Perth and Kinross Council
Planning and Placemaking Committee – 22 February 2023
Report of Handling by Head of Planning & Development
(Report No 23/61) 
PROPOSAL: Formation of a 49.9MW solar farm comprising ground mounted solar
arrays, inverters, transformers, a substation, security fencing, CCTV
cameras, cabling, access tracks and associated works  
LOCATION: Land 130 Metres southeast of Coupar Angus Substation, Pleasance
Road, Coupar Angus 
Ref. No: 22/01285/FLM
Ward No: P2- Strathmore 
Summary 
This report recommends refusal of the application which proposes the formation of a
49.9MW solar farm comprising: ground mounted solar arrays, inverters, transformers,
a substation, security fencing, CCTV cameras, cabling, access tracks and associated
works all on land 130 Metres southeast of Coupar Angus Substation, Pleasance Road,
Coupar Angus. The report concludes that the proposal does not comply with the
provisions of the Development Plan, namely Policies 1A, 1B, 39 and 50 of the Perth
and Kinross Local Development Plan 2, nor does is comply with Policy 11 of the
National Planning Framework 4, and there are no material considerations apparent
which outweigh the Development Plan in this instance. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The application site, referred to as ‘Markethill Solar Farm,’ is c.90.6 Hectares
(ha) in area, and located approximately 650m south from the centre of Coupar
Angus. Although not directly bordering, the site will be clearly visible from the
northwest and northeast by the A923 and A94 public roads particularly on
approach into Coupar Angus. The southern and south-eastern site boundaries
are defined by Wester Balgersho and Pleasence Road.  The Site is located
approximately 2.5 km northwest of the ‘Sidlaw Hills’ Special Landscape Area
and approximately 900 m south of the ‘River Tay’ Special Area of
Conservation (SAC). The ‘Coupar Angus’ Conservation Area is located 245 m
to the north (at the nearest point) and the Category C Listed Building
‘Pleasance Farmhouse’ and the Category B Listed Building ‘Balgersho House’
are located approximately 200 m north and 100 m southeast. The ‘Coupar
Angus Abbey precinct’ and ‘Coupar Angus Abbey gatehouse,’ both Scheduled
Monuments are located 290 m and 390 m north. 
2 There are no Core Paths affected by proposed development, however
Pleasance Road, which is used by the public as a footpath and walking route
(non-designated), bisects the eastern area on a northwest to southeast angle.

Page 2

There are several other Core Paths in the vicinity, including the A923 footway
(COUP/121) - located near to the north-eastern boundary of the site and the
A94 footway (COUP/139) - located near the north-western boundary of the
site. 
3 In physical terms the design and layout submitted is partially indicative, as the
exact type and model of solar panels are not confirmed, and further pre-
commencement surveys may indicate a need for micro siting of panels.
However, in broad terms the development would consist of rows or ‘strings’ of
solar photovoltaic (PV) panels occupying approximately 70 of the 90.6ha
area. The panels would comprise photovoltaic cells (typically 60 to 72 cells
per module) which are dark coloured and designed to maximise the
absorbency of the sun’s rays and minimise solar glare. Each string of panels
would be mounted on a metal frame and supports, pile driven into the ground
to a depth of approximately 1 to 2 m or on concrete footings. Fixing details will
be confirmed after pre-construction surveys. Between each frame there would
be a distance of between 3 m - 6 m, to avoid inter-panel shading and provide
suitable access. Panels would be tilted at typically 15 to 30 degrees from the
horizontal and orientated to face south. Panels would sit approximately 0.8 m
from the ground at the lowest point (the southern edge) rising to
approximately 3 m at the highest point (the northern edge). 
4 Further associated infrastructure will comprise: electrical equipment, inverters
and transformers, housed inside a  container (c.7 m x 2.5 m x 3 m); a
substation compound and two buildings (c.10 m x 6 m x 3 m and 18 m x 6 m x
3 m); a temporary construction compound to store equipment and a site office
(indicated on Drawing 08); a 2.4 m high perimeter/ deer fence; 4 m wide
access tracks as indicated on the site layout Drawing 04 as well as landscape
planting indicated on Drawing 09. 
5 It is assessed that the development will have an immediate and extended
negative impacts on the landscape character and visual amenity within two
kilometres of the development and on residents within Coupar Angus, owing
to its size, form and location. This is discussed in more detail within the
appraisal of this report (Paras: 52- 56).   
Environmental Impact Assessment 
6 Directive 2011/92/EU (as amended) requires the ‘competent authority’ (in this
case Perth and Kinross Council) when giving a planning permission for
particular large-scale projects to do so in the knowledge of any likely
significant effects on the environment.  The Directive therefore sets out a
procedure that must be followed before ‘development consent’ can be given. 
7 This procedure, known as Environmental Impact Assessment (EIA), is a
means of drawing together, in a systematic way, an assessment of a project’s
likely significant environmental effects.  The EIA Report helps to ensure that
the importance of the predicted effects, and the scope for reducing any
adverse effects, are properly understood by the public and the relevant
competent authority before it makes its decision.

Page 3

8 An EIA screening has previously been undertaken for a development of
similar scale and type to that now set out, (Reference 21/02234/SCRN),
concluding that an EIA was not required as the proposal was not considered
likely to have significant environmental effects. However, a suite of supporting
assessments, presenting environmental information in respect of
archaeological, flooding/drainage, noise, ecology, traffic and transport,
landscape visual impact and a risk management of development near to
major gas pipelines was required to support any planning application. 
Pre application Consultation 
9 The proposed development is a ‘Major’ development, in terms of the Town
and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009, due to size and scale.  The applicant was therefore required to
undertake formal pre-application consultation with the local community. 
Significant feedback resulted with the principle issues raised being: concerns
over landscape and visual amenity; if there were any community and or
economic benefits; impacts to recreation in the area and/or if there would be
any benefits resulting from the development, such as community paths of
recreation areas; concerns over the site selection and the use of prime
agricultural land; impacts form artificial light and safety equipment; foundation
design and impacts to archaeology; and impacts on the gas pipeline running
through the site. 
10 The Pre-Application Consultation (PAC) Report submitted with this application
noted that two webinars or online events were held on 23 March and 2 of April
2022. The content and coverage of the community consultation exercise was
considered sufficient and proportionate and in line with the aforementioned
regulations, including the emergency provisions in place at the time due to the
pandemic.  Notwithstanding the approach taken aligns with the relevant
regulations significant concern has been raised that the two online events
were inadequate given the scale of development proposed and relaying that
many residents in Coupar Angus were elderly and did not have adequate
access to the consultation events.   
National Policy and Guidance 
11 The Scottish Government expresses its planning policies through The
National Planning Framework, Planning Advice Notes (PAN), Creating
Places, Designing Streets, National Roads Development Guide and a series
of Circulars.   
National Planning Framework 4 
12 The National Planning Framework 4 (NPF4) was approved by the Scottish
Parliament on 11 January 2023, and was adopted on 13 February 2023.
NPF4 has an increased status over previous NPFs and comprises part of the
statutory development plan. NPF4 itself is a long-term strategy for Scotland
and is a spatial expression of the Government’s Economic Strategy and plans
for development and investment in infrastructure. This is a statutory document
and material consideration in any planning application. In this case policies

Page 4

encourage, promote and facilitate development that minimises emissions and
adapts to the current and future impacts of climate change. Whilst recognising
that significant landscape and visual impacts can be expected by energy
developments, it must be demonstrated that any impacts are localised and or
employ appropriate design mitigation. It is assessed in this case that those
impacts cannot be appropriately mitigated due to the size, location and scale
of the development which will have immediate and enduring impacts on
Coupar Angus and the surrounding landscape.       
Planning Advice Notes 
13 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport
• PAN 79 Water and Drainage 
Perth and Kinross Local Development Plan 2 
14 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.”  It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 8: Rural Business and Diversification
• Policy 6: Settlement Boundaries
• Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
• Policy 15: Public Access
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled
Monuments
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 27A: Listed Buildings
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 35:
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape

Page 5

• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 50: Prime Agricultural Land
• Policy 51: Soils
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 54: Health and Safety Consultation Zones 
• Policy 55: Artificial Light Pollution 
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals
• Policy 61: Airfield Safeguarding 
Other Policies  
• Perth & Kinross Council Supplementary guidance on Flood Risk and Flood
Risk Assessments, March 2021.
• Landscape Supplementary Guidance, February 2020.
• Placemaking Supplementary Guidance, February 2020.
• Planning for Nature – Development Management and Wildlife
Supplementary Guidance, April 2022.  
• Renewable & Low Carbon Energy Supplementary Guidance (Draft). 
Site History 
History pertaining to adjoining Land 
15 18/00016/PAN A proposal of application notice was submitted on 6 February
2019 seeking the formation of an energy storage compound including 15
battery storage units, inverters and transformers, a substation, ancillary
equipment, store, vehicular access, track and associated works 
16 19/00513/FLM Full Planning Permission was approved on 24 September
2019 for the formation of a battery storage facility, vehicular access and
associated works. This development was commenced in 2021. However,
following design changes work stopped to allow for communications with the
Council which eventually resulted in the submission of a revised application.
(Planning Permission 22/00195/FLM).     
17 21/00015/PAN a proposal of application notice was submitted on 18
November 2021 seeking the formation of a 49.9MW battery energy storage
system with associated work and infrastructure. This proposal notice sought a
materially different layout to that previously approved for this site.   
18 22/00195/FLM Planning Permission was approved on 1 June 2022
authorising the formation of a 49.9MW battery energy storage system with

Page 6

associated work and infrastructure.  This permission is currently being
implemented. 
History pertaining to the application site 
19 21/02234/SCRN An Environmental Screening Opinion was sought from the
Planning Authority on 1 February 2022 for a ground mounted solar
photovoltaic array development similar to that proposed by this application.  It
was determined that the development would have localised impacts but that
the development was not EIA Development in accordance with the
regulations.   
20 22/00006/PAN A proposal of application notice was submitted on 25 February
2022 for the Installation of a 49.9MW ground-mounted solar array and
associated works.  The details of any pre application consultation are included
within the Pre-Application Report submitted with this application.   
CONSULTATIONS 
21 As part of the planning application process the following bodies were
consulted: 
External 
22 Scottish and Southern Energy (SSEN): No Objection. Initial concerns raised
in respect of thermal radiation and earthworks impacting on SSE existing
infrastructure.  However, clarifications have seen these concerns addressed.   
23 Historic Environment Scotland: No Objection. HES confirm the solar farm
will have a visual impact on the wider countryside and setting of Scheduled
Monuments SM5772 – Coupar Angus Abbey prescient and SM7250 –
Lintrose House, but that any impacts will not detract in a way which impacts
experience and appreciation. 
24 Transport Scotland: No objection. Conditions are recommended to secure
further consultation with TS in the event that any abnormal loads and or
temporary traffic signage are required.   
25 Scottish Water: No objection. The applicant will be required to consult with
Scottish Water regarding any required water connections.   
26 Scottish Environment Protection Agency: No Objection. No land raising is
proposed and based on the land use vulnerability identified by this
development no concerns are raised.   
27 National Grid Plant Protection Team: No Objection. The applicant is
advised they must consult National Grid prior to works starting.   
28 Dundee Airport Ltd: No objection. No comments offered.   
29 Blairgowrie and Rattray Community Council: No response.

Page 7

30 Kettins Parish Community Council: Object. Significant concerns raised in
terms of landscape and visual impacts, impacts on walking and cycling in the
area and industrialised use of prime agricultural land.   
Internal 
31 Structures and Flooding: Objection / Incomplete information. Further flood
modelling of the site is required. The details provided for the flood modeller
extents do not at this stage justify the significant difference between its output
and that produced by the SEPA flood maps. No details appear to have been
provided for existing land drains.  Details pertaining to the functioning of
existing drainage and any mitigation caused by piling to install the panels. 
32 Environmental Health (Noise, Glint and Glare): No Objections, subject to
conditions. In terms of ‘Glint and Glare’ modelling predicts significant impacts
upon road users travelling along a section of the A94 and for two
dwellinghouses: 9 Wester Balgersho Farm and dwelling 53 Easter Balgersho
and, therefore there is a requirement for mitigation. Screening mitigation in
line with that proposed is recommended.  Noise impacts are identified from
construction work and conditions are recommended to control plant
equipment operations and that an appropriate complaint procedure is
secured.   
33 Transport Planning: No Objection subject to conditions related to an
upgraded vehicle access and visibility splays, a construction traffic
management plan and the provision of passing places on the C443 Road
(Pleasence Road). 
34 Development Contributions Officer: Consulted in error. 
35 Biodiversity/Tree Officer: No Objections subject to conditions, namely: the
provision of protection for existing trees onsite; the implementation of the 
planting and landscape plan submitted; the implementation of the mitigation
identified within the biodiversity survey submitted; an updated ecological
survey prior to the commencement of works; and the provision of a
biodiversity action plan for agreement prior to development commencing.     
36 NatureScot: No comments. 
37 Community Greenspace: No comments. 
38 Perth and Kinross Heritage Trust: No Objection, subject to an
archaeological watching brief condition, as the site is within an area of
Archaeological interest and due to the undeveloped nature of this site, there
remains the possibility of buried remains still existing.   
39 Development Plan Team/Strategy and Housing: No objection, subject to
conditions regarding: the decommissioning of the development at the end of
its life; and a soil management plan.  The general principle of the
development is broadly supported by LDP2. However, the renewable energy
considerations must be balanced against any landscape impacts.

Page 8

Representations 
40 164 representations were received, 145 objecting and 11 in support.  In
addition, a number of late comments in support of the development were
received but being received after the statutory consultation period had ended,
these have not been included in the total number of representations. 
41 The main reoccurring reasons for objection are: 
• Adverse effects on Visual Amenity
• Inappropriate land use
• Out of character for area 
• Light Pollution (this takes into consideration comments relating to the    
glare and light pollution from operation of the solar farm)
• Ecology and Wildlife 
• Affects to walking and cycling 
• Road Safety and Traffic congestion 
• Noise Pollution
• Over Intensive Development 
• Flood Risk 
• Inadequate landscape proposals 
42 The principal reasons for support cited are: 
• The climate emergency and the need to de-carbonise the economy 
• Positive economic benefits
• Security of electricity supply     
These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS
43 
Screening Opinion  Issued – The development is not
EIA Development 
Environmental Impact Assessment (EIA):
Environmental Report
Not Required
Appropriate Assessment
Habitats Regulations Appraisal 
completed - addressed within
supporting statement 
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact  Landscape and Visual Impact
Assessment 
Glint and Glare Study
Ecological Impact Assessment 
Biodiversity Metric Assessment 
Sequential Site Selection Test
Analysis 
Flood Risk Assessment

Page 9

Transport Statement 
Land Capability Classification
Pre-Application Consultation
(PAC) Report 
Design and Access Statement 
Heritage Impact Assessment   
APPRAISAL 
44 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997
(as amended) require the determination of the proposal to be made in
accordance with the provisions of the Development Plan, unless material
considerations indicate otherwise.  The adopted Development Plan comprises
the National Planning Framework 4 (NPF4) and the Perth and Kinross Local
Development Plan 2019. The relevant policy considerations are outlined in the
policy section above and are considered in more detail below.  In terms of
other material considerations, this involves considerations of the Council’s
other approved policies and supplementary guidance, namely the
Placemaking Guide, Flood Risks and Flood Assessment and Planning for
Nature and Wildlife.   
Principle 
45 The key determining policy issues for this specific proposal at this location
include: the principle of the development and its contribution towards
renewable generation targets/net zero agenda, (Policies 33 and 35 of the
LDP2 and Policies 1 and 11 of the NPF 4), landscape/visual impact and
recreational interests/access, (Polices 15 and 39 of the LDP2 and Policy 21 of
the NPF4), impacts on prime agricultural land (Policy 50 of the LDP2 and
Policy 5 of the NPF 4)), impacts on/from flooding and the water environment
(Polies 52 and 53A of the LDP2 and Policy 22 of the NPF4), residential
amenity (Policies 1A and 1B), cultural heritage & historic environment
(Policies 26A, 26B, 27A of the LDP2 and Policy 7 of the NPF4),
biodiversity/ecological impact (Policies 40 and 41 of the LDP2 and Policy 3 of
the NPF4), pipeline and airfield safeguarding (Policies 54 and 61 of the
LDP2), and transport (Policy 60A of the LDP2 and Policy 13 of the NPF4).   
46 Policy 33 of the LDP2 generally provides support for the development of
renewable and low carbon energy and associated infrastructure, subject to
detailed assessment against various environmental and other planning
issues. This is also reflected in Policies 1 and 11 of the NPF4, however,
stronger emphasis is placed over the contribution of the proposal to
renewable energy generations targets than to other landscape and or amenity
impacts.    Justification for the development in relation to the net zero agenda
is detailed in the submitted Planning, Design & Access Statement. In this case
the proposal is a 49.9MW solar farm and associated infrastructure/works
which would generate renewably sourced electricity into the national grid, via
the Coupar Angus sub-station.  It is indicated that this would be the equivalent
to providing energy that could power approximately 11,000 homes.
Notwithstanding any environmental or other planning issues, the proposal
would provide a substantial contribution towards renewable energy generation

Page 10

to support national and local objectives in relation to net zero and carbon
emission reduction. 
47 Policy 35 of the LDP2 also supports the development of electricity
transmission infrastructure, where this is sensitively designed, and suitable
mitigation is ensured. In this case it is not considered that the development is
sensitively designed or that suitable mitigation is offered.  The development
proposed raises significant landscape and visual amenity concerns being of a
scale, form and location which will dominate the immediately adjoining
settlement of Coupar Angus. It is considered that its visually prominent
location, situated on elevated ground between both main approach roads into
Coupar Angus from Perth and Dundee, will greatly alter the character and
appearance of this location, at odds with the wider agricultural setting in which
it is located. Overall, it is considered that the proposal does not contribute
positively to its setting and is contrary to Policies 1A and 1B of the LDP2 and
the Council’s Placemaking Supplementary Guidance. 
Design and Layout 
48 The design and layout essentially reflect the physical and engineering
requirements for this type of development, taking into account environmental
and technical standards.  In physical terms all development will not exceed4m
in height with the tallest being the CCTV poles at 4m high. The remaining
visual elements are the solar panels, being 3m at their tallest, the storage and
or electoral equipment containers at approximately 3mand the security fence
at 2.4m. 
49 In this case horizontal impacts of built development, in terms of the expansive
scale of development proposed, are more significant than vertical height. The
greatest observed horizontal expanse of panel strings or rows will be from the
A94 Perth to Coupar Angus Road, extending to an almost  unbroken distance
of  800m. Owing to the site topography, whereby the ground level rises
moderately from the A94 west to east, the panels will in many instances be
located on sloping ground, being oriented in a southwards direction Whilst is it
confirmed the panels can be arranged to fit with the site contours, minimising
ground disturbance, the raised open ground will increase the visual
prominence of any development on this ground. This will be particularly
prevalent from the southern areas of Coupar Angus and Pleasence Road.   
50 Mitigation of any visual and landscape character impacts is to be almost
entirely addressed through a mix of existing perimeter planting, supplemented
by an extensive landscape and planting scheme. Some mitigation is offered
by the layout, through physical separation of panel rows from key residential
receptors. Whilst it is appreciated that the proposed planting scheme is a
positive and would provide some mitigation, significant concern is raised that
such planting will take time to become established and provide any significant
mitigation. This will mean that significant mitigation will not be fully effective on
completion of the development and will take some 10-15 years to establish
and provide full benefit. This statement is supported by the applicant’s
Landscape and Visual Impact assessment (LVIA) which confirms that whilst
the predicted impacts on landscape character and visual amenity are likely to

Page 11

be localised (within 2 km), such impacts are ‘minor-adverse’ and “major-
adverse” respectfully, following the immediate implementation of
development.       
51 Given the scale and location of the proposed development it is considered
that the introduction of such an industrialised feature into the landscape, with
limited mitigation (at least in the first decade), will have a significant and
immediate impact on the character and amenity of this location. In terms of
scale and appearance the development is considering in this case contrary to
Policy 1B of the LDP2 2019. 
Landscape and Visual Amenity 
52 Safeguarding and enhancing landscape character and green infrastructure is
considered via LDP Policies 1A, 1B and 33 of the LDP2. Whilst Policy 4 of the
NPF4 considers impacts on the natural environment, Policy 11 (Energy) is of
more relevance to an equivalent landscape assessment. In that case the
policy balance favours renewable energy contribution over any landscape
impacts.   
53 An (LVIA) has been prepared as part of the Planning, Design & Access
Statement submitted in support of the application. Policy 39 of LDP2 and
associated Placemaking Supplementary Guidance is of relevance in relation
to the potential landscape & visual impact of the development. The landscape
context sees the site set in a predominantly rural/agricultural setting with the
settlement of Coupar Angus to the north/northeast and smaller clusters of,
and individual, buildings in the surrounding area. The location is within the
‘The Broad Valley Lowlands – Tayside Landscape Character Type’ as defined
in the Landscape Character Assessment. However, there are no formal
landscape designations associated, however the Sidlaw Hills Local
Landscape Area is located approximately 2.5km to the east and southeast. 
54 The LVIA includes: a desk-based study; field study; Zone of Theoretical
Visibility (ZTV); and assessment of selected viewpoints. The study has
considered landscape character (national/regional/local), local landscape
context, character of the site and immediate context, landscape designations
and a range of other considerations such as scheduled monuments,
conservation areas, listed buildings, gardens and designed landscapes, long-
distance recreational routes, public rights of way, and visual receptors (e.g.
settlements and residential properties, recreational routes, transport routes).
The study also provides an appraisal of likely effects, mitigation and residual
landscape effects in relation to the above-noted considerations. In addition, it
considers the potential for cumulative effects. Mitigation measures are then
detailed and are supported by a landscape mitigation plan which includes
supplementing existing and new additional planting as noted above.
Landscape mitigation is considered over a 15-year timeframe as a result of
vegetation becoming established and taking full-effect. 
55 Taking in to account the results of the assessment work undertaken to
consider landscape and visual effects, the study concludes: “The nature,
scale and form of the Development would inevitably result in some adverse

Page 12

effects on landscape character and on visual amenity…However, the limited
height of the Development combined with the containment afforded by the
framework of existing and new boundary vegetation ensures that effect would
be mostly localised in their extent.”  In physical terms prior to planting the
study sets out that 70-100% of the development will be visible in a local
setting.  After planting has been fully established in 15 years this reduces to
approximately 50 -70% total visibility overall, reducing the visibility impact
threshold to “moderate neutral”.  As noted, a planning balance in this case
must be considered having regard to any landscape impacts against the zero
carbon renewable energy benefits provided by the NPF4.  In this case it is the
view of officers that the significant landscape impacts outweigh those
renewable energy benefits.  Consideration has been given to a comparable
planning application currently before the Scottish Government Energy
Consents Unit (Reference: ECU00004521) which seeks authorisation for two
battery energy storage compounds and a 32MW Solar Farm, occupying
approximately 70 ha of agricultural land in total at Keithick Farm,
approximately 900 metres north west of Coupar Angus or 1.3 kilometres to
the west of the centre of this proposed development.  Whilst that development
seeks a slightly smaller solar farm footprint than that proposed in this case,
overall, the proposed development site lends itself more to an energy
development in landscape terms.  That development site is broken up by
changes in land orientation (i.e parts of it slope east and other parts slope
west) and has well established hedgerows and mature woodland surrounding
much of the development land. This will have an immediately benefit to break
up any visual mass. The site is also not located near any main transportation
routes and as such is less obvious in a wider setting.   This directly contrasts
to this development proposal, which will have longer unbroken visual
massing, be located in a very visually prominent location and only partial
landscape mitigation existing. It is considered the development, owing to its
proximity to Coupar Angus, will appear to dominate this settlement, negatively
impacting residents, particularly those residing in the southern most areas of
the village.   
56 Whilst the development may soften in time as planting becomes established,
there will be an immediate and sudden change in landscape character in this
localised setting, impacting not just views outward from Coupar Angus, but
also local walking and cycling routes nearby. The development is considered
contrary to Policies 1A and 1B of the LDP2 2019 as well as the adopted
Placemaking Supplementary Guidance.  It is not considered the development
is contrary to Policy 11 of the NPF4 whereby greater weight in any planning
balance under this policy is placed on renewable energy benefits.  However,
in order for a development to be fully supported by this policy it is necessary
for a development proposal to set out appropriate mitigation.  In this case it is
not considered appropriate mitigation is offered to offset significant landscape
character impacts.

Page 13

Residential Amenity 
Glint and Glare 
57 Policies 55 and 56 of the LDP2 are of relevance in relation to light and noise
pollution. The Council’s Environmental Health team has been consulted to
consider any impact in relation to noise as well as glint & glare and a Glint &
Glare Study has been submitted as part of the Planning, Design & Access
Statement. This assessment has been undertaken to consider the possible
effects on the surrounding road network and the residential properties within a
1km radius. 
58 The assessment undertakes geometric reflection calculations and, where a
solar reflection is predicted, the screening (existing and/or proposed) between
the receptor and the reflecting solar panels is taken into consideration. Based
on the results of the geometric calculations it is determined whether a
reflection can occur, and if so, at what time. Then both the solar reflection
from the solar development and the location of the direct sunlight with respect
to the receptor’s position is considered. This assessment was carried out
using different panel characteristics and modelling has predicted significant
impacts upon road users travelling along a section of the A94 and for two
dwellinghouses, 9 Wester Balgersho Farm and dwelling 53 Easter Balgersho
and, therefore a requirement for mitigation. The report outlines the proposed
screening mitigation for the A94, which with other existing mitigation factors
would result in a moderate impact and no further mitigation is required. The
mitigation screening for the two dwellinghouses would reduce the impact on
dwelling 9 to ‘low’ and no impact is predicted for dwelling 53. Consequently, it
is concluded that the any impacts are negligible owing to the existing and
proposed mitigation. Environmental Health raise no objection, subject to a
condition to secure the proposed mitigation planting. Whilst the proposed
planting scheme will afford some mitigation, the full effects of any mitigation
will take time to establish. It therefore cannot be assured that there will be no
impacts on the A94 Road and or those dwellings identified as being affected
by glint and glare, with such effects being considered moderate / low as
opposed to nil. When these impacts are considered in a wider context within
the overall landscape and visual amenity impacts assessed, the potential for
road safety concerns and direct impacts on nearby dwellings raises further
concern that the development is of a scale which is too large for its proposed
setting.   
Noise 
59 The planning and design statement states that the construction and
installation of the development will take approximately 6 months and there will
be a temporary construction compound on site for the duration of the
construction period. There is the potential for noise and vibration during any
piling stage for the panel mounting posts structures.  During operations there
is the potential for noise from the inverter kiosks, cooling fans and
transformers to adversely affect residential amenity. The operation of the fans
will be related to both the intensity of light  and the air temperature. During
night-time periods, any sound emitted would be from the substation

Page 14

transformers. Inverters and transformers will operate in varying loads
depending on cooling requirements. 
60 The assessed noise sources can create noise which has characteristics, such
as low frequency humming, which if not mitigated can have adverse impacts
on residential amenity.  Environmental Health Officers are satisfied any such
impacts can be mitigated and controlled by conditions.   
Light from Operational Sources 
61 Any light required for the development would likely be for maintenance and or
security purposes. It is not stated what external lighting is proposed but such
impacts are considered to be able to be mitigated through appropriate
placement and that it should only be required where necessary.  No
significant concerns in terms of light pollution are assessed.   
Roads and Access 
62 LDP2 Policy 60B requires that local road networks be capable of absorbing
traffic generated by development and that satisfactory access is provided. 
Policy 13 of the NPF4 focuses more of sustainable travel and ensures
development is sited approximately. The development proposes to access the
site form the C443 between Pleasance Road to Campmuir. The applicant is
proposing to erect two vehicle accesses, one to the east of the C443 and the
other to the west of C443.  The vehicle accesses will be constructed with a
larger radius to the south to encourage HGV movements in that direction,
rather than travelling into Coupar Angus via Pleasance Road. Up to 145
articulated lorries will be required to deliver the solar panels to site and there
would be a period of a month where it is anticipated that there will be 81 two-
way movements from the site, with 27 HGV movements per day.  This is likely
to reduce in other months.  With such an increase in HGV traffic movements
on the C443 and the width of the road being around 4m some initial concern
was raised by Transport Planning colleagues as to the ability of the road in its
current condition to allow lorries to pass one another.  However, this could be
resolved through the provision of a passing place, secured by conditions.
Further conditions could also relate to the vehicle crossings / accesses,
visibility splays, road maintenance agreement and a construction traffic
management plan.  Subject to securing those conditions no objection is raised
by Transport Planning.  Notwithstanding, objectors have noted concerns with
increased traffic and visual impacts from Pleasence Road as this area is used
regularly for walking by residents.     
63 Having regard to any impacts on the Trunk Road Network no concerns been
raised by Transport Scotland, subject to conditions regarding the need for
abnormal loads or temporary traffic management in those circumstances.   
64 Overall, no significant road and or transport impacts are identified, and it is
concluded subject to conditions regarding construction traffic management,
that the development conforms with Policy 60B. Whilst no specific engineering
concerns are raised, the development is likely to result in landscape and
visual impacts along both sides of Pleasence Road due to the position of

Page 15

panels on either side. The existing screen planting at this location will afford
some mitigation but will not be sufficient to offset impacts initially. As a key
walking route for residents, the development will impact their experience of
this location by changing the character and outlook. It is considered such
impacts may be detrimental to the wellbeing of residents who use or live on
Pleasance Road.   
Drainage and Flooding 
65 Policy 53A and 53C of the LDP2 sets out that development proposals must
have regard to the water environment and drainage, including floodwater
management within any proposal. Policy 22 of the NPF4 sets out that
proposals in flood risk areas should only be supported in set situations.  In the
case of this site, it is known to be within an active surface water flooding area
and does regularly flood.  The Councils Flood Risk Officer has been consulted
and raised concerns with the modelling outputs and lack of land drainage
information provided by the applicant. At the time of this report those matters
remain outstanding and as such an objection from the officer on flood risk
grounds remain.  Flood hazard concerns and mitigation has also been raised
by objectors. It is known that this site floods regularly.   
66 The principal concerns raised by the officer in this case relate to;
a)  Unclear modelling outputs within the submitted Flood Risk Assessment,
including differences between the modelling provided and the flood risk
maps prepared by SEPA. 
b)  The impacts the development will have on land drainage and including
overland flows path for water.       
67 The risk of the development being flooded is considered negligible, owing to
the type of development in terms of land use vulnerability (i.e. the
development will not be occupied apart from any staff who may happen to be
onsite during a flood event) and as the panels themselves are to be raised
approximately 1.2m off ground level – above any flood water. As such, those
impacts are of lesser concern. Therefore, the primary flood related questions
are in respect of onsite drainage.  Limited account appears to have been had
to preferential flow paths onsite and or the impacts of rainwater falling from
the panels and the subsequent drainage requirements. The Flood Risk Officer
considered the matters likely to be able to be addressed by design and or the
specific siting of panels.  However, without that detail being agreed it is not
possible to conclude further. 
68 Accordingly, as matters pertaining to flood risk have not been satisfactorily
resolved the development is not considered to comply with Policies 53A and
53C of the LDP2 or Policy 22 of the NPF4.    
Cultural Heritage and Conservation Considerations 
69 Polices 26A, 26B and 27A of the LDP2 and Policy 7 of the NPF4 are
applicable to the application.  It is confirmed that the site lies within an area
considered to be archaeologically sensitive. As it is greenfield and does not
appear to have been developed in the past there is potential for unknown

Page 16

buried archaeological remains to survive. Despite the known areas of interest,
no objection is raised by Perth and Kinross Heritage Trust. However, a
suspensive condition is recommended in the event that permission is granted
seeking a programme of archaeological works to ensure the development
does not destroy significant archaeological remains. 
70 In terms of the Coupar Angus Conservation Area and any heritage assets in
the immediate location (listed buildings, scheduled monuments), a heritage
Impact assessment has been undertaken in this case.  This assessment
considers the potential effects of the development on the Coupar Angus
Conservation Area, Scheduled Monuments and listed buildings within 3km of
the site.   Impacts to the setting of nearby listed buildings and monuments
was observed in terms of landscape character and amenity. However, those
impacts were not considered to adversely impact peoples experience of the
monuments and architectural heritage.  Historic Environment Scotland as well
as the Council’s Conservation Officer were consulted and confirmed general
acceptance of the conclusions noted within the impact assessment.  No
objections have been raised provided landscape and screening planting is
implemented. As the development will not directly impact the identified
heritage assets locally, the proposal is considered to accord with Policies 26A,
26B and 27A of the LDP2 2019 as well as Policy 7 of the NPF4.   
Natural Heritage and Biodiversity 
71 Policies 40 and 41 of the LDP2 as well as Policy 3 of the NPF4 are applicable
in this regard. The Council will apply the principles of the Scottish Government
Policy on Control of Woodland Removal and there will be a presumption in
favour of protecting woodland resources. Where the loss of woodland is
unavoidable, mitigation measures in the form of compensatory planting will be
required.  The submitted ecological survey information is good quality and
provides a comprehensive assessment of the proposed development impacts
on trees, woodland and biodiversity. All existing hedges, woodland, and trees
will be retained. Enhancing connectivity between existing and newly created
habitats is strongly encouraged to benefit biodiversity. 
72 The submitted Preliminary Ecological Appraisal Report and Ecological Impact
Assessment were undertaken at the correct time of year and do not
recommend further survey is required. The Council’s biodiversity Officer has
been consulted on the biodiversity impacts of this development.  No objection
is raised provided all the mitigation measures listed in the Appraisal Report
are adhered to in full. If permission is granted this should be secured by way
of condition. A further condition is also recommended that a pre
commencement survey be undertaken for breeding birds and nest sites prior
to development proceeding.   
73 Whilst the overall biodiversity enhancements being offered may benefit the
site as a whole, those benefits must be considered against wider visual
amenity and the overall scale and location of the development proposed.  In
this case Policy 39 of the LDP2 provides that development should be
compatible with the distinctive characteristics and features of Perth and
Kinross’s landscapes.  Development proposal will be supported where they do

Page 17

not conflict with the aim of maintaining and enhancing the landscape qualities.
In this case Broad Valley Lowlands, in which this development sits, are
characterised by, broad straths, undersized rivers, complex local topography,
distinctive soils, dominance of arable and root crops in large fields, trees and
hedgerows, well settle landscapes with well populated agricultural landscapes
and wide panoramic views.  It is considered that the development will impact
local landscape qualities, including the distinct fullness of this location, owing
to its scale, location and form. In particular, the proximity to Coupar Angus
and direct impacts on the visual integrity from within the settlement and
nearby, including along Pleasance Road are raised as being of concern.  It is
not considered that the proposed planting will provide the necessary
mitigation identified in the short to immediate term. As such, the development
will result in an abrupt change in the surrounding landscape character which
in the opinion of officers directly and negatively impacts the quality and
experience of the landscape from these locations, contrary to Policy 39 of the
LDP2 2019.  As the development would seek to reverse some of the loss
biodiversity to this location and enhance it with further planting it is not
considered the Development is contrary to Policy 3 of the NPF4.    
Loss of Prime Agricultural Land and Soils 
74 The site is located on an area of prime agricultural land and therefore Policies
50 (Prime Agricultural Land) and 51 (Soils) of the LDP 2 as well as Policy 5 of
the NPF4 are of relevance. A sequential test has been undertaken by the
applicant to detail the site-specific justification for the development,
considering numerous sites within the local area. A 3km buffer has been used
for analysing alternative sites taking in to account a viability cost threshold for
connecting to the substation. 
75 The proposal involves a significant area of land, with the developable area
extending to approximately 70 ha (as detailed in the Planning, Design &
Access Statement). The Land Capability Classification for Agriculture Map
(1:50,000 scale) identifies the site is classified as Class 2 prime agricultural
land. A follow-up soil report & survey has outlined that the site comprises a
combination of Class 2 and Class 3.1 land. 
76 The Development Plans team has been consulted and raised no objection to
the development and has noted the following in its policy assessment relative
to Policy 50. In terms of the justification of the proposal in relation to prime
agricultural land it is considered that the development has been sequentially
justified on the basis that a site is required to be sited within 3km of the
existing substation and other sites have not been identified as more
favourable for various reasons. It is also identified that the majority of the
development will comprise the solar farm element which will not result in the
loss of prime agricultural land, rather the land use will change for a temporary
period of 35 years (as proposed) with grazing able to take place with the
potential for the land to revert back to productive agricultural land following
decommissioning of the development. If the energy generation is still viable at
the end of the 35-year period, then a further application for planning
permission would be required to continue the use and the removal of the

Page 18

agricultural land from production could be once again assessed based upon
the policy position at that time. 
77 Based on individual merits, and the sequential test provided, regard is had to
the particular site requirements of this type of development, noting that grid
connection is of critical importance to the development viability.  As such the
use and occupation of prime land alone is not considered to be a reason for
refusal. However, consideration of the cumulative loss of prime land, noting
the scale of this development, must be considered further under Policy 50. In
this case an application is currently before the Scottish Government Energy
Consents Unit (Reference: ECU00003397 on land to the at Keithick Farm,
Coupar Angus (approximately 800m) to the north-east of the proposed
development.  That proposal is for a 32MW Solar Farm and two separate
Battery Energy Storage Facilities, comprising 66MW capacity.  That proposed
development if approved would also occupy approximately 70ha of prime
land.   Combined both developments if approved could result in approximately
140 ha of prime land being occupied, limiting food production and or food
security potential for this location over the lifetime of both developments. At
that scale it is considered that the cumulative loss of prime land is significant
in a localised sense. Furthermore, both proposed developments are justified
on the basis of national grid connection via the Coupar Angus Substation.
Given the connection capacity which exists at this substation there is a high
likelihood for further subsequent energy related development within this
immediate location. When this factor is considered alongside any wider visual
amenity impacts already identified, the development is not considered to
comply with Policy 50 of the LDP2. 
78 For those elements of the development that require the removal or movement
of soils e.g. substation and access tracks, under the terms of Policy 51 of the
LDP2 and Policy 5 of the NPF4 further details will be required to demonstrate
that the development complies i.e. a Soil Management Plan. The
Development Plans Team in their assessment of this proposal have
considered this matter could be resolved by pre commencement condition if
the proposal is minded to be approved.  Accordingly, the development is
considered to be in compliance with Policy 51 of the LDP2 2019 and Policy 5
of the NPF4. 
Economic Impact 
79 In the short term, construction will create jobs with scope for local
employment. However, the development is not supported by any economic
information to further assess this impact.  It is however predicted that once
construction work is complete, further employment opportunities will be
limited.  However, and notwithstanding the significant visual and landscape
impacts raised by the Planning Authority, the development is a clear fit for the
Scottish Governments policy direction set out within the Scottish Energy
Strategy and NPF4 of transitioning to a low carbon economy with renewable
energy generation. It also represents a significant inward investment in rural
Perthshire, assisting in the creation of a national grid asset of regional
significance for the Perth and Kinross area.

Page 19

PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
80 None. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
81 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is considered to be contrary to the Development
Plan.  Account has been taken account of the relevant material considerations
and none has been found that would justify overriding the adopted
Development Plan. 
82 Accordingly, the proposal is recommended for refusal on the grounds
identified below. 
A RECOMMENDATION   
Reasons for Refusal 
1. The development, owing to its size, appearance and location raises significant
landscape character and visual impact concerns, failing to contribute
positively to the quality of the surrounding built and natural environment. The
development is considered contrary to Policies 1A and 1B of the LDP2 2019
as well as the Council’s Placemaking Supplementary Guidance. 
2  The development, owing to inadequate mitigation in seeking to offset
landscape concerns raised, fails to comply with Policy 11 of the National
Planning Framework 4. 
3. Development and land use change should be compatible with the distinctive
characteristics and features of Perth and Kinross's landscapes.  The
development, owing to its scale, area, and open location, on the main
approach roads to Coupar Angus, will erode the local distinctiveness of
landscape character at this location significantly impacting the visual integrity
of the area. The development is not considered to comply with Policy 39 of
the LDP2 2019. 
4. The development, owing to its scale, massing, and location may contribute to
the cumulative loss of prime agricultural land within a wider setting, whilst also
resulting in the loss of food production potential and food security over its
lifetime.  The development does not comply with Policy 50 of the LDP2 2019.   
5. The development, on account of a lack of technical detail, has not
satisfactorily demonstrated that any impacts on flood risk and or land drainage
are acceptable or appropriately managed. Consequently, it cannot be
confirmed that the development complies with Polices 53A and 53C of the
LDP2 2019 nor Policy 22 of the National Planning Framework 4.

Page 20

Background Papers:  164 letters of representation
Contact Officer:   Jamie Torrance  
Date:  9 February 2023 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT