PLANNING AND PLACEMAKING COMMITTEE 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 19 April 2023 at 9:30am. 
Present:  Councillors I Massie and G Stewart, Bailies C Ahern (Substituting for Bailie
C McLaren) and M Williamson, Councillors H Anderson, B Brawn, D Cuthbert,
E Drysdale, A Forbes (Substituting for Councillor I James), D Illingworth,
B Leishman, C Reid and R Watters. 
In Attendance: S Panton, L Reid, D Salman, K Smith, and P Williamson (all
Communities); A Brown, G Fogg, J Guild and R Ramsay (all Corporate and
Democratic Services). 
Apologies: Bailie C McLaren and Councillor I James. 
Councillor I Massie, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed everyone present to the meeting.  Apologies were
noted as above. 
2. DECLARATIONS OF INTEREST 
Councillor B Brawn declared a non-financial interest in Item 5(2)(i) –
22/01981/FLL. 
3. MINUTES 
The minute of meeting of the Planning and Placemaking Committee of 22
March 2023, be approved. 
4.  DEPUTATIONS 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.    Item No. 
22/00115/FLL     5(2)(iii) 
5. APPLICATIONS FOR DETERMINATION 
(1) Major Applications 
(i) 22/02204/FLM – S42 application to amend Condition 19 and
20 (cycle and scooter parking) of permission 21/00096/FLM,
North Muirton Primary School, Uist Place, Perth PH1 3BY   
Resolved:
Grant, subject to the following conditions, terms and
informatives:

Page 2

Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason – This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
3. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason – In order to safeguard the residential amenity of
the area.
4. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.
Reason – In order to safeguard the residential amenity of
the area.
5. The development shall be completed in accordance with
the Construction Method Statement (CMS) and a Dust
Management Plan (DMP) agreed under permission
21/00096/FLM plan ref 99 and 100.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
6. Noisy Construction work shall be limited to Monday to
Friday 0700 hours to 1900 hours and Saturday 0800
hours to 1300 hours with no noisy works out with these
times or at any time on Sundays or bank holidays.
Reason – In order to safeguard the residential amenity of
the area.
7. The development shall be completed in accordance with
the sustainable urban drainage system (SUDS) scheme
agreed under permission 21/00096/FLM plan ref 101.
Reason – To ensure the provision of effective drainage
for the site.
8. Storm water drainage from all paved surfaces, including
the access, shall be disposed of by means of suitable

Page 3

Sustainable Urban Drainage Systems to meet the
requirements of best management practices.
Reason – To ensure the provision of effective drainage
for the site.
9. Concurrent with the initiation of the development hereby
approved and for the duration of construction, a
temporary surface water treatment facility which accords
with Sustainable Urban Drainage System principles shall
be implemented for the site and maintained for the
duration of the approved development works.  The
temporary surface water treatment facility shall remain in
place until the permanent surface water drainage scheme
is implemented.
Reason – To ensure the appropriate management of
construction surface water run-off to minimise flooding
and avoid discharge of sediment/pollution to the local
water environment or neighbouring property, in the
interests of residential and environmental amenity.
10. The development shall be occupied in accordance with
the Flood Action Plan agreed under permission
21/00096/FLM plan ref 76.
Reason – The site is located within the 1/200 (0.5% AEP)
flood extent and therefore has a medium to high risk of
flooding.
11. The Finished Floor Level of the replacement North
Muirton Primary School shall be a minimum of 7.55m
Above Ordnance Datum, as stated in Section 3.0 of the
Flood Risk Assessment dated 11 January 2021 plan ref
(prepared by Goodson Associates P13704 - Rev A).
Reason – The site is located within the 1/200 (0.5% AEP)
flood extent which has a medium to high risk of flooding
and therefore this mitigation is required.
12. The development hereby approved shall be constructed
so as to be flood resilient in order to reduce the extent of
potential flood damage and thereby reduce repair costs
and speed up building restoration should a flood event
occur.
Reason – The site is located within the 1/200 (0.5% AEP)
flood extent which has a medium to high risk of flooding
and therefore this mitigation is required.
13. The conclusions and recommended action points within
the supporting biodiversity survey by Direct Ecology
dated 2 November 2020 as approved under
21/00096/FLM plan ref 30 submitted and hereby
approved, shall be fully adhered to, respected and
undertaken as part of the construction phase of
development (Particular attention is drawn to Section 8:
Impact Assessment).
Reason – In the interests of employing best practice
ecology and to ensure there is no adverse impact on any

Page 4

protected species as identified under the Wildlife and
Countryside Act (1981).
14. The development shall be completed in accordance with
the details of the location and specification of the swift
nest boxes or bricks agreed under permission
21/00096/FLM plan ref 67 -70. 
Reason – In the interests of protecting environmental
quality and of biodiversity.
15. The development shall be completed in accordance with
the details of the location and specification of the swift
nest boxes or bricks agreed under permission
21/00096/FLM plan ref 67 -70. 
Reason – In the interests of protecting environmental
quality and of biodiversity.
16. All trees on site, other than those marked for felling on
the approved plans, shall be retained.
Reason – To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
17. Prior to the commencement of any works on site, all trees
on site (other than those marked for felling on the
approved plans) and those which have Root Protection
Areas which fall within the site shall be protected.
Protection methods shall be strictly in accordance with
BS 5837 2012: Trees in Relation to Design, Demolition
and Construction.  Protection measures, once in place,
shall remain in place for the duration of construction. 
Reason – To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
18. The detailed landscaping and planting scheme which is
hereby approved shall be completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier.  The approved scheme shall
thereafter be maintained to the satisfaction of the Council
as Planning Authority, with any planting which fails to
become established within five years being replaced in
the following planting season with others of a size and
species as previously approved.
Reason – In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
19. No part of the development shall be occupied until a
School Travel Plan (STP), aimed to encourage more
sustainable means of travel, has been submitted and
approved in writing by the Council.  The STP will have
particular regard to provision for walking, cycling and
public transport access to and within the site and will
identify the measures to be provided, the system of

Page 5

management, monitoring, review, reporting and the
duration of the plan.
Reason – To promote sustainable transport options and
to meet advice within Scottish Planning Policy on
transport.
20. Prior to the occupation or use of the approved
development, the temporary agreed cycle storage area
(plan ref 126) shall be provided.  Thereafter, the secure
waterproof cycle parking facility (agreed under reference
21/00096/FLM) for a minimum of 94 cycles, shall be
provided prior to the completion of the development. 
Reason – To encourage active travel and meet advice
within NPF4.
21. Prior to the occupation or use of the approved
development, the temporary agreed scooter storage area
(plan ref 126) shall be provided. Thereafter, the secure
scooter parking facility (agreed under reference
21/00096/FLM) for a minimum of 30 scooter spaces shall
be provided prior to the completion of the development. 
Reason – To encourage active travel and meet advice
within NPF4.
22. Prior to the occupation or use of the approved
development a minimum of four electric charge bays shall
be provided within the site to the satisfaction of the
Council as Planning Authority.
Reason – To encourage the shift to alternative fuelled
vehicles.
23. Prior to the development hereby approved being
completed or brought into use, the vehicular access shall
be formed in accordance with Perth & Kinross Council's
Road Development Guide Type C Figure 5.7 access
detail, of Type B Road construction detail.  The Type B
Road construction detail shall continue into the entrance
for a distance of 5 metres from the boundary of the public
road surface.
Reason – In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
24. The development shall be completed in accordance with
the Construction Traffic Management Scheme (TMS)
agreed under permission 21/00096/FLM plan ref 95, 96,
84, 85, 86, 87, 88, 89, 94, 98.
Reason – In the interests of pedestrian and traffic safety. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would

Page 6

constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.
3. No work shall be commenced until an application for a
building warrant has been submitted and approved.
4. SEPA operate an advance flood warning system that
helps the Council facilitate the timely closure of the flood
gates.  The early warning system is supplemented by the
Council's telemetry system that monitors various
watercourses in the Perth area to provide additional flood
warning alarms and river level data.
5. Existing buildings or structures may contain nesting birds
between 1st March and 31st August inclusive.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an
offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
6. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive.  Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
7. The applicant should be advised that in terms of Section
56 of the Roads (Scotland) Act 1984 he must obtain from
the Council as Roads Authority consent to open an
existing road or footway prior to the commencement of
works.  Advice on the disposal of surface water must be
sought at the initial stages of design from Scottish Water
and the Scottish Environment Protection Agency.
8. The applicant should be advised that in terms of Section
21 of the Roads (Scotland) Act 1984 they must obtain
from the Council as Roads Authority consent to construct
a new road prior to the commencement of roadworks. 
Advice on the disposal of surface water must be sought
at the initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.  Please note
that a fee is chargeable for the processing of RCC
applications.

Page 7

9. The Street lighting column that is present at the site
discussion must be had with the Street Lighting
Partnership to obtain the locations of plant and the
possible relocation of the lighting column.  Contact Mark
Gorrie at Perth & Kinross Council Street Lighting
Department for further details.
10. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity
of the site of the development. 
• Readily visible to the public. 
• Printed on durable material. 
HAVING DECLARED AN INTEREST IN THE FOLLOWING ITEM, COUNCILLOR B
BRAWN LEFT THE CHAMBER. 
(2) Local Applications 
(i) 22/01981/FLL – Erection of a dwellinghouse land north of
Eskbank, 55 George Street, Blairgowrie PH10 6HP 
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason – This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
3. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority.  The scheme as agreed shall be

Page 8

implemented prior to the completion or bringing into use
of the development, whichever is the earlier.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
4. Prior to the commencement of the development hereby
approved, 1:10 scaled elevations and sections of all
proposed windows and doors shall be submitted to and
approved in writing by the Council as Planning Authority. 
The approved details shall thereafter be implemented in
full.
Reason – In order to protect the character and
appearance of the Conservation Area
5. Prior to the commencement of the development hereby
approved, details of the proposed boundary treatments
for the site shall be submitted for the written agreement of
the Council as Planning Authority.  The scheme as
subsequently agreed shall be implemented prior to the
completion or bringing into use of the development,
whichever is the earlier.
Reason – In order to protect the character and
appearance of the Conservation Area
6. Prior to the development hereby approved being
completed or brought into use, the vehicular access shall
be formed in accordance with Perth & Kinross Council's
Road Development Guide Type B Figure 5.6 access
detail, of Type A Road construction detail.  
Reason – In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
7. Prior to the development hereby approved being
completed or brought into use, the access shall be
constructed so that no surface water or surfacing
aggregate is discharged onto the public road.
Reason – In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary. 
8. Prior to the completion or bringing into use of the
dwellinghouse hereby approved, whichever is the earlier,
one swift brick shall be provided on the North elevation
gable end of the building and one bat brick shall be
provided on the South elevation gable end of the building,
to the satisfaction of the Council as Planning Authority. 
Thereafter, the bricks shall be retained in a reasonable
condition for the life of the development.
Reason – In the interests of protecting environmental
quality and of biodiversity.
9. Prior to the development hereby approved being
completed or brought into use, all works shall be carried
out in accordance with the agreed Drainage Options
Report by McGregor McMahon Consulting Engineers
dated 10 March 2023 (document reference 08).

Page 9

Reason – To ensure the provision of effective drainage
for the site. 
Procedural Notes
The planning permission decision notice shall not be issued until
such time as the required Developer Contributions have been
secured or paid in full.   
In the event the applicant does not either make the required
payment within 28 days from the date the agent/applicant is
advised of the need for the contributions, or complete a legal
agreement for delayed payment within a 4 month period from
the date the agent/applicant is advised of the need for the
contributions the application may be refused under delegated
powers without any further discussion with the applicant. 
Informatives 
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken. 
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.
3. No work shall be commenced until an application for
building warrant has been submitted and approved.
4. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
5. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
6. Application for a new postal address should be made via
the Street Naming and Numbering page on the Perth &
Kinross Council website at www.pkc.gov.uk/snn.  Please
note there is a charge for this service and submission

Page 10

cannot be made until the relevant Building Warrant has
been approved.
7. This application was varied prior to determination, in
accordance with the terms of Section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to the proposed
boundary and drainage arrangements.
8. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.  The
Council has two months to consider the information.  You
should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses. 
COUNCILLOR B BRAWN RETURNED TO THE CHAMBER. 
(ii) 22/02005/FLL – Erection of a dwellinghouse (in part
retrospect), land 40 metres north of Easter Achtar, Fearnan,
Aberfeldy 
Motion (Councillor D Cuthbert) 
Refuse, as the proposal is contrary to Policy 1B(c) of the Perth
and Kinross Local Development Plan 2 (2019), due to the black
finish and visibility from Drummond Hill. 
In line with Standing Order 18.3, as no seconder to the
amendment was forthcoming, the motion subsequently fell. 
Motion (Councillor D Illingworth and B Brawn) 
Grant, subject to the following conditions, terms and
informatives: 
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.

Page 11

Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
2. Within six months of the approval of this development, a
detailed landscaping and planting scheme for the site
shall be submitted for the written agreement of the
Council as Planning Authority.  The scheme shall include
details of the height and slopes of any mounding or
recontouring of the site, full details of all hard landscaping
proposals including materials and installation methods
and, species, height, size and density of trees and shrubs
to be planted.  The scheme as subsequently approved
shall be carried out and completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.  The scheme as agreed and
implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.
Reason – To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
3. Prior to the development hereby approved being
completed or brought into use, the access shall be
constructed so that no surface water or surfacing
aggregate is discharged onto the public road. 
Reason – In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
4. Prior to the development hereby approved being
completed or brought into use, the vehicular access shall
be formed in accordance with Perth & Kinross Council's
Road Development Guide Type B Figure 5.6 access
detail with 3 metre radii kerbing, of Type A Road
construction detail.  The Type A Road construction detail
shall continue to the entrance for a minimum distance of
3 metres. 
Reason – In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary. 
Informatives 
1. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.
2. A building warrant is required to be submitted and
approved.

Page 12

3. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
4. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
5. The applicant is advised that, in terms of Sections 109 of
the New Roads and Street Works Act 1991, he/she/they
must obtain from the Council, to place, maintain or adjust
apparatus in, or under a Road or remove apparatus from
a road.  Application forms are available at
https://www.pkc.gov.uk/article/14916/Road-and-footway-
permits.
6. The approved stove system shall be installed and
thereafter operated and maintained in accordance with
the manufacturer's recommendations, such that smoke
odours are not exhausted into or escape into any
neighbouring dwellings. Failure to do so may result in an
investigation and possible action by Environmental Health
under the Environmental Protection Act 1990.
7. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive.  Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built.  Planning
permission for a development does not provide a defence
against prosecution under this Act.
8. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires.

Page 13

We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses. 
Resolved:
In accordance with the Motion. 
(iii) 23/00115/FLL – Formation of forestry track, Auchingarrich
Forest, Comrie 
Ms Gillian Fleming and Councillor Stewart Donaldson, objectors
to the application, followed by Mr Gavin Mann, on behalf of the
applicant, addressed the Committee and answered Members’
questions. 
Motion (Councillors D Illingworth and C Reid) 
Grant, subject to the following conditions, terms and
informatives, including a condition to restrict transport
movements from 8am onwards only: 
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason – This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
3. Prior to the commencement of the development hereby
approved, the developer shall submit for the further
written agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (CTMS) which
shall include the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;

Page 14

(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f) arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction
sites associated with the development being
deposited on the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road
users of construction traffic;
(j) arrangements to ensure that access for emergency
service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) the provision and installation of traffic counters at the
applicant's expense at locations to be agreed prior
to the commencement of construction;
(n) monitoring, reporting and implementation
arrangements; 
(o) arrangements for dealing with non-compliance; and
(p) details of HGV movements to and from the site. 
The CTMS as approved shall be strictly adhered to during
the entire site construction programme.
Reason – In the interests of pedestrian and traffic safety.
4. The measures contained in approved drawings 09 and 10
for the proposed safeguarding and continued operation,
or replacement, of the private water sources, private
water supply storage facilities and private water supply
pipes serving properties in the vicinity, sited within and
running through the application site, shall be put in place
prior to the commencement of the development and shall
thereafter be so maintained insofar as it relates to the
development hereby approved. 
Reason – To ensure existing water and drainage
infrastructures are not compromised.
5. Prior to the commencement of the development hereby
approved, a management plan indicating any temporary
diversions and signage needed to facilitate the
development and/or any works proposed to the right of
way/core path as part of the development shall be
submitted for the written agreement of the Council as

Page 15

Planning Authority.  The plan as agreed shall be
implemented in accordance with the timings identified in
the plan.
Reason – To ensure continued public access to the
public paths and in the interests of public safety within the
site.
6. Prior to the commencement of the development hereby
approved, details of the passing place to be formed on
the track, including its width and precise location, shall be
submitted for the written agreement of the Council as
Planning Authority.  The scheme as agreed shall be
implemented prior to the completion or bringing into use
of the development, whichever is the earlier.
Reason – To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken. 
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.
3. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
4. The applicant should ensure that any existing wayleaves
for maintenance or repair to existing private water supply

Page 16

or septic drainage infrastructure in the development area
are honoured throughout and after completion of the
development.