Page 1

Perth and Kinross Council
Planning and Placemaking Committee – 25 January 2023
Report of Handling by Head of Planning & Development
(Report No. 23/03) 
PROPOSAL: Erection of 20 dwellinghouses and associated works 
LOCATION: Land 70 metres east of 3 Losset Park, Losset Road, Alyth 
Ref. No: 22/01043/FLL
Ward No: P2 – Strathmore 
Summary 
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and there
are no material considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 Full planning permission is sought for the erection of 20 dwellinghouses and
associated works within a 1.3 hectare paddock in north east Alyth.  The
paddock is associated with ‘The Losset’, a detached dwellinghouse located to
the south east of the paddock but out with the application site.  The site is
accessed from Losset Road which occupies the southern boundary of the
application site.  The site rises from Losset Road northwards by
approximately 11 metres.  There is a saddle in the centre of the site with level
differences of approximately 1-2 metres.  There are five Sitka Spruce trees
located close to Losset Road.  The site is surrounded by existing residential
development on the north, west and east sides.  Along the western boundary
are no’s 2-5 Losset Park, a small cul-de-sac development of modern
detached houses, approved in 2000-2001, which back onto the application
site.  These houses sit relatively close to the application site boundary with
limited rear garden ground depths.  To the east is a further cul-de-sac
development which is a spur of Losset Road.  There are further detached
properties here which overlook the site.  To the north is Meethill Road which
runs parallel to Losset Road, again with properties backing onto the
application site.  To the south, on the opposite side of Losset Road is the
Diamond Jubilee Park and Play Area which includes the Jubilee Park
House/Fyfe Jamieson Pavilion building.   
2 The proposal is to form a single access at the southern edge of the site onto
Losset Road.  Flanking the access are two sets of semi detached affordable
dwellings which are proposed to be single storey, 5.6 metres in height, two
bedroom units finished in anthracite concrete tiles, white render and larch
cladding.  The access extends centrally into the site with a loop road
proposed within the site, 11 detached dwellings are proposed on the outer

Page 2

side of the loop with 5 further detached dwellings located centrally within the
loop.  All are proposed to front onto the loop road. 
3 There are 6 house types proposed, all are similar in their form and scale other
than House Type 4A and B which are proposed to be larger given the scale of
plots 5 and 9.  Each house type is generally a storey and a half in height, with
upper floors served by either dormer windows or rooflights.  There is a
consistency in finishing materials across all plots with the finishes proposed to
match the affordable units as outlined above. 
4 A Sustainable Urban Drainage Pond (SUDS) is proposed in the south west
corner of the site, adjacent to the affordable housing units.  A retaining
structure is proposed to the north of plots 6, 7 and 8 to take account of the
slope on this part of the site. 
Pre-Application Consultation 
5 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009. Therefore, the applicant was not required to undertake any
formal pre-application consultation with the local community. 
National Policy and Guidance 
6 The Scottish Government expresses its planning policies through The
National Planning Frameworks, the Scottish Planning Policy (SPP), Planning
Advice Notes (PAN), Creating Places, Designing Streets, National Roads
Development Guide and a series of Circulars.   
National Planning Framework 2014 
7 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment
in infrastructure. This is a statutory document and material consideration in
any planning application. It provides a national context for development plans
and planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
Revised Draft National Planning Framework 2022 
8 The revised draft 4 National Planning Statement was published on 8
November 2022 and approved at Parliament on 11 January 2023.  The
principal policies of this document set out to encourage, promote and facilitate
development that meets with the six overarching spatial principles, which
includes local living, compact urban growth and the creation of sustainable
and liveable places.  This development proposal accords with the principal
intentions of this document.

Page 3

The Scottish Planning Policy 2014 (SPP) 
9 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and
for the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to
reflect local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
10 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57  
Planning Advice Notes 
11 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Creating Places 2013 
12 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It
notes that successful places can unlock opportunities, build vibrant
communities and contribute to a flourishing economy and set out actions that
can achieve positive changes in our places. 
Designing Streets 2010 
13 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making
and away from a system focused upon the dominance of motor vehicles. It
was created to support the Scottish Government’s place-making agenda,
alongside Creating Places.

Page 4

National Roads Development Guide 2014 
14 This document supports Designing Streets and expands on its principles and
is considered to be the technical advice that should be followed in designing
and approving of all streets including parking provision. 
Development Plan 
15 The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2019. 
TAYPlan Strategic Development Plan 2016-2036 
16 TAYPlan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plans states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive
and vibrant without creating an unacceptable burden on our planet. The
quality of life will make it a place of first choice where more people choose to
live, work, study and visit, and where businesses choose to invest and create
jobs.” 
Perth and Kinross Local Development Plan 2 
17 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.”  It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
18 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
• Policy 15: Public Access
• Policy 17: Residential Areas
• Policy 20: Affordable Housing
• Policy 26B: Archaeology and Archaeology: Archaeology
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in
New Development
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 52: New Development and Flooding

Page 5

• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
OTHER POLICIES 
Developer Contributions and Affordable Housing Supplementary
Guidance April 2020 
19 This document sets out the Council’s policies on Developer Contributions in
relation to Primary Education and Transport Infrastructure/A9 junction
upgrades, as well as setting out what Affordable Housing provision is required
for new developments. 
Placemaking Supplementary Guidance 2020 
20 The Council has prepared Placemaking Supplementary Guidance (2020) to
support Policy 1 (Placemaking) of the Perth and Kinross Local Development
Plan 2 (2019). It is to be used in the assessment of planning applications and
to assist in the placemaking process.  
Open Space for New Developments Supplementary Guidance 2021 
21 This document sets out the open space requirements for new housing
developments. 
SITE HISTORY 
22 None. 
CONSULTATIONS 
23 As part of the planning application process the following bodies were
consulted: 
External 
24 Alyth Community Council – Concerns expressed regarding cumulative
impact with other housing developments.  Concerns regarding traffic
generation/safety and impact on local services/lack of drainage capacity. 
25 Scottish Water – No objection but separate application required to connect to
their assets. 
26 Perth and Kinross Heritage Trust – Condition recommended to ensure
archaeological investigation 
Internal 
27 Community Greenspace – No objection.

Page 6

28 Development Plan – Comments provided regarding layout and open space
requirements. 
29 Environmental Health (Contaminated Land) – No objection. 
30 Transport Planning – No objection.  Road layout, parking and turning
arrangements considered to be acceptable.  Existing road network considered
to be capable of accommodating traffic associated with both construction
operations and upon completion, subject to conditions. 
31 Development Contributions Officer – No contributions required. 
32 Affordable Housing Officer – Provision of four on site units considered to be
acceptable with fifth affordable unit being secured by a commuted sum. 
33 Environmental Health (Noise Odour) – No objection. 
34 Community Waste Advisor - Environment Service – No objection. 
35 Biodiversity/Tree Officer – Ecological Assessment considered to be
acceptable subject to a condition to secure biodiversity enhancement on site. 
36 Structures and Flooding – Proposed drainage arrangements considered to
be acceptable subject to a condition to secure detailed design.  
Representations 
37 Nine representations were received including one from Alyth Community
Council all of which object to the proposal.  The main issues raised within the
representations are: 
• Construction traffic impact
• Road safety 
• Traffic congestion
• Sewer capacity
• Impact on trees
• Impact on local services (health care/refuse/education)
• Impact on landscape
• Noise pollution
• Light pollution
• Adverse effect on visual amenity
• Flood risk
• Inappropriate land use
• Loss of open space
• Out of character with area
• Overlooking
• Air pollution
• Overdevelopment
• Loss of agricultural land
• Not allocated for development in Local Development Plan

Page 7

• Cumulative impact with other ongoing housing developments 
38 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS 
39
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Submitted/Not Required/Not
applicable
Appropriate Assessment Habitats Regulations Appraisal
AA Not Required 
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact  Ecological Survey
Supporting Planning Statement
Tree Survey 
APPRAISAL 
40 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997
(as amended) require the determination of the proposal to be made in
accordance with the provisions of the Development Plan unless material
considerations indicate otherwise.  The adopted Development Plan comprises
the TAYplan Strategic Development Plan 2016–2036 and the Perth and
Kinross Local Development Plan 2019.  The relevant policy considerations
are outlined in the policy section above and are considered in more detail
below.  In terms of other material considerations, this involves considerations
of the Council’s other approved policies and supplementary guidance, as
outlined above. 
Principle 
41 Alyth is identified as a settlement within the Perth and Kinross Local
Development Plan 2 (2019) and is identified as "white land" where Policy 17
applies.  This states that infill residential development will be appropriate
subject to it reflecting the character, layout and amenity of the area.  Policies 1A
and B echoes this and states that new development should complement its
surroundings in terms of form, appearance, height, scale, massing, materials,
finishes and colours, amongst other criteria.   
42 Whilst the application site is currently used as a paddock and does provide an
attractive green space close to the edge of the settlement it does not have any
formal designation with the LDP2 and therefore there is no protection offered to
the site in planning policy terms as would be the case if the site had been
designated as open space, such as like the Diamond Jubilee Park has been to
the south.  Furthermore, the site has been used previously for agricultural
purposes but given the sites location within a settlement, close to existing
services it is considered to be appropriate for residential development. The
agricultural use of the site can be catered for elsewhere out with the settlement.

Page 8

43 The general principle of the residential development is therefore acceptable
given the proposal for infill development and the proposal and is considered to
accord with Policy 17 of the LDP2.  An assessment of the design and layout
along with other technical matters including drainage, access, residential
amenity and ecology is provided below. 
Design and Layout 
44 Generally, the design and scale of development should respect its surroundings
and adhere to Policies 1A and B of LDP2, which relate to placemaking.  Further
guidance is also provided within the associated Placemaking Supplementary
Guidance.   
45 Furthermore, through Creating Places 2013, Scottish Ministers set out the
comprehensive value good design can deliver. It notes that successful places
can unlock opportunities, build vibrant communities and contribute to a
flourishing economy and set out actions that can achieve positive changes in
our places. 
46 The character of the area is relatively uniform, with detached properties located
to the west and east of the site, both served by cul-de-sacs and properties to
the north and south fronting onto both Losset Road and Meethill Road.  Plot
sizes are relatively consistent and generally quite large reflecting the relatively
open feel to this edge of settlement location. 
47 The proposal includes a number of varying plot sizes which range from smaller
plots to accommodate the two bedroom affordable units which are
approximately 270sqm each.  The remaining plots range from 300sqm to
1115sqm providing a range of house plots sizes.  Each house is to be provided
with a driveway and parking area to the side of the house to avoid car
orientated frontages. 
48 The plot sizes proposed in this instance are considered acceptable as they
exceed the standards of the Placemaking Supplementary Guidance in terms of
overall plot footprint and provision of garden ground and are not out of context
with existing house plots in the area. Overall, the site layout proposed is
considered be relatively low density. 
49 There is only one available access and egress point for the site at Losset Road
and therefore the use of a loop road layout is considered to be appropriate as it
avoids any cul-de-sac/dead end arrangements which would not meet the
Council's Placemaking Supplementary Guidance. 
50 In terms of design the houses are proposed to be storey and half with either
dormer windows or rooflights serving upstairs accommodation.  A total of six
differing house types are proposed to enable variation across the site.  The
design form and scale of the proposed dwellings is considered to be consistent
with other dwellings in the locality, reflecting the established character.  A
consistent palette of materials across the site is proposed including anthracite
roof tiles, white render and larch cladding.

Page 9

51 As mentioned above given the topography of the site and the steep slope at the
northern end, a retaining structure is proposed behind plots 6, 7 and 8.  Clarity
has been provided on the design and form of this structure in the form of
sectional drawings.  This is proposed to be a stepped structure which will help
to limit its bulk and mass when viewed from the rear of plots 6-8.  The structure
is proposed to be planted to help to soften its appearance.   
52 It is considered that the layout is not an overdevelopment of the site and
reflects the general character and layout of the surrounding built form. The
design and scale of development proposed is therefore considered to comply
with Policies 1A and B, which relate to placemaking, and the criteria outlined in
Policy 17 for residential areas of LDP2. 
Residential Amenity 
53 Policies 1A and B require any development to not detrimentally impact on
residential amenity and to ensure any occupiers of new development have an
adequate level of residential amenity. 
Impacts on adjoining properties 
54 The formation of residential development has the potential to result in
overlooking and overshadowing to neighbouring dwellings and garden ground. 
There is a need to secure privacy for all the parties to the development, those
who would live in the new dwellings, those that live in the existing house and
those that live in adjoining dwellings.  Planning control has a duty to future
occupiers not to create situations of potential conflict between neighbours.   
55 The Council's guidance generally seeks to ensure there is a minimum distance
of 9m from windows to boundaries in order to mitigate overlooking from new
development.  In this instance the layout has been formed to take account of
these requirements and the window to boundary distances are marked on the
submitted site plan.  Furthermore plots 1-4 along the western boundary of the
site have been set back into the site to take account of the properties to the
west at Losset Park being located so close to the boundary.  This enables the
required 18 metres from window to window to be achieved which is considered
to be sufficient to mitigate overlooking. 
56 There are not considered to be any overlooking concerns from the other plots. 
Plots 5-9 sit substantially lower in the site than the neighbouring properties
which will ensure they do not overlook the neighbours.  Furthermore, these
properties also meet the Placemaking Supplementary Guidance which require
9m window to boundary distances.  The remaining plots, located within the
loop, and the affordable units to the south of the site, have all been oriented to
meet the Placemaking Supplementary Guidance requirements in terms of
window to boundary and garden ground sizes.

Page 10

Daylight/Overshadowing 
57 Although overshadowing is not a matter specifically referred to in ministerial
guidance, the protection of neighbouring developments from unreasonable loss
of light is a well-established proper planning consideration. 
58 The Council's adopted Supplementary Guidance relating to Placemaking
includes specific information on how the issue of overshadowing can be
assessed.  This is known as the 25 degrees rule.  Any proposed development
should maintain and allow for a reasonable amount of natural daylight to the
internal living space of neighbouring residential properties.  Established practise
determines that 25 degrees is a suitable maximum obstruction path which
should be afforded directly to a front or rear aspect.   Having carried out an
assessment of the proposed development the height of the proposed buildings
does not breach the 25-degree obstruction path as outlined in the
Supplementary Guidance.  Therefore, the proposed development is thus
considered acceptable in terms of its impact on daylight. 
Private Amenity Space 
59 The extent in which private amenity space is used relates specifically to the
dwellings occupant. It is therefore particularly difficult to forecast the extent of
garden ground required and ultimately overtime this will change with any new
inhabitant. Nevertheless, it is important to seek an outside area that can
perform the minimum to be expected of a garden i.e., clothes drying, dustbin
storage and sitting out.  Each house is provided with an adequate level of
garden ground for the size of house and meets the Placemaking
Supplementary Guidance in terms of garden ground. 
60 Overall, the development is considered acceptable in terms of the impact on
residential amenity of neighbours and the amenity of future occupiers and
therefore accords with the Local Development Plan where it relates to
residential amenity. 
Landscaping and Trees 
61 Policies 1A and B of the LDP2 seek (amongst other things) to ensure that all
new sites have a suitable landscape framework which can absorb the
development proposed and that development contributes positively to the
surrounding built and natural environment.  Policy 40B requires applications to
be accompanied by a tree survey where there are existing trees on a site. 
62 A Tree Survey accompanies the application and makes reference to a total of
19 trees, however the majority of these trees are located within the grounds of
The Losset which is actually outwith the planning application site to the south
east.  The only trees located within the application site are trees T1343-B1
located in the south west corner and trees T1433-C1 and T1432-U located
adjacent to the main access into the site.  All of these trees are Sitka Spruce. 
The trees at the access are proposed to be felled to accommodate the access
and both are described within the tree survey to be in poor condition with
limited life span.  The Sitka Spruce in the south west corner is proposed to be

Page 11

retained.  The level of felling, given the condition of the trees is considered to
be acceptable. 
63 A condition is recommended to ensure the mitigation contained within the tree
report and tree protection measures are implemented (Condition 4).  The
proposal also includes a detailed landscaping scheme including provision of a
landscape belt around the edge of the site to aid in protected species
movement across the site.  A further condition requiring the implementation of
the landscaping plan is also recommended, to compensate for the tree loss
(Condition 5). 
64 Subject to the above conditions the proposal is considered to accord with
Policies 1A and B relating to placemaking and 40B relating to trees and
woodland of LDP2. 
Open Space 
65 The Council's Open Space for New Developments Supplementary Guidance
2021 outlines the situations in which public open space is required within new
housing development sites.  The SG makes it clear that open space within new
development sites is only required depending on the proximity of the
development to existing provision.  It outlines a series of accessibility
benchmarks which outline how close an individual should be to a public park,
playground, playing field and path/green corridor.  In this instance the
application sits immediately adjacent to the Diamond Jubilee Park which is
located on the opposite side of Losset Road to the south of the site.  This park
includes a large recreation ground and play area.  The presence of the adjacent
large park is considered to be sufficient to cater for the future residents of the
application site and therefore an area of landscaped open space is not
considered to be necessary. 
66 Nevertheless, the proposal includes a landscaping belt around the site together
with a planted SUDS pond area and small area of landscaping to the south of
plot 16 which are considered to be appropriate in terms of general landscaping
provision on site.  A condition is recommended to ensure the landscaping and
planting is implemented (Condition 5). 
Traffic and Transport 
67 Policy 60B of LDP2 is relevant and requires that new development does not
impact on the road safety of the area.  The National Roads Development Guide
(NRDG) is also considered to be relevant.  This provides detail on parking and
access requirements.  The proposed access is to be taken from Losset Road
on the southern boundary of the site.  This is an adopted public road which
provides a westwards connection towards central Alyth and onto the B952
Commercial Street.  This provides connections to the north and also to the
south towards the A926 (Blairgowrie to Forfar) .  The existing public road
network has been reviewed by Transport Planning and is considered to be
capable of accommodation the traffic associated with this 20 house
development.

Page 12

68 Each dwelling is provided with an appropriate parking and turning area in
accordance with policy and guidance.   Transport Planning have offered no
objection to the application.   
69 A Construction Traffic Management Statement will be required by condition, to
ensure that construction traffic movement impacts are managed. (Condition
10). 
70 Furthermore, a Residential Travel Plan will also be required by condition to
encourage occupiers of the site to utilise sustainable means of transport.
(Condition 12). 
71 The proposal therefore complies with Policy 60B of the LDP2.   
Pedestrian Linkages 
72 As mentioned elsewhere there is only one point of access into the site with the
remainder of the site enclosed by existing housing.  Losset Road to the south is
identified as part of the core path network between Alyth and Glenisla golf
course to the east and the footway network proposed within the site connects
directly onto the core path.  A crossing point is proposed over the vehicular
access to ensure users of the core path are catered for in accordance with the
requirements of Policy 15 of the LDP2.  For the avoidance of any doubt a
condition is recommended to ensure that the core path is not obstructed during
construction works (Condition 8). 
Ecology 
73 Policy 41 of the LDP2 states that the Council will seek to protect and enhance
all wildlife and habitats, whether formally designated or not, considering natural
processes in the area. Planning permission will not be granted for development
likely to have an adverse effect on protected species unless clear evidence can
be provided that the ecological impacts can be satisfactorily mitigated. 
74 The submission includes an Ecological Assessment which has been reviewed
and accepted by the Council's Biodiversity Officer.  It states that the site is
limited ecological value given its grassland nature.  It does, however
recommended bio diversity enhancement measures including provision of bird
and bat boxes within the development and landscape connectivity.  The
enhancement measures can be secured by condition (Condition 6). 
75 Subject to these conditions it is considered that the proposal will meet the
requirements of Policy 41 of LDP2 in relation to ecology. 
Foul Drainage 
76 The proposal is to connect the development to the Scottish Water foul drainage
infrastructure which is appropriate and accords with the requirements of Policy
53B of the LDP2.  However, a separate application process to Scottish Water is
required to connect to their assets.  An informative is recommended to make
the developer aware of the requirement for a separate application to Scottish

Page 13

Water.  The applicant has had discussions with Scottish Water during the
assessment of the application given the concerns which have been expressed
in letters of representation and following this Scottish Water have indicated that
there is sufficient capacity with the public drainage system to accommodate the
development.   
77 The proposal is therefore considered to comply with the requirements of Policy
53B relating to foul drainage. 
Surface Water Drainage 
78 Surface Water Drainage is proposed to be catered for utilising a Sustainable
Urban Drainage System which accords with the requirements of Policy 53C of
the LDP2.  This includes a SUDS pond in the south west corner of the site
between plots 1 and 17.  An infiltration trench on the eastern side of the access
road adjacent to plot 19 is also proposed.  The Structures and Flooding Team
have indicated that this is acceptable and that the detailed design of the system
can be secured by an appropriately worded condition (Condition 7). 
Furthermore, a temporary construction surface water drainage facility will also
be secured by condition (Condition 13) to ensure surface water issues during
construction can be appropriately dealt with. 
Affordable Housing 
79 The Council's Affordable Housing Policy requires that 25% of the total number
of houses, above a threshold of 5 units, for which planning consent is being
sought is to be in the form of affordable housing. 
80 The Affordable Housing requirement is therefore 5no units (20 x 0.25). 
81 The site is located in the Strathmore Housing Market Area. In line with the
Developer Contributions & Affordable Housing Supplementary Guidance (SG),
on-site provision is preferred for larger developments (20+ houses or over) in
Auchterarder, Blairgowrie, Crieff, Kinross, Milnathort, Perth (excluding city
centre) and Scone and 10 houses or over elsewhere.   
82 The proposal involves the provision of four affordable units at the southern end
of the site adjacent to the access (plots 17-20).  A condition is recommended to
ensure these are occupied as affordable housing units in accordance with the
SG (Condition 14).  The Council's Affordable Housing Enabler has confirmed
that the provision of four units on site and the payment of a commuted sum for
the fifth required unit is acceptable.  The commuted sum within the Strathmore
Housing Market Area is £15,000.  The required commuted sum must be
secured prior to any decision notice being issued. 
Developer Contributions 
83 The Council Developer Contributions Supplementary Guidance requires a
financial contribution towards increased primary school capacity in areas where
a primary school capacity constraint has been identified. A capacity constraint
is defined as where a primary school is operating at over 80% and is likely to be

Page 14

operating following completion of the proposed development, extant planning
permissions and Local Development Plan allocations, at or above 100% of total
capacity. 
84 This proposal is within the catchment of Alyth Primary School.   Education &
Children's Services have no capacity concerns in this catchment area at this
time and therefore no developer contributions are required. 
85 The site is located out with the areas where transportation contributions are
required. 
Waste 
86 Waste storage facilities are proposed within each plot.  Furthermore, swept
path details for waste vehicles have been provided and are acceptable. 
Therefore, the arrangements for waste storage and collection are appropriate. 
Low Carbon Technology 
87 Policy 32 requires proposals for new buildings to demonstrate that at least 10%
of the current carbon reduction emissions will be met through the installation
and operation of zero and low-carbon generating technology. 
88 The properties will need to meet the standard required under Scottish Building
Standards and it is recognised that the Policy 32 requirement can be technically
achieved. The exact nature and specification of these technologies can be
verified prior to development commencing, and for the technology to be in place
prior to occupation of the buildings to ensure the objectives of LDP2 Policy 32
are met (Condition 9). 
Archaeology 
89 Perth and Kinross Heritage Trust have indicated that the application site has
archaeological potential and therefore in accordance with the requirements of
Scottish Planning Policy (SPP) and Policy 26B of the LDP2, they have
recommended that an archaeological investigation is undertaken.  This can be
secured by condition (Condition 3). 
Light Pollution 
90 Whilst the development will result in additional lighting this is not considered to
significantly alter light levels in the area given the location of the site within an
existing settlement and therefore the light levels apparent from the site are not
considered to be detrimental to the amenity of the area. 
Air Pollution 
91 The application site is located outwith the Air Quality Management Areas within
Perth and Kinross and therefore there are not considered to be any significant
concerns relating to air quality in this area.  Nevertheless, a Construction

Page 15

Management Plan will be secured by condition to ensure dust is managed
appropriately during construction (Condition 11) 
Cumulative Impact with Other Developments 
92 The Planning Act dictates that every development must be considered on its
own merits.  For the reasons outlined above this proposal is considered to
comply with the requirements of the LDP2.  Whilst there may be a degree of
impact in terms of construction traffic and how this will relate to other ongoing
developments in the local area, the impact which this has can be suitably
managed and controlled through the use of a Construction Traffic Management
Plan as required by Condition 10. 
Health Care 
93 There is an existing health centre within Alyth on New Alyth Road.  There is no
information to suggest that there is a capacity constraint at the local health
centre at this time. 
Construction Management 
94 It is unfortunately inevitable that construction operations will result in a degree
of disturbance to the local area but this is for a temporary period only.   
Therefore, in order to limit this as much as possible a Construction
Management Plan will be secured by condition (Condition 11). 
Economic Impact 
95 During the construction period, jobs will be created and sustained, supporting
indirect employment and revenue that this volume of construction activity will
generate from employees spending on local goods and services. Longer term,
additional residents to the area will support existing local employment and
services in the area. 
VARIATION OF APPLICATION UNDER SECTION 32A 
96 This application was varied prior to determination, in accordance with the
terms of section 32A of the Town and Country Planning (Scotland) Act 1997,
as amended.  The variations incorporate changes to the affordable house
types at plots 17-20 to reduce these in scale from two storey to single storey. 
Some other minor amendments were made to the layout to improve
landscaping provision. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
97 None. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
98 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.

Page 16

In this respect, the proposal is considered to comply with the approved
TAYplan 2016 and the adopted Local Development Plan 2 (2019).  Account
has been taken account of the relevant material considerations and none has
been found that would justify overriding the adopted Development Plan. 
99 Accordingly the proposal is recommended for approval subject to the following
conditions. 
RECOMMENDATION   
Approve the application 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason – This is a Planning Permission in terms of Section 58 of the Town
and Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by
conditions imposed by this decision notice. 
Reason – To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
written scheme of archaeological investigation which has been submitted by
the applicant, and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust.  Thereafter, the developer
shall ensure that the programme of archaeological works is fully implemented
including that all excavation, preservation, recording, recovery, analysis,
publication and archiving of archaeological resources within the development
site is undertaken.  In addition, the developer shall afford access at all
reasonable times to Perth and Kinross Heritage Trust or a nominated
representative and shall allow them to observe work in progress. 
Reason – The site lies adjacent to an area of archaeological interest. 
4. Prior to the commencement of any works on site, all trees on site (other than
those marked for felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be retained and protected.
Protection methods shall be strictly in accordance with BS 5837 2012: Trees
in Relation to Design, Demolition and Construction.  Protection measures,
once in place, shall remain in place for the duration of construction. 
Reason – To ensure the protection of retained trees on site.

Page 17

5. The detailed landscaping and planting scheme which is hereby approved shall
be completed within the first available planting season (October to March)
after the completion or bringing into use of the development, whichever is the
earlier.  The approved scheme shall thereafter be maintained to the
satisfaction of the Council as Planning Authority, with any planting which fails
to become established within five years being replaced in the following
planting season with others of a size and species as previously approved. 
Reason – In the interests of visual amenity; to ensure a satisfactory standard
of local environmental quality. 
6. The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (document 40 relates)
shall be fully adhered to, respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council as Planning Authority. 
Reason – In the interests of employing best practice ecology and to ensure
there is no adverse impact on any protected species as identified under the
Wildlife and Countryside Act (1981). 
7. Development shall not commence on site until a detailed sustainable urban
drainage system (SUDS) has been submitted for the written agreement of the
Council as Planning Authority, in consultation with SEPA where necessary. 
The scheme shall be developed in accordance with the technical guidance
contained in The SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall incorporate source
control. 
All works shall be carried out in accordance with the agreed scheme and be
operational prior to the bringing into use of the development. 
Reason – To ensure the provision of effective drainage for the site. 
8. The asserted right of way/core path shown which runs along Losset Road on
the immediate boundary of the site must not be obstructed during building
works or on completion of the development.  Any damage done to the route
and/or the associated signage during building works must be made good
before the development is completed or brought into use, whichever is the
earlier. 
Reason – To ensure continued public access to the public paths and in the
interests of public safety within the site. 
9. Prior to the commencement of development hereby approved, a scheme shall
be submitted to, and approved in writing by, the Council as Planning Authority
that demonstrates how at least 10% of the current carbon emissions reduction
set by the Scottish Buildings Standards will be met through the installation
and operation of low and zero-carbon technologies.  This scheme shall detail
for each building: 
a) the technology types;

Page 18

b) illustrate, through technical calculations, that these will meet at least the
10% reduction;
c)  their siting and location; and
d)  ongoing operation and maintenance. 
Once approved, the development shall be completed in accordance with the
approved scheme and no individual unit shall be occupied until the scheme
has been installed and operating. 
Reason – To embed low and zero-carbon technologies within the
development in the interest of environmental sustainability. 
10. Prior to the commencement of the development hereby approved, the
developer shall submit for the further written agreement of the Council as
Planning Authority, in consultation with the Roads Authority (Structures), a
following: 
(a)  restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used;
(b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c)  a code of conduct for HGV drivers to allow for queuing traffic to pass;
(d)  arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e)  emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f)  arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development
being deposited on the road;
(g)  arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
(h)  arrangements for signage at site accesses and crossovers and on roads
to be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i)  details of information signs to inform other road users of construction
traffic;
(j)  arrangements to ensure that access for emergency service vehicles are
not impeded;
(k) co-ordination with other significant developments known to use roads
affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m) the provision and installation of traffic counters at the applicant's
expense at locations to be agreed prior to the commencement of
construction;
(n) monitoring, reporting and implementation arrangements; 
(o) arrangements for dealing with non-compliance; and
(p) details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme.

Page 19

Reason – In the interests of pedestrian and traffic safety. 
11. Prior to the commencement of any development a Construction Management
Plan (CMP) shall be submitted to and approved in writing by the Council as
Planning Authority.  The CMP shall detail required mitigation measures and
construction method statements, including specific measures for monitoring
during construction.  The CMP should include detailed pollution avoidance
measures and dust control measures for all construction elements.  The CMP,
as approved in writing, shall be strictly adhered to for the duration of the
construction phase of the development. 
Reason – To ensure the construction phase is carefully managed to minimise
landscape impacts and mitigate for any associated impacts on neighbours,
general public and the wider environment. 
12. Prior to the development hereby approved being completed or brought into
use a Residential Travel Plan (RTP), aimed to encourage more sustainable
means of travel, shall be submitted and approved in writing by the Council.
The RTP will have particular regard to provision for walking, cycling and public
transport access to and within the site and will identify the measures to be
provided, the system of management, monitoring, review, reporting and the
duration of the plan. 
Reason – In the interest of sustainable travel and in accordance with the
policies of the adopted Perth and Kinross Local Development Plan 2019. 
13. Concurrent with the initiation of the development hereby approved and for the
duration of construction, a temporary surface water treatment facility shall be
implemented on site and maintained for the duration of the approved
development works.  The temporary surface water treatment facility shall
remain in place until the permanent surface water drainage scheme is
implemented in full. 
Reason – To ensure surface water drainage is adequately managed during
construction operations. 
14. The onsite affordable units hereby approved (Plots 17, 18, 19 and 20) shall be
occupied solely for the purposes of affordable housing, as defined within the
Council's Developer Contributions and Affordable Housing Supplementary
Guidance 2020 and Policy 20 of the Perth and Kinross Council Local
Development Plan 2 (2019), to the satisfaction of the Council as Planning
Authority. 
Reason – To comply with the Council's policy on affordable housing. 
JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan.

Page 20

PROCEDURAL NOTES 
No permission should be issued until the commuted sum relating to Affordable
Housing provision (£15,000) has been paid in full. 
INFORMATIVES 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997
(as amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended
to commence the development.  A failure to comply with this statutory
requirement would constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action being taken. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and
Country Planning (Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position. 
3. This planning permission is granted subject to conditions, some of which
require further information to be submitted to Development Management
either before works can start on site or at a certain time.  The required
information must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware that a fee is
payable in respect of each request made, though there is no limit to the
number of conditions that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information.  You should
therefore submit the required information more than two months before your
permission expires.  We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able to be dealt with
before your permission lapses. 
4. No work shall be commenced until an application for building warrant has
been submitted and approved. 
5. Application for a new postal address should be made via the Street Naming
and Numbering page on the Perth & Kinross Council website at
www.pkc.gov.uk/snn.  Please note there is a charge for this service and
submission cannot be made until the relevant Building Warrant has been
approved. 
6. The applicant is advised that in terms of Sections 56 of the Roads (Scotland)
Act 1984 he/she/they must obtain from the Council, as Roads Authority,
consent to open an existing road or footway prior to the commencement of
works.  Information on junction types, requirements for Vehicular Access
consents (VA1) and application forms are available at
www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of surface water

Page 21

should be sought at the initial stages of design from Scottish Water and the
Scottish Environment Protection Agency. 
7. The applicant is advised that the granting of planning permission does not
guarantee a connection to Scottish Water’s assets.  The applicant must make
a separate application to Scottish Water Planning & Development Services
team for permission to connect to the public wastewater system and/or water
network and all their requirements must be fully adhered to. 
8. An approved Street Lighting design is required please contact Perth & Kinross
Council Street Lighting department for further details. 
9. The applicant should be aware of the requirements of the Council's
Environment and Regulatory Services in relation to waste collection from the
site and should ensure adequate measures are provided on site to allow for
the collection of waste. 
10. The approved stove system shall be installed and thereafter operated and
maintained in accordance with the manufacturer's recommendations, such
that smoke odours are not exhausted into or escape into any neighbouring
dwellings.  Failure to do so may result in an investigation and possible action
by Environmental Health under the Environmental Protection Act 1990. 
11. The applicant is advised that in terms of Sections 21 of the Roads (Scotland)
Act 1984 he/she/they must obtain from the Council as Roads Authority Road
Construction Consent (RCC) to construct a new road prior to the
commencement of roadworks.  Advice on the disposal of surface water must
be sought at the initial stages of design from Scottish Water and the Scottish
Environmental Protection Agency.  Please note that a fee is chargeable for
the processing of RCC applications. 
12. The developer is advised to contact Sophie Nicol, Historic Environment
Manager (tel 01738 477027) Perth and Kinross Heritage Trust, to discuss
terms of reference for work required. 
Background Papers:  9 letters of representation
Contact Officer:  John Williamson 
Date: 13 January 2023 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT