Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
17/11/2023 
A hybrid meeting of the Scrutiny and Performance Committee will be held in the
Council Chamber on Wednesday, 22 November 2023 at 10:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Colin Stewart  (Convener)
Bailie Alasdair Bailey  (Vice-Convener)
Councillor Keith Allan
Councillor Steven Carr
Councillor Eric Drysdale
Councillor Angus Forbes
Councillor Ian Massie
Councillor Willie Robertson
Councillor Caroline Shiers
Councillor Frank Smith
Councillor Jack Welch
Page 1 of 50

Page 2

Page 2 of 50

Page 3

Scrutiny and Performance Committee 
Wednesday, 22 November 2023 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 DEPUTATIONS   
4 REVIEW OF EXTREME WEATHER EVENTS IN PERTH AND
KINROSS IN OCTOBER 2023
Report by Chief Executive (copy herewith 23/323) 
5 - 50 
Page 3 of 50

Page 4

Page 4 of 50

Page 5

Perth And Kinross Council 
Scrutiny & Performance Committee 
22 November 2023 
REVIEW OF EXTREME WEATHER EVENTS
IN PERTH AND KINROSS IN OCTOBER 2023 
Report by the Chief Executive 
(Report No. 23/232) 
1. PURPOSE 
1.1 Following the events of 6-8 October 2023, specifically in relation to flooding
close to the North Inch, Perth, officers were asked by elected members to
review the arrangements in place over that weekend. Given the two
subsequent weather events in quick succession (18-21 October and 27-29
October), these have also been considered to establish if there are lessons to
be learned from similarities and differences in how these three events
presented and how we responded to them. This is a first report as
investigations continue. However, the report includes identified improvement
activity to date for preparing for, and responding to, future severe weather
events, as well as examples of good practice. 
1.2 The Council acknowledges that, for residents and businesses affected as a
result of the weather events, especially those who experienced flooding, this
has been a very difficult time, particularly financially and emotionally, with
some people facing ongoing disruption. 
1.3 Elected members were invited to submit questions about the extreme weather
events during October. Many of these are addressed within this report. Where
this is not the case, elected members will receive a response via email. 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
• notes the impact on residents and businesses as a result of the severe
weather experienced across Perth and Kinross area over October 2023 
• considers the findings of this review into the Council’s preparedness,
response and recovery activity during each of the three October weather
events
• considers the improvement actions identified within the report and
makes recommendations for any other areas of improvement
• notes that there will be a further detailed flooding report looking at the
impact and contributory factors 
• notes that there will be a further review with partners, which will take
place as soon as possible
• thanks the Community Resilience Groups, and other community
members, for their commitment and hard work, in responding to incidents
4
Page 5 of 50

Page 6

3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Scope of review
• Section 5: Background
• Section 5: Preparedness for 6-8 October 2023 weather events
• Section 6: 6-8 October 2023 weather events
• Section 7: 18-21 October 2023 (Storm Babet) weather event
• Section 8: 27 – 29 October weather events 
• Section 9: Findings, Improvement Actions and Conclusions 
4. SCOPE OF REVIEW 
4.1 During October 2023, Perth and Kinross experienced periods of extreme
weather, which had a significant impact on a number of communities across
the area. In some areas, the disruption to residents, businesses and
communities is ongoing.  
4.2 While mainly focussed on 6-8 October, the scope of the review looks at the
following areas of activity for all three events:
• notification and preparedness
• response management
• impact and recovery
4.3 There is a specific focus on the late closure of gates on the North Inch,
Perth.  The report also covers identified improvement activity for future
significant weather events.  These, in the most part, will require a detailed
review, as time is needed to develop options, and for these to be costed. 
Therefore, a further report will be brought to elected members as early as
possible. 
4.4 The review recognises that there were particular circumstances surrounding
these weather events, which tested existing arrangements. These included
limited staff availability to supplement the standby arrangements with the first
incident coinciding with the October holiday period. This, alongside the
volume of rainfall and, for the subsequent events, the saturated catchments
following the extreme weather on 6-8 October 2023 and Storm Babet, all
combined to create a very specific set of circumstances. In preparing this
report, officers have reviewed the Council’s preparedness and response to
the October weather events. This has included:
: 
• holding a debrief session with all officers involved in planning for, and
responding, to the incidents; 
• visiting available residents and businesses affected by flooding near the
North Inch, including Bells Sports Centre, to provide support, establish
the detail of what happened and the impacts as a result;
• seeking feedback and questions from elected members;
• holding a residents’ meeting with members of the community impacted
by the events near the North Inch;
Page 6 of 50

Page 7

• investigating the flood extent, flood mechanisms and causes of the
flooding to properties around the North Inch; 
• investigating the flood extents, flood mechanisms and causes of the
flooding in other areas also impacted, such as Invergowrie;
• undertaking engagement with a range of partners including SEPA, SSE
Renewables and local resilience partners
• commencing a detailed review of current procedures against our
response to identify areas for further review and potential improvement. 
4.5 Whilst the report focuses on the impact of extreme weather events, which
generally only take place for a short period of time, it is acknowledged that the
financial and emotional impact of such events can have a significant and long
lasting affect. 
5. BACKGROUND
5.1 Extreme events are becoming more frequent, and it is important that the
Council and its partners, are effectively resourced, prepared and work
alongside each other in their respective roles to mitigate the impact on local
residents, when at all possible. 
Existing procedures 
5.2 The Council has well established processes in place which have proven
effective over many years in relation to civil contingencies, emergency
planning and business continuity. This includes a concurrent risk approach
recognising that more than one incident may occur at the same time. This
covers incidents such as severe weather, power outage, civil unrest, and
cyber attack. There are also specific processes, set out in the Perth Flood
Scheme Operating Manual which cover the operation of and triggers for flood
gate (barrier) closure based upon tide levels and water flow data. 
5.3 These arrangements are outlined in Appendix 1 of this report. These set out
areas such as preparation, out of hours arrangements and stand by
arrangements. 
Severe weather planning 
5.4 The focus on severe weather contingency planning has traditionally been
around the winter period. While primarily focussed on the impact of cold
weather (snow and ice), for a number of years, the annual winter maintenance
policy report has highlighted that, in severe weather events, demand may
exceed resources and often the Council will be unable to meet the public’s
expectations.  When this year’s report was considered in November (Report
No 23/291 refers) at the Environment, Infrastructure and Economic
Development Committee, it was agreed that, in recognition of changing
weather patterns, officers will bring forward a report before summer recess
2024. This is to examine resource requirements to support year round
resilience, recognising changing weather patterns. 
5.5 Weather warnings from the Met Office affecting Perth and Kinross are not
uncommon. Our records show that since July 2020 there have been 153
Page 7 of 50

Page 8

Yellow weather warnings, 11 Amber and three Red warnings. On this basis,
there are approximately five weather warnings a month.  Some warnings have
been snow related, however the majority have been for rainfall and on only a
small number of occasions have required action to be taken.   During the
same period, excluding the recent weather events experienced in October
2023 which are the subject of this report, there have only been four significant
flooding events in Perth and Kinross since July 2020.  On two of these
occasions an amber warning was issued, whilst on two others only a yellow
warning was issued. 
Date Area affected Amber
Warning
August 2020 Perth, Alyth, Blairgowrie & Rattray,
Dunning, Forgandenny, Kinross
Yes
February 2021 Aberfeldy, Bankfoot, Fearnan, Methven &
St Fillans
Yes
October 2021 Alyth, Blairgowrie & Rattray No
September 2022 Perth and Bridge of Earn No 
5.6 Not all weather warnings will necessitate an Incident Management Team to be
stood up. The requirement for this will be based on a risk assessment, based
on the information available. These meetings generally take the same format
and a copy of a generic agenda is attached as part of Appendix 1. 
5.7 Our internal arrangements are also supplemented by long-established
relationships and formal arrangements through the Tayside Local Resilience
Partnership, with partner agencies including Police Scotland, Scottish Fire and
Rescue Services (SFRS), SEPA, Scottish Water, NHS Tayside as well as
Dundee and Angus Councils. Resilience is also supported by strong and
effective relationships with Community Resilience Groups (CRGs), made up
of local volunteers prepared to support their local area during emergency
situations, including weather. There are currently 42 CRGs in Perth and
Kinross. 
Previous major weather event report and recommendations 
5.8 The catchment area for the Tay covers approximately 5,000 sq km.  As a
result, the Perth and Kinross Council area has a long history of flooding. In
1993, Perth experienced a significant flooding event, following heavy snowfall
and a rapid melt. Comrie has experienced a number of flooding events from
the Water of Ruchill, the River Earn and the River Lednock. In July 2015,
Alyth Burn caused significant flooding as a result of extreme rainfall and high
flows. Storms Desmond and Frank in December 2015/January 2016 caused
severe flooding on many roads across the area, as well as the failure of
Bleaton Hallet bridge. 
5.9 On 18 August 2021, the Environment & Infrastructure Committee considered
a report on the flooding of 11/12 August 2020 (Report No.  21/122 refers). The
report described the extent of the severe flooding which occurred in Perth and
Kinross on 11 and 12 August 2020. The entire Perth and Kinross Council area
suffered extensive rainfall (for approximately 6 hours) from around 11pm on
Page 8 of 50

Page 9

11 August 2020 into the early hours of the following morning. The storm was
significant and particularly affected parts of Perth City, Alyth, Dunning,
Forgandenny, Kinross, Pitlochry, Blairgowrie, Methven and other areas.  The
report also included the findings of the review of the Council’s response to the
flooding along with actions taken in response to the emergency motion
approved by Committee on 19 August 2020. 
5.10 The Council, across all these events, has recognised the impact on
communities, residents and businesses, and worked, wherever possible, to
look at support and mitigations, including undertaking flood studies and
building flooding schemes. 
Perth Flood Scheme protocol 
5.11  The Perth Flood Scheme is managed and operated on behalf of the Council 
by the Roads Maintenance Partnership (RMP) and has been since its 
inception in 2001. The operational manual was developed utilising data 
provided by the scheme’s design consultants relative to the level of protection 
the scheme gives. The scheme is designed to protect Perth City from flooding 
from the River Tay and consists of 77 operational flood barriers (gates) that 
require varying levels of intervention to put in place. It is also important to note 
that 10 barriers are permanently closed, and a further 10 closed during the 
winter months (1 October – 31 March). 
5.12 As a result, the Flood Gate closure triggers do not include Yellow or Amber
warnings issued by the Met Office. The triggers are based around tide levels
and water flow data, which SEPA provides to the Council, and this data is
applied to a “gate closure” table. The Flood Protection Scheme also includes
12 gate closure plans, and the appropriate one is initiated based upon the
data provided by SEPA based on a template. 
5.13 SEPA play an important role in the Perth Flood Protection Scheme. The Perth
Flood Scheme Operating Manual states that: 
In response to the special requirements of Perth, SEPA have agreed to
provide the following warning services to PKC:   
1.   An advance warning whenever conditions in the upper catchment of the
Tay indicate that exceptional river flow may result. 
2.  An advance warning if Met. Office tidal surge forecasts indicate that a
tide higher than 2.9M at Newport is expected. 
3.  A flood warning when the combined flow of the Tay and the Tummel at
Ballinluig exceeds 550m3/sec, indicating flow at Ballathie, immediately
upstream of Perth, of more than 800 m3/sec. 
4.  Notification of amber and red flood warnings for the River Almond 
5.  Periodic updates of the fluvial and tidal situation flowing either 2 or 3, in
particular informing PKC when the fluvial or tidal thresholds shown on Table 15
are likely to be exceeded. 
6.  An “all clear” report when the flood risk has passed. 
Page 9 of 50

Page 10

5.14 Since 2013, Council records show that there have been 10 occasions where
the flood gate closure plans have needed to be fully implemented. Appendix 1
outlines details of the flood gate closure protocols and triggers. On all
occasions, the required plan has been implemented and the flood scheme has
worked effectively, reducing the risk of flooding directly from the River Tay.  In
addition to this, there have been a number of occasions where the flood gates
have been closed on the South Inch, due to weather warnings.  Again, this
procedure has worked effectively with the exception of two occasions.  Firstly,
when not all of the gates on the South Inch were closed on 12 August 2020,
which contributed to flooding in the vicinity of Marshall Place, and also on 10
September 2023, although on this occasion there was no impact on any
property.   
Summary of October 2023 weather events 
5.15 Two major flood events impacted upon Perth and Kinross during October 
2023:
• 6-8 October 2023;
• 18-21 October 2023. 
5.16 Both periods of severe weather were preceded by weather warnings. There
was another weather warning in place for the weekend of 27-29 October,
which did not result in major flooding. Whilst the extreme weather during all
three incidents took place over a relatively short period of time, the Council
recognises that the impact of flooding on individual residents and property
owners may last significantly longer. 
5.17 The Council has now activated the Bellwin Scheme, which is now active for
the remainder of the year. Under the terms of the scheme, the first £797,780
is to be met by the Council from existing resources. On 16 November 2023,
the Scottish Government also announced communities affected by the worst
flooding from Storm Babet will be able to claim financial support. Grants of
£1,500 will be available for homeowners and £3,000 for businesses. We are
looking at the detail of this to see whether Scottish Government support may
be available for Perth and Kinross residents and businesses. 
6. 6-8 OCTOBER 2023 WEATHER EVENTS 
Notifications and preparedness 
Weather and flooding risk warnings 
6.1 In the days prior to the extreme weather, the Met Office issued a number of
weather warnings for the week commencing 2 October 2023. The warnings
received indicated persistent heavy rain, with the level of warning escalating
from yellow to amber, the first of which was on the morning of Friday 6
October 2023.  
Page 10 of 50

Page 11

Date Issued Period Covered Warning Reason
2 October 2023 5 – 6 October 2023 Yellow Heavy Rain
4 October 2023 6 – 7 October 2023 Yellow Heavy Rain
5 October 2023 7 – 8 October 2023 Yellow Heavy Rain
6 October 2023 7 – 8 October 2023 Amber Heavy Rain
7 October 2023 7 – 8 October 2023 Yellow Heavy Rain
7 October 2023 7 – 8 October 2023
(extended end time)
Amber Heavy Rain
7 October 2023 8 October 2023
(extended end time)
Yellow Heavy Rain  
6.2 In addition to the information provided by the Met Office, SEPA’s Scottish
Flood Forecasting Service issue a daily Flood Guidance Statement. 
Date of Issue Flooding Risk Level 
Weds
4 Oct
Thurs
5 Oct
Fri
6 Oct
Sat
7 Oct
Sun
8 Oct
3 October 2023 Very Low Very Low Low Low N/A 
4 October 2023 Very Low Very Low Low Low Very
Low
5 October 2023  N/A Very Low Very
Low
Low Low 
6 October 2023
N/A N/A Very
Low
Medium Medium
7 October 2023  N/A N/A N/A Medium Medium
8 October 2023
(10.30am)
N/A N/A N/A N/A Medium
8 October 2023
(4pm)
N/A N/A N/A N/A High 
6.3 In line with the information provided by the Met Office, the likelihood of severe
weather during the 6-8 October 2023 was low or very low until Friday 6
October 2023. The Amber weather warning and medium flooding risk
warnings issued on 6 October were the trigger for the additional preparations
noted below. 
Engagement with partners 
6.4 In addition to the information received by email from SEPA and the Met Office,
the Roads Maintenance Partnership contacted Scottish Water to check all
seven pumping stations associated with the Perth Flood Protection Scheme
were working correctly.  Scottish Water confirmed that all pumps had been
checked and were working correctly. Telemetry data from South Inch pumping
station pumps for 8 October indicates pumps were operating satisfactorily
throughout the flooding event on that day. 
Page 11 of 50

Page 12

Engagement with communities 
6.5 All Community Resilience Groups were made aware of the weather warnings
issued once the initial Amber weather alert was issued on 6 October 2023.
Over the course of the weekend, they were provided with information, advice
and support as required. 
Communication 
6.6 Weather warning information for the weekend, including information to the
Ready Scotland website, was first shared on the Council’s social media
channels at 9am on 6 October and later that day updated to reflect the Amber
warning issued. An Elected Member Briefing Note issued at 5pm on 6 October
provided an overview of arrangements for the weekend ahead. No public
statement was made advising of the Council’s preparations for the weekend. 
6.7 The Council’s social media channels shared updates through Saturday and
Sunday to highlight SEPA-issued public flood alerts, road closures and
warnings, and information on gate closures. Four further Elected Member
Briefing Notes were also issued over the course of the weekend to provide
updates on the flooding response. 
6.8 Updates were issued to Elected Members on the response to flooding and
preparations for the expected high tide at 6pm and 10pm. 
General operational preparedness 
6.9  A winter preparedness meeting with all relevant council services and the
Health and Social Care Partnership had taken place on 25 September 2023,
in line with normal practice. While this meeting is focussed on the winter
period, it also ensures that all relevant teams are aware of arrangements for
out of hours responses. 
6.10 As part of the flood gate routine maintenance, an external contractor had
undertaken an inspection of all flood gates in the weeks prior to October 2023. 
Some minor repairs were identified and are on-going. Furthermore, as part of
the annual preparations for a flood event and to provide an annual training
exercise for officers, the annual trial closure of the flood gates had taken place
on 29 September to 1 October 2023. During this exercise it was established
that one gate, at Mill Wynd, Perth, was not closing properly, although it could
be closed with the assistance of a vehicle. This matter was not resolved prior
to the weekend of 7-8 October 2023. However, contingency measures
consisting of around thirty sandbags was in put in place following the test.
While water did build up on the road during flood event of 8 October, there
was no threat to any properties. 
6.11  Blocked gullies are often thought to be a contributing factor in relation to
flooding. Road gullies (drains) only hold a very small quantity of water have a
Page 12 of 50

Page 13

sump area in the base to allow solids to settle and prevent them entering and
blocking the pipe system. The water collected in the gully discharges,
principally, into the combined sewerage system in older urban environments.
This system is usually owned and maintained by Scottish Water. During flood
events, the combined sewer is often full to capacity, and the road gullies
cannot drain away, leading to surface water ponding/flooding. This surface
water drains away after the flood peak has passed and capacity returns to the
combined sewer. Road gullies can often become blocked due to the volume of
debris generated during a flood event. There will be isolated gullies blocked at
any point in time across the Council network, however, in events such as
these, locally blocked gullies would not have a significant impact. 
6.12 The Council’s gully cleansing programme consists of an annual cleanse of all
road gullies on the A class network and a biennial cleanse for all other gullies.
As at 6 October 2023, 14,860 (59%) had been cleansed in the financial year,
out of a target of 25,000 for the full year. 
6.13  Furthermore, gullies in areas which are considered “flood susceptible” are
cleansed every six months. There are approximately 1,000 such gullies, some
of which are located in Perth City Centre, including Barossa Place/Street,
which were last cleansed in August 2023. 
6.14 A review of the gully cleansing policy, particularly gullies, which fall into the
definition of “flood susceptible”, will be undertaken. 
Preparedness specifically for 7-8 October 
6.15 The weekend of 7-8 October was the start of the October break in Perth and
Kinross, and part-way through the October school holidays in neighbouring
areas. As this is also the last school holiday period before the winter
maintenance policy comes into effect, it is a time when traditionally higher
than average numbers of staff take leave. This impacted on the availability of
additional volunteers to supplement standby arrangements throughout the
weekend. However, once the amber warning was issued on 6 October 2023,
additional volunteers from the Roads Maintenance Partnership and Council
staff involved in civil contingency work were sought to be on standby across
key roles. The support of these volunteers was essential in delivering a
response to communities across the weekend: 
• 24 staff from the Council’s Parking and Civil Contingency teams on
standby
• 8 vehicles prepared for deployment with sandbags, traffic cones and
barriers
• 8 additional Roads Maintenance Partnership staff members volunteered
to support the planned standby arrangements. This increased the
available resource to 14 people across the whole of Perth and Kinross.
• Roads Maintenance Partnership standby arrangements for the weekend
of 7-8 October 2023 included a Duty officer, two duty supervisory
officers, seven operatives based at Ruthvenfield, three operatives at the
Blairgowrie Depot, and a further four operatives at the Aberfeldy depot.
• The normal Housing out of hours service was in place 
Page 13 of 50

Page 14

6.16 The Council contracts with Aberdeen City Council Customer Contact Centre
to support the operation of emergency contact lines for roads, flooding and
housing repairs. In line with the agreed process, Aberdeen City were
contacted on 6 October to request that they arranged additional resources to
support the answering of calls from Perth and Kinross given the amber
warning. 
6.17 While officers were involved in conversations around response planning and
the direction of, and availability of resources, based on the available
information on 6 October, no Incident Management Team meeting took place.
However, members of a potential Incident Management Team were identified
and placed on standby to meet when required. The Executive Director
(Communities) was the strategic lead and “Gold Commander” for the
weekend. 
Response Management 
6.18 During the weekend, groups in Alyth, Rattray and Aberfeldy were mobilised
and provided assistance to their communities. At around 10.10am on Sunday
8 October, Aberfeldy CRG advised the Council that the water levels were
rising again and that they had started to deploy sandbags. Officers were also
in contact with Alyth CRG and Rattray CRG on the morning of 8 October
2023, who were also proactive. Council officers were deployed to various
locations as resources allowed to provide assistance to the CRGs and deliver
and deploy sandbags. 
6.19 In communities, where a CRG has been established, particularly Aberfeldy,
Alyth and Perth, the groups proved to be invaluable in providing an effective
response and a valuable support to residents and businesses. The Council
acknowledges the outstanding work of the resilience groups during the flood
events. 
6.20 Roads Maintenance Partnership officers and Parking attendants played an
important role throughout the weekend, working alongside colleagues from
the Scottish Fire and Rescue Service, Police Scotland and Community
Resilience Groups. The teams were involved in dealing with issues including
distributing and deploying sandbags as well as feeding back information from
the ground to assist with identifying issues and targeting resources where they
were needed. 
6.21 During the weekend of 7-8 October, Aberdeen’s Contact Centre received 615
calls to PKC out of hours numbers, of which 257 were answered. Some of the
unanswered calls would have been repeat callers who were later answered,
but it is not possible to identify how many of these there were: 
Date/Time  Calls made to
Aberdeen
Calls answered
by Aberdeen
Saturday – 7 October  297 110
Sunday – 8 October  318 147
Total  615 257 
Page 14 of 50

Page 15

6.22 145 calls were in relation to housing repairs, the majority of which were
weather related, mainly due to small leaks. A total of 39 calls were forwarded
to the Repairs Inspector on stand-by. The remainder being resolved at point of
contact or forwarded to the Trades directly. Only two Council tenancies
required decanting due to flooding and, in both cases, alternative temporary
accommodation was provided. 
6.23 A number of locations across Scotland were experiencing extreme weather
events at the same time, therefore call volumes were significant from
residents from across Scotland. Also, given the nature of these extreme
weather events, it is unlikely that any Contact Centre would be able to
adequately cope with demand. 
6.24 At the request of the Incident Management Team, the Council’s Customer
Service Centre was opened from 5pm-10.20pm on Sunday 8 October to
assist with answering calls to the roads emergencies line. While no out of
hours service is operated by the Council’s Customer Service Centre, four
members of staff volunteered to answer phones during this time. 
Date/Time Calls made to
CSC
Calls Answered by CSC
8/10/2023 (5pm – 10.20pm) 16 15 
Aberfeldy 
6.25 The main area affected on Saturday 7 October 2023 was Aberfeldy Holiday
Park. Officers first became aware of potential flooding at the Park at around
11am on 7 October 2023. An officer from the Parking & Civil Contingencies
Team was deployed to the site with a 4x4 vehicle to assist and to assess the
developing situation, and a request was made by the Council to the Aberfeldy
CRG for assistance. It was reported that the Park was well under water by
1.20pm (approximately 3 feet in depth at the entrance). Contact was
established with the Chair of the Aberfeldy Community Council who advised
that they were ready to open up the town hall as a rest centre, if required.
There were 10 displaced people, although none required assistance and all
managed to make alternative arrangements. 
Perth 
6.26 Officers from the Parking & Civil Contingencies Team worked throughout the
weekend distributing and deploying sandbags, assisting with road closures,
and providing eyes and ears on the ground to assist in situational awareness.
The team commenced around 9.30am on 8 October deploying sandbags, in
locations such as Queen Street and assisting residents (including visiting
vulnerable residents in the area) to provide assistance and reassurance. A
decision was made at around 9.45am by Parking to close a number of roads
including Queen Street.  This was due to vehicles driving through surface
water, which was creating a wave effect and overcoming residents sandbag
defences. In Windsor Terrace, a sandbag dam was created across to the road
to successfully divert water back into the watercourse and protect properties.
The team also provided support and deployed sandbags at Glenearn
Campus. 
Page 15 of 50

Page 16

6.27 In addition, the Parking Attendants visited properties on Tayside Crescent and
Wade Place Aberfeldy, during the afternoon and Charlotte Street, Barossa
Place and Rose Terrace at various times throughout the afternoon and
evening on Sunday engaging with residents affected, colleagues from SFRS
and Police Scotland, offering support and assistance. 
Perth Flood Scheme 
6.28 The Roads Maintenance Partnership (RMP) is a partnership between Perth
and Kinross Council and Tayside Contracts, which undertake a number of
activities on behalf of the Council, including responding to extreme weather
events and operating and maintaining the Perth Flood Protection Scheme.
The scheme is designed to protect Perth City from flooding from the River Tay
and the Scouring and Craigie Burns. It consists of 77 operational flood gates
that require varying levels of intervention to put in place. Ten gates are
permanently closed, and a further 10 closed during the winter months (1
October 2023-31 March 2023). Therefore, on 6 October 2023, 20 gates plus
those at the South Inch (3) were already closed leaving 54 flood gates open at
this time. 
6.29 The Roads Maintenance Partnership Duty Officer was the main point of
contact with SEPA during the weather event. The following information across
the remainder of the weekend is based on our records. During Saturday 7
October, the Council was provided with information by SEPA about water
levels in the rivers Earn, Lyon, Isla and Upper Tay at Aberfeldy. No
information on the River Tay at Ballathie was provided until the RMP Duty
Officer specifically requested an update at 7.10pm, at which point SEPA
advised no Perth Flood template was to be issued by them at that time (see
Appendix 1 for operating procedures). No action was therefore triggered in
relation to the River Tay at that time. 
6.30 SEPA phoned the RMP Duty Officer at 8.14pm to advise that the flow rate in
the river was forecast to be 1,400 m3/sec and the tide level would be 1.3m at
high tide (9.45pm). This information indicated that flood closure Plan 9 (all
gates to be closed except Tay Street, Queens Bridge and three gates at
Friarton) should be activated. 
6.31 The Operations Manual states that three squads of four men are required to
undertake the procedure. Given that at this point, there was only 1 hour and
31 minutes before high tide, and it takes four and three quarter hours to close
the gates, there would not have been enough time to implement Plan 9, nor
enough staff on standby to undertake the procedure. 
6.32 Consequently, the Duty officer consulted with another senior colleague within
the RMP and agreed that the best course of action was to instruct the Duty
Supervisor (Assistant Roads Maintenance Officer - ARMO) to undertake a
visual inspection of the water levels in the River Tay from that point until
midnight. While this was not in line with the agreed operating procedure, the
decision was taken on the available information and resources. The officer
arrived at approximately 8.30pm and reported that there was approximately
.1.5m freeboard at Perth Harbour. Checks at Commercial Street and Tay
Page 16 of 50

Page 17

Street were also undertaken, with around 1.5m of freeboard at Commercial
Street and no flooding issues at Tay Street dry arch section. No further action
was taken to implement flood gate closures or standby procedures at that
time, and high tide in Perth passed without significant issue. 
6.33 Several more calls took place throughout the night to establish forecasts for
high tide the following day, which SEPA advised were still being calculated. At
12.40am, SEPA advised that while the forecast looked uncertain they were
expecting a marginally lower tide next morning and broadly similar flow rates
to the 9.45pm high tide. Given there were no significant issues at the earlier
high tide, the decision was taken to seek a further update from SEPA at 6am.
No further action was taken to implement flood gate closures or standby
procedures at that time. 
6.34 The RMP Officer contacted SEPA to request an update at 5.16am on Sunday
8 October. SEPA advised that the flow rate had increased to 1,528 (m3/sec)
and may increase further to 1,650 at high tide. Consequently, the Duty Officer
activated standby procedures and an RMP senior engineer with previous
experience of managing the flood gate closure process came into support this. 
6.35 By 7am, all five “on call” operatives, the duty officer, senior engineer and one
ARMO were at the Ruthvenfield Depot and ready to be deployed, with two
further operatives having already been deployed to clear trash screens on the
Craigie Burn. A briefing took place at around 7.15am at which point a plan of
action was agreed which took into account that there were only seven
individuals available to implement the flood gate closure process which would
normally have taken 12 officers. 
6.36 Two separate squads left the depot at around 7.30am, with one squad of four
employees going to the flood gates at Perth Harbour and the second squad
containing three employees attending to the flood gates at Commercial
Street/Bridgend Court. These two locations were prioritised to focus on
protecting the most vulnerable residents and business premises. 
6.37 Throughout the morning, the heavy rain persisted and flooding was present at
a number of locations. Consequently, resources were deployed in response to
the emerging situation. A summary of the key decision points around the
closing of flood gates are below.  
Flood gates in the vicinity of the North Inch 
6.38 At approximately 9.10am, water was noted to be accessing the North Inch via
the open gate at the War Memorial, and was at this point approximately 30cm-
50cm deep. The squad at Commercial Street/ Bridgend were instructed to
proceed immediately to the North Inch once they had concluded the closure of
those flood gates. An additional two off-duty RMP officers who were
previously called (05:45) contacted the RMP senior engineer around this time
and came in to support flood gate closures. 
6.39 When the squad arrived at the North Inch at 9.40am, they were unable to
close the flood gate at the War Memorial as the force of water was too strong
to stand up in and padlocks were submerged. The remaining four North Inch
Page 17 of 50

Page 18

gates were closed by 11.40am, but despite checking again at that time, the
force of water at the War Memorial gate remained too strong to stand in. As
such, the decision was taken to monitor the water level while moving the
squad on to close other gates in Perth city centre. 
6.40 A request was also made for sandbags to be delivered to the rear of Charlotte
Street properties and be deployed to protect the threshold of the properties.
This was because at this point the gate at the rear of Charlotte Street was
also open and had been breached. This gate was eventually closed at around
10.55am   
6.41 All of the remaining gates, were closed by approximately 3.30pm at which
point, the squad went to Ruthvenfield Depot and retrieved a JCB digger and
then returned to the remaining open gate. The squad proceeded to close it,
and this was completed at around 5pm. 
Mill Wynd 
6.42 As the flood gate at Mill Wynd would not close fully due to the issue identified
during the previous flood closure trial, sandbags were already in place. Water
from the lade was reported to be approximately 30cm deep on the
carriageway but no properties were affected. 
Perth Harbour/Lower Friarton flood gates 
6.43 The senior engineer arrived at Lower Friarton at around 9.00am, at which
point there was surface water on roads in the area. In addition, he witnessed
water flows, which, in his opinion, had increased significantly above those
previously advised by SEPA. Consequently, he commenced closing the three
flood gates at Lower Friarton which, according to the Operating Manual, are
only required when the water flow is in excess of 1,800 m3/sec. 
6.44 At around 9.45am, the senior engineer received a call from SEPA to advise
that overnight a considerable amount of water had flowed from SSE Hydro’s
dams infrastructure and along with the heavy rainfall, the River Tay was rising
rapidly. He was also advised that the current estimate was around 1,650
m3/sec. The senior engineer responded by stating that, in his opinion from
observations, the water flow was significantly greater than the estimate and he
advised that the “full” gate closure process (Plan 12) was being implemented. 
6.45 Given the extent of the issue, and the observed water flows, the squad was
then instructed to prepare and initiate the closure process at Queen’s Bridge
and Tay Street Promontory. This requires the collection of modular gate
sections from storage from Ruthvenfield and a hi-ab crane and operator to
move them. This was completed at 3.30pm. 
Property Services 
6.46 At approximately 1.40pm on Sunday 8 October, a request was made by the
Scottish Fire and Rescue Service (SFRS) for the Council to attend to a
potentially dangerous building in George Street, Perth, due to falling masonry.
Property Services sourced a consultant structural engineer who made
Page 18 of 50

Page 19

recommendations to make safe (erect fencing). Property Services arranged
heras fencing which was installed on 9 October. Whilst a solution was found
to deal with this matter, a review of the out of hours arrangements with regard
to dangerous structures would be appropriate. 
Local Resilience Partnership and Incident Management Team
arrangements 
6.47 Given the extreme weather, a major incident was declared by Police Scotland
in Tayside at 9.36am on Sunday 8 October 2023 and a Tayside Local
Resilience Partnership (TLRP) meeting held at 10.15am. 
6.48 Whilst the first IMT and TLRP meetings were not until Sunday, there was a
significant amount of communication on both Saturday and Sunday involving
numerous officers at all levels of the organisation. This included the direction
of staff to respond to issues in various areas of Perth and Kinross. 
6.49 The TLRP meeting was attended by the Executive Director (Communities),
the Emergency Response Duty Officer (ERDO), and the on-call
Communications Officer. At this meeting the on-duty SEPA Officer informed
us that Aberfeldy Caravan Park was at risk of flooding at some point today –
this had flooded approximately 24 hours earlier and had been dealt with. He
went on to update that the forecast was for high levels tomorrow, similar to
2016 and that flood gates should be closed. 
6.50 Further LRP meetings were held on Sunday at 2.45pm, 7pm, 9.30pm and
finally on Monday 9 October 2023 at 11am. Incident Management Team
meetings were also held on Sunday. The first IMT meeting during the extreme
weather was at 4.15pm, and was followed by two further IMT meetings later
that day at 6.30pm and 9.15pm, and continued on Monday, Tuesday and
Wednesday. These meetings helped to co-ordinate information and
responses across the area, and were a prompt for elected member and public
updates. The Incident Management Team also prepared a rest centre to be
stood up for residents around the North Inch if it became necessary. This was
ultimately not required. 
SSE 
6.51 During the incident the Council had no direct contact with SSE Renewables.
SSE have advised that the company did have regular dialogue with SEPA
during the event via the company’s 24/7 Hydro Operations Centre. However,
at the Council’s request SSE Renewables joined the TLRP meetings from the
second meeting on 8 October 2023. 
6.52 The Council has also since been advised by SSE (Renewables) Head of
Hydro Programmes that in the days leading up to the extreme weather (and
during it) SSE’s assets were discharging water into the overall Tay system at
Perth, and during the 7-8 October 2023 a series of reservoirs did go on
uncontrollable spill (simply due to volume or rainfall). However, the main
storage reservoir in the Tummel Valley at Loch Ericht did not spill and the
Company did not generate or discharge flows from it through the event until
Page 19 of 50

Page 20

after the peak of the event in Perth, which SSE advises provided a net benefit
to the Tummel Valley and indeed Perth. 
Impact and recovery 
6.53 Within Perth and Kinross, the extreme weather during 7-8 October 2023
predominately affected Perth, although other areas were affected including: 
• Aberfeldy Caravan Park
• Pitlochry – Moulin Burn. 
• Bridge of Earn (Back Street and Old Edinburgh Road). 
• Bankfoot (Prieston Road, Nicoll Drive and Church Lane) 
• Alyth (Meigle Road, Cambridge Street, and Loyal Road) 
• Blairgowrie/Rattray – Rattray Burn (David Grimmond Drive, Back Row,
Schoolfield Road and High Street) 
• Tibbermore at Pow Bridge 
• Methven (east end of Main Street around Bowling Club). 
Communities Affected 
6.54 The Council understands that the impact of flooding on households lasts
beyond the days of the severe weather, and that many residents are
continuing to deal with the after effects of their property being flooded. As part
of the ongoing work to recover from and review the circumstances
surrounding the 7-8 October officers have been speaking to residents to listen
to, and understand their concerns. Feedback from a residents meeting for
those impacted by the North Inch flooding is included within this report. In line
with normal practice, over the coming weeks, community meetings will be held
for residents and businesses in the areas affected. The meetings will be
supported by a multi-agency group, including the Council’s flooding team, the
Roads Maintenance Partnership, the Scottish Flood Forum, Scottish Water,
SEPA and the emergency services, where appropriate. 
6.55 Following the event, in line with similar extreme weather events, a Flooding
Bulletin was issued on 13 October 2023 Perth and Kinross flooding bulletin -
Perth & Kinross Council (pkc.gov.uk). This bulletin, which is a joint agency
communication, provided an update on the weather event, and asked directly
affected property owners to contact the Council’s flooding team to assist in
understanding the impact of the event and the cause. 
6.56 To date, across the Council area, investigations indicate that approximately
120 properties have been affected, with approximately 70 experiencing some
internal flooding. It has been reported that approximately 91mm of rainfall fell
in Perth, which is more than an average month’s rainfall at this time of year.
SEPA will provide an assessment of the storm event when data analysis is
complete. 
6.57 While the Council is aware that 14 households had to find alternative
accommodation, 10 of which were displaced from Aberfeldy Caravan Park,
the majority of people made their own arrangements. Temporary
accommodation was provided for Council tenants of two properties, who were
amongst those affected by the flooding in Commercial Street, Perth.
Page 20 of 50

Page 21

tag2.5km from C449 Ju   
Perth City 
6.58 In Perth, as a result of the extreme weather on 7-8 October 2023, the
following were affected: 
• The North Inch (Charlotte Street, Charlotte Place, Atholl Place, Rose
Terrace, Barossa Place and Bells Sports Centre); 
• The Scouring and Craigie Burn catchment (Broxden, Lamberkine Drive,
Cherrybank, Low Road, Murray Crescent, Balmoral Place, Queen Street,
Queen Avenue, Queens Court, Windsor Terrace, Glenearn Road, Croft
Park and South Inch); 
• Feus Road, Cavendish Avenue/Gray St, Marshall Place, Perth Town
Lade, Commercial Street, 
6.59 The Council has been provided with information from properties in the vicinity
of the North Inch that were directly affected by flooding in Perth on 8 October.
A total of 34 properties located behind the Perth Flood Scheme experienced
internal flooding. 
6.60 Four flood gates adjacent to the North Inch remained open for a period of time
during the flood event. The Council acknowledges that the delayed closure of
these may have contributed to the flooding of some properties. However, full
investigations to determine the impact of this are yet to be completed as there
are also existing sewer, surface water and/or groundwater issues in this area.
This will form a more detailed flood report in due course. 
6.61 A number of property owners incurred water damage to their property and
possessions as a result of flooding, which unfortunately caused personal loss
and distress. An initial summary of the properties and location impacted is set
out in the table below: 
Location  Impact 
Bells Sports Centre &
North Inch Bowling
Club
• Both properties experienced flooding 
Barossa Place  • 7 properties internally flooded 
Rose Terrace  • 15 property basements flooded (4 confirmed to be
habitable, others abandoned or used for storage
only).  Flooding from the River Tay did not reach
these properties (there was no direct flow path) 
Charlotte Street  • 2 properties flooded internally 
• A third property was protected from internal flooding
by sandbags. Closure of the flood gate at 11am
prevented flooding from the River Tay at this location.
Charlotte Place  • 2 properties flooded internally  
Atholl Place  • 1 property basement (affected by minor water
ingress) 
Page 21 of 50

Page 22

Five properties were also flooded in Commercial Street. Initial flooding was
due to surface water as a result of heavy rainfall, and the outfall of surface
water drainage system being submerged. The main cause of flooding in this
case was due to flood water from the River Tay infiltrating the combined
sewer (via manholes on ‘wet’ side of the flood barrier). 
6.62  A meeting was held at 6pm on 15 October 2023 in the Civic Hall in 2 High
Street, Perth with affected residents from those streets listed in the table
above.  Some residents who were also affected and lived on Tay Street or
had businesses located on Tay Street also attended.  In total, there were
approximately 30 residents/business owners in attendance.  The meeting was
also attended by elected members, including the Leader of the Council, the
Depute Leader of the Council, the Convenor and Vice Convenor of Scrutiny
and Performance Committee, the vice convenor of Environment and
Infrastructure Committee, and the local ward elected members.  The meeting
was chaired by the Chief Executive and supported by officers.  The Chief
Executive opened the meeting by recognising that the meeting was to listen
and understand the impact on those affected, which would then be
summarised within this report.  Information would also be used to underpin
improvement activity as a result of feedback from those impacted. 
6.63 Understandably, residents and business owners were frustrated, upset and
angry about recent events. Attendees expressed their views and sought
answers about the Council’s involvement prior to, during and after the extreme
weather on 6-8 October 2023. 
6.64 The key themes raised at the meeting included: 
• The timing and decision making around the gate closures, particularly why
the large gate on the North Inch was not closed until after 5pm on Sunday
afternoon and what the rationale was for closing the gates in the order
that they were closed. 
• What plans were in place for a weather event, what were the standby
arrangements and why the gates were not closed much earlier in the
week when weather warnings were being issued. 
• Residents had been living in their properties for a number of years and
had a lot of “lived experience” with regard to flooding and monitoring the
River Tay.  The residents felt that this experience and “eyes on the
ground” should be utilised, for example introducing a means by which
residents could contact officers if and when issues were developing.   
• The issue of insurance and liability for damage to properties around the
North Inch that may have been impacted upon by the late closure of the
flood gates 
• Concerns were raised about the capacity of Scottish Water’s sewer
network in and around the Commercial Street area.  Residents suggested
that this was a historical issue 
Page 22 of 50

Page 23

• Comments were made about the visibility, support, and effectiveness of
the Council’s officers during the flood event on Sunday 8 October 2023
and since the event.  Residents’ ability to speak to somebody and receive
advice and support was also felt to be lacking.  There was also criticism of
some of the responses from the Out of Hours contact centre, and this will
be considered as part of our further review. 
6.65 It was agreed that further engagement would take place with residents
following the meeting.  It was also requested that residents come together to
agree how they would like to present any deputations at the Committee
meeting, and a commitment was provided that the Civic Hall would be made
available for residents to watch the meeting on the TV screen should there not
be enough room in the Council Chamber. 
Bells Sports Centre  
6.66 In addition, Bells Sports Centre incurred significant damage across the entire
ground floor including the arena, new gym and associated equipment, squash
courts, meeting rooms and changing rooms. This is not the first time that the
Sports Centre has incurred water damage from flooding. The last notable
event occurred on 12 August 2020, as a result of the widespread surface
water flooding which overloaded the combined sewer network in this area. 
Impact on roads 
6.67 More than 20 roads were impacted by flooding, many of which were required
to be closed during parts of the weekend although two landslips and a fallen
tree also played a part. Some roads remained closed for days after the event
whilst water levels receded, further impacting residents. Adverse Weather
Road Closure Updates were issued regularly during both days to an extensive
distribution list, including elected members, community councils, key officers
and partner agencies and used to update the public information on the
Council’s social media channels. 
6.68 The C448 Glen Lyon road at Woodend Cottage was one of the most affected
roads, as this was damaged by a landslide. In response the RMP prioritised
its safe repair, working weekends and mobilising contractors in order to
reopen the road as a matter of urgency. The road reopened on Thursday 26
October 2023. 
Communications 
6.69 The majority of communication amongst officers during 7-8 October 2023 at
both a strategic and tactical level was online. All LRP and IMT meetings took
place on-line via MS Teams, which is common practice given the timing of
these meetings and the geographic location of officers, particularly when
multi-agency partners are involved. This approach allowed for meetings to be
arranged quickly and for officers to inform, advise, instruct and respond as
appropriate in a timely manner. 
6.70 There were no discussions with SSE during the 7-8 October event.
Communication with regard to SSE assets and the management of water, and
Page 23 of 50

Page 24

the impact on the Tay catchment area take place between SSE and SEPA.
This may have impacted upon the Council’s ability to make timely decisions. 
6.71 The Flood Gate Closure Operating Procedure states that the RMP Duty
Controller will make contact with a list of named businesses and contacts in
the event of a gate closure. However, given the shortage of the resources, the
Duty Controller was needed to assist with the closure process and therefore
was not able to telephone the list of contacts. This will be considered as part
of the improvement action to review the flood gate closing procedures. 
7. 16-21 OCTOBER (STORM BABET) WEATHER EVENT 
Notifications and preparedness 
7.1 Learning from the experience of the previous weather event influenced
preparations for Storm Babet. 
7.2 Over the weekend of 15/16 October, the Met Office began to warn of high
winds and rainfall that would move northward, and likely impact the eastern
part of Scotland. Heavy downpours were forecast from Wednesday 18
October. The Met office advised that as this rain would fall on saturated
ground there would be a risk of localised flooding. The rain was forecast to be
accompanied by high winds in places, and unusually the wind would be from
the east with the potential to topple trees in leaf.
7.3 At 11.30am on Monday 16 October the Met Office issued a severe weather
warning: “As well as heavy rain, Storm Babet will bring some very strong
winds and large waves near some eastern coasts too. Gusts in excess of
60mph are possible in eastern and northern Scotland from Thursday. It is
likely Met Office warnings will be updated through the week.”
7.4 Preparations for responding to the likely impact of the weather warning began
on Monday with discussions with SEPA taking place regularly to ensure clear
lines of communication were in place.
7.5 On Tuesday afternoon the rain forecast for north-east Scotland, covering the
north-eastern part Perth and Kinross was updated to Amber, with the rest of
the Perth and Kinross area remaining Yellow. The wind risk was also Yellow
for the east coast, with some concern for coastal communities as this was not
the prevailing wind direction. 
7.6 An IMT meeting was held at 4pm where it was agreed that a command
structure would be put in place to manage any required response to Storm
Babet led by the Head of Planning and Development (gold), Head of
Communities Business and Resources (silver) and the required service leads
(bronze). 
7.7 At that meeting it was noted that 31 flood gates remained closed following the
previous weather event, including all those at the South Inch. The IMT agreed
that flood risk would be reviewed on Wednesday morning following SEPA’s
daily update. It was also agreed that sandbags would be delivered to key at
risk locations including Bell’s Sports Centre in Perth and Alyth town centre,
and communications issued.
Page 24 of 50

Page 25

Communication
7.8 As with the previous weather event, all IMT meetings were held online and a
specific Storm Babet IMT Teams chat was set up. This proved useful in
separating strategic and tactical decisions and actions from “on the ground”
operational decisions and actions were then communicated from staff on duty.
All agreed IMT actions were logged. Both gold and silver commanders were
physically present at 2 High Street working alongside Communication Team
colleagues.
7.9 As per the previous weather event, posts were shared on the Council’s social
media channels advising of weather warnings. An Elected Member Briefing
Note advising on arrangements for the weekend was also issued. Given the
degree of public interest following the previous weather event a public
statement was also issued to media and published on the Council’s website
and main social media channels advising on the arrangements which had
been put in place to prepare for the forecasted weather. 
Response management 
7.10 During Storm Babet much of Scotland was affected by significant rainfall,
resulting in widespread flooding. Within Perth and Kinross, the flooding
predominately affected properties in some parts of Invergowrie, although other
areas were affected including Alyth and Coupar Angus. To date,
investigations indicate that approximately 31 properties have been affected,
with approximately 7 experiencing some internal flooding. It has been reported
that approximately 119 mm of rainfall fell near Invergowrie, which is more than
an average month’s rainfall at this time of year. SEPA will provide an
assessment of the storm event when data analysis is complete. 
7.11 However, although Storm Babet impacted several communities notably,
Invergowrie, the greatest impact of the exceptional rainfall was experienced
further north. SEPA did not issue any localised flood warnings and although
the water level of the Tay rose sufficiently to cause overtopping at the harbour
at high tide, the volumes of water flowing into the Tay from the rivers Isla and
Ericht did not cause any unmanageable issue further downstream. 
7.12 On the morning of Wednesday 18 October SEPA advised that the Met Office
was considering raising the Amber warning for heavy rain to a Red warning
for severe rain largely covering south Aberdeenshire and Angus but also
extending to the northern edges of Perth. This indicated that the Tay
catchment would be more directly affected by what was being termed
exceptional rain and impactful wind. It also became clear that that this
exceptional rain in part of the Tay catchment may affect the river level at Perth
and would coincide with a particularly high tide, with water potentially being
pushed up the estuary by gale force winds. 
7.13 By late afternoon power outages, caused by falling trees, began to be
reported along with road closures due to landslips. Kettins experienced a
power outage. Some surface water flooding was reported in Blairgowrie,
Coupar Angus, the A85 at Huntingtower, Alyth and Bridge of Earn, but no
properties in these communities were reported as being affected. However, by
early evening reports of some flooding in parts of Invergowrie were being
Page 25 of 50

Page 26

received, and by early morning there was confirmation of significant flooding
in parts of Invergowrie. 
7.14 The response to Storm Babet was in line with Council protocols and
procedures for significant weather events. Given the learning from the
previous flooding event there are no additional specific improvement actions
identified in respect of the Council’s response. 
7.15 A decision was taken by the gold and silver commanders to close all the flood
protection gates that remained open except for the Queen’s Bridge and the
Harbour which would be reviewed early on Thursday morning as the potential
impact on the Tay became clearer. 
7.16 At 1pm on Wednesday, a North of Scotland Regional Resilience Partnership
meeting was chaired by the Scottish Government and attended by PKC’s gold
commander and ERDO, and the Tayside LRP was stood up at 3pm. The PKC
IMT also met and continued to meet three times a day on 19 and 20 October
and once on Saturday 21 October before being stood down. The Tayside LRP
continued to meet, principally focussed on the major incident at Brechin. 
7.17 On the morning of Thursday 19 October, the flood protection gates at Queen’s
Bridge were lowered into place after the traffic peak and the Harbour flood
gates closed. 24/7 cover was provided at the Harbour to facilitate business
access/egress although the staff on duty there also assisted with trash screen
clearing at the Craigie Burn etc. Trash screen clearing continued throughout
the storm event. 
Impact and recovery 
7.18 The impact of the Queen’s Bridge closure was minimal as Police Scotland
advice was to avoid all unnecessary travel and some city centre businesses,
opted to close and send staff home. Council employees were advised to work
from home. Following the afternoon IMT the decision was taken to suspend
waste collections on Friday 20 October and for recycling centres to remain
closed in the interests of public and staff safety. All burials and cremations on
Friday 20 October were also cancelled. Education and Children’s Services
advised that all open schools would be closing at 3pm – as most schools were
closed for the October break this only impacted schools operating lets and
other holiday services. Vulnerable housing tenants in known flood risk
locations were contacted and at home care visits completed. Staff were also
on standby to open emergency rest centres if needed. 
7.19 The local Community Resilience Group opened the village hall as a rest
centre and sourced a generator to provide power. 
7.20 At its early morning meeting on Friday 20 October the IMT became aware of
significant flooding in parts of Invergowrie. Council staff were on the ground to
assist the emergency services including the Coastguard and the Scottish Fire
and Rescue Service for evacuation of properties. It was agreed to open a rest
centre in the Invergowrie sheltered housing development and staff were on
standby to open the primary school if needed. Ultimately the number of
Page 26 of 50

Page 27

residents requiring assistance was minimal, with everyone affected being
supported directly by friends or family. 
7.21 In addition approximately 20 road closures had been put in place by the
Friday morning as a result of flooding with regular updates being posted on
social media channels as new road closures were added and others removed.
It was also noted that some local bus operators had cancelled services for the
day and rail services had been cancelled into the Met Office designated red
area. 
7.22 Relevant members of the IMT agreed to meet again at 8pm following the high
tide at Perth. Photos showed the river at the Harbour had overtopped the
quay walls but there was no flooding of business premises. It was agreed to
meet the following morning to consider the re-opening of the Queen’s Bridge
and some of the Harbour gates. The situation across Perth and Kinross had
largely stabilised except for Invergowrie where the flood water continued to
rise but affecting no additional properties. 
7.23 The approach to communications in response to Storm Babet was broadly
similar to that adopted in respect of the previous flooding event. Social media
posts were made regularly updating on known surface water flooding, land
slips and road closures. Reminders of numbers to call were also regularly
posted. 
7.24 As and when significant actions were taken, such as the closure of the
Queen’s Bridge, communications statements and social media posts were
issued. After each IMT further statements were released and an Elected
Member briefing was also issued. In total five Elected Member briefings were
issued, one each day from October 17 to 21. 
7.25 On Monday morning based on the latest SEPA river flow data and Met Office
forecast a decision to re-open the Queen’s Bridge and some Harbour area
gates was confirmed and actioned that morning with regular in person checks
carried out throughout the day and into the evening at high tide. Staff were on
standby to close at short notice if required. It was agreed the status of the
remainder of the gates would be reviewed the week commencing 23 October.
The full IMT met at 11am on 21 October when it was agreed to stand down
and revert to the Council’s normal out of hours emergency and civil
contingency procedures. The ERDO agreed to advise the Tayside LRP of this
decision at its next meeting later in the day. 
7.26 Council staff continued to carry out welfare checks in affected communities
and initial recovery/clear up activity was actioned in Invergowrie with
Operations staff removing large quantities of sludge and silt from the road and
path network and debris left by the flood water. A gully emptying vehicle was
also dispatched to Invergowrie on October 23 to provide additional cleans in
the most affected streets. 
Impact on roads 
7.27 The Council is working with Transport Scotland and the National Trust for
Scotland to repair a pedestrian footbridge on the river Braan which connects
Page 27 of 50

Page 28

Dunkeld with Inver after the bridge was damaged during storm Babet. Repair
work commenced this week (w/c 13 November) but no completion date is
available at the present time. 
7.28 On the C502 Rotmel road between Dunkeld and Dowally a section of
carriageway and embankment sustained damage during storm Babet which
has led to the road being closed. The Rotmel road remains closed while repair
option designs are being considered by Council staff. 
7.29 A further flood bulletin was issued on 27 October 2023 following Storm Babet.
Perth and Kinross Flooding Bulletin - Perth & Kinross Council (pkc.gov.uk) 
8. 27 – 29 OCTOBER WEATHER EVENT 
Notifications and Preparedness 
8.1 During the week commencing 23 October 2023 the Met Office first issued a
Yellow weather warning on Wednesday 25 October 2023, which covered
Thursday 24 October through to Saturday 28 October 2023, then a further
Yellow warning which extended through to Sunday. It is not usual for an
Incident Management Team meeting to be arranged when a Yellow warning is
issued, however given the already saturated ground from previous extreme
weather events an Incident Management Team (IMT) was held at 12.30pm on
Friday 2023. A further meeting was also arranged for later that day at 4pm. 
8.2 A large number of Perth Flood Scheme flood gates were already closed from
the previous extreme weather events at this point, although further closures
were undertaken so all gates other than the gates at the bottom of Charlotte
Road, Queens Bridge and Lower Friarton would be closed during the
weekend. 
8.3 Various preparatory activities were undertaken during the previous evening by
the RMP, including clearing trash screens, and monitoring flood storage
ponds. The normal stand-by arrangements were in place and there were
approximately 15 staff from the RMP that could be called in over the weekend.
Additional support was also made available from the Parking and Civil
Contingency team in the form of staff and vehicles, which were stocked with
sandbags to help affected areas if necessary. Housing Trades staff were also
kept on until later that today to cover emergency repairs. 
8.4 An Elected Member Briefing Note advising on arrangements for the weekend
was issued at 5.45pm on 27 October, with an updated note issued on 28
October. Social media updates were also provided throughout the day on 27
October on road closures. 
Response management 
8.5 Issues first began to be reported during the morning of Friday 27 October
2023. It was reported that the Burn was rising at Coupar Angus, therefore
sandbags were delivered. At Bridge of Earn a 3 inch pump was deployed by
the RMP early morning, which was later replaced with a larger 6 inch pump to
clear water at Back Street and Burnside following reports of surface water,
Page 28 of 50

Page 29

which was at risk of entering residential properties caused by vehicles driving
through the surface water. A pump was in situ until the water had been
cleared later that evening.  A gully motor was also sent to the area on
Saturday morning. 
Impact and recovery 
8.6 There were a number of further issues reported during the Saturday, which
required road closures, and the routine clearance of trash screens, however
there were no initial reports of flooding to any properties and no response
required. It was therefore agreed that no further IMT was required. 
8.7 To date, investigations indicate that approximately 4 properties have been
affected, with approximately 2 experiencing some internal flooding. 
9 FINDINGS, IMPROVEMENT ACTIONS AND CONCLUSION 
9.1 This review was established to consider the Council’s preparedness,
response and recovery from the weather events which impacted Perth and
Kinross during October 2023 and in particular the response to the weather
events of the 6-8 October. The findings of the review, and learning actions
based on these findings, are set out within this section against the key themes
within the scope, these being: 
- Notifications and Preparedness
- Response Management
- Impact and Recovery 
Notifications and preparedness 
9.2 The Council has plans and arrangements in place to respond to emergency
situations and these have worked well over many years. 
9.3 In the weeks leading up to the weather event, the Council had prepared its
annual winter resilience plan, subsequently signed off by its EI&ED committee
in early November, where it was recognised that the changing weather
patterns required consideration of a whole year resilience plan to be
developed and brought back to committee by June 2024. 
9.4 The Council had also undertaken a training exercise to test the deployment of
the Perth City Flood Defence System which was carried out successfully but
highlighted a defect in the deployment of one of the network of gates across
Perth city. 
9.5 Additionally, there is the ongoing leadership review and changes in the
leadership structure across the Council which will be finalised over the coming
months and it is required that this ensure that there is continuing robust
command and resilience management structures and processes in place. 
9.6 The Council was aware of the potential for the extreme weather events in
October 2023, which were set out in information provided by the Met Office
Page 29 of 50

Page 30

and SEPA and preparations were made accordingly, within the deployed
resources. This information was generally well utilised by the Council to
provide regular updates to the public in advance of weather events impacting
on Perth and Kinross and to share this information with local resilience
groups. However, it is it is clear than the impact of the extreme weather on
Perth and Kinross, particularly during the weekend of 6-8 October 2023 was
more severe than anticipated. 
9.7 Between 2 October and 6 October there were five Yellow weather warnings
issued, with the forecasted times and areas impacted changing with each
warning as the forecast was updated. Once the first Amber warning was
issued on the morning of 6 October action was taken to identify additional
staff volunteers to enhance standby arrangements in case they were required
however resources available at that time were not sufficient to mobilise and
deploy flood defence systems within normal operational timescales. 
9.8 In the lead up to Storm Babet the first Yellow warning was issued on 17
October, 36 hours before it was due to take effect. This additional notification
time, in addition to the learning from the impact of the previous weather event,
was beneficial in preparing the Council’s response. 
Improvement Action 
9.9 In addition to the agreed action from the Council’s EI&ED committee to
bring back an all year resilience plan by June 2024, officers review and
put in place new minimum staffing/stand-by levels at command and
operational levels to ensure resources are available, including the
utilisation of staff from other services, to successfully co-ordinate and
deploy all flood defence measures within timescales set within the to be
revised protocols. 
Incident Management, Resourcing and Response 
9.10 The period of the weather event fell during the October School holidays and in
advance of the move to the Council’s traditional winter response
arrangements, when additional staffing resources are deployed to address the
weather patterns over the period to April 2024. 
9.11 Based on the information collected during the review, it is evident from the
level of resources available that there were insufficient staff resources
available to effectively deploy the range of necessary measures, at speed,
during a significant weather event. 
Incident Management 
9.12 The Council has agreed protocol and command structure arrangements for
overseeing weather and other incidents and these were activated during the
period. It is recognised that not all weather events trigger the need for the
establishment of an Incident Management Team (IMT) nor the standing up of
the Local Resilience Partnership at a regional level. 
Page 30 of 50

Page 31

9.13 The requirement for this will be based on a risk assessment of the available
information and conditions. Not having an Incident Management Team does
not preclude direction and advice being sought and provided from across the
Council or from partners, and this was undertaken in the period leading up to
the 6 to 8 October, before the first Incident Management Team first met on
Sunday 8 October and through that day. Incident Management Teams
continued until Wednesday 11 October. Further IMTs were stood up in
advance of the arrival of and during the Storm Babet period before standing
down after the incident No IMTs were required for the period of the weather
event for the final weekend of the weather event. 
9.14 Officers recognise that some residents in Perth have criticised the visibility,
support, and effectiveness of the Council’s officers during the flood event on
Sunday 8 October 2023 and following. Ensuring that welfare needs are
consistently considered within Incident Management Teams both during and
following events will be built into the further training in terms of emergency
planning across the wider leadership team. 
9.15 As part of preparations for the Council’s new operating model and changes in
personnel as a result of the Leadership Review, it has been identified that
there is a need to ensure more officers are aware of, and involved in leading,
the response to incidents. Following the events over the period a session has
been held with the Extended Executive Leadership Team to widen awareness
of, and preparedness, for addressing incidents. Revised arrangements for the
strategic planning, operational oversight and response to incidents have also
been agreed, prior to the loss of experienced officers. 
Improvement Action 
9.16 Undertake further training in terms of emergency planning across the
wider leadership team to ensure resilience to deal with incidents. 
Operational Resourcing and Response 
9.17 The Council and the Roads Maintenance Partnership (RMP) had plans in
place to respond to out of hours emergencies and severe flood events and
these were initiated as appropriate and within the available resources. The out
of hours stand-by arrangements are insufficient to undertake the Perth Flood
Scheme Gate Closure Operational Procedures out with the Winter period, and
this was evident on 7-8 October 2023. It is important to recognise that the
height of the River Tay and the water flows on the 7-8 October 2023 were the
worst for more than 30 years, and as such is an extremely unusual situation.
However, for the same situation to be avoided in the future, the standby
arrangements need to be reviewed, which should include exploring the
opportunities for expanding the remit of council staff from other Council
services. 
Improvement Action 
9.18 The Council’s Out of Hours Standby arrangements be reviewed to
include exploring the opportunities for expanding the remit of staff from
other Council services.
Page 31 of 50

Page 32

Engagement with communities 
9.19 Individuals, businesses and communities played an important part in making
themselves more resilient and helping to reduce the impact of flooding. It is
important to note that those owners can take steps to protect their own
properties. Part of the Council’s public messaging was to direct people to the
Council’s website, Ready Scotland and the Scottish Flood Forum website
where there is information about the steps property owners can take. This
was even more evident in communities where residents have come together
to form Community Resilience Groups. 
9.20 The Community Resilience Groups at Alyth, Rattray and Aberfeldy made a
significant contribution towards minimising the impact of the extreme weather
events in their areas. Community Resilience Groups have a vital part to play
in ensuring that local communities are able to quickly access support in the
case of a severe weather event. The Council’s Parking & Civil Contingencies
Team continue to work to encourage and support new groups where there are
currently none with the aim of ensuring as many areas as possible establish
Community Resilience Groups. Officers also recognise that the best time to
galvanise support to establish such a group is in the immediate aftermath of
an incident and are therefore increasing efforts in areas where contacts were
established during the October events. 
Improvement Action: 
9.21 Continue to work with current Community Resilience Groups and build
on the success of these models, reflecting that public agencies
including the Council are unable to respond to all impacts across the
authority. 
Engagement with partners 
9.22 Over the period of the weather incidents, there was regular and ongoing
engagement with a range of partners, both in community and at a co-
ordinated level through established Local Resilience Partnerships, stood up
initially over 8 October and then redeployed in advance of Storm Babet.
Partners from the transport network and utilities networks were also engaged
and deployed to address incidents across the roads and drainage network as
well as responding to power outages in a number of communities, most
notably the village of Kettins. 
9.23 Overall, these arrangements worked extremely effectively and most notably in
the co-ordinated response to the flooding experienced in the Invergowrie area
during the Storm Babet event with colleagues from the Council, including the
Health and Social Care Partnership, Police, SF&R and Coastguard working
effectively alongside local community representatives. 
9.24 As is usual, the Local Resilience Partnership will undertake a review of the
response and this will take place at the end of November. 
Page 32 of 50

Page 33

9.25 Since the 6-8 October, Council officers have had a number of discussions
with key partners such SEPA and SSE Renewables. This has included a
discussion at Chief Executive and senior officer level between the Council and
SEPA.  From this, it was clear that there was some disparity of information
held between both organisations.  It was also agreed that the protocols in
terms of logistical and resource constraints requires to be reviewed. 
Improvement Action 
9.26 Review how the logging and sharing of information between partner
agencies is undertaken, building upon the conversations which have
taken place to date with SSE and SEPA 
Call Handling 
9.27 The Council’s Out of Hours Call handling arrangements are provided by
Aberdeen City Council, and this has been the case since 2010. In line with the
policy agreed by Environment and Infrastructure Committee following an
emergency motion, on the issuing of an amber warning officers will make a
request to Aberdeen for up to three additional call handlers. This request was
made prior to the extreme weather during the weekend of 7-8 October. 
9.28 A significant volume of calls were made to Aberdeen during that weekend,
with a significant number of these calls not answered. However, it is not clear
how many of these were repeat callers who did get through when redialling. 
9.29 After the Incident Management Team instructed that the Council’s Customer
Service Centre should be stood up on Sunday evening all but one of the calls
made to the Perth CSC were answered. However, given that this was in the
evening after the peak of the flooding incidents it does not provide a strong
indication the ability to have answered more calls locally than were answered
in Aberdeen, if the Perth CSC had been operational earlier. 
9.30 It should be recognised that it would be extremely difficult and unlikely to be
cost effective to put arrangements in place to deal with a very infrequent high
volume of out of hours calls inhouse, nevertheless, it can be concluded that
the current arrangements are not effective when having to deal with a
situation similar to that which incurred during 7-8 October 2023. 
9.31 Following criticism received at the Perth residents’ meeting about some of the
responses individuals experienced from the Out of Hours contact centre, a
review of how these calls were handled will be incorporated within the wider
review of out of hours customer contact arrangements. 
Improvement Action: 
9.32 A review of the handling of calls to the Out of Hours contact centre, as
well as a further review of the Council’s out of hours customer contact
arrangements should take place alongside the review of out of hours
standby arrangements. 
Perth Flood Scheme
Page 33 of 50

Page 34

9.33 Whilst the engagement with partners as set out in the previous section has
been broadly positive there remains a question over the engagement and
information sharing in relation to the data and decision making around the
operation of the Perth flood scheme over the weekend of 6-8 October. 
9.34 Weather and flood updates were provided by SEPA to the Council and other
partners in the lead up to the events of that weekend and there were a
number of conversations with colleagues from SEPA on Saturday 7 October
2023. However, the first time that the Council received information from SEPA
about the water flow and tide levels at Ballathie in the River Tay was at
8.14pm, which was just 1hr and 31 minutes prior to high tide. 
9.35 Notwithstanding the shortage of resources available noted above, this did not
provide sufficient time to put in place the Council’s operational plans. It is
therefore vital that the Council and SEPA work together to review the existing
communication protocols to ensure that they are sufficient to be able to deliver
the flood gate closure plan. 
9.36 An operational decision, based upon the timing of the warning, the information
provided by SEPA and the available resources not to initiate the flood gate
closure procedure (Plan 9) on the evening of Saturday 7 October 2023. This
decision was delayed until the following morning when SEPA provided further
information, which set out higher flow rate and a worsening potential flooding
position. As there had not been enough staffing resources available to close
the gates in line with the Plan 9 operating procedure, a decision was made to
deploy resources to Commercial Street and Perth Harbour to prioritise
vulnerable residents and businesses, and not the North Inch. These decisions
contributed to water breaching the flood gates at North Inch, particularly at the
War Memorial site, before they could be closed by council officers. 
Improvement Action: 
9.37 Review the Perth Flood Scheme Gate Closure Operational Procedure
document with SEPA. 
Communications and Engagement 
Internal 
9.38 The use of online resources and messaging amongst officers worked well and
enabled timely information to be communicated to the relevant officers, who
could assist in the response. 
9.39 The Elected Member Briefing Note process introduced in 2022 provided a
solid foundation for the regular distribution of updates to Elected Members
throughout each of the October weather events. Elected Members were also
copied into Adverse Weather Road Closure updates as they were issued
throughout each of the events, which allowed them access to the latest
information on road conditions within their ward, as well as providing an
overview of the impact of the weather across the whole area. 
Page 34 of 50

Page 35

Public Communications 
9.40 In each of the weather incidents information from partners on confirmed
weather warnings for Perth and Kinross were shared on the Council’s social
media channels, with links to where further information could be found. This
assisted with public awareness and provided the opportunity for property
owners to take appropriate precautions. 
9.41 Following the learning from the 7-8 October weather event additional
proactive media statements, also shared on the Council’s website and social
media statements, provided updates in the days ahead of the weather
incident about the Council’s preparations. This was a positive additional step
to help build public awareness and reassurance and will be considered for
future Amber warnings. 
Engagement with those directly impacted 
9.42 Whilst the focus of much of the resources deployed by partners in
communities was focused on responding to the impact of flooding on the
roads network and protecting properties the focus on those directly impacted
by flooding has been an area where there have been mixed experiences.
Whilst there have been examples of positive feedback on the visibility,
deployment and support from a wide range of council and partner services,
there has been criticism from a number of those individuals and businesses
directly impacted by flooding within Perth City Centre. A lack of visibility at the
height of the flooding on the October 8 has been fed back along with
comments on the sensitivity of the impact experienced by those who saw their
properties flooded. 
9.43 Engagement after the immediate impact in relation to the recovery process
and assistance with welfare checks and support was also highlighted by some
individuals as being a failing on the part of the Council. 
9.44 This has not been the feedback in other areas, including Aberfeldy where
individuals were asked re accommodation and other needs and similarly in
Invergowrie where the Council, Health and Social Care and colleagues from
blue light services supported the establishment of a rest centre during the
incident. 
9.45 More widely whilst there has been operational engagement of resources over
the period since the weather event, there has been no formal feedback
undertaken with local community resilience groups or other impacted
communities, beyond the engagement event with impacted residents and
businesses in Perth City Centre. 
9.46 Whilst it is recognised that there are improvements to be made in the
preparation for and response to the recent weather events, it is noted that in
many areas the Council and partners worked extremely well to respond to and
support communities across the authority. A significant number of Council
officers worked tirelessly during the extreme weather, supporting residents
and assisting in any way they could. A number of officers volunteered to come
on shift, chose to work during agreed holiday periods or worked unpaid to
Page 35 of 50

Page 36

support residents. Their efforts are recognised and are consistent with our
values as a public service organisation. 
Impact and Recovery 
9.47 The extreme weather events that affected areas of Perth and Kinross during
October 2023 had a significant impact on a number of our residents and their
properties, particularly on 7-8 October where the worst affected areas were
Aberfeldy, Perth City and surrounding area, whilst between 20- 22 October
2023 where the worst affected area was Invergowrie. However, all
communities were impacted to some extent with localised flooding, road
closures and power outages were experienced across Highland Perthshire
into Alyth, Blairgowrie, Coupar Angus, Kettins and other rural communities. 
9.48 It is also important to acknowledge that a Strathtay resident sadly died during
the flooding, and our thoughts remain with his family and friends. 
9.49 Over the weekend of 7-8 October, the primary adverse impact was on a small
number of properties in Perth City Centre in and around the North Inch,
Commercial Street and Tay Street. Whilst council and partners resources
were deployed into this area on these days and in the days to follow, the
feedback from a number of local residents and businesses, invited to meet
with the Council Chief Executive and officers, has been that there was a lack
of visibility by the council and questions raised over the welfare response
provided to those directly impacted during and after the flooding event.
Criticism of the clean up operation by the Council and Scottish Water was
also made. In response the Chief Executive has issued an apology to those
impacted where it was considered by residents that the response and support
did not meet with our organisational values and expected levels of support. 
9.50 Over the period of the 20-22 October when during this event there was a red
weather warning in place for much of Perth and Kinross, there was significant
disruption to the traffic network, impact on the power network, landsides, trees
down and at least one bridge outage. During this period the Council and
partners continue to deliver emergency responses, whilst a number of Council
services were suspended against national advice for only essential travel to
be undertaken. 
9.51 The main impacted community across Perth and Kinross was that of
Invergowrie where flooding impacted a number of properties and Council,
Health and Social Care, Police, SF&R and Coastguard services were
deployed alongside community resources. During the period a number of
properties were evacuated and a rest centre stood up. Post event the Council
mobilised significant resources to support the clean up operation in the local
area. 
9.52 More widely Council services and partners have continued to be engaged
across the authority, reinstating infrastructure and addressing road closures,
including the early reinstatement of the road near Glenlyon impacted by a
landslide. 
Page 36 of 50

Page 37

9.53 Ongoing engagement with local resilience groups has taken place however at
this stage no formal engagement and learning review has been carried out. 
Improvement Actions: 
9.54 Review of welfare response protocols and engagement with those
directly impacted, including follow up with affected individuals in Perth
City and Invergowrie. 
9.55 Establish formal feedback mechanisms from community resilience
groups to take on board learning and develop future response
arrangements. 
Author
Name  Designation Contact Details
Mark Butterworth 
Fraser Crofts 
Head of
Environmental &
Consumer Services 
Strategic Lead –
Environment &
Infrastructure
ComCommitteeReports@pkc.gov.uk
01738 475000
Approved 
Name Designation Date
Thomas Glen  Chief Executive 17 November 2023 
APPENDICES 
• Appendix 1 – Incident Planning/Standby Arrangements
• Appendix 2 – Improvement Plan
• Appendix 3 – Flood gate location map 
Page 37 of 50

Page 38

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment None
Strategic Environmental Assessment None
Sustainability (community, economic, environmental) None
Legal and Governance  Yes
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications  
Corporate Plan 
1.1 This report supports the following objectives within the Corporate Plan:- 
• tackling climate change and supporting sustainable places
• developing a resilient, stronger and greener local economy
• protecting and caring for our most vulnerable people
• working in partnership with communities
2. Resource Implications 
Financial 
2.1 The Council incurred a number of additional costs in response to the winter
flooding events, mainly in the form of officer time, over time and call out
allowance. The Council also incurred costs as a result of, for example of the
damage to the Glen Lyon road. 
2.2 The recommendations in this report could have financial implications,
however the exact extent of these cannot be quantified until a more detailed
analysis is undertaken. 
Workforce 
Page 38 of 50

Page 39

2.3 The recommendations in this report could have implications for Council officers,
and those within the Roads Maintenance Partnership, however the exact extent
of these cannot be quantified until a more detailed analysis is undertaken. 
Asset Management (land, property, IT) 
2.4 None. 
3. Assessments 
3.1 The Impact and Value Assessment Tool has been completed for this paper,
with the following findings: 
3.2 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. 
(i) Assessed as not relevant for the purposes of EqIA 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 However, no action is required as the Act does not apply to the matters
presented in this report. This is because the Committee are requested to note
the contents of the report only and the Committee are not being requested to
approve, adopt or agree to an action or to set the framework for future
decisions. 
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
Legal and Governance 
Page 39 of 50

Page 40

3.6 Officers from Legal and Governance have been consulted in the preparation
of this report. 
Risk 
3.7 Not applicable. 
4. Consultation 
Internal 
4.1 Officers from a number of services involved in the preparedness, response
and communications with regard to the recent extreme weather events have
contributed to this drafting of this report. 
External 
4.2 None. 
5. Communication 
5.1 Not applicable. 
2. BACKGROUND PAPERS 
2.1 Perth Flood Scheme Operating Manual
Page 40 of 50

Page 41

Appendix 1
INCIDENT PLANNING/STANDBY ARRANGEMENTS
INTRODUCTION
The Council has well established processes in place which have proven effective over
many years in relation to civil contingencies, emergency planning and business
continuity. This includes a concurrent risk approach to consider that more than one
incident may occur at the same time. This covers incidents such as severe weather,
power outage, civil unrest and cyber attack. 
The operational concurrent risk approach outlines the following assumptions as the
basis for continued planning and preparation:  
1. weather pressures, such as flooding, severe snow and additional burdens on
the health, social care and education systems may be heightened due to
seasonal flu and other illnesses. There are, of course, other hazards and
threats evident as per national and regional risk registers such as a total loss
of utilities and the ever-present threat of cyber-crime. In reality, there is a risk
that any event can happen at any time of the year. 
2. the Council (and the Local Resilience Partnership) have well-rehearsed plans,
procedures and structures in place, which are adaptable to a range of
scenarios. Our collaboration in preparation for, and our sustained response to,
a range of previous incidents, provides a level of competence and confidence
in our ability to respond and recover. 
3. as we become a leaner organisation, this creates challenges in sustaining our
resilience. We must therefore have regard to the impact on our workforce
alongside the prioritisation of agreeing what is essential for service delivery. 
4. timeous and targeted communication forms an essential part of the Council
response
In the event of a major civil emergency during working hours requiring the assistance
of Perth & Kinross Council services, initial contact is with the Service Manager,
Parking, Public Transport and Civil Contingencies (or nominee), and the Executive
Director (Communities) (or nominee). 
Outwith normal working hours, the Council has an emergency duty rota in place
which operates 365 days a year, 7 days per week and 24 hours per day. A pager
service is out with working hours by a team of 5 Emergency Response Duty Officers
(ERDOs). The ERDOs will stand-up Council assets as required in the context of the
emergency. In addition to this, Parking & Civil Contingencies have a duty manager
and two Parking Attendants on standby should an immediate response be required
on the ground during “out of hours”. The team also has the ability to place up to an
additional 24 staff on standby when required. 
4
Page 41 of 50

Page 42

WEATHER RELATED APPROACH 
In addition, to the Emergency Duty arrangements, the Roads Maintenance
Partnership Out of Hours Stand By arrangements are in place, which provide the
basis on which extreme weather events are managed. These include: 
• Yellow Warning from the Met Office 
The only action taken by the Council on the issue of a Yellow weather warning is to
close the flood barriers on the South Inch and to maintain a watching brief, as
agreed by the Environment and Infrastructure Committee. 
• Amber Warning from the Met Office 
On the issuing of an Amber flood warning an Incident Management Team (IMT) may
be held to discuss the forecast weather event and ensure that the necessary
resources are in place to respond if required. This can be undertaken virtually with
key service areas. This includes requesting additional “out of hours” call handling
resources from Aberdeen City Council’s Customer Contact Centre. It is important to
note that there is no prescribed circumstances when an IMT would be called,
therefore this is a risk based approach by the nominated Gold Commander. 
PERTH FLOOD SCHEME
The Perth Flood Scheme is managed and operated on behalf of the Council by the
Roads Maintenance Partnership (RMP) and has been since its inception in 2001.
The operational manual was developed utilising data provided by the scheme’s
design consultants relative to the level of protection the scheme gives. The scheme
is designed to protect Perth City from flooding from the River Tay and consists of 77
operational flood barriers (gates) that require varying levels of intervention to put in
place. It is also important to note that 10 barriers are permanently closed, and a
further 10 closed during the winter months (1 October – 31 March). 
With the exception of the closure of the gates on the South Inch, the Flood Gate
closure triggers do not include Yellow or Amber warnings issued by the Met Office.
The triggers are based around tide levels and water flow data, which SEPA have
provided to the Council, and this data is applied to a “gate closure” table (referred to
as Table 15). The Flood Protection Scheme also includes 12 operational (or gate
closure) plans, and the appropriate one is initiated based upon the data provided by
SEPA based on a template. 
Page 42 of 50

Page 43

SEPA play an important role in the Perth Flood Protection Scheme. The Operating
Manual states that:
In response to the special requirements of Perth, SEPA have agreed to provide the
following warning services to PKC: 
1.  An advance warning whenever conditions in the upper catchment of
the Tay indicate that exceptional river flow may result.
2. An advance warning if Met. Office tidal surge forecasts indicate that a
tide higher than 2.9Mod at Newport is expected.
3. A flood warning when the combined flow of the Tay and the Tummel at
Ballinluig exceeds 550m3/sec, indicating flow at Ballathie,
immediately upstream of Perth, of more than 800 m3/sec.
4. Notification of amber and red flood warnings for the River Almond
5. Periodic updates of the fluvial and tidal situation flowing either 2 or 3,
in particular informing PKC when the fluvial or tidal thresholds shown
on Table 15 are likely to be exceeded.
6. An “all clear” report when the flood risk has passed.
A full gate closure from a standing start can take around 5 hours, in poor weather
conditions from the time which crews leave the depot. Four crews of three operatives
are required, plus a specialist hi-ab operator and a supervisor for each crew, which
totals a minimum of 17 people to deliver the closure in this timescale. A hi-ab
operator is required, as some of the larger gates with in excess of 500lbs and the
gates at Queens Bridge are modular and require lifting in. These four crews   are
dispatched to key locations across the scheme, in line with the relevant gate closure
plan. However, each of the 12 gate closure plan requires a different level of
resource.
STANDBY ARRANGEMENTS
During working hours, the Council and Tayside Contracts, via its Road Maintenance
Partnership (RMP) and Parking & Civil Contingencies Team have significant
resources in place to manage severe weather events. In addition, further support
can, if necessary, be provided by other teams such as the Customer Contact Centre,
Community Safety Officers and Housing colleagues. 
During non-working hours, stand-by arrangements are in place, which during the
summer months involve 6 operatives from the Roads Maintenance Partnership (2 at
Blairgowrie Depot, 2 at Aberfeldy depot, and 2 at Ruthvenfield Depot) plus/or
including a Gully Motor operator. This is increased significantly in the winter period to
up approximately 30 operatives. The winter period is outlined in the policy report
approved by the Environment, Infrastructure and Economic Development Committee
each year. This arrangement is in place because, during the winter period, the stand-
by arrangements are designed to cover surface treatment during periods of cold
weather.  
Page 43 of 50

Page 44

The majority of Council services do not have stand by arrangements in place,
although as outlined above, the Council operates a rota of Out of Hours emergency
duty officers, which is discussed in more detail below. In addition, the Council has
Out of Hours customer contact arrangements with Aberdeen City Council. This
service covers emergency housing repairs and general enquiries. 
HOUSING OUT OF HOURS 
The Housing Repairs Service repairs and services the Council’s housing stock and
provides an out of hours emergency repairs service. The following out of hours
service is provided to tenants:
• After 5pm and during the weekend and public holidays, all housing
repair calls are handled by Aberdeen City Council, supported by a
Repairs Inspector on stand-by.
• All repairs are directly scheduled by Aberdeen with the relevant Trade.
• With any complex issue or concern, the Standby Repairs Inspector is
contacted. 
• Volume and nature of calls with Aberdeen are closely monitored by the
Repairs Inspector and thresholds are in place for the Repairs Call
Centre to take back all housing repairs calls from Aberdeen.  
• A Duty Manager is also available to support the Repairs Inspector.  
• A shadow rota (Repairs Advisors, Trades, Inspectors and Managers) is
activated should volume of calls and work orders reach a threshold that
current out of hours service cannot cope with or respond to effectively. 
HOUSING ADVICE AND HOMELESSNESS ASSISTANCE  
The Housing Options and Support Team provides housing advice and assistance to
those in housing need or with a housing issue.  The Team also provides an out of
hours service to those tenants and residents requiring emergency accommodation
due to homelessness or through adverse weather or a significant incident.  The
Team will: 
• Offer a range of advice and support – to keep the person / household
safe.
• Provide emergency accommodation – hotel or B&B or temporary
accommodation within the Council’s portfolio during working hours or
through its out of hours service based at Greyfriars House. The out of
hours service is supported by a Duty Manager on call 24 hours. 
• Provide support – food, clothing, travel warrants, assistance with
transport etc.
• Store belongings.
• Liaise with landlords on behalf or private tenants. 
• Liaise with other services - Welfare Rights, HSCP, voluntary sector etc. 
Page 44 of 50

Page 45

HOUSING LOCALITY TEAMS 
Our Locality Housing Teams work in their communities in partnership with
tenants/residents, other agencies and colleagues from across the Council to provide
high-quality joined-up services for people who need them.  When there is a weather
event or an incident that could impact on council tenants and their homes, Locality
Housing Teams will:  
• Undertake welfare checks (phone or in person) on the most vulnerable
tenants.
• Contact tenants living in properties at risk (flooding).
• Arrange for support and assistance to be provided – food parcels,
meter top ups, water, heaters, alternative accommodation etc.
• Ensure appropriate communication and updates are provided through
the social media channels, noticeboards and staff updates.  
• Liaise with other services - Welfare Rights, HSCP, voluntary sector etc. 
HEALTH AND SOCIAL CARE
Care at Home services have Business Continuity Plans in place, which are actioned
as required. Lists of vulnerable people are reviewed regularly and prioritised in
relation to risk. Where appropriate, families are contacted and asked to provide
support in event of carers being unable to reach them. Depending on the level of
risk, volunteers are put on stand-by to open Emergency Rest Centres if required, for
which regular refresher sessions are held. Contact lists of volunteers are also
reviewed and updated regularly. The Social Work Out of Hours Service is also
available to support as required out with office hours. 
Page 45 of 50

Page 46

Weather Incident Management Team 
AGENDA 
1. Weather forecast and Situation Update 
2. Command Structure 
3. Update from Services
• Roads Maintenance Partnership
• Flooding Team
• Transport
• Operations
• Housing
• Education & Children’s Services
• Health & Social Care
• Communications
• Customer Service Centre
• Parking and Civil Contingencies
• Emergency Planning
• Live Active Leisure 
4. Agreed Actions 
5. Communications 
6. AOCB 
7. Next Meeting Date 
Page 46 of 50

Page 47

Appendix 2 
Improvement plan
Theme Ref.
no.
Activity Responsible Officer Timescale Comments
Notifications and
preparedness
1 Report to EI&ED on resource
requirements to support year-round
resilience.
Strategic Lead –
Environment &
Infrastructure
No later than June
2024
Process already
underway 
2 Officers to review and put in place new
minimum staffing/standby-levels at
command and operational levels to
ensure resources are available to
successfully co-ordinate and deploy all
flood defence measures within
timescales set within the to be revised
protocols (action 8 refers).
Roads Maintenance
Partnership Manager
By June 2024 To be undertaken in
conjunction with action
4
Process already
underway
Incident Management,
Resourcing and
Response
3 Undertake further training in terms of
emergency planning across the wider
leadership team to ensure resilience to
deal with incidents
Strategic Lead –
Strategic Planning,
Policy & Resources
By March 2024 Process already
underway 
4 The Council’s Out of Hours Standby
arrangements be reviewed to include
exploring the opportunities for
expanding the remit of staff from other
Council services.
Strategic Lead –
Environment &
Infrastructure
By March 2024 To be undertaken in
conjunction with
actions 2 and 7
Process already
underway 
5 Continue to work with current
Community Resilience Groups and build
on the success of these models,
reflecting that public agencies including
the Council are unable to respond to all
impacts across the authority
Strategic Lead –
Housing & Communities
This is an ongoing
action, which is
monitored within the
service. 
4
Page 47 of 50

Page 48

6 Review how the logging and sharing of
information between partner agencies is
undertaken, building upon the
conversations which have taken place to
date with SSE and SEPA
Strategic Lead –
Environment &
Infrastructure
By March 2024 
7 Undertake a review of the handling of
calls to the Out of Hours contact centre,
as well as a further review of the
Council’s out of hours customer contact
arrangements
Strategic Lead –
Environment &
Infrastructure 
Strategic Lead –
Customer & Digital
Services
By March 2024 To be undertaken in
conjunction with action
4
8 Review the Perth Flood Scheme Gate
Closure Operational Procedure
document with SEPA
Strategic Lead –
Environment &
Infrastructure
By June 2024 To be cross-referenced
with action 2
Impact and Recovery 9 Review of welfare response protocols
and engagement with those directly
impacted, including follow up with
affected individuals in Perth City and
Invergowrie.
Head of Environmental
& Consumer Services 
Senior Service Manager
Housing 
By 23 December 2024 
10 Establish formal feedback mechanisms
from community resilience groups to
take on board learning and develop
future response arrangements
Strategic Lead –
Housing & Communities
By March 2024 
Page 48 of 50

Page 49

4
Page 49 of 50

Page 50

Page 50 of 50