Democracy Spraffa

22/01784/Fll

Perth and Kinross Council · 22 February 2023
Back to Planning and Placemaking Committee — 22 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Perth and Kinross Council
Planning and Placemaking Committee – 22 February 2023
Report of Handling by Head of Planning & Development
(Report No 23/67) 
PROPOSAL: Formation of hardstanding areas and landscaping, erection of storage
shed, gates, alterations to fencing and associated works 
LOCATION: King George V Playing Field, Muirs, Kinross 
Ref. No: 22/01784/FLL
Ward No: P8- Kinross-shire 
Summary 
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and there
are no material considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL  
1 The application site is located within the settlement boundary of Kinross and
forms part of a wider area of open space which is in recreational use.  The
application site forms a linear strip of land located between existing dwellings
and a multi-use sports pitch. 
2 The proposal is to enclose the area by erecting a new fence and gate at either
end of the strip, alter the boundary fence to pitch forming a new 1.2m
pedestrian barrier rail, formation of a spectator/warm up hardstanding area
with dugouts, erection of a storage shed and associated work. 
3 This application follows on from similar proposal which was refused under
delegated powers due to the combination of the removal of trees and the
impact on the amenity of the area.  Subsequently the application was
appealed to the LRB with the review dismissed for the same reasons.   Prior
to the submission of this application the applicant has discussed the proposal
with the Tree Enforcement Officer. 
Pre-Application Consultation 
4 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009. Therefore the applicant was not required to undertake any
formal pre-application consultation with the local community.

Page 2

National Policy and Guidance 
5 The Scottish Government expresses its planning policies through The
National Planning Frameworks, the Scottish Planning Policy (SPP), Planning
Advice Notes (PAN), Creating Places, Designing Streets, National Roads
Development Guide and a series of Circulars.   
National Planning Framework 4 
6 The National Planning Framework 4 (NPF4) was approved by the Scottish
Parliament on 11 January 2023. NPF4 has an increased status over previous
NPFs and now comprises part of the statutory development plan. 
7 The Council’s assessment of this application has considered the policies of
NPF4 and it is considered that the development proposal accords with the
intentions of this document.   
8 The following sections of the NPF will be of particular importance in the
assessment of this proposal: 
• Policy 14 Design, quality and place
• Policy 21 Play, recreation and sport  
Planning Advice Notes 
9 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management 
Development Plan 
10 The Development Plan for the area comprises NPF4 (as mentioned above)
and the Perth and Kinross Local Development Plan 2019. 
Perth and Kinross Local Development 2019 
11 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.”  It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
12 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 14A: Open Space Retention and Provision: Existing Areas
• Policy 15: Public Access
• Policy 17: Residential Areas
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy

Page 3

• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Other Policies 
Placemaking Supplementary Guidance 2020 
13 The Council has prepared Placemaking Supplementary Guidance (2020) to
support Policy 1 (Placemaking) of the Perth and Kinross Local Development
Plan 2 (2019). It is to be used in the assessment of planning applications and
to assist in the placemaking process. 
Site History 
14 98/01532/FUL Full Planning Permission was Approved On 14 January 1999
for Formation of an all weather pitch facility with 3m high fencing and
floodlighting 
15 20/00288/FLL Full Planning Permission was refused on 30 May 2020 for
Alterations to boundary fence, formation of hardstanding area, erection of a
storage shed and associated works with a subsequent review to the Local
Review Body dismissed. 
16 21/02225/FLL Full Planning Permission application was withdrawn on 8 April
2022 for Formation of hardstanding area, erection of storage shed, gates,
alterations to fencing and associated works. 
CONSULTATIONS 
17 As part of the planning application process the following bodies were
consulted: 
External 
18 No external consultations required. 
Internal 
Estates 
19 Confirmation that PKC are the landowners and King George V Playing Fields
Management Committee are the tenants of the Council. 
Environmental Health   
20 No objection conditions required in relation to noise.

Page 4

Transportation and Development 
21 No comments to make on proposal. 
Biodiversity/Tree Officer 
22 No objection to proposal conditions requested in relation to landscaping and
tree protection. 
Community Greenspace 
23 Have requested replacement planting and that gates are not locked to restrict
access through. 
Representations 
24 9 representations were received. The main issues raised within the
representations are:   
• Contrary to LDP2 
• Loss of public access/area for dog walking 
• Loss of a tree
• Impact on biodiversity 
• Not in keeping with amenity of the area
• Danger from hockey balls
• Noise 
These issues are addressed in the appraisal section, but it should be noted
that the safety issue in relation to the balls and fence heights is not a matter
for planning and the applicant should be aware of health and safety
requirements in relation to the public. 
ADDITIONAL STATEMENTS
25
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable
Appropriate Assessment under Habitats R Habitats Regulations Appraisal
AA Not Required
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact eg
Flood Risk Assessment
Not Required 
APPRAISAL 
26 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997
(as amended) require the determination of the proposal to be made in
accordance with the provisions of the Development Plan, unless material
considerations indicate otherwise.  The Development Plan comprises NPF4
and the Perth and Kinross Local Development Plan 2019.  The relevant policy

Page 5

considerations are outlined in the policy section above and are considered in
more detail below.  In terms of other material considerations, this involves
considerations of the Council’s other approved policies and supplementary
guidance. 
Principle 
27 The site is located within the settlement boundary of Kinross within an area of
zoned open space.  Policy 14 Open Space Retention and Provision seeks to
protect areas of open space and development will be supported where it is
ancillary to the principal use of the site as a recreational resource.  The
proposal does not involve a change of use (as the land is in recreational use)
the proposal is only for the structures etc so in principle the development
complies with Policy 14, together with that of Policy 21 of NPF 4 which also
seeks to support proposals for play and sport. 
28 The application is required for the engineering works, shed and enclosures
etc required to supplement the existing use this is considered against Policy 1
Placemaking and Policy 17 Residential Areas.  These polices seek to ensure
that the residential amenity of existing dwellings is protected from
development and the wider visual amenity of the area is maintained.  The
pitch is located in close proximity to the existing dwellings and with the
grassed/tree strip providing a buffer. 
29 The previous proposal involved the removal of the trees which contributed to
the amenity within the area enhancing the open space gap and providing a
degree of separation between the field and dwellings.  In contrast this
proposal retains the trees (1 to be replaced) to address the reasons for
refusal.  The area as it is currently in recreational use and can be used for the
activities noted in the submission although the proposal will provide a formal
setting.   
30 The proposal on balance with the retention of the trees visually retains the
character of the landscaped strip whilst the works provides a complementary
formal area ancillary to the recreational use of the site. 
Design and Layout 
31 The proposal will enclose the area with gates and a fence along the entire  
length of the pitch.  Within this an area of approx. 560sq metres is to be made
level and finished in a permeable hard surface to be used a warm up area.  A
kerb upstand is proposed along the boundary with the dwellings and around
the five trees to be retained and the new one to be planted. A storage shed
(7sq m in area) is proposed centrally within the strip.   
32 The closing of the strip will allow the existing fence (which encloses the west
side of the pitch) is to be lowered from 3.6m to 1.2m providing greater visibility
for spectators and provide two pitch side dugouts. Two additional sections of
the existing perimeter fence of the pitch on the north and south boundary are
to be increased to 4.5m in height.

Page 6

33 The works proposed are acceptable in terms of the siting of the small shed,
formation of the hardstanding which is softened by the retention of the trees. 
Residential Amenity 
34 There are a number of residential properties within close proximity to the 
proposed hardstanding area, the existing hockey pitch and playing fields with
the gardens area being approximately 11 metres away. 
35 The area is within recreational use so although the proposal makes the area
more user friendly it doesn’t change how the area could be currently utilised
and the activities which take place on the pitch are not altered.  Noise has
been raised as an issue however the proposal is for an associated use with
the sports pitch so it would not be considered to generate any significant
increase in noise as this area can currently be occupied when sports are
taking place. Spectators can use the area at present to watch matches
through the existing mesh fence.   
36 Environmental Health have confirmed that their Service has not received any
noise complaints with regards to noise from the use of these pitches. 
37 This development means that spectators could be slightly closer to existing
residential properties but it is considered that noise from the public and teams
can be controlled, monitored and reacted to through good management of the
area through the implementation of a noise management plan (NMP). 
38 A condition is recommended (Condition 5) for a Noise Management Plan
which will be required to layout the proposed procedures, codes of conduct for
the public and team members to be implemented for the control of noise from
the spectators and teams using as warm up area. The NMP shall state the
person responsible to monitor the area and control noise levels as well as any
anti- social behaviour that may arise. 
39 The Environmental Health Officer recommended a lighting condition but no
new lights are proposed as part of this application and the existing lighting is
covered under a previous permission.   
Visual Amenity 
40 The proposal retains the trees with the removal of one which is to be
replaced.  The retention of the trees retains the visual buffer that they provide
its accepted that they don’t screen the development, but they retain an
amenity value and soften the impact of the hardstanding.  The tree proposed
is not considered to be an acceptable replacement so a recommended
species and size will be covered by condition.   
Roads and Access 
41 There are no alterations proposed to the existing vehicular access.  Concerns
have been raised about loss of access through the area.  The open space is
nearly exclusively within recreational use with two rugby pitches, the hockey

Page 7

pitch and clubhouse with car park.  There is a core path to the south which is
not impacted. 
42 There is an existing path which runs around the pitch however this is not an
asserted right of way or core path.  The proposal would result in this route
being closed however access would still be available through the wider area
of open space. Community Greenspace have requested that the gates remain
open however this would need to be discussed as part of the lease process
rather than controlled through planning.  In planning terms there is still access
provided as a short detour around the pitch. 
Drainage and Flooding 
43 The site does not lie within an area of flood risk and the hardstanding is
porous. The proposal is not considered to raise any drainage or flooding
concerns. 
Natural Heritage and Biodiversity 
44 A tree report has been submitted providing an assessment of the trees at the
site, advice on the potential impact of the proposed development on the trees,
mitigation measures to safeguard the trees, and recommendations for tree
works, and planting recommendations. 
45 The Tree Officer has examined the plans and submissions, and is content that
the proposed works should, if executed appropriately safeguard the amenity
provision afforded by the trees at the site. The report advises that 1 x rowan
tree be removed. 
46 It is considered however that an Arboricultural Method Statement be
submitted that clearly sets out the sequence of site operations to be
undertaken, tree protection measures, tree works, root pruning (if roots
encountered), soil removal, hard landscaping, site storage, plant & machinery
storage, type of plant to be used, pre-start agreement with contractors,
concrete preparation. (Condition 3) 
47 In relation to the proposed planting – the landscape plan has proposed 1 x
Griselinia littoralis, and a hedgerow of Viburnum tinus at the boundary wall,
both evergreen shrubs. Community Greenspace recommended that 3 trees
be planted however these would need to be out with the site which could not
be controlled by condition.  It would be preferable instead to plant a heavy
standard size, rootballed, broadleaf tree in place of the rowan, rather than the
Griselinia, such as, rowan, Sorbus aucuparia Hupehensis, or lime, Tilia
cordata Greenspire, or Turkish hazel, Corylus colurna.  This will be covered
by condition (Condition 4). 
48 The development proposal and landscape scheme submitted takes account of
the existing trees at the site, and should not adversely impact their future
viability, subject to approval of an Arboricultural Method Statement. 
49 Only one tree is proposed for removal.  The biodiversity opportunities that the
tree and area can provide are noted as a concern in representations

Page 8

particularly in relation to birds, red squirrels and bats.  No Ecology Survey has
been submitted with the proposal.  The Biodiversity Officer considers (from
images supplied) that there is likely to be little opportunities for roosting bats
due to the age, size and overall good condition of the trees. Therefore a
survey isn’t considered necessary. 
Developer Contributions 
50 The developer contributions guidance is not applicable to this proposal. 
Economic Impact 
51 Is it considered that the development will provide improved facilities for the
hockey club and some opportunities for local construction companies. 
VARIATION OF APPLICATION UNDER SECTION 32A 
52 This application was not varied prior to determination. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
53 Not required. 
DIRECTION BY SCOTTISH MINISTERS 
54 Under the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013, regulations 30 – 33 there have been
no directions by the Scottish Government in respect of an Environmental
Impact Assessment screening opinion, call in or notification relating to this
application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
55 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4 and the adopted
Local Development Plan 2 (2019).  Account has been taken account of the
relevant material considerations and none has been found that would justify
overriding the Development Plan. 
56 Accordingly the proposal is recommended for approval subject to the following
conditions. 
A RECOMMENDATION   
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period.

Page 9

Reason - This is a Planning Permission in terms of Section 58 of the Town
and Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by
conditions imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. Prior to the commencement of development an Arboricultural Method
Statement (AMS) be submitted and agreed in writing with the Council as
Planning Authority.  The AMS shall clearly sets out the sequence of site
operations to be undertaken, tree protection measures, tree works, root
pruning (if roots encountered), soil removal, hard landscaping, site storage,
plant & machinery storage, type of plant to be used, pre-start agreement with
contractors, concrete preparation.   The statement as agreed shall be
implemented in full as part of the development of the site. 
Reason - To ensure a satisfactory standard of development and
environmental quality and to reserve the rights of the Planning Authority. 
4. Prior to the commencement of the development hereby approved, a detailed
landscaping and planting scheme for the site shall be submitted for the written
agreement of the Council as Planning Authority.  The scheme shall include
replacement of the propsoed Griselinia littoralis with a heavy standrad size,
rootballed, broadleaf tree such as, rowan, Sorbus aucuparia Hupehensis, or
lime, Tilia cordata Greenspire, or Turkish hazel, Corylus colurna. The scheme
as subsequently approved shall be carried out and completed within the first
available planting season (October to March) after the completion or bringing
into use of the development, whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied in writing to the
Council as Planning Authority within 7 days of that date.  The scheme as
agreed and implemented shall thereafter be maintained to the satisfaction of
the Council as Planning Authority 
Reason - To ensure a satisfactory standard of development and
environmental quality and to reserve the rights of the Planning Authority. 
5. Prior to the commencement of the development a Noise Management Plan
shall be submitted for the written approval of the planning authority. The plan
shall include all sources of noise associated with the use of the spectator and
team warm up area including user noise, including noise from antisocial
behaviour, activity noise and the measures that will be put in place to
minimise and/or control noise. The plan shall be reviewed on a regular basis
or, following receipt of a justified complaint or at the request of the planning
authority. Once the Noise Management Plan has been approved, it shall be
fully implemented for the lifetime of the development. 
Reason - In order to safeguard the residential amenity of the area.

Page 10

6. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the
Planning Authority to carry out a noise assessment. The assessment will be
carried out to an appropriate methodology agreed in writing with the Planning
Authority. A scheme of any proposed noise mitigation shall be included with
the noise assessment, specifying timescales for the implementation of the
scheme, and shall be submitted to the Planning Authority with 28 days of the
assessment.  The mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales.   
Reason - In order to safeguard the residential amenity of the area. 
B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan. 
C PROCEDURAL NOTES 
None required. 
D INFORMATIVES 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended
to commence the development. A failure to comply with this statutory
requirement would constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action being taken. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and
Country Planning (Scotland) Act 1997 (as amended) to give the planning
authority written notice of that position. 
3. This planning permission is granted subject to conditions, some of which
require further information to be submitted to Development Management
either before works can start on site or at a certain time.  The required
information must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware that a fee is
payable in respect of each request made, though there is no limit to the
number of conditions that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
4. The Council has two months to consider the information.  You should
therefore submit the required information more than two months before your
permission expires.  We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able to be dealt with
before your permission lapses.

Page 11

5. Trees and scrub are likely to contain nesting birds between 1st March and
31st August inclusive. Trees and scrub are present on the application site and
are to be assumed to contain nesting birds between the above dates. The
applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended (section 1), it is an offence to remove, damage or destroy the nest
of any wild bird while that nest is in use or being built. Planning permission for
a development does not provide a defence against prosecution under this Act. 
Background Papers:  9 letters of representation
Contact Officer:  Joanne Ferguson
Date: 10 February 2023 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT