Perth And Kinross Council 
Scrutiny and Performance Committee 
18 September 2024 
PERTH AND KINROSS HEALTH & SOCIAL CARE PARTNERSHIP (HSCP)
CLINICAL AND CARE GOVERNANCE ASSURANCE REPORT 
Chief Officer, Perth and Kinross HSCP
(Report No. 24/256) 
1. PURPOSE OF REPORT 
1.1 This purpose of this report is to provide assurance to Perth & Kinross Council’s
Scrutiny and Performance Committee on the Clinical Care and Professional
Governance of the Perth and Kinross HSCP. 
2. SITUATION 
2.1 This report provides assurance on the clinical and care governance arrangements for
services delegated within the Perth and Kinross Integration Scheme (approved June
2022) and delivered by the HSCP. The clinical and care governance arrangements
adhere to the Getting It Right For Everyone (GIRFE) Framework. Clinical Governance
is a statutory reporting requirement at NHS Board level and our integrated approach
enables Perth & Kinross Council to be assured about the standards and quality of
social work and social care services 
2.2 The Scrutiny and Performance Committee is asked to scrutinise this report and agree
the level of assurance. The timescale for the data within this report are the four
months between 1 March 2024 and 30 June 2024. 
2.3 The recommended level of assurance is: Reasonable Assurance; due to the
following factors: 
• recent annual reports received in line with the agreed reporting framework
demonstrated reasonable levels of assurance to the Care and Professional
Governance Forum co-chaired by the Clinical Director for the HSCP and the
Council’s Chief Social Work Officer. 
Reporting and escalation of operational risks which have a bearing on clinical and
care governance and associated mitigating actions and an established process for
ensuring that the strategic risks to the Perth & Kinross Integration Joint Board take
account of this where appropriate
3. BACKGROUND
3.1 The role of the Perth & Kinross Care and Professional Governance Forum is to
provide assurance that there are effective and embedded systems for Clinical, 
Care and Professional Governance in all services within Perth & Kinross HSCP.

Page 2

3.2 The GIRFE Framework is an agreed tool used by all three HSCPs to ensure
consistency of approach between Local Authorities, Tayside NHS Board and the IJBs
for the three HSCPs; quality assurance is assessed against an agreed, prioritised
common data set for each of the governance domains as detailed below.  A GIRFE
Steering Group continues to meet, with representatives from each of the three
Partnerships and part of its remit is to support additional common assurance
measures and this template 
3.3 The six domains continue to evolve over time and must be adaptable and responsive
to the changes in legislation and external support and monitoring.  The domains reflect
the principles set out in the Health and Social Care Standards, My support, My life;
Scottish Government, 2018 and the Quality of Care Approach, HIS and Care
Inspectorate, September 2018. The domains are:
4. ASSESSMENT
4.1 Exceptions: 
There was a risk in relation to Occupational Therapy staffing across both inpatient and
locality community services.   
4.2 A risk had previously existed on DATIX regarding OT staffing challenges, and this risk
had been archived due to positive progress and a period of stability.  This risk was
reinstated, and rag rated as red. 
4.3 There was also an ongoing red risk within Adult Social Work and Social Care for OT
capacity as a result of increased demand and staff vacancies.  All vacancies are now
advertised and some successfully recruited to.  Controls were put in place to manage
the risk, such as daily site huddles to prioritise work and communicate with the wards. 
4.4 The reduced Adult Social Work & Social Care OT capacity for assessment for aids
and adaptations had impacted on waiting times (currently >400 people) and response
times for non-urgent cases. 
4.5 P&K locality OT teams had also experienced staffing difficulties due to resignations
and staff absences adding to the risk. 
Information Governance
Professional Regulation and Workforce Development
Patient/Service user/Carer and Staff Safety
Patient/Service user/Carer and Staff Experience
Quality and effectiveness of care
Promotion of Equality and Social Justice

Page 3

4.6 The Chief Officer commissioned a review of the Allied Health Professional workforce
across the HSCP and this has now been completed by the Director of Allied Health
Professions along with the HSCP Lead. As a result, a redesign of AHP provision will
commence in October led by a suitably qualified and experienced manager to improve
the longer-term effectiveness and efficiency of AHP provision, including Occupational
Therapy 
5. CLINICAL AND CARE RISK MANAGEMENT
5.1 The operational / team level risk registers for HSCP Health and for Adult Social
Work and Social Care (appendices 2 & 3) services are discussed monthly at the
HSCP Care & Professional Governance Forum. 
5.2 Managers of red risks provide a written update at every meeting, and managers of
amber risks are asked for update at every other meeting. 
5.3 This supports assurances that the relevant risks are being regularly monitored;
ensures measures are put in place to minimise the risk; what alternative mitigations
plans and actions are in place to minimise the risk; that where the risk affects, or is
impacted by, other parts of the health or social care system, or indeed other
agency, we are assured that they are fully informed and engaged in the process. 
5.4 P&K HSCP health red risks as at 9th July 2024
Datix
Ref
Risk
Exposure –
No controls
Current Risk Exposure Rating Planned
Risk
Exposure
Risk
Trend  Please include data from previous four reporting periods
Aug
2023 Nov 2023 Mar 2024 Jul 2024 
L C RER L C RER L C RER L C RER L C RER L C RER 
829 4 5 20 4 5 20 4 5 20 4 5 20 4 5 20 2 5 10 ↓
886 5 4 20 - - - - - - 5 4 20 5 4 20 2 4 8   ↓
L = Likelihood   C = Consequence  RER = Risk Exposure Rating 
5.4.1 Risk 829 - Challenges in relation to accommodation for clinical and non-clinical staff
across P&K 
In June, the movement of iDART (Integrated Drug & Alcohol Team) from Drumhar
Health Centre to Birnam Day Centre at Murray Royal Hospital was noted to be
making progress within key timescales. The movement of services (Speech and
Language Therapy, vaccination team, and incontinence service) needed further
support from support services to enable the Care & Treatment Service to relocate
from Beechgrove to Drumhar Health Centre. 
By end of July 2024, a series of successful moves had been completed addressing
the immediate premises and accommodation risks for health and social care
services as follows:

Page 4

• iDART has relocated from Drumhar to Birnam Day Centre at Murray Royal
Hospital.
• the Perth City Care & Treatment Service has relocated from Beechgrove
(former PKC Care Home) to Drumhar Health Centre 
The child immunisation clinic has relocated from Drumhar Health Centre to Pullar
House along with the community vaccination centre which relocated from a leased
shop front to Pullar House. 
5.4.2 Risk 886 - Staffing challenges within the OT service at Perth Royal Infirmary 
The Chief Officer commissioned a review of the Allied Health Professional workforce
across the HSCP and this has now been completed by the Director of Allied Health
Professions along with the HSCP Lead.   As a result, a redesign of AHP provision will
commence in October led by a suitably qualified and experienced manager to improve
the longer-term effectiveness and efficiency of AHP provision,  including Occupational
Therapy across the HSCP. 
5.5 P&K HSCP Adult Social Work & Social Care red risks as at 9th July 2024: 
Risk
Risk
Exposure –
No controls
Current Risk Exposure Rating Risk
Trend
(↑/→/↓) Please include data from previous four reporting periods
Jul 2023 Nov 2023 Mar 2024 Jul 2024 
L C RER L C RER L C RER L C RER L C RER 
1 4 5 20 4 5 20 4 5 20 4 5 20 4 5 20 →
2 4 5 20 4 5 20 4 5 20 4 5 20 4 5 20 →
L = Likelihood   C = Consequence  RER = Risk Exposure Rating 
5.5.1 Adult Social Work and Social Care Risk 1 – Lack of Care at Home capacity,
especially around rural P&K. 
Recruitment was ongoing for a number of posts within HART, HART Plus and Living
well, with several posts recruited to, and interviews planned.  The internal Care at
Home Service is now fully staffed and there has been a successful international
recruitment with six new employees sponsored by PKC and joining the HSCP in
July 2024. 
5.5.2 Adult Social Work and Social Care Risk 2 – Lack of OT capacity 
Staffing vacancies are being recruited to with support from agency OT staff and
temporary additional management capacity in place. 
The Chief Officer commissioned a review of the Allied Health Professional workforce
across the HSCP and this has now been completed by the Director of Allied Health
Professions along with the HSCP Lead.

Page 5

As a result, a redesign of AHP provision will commence in October led by a suitably
qualified and experienced manager to improve the longer-term effectiveness and
efficiency of AHP provision, including Occupational Therapy across the HSCP. 
6. CLINICAL & CARE GOVERNANCE ARRANGEMENTS:
6.1 As per the Integration Scheme (June 2022) each HSCP in Tayside is a Lead Partner
for a number of services that are better planned for and managed by one HSCP but
provided for all communities across Tayside. These services report through to the
Clinical Care and Professional Governance Forum for that HSCP. At the Clinical Care
and Professional Governance Forum the Lead Partner Service reports receive the
relevant level of scrutiny as other reports. 
6.2 Systems and processes are being established to ensure that all three HSCPs receive
copies of reports from other Lead Partner Services to support integration, and effective
whole system working. 
6.3 Full details of the Clinical & Care Governance Arrangements in P&K HSCP are
provided within appendix 1.  
7. SUMMARY OF KEY EXCEPTIONS RAISED AT RECENT CPGF MEETINGS:
7.1 Key exceptions identified within the exception reports from the CPGF meetings
held in March, April, May and June 2024: 
• North Locality:
o DATIX raised in regards to parallel bars (PCH) Physio department. 
Procurement options being explored.
o Enhanced support provided through multi-disciplinary team approach to a
commissioned care home. 
• Urgent Care:
o Hospital at Home – transitional process to close the service from July 2024.
Evaluation of learning being captured. 
• Podiatry:
o At end April 24, there was a caseload of approx 7,000 patients. Of 627
people on the Podiatry waiting list 354 had been waiting over 12 weeks. 
Slight improvements noted. 
• Perth City:
o Community Rehabilitation Team Occupational Therapy at Red RAG
staffing due to vacancy, planned and unplanned leave.  Recruitment to
vacant and fixed term posts progressing with use of Locum in the interim.   
• South Locality
o Psychiatry of Old Age Community Team RED staffing risk.  Leadership
support from South OT Lead & Clinical Practice Team Manager. 
Recruitment progressing. 
• Prison Healthcare
o Prison Healthcare: Dentist – only urgent appointments being seen due to
capacity. Waiting time 22 weeks in HMP Perth for routine. HMP Castle

Page 6

Huntly / HMP Bella patients are appointed by Kings Cross Hospital. 
Dentists triage all referrals. 
• Public Dental Service:
o Awaiting input from Property Department to progress essential ventilation
and building works. Work has been approved in principle and funding in
place. 
• Medicine for the Elderly, Allied Health Professionals and discharge services:
o Awaiting input from Property Department to progress essential ventilation
and building works. Work has been approved in principle and funding in
place. 
7.2 Key exceptions identified within the annual reports from the CPGF meetings held
in March, April, May and June 2024: 
• Access Team
o The Team has introduced Quality Assurance measures to complement
feedback received from Care Opinion. The team has undertaken two
peer audit sessions and shared learning. 
• North Locality
o To create more sustainability within care at home, we have identified
difficult to reach geographical areas where Care at Home provision will
be delivered solely by HART. In addition, HART will continue to provide
Care at Home for individuals assessed and waiting more than 3 months
for a commissioned option 3 provider. 
o AHP workforce tool has been completed in line with Safer Staffing
requirements, which has evidenced a significant shortfall within
Physiotherapy. 
o Social Work Community OT waiting lists remain high as a result of long-
term vacancies which are difficult to recruit to. Kept under review at the
Social Care / Social Work Forum. 
o The locality is recovering from a period of shortage within AHP teams
due to vacancy and sickness but sharing resources to spread risk. 
• Medicine for the Elderly, AHP and discharge services at PRI:
o Tay Ward has recently reduced to its core bed footprint. Over the past
reporting year, there have been difficulties experienced with lengthy
delayed discharges. The target length of stay for Tay Ward is <28 days
and this was achieved in February 2024, following reduction in bed
capacity. The Optimising Flow work stream has developed monthly
meetings to review data commencing April 2024, The Integrated
Discharge Hub supports Tay Ward with an allocated Social Worker and
Discharge Coordinator.
o The Integrated Discharge Hub has worked with multidisciplinary teams in
PRI and community services to achieve a steady amber status (local
target) for delayed discharges throughout winter. There have been
several instances when there has been a sharp increase into red status
and the teams have responded with immediate actions to regain a
positive position. A new management structure was introduced in the last
year to include an Integrated Service Manager and Improvement Officer.

Page 7

o The MSK team have successfully been able to reduce the number of
patients waiting on MSK physiotherapy since the start of 23-24 financial
year. (Latest waiting 935 as of week 21/03/24).
o Both Tay Ward and Stroke Unit are self assessing in order to be ‘Inspection
Ready’. Service Manager and Senior Nurse have met with both Senior Charge
Nurses March 2024 and Care Assurance Toolkit assessments will be
completed by Senior Nurse every 2 months. 
8. ADVERSE EVENTS
8.1 Systems are in place for services/localities to review DATIX incidents.  
The Nursing & AHP leads meet along with the Clinical Governance Coordinator on
monthly basis to review the top 5 incident categories.  This helps to identify any
trends or any appropriate action and supports closing the loop. 
8.2 Regarding adverse events, the main themes reported during the months between
March and June 2024 were: 
Highest frequency events: 
1. Slips, Trips and Falls 
2. Medication 
3. Pressure Ulcer
4. Clinical Challenging behaviour
5. Violence & Aggression 
Harm is defined as an outcome with a negative effect. Harm to a person or groups
of people may result from worsening of a medical condition, the inherent risk of an
investigation or treatment, system failure provider performance issues, service
disruption, financial loss or adverse publicity. 
8.2.1 Slip, Trip & Falls 
During the time period between March and June 2024, there were 160 incidents
recorded, of which 22 involved harm.  44 occurred at MRH, 18 at PRI, 58 in
Community Hospitals and the remaining 40 in other areas.

Page 8

The Prevention & Early Intervention Manager continues to:
• review all of the wards in-patient falls Datix reports and provide feedback to
the ward with a breakdown of their falls, outlining any trends, highlighting
patients who fall repeatedly and enquiring if further information is required
• Supports all of the HSCP wards to have strength and balance exercise panels
fitted on their walls and suitable patients also receive a set of strength and
balance cue cards which they can take home with them. Along with that they
receive a Care About Walking booklet and record charts for recording activity /
steps. 
8.2.2 Medication
During the time period between March and June 2024, there were 79 incidents
recorded, of which 5 involved harm.  11 occurred at MRH, 4 at PRI, 14 in
Community Hospitals, 28 within a Prison Establishment and the remaining 22 in
other areas. 
The majority of medication adverse events occurred with the Prison Healthcare
service.  The prison healthcare service manages and administers a high volume of
medication across three sites across Tayside - HMP Perth, HMP Castle Huntly and
HMP & YOI Bella.   
8.2.3 Violence & Aggression
During the time period between March and June 2024, there were 28 incidents
recorded, of which 6 involved harm.  7 occurred at MRH, 9 at PRI, 4 in Community
Hospitals, and the remaining 8 in other areas.

Page 9

All of the 7 incidents within Murray Royal Hospital were within the Psychiatry of Old
Age wards. All 9 of the incidents at PRI were at Cairnwell (Perth City CMHT base) 
8.2.4 Clinical Challenging Behaviour (such as patient unable to understand risks,
sexual disinhibition, general agitation) 
During the time period between March and June 2024, there were 57 incidents
recorded, of which 4 involved harm.  48 occurred at MRH, 3 at PRI, 4 in Community
Hospitals and 3 others. 
The vast majority of these incidents were within the Psychiatry of Old Age wards at
Murray Royal Hospital.  The rise in incidents (albeit of negligible grading) in October
2023 appears to be attributable to a small group of patients in one particular POA
ward who are exhibiting these behaviours. 
The wards have sought input from the NHST PMVA team regarding the ongoing
management of Violence & Aggression and Clinical Challenging Behaviour. 
8.2.5 Pressure Ulcers 
During the time period between March and June 2024, there were 67 incidents
recorded, of which 57 involved harm.  26 were within the patients home, 19 within
Care Homes, 11 within Community Hospitals, and the remaining 11 in other areas.

Page 10

The yellow graded events are discussed at the relevant locality Care Governance
meeting.  It should be noted that some of these pressure ulcer incidents are
regarding patients who have been discharged from hospital to the community with a
pressure ulcer, which has then been picked up and reported by a service in P&K
HSCP. 
Each geographical locality in P&K is provided with a summary of adverse events
specific to their locality to enable them to identify trends and any learning.   
Adverse events are regularly reviewed and form a standing agenda item at the
locality governance groups to identify learning, improvements, training needs or
themes. 
It has been identified and acknowledged by the CPGF that further performance
improvement is required regarding the timescales for reporting and verifying DATIX
incidents.  This continues to improve and to be monitored at CPGF meetings. 
8.3 Adult Social Work & Social Care Incident Summary:
Information for recent quarters not yet available.
8.4 Significant Adverse Event Reviews
One SAER regarding the care and treatment of a resident in a Care Home has been
commissioned.  SAER processes ensure that there is oversight and sign off by the
Executive Director of Nursing and Medical Director. 
Pressure Ulcers & Falls
Details regarding both of the types of Adverse events has been provided above in
section 8.2.  Pressure ulcers are reviewed on an individual basis to ensure that all
mitigating actions are in place and any themes in relation to learning are identified. 
Complaints 
Current Health Complaints as at 16/07/2024 - Stage 1
Service Area 0-5 Days 6-9 Days Total
Perth & Kinross HSCP 3  0 3 
Current Health Complaints as at 16/07/2024 - Stage 2
Service Area 0-5
days
6-10 days 11 -15 days 16-20
days
>20 days Total
Perth & Kinross HSCP 2 3 1 2 1 9

Page 11

Health Complaint Summary for June 2024 (Part Month):
*report created on 26th June 2024 
Number of complaints closed by month: 
• Total number of complaints received in June* 2024  = 35
• Total number of complaints closed in June* 2024  = 28
• Stage 1 = 16 (7 upheld or partially upheld)
• Stage 2 = 12 (6 upheld or partially upheld)
o % Stage 2 completed within timescales = 100
o % Stage 2 not completed within timescales = 0% 
➢ Services
• Prison Healthcare – 26
• Mental Health – 1
• North – 1
• Top themes for June* 24 (Prison Healthcare):
➢ Overall (more than one theme can be applicable per complaint)
• Medication – 12
• Disagreement with treatment plan or outcome – 8
• Wait times / delay – 5
• Transport not available so unable to attend appointment - 2
➢ Upheld or Partially Upheld complaints (more than one theme can be
applicable per complaint)
• Medication – 6
• Disagreement with treatment plan or outcome – 1
• Wait times / delay – 4
• Transport cancelled so unable to attend appointment – 1
• Top themes for June* 24 (other HSCP services):
➢ Overall (more than one theme can be applicable per complaint)
0
10
20
30
40
50
60
Stage 1
Stage 2

Page 12

• Missing sample – 1
• Delay in assessment – 1
➢ Upheld or Partially Upheld complaints (more than one theme can be
applicable per complaint)
• Missing sample – 1
• Delay in assessment – 1 
PKC Complaint Summary For June 2024: 
• Total number of complaints received in June 2024 = 12
• Services the complaints relate to as below
o Access Team - 3
o Perth City Locality North – 1
0
1
2
3
4
5
6
7
8
9
10
April May June July Aug Sept Oct Nov Dec Jan Feb March
Complaints Closed 2023 -2024
Stage 1 Stage 2
0
2
4
6
8
10
12
April May June July Aug Sept Oct Nov Dec Jan Feb March
Complaints Closed 2024-2025
Stage 1 Stage 2

Page 13

o Assessment & Charging – 1 
o South Locality Crieff – 2
o Community Alarm – 1
o Hospital Discharge Team – 1
o HART – 1
o North Locality Blair – 1
o OT – 1
• Top themes 
➢ Overall (more than one theme can be applicable per complaint)
• Quality of Care - 2 
• Staff Conduct - 4
• Waiting Times/Delays – 1
• Disagreement with Assessment - 2
• Paying for Care – 1
• Involvement with decisions – 1
• Entitlement to services - 1 
• Total number of complaints closed in June 2024 = 12
• Stage 1 = 10 (4 Fully Resolved, 3 Upheld, 3 Not Upheld)
• Stage 2 = 2 (1 Not Upheld, 1 Partially Upheld) 
•  Upheld or Partially Upheld complaints (more than one theme can be
applicable per complaint)
➢ Stage 1 - 
• Disagreement with Assessment 
• Staff Conduct
• Waiting times/Delays 
➢ Stage 2 –  
• Complaints Response 
Actions taken from upheld/partially upheld stage 1 complaints: 
• Reassessment of needs offered.
• Discussions held in supervision and reflections.
• Reassurance provided and update on waiting timescales. 
Scottish Public Services Ombudsman Reports
There have been no complaints referred to the SPSO during the time period.

Page 14

The last complaint which was referred to the SPSO was from December 2021, and
SPSO found that the Boards complaint response was reasonable and decided not
to investigate further. 
8.5 External Reports & Inspections
No Inspections during the time period.
9. ADULT SUPPORT & PROTECTION 
9.1 Responding to concerns about adults at risk of harm is prioritised and, despite this
increase in referrals, 97% of all concerns are screened within 24-hours. This
indicator, together with the wider performance framework, is monitored at locality
governance meetings, the Public Protection Group, Chief Officers Group and the
Adult Protection Committee. 
9.2 MAT Standards
Current RAG scores as at Jun 2024 are: 
Standard
1
Standard
2
Standard
3
Standard
4
Standard
5
Standard
6
Standard
7
Standard
8
Standard
9
Standard
10
RAG
Score           
0
50
100
150
200
250
9th
March -
5th April
2023
6th April
- 3rd
May
2023
4th May
- 31 May
2023
1st June
- 28th
June
2023
29th
June -
26th July
2023
27th July
- 23 Aug
2023
24 Aug -
20 Sept
2023
21 Sep -
18 Oct
2023
19 Oct -
15 Nov
2023
16th Nov
- 13 Dec
2023
14 Dec
2024 -
10 Jan
2024
11 Jan -
7 Feb
2024
8 Feb - 6
Mar
2024
7 Mar - 3
Apr 2024
Number of individual ASP referrals over
the last four weeks
Number of adult concerns (from Police
Scotland) over the last four weeks

Page 15

Standard 1 – All people accessing services have the option to start MAT from
the same day of presentation. 
GREEN   
Standard 2 – All people are supported to make an informed choice on what
medication to use for MAT, and the appropriate dose. 
GREEN   
Standard 3 – All people at high risk of drug-related harm are proactively
identified and offered support to commence or continue MAT. 
GREEN 
Standard 4 – All people are offered evidence based harm reduction at the
point of MAT delivery. 
GREEN 
Standard 5 – All people will receive support to remain in treatment for as long
as requested. 
GREEN 
Standard 6 – The system that provides MAT is psychologically informed (tier
1); routinely delivers evidence-based low intensity psychosocial interventions
(tier 2); and supports individuals to grow social networks. 
AWAITING ASSESSMENT – EVIDENCE BEING GATHERED AND SUBMITTED 
Standard 7 – All people have the option of MAT shared with Primary Care. 
AWAITING ASSESSMENT – EVIDENCE BEING GATHERED AND SUBMITTED 
Standard 8 – All people have access to advocacy and support for housing,
welfare and income needs. 
AWAITING ASSESSMENT – EVIDENCE BEING GATHERED AND SUBMITTED 
Standard 9 – All people with co-occurring drug use and mental health
difficulties can receive mental health care at the point of MAT delivery. 
AWAITING ASSESSMENT – EVIDENCE BEING GATHERED AND SUBMITTED 
Standard 10 – All people receive trauma informed care. 
AWAITING ASSESSMENT – EVIDENCE BEING GATHERED AND SUBMITTED 
Mental Health waiting times (1st Jan 2024 – 1 Jun 2024)

Page 16

The following is waiting time data for teams where their referral to assessment or
their assessment to treatment intervention wait time standard has breached 
Team Wait Time Standards Breach
Status
Adult Mental Health Occupational Therapy Team P1 – 5 Working Days
P2 – 6 Weeks
P3 – 12 Weeks 
Community Learning Disabilities Team (Wait times currently
being explored for Dietetics, Speech & Language, Clinical
Psychology)
12 Weeks 
Clinical Psychology, Adult Community Mental Health Teams  18 Weeks 
Garry Ward, Psychiatry of Old Age Inpatients 0 Days 
Integrated Drug and Alcohol Recovery Team 3 Weeks 
Learning Disability Intensive Support Service 12 Weeks 
Leven Ward, Psychiatry of Old Age Inpatients 0 Days 
Mental Health Officers 0 Days 
Mental Health Physiotherapy P1 – 3 Working Days
P2 – 5 Working Days 
P3 – 10 Working Days 
MoveAhead 12 Weeks 
North Perthshire Adult Community Mental Health Teams Urgent – 72 Hours
Routine - 12 Weeks 
North Perthshire Primary Care Mental Health and Wellbeing
Team
12 Weeks 
Perth City Adult Community Mental Health Team Urgent – 72 Hours
Routine - 12 Weeks 
Perth City Primary Care Mental Health and Wellbeing Team 12 Weeks 
SCOPE AP Concerns – 24 hrs
ASP Inquiry – 10 days
ASP Investigation – 28
Days 
South Perthshire Adult Community Mental Health Team Urgent – 72 Hours
Routine - 12 Weeks 
South Perthshire Primary Care Mental Health and Wellbeing
Team
12 Weeks 
Therapeutics & ECT Team 0 Weeks 
The Wellbeing Support Team  
Tummel Ward, Psychiatry of Old Age Inpatients 0 Days 
⚫ No Wait Time Breaches              ⚫  Wait Time Breached              ⚫  Data Pending (work
being explored)
.

Page 17

Clinical Psychology – Adult CMHTs 
Clinical Psychologists provide psychological therapies for people with complex mental illness who are working with the North Perthshire,
Perth City and South Perthshire CMHTs. All patients on the Clinical Psychology waiting list will have received an initial mental health
assessment, will be engaged in treatment interventions with another member(s) of the Adult CMHT and will have access to the CMHT Duty
Worker. Clinical Psychology is a Dundee HSCP hosted service and monthly wait times are reported via this route. Clinical Psychologists
work to a 12 week waiting time target. 
North CMHT CP  Perth City CMHT CP  South CMHT CP 
January June +/- January June +/- January June +/-
Total Patients 11 15 +4 55 51 -4 7 9 +2
Within 3 months 10 5 -5 31 0 -31 0 2 +2
Outwith 3 months 1 10 +9 24 51 +27 7 7 0
Adherence to standard 91% 33% -58% 56% 0% -56% 0% 22% +22%
Greatest Distribution 6-12 26-52 - 0-6 52+ - 18-22 22-26 -

Page 18

Adult Mental Health Occupational Therapy Team 
Adult Mental Health Occupational Therapists provide OT interventions for people with complex mental illness who are working with the North Perthshire,
Perth City and South Perthshire CMHTs. All patients on the OT waiting list will have received an initial mental health assessment prior to being referred
to the Mental Health OT Team and will have access to the CMHT Duty Worker. OT wait times have traditionally been extensive however a proactive
approach to waiting list management over the last reporting period has resulted in significant improvements in waiting times for patients. The longest
wait time has reduced from 22 months to 5 months. The Team are to be commended for their waiting list management work which is supporting people
to engage with OT interventions. 
North CMHT OT  South CMHT OT  Perth City CMHT OT 
January June +/- January June +/- January June +/-
Total Patients 9 0 -9 10 2 -8 16 5 -11
Within 3 months 0 0 0 0 0 0 0 1 +1
Outwith 3 months 0 0 0 10 2 -8 16 4 -12
Adherence to standard 0% 100% +100% 0% 0% 0% 0% 20% +20% 
Average Wait (Months) 15 0 -15 15 5 -10 13 3 -10
1
2 2
1 1 1 1
2
1
2
1 1
3
1 1
2
1 1 1 1 1 1
2
1
2
11
3
1 1 1
0
1
2
3
4
6 11 14 18 20 21 22 1 3 4 5 7 8 9 12 14 15 16 17 19 22 4 5 6 8 10 15 17 18 20 21
North CMHT OT PC CMHT OT South CMHT OT
# of Patients
# of Months
Wait Times Adult Mental Health OTs Jan vs June 2024 (Months)
January
June

Page 19

Mental Health Physiotherapy 
Mental Health Physiotherapy provides interventions for people with complex mental illness who are currently engaged in treatment with the
Adult and Older People’s CMHTs within North Perthshire, Perth City and South Perthshire (6 Teams), to all inpatients within the Perth and
Kinross Psychiatry of Old Age Inpatient Unit (3 wards) and the General Adult Psychiatry Inpatient Unit (3 wards). The Team has a wide
remit and a small staffing resource consisting of 1.4wte Specialist Physiotherapy staff and 1.0wte Community Support Worker staff. An
SBAR detailing the range of pressures the Team are experiencing is currently being explored at senior management level. The Team works
efficiently and effectively and will continue to experience wait time breaches unless there is investment to enhance what is a small staffing
resource. 
Priority Banding 2  Priority Banding 3 
January June +/- January June +/-
Total Patients 6 3 -3 14 10 -4
Within Banding Limit 0 0 0 0 0 0
Out with Banding Limit 6 3 0 14 10 -4
Adherence to standard 0% 0% 0% 0% 0% 0%
Average Wait (Weeks) 7 3 -4 6 5 -1
1 1 1 1 1 1
3
2
4
1
2 2
1 1 1
5
1
2
1 1
0
1
2
3
4
5
6
2 3 4 6 7 8 9 10 3 4 5 6 7 8 9 10
Priority Banding 2 Priority Banding 3
MH Physio
# of Patients
# Weeks Waiting
MH Physios Wait Times Jan vs June (Weeks) (In Priority Bandings)
Jan
June

Page 20

North Perthshire Adult CMHT – ADHD Wait Times 
The Adult CMHTs have seen a significant increase in referrals for people with potential ADHD and are overwhelmed by the demand. This
correlates with the emerging data across Scotland and rates are expected to increase exponentially. All patients on the ADHD waiting list
have received baseline screening tools to determine whether they require to be assessed by a CMHT, self help information to access whilst
they wait for initial assessment and will have access to the CMHT Duty Worker. Whilst we do await the outcome of the Tayside
Neurodevelopmental Pathway, locally we have been successful in recruiting a Neurodevelopmental Disorder Nurse Coordinator who once
in post will work across the Teams with staff to progress assessments and treatment interventions. The North Perthshire CMHT have a
lower wait time compared to the other two Teams given they had an ANP in post who was progressing assessments however they have
now left post. 
2
4
3
8
1
3
1 1
2
1
2 2
4
10
2
4
6
2
3
9
1
4
1
2 2
1
2
1
0
2
4
6
8
10
12
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
North Perth ADHD
# of Patients
# of Months Waiting
North CMHT ADHD Jan vs June Wait Times (Months)
January
June
North CMHT ADHD 
January June +/-
Total Patients 30 54 +24
Within 3 months 0 4 +4
Outwith 3 months 30 50 +20
Adherence to standard 0% 7% +7%
Average Wait (Months) 8 8 0

Page 21

Perth City Adult CMHT – ADHD Wait Times 
The Adult CMHTs have seen a significant increase in referrals for people with potential ADHD and are overwhelmed by the demand. This
correlates with the emerging data across Scotland and rates are expected to increase exponentially. All patients on the ADHD waiting list
have received baseline screening tools to determine whether they require to be assessed by a CMHT, self help information to access whilst
they wait for initial assessment and will have access to the CMHT Duty Worker. Whilst we do await the outcome of the Tayside
Neurodevelopmental Pathway, locally we have been successful in recruiting a Neurodevelopmental Disorder Nurse Coordinator who once
in post will work across the Teams with staff to progress assessments and treatment interventions. 
40
33 38
22
14 13
70
50 47
27
11
0
10
20
30
40
50
60
70
80
0-6 7-12 13-19 20-26 27-32 33+
Perth City (ADHD)
# of Patients
# of Months Waiting
Perth City Adult CMHT –ADHD Jan vs June Wait Times (Months)
January
June
Perth City ADHD 
January June +/-
Total Patients 160 205 +45
Within 3 months 10 26 +16
Outwith 3 months 150 179 +29
Adherence to standard 6% 13% +7%
Average Wait (Months) 15 11 -4

Page 22

South Perthshire Adult CMHT – ADHD Wait Times 
The Adult CMHTs have seen a significant increase in referrals for people with potential ADHD and are overwhelmed by the demand. This
correlates with the emerging data across Scotland and rates are expected to increase exponentially. All patients on the ADHD waiting list
have received baseline screening tools to determine whether they require to be assessed by a CMHT, self help information to access whilst
they wait for initial assessment and will have access to the CMHT Duty Worker. Whilst we do await the outcome of the Tayside
Neurodevelopmental Pathway, locally we have been successful in recruiting a Neurodevelopmental Disorder Nurse Coordinator who once
in post will work across the Teams with staff to progress assessments and treatment interventions. 
South Perthshire ADHD 
January June +/-
Total Patients 149 181 +32
Within 3 months 1 14 +13
Outwith 3 months 148 167 +19
Adherence to standard 1% 8% +7%
Average Wait (Months) 17 13 -4

Page 23

Perth City Adult CMHT – Consultant Psychiatrist Referral to Assessment 
Wait times for Consultant Psychiatrist/Medical assessments are primarily due to recruitment issues and a reliance on temporary locum staff
alongside outdated models of practice where Consultants primarily undertake outpatient clinics largely for people with less complex needs.
Work to review the CMHT model of care across Tayside is progressing and this will include new ways of working for Consultant
Psychiatrists. Perth City CMHT is showing improvements in the wait time for assessment with an increase in the adherence to the wait time
standard by 11% from 33% to 43%. 
Perth City CP +/- 
January June 
Total Patients 149 162 +13
Within 3 months 49 70 +21
Outwith 3 months 100 92 -8
Adherence to standard 33% 43% +11%
Average Wait (Months) 4 3 -1

Page 24

South Perthshire Adult CMHT – Consultant Psychiatrist Referral to 
Assessment 
Wait times for Consultant Psychiatrist/Medical assessments are primarily due to recruitment issues and a reliance on temporary locum staff
alongside outdated models of practice where Consultants primarily undertake outpatient clinics largely for people with less complex needs.
Work to review the CMHT model of care across Tayside is progressing and this will include new ways of working for Consultant
Psychiatrists. South Perthshire CMHT is showing improvements in the wait time for assessment with an increase in the adherence to the
wait time standard by 34% from 25% to 59%. 
South Perth CP 
January June +/-
Total Patients 36 39 +4
Within 3 months 9 23 +14
Outwith 3 months 27 16 -11
Adherence to standard 25% 59% +34%
Average Wait (Months) 5 3 -2

Page 25

9.3 Development of HSCP Mental Health Key Performance Indicators  (KPIs) 
The development of the suite of KPIs for Mental Health across Tayside has continued
with initial approval for the indicator suite having been reached. P&K HSCP are now
in a data source/discovery phase. For data which sits within NHST systems we have
agreement that the Business Unit will produce a data report covering each of the
KPIs. This will be produced for Tayside, and each of the HSCPs and will therefore
allow us to report independently but using the same suite of KPI data. We were due to
receive the first draft of that data report by the end of Feb and so this is now overdue.
This may be due to additional work which has been undertaken within NHST to
produce NHST’s Annual Delivery Plan and 3 year Strategic Plan. 
In terms of the KPIs which are based on Local Government based data we have met
recently with colleagues in Dundee and Angus to discuss the approaches that need to
be taken to extract the data. Largely this will relate to our use of Social Care systems.
In P&K with the move to MOSIAC upon us it may take a little longer to work through
the detail and extract a first draft.  
We have made good progress on this piece of the work but there are some pieces
that still need to be completed. As we move forward we will insert a relatively short
time horizon for P&K HSCP to review what’s all been included in the suite of KPIs and
make an assessment of the value and impact of including each of the indicators. This
work will link with the NHST Strategic Plan, Scottish Government Mental Health
Quality Indicators and the National Confidential Inquiry into Suicide and Safety in
Mental Health Services(NCISH). 
Quality/Patient Care 
There are a number of ongoing risks (summarised within Appendices 2 &3) which,
if not mitigated, pose a risk to the provision of safe care which is of high quality. 
The HSCP continues to manage these risks proactively. 
Drug related deaths: 
Numbers of suspected drug related deaths are recorded across the three HSCP’s,
and is used to inform learning and context within and across the HSCP’s.  The
following shows data regarding confirmed drug deaths in P&K as compared to
across Scotland (please note the two y-axes): 
3 5 8 3 9 10 11
19
30
25
34
20
21485 584 581 527 614 706 868 934
1187 1280 1339 1330
1051
0
500
1000
1500
0
10
20
30
40
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Confirmed DD
Year
Confirmed Drug Deaths
P&K Scotland

Page 26

Local actions to mitigate risks in Perth and Kinross include:
• Implementation of Medication Assistant Treatment (MAT) Standards 1-5 by
April 2023Implementation of MAT Standards 6-10 by April 2024
• National Mission to reduce drug deaths funding utilised to increase IDART
staff compliment to reduce waiting times and enhance service provision e.g. –
provision of an OT service and the creation of a new psychology assistant
post to provide low level psychological interventions.
• Creation of a multiagency referral pathway for all new substance use referrals. 
• Creation of a near fatal overdose pathway and multiagency group to review all
reported near fatal overdoses with funding provided to third sector partners to
employ assertive outreach workers to actively engage with service users.  
• Creation of a residential rehabilitation pathway and funding panel to facilitate
access to rehabilitation services for service users.
Workforce
There are a number of ongoing risks regarding workforce challenges (summarised
within Appendices 2 &3) which, if not mitigated, pose a risk to the provision of safe
care which is of high quality.  The HSCP continues to manage these risks
proactively. 
Financial 
The composition of the Executive Management Team allows for a discussion of any
financial issues from the perspective of Care & Professional Governance. 
Risk Assessment/Management 
Key risks and risk assurance process is detailed under section 2.3a. 
Equality and Diversity, including health inequalities 
Equality, diversity and health inequalities are core to the Getting it Right Framework
and the domains within. Each service provides exception reports which include this
aspect. Currently there are no exceptions requiring to be escalated to CGC. 
Other impacts 
N/A
Communication, involvement, engagement and consultation
All HSCP Staff have been invited to complete the latest iMatter survey, and teams
will  meet to discuss the results of these and create actions to take forward. 
The use of Care Opinion continues to expand within the HSCP, and during
reporting this reporting period, we have continued to be the most active HSCP in
Scotland, and are ranked 16th within the top 35 most active Care Opinion
subscriptions across the UK.  There were 139 stories between Mar – Jun 2024,
viewed a total of 6288 times.

Page 27

To date we have had 5 changes planned; these changes were promised before this
reporting period. As you can see 2 changes have been made and 3 are being worked
on. 
In this bar chart below, you can see month by month how many stories we received
over the reporting period.   
Looking at the most common word tag added by the authors, we can see by the total
number of reactions that people have responded positively when sharing their story; 
Route to the Meeting 
This has been previously considered by the following groups as part of its
development. The groups have either supported the content, or their feedback has
informed the development of the content presented in this report. 
• P&K HSCP Care & Professional Governance Forum members
• P&K HSCP Professional Leads and Heads of Service
• P&K HSCP Executive Management Team (final draft)

Page 28

10. RECOMMENDATION
10.1 This report is being presented for:
• Reasonable Assurance
As Lead Officer for Perth & Kinross HSCP I would suggest that the level of assurance
provided is: Reasonable Assurance 
Level of Assurance System Adequacy Controls ✓
Substantial
Assurance  A sound system of governance, risk
management and control exists, with
internal controls operating effectively and
being consistently applied to support the
achievement of objectives in the area
audited
Controls are applied
continuously or with only
minor lapses. 
Reasonable
Assurance  There is a generally sound system of
governance, risk management and control
in place. Some issues, non-compliance or
scope for improvement were identified
which may put at risk the achievement of
objectives in the area audited.
Controls are applied
frequently but with evidence
of non-compliance. 
✓
Limited
Assurance 
Significant gaps, weaknesses or non-
compliance were identified. Improvement
is required to the system of governance,
risk management and control to
effectively manage risks to the
achievement of objectives in the area
audited.
Controls are applied but with
some significant lapses. 
No
Assurance 
Immediate action is required to address
fundamental gaps, weaknesses or non-
compliance identified. The system of
governance, risk management and control
is inadequate to effectively manage risks
to the achievement of objectives in the
area audited.
Significant breakdown in the
application of controls.