ANNUAL
PERFORMANCE
REPORT
2022/23

Page 2

Page
Introduction 3
Corporate Leadership Team 5
Tayside Contracts - Who We Are, and What
We Do 6
Plan on a Page 8
Our 5C’s:
Confidence, Trust and Relationships 9
Commercial Approach 15
Collaboration and Sharing 20
Continuous Improvement and
Performance 29
Communities, Councils and Customers 40
Summary of KPI’s and Targets 50
1

Page 3

2

Page 4

Thank you for taking the time read our
Annual Performance Report. This
report summarises the work
undertaken across all Tayside
Contracts’ activities during 2022/23, to
deliver the best possible services, and
achieve the best possible outcomes,
for the communities of Tayside. We
are proud of what we do, and the
report presents us with an opportunity
to celebrate our successes, and
highlights our strengths, whilst also
reflecting on the challenges we have
faced, and those areas where we need
to make further improvements.
The period covered in this report
represents one of the most difficult
and unpredictable periods in the
organisation's 27-year history, as we
emerged from the last of the COVID
lockdowns, and faced the impacts of
the post pandemic recovery, including
severe shortages of goods and
services, coupled with essential items
– such as gas, electricity, diesel and
bitumen – increasing at rates, far
higher than general inflation. With
inflation at record levels during the
year, this resulted in unprecedented
pay costs. With pay awards weighted
to lower paid workers, this was
especially expensive for Tayside
Contract.  We also experienced low
school meal uptake following the
pandemic, as well some of our highest
levels of sickness absence, turnover,
and skills shortages during the year,
reflecting similar national trends
across the public and private sector.
These pressures on our people – both
at work and in their home lives – have
had a substantial bearing on our
employees and it is no surprise that
stress, work-related stress and
depression now account for 43% of the
total days lost through sickness absence.
Our Annual Performance Report
highlights the proactive measures we
have taken to help deal with these
physical and mental health challenges,
to keep our people safe. 
Despite these challenges, we achieved a
range of successes. For example; 
the success of our School Meals
Action Plan delivered an increase of
14% in average daily meal uptake
over the year.
we generated an additional income
from other public bodies and external
customers of £1.2m (an increase of
26% from the previous year). 
the launch of our new Community
Fund, which enabled us to support 29
groups deliver local community
empowerment.
Despite the ongoing challenges of
recruitment difficulties and higher
than normal sickness levels, we
continued to deliver services across
all Council areas with no service
failure.
The success of Tayside Contracts relies
on our employees. This has been no
exception during the last 12 months,
with our employees working tirelessly,
under the most difficult circumstances,
to deliver the essential services needed
by our communities across the area.
Without their commitment and
dedication, many of the core services
that our stakeholders have been
required to deliver to support to our
schools and communities, as well as
keeping the road network serviced and
maintained in all weather conditions,
would not have been possible.
3

Page 5

The greatest challenge we continue to face
will be the significant financial pressures
arising from government budget
restrictions, record levels of inflation, and
unprecedented increases in costs such as
pay awards. These will put a substantial
pressure on meeting our budgets and
delivering our essential services, for 2023/24
and beyond. 
To achieve our aims, teamwork is essential,
and we would like to thank members of the
Tayside Contracts Joint Committee,
colleagues from our three constituent
Councils, our affiliated Trade Unions, and our
selfless and hardworking people within
Tayside Contracts, for their contribution to
working together to deliver the actions
contained in this Annual Performance
Report and to deliver vital services to the
communities of Tayside.
We have set out our 2022/23 achievements
under the ‘5C themes’ of the current 2021/24
Business Plan. These themes are:
Confidence, Trust and Relationships
Commercial Approach
Collaboration and Sharing
Continuous Improvement & Performance
Communities, Councils and Customers
Bailie Mike Williamson
Convener of Tayside Contracts
Keith McNamara
Managing Director
4

Page 6

Our Corporate Leadership Team
5

Page 7

Our Facilities Management team keep
over 400 buildings clean and well
maintained and help ensure all the
occupants are safe.
We are very proud of what we do in Tayside
Contracts;
We are the largest civil engineering
construction organisation in Tayside -
carrying out £45 million of road repairs,
maintenance and construction, winter
maintenance, and street lighting
improvements each year.
We are also Tayside’s largest catering
organisation – serving over 5 million meals
every year to schools and community
customers – that’s 28,000 meals each day.
Our School Crossing Patrollers help to
keep the children of Tayside safe when
travelling to and from the 175 schools in
Tayside.
During the winter we treat over 355,000
kilometres of roads, to protect the
travelling public
We operate a fleet of 600 Tayside
Contracts vehicles and plant. Through the
Angus Fleet Partnership, we also manage
and maintain a further 370 vehicles and
plant on behalf of Angus Council.
6
Who We Are
For the past 27 years, Tayside Contracts
has been the collaborative and
commercial operating arm for the three
Councils in Tayside (our constituent
Councils):
Angus Council
Dundee City Council
Perth & Kinross Council
We are not a private company. We are
governed by a Joint Committee of 18
Elected Members from the three
Councils.
Who We Are and
What We Do
What We Do
We provide essential public services to the
400,000 residents in Tayside on behalf of
the three Councils.
Our annualOur annualOur annual
Turnover is aroundTurnover is aroundTurnover is around
We have 4 recycling depots strategically
placed within the Tayside area, ensuring
waste from our construction activities is
reprocessed into saleable products.
Our Quarry at Collace in Perthshire
produces over 110,000 tonnes of coated
and dry roadstone materials each year, to
keep Tayside’s roads well maintained.
We currentlyWe currentlyWe currently
havehavehave
posts.posts.posts.
3,200
£89m

Page 8

We operate as a business and
carry out work for other public
bodies, private firms and the
wider public.  Every pound we
make through our commercial
activities is reinvested in our
public services and local
communities.
By doing what we do and making
sure we provide high quality and
cost-effective services, we are
enhancing the communities of
Tayside.
To view a short video on who we
are and what we do, click here.
All of these activities are
supported by our highly
professional Human Resources,
Safety and Training, IT, Finance,
Communications, Equalities and
Business Support teams – who are
invaluable to our success.
7

Page 9

1
8

Page 10

Confidence, Trust and Relationships
‘Proud of what we do, chosen for how we do it’
Tayside Contracts can only survive and thrive if we have the strongest possible
relationship of transparency, honesty, mutual respect and trust with the Elected
Members and officers of our constituent Councils. We rely on Councils to trust us to
deliver shared services on their behalf, based on their confidence in our ability to
deliver excellent services. 
Our Vision is to grow our organisation by taking on greater business opportunities
beyond the Councils in Tayside. Therefore, we also want these other prospective
customers to choose Tayside Contracts, for how we do things - for anticipating their
needs, providing high quality services, and delivering best value for them.
Introduction
Here are some of our highlights during 2022/23: -
The financial stability of Tayside Contracts is essential to maintain the confidence of
our constituent Councils.  For the year 2022/23, despite the unprecedented trading
conditions, we achieved an overall distributable surplus of £977k. This surplus was
achieved through the positive performance and contribution by all parts of the
organisation, as well as close working with our constituent Councils, which had to
incur additional costs, as we passed on increased charges to cover the impact of
record levels of pay awards. 
The statutory trading surpluses achieved over the last three years are £3.4m for the
Construction Division and a break-even position for the Facilities Services
Division- with all surpluses being distributed to the constituent Councils.
Over the past 27 years, Tayside Contracts has performed well in terms of operational
and financial performance, returning over £31m to the constituent Councils in
surpluses, to allow reinvestment in public services.
Despite the various challenges of supply chain shortages of essential materials,
accompanied by significantly higher than inflation costs for many materials and
services, our Construction Division increased its turnover by £1.5m (3.1%) to £51.2m
in 2022/23, compared to £49.7m in 2021/22.  Income from the constituent Councils
increased by £305k to £46.5m. Work from other public bodies and external
customers increased by £1.2m (a 26% increase) to £4.6m. This was achieved
through additional Scottish Government- funded active travel projects, and
significant additional income from private customers and other new constituent
Councils' works, combined with a saving in various overheads, helping to maximise
both workloads and income.
9

Page 11

We also benchmark with other organisations to learn about areas we can improve,
and we celebrate our successes through the award nominations we receive. 2022/23
was another successful year for Tayside Contracts, where we were proud to be
nominated for the following UK-wide APSE Performance Networks awards:
The fact that we were nominated for these national awards is evidence of the quality
of services we provided during the year.  
With the significant challenges facing Scottish Councils over the next few years, it is
more vital than ever to be reassured that public services are being provided through
the most appropriate service delivery models; and that the greatest focus is given to
ensuring efficiencies, transformation and income generation, to mitigate against
reductions in public service delivery - as well as maximising the advantages of the
greater collaboration that Tayside Contracts offers. We have worked with our Council
colleagues or the Governance and Strategy Group on a shared development of
transformational actions that maximise the delivery of service, whilst minimising
costs – this is known as our ‘Change Plan’.
Overall, the organisation achieved a 5.4 % increase in income of £92,265k which is a
£4,753k increase on the 2021/22 figure of £87,512k (and above budget expectations by
£8,620k).
The Facilities Services Division comprises the Facilities Management (FM) and
Catering Units. The underlying operational and financial performance of the Division
remained sound. However, 2022/23 saw the consequences of the pandemic having
an opposite impact on the two units within the Division. The FM Unit achieved a
significantly higher surplus, due to the greatly increased amount of cleaning required
across the school estate and in non-school premises - showing an increase of £1.3m
compared to budget, and a £708k increase on the 2021-22 surplus. 
However, due to change in habits formed as a result of COVID-19, meal uptake has
not reverted to pre-pandemic levels (a situation reflected within school catering
services throughout Scotland). This has severely impacted on the financial outcomes
of the Catering Unit, although, more encouragingly, meal numbers did increase
steadily during the financial year (average daily meal numbers increased by 14% over
the year).
Despite the challenges, Facilities Services Trading Account for 2022/23 shows an
increase in income of £3.2m (8.5%), to £41m compared with 2021/22 (£37.8m), with a
distributable surplus of £367k achieved for the Facilities Division.
10
Street Lighting Partnership (Dundee) - nomination for Street Lighting ‘Best
Performer’ and ‘Most Improved’ finalist. 
Transport Services – nomination for Transport
Operations and Vehicle Maintenance- ‘Most
Improved’ finalist
Angus Council – nomination for Roads, Highways
and Winter Maintenance - ‘Most Improved’ finalist

Page 12

1
These developments have been informed in part by the outcomes from joint
workshops held with colleagues in our constituent Councils in 2022 on Roads
Maintenance and Facilities Services, to identify transformational options, to meet the
challenges.
As part of our drive to reassure our constituent Councils that we are as cost-efficient
as we can possibly be, and that our future plans to maximise sharing services and
expand our business to other customers are effective,  in March 2023, the Chief
Executives of the three constituent Councils  and the Managing Director of Tayside
Contracts commissioned a Supported Self-Assessment by an independent reviewer
into the activities of Tayside Contracts.
The outcomes of this review work will help strengthen our approach to the
challenges ahead.
We are committed to sound governance and the effective delivery of services. The
effectiveness of our governance framework is reviewed annually by the Managing
Director and the Corporate Leadership Team, through use of a self-assessment
scoring mechanism as part our Annual Governance Statement. This assessment
showed that Tayside Contracts had 68 items (91%) fully compliant with the
existing guidelines (exceeding our 80% target). This objective evaluation provides
reassurance over  Tayside Contracts’ governance arrangements.
Confidence in our activities can also be gained by the independent assurance on our
performance, provided by our Internal Auditors. For their 2022/23 annual report,
Internal Audit concluded that 'Tayside Contracts had adequate and effective risk
management, control and governance processes to manage the achievement of its
objectives, and that Tayside Contracts has proper arrangements to promote and
secure value for money'.
Internal Audit provided a ‘Strong' level of assurance that the organisation had
implemented their Auditor’s recommendations. In addition, Internal Auditors
awarded Tayside Contracts with a 'Strong' level of assurance relating to our
Procurement arrangements, identifying 7 areas of good practice. A similar 'Strong'
level of assurance was given for the organisation’s Communications and Social Media
functions, with Auditors highlighting 13 areas of good practice within the
organisation. 
Tayside Contracts continues to retain ‘High Confidence’ centre accreditation to
enable us to deliver a wide range of training, qualifications and awards. We are proud
to be accredited as approved providers/trainers with the following organisations:
11

Page 13

Royal Environmental
Health Institute of
Scotland (REHIS)
Scottish Qualification
Authority (SQA)
The Institution of
Occupational Safety
and Health (IOSH)
Highway and
Construction Training
Association (HCTA)
DVSA Training
Accreditation (DVSA)
Street Works
Qualifications Register
(SWQR)
Public Health Scotland – Scotland’s
Mental Health First Aid (SMHFA)
Casestudy
In early 2023, our Training and Development Adviser, Susie Newton was recognised by the
Royal Environmental Health Institute of Scotland (REHIS), by being awarded the
prestigious REHIS ‘President's Award’ for an ‘individual who has significantly
contributed to the improvement and protection of health and wellbeing in Scotland’. 
This award was given for the REHIS courses delivered both in-house, externally to other
groups, and to the local charity, Dundee Bairns In addition Susie developed and piloted a
new national course in the important area of food nutrition; and she was also recognised
for her selfless volunteering work with local soup kitchen, ‘Graham’s Kitchen’.
12
Confidence and trust in our High Performing Employees
pictured here L to R is Ron
McCabe, Safety & Training
Manager, Susie Newton and
Evonne Bauer, REHIS President

Page 14

Award Winning Response to Successful Operation Unicorn
Tayside Contracts played a key part in the multi-agency planning and assisting with the
delivery and resources of within the Dundee and Angus.
With global media attention on Dundee section of the cortege route, there was no room
for oversights or mistakes which could affect the cortege’s safety or delay free passage
through the city.  Planning was of vital importance given the city’s roads were expected to
be overwhelmed by an estimated 75,000 members of the public expecting to pay their
final respects.
Volunteers from throughout the Dundee Roads Maintenance Partnership (DRMP) and
Dundee Street Lighting Partnership (DSLP) planned for and implemented over 30 closures
only minutes before HM cortege passed through the city. The cortege passed through the
city of Dundee trouble-free and immediately closures began to be removed by the DRMP
and DSLP volunteers to allow well-wishers and the residents of Dundee to return back to
their normal day to day. Tayside Contracts Facilities Team also supported this event by
providing 700 welcome meals and drinks for the volunteers attending the route of the
cortege.   
The efforts of these partnerships, as part of the greater Dundee City Council Operation
Unicorn delivery team, was recognised at Dundee City Councils annual awards ceremony
(the OSCAs) by winning the ‘Above and Beyond Award’ from the Leader of Dundee City
Council.
Without doubt the greatest challenge has been the post-pandemic supply chain
and cost of living crisis, with resulting financial consequences.  International supply
chain pressures meant that the lead times for supply (and occasionally zero supply)
of essential goods such as replacement vehicles, flood and bitumen for roads
surfacing caused significant disruption to the organisation.
Record levels of inflation has hit Tayside Contracts in two main ways. Firstly, the
spiralling price of goods and services has hit Tayside Contracts with certain key items
greatly exceeding inflation (in many cases over 50% and sometimes up to 150%) - this
has impacted on the organisation's costs and profitability, as we attempted to absorb
these costs wherever we can rather than charge these to our constituent Councils.  
Additional costs such as labour, materials, plant and sub-contractors have resulted in
our surplus of £977k being lower than originally budgeted a (£1,634k). 
Casestudy
Following the sad announcement of HM Queen Elizabeth passing on 8
September 2022, longstanding plans were activated for 'Operation
Unicorn', for the funeral cortege passing through the country, including
Dundee on Sunday 11 September.
13

Page 15

Next Steps:
The financial issues facing Tayside Contracts and Councils are both complex and
challenging, and further engagements with Joint Committee members will be needed
to share information on the scale of the financial challenges, as well as options to
address these, to help inform Councillors when developing both Council budgets and
Tayside Contracts budget, as well as the development of Tayside Contracts Medium
Term Financial Strategy.
We have engaged with the Joint Committee members and the Governance & Strategy
Group, to ensure we provide the right performance information, at the right time and
in the right format, for these groups and also, to our Council partners and our citizens.
We are currently developing this into a dashboard approach, where performance
information will be presented more clearly and pictorially, and will be accessible to
stakeholders at any time, rather than needing to wait for scheduled update reports.
The involvement of the Joint Committee and other key stakeholders will be essential in
building a shared view of the future priorities for Tayside Contracts, New Business Plan
which will set the agenda for the next 3 years, from 2024 onwards.
We build confidence and trust in our services through our participation in national
benchmarking exercise such as APSE (Association of Public Service Excellence)
performance networks, the largest voluntary public sector benchmarking service
across the UK, which is used by over 200 local authorities. Due to delays at APSE, the
2022/23 figures have not yet been released. Once these are issued we will use the data
to compare our performance and target our prioritised areas for improvement. 
We will be incorporating the outcome and recommendations of the independent
Supported Self-Assessment review into our future Improvement Plans.
Record inflation has also greatly impacted on costs through the local authority pay
award. As 73% of Tayside Contracts employees are on the Scottish Government Living
Wage level (compared to 0% in our constituent Councils), these costs have
disproportionately affected Tayside Contracts. The costs of the 2022/23 pay award
added an extra £4.5m cost to the organisation (approximately 10% increase on pay
costs), which was £3m higher than budgeted. This created both a pressure for
Tayside Contracts and the constituent Councils during 2022/23, but these increases
also add to the baseline of costs for 2023/24 budget and beyond. 
The other significant challenge in 2022/23 related to school meal numbers. The meal
number targets were set with each of the Councils, at levels prior to the pandemic.
However, the changes in behaviours of school pupils, developed during lockdown
and restricted meal service (where pupils brought their own lunches or went out with
the school to buy food) has carried forward into the year.  This also impacted on
Tayside Contracts' financial performance. 
14

Page 16

‘Business head, community heart’
Commercial Approach
Introduction
The need for Tayside Contracts to extend our commercial approach is more vital than
ever. We recognise that increasing our commercial income protects us from making
savings in jobs and services. This safeguards public services from declining funding
experienced in recent years, and likely to continue, as the economy recovers from the
global pandemic.
Expanding on our commercial portfolio is an essential part of our vision for the growth
of the organisation.
Here are some of our highlights during 2022/23: -
Providing winter maintenance services and sharing our depots with the new North
East Trunk Road operator, Amey – as part of our ongoing partnering arrangements
(see case study).
Provision of 134,500 tonnes of roadstone materials to the contractor in the
construction of the Cross Tay Link Road (see case study on page 18).
Commercial Business Achievements
Our successful commercial activities delivered £4.6m of income from commercial
customers and other public bodies, outwith our three constituent Councils in 2022/23 an
increase of 26% (£1.2m) over the previous year.  Highlights include.
Delivery of roads improvement services to Fife Council, as part of their preparations
for the 2022 Open Golf Championship at St Andrews.
Provision of the Community meals teatime service for Angus Health & Social Care
Partnership.
15

Page 17

North East Trunk Road
Partnership with AMEY 
Tayside Contracts’ successful
commercial approach can be
demonstrated through our partnership
working with the national
infrastructure services and engineering
company, Amey, to develop a bid to
operate the maintenance of the
strategic trunk roads in Scotland. This
responsibility for roads in Scotland is
split between local Councils for the
majority of the roads - other than the
main Trunk Roads, which are the
responsibility of the Scottish
Government, which tenders for
providers to carry out all maintenance
and management of these roads.
Our hard work with AMEY was
rewarded when in April 2022 Amey
were awarded the North East
Operating and Maintenance contract.
This contract covers roads from the
River Forth to the Moray Coast.
Working in partnership with Amey, we
are providing Depot facilities, fuel
services and Stores at Forfar, Dundee
and Perth, as well as providing a Winter
Maintenance service on behalf of Amey.
As the Trunk Road contract duration is
8 years with an additional 4 year option,
this provides a substantial and
sustained income to Tayside Contracts. 
We look forward to building on the
commercial and partnership
opportunities with Amey throughout
the duration of the contract.
Casestudies
Providing Secure Supplies of Road
Materials, and Commercial
Opportunities, by Extending the
Future Life of Collace Quarry
Our shared quarry at Collace is located in
the Sidlaw hills between Dundee and
Perth and is therefore well placed relative
to the Council areas it serves. It  provides
the three Councils and Tayside Contracts
with an assured reasonably priced supply
of roadstone materials to keep Tayside
roads maintained. The quarry also
generates income by providing its
materials to other customers. The quarry
produces more than 100,000 tonnes of
material each year, and generates a
turnover of £7.6 million.
16
Under the current planning approval, the
remaining stone we are permitted to
extract is estimated to be exhausted by
2025. To increase the operational life at
Collace, to ensure long term security of
supply, and expand commercial
opportunities, during 2022/23 we invested
in the detailed investigatory work,
regulatory processes, and extensive
community consultation to extend the
quarry. If successful this will increase our
stone reserves by over 3 million tonnes, 30-
year extra life, increasing the area of the
quarry by 2.2 hectares.

Page 18

Maximising our Commercial
Activity - Cross Tay Link Road
The Cross Tay Link Road is one of the
largest infrastructure projects ever
undertaken by Perth & Kinross Council. 
It involves the construction of a new 3-
span bridge over the River Tay and a six
kilometre stretch of new carriageway.
The project will improve the local
transport network and traffic flow and
reduce journey times. It will also
enhance pedestrian and cycle safety,
increase network capacity as well as
significantly reducing traffic congestion
and related pollution in Perth city
centre.
The project is being delivered by
engineering and construction group
BAM Nuttall (BAM). During 2022/23 we
worked with BAM to assist in the
delivery of this key project.
The location of Tayside Contracts and
our Quarry at Collace in Perth & Kinross,
are instrumental in helping to achieve a
key objective of the project - to spread
the benefits to the local community,
and minimise the impact on the
environment, using locally available
resources where possible.
Casestudy
As part of a formal procurement
process, Tayside Contracts successfully
bid to provide capping materials (dry
stone) for the project. In May 2022 an
order was placed for more than
200,000 tonnes of stone.
This is a great achievement for
everyone at the quarry, as this material
has been blasted, crushed, loaded, and
transported to the project by the
existing team on site. At the end of
financial year 2022/23 this equated to
134,852 tonnes of material. Putting this
into context, Collace averages 30,000
tonnes of capping sales per annum, so
our production output had to increase
by 450%.
Not only does this give a boost to the
quarry income it has the added
advantage of accelerating the
development of the southern rock
faces within Collace. These faces have
the “Red” rock conglomerate, which are
not suitable for our normal asphalt road
construction products, however this is,
perfect rock for capping material,
required for the Cross Tay project.
In addition to the dry stone provision,
Tayside Contracts, in partnership with
Breedon Group, have also provided
asphalt products for the contract. The
provision of this service is ongoing and
it is anticipated that Collace quarry will
have supplied approximately 8,000T of
coated material by the time the
contract is completed.
17

Page 19

Casestudy
Exploring further opportunities to provide meals and catering services for other
councils were constrained by uncertainties across Scotland, as councils struggled to
reach pre-pandemic levels of meal uptake. This also combined with uncertainties
from the Scottish Government over the timescale for the introduction of the next
phase of Universal Free School Meals (UFSM) in primaries (for P6 and P7), which
would boost meal number demands on all councils. This made strategic planning
very challenging for the councils we were keen to provide services for, as they
prioritised the recovery of their existing services.  With the Scottish Government now
confirming the implementation of USFM by the end of 2025, this gives greater
certainty for Councils future planning, and engagement with Tayside Contracts over
how we can provide services to them.
Provision of Community Meals Teas for Angus Council
In August 2022, Tayside Contracts was asked by Angus Health &
Social Care Partnership to temporarily provide a Cold Teas
service, 7 days per week, for its Community Meals’ service users
in Angus, due to supply issues with the Partnership’s current
supplier. We were able to swiftly put arrangements in place to
meet their needs, and the meals were freshly prepared daily by
our Community Meals team based at Sidlawview Primary
School in Dundee, who currently provide the meals for the
Community Meals service in Dundee.
We continued to provide these meals until October 2022.  By
that time our client decided to extend the arrangement due to
the high quality of our service and product, and we are still
providing this service.
Mirroring national trends in 2022/23 following the pandemic, we experienced
historically higher than average sickness absence rates and vacancy levels - with both
these factors reaching the highest level in Tayside Contracts for several years. This
challenged our ability to pursue external income in some cases, because with
shortages in employees across the organisation, we did not have the confidence to
deliver additional work, when staffing shortages were already impacting on our
existing core services for our constituent Councils.
18

Page 20

Next Steps:
Despite the above challenges our main target continues to be building on the
investment made by our constituent Councils in our innovative cook freeze unit at Tay
Cuisine. This project has been one of the largest initiatives ever embarked upon by
Tayside Contracts, with an investment of £1.9m and years of planning and
development. This creates excellent commercial opportunities. The unit is currently
scheduled to produce around 5 million meals for nurseries, schools and community
meals but has the potential capacity to produce up to 10 million meals per year.
Therefore, we can offer the extra production capacity at the facility to other potential
customers. We are currently engaging with several organisations which need school
and community meals service, and are attracted by the low cost, high quality and
consistency model offered by Tay Cuisine.
We will continue to maximise the opportunities to generate more commercial income
for Tayside Contracts so the financial benefits can be shared by our constituent
Councils. We have a targeted list of commercial opportunities and are working
through these with our teams, and prospective customers.
We continue to tackle recruitment and sickness absence through implementation of
our Wellbeing Strategy and Recruitment and Retention Strategy and their action
plans, to ensure we have the workforce in place to meet the commercial opportunities
which arise.
19

Page 21

Collaboration and Sharing
‘Sharing the gain’
Introduction
Greater collaboration between our constituent Councils offers a proven route to
reducing costs whilst maintaining service quality. If savings are not found through
innovations such as sharing services, then our Councils will need to find these savings
by other means, including service reductions.
Sharing services also offers other benefits, such as
being more attractive to recruit and retain staff;
offering improved innovation opportunities by pooling investment across partners;
providing the scale to access best practice and create centres of expertise;
ensuring a large, flexible workforce available to deploy to priorities such as extreme
weather events; and
having access to specialist staff that individual partners would struggle to supply, if
operating independently.
Here are some of our highlights during 2022/23: -
Our innovative cook freeze unit at Tay Cuisine (also known as the Central Production
Unit, or CPU), had a first successful year of operation, including the incorporation of
the primary school meals service for Perth & Kinross Council in 2022, which was a
significant implementation project. Not only will this deliver year on year cost
reductions of nearly £1m to the three Councils, and protects catering jobs and
services long into the future, it also ‘future proofs’ the participating Councils from the
advent of Universal Free School Meals for primary pupils - which will require an
estimated 1.5 million extra meals to be produced across Tayside to meet demand.
In 2022/23, we continued to expand the services we provide to our constituent
Councils, generating additional income, and delivering more efficient services.
Examples include:
Gutter Cleaning service for Perth & Kinross Council schools now delivered in
house, rather than outsourced.
School window cleaning service for all three Councils now delivered in house,
rather than outsourced.
Providing Facilities Management services for Dundee City Council Community
Centres, by transferring of 16 Resource Assistants to Tayside Contracts
These additional activities contributed to the additional 5.4% income achieved by
Tayside Contracts during the year.
20

Page 22

Window and Gutter Cleaning Minor
Works Team
Our Facilities Services Division (FSD) is
always looking for innovative ways to
improve and expand the services we
provide to our constituent Councils. The
close working relationship with Perth
and Kinross’ Property Maintenance team
highlighted an opportunity for our
Business Improvement section to
provide a service which was a significant
departure from the kind of services we
usually provide. 
The regular maintenance of flat roofs,
gutter and down pipes is a cost-effective
way to avoid the huge costs associated
with repairing a building which has been
damaged by roof leaks. Tayside
Contracts and Perth and Kinross Council
have already achieved a number of
successes in providing minor works
teams for property related works in
schools and other buildings. Following a
period of research and investigation, the
gutter cleaning team was set up, to
deliver this service for PKC to mitigate
the risk of costly roof leaks. 
Taking up an opportunity to diversify and
expand our business portfolio and
further enhance the cost-efficiency of
our services, we identified an opportunity
to provide an ‘in-house’ window cleaning
service for schools and other buildings in
all three Council areas.
Casestudy
This service was previously delivered by a
private window cleaning contractor but
could now be amalgamated with our gutter
cleaning service, given their synergies.
In addition to the savings and improvement
in quality achieved by providing these
services ‘in-house’, the environmental
credentials of the service were improved by
implementing a ‘Smart Water’ window
cleaning system which avoids the use of
harsh chemicals in the delivery of these
services. Further environmental benefits
were realised in the reduction of road miles
by providing the two services
simultaneously from the same vehicle. 
The successful implementation of this
initiative opens up the opportunity for the
Facilities Services Team to expand into
other minor works at schools and other
sites, when our people are based at these
locations, rather than pay expensive callout
charges for private contractors.    
21

Page 23

Roads Maintenance Partnerships in both Dundee City and Perth & Kinross, where we
share Partnership Managers, who report jointly to both Tayside and Contracts and
the Councils. 
Tayside wide Street Lighting Partnership. This partnership now includes all three
Councils, so this one team provides an effective and integrated service across all of
Tayside. 
Partnering arrangements with each of the three Councils for Facilities Management.
The strong working relationship between Angus Council colleagues and our vehicle
workshop maintenance staff is vital as we provide the Council’s Fleet Maintenance
Service, keeping their staff on the move. The partnership is due for renewal in April
2024, as part of the process an overarching review will be undertaken, assisted by
APSE, to review the benefits achieved to date and the areas where opportunities exist
for further improvement.  
We are part of the shared Procurement Board with our three Councils (formerly
known as Tayside Procurement Consortium).
Partnerships in Practice
We have continued to build positive trust and confidence through the successful formal
partnerships we have with our constituent Councils.  There is great value in the
partnership approach to sharing staff and resources, as it saves considerable costs from
having separate ‘Client’ and ‘Contractor’ roles in each organisation. The Partnerships we
share with our Councils are:
22

Page 24

Financial Benefits of Partnering
with Tayside Contracts in Perth &
Kinross
Working in partnership with Tayside
Contracts enables a readily available
workforce to be retained to deliver
essential services such as Winter
Maintenance and an Out of Hours
response to weather events such as
flooding, but also remains flexible
enough to adjust workforce levels to
accommodate fluctuations in road
maintenance budgets. This gives our
Councils confidence in being able to
manage and maintain the road network,
to meet statutory requirements, whilst
providing reactive responses to assist
local communities, when needed.  
As part of the partnership arrangement
in Perth & Kinross, for example, a road
maintenance framework contract is
used by the Council to procure works
both from Tayside Contracts and
external contractors. This is one of the
processes used to demonstrate ‘Best
Value’ is being provided. An updated
framework was issued for pricing in May
2022. Only 18 private sector contractors
across 11 work activities submitted rates.
Tayside Contracts were the only
contractor to submit prices across all
activities, ensuring Perth & Kinross has a
trusted supplier which could fulfil the full
range of works required by the Council.  
Casestudy
Through the period of the previous
framework contract (2017-2022) there
was a request via the Partnering Board
to focus potential savings back to the
service, in addition to providing the
agreed level of surplus. A key area of
where this could be achieved was by not
claiming additional contractual
entitlements such as contract inflation
allowed for by construction industry
indices uplifts (BERR).   In effect, this
means that Tayside Contracts did not
charge the Council for certain tasks,
which we were entitled to do. Private
sector contractors, however, would have
claimed these contracted costs,
irrespective of profit levels, with no
returns to the Council. 
Over the course of the partnership
period, (April 2019 to March 2023) this
resulted in a total of just under £2m not
being claimed by Tayside Contracts.
Instead, this money was reinvested
back in the road network – equivalent
to almost 9 km of A Class road being
resurfaced that wouldn’t otherwise have
been done, thereby demonstrating a
clear benefit to the Council of partnering
with Tayside Contracts.
23

Page 25

Tri Council and Tayside Contracts
Collaborative Service Delivery
There is a history of collaboration of the
three roads authorities across Tayside
which has led to extensive close working
arrangements, information sharing and
joint procurement over the years.
Tayside Contracts are fundamental to
this collaboration, with the benefits of
people and vehicle/equipment
resources, which can be shared across
the three authorities, as well as
delivering the economies of scale in
procurement for roads maintenance
materials, and the ability to share
specialist plant. With quarrying and
bituminous plant capability provided by
our Quarry at Collace, Tayside Contracts
influence the market in the region, so
competitors have to be wary about
increasing their prices.    
The Tri-Council Maintenance Strategy
Group (TCMSG) has worked on a range of
projects initiated by the needs of its
constituent councils to develop a joint
understanding an approach to roads
maintenance, with the common service
provided by Tayside Contracts. This
approach has been further strengthened
in 2022/23 following conclusion of a ‘Test
of Change’ review commissioned by the
Chief Executives of the three Councils, 
and ‘Innovation Workshops’ between
partners. Examples of the benefits
achieved include:  
Casestudy
Salt financial savings achieved by moving
to the use of indigenous “Rock Salt” away
from the much more expensive ‘Marine
Salt’.
Reduced road surfacing material types,
with a standardised material guide,
reducing Tayside Contracts costs.
GPS tracking of Tayside Contracts vehicles
to maximise fuel and vehicle maintenance
economy.
Shared training events.
Winter forecasting contract procured 
across eight councils.
Winter Policy alignment: cross boundary
routes, to provide more standardisation
and cost reductions.
24

Page 26

Casestudy
Casestudy
Road Condition Figure (RCI) improved by 0.9% meaning 22km of network in better
condition.
Safety Inspections again achieved the target of 95%.
The number of potholes repaired in total (Category 1 to 4) was 10,443 which is
significantly lower than the previous year, suggesting the investment by PKC is
having a positive impact on both RCI and pothole numbers.
First Time Permanent (FTP) repairs achieved the 80% target with 81% (8489) receiving
a 1st time fix.          
Sharing Good Practice on Salt Use Reduces Council Costs
Each winter Tayside Contracts procures road salt for the constituent Councils. There are
two types of salt, marine and rock, with marine coming mainly from Spain and rock from
England.
There has always been a price differential between rock and marine salt with marine salt
historically being substantially more expensive. Rock salt can potentially deteriorate when
stored outside for prolonged periods and therefore Councils have traditionally purchased
the more expensive marine salt for areas which had no storage cover.
For winter 2022/23, an additional increase in prices for haulage was applied and the cost 
for marine salt increased again. For Perth and Kinross this would equate to an increased
cost of £120k. A trial approach was taken, purchasing rock salt and storing it outside. This
was closely monitored, and the assessment indicated that service was not compromised
by this different approach.
Roads Maintenance Partnerships:
Collaborating to Deliver Improvements
Perth Road Maintenance Partnership (PRMP)
Investment is road resurfacing has continued to be a priority of Perth and Kinross Council
again in 2022/23, and through the high quality, works carried out by Tayside Contracts, the
national Road Condition Indicator (RCI) has improved. This was a key objective of Perth and
Kinross Council, when allocating additional funding to road maintenance.
Over the three-year period to the end of 2022/23, this investment has resulted in 160km of
the road network being in a better condition. The value of operating our own quarry at
Collace contributed substantially, by supply 40,965 tonnes of coated material through a
collaborative planning and programmed approach to ensure maximum efficiency and
delivery. The key highlights from 2022/23:
25
Sharing this experience through the Tri Council Maintenance
Strategy Group has resulted in Angus Council also moving to rock
salt use, in areas where externally stored, for winter 2023/24, which
will also provide savings for that Council.

Page 27

Percentage of jobs with works information received from Angus Council prior to works
starting (2 weeks baseline), Target 60%, Actual 67%. The receipt of this info is crucial in
the planning and programming of works.
Percentage of jobs started on (agreed) time, Target 90%, Actual 70%. This is an area
that is influenced by when work information is received, when previous works are
completed and available resources to undertake. It was agreed to look at this
collectively with an aim to improve for 2023/24.
Percentage of jobs completed in (agreed) duration, Target 80%, Actual 74%. This can
be influenced when additional works have been commissioned. Although the
outcome was close to the intended target, it was agreed to look at this collectively
with an aim to improve for 2023/24.
First Time Permanent fix repairs completed for the year was 3325 m2. There is no
formal target for this and is based on the requirements set out in the specification.
Gully cleansing for 2022/23 – cleaned 32,596 (102%) of the targeted 32,000 gullies per
annum.
Dundee Road Maintenance Partnership (DRMP)
Performance is monitored and reported to the Dundee Road Maintenance Partnership
Board Quarterly, with an annual report summarising the overall performance in June each
year. The key highlights from 2022/23:
Safety Inspection performing above target at 96% against a target of 95%
Defect repair compliance was very positive. with Category 1, 2 & 3 road repairs all
completed within target times for 2022/23 with response rates of Cat 1 (100%
compared to target 90%), Cat 2 (94% compared to target 85%) and Cat 3 (97%
compared to target 80%)
First Time Permanent (FTP) repairs significantly increased year on year with 43.6%
(30% target) of all defects repaired by permanent methods, an improvement
compared to 15.1% as recorded last year.
Gully cleansing - the rolling 2-year average of 35,116 remains above targeted level of
33,200 cleans.
Angus Operations – Collaborative Roads Maintenance Service Delivery
Tayside Contracts has been delivering the core infrastructure service for Angus Council
since it was established, the service provision is discussed and monitored at an Angus
Headquarters meeting, quarterly.  The key areas monitored for 2022/23 are:
26

Page 28

Casestudy
Angus
Tayside-wide Collaboration in Practice
Street Lighting Partnership
Street Lighting is a core service delivered by Tayside Contracts, maintaining a large scale
illuminated asset to keep people safe – this includes 72,000 illuminated columns, 4,560
illuminated signs and 1,380 illuminated bollards. The Partnership also undertakes a variety
of electrical and lighting commissioned for private sector clients and developers. Our
recently expanded tri-Council Partnership for Street Lighting now includes Angus Council,
which now benefits from our collaborative approach to service provision.
The Street Lighting Partnership is an excellent example of collaborative success in practice,
and this can be evidenced through performance information, which is monitored through
the Tri Street Lighting Partnership Board which meet on a quarterly basis as part of the
formal governance arrangements.
The performance data used are a combination of information made available through the
Society of Chief Officers of Transportation in Scotland (SCOTS)/Association of Public Service
Excellence (APSE) annual return and internal indicators. A summary of some of our
highlights are detailed below.
Faults repaired over
the year.
384
Faults completed within
7 days for the year.
71%
Average days to repair
within the target of 7 days.
6.4
Dundee
Faults repaired over
the year.
251
Faults completed within
7 days for the year.
97.5%
Average days to repair
within the target of 7 days.
3.2
Perth & Kinross
Faults repaired over
the year.
1,240
Faults completed within
7 days for the year.
96.7%
Average days to repair
within the target of 7 days.
2.7
27

Page 29

The opportunities available for collaboration greatly exceed our capacity to deliver,
and we need to ensure that our collaborations are prioritised and have the
appropriate levels of staffing resources and funding, to provide the capacity to be
successful. If we expect these major initiatives to be delivered as an add-on to
peoples’ busy operational jobs, we run the risk of failure. Therefore we, have
implemented an ‘Innovation and Improvement Fund’ of £200,000 to ensure we have
the capacity to support more collaboration, through funding projects which will
further the objectives of our Business Plan.
The past year has been a challenge for the Street Lighting Partnership in retaining
and recruiting staff. Like most businesses, it has been difficult to recruit qualified staff
leading to shortages in some areas. The strength in the Partnership arrangement has
been evident in the ability to flexibly deploy staff, between Council areas, where
resources have been required - rather than have gaps in service provision, if these
services were ‘standalone’ functions within Councils.
We acknowledge challenges in delivery within Angus Construction Operations. There
is a desire to build on the long-standing collaborative arrangement between both
parties to address the challenges of reducing budgets and also to address some
concerns around the service delivery. A working group consisting of Senior Officers
from both organisations has been established to progress this agenda.
Next Steps:
We have identified opportunities for further collaborative service delivery using a
criteria-based priority programme of collaborative opportunities, and we will work with
our councils to develop an agreed programme of collaborations, for the next 3 years
and beyond.
The Scottish Government’s National Roads Maintenance Review has stressed the
importance of the benefits of a collaborative approach to roads-related functions, Our
work in Tayside between our Councils, and now with Amey as the trunk road operator,
places us much further ahead than most areas in Scotland, however, there are greater
opportunities for fuller integration, and a real opportunity to build on the willingness
from the three Councils to pursue greater levels of roads service collaboration. We look
to build on the improvements already identified and implemented by the Tri-Council
Roads Maintenance Strategy Group (detailed in the Highlights section).
We will take forward the collaborative opportunities with our constituent Councils for
our Facilities Management (FM) service to focus on expanding by diversifying further
into what is known as Hard FM (e.g., building maintenance, etc) in addition to Soft FM
(the traditional janitorial and cleaning services currently provided by Tayside
Contracts), to achieve cost and efficiency benefits for our Councils.
28

Page 30

Continuous Improvement &
Performance
‘Think like a customer, act like taxpayer’
Introduction
The need to make sure we are delivering excellent public services at the right time, in
the right way, and to the right people and communities, has never been greater.
The future sustainability of public services requires us all to be more innovative and
open to change; we must be more entrepreneurial and innovative, in order to make
the best use of the limited resources that we have and provide the best service to
our customers and communities. The more efficient and effective we are, the more
competitive we will be.
Here are some of our highlights during 2022/23: -
Recognising the financial pressures on Tayside Contracts and our constituent
Councils we engaged with our wider group of senior managers to stress the financial
challenges, the pressures ahead, and the steps we collectively need to take to reduce
costs and maximise income. From this we established a 3-year Change Plan.  Of the
targeted £3.5m efficiencies and service reductions, we have achieved £1.7m by the
end of 2022/23 with an additional £2.8m income generated during the year. The
following examples highlight how we achieved these results.
At the start of 2022/23 we reduced the number of funded posts on our Facilities
Services Division (FSD) Establishment by 193 posts, reducing labour costs in 2022/23
by £1.35m. We were able to achieve these reductions through robust vacancy
management, thereby ensuring our existing employee’s jobs were not at risk as we
reduced the posts. 
During the year we continued to manage labour costs in accordance with our
Establishment Control and Vacancy Management Policy to achieve the highest level
of slippage possible without unduly risking service failure. Our full Establishment
during the year totalled 3,270 posts, however, only 3,069 of these posts were occupied.
These proactive measures carried out provided some mitigation of the significant pay
costs and inflation increases that the organisation and to constituent Councils had to
incur during the year.
29

Page 31

Casestudy
Perth & Kinross
Dundee
Shared with Amey PLC
(North East Trunk Road
operator)
Shared between *DRMP & Street
Lighting Partnership
and now Dundee City Council
Construction Services
Shared between PRMP,
Street Lighting Partnership,
Perth Housing repairs team
and Amey PLC
Shared with *PRMP and sharing
depot space to facilitate a potential
review of waste management
services on the adjacent Perth &
Kinross Council site
We moved to a more modern and better located site in Aberfeldy. Gritting
routes have been redesigned, improving efficiency, as we no longer need
temporary cabins and loading equipment to be situated at satellite depots.
P&K Council Grounds Maintenance team are also sharing the site, freeing up
their previous location for commercial rent.
Shared with Angus Council
Waste Management and
Roads Infrastructure teams.
Shared between Street Lighting
Partnership, Angus Education
Mini Bus Services and Amey PLC
(Trunk Road, Contractor).
Angus
Carnie Depot Arbroath
Continuous Improvement by
Building Rationalisation and Sharing Buildings
Our Business Plan gave a commitment to ‘Make Best Use of Our Assets’ in our drive to
reduce costs. We targeted our property portfolio, and through working with Councils and
other partners, we have extended our sharing of facilities (and sharing costs) in our offices
and depots across Tayside. The following summarises activities:
Forfar Depot
Fairmuir Depot Marchbanks Depot
Blairgowrie Depot Ruthvenfield Depot
Blair Atholl to Aberfeldy move
The net effect of reducing our building footprint, and sharing accommodation and
costs with partners, will reduce our annual costs for property by £500k per annum.
*DRMP = Dundee Roads Maintenance Partnership
*PRMP = Perth Roads Maintenance Partnership
30

Page 32

Casestudy
Casestudy
Sharing Headquarters Accommodation and Sharing Costs
Investment in New Weighbridges
Delivering Partnering and Efficiency Opportunities
These weighbridges, replaced end of life
weighbridges at each site, increasing
reliability and thus availability, but also
offering the facility to access weighbridge
information ‘real time’ remotely allowing
management staff to carefully manage
winter de-icing stock levels through
specialist software to give a better public
service. This facility is of huge benefit given
all three sites are now shared with the Trunk
Road operator AMEY, and allows shared
In March 2023, significant changes were made within our Headquarters at Contracts
House, following the successful implementation of a ‘Home & Hybrid Working Policy’, using
learning from the COVID pandemic, where homeworking became much more common.
This resulted in   Contracts House having spare capacity, and following a review, we
decided we could accommodate both our existing staff within Contracts House as well as
operational staff from the adjacent Fairmuir Depot office i.e. Dundee Roads Maintenance
Partnership (DRMP) and Dundee Street Lighting Partnership (DSLP), into the Contracts
House building.
By rationalising the office space and people from
two buildings into one, this not only enabled
Tayside Contracts to make significant savings in
running costs by reducing its asset portfolio by one
building, but also enabled the vacated office
building to be occupied by Dundee City Council’s
Construction Services, which allowed them to
relocate from their unsuitable existing
accommodation, and avoid them incurring
substantial costs to refurbish their building or
relocate elsewhere.
31
As part of our ongoing investment in plant and equipment to maximise efficiency, three
new operator-free weighbridges were installed in Arbroath, Forfar and Dundee during
2022/23.
stock utilised by both parties to be correctly allocated to each end user.

Page 33

Casestudy
School Meal Review and Action Plan
Following a review of our school meals service, an Action Plan was developed in
partnership with our constituent Councils, to increase the uptake of school meals to
support the Scottish Government’s agenda to tackle poverty, reduce childhood obesity
and support learning, through school meals.
Daily average meal uptake was significantly impacted by the Covid pandemic, however
2022/23 saw an encouraging and continued steady recovery in meal uptake, heading
towards pre Covid levels, and - in the case of primary uptake - exceeding these levels.
Average daily meals increased by 14% over the year, as the following charts
demonstrate.
Part of our Action Plan was a more
visible presence on social media,
including a regular electronic
newsletter for parents and pupils. The
following positive feedback shows the
impact of this new development:
‘I just wanted to let you know that I
think your recent newsletter is
excellent. Clearly lots of research has
been done surrounding food and
nutrition. Teachings/language
including ‘good’ or ‘healthy’ and
‘bad’ or ‘unhealthy’ options and age-
appropriate explanations of eating in
moderation and how certain foods
help and fuel the body.
The visual menus are a fantastic idea
and may help my child to look
forward to picking her meals and
encourage her to eat what she has
chosen. It’s lovely that the research
is being put into practise resulting in
old beliefs and habits dying out.
Ultimately resulting in a positive
change and healthier children.’
32

Page 34

Transport/Fleet Performance
Maintaining High Standards for Reliable Service Delivery
2022/23 was another outstanding year from the Fleet Maintenance team maintaining their
performance well above the national average performance. This not only demonstrates a
high level of performance it also provides the assurance that a reliable fleet is managed
and maintained to meet the needs of our vehicle users.
The annual test pass rate for 'first time pass' was 97.2%, this remains an exceptionally high
score, compared to the national average of 89.15%. Our high score at annual test is
attributed to regular staff training, good workshop practice, regular vehicle inspections
and quality control checks on maintenance staff.
Currently Tayside Contracts
Operator Compliance Risk Score
remains at ‘G00’ for both
Roadworthiness and Traffic which is
the best score that can be achieved
and has never been below this
rating since the introduction of the
system in October 2012.
33

Page 35

CasestudySupporting our People and Tackling Absences
Through our Wellbeing Strategy
National data has highlighted significantly higher levels of absence in workplaces across
the UK. The UK Office for National Statistics (ONS) reported that 2022, saw the highest
level of working days lost due to sickness or injury across all employment sectors, since
2004. The Improvement Service National Benchmarking Overview Report published in
March 2023 highlighted that staff absence levels were the highest ever reported for local
authorities in Scotland. A recent survey by ACAS found that the mental health of nearly
half (47%) of British workers has suffered due to the cost-of-living crisis.
Tayside Contracts values the contribution of its employees and recognises that their
health, motivation and wellbeing is essential to the delivery and maintenance of quality
services to the community. We believe that supporting, encouraging and enabling
employees to maintain a healthy balance between their work and other interests and
responsibilities in their life is the core principle underpinning our Wellbeing Strategy.
The top ten reasons for sickness absence within Tayside Contracts for 2022/2023 are
detailed below:
Stress has moved to the top reason
for sickness absence in 2022/2023.
Stress, work-related stress and
depression now account for 43% of
the total days lost through sickness
absence.
Several initiatives have been
identified as part of Tayside
Contracts Wellbeing Strategy and
Action Plan which aims to promote
and encourage good physical and
mental health as well as providing
support mechanisms to help deal
with physical and mental health
problems.
During 2022, we teamed up with the expert mental health organisation ‘Headtorch’ to
roll out training on mental health in the workplace to all managers and employees. All
managers were invited to attend online training called Headtorch Aware. This was
designed to provide them with the skills to better understand mental health and how
this can impact on them and their teams.
Following this success, we moved our focus to providing training to our front-line
employees through ‘Head Start’- a televisual online learning programme which is an
introduction to mental health with hints and tips on how employees can look after their
own mental health and wellbeing, as well as spotting the signs that others around them
might be struggling and what they can do about that. Since February 2022,
approximately 1,100 employees have completed HeadStart online training.
cont/...
34

Page 36

Managers within Tayside Contracts continue to utilise the Work-Related Stress Policy and
associated risk assessment and action plan templates to identify, address and ideally
prevent stress-related absences. Tayside Contracts also continues to refer employees for
counselling through its occupational health provider. 
It is extremely encouraging to note that the since December 2020, stress, depression,
and anxiety-related absences have reduced by 10%.
Scottish Mental Health First Aid training was delivered during the year,
giving delegates general information surrounding mental health and
allows them to develop an understanding which will help them remove
the stigma and fear of dealing with employees who may be
experiencing poor mental health.
We introduced an Employee Benefits Platform in March 2023 which is designed to
improve employees physical, financial and mental wellbeing.  The platform gives
employees access to lifestyle savings, an Employee Assistance Programme (EAP), Your
Care, Cycle to Work Scheme, Home and Electronics and in the future, we will introduce;
car leasing, providing access to brand new, affordable fuel-efficient cars and a Salary
Sacrifice Shared Cost Additional Voluntary Contribution (AVC) scheme.
It also includes access to confidential external support via
the 24/7 Employee Assistance Programme and Your
Care, which is a dynamic wellbeing platform offering a
range of personal, emotional, and financial wellbeing
tools.
35

Page 37

CasestudySocial Media Performance for 2022-23
With the significant shift towards social media as the main communications means for
millions of people, we have focussed on developing or approach to ensure that Tayside
Contracts is maximising the benefits from engaging with employees, stakeholders and the
public across multiple social media platforms. The following analytics overview provides
examples of the effectiveness of our social media campaigns, audience engagement, and
overall social media presence. It provides valuable insights that will guide our decision-
making and help to optimise our future social media strategies.
Followers 2,022
Facebook Jobs
Account
lifetime March 2020
171,015Reach
The highest reaching posts were for the pre-
launch of the Apprentice Roadworker
applications in March 2023. These initiatives and
their successful reach supports the organisation
tackling the challenges we are facing with
recruitment
36,027
Followers 447
Facebook
Account
lifetime March 2020
Reach
The highest reaching post in the last 90 days of
2022 was the School Meals Parents Information
Newsletter, which also had the highest
‘reactions’. This is part of our approach to
promoting school meals to parents and pupils.
Tayside Contracts’ Procurement Team attending
the ‘Meet the Buyer’ event received the highest
number of comments, which were all positive.
36

Page 38

(previously known as Twitter)
Followers 1,536
The top tweets were for the School Meals
Parents Information newsletter and the
Scottish Apprentice Week.
Linkedin
Followers 155 Account
lifetime April 2022
Instagram
Followers 153 Account
lifetime August 2022
Youtube Channel
Subsribers 119 Channel
lifetime April 2018
37

Page 39

YEAR 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
ORGANISATIONAL
% DAYS LOST 5.9% 6% 6.2% 3.6% 5.9% 6.4%
Despite all the actions we have taken, the recruitment challenges Tayside Contracts, (and
employers in the UK and indeed globally), faced in 2021/22 have continued into 2022/23.
During 2022/23, the percentage of days lost due to sickness absence for the organisation as
a whole was 6.4%, an increase of 0.5% compared to 2021/22. This resulted in the organisation
failing to achieve our Business Plan Performance Indicator of 6.1%. This is the first time we
have not met this target.
Tayside Contracts continues to explore all available options in relation to improving
absence rates and managing this cost area.
Employee turnover for the organisation as a whole during 2022/23 was 14.5%, an increase of
1.6% on the previous year and 3% higher than the KPI target. Our turnover is at its highest
level in the last ten years:
Financial
Year
2013/
14
2014/
15
2015/
16
2016/
17
2017/
18
2018/
19
2019/
20
2020/
21
2021/
22
2022/
23
Turnover
(%) 9.1 10.6 11.8 10.8 11.6 12.3 11.5 9.6 12.9 14.5
Issues with high turnover are not confined to Tayside Contracts.  Price Waterhouse Cooper’s
national benchmarking study (June 2023) noted that, ‘the competition for talent and the
risk of high employee churn persists. Even amid recessionary pressures, rising interest
rates, and record-high inflation, employee turnover increased in 2022.’
Tayside Contracts has been addressing the ongoing employee turnover concerns through
our Recruitment and Retention Strategy Action Plan and we continue to explore other
ways to improve employee turnover and retention.
However, despite this intense activity, high turnover rates continue to remain a challenge,
with pay and conditions being identified as the main reason for people leaving the
organisation.
38

Page 40

Next Steps:
We have been reviewing our organisational structure as per of our ‘Future Thinking’
programme with a view to significantly reshaping our management and support
services costs and will be bringing forward proposals to ensure the organisations
structure is fit for purpose.
Positive and evident progress has been made with the Wellbeing Strategy Action Plan,
especially in relation to manager and employee mental health awareness training and
policy development. There is some evidence that these interventions may have
reduced stress, depression and anxiety related absences in 2022, but further work is
required around this, and benchmarking conducted, before any formal conclusions
can be drawn.
Investors in People (IIP) re-accreditation IIP is a nationally recognised standard for
people management, defining what it takes to lead, support, and manage people
effectively to achieve sustainable results. To ensure we maximise the benefits for our
employees, and maintain our IIP accreditation, we have developed an IIP Action Plan,
which summarises where the organisation believes it currently sits, and where it
aspires to be to achieve its organisational ambition. This includes a comprehensive
survey of all our employees taking place in the latter half of 2023.
Our focus on technology has great potential to release capacity, with transformation
projects in areas such as mobile working, working from home, streamlining former
paper-based processes, and moving to ‘digital by default’ – all of which are capable of
delivering great improvements. During 2022/23, we invested in new systems for
Financial Management and Human Resources and are implementing these to deliver
both productivity and efficiency improvements.
39

Page 41

Communities, Councils & Customers
‘Creating community wealth’
Introduction
As one of the largest employers in the area with a firm commitment to corporate
social, ethical and environmental responsibility, we are in a strong position to support
the wider ambitions of our constituent Councils and our communities, to enhance the
lives of everyone in Tayside.
As part of its Business Plan’s objectives, Tayside Contracts stated its commitment to
support the wider strategic aims of our constituent Councils, and their respective
Community Planning Partnerships, to share in delivering the Councils’ strategic aims
around community empowerment; equality and fairness; economy and education;
employability; tackling climate change and building community wealth.
Here are some of our highlights during 2022/23: -
Tayside Contracts provides a range of services, which could potentially be beneficial to local
community groups and charities, Examples include: -
Community Empowerment
Carrying out roads/footway improvements and repairs to community facilities such
as community hall car parks, or a local pathway.
Providing Catering for a community/charity event.
Provision of signage via our Sign Shop for a range of community needs.
Provision of Traffic Management for a community event.
In January 2023, we successfully launched our Community Fund, where we support local
community and charity groups, by carrying out these types of works for these groups. The
costs are paid by the Community Fund, with the income for the Fund provided by Brakes,
(one of our major national food suppliers), as part of their own community benefit
commitment.
In 2022/23 we approved nine Fast Track (lower cost) applications. We have also had a
positive 27 applications for full funding (up to £3,000) for community groups across
Tayside. We were able to say ‘yes’ to the vast majority of applications – some examples of
successful applications were: -
40

Page 42

The following comment from one of the successful applicants shows how much this help means to local groups:
“Thank you for the fantastic news – the works will make a significant difference to us, and more importantly the
children and families who use the service!”
In 2022 we achieved recognition as an approved official Young Person’s Guarantee
Employer which is a commitment to connect every 16 to 24 year old in Scotland to an
employment opportunity. This shows the commitment the organisation
has to developing and engaging with young people.
Since June 2022, we’ve attended 12 recruitment events hosted by local employability
teams across Tayside. By attending job fairs we’re increasing the public awareness of
Tayside Contracts and showcasing our organisation as a local employer of choice. Each
job fair is a great way to inform individuals of current job opportunities, answer queries
about our roles, the application process and finally to encourage applications.
Provision of a pathway
round the building for a
charity for the elderly in
Blairgowrie.
Laying a slabbed area for a
charity for children with
complex needs in
Rumbling Bridge.
Ground works to help a
community garden in
Dundee.
Seated shelter for a Stroke
Club in Montrose.
Education and Employability
The Tay Cities deal sets out an ambitious agenda to increase
employability and skills.in 2022 we teamed up with Council
employability teams and Skills Development Scotland to create
pathways to give job seekers guidance, training and employment
opportunities with Tayside Contracts. We also worked with Developing
the Young Workforce (Tay City Deals) to support young people to
prepare for work and the transition needed with support from schools,
colleges, and our managers.
During the year, we participated in the Developing the Young Workforce’s social media
campaign ‘#NoWrongPath’ which provides inspiration and reassurance to young
people receiving their exam results. The campaign aims to demonstrate that many
people in interesting job roles may not have taken a straight, obvious, or traditional path
to get there - that there is #NoWrongPath. Tayside Contracts will continue to
participate in this annual campaign to promote Tayside Contracts as a local employer of
choice.
We also attended careers events at Barnardos: Employability4All, Remploy and
Jobcentres in Angus, Dundee and Perth, Skills Development Scotland, Tayside Pace
Team and held our own event at Street Soccer Dundee.
Tayside Contracts’ success in working with partners in employability led to recognition
in Remploy’s case study: ‘The importance of working with Living Wage Employers,
like Tayside Contracts across Scotland’.
‘We have been working with Tayside Contracts in Dundee, Perth and Angus for the last year. They
have been in credibly supportive of our participants and everyone who has secured work with
them has loved it. They are a fantastic employer to work with.’
Amy Wilson, Regional Account Manager, Remploy
41

Page 43

1
We produced video employee testimonials and now have a Cleaning, Catering,
Construction and Transport testimonials published on our YouTube channel. Quotes
and photographs have also been published for a Facilities Assistant, Apprentice
Roadworkers and Erika and Debbie both School Crossing Patrollers. Weblinks to our
employee testimonials are available on our website, Facebook Jobs page and our
Indeed employer page.
An Apprenticeship webpage is now available on our website highlighting our
successful Apprentice Roadworker and Apprentice Mechanic programmes.
Casestudy
Our Business Plan commits the organisation to work with Councils’ Education Services, as
well as local schools and universities, to add value to the education experience, support
career paths and positive destinations, and potentially attract a new generation of local
talented people to work with us.
Tayside Contracts continues to work closely with our constituent Councils’ Education
Services, to offer work experience placements - 18 placements were offered during 2022/23.
During 2022/23 we attended nine school/career events, delivered talks, and targeted
supporting six local schools, working in partnership with Education Services of the three
Councils. We worked with Brechin High School, Arbroath High School, Braeview Academy
and St Johns High School in Dundee, and Bertha Park and Blairgowrie High School in
Perth and Kinross. In addition, we were also invited to attend school career events and
attended Arbroath Academy, Brechin Campus, Forfar Academy and Monifieth High School
in Angus. Grove Academy and Braeview Academy in Dundee and Blairgowrie High School
and Breadalbane Academy in Perth and Kinross.
Working with Education Partners to Support Employability
Casestudy
Tayside Contracts continued to engage with community and further education
establishments during 2022/23. One such example of this was John Curran, the Dundee
Roads Maintenance Partnership Manager acting as an industry expert assessor for the
Engineering Development trust. This involved spending a day assessing eight very well
prepared and presented projects at the Tayside region Industrial Cadets assessment day
for S2 level pupils held at Abertay University.
The event encourages participants to consider future careers in STEM subjects (Science,
Technology, Engineering and Mathematics) and cannot run without the support of
volunteers with STEM knowledge and the financial support of external industry. The patron
of Industrial Cadets is HRH Charles the 3rd and is directly comparable to the Duke of
Edinburgh scheme.
This positive engagement not only encourages pupils to enter into an engineering
profession but also promotes the career opportunities available at Tayside Contracts.
Working with Education Partners to Support Employability
42

Page 44

Fuel Used (L) Miles Travelled Fuel Spend (£) Overall MPG Year
700.7K 2,000K £992.5K 12.9 2022/23
688.8K 1,919K £761.4K 12.5 2021/22
Climate Change and Sustainability
Our first Climate Change Plan was introduced in 2021, setting out how the organisation
will move towards net zero, influence others to take action on climate change. Good
progress has been made with 12 items in the Climate Change Action Plan, with some
progress being made on 16 actions.
Transport is the biggest contributor to greenhouse gases in Scotland, and reductions in
emissions can only be achieved through significant changes to our reliance on fossil
fuel powered vehicles and plant. Although there were further miles travelled in 2022/23
compared to 2021/22 by Tayside Contracts (this is heavily dependent on work locations),
our overall fuel consumption performance improved by 3.2%. Given that fuel prices
increased by 19% over the period, our proactive management of consumption and
driver behaviour offset the impact of fuel increases in the year by £31k. This has also
benefitted the environmental impact of our fleet by reducing our average CO2
emissions per mile from 1.0 to 0.9.
In 2022 the Transport Services Team took the lead in reducing vehicle idling across
Tayside Contracts with our “TURN IT OFF" campaign. This campaign is aimed at
encouraging drivers to turn off their engines while parked, with the goal of reducing
emissions, improving air quality, and achieving substantial savings. The campaign
messaging was based on the following key facts, and was a key part of the reduced fuel
consumption in 2022/23
TURN
IT
OFF!
43

Page 45

Casestudy
Over the last 10 years, the Street Lighting Partnership teams have been working to install
LED lighting throughout the Council areas drive down energy consumption and reduce
the Councils’ carbon footprints. Our teams have achieved the following by the end of
2022/23.
68%
decrease in energy
consumption since 2012.
Dundee
each travelling
5,000 miles.
1,269
diesel cars
= travelling to the
moon
and back
Over 6.3m
diesel road miles
63%
decrease in energy
consumption since 2012.
Angus
47%
decrease in energy
consumption since 2012.
Perth & Kinross
vehicle miles
33 million
fridges
for a year
148,500
Operating
A key element in our transition to net zero will be to move our 250 commercial vehicle
fleet away from dependency on diesel fuel. In 2022/23 we developed a strategy for the
introduction of alternative fuelled vehicles and plant to Tayside Contracts fleet, which
was approved by the Joint Committee in November 2022.
We worked with constituent Councils, and partners including the Energy Savings Trust
and TACTRAN to explore electric and hydrogen fuelled alternatives for our fleet,
including sharing electrical charging points at depots.  We now have 27 Electric
Vehicle (EV) small panel vans on the fleet and a further 6 on order.
During the production of road construction materials at Collace Quarry, raw aggregates
are heated through a drying drum. We switched the fuel for this heating process in the
asphalt plant from the heavy polluting diesel to a cleaner burning liquid gas (LPG) in
May 2019. Since that time up to March 2023 this switch has reduced the Quarry’s
emissions by over 1.7 million kilograms of carbon dioxide.  This is equivalent to:
Street Lighting Partnership Leads the Way with Tackling
Climate Change
In totality, across the three council areas, we have achieved a saving of 13,500 tonnes of
CO2 This is the equivalent to;
from
CO2
emissions
81,000
trees 44

Page 46

Casestudy
Health data shows that over one third of pupils in Primary 1 in the most deprived areas of
Scotland are overweight and at risk of obesity. Dundee is one of the Scottish Government’s
Early Adopter areas for its ‘Whole Systems Approach to Diet and Healthy Weight’. Tayside
Contracts was part of a Multi-Agency Health Weight Partnership, including Dundee City
Council Children and Families Service, NHS Tayside’s Public Health Directorate, working
together to tackle this issue.
In October 2022, Rosebank Primary School launched their Best Foot Forward initiative
which links with the ambitions of the local Child Healthy Weight Strategy ‘Helping
Tayside’s Children and Young People to Feel Great and Ready to Learn’. The ‘Best Foot
Forward’ was a whole school approach to an inclusive and health promoting environment,
which aims to help families take positive steps towards a healthier and sustainable
lifestyle.
Families were invited to join the 15-week programme with a series of interactive
workshops to develop knowledge around all aspects of health and wellbeing, including
screentime, sleep, regular physical activity and the development of a healthy eating and
snack policy whereby only fruit and water could be consumed as snacks during the school
day. Tayside Contracts delivered practical cookery sessions, including a ‘Fakeaway vs
Takeaway’ event. We provided recipes for batch cooking and freezing and gave advice on
healthy snacks at home.
Health and Wellbeing
Best Foot Forward Project – Rosebank Primary School
45
We were proud to have contributed to
this fantastic initiative, which should have
substantial community benefit. It is
especially encouraging to note that
school meal uptake at Rosebank Primary
School has increased since the start of
the project with average meals
increasing from 127 to 174.
The Best Foot Forward project was
nominated for an award at the Dundee
City Council OSCA’s (Outstanding Service
& Commitment Awards) in June 2023 for
‘Improving Services through Partnership
Working’.
Norrie, our Menu Development Chef sharing his
skills with parents

Page 47

Casestudy
Throughout 2022/23, Tayside Contracts has been involved in delivering various phases of
the Broughty Ferry to Monifieth Active Travel Route Upgrades. The works, which have a
total budget of £18million, aim to deliver transformational improvements for active travel
in the area, creating a high quality and fully inclusive walking and cycling route, with
associated public realm, biodiversity and landscape enhancements.
The project, all of which falls within the National Cycle Route 1, spans from Castle
Approach, Broughty Ferry to Marine Drive, Monifieth. The section of route going westwards
from Castle Approach to Douglas Terrace was also upgraded, as part of the Broughty Ferry
Flood Protection Scheme.
Tayside Contracts are proud to have assisted Dundee City Council as one of the
contractors of choice in the delivery of this exciting and ambitious project. Following an
open tender procurement process, the Dundee Road Maintenance Partnership (DRMP)
have delivered two phases of the project. Phases 2A, a value of £1.7M, was delivered in
conjunction with supply chain partners Kilmac Construction and most recently, Phase 3, a
value of £800k was delivered using internal resource. These works have allowed the entire
workforce to demonstrate the breadth of skills, knowledge and adaptability within the
DRMP, given the extremely varied and complex work types involved.
Future phases are planned throughout 2023/24 and Tayside Contracts will seek to assist
further in the delivery of this project.
Broughty Ferry to Monifieth Active Travel (BFMAT)
Route Upgrades
46

Page 48

Tayside is recognised - both nationally and internationally - as a place that produces the
finest food and drink, and as the largest catering organisation in the Tayside area providing
over 5 million meals to schools and communities every year, we are committed to using as
much locally sourced produce as possible. 
Economy
Supporting Local Food Producers
We also established a dedicated webpage to help local food producers become
suppliers to Tayside Contracts – click here
Market research is conducted prior to any procurement exercise to engage with local
suppliers. We hold a database which records all supplier enquiries to maximise
opportunities to local enterprises where possible.
We hold our annual Meet the Buyer event in conjunction with the Supplier Development
Programme to network with local suppliers.
We also worked with Perth & Kinross Councils Good Food Project, Eat and Drink
Dundee to share and collaborate with groups such as Nourish Scotland, GrowBiz
Scotland, to attract local suppliers.
47
meals; however, we are looking to extend that to ensure that we continue to provide
sustainable, high quality, healthy, nutritious, and delicious meals, whilst generating more
income for local businesses. The event was very successful with presentations by our
suppliers Total Produce, Brakes, Campbells Prime Meats, looking to take on local producers
as part of their supply chain.
Tayside Contracts in partnership with NFU Scotland, hosted an
event in November 2022 that brought together local food
producers across Tayside, to explore working together to support
Tayside businesses, and increase the levels of locally grown and
produced food served in school lunches.  Several local food
producers already supply produce for school and community 
In addition:

Page 49

Casestudy
We are proud to have work in partnership with the Dundee Bairns Fun and Food
Programme since April 2016. During that period, we have supported the provision of more
than 300,000 meals to children who need additional support, across the city of Dundee.
Children who received and indeed rely on free school meals during school term time,
often have no such provision during school holiday periods. It was this that inspired the
aptly named Dundee Bairns Fun & Food Programme, with our involvement. The activities
extended to include the provision of a Tea Club which is an after-school homework club
that runs between 3.30 and 5.00pm and includes a 2-course hot evening meal provided
by the hard-working Tayside Contract catering teams.
We have been able to evidence that, even within a short time frame, an after-school study
club with a hot meal provided, can have a positive impact on attainment, pupil
perceptions of health and happiness, and teachers’ perceptions of pupil confidence and
engagement with learning.
Genna Miller of Dundee Bairns pictured below stated:
‘I would like to thank you and all of the staff at Tayside Contracts for the provision of our Tea Club
meals. The 15 projects we delivered to over the course of the 5 month period were very grateful for
the meals, which fed children in football clubs, homework clubs, and 'cosy spaces' around the city
who might not have otherwise had access to a hot evening meal.’
Supporting Dundee Bairns
48

Page 50

Although good progress has been made with some Climate Change actions, several
others are still in progress. We had to prioritise attention to dealing with challenges,
and major supply chain shortages in essential goods and services. In addition, lengthy
recruitment challenges in filling vacant posts which were essential for taking forward
many of the actions in the Plan also contributed to implementation delays. All key
vacant posts have been filled, so we are in a much better position to progress the
actions that have not advanced as far as originally explained.
Despite our actions to attract local food producers to become suppliers for Tayside
Contracts, the uptake of local producers providing to Tayside Contracts has not
reached our target level for 2022/23. Further engagement is needed to understand
the barriers to local producers, and how these can be overcome.
Next Steps:
We are reviewing our Procurement Strategy to ensure that sufficient weight is given to
fair work, local producers, community benefit and procurement equality duties. We will
support this by reviewing our community benefit clauses on our tender
documentation, considering best practice from other organisations - to demonstrate
the power of effective procurement to lever social, economic and environmental
benefits to the local community, including building local community wealth.
Our Training team is currently working on a project with the three Councils’
employability teams, to pull together the employability information relevant to Tayside
Contracts (such as the various schemes available, funding available, and
contact/application details) into a central resource to share with our managers, so they
can take advantage of the opportunities to provide learning/training experiences for
people needing employment support within the Tayside area. This will be available in
2023/24.
49

Page 51

The table below details the target KPIs for 2022/23 from our Business Plan and the actual
results.
50
(not achieved)

Page 52