Key Improvement activities from CDIP 2024-25                         Appendix 4 
The following section provides an update on improvement actions included in the Corporate Delivery Improvement Plan 2024/25,
approved at Council on 15 May 2024. 
Priority: Tackling Poverty
What improvements
do we want to
achieve? 
How will we make
these
improvements? 
How will we know
if we have been
successful
(Baseline included
for reference)  
Strategic
Lead 
Target
Date 
Progress Update 
A co-ordinated and
collaborative approach
with partners and
communities to
mitigate the impact of
poverty across Perth
and Kinross 
An overarching
Poverty Strategy,
including key strategic
actions for 2024/25 to
prevent and mitigate
the impacts of poverty
for children living
locally, will be
considered later in
2024 
Performance
measures will be
agreed as part of
the Poverty
Strategy (including
baselines)
Strategic
Planning,
People and
Performance
March
2025
A Tacking Poverty Strategy was approved in November
2024. An action plan which includes actions and
performance measures has been developed by the
Anti-Poverty Task Force.  This is currently being taken
forward by thematic sub-groups for delivery.
Encourage and
maximise the update
of all supports targeted
for children and young
people to reduce costs
and to reduce the
impact such costs
have on the outgoings
of families in poverty 
Increasing uptake of
free school meals for
eligible children 
A 5% increase of
uptake of free
school meals 
Baseline: 2022/23:
65% (primary
pupils); 43%
(secondary pupils) 
Education
and
Learning 
March
2025
2023/24: 65% Primary, 53% Secondary
2024/25:  66% Primary, 60% Secondary 
While the uptake of Free School Meals (FSM) has
increased among secondary pupils, Primary uptake has
not increased significantly and overall, there has only
been a slight increase of around 1% in uptake.  The
uptake of FSM has been actively promoted by schools
and by the corporate communications team to
encourage applications and uptake. Support is also
provided for families to complete applications.
Encourage and
maximise the update
of all supports targeted
for children and young
Reduce the cost of the
school day
Schools using the
Cost of the School
Day toolkit with
Education
and
Learning
March
2025
The majority of schools have now included Cost of the
School Day within their school improvement plans and 
Cost of the School Day guidance has been published.

Page 2

2 
Priority: Tackling Poverty
What improvements
do we want to
achieve? 
How will we make
these
improvements? 
How will we know
if we have been
successful
(Baseline included
for reference)  
Strategic
Lead 
Target
Date 
Progress Update 
people to reduce costs
to reduce the impact
such costs have on the
outgoing’s families in
poverty 
action plans in
place 
Quality Improvement Officers are following up with the
remaining schools, and Cost of the School Day plans
are now integrated within School Improvement
paperwork. 
Impact will be measured over the course of 2025/26
based on measures included in the plans submitted.
Increasing uptake of
the National
Entitlement Card for
free bus travel to
reduce travel costs
Run drop-in sign up
sessions to support
people who have
challenges to sign up
online. 
A 5% increase in
uptake of the
National
Entitlement Card
amongst under-
22s. 
Baseline: March
2024 18,742 of
under 22s with a
card, 69.4% of
under 22s in P&K
Strategic
Planning,
People and
Performance
March
2025
March 2025 – 20,323 young people between 5 – 21
years with a card – 77.5% of U22s in PKC – this is an
increase of 8.1% compared to the previous year and
above the 5% increase target.  Of the young people 5 –
11 years, 45% with a card, of the young people 12 – 21
years, 99.6% with a card.   
Comms have been issued throughout the year, on the
Council’s social media platforms and on the real time
information screens promoting the free 60+, disabled
and U22s free bus passes.  The free first Saturday in
the month bus travel was also promoted in these areas.
Promote NEC take up
alongside free
Saturday bus travel
marketing activity

Page 3

3 
Priority: Tackling climate change and supporting greener sustainable places
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target  
Date
Progress Update 
Ensure we
have a cleaner
and greener
Council fleet 
Implement the Fleet
Decarbonisation
Strategy for Perth and
Kinross Council
From 2025 100% of all
fleet vehicles under 3.5
tonnes which reach the
end of their useful life or
lease period to be
replaced with electric
vehicles
Baseline: In 2022/23 17
fleet vehicles were
electric (4% of total fleet)
Environment
and
Infrastructure 
March
2025
The Fleet Decarbonisation Strategy was approved by
the Climate Change & Sustainability Committee in April
2025, with the aim of aligning fleet purchases with
future developments in technology, and with the aim of
increasing the number of Low Emissions Vehicles
(LEVs) within the Council fleet between 2025-2030. 
We continue to closely scrutinise UK and Scottish
Government targets relating to green transport to
ensure that we continue to adhere to these. We also
participate in Transport Scotland’s Policy Consultative
Group. In 2024/25, 4.5% of the Council’s fleet were
electric or powered by other zero direct carbon fuel
technologies, above the target of 3.85% with three
electric vehicles purchased in the year.
Develop local
public
transport
solutions
which set the
needs of
residents and
the
environment
as top priority 
Consider how
subsidised local bus
services could be
configured to be more
effective, efficient and
economic, addressing
equality issues and
environmental
commitments
Develop a fully costed
business case for new
models of public
transport delivery
Scoping of proposals and
project plan developed
Establish baseline for
number of journeys
delivered through
subsidised local bus
transport, including
existing support provided
through Demand
Responsive Transport
and Community Transport
Housing and
Communities 
March
2026
PKC IT department have built a Power BI dashboard
for reporting and analysing on bus passenger and
revenue information.  PTU have set up data feeds from
the bus companies who use Ticketer electronic ticket
machines and also a data feed from Stagecoach East
Scotland’s electronic ticket machines.  The Demand
Responsive Data can be inputted manually from
monthly returns.
Consultants have been engaged to support the Council
in the delivery of the outline business case and five
workstreams have been established.
Improved
energy
efficiency and
A Local Heat and
Energy Efficiency
Strategy (LHEES) will
Progress on LHEES.
Performance measures
on this improvement will
Economy,
Development
and Planning
March
2025
The final approved LHEES and Local Area Energy
Plans were published in May 2024.   Following
publication, a KPI framework has been developed and

Page 4

4 
Priority: Tackling climate change and supporting greener sustainable places
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target  
Date
Progress Update 
reduction in
carbon
emissions in
the Council
estate
be published in May
2024
be agreed as part of
LHEES 
external delivery groups have been established.  Key
LHEES delivery actions have been progressed
including option development for a new Perth City
Centre Heat Network and Heat Network Designation
Zoning across Perth and Kinross more widely. 
This Council continued to fund SCARF to provide free
home energy advice. This benefitted over 1638
households, helping to increase the warmth of homes
while bringing down fuel bills and lowering emissions.
As a result, £3,360 of fuel debt was written off,
relieving immediate pressure for households in crisis.
558 households were provided with face-to-face
support and personalised advice and interventions that
helped them take control of their energy usage. This
advice delivered an estimated £51,661 in household
savings and 123.56 tonnes of carbon dioxide
emissions savings. Last, 108 onward referrals were
made to additional schemes and support services,
ensuring clients could access everything from energy
advice funding to welfare rights advice.
Increase
provision of
biodiversity
sites 
Developing a long-term
plan for managed
grassland areas
Increase volume of uncut
grassland areas 
Baseline: 2023/24 40.4ha
(53.68 acres)
Environment
and
Infrastructure 
Housing and
Communities
March
2025
The grassland management trials were further
extended in 2024/25 to include all sites in Perth and
the surrounding landward areas towards Dundee. 
This forms part of the ongoing development of a long-
term plan to support a “long grass” approach across
Perth and Kinross. As part of ‘Grow Wild’ Phase 1, the
area managed under this approach has increased from
49.16 hectares to 121.5 hectares in 2024/25.
Initial monitoring shows that unmown areas support
greater biodiversity, with increases in both insect and

Page 5

5 
Priority: Tackling climate change and supporting greener sustainable places
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target  
Date
Progress Update 
Increase
provision of
biodiversity
sites 
flower populations. This contributes to reversing the
decline in pollinators—essential for food production—
and supports efforts to halt biodiversity loss.
Delivery of UK Shared
Prosperity Fund funded
Biodiversity Towns and
Villages Project and the
Greening Industrial
Estates Project
Increase in number of
biodiversity interventions 
Baseline: 2022/23 – 64
biodiversity interventions
completed
Environment
and
Infrastructure 
Housing and
Communities 
March
2025
114 community engagements carried out for
Biodiversity towns and villages. 
Biodiversity towns and villages help to create habitat
and the monitoring contributes to national recording
statistics to show the changes nationally.
Raingardens help to mitigate flooding. 
Activities delivered include: 
• 10 community mapping sessions; 
• 11 events (Gardening for Wildlife, Amphibian
Ladders, Scottish Swift Conference, Portmoak
Gala, Hedgehog Highways); 
• 27 site visits & recces; 
• 2 volunteer sessions; 
• 5 tutorials; 
• 18 Snowdrop plantings; 
• 27 swift box installs;
• 7 meetings in person or online; 
• 7 interactive Zoom conferences; 
• 226 fruit tree plantings, 
• 18 Mag/BeePost installs (will update).
• 5 Businesses received non-financial support.
• 2 SuDS raingardens implemented.

Page 6

6 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
Unlock new
investment in
employment
and housing
land to
support
business
growth in new
growth sectors
Commence design
work and
development of Perth
West Eco Innovation
Park
Level of business interest
in Perth West
demonstrated by leasing
or buying land Baseline:
new measure, baseline
data to be established
2024/25
Economy
Development
and Planning 
March
2025
Design work has already commenced with respect to
opening up the 11ha of land that will form the first
phase of the Perth Eco-Innovation Park at Perth
West.  Ground investigations have been carried out
and Heads of Terms will soon be agreed allowing the
transfer of land to the Council.  A commercial real
estate and property investment consultancy (JLL)
began work in May to review market conditions and
recommend a development partner who can work
with the Council to realise the employment potential
of the site. 
There is a steady level of interest from businesses in
industrial sites and premises that the Council owns or
manages including Northfield Business Park. 
Enquiries from companies looking for new premises
in existing commercial business complexes remains
steady.  A baseline measure for this KPI is in the
process of being established. 
Make Perth
and Kinross a
more
competitive
inward
investment
destination
and
encourage
investment for
growth from
Developing and
improving Invest in
Perth information and
support for new and
existing businesses
investing in Perth and
Kinross 
Introduce Business
Enquiry Management
Increased levels of
interest and awareness in
inward investment
opportunities in Perth and
Kinross 
Baseline: new measure,
baseline data to be
establish in 2024/25
through the new Business
Enquiry Management
Economy
Development
and Planning 
March
2025
In October 2024, we launched a refreshed Invest in
Perth website designed to promote Perth and
Kinross as a prime location for doing business. The
new site targets both local businesses seeking
support and those interested in inward investment
and land opportunities. With a cleaner, more user-
friendly design, the website serves as a hub for
signposting to business support agencies while
showcasing current investment prospects.

Page 7

7 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
existing
businesses in
key growth
sectors 
System to provide
more data and insight 
System being introduced
in 2024
In January 2025, we launched and implemented our
new Customer Relationship Management (CRM)
system. This allows us to track all business
interactions and engagements and monitor business
opportunities and challenges.  
Make Perth
and Kinross a
more
competitive
inward
investment
destination
and
encourage
investment for
growth from
existing
businesses in
key growth
sectors 
Working more closely
with Business
Gateway, Growbiz
and key businesses
and sector
representatives
Increased levels of
interest and awareness in
inward investment
opportunities in Perth 
Baseline: new measure,
baseline data to be
established in 2024/25
through the new Business
Enquiry Management
System being introduced
in 2024
Economy
Development
and Planning 
March
2025
252 Business start-ups were supported by Business
Gateway; this is an increase compared to 23/24
figures. Our New Start and Pre-Start Plus (previously
Early-Stage Growth) target (20) exceeded, with over
22 businesses supported. Perth and Kinross had the
highest BG Growth referrals across Tayside with 23,
which are businesses with projected turnover
increases of £200k+.  Funding is provided to
GrowBiz to support start-up micro enterprises/self-
employed individuals and social enterprises in rural
Perth and Kinross. Support is also provided for
developing an enterprising culture in young people
and in rural communities.  The 2024/25 target for
Enterprise Support for GrowBiz was 45 businesses a
month, totalling 180 over a 12-month period.  This
target was exceeded with a total of 254 businesses
receiving enterprise support in 2024/25.  231
businesses attended learning & networking sessions,
exceeding the target of 180.  43% of businesses
supported in 2024/25 fell into the category of Perth
and Kinross Council's targeted growth sectors.  The
number of new businesses that started trading with
the assistance of GrowBiz was 76.  Perthshire
Artisans had a target to support 36 creative sector
businesses and was supporting 168 by the end of
the 2024/25 financial year.

Page 8

8 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
Increased
number of
businesses in
the creative
and digital
industries 
Renewed focus on the
visitor, cultural and
creative economy as a
result of greater
collaboration through
the new focussed
delivery structure. 
Demand for business space
for creative and digital
industries will increase 
Baseline: new measure,
baseline data to be establish 
In 2024/25 through the new
Cultural Database in
progress for 2024
Economy
Development
and Planning 
March
2025
Perth and Kinross now hosts 355 registered creative
businesses, with initiatives underway to grow this
number. The Culture Strategy 2023–2025 is being
actively progressed, embedding culture as a driver
of economic growth.
Perth’s UNESCO City of Crafts and Folk Art status
is enhancing its profile, supported by a programme
of impactful local and international projects. The
Famous Grouse Ideas Centre continues to support
innovation, entrepreneurship, and digital growth,
with programmes like The Angel’s Share attracting
investment and supporting business
development. Techscaler has established a regular
presence, helping build a strong tech community
and promoting Perth and Kinross as a hub for digital
business. 
Unlock private
investment and
expertise to
support public
and private
energy projects    
Develop a Strategic
Energy Partnership with
private partner and
pipeline of energy
investable projects
Increased investment in
energy projects shown
through number of strategic
cases approved for delivery
which include financial
investment 
Baseline: new measure,
baseline data to be establish
in 2024/25 
Increase in number of
registered businesses in
energy
Economy
Development
and Planning 
March
2025
We are progressing the Strategic Energy
Partnership approach and have received advice
from our legal advisers on the appropriate delivery
models – based on other experience from similar
models from across the UK.  A draft Procurement
Strategy will be agreed by an officer Board
currently being established.  A Competitive
Dialogue process will be used to select a private
sector partner which should be announced by
March 2026.

Page 9

9 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
Baseline: established in
2022/23 Annual
Performance Report
More people
choose Perth
and Kinross as
a destination
for holidays
and day trips
Increased promotion of
consumer and visitor
offer via Perth City and
Towns website and
social media channels 
Deliver national and
international tourism
campaigns with Visit
Scotland. Attend or be
represented at national
and regional travel trade
events
Increased consumer and
visitor expenditure, dwell
time and overnight stays.
Baseline: 2022 
Direct tourism expenditure:
£463.48 million
Average length of stay
(staying visitors): 3.1 days 
Economic impact of tourism:
£646.50 million
Economy
Development
and Planning 
March
2025
Perth City & Towns is the promotional arm of Perth &
Kinross Council in terms of residents and visitors,
overseeing the marketing and promotion of Perth City
and the surrounding towns, large events, and footfall
drivers, as well as tourism initiatives for the area, The
website offers promotional opportunities for retail,
hospitality businesses, visitor attractions and event
organisers via a multi-platform marketing strategy and
vibrant, varied programme of events. Perth City and
Towns Website – 
108,685 Active Users - 57,670 of which is organic
search. 
Top Location – London with 23,169
Followed by Perth – 17,604  
Edinburgh, Dundee and Glasgow. 
Locations spanning across the UK.   
Social Channels: 
Facebook 33K followers 
Twitter / X 11K followers  
Instagram 7K followers.   
Mailchimp Newsletter – 23K – Monthly Newsletter
advertising what’s on across the region.   
We delivered a series of creative campaigns and events
to promote Perth city centre and support local
businesses. Notable new additions included Perth

Page 10

10 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
Cocktail Week, which showcased 35 venues and
generated an economic impact of £263K, and the Street
Life Campaign, which highlighted over 130 independent
retailers, reinforcing Perth’s identity as a hub for unique,
local shopping. 
Other initiatives included Perth Eat Week, the launch of
a new City Centre Map, and continued promotion of the
Perth & Kinross Gift Card, all aimed at boosting visibility
and footfall across the city.  
Events are the most popular pages with the Christmas
Blog generating 21,158 page views, followed by the
events and festivals blog generating 19,341 page views. 
Perth City and Towns platform will continue to be used
to promote the region. The website will undergo a
rebuild in 2025/2026 to further enhance the brand,
improve navigation, refresh content whilst also adding
additional functions to support promoters and end users.  
Further
enhance our
employability
outreach
capacity,
supporting
individuals in
community
settings   
Review and increase
the number of
employability outreach
locations and frequency
Increased numbers of
individuals supported in
targeted locations and
overall increase in number
of people supported 
Baseline: 2022/23 - 215
number of people supported
in outreach locations
Economy
Development
and Planning 
March
2025
We have increased the number of people supported
overall, including within key priority areas. Within
2024/2025 we have supported 199 parents with 45 of
those participants moving into Self-employment 13 of
which were supported with childcare whilst moving
back into employment. 119 participants have been
successful at accessing our training grant which is in
place to upskill or gain a new qualification.  While
direct outreach remains a challenge, we have
strengthened local visibility and access by working
through trusted partners, improving referral routes,
and responding quickly to identified needs. Working
in partnership with different services at the NEXT

Page 11

11 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
STEPS 4 ALL employment drop ins at Letham 4 all
we have seen 21 clients engage with us since this
began in March 25’   We are a referral pathway on
FORT giving better access to employability services –
1 referral from a different agent so far but support is
now in place.   
Crieff community campus remains an outreach hub
on the first Thursday of every month – the staff were
keen to give us a bigger presence in the library
allowing us to connect with book bug attendees.   
Recognising challenges around traditional outreach,
our approach has focused on making ourselves more
visible and accessible where families already are –
flexibility has been key. Strengthening warm referral
pathways through partners such as Business
Gateway and establishing a regular presence at The
Hub – allowing families to meet with us in trusted,
familiar spaces. We are collaborating and working
together to improve visibility – employability board/
flyers on tables and marketing for tv screen in main
foyer.

Page 12

12 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
Attainment at key
milestones is raised
for all children and
young people 
Using health and
wellbeing census
data to inform
school level
improvement
plans 
PKC attainment for each
of the indicators within the
Corporate Plan will
increase to at least target
levels. 
Baseline: established in
2022/23 Annual
Performance Report
Education
and
Learning 
February
2026
For Session 2024/25:31% of primary schools had
included a priority addressing Health and Wellbeing on
their School Improvement Plans:
22% of primary schools identified the Nurturing Schools
programme
13% identified Relationships and Behaviour
10% identified Health and Wellbeing curriculum
development
Over 70% of schools have now engaged with the
Nurturing Schools Programme. 
Increase the number
of young people
going into positive 
destinations such as 
work experience, 
further education, 
volunteering and 
employment 
By placing an 
Employability
Youth 
Worker in each 
locality to liaise
with 
school 
Early intervention
approach in
Increase in school leavers
entering positive initial
destinations 
Baseline: 2022/23
(95.97%) 
Education
and
Learning 
March
2025 
Summer leaver data is not yet available for 2024/25,
however for 2023/24 the percentage of school levers
entering an initial positive destination increased to 96.4%
from 95.97% in 2022/23. 
Over the course of the year, an internal Work Placement
Assessors course has been delivered in conjunction with
the corporate Health and Safety team.  20 staff have now
been trained, including Employability Youth Workers. 
This has built additional capacity for work placements to
be arranged and by training the Employability Youth
Workers, those who are most at risk of not achieving a

Page 13

13 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update 
school and
delivery of
employability
programmes 
positive destination can be prioritised for work experience
placements. 
The number of pupils undertaking work experience
placements has increased to 596 in 2024/25 and is on a
steady upward trajectory from 264 in 2021/22.
External funding has been secured to run a pilot
Enterprise and Employability programme at Perth High
School for S3 pupils who are at risk of not achieving a
positive destination. YMCA are working with groups of 6-
8 young people in each school with a focus on
employability skills.
The impact of the programme includes an Employability
Award at SCQF Level 4 which all participants are on
track to achieve. This recognises improved consistency in
attendance and engagement, improved attitude towards
youth workers, improved engagement in accredited work
and participation in wider opportunities.  Those delivering
the programme reported improved engagement,
development of key life skills, and increased self-
confidence among participants, many of whom may
underachieve within the school environment and leave
school with no positive destination.
A school
atmosphere
conducive to
Implementation of
the updated Anti-
Bullying Strategy
Schools will have robust
procedures to reduce
Education
and
Learning
March
2025
The PKC Anti-Bullying Strategy and supporting
Operational Guidance were published in June 2024.
These support children, young people, parents and staff

Page 14

14 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
learning and
personal
development, where
children and young
people feel safe,
secure, listed to and
have their views
taken into account
on issues that affect
them
which will include
key strategic
actions for
2024/25 
bullying in line with
improving relationships     
in schools and ELC settings to feel be informed on
approaches to prevent bullying and be confident that
bullying can be addressed wherever it happens. 
Schools are using these to inform the development of
local procedures, appropriate to their own context.
Considerable work has been undertaken on
Relationships and Behaviour with the promotion of a
culture and ethos within our settings where positive,
respectful relationships and valued and invested in. 
Guidance on relational approaches has been shared with
schools. Support and professional learning has also been
provided to ensure that respectful relationships and
positive behaviour are a foundation of practice within
schools and ELC settings. The most recent available data
for 2024/25 shows a reduction of 7% in the number of
bullying incidents recorded when compared with the
previous year.
Improved
understanding of
causes of
attainment gap so
that effective
interventions can be
identified and
implemented
Review and
refresh the Perth
and Kinross
Council
interventions
toolkit to address
the needs of key
priority groups 
All schools will plan,
record and track pupil
progress via the Closing
the Gap tool 
Education
and
Learning 
March
2025
The Interventions Toolkit was launched in 2023 and was
subsequently updated in 2024 to share details of impact
of interventions in Perth and Kinross settings.  The tool
provides links to resources, training and guidance with a
focus on evidence-based interventions and approaches,
including support for practitioners in undertaking needs
analysis.

Page 15

15 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
A reduction in the poverty-
related attainment gap for
school leavers 
Baseline: established in
2022/23 Annual
Performance Report 
It links very closely with the Closing the Gap Tool (CTGT)
which tracks and monitors PEF-funded interventions
aimed at improving outcomes for children and young
people impacted by poverty, with a focus on tackling the
poverty-related attainment gap.
KPI - 100% of schools are using the CTGT to plan, track
and monitor interventions, with impact measured and
next steps noted.  This facilitates quality assurance of all
interventions funded by Pupil Equity Funding (ensuring
that the conditions of the grant are adhered to and that
interventions are appropriately targeted and evidence-
based). It also enables the dissemination of good practice
and successful outcomes across the service through
case study and report evidence. 
KPI - Leaver data in relation to the Poverty Related
Attainment Gap demonstrates a reduction over time. The
gap between SIMD Q1 and SIMD Q5 school leavers
attaining 1 or more qualification at SCQF Level 5 has
reduced from 28% in 2020/21 to 19% in 2023/24. The
gap between SIMD Q1 and SIMD Q5 school leavers
attaining 1 or more qualification at SCQF Level 6 has
reduced from 41% in 2020/21 to 28% in 2023/24
Improve support to
children and young
people with
additional support
Through the
Additional
Support for
Learning
Maintain or reduce
placement within
independent schools
Baseline: new measure,
Education
and
Learning 
March
2025
We currently have 29 children placed in independent
schools. This is a concerning spike in what was
previously a downwards trajectory.  The implementation
of actions from the ASN Transformation Programme will

Page 16

16 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
needs to realise
their full potential 
Transformation
Programme 
baseline to be established
in 2024/25 
address this going forward with the creation of three
additional Intensive Support Provisions across Perth and
Kinross (open in August 2025).  Additionally, a review of
the provision for children and young people with Social
and Emotional Behaviour Needs (SEBN) will ensure that
their needs can be appropriately met.
A revised model for support staff and the use of PowerBI
will provide time for schools to ensure that ASN data is
accurately recorded and that the allocation of support is
closely linked to identified need. 
Career Progression Pathway models for staff supporting
learners with ASN have been drafted with mapping
underway to ensure that all training is linked to statutory
duties, is evidence-based and links to the Staged Levels
of Interventions. 
The Compass App, designed by ARC Scotland, is being
rolled out across PKC secondary schools. This enhances
understanding of the post-school transition process by
young people with additional support needs and the
adults supporting them, enabling them to be more in
control of the process.
Education and Learning and NHS Tayside have
collaborated to complete an audit of young people in S3 –
S6 who meet the criteria for an intellectual disability,
facilitating services providing post-school support to more

Page 17

17 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
effectively plan their provision to improve options for the
young people.
Various initiatives have been implemented to support
inclusive learning environments across PKC, including
the purchase of enhanced support resources, such as
pop-up sensory spaces (tents) and weighted blankets,
vests, or body socks for children who require appropriate
pressure support to help them regulate their behaviour. 
Compared with the previous year 2023/24, data on the
number of incidents of incidents of distressed,
challenging, violent or aggressive behaviour reported by
staff in 2024/25 has shown a reduction of 12%, which is
almost 200 fewer incidents.
Provide Kinship
Carers with a range
of supports to
enable them to meet
the needs of
children in their care 
Provide
opportunities for
Kinship Carers to
engage in: 
• Support groups 
• Training 
Number of Support
Groups and Training
Opportunities afforded to
Kinship Carers 
Baseline: new measure
baseline to be established
in 2024/25
Children,
Families
and Justice 
March
2025
Our Carers Group for kinship meet monthly. We have a
core group of around 12 carers who attend regularly. The
group is gaining popularity, and our carers are actively
encouraged to join us. In the support group we present
opportunities for learning. The model works very well as it
generates a lot of discussion. During the assessment
process, learning for carers takes place – for example, a
common theme is trauma related care, and carers are
asked to reflect on this to increase their understanding.
Following the placement of a child a common theme we
address is around Life Story and how carers can help a
child understand their circumstances.

Page 18

18 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update 
There are also ongoing supports in local communities
being developed to support the development of informal
networks. The support has ensured that carers feel able
to care for the children and avoid a breakdown in the
arrangement. 
We recognise that not all carers want to attend a group
and have a model of support where individual carers are
allocated an individual worker this allows for one-to-one
support if that is there preferred option. National
resources are available and carers are aware of how to
access them.
Improve educational
outcomes for looked
after children 
Where additional
educational
support is
identified in a
child’s plan – to
provide access to
online tutoring. 
Number of looked after
children in receipt of online
tutoring. 
Baseline: new measure,
baseline to be established
in 2024/25 
Children,
Families
and Justice 
March
2025
29 pupils have been supported via online and face 2 face
tutoring support from the Volunteer Tutors Organisation
(VTO).

Page 19

19 
Priority: Protecting and caring for our most vulnerable people 
What
improvements
do we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Target
Date 
Progress Update 
Take a
partnership
approach to the
assessment of
risk of significant
harm to a child 
Undertake Initial
Referral
Discussions
between Social
Work, Police,
Health and
Education
Number of Initial Referral
Discussions 
Baseline: new measure,
baseline to be established
in 2024/25
Children,
Families
and
Justice 
March
2025
In 2024/2025 there was a total of 222 Initial referral
discussion (IRDs) across Children and Family social
work service. These IRDs involved 358 children and
young people. These discussions always include
relevant partners in the police, social work, health
and, where necessary, education. In keeping with
the previous years, the need for IRDs continues to
reduce and we think this relates to improved
universal support services and increased early
intervention preventing crisis and the need for crisis
intervention. 
Take a
partnership
approach to
minimising and
reducing risk
through early
support and
assessment
Weekly Multi
Agency Screening
Group (MASH) to
triage referrals
Number of Families triaged 
Number of children triaged
Baseline: new measure,
baseline to be established in
2024/25 
Children,
Families and
Justice 
March
2025
Between April 2024 to March 25, 218 children were
triaged and allocated via the weekly MASH meetings.
This equates to 185 families which has increased from
the 170 in the last reporting year. 
We are keeping intervention at a proportionate level
according to assessed need. In line with the Promise,
we are ensuring that families are receiving the right
support at the right time. It’s not appropriate for us to
measure impact/ outcome when all we have done is
triaged the referral to the most appropriate place.
Enhance our
housing support
offer by
implementing an
Intensive
Housing Support
Service for
people with
complex needs
Commission a third
sector provider to
deliver intensive
housing support.
Repeat homelessness
presentations will be
minimised and tenancy
sustainment for previously
homeless people with
complex needs will increase 
Baseline: 
Housing and
Communities 
March
2025
The Intensive Housing Support service was
commissioned and launched in October 2023. Since its
introduction, the service has consistently operated at
full capacity, supporting approximately 20 individuals at
any given time.
It is delivering significant benefits for people whose
needs exceed the scope of existing support services.
However, due to the relatively small scale of the service
and the short time it has been in place, it is challenging
to demonstrate outcomes through key performance

Page 20

20 
Priority: Protecting and caring for our most vulnerable people 
What
improvements
do we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Target
Date 
Progress Update 
2019/20 (25); 2020/21 (30);
2021/22 (15); 2022/23 (5)
Feedback from people with
complex care needs will be
positive with better outcomes
being reached. Qualitative
measure to demonstrate
positive impact
indicators (KPIs). Many of the individuals supported
have complex, long-term needs and deeply embedded
behaviours, which require time and sustained support
to address. The Intensive Housing Support service
contract runs to October 2025 and has been extended
to March 2026. Beyond this, we intend to mainstream
the service by including it as part of the
recommissioning of the much larger Floating Housing
Support service, by redesigning the model to provide
for service-users with Low, Medium and High support
needs. The new, integrated service will be in place from
April 2026.
Where children
cannot remain
living at home,
every effort is
made to keep
them within their
kin network
Children, parents /
carers and kin
networks are
listened to and
afforded the
opportunity to have
their say through
Family Group
Decision Making
Number of families
completing the Family Group
Decision Making (FGDM)
process and adhering to a
family plan 
Baseline: new measure,
baseline to be established in
2024/25
Children,
Families and
Justice 
March
2025
The FGDM and Lifelong Links continue to be promoted
and offered to families. We have rolled out the
connections tool which identifies who is important to the
child and who they want to keep in touch with. This is
proving very popular with children and young people
and other local authorities. In the past year 76
children/young people were referred, and plans agreed
for 54 of these. This is shown in the overall decrease of
children and young people being accommodated and
an increase in those in kinship arrangements.
Maintain
significant
relationships for
care experienced
children to deliver
on the principles
of The Promise
Offer care
experienced
children and young
people to create a
Lifelong Links
plans to maintain
significant
relationships.
Number of children and
young people completing
Lifelong Links plans
Baseline: new measure,
baseline to be established in
2024/25
Children,
Families and
Justice 
March
2025
We have identified a space where brothers and sisters
who are separated can come together and have fun.
During 2025/26 this will become operational and is
being designed with the voice of children and young
people and carers in mind. 
In line with The Promise which recognises the
importance of sibling relationships - we are creating a
place where meaningful sibling family time can take

Page 21

21 
Priority: Protecting and caring for our most vulnerable people 
What
improvements
do we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Target
Date 
Progress Update 
place. We want this to be an organic development and
will promote it through our networks.

Page 22

22 
Priority: Supporting and promoting physical and mental wellbeing
What
improvement
s do we want
to achieve? 
How will we
make these
improvements? 
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Targ
et
Date
Progress Update 
Increase uptake
of sport and
physical
activities.
Work with key
partners to develop
programmes which
optimise
opportunities for
physical activity
Numbers of participants have
increased. Baseline: 2022/23
(1.002M)
Economy,
Development
and Planning 
March
2025
Working with key partners throughout 2023-24 and into
early 2024-25, there was continued focus on the
completion of the Year 1 Action Plan, developed as part
of the Physical Activity & Sport Strategy 2023-2028.   
However, due to the unexpected flooding and
subsequent closure of Bells Sports Centre in October
2024, this had a significant impact on the usage levels
and all individual and group bookings, had to be re-
directed to other available venues across Perth & Kinross
for the foreseeable future.   
The Olympia Dundee re-opening early in 2024, also
impacted the displacement that had been evident
throughout 2023-24 at Perth Leisure Pool.   
Overall, participation in 2024-25 dropped to 886,359.
Increase uptake
of sport and
physical
activities.
Social prescribers
encouraging the
use of outdoor
activities
Reduction in health and social
care issues related to
inactivity. Baseline: new
measure, baseline to be
established in 2024/25
Health and
Social Care
Partnership 
March
2025  
This action is to be removed as there is no data and for a
range of reasons this is not measurable.
Increase uptake
of sport and
physical
activities.
Work with schools
and sport groups to
increase the
number of
opportunities for
children and young
people to take part
in physical activity
Number and percentage of the
total school roll (primary and
secondary) participating in
Active Schools/ school sports 
Baseline: established in
2022/23 Annual Performance
Report
Education
and Learning 
March
2025
Through our commitment to Physical Education, Physical
Activity and Sport (PEPAS), and working in partnership
with a range of other organisations (e.g. Live Active
Leisure, UHI Perth, SportScotland and community clubs),
participation in extra-curricular sport activities has
continued to improve with a 43% participation rate in
2024/25.

Page 23

23 
Priority: Supporting and promoting physical and mental wellbeing
What
improvement
s do we want
to achieve? 
How will we
make these
improvements? 
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Targ
et
Date
Progress Update 
This equates to 7859 primary and secondary pupils
taking part in extracurricular sport and physical activity, a
1% increase on the 2023/24 academic year.  
Notably PKC secondary school pupils’ participation in
extracurricular clubs is in the top 3 local authorities in
Scotland at 38%.
Reduce waiting
times for people
to access
Mental Health
Services. 
Redesigning
specialist
community mental
health services
across Tayside.
Reduction in waiting lists
(weeks) 
Baseline: established in
2022/23 Annual Performance
Report 
Health and
Social Care
Partnership 
March
2025
The CMHWB Delivery Plan has now come its conclusion
and so we are moving to a new version which will be
more strongly aligned to the pan-Tayside vision of have a
more uniform "Model of Care" for Tayside.
Deliver the
Strategic Delivery
Plan for
Community Mental
Health and
Wellbeing
(CMHWB)
Increase access to
preventative and
community
support. 
Reduction in waiting lists
(weeks) 
Baseline: established in
2022/23 Annual Performance
Report 
Health and
Social Care
Partnership 
March
2025

Page 24

24 
Priority: Working in Partnership with Communities
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we have
been successful (Baseline
included for reference)
Strategic
Lead
Target
Date
Progress Update
Deliver a clear,
consistent, and
joined up approach
to supporting
communities and
households with the
help and support
they need to
mitigate and move
beyond poverty. 
Develop multi-
disciplinary
locality working
focussed on
locally identified
needs. 
Feedback from communities
and staff on the effectiveness of
the multi-disciplinary team
approach 
Strengthened partnerships
within localities with case
studies to evidence 
Qualitative measure to
demonstrate impact
Strategic
Planning,
People and
Performance 
March
2025
March
2026
Progress has been made in several areas and new
areas have been identified to enhance our rolling
programme. External evaluation activity with the
Scottish Government is planned for 2025 to better
assess which approaches and interventions have
the biggest impact.
Provide more
affordable homes to
support liveable and
sustainable
communities
Deliver PKCs
affordable
housing
programme of
1,050 over the
next 5 years 
Maintain 53%/47% split across
urban and rural areas, which is
in line with the population split
in Perth and Kinross 
Baseline: 22/23: Total 242
homes (54 buybacks/ empty
homes; 145 new rural homes
(77%) and 43 new urban homes
(23%)
Achieve an average 210
affordable housing completions
Economy
Development
and Planning 
March
2027
The adopted Local Housing Strategy 2022-27
(March 2023) target is to deliver 1050 affordable
homes with an Urban (53%) / Rural (47%) split to
ensure representative distribution. In financial year
2024/25, there were 264 (above target of 210) new
affordable homes completed by PKC and our RSL
partnerships with an urban/rural split of 53% Urban
(140) and 47% Rural (124).

Page 25

25 
Priority: Working in Partnership with Communities
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we have
been successful (Baseline
included for reference)
Strategic
Lead
Target
Date
Progress Update
each year. Baseline: 2022/23
(203) 
Support community
groups to manage
local assets, such as
community halls
Support
community
groups to
develop
Community
Asset Transfer
(CAT) plans 
Carry out
engagement
activity to
promote
Community
Asset Transfer
as an option
Increase in number of
Community Asset Transfers 
Baseline: 2022/23 (0) 
Increase in community groups
applying for community asset
opportunities. 
Baseline: established in
2022/23 Annual Performance
Report 
Housing and
Communities 
March
2025
In 2024/25, we supported 34 community groups who
expressed interest in Community Asset Transfer
(CAT), providing them with relevant asset
information and a single point of contact. This is an
increase from 31 groups supported in 2023/24.
This approach has helped build relationships and
enabled meaningful discussions about whether CAT
is the right path for each group. Currently, 16 groups
are still considering the CAT process—a reduction
from 21 live cases at the end of 2023/24. This
decrease is due to some groups finding alternative
solutions outside the CAT process, while others
have chosen not to proceed with their projects. Each
group progresses at its own pace, but several are
expected to move forward with full Stage 2
applications within the next year.
The launch of the Advancing Community Assets
Fund in 2024/25 has further supported progress. To
date, £74,000 has been allocated to fund capital
works, surveys, valuations, and development
workers to strengthen community ownership
applications.

Page 26

26 
Priority: Working in Partnership with Communities
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we have
been successful (Baseline
included for reference)
Strategic
Lead
Target
Date
Progress Update
Examples of groups that found alternative solutions
in 2024/25 include:
• Blairgowrie and Rattray Development Trust, who
secured a long-term lease for Wellmeadow
Toilets in July 2024, ensuring the facility—
previously earmarked for closure—remains open
to the public.
• Aberfeldy Development Trust, who completed the
purchase of the Slaughterhouse Field site to
develop community-owned affordable housing.
Increased
engagement and
applications from
communities to the
Community
Investment Fund
(CIF) grants
programme
Review
application and
assessment
process and
implement
improvements
identified
through
evaluation of the
2023/24
Community
Investment Fund
programme
Increase in the number of
groups receiving community
investment funding 
Baseline: established in
2022/23 Annual Performance
Report
Increase in the number of
people benefitting from a
Community Investment Fund
funded project 
Baseline: 2021/22 36,115
people benefitted from a
Community Investment Fund
funded project
Housing and
Communities 
March
2025
In 2024/25, Ward Panels allocated just over
£326,000 to support 114 projects aligned with the
priorities set out in the Council’s Corporate Plan.
A review of the application and assessment process
has been completed, and a new proposal will be
brought forward for the 2025/26 Community
Investment Fund grant programme. The proposed
model aims to:
• Increase engagement with communities and
community organisations
• Strengthen collaborative working at a local level

Page 27

27 
Priority: Working in Partnership with Communities
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we have
been successful (Baseline
included for reference)
Strategic
Lead
Target
Date
Progress Update
This refreshed approach is designed to ensure the
fund continues to deliver meaningful impact and
supports community-led priorities.
An empowered and
skilled workforce
who are confident in
engaging with
resident and
communities and
demonstrate the
organisational
values and expected
behaviours at all
times. 
Delivery of
action within the
Employee
Engagement
and Cultural
Change
Programme.
Feedback from our workforce,
managers, and community
members
Strategic
Planning,
People and
Performance 
March
2025
The People and Culture Strategy 2024-28 Delivery
Action Plan was approved in June 2024 and
expanded on the work of the previous Employee
Engagement and Cultural Change Programme. It
includes specific measures allowing the monitoring
and measurement in specific areas to identify
improvement and the need for further action.  The
plan is monitored by the Workforce Planning Board,
chaired by the Strategic Lead for Strategic Planning,
People and Performance.
The 2024 Employee Survey results are a positive
indication that we are effectively delivering the
improvements with 92% of respondents saying they
feel their team demonstrates our PKC values often /
every day. The development of individual team
action plans created in response to the survey
results and the progress made with these has
allowed continued monitoring of the response and
progress towards improvement. A further survey will
take place in November 2025.