Perth and Kinross Council
Planning and Placemaking Committee – 25 January 2023
Pre-Application Report by Head of Planning and Development
(Report No. 23/4) 
Installation of a 49.9MW ground-mounted solar array and associated works, land
500 metres north-west of East Saucher House, Kinrossie 
Ref. No: 22/00022/PAN
Ward No: P2- Strathmore 
Summary 
This report is to inform the Committee of a potential forthcoming planning application
in respect of a major development comprising a 49.9MW ground-mounted solar
array and associated works west of Saucher, Kinrossie. The report also aims to
highlight the key planning policies and the likely stakeholders who would be involved
in the decision-making process, and to offer a brief overview of the key planning
issues which are likely to be relevant to the proposal. 
BACKGROUND AND DESCRIPTION 
1 In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicants submitted a Proposal of Application
Notice (PoAN) on 15 November 2022. The purpose of this report is to inform
the Planning and Placemaking Committee of a forthcoming planning
application in respect of a major development for land 500 Metres North-West
of East Saucher House, Kinrossie. This pre-application reports give the
Committee an opportunity to raise issues which it would like to see considered
in the planning application. 
2 This PoAN advises of a major development comprising the installation of an
up to 49.9MW ground-mounted solar array and associated works. The exact
scale and design of the development will be arrived at during ongoing
discussions with the applicant and are not provided at this time. 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
3 Due to the scale of the proposal, it will require to be screened as to whether it
is an EIA development under the EIA 2017 Regulations. 
PRE-APPLICATION PROCESS 
4 The PoAN confirms that two public consultation events will be held at the
Three Witches café in Burrelton on 14 and 29 March 2023.

Page 2

5 The Burrelton and District Community Council that formally represent this
area has been disbanded. The applicant therefore proposes establishing a
community liaison group consisting of residents within 2km of the site. In
addition, Kettins Community Council and Blairgowrie Community Council
have been notified. Inchture Community Council, being one of the areas
closest and most likely to be impacted by the proposal, will also be notified.
The Ward Councillors, local MSP and local MP have been notified. The
results of the community consultation will be submitted with the planning
application as part of the required Pre-Application Consultation (PAC) Report. 
NATIONAL POLICY AND GUIDANCE 
6 The Scottish Government expresses its planning policies through the National
Planning Framework (NPF3) 3, Revised Draft National Planning Framework
(NPF4) 4, the National Roads Development Guide 2014, Scottish Planning
Policy (SPP) 2014 and Planning Advice Notes (PAN). 
National Planning Framework 
7 The NPF3 is a long-term strategy for Scotland and is a spatial expression of
the Government’s Economic Strategy and plans for development and
investment in infrastructure. Under the Planning etc (Scotland) Act 2006, this
is now a statutory document and a material consideration in any planning
application. The document provides a national context for development plans
and planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
8 The NPF4 was laid before the Scottish Parliament on 8 November 2022 for
approval. As it has not completed its parliamentary process, only limited
weight can be attached to it as a material consideration. However, in the
event that it is adopted prior to or during the submission of any forthcoming
planning application, NPF4 will form part of the statutory development plan
and will require to be considered in the determination of the application. 
The Scottish Planning Policy 2014 (SPP) 
9 The SPP is a statement of Scottish Government policy on land use planning.
The following sections of the SPP will be of particular importance in the
assessment of this proposal:- 
• Sustainability: paragraphs 24 – 35 
• Placemaking: paragraphs 36 – 57
• Promoting Rural Development: paragraphs 74 – 91
• Supporting Business and Employment: paragraphs 92 – 108
• Valuing the Historic Environment: paragraphs 135 – 151 
• Valuing the Natural Environment: paragraphs 193 – 218
• Maximising the Benefits of Green Infrastructure: paragraphs 219 – 233
• Managing Flood Risk and Drainage: paragraphs 254 – 268

Page 3

10 The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal:- 
• PAN 3/2010 Community Engagement
• PAN 2/2011 Planning and Archaeology
• PAN 1/2013 Environmental Impact Assessment
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 73 Rural Diversification 
LOCAL POLICY AND GUIDANCE 
TAYPlan Strategic Development Plan 2016-2036 
11 TAYPlan sets out a vision for how the region will be in 2032 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plan states that: 
“By 2032 the TAYplan region will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs” 
12 The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application: 
• Policy 1 – Location Priorities
• Policy 2 – Shaping better quality places
• Policy 3 – A First Choice for Investment
• Policy 7 – Energy, Waste and Resources
• Policy 9 – Managing Tayplan’s Assets 
Perth and Kinross Local Development Plan 2019 
13 The Local Development Plan 2 (LDP2) was adopted by Perth and Kinross
Council on 29 November 2019.  It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
14 The LDP2 sets out a vision statement for the area and states that:
“Our vision is of a Perth and Kinross which is dynamic, attractive and effective
which protects its assets whilst welcoming population and economic growth.” 
15 Under the LDP2, the following polices are of particular importance in the
assessment of this application: 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 2: Design Statements

Page 4

• Policy 8: Rural Business and Diversification
• Policy 26B: Archaeology
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in
New Development
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 35: Electricity Transmission Infrastructure
• Policy 39: Landscape 
• Policy 41: Biodiversity 
• Policy 42: Green Infrastructure 
• Policy 52: New Development and Flooding 
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 60A: Transport Standards and Accessibility Requirements:
Existing Infrastructure
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals
• Policy 61: Airfield Safeguarding 
OTHER POLICIES 
16 The following supplementary guidance and documents are of particular
importance in the assessment of this application: 
• Placemaking Supplementary Guidance (2020)
• Landscape Supplementary Guidance (2020)
• Flood Risk and Flood Risk Assessments Supplementary Guidance
(2021)
• Green and Blue Infrastructure Supplementary Guidance (2020)
• Renewables and Low Carbon Energy Supplementary Guidance (draft
2019)
• Perth and Kinross Community Plan 2013/2023 
PLANNING SITE HISTORY 
17 No relevant site history. 
CONSULTATIONS 
18 As part of the planning application process the following would be consulted: 
External 
• Scottish Environment Protection Agency (SEPA) 
• NatureScot
• National Grid
• Scottish Water
• Transport Scotland

Page 5

• Perth and Kinross Heritage Trust 
• Kettins Community Council
• Inchture Community Council 
Internal 
• Environmental Health 
• Strategic Planning and Policy
• Developer Negotiations Officer
• Community Greenspace including Access
• Transport Planning
• Structures and Flooding
• Biodiversity Officer 
KEY ISSUES AGAINST WHICH A FUTURE APPLICATION WILL BE ASSESSED 
19 The key considerations against which the eventual application will be
assessed include: 
a. Landscape and visual impact, including cumulative impacts
b. Relationship to nearby land uses and landscape
c. Biodiversity and ecology
d. Flood risk and drainage impacts 
e. Transport impacts 
f. Archaeology and cultural heritage
g. Impacts on core paths and recreational spaces
h. Impacts on the National Grid and or Scottish Gas network 
ADDITIONAL STATEMENTS WHICH WILL BE REQUIRED 
20 Should an EIA Report not be required the following supporting documents will
need to be submitted with any planning application: 
• Planning Statement
• Design and Access Statement
• Pre-Application Consultation (PAC) Report
• Transport Assessment
• Flood Risk and Drainage Assessment
• Landscape and Visual Impact Assessment
• Tree and Woodland Survey
• Habitat Survey
• Archaeological Assessment
• Sustainability Assessment
• Noise and Light Assessment
• Grid Connection Site Survey
• Construction Traffic Management Plan

Page 6

CONCLUSION AND RECOMMENDATION 
21 This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in
respect of this development and members are recommended to note these
key issues and advise officers of any other issues which they consider should
be included as part of the application and assessment.  
Background Papers: None
Contact Officer: Alex Gudgeon
Date: 13 January 2023 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT