PKC Annual Performance Report
2023/24
A Perth and Kinross where everyone can live life well,
free from poverty and inequalities.
Appendix 2

Page 2

Annual Performance Report 2023/24 
1
Contents
Contents 
Introduction 2
Performance summary 4
Priority: Tackling poverty 5
Priority: Tackling climate change and supporting greener sustainable places 12
Priority: Developing a resilient, stronger and greener local economy 19
Priority: Enabling our children and young people to achieve their full potential 26
Priority: Protecting and caring for our most vulnerable people 33
Priority: Supporting and promoting physical and mental wellbeing 42
Priority: Working in partnership with communities 49
Key contact 55

Page 3

Annual Performance Report 2023/24 
2
Introduction
Welcome to our Annual Performance Report for 2023/24.
The Annual Performance Report provides a summary of the work
that has been undertaken over the past year for the residents of
Perth and Kinross to deliver on the Council’s seven priorities which
underpin our vision for: 
a Perth and Kinross where everyone can live life well, free from
poverty and inequalities. 
In setting this vision and our priorities we knew that there were
challenges ahead. Tackling poverty and climate change are big
issues with causes and solutions that we cannot overcome alone.
However, we do have a very important part to play in addressing
these. In 2023/24 we invested £1.5M in projects to support our
residents who were most in need, including £600,000 to help those
worst affected by the Cost of Living crisis.
However, local authority budgets are coming under increasing
pressure while demand increases. 
In order to deliver a balanced budget in 2023/24 we set tough
energy efficiency targets as part of a range of measures to meet the
financial challenges we face. As budgets tighten in future years, the
need for greater efficiencies and savings will become even more
pressing.
In reporting on our performance, we have also reflected on where
things have not gone as expected, to create a balanced picture of
what has been achieved this year. More detailed information about
improvement activity is available in our Corporate Delivery and
Improvement Plan (CDIP) which is attached as an appendix to this
report with progress updates.  
Similar to last year, to improve our public performance reporting we
have created an accompanying executive summary version of this
report to provide an at-a-glance guide to our performance. We have
also published on our website additional contextual information,
including case studies, financial details and how we deliver on the
national Best Value themes. Links to these can be found at the
relevant points in this report. 
We are grateful to all residents, businesses, partner organisations
and everyone in our teams who have contributed to the work we are
reporting on here. We hope that you find this report useful in
providing an oversight of how we have performed as an
organisation in 2023/24.     
Councillor Grant Laing   Thomas Glen
Council Leader    Chief Executive

Page 4

3

Page 5

4 
Performance summary 
Performance against priorities and actions 
The following pages highlight just some of the work we have
undertaken with our communities and partners across the private,
public and third sectors throughout the year. This is listed by priority
area as outlined within our Corporate Plan 2022/23-2027/28.
Case Studies
Each priority area contains links to relevant case studies. These
can be viewed on PK Performs website. 
Key Performance Indicators
Each priority area also includes Key Performance Indicator (KPI)
data with an indication of trend over the last year and
accompanying commentary.   
Data is shown between 2021/22 - 2023/24, or the most recent year
available.   
Caution should be applied when interpreting KPI data, as trends will
only be indicative of performance. Trends should be considered in
the context of the current operating environment, challenges and
whether we control, influence or are informed by the data. 
Targets
Targets for each KPI are also presented where relevant and
highlighted by a traffic light system as to whether the 2023/24 data
has met the target. 
KPI Overview
KPI trends 
Data trending
in a
favourable
direction
Data trending in an
unfavourable
direction
Data trend
remains
static
No data
available to
make
comparison in
trend 
   N/A
31 14 7 2
KPI performance against target
Met or
exceeded
target 
Target
not met  Target
Not Set 
23/24
Target Set
but data not
yet available
Not appropriate
to set target
15 15 4 11 9 
Supporting information 
Best Value themes
In addition to reporting on performance against the actions and
indicators set out within our Corporate Plan and in line with the
statutory performance information direction, we have created a
supplementary report on our performance aligned to the Best Value
themes. Read the Best Value Themes Performance Report 2023/24
on our PK Performs website. 
Financial information 
We have also included financial information online which details
where we get our money from and how we spend the budget. Read
the supporting financial information on our PK Performs website.

Page 6

5 
Priority: Tackling poverty 
Action: Prevent and mitigate the impacts of
poverty for children living in Perth and Kinross 
Our work on child poverty has been significant this year with
particular focus on the priority family groups as defined by Scottish
Government. Some of the ways we have and are continuing to do
this include: 
Our sixth Child Poverty Action Report 2023/24 has been jointly
produced by Perth and Kinross Council and NHS Tayside and
reflects the wider collaboration with our Community Planning
Partners and a deepening engagement with our key stakeholder
Groups. The report includes actions taken to implement our Child
Poverty Delivery Plan 2022-26. 
• We supported parents into work removing barriers to
employment for example through the Future for Families project,
support included:
o Engagement with 181 families for support; 
o 53 of these families were issued/approved for digital devices;
o £178k of Elev8 Training Grants to support clients into
new/better employment;
o £11k worth of payments to private childcare providers on
behalf of clients. 48 payments for client travel, spending £8k
to support our clients; and
o 36 clothing vouchers to clients for essential workwear and
interview attire.
• Funding is also available through the Future for Families to
support parents into self-employment, 7 clients took up this offer
between launch in September 2023 and March 2024. Support
comes in the form of a ‘safety net’ in terms of income for the first
three months of self-employment whilst establishing their new
business.  
• Worked with priority family groups to understand the barriers
being faced and the areas which would have the biggest impact
to enable families in crisis to move to sustainable livelihoods. We
have secured over £1.3 million to invest in the Supporting People
– Addressing Needs Programme (SPAN).  This provides a
platform for the integration of services across income
maximisation, employability and wellbeing.  It will deliver an offer
tailored to families affected by poverty.  
• The proportion of children who have been placed in temporary
accommodation has been generally falling since 2008, while the
national and comparator trend has been upwards in recent
years. The Scottish Government declared a ‘Housing
Emergency’ in May 2024, recognising the extreme housing
supply and demand pressures. We are experiencing these
pressures in Perth and Kinross but are prioritising minimising the
number of families requiring temporary accommodation through
our ‘Home First’ response to homelessness.
• Progress is being made across the authority in closing the
poverty-related attainment gap. Evidence gathered on the
‘Closing the Gap’ tool indicates that 610 interventions were
delivered to 17,309 children and young people targeted at
addressing poverty-related gaps in literacy, numeracy and health
and wellbeing.  Many of these interventions were funded by Pupil
Equity Funding.   
CASE STUDY
Key elements within the Supporting People –
Addressing Needs Programme (SPAN) were identified
following feedback from parents from Priority Family
Groups.  Working with partners, the programme will deliver
support tailored to families affected by poverty including
money talk service, tackling poverty unit and universal
whole family support service.

Page 7

6 
• During 2023/24, 3,413 funded childcare places were provided by
local authority, funded provider and childminder settings. Of
these, 300 were funded Strong Start places for eligible two-year
olds, an increase from 216 places in 2022/23. Additionally,
arranged home to school transport for around 4,100 school
pupils in Perth and Kinross.  
• The Big Hoose was founded in 2021 by the Cottage Family
Centre and Amazon UK to distribute surplus everyday household
essential products from Amazon and around 30 other local and
multi-national businesses to families who need them most.  The
project originated in Fife but has, with financial support and
premises from the Council expanded to create a hub service in
Perth and Kinross. The project is hosted by PKAVS Carers. So
far, 19,500 items have been distributed to 922 families with 1,635
children. The next steps are to make the project available across
rural Perthshire by creating local access points in 5 or more
locations. 
Action: Mitigate cost of living pressures for
households experiencing or at risk of poverty 
• Our staff provide advice and support to tenants to assist them to
maximise their income, supporting their ability to pay their rent.
We supported 566 tenants with £215k assistance from our
Tenancy Sustainment Fund (TSF) to either clear arrears
balances or match their arrears payments to reduce financial
hardship and sustain their tenancy.
• Recognising that most gypsy/travellers are living rurally with no
fixed-abode and this too can bring barriers to access to support
we delivered three outreach sessions, specifically targeting
Gypsy/Traveller sites. As a result, we were able to assist with
almost £5k in Financial Insecurity Fund payments paid between
13 households to assist with rural hardship, solid fuel, clothing
for children and adults and data packages for mobile phone use
to help the community stay connected with extended family in
other parts of the country.  Additionally, we identified credits on
Council Tax accounts for 16 of the households totalling £3,398
and arranged for refund of these credits to each of these
households.
• Through the Strategic Housing Investment Plan in 2023/24, 18
new build affordable homes were delivered in SIMD lowest
quintile (lowest 20%), 37 new affordable homes were suitable for
larger families, and 11 suitable for households with disabilities,
both household types have been identified as two of the six
recognised priority groups at greatest risk of poverty.
• We have developed a programme of six interconnected projects
that together have attracted over £1m of funding from the
Scottish Government and external funders. These are being
taken forward in partnership with Citizens Advice Bureau (CAB),
and various council teams and comprise of: Social Needs
Screening, Support and Connect, Building resilient families and
communities, Cash First Partnership, Money Talk plus and the
Universal Whole Family Wellbeing service. 
CASE STUDY
Perth and Kinross Council granted a budget of £250,000 for
the Warm Welcome Fund Initiative. The aim of the
funding was to support community and organisations in
their delivery of the provision of warm spaces and home
packs over the winter months; funding was provided to 94
community organisations.

Page 8

7 
Action: Maximise income from benefit
entitlement and concessions for households
experiencing or at risk of poverty
• We generated £8.5m in additional income for Perth and Kinross
residents through the benefits system; this is a 31% increase on
last financial year when we generated £6.5m in benefit gains.
We received 8,022 referrals, an increase of 7% compared to the
previous year.  Clients are surveyed on an ongoing basis, 95%
people surveyed had no problems accessing the service and
96% felt the service was delivered in a way that suited their
needs.  
• During 2023/24 we received 2,556 Financial Insecurity Fund
(FIF) applications with an award rate of 62% and average award
of £419; the total spend was £664k, with a 3,347 payments being
made to households. Payments included one-off rural hardship
payments; assistance with priority debt (energy, Council Tax,
rent); clothing for children over the winter period, school dinner
and assistance with Infant Formula.  The scheme has been
recognised by the Scottish Poverty and Inequality Research Unit
(SPIRU) at Glasgow Caledonian University in their Tackling
Poverty Locally Online Directory.
• We established a partnership with Aberlour and our Tayside
counterparts to provide a comprehensive and enhanced welfare
rights service to vulnerable families with dependent children.
During 2023/24 through our formal referral agreement with
Aberlour, 11 families with children on the "edge of care" were
referred to the Welfare Rights service for comprehensive
benefits advice and assistance.
More information on Welfare Rights activity during this year can
be found in the Welfare Rights Team Annual Performance
Report 2023/24 
CASE STUDY
Perth CAB – Pathways to Advice Cash/Cash First
Partnership project secured funding from Trussell Trust
and Whole Family Wellbeing Fund. Working closely with
partners the aim of the project is to ensure easy access to
‘holistic’ support is provided to priority families and children
in need. 
Action: Promote and encourage local
employers to follow the principles of the
Scottish Government Fair Work Action Plan,
including the real Living Wage and Scottish
Business Pledge
• To support employers and promote the Real Living Wage our
Rural Employment Incentive helped to create 25 new rural jobs
for rural young people in 2023/24. These roles create vital new
positions in smaller communities and enhance the chances of
sustained jobs remaining after the funding period. A re-design
and securing of further funding has led to an enhanced offer to
businesses in 2024/25 with funding for up to 70 newly created
jobs for clients with employment barriers.
• We already paid the Real Living Wage to 16 and 17-year-olds
who are not in apprenticeship or trainee positions. It was
approved at Committee in November 2023 to implement the
payment of the Real Living Wage of £12 per hour, announced on
24 October 2023, to Apprentices and Trainees with effect from 1
April 2024. This meets with our obligations as a Fair Work
employer.

Page 9

8 
• Work is ongoing to further develop the availability of flexible
working practices from day one of employment in line with
changes in legislation. We already offer flexible working
practices and policies from day one of employment, for example
flexi time and hybrid working (where these are appropriate to the
role). These provisions were incorporated within a new Flexible
Working Framework, approved at Finance and Resources
Committee in January 2024. 
Key Areas for Improvement  
• A co-ordinated and collaborative approach with partners and
communities to mitigate the impact of poverty across Perth and
Kinross
• Encourage and maximise the uptake of all supports targeted for
children and young people to reduce costs and the impact such
costs have on the outgoings on families in poverty
• Working with the Anti-Poverty Task Force and stakeholders to
develop the wider Poverty Strategy and take forward resultant
actions 
Links to other Performance Information
➢ Child poverty action in Perth and Kinross - Perth & Kinross
Council (pkc.gov.uk)

Page 10

9 
Key Performance Indicators related to this Priority:     
Trends will be indicative of performance and should be considered in the context of the current operating environment and level of influence. 
Key Actions
(summary)
Indicator Control /
Influence
Performance
Comments 20/21 21/22 22/23 23/24 Trend Target Target
Met/
Not Met
Prevent and
mitigate the
impacts of
poverty for
children 
Percentage of
children living
in poverty after
housing costs
in P&K 
Inform 18.7% 21.9% 21.7% N/A

18% by
2023
(National
Target)
2023/24 information will not be published
until January 2025; therefore, trend and
commentary are based upon on most recent
data published. All figures are based on
estimates using Scottish Government data. 
Child poverty rates and numbers have
remained relatively stable with 5,750 children
living in poverty (21.7% 2022/23) compared
to 5,914 (21.9% 2021/22).   
These figures reflect the national situation
where despite investment of significant
financial and other resources, child poverty
has remained static.   
Note: Child Poverty rates and numbers are developed through the Scottish Household Survey and
may not be the best representative measure due to small number of households.  Figures for
2020/21 are not regarded as reliable due to problems with data collection during the pandemic and
also include a period when the Universal Credit uplift of £20 a week was still in place, which had
the effect of reducing the numbers of children in poverty.

Page 11

10 
Key Actions
(summary)
Indicator Control /
Influence
Performance
Comments 20/21 21/22 22/23 23/24 Trend Target Target
Met/
Not Met
Mitigate
cost of
living
pressures
for
households
experiencin
g and at
risk of
poverty 
Number of P&K
households
provided with
energy efficiency
and/or low
carbon heating
advice (PKC
funded)
Influence 545 256 884 2,205

500     2,205 households were provided with advice
compared to 884 in 2022/23, an increase of
149%. In 2023/24, emergency funding was
put in place to fund the Heat Project.  PKC
Climate Change funding to SCARF continued
throughout 2023/24 and has been extended
to April and May 2024 until a decision on
future funding has been made. 
Number of new
affordable homes,
including new
build and buy
backs
Control 124
(100 new
build, 
24 buy
backs)
308
(276 new
build, 
32 buy
backs)
203
(167 new
build, 
36 buy
backs)
173
(105 new
build, 
48 buy
backs, 
20 empty
homes)

210 Whilst performance in this area declined in
2023/24 with 173 homes delivered, the PKC
SHIP 2024-29 plans to deliver of the Local
Housing Strategy target of 210 affordable
homes per year over the 5-year period.
Maximise
income from
benefits and
concessions
Number of
Scottish Welfare
Fund Crisis Grant
applications 
Influence 6,336 5,498 6,539 7,421

N/A
(not
appropriate
to set
targets) 
N/A There has been an increase in applications
due to the combined effect of Universal
Credit deductions and the current Cost of
Living Crisis. Almost 100% of the total
Scottish Government allocation for Scottish
Welfare Fund was spent in respect of Crisis
Grants. Including money allocated by
ourselves to support this fund, the total
spend in this area was £1.4m. 4,805
households were awarded crisis grants,
equating to a 65% award rate.

Page 12

11 
Key Actions
(summary)
Indicator Control /
Influence
Performance
Comments 20/21 21/22 22/23 23/24 Trend Target Target
Met/
Not Met
Total amount of
benefit income
gained as a direct
result of
involvement from
the Welfare
Rights Team
Influence £5.5m £5.3m £6.5m £8.5m

N/A
(not
appropriate
to set
targets)
N/A 31% increase in verified benefit gains by the
Welfare Rights Team via advice, assistance
and representation. A 31% increase on last
financial year.
Promote and
encourage
principles of
the Scottish
Government
Fair Work
Action Plan
Number of
employers signed
up as Living
Wage employers
in Perth & Kinross
Influence N/A New
Indicator
91 97 100   100     The number of employers officially
accredited as Living Wage employers has
increased slightly. Employers do have to pay
a fee to become accredited. A better
indication of those being paid the Living
Wage is available via the indicator below.
Percentage of
people earning
less than the real
Living Wage 
Influence 25.3% 16.5% 12% 10.4% 16%     We have seen a significant reduction in the
number of employees earning less than the
real Living Wage over the last year.

Page 13

12 
Priority: Tackling climate
change and supporting
greener sustainable places 
We continue to deliver the Climate Change Strategy and Action
Plan for Perth and Kinross, which sets out our plans and actions to
reduce carbon emissions and build resilience, meet our regulatory
requirements and protect our environment for current and future
generations. 
Action: Support the prioritisation of
sustainable, cleaner and greener transport in
line with the National and Regional Transport
Strategies 
In February 2024, a report on ‘Fleet Decarbonisation Strategy’ was
presented at the Climate Change and Sustainability Committee . 
Highlights included:
• We trialled the use of Hydrotreated Vegetable Oil (HVO) in
refuse collection vehicles (RCVs) aimed at reducing the amount
of Co2 emitted by up to 90%.  It is anticipated that the entire
RCV fleet will be switched to using HVO permanently. The aim is
to save c700 tonnes of Co2 for the Council each financial year.  
• To further decarbonise staff vehicle journeys we are seeking
approval to expand the Council pool car fleet by 20 vehicles.
Over the course of the last year we have seen an increase in the
total number of bookings during 2023/24 sitting at 7,233. The
total distance covered is  292,721 miles, which is an equivalent
saving of £131,724 by not having to pay for mileage claims on
personal vehicles. The vehicles would  be located around the
council area to expand the availability of pool vehicles; these
vehicles would likely be powered by a mix of petrol and electric
depending on a consideration of the availability of charging
points and the range of mileage required. 
• The Broxden – Low Carbon Transport Hub (opened in January
2024) provides a sustainable EV charging hub to support the 
reduction of  carbon emissions.  The Hub provides access to 15 
EV chargers (1 Disabled/Mobility impaired) and 2 E-Bike
chargers, additionally a new SSE substation, Car Port Solar
Canopy and  Public Transport Information Display have been
installed.  
• We secured £90k of external funding to pilot an increased local
public transport service in the Loch Tay area and a new service
between Kinloch Rannoch and Aberfeldy on Saturdays.
• There were significant challenges towards the end of 2023/24
when Stagecoach East Scotland advised their intention to make
significant commercial service cuts across Perth and Kinross as
from May 2024.  However, due to close working between the
Public Transport Unit and Stagecoach East Scotland during
March 2024 a better outcome was negotiated and resulted in
fewer service reductions than originally proposed.  We recognise
that similar challenges may occur in future years therefore a
£300k budget has been committed over three years to explore
alternative ways of delivering public transport solutions. 
Action: Improve the energy efficiency of our
Council housing stock and public buildings,
and encourage our partners and private
householders to consider where they can
make improvements 
• In 2023, a £3m development of 18 new flats available for
affordable social rent was completed on the site of the former
Fairfield Community Centre in Perth.  All are linked to solar
panels and are insulated to the highest standard, which allows
tenants to keep energy bills low, whilst also reducing the overall
carbon footprint of the development.

Page 14

13 
• Our housing stock has been categorised based on the data from
the Energy Performance Certificates (EPC’s).  This has allowed
us to prioritise the properties in lower EPC Bands E & F to
ensure that they are brought up to the minimum of EPC Band D
by 2025.    
• A total of 1,300 properties were brought up to Scottish Housing
Quality Standards (SHQS) during 2023/24. Over the last year,
there has been investment in Capital funded upgrades, which
aimed to improve the housing stock for tenants as well as
ensuring that we maintain a high SHQS pass rate in the future.
• Following a successful bid to the Scottish Government for
funding to replace the 20 chalets at the Double Dykes Gypsy
Traveller Site, this project has been progressing through the
design development phase.  There has been ongoing
engagement with the residents on the site in relation to the
proposed layouts for the replacement chalets and the works are
proposed to start onsite in November 2024.   
• Perth and Kinross Local Heat and Energy Efficiency Strategy
2024-2045 (LHEES) and Delivery Plan and Perth and Kinross
Local Area Energy Plan (LAEP) were developed and approved.
Both provide the direction of travel towards Net Zero by 2045,
further details on climate change activity can be accessed via
Perth and Kinross Climate Action.  The LHEES Strategy was
reviewed by Scottish Government in December 2023. The
assessment concluded that the strategy provides an excellent
overview of the challenges associated with the current building
stock and the scale of change required to meet national targets. 
That the Council's strategic priorities are clear and there is
comprehensive recommendations and discussion about how
these might be progressed towards delivery. 
CASE STUDY
Riverside Primary School, a £16.5 million project, is one
of the first primary schools in Scotland built to Passivhaus
standards, where quality of construction and energy saving
measures are integral to the construction of the building.
The school won the ‘Innovation in Delivering a Sustainable
Learning Place’ at The Learning Places Scotland Awards
(November 2023). 
Action: To conserve and enhance the
biodiversity of our natural environment 
• In 2023/24 the Council received £353k for nature restoration
projects from the Scottish Governments nature restoration fund
to address the drivers of biodiversity loss. A total of 16 projects
(4 council and 12 community projects) across the area were
approved.  These projects will enhance biodiversity across by
providing essential habitat restoration and connectivity for
wildlife. 
• We received an ‘A’ rating for environmental action in 2023, from
the Carbon Disclosure Project (CDP), which recognises the
significant efforts taken by Perth & Kinross Council to address
the climate and biodiversity emergencies. In 2019, Perth and
Kinross received a D-grade from the CDP, but this improved to a
B in 2022.  To achieve an ‘A’ rating, cities and local authorities
must disclose publicly through CDP-ICLEI Track, have an area-
wide emissions inventory, and have published a climate action
plan. 
• We planted 2,512 trees on Council owned or managed open
spaces, this is an increase of 1,842 compared to last year and
supported 118 volunteer groups to undertake over 40,000 hours
actively managing, developing and maintaining community
greenspaces.

Page 15

14 
• Our Tayside Biodiversity Partnership project, ‘Perth & Kinross
Ponds for Puddocks’ helped to make six ponds across the area
better places for wildlife. The project was shortlisted for the
Nature of Scotland Community Initiative award in 2023. 
CASE STUDY
Rewilding Denmarkfield is a major rewilding project and a
great example of Perth and Kinross Council’s commitment
to providing additional value to local communities as part of
the Cross Tay Link Road project. 
Action: To adapt to and mitigate the impact of
climate change on the way we operate 
•  We completed a number of flood studies in local communities to
understand the risk of flooding, engage the community to
disseminate the study findings, and raise awareness of other
actions such as community flood resilience.  We continue to
inspect key watercourses and carry out clearance and repair
works where this would substantially reduce flood risk to local
communities.  We continue to progress the development of flood
schemes (at Comrie, South Kinross, and Milnathort) to improve
the resilience of flood sensitive communities.  At the Climate
Change Sustainability Committee in November 2023 Elected
Members agreed to adopt the recommended proposals of the
£15.3m flood prevention scheme for South Kinross as the
preferred scheme and to seek statutory approval by publishing
the scheme under the Flood Risk Management (Scotland) Act.
The project aims to protect approximately 194 homes and
businesses in the area.  The construction contract for Comrie
Flood Protection Scheme is due to be signed imminently with an
anticipated construction start date of September 2024 and a
construction end date of September 2026.  
• Following the £2.72m capital investment from the Recycling
Improvement Fund and then rolled out the fourth bin in
compliance with the new Scottish Charter for Household
Recycling.  This meant that 73,000 households now have a more
equitable service, material is better quality and less
contaminated and households can dispose of additional waste at
the kerbside. Prior to the grey bin, contamination rates for the
blue bin were 18.7%.  Following the interdiction of the grey bin,
this reduced to 2.5% for the blue bin and 10.6% for the grey bin. 
In addition, the non-recyclable waste also reduced by 7.5% in
Jan-Mar 2024 compared to the same time period in 2023.  The
twin stream roll out was successful in securing a Scottish Award.
• From the end of 2025, regulations by the Scottish Government
will impose a ban on bio-degradable waste being sent to landfill.
In August 2023, our general waste moved from a landfill to an
Energy from Waste contract. This has reduced the amount of
methane (a greenhouse gas 20 times more impactful than
carbon dioxide) being emitted from landfill.  
• Working closely with Third Sector organisations, we have been
able to support and develop activities around reuse, and the sale
or repurpose of goods. We have a total of 4 reuse cabins at our
Recycling Centres which diverted 137 tonnes from landfill in
2023/24.  In addition, 41 tonnes of bicycles which are either
repaired and sold or stripped for reuse.
• The introduction of a new motorhome waste disposal point
located at Broxden Park and Ride, was provided to meet
demands in the surge of mobile holiday makers since the
pandemic.  It is hoped this will deter motorhome users from
dumping their waste in the natural environment.  The facility is
the first of its kind for Perth and Kinross Council and is open 24
hours a day from Easter until the end of October each year.
• We continued works on the LED Replacement Programme.  We 
have 25,000 streeting lighting lanterns, and as of 2023/24 19,000
street lights have been replaced with LED lanterns. The
programme has had a positive impact on carbon reduction and
energy consumption.  To date, the programme has reduced the
energy consumption by 52% which represents an annual

Page 16

15 
reduction of 5,500,000 kWh of electricity. Carbon emissions have
reduced by 80%, which represents an annual reduction of 4,540
tonnes of Co2. Additionally, the introduction of LED light
technology has further improved reliability and extended the
operational life of the lamps. Since 2013/14 there were 6,000
street lighting faults, this reduced to 2,000 faults in 2023/24. This
delivers further cost savings by reducing the revenue
maintenance budget by 50%. The cost savings for the Council
associated with this LED replacement scheme are estimated to
provide a £20m cost saving over the 20 year life of the lanterns. 
CASE STUDY
Perth and Kinross Council Youth Climate Conference
brings together pupils from S1 to S6 from both local
authority and independent schools across the region.  The
conference is designed to inspire and empower young
people to talk about, and take action on, climate change in
all facets of their lives. 
Links to other Performance Information
➢ Statutory Biodiversity Duty: Report on Delivery January
2021 to December 2023 
➢ Waste Management Plan 2010-2025 - Progress Report   
Key Areas of Improvement 
• Ensure we have a cleaner and greener Council fleet 
• Develop local public transport solutions which set the needs of
residents and the environment as top priority
• Improved energy efficiency and reduction in carbon emissions in
the Council estate
• Increase provision of biodiversity sites

Page 17

16 
Key Performance Indicators related to this priority:
Trends will be indicative of performance and should be considered in the context of the current operating environment and level of influence. 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Trend Target
Target
Met/Not
Met
Support the
prioritisation
of sustainable,
cleaner, and
greener
transport 
Number of
publicly
available
charging
devices per
100,000
population 
Influence 69.8 84.9 125.5 209

469  The number of publicly available charge
points has increased year-on-year. Since
2021/22 there has been no funding from
Transport Scotland for EV chargers. To
date PKC has installed a total of 31 new
chargers at various locations across the
Perth & Kinross area. These have been
funded via The Tay Cities Deal/ERDF,
internal Council Revenue Funds and
ORCS. For noting - all PKC and most of
the Private Charge points are Dual Outlet.
Percentage
of Council
fleet vehicles
that are
electric or
other zero
direct carbon
fuel
technologies 
Control 5.3% 5.3% 3.8% 3.6%

3.85%  There has been a reduction in this indicator
due to 1 EV being written off following an
accident & the total number of PKC
vehicles increasing.  We are committed to
transitioning our fleet to low emission
vehicles to ensure that we have a cleaner
and greener fleet, as well as meeting
Government targets.

Page 18

17 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Trend Target
Target
Met/Not
Met
Improve the
energy
efficiency of
our buildings,
and
encourage our
partners and
private
householders
to consider
improvements
Percentage
of Council
housing
meeting the
Energy
Efficient
Standard 2
for social
housing
(minimum
EPC B)
Control 5.1% 6.2% 6.6% 7.1%

7.0%     Of the total housing stock (8,053 properties
as of 31st March 2024) there has been an
increase of 25 properties meeting the
Energy Efficient Standard 2 which has
been achieved by the completion of
newbuild properties and capital works to
existing properties.  
Scope 1 and
2 Emissions
from Council
Non-
Domestic
Estate
(tonnes
CO2e) 
Control 10,111 10,761 9,226 9,080

N/A
(awaiti
ng
decarb
onisatio
n plan)
N/A Conversion factors went up for oil and
electricity that had an impact on reductions.
Additional sites being added to portfolio
also resulted in decrease of emissions.
To conserve
and enhance
the
biodiversity of
our natural
environment 
Area
grassland
managed by
PKC for
biodiversity
improvement
objectives (ha) 
Control 21.8ha 21.8ha 40.4ha 40.4ha

N/A
(future
years
will
have
targets)
N/A Following on from the overall success of the
grassland management trials undertaken in
previous years on 42 sites, the trials are
being extended over the next 3 years. This
will allow the development of a long-term
action plan to support the long grass
approach on more sites across Perth and
Kinross, potentially covering 1,700 of the
1,900 sites the Council currently maintain.

Page 19

18 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Trend Target
Target
Met/Not
Met
To adapt to
and mitigate
the impact of
climate
changes on
the way we
operate
Total
household
waste
recycled/comp
osted as % of
all household
waste 
Influence 49.4% 50.1% 48.5% 50.6%

60%  The recycling rate increased by 2.1% since
last year. This can be attributed to the
success of the Twin Stream rollout which
has reduced the contamination rates of our
kerbside recycling. Additionally, changes to
our residual waste contract has allowed a
proportion of our general waste to be
recycled. Previously, all general waste was
landfilled.
Climate
Change
Assessment
Tool (CCAT)
overall score 
Control 51% 61% 69% 71%

74%  There has been an increase of 2% on our
overall score since the previous year. Two
of the five sub-topics showed progress. 
Climate Governance showing the biggest
improvement from 89% to 93%.  This
increase is attributed to the inclusion of
Climate Change as a strategic priority in the
new Corporate Plan, increased
organisational accountability and the
implementation of the Impact and Value
Assessment Tool which was introduced in
2023. Progress was also identified in the
Adaptation sub-topic that covers questions
related to climate risks and opportunities as
a result of climate hazards – utilising the
results of the Climate Risk and Opportunity
Assessment for Perth and Kinross that was
finalised in Spring 2023. 
Procurement has remained the lowest
scoring sub-topic at 38%,  The need to
improve climate considerations in
procurement is an identified aim of the
ongoing procurement transformation
programme.

Page 20

19 
Priority: Developing a
resilient, stronger and
greener local economy 
Action: Support and promote business growth,
business and place innovation and investment
in both our urban and rural areas 
• 231 Business start-ups were supported by Business Gateway;
this is a reduction compared to 2022/23 figure of 250 but
remains at the same level of other Tayside local authorities.
Additionally, we provided funding to Growbiz to support start-up
micro enterprises/self-employed individuals and social
enterprises in rural Perth and Kinross.  Support is also provided
for enterprising culture in young people and in rural communities. 
• The Roads Maintenance Partnership (RMP) have liaised with
business owners within the city centre to help deliver their
offering of external dining in public open spaces. Agreements are
in place to ensure they can effectively trade whilst not detracting
from the amenity of the space for others and this will be
expanded to other existing premises in 2024/25. 
• We deployed two Tay Cities Digital Engagement Officers with
Shared Prosperity Funding to enable Scottish Broadband
Vouchers to connect more businesses and homes to improved
internet. Through national interventions R100 and Project
Gigabyte there has been significant building of gigabit capable
connections in the region. This uplift has also been supported by
investment in commercial rollout. 
Action: Invest in innovative green power and
smart technology solutions to reduce reliance
on electricity from the national grid and create
opportunities for business growth and
regeneration 
• Capital Investment of circa £500,000 was scheduled for 2023/24
and an additional £2 million of capital funding was added into the
Council budget in March 2023 for decarbonisation. We are also
developing the detail behind the Climate Change Strategy Action
Plan to move towards decarbonising the estate by 2045. 
• We supported Binn Group to create a £100m Energy from Waste
Plant at Binn Eco-Park joining forces with Paprec, the French-
based leader in recycling and green energies. 60% of the civil
works are being managed by locally based companies or
branches and along with the 200 jobs created for its construction
phase, the new EfW will also generate 30 long-term skilled posts
once the facility is operational in early 2026. 
• We have attracted £100k from the Scottish Government to
develop heat networks at scale and explore options for the
development of a Strategic Energy Partnership. Heat Networks
(Scotland) Act 2021 places a duty on local authorities to carry
out a review of potential areas for heat networks as part of Local
Heat and Energy Efficiency Strategies.
• Phase 2 of the Cross Tay Link Road (CTLR) project is continuing
to progress well and is on programme for completion in Spring
2025. A key part of the project has been the delivery of benefits
relating to local spend and employment during construction.
Examples of benefits can be found on the project’s website via
www.perthtransportfutures.co.uk. This project addresses the
long-term transportation needs of the area and facilitate
investment of £174 million in new commercial space and bring
the prospect of more than 5,000 new jobs to the area. Design

Page 21

20 
work has started on Phase 3 (Bertha Park Link) with completion
of specimen design in October 2024. 
• A hydrogen facility is being constructed by Greencat Energy at
the Binn Eco Park, ready for use by June 2027. This will enable
the Council to consider using hydrogen as a fuel source and this
will be progressed by fleet in due course. Our Projects – Green
Cat Hydrogen (gchydrogen.co.uk)
• Two engineers from Perth & Kinross Council and four from
Sweco, one of the designers of the Cross Tay Link Road project,
have been awarded the accolade of Institution of Civil Engineers
(ICE) Carbon Champions for their work on decarbonising the
build through the design and procurement process.  Perth and
Kinross Council (asset owner) and Sweco (designer) worked in
collaboration, with a focus on minimising the carbon output and
environmental impacts of the project at design stage. ICE
Carbon Champions Award For CTLR
(perthtransportfutures.co.uk)
• The CTLR project has also been presented as a Case Study in
the PAS 2080 Guidance updated in April 2023. This Case Study
demonstrates how designers can support asset owners to
embed decarbonisation principles and requirements into
procurement. 
Action: Promote what our city and towns have
to offer to businesses, investors and tourists
by capitalising on built and natural heritage
and assets such as the new Perth Museum and
the benefits to the whole area of Perth’s status
as UNESCO City of Craft and Folk Art 
• Perth & Kinross Council have invested £50m in cultural
infrastructure in Perth City Centre in the last decade, which
includes Perth’s Creative Exchange, Perth Theatre, Perth Art
Gallery, St Paul’s Church and the Perth City of Light Lighting
Strategy.  Perth Museum is the newest investment and is home
to the symbolic Stone of Destiny. The museum opened on 30
March 2024 (following a £27m re-development) with 3,000
visitors on the opening weekend. The cultural & heritage visitor
attraction was awarded 5* status from VisitScotland.  
• Our reputation for major events continued when we delivered the
UCI Enduro Gran Fondo in August 2023, part of the UCI
Championships which were held across Scotland.  Perthshire
hosted the Gran and Media Fondo long distance mass
participation road races which brought 30,000 visitors to the
area.  This enhanced an already strong programme which
includes a wide range of music, cultural and sporting events.  
• In December 2023, to build on the success of the Christmas
Lights Switch On, three weekends of free family entertainment
were held in Perth.  Additionally, 6,800 people were able to enjoy
free travel on all local bus services within the Perth & Kinross
Council area, on the four Saturdays leading up to Christmas in
an initiative supported by Smarter Choices Smarter Places.  This
initiative enhanced footfall, supporting our retailers, restaurants,
and other traders across Perth & Kinross.  Events are major
drivers of economic activity and the annual impact of the
programme has been calculated at £30 million, supporting over
500 jobs. 
• A refreshed marketing plan, delivered through Perth City and
Towns, has been developed to promote our area.  This is
delivered in partnership with local businesses and a new website
(perthcityandtowns.co.uk) and social media campaigns are
successfully increasing brand awareness, media profile and
economic impact in our places.  A new cultural guide for the area
has been developed and promotes our attractions and the
significant investment over the last decade.  We also launched a
Christmas Campaign in October 2023 – giving promotional
opportunities for over 150 independent businesses across the
whole region.

Page 22

21 
• We are part of the Tay Cities Regional Tourism Partnership
which focuses on bringing international visitors to our area. 
Internationalisation is an important part in restoring the value of
tourism and activities focus on supporting businesses to become
trade ready.  The recent Scotland Visitor Survey showed that
32% of all overnight visitors to Perthshire in 2023 were
international, up from 11% in 2019.  
• We continued to work in partnership with Wasps, Culture Perth &
Kinross, UHI Perth and Business Gateway Tayside to promote
Perth Creative Exchange and maximise the opportunities and
facilities available to artists, makers and the wider sector.
• The Famous Grouse Ideas Centre continued to provide facilities
and programmes designed support to entrepreneurs and
innovators.  
o Our Angel’s Share programme delivered 2 events providing
founders and entrepreneurs with the opportunity to pitch
their ideas to investors.  
o Elevator UK delivered their ‘Purpose Led Business
Accelerator’ to local SMEs, providing the opportunity to think
differently about their ethos and purpose whilst growing their
business.  
o The Famous Grouse Ideas Centre also became the first
venue in Perth & Kinross to host CodeBase.  Codebase is a
digital tech incubator which supports start-up and growth
business across a number of sectors.  The digital sector is a
growing and this partnership presents an excellent
opportunity to attract digital businesses to Perth & Kinross
and impact across a number of other sectors. 
CASE STUDY
Perth Museum opened its doors in March this year and 
has already welcomed more than 100,000 visitors and
received five star award from Visit Scotland. 
Action: Support individuals into work and to
progress into better paid work, encouraging
businesses to access initiatives to create new
opportunities for those furthest from the
employment market and those currently in low
wage jobs 
• The Futures for Families project has assisted parents into self-
employment by funding the transient period between
employment/unemployment and into self-employment. This
funding creates a ‘safety net’ in terms of income for the first 3
months of self-employment whilst establishing the new business.
7 clients took up this offer between launch in September ’23 and
March ’24.
• Rural Employment Incentive has delivered 25 new rural jobs for
rural young people in 2023/24. These roles create vital new
positions in smaller communities and enhance the chances of
sustained jobs remaining after the funding period.
• In terms of supporting people into work via our Skills Passport
project (funded by the UK SPF) the following was achieved in
2023/24: 
o In total – 40 Clients supported 
o 32 Unemployed Individuals supported and received funding
for training.
o 8 Individuals supported into self- employment
o 9 People now in employment, however several applicants are
still in the training phase who will hopefully gain employment
thereafter. 
• 901 adult learners were supported by PKC and Adult Learning
Partnership to achieve a qualification, helping them to improve
their digital, employability skills, literacy or language skills.  This
was an increase of 121 learners from 2022/23 and reflects our
approach to identifying and targeting areas of highest need.

Page 23

22 
CASE STUDY (anonymised)
Futures for Families – With the provision of Elev8 and a
Digital Grant we were able to support ‘Barry’ with digital
equipment and pay for a management qualification. 
Thereafter, with the support of the Self Employment Grant,
he was able to launch his own business. 
Key Areas for Improvement  
• Unlock new investment in employment and housing land to
support business growth in new growth sectors
• Make Perth and Kinross a more competitive inward investment
destination and encourage investment for growth from existing
businesses in key growth sectors 
• Increased number of businesses in the creative and digital
industries.
• Unlock private investment and expertise to support public and
private energy projects.   
• More people choose Perth and Kinross as a destination for
holidays and day trips. 
• Further enhance our employability outreach capacity, supporting
individuals in community settings. 
Links to other Performance Information
➢  Local Development Plan 2 Delivery Programme 2019-29
February 2024 Update

Page 24

23 
Key Performance Indicators related to this priority:
Trends will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Trend Target Met/No
t Met
Support and
promote
business
growth and
investment 
Number of new
business start-ups
with support from
Business Gateway 
Influence 267 220 250 231

275     Performance has declined however remains at
the same level of the other Tayside local
authorities. Support for start-up micro
enterprises/self-employed 
individuals and social enterprises in rural Perth
and Kinross is also provided by Growbiz,
whom we provided with financial support in
2023/24 to expand its provision. However,
these are not included in the target.
Area of available
Serviced
Employment Land
(Ha) 
Influence N/A
New Indicator
Dec 24 N/A 35 N/A Data not available until December 2024 
Percentage of
premises connected
to gigabit broadband 
Influence 4.7% 40% 43% 46%  45%     The percentage of premises connected is
increasing although slowly showing that
Scottish and UK Government gigabit roll-out
programmes are starting to make an impact.
The Council is supporting these programmes
by raising awareness of financial incentives
such as gigabit broadband vouchers.
Thinkbroadband.com.

Page 25

24 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Trend Target Met/No
t Met
Number of
registered
businesses in
Creative Industries
(including digital)
Influence 400 380 350 335

400     There has been a reduction in the number of
registered businesses in creative industries
compared to the previous year.  This KPI is an
indication of how the local economy is
adapting to new technologies and innovation. 
There will be a focus on dedicated and tailored
business advice to the sector, delivered in
partnership with Business Gateway, Famous
Grouse Ideas Centre, Perth Creative
Exchange, Codebase and Perth UHI.  This will
encourage start-ups and support identified
growth businesses, with the aim of increasing
the number of businesses and jobs in the
creative industries.
Invest in
innovative
green power
and smart
technology
solutions
Renewable energy
generated across
the PKC estate,
including from low
carbon heat sources
(MWh)
Control 2,972 2,535 2,226 2,703  N/A
(awaiting
decarboni
sation
plan)
N/A Number of the biomass sites are still offline
which has a huge effect on overall generation.
Additional sites have had heat pumps
installed.
Number of
registered
businesses in
energy (including
renewables growth
sector) 
Influence 140 140 145 140
(Dec 24) 
154     An increasing number of businesses in energy
(including renewables) is seen as an indicator of
the local economy adapting to the transition to
net zero. The number has slightly decreased
from the previous year. Business advice will
continue to be provided to support start-ups and
business expansion through Business Gateway
and initiatives boosting clean growth sector
such as Tay Cities Clean Growth Cluster or
Perth Eco-Innovation Park or Binn Eco-Park.

Page 26

25 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Trend Target Met/No
t Met
Promote what
our city and
towns have to
offer to
businesses,
investors and
tourists
Investment in
economic
development and
tourism (£ per 1,000
population) 
Control £63,504 £100,569 £91,711 Dec 24

N/A
(not  
appropria
te to set
targets)
N/A  Data not available until publication of LGBF.
Trends are based upon most recent data
published. 
Total number of
visits (in person) to
libraries, museums,
and galleries 
Influence 32K 246K 441K 484K  315K     Overall footfall to CPK venues is up 9.7%
(43,097) from last year. Libraries increased by
15.1% over that same period with new events
and activities attracting customers back to
venues. Visits to Perth Art Gallery are lower due
to the ongoing refurbishment works (down by
37.9%) but satisfaction rates remain high across
all venues (with a slight dip due to heating
issues in some Libraries). The figures include
the opening weekend of Perth Museum with
4,805 visitors over the first 2 days.
Support
people into
work and
encourage
business to
access
initiatives to
create new
opportunities 
Percentage of
unemployed people
assisted into work
from council
operated/funded
employability
programmes
Influence 7.9% 15.7% 13.0% 13.7%  15%     A slight increase in performance from 2022/23;
however, below target. Less external activity
funded in 2023/24 due to the late award of
funding from SG and lack of applications from
providers.
Number of adult
learners achieving
outcomes 
Influenc
e
110 279 780 901  293     901 adult learners were supported by PKC and
Adult Learning Partnership to achieve a
qualification, helping them to improve their
digital, employability skills, literacy or language
skills.  This was an increase of 121 learners
from 2022/23 and reflects our approach to
identifying and targeting areas of highest need.

Page 27

26 
Priority: Enabling our
children and young people to
achieve their full potential 
The PKC Raising Attainment Strategy 2024-2027 sets out a shared
vision, priorities, and expectations in relation to raising attainment
and achievement for every child and young person. This strategy
reflects the national ambitions of attaining excellence and achieving
equity. Progress is reported in the annual Education Improvement
Plan and will be presented at the Learning and Families Committee
28 August 2024. 
Overall, schools and ELC settings in PKC perform well and deliver
high quality education. Inspection data shows that ELC settings and
primary schools achieve evaluations above both comparator
authorities and the national average. Care Inspectorate inspection
data shows a similar picture, with PKC outperforming comparator
and national benchmarks. 
Action: Ensure inclusive and quality education
for all and promote lifelong learning 
• Perth High School was commended for its Reflect, Restore and
Re-engage Provision, which has led to a significant reduction in
pupil exclusions. Reported on in our Attainment 2022/23 report,
the number of exclusions dropped from 99 to 61. The school’s
approach encourages students to reflect on their behaviour as
an alternative to exclusion, resulting in “a calm and positive
atmosphere in almost all lessons.”
• Educational attainment across all sectors is strong with a steady
upward trend in attainment of Curriculum for Excellence levels
across P1-S3, with increases of between 5  and 7 percentages
points in Literacy and Numeracy in the last 5 years. Senior
phase attainment is also showing positive trends, with increases
of 4 to 5 percentage points in school leavers attaining at SCQF
Levels 5 and 6, and also increases in the proportion of young
people participating in education, employment or training over
the last 5 years (COVID years excepted).
• The percentage of young people (16-19 year olds) participating
in education, training or employment has increased year-on-year
over the last three years and remains ahead of the national
average. This is supported by an increase in the number of
young people participating in work experience.
• Young people’s participation in sport has continued to improve
with notable increases in target groups such as those from
backgrounds affected by poverty, young carers and those who
are looked after.  Additionally, young people are supporting the
delivery of extracurricular activity in PKC schools with leadership,
coaching and officiating awards being gained. 
CASE STUDY
Our first intergenerational Peep (Peers Early
Education Partnership) group was piloted at Strathmore
Street Sheltered Housing Complex. The pilot provided the
opportunity for participants to learn new skills, share
experiences across generations and reduce loneliness and
isolation. 
• Inspection results for services across the Day Care, ELC and
Primary sectors remain strong, consistently above national
results and comparator authorities. Inspection outcomes in
Secondary Schools have not met the local expectations of good
or better. The focus for improvement in this sector is around
Leadership of Change and improving Learning and Teaching.

Page 28

27 
• The inspection report for Perth Academy, published in November
2023 had two satisfactory and two weak quality indicators which
is below our expectations of good or better. Work is underway to
address these prior to a return visit by Education Scotland in
2024.
• 34 schools have achieved the ‘Digital Schools Award’, with a
further eight schools ready for validation. This is a 100%
increase on 2022/23. There are a further 36 schools registered
for the award with the majority of these making good progress
towards formal accreditation.
• 26 schools have achieved their Bronze Rights Respecting
Schools Award, with 23 achieving Silver and 12 Gold. Seven
schools are awaiting accreditation visits, five for Gold and two for
Silver. 
CASE STUDY
To promote education and a wider range of opportunities
for pupils across science and wider STEM subjects. Kinross
High School introduced new courses such as Practical
Electronics, Laboratory Science. The school received the
STEM Nation Award by Education Scotland in 2023, which
celebrates excellent practice in Science, Technology,
Engineering and Maths education. 
Action: Reduce the poverty-related attainment
gap 
• We have reported on a narrowing gap for attainment results for
pupils in Perth & Kinross, which is showing a positive and
improving picture, across all sectors. The poverty-related
attainment gap is a term used to describe the difference in
attainment between children from better off backgrounds and
their peers impacted by poverty. The report showed 79.8% of all
P1 children have met all development milestones before starting
primary school, and literacy and numeracy levels have improved
for P1, P4, P7 and S3 pupils. It also found the poverty-related
attainment gap, in terms of pass rates is better than the Scottish
national average for National 5, Higher and Advanced Higher. 
• Effective use of Scottish Attainment Challenge funding, including
the Pupil Equity Fund, is helping to close the poverty-related
attainment gap with notable progress being made in reducing the
gap in senior phase attainment.  Secondary attendance remains
challenging and an area of particular focus. 
Action: Ensure that Looked After Children and
children and young people with additional
support needs achieve health, wellbeing and
education outcomes comparable with their
peers 
• Outcomes for our care-experienced children and young people
are improving with increased levels of attainment in literacy and
numeracy as well as a significant increase in the percentage of
young people entering a positive destination on leaving school. 
However, outcomes for care-experienced young people remain
lower than their peers. 
• Our Corporate Parenting Plan 21-24 supports Looked After
Children to achieve their full potential.  The plan notes progress
in all areas in respect to health, wellbeing and education. It is
monitored by the Corporate Parenting sub-group that reports to
the Children, Young People and Families Partnership.  
• In 2022/23, 16 out of 17 LAC pupils (94%) attained at least one
SCQF Level 4 qualification.  Care should be taken when
comparing these figures across years and cohorts due to the

Page 29

28 
small numbers involved.  This improvement exceeds the national
average of 78% for this indicator, though still below the overall
performance achieved in respect of all school leavers. We
recognise that this group is a key priority for improved attainment
and have established a sub-group of the Raising Attainment
Board to focus on further improvement, including supporting the
Chief Social Worker and Education Officers in the allocation of
the Care Experienced Children and Young Persons
Funding.  The actions of the sub-group included the
establishment of a Promise Improvement Lead post which
focuses on raising attainment of all care experienced children
and young people and young carers.
• Inclusion Ambassadors. Fairview School, Perth & Kinross
Council's school for children and young people with significant
additional support needs (ASN), is celebrating a national awards
win for its work to help pupils locally with ASN feel included,
supported and celebrated.   
CASE STUDY (anonymised)
Crest Service, Lifelong Links service supports children and
young people to reconnect with those who are important to
them in a planned, structured and safe way.  The service and
a lifelong links co-ordinator supported  ‘John’ to find out more
about his birth family and being part of a wider family
network. 
Key Areas for Improvement   
• Attainment at key milestones is raised for all children and young
people.
• Attendance rates improve, particularly in the secondary sector.  
• Increase the number of young people going into positive
destinations such as work experience, further education,
volunteering and employment.
• Improved understanding of causes of attainment gap so that
effective interventions can be identified and implemented.
• Improve support to children and young people with additional
support needs to realise their full potential.
• Provide Kinship Carers with a range of supports to enable them
to meet the needs of children in their care. 
Links to other Performance Information
➢ Corporate Parenting Update 
➢ Community Learning and Development Plan 2021-24 - Year
2 Update Report  
➢ Raising Attainment Update 2022/23

Page 30

29 
Key Performance Indicators related to this priority:
Trends will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
*Attainment indicator data will not be published until February 2024; therefore trend arrows relate to the most recent year of publication. 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Trend Target
Target
Met/
Not Met
Ensure
inclusive and
quality
education for
all and
promote
lifelong
learning 
Percentage of
children
meeting
expected
developmental
milestones
when entering
primary school 
Influence 82% 81.7% 80.6% N/A N/A 81% N/A Data not available until end of September 2024 
The proportion of P1s meeting all their expected
developmental milestones has decreased slightly
in 2023. For this cohort of children, all 9
developmental milestones (Attention, Behaviour,
Emotional Development, Fine Motor Skills, Gross
Motor Skills, Hearing, Social Development,
Speech and Language and Vision) have seen a
drop in levels of achievement. Speech and
language development and social and emotional
development are the areas which are most
affected. 
Our data aligns with that published in Public
Health Scotland’s Early Child Development
Statistics in April 2023, highlighting the national
increase in the proportion of children with a
developmental concern assessed during the 13–
15-month, 27-30 month, and 4–5-year child health
reviews.
Work is being undertaken across all ELC settings
to mitigate the impact of these developmental
concerns and to ensure that children are
supported to achieve their potential through a
focus on the overall quality of provision, outdoor
learning, language development and emotional
resilience.

Page 31

30 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Trend Target
Target
Met/
Not Met 
Ensure
inclusive and
quality
education for
all and
promote
lifelong
learning 
Percentage of
primary school
pupils (P1, P4
& P7
combined)
achieving
expected levels
in literacy and
numeracy
Control 74% 77% 78% *N/A

79% N/A There has been steady progress over time in P1,4
and 7 Achievement of a Curriculum for Excellence
(CfE) Levels. In 2022-2023 a targeted programme
of work to improve writing with 6 pilot schools
created significant improvement in writing in these
schools. This methodology will be used in at least
20 more schools in session 2023-2024.
Proportion of
school leavers
attaining 1 or
more passes at
SCQF Level 5 
Control 89% 89% 90% *N/A

91% N/A Performance for Scottish Credit and Qualification
Framework (SCQF) attainment against both of
these indicators remain close to our virtual
comparator, and in line with the national averages
of 86% at level 5 and 61% at level 6. These
measures remain a focus of term visits by officers
to schools. Specific guidance has been shared
with schools to maximise the number of young
people who leave with at least 1 level 5
qualification and if possible 1 level 6 qualification. 
Schools closely monitor the proportion of young
people achieving these measures, and act to
intervene to support young people, where
necessary. The fall in the proportion of school
leavers leaving with at least 1 qualification at level
6 is mirrored nationally as we have moved from
teacher professional judgement through the
alternative certification model to the “normal” SQA
assessment process in a post-covid environment. 
Proportion of
school leavers
attaining 1 or
more passes at
SCQF Level 6 
Control 71% 66% 66% *N/A

67% N/A

Page 32

31 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Trend Target
Target
Met/
Not Met 
Ensure
inclusive and
quality
education for
all and
promote
lifelong
learning
Participation of
16–19-year-
olds
participating in
learning,
training or work
(%) 
Influence 94% 94% 95% N/A

95% N/A Data not available until end of September
annually. Figures are based upon most recent
data published.
We are implementing a much more rigorous 16
plus framework in partnership with Skills
Development Scotland to effect further
improvement in this measure. This has been
identified by Skills Development Scotland as
sector leading practice nationally and involves
close and clearly structured partnership working
with all stakeholders.
The recently established16 plus sub group of the
Local Employability Partnership is identifying skills
gaps and working to match those with funded
opportunities.
Reduce the
poverty-
related
attainment
gap
Percentage
gap between
SIMD 1 and
SIMD 5 for
school leavers
attaining 1 or
more passes at
SCQF Level 5
Control 28% 24% 17% *N/A

24% N/A Performance for SCQF Level 5 and 6 attainment
remains slightly better than both our virtual
comparator and the national average. Nine of our
secondary schools are now SCQF ambassadors,
committed to finding flexible senior phase options
for all learners. 
This will be a key improvement outcome for our
planned senior phase curricular input in session
2023/24. It is worth noting that SIMD in terms of
quintile one is relevant only in Perth city schools
and Blairgowrie High School. 
Other measures of deprivation are more relevant
in our rural settings. 
Percentage
gap between
SIMD 1 and
SIMD 5 for
school leavers
attaining 1 or
more passes at
SCQF Level 6 
Control 41% 35% 29% *N/A  34% N/A

Page 33

32 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Trend Target
Target
Met/
Not Met
Ensure that
Looked After
Children and
children and
young people
with
additional
support
needs achieve
comparable
outcomes
Percentage of
children being
looked after in
community
placements
rather than
residential
placements –
balance of care 
Control 96% 94% 94% *N/A

90% N/A There were 248 Looked After Children as at the
end of July 2023. Of these, 233 were in community
placements, and 15 were in residential or secure
care placements. 
The social and emotional impact of Covid-19 has
had a major impact on emotional distress and risk
taking behaviour amongst young people which
coupled with vacancies in our early intervention
services has required increased use of residential
placements. This situation is being monitored
closely with emphasis on enabling the young
people to return home.
Percentage of
school leavers
looked after
within the last
year with 1 or
more
qualification at
SCQF level 4 
Control 62% 87% 94% *N/A

88% N/A 16 out of 17 LAC pupils attained at least one
SCQF Level 4 qualification.  Care should be taking
when comparing these figures across years and
cohorts due to the small numbers involved.
There has been significant focus on the level 4
outcomes for this cohort of young people and this
is reflected in the figures. This improvement puts
us above the national average of 78% for this
indicator, though still below the overall
performance achieved in respect of all school
leavers. We recognise that this group is a key
priority for improved attainment. We have recently
appointed a Promise Implementation Lead to track
the educational journeys of all school aged looked
after children and young people.

Page 34

33 
Priority: Protecting and
caring for our most
vulnerable people 
The Council’s Adult Social Work and Social Care services are
delegated to the Perth and Kinross Integration Joint Board (IJB) and
managed by the Health and Social Care Partnership (HSCP). There
is a statutory requirement for the IJB to produce an Annual
Performance Report and this is reported to the Audit and
Performance Committee of the IJB. This report highlights progress
against the strategic ambitions of the IJB as set out in the IJB’s new
Strategic Plan 2024-27. The following content contains information
taken from the IJB’s Annual Performance about integrated Health
and Social Care services which relate to adults. This has been
combined with information from other Council services which are
not delegated. 
Action: Ensure we quickly identify children,
young people and adults at risk of harm and
abuse and take the necessary actions to keep
them safe 
• A steady increase in qualified Council Officers - only a qualified
Council Officer is authorised to undertake certain functions of the
Adult Support and Protection (Scotland) Act 2007. Perth and
Kinross has increased the number of available Council Officers
from 40 full and part-time Council Officers in January 2021 to 61
in January 2024. This demonstrates a commitment to fulfilling
statutory responsibilities, our ability to recruit, retain, support,
and encourage social workers’ development and our
commitment to understanding current and future workforce
planning needs.
• Police Vulnerable Reports (VPR) continue to dominate the total
numbers of all adult protection concerns received, and this is
consistent with the data from previous years and with the
national picture. This is the first year that our data indicates that
there is no significant increase in the numbers of VPRs received
in comparison to the previous year. Many factors contribute to
this, and a short life working group has been established to
explore this in more detail.
• Mental Health features in many of the VPRs received, on its
own, or linked to other areas of concern including those who
experience drug and alcohol addiction. Front line mental health
services have (and continue) to be redesigned to reflect
emerging themes and trends. This includes the Access Team
who facilitate and co-ordinate a fast track triage system into
specialist services for all adult protection concerns where mental
health and drug and alcohol features. This triage implemented by
our Access Team follows the principles and the benefits of early
intervention and prevention. 
• In 2023/24, we increased our use of social media sites to raise
awareness of adult protection and how to respond to it. Raising
public awareness of the ASP agenda remains a key priority. This
data also reflects the value of the dedicated NHS Tayside Adult
Protection team who support health colleagues to respond to
and report any adult protection concerns that exist in health
settings. 
• Responding early to any adult protection concern received is
crucial. The earlier that services can respond to harm the better
they are able to intervene effectively. An average of 98.5% of all
of these concerns were screened within 24-hours of being
received. The Adult Protection Concern VPRs audit 2023/24
found that:

Page 35

34 
“In recent years, commitment has been given to service
redesign, particularly the Access Team who provide that first
point of contact for many adult concern referrals. This
supports a wider HSCP commitment  to the principles of
supporting an early intervention and preventative approach
to responding to harm and to the principles of Getting It Right
for Everyone (GIRFE) and getting the right support, from the
right people at the right time. Whilst there is room for
improvement, this audit demonstrates that the principles of
GIRFE and early intervention and prevention are embedded
into adult protection decision making and practice.”
• The ASP co-ordinator audits the adult protection concerns which
were not screened within 24-hours (34 out of 2,262) and no adult
was left at any undue harm as a consequence of this delay.
Some of the findings from this self-evaluation and quality
assurance have led to improvement work. 
• The ASP Act makes no reference to Large Scale Investigations
(LSIs), but these have become increasingly prevalent across
Scotland since the implementation of the Act. In 2022/23, a
thematic review of our use of LSIs was completed and
highlighted a number of emerging and often recurring themes
that led to an LSI being instigated, including staff shortages,
medication being wrongly administered, lack of leadership and
poor moving and handling practices. It also found that missed
opportunities existed to deliver a truly multi-agency approach to
LSIs. The findings from this review led to several improvements.
The most crucial being that colleagues from the Care Home
Operational Group and the Enhanced Care Home team remain
central to determining whether an LSI is required to safeguard
adults at risk of harm and to use their expertise to consider what
support and from whom is required to mitigate any risk and
improve standards of care. Understanding these themes has
allowed the provision of a more targeted, early intervention and
preventative support to the care home sector. 
• Following our audit and implementing the improvements, our
LSIs have reduced in numbers and in length of time between
start and it being concluded: 
• From April 21 – March 22, we opened 11 LSIs with an average
length of each LSI being 7.5 months. From April 22 – March 23,
we held 7 LSIs with an average length of 5 months From April 23
– March 24, we held 6 LSIs with an average length of 3.5
months.
• The number of referrals to the Child Protection Duty Team are
increasing at around 15% every year, however all referrals that
are received are triaged immediately or within 24 hours.
Situations flagged as being a significant child protection concern
receive an immediate response to safeguarding the child or
young person’s wellbeing.  
• The Scottish Child Interview Model (SCIM) was implemented
across Tayside in May 2024. A soft boarder approach was
agreed with our Tayside partners allowing trained staff to work
across boundaries.  SCIM was developed in response to the
recommendations within the Evidence and Procedure Review;
Child and Vulnerable Witnesses Project. The two main goals of
the new model are:
o To remove the need for children to give evidence in Court and
to instead have their Joint Investigative Interview used as
‘Evidence in Chief’
o To be trauma informed, reducing the risk of children being re-
traumatised during the interview itself and during subsequent
processes.
• The Multi Agency Screening Hub (MASH) was initially set up in
June 2022 to provide early help to families in need.  MASH
meets 2 weekly and is well represented by statutory and non-
statutory partners from social work, the 3rd sector, health and
education; approximately 35 different teams are involved in this
process. On a 2 weekly basis MASH triage and allocate non
urgent referrals which have been submitted to the Child
Protection Duty Team (CPDT).  This process has allowed for
better sharing of information and has promoted relationships

Page 36

35 
across the partnership and most importantly it has allowed us to
provide a range of supports to families at an earlier point in need.
• Perth and Kinross Child Protection Committee (CPC) has
continued to progress its three main objectives, focusing on
continuous improvement, engagement and participation and
strategic connections.  Positive developments include the
establishment of a Multi-Agency Screening Hub (MASH) for early
help and the realignment of third sector Service Level
Agreements towards early intervention, are beginning to have an
impact. These developments include a comparatively low
number of children and young people on the Child Protection
Register, a smaller increase in referrals to Children and Families
Social Work than in preceding years, the number of Inter-agency
Referral Discussions remaining steady after a decline of 16%
last year, and a small decrease in the number of children and
young people who need to be  jointly interviewed by police and
social work following a disclosure of harm. 
• The CPC participates in national campaigns to raise awareness
and continues to work with NSPCC Scotland to deliver the
‘Speak Out, Stay Safe’ programme, fully committed to a Whole
Family Approach working closely with our partners  to ensure
risks are identified and mitigated as far as possible.
• It was decided in 2023 that the Bairns’ Hoose Pathfinder Project
will go ahead, the project will provide coordinated child-centred
and trauma-informed support from all agencies who support
children and young people who have been harmed or who are
witnesses to harm. The project will include services such as child
protection and justice, healthcare, education, and therapeutic
support, as a blueprint for full implementation across Scotland in
2025. The project is a partnership between Perth and Kinross
Council, Dundee City Council, Angus Council, Police Scotland,
and NHS Tayside. 
Action: Ensure that people get the right care,
accommodation and support where and when
they need it 
The Perth and Kinross Health and Social Care Partnership (HSCP)
provides and commissions local health and social care services to
meet the strategic direction of the Integration Joint Board (IJB). Our
aim is to improve health and wellbeing outcomes by providing the
right care and support in the right way and at the right time for the
adult population of Perth and Kinross. Refer to Integration Joint
Board Annual Performance Report 2023/24 which provides detail
on the activities undertaken to ensure people have get the right
care, accommodation and support where and when they need it.
• We have continued to support over 450 people from Ukraine to
settle into accommodation and continue to work with the third
sector and community groups to provide support to these and
around 110 people seeking asylum. This includes expanding
provision of English for Speakers of Other Languages (ESOL) to
support the 98 Ukrainian children who have enrolled in our local
schools.
• We continue to receive referrals from CoSLA to support
unaccompanied asylum-seeking young people (16-18 years) to
settle into the local community. Due to the age of the young
people on arrival, they have Looked After status and are afforded
the same rights and supports as other Looked After and care
experienced (18 years+) young people. As a result, it has been
necessary to expand our support service for these young people
and host families. The Children Alone Seeking Asylum (CASA)
team are supporting 49 young people between ages 15 to 23. 
• We have recruited sufficient Host Families to provide support to
our young unaccompanied asylum-seeking children (UASC)
population being transferred through the national transfer
scheme and who are presenting as children in the Adult Asylum
Hotels.

Page 37

36 
• We continue to recruit Foster Carers against a national picture
which shows recruitment crisis. We are reducing the number of
children placed with independent fostering agencies to 22 with a
further 3 due to move shortly.  We continue to work hard to
reduce the number of children and young people in residential
accommodation. Active care planning is in place to support
alternative family based care options.
• Care at Home Transformation - There are increasing needs for
social care services to support older people who need support
with the activities which are essential for independent living. Our
Care at Home transformation programme aims to ensure that
high-quality care is available for people in the right place at the
right time, promoting healthy, independent and dignified lives.
Having reduced unmet needs by 20% in the reporting year we
will continue this work to reduce it further, improve the speed
with which care is available, and increase personal contact time.
We have progressed this work throughout 2023/24 and this will
continue beyond 2024/25 as a long-term improvement
programme. One of the key deliverables of the programme is to
the redesign of our Care at Home and Reablement approach.
This will establish/embed a hybrid model of commissioned,
community led and internal services.
• Locality Integrated Working - We have made great progress,
building on our well established LINCS (Locality Integrated Care
Service) model. We have developed new roles such as Clinical
Co-ordinators and Assistant Practitioners that work alongside
health and social care services to improve efficiencies and
develop more co-ordinated support.
• In 2023 our partnership was accepted on to the Healthcare
Improvement Scotland (HIS) Focus on Frailty programme, which
brings together teams from six NHS boards and social care
partnerships and the third and independent sector from across
Scotland. Running until 2024, this national quality improvement
programme aims to explore and improve access to person-
centred, co-ordinated health and social care for people aged 65
and over who are living with frailty.
• Through our Early Discharge Project (EDP) we supported 213
people with 92 having been re-abled to regain full independence.
56 people were supported to return home when they would
otherwise have been delayed due to unavailability of immediate
capacity in our HART or care at home services. As such EDP
‘bridged the gap’ to allow them to be discharged home swiftly,
supporting our Discharge Without Delay performance. 15 people
were identified as requiring ongoing care at home and so were
transitioned over to a care at home service provider. 33 people
needed to be readmitted to hospital and 3 were admitted to
residential care/crisis placements. 
CASE STUDY
The PKC Lets and Ukraine Landlord Offer project was
the winner in the ‘Excellence in the Private Rented Sector’
category at the Chartered Institute of Housing Scotland
Awards (October 2023). The award recognised the work by
the Housing service for their work in resettling people fleeing
the war in Ukraine. 
Action: Prepare for the establishment of the
National Care Service and continue to strive
for excellent health and social care outcomes
for the people of Perth and Kinross 
We will continue to monitor national developments and consider
activity as required,

Page 38

37 
Action: Work with partners to reduce re-
offending and support effective interventions
for people in the justice system 
• Around 3,000 ‘person of concern’ cases have been considered
since April 2021. This is a multi-disciplinary approach where a
concern for someone’s welfare has been raised with nearly 90%
being related to substance use, the other 10% relating largely to
mental or physical health. 
• Occupational Therapists provide support through a range of
measures, from liberation planning and rehabilitation (across
cognitive, physical and mental health) to environment
assessment and specialist equipment provision. While they
primarily work with people with mental health issues, we have
ensured there is capacity to also support people with substance
use and physical health needs.
• Hillcrest Futures are commissioned to support residents and the
following outlines the activities undertaken within the year:
o Scottish Prison Service: SMART Recovery - 33 Groups
attended by 412 residents. 
o Relapse Prevention/Harm Reduction/Mindfulness - 27 Groups
attended by 216 residents. 
o Recovery Café - 47 Groups attended by 614 residents. 
o Recovery Discussion/Book Group - 16 Groups attended by
113 residents. 
o Recovery Coaching - 36 Groups attended by 1,253 residents. 
o Art Group - 32 Groups attended by 362 residents. 
o Yoga - 5 Groups attended by 75 residents. 
o Harm Reduction/Overdose - 87 One to One Sessions Mental
Health/Wellbeing - 49 One to One Sessions Advice and
Information - 126 One to One Sessions Recovery Support -
178 One to One Sessions.  During this reporting period they
delivered 440 One to One Sessions. 3,495 sessions were
delivered by Peer workers to support people in their recovery
and help to reduce their substance use.
• The Perth and Kinross Community Justice and Safety
Partnership launched a new Community Justice Outcome
Improvement Plan (CJOIP) in June 2023 and provides  the
Partnership with a direction of travel in line with The Vision for
Justice 2022 and National Strategy for Community Justice.
• Bail supervision provides people access to a bespoke person-
centred program, tailored to their individuals needs as a means
of improving their life chances. In 2023/24, 40 commenced Bail
supervision as an alternative to remand.   
CASE STUDY
Voluntary Throughcare Co-ordination & Sustainable
Tenancy Tests of Change were established to enhance the
support offer available to people being released from a short-
term prison sentence.  Support included access to services
best able to meet needs on release and exploring opportunities
to move directly from prison to a sustainable tenancy. 
Key Areas for Improvement  
• Take a partnership approach to the assessment of risk of
significant harm to a child and minimising and reducing risk
through early support and assessment.
• Enhance our housing support offer by implementing an
Intensive Housing Support Service for people with complex
needs.
• Where children cannot remain living at home, every effort is
made to keep them within their kin network. 
• Maintain significant relationships for care experienced children
to deliver on the principles of The Promise. 
Links to other Performance Information
➢  HSCP Annual Performance Report 2023/24

Page 39

38 
Key Performance Indicators related to this priority:
Trends will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24  Trend Target
Met/Not
Met
Target
Ensure we
quickly
identify
children,
young
people and
adults at risk
of harm and
abuse and
take the
necessary
actions to
keep them
safe.
(Children
and young
people) 
Percentage of
children on child
protection
register over 12
months 
Control 21% 8% 4% 6%

N/A
(not
appropriate
to set
targets) 
N/A Most child protection registrations last less than
a year and the number of children and young
people who remain on the child protection
register for 12 months or more has remained
low. This was following a peak (28%) in 2020/21
due to the impact of Covid-19. Many of these
children and young people have multiple and/or
complex needs which require coordinated
support. We have implemented the National
Child Protection Guidance 2021 (revised 2023)
with minimum registrations being 6 months.
Rate of children
on the child
protection
register per
10,000 children
Control 27 21 20 N/A

N/A
(not
appropriate
to set
targets) 
N/A Data not available until end of September
2024.
Calculated using 2022 MYE Population (0-15)
figures until updated figures are published. In line
with national approach.
Child Protection registrations in Perth and
Kinross remain in line with the national average
rate (from 2022) of 20 per 10,000 population.
This ongoing reduction is a consequence of a
significant investment made to secure consistent
chairing of case conferences and increasing use
of Child and Young Person’s Plans at a much
earlier stage; reducing the need to go to case
conference and registration by working
collaboratively with families.

Page 40

39 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24  Trend Target
Met/Not
Met
Target
Ensure we
quickly
identify
children,
young
people and
adults at risk
of harm and
abuse and
take the
necessary
actions to
keep them
safe.
(Adults) 
Number of
Vulnerable
Person Reports
received 
Influence 1,515 1,755 2,254 2,262

N/A
(not
appropriate
to set
targets) 
N/A The Adult Support and Protection Committee
(APC) takes the view that where concerns exist,
it is better to share these so that services can
intervene and safeguard where required. Police
Vulnerable Person Reports (VPR) continue to
dominate the total numbers of all adult protection
concerns received, and this is consistent with the
data from previous years and with the national
picture. 
This is the first year that our data indicates that
there is no significant increase in the numbers of
VPRs received in comparison to the previous
year. Many factors contribute to this and a short
life working group has been established to
explore this in more detail. 
Mental Health features in many of the VPRs
received, on its own, or linked to other areas of
concern including those who experience drug
and alcohol addiction. Front line mental health
services have (and continue) to be redesigned to
reflect emerging themes and trends. This
includes the Access Team who facilitate and co-
ordinate a fast track triage system into specialist
services for all adult protection concerns where
mental health and drug and alcohol features.
This triage implemented by our Access Team
follows the principles and the benefits of early
intervention and prevention.

Page 41

40 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24  Trend Target
Met/Not
Met
Target
Ensure we
quickly
identify
children,
young
people and
adults at risk
of harm and
abuse and
take the
necessary
actions to
keep them
safe.
(Adults) 
In 2023/24, we increased our use of social media
sites to raise awareness of adult protection and
how to respond to it. Raising public awareness of
the Adult Support and Protection (ASP)  agenda
remains a key priority. This data also reflects the
value of the dedicated NHS Tayside Adult
Protection team who support health colleagues
to respond to and report any adult protection
concerns that exist in health settings. 
Source: IJB APR 2023/24. Health and social
work data is subject to review and validation and
figures can change over time. This has led to
some figures being amended from those
previously reported in our Corporate Plan.
Percentage of
Adult Support
and Protection
(ASP) Initial
Referral
Discussions held
within timescale 
Control N/A 67% 69% 69%

90%     Initial Referral Discussions (IRDs) were
introduced into adult protection practices in
December 2020 to facilitate a multi-agency way
to identify adults at risk of harm and coordinate
how any risk could be managed. The joint ASP
inspection in 2022 considered IRDs in Perth and
Kinross as an example of sound practice. 
69 IRDs were held between 2023/24. 75% of
IRDs were held within a three working day period
between deciding to hold and an IRD and an IRD
being held. However, legitimate reasons exist
why an IRD may not be held within 3 days.  Our
2023/24 multi-agency audit into IRDs found that
no adult was left at any undue risk of harm
because of an IRD that was delayed.  For this
reason we are proposing this PI is deleted.

Page 42

41 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24  Trend Target
Met/Not
Met
Target
Ensure that
people get
the right
care and
support
where and
when they
need it.
Number of
households
presenting as
homeless 
Influence 670 610 737 849  N/A
(not
appropriate
to set
targets) 
N/A We experienced a further 15% increase in
homelessness presentations in 2023/24. The
sustained higher demand is linked to cost of
living pressures and disfunction in the housing
system. These pressures and challenges
resulted in the Scottish Government declaring a 
national Housing Emergency in May 2024.
Percentage of
affordable
homes built to
wheelchair and
adaptable
standard (units) 
Control 8% 4.3% 8.9% 10%  10% 
of all
social
housing
built     
11 new build affordable homes have been
constructed to wheelchair and adaptable
standard (9 RSL & 2 PKC) which aligns with our
Local Housing Strategy.
This  indicator reflects the minimum target of
10% of all affordable homes, built by us and
RSLs, being to wheelchair and adaptable
standard.
Percentage of
adults receiving
any care or
support who rate
it as excellent or
good
Influence 89% 77% 73% 70%

80%     For 2023/24, the percentage of people receiving
any care or support who rated it as excellent or
good was 70.1% (201 responses), a reduction of
9.0% from when previously reported in 2021/22
(HACE NI 5).
Throughout 2023/24 we continued to gather
feedback via our internal Service User Patient
Experience (SUPE) Survey. This replicates to
a large extent the questions which are asked
within the HACE questionnaire and so
provides good local data. Although the
number of people surveyed is significantly
smaller than that for HACE we know that
respondents have accessed our services, and
we value their feedback.  97% of people (58
responses) indicated that they rated their care
or support as excellent or good.
Percentage of
adults supported
at home who
agree that their
services and
support had an
impact in
improving or
maintaining their
quality of life. 
Influence N/A 76% N/A 76%

80%

Page 43

42 
Priority: Supporting and
promoting physical and
mental wellbeing 
The Council’s Adult Social Work and Social Care services are
delegated to the Perth and Kinross Integration Joint Board (IJB) and
managed by the Health and Social Care Partnership (HSCP). There
is a statutory requirement for the IJB to produce an Annual
Performance Report and this is reported to the Audit and
Performance Committee of the IJB. This report highlights progress
against the strategic ambitions of the IJB as set out in the IJB’s new
Strategic Plan 2024-27. The following content contains information
taken from the IJB’s Annual Performance about integrated Health
and Social Care services which relate to adults. This has been
combined with information from other Council services which are
not delegated. 
Action: Work with partners to provide
localised health and social care provision in
areas of greatest need and in those most
geographically distant from services 
• Working with third sector partners, we promoted and developed
peer to peer support networks and there are now 15 groups. We
worked with partners to set up carer cafés in Crieff, Aberfeldy
and Blairgowrie as well as supporting PKAVS. 
Action: Improve health and wellbeing in Perth
and Kinross by increasing overall participation
in sport and physical activity and promoting
the wellbeing benefits of time spent in our
natural surroundings 
• Change Mental Health are commissioned to help people affected
by serious mental illness, including family members and carers.
Since January 2023, in partnership with All Strong, they have
supported carers to participate in programmes for fitness and
wellbeing. The team continues to support and run a number of
group activities (Book Club, Carers’ Café, Gardening Group,
Creative Writing) as well supporting carers more holistically. This
has included supporting them to access provision from partners
such as All Strong, Gym, secure Live Active compass cards, and
to apply for various types of funding (including Time4Me Fund).
Information and advice was provided, with 215 subscribers to the
monthly newsletter and 62 people received support. 
CASE STUDY
To promote Active Travel, Cycling and Road Safety in
Perth and Kinross. PKC Roads, Safer Communities and
Sustrans worked together to develop a ‘virtual’ unit working
with communities and across disciplines, to co-ordinate
activities such cycle hub at Balhousie Primary School and
Women’s Cycle Confidence classes.

Page 44

43 
• The Physical and Sports Strategy focussed on increasing
participation in physical and sport to support positive mental
health and physical wellbeing.  Activities during 2023/24
included:
o Young Leaders who completed Aspiring Coaches (62 attended in
June 2023), 26 completed Level 1 and 34 are actively
volunteering.
o Active Schools organised “Gie it Laldy” event in October
2023, the event was  targeted at increasing confidence in
sport and physical activity in girls from disadvantaged
backgrounds.
o Kit banks established in all Primary schools. Further kit banks
to be introduced in areas of highest need using SIMD data.
o LAL Sports Development have in place a Coach & Volunteer
Education Calendar for 23-24 to upskill volunteers from local
clubs and community organisations.   
o The Bikeability programme was delivered in 67 of our primary
schools. In term 1 instruction was delivered to 592 pupils in 19
schools. 
o New volunteer website (Be the Change) launched by PKAVS
and PKC to help community groups, including sports clubs
promote opportunities and recruit volunteers.
• In 2023/24 over £1.1m was spent on projects to improve the
infrastructure for walking and cycling in Perth and Kinross. The
projects provided improvements and new infrastructure including
shared use footpaths, cycling parking provisions and shared use
links to assist and encourage pedestrians and cyclists in local
communities to use more active forms of travel.
• In the latest Sustrans Walking and Cycling Index (March 24),
with reference to  Perth it noted that every day walking, cycling
and wheeling takes up to 13,000 cars off the road, making an
annual saving of 2,100 tonnes of greenhouse gas emissions in
the city. The number of journeys cycled has grown since 2021.
As well as positive detail within the Index, it also highlighted
areas for improvement that we are looking to address such as
increasing numbers of School Exclusion Zones. Perth Walking
and Cycling Index - Sustrans.org.uk
• A new outdoor Early Learning Childcare (ELC) project opened its
gates in Perth to local nursery children.  The Westbank Outdoor
project supports children from nursery settings to access nature
without barriers and allow for outdoor play experiences that are
known to have a direct and positive impact on children’s mental
and physical health.
• We improved 10 parks and play areas in Auchterarder, Blair
Atholl, Perth, Crieff, Dunning, Milnathort and Stanley to
encourage healthy outdoor physical activity for all abilities.  In
2023/24, £291k of Scottish Funding was utilised supplemented
by the Council’s own Community Greenspace Programme and
funding raised through community groups. 
CASE STUDY
The Scottish Government Children’s Play Park Renewal
Initiative allocated funding of £1.741m to the Council over a
5 year period 2021/22 – 2025/26. The funding is used to
target play areas in most need of renewal.  A recent example
is the  full upgrade of the ‘Premier’ play area at Auchterarder
Primrose Park costing over £300k with the community raising
£150k.

Page 45

44 
Action: Improve health and wellbeing in Perth
and Kinross by ensuring that people have
access to wellbeing support when they need it 
• Development of the Health Hub within Murray Royal Hospital.
This is based in the main foyer area and funding has been
secured to develop this area into a health hub, offering physical
health and wellbeing advice to patients, carers, staff and visitors. 
• Social Prescribers continue to signpost people to and support
them into open access and community-based activities. The
service complements healthcare and can replace or avoid the
need for medical interventions. People can access a social
prescriber via their GP Practice, local community organisations
or self-refer.  Across all localities social prescribers worked with
658 individuals.
• The Primary Care Mental Health and Wellbeing Nursing Service
- Primary Care Mental Health and Wellbeing Nurses provide
mental health and wellbeing triage assessments to individuals
aged 16 years and above experiencing a range of mental health 
and wellbeing issues such as low mood, stress or distress, non-
fatal self-harm, and mild to moderate anxiety and depression. 
Key Areas of Improvement   
• Improve health and wellbeing in Perth and Kinross by increasing
overall participation in sport and physical activity and promoting
the wellbeing benefits of time spent in our natural surroundings
• Improve health and wellbeing in Perth and Kinross by ensuring
that people have access to wellbeing support when they need it 
Links to other Performance Information
➢ HSCP Annual Performance Report 23-24 2023/24
➢ Community Investment and Local Action Partnership Funds
2023-24 
➢ Community Investment Fund 2023/24 
CASE STUDY
MacRosty Park in Crieff was granted a dementia-friendly
status from Paths for All.  The park is only the second in
Scotland to have the status.  The award comes after a series
of improvements were made to the park to make it more
inclusive for people living with dementia.

Page 46

45 
Key Performance Indicators related to this priority.
Trends will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24  Trend Target
Target:
Met/Not
Met
Improve health
and wellbeing in
Perth and
Kinross by
increasing
overall
participation in
sport and
physical activity
and promoting
the wellbeing
benefits of time
spent in our
natural
surroundings
Number and
percentage of
the total
school roll
(primary and
secondary)
participating in
Active
Schools/
School Sports 
Influence Not
collected
due to
Covid
5,190
29%
7,200
39%
7,776
42% 
7,500
(33%)      Figures for this indicator are calculated
across three terms and may include some
individual pupils being counted more than
once if they participated during more than
one term.
Since school activity programmes have
returned more fully in 2022/23 the
number of participating pupils has begun
to recover.  During 2023/24 there have
been improvements for specific targeted
groups with increased rates of
participation for secondary girls, young
carers and care experienced children and
young people.
Number of
attendances at
pools, indoor
and outdoor
sports and
leisure
facilities and
programmes
(thousands) 
Influence 63K 564K 1.002M 1.116M  930K      There was a decrease in pool and indoor
sports attendances due to flooding and
subsequent closure of Bells Sports
Centre in October 2023 and temporary
closures for Perth Leisure Pool. 
However, this was offset but an increase
in outdoor activity.  This was mainly due
to the introduction of free grass pitch use
for the residents of Perth & Kinross.

Page 47

46 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24  Trend Target
Target:
Met/Not
Met 
Percentage of
residents
satisfied with
local leisure
facilities 
Influence 74%   
(2018 –
2021)
74%
(2019-
2022)
73%
(2020-
2023)
N/A

75% N/A Data not available until publication of
LGBF. Trends are based upon most
recent data published. 
Latest figures of 73% is above the
national average of 71%.
Percentage of
adults satisfied
with parks and
open spaces 
Control 89%
(2018-
2021)
90%
(2019-
2022)
91%
(2020-
2023)
N/A


N/A  N/A Data not available until publication of
LGBF. Trends are based upon most
recent data published. 
Latest figures of 91% is above the
national average of 87%. 
Improve health and
wellbeing in Perth
and Kinross by
ensuring that
people have
access to
wellbeing support
when they need it 
Mental Health
- Reduction in
waiting times
for people to
access Mental
Health
Services
(weeks) 
Influence N/A New
Indicator
33 36 39

N/A
(baseline
to be
establish
ed)
N/A Demand for all mental health services is
high and teams are collectively working
with around 5,000 people at any time.
Waiting lists are larger and longer than
we would like, particularly for Consultant
Psychiatry assessment/ADHD
assessment and Mental Health OT
intervention within the Adult Community
Mental Health Teams. There has
however been a 27% improvement in the
number of people waiting and all other
initial mental health assessments are
currently being undertaken within 10
working days.

Page 48

47 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24  Trend Target
Target:
Met/Not
Met 
Improve health and
wellbeing in Perth
and Kinross by
ensuring that people
have access to
wellbeing support
when they need it 
The Primary Care Mental Health
Transformation Programme was
launched in March 2024 to support a
sustainable longer-term approach to
population mental health. Mental health
issues are a common feature in General
Practice and it is estimated that one third
of GP consultations have a mental health
component (Mental Health and Wellbeing
Strategy 2023). Our Primary Care Mental
Health and Wellbeing Nurses provide an
early intervention and prevention service
for a range of mental health issues.
Source: IJB APR 2023/24. 
Percentage
increase in
people who
feel that their
health and
social care
support was
easily
accessible and
well
communicated 
Influence 91% 80% 89% 57%

80%     For 2023/24, the percentage of people
supported at home who agree that their
health and care services seemed to be
well co-ordinated was 57.3% (1,912
responses), a reduction of 7.8% from
when previously reported in 2021/22
(HACE NI 4). 
Throughout 2023/24 we continued to
gather feedback via our internal Service
User Patient Experience (SUPE) Survey.
This replicates to a large extent the
questions which are asked within the
HACE questionnaire and so provides
good local data. Although the number of
people surveyed is significantly smaller

Page 49

48 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24  Trend Target
Target:
Met/Not
Met 
Improve health and
wellbeing in Perth
and Kinross by
ensuring that people
have access to
wellbeing support
when they need it
than that for HACE we know that
respondents have accessed our services,
and we value their feedback.  92% (59
responses) indicated that their health and
support was well communicated, and
83% (58 responses) felt their health or
support was easily accessible. 
Feedback from Care Opinion shows that
for 2023/24 of 119 people who shared
stories on the platform, an overall rating
of 4.73 out of 5 was achieved for Clear
Information. For Information and Decision
Making Shared Appropriately, 119 people
gave an overall rating of 4.75 out of 5.
Service User and Experience Reporting
(SUPE) Survey results demonstrate that
people broadly feel that their health and
social care support was easily accessible
and well communicated. While the
sample size for this measure remains
smaller than we would like, work
continues to expand the reach of the
SUPE Survey to additional teams and
services throughout the Health and Social
Care Partnership.

Page 50

49 
Priority: Working in
partnership with
communities 
We recognise that there is no one-size fits all solution to working
with communities to address local needs. In 2023/24 we have
tested and operated different approaches. Some of the progress
made is 2023/24 is outlined below. 
Action: Establish locality multidisciplinary
teams working with our community planning
partners and residents to identify and address
local solutions to local needs 
• Pilot locality working projects are well underway in Highland
Perthshire, Letham and Coupar Angus, with further rollout to
Perth City and Crieff planned. A full rollout plan has been drafted
to wider rollout across Perth and Kinross.
• In Highland Perthshire the Multi-disciplinary team has been
developed and a steering group formed to deliver on agreed
actions, community engagement is taking place all supported by
the Improvement Service. 
• The new Letham Hub is central to the work in Letham where a
multi-disciplinary operating model is being developed between
council services and partners. The work incorporates learning
and feedback from the Love Letham project and integrates this
with existing community groups and plans to provide a joined-up
partnership approach to delivering better outcomes in Letham.
• In Coupar Angus work continues to address the issues raised in
the community action plan commissioned by the Community
Planning Partnership. 
• We formed a Public Social Partnership with Glenfarg Community
Transport Group (GCTG).  As from 03 April 2023 GCTG have
been delivering a local bus service and school transport contract
with funding and support from PKC.
• We secured £30k of external funding to undertake an options
appraisal for a Local Authority and Community bus depot in
Aberfeldy.
• We provided Kirkmichael Community Transport Group with a
Council pool car and Council fuel card in order that volunteers
had a vehicle to deliver community led public transport solutions.
• We committed to invest £150k of Community Bus Funding to
purchase 6-8 seat vehicles and lend these to Muthill Community
Transport Group, Tay Valley Connections, Kirkmichael
Community Transport Group and Stagecoach East Scotland to
deliver public transport solutions in our deep rural areas. 
Action: Increase the supply and availability of
rural housing 
• The recently adopted Local Housing Strategy 2022-27 (March
2023) target is to deliver 1050 affordable homes with an Urban
(53%) / Rural (47%) split to ensure representative distribution. In
financial year 2023/24, there was 173 new affordable homes
completed by PKC and our RSL partnerships with an urban/rural
split of 62 new urban affordable homes (36%) and 111 new rural
affordable homes (64).   
CASE STUDY
The LethamHub provides opportunities for partner agencies
to deliver a range of services in the locality and engage with
local people who attend the many community based activities.

Page 51

50 
Action: Develop and expand our approach to
working with communities to identify local
actions and priorities and deliver on these
together 
• 104 groups received Community Investment Funding to deliver
projects which local priorities in their communities; this was an
increase of 24 compared to the previous year. The increase was
due to a greater awareness of the fund amongst community
groups and increased engagement with groups interested in
applying. 
• 258 groups were supported to improve their capacity to work
within their local communities to deliver a variety of projects and
interventions. For example, the CLD Team supported small
community groups within Strathearn and Strathallan to expand
their offer to a wider area and create new provision for
community members to access, including the Safeart Group and
the Neurodiversity group which both originally started in Crieff
and now offer activities in Auchterarder.  
• Staff at Strathmore Hub were supported to build skills and
knowledge in applying for funding (such as CIF and Warm
Welcome Fund) for pilot projects around cost of living. Support
provided for community groups to manage public assets such as
Alyth Community Wing so that availability and usage by
communities was increased.
• We offered Digital Skills courses at Pitlochry Library to support
people in gaining confidence using devices, reduce isolation and
feel part of their community. Courses offered people the
opportunity to gain digital skills to enable them to keep in touch
with family, online shopping, and using community apps keep up
to date with what is happening in their local area.  A total of 104
hours of learning was provided and 58 people participated.
• 118 volunteer groups were supported generating around 40,000
hours of work to compliment the work the Council undertakes in
managing greenspace assets. It has greatly added value in
ensuring the places we live in and visit are fit for purpose and
attractive, as well as contributing to the physical and mental
wellbeing of those involved and creating a community sense of
pride.  Support included Paths Groups, Friends of Cemeteries
Groups, Bloom Groups, Community Allotment Associations,
Health and Wellbeing Groups. Most groups were provided with
insurance, relevant training and materials and many were
provided with financial assistance including awards from the
Council’s Community Environmental Challenge Fund (CECF),
often ‘levering in’ significant amounts of additional funding.  
• In June 2023 the new community co-designed and funded £300k
all abilities play area in Primrose Park Auchterarder was opened
and in November 2023, a Food Growing Officer was appointed
to help local groups find and develop land for community food
growing, as part of delivering the Council’s Food Growing
Strategy.  
• Throughout 2023/24, support was provided to help the
Blairgowrie and Rattray Community Football Club develop their
new changing facilities at Davie Park to complement their Phase
1 3G all-weather pitch completed in 2022 as part their ambitious
£1.2m plan.   
• We completed a number of flood studies in local communities
(including Craigie Burn, South Kinross, Dunkeld and Perth) to
understand the risk of flooding, engage the community to
disseminate the study findings, and raise awareness of other
actions such as community flood resilience.  In February 2024,
Full Council Committee approved £1M for Craigie Burn and
Dunkeld Flood Schemes.  
• In September 2023, we introduced a dedicated Safer
Communities Warden for the area of Perth City North through
partnership working. The funding drawn from monies approved
during the budget-setting process for 2023/24 will provide a
visible, consistent presence in the area, the new role will be

Page 52

51 
focused on helping to tackle anti-social behaviour, engagement
with the community, liaison with schools, and close joint working
with other council teams and Police Scotland colleagues. 
Action: Deliver our internal cultural change
programme ensuring all staff contribute to our
commitment to engage with and be accessible
and responsive to our residents and
communities 
• Our internal cultural change programme continued to be a focus
during 2023/24 with the Employee Experience (EE) being
delivered which focused on the values and behaviours
framework, our ‘eyes and ears’ of PKC (or No Wrong Door) and
how we work more effectively with partners and communities.  
• By the end of April 2023 85% of the organisation had attended a
session either virtually or in person or had a session within their
areas of work using the EE materials to ensure consistency.
• In 2023 a staff recognition programme was introduced, and
leaders were encouraged to nominate staff who demonstrated
the values and behaviours, went above and beyond what was
expected or made a significant impact to our communities. The
informal events were held by the Chief Executive to personally
thank staff for going the extra mile.
• The Leadership for All Programme, launched April 2023, sets out
a programme of development opportunities, aligned to our
corporate plan, all designed to build confidence, skills and
knowledge whilst challenging traditional ways of thinking and
working to reform. Over 60 sessions were delivered with more
than 600 individual staff attending.
• Early 2024 we procured Adapt2Digital to work with PKC to
design and deliver a 12-month Senior Leadership Development
Programme for the new Executive and Strategic Leadership
Teams which is focused on establishing a well-connected,
supportive and high performing team.
• Continued to offer bespoke cultural change programmes for
teams to work more effectively with communities and customers
and address and remove barriers to working as effectively as
possible.
• In January 2024 we launched the new Performance and
Development Discussion Framework which is aligned to the
Leadership Competencies and Values and Behaviours
Framework to provide clarity over what’s expected from staff and
to provide support and development to gain knowledge and skills
to drive performance and support career progression.
• Our work with the Insights Team Discovery Model gathered pace
during 2023 and PKC were approached by Insights to take part
in research as they evolved a new Insights model. 208 staff took
the opportunity to be part of the study which had a significant
impact on their individual role and team with improved
communication, decision-making and more effective and efficient
ways of working.   
CASE STUDY
The Friends of Cemetries Initiative was established in
2022 to address community concerns about the upkeep of
cemeteries.  Since 2022, there are now over 20 active
supported groups throughout Perth and Kinross and an
estimated 4,000 volunteer hours spent improving and
transforming local cemeteries.

Page 53

52 
Key Areas of Improvement  
• Deliver a clear, consistent, and joined up approach to supporting
communities and households with the help and support they
need to mitigate and move beyond poverty.
• Provide more affordable homes to support liveable and
sustainable communities.
• Support community groups to manage local assets.
• Increased engagement and applications from communities to the
Community Investment Fund grants programme. 
• An empowered and skilled workforce who are confident in
engaging with resident and communities and demonstrate the
organisational values and expected behaviours at all times 
Links to other Performance Information
➢ Perth & Kinross Council Equalities Mainstreaming Report
2023-25

Page 54

53 
Key Performance Indicators related to this priority.
Trends will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Trend Target
Target:
Met/
Not Met
Increase the
supply and
availability of
rural housing
Total number of
houses built in
rural areas of
Perth and Kinross 
Influence 26 55 63 111

60      This includes part completion of 22 new
Council homes in Methven during
2023/24 as a result of an approximately
£4.4m investment from ourselves and
the Scottish Government.
Number of
Community
Development
Trusts supported
to increase the
availability of rural
housing 
Control N/A New
Indicator,
baseline to be
established
and targets set
thereafter
3 4

4    
PKC is actively enabling and supporting
4 community development trusts and
engaging with two Community Council’s
with a view to exploring community-led
affordable housing initiatives further.
Develop and
expand our
approach to
working with
communities 
Number of
community groups
with local
resilience plans
Influence 35 26 28 53

30      The number of community groups with local
resilience plans has increased for 2023/24.
Number of
community groups
supported to
increase their
capacity 
Control 270 236 343 258

270     Although the figures show a decline in
the previous year, this is due to smarter
reporting mechanisms which ensure that
staff are not double counting the number
of groups receiving capacity building
support across multiple areas. This is
particularly applicable where
organisations and groups cover multiple
localities. This means that these figures
are more accurate.

Page 55

54 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Trend Target
Target:
Met/
Not Met
Number of
community groups
supported in the
asset transfer
process 
Influence 5 7 26 31

25      In 2023/24, we supported 31 community
groups who enquired about Community
Asset Transfer (CAT), providing relevant
known information regarding assets and a
single point of contact. This approach has
allowed for relationship building and
facilitated discussions as to whether a CAT
is right for the group at this time. 21 groups
are currently still considering the CAT
process. Groups will all move at different
speeds, however, some of these groups are
expected to progress to full Stage 2
requests within the next year
Number of groups
receiving
community
investment funding 
Control N/A 141 85 104

100      CIF application numbers will vary year on
year depending on the projects that ward
panels chose to support. In 2023/24 there
were 110 applications and  £402,878.39
was distributed between 104 groups.
Number of
participation
requests 
Influence 1 0 0 0

N/A
(not
appropria
te to set
targets) 
N/A In 2023/24, we received no Participation
Requests. This situation is not unique to
Perth and Kinross, as other local authorities
also report low numbers. In recognition of
this, Part 3 of the Community Empowerment
Act 2015 is being reviewed first as part of a
broader Community Empowerment Act
review by the Scottish Government. The
Scottish Community Development Centre
has formed a working group to lead this
review with relevant authorities, and we are
represented in this working group.

Page 56

55 