meeting priority targets and no M & H reviews taking place. 
the Duty Team now stable and making a positive impact. 
2.3.3 Clinical & Care Governance Arrangements 
Lead Partners Services 
Each HSCP is a Lead Partner for a number of services. These services report through
to the Clinical Care and Professional Governance Forum for that HSCP. At the
Clinical Care and Professional Governance Forum the Lead Partner Service reports
receive the relevant level of scrutiny as other reports. 
Systems and processes are being established to ensure that all three HSCPs receive
copies of reports from other Lead Partner Services to support integration, and
effective whole system working. 
Page 65 of 96

Page 66

Full details of the Clinical & Care Governance Arrangements in P&K HSCP are
provided within appendix 1.   
Summary of key exceptions raised at recent CPGF meetings: 
Key exceptions identified within the exception reports from the CPGF meetings
held in August, September and October 2023: 
• Prison Healthcare:
o Mental Health Waiting Times within the Prison Healthcare Service.  There
are plans in place to address Green list including Listening Service and
Safety & Stabilisation groups, as well as ongoing recruitment.
o Non Emergency Transfer of Patients to Hospital. This is being monitored
locally and nationally and escalated regularly. Cancellations have been
increasing 
• North Locality:
o Some examples of of poor planning / communication from acute sites on
discharge to P&K have been noted.  Datix linked to NWH EM Consultant
for review. CPTM North collating information from LInCS to understand
issues and provide evidence to share with acute sites and discharge
teams. Current individual cases being wrapped around by the LInCS
team to ensure immediate safety, assurance and care.
o National issues with HEPMA. Additional transmitters added to the
service have now resolved this problem.  Locally the WiFi in Blairgowrie
has also been problematic. IT attending site on 2nd of October to
upgrade the system and signal (this will take approx one week Ongoing
issues with generator testing knocking outIT systems – ongoing
discussions with IT and Estates to find solution or mitigate risk. 
• South Locality:
o Ongoing Social Work vacancies impacting availability of AP trained
capacity and general service delivery. 
• Perth City Locality:
o Within the CCATS service, additional Asylum assessments proving
challenging to support timely given staffing pressures, sickness and
vacancies in the service.  North Locality supporting from CCATS.
o There are limited Care Home placements due to care homes being
at full capacity especially in nursing and EMI units.  The service is
reviewing officers and staff are ensuring only clients that require EMI
care are in EMI beds. Staff are checking during reviews that the level of
care is suitable for client needs. 
• Public Dental service
o Awaiting input from Property Department to progress essential
ventilation and building works. Work has been approved in principle by
AMG and funding in place. 
Page 66 of 96

Page 67

• Tay & Stroke wards and Intermediate Care
o Hospital Discharge Team – Discharge Coordinator shortage. Service
Manager has escalated to ‘Hot Red’ staffing status. Recruitment is
ongoing – poor applicant uptake due to temporary posts. 1 part time post
has been filled.  Service Manager and Senior Nurse providing
operational support to maintain HDT service and support patient
discharge planning and flow. 
Key exceptions identified within the annual reports from the CPGF meetings held
in August, September and October 2023: 
• Podiatry
o Ongoing DATIX risks regarding the staffing recruitment challenges
nationally, along with recent unexpected resignations.  This has created
a risk of the Podiatry service being unable to treat higher risk patients,
and to positively address the existing patient waiting times.
o The transition from paper records onto EMIS has provided a more
secure clinical record keeping system.  The improved quality of note
keeping and allows improved communication with other healthcare
professionals supporting better patient outcomes.
o There is currently insufficient capacity to meet patient demand for
Podiatry within Justice Healthcare 
• Registered Services
o Kinnoull Community Day Opportunities and Gleneagles Day
Opportunities both retain staff well, but struggle to recruit to vany vacant
social care posts. 
• Mental Health Services
o With an increasing understanding of ADHD as a lifelong condition,
services have seen a significant increase in referral for people with
potential ADHD and are overwhelmed by the demand. 
o Red DATIX risk regarding an NHST inability to recruit and retain
Consultant Psychaitrists.
o Amber DATIX risk regarding ligature anchor points in P&K POA wards.
o Mental Welfare Comission visits to the P&K POA wards in early 2023,
which was overall positive. Several recommendations were made, and
good progress is being made with these. 
• Urgent Care
o Hospital at Home experienced IT issues affecting the ability of the team to
use eKORA. This delayed the service’s soft launch date and required an
alternative way of recording patient information to support escalation and
safety netting in both the in hours and the out of hours periods. This issue
is now resolved and the team are able to utilise Trakcare and eKORA in
the management of patient’s within the community. 
• Primary Care
o DATIX risk regarding seven practices who are at high risk of closure or
transition to 2C, which would lead to disruption to service provision for that
practice population.  This is a result of a combination of workforce and
workload factors.
Page 67 of 96

Page 68

Adverse Events: 
Systems are in place for services/localities to review DATIX incidents.  
The Nursing & AHP leads meet along with the Clinical Governance Coordinator on
monthly basis to review the top 5 incident categories.  This helps to identify any
trends or any appropriate action and supports closing the loop. 
Regarding adverse events, the main themes reported during the months between
July 2023 and October 2023 were: 
Highest frequency events: 
1. Slips, Trips and Falls 
2. Medication 
3. Clinical Challenging behaviour
4. Violence & Aggression
5. Pressure Ulcer 
Harm is defined as an outcome with a negative effect. Harm to a person or groups
of people may result from worsening of a medical condition, the inherent risk of an
investigation or treatment, system failure provider performance issues, service
disruption, financial loss or adverse publicity. 
Slip, Trip & Falls
During the time period between July 2023 and October 2023, there were 180
incidents recorded, of which 24 involved harm.  82 occurred at MRH, 29 at PRI, 58
in Community Hospitals and the remaining 11 in other areas. 
The Psychiatry of Old Age inpatient wards at Murray Royal Hospital experienced a
higher than usual number of falls at the end of 2021 due to several patients who
had multiple falls (many of which were controlled).  Ward staff were doing all they
could to manage the falls, and they had support from the Falls coordinator during
this time. 
Page 68 of 96

Page 69

In addition, the Falls Coordinator continues to: 
▪ review all of the wards in-patient falls Datix reports and provide feedback to
the ward with a breakdown of their falls, outlining any trends, highlighting
patients who fall repeatedly and enquiring if further information is required 
▪ Supports all of the HSCP wards to have strength and balance exercise panels
fitted on their walls and suitable patients also receive a set of strength and
balance cue cards which they can take home with them. Along with that they
receive a Care About Walking booklet and record charts for recording activity /
steps. 
• Medication
During the time period between March July 2023 and October 2023, there
were 102 incidents recorded, of which 5 involved harm.  10 occurred at MRH,
7 at PRI, 27 in Community Hospitals, 42 within a Prison Establishment and the
remaining 16 in other areas. 
The majority of medication adverse events occurred with the Prison Healthcare
service.  The prison healthcare service manages and administers a high volume
of medication across three sites across Tayside - HMP Perth, HMP Castle Huntly
and HMP & YOI Bella.  
• Violence & Aggression
During the time period between July 2023 and October 2023, there were 35
incidents recorded, of which 3 involved harm.  15 occurred at MRH, 9 at PRI,
4 in Community Hospitals, and the remaining 7 in other areas. 
Page 69 of 96

Page 70

The 15 incidents within Murray Royal Hospital were within the Psychiatry of
Old Age wards. The 3 incidents which involved harm were all in different
inpatient wards, 2 of which were physical and one verbal.  All three incidents
are graded green. 
• Clinical Challenging Behaviour (such as patient unable to understand risks,
sexual disinhibition, general agitation) 
During the time period between July 2023 and October 2023, there were 72
incidents recorded, of which 5 involved harm.  64 occurred at MRH, 4 at PRI
and 4 in Community Hospitals. 
The vast majority of these incidents were within the Psychiatry of Old Age
wards at Murray Royal Hospital.  The rise in incidents (albeit of negligible
grading) in October 2023 have been noted by the service.  This appears to be
attributable to a small group of patients in one particular POA ward who are
exhibiting these behaviours. 
The wards have sought input from the NHST PMVA team regarding the
ongoing management of Violence & Aggression and Clinical Challenging
Behaviour. 
• Pressure Ulcers 
During the time period between July 2023 and October 2023, there were 31
incidents recorded, of which 28 involved harm.  15 were within the patients
home, 3 within Care Homes, 5 within Community Hospitals, and the remaining
8 in other areas. 
Page 70 of 96

Page 71

Further exploration on DATIX regarding the recent moderate events taken
place.  
3 of these were recorded by the Community Nursing service regarding
patients in their own home, and 3 by Podiatry.
Each geographical locality in P&K is provided with a summary of adverse
events specific to their locality to enable them to identify trends and any
learning.   
Adverse events are regularly reviewed and form a standing agenda item at the
locality governance groups to identify learning, improvements, training needs
or themes. 
It has been identified and acknowledged by the CPGF that further
performance improvement is required regarding the timescales for reporting
and verifying DATIX incidents.  This continues to be monitored at CPGF
meetings. 
Adverse events are regularly reviewed and form a standing agenda item at the
locality governance groups to identify learning, improvements, training needs
or themes. 
It has been identified and acknowledged by the CPGF that further
performance improvement is required regarding the timescales for reporting
and verifying DATIX incidents.  This continues to be monitored at CPGF
meetings. 
Incident Record Dashboard for Adult Social Work & Social Care: 
Page 71 of 96

Page 72

Page 72 of 96

Page 73

2.3.4 Significant Adverse Event Reviews 
Report and action plan for DATIX 136987 fully signed off.  Action plan being
progressed through the P&K HSCP Mental Health Care Governance Group.  5/15
actions completed at present. 
2.3.5 Pressure Ulcers & Falls 
Details regarding both of the types of Adverse events has been provided above in
section 2.3.3. 
Pressure ulcers are reviewed on an individual basis to ensure that all mitigating
actions are in place and any themes in relation to learning are identified. 
Each geographical locality in P&K is provided with a summary of adverse events
specific to their locality to enable them to identify trends and any learning.   
2.3.6 Complaints 
Current Health Complaints as at 14/07/2023 - Stage 1 
Service Area 0-4 Days 5-9 Days Total
Perth & Kinross HSCP 6  0 5 
Current Health Complaints as at 14/07/2023 - Stage 2 
Service Area 0-5
days
6-10 days >20 days >60 days Total
Perth & Kinross HSCP 3 1 0 2 6 
Current Adult Social Work & Social Care Complaints for July 2023: 
Stage 1: 
There were 10 stage 1 complaints received in the time frame noted.
Reasons for stage 1 complaints:
Service Provision - 5
Complaints regarding employees - 3
Policy and procedure - 2
Stage 1 complaints by general theme:
Quality of Care – 5
Waiting times – 1
Page 73 of 96

Page 74

Staff conduct – 3
Paying for Care – 1 
Stage 2: 
There were 2 stage 2 complaints.
2 stage 2 complaints were upheld in the reporting period.
Reasons for stage 2 complaints:
Service Provision – 1
Policy and Procedure - 1
Stage 2 complaints by general theme:
Disagreement with Ax (assessments) - 1
Paying for Care : 1 
2.3.7 Scottish Public Services Ombudsman Reports
There have been no complaints referred to the SPSO during the time period. 
The last complaint which was referred to the SPSO was from October 2020, and
further information has recently been provided to the SPSO regarding this
complaint. 
2.3.8 External Reports & Inspections 
Mental Welfare Commission (MWC) announced visits to Garry and Tummel
Wards at Murray Royal Hospital on the 31th and 31st January 2023. 
Garry and Tummel wards are both 12 bedded wards and provide assessment, care
and treatment for people with dementia.  The wards uses a multi-professional
approach to ensure person centred, recovery focussed care. 
The MWC last visited these wards in July 2019, and made recommendations
regarding the auditing of care plans, authority to treat certificates, discharge
planning arrangements and improving the décor in Garry ward. 
From staff that the inspectors spoke with, they heard how challenging the last two
years had been since the start of the Covid-19 pandemic, and the inspectors were
pleased to hear that there has been a focus on staff wellbeing throughout the
pandemic and this has continued. 
The MWC found that on both wards, nursing staff interacted in a kind and
supportive way.  The patients were not able to engage in a discussion about their
care and treatment due to the extent of their cognitive impairment, but relatives
were overwhelmingly positive about the care, treatment and support on the wards.  
Page 74 of 96

Page 75

Staff were described as outstanding, exceptionally kind and that the care and
attitude of staff was above and beyond. 
Relatives fedback that staff kept in contact with them and they felt listened to. Some
of the relatives said they had been invited to meetings, others had not, and all the
relatives we spoke to had been given copies of care plans. 
During the visit, care plans were reviewed and found to be person-centred and it
was clear that staff knew patients on the ward very well. There was thorough
background personal information in care plans. The care plans inspected
addressed a range of needs including mental and physical health needs and
outlined goals and interventions required to meet needs. 
The inspectors hears that an activity support worker had recently trained in ‘playlist
for life’, an evidence-based initiative to support people living with dementia to create
a playlist of personally meaningful music, with the aim to reduce stress and
distress. 
The inspectors also heard about the development of a transitional care nurse who
supports discharge planning. This nurse supports patients for a transitional period
when they had moved from hospital to long-term care, thereby bridging the gap
between hospital and community mental health teams. 
The MWC made 6 recommendations from their visit, these being that managers
should: 
• ensure that staff completing care plans undertake care plan training and refer
to NHS Tayside’s person-centred care planning standards.
• ensure that nursing staff include summative evaluations of care plans in
patient notes that clearly indicate the effectiveness of the interventions being
carried out and any required.
• ensure that patient/relative involvement in care planning is encouraged and
recorded.
• ensure that MDT meetings are fully recorded 
• ensure that where a patient lacks capacity in relation to medical treatment,
S47 certificates and treatment plans must cover all relevant medical treatment
the individual is receiving. Treatment should be described in full and
abbreviations should not be used.
• explore solutions to ensure patients are able to look out of the ward windows,
without their privacy being compromised. 
Good progress is being made with recommendations, with one fully complete as of
June 2023. 
Mental Welfare Commission (MWC) announced visit to Leven Ward at Murray
Royal Hospital on the 20th March 2023. 
Leven ward is a 14 bedded ward for patients who have a mental health diagnosis
and are over 65.  The ward uses a multi-professional approach to ensure person
centred, recovery focussed care. 
We last visited this service on 5 September 2018, along with two other wards, and
made recommendations regarding the auditing of care plans, authority to treat
certificates and auditing the provision of activities.
Page 75 of 96

Page 76

The patients the inspectors met with during our visit were very complimentary about
the staff on Leven ward. They were described as wonderful, cheery, approachable,
kind and friendly. 
Staff took the time to get to know the patients on the ward. One patient however
was not sure who their named nurse was. 
The relatives spoken to were equally positive about staff and told us that staff were
concerned not just about patients, but about the wider family also. Relatives told
inspectors that they had been linked in with a carer support worker who provided
support and had arranged for a carer’s assessment to be undertaken. 
The inspectors heard from relatives that treatment on the ward was superb and that
they were very happy with the care their relative had received. Inspectors were told
by relatives that the ward was well staffed, relatives felt listened to and that
information and suggestions they provided were acted upon. Relatives told us they
felt part of the care team. 
Inspectors heard about the work that was taking place in relation to anticipatory
care planning (ACP) with a focus on involving patients and their families in drawing
up an individualised ACP. 
The risk assessments the inspectors saw were comprehensive and of a good
standard, showing appropriate interventions to manage risk.  Risk management
plans were clear and corresponded to risks identified. 
Inspectors heard that Leven ward had a full-time activity support worker (ASW) who
worked alongside the clinical team, patients, carers and families developing and
delivering person-centred activities on a daily basis.  During the visit, inspectors
saw patient’s engaging in activities on the ward with staff and other patients. 
The patients and relatives who we met with during our visit spoke positively about
the range of activities on offer on Leven ward and told us that staff encouraged
patients to participate in activities. 
During the visit inspectors saw an up-to-date activities timetable on the ward. In
patients’ files, inspectors found evidence of daily recordings of activities that had
been offered to patients and whether they had participated or declined. All patients
had an individualised activity care plan which was very detailed, person-centred
and regularly updated. Activities on offer to patients included both one-to-one and
group activities. 
Summary of recommendations: 
• Managers should ensure that when a welfare proxy is in place for a patient, a
copy of the document stating the powers of the proxy should be held within
the case notes.
• Managers should ensure that staff completing care plans undertake care plan
training and refer to NHS Tayside’s person-centred care planning standards.
• Managers should ensure that nursing staff include summative evaluations of
care plans in patient notes that clearly indicate the effectiveness of the
interventions being carried out and any required changes to meet care goals.
Page 76 of 96

Page 77

• Managers should ensure that patient/relative involvement in care planning is
encouraged and recorded.
• Managers should ensure that communication between the MDT and
patients/relatives is formalised and that MDT meetings are fully recorded
including patient/relative involvement. 
2.3.9 Adult Support & Protection 
Page 77 of 96

Page 78

This above shows a significant increase in both AP concerns and VPRs.  This is, at
least partly, a result of increased awareness due to ongoing information campaigns
and improved multi-agency working. Extra social worker posts have been recruited
to respond to this increased demand.
Responding to concerns about adults at risk of harm is prioritised and, despite this
increase in referrals, 97% of all concerns are screened within 24-hours. This
indicator, together with the wider performance framework, is monitored at locality
governance meetings, the Public Protection Group, Chief Officers Group and the
Adult Protection Committee.
MAT Standards
Current RAG scores as at June 2023 are: 
Standard
1
Standard
2
Standard
3
Standard
4
Standard
5
Standard
6
Standard
7
Standard
8
Standard
9
Standard
10
RAG
Score  
PROV PROV PROV PROV   PROV PROV 
Standard 1 – All people accessing services have the option to start MAT from the
same day of presentation. 
AMBER because we are offering same day prescribing one day a week. To
supplement the existing Tuesday all-day clinic, from Monday 5th June, one slot a day
has been made available on Mondays, Wednesday, Thursday and Friday which MIST
(MATS Implementation Support Team) has confirmed is sufficient to achieve a green
RAG. 
Standard 2 – All people are supported to make an informed choice on what
medication to use for MAT, and the appropriate dose. 
AMBER because we have an evidence gap for a process for people out with Perth
City to enable them to commence OST where they live, and that long-acting injectable
buprenorphine can be used. To fill this gap and meet the requirements of the
standards, a process has been devised and a named patient SOP. This document is
being reviewed with an intention to submit this to MIST by the end of June to enable a
green RAG to be achieved for this standard. 
Standard 3 – All people at high risk of drug-related harm are proactively
identified and offered support to commence or continue MAT. 
PROVISIONAL GREEN 
Page 78 of 96

Page 79

Standard 4 – All people are offered evidence based harm reduction at the
point of MAT delivery. 
PROVISIONAL GREEN 
Standard 5 – All people will receive support to remain in treatment for as long
as requested. 
PROVISIONAL GREEN 
Standard 6 – The system that provides MAT is psychologically informed (tier
1); routinely delivers evidence-based low intensity psychosocial
interventions (tier 2); and supports individuals to grow social networks. 
PROVISIONAL AMBER 
Standard 7 – All people have the option of MAT shared with Primary Care. 
AMBER 
Standard 8 – All people have access to advocacy and support for housing,
welfare and income needs. 
AMBER
Standard 9 – All people with co-occurring drug use and mental health
difficulties can receive mental health care at the point of MAT delivery. 
PROVISIONAL AMBER 
Standard 10 – All people receive trauma informed care. 
PROVISIONAL AMBER 
Note: The acceptance criteria for standards 6 to 10 has not been finalised and so
green ratings have not been available for these. The current expectation is that MIST
will release this information in October 2023. 
Practical changes that have been introduced as part of the MAT standards
implementation include: 
• Same day prescribing available via a Tuesday clinic, but now expanded to be
available five days a week (standard 1)
Page 79 of 96

Page 80

• Information about treatment options provided to service users to enable
informed decisions to be taken (standard 2)
•  Linkages to other supports developed or strengthened to identify individuals at
risk and enable support to be offered (standard 3)
•  All staff trained in harm reduction and equipped with carry packs containing
necessary supplies to support harm reduction delivery. IDART rooms in
Drumhar Health Centre also appropriately stocked (standard 4)
•  Deeper review of IDART worker caseloads undertaken as part of supervision
with agreement on any necessary actions to ensure individuals remain engaged
with service whenever possible (standard 5)
•  A working group established to review and reconfigure referral routes and
resources between substance use services, general practice and community
mental health teams (stands 7and 9)
•  Training delivered to staff on independent advocacy and social supports to
increase the awareness of these supports and increase referrals (standard 8) 
Page 80 of 96

Page 81

2.3.10 Mental Health 
Community Mental Health Service Activity (PERTH CITY) 
Page 81 of 96

Page 82

Community Mental Health Service Activity (NORTH) 
Page 82 of 96

Page 83

Community Mental Health Service Activity (SOUTH) 
The above data is provided to HSCP’s routinely by the NHS Health & Business
Intelligence Team.  Some further improvement activity is ongoing within the CMHT’s
Page 83 of 96

Page 84

to improve the consistency of recording within the source system (Trakcare).  This will
improve the accuracy of this data for future reports. 
Development of HSCP Mental Health KPIs 
Work continues across the three HSCP’s to agree a series of Mental Health KPI’s
which can be used for consistent reporting within HSCP’s and for onward reporting to
this Committee and others where appropriate. 
The mapping undertaken thus far has shown that there is commonality in the data set
across the three HSCP’s , with P&K and Angus using the same data set and Dundee
using a slightly different set. 
A draft set of proposed indicators which are common across all three HSCP’s  will be
created and shared with a view to having these agreed and finalised.   
Public Health Scotland (PHS) now produces national data sets quarterly rather than
monthly, and we will look to work with the Business Unit to ensure accessibility and
supply of the relevant data. 
2.4 Quality/Patient Care
There are a number of ongoing risks (summarised within Appendices 2 &3) which,
if not mitigated, pose a risk to the provision of safe care which is of high quality. 
The HSCP continues to manage these risks proactively.   
Hospital at Home 
Hospital at home is a team of healthcare professionals who provide hospital level
treatment at home as an alternative to hospital admission.   Hospital at home is
proven to be a safe cost-effective and patient centred approach which started
looking after patients within Perth City on 17th July 2023.  The service in Perth City
is currently available between 0800 – 1800 (Mon-Fri), but P&K HSCP ultimately
plans to offer hospital at home as an option to patients across Perth & Kinross, 7
days per week. 
Public Consultation in Bridge of Earn 
The healthcare needs assessment went live from Monday 15th May and ran until
25th June 2023. It invites patients to complete a survey to give feedback about
health and care services in their local areas and was targeted at Bridge of Earn and
surrounding area. The responses will help P&K HSCP understand what patients
need locally and if the current service provision are meeting those needs. 
The survey was available online on the Your Community Perth and Kinross
Facebook page, and on Practice websites, NHS Tayside also promoting this
through their Facebook page. 
Paper copies were available at all local GP practices that Bridge of Earn patients
were dispersed to, Community Care and Treatment centres, pharmacies, and
identified community venues and noticeboards. P&K Community and Engagement
workers attended many local events and were able to support people complete a
submission. The recent Stronger Communities event was attended by several
Page 84 of 96

Page 85

HSCP representatives and approximately 35 community members and was
positively received. 
Earn Community Council was fully involved and supported the engagement
process.  A total of 600 responses were received and are currently being reviewed.
An evaluation report with recommendations will be undertaken and the results
widely publicised. 
Drug related deaths:
Numbers of suspected drug related deaths are recorded across the three HSCP’s,
and is used to inform learning and context within and across the HSCP’s. 
The following shows data regarding confirmed drug deaths in P&K as compared to
across Scotland (please note the two y-axes): 
The following shows data regarding confirmed drug deaths in P&K as compared to
across Scotland (please note the two y-axes): 
• Local actions to mitigate risks in Perth and Kinross include:
• Implementation of Medication Assistant Treatment (MAT) Standards 1-5 by
April 2023
• Implementation of MAT Standards 6-10 by April 2024
• National Mission to reduce drug deaths funding utilised to increase IDART
staff compliment to reduce waiting times and enhance service provision e.g. –
provision of an OT service and the creation of a new psychology assistant
post to provide low level psychological interventions.
• Creation of a multiagency referral pathway for all new substance use referrals. 
• Creation of a near fatal overdose pathway and multiagency group to review all
reported near fatal overdoses with funding provided to third sector partners to
employ assertive outreach workers to actively engage with service users.  
• Creation of a residential rehabilitation pathway and funding panel to facilitate
access to rehabilitation services for service users.
Page 85 of 96

Page 86

2.4 Workforce
There are a number of ongoing risks regarding workforce challenges (summarised
within Appendices 2 &3) which, if not mitigated, pose a risk to the provision of safe
care which is of high quality.  The HSCP continues to manage these risks
proactively. 
P&K HSCP ensures alignment with NHS Tayside’s approved 3-year workforce
strategy and PKC workforce plan. 
Workload tools are in use within the Community Nursing service, and workload
tools have also been used in the past within services such as POA, and these
requires to be conducted again.  There are a number of workload tools which can
be used, and the purpose of each tool is to provide information and
recommendations on staffing levels based on patient workload.  AHP staff have
also been engaging in testing Workforce Templates in some of our services in
conjunction with Healthcare Improvement Scotland (HIS) colleagues, as part of the
Common Staffing Method approach. 
A Workforce Steering Group has been established to oversee the implementation
of the P & K HSCP Workforce Plan. 
2.5 Financial
The composition of the Executive Management Team allows for a discussion of any
financial issues from the perspective of Care & Professional Governance. 
2.6 Risk Assessment/Management
Key risks and risk assurance process is detailed under section 2.3a. 
2.7 Equality and Diversity, including health inequalities
Equality, diversity and health inequalities are core to the Getting it Right Framework
and the domains within. Each service provides exception reports which include this
aspect. Currently there are no exceptions requiring to be escalated to CGC. 
2.8 Other impacts 
N/A 
2.9 Communication, involvement, engagement and consultation
All HSCP Staff have been invited to complete the latest iMatter survey, and teams
will  meet to discuss the results of these and create actions to take forward. 
The HSCP is working with the Strategic Planning and Communication and
Engagement Groups to support more effective communication, engagement and
involvement, and exploring the most appropriate way to respond to the feedback we
have received. The North Locality is also trialling a ‘you said, we did’ approach to a
recent community consultation.
Page 86 of 96

Page 87

The HSCP took out a subscription to Care Opinion in May 2022, following a Test
period. We continue to receive feedback from people who use our services from this
public platform. To date we have had over 150  feedback stories submitted with 96% 
of the feedback received being positive. We are rolling Care Opinion out across all of
our services in a cumulative approach and teams are now using its performance
generated reporting data within their business activities. We are currently one of the
best performing HSCPs in Scotland with regards to utilisation and growth of Care
Opinion. 
2.10 Route to the Meeting
This has been previously considered by the following groups as part of its
development. The groups have either supported the content, or their feedback has
informed the development of the content presented in this report. 
• P&K HSCP Care & Professional Governance Forum members
• P&K HSCP Professional Leads and Heads of Service
• P&K HSCP Executive Management Team (final draft) 
3 RECOMMENDATION
This report is being presented for:
• Reasonable Assurance 
As Lead Officer for Perth & Kinross HSCP I would suggest that the level of assurance
provided is: Reasonable Assurance; due to the following factors: 
Please ✓ the level of assurance you are providing:
Level of Assurance System Adequacy Controls ✓
Substantial
Assurance  A sound system of governance, risk
management and control exists, with
internal controls operating effectively
and being consistently applied to support
the achievement of objectives in the
area audited
Controls are applied
continuously or with only
minor lapses. 
Reasonable
Assurance  There is a generally sound system of
governance, risk management and
control in place. Some issues, non-
compliance or scope for improvement
were identified which may put at risk the
achievement of objectives in the area
audited.
Controls are applied
frequently but with evidence
of non-compliance. 
✓
Limited
Assurance 
Significant gaps, weaknesses or non-
compliance were identified.
Improvement is required to the system of
governance, risk management and
control to effectively manage risks to the
achievement of objectives in the area
audited.
Controls are applied but
with some significant
lapses. 
Page 87 of 96

Page 88

No
Assurance 
Immediate action is required to address
fundamental gaps, weaknesses or non-
compliance identified. The system of
governance, risk management and
control is inadequate to effectively
manage risks to the achievement of
objectives in the area audited.
Significant breakdown in
the application of controls. 
Page 88 of 96

Page 89

Appendix 1
List of services within P&K HSCP 
The P&K HSCP works within a locality model to deliver the following delegated
services and hosted services: 
Perth City Locality
Community Nursing, 
Community Mental Health Teams 
(Adult and Older Peoples), 
Community Allied Health Profession Teams
Integrated Drug & Alcohol Recovery Team, 
Advanced Nurse Practitioners, 
Community Hospitals (x4), 
Community Care & Treatment Teams, 
Community Learning Disability Services, 
Adult Social Work Teams
Respiratory Team
Care Home Liaison (Mental Health)
Access Team
Mental Health Officer Team
Wellbeing Team
Hospital Discharge Team
Discharge Hub
Delegated
North Locality
Delegated
South Locality
Delegated
Perth Royal Infirmary
Stroke Ward
Medicine for the Elderly Ward
Discharge Liaison Team
Allied Health Profession Team (Inpatients)
Allied Health Professions (Outpatient Teams)
Delegated
Murray Royal Hospital 3 Older Peoples Mental Health Inpatient Wards Delegated
Commissioned Services Care at Home, 
42 Care Homes, 
Supported Accommodation
Delegated
Registered Services Dalweem & Parkdale Care Homes, 
Day Care, 
HART
Delegated
Equipment & TEC Joint Equipment Loan Store,
Community Alarm
Delegated
Mental Health Officer
Team
Mental Health Officers across P&K Delegated
Prison Healthcare
Across 2 sites – HMP Perth and HMP Castle Huntly
Pharmacy Team
Primary Care Medical & Nursing Team
Integrated Mental Health & Substance Misuse Team
Occupational Therapy Team
Physiotherapy
Clinical Psychology
In-reach Podiatry
In-reach Dental
In-reach Blood Borne Virus
Hosted
Public Dental Service Tayside wide Services Hosted
Podiatry Tayside wide Services Hosted 
8
Page 89 of 96

Page 90

Page 90 of 96

Page 91

Appendix 2
Clinical & Care Governance Arrangements 
The P&K Care & Professional Governance Forum (CPGF) has responsibility to ensure
that there are effective and embedded systems for Clinical, Care & Professional
Governance in all services within the partnership.  This includes seeking assurances
from all partnership localities and hosted services within the context of the six domains
of Clinical, Care & Professional governance.  Localities and Hosted Services have
regular Governance Forums within their own services attended where appropriate by
HSCP professional leads.  
The HSCP remain committed to improving Care & Professional Governance.  Work is
progressing to develop governance and performance dashboards to support Care
Assurance across agreed professional standards.  Although delayed due to the Covid
response, work to progress this has now resumed and is being tested in one of the
localities.  Additionally, work is underway to improve availability of locality performance
data. 
The HSCP has also commenced a Mental Health Clinical Care & Professional
Governance Group, which reports directly to P&K CPGF and the Tayside Mental
Health Quality & Performance Review.  This will allow targeted improvement to
improve Mental Health performance data, mitigation of Mental Health risks and to
support scrutiny on progress made in respect of HIS Improvement Plan and Listen,
Learn, Change work streams. 
Exception reporting is a mechanism for services to quickly and easily flag up where
work or events vary significantly from that which would be expected. 
Exception reports were provided by all HSCP service grouping and localities
(including hosted services) at each meeting of the previous bi-monthly Care &
Professional Governance Forum (CPGF). Now that these meetings are occurring
monthly such exception reports are now expected from half the services at each
meeting, thus continuing the service reporting every 2-months. 
Exception reports received during the previous year have been: 
SEP
2022
OCT
2022
NOV
2022
DEC
2022
JAN
2023
FEB
2023
MAR
2022
APR
2022
MAY
2023
JUN
2023
ACCESS TEAM &
MHO ✓
NOT
REQUIRED ✓
NOT
REQUIRED ✓
NOT
REQUIRED ✓
NOT
REQUIRED ✓
NOT
REQUIRED
COMMISSIONED
SERVICES ✓
NOT
REQUIRED ✓
NOT
REQUIRED
NOT
RECEIVED
NOT
REQUIRED ✓
NOT
REQUIRED ✓
NOT
REQUIRED
EQUIPMENT & TEC
NOT
REQUIRED NOT
RECEIVED
NOT
REQUIRED
✓
NOT
REQUIRED
✓
NOT
REQUIRED
✓
NOT
REQUIRED
✓
NORTH LOCALITY
NOT
REQUIRED
✓
NOT
REQUIRED
✓
NOT
REQUIRED
✓
NOT
REQUIRED
✓
NOT
REQUIRED
✓
PERTH CITY
LOCALITY
NOT
REQUIRED
✓
NOT
REQUIRED
✓
NOT
REQUIRED NOT
REQUIRED
NOT
REQUIRED
✓
NOT
REQUIRED NOT
REQUIRED
8
Page 91 of 96

Page 92

MFTE/POA IN-
PATIENTS & 
INTERMEDIATE
CARE
NOT
REQUIRED
NOT
RECEIVED
✓
NOT
REQUIRED
✓
NOT
REQUIRED
✓
NOT
REQUIRED
✓
NOT
REQUIRED
PODIATRY
NOT
REQUIRED
✓
NOT
REQUIRED
✓
NOT
REQUIRED
✓
NOT
REQUIRED
✓
NOT
REQUIRED
✓
PRISON
HEALTHCARE ✓
NOT
REQUIRED ✓
NOT
REQUIRED ✓
NOT
REQUIRED ✓
NOT
REQUIRED ✓
NOT
REQUIRED
PUBLIC DENTAL
SERVICES ✓
NOT
REQUIRED ✓
NOT
REQUIRED ✓
NOT
REQUIRED ✓
NOT
REQUIRED ✓
NOT
REQUIRED
REGISTERED
SERVICES
NOT
REQUIRED
NOT
RECEIVED
NOT
REQUIRED ✓
NOT
REQUIRED ✓
NOT
REQUIRED ✓
NOT
REQUIRED ✓
SOUTH LOCALITY NOT
REQUIRED
NOT
RECEIVED
NOT
REQUIRED
NOT
REQUIRED
NOT
REQUIRED ✓
NOT
REQUIRED
NOT
REQUIRED
NOT
REQUIRED ✓
* non submission of reports highlighted to manager for action 
Annual reports are provided by all HSCP services and localities (including hosted
services). 
The structured annual reporting template brings together the six domains of Clinical,
Care & Professional Governance outlined in the Getting it Right Framework, and
also seeks to incorporate the new Health & Social Care Standards. Managers submit
report and attend Care Governance Forum to present report, give assurance and
answer questions.  The HSCP have begun cycle four and has now received all annual
reports from the 3rd cycle. 
2nd Cycle 3rd Cycle 4TH Cycle
ACCESS TEAM & MHO November 2020 April 2022 
COMMISSIONED SERVICES July 2021 July 2022 
EQUIPMENT & TEC June 2021 May 2022 Jun 2023
NORTH LOCALITY July 2021 June 2022 May 2023
PERTH CITY LOCALITY April 2021 February 2022 Apr 2023
MFTE/POA IN-PATIENTS &
INTERMEDIATE CARE May 2021 April 2022 Jun 2023
PODIATRY September 2021 September 2022 
PRISON HEALTHCARE March 2021 March 2022 Mar 2023
PUBLIC DENTAL SERVICES November 2020 January 2022 
REGISTERED SERVICES August 2021 August 2022 
SOUTH LOCALITY September 2020 November 2021 
POA Inpatients (added in cycle 3)  November 2021 
Page 92 of 96

Page 93

Wider governance arrangements: 
• Integrated Locality Care Governance Groups (bi monthly)
• Prison Healthcare Medicines Management Governance Group (monthly)
• Prison Healthcare Business & Governance Group (monthly)
• Nursing and Allied Health Profession Forum (bi-monthly) to explore pertinent
professional issues with CPTMs and other relevant colleagues.
• Senior Nurses, AHP Professional Leads, and the Clinical & Professional Team
Managers meet regularly on an individual 1:1 basis with the Lead Nurse and also
the AHP Lead to discuss relevant professional and governance issues.
• Mental Health Portfolio Lead contributes to the Mental Health QPR Forum
• Partnership Short Life Working Group commenced to improve care governance
for mental health services 
• Health Senior Management Team Huddle weekly to review Datix risks and red
adverse events 
• Clinical Governance Coordinator supports locality groups to undertake Local
Adverse Event Reviews (LAER’s) where required.  All LAER’s are signed off by a
senior manager.
• Care Home Oversight Group meeting at times daily to monitor and provide
support to Care Home resident and staff safety wellbeing.
• The P&K CPGF co-chairs contribute to the NHST Getting It Right For Everyone
(GIRFE) group.
• Adult Social Work and Social Care Forum (monthly) 
Page 93 of 96

Page 94

Page 94 of 96

Page 95

Appendix 3
Glossary 
ADP Alcohol & Drug Partnership
AHP Allied Health Professions
AMD Associate Medical Director
AP Adult Protection
CAMHS Child & Adolescent Mental Health Services
CCATS Community Care And Treatment Service
CMHT Community Mental Health Team
CN Charge Nurse
DD Delayed Discharge
EMT Executive Management Team
GAP General Adult Psychiatry 
GIRFE Getting It Right For Everyone
HART Home Assessment Recovery Team
IDART Integrated Drug & Alcohol Recovery Team
LAER Local Adverse Event Review
LD Learning Disabilities
MAT Medicine Assisted Treatment
MFE Medicine for the Elderly
MRH Murray Royal Hospital
OOH Out of Hours
OT Occupational Therapy
PDD Planned Date of Discharge
PHC Prison Healthcare
PMVA Prevention & Management of Violence & Aggression
POA Psychiatry of Old Age
PRI Perth Royal Infirmary
RN Registered Nurse
SCN Senior Charge Nurse
SPSO Scottish Public Services Ombudsman
VPR Vulnerable Persons Report 