Perth and Kinross Council
Planning and Placemaking Committee – 1 June 2022
Report of Handling by Head of Planning & Development
(Report No. 22/113) 
PROPOSAL:  Erection of retail unit (Class 1), formation of access, car parking,
engineering works, landscaping and associated works 
LOCATION: Land west of 4 Pickembere, Pitheavlis, Perth 
Ref. No: 21/00248/FLL
Ward No: P10- Perth City South 
Summary 
This report recommends approval of the application, subject to receipt of or other
means of securing identified developer contributions and the revocation of the
aspect of planning permission 99/00818/FUL to remove the ability to use that
premises for Class 1 retail use at the applicants existing Glasgow Road store.
Although the development is not considered to fully comply with the relevant
provisions of the Development Plan, there are material considerations which
outweigh the position of the Development Plan and justify a recommendation of
approval. 
BACKGROUND AND DESCRIPTION OF PROPOSAL  
1 The application site is located within the settlement boundary of Perth, on the
southern edge.  The Aviva campus, the main building of which is Category A
listed, lies to the south in an elevated position. Currently access is from the
main Aviva service road, through a vacant site to the southwest.  This area
previously used as a hotel/training centre linked to Aviva.  Topography
generally falls by c.5 metres west to east towards woodland (forming the Buckie
Braes) and a row of traditional stone cottages.  To the northwest, across
Necessity Brae is a residential area. 
2 Outline planning permission has previously been granted on a wider site,  this
including office use on the site and the subsequently developed housing across
Necessity Brae. The office element has never progressed. 
3 Aldi have explored extending their current store at Glasgow Road, which is
allocated in the Perth and Kinross Local Development Plan 2 within an
‘Employment Safeguarding’ adjacent to the city centre.  However they consider
the site is not large enough to deliver the business requirements sought in this
proposal. The existing store extends to a gross floorspace of  1,173sq metres
and the new store would increase to 1,884sq metres. In order to limit the
drawing of trade away from the city centre area, the permission for the existing
store will in part be revoked, to remove the ability to use it for Class 1 (retail)

Page 2

purposes and the new store, in terms of retail impacts on existing identified
centres, considered only on the basis of it’s uplift in retail floorspace rather than
in addition to the vacated store.  The revocation process would require to be
completed before any positive decision was issued, if this proposal is supported
by committee.   
4 In addition to delivering a new retail store, replacing that at Glasgow Road. The
plans also include a new access junction from Necessity Brae, parking facilities,
retaining structures and landscaping. 
Pre-Application Consultation 
5 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009. Therefore, the applicant was not required to undertake any
formal pre-application consultation with the local community. 
6 The applicant did however undertake engagement early with the local
community and Councillors, to inform their submission. 
7 Online consultations were held with virtual question and answer sessions.  The
report on this indicates that there was a good level of support for the scheme
from 250 respondents (c.64%), with the concerns raised being considered and
responded to in the final submitted design, etc. 
NATIONAL POLICY AND GUIDANCE 
8 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework 2014 
9 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SSP) 
10 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and

Page 3

• The determination of planning applications and appeals. 
11 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Promoting Town Centres: paragraphs 58 – 73 
• Supporting Business and Employment: paragraphs 92 –108
• Valuing the Historic Environment: paragraphs 135 – 151 
• Valuing the Natural Environment: paragraphs 193 – 218 
• Maximising the Benefits of Green Infrastructure: paragraphs 219 – 233 
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
• Promoting Sustainable Transport and Active Travel: paragraphs 269 – 291 
Planning Advice Notes 
12 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Other Material Considerations 
Getting the Right Change: A Retail Strategy for Scotland – March 2022 
Scotland Retail Strategy 
13 The ‘Place Principle’ adopted in this recent Scottish Government publication is
one where people, location and resources combine to create a sense of
identity and purpose, and is at the heart of addressing the needs and realising
the full potential of communities. Creating communities and places people
want to visit, live and shop in, is seen as vital to Scotland’s Covid recovery –
not only for retail, but for culture, hospitality and tourism too. Where there are
actions to support a strong local retail and cultural destinations, there will be
opportunities for other businesses, such as hospitality and tourism, to
capitalise on increased footfall. ‘20 minute’ neighbourhoods are places where
people live within 20 minutes of walking, wheeling, cycling or using public
transport to reach key amenities like shops, services and green spaces. 
Scotland's National Strategy for Economic Transformation: Published March
2022. 
14 The Scottish Government launched its Economic Development Plan with a
vision to create a well-being economy: a society that is thriving across

Page 4

economic, social, and environmental dimensions, and that delivers prosperity
for all Scotland's people and places. The aim to achieve this while respecting
environmental limits embodied by our climate and nature targets. Whilst
creating this vision to increase investment and increase productivity. 
Creating Places 2013 
15 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It
notes that successful places can unlock opportunities, build vibrant
communities and contribute to a flourishing economy and set out actions that
can achieve positive changes in our places. 
National Roads Development Guide 2014 
16 This document supports Designing Streets and expands on its principles and is
considered to be the technical advice that should be followed in designing and
approving of all streets including parking provision. 
DEVELOPMENT PLAN 
17 The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2019. 
TAYPlan Strategic Development Plan 2016-2036 
18 TAYPlan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plans states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
19 The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application. 
• Policy 3: First choice for investment
• Policy 5: Town Centres First 
Perth and Kinross Local Development Plan 2 
20 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance.

Page 5

21 The principal relevant policies are, in summary: 
• Policy 1: Placemaking 
• Policy 2: Design Statements 
• Policy 5: Infrastructure Contributions 
• Policy 6: Settlement Boundaries 
• Policy 7: Employment and Mixed Used Areas: Business and Industrial
• Policy 13: Retail and Commercial Leisure Proposals
• Policy 15: Public Access 
• Policy 16: Social, Cultural and Communities Facilities 
• Policy 25: Housing Mix 
• Policy 27: Listed Buildings 
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development 
• Policy 38: Environment and Conservation 
• Policy 39: Landscape 
• Policy 40: Forestry, Woodland and Trees 
• Policy 41: Biodiversity 
• Policy 52: New Development and Flooding 
• Policy 53: Water Environment and Drainage 
• Policy 55: Nuisance from Artificial Light and Light Pollution 
• Policy 56: Noise Pollution 
• Policy 57: Air Quality 
• Policy 60: Transport Standards and Accessibility Requirements 
Other Policies 
Developer Contributions and Affordable Housing Supplementary
Guidance April 2020 
22 This document sets out the Council’s policies on Developer Contributions in
relation to Primary Education and Transport Infrastructure/A9 junction
upgrades, as well as setting out what Affordable Housing provision is required
for new developments. 
Placemaking Supplementary Guidance 2020 
23 The Council has prepared Placemaking Supplementary Guidance (2020) to
support Policy 1 (Placemaking) of the Perth and Kinross Local Development
Plan 2 (2019). It is to be used in the assessment of planning applications and to
assist in the placemaking process. 
Perth and Kinross Town Centre and Retail Study 2016 
24 The retail study is the most up to date assessment that has been undertaken of
capacity across the city to accommodate additional retail floorspace. 
SITE HISTORY 
25 08/00122/OUT Outline planning permission was approved on 15 August 2008
for a mixed use development comprising residential, hotel with associated

Page 6

public house/restaurant, care home and offices with associated car parking,
internal access roads and adjusted site levels. 
26 14/00269/AMM related to the above parent permission and a subsequent
Section 42 consent (11/00933/FLM) matters specified in conditions were
approved on 12 September 2014 for the residential development now present
on the north side of Necessity Brae. 
CONSULTATIONS 
27 As part of the planning application process the following bodies were consulted: 
External 
28  Historic Environment Scotland – No objection, initial concerns addressed by
submission of a Heritage Assessment. 
29 Scottish Water – No objection. Note that capacity is available for foul and
water, subject to an application to secure connections. 
Internal 
30  Biodiversity/Tree Officer – No objection. Advise of no impact on protected
species. Concerns raised over the removal of trees and limited of biodiversity
enhancements. 
31  Community Greenspace – Initially objected to the proposals on the basis of
landscape concerns.  It was considered that these were largely addressed by
the subsequent   heritage assessment, design/boundary revisions and updated
landscaping proposals. 
32  Development Contributions Officer – No objection. Advise a contribution is
required for transport infrastructure (£87,654). 
33  Environmental Health (Contaminated Land) – No objection and no
conditions required. 
34 Environmental Health (Noise Odour) - No objection. Conditions
recommended related to noise, lighting and constriction management. 
35  Structures And Flooding – No objection to drainage proposals. 
36 Transport Planning – No objection. Conditions recommended for construction
traffic management, road improvements and submission of travel plan.  
Representations 
37  27 representations have been received, 16 in support and 11 objections.  The
main issues raised within the representations are:

Page 7

38 Support 
• Employment Provision
• Enhances Character of Area
• Results in Environmental Improvements
• Supports Economic Development
• Provides a shop within walking distance/shorter car trips 
39 Objections 
• Impact on Buckie Braes 
• Out of character with the area
• Adverse effect on visual amenity
• Contrary to development plan policy
• Inappropriate land use
• Loss of open space
• Loss of trees
• Noise pollution
• Road safety concerns
• Traffic congestion
• Flooding 
40 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS 
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not Required
Appropriate Assessment Habitats Regulations Appraisal AA
Not Required
Design Statement or Design and Access
Statement
Submitted
Reports on Impact or Potential Impact • Heritage Assessment, 
• Landscape Design Statement,
• Tree Survey, 
• Planning and Retail Statement, 
• Employment Land and Viability
Report, 
• Drainage Impact Assessment
inc Flood Risk Assessment, 
• Geo-Environmental
Assessment, 
• Consultation Report, 
• Transport Assessment, 
• Ecological Survey, 
• Noise Report.

Page 8

APPRAISAL 
41 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2019.  The relevant policy considerations are outlined in the
policy section above and are considered in more detail below.  In terms of other
material considerations, this involves considerations of the Council’s other
approved policies and supplementary guidance. 
42 In this instance, section 14(2) of the Planning (Listed Buildings and
Conservation Areas) (Scotland) Act 1997 places a duty on planning authorities
in determining such an application as this to have special regard to the
desirability of preserving the building or its setting or any features of special
architectural or historic interest which it possesses.   
Principle 
43 Aldi currently operate two stores in Perth, with the Glasgow Road store one of
the smallest in their Scottish portfolio with a gross floorspace of 1,173sq
metres. As such Aldi have been exploring opportunities to improve this stores
offering to be more in line with its other stores, such as through an extension. 
However, they advise this has not been feasible, due to the physical and
operational constraints of that site. The alternative instead being to relocate to a
larger site within the city. As a result of the alternative location, the existing
store on Glasgow Road would be closed and the ability of the building to
operate as a Class 1 retail facility removed, through a formal revocation. 
44 In seeking a new site within the city, Aldi considered a range of options
including alternative locations within the city centre, although none were
available, nor any sequentially preferable – in terms of retail policy
considerations. Following this, efforts were focused on considering sites in the
southern part of Perth, given their existing presence at Inveralmond (covering
the north area), leading to the selection of the application site. The Necessity
Brae site considered to occupy a prominent location, in a walkable location
which is highly accessible via a range of sustainable transport modes, given the
proximity to the A93.  The proposal therefore aligns with the principles
contained within the Scottish Government’s Retail Strategy for Scotland
published in March of this year. 
45 The site has been allocated in Local Development Plans for employment uses
for a number of years and planning permission has previously been granted for
a mixed commercial development.  However, the site has remained vacant and
the supporting statement details that there has not been any credible interest
for office development. Furthermore, a viability appraisal has been completed
which further identifies that development of the site for office, industrial or hotel
use would not be viable due to the significant abnormal development costs
associated to the site adversely affecting returns on investment and making it
unattractive to investors.

Page 9

46 In terms of the principle of retail use the site is identified as employment site
E165 within LDP2, specifically for employment uses (core), hotel, and non-
residential institutions – reflective of the historic planning permission. 
47 Policy 7 Employment and mixed-use areas applies and in relation to a
proposed retail use it has the following limited exceptions: 
‘(d) Proposals for retail uses in employment areas will not be acceptable unless
they are ancillary to an acceptable use on the site: 
(e) Proposals for service facilities (should exclude retail and commercial
facilities over 100 m2) and should serve the business and industrial area rather
than draw out-side trade and cumulatively should not equal more than 15% of
the allocated employment area.’ 
48 The proposed retail use does not meet either of these exceptions. Thus, the
proposal is contrary to the LDP2 Policy 7 and to the uses identified for E165. 
49 The supporting Employment Land and Viability Report (ELVR) acknowledges
that PKC’s Employment Land Audit shows an employment land supply of
213ha within Perth Core. However, this land supply largely relies on sites yet to
be serviced. In terms of sites which are already serviced and more readily
available, such as E165, there is a more limited supply. When considering
impact on employment land supply the Employment Land Audit 2020 identifies
that of the 22.23 ha of serviced land available within Perth Core area, 2.15 ha is
within E165, and 0.97ha of it would be lost if this planning application is
approved. In this regard it is noted that PKC are committed to providing 11.25
ha of employment land over the next five years (to meet demand), although not
directly in control of delivery. 
50 The site has potential to attract employment uses (class 4, 5 or 6), due to the
good public transport provision, including dedicated bus services to the
adjacent Aviva.  It is however acknowledged that the Post covid-19 situation is
more uncertain. The ELVR also identifies that neither an office, industrial or
hotel scheme is likely to be viable on the site, given the significant costs of
developing the site. PKC’s Estates and Commercial Investment team have
confirmed that the ELVR is well researched and makes a robust supporting
case on non-viability.  Furthermore, given the lack of delivery of the 
employment uses on site while other aspects have been delivered, the tabled
proposal would also align with Scotland’s National Strategy for Economic
Transformation in that the development would increase investment in the area
whilst also catering for social and economic benefits locally. 
51 It must therefore be considered whether the loss of 0.97ha is significant in
terms of the serviced employment land and the wider supply.  In real terms
0.5% of the overall employment land allocation in Perth Core would be lost,
furthermore it would lead to a loss of 4.3% of the serviced employment land in
that Core.

Page 10

52 Policy 13 Retail and Commercial Leisure Proposals is another key policy in
terms of considering the principle of this proposal. The Council’s own Retail
Study from 2016 identifies convenience retail capacity within the Perth
catchment. From the applicant’s assessment, it is stated that this floorspace
uplift can easily be accommodated, without significant impact on any protected
centre. 
53 The proposed store is a direct, if slightly larger, replacement for Aldi’s existing
store at Glasgow Road.  However, if the planning permission is granted without
securing the revocation of the retail use of the Glasgow Road store then there
would be a need for a Retail Impact Assessment (RIA) to consider the impacts
of an additional of 1,884m2 gross convenience floor space on existing identified
centres. This being reflective of Policy 13 within LDP2 which states, “retail and
leisure development of 1,500 square metres or more gross floor space outwith
a defined town centre boundary, and not in accordance with the Development
Plan, will require a transport, retail or leisure impact assessment.” However, if
the existing out of centre retail use is revoked then this proposal would only
result in an additional 711m2 of gross floorspace, containing 444m2 of retail
floorspace (355m2 for food sales and 89 m2 non-food). Only on this basis is it
considered that a RIA is not required. 
54 The Perth and Kinross Town Centre and Retail Study 2016 acknowledges two
main considerations and states, “In terms of the distribution of potential
opportunities for new store development in the Perth sub area, it is reasonable
to consider that Scone is a possible location for new store development to
serve the local population. For example, there would be capacity to support the
existing supermarket consent at Scone, or an alternative proposal, such as a
discount food store.” 
55 It is considered that the additional 444m2 of discount store provision proposed
helps address spare capacity for discount food store identified in the Perth and
Kinross Town Centre and Retail Study 2016, although not in Scone. However
the south/west area of Perth is one which is now identified for significant future
growth and has seen some of this in recent years – post 2016.  Furthermore,
the applicant has submitted a sequential assessment and it is considered that
the proposal meets the sequential test, as there are no suitable opportunities
within sequentially preferable locations. 
56 The following are site specific developer requirements associated to the E165
allocation:   
• Connect to the core path network to east.
• Tree survey required: enhancement of biodiversity and habitats and retention
of existing woodland.
• Flood Risk Assessment. 
57 These are considered in more detail in subsequent sections of the report. 
58 Overall, the proposed retail use is contrary to LDP2 Policy 7: Employment and
Mixed - Use Areas as well as the specific land use allocation set out in E165,
thus a departure from the Development Plan. However, alongside the

Page 11

revocation of the Glasgow Road retail use it is considered that the proposal is
in accordance with Policy 13: Retail and Commercial proposals, as it meets the
sequential test which indicates there are no suitable opportunities within better
locations. In addition, the proposal would see 0.97ha developed of the
remaining 2.1ha at E165, leaving 1.13 ha for employment uses.  In turn the
proposal could allow the existing Aldi site to be utilised for Class 4, 5 and 6
potentially bringing 0.4 ha of serviced employment land forward, which is
currently in Class 1 (retail) use. 
Design and Layout 
59 The proposed retail unit with car parking, servicing and landscaping sees a
single storey building located to the south of the site with the service area
contained to the rear.  The access is to the west onto Necessity Brae and the
carpark lies to the north/northwest.   
60 The building has a simple rectangular floor plan with a low mono-pitch roof. 
The site, due to the sloping topography, requires land engineering works to
increase levels and create a platform for development. The building is to be
sited in the northern part, where no significant increase in levels are required.
Where the levels require to be increased and retained, to a maximum height of
c.4.95m (to the north/east) carparking areas will be provided.  The platforming
and cut and fill of sloping sites is not uncommon and can include the use of
masonry/ concrete retaining walls, gabion baskets or a crib lock structures.
However, the approach proposed seeks to mitigate the impacts and provide a
softer solution via the use of ‘Tensar Greenslope’, which is a naturally
vegetated, steep-slope earth retaining system. 
61 The buildings finishes were originally to be a grey roof and wall cladding with a
small amount of timber.  The plans have since been revised and now see
expansive timber cladding to walls and the roof finished in green coloured
panels, to tie in with the natural character of the site and the immediate context
of the woodland backdrop. 
62 The design, siting and materials are considered to be acceptable and comply
with Policy 1 Placemaking and the Placemaking Supplementary Guidance. 
Residential Amenity 
63 The proposed opening hours of the store are between 8am and 10pm, Monday
to Saturday and 9am to 8pm on Sundays. 
64 The site sees the closest residential properties to the east at 1 to 4 Pickembere
(Low Road) and then to the northwest (separated by Necessity Brae) where
there are flatted properties at Arthur Park. 
65 The store and its service yard are located to the south of the site set at the
furthest point from these dwellings.  The car park is however sited closer to 1 to
4 Pickembere.

Page 12

Air Quality  
66 The site is within the Perth Air Quality Management Area (AQMA) and an Air
Quality Assessment (AQA) supports the application.  The AQA aligns with the
submitted Transport Assessment and has used the traffic data from the recently
produced Systra 2019 baseline traffic model for Perth.  In line with the Institute
Air Quality Management impact descriptor the AQA concluded that the impact
from the proposed development will be insignificant for all pollutants. 
67 A dust assessment was also undertaken to assess construction phase impacts
and concluded that dust generated from the site construction activities would be
low risk. However, a construction management plan shall be required by
condition to ensure control measures and procedure to mitigate the effects of
dust and noise during the construction period of the development. (Condition 7) 
Noise  
68 The submission is also accompanied by a Noise Impact Assessment (NIA)
which assesses noise from the proposed car park, store service area, fixed
plant noise sources and deposit return scheme facilities. 
69 The NIA concluded that no additional mitigation noise control measures would
be required. As the development is not likely to have a detrimental effect on the
existing residential amenity at closest dwellinghouses for both daytime and
night-time as target criteria levels are not exceeded.  Conditions are
recommended in relation to noise to ensure that residential amenity is protected
from noise from the daily operations of the development. (Conditions 2, 3, 4
and 5) 
70 The NIA did not assess construction noise at the closest noise sensitive
residential properties therefore, a condition to control noise during the
construction phase due to the close proximity of the site to residential
properties is proposed. (Condition 15) 
Lighting 
71 The carpark would be at a higher level than the current ground level, as a result
of site level works.  However, the retaining structure would form a pediment
enclosure to the boundaries which will screen car headlights.  Otherwise, an
overall lighting scheme is proposed for the carpark and a condition will be
added to ensure that this is adequately screened. (Condition 6) 
72 It is therefore concluded that there is no unacceptable impact on residential
amenity from lighting and, subject to the conditions proposed, the proposal
complies with LDP2 Policies 17, 55, 56 and 57. 
Contaminated Land 
73 Site investigations have been undertaken to support a previous application for a
larger site (which included the application site). This saw no constraints to the
site’s redevelopment due to the presence of any contamination.

Page 13

Roads and Access 
74 The proposed vehicle and pedestrian access is to be formed directly onto the
B9112 (Necessity Brae).  The site-specific developer requirements states that
connection is to be made to the core path network to east.  However, this is not
included in the proposal, due to the change in levels which would require a
substantial stepped/ramp access and also reduce the potential for
landscaping/compensatory planting.   It is also considered that the link would
offer little benefit, as the Buckie Breas lead out of Perth and do not connect any
residential areas.  As such this aspect is not considered necessary. 
75 The site will be served by 100 parking spaces, including 8 accessible (two of
which would see electric vehicle charging points (EVCP)) along with 9 parent
and child spaces, and 4 EVCPs, (2 of which will be accessible, in addition to
the 6 disabled spaces). Furthermore, ducting will be provided within the car
park for a further 16 EVCPs should the need arise in the future. Cycle stands
will also be installed at the shopfront, for up to 10 bicycles. This is an
acceptable level of car and cycle parking for the development.  A condition is
recommended to secure the minimum number of cycle parking spaces and the
timing of their installation. (Condition 11) 
76 The delivery regime for Aldi stores generally involves the following: one to two
HGV deliveries (16.5m vehicles) and a smaller milk delivery (small rigid truck)
each day.  The HGV driving forwards into the site, reversing into the carpark
and then exit the site in forward gear. 
77 To facilitate the vehicle access into the site, the proposal is to relocate the
southwest bound bus stop.    
78 Trip generation information for the development, shows that there will be a
number of new trips and pass-by trips attracted to the store. 
79 With approximately 300 residential properties to the northern side of Necessity
Brae, it is considered that a signalised pedestrian crossing should be provided
to enable residents to cross and access the proposed Aldi store.  The location
of the crossing shall be agreed with the roads authority and operational prior to
the store opening. (Condition 9) 
80 The footway on the southern side of Necessity Brae is currently slabbed and
resulting increased footfall sees it recommended that an alternative material is
considered, such as a Hot Rolled Asphalt.  Improving evenness and navigation
by those with visual impairment. (Condition 9) 
81 With the large employment at Aviva to the southwest, it is recommended that
the footway to the west of the proposed vehicle access is extended round into
the site to the gas meter housing, to reduce the conflict between pedestrians
and vehicles. (Condition 9) 
82 Proposed ‘yellow box’ junction markings shall be subject to further discussion
with Perth & Kinross Council and Police Scotland, therefore the implementation
of the yellow box markings would not be approved through this planning

Page 14

application.  An informative is recommended for discussions to take place, prior
to the implementation on the public road network. (Informative 11) 
83 Overall, the proposal is considered to comply with LDP2 Policy 60: Transport
Standards and Accessibility Requirements. 
Drainage and Flooding 
84 The application is supported by a Drainage Impact Assessment which includes
a Flood Risk Assessment.  This sees the site not identified within an area of
flood risk, but there are known surface water flooding issues within the area. 
The reports submitted have considered these issues and drainage proposed to
ensure the development does not contribute to any existing issues.   
85 The development is also to be connected to the Scottish Water network for
water and foul drainage.  Scottish Water note that the following assets are
within/or close proximity: a 225mm foul and combined sewer, 100mm surface
water sewer and a 200mm distribution main.  These have impacted the
development layout and the planting scheme. 
86 It is considered that the proposal complies with LDP2 Policy 52 - New
Development and Flooding and Policy 53 - Water Environment and Drainage 
Conservation Considerations 
87 The site is located to the north of the category A listed Aviva Insurance
Building.  Historic Environment Scotland (HES) initially considered that the
development proposed could have a negative impact on key views from the
Aviva Building in the immediate designed landscape which slopes down to the
development site. To better understand the impacts, they recommended that
further analysis of the setting was carried out to inform the design, proposed
materials and mitigation measures. Also advising that visualisations should be
produced to confirm the appearance of the building and car park in key views
northwards from the Aviva Building. 
88 This information has been submitted and HES reconsulted, where they
welcome the amendments and supporting information in the revisions that are
in line with their previous advice. These include a new Heritage Assessment,
updated Design and Access statement and landscape design plan, and
changes to the building design. They particularly welcome the visualisations
which help to show how the building will be seen in key views from the Aviva
building.
89 It is therefore considered that the proposed mitigation measures – including
changes to the roof colour and removal of cowls, timber clad elevations, and
redefining of the northern edge of the site with micro siting of new trees - will
make the supermarket building sufficiently recessive in the setting of the Aviva
Building.  The proposal is therefore considered to comply with Policy 28 Listed
Budlings of LDP2.

Page 15

Natural Heritage and Biodiversity 
90 A Preliminary Ecological Appraisal Report (PEAR) was undertaken in
September 2020 in accordance with best practice guidance.  The PEAR
reported that the trees present were not suitable to support roosting bats and
no evidence of mammals were found within the site or immediate surroundings. 
91 Overall, the site was assessed as providing low suitability to support protected
species and no evidence was found during the survey. 
92 The PEAR notes that the trees provide suitable nesting habitat for small bird
species and several birds were recorded during the survey. The grassland
within the site was noted as having a tall sward height and suitable for breeding
birds, but that human disturbance may limit this. As recommended in section
5:2 of the PEAR, any vegetation clearance must be undertaken outside of the
bird breeding season.  This will be covered by recommended Condition 13. 
93 The Biodiversity Officer noted that the original landscaping scheme could offer
enhancement for biodiversity.  The revised plans have enhanced this by
including planting to tie in with the Buckie Braes, planting native trees, pollinator
friendly planting, installing a variety of bird boxes, a bee post and pole mounted
bat boxes. 
94 Although the proposal involves significant clearance of trees there will be no
detrimental impact on protected species and the proposal is incorporating
biodiversity enhancement.  The proposal is therefore considered to comply with 
Policy 41 Biodiversity. 
Trees/Landscape 
95 The site is covered by a mix of tree species that are spread throughout forming
small groupings and boundary screening.   It is evident that a significant
number of trees would need to be felled to enable the development of the site
as there is not any significant existing clearing for either a building or parking. 
In addition, the site layout requires a new access point, engineering works and
sewer diversions, all further impacting tree retention. This is also confirmed in
supporting documents, which confirm it would not be feasible to retain a
significant amount of the trees and see the site developed for any significant
use, not just a supermarket.  It is therefore accepted that trees will need to be
felled to facilitate the development of this site and whilst the level of tree felling
is unfortunate it must overall be weighted against the benefits of bringing a site
forward. All recognising that it is zoned for development, is within the settlement
boundary, meets a retail need within the area, will serve an existing residential
population who can access on foot and will also provide employment
opportunities.   
96 If the tree loss is accepted then the landscaping scheme must offer acceptable
mitigation.  In this sense the initial landscaping scheme has been revised to
address concerns regarding the species chosen, etc. but also due to
clarifications on drainage wayleaves which has seen planting removed from

Page 16

areas where it was previously shown.  The revised scheme also includes a
small amount of planting beyond the site boundary which the agent confirms
has been discussed with the relevant landowners.  Whilst this planting is
welcomed it couldn’t be controlled via condition or enforced and is therefore not
a determining issue in relation to the acceptability of the scheme. 
97 The supporting statement advises that 95 trees are to be removed, with only
one tree at the north boundary identified for retention.  The revised landscape
plan sees 102 trees to be planted, comprising: 2 trees at the west boundary, 46
at north, 40 at east, with 14 trees off site.  Overall the increase in tree numbers
is heavily weighted to the east.  This provides screening of the site to walkers
accessing Buckie Braes addressing some of the Community Greenspace
comments it also affords screening to the local residents adjacent to the east
boundary.   
98 The landscaping scheme includes herbaceous planting along the boundary with
Necessity Brae, this offers benefit for pollinators but would not screen the
building.  The supporting documents note that due to wayleaves and position of
retaining slopes tree planting cannot be accommodated within this area.  It
must also be noted that in planning terms it is not necessary to hide or screen
the development it is more important that the cumulative impacts of the
proposal can be accommodated within the landscape capacity.  It is considered
that the design of the building and colour pallet of materials (timber
cladding/green roof) will enable the building to blend with the landscape
backdrop.  The use of the Tensar Greenslope will also help integrate the
retaining structures into the landscape framework the herbaceous planting can
contribute in providing a green edge. 
99 The landscape proposals for the site are considered to provide adequate
mitigation and to comply with Policy 1 Placemaking. The proposal is also
considered to comply with Policy 40 Forestry, Woodland and Trees as
mitigation in the form of replacement planting has been included. 
Developer Contributions   
100 The Councils Transport Infrastructure Developer Contributions Supplementary
Guidance requires a financial contribution towards the cost of delivering the
transport infrastructure improvements which are required for the release of all
development sites in and around Perth. 
101 In this regard the site is located in the Perth Transport Infrastructure zone
(Appendix 3 of the Supplementary Guidance). 
102 The planning application form confirms that the proposed retail unit is 1,884
sqm of gross floorspace, comprising; trading (1,315 sqm) and non-trading
floorspace (569 sqm).  In line with par 6.8 of the Supplementary Guidance,
trading floorspace is calculated under the “Retail” contribution rate (£154 per
sqm) and non-trading floorspace is calculated under the “Employment”
contribution rate (£14 per sqm). 
103 It is however proposed that the retail operator’s existing site (located on
Glasgow Road) will see its retail permission revoked if this proposal is granted.

Page 17

Therefore, only the net increase in floorspace will be assessed for
Contributions. 
104 The applicant’s Planning Statement (par 1.11) indicates that the existing retail
site provides 1,173 sqm gross floorspace, comprising; 760 sqm net floorspace.
This provides 760 sqm trading and 413 sqm non-trading. The contribution
required is therefore as follows:  
105 Trading: (1,315 – 760 sqm) 555 sqm x £154 = £85,470 
Non-trading: (569 – 413 sqm) 156 x £14 = £2,184 
Total: £87,654 
Economic Impact 
106 The supporting information indicates that all existing employees at Glasgow
Road would be transferred to the proposed new store. with an opportunity for
further full and part time roles. It will also provide additional employment during
the construction process. 
107 The proposal will also in turn through the closure and vacating of the existing
store provide an opportunity for new uses and associated economic activity.  As
the existing building would no longer have a lawful use, due to the revocation,
its location within a Class 4, 5, 6 allocation within LDP2 would see the principle
of such uses and the associated employment opportunities acceptable in
principle – subject to obtaining planning permission for such a use. 
Sustainable Development   
108 Policy 32 requires that proposals for all new buildings are required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. 
109 The supporting statement details that the objective is to minimise energy needs
in development by following the Government’s Energy Hierarchy approach to
minimising energy use. This includes the innovative “heat recovery” technology
which removes 100% of a store’s requirement for heating equipment by
recycling heat from the refrigeration units.  In this case a condition will be added
so this can be agreed formally as the details submitted don’t cover the specific
10% requirement as outlined in the policy. (Condition 14) 
VARIATION OF APPLICATION UNDER SECTION 32A 
110 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the landscaping scheme,
finish materials and submission of additional supporting documents.

Page 18

PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
111 The applicant will be required to enter into a Section 75 legal agreement in
order to secure the necessary contributions towards transport infrastructure. 
112 The existing permission for the Glasgow Road store will need to be part
revoked so that the retail use is removed as the applicant is seeking to justify
this application as an uplift in the existing retail store offering and not as a new
store.  This can be done under Section 65 of the Town and Country Planning
(Scotland) Act (as amended) which allows a planning authority to revoke or
modify a planning consent. 
DIRECTION BY SCOTTISH MINISTERS 
113 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
114 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is contrary to Policy 7 in that it would provide a
non-conforming use (Class 1 –Retail) and lead to a loss of employment land,
however a justification has been provided for the retail need in the area in
accordance with Policy 13.  It is therefore considered due to the site forming a
small proportion of the overall employment land supply and that as there is no
available/more preferable site that in this case there is a justification to override
the adopted Development Plan. 
115 Accordingly the proposal is recommended for approval subject to conclusion of
the required legal agreement(s) and thereafter the following conditions. 
A RECOMMENDATION 
Conditions and Reasons for Recommendation 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
2. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily,
within any neighbouring residential property, with all windows slightly open,
when measured and/ or calculated and plotted on a rating curve chart.

Page 19

Reason - In order to safeguard the neighbouring residential amenity in the
area. 
3. Noise levels form the operation and servicing of the development shall be
limited to an internal night-time target noise level of 42 dB LAFmax at
residential receptors. 
Reason - In order to safeguard the neighbouring residential amenity in the
area. 
4. Prior to the commencement of the development a Service Delivery Noise
Management Plan, shall be submitted to and agreed in writing by the Council
as Planning Authority and Environmental Health.  The plan shall include the
procedures and mitigation measures to control noise from all service delivery
operations of the store.  The details as approved shall then be implemented in
full as part of the operation of the site. 
Reason - In order to safeguard the neighbouring residential amenity in the
area. 
5. In the event of a justified noise complaint being received by the Council relating
to the operation of the development hereby approved, the operator shall, at its
own expense, employ a consultant approved by the Planning Authority to carry
out a noise assessment.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the noise
assessment shows that the noise levels do not comply with noise conditions, a
scheme of noise mitigation shall be included with the noise assessment,
specifying timescales for the implementation of the scheme, and shall be
submitted to the Planning Authority with 28 days of the assessment.  The
mitigation scheme shall thereafter be implemented in accordance with the
approved scheme and timescales and included within an updated Noise
Management Plan. 
Reason - In order to safeguard the neighbouring residential amenity in the
area. 
6. All external lighting shall be sufficiently screened and aligned so as to ensure
that there is no direct illumination of neighbouring land and that light spillage
beyond the boundaries of the site is minimised to a degree that it does not
adversely affect the amenity of the neighbouring land. 
Reason - In order to safeguard the neighbouring residential amenity in the
area. 
7. Prior to the commencement of the development a Construction Management
Plan shall be submitted to and agreed in writing by the Council as Planning
Authority and Environmental Health.  The CMP shall include a Dust
Management Plan for the control of dust and Noise Management Plan for the
control of noise during the construction phase of the development. 
Reason - In order to safeguard the neighbouring residential amenity in the area.

Page 20

8. Prior to the commencement of the development hereby approved, the applicant
shall submit a street light system designed to EN 13201 / BS 5489 to be
provided at the vehicle entrance to the development.  The type and standard of
lighting shall be assessed using the zoning system outlined in ‘The Institution of
Lighting Engineers Guidance Notes for the Reduction of Light Pollution’ and be
agreed in writing with the Council as Planning Authority and implemented in
accordance with the approved plans.   
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
9. Prior to the commencement of development, a detail design showing the
vehicle access onto B9112 Necessity Brae with the following schemes shall be
provided for: 
(a) a signalised pedestrian crossing on B9112 Necessity Brae to link footways
on either side of the road from the development site to the housing on the
north and northwest;
(b) a footway from the west of the vehicle access into the site round to the gas
meter housing;
(c) the finalised position of the relocated bus stop and associated road
markings; and
(d) the footway along the B9112 removing the slabbing to replace with for
example hot rolled asphalt between Low Road and Aviva’s most northerly
vehicle access, 
The scheme shall be submitted to, and approved in writing by, the Council as
Planning Authority.  The submission will confirm the location, specification,
detailed design and delivery timescales for the pedestrian crossing, footway link
from the west into the site, the relocation of the bus stop and footway at the
frontage of the development site.  The scheme for the approved shall thereafter
be implemented in full, prior to the opening of the retail unit. 
Reason - In the interests of road, pedestrian safety and connectivity with the
residential developments to the north and northwest of the development. 
10. No part of the development shall be occupied until a Travel Plan (TP), aimed to
encourage more sustainable means of travel, has been submitted and
approved in writing by the Council. The TP will have particular regard to
provision for walking, cycling and public transport access to and within the site
and will identify the measures to be provided, the system of management,
monitoring, review, reporting and the duration of the plan. 
Reason - To promote sustainable transport options and to meet advice within
Scottish Planning Policy on transport. 
11. Prior to occupation of the development on site, a cycle parking facility (Sheffield
Stand or equivalent) for a minimum of 10 cycles shall be provided at the
location detailed on drawing ref 35.

Page 21

Reason - To encourage active travel and meet advice within Scottish Planning
Policy on transport. 
12. Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning
Authority, in consultation with the Roads Authority (Structures), a Construction
Traffic Management Scheme (TMS) which shall include the following: 
(a) restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used;
(b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f) arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development
being deposited on the road;
(g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
(h) arrangements for signage at site accesses and crossovers and on roads
to be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road users of construction
traffic;
(j) arrangements to ensure that access for emergency service vehicles are
not impeded;
(k) co-ordination with other significant developments known to use roads
affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m) the provision and installation of traffic counters at the applicant's expense
at locations to be agreed prior to the commencement of construction;
(n) monitoring, reporting and implementation arrangements; 
(o) arrangements for dealing with non-compliance; and
(p) details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interest of proper site management 
13. No removal of hedgerows, trees or shrubs or works to, or demolition of,
buildings or structures that may be used by breeding birds shall take place
between 1st March and 31st August inclusive, unless a competent ecologist
has undertaken a careful, detailed check of vegetation for active birds' nests
immediately before the vegetation is cleared or building affected, and provided
written confirmation that no birds will be harmed and/or that there are

Page 22

appropriate measures in place to protect nesting bird interest on site.  Any such
written confirmation should be submitted to the Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
14. Prior to the commencement of development a statement shall be submitted
demonstrating compliance that at least 10% of the current carbon emissions
reduction set by Scottish Building Standards will be met through the installation
and operation of low and zero-carbon generating technologies.  The measures
as agreed shall be installed prior to operation/binging into use of the
development. 
Reason - to comply with Policy 32 of the Local Development Plan 2  
15. Noisy Construction work shall be limited to Monday to Friday 0700 hours to
1900 hours and Saturday 0800 hours to 1300 hours with no noisy works out
with these times or at any time on Sundays or bank holidays (as identified by
Scottish Government). 
Reason - In order to safeguard the neighbouring residential amenity in the
area. 
16. The detailed landscaping and planting scheme which is hereby approved shall
be implemented as part of the site development programme and thereafter
maintained to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
B JUSTIFICATION 
There are material considerations that result in a recommendation to depart
from the approved Development Plan 
C PROCEDURAL NOTES 
Permission shall not to be issued until the Section 75 Agreement and
revocation of the use of the existing store has been signed and registered to
take account of this application. The legal agreement should be concluded and
completed within 4 months of the date of any Committee approval. Failure to
conclude a legal agreement within 4 months will result in the planning
application being re-assessed through failing to comply with the associated
developer contributions policy and may be ultimately recommended for refusal
under delegated powers 
D INFORMATIVES 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period
(see section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended)).

Page 23

2. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory
requirement would constitute a breach of planning control under section 123(1)
of that Act, which may result in enforcement action being taken. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority
written notice of that position. 
4. No work requiring of a building warrant shall be commenced until an application
for building warrant has been submitted and approved. 
5. Application for a new postal address should be made via the Street Naming
and Numbering page on the Perth & Kinross Council website at
www.pkc.gov.uk/snn.  Please note there is a charge for this service and
submission cannot be made until the relevant Building Warrant has been
approved. 
6. This planning permission is granted subject to conditions, some of which
require further information to be submitted to Development Management either
before works can start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original application was
lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware that a fee is payable
in respect of each request made, though there is no limit to the number of
conditions that can be discharged in a single request.  The Fees Charter is
available on our website www.pkc.gov.uk.   
7. An inspection of the proposed development site did not raise any identified
concerns, although historical mapping indicates there was previously a nearby
use which may have resulted in contamination in the vicinity of the site.  The
applicant is advised that, given historical uses of the wider area, there may be
potential for contamination within the site.  Should any contamination be found
during the approved works, works should cease and the Land Quality team
should be contacted on 01738 475000 or es@pkc.gov.uk for further advice. 
8. The applicant is advised that in terms of Sections 56 of the Roads (Scotland)
Act 1984 he/she/they must obtain from the Council, as Roads Authority,
consent to open an existing road or footway prior to the commencement of
works.  Information on junction types, requirements for Vehicular Access
consents (VA1) and application forms are available at
www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of surface water
should be sought at the initial stages of design from Scottish Water and the
Scottish Environment Protection Agency. 
9. Street lighting plant is present at the site, discussions must be had with the
Street Lighting Partnership to obtain the locations of plant and the position of

Page 24

the lighting columns at the vehicle access.  Contact Mark Gorrie at Perth &
Kinross Council Street Lighting Department for further details. 
10. This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to landscaping, elevation
finishes and supporting docs. 
11. Prior to the installation of the Yellow Box Junction Markings on the B9112
Necessity Brae, approval must take place with Police Scotland and the Roads
Authority. The Yellow Box Junction Markings must comply with Section 8 of
Traffic Signs Manual, Chapter 5 – Road markings (Department of Transport,
2018), including their suitability.  The and Network Team should be contacted
in this regard traffic@pkc.gov.uk 
Background Papers:  27 letters of representation
Contact Officer:  Joanne Ferguson 
Date: 19 May 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT