1 
Appendix 3
Key Improvement activities from CDIP 2024-25 
The following section provides an update on improvement actions included in the Corporate Delivery Improvement Plan 2024/25,
approved at Council  on 15 May 2024. 
Priority: Tackling Poverty
What improvements
do we want to
achieve? 
How will we make
these
improvements? 
How will we
know if we have
been successful
(Baseline
included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
A co-ordinated and
collaborative approach
with partners and
communities to mitigate
the impact of poverty
across Perth and
Kinross 
An overarching
Poverty Strategy for
Perth and Kinross,
including key
strategic actions for
2024/25 to prevent
and mitigate the
impacts of poverty for
children living locally,
will be considered
later in 2024 
Performance
measures will be
agreed as part of
the Poverty
Strategy
(including
baselines)
Strategic
Planning,
People and
Performance 
March
2025
We are continuing to develop the Anti-
Poverty Task Force and are developing a
tackling poverty strategy to start to shift
the focus from reactive to early and
preventative work. 
Encourage and
maximise the update of
all supports targeted for
children and young
people to reduce costs
to reduce the impact
such costs have on the
outgoings families in
poverty
Increasing uptake of
free school meals for
eligible children 
A 5% increase of
uptake of free
school meals 
Baseline:
2022/23: 65%
(primary pupils);
43% (secondary
pupils)
Education
and Learning 
March
2025 
Improvements have been seen in
secondary uptake which rose from 51.6%
for 2023/24 to around 58% and continues
to rise.  However, primary uptake remains
around 65%. We continue to promote
Free School Meals to all parents both as
part of the universal provision and for
those who qualify on the basis of receipt
of qualifying benefits.

Page 2

2 
Priority: Tackling Poverty
What improvements
do we want to
achieve? 
How will we make
these
improvements? 
How will we
know if we have
been successful
(Baseline
included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
Encourage and
maximise the update of
all supports targeted for
children and young
people to reduce costs
to reduce the impact
such costs have on the
outgoings families in
poverty 
Reduce the cost of
the school day
Schools using
the Cost of the
School Day
toolkit with action
plans in place 
Qualitative
measure to
demonstrate
positive impact
Education
and Learning 
March
2025
Cost of the School Day resources have
been provided to all schools to enable
consideration and inclusion as part of
Quality Improvement Planning for
2024/25. This includes training materials
provided by the Child Poverty Action
Group (CPAG) as well as exemplar
action plans and checklists based on the
CPAG Cost of the School Day toolkit. 
Good practice has been recognised in
Education Scotland Triannual Reports.
Increasing uptake of
the National
Entitlement Card for
free bus travel to
reduce travel costs
Run drop-in sign up
sessions to support
people who have
challenges to sign up
online. 
A 5% increase in
uptake of the
National
Entitlement Card
amongst under-
22s. 
Baseline: March
2024 22,091 of
under 22s with a
card, 82% of
under 22s in
Perth and
Kinross
Strategic
Planning,
People and
Performance 
March
2025
During July 2023, drop in events were
held in Letham Housing Office,
Community Campus at Loch Leven,
Breadalbane, Strathearn and Learning
Curve.  In November 2023, we visited
Breadalbane Academy after a lot of
preparation with the school and
processed 150 different requests either
getting cards replaced, photos updated
and adding the free travel element. After
the success of this event similar events
were offered to Education and Schools.

Page 3

3 
Priority: Tackling Poverty
What improvements
do we want to
achieve? 
How will we make
these
improvements? 
How will we
know if we have
been successful
(Baseline
included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
Encourage and
maximise the update of
all supports targeted for
children and young
people to reduce costs
to reduce the impact
such costs have on the
outgoings families in
poverty.
Promote NEC take up
alongside free
Saturday bus travel
marketing activity   
We are working in partnership with local
bus operators in terms of branding and
advertising, the first Saturday free Bus
travel started on 1 June 2024.

Page 4

4 
Priority: Tackling climate change and supporting greener sustainable places
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target  
Date
Progress Update 
Ensure we
have a cleaner
and greener
Council fleet 
Implement the Fleet
Decarbonisation
Strategy for Perth and
Kinross Council
From 2025 100% of all
fleet vehicles under 3.5
tonnes which reach the
end of their useful life or
lease period to be
replaced with electric
vehicles
Baseline: In 2022/23 17
fleet vehicles were
electric (4% of total fleet)
Environment
and
Infrastructure 
March
2025
In February 2024, a report on ‘Fleet
Decarbonisation Strategy’ was presented
at the Climate Change and Sustainability
Committee. 
Develop local
public
transport
solutions
which set the
needs of
residents and
the
environment
as top priority 
Consider how
subsidised local bus
services could be
configured to be more
effective, efficient and
economic, addressing
equality issues and
environmental
commitments
Develop a fully costed
business case for new
models of public
transport delivery
Scoping of proposals and
project plan developed
Establish baseline for
number of journeys
delivered through
subsidised local bus
transport, including
existing support provided
through Demand
Responsive Transport
and Community Transport
Housing and
Communities 
March
2026
Improvement Actions sit within the Buses
2030 Transformation Project; Elected
Members committed a budget motion of
£320K over three years to facilitate this.

Page 5

5 
Priority: Tackling climate change and supporting greener sustainable places
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target  
Date
Progress Update 
Improved
energy
efficiency and
reduction in
carbon
emissions in
the Council
estate
A Local Heat and
Energy Efficiency
Strategy (LHEES) will
be published in May
2024
Progress on LHEES.
Performance measures
on this improvement will
be agreed as part of
LHEES
Economy,
Development
and Planning 
March
2025
Publication of the LHEES Strategy and
delivery post-election July 2024.
Increase
provision of
biodiversity
sites 
Developing a long term
plan for managed
grassland areas
Increase volume of uncut
grassland areas 
Baseline: 2023/24 21.7ha
(53.68 acres)
Environment
and
Infrastructure 
Housing and
Communities
March
2025
Following the grassland management
trials in previous years the Council’s Grow
Wild for Perth and Kinross initiative has
been launched this year to significantly
increase the areas of grassland to
encourage biodiversity.  
Delivery of UK Shared
Prosperity Fund funded
Biodiversity Towns and
Villages Project and the
Greening Industrial
Estates Project
Increase in number of
biodiversity interventions 
Baseline: 2022/23 – 64
biodiversity interventions
completed
Environment
and
Infrastructure 
Housing and
Communities 
March
2025
Progress has been made in areas of
recruitment and engagement:
• Two new officer positions have been
created to lead and coordinate works
• Engaging with local communities who
will be involved in the Biodiversity
Villages, Towns & Neighbourhood
Initiative.

Page 6

6 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
Unlock new
investment in
employment
and housing
land to
support
business
growth in new
growth sectors
Commence design
work and
development of Perth
West Eco Innovation
Park
Level of business interest
in Perth West
demonstrated by leasing
or buying land Baseline:
new measure, baseline
data to be established
2024/25
Economy
Development
and Planning 
March
2025
Following Council’s approval in June
2024 to commit funding, a consultant is
being appointed to start design work in
August 2024. Tay Cities Deal Outline
Business Case approved in July 2024
and positive discussions have taken
place with developers to secure
financial contributions. This would allow
full funding package to be in place to
develop Perth West including Perth
Eco-Innovation Park.
Make Perth
and Kinross a
more
competitive
inward
investment
destination
and
encourage
investment for
growth from
existing
businesses in
key growth
sectors 
Developing and
improving Invest in
Perth information and
support for new and
existing businesses
investing in Perth and
Kinross 
Introduce Business
Enquiry Management
System to provide
more data and insight 
Increased levels of
interest and awareness in
inward investment
opportunities in Perth and
Kinross 
Baseline: new measure,
baseline data to be
establish in 2024/25
through the new Business
Enquiry Management
System being introduced
in 2024
Economy
Development
and Planning 
March
2025
Invest in Perth website content and
format have been reviewed and a new
version will be launched. Business
information has been reviewed and
Business Enquiry Management system
is also being reviewed.

Page 7

7 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
Make Perth
and Kinross a
more
competitive
inward
investment
destination
and
encourage
investment for
growth from
existing
businesses in
key growth
sectors 
Working more closely
with Business
Gateway, Growbiz
and key businesses
and sector
representatives
Increased levels of
interest and awareness in
inward investment
opportunities in Perth 
Baseline: new measure,
baseline data to be
established in 2024/25
through the new Business
Enquiry Management
System being introduced
in 2024
Economy
Development
and Planning 
March
2025
A top 100 businesses list has been
created to improve customer
management relationship with key
businesses and intelligence is being
collated to identify possible investments
from companies already located in
Perth and Kinross. 
Key economic stakeholders have been
engaged in the development of the
Perth and Kinross Economic Action
Plan including Growbiz and Business
Gateway. The Action Plan will be
delivered by the Perth and Kinross
Economic Partnership and provide the
basis for raising awareness in inward
investment opportunities.
Increased
number of
businesses in
the creative
and digital
industries 
Renewed focus on the
visitor, cultural and
creative economy as a
result of greater
collaboration through
the new focussed
delivery structure. 
Demand for business space
for creative and digital
industries will increase 
Baseline: new measure,
baseline data to be establish 
In 2024/25 through the new
Cultural Database in
progress for 2024
Economy
Development
and Planning 
March
2025
Perth Creative Exchange is regularly
being promoted to the cultural sector
with various open days to showcase
facilities.
The Cultural Forum has now been set
up and is being administered by
Culture PK acting as a platform for
peer-to-peer support. The Perthshire
Box Office pilot project is underway
with KPIs set for 2024-2025 with a
budget contribution of £80k.

Page 8

8 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
Unlock private
investment and
expertise to
support public
and private
energy projects    
Develop a Strategic
Energy Partnership with
private partner and
pipeline of energy
investable projects
Increased investment in
energy projects shown
through number of strategic
cases approved for delivery
which include financial
investment 
Baseline: new measure,
baseline data to be establish
in 2024/25 
Increase in number of
registered business in
energy
Baseline: established in
2022/23 Annual
Performance Report
Economy
Development
and Planning 
March
2025
A Prior Information Notice has been
published on Public Contracts
Scotland to engage with the market to
explore options to develop a Strategic
Energy Partnership. Good level of
engagement has taken place and
options will now be reported for
consideration before the end of the
calendar year. 
The Strategic Energy Partnership will
support the delivery of the Local Heat
Energy Efficiency Strategy and the
Local Area Energy Plan which have
been published in July 2024 including
the development of a pipeline of
energy investable projects.
More people
choose Perth
and Kinross as
a destination
for holidays
and day trips
Increased promotion of
consumer and visitor
offer via Perth City and
Towns website and
social media channels 
Deliver national and
international  tourism
campaigns with Visit
Scotland. Attend or be
represented at national
and regional travel trade
events
Increased consumer and
visitor expenditure, dwell
time and overnight stays.
Baseline: 2022 
Direct tourism expenditure:
£463.48 million
Average length of stay
(staying visitors): 3.1 days 
Economic impact of tourism:
£646.50 million
Economy
Development
and Planning 
March
2025
The first Tay Cities Regional Tourism
Strategy was published in September
2019 and completed in 2024. It
demonstrated the success of a regional
partnership approach which had clearly
focussed on specific activities which were
most effectively and efficiently delivered
at a regional level. The partnership had
successfully sought funding from the
Destination & Sector Marketing Fund in
2022 £56k and UK Shared Prosperity
Fund 2023-2025 £80k.

Page 9

9 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
Further
enhance our
employability
outreach
capacity,
supporting
individuals in
community
settings   
Review and increase
the number of
employability outreach
locations and frequency
Increased numbers of
individuals supported in
targeted locations and
overall increase in number
of people supported 
Baseline: 2022/23 - 215
number of people supported
in outreach locations
Economy
Development
and Planning 
March
2025
In 2023/24, the total number supported
in Outreach locations was 235, we
would hope to increase to at least 250
by end of 2024/25. 
We provided outreach services in 6
locations.  These have been reviewed
and an additional location has been
added at the new Letham Hub for
2024/25.

Page 10

10 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
Attainment at key
milestones is raised
for all children and
young people 
Using health and
wellbeing census
data to inform
school level
improvement
plans 
PKC attainment for each
of the indicators within the
Corporate Plan will
increase to at least target
levels. 
Baseline: established in
2022/23 Annual
Performance Report
Education
and
Learning 
February
2026
(due to
timing of
publicatio
n of data
for
2024/25)
Early indications are that steady progress is
being made with year on year increases in
key attainment measures. 
Literacy and numeracy P1-S3 showing
improvement of 1-2%.
Increase the number
of 
young people going 
into positive 
destinations such as 
work experience, 
further education, 
volunteering and 
employment 
A school
atmosphere
conducive to
learning and
personal
development, where
children and young
people feel safe,
secure, listed to and
have their views
taken into account
on issues that affect
them
By placing an 
Employability
Youth 
Worker in each 
locality to liaise
with 
school 
Early intervention
approach in
school and
delivery of
employability
programmes 
Implementation of
the updated Anti-
Bullying Strategy
which will include
key strategic
actions for
2024/25 
Increase in school leavers
entering positive initial
destinations 
Baseline: 2022/23
(95.97%) 
Schools will have robust
procedures to reduce
bullying in line with
improving relationships 
Measures and baselines
to be established in Anti-
Bullying Strategy 
Education
and
Learning 
March
2025 
Initial 2024 leaver data not yet  available.
SDS Annual Participation Measure data will
be published in August 2024.  There have
been year on year increases in the number
of young people participating in work
experience since 2021. 
The Anti-Bullying Strategy and Operational
Guidance for Perth and Kinross Council
Early Learning and Childcare settings and
School has been finalised and shared.  This
can be accessed through the PKC website. 
42 schools currently have a school level
anti-bullying policy, however almost all
school intend to revise their school-level
policy over the 2024/25 academic year to
refresh their approaches and support
alignment to the PKC strategy. Data
recorded in the SEEMiS Bullying and
Equalities Module is gathered to form a data
set that will be regularly scrutinised by both
central and school-based staff.

Page 11

11 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
Improved
understanding of
causes of
attainment gap so
that effective
interventions can be
identified and
implemented
Review and
refresh the Perth
and Kinross
Council
interventions
toolkit to address
the needs of key
priority groups 
All schools will plan,
record and track pupil
progress via the Closing
the Gap t tool 
A reduction in the
poverty-related attainment
gap for schools leavers 
Baseline: established in
2022/23 Annual
Performance Report
Education
and
Learning 
March
2025
All schools are tracking and monitoring
interventions on the Closing the Gap Tool. 
Support and feedback have been provided
to all schools on their planning and data
analysis needs. More tailored support has
also been provided to identified settings on
a risk-assessed basis. 
2023 leaver data evidences a narrowing of
the poverty-related attainment gap in key
measures such as achievement of SCQF
Level 5 and 6 qualifications.
Improve support to
children and young
people with
additional support
needs to realise
their full potential 
Through the
Additional
Support for
Learning
Transformation
Programme
Maintain or reduce
placement within
independent schools
Baseline: new measure,
baseline to be established
in 2024/25
Education
and
Learning 
March
2025
Following the establishment of a
governance board, programme
management, project documentation and
identification of specific workstreams, work
is underway to implement the priority
projects for year two and identify the
resources to support their delivery. 
Project sponsors for each of the
workstreams have been identified along with
leads for specific pieces of work within
them. 
Focus is now on project implementation;
monitoring, evaluation and reporting.

Page 12

12 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
Provide Kinship
Carers with a range
of supports to
enable them to meet
the needs of
children in their care 
Provide
opportunities for
Kinship Carers to
engage in: 
• Support groups 
• Training 
Number of Support
Groups and Training
Opportunities afforded to
Kinship Carers 
Baseline: new measure
baseline to be established
in 2024/25
Children,
Families
and Justice 
March
2025
Our Carers Group for kinship meet monthly.
We have a core group of around 12 carers
who attend regularly. The group is gaining
popularity, and our carers are actively
encouraged to join us. In the support group
we present opportunities for learning. The
model works very well as it generates a lot
of discussion. During the assessment
process, learning for carers takes place –
for example, a common theme is trauma
related care, and carers are asked to reflect
on this to increase their understanding.
Following the placement of a child a
common theme we address is around Life
Story and how carers can help a child
understand their circumstances. 
All carers are encouraged to access KCASS
resources, and any training being offered by
KCASS is sent out to our carers – Kinship
Care Week held every March offers a host
of training/learning opportunities for kinship
carers. We do have a Carers Resource
Leaflet for carers which we can send out to
carers, and this has on line links to learning
on specific areas
Our model of support with SSCO’s link also
identifies learning/training needs and
SSCO’s access resources for them to give
carers and this assists with their learning.

Page 13

13 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
Improve educational
outcomes for looked
after children 
Where additional
educational
support is
identified in a
child’s plan – to
provide access to
online tutoring. 
Number of looked after
children in receipt of online
tutoring. 
Baseline: new measure,
baseline to be established
in 2024/25 
Children,
Families
and Justice 
March
2025
29 looked after young people have
accessed tutoring online in the past year.

Page 14

14 
Priority: Protecting and caring for our most vulnerable people 
What
improvements
do we want to
achieve? 
How will we
make these
improvements? 
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Target
Date 
Progress Update 
Take a
partnership
approach to the
assessment of
risk of significant
harm to a child 
Undertake Initial
Referral
Discussions
between Social
Work, Police,
Health and
Education
Number of Initial Referral
Discussions 
Baseline: new measure,
baseline to be established
in 2024/25
Children,
Families
and
Justice 
March
2025
In 23/24 there was a total of 295 Initial
referral discussion (IRDs) across Children
and Family social work service.  These
IRDs involved 484 children and young
people.  These discussions always
include relevant partners in the police,
social work, health and where necessary
education. 
Take a
partnership
approach to
minimising and
reducing risk
through early
support and
assessment
Weekly Multi
Agency Screening
Group (MASH) to
triage referrals
Number of Families triaged 
Number of children triaged
Baseline: new measure,
baseline to be established in
2024/25 
Children,
Families and
Justice 
March
2025
Between April 23 to March 24,  217
children were triaged and allocated via the
weekly MASH meetings. This equates to
170 families. 
The base line will be 217 children and 170
families for 23/24, as this  is the first full
year the group has been in operation.  
Enhance our
housing support
offer by
implementing an
Intensive
Housing Support
Service for
people with
complex needs
Commission a third
sector provider to
deliver intensive
housing support.
Repeat homelessness
presentations will be
minimised and tenancy
sustainment for previously
homeless people with
complex needs will increase 
Housing and
Communities 
March
2025
Following an open tender process,
Turning Point Scotland were appointed to
deliver this service.  The contract began in
October 2023 and is for 2 years with a 12-
month optional extension.
The service is operating beyond capacity
with 22 service-users and is achieving
good outcomes for some of our most
vulnerable people.

Page 15

15 
Priority: Protecting and caring for our most vulnerable people 
What
improvements
do we want to
achieve? 
How will we
make these
improvements? 
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Target
Date 
Progress Update 
Baseline: 
2019/20 (25); 2020/21 (30);
2021/22 (15); 2022/23 (5)
Feedback from people with
complex care needs will be
positive with better outcomes
being reached. Qualitative
measure to demonstrate
positive impact
We are currently exploring options to
identify new funding to enable the capacity
of the service to be increased.
Where children
cannot remain
living at home,
every effort is
made to keep
them within their
kin network
Children, parents /
carers and kin
networks are
listened to and
afforded the
opportunity to have
their say through
Family Group
Decision Making
Number of families
completing the Family Group
Decision Making (FGDM)
process and adhering to a
family plan 
Baseline: new measure,
baseline to be established in
2024/25
Children,
Families and
Justice 
March
2025
We have seen the use of FGDM
processes expand and now include pre-
birth decision making.  The feedback from
the process is that families feel
empowered.  
The baseline figure created will allow for
monitoring of success but anecdotally
there are few families which have not kept
to the plan and evidence of a reducing
number of children and young people who
are accommodated.

Page 16

16 
Priority: Protecting and caring for our most vulnerable people 
What
improvements
do we want to
achieve? 
How will we
make these
improvements? 
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Target
Date 
Progress Update 
Maintain
significant
relationships for
care experienced
children to deliver
on the principles
of The Promise
Offer care
experienced
children and young
people to create a
Lifelong Links
plans to maintain
significant
relationships.
Number of children and
young people completing
Lifelong Links plans
Baseline: new measure,
baseline to be established in
2024/25
Children,
Families and
Justice 
March
2025
The provision of lifelong links has
increased but remains voluntary for the
children and young people involved.  One
success story has been that one young
person has made a connection with their
birth family and now lives with them. 
Other children and young people have
found relatives that they thought were
deceased.

Page 17

17 
Priority: Supporting and promoting physical and mental wellbeing
What
improvement
s do we want
to achieve? 
How will we
make these
improvements? 
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Targ
et
Date
Progress Update 
Increase uptake
of sport and
physical
activities.
Work with key
partners to develop
programmes which
optimise
opportunities for
physical activity
Numbers of participants have
increased. Baseline: 2022/23
(1.002M)
Economy,
Development
and Planning 
March
2025
Attendance levels at pools, indoor and
outdoor sports and leisure facilities has
increased from 1.002M in 22/23 to 1.116M
in 23/24.
The Physical and Sports Strategy focusses
on increasing participation in physical and
sport to support mental health and
wellbeing. Initiatives include Aspiring
Coaches for Young Leaders, KIT banks
established in Primary Schools including
areas of highest need and the Bikeability
programme delivered in 67 of our primary
schools.
Increase uptake
of sport and
physical
activities.
Social prescribers
encouraging the
use of outdoor
activities
Reduction in health and social
care issues related to
inactivity. Baseline: new
measure, baseline to be
established in 2024/25
Health and
Social Care
Partnership
March
2025  
This action is to be removed as there is no
data and for a range of reasons this is not
measurable.
Increase uptake
of sport and
physical
activities.
Work with schools
and sport groups to
increase the
number of
opportunities for
children and young
people to take part
in physical activity
Number and percentage of the
total school roll (primary and
secondary) participating in
Active Schools/ school sports 
Baseline: established in
2022/23 Annual Performance
Report
Education
and Learning 
March
2025
Since school activity programmes have
returned more fully in 2022/23 the number
of participating pupils has begun to recover
– 39% in 22/23 to 42% in 23/24 and
exceeds target of 33%.  There have been
improvements for specific targeted groups
with increased rates of participation for
secondary girls, young carers and care
experienced children and young people.

Page 18

18 
Priority: Supporting and promoting physical and mental wellbeing
What
improvement
s do we want
to achieve? 
How will we
make these
improvements? 
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Targ
et
Date
Progress Update 
Reduce waiting
times for people
to access
Mental Health
Services. 
Redesigning
specialist
community mental
health services
across Tayside.
Reduction in waiting lists
(weeks) 
Baseline: established in
2022/23 Annual Performance
Report 
Health and
Social Care
Partnership 
March
2025
The CMHWB Strategy provides an update
on how the HSCP is supporting the
Council’s CDIP actions.     
Deliver the
Strategic Delivery
Plan for
Community Mental
Health and
Wellbeing
(CMHWB)
Increase access to
preventative and
community
support. 
Reduction in waiting lists
(weeks) 
Baseline: established in
2022/23 Annual Performance
Report
Health and
Social Care
Partnership 
March
2025

Page 19

19 
Priority: Working in Partnership with Communities
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we have
been successful (Baseline
included for reference)
Strategic
Lead
Target
Date
Progress Update
Deliver a clear,
consistent, and
joined up approach
to supporting
communities and
households with the
help and support
they need to mitigate
and move beyond
poverty. 
Develop multi-
disciplinary
locality working
focussed on
locally identified
needs. 
Feedback from communities and
staff on the effectiveness of the
multi-disciplinary team approach 
Strengthened partnerships
within localities with case
studies to evidence 
Qualitative measure to
demonstrate impact
Strategic
Planning,
People and
Performance 
March
2025
Pilot locality working projects are well
underway in Highland Perthshire,
Letham and Coupar Angus, with further
rollout to Perth City and Crieff planned.
A full rollout plan has been drafted to
wider rollout across Perth and Kinross. 
Provide more
affordable homes to
support liveable and
sustainable
communities
Deliver PKCs
affordable
housing
programme of
1,050 over the
next 5 years 
Maintain 53%/47% split across
urban and rural areas, which is
in line with the population split in
Perth and Kinross 
Baseline: 22/23: Total 242
homes (54 buybacks/ empty
homes; 145 new rural homes
(77%) and 43 new urban homes
(23%)
Achieve an average 210
affordable housing completions
each year. Baseline: 2022/23
(203)
Economy
Development
and Planning 
March
2027
The recently adopted Local Housing
Strategy 2022-27 (March 2023) target is
to deliver 1050 affordable homes with
an Urban (53%) / Rural (47%) split to
ensure representative distribution. In
financial year 2023/24, there was 173
new affordable homes completed by
PKC and our RSL partnerships with an
urban/rural split of 62 new urban
affordable homes (36%) and 111 new
rural affordable homes (64).

Page 20

20 
Priority: Working in Partnership with Communities
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we have
been successful (Baseline
included for reference)
Strategic
Lead
Target
Date
Progress Update
Support community
groups to manage
local assets, such as
community halls
Support
community
groups to
develop
Community
Asset Transfer
(CAT) plans 
Carry out
engagement
activity to
promote
Community
Asset Transfer
as an option
Increase in number of
Community Asset Transfers 
Baseline: 2022/23 (0) 
Increase in community groups
applying for community asset
opportunities. 
Baseline: established in 2022/23
Annual Performance Report 
Housing and
Communities 
March
2025
Web based resources for groups to
access have been updated and the
CAT process reviewed.
Pro-active engagement in localities with
LAL managed halls taken place to
gauge interest in CAT and promote
benefits.
Access to external funding to facilitate
CAT being reviewed.
Increased
engagement and
applications from
communities to the
Community
Investment Fund
(CIF) grants
programme
Review
application and
assessment
process and
implement
improvements
identified
through
evaluation of the
2023/24
Community
Investment Fund
programme
Increase in the number of
groups receiving community
investment funding 
Baseline: established in 2022/23
Annual Performance Report
Increase in the number of
people benefitting from a
Community Investment Fund
funded project 
Baseline: 2021/22 36,115
people benefitted from a
Community Investment Fund
funded project
Housing and
Communities 
March
2025
Application and assessment process
reviewed and improvements made to
the online portal to ensure it is more
user friendly.
Locality staff to promote CIF funding to
key groups and support application
process.

Page 21

21 
Priority: Working in Partnership with Communities
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we have
been successful (Baseline
included for reference)
Strategic
Lead
Target
Date
Progress Update
An empowered and
skilled workforce
who are confident in
engaging with
resident and
communities and
demonstrate the
organisational
values and expected
behaviours at all
times. 
Delivery of
action within the
Employee
Engagement
and Cultural
Change
Programme.
Feedback from our workforce,
managers, and community
members
Strategic
Planning,
People and
Performance 
March
2025
The People and Culture Strategy 2024-
28 Delivery Action Plan will replace the
Employee Engagement and Cultural
Change Programme to monitor and
measure improvements.
The 2024 Employee Survey results are
a positive indication that we are
effectively delivering the improvements
with 92% of respondents saying they
feel their team demonstrates the PKC
values often / every day.