Perth And Kinross Health & Social Care Partnership (HSCP) Clinical And Care Governance Assurance Report

Perth and Kinross Council · 31 January 2024
Back to Scrutiny and Performance Committee — 31 January 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

Perth And Kinross Council 
Scrutiny and Performance Committee 
31 January 2024 
PERTH AND KINROSS HEALTH & SOCIAL CARE PARTNERSHIP (HSCP)
CLINICAL AND CARE GOVERNANCE ASSURANCE REPORT 
Jacquie Pepper, Chief Officer, Perth and Kinross HSCP
(Report No. 24/46) 
1. PURPOSE OF REPORT 
1.1 The purpose of this report is to provide assurance to Perth & Kinross Council’s
Scrutiny and Performance Committee on the Clinical Care and Professional
Governance of the Perth and Kinross HSCP. 
2. REPORT SUMMARY 
2.1  Situation 
This report is being brought to the meeting to provide assurance on the clinical and
care governance activities and arrangements across the Partnership as outlined in
the Getting It Right for Everyone (GIRFE) Framework in accordance with the
Partnership integration scheme. Clinical Governance is a statutory requirement to
report on, at Board level, from Scottish Government as per NHS MEL (1998) 75.   
The Scrutiny and Performance Committee is being asked to provide their view on
the level of assurance this report provides and therefore the level of assurance
regards clinical and care governance within the Partnership.  The timescale for the
data within this report is from 1st July 2023 to 31 October 2023. 
As Lead Officer for Perth and Kinross HSCP I would suggest that the level of
assurance provided is: Reasonable Assurance. 
2.2 Background 
The role of the Perth and Kinross HSCP Governance forum is to provide assurance
to the Perth and Kinross HSCP Integration Joint Board (IJB), NHS Tayside Board
(through the Care Governance Committee) and Perth and Kinross Council (through
the Scrutiny and Performance Committee), that there are effective and embedded
systems for Clinical, Care and Professional Governance in all services within Perth
and Kinross HSCP. 
The GIRFE Framework is an agreed tool used by all three HSCPs to ensure
consistency of approach between Local Authorities, Tayside NHS Board and the
IJBs for the three HSCPs; quality assurance is assessed against an agreed,
prioritised common data set for each of the governance domains as detailed below. 
A GIRFE Steering Group continues to meet, with representatives from each of the

Page 2

three Partnerships and part of its remit is to support additional common assurance
measures and this template.
The six domains continue to evolve over time and must be adaptable and
responsive to the changes in legislation and external support and monitoring.  The
domains reflect the principles set out in the Health and Social Care Standards, My
support, My life; Scottish Government, 2018 and the Quality-of-Care Approach, HIS
and Care Inspectorate, September 2018. The domains are: 
Information Governance
Professional Regulation and Workforce Development
Patient/Service user/Carer and Staff Safety
Patient/Service user/Carer and Staff Experience
Quality and effectiveness of care
Promotion of Equality and Social Justice 
2.3 Assessment 
2.3.1 Exceptions 
A risk has been identified and recently added to DATIX regarding the ageing
decontamination equipment at Broxden Dental Centre, and the resultant risk of failure. 
The current washers and disinfectors at Broxden Dental Centre were brought into
service some time ago, and are now reaching end of life.  The equipment also serves
as a contingency for CSSD at Ninewells, as part of a reciprocal arrangement. 
There is a risk of equipment failure, resulting in the service being unable to provide
dental care to patients.  In the event of a failure, securing spare parts may also be
challenging due to the age of the equipment. 
The Public Dental service will complete and submit a capital equipment replacement
plan, which, if accepted and progressed, would result in replacement equipment being
installed.  This equipment would also be easier to service due to accessibility of spare
parts. 
Preventative planned maintenance is ongoing by estates engineers, and there are
daily checks made by staff.  A reciprocal arrangement is in place with CSSD at
Ninewells regarding use of equipment at either site in the event of disruption. 
The service intends to submit a capital replacement plan in the near future. 
Home Office Controlled Drug Licence is outstanding for The Bella Centre. 
The Bella Centre is a recently opened Community Custody Unit and houses low
supervision women and young people.  The Prison Healthcare service (hosted in P&K
HSCP) provide healthcare to the population of the Centre.  Due to a processing delay,
the Controlled Drug licenses for HMP Perth, HMP Castle Huntly and The Bella Centre
lapsed.  Licences for HMP Perth and HMP Castle Huntly have since been
successfully renewed.

Page 3

Due to a processing delay, the Controlled Drug licence is outstanding for The Bella
Centre.  The majority of patients at the Centre are prescribed medication via “named
patient”, so no stock is required to be held at the Centre.   
2.3.2 Clinical and Care Risk Management 
The risk registers for Health and for Adult Social Work and Social Care are
discussed monthly at the P&K HSCP Care & Professional Governance Forum.   
Managers of red risks provide a written update at every meeting, and managers of
amber risks are asked for update at every other meeting. 
This supports assurances that the relevant risks are being regularly monitored;
what measures are in place to minimise the risk; what alternative mitigations plans
and actions are in place to minimise the risk; that where the risk affects, or is
impacted by, other parts of the health or social care system, or indeed other
agency, we are assured that they are fully informed and engaged in the process.   
The controls listed under each risk are the cumulative efforts being made to mitigate
the risk. 
P&K HSCP health red risks as at 15th Nov 2023: 
DatixRef
Risk
Exposure –
No controls
Current Risk Exposure Rating Planned
Risk
Exposure
Risk
Trend
(↑/→/↓) Please include data from previous four reporting periods
Dec 2022 April 2023 Aug 2023 Nov 2023 
L C RER L C RER L C RER L C RER L C RER L C RER 
829 4 5 20 4 5 20 4 5 20 4 5 20 4 5 20 2 5 10 →
982 5 4 20 5 4 20 5 4 20 5 4 20 5 4 20 2 4 8 →
701 5 3 15
* 3 3 9 5 4 20 5 4 20 5 4 20 1 4 4 →
1321 5 4 20 - - - - - - 5 4 20 5 4 20 2 4 8 → 
L = Likelihood   C = Consequence  RER = Risk Exposure Rating 
* The current risk score is higher than the inherent score due to exacerbations of the risk by further
staffing challenges.

Page 4

P&K HSCP Adult Social Work & Social Care red risks as at 15th Nov 2023: 
Risk
Risk
Exposure –
No controls
Current Risk Exposure Rating Risk
Trend
(↑/→/↓) Please include data from previous four reporting periods
Dec 2022 April 2023 Jul 2023 Nov 2023 
L C RER L C RER L C RER L C RER L C RER 
1 4 5 20 - - - 4 5 20 4 5 20 4 5 20 →
2 4 5 20 1 3 3 4 5 20 4 5 20 4 5 20 → 
Health Risk 829 - Challenges in relation to accommodation for clinical and non-
clinical staff across P&K 
Accommodation walkrounds have been completed across Health & Social care
sites with a view to mapping sites to accommodate future teams. 
A short life working group has been recommenced with NHST support service and
Estates in order to review the accommodation needs for CCATS, IDART, Urgent
Care and Community AHP's.  A consultation paper to be completed in relation to
engaging with staff re: accommodation moves.  Paper to be written to describe the
options going forward (option appraisal) in conjunction with NHST estates and
support services. 
Smartsheet is being used to capture the current situation at each site where
accommodation required review, and supporting SBAR’s being used. 
Health Risk 982 - Mental Health Medical Workforce in P&K HSCP 
A meeting has taken place to discuss medical workforce.  Current redesign of
inpatient services and CMHT is progressing, and this will include medical workforce
as well as other professionals in future design. 
Services remain reliant on locum agencies to fill consultant psychiatry gaps and
regularly advertising substantive positions, but to no avail. 
Nursing workforce situation has improved recently in terms of recruitment.  There
continue to be challenges with Medical and AHP recruitment however. 
Health Risk 701 - Mental Health Waiting Times within the Prison Healthcare Service 
Two additional nurses have been recruited, and start dates are awaited. Mental
Health ANP recruitment is also underway.  The service has also been seeking
agency nursing staff to reduce the time spent by the team administering
medication.

Page 5

It is anticipated that the listening service will be able to support appointments
categorised as green.  It is also noted that staffing levels within the Mental Health team
are beginning to improve. 
Health Risk 1321 - Inadequate environment for the Perth City CCATS service 
This risk was added in April 2023, as in relation to the current CCATS service which
is located within Beechgrove House, Perth.  A recent Infection Prevention and
Control team visit to the site found numerous environmental Infection Control
concerns.  A site visit has taken place from the current cleaning contractor, soft
facilities and PKC estates to explore gaps and potential solutions within current
provision.  There is in place a Short Life Working Group regarding accommodation
across P&K HSCP, and the CCATS service in Perth City is part of this working
group.
CCATS continue to undertake risk mitigation such as additional cleaning and
handwashing.  Property application for CCATS submitted to short life working group. 
Adult Social Work and Social Care Risk 1 – Lack of Care at Home capacity,
especially around rural P&K. 
Care at Home Transformation group and workstreams are in action.  HART continue
to be in a +3 position each month with domestic recruitment.  Overseas recruitment
pilot in progress with aim for 4-5 staff in place for 1st cohort by Dec 23 and a second
cohort by March 24.
Automated scheduling went live 20 September. HART and Living Well Rotas being
reviewed.  PinPoint system being investigated to support easier access to unmet
need across all internal and external providers.  Alliance contracting with
independent sector progressing. 
Adult Social Work and Social Care Risk 2 – Lack of OT capacity 
There are currently 1.5  North OTs out to advert, as well as one admin advert.  The
service is no currently meeting priority targets and no M & H reviews taking place. 
the Duty Team now stable and making a positive impact. 
2.3.3 Clinical & Care Governance Arrangements 
Lead Partners Services 
Each HSCP is a Lead Partner for a number of services. These services report through
to the Clinical Care and Professional Governance Forum for that HSCP. At the
Clinical Care and Professional Governance Forum the Lead Partner Service reports
receive the relevant level of scrutiny as other reports. 
Systems and processes are being established to ensure that all three HSCPs receive
copies of reports from other Lead Partner Services to support integration, and
effective whole system working.

Page 6

Full details of the Clinical & Care Governance Arrangements in P&K HSCP are
provided within appendix 1.   
Summary of key exceptions raised at recent CPGF meetings: 
Key exceptions identified within the exception reports from the CPGF meetings
held in August, September and October 2023: 
• Prison Healthcare:
o Mental Health Waiting Times within the Prison Healthcare Service.  There
are plans in place to address Green list including Listening Service and
Safety & Stabilisation groups, as well as ongoing recruitment.
o Non Emergency Transfer of Patients to Hospital. This is being monitored
locally and nationally and escalated regularly. Cancellations have been
increasing 
• North Locality:
o Some examples of of poor planning / communication from acute sites on
discharge to P&K have been noted.  Datix linked to NWH EM Consultant
for review. CPTM North collating information from LInCS to understand
issues and provide evidence to share with acute sites and discharge
teams. Current individual cases being wrapped around by the LInCS
team to ensure immediate safety, assurance and care.
o National issues with HEPMA. Additional transmitters added to the
service have now resolved this problem.  Locally the WiFi in Blairgowrie
has also been problematic. IT attending site on 2nd of October to
upgrade the system and signal (this will take approx one week Ongoing
issues with generator testing knocking outIT systems – ongoing
discussions with IT and Estates to find solution or mitigate risk. 
• South Locality:
o Ongoing Social Work vacancies impacting availability of AP trained
capacity and general service delivery. 
• Perth City Locality:
o Within the CCATS service, additional Asylum assessments proving
challenging to support timely given staffing pressures, sickness and
vacancies in the service.  North Locality supporting from CCATS.
o There are limited Care Home placements due to care homes being
at full capacity especially in nursing and EMI units.  The service is
reviewing officers and staff are ensuring only clients that require EMI
care are in EMI beds. Staff are checking during reviews that the level of
care is suitable for client needs. 
• Public Dental service
o Awaiting input from Property Department to progress essential
ventilation and building works. Work has been approved in principle by
AMG and funding in place.

Page 7

• Tay & Stroke wards and Intermediate Care
o Hospital Discharge Team – Discharge Coordinator shortage. Service
Manager has escalated to ‘Hot Red’ staffing status. Recruitment is
ongoing – poor applicant uptake due to temporary posts. 1 part time post
has been filled.  Service Manager and Senior Nurse providing
operational support to maintain HDT service and support patient
discharge planning and flow. 
Key exceptions identified within the annual reports from the CPGF meetings held
in August, September and October 2023: 
• Podiatry
o Ongoing DATIX risks regarding the staffing recruitment challenges
nationally, along with recent unexpected resignations.  This has created
a risk of the Podiatry service being unable to treat higher risk patients,
and to positively address the existing patient waiting times.
o The transition from paper records onto EMIS has provided a more
secure clinical record keeping system.  The improved quality of note
keeping and allows improved communication with other healthcare
professionals supporting better patient outcomes.
o There is currently insufficient capacity to meet patient demand for
Podiatry within Justice Healthcare 
• Registered Services
o Kinnoull Community Day Opportunities and Gleneagles Day
Opportunities both retain staff well, but struggle to recruit to vany vacant
social care posts. 
• Mental Health Services
o With an increasing understanding of ADHD as a lifelong condition,
services have seen a significant increase in referral for people with
potential ADHD and are overwhelmed by the demand. 
o Red DATIX risk regarding an NHST inability to recruit and retain
Consultant Psychaitrists.
o Amber DATIX risk regarding ligature anchor points in P&K POA wards.
o Mental Welfare Comission visits to the P&K POA wards in early 2023,
which was overall positive. Several recommendations were made, and
good progress is being made with these. 
• Urgent Care
o Hospital at Home experienced IT issues affecting the ability of the team to
use eKORA. This delayed the service’s soft launch date and required an
alternative way of recording patient information to support escalation and
safety netting in both the in hours and the out of hours periods. This issue
is now resolved and the team are able to utilise Trakcare and eKORA in
the management of patient’s within the community. 
• Primary Care
o DATIX risk regarding seven practices who are at high risk of closure or
transition to 2C, which would lead to disruption to service provision for that
practice population.  This is a result of a combination of workforce and
workload factors.

Page 8

Adverse Events: 
Systems are in place for services/localities to review DATIX incidents.  
The Nursing & AHP leads meet along with the Clinical Governance Coordinator on
monthly basis to review the top 5 incident categories.  This helps to identify any
trends or any appropriate action and supports closing the loop. 
Regarding adverse events, the main themes reported during the months between
July 2023 and October 2023 were: 
Highest frequency events: 
1. Slips, Trips and Falls 
2. Medication 
3. Clinical Challenging behaviour
4. Violence & Aggression
5. Pressure Ulcer 
Harm is defined as an outcome with a negative effect. Harm to a person or groups
of people may result from worsening of a medical condition, the inherent risk of an
investigation or treatment, system failure provider performance issues, service
disruption, financial loss or adverse publicity. 
Slip, Trip & Falls
During the time period between July 2023 and October 2023, there were 180
incidents recorded, of which 24 involved harm.  82 occurred at MRH, 29 at PRI, 58
in Community Hospitals and the remaining 11 in other areas. 
The Psychiatry of Old Age inpatient wards at Murray Royal Hospital experienced a
higher than usual number of falls at the end of 2021 due to several patients who
had multiple falls (many of which were controlled).  Ward staff were doing all they
could to manage the falls, and they had support from the Falls coordinator during
this time.

Page 9

In addition, the Falls Coordinator continues to: 
▪ review all of the wards in-patient falls Datix reports and provide feedback to
the ward with a breakdown of their falls, outlining any trends, highlighting
patients who fall repeatedly and enquiring if further information is required 
▪ Supports all of the HSCP wards to have strength and balance exercise panels
fitted on their walls and suitable patients also receive a set of strength and
balance cue cards which they can take home with them. Along with that they
receive a Care About Walking booklet and record charts for recording activity /
steps. 
• Medication
During the time period between March July 2023 and October 2023, there
were 102 incidents recorded, of which 5 involved harm.  10 occurred at MRH,
7 at PRI, 27 in Community Hospitals, 42 within a Prison Establishment and the
remaining 16 in other areas. 
The majority of medication adverse events occurred with the Prison Healthcare
service.  The prison healthcare service manages and administers a high volume
of medication across three sites across Tayside - HMP Perth, HMP Castle Huntly
and HMP & YOI Bella.  
• Violence & Aggression
During the time period between July 2023 and October 2023, there were 35
incidents recorded, of which 3 involved harm.  15 occurred at MRH, 9 at PRI,
4 in Community Hospitals, and the remaining 7 in other areas.

Page 10

The 15 incidents within Murray Royal Hospital were within the Psychiatry of
Old Age wards. The 3 incidents which involved harm were all in different
inpatient wards, 2 of which were physical and one verbal.  All three incidents
are graded green. 
• Clinical Challenging Behaviour (such as patient unable to understand risks,
sexual disinhibition, general agitation) 
During the time period between July 2023 and October 2023, there were 72
incidents recorded, of which 5 involved harm.  64 occurred at MRH, 4 at PRI
and 4 in Community Hospitals. 
The vast majority of these incidents were within the Psychiatry of Old Age
wards at Murray Royal Hospital.  The rise in incidents (albeit of negligible
grading) in October 2023 have been noted by the service.  This appears to be
attributable to a small group of patients in one particular POA ward who are
exhibiting these behaviours. 
The wards have sought input from the NHST PMVA team regarding the
ongoing management of Violence & Aggression and Clinical Challenging
Behaviour. 
• Pressure Ulcers 
During the time period between July 2023 and October 2023, there were 31
incidents recorded, of which 28 involved harm.  15 were within the patients
home, 3 within Care Homes, 5 within Community Hospitals, and the remaining
8 in other areas.

Page 11

Further exploration on DATIX regarding the recent moderate events taken
place.  
3 of these were recorded by the Community Nursing service regarding
patients in their own home, and 3 by Podiatry.
Each geographical locality in P&K is provided with a summary of adverse
events specific to their locality to enable them to identify trends and any
learning.   
Adverse events are regularly reviewed and form a standing agenda item at the
locality governance groups to identify learning, improvements, training needs
or themes. 
It has been identified and acknowledged by the CPGF that further
performance improvement is required regarding the timescales for reporting
and verifying DATIX incidents.  This continues to be monitored at CPGF
meetings. 
Adverse events are regularly reviewed and form a standing agenda item at the
locality governance groups to identify learning, improvements, training needs
or themes. 
It has been identified and acknowledged by the CPGF that further
performance improvement is required regarding the timescales for reporting
and verifying DATIX incidents.  This continues to be monitored at CPGF
meetings. 
Incident Record Dashboard for Adult Social Work & Social Care:

Page 12

No embedded text on this page.

Page 13

2.3.4 Significant Adverse Event Reviews 
Report and action plan for DATIX 136987 fully signed off.  Action plan being
progressed through the P&K HSCP Mental Health Care Governance Group.  5/15
actions completed at present. 
2.3.5 Pressure Ulcers & Falls 
Details regarding both of the types of Adverse events has been provided above in
section 2.3.3. 
Pressure ulcers are reviewed on an individual basis to ensure that all mitigating
actions are in place and any themes in relation to learning are identified. 
Each geographical locality in P&K is provided with a summary of adverse events
specific to their locality to enable them to identify trends and any learning.   
2.3.6 Complaints 
Current Health Complaints as at 14/07/2023 - Stage 1 
Service Area 0-4 Days 5-9 Days Total
Perth & Kinross HSCP 6  0 5 
Current Health Complaints as at 14/07/2023 - Stage 2 
Service Area 0-5
days
6-10 days >20 days >60 days Total
Perth & Kinross HSCP 3 1 0 2 6 
Current Adult Social Work & Social Care Complaints for July 2023: 
Stage 1: 
There were 10 stage 1 complaints received in the time frame noted.
Reasons for stage 1 complaints:
Service Provision - 5
Complaints regarding employees - 3
Policy and procedure - 2
Stage 1 complaints by general theme:
Quality of Care – 5
Waiting times – 1

Page 14

Staff conduct – 3
Paying for Care – 1 
Stage 2: 
There were 2 stage 2 complaints.
2 stage 2 complaints were upheld in the reporting period.
Reasons for stage 2 complaints:
Service Provision – 1
Policy and Procedure - 1
Stage 2 complaints by general theme:
Disagreement with Ax (assessments) - 1
Paying for Care : 1 
2.3.7 Scottish Public Services Ombudsman Reports
There have been no complaints referred to the SPSO during the time period. 
The last complaint which was referred to the SPSO was from October 2020, and
further information has recently been provided to the SPSO regarding this
complaint. 
2.3.8 External Reports & Inspections 
Mental Welfare Commission (MWC) announced visits to Garry and Tummel
Wards at Murray Royal Hospital on the 31th and 31st January 2023. 
Garry and Tummel wards are both 12 bedded wards and provide assessment, care
and treatment for people with dementia.  The wards uses a multi-professional
approach to ensure person centred, recovery focussed care. 
The MWC last visited these wards in July 2019, and made recommendations
regarding the auditing of care plans, authority to treat certificates, discharge
planning arrangements and improving the décor in Garry ward. 
From staff that the inspectors spoke with, they heard how challenging the last two
years had been since the start of the Covid-19 pandemic, and the inspectors were
pleased to hear that there has been a focus on staff wellbeing throughout the
pandemic and this has continued. 
The MWC found that on both wards, nursing staff interacted in a kind and
supportive way.  The patients were not able to engage in a discussion about their
care and treatment due to the extent of their cognitive impairment, but relatives
were overwhelmingly positive about the care, treatment and support on the wards.

Page 15

Staff were described as outstanding, exceptionally kind and that the care and
attitude of staff was above and beyond. 
Relatives fedback that staff kept in contact with them and they felt listened to. Some
of the relatives said they had been invited to meetings, others had not, and all the
relatives we spoke to had been given copies of care plans. 
During the visit, care plans were reviewed and found to be person-centred and it
was clear that staff knew patients on the ward very well. There was thorough
background personal information in care plans. The care plans inspected
addressed a range of needs including mental and physical health needs and
outlined goals and interventions required to meet needs. 
The inspectors hears that an activity support worker had recently trained in ‘playlist
for life’, an evidence-based initiative to support people living with dementia to create
a playlist of personally meaningful music, with the aim to reduce stress and
distress. 
The inspectors also heard about the development of a transitional care nurse who
supports discharge planning. This nurse supports patients for a transitional period
when they had moved from hospital to long-term care, thereby bridging the gap
between hospital and community mental health teams. 
The MWC made 6 recommendations from their visit, these being that managers
should: 
• ensure that staff completing care plans undertake care plan training and refer
to NHS Tayside’s person-centred care planning standards.
• ensure that nursing staff include summative evaluations of care plans in
patient notes that clearly indicate the effectiveness of the interventions being
carried out and any required.
• ensure that patient/relative involvement in care planning is encouraged and
recorded.
• ensure that MDT meetings are fully recorded 
• ensure that where a patient lacks capacity in relation to medical treatment,
S47 certificates and treatment plans must cover all relevant medical treatment
the individual is receiving. Treatment should be described in full and
abbreviations should not be used.
• explore solutions to ensure patients are able to look out of the ward windows,
without their privacy being compromised. 
Good progress is being made with recommendations, with one fully complete as of
June 2023. 
Mental Welfare Commission (MWC) announced visit to Leven Ward at Murray
Royal Hospital on the 20th March 2023. 
Leven ward is a 14 bedded ward for patients who have a mental health diagnosis
and are over 65.  The ward uses a multi-professional approach to ensure person
centred, recovery focussed care. 
We last visited this service on 5 September 2018, along with two other wards, and
made recommendations regarding the auditing of care plans, authority to treat
certificates and auditing the provision of activities.

Page 16

The patients the inspectors met with during our visit were very complimentary about
the staff on Leven ward. They were described as wonderful, cheery, approachable,
kind and friendly. 
Staff took the time to get to know the patients on the ward. One patient however
was not sure who their named nurse was. 
The relatives spoken to were equally positive about staff and told us that staff were
concerned not just about patients, but about the wider family also. Relatives told
inspectors that they had been linked in with a carer support worker who provided
support and had arranged for a carer’s assessment to be undertaken. 
The inspectors heard from relatives that treatment on the ward was superb and that
they were very happy with the care their relative had received. Inspectors were told
by relatives that the ward was well staffed, relatives felt listened to and that
information and suggestions they provided were acted upon. Relatives told us they
felt part of the care team. 
Inspectors heard about the work that was taking place in relation to anticipatory
care planning (ACP) with a focus on involving patients and their families in drawing
up an individualised ACP. 
The risk assessments the inspectors saw were comprehensive and of a good
standard, showing appropriate interventions to manage risk.  Risk management
plans were clear and corresponded to risks identified. 
Inspectors heard that Leven ward had a full-time activity support worker (ASW) who
worked alongside the clinical team, patients, carers and families developing and
delivering person-centred activities on a daily basis.  During the visit, inspectors
saw patient’s engaging in activities on the ward with staff and other patients. 
The patients and relatives who we met with during our visit spoke positively about
the range of activities on offer on Leven ward and told us that staff encouraged
patients to participate in activities. 
During the visit inspectors saw an up-to-date activities timetable on the ward. In
patients’ files, inspectors found evidence of daily recordings of activities that had
been offered to patients and whether they had participated or declined. All patients
had an individualised activity care plan which was very detailed, person-centred
and regularly updated. Activities on offer to patients included both one-to-one and
group activities. 
Summary of recommendations: 
• Managers should ensure that when a welfare proxy is in place for a patient, a
copy of the document stating the powers of the proxy should be held within
the case notes.
• Managers should ensure that staff completing care plans undertake care plan
training and refer to NHS Tayside’s person-centred care planning standards.
• Managers should ensure that nursing staff include summative evaluations of
care plans in patient notes that clearly indicate the effectiveness of the
interventions being carried out and any required changes to meet care goals.

Page 17

• Managers should ensure that patient/relative involvement in care planning is
encouraged and recorded.
• Managers should ensure that communication between the MDT and
patients/relatives is formalised and that MDT meetings are fully recorded
including patient/relative involvement. 
2.3.9 Adult Support & Protection

Page 18

This above shows a significant increase in both AP concerns and VPRs.  This is, at
least partly, a result of increased awareness due to ongoing information campaigns
and improved multi-agency working. Extra social worker posts have been recruited
to respond to this increased demand.
Responding to concerns about adults at risk of harm is prioritised and, despite this
increase in referrals, 97% of all concerns are screened within 24-hours. This
indicator, together with the wider performance framework, is monitored at locality
governance meetings, the Public Protection Group, Chief Officers Group and the
Adult Protection Committee.
MAT Standards
Current RAG scores as at June 2023 are: 
Standard
1
Standard
2
Standard
3
Standard
4
Standard
5
Standard
6
Standard
7
Standard
8
Standard
9
Standard
10
RAG
Score  
PROV PROV PROV PROV   PROV PROV 
Standard 1 – All people accessing services have the option to start MAT from the
same day of presentation. 
AMBER because we are offering same day prescribing one day a week. To
supplement the existing Tuesday all-day clinic, from Monday 5th June, one slot a day
has been made available on Mondays, Wednesday, Thursday and Friday which MIST
(MATS Implementation Support Team) has confirmed is sufficient to achieve a green
RAG. 
Standard 2 – All people are supported to make an informed choice on what
medication to use for MAT, and the appropriate dose. 
AMBER because we have an evidence gap for a process for people out with Perth
City to enable them to commence OST where they live, and that long-acting injectable
buprenorphine can be used. To fill this gap and meet the requirements of the
standards, a process has been devised and a named patient SOP. This document is
being reviewed with an intention to submit this to MIST by the end of June to enable a
green RAG to be achieved for this standard. 
Standard 3 – All people at high risk of drug-related harm are proactively
identified and offered support to commence or continue MAT. 
PROVISIONAL GREEN

Page 19

Standard 4 – All people are offered evidence based harm reduction at the
point of MAT delivery. 
PROVISIONAL GREEN 
Standard 5 – All people will receive support to remain in treatment for as long
as requested. 
PROVISIONAL GREEN 
Standard 6 – The system that provides MAT is psychologically informed (tier
1); routinely delivers evidence-based low intensity psychosocial
interventions (tier 2); and supports individuals to grow social networks. 
PROVISIONAL AMBER 
Standard 7 – All people have the option of MAT shared with Primary Care. 
AMBER 
Standard 8 – All people have access to advocacy and support for housing,
welfare and income needs. 
AMBER
Standard 9 – All people with co-occurring drug use and mental health
difficulties can receive mental health care at the point of MAT delivery. 
PROVISIONAL AMBER 
Standard 10 – All people receive trauma informed care. 
PROVISIONAL AMBER 
Note: The acceptance criteria for standards 6 to 10 has not been finalised and so
green ratings have not been available for these. The current expectation is that MIST
will release this information in October 2023. 
Practical changes that have been introduced as part of the MAT standards
implementation include: 
• Same day prescribing available via a Tuesday clinic, but now expanded to be
available five days a week (standard 1)

Page 20

• Information about treatment options provided to service users to enable
informed decisions to be taken (standard 2)
•  Linkages to other supports developed or strengthened to identify individuals at
risk and enable support to be offered (standard 3)
•  All staff trained in harm reduction and equipped with carry packs containing
necessary supplies to support harm reduction delivery. IDART rooms in
Drumhar Health Centre also appropriately stocked (standard 4)
•  Deeper review of IDART worker caseloads undertaken as part of supervision
with agreement on any necessary actions to ensure individuals remain engaged
with service whenever possible (standard 5)
•  A working group established to review and reconfigure referral routes and
resources between substance use services, general practice and community
mental health teams (stands 7and 9)
•  Training delivered to staff on independent advocacy and social supports to
increase the awareness of these supports and increase referrals (standard 8)

Page 21

2.3.10 Mental Health 
Community Mental Health Service Activity (PERTH CITY)

Page 22

Community Mental Health Service Activity (NORTH)

Page 23

Community Mental Health Service Activity (SOUTH) 
The above data is provided to HSCP’s routinely by the NHS Health & Business
Intelligence Team.  Some further improvement activity is ongoing within the CMHT’s

Page 24

to improve the consistency of recording within the source system (Trakcare).  This will
improve the accuracy of this data for future reports. 
Development of HSCP Mental Health KPIs 
Work continues across the three HSCP’s to agree a series of Mental Health KPI’s
which can be used for consistent reporting within HSCP’s and for onward reporting to
this Committee and others where appropriate. 
The mapping undertaken thus far has shown that there is commonality in the data set
across the three HSCP’s , with P&K and Angus using the same data set and Dundee
using a slightly different set. 
A draft set of proposed indicators which are common across all three HSCP’s  will be
created and shared with a view to having these agreed and finalised.   
Public Health Scotland (PHS) now produces national data sets quarterly rather than
monthly, and we will look to work with the Business Unit to ensure accessibility and
supply of the relevant data. 
2.4 Quality/Patient Care
There are a number of ongoing risks (summarised within Appendices 2 &3) which,
if not mitigated, pose a risk to the provision of safe care which is of high quality. 
The HSCP continues to manage these risks proactively.   
Hospital at Home 
Hospital at home is a team of healthcare professionals who provide hospital level
treatment at home as an alternative to hospital admission.   Hospital at home is
proven to be a safe cost-effective and patient centred approach which started
looking after patients within Perth City on 17th July 2023.  The service in Perth City
is currently available between 0800 – 1800 (Mon-Fri), but P&K HSCP ultimately
plans to offer hospital at home as an option to patients across Perth & Kinross, 7
days per week. 
Public Consultation in Bridge of Earn 
The healthcare needs assessment went live from Monday 15th May and ran until
25th June 2023. It invites patients to complete a survey to give feedback about
health and care services in their local areas and was targeted at Bridge of Earn and
surrounding area. The responses will help P&K HSCP understand what patients
need locally and if the current service provision are meeting those needs. 
The survey was available online on the Your Community Perth and Kinross
Facebook page, and on Practice websites, NHS Tayside also promoting this
through their Facebook page. 
Paper copies were available at all local GP practices that Bridge of Earn patients
were dispersed to, Community Care and Treatment centres, pharmacies, and
identified community venues and noticeboards. P&K Community and Engagement
workers attended many local events and were able to support people complete a
submission. The recent Stronger Communities event was attended by several

Page 25

HSCP representatives and approximately 35 community members and was
positively received. 
Earn Community Council was fully involved and supported the engagement
process.  A total of 600 responses were received and are currently being reviewed.
An evaluation report with recommendations will be undertaken and the results
widely publicised. 
Drug related deaths:
Numbers of suspected drug related deaths are recorded across the three HSCP’s,
and is used to inform learning and context within and across the HSCP’s. 
The following shows data regarding confirmed drug deaths in P&K as compared to
across Scotland (please note the two y-axes): 
The following shows data regarding confirmed drug deaths in P&K as compared to
across Scotland (please note the two y-axes): 
• Local actions to mitigate risks in Perth and Kinross include:
• Implementation of Medication Assistant Treatment (MAT) Standards 1-5 by
April 2023
• Implementation of MAT Standards 6-10 by April 2024
• National Mission to reduce drug deaths funding utilised to increase IDART
staff compliment to reduce waiting times and enhance service provision e.g. –
provision of an OT service and the creation of a new psychology assistant
post to provide low level psychological interventions.
• Creation of a multiagency referral pathway for all new substance use referrals. 
• Creation of a near fatal overdose pathway and multiagency group to review all
reported near fatal overdoses with funding provided to third sector partners to
employ assertive outreach workers to actively engage with service users.  
• Creation of a residential rehabilitation pathway and funding panel to facilitate
access to rehabilitation services for service users.

Page 26

2.4 Workforce
There are a number of ongoing risks regarding workforce challenges (summarised
within Appendices 2 &3) which, if not mitigated, pose a risk to the provision of safe
care which is of high quality.  The HSCP continues to manage these risks
proactively. 
P&K HSCP ensures alignment with NHS Tayside’s approved 3-year workforce
strategy and PKC workforce plan. 
Workload tools are in use within the Community Nursing service, and workload
tools have also been used in the past within services such as POA, and these
requires to be conducted again.  There are a number of workload tools which can
be used, and the purpose of each tool is to provide information and
recommendations on staffing levels based on patient workload.  AHP staff have
also been engaging in testing Workforce Templates in some of our services in
conjunction with Healthcare Improvement Scotland (HIS) colleagues, as part of the
Common Staffing Method approach. 
A Workforce Steering Group has been established to oversee the implementation
of the P & K HSCP Workforce Plan. 
2.5 Financial
The composition of the Executive Management Team allows for a discussion of any
financial issues from the perspective of Care & Professional Governance. 
2.6 Risk Assessment/Management
Key risks and risk assurance process is detailed under section 2.3a. 
2.7 Equality and Diversity, including health inequalities
Equality, diversity and health inequalities are core to the Getting it Right Framework
and the domains within. Each service provides exception reports which include this
aspect. Currently there are no exceptions requiring to be escalated to CGC. 
2.8 Other impacts 
N/A 
2.9 Communication, involvement, engagement and consultation
All HSCP Staff have been invited to complete the latest iMatter survey, and teams
will  meet to discuss the results of these and create actions to take forward. 
The HSCP is working with the Strategic Planning and Communication and
Engagement Groups to support more effective communication, engagement and
involvement, and exploring the most appropriate way to respond to the feedback we
have received. The North Locality is also trialling a ‘you said, we did’ approach to a
recent community consultation.

Page 27

The HSCP took out a subscription to Care Opinion in May 2022, following a Test
period. We continue to receive feedback from people who use our services from this
public platform. To date we have had over 150  feedback stories submitted with 96% 
of the feedback received being positive. We are rolling Care Opinion out across all of
our services in a cumulative approach and teams are now using its performance
generated reporting data within their business activities. We are currently one of the
best performing HSCPs in Scotland with regards to utilisation and growth of Care
Opinion. 
2.10 Route to the Meeting
This has been previously considered by the following groups as part of its
development. The groups have either supported the content, or their feedback has
informed the development of the content presented in this report. 
• P&K HSCP Care & Professional Governance Forum members
• P&K HSCP Professional Leads and Heads of Service
• P&K HSCP Executive Management Team (final draft) 
3 RECOMMENDATION
This report is being presented for:
• Reasonable Assurance 
As Lead Officer for Perth & Kinross HSCP I would suggest that the level of assurance
provided is: Reasonable Assurance; due to the following factors: 
Please ✓ the level of assurance you are providing:
Level of Assurance System Adequacy Controls ✓
Substantial
Assurance  A sound system of governance, risk
management and control exists, with
internal controls operating effectively
and being consistently applied to support
the achievement of objectives in the
area audited
Controls are applied
continuously or with only
minor lapses. 
Reasonable
Assurance  There is a generally sound system of
governance, risk management and
control in place. Some issues, non-
compliance or scope for improvement
were identified which may put at risk the
achievement of objectives in the area
audited.
Controls are applied
frequently but with evidence
of non-compliance. 
✓
Limited
Assurance 
Significant gaps, weaknesses or non-
compliance were identified.
Improvement is required to the system of
governance, risk management and
control to effectively manage risks to the
achievement of objectives in the area
audited.
Controls are applied but
with some significant
lapses.

Page 28

No
Assurance 
Immediate action is required to address
fundamental gaps, weaknesses or non-
compliance identified. The system of
governance, risk management and
control is inadequate to effectively
manage risks to the achievement of
objectives in the area audited.
Significant breakdown in
the application of controls.