PLANNING AND PLACEMAKING COMMITTEE 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 25 January 2023 at 9:30am. 
Present:  Councillors I Massie and G Stewart, Bailies C Ahern (Substituting for
Councillor C Reid), C McLaren and M Williamson, Councillors H Anderson, B Brawn,
D Cuthbert, E Drysdale, A Forbes (Substituting for Councillor I James), D Illingworth,
B Leishman and R Watters. 
In Attendance: D Littlejohn, L Reid, D Salman, K Smith and P Williamson (all
Communities); A Brown, C Elliott, J Guild and M Pasternak (all Corporate and
Democratic Services). 
Apologies: Councillors I James and C Reid. 
Councillor I Massie, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed everyone present to the meeting.  Apologies were
noted as above. 
2. DECLARATIONS OF INTEREST 
No Declarations of Interest were made in terms of the Councillors’ Code of
Conduct. 
3. MINUTES 
The minute of meeting of the Planning and Placemaking Committee of 23
November 2022, be approved.   
4. APPLICATIONS FOR DETERMINATION 
(1) Major Applications 
(i) 22/01071/FLM Formation of an energy storage facility
comprising control building, battery storage container
units, ancillary equipment, boundary treatments, bund,
landscaping and associated works, land 170 metres South
of Newhouse Farm, Perth 
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
General
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,

Page 2

unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
2. This planning permission will last only for three years
from the date of this decision notice unless the
development has been lawfully started within that period.
Reason – This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
Noise 
3. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/or calculated
and plotted on a rating curve chart.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
4. In the event of a justified noise complaint being received
by the Council the operator shall, at its own expense,
employ a consultant approved by the Planning Authority
to carry out a noise assessment to verify compliance with
‘Condition 3’.  The assessment will be carried out to an
appropriate methodology agreed in writing with the
Planning Authority.  If the noise assessment shows that
the noise levels do not comply with ‘Condition 3’ a
scheme of noise mitigation shall be submitted to the
Council as Planning Authority, within 28 days of the noise
assessment, for written approval, specifying timescales
for the implementation of the scheme.  The mitigation
scheme shall thereafter be implemented in accordance
with the approved scheme and timescales.  
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
5. The hours of construction activity shall be restricted to
between 0700 hours and 1900 hours Monday to Saturday
only, with no construction activity permitted on Sundays.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
Lighting
6. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of residential property and that light spillage beyond the
boundaries of the site is minimised.  In association, the
operation of the lighting shall be controlled so as to only
be triggered by motion within the security fenced
boundaries of the site.

Page 3

Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
Road Safety
7. Prior to the commencement of works associated to the
hereby approved development, a Construction Traffic
Management Scheme (TMS) shall be submitted for the
written approval of the Planning Authority, such TMS
shall include details of the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass; 
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road
users of construction traffic;
(j) arrangements to ensure that access for
emergency service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction; 
(n) monitoring, reporting and implementation
arrangements; 
(o) arrangements for dealing with non-compliance;
and
(p) details of HGV movements to and from the site.

Page 4

The TMS as approved shall be strictly adhered to during
the entire site construction programme all to the
satisfaction of the Council as Planning Authority.
Reason – In the interests of road safety.
8. The proposed route for any abnormal loads on the trunk
road network must be approved in writing prior to any
such movements being undertaken.  Where any
abnormal loads are required to be undertaken in
implementing the development hereby approved, a
written program of those movements shall be submitted
to the Council as Planning Authority for approval in
consultation with Transport Scotland.  Thereafter, any
such movements shall be undertaken in accordance with
the agreed program of movements, including any
mitigation measures required.  Any accommodation
measures required including the removal of street
furniture, junction widening, traffic management must
similarly be approved and should be included with any
written program of works.  
Reason – To ensure that the transportation of abnormal
loads will not have any detrimental effect on the trunk
road network
9. Any additional signing or temporary traffic control
measures deemed necessary due to the size or length of
loads being delivered to the development hereby
approved must be undertaken by a recognised Quality
Assured traffic management consultant, to be approved
in writing by the Council as Planning Authority for
approval in consultation with Transport Scotland.  The
approval any such management consultant shall be
agreed prior to the placement or implementation of any
signage and or traffic control measures. 
Reason – To ensure that the transportation of abnormal
loads will not have any detrimental effect on the trunk
road network.
External Finishes
10. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority.  The scheme as agreed shall be
implemented prior to the completion or bringing into use
of the development, whichever is the earlier.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
Biodiversity and Landscaping 
11. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted to and approved in writing
by the Planning Authority.  The scheme shall include

Page 5

details of the height and slopes of any mounding or
recontouring of the site, full details of all hard landscaping
proposals including materials and installation methods
and, species, height, size and density of trees and shrubs
to be planted.  The scheme as subsequently approved
shall be carried out and completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.  The scheme as agreed and
implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority. 
Reason – In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
12. The conclusions and recommended action points within
the supporting Preliminary Ecological Survey dated 26
November 2020, (Document 17) and Supporting
Statement dated 29 November 2022, prepared by
Overland Environmental Ltd, (Document 20), submitted
and hereby approved shall be fully adhered to, respected
and undertaken as part of the construction phase of
development, to the satisfaction of the Council as
Planning Authority.  A written statement confirming and or
setting out the physical means of compliance with these
mitigation points shall be submitted to the Council as
Planning Authority prior to works commencing onsite. 
Reason – In the interests enhancing biodiversity and to
ensure the satisfactory implementation of mitigation
measures to protect habitat onsite.  
13. Prior to the completion or occupation of the development
hereby approved, whichever is the earlier, 10 bird nesting
boxes and 10 bat roosting boxes shall be provided within
the site as part of the approved landscape scheme,
(Condition 11).  The size, type and locations of the
nesting and roosting boxes shall be submitted to the
Council as Planning Authority for prior approval to their
placement onsite.  Thereafter, the agreed boxes shall be
maintained in a reasonable condition for the life of the
development, to the satisfaction of the Council as
Planning Authority.
Reason – In the interests enhancing biodiversity and to
ensure the satisfactory implementation of mitigation
measures to protect habitat onsite. 
Dust
14. Prior to the commencement of construction for the
development a Dust Management Plan shall be
submitted for the written approval of the Planning

Page 6

Authority, in consultation with Environmental Health.  The
plan shall outline all construction activities that has the
potential to cause dust and shall state methods and
procedures to minimise the dust.  Thereafter, the
approved dust management plan shall be implemented in
full for the duration of all construction works hereby
approved.  
Reason – In the interests of residential amenity and to
ensure a satisfactory standard of local environmental
quality.
Archaeology 
15. Development shall not commence until the developer has
secured the implementation of an archaeological
watching brief, to be carried out by an archaeological
organisation acceptable to the Council as Planning
Authority, during development work.  The retained
archaeological organisation shall be afforded access at
all reasonable times and allowed to record and recover
items of interest and finds.  The name of archaeological
organisation retained by the developer shall be given to
the Planning Authority and Perth and Kinross Heritage
Trust in writing not less than fourteen days before the
commencement date provided in the Notice of Initiation of
Development. 
Reason – To ensure a programme of archaeological
works is carried out to safeguard and record any
archaeological remains within the development area.
Paths
16. The core path and right of way 34/15, located within the
site access road and shown on approved drawing
22/01071/01 must not be obstructed during building
works or on completion of the development.  Any damage
done to the route and/or the associated signage during
building works must be made good before the
development is completed or brought into use, whichever
is the earlier.
Reason – To ensure that public access is maintained at
all reasonable times, to the local path network.
Facility Lifespan
17. In the event the hereby approved development fails to
store electricity on a commercial basis for a continuous
period of 12 months, or 50 years from the date of
commencement of development, whichever is sooner,
then it shall be deemed to have permanently ceased to
be required.  In such an event the development shall be
decommissioned, and the relevant parts of the site
reinstated within such timescale as agreed in writing by
the Council as Planning Authority.  A reinstatement and
or decommissioning plan shall be submitted to the

Page 7

Council as Planning Authority for prior approval before
any site reinstatement works are commenced.  
Reason – To ensure the facility is removed from the site
at the end of its operational life, and to protect the
character of the countryside, the visual amenity of the
area and nature conservation interests.
Drainage 
18. Prior to the installation of any drainage works within the
development hereby approved, the final technical
drainage designs shall be submitted to, and approved in
writing by Council as the Planning Authority in
consultation with the Council's Structures and Flooding
team.  The drainage details as approved shall be carried
out in accordance with the agreed scheme and
completed prior to bringing into use of the development
herby approved.
Reason – In order to safeguard any offsite drainage
impacts of the development and in the interests of public
safety.
19. The discharge volume and rate from the proposed onsite
drainage system shall not exceed existing greenfield
levels. Compliance with this condition shall be
demonstrated through the provision of a drainage report
in compliance with ‘Condition 18’. 
Reason – In order to safeguard any offsite drainage
impacts of the development and in the interests of public
safety.
Soils
20. All soils excavated in the course of the development
hereby approved shall be retained onsite and repurposed
unless otherwise approved in writing by the Council as
Planning Authority. Prior to the development hereby
approved commencing, a Soil Management Statement
shall be submitted to the Council as Planning Authority
for approval in writing. This Statement shall set out the
extent of any excavation works to be undertaken and how
soils shall be reused and or managed onsite. All
excavation and repurposing of soil shall then proceed in
accordance with the agreed Statement.
Reason – In the interests of appropriately managing
prime quality soils and minimising the long-term impacts
of developing the site in accordance with Policy 51 of the
LDP2. 
Justification
The proposal is considered to comply with the Development
Plan and there are no material circumstances that would justify
a departure from relevant policies of the LDP2 2019.

Page 8

Informatives
1. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
planning authority prior written notification of the date on
which it is intended to commence the development. A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action
being taken.
2. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time. The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk. Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request. The Fees
Charter is available on our website www.pkc.gov.uk. The
Council has two months to consider the information. You
should therefore submit the required information more
than two months before your permission expires. We
cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
3. The developer is advised to contact Sophie Nicol, Historic
Environment Manager (Tel: 01738 477027) Perth and
Kinross Heritage Trust, to discuss terms of reference for
work required.
4. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works. Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess. Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
5. The presence of protected species, and the extent to
which they could be affected by the proposed
development, should be established before works
commence. Should protected species be identified within
the site the developer should ensure that all appropriate
measures required to comply with the relevant legislation
are carried out.
6. As soon as practicable after the development is
complete, the person who completes the development is

Page 9

obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the planning
authority written notice of that position.
7. The granting of planning permission does not stop the
continued right of public access along the existing core
path METH 34/15 Ruthvenpark Path. 
8. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk.
9. No work shall be commenced until an application for
building warrant has been submitted and approved.
10. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013. The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity of
the site of the development 
• Readily visible to the public.
• Printed on durable material.
11. Existing buildings or structures may contain nesting birds
between 1st March and 31st August inclusive.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (Section 1), it is an
offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act. 
(2) Local Applications 
(i) 22/01043/FLL Erection of 20 dwellinghouses and associated
works, land 70 metres East of 3 Losset Park, Losset Road,
Alyth 
Motion (Bailie C McLaren and Councillor I Massie) 
Grant, subject to the following conditions, terms and
informatives: 
1. This planning permission will last only for three years
from the date of this decision notice unless the
development has been lawfully started within that period.
Reason – This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)

Page 10

Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
3. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a written scheme
of archaeological investigation which has been submitted
by the applicant and agreed in writing by the Council as
Planning Authority, in consultation with Perth and Kinross
Heritage Trust. Thereafter, the developer shall ensure
that the programme of archaeological works is fully
implemented including that all excavation, preservation,
recording, recovery, analysis, publication and archiving of
archaeological resources within the development site is
undertaken.  In addition, the developer shall afford
access at all reasonable times to Perth and Kinross
Heritage Trust or a nominated representative and shall
allow them to observe work in progress.
Reason – The site lies adjacent to an area of
archaeological interest.
4. Prior to the commencement of any works on site, all trees
on site (other than those marked for felling on the
approved plans) and those which have Root Protection
Areas which fall within the site shall be retained and
protected. Protection methods shall be strictly in
accordance with BS 5837 2012: Trees in Relation to
Design, Demolition and Construction.  Protection
measures, once in place, shall remain in place for the
duration of construction. 
Reason – To ensure the protection of retained trees on
site.
5. The detailed landscaping and planting scheme which is
hereby approved shall be completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier.  The approved scheme shall
thereafter be maintained to the satisfaction of the Council
as Planning Authority, with any planting which fails to
become established within five years being replaced in
the following planting season with others of a size and
species as previously approved.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
6. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby

Page 11

approved (document 40 relates) shall be fully adhered to,
respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.
Reason – In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981). 
7. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance and shall
incorporate source control.  All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.
Reason – To ensure the provision of effective drainage
for the site.
8. The core path which runs along Losset Road on the
immediate boundary of the site must not be obstructed
during building works or on completion of the
development. Any damage done to the route and/or the
associated signage during building works must be made
good before the development is completed or brought
into use, whichever is the earlier.
Reason – To ensure continued public access to the
public paths and in the interests of public safety within the
site.
9. Prior to the commencement of development hereby
approved, a scheme shall be submitted to, and approved
in writing by, the Council as Planning Authority that
demonstrates how at least 10% of the current carbon
emissions reduction set by the Scottish Buildings
Standards will be met through the installation and
operation of low and zero-carbon technologies. This
scheme shall detail for each building:
(a) the technology types;
(b) illustrate, through technical calculations, that these
will meet at least the 10% reduction;
(c) their siting and location; and
(d) ongoing operation and maintenance.
Once approved, the development shall be completed in
accordance with the approved scheme and no individual
unit shall be occupied until the scheme has been installed
and is operating.

Page 12

Reason – To embed low and zero-carbon technologies
within the development in the interest of environmental
sustainability.
10. Prior to the commencement of the development hereby
approved, the developer shall submit for the further
written agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (CTMS) to
cover the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities, particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road
users of construction traffic;
(j) arrangements to ensure that access for
emergency service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction;
(n) monitoring, reporting and implementation
arrangements; 
(o) arrangements for dealing with non-compliance;
and
(p) details of HGV movements to and from the site.

Page 13

The CTMS as approved shall be strictly adhered to during
the entire site construction programme.
Reason – In the interests of pedestrian and traffic safety.
11. Prior to the commencement of any development a
Construction Management Plan (CMP) shall be submitted
to and approved in writing by the Council as Planning
Authority.  The CMP shall detail required mitigation
measures and construction method statements, including
specific measures for monitoring during construction. 
The CMP should include detailed pollution avoidance
measures and dust control measures for all construction
elements.  The CMP, as approved in writing, shall be
strictly adhered to for the duration of the construction
phase of the development.
Reason – To ensure the construction phase is carefully
managed to minimise landscape impacts and mitigate for
any associated impacts on neighbours, general public
and the wider environment.
12. Prior to the development hereby approved being
completed or brought into use a Residential Travel Plan
(RTP), aimed to encourage more sustainable means of
travel, shall be submitted and approved in writing by the
Council. The RTP will have particular regard to provision
for walking, cycling and public transport access to and
within the site and will identify the measures to be
provided, the system of management, monitoring, review,
reporting and the duration of the plan. 
Reason – In the interest of sustainable travel and in
accordance with the policies of the adopted Perth and
Kinross Local Development Plan 2019.
13. Concurrent with the initiation of the development hereby
approved and for the duration of construction, a
temporary surface water treatment facility shall be
implemented on site and maintained for the duration of
the approved development works.  The temporary
surface water treatment facility shall remain in place until
the permanent surface water drainage scheme is
implemented in full. 
Reason – To ensure surface water drainage is
adequately managed during construction operations.
14. The onsite affordable units hereby approved (Plots 17,
18, 19 and 20) shall be occupied solely for the purposes
of affordable housing, as defined within the Council's
Developer Contributions and Affordable Housing
Supplementary Guidance 2020 and Policy 20 of the Perth
and Kinross Council Local Development Plan 2 (2019), to
the satisfaction of the Council as Planning Authority.
Reason – To comply with the Council's policy on
affordable housing.

Page 14

Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
planning authority prior written notification of the date on
which it is intended to commence the development. A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action
being taken. 
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the planning
authority written notice of that position.
3. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.  The
Council has two months to consider the information.  You
should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
4. No work shall be commenced until an application for
building warrant has been submitted and approved.
5. Application for a new postal address should be made via
the Street Naming and Numbering page on the Perth &
Kinross Council website at www.pkc.gov.uk/snn.  Please
note there is a charge for this service and submission
cannot be made until the relevant Building Warrant has
been approved.
6. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for

Page 15

Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environmental Protection Agency.
7. The applicant is advised that the granting of planning
permission does not guarantee a connection to Scottish
Water’s assets. The applicant must make a separate
application to Scottish Water Planning & Development
Services team for permission to connect to the public
wastewater system and/or water network and all their
requirements must be fully adhered to.
8. An approved Street Lighting design is required please
contact Perth & Kinross Council Street Lighting
department for further details.
9. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
10. The approved stove system shall be installed and
thereafter operated and maintained in accordance with
the manufacturer's recommendations, such that smoke
odours are not exhausted into or escape into any
neighbouring dwellings. Failure to do so may result in an
investigation and possible action by Environmental Health
under the Environmental Protection Act 1990.
11. The applicant is advised that in terms of Sections 21 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council as Roads Authority Road Construction
Consent (RCC) to construct a new road prior to the
commencement of roadworks.  Advice on the disposal of
surface water must be sought at the initial stages of
design from Scottish Water and the Scottish
Environmental Protection Agency.  Please note that a fee
is chargeable for the processing of RCC applications.
12. The developer is advised to contact Sophie Nicol, Historic
Environment Manager (Tel 01738 477027) Perth and
Kinross Heritage Trust, to discuss terms of reference for
work required. 
Amendment (Bailie M Williamson and Councillor A Forbes) 
Refuse, as the application is contrary to Policy 20 Affordable
Housing of the Perth and Kinross Local Development Plan 2
(2019) and the Developer Contributions and Affordable Housing
Supplementary Guidance 2020, as the design and location of
Plots 17-20 are not integrated with and indistinguishable from
the other houses in the development.

Page 16

In terms of Standing Order 21.5, a roll call vote was taken. 
6 members voted in accordance with the Motion as follows:
Councillors B Brawn, D Illingworth, I Massie, Bailie C McLaren,
Councillors G Stewart and R Watters. 
7 members voted in accordance with the Amendment as follows:
Bailie C Ahern, Councillors H Anderson, D Cuthbert, E Drysdale,
A Forbes, B Leishman and Bailie M Williamson. 
Resolved:
In accordance with the Amendment. 
6. PROPOSAL OF APPLICATION NOTICES (PAN) 
(i) 22/00022/PAN Installation of a 49.9MW ground-mounted solar
array and associated works, land 500 metres North West of East
Saucher House, Kinrossie 
The contents of the Head of Planning & Development’s Report were
noted. 
(ii) 22/00026/PAN Formation of 30MW battery storage facility with
associated access and infrastructure, land 600 metres North East
of Cordon Farm, Abernethy 
Councillor Illingworth requested that due consideration is given to
appropriate screening for the site, and the core path network when
creating a transport plan for the site. 
The contents of the Head of Planning & Development’s Report were
noted.