PLANNING AND PLACEMAKING COMMITTEE 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth on Wednesday 23 November 2022 at
10:00am. 
Present: Councillors I Massie and G Stewart, Bailies C Ahern (Substituting for
Councillor D Illingworth) (Items 5(1)(i) and 5(1)(ii) only), C McLaren and M
Williamson, Councillors H Anderson, B Brawn, D Cuthbert, E Drysdale, I James,
B Leishman, C Reid (Items 5(1)(i) and 5(1)(ii) only) and R Watters (Items 5(1)(i) and
5(1)(ii) only). 
In Attendance: G Bissett, S Panton, L Reid, D Salman, K Smith, P Williamson and
B Wilson (all Communities); A Brown, G Fogg, J Guild and M Pasternak (all
Corporate and Democratic Services). 
Apologies: Councillor D Illingworth. 
Councillor I Massie, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed everyone present to the meeting.  Apologies were
noted as above. 
2. DECLARATIONS OF INTEREST 
Bailie M Williamson and Councillor D Cuthbert declared a non-financial
interest in Item 5(1)(i) – 21/02104/FLM. 
Councillor C Reid declared a non-financial interest in Item 5(1)(ii) –
21/01968/FLM. 
3. MINUTES 
The minute of meeting of the Planning and Placemaking Committee of
22 September 2022, be approved. 
4. DEPUTATIONS 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No. Item No.
21/02104/FLM 5(1)(i)
21/01968/FLM 5(1)(ii)
22/00546/FLL 5(2)(i)
21/01755/FLL 5(2)(ii)
21/02005/FLL 5(2)(iii)

Page 2

HAVING DECLARED AN INTEREST IN THE FOLLOWING ITEM, BAILIE M
WILLIAMSON AND COUNCILLOR D CUTHBERT, LEFT THE CHAMBER. 
5. APPLICATIONS FOR DETERMINATION 
(1) Major Applications 
(i) 21/02104/FLM Extension to quarry and associated works,
land 750 metres north east of Marlee Quarry, Essendy,
Blairgowrie 
Councillor C Shiers, Councillor T McEwan, Mr T Baynes,
objectors to the application, addressed the Committee and
answered Members’ questions.  Mr W Booth, agent, on behalf of
the applicant, addressed the Committee and answered
Members’ questions. 
Resolved:
Refuse, for the following reasons: 
The application is contrary to the Perth and Kinross Local
Development Plan 2 (2019) as follows:
1. Policies 1A, 7A(a), and 8(a), (c), and (e) due to the
adverse impacts on nearby residential amenity;
2. Policies 38A(b) and (c) as it has not been satisfactorily
demonstrated that there are public interest benefits that
outweigh any adverse effects on the conservation sites
and designations;
3. Policy 49A(a) and (i), (ii), (v) and (vi) as it has not been
satisfactorily demonstrated that there are no alternative
sources and that there will not be adverse residual effects
from the proposal. 
BAILIE M WILLIAMSON AND COUNCILLOR D CUTHBERT RETURNED TO THE
CHAMBER. 
COMMITTEE ADJOURNED FOR A SHORT BREAK AND RECONVENED AT
11:55AM. 
HAVING DECLARED AN INTEREST IN THE FOLLOWING ITEM, COUNCILLOR C
REID LEFT THE CHAMBER. 
(ii) 21/01968/FLM Formation of A9 slip road and junction
including road widening, landscaping, drainage works and
erection of replacement bridge, land at A9(T) and Shinafoot
Road, (B9062) near Auchterarder 
Councillor C Reid and Mr J Cameron, objectors to the
application, addressed the Committee and answered Members’
questions.  Ms E Farquharson-Black, Solicitor of Brodies LLP,
and Mr R Gray, Engineer of Fairhurst, both for the applicants,

Page 3

addressed the Committee and were joined by Ms N McCowan,
Land and Planning Manager of Muir Homes Ltd and Mr G Milne,
Technical and Design Director of Stewart Milne Homes, to
answer Members’ questions. 
Resolved:
Refuse, for the following reasons:
1. The development proposed is contrary to the
Auchterarder Expansion Townhead & Northeast
Development Framework as well as policy 60B of the
adopted Perth and Kinross Local Development Plan 2
(2019). 
2. The projected vehicle movement increases through
Auchterarder are detrimental to the town’s sense of
place, its health and wellbeing and may impact other
forms of active and sustainable travel methods.
Accordingly, the proposal is contrary to the Scottish
Government National Roads Development Guide 2014
and National Transport Strategy 2020. 
3. The proposed financial offset to mitigate the loss of
woodland and biodiversity within the site is considered to
set a precedent and fails to accord with the principles of
the Scottish Government Policy on Control of Woodland
Removal. The proposal is therefore contrary to Policy 41
of the adopted Perth and Kinross Local Development
Plan 2 (2019) and fails to accord with the principals of the
Perth and Kinross Planning for Nature Development
Management and Wildlife Guide April 2022. 
COUNCILLOR C REID RETURNED TO THE CHAMBER. 
COMMITTEE ADJOURNED FOR A ONE HOUR RECESS AND RECONVENED AT
2:30PM. 
(2) Local Applications 
(i) 22/00546/FLL Formation of road widening and draining
works associated with 21/01968/FLM works to A9(T) and
Shinafoot Road (B8062), Auchterarder 
Mr A McCafferty, Planning and Development Consultant of
Andrew McCafferty Associates, on behalf of the applicant,
addressed the Committee and answered Members’ questions.   
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
General
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,

Page 4

unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
2. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period (see
section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended)). 
Reason – This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019. 
Noise
3. Construction work shall be limited to Monday to Friday
07:00 to 19:00 and Saturday 08:00 to 13:00 with no noisy
works out with these times or at any time on Sundays or
Bank Holidays.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
4. Prior to the commencement of development hereby
approved, the developer shall submit a detailed scheme
and specification for the proposed mitigation acoustic
barriers on the B8062 to ensure a 10db reduction as
outlined in the Noise and Vibration Assessment Report
2060467.RSK-001-(00) dated 14 March 2022 undertaken
by RSK Environmental Ltd for the written approval of the
planning authority.  Thereafter the approved scheme for
the acoustic barriers shall be installed to the satisfaction
of the planning authority prior to the operation of the
Shinafoot Junction.
Reason – In the interests of residential amenity and
avoiding adverse direct impacts on those properties
adjoining the B8062 local road.
5. The Best Practical Means Control Measures outlined in
Section 5.3 of the hereby approved Noise and Vibration
Assessment Report 2060467RSK001-(001) dated 14
March 2022 undertaken by RSK Environmental Ltd (Plan
reference 21/01968/), shall be implemented prior to the
hereby approved development being brought into use.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality. 
6. In the event of a justified noise complaint being received
by the Council the operator shall, at its own expense,
employ a consultant approved by the Planning Authority
to carry out a noise assessment to verify compliance with
conditions 3 - 5.  The assessment will be carried out to an
appropriate methodology agreed in writing with the
Planning Authority.  If the noise assessment shows that
the noise levels do not comply with conditions 4 and 5 a
scheme of noise mitigation shall be included with the

Page 5

noise assessment, specifying timescales for the
implementation of the scheme and shall be submitted to
the Planning Authority within 28 days of the assessment. 
The mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales. 
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
Dust
7. Prior to the commencement of the development hereby
approved a Dust Management Plan (DMP) shall be
submitted to and agreed in writing by the Council as
Planning Authority in consultation with Environmental
Health. The DMP shall be adhered to throughout the
construction stage of the development and shall be
reviewed by the applicant on request of the Planning
Authority or Environmental Health.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
Biodiversity
8. The mitigation and compensation strategy recommended
action points within the hereby approved Ecological
Impact Assessment Report, prepared by Eco North
Ecological Consultants – dated 24 June 2022 shall be
fully adhered to, respected and undertaken as part of the
construction phase of development.
Reason – In the interests of protecting environmental
quality and of biodiversity.
9. No later than two months prior to the commencement of
development hereby approved, an updated Construction
Environment Management Plan (CEMP), incorporating a
Construction Method Statement (CMS), a Site Waste
Management Plan (SWMP), a Drainage Management
Statement (DMS), a Dust management Plan (DMP) and
Environmental Management Plan (EMP) detailing
pollution prevention and control measures for all phases
of the felling, construction and operation programmes
shall be submitted to and be approved in writing by the
Council as Planning Authority, in consultation with
Transport Scotland and the Council’s Biodiversity Officer. 
The Construction Environment Management Plan
(CEMP) approved via condition 8 shall incorporate
detailed pollution avoidance and mitigation measures for
all construction elements. Thereafter the development
shall be fully undertaken in accordance with the CEMP. 
Reason – In the interest of protecting environmental
quality and to mitigate the adverse impact of development
on the local environment.
Traffic and Transport
10. Two months prior to the commencement of works on the
development hereby approved, the applicant shall submit
for the written approval of the Planning Authority a

Page 6

Construction Traffic Management Plan (CTMP) which
shall include the following:
a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c) a code of conduct for HGV drivers to allow for
queuing traffic to pass; 
d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
h) arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
i) details of information signs to inform other road
users of construction traffic;
j) arrangements to ensure that access for
emergency service vehicles are not impeded;
k) co-ordination with other significant developments
known to use roads affected by construction traffic;
l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
m) the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction; 
n) monitoring, reporting and implementation
arrangements; 
o) arrangements for dealing with non-compliance;
and
p) details of HGV movements to and from the site.  
The CTMP as approved shall be strictly adhered to during
the entire site construction programme.
Reason – In the interests of vehicle and pedestrian safety.
11. At least two months prior to the commencement of works
to upgrade the B8062, including any works to the bridge
over Ruthven Water, the developer shall submit all final
road construction drawings and any engineering
specifications pertaining to these works to the Planning

Page 7

Authority, in consultation with the Roads Authority, for
written approval. No development shall commence until
the prior written approval and agreement has been
obtained.  Prior to the opening or public use of the new
southbound A9 diverge slip hereby approved, all road
infrastructure upgrade works to the B8062, including the
promoting of any amendments to the existing traffic
regulation orders, shall be complete to a design &
specification to the satisfaction of Perth and Kinross
Council as Planning Authority and in consultation with the
Roads Authority.
Reason – In the interests of road safety and to ensure
that the works meet the necessary engineering standards
for road construction.
12. The upstream splayed span of the Replacement Ruthven
Water Road Bridge hereby approved, shall be reduced by
1.15 metres in accordance with the submitted Flood Risk
Assessment prepared by Fairhurst, dated 14th March
2022. At least two months prior to the commencement of
works to replace the bridge the finalised bridge design
shall be submitted to the Council as Planning Authority, in
consultation with the Roads Authority for agreement and
written approval in accordance with condition 11. No
development shall commence until the prior written
approval and agreement has been obtained. 
Reason – To ensure the development has no significant
negative flood impacts and proceeds in accordance with
the flood risk assessment submitted. 
Justification
The proposal is considered to comply with the Development
Plan and there are no other material considerations that would
justify a departure from the relevant policies. 
Informatives
1. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
planning authority prior written notification of the date on
which it is intended to commence the development. A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action
being taken.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the planning
authority written notice of that position.
3. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and

Page 8

Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/media/48541/Flood-Risk-Flood-
Risk-
Assessment/pdf/Flood_Risk___Flood_Risk_Assessments
_adopted_March21.pdf?m=637647027940470000
4. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess. Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency. 
5. The applicant should be advised that in terms of Section
21 of the Roads (Scotland) Act 1984 they must obtain
from the Council as Roads Authority consent to construct
a new road prior to the commencement of roadworks.
Advice on the disposal of surface water must be sought
at the initial stages of design from Scottish Water and the
Scottish Environmental Protection Agency.
6. The applicant should be advised that in terms of Section
96 of the Roads (Scotland) Act 1984 a road condition
survey will be required to be agreed with the Council as
Roads Authority prior to the commencement of works. To
ensure the public road is reinstated to its present
standard.
7. All proposed structures supporting the road, or which the
developer is intending the Council adopt, will require
technical approval in accordance with the Design Manual
for Roads & Bridges standard BD 2/12 (& HD 22/08
where relevant).  Bridges and culverts shall also be
designed in accordance with the requirements contained
within Perth & Kinross Council’s Developers Guidance
Note on Flooding & Drainage.  The developer is advised
to contact Perth & Kinross Council’s Structures &
Flooding Team (tel 01738 475000, email
structuresplanning@pkc.gov.uk) for further information
and prior to commencing designs in order to ensure
technical compliance.
8. The applicant should be informed that the granting of
planning permission does not carry with it the right to
carry out works within the trunk round boundary and that
permission must be granted by Transport Scotland Roads
Directorate. Where any works are required on the trunk
road, contact details are provided on Transport
Scotland’s response to the planning authority which is
available on the Council’s planning portal.

Page 9

9. Trunk road modification works shall, in all respects,
comply with the Design Manual for Roads and Bridges
and the Specification for Highway Works published by
HMSO. The developer shall issue a certificate to that
effect, signed by the design organisation. 
10. Trunk road modifications shall, in all respects, be
designed and constructed to arrangements that comply
with the Disability Discrimination Act: Good Practice
Guide for Roads published by Transport Scotland. The
developer shall provide written confirmation of this,
signed by the design organisation.
11. The road works which are required due to the above
Conditions will require a Road Safety Audit as specified
by the Design Manual for Roads and Bridges. 
12. Any trunk road works will necessitate a Minute of
Agreement with the Trunk Roads Authority prior to
commencement Any additional works required to mitigate
the impact on the trunk road will necessitate a Legal
Agreement with the Trunk Roads Authority prior to
commencement. 
13. An application for Building Warrant may be required. 
14. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.  
(ii) 21/01755/FLL Erection of 3 dwellinghouses, 3 garages and
associated works, land 30 metres north east of Rantrie
Knowe, Drum 
Mr A Morrison, Mr D Mudie (via audioconference), Ms M Bray
(via audioconference), objectors to the application, addressed
the Committee and answered Members’ questions.  
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
General
1. This planning permission will last only for three years
from the date of this decision notice unless the
development has been started within that period.
Reason – This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)

Page 10

Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice. 
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
3. Prior to the commencement of the development hereby
approved, details of the proposed boundary treatments
for the site shall be submitted for the written agreement of
the Council as Planning Authority.  The scheme as
subsequently agreed shall be implemented prior to the
completion or bringing into use of the development,
whichever is the earlier. 
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
4. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted for the written agreement of
the Council as Planning Authority.  The scheme shall
include details of the height and slopes of any mounding
or recontouring of the site, full details of all hard
landscaping proposals including materials and installation
methods and, species, height, size and density of trees
and shrubs to be planted.  The scheme as subsequently
approved shall be carried out and completed within the
first available planting season (October to March) after
the completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.  The scheme as agreed and
implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority. 
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
5. Any planting failing to become established within five
years shall be replaced in the following planting season
with others of similar size, species and number to the
satisfaction of the Council as Planning Authority.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
6. Prior to the commencement of any works on site, all trees
on site (other than those marked for felling on the
approved plans) and those which have Root Protection
Areas which fall within the site shall be retained and
protected. Protection methods shall be strictly in
accordance with BS 5837 2012: Trees in Relation to
Design, Demolition and Construction.  Protection

Page 11

measures, once in place, shall remain in place for the
duration of construction. 
Reason – To ensure the protection of all retained trees, in
the interests of visual amenity. 
7. Prior to the commencement of the development hereby
approved, a 1:200 site plan which identifies the
Construction Exclusion Zone (CEZ) shall be submitted for
the written agreement of the Council as Planning
Authority. This plan shall ensure all fencing adheres to
BS 5837 2012: Trees in Relation to Design, Demolition
and Construction. The CEZ as subsequently agreed shall
be strictly adhered to during construction of the
development.
Reason – To ensure the protection of all retained trees, in
the interests of visual amenity. 
8. The dwellinghouses shall be designed and constructed
such that at the time of completion internal noise levels in
bedrooms from road traffic noise shall not exceed LAeq
2300-0700 30dB, with windows open.  Any bedroom
where such a level is not achievable with windows open,
sound insulating mechanical ventilators shall be installed
in addition to any acoustic trickle ventilators to be
provided.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
9. The foul drainage for the development shall be drained to
the public mains sewerage system.
Reason – To ensure appropriate drainage arrangements
are installed thereby ensuring compliance with Policy 53B
of the Local Development Plan 2019.
10. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the further written agreement of the Council
as Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance and shall
incorporate source control and shall be based upon the
information submitted and discussed with PKC Structures
and Flooding. All works shall be carried out in accordance
with the agreed scheme and be operational prior to the
bringing into use of the development. 
Reason – To ensure the provision of effective drainage
for the site. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.

Page 12

Informatives
1. Records indicate that at least part of the proposed
development site lies within a radon affected area where
the measurement/monitoring of radon gas and the
installation of mitigation measures may be required.
2. Further information on radon gas and the associated
reports that can be obtained is available at
www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/
3. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken. 
4. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.
5. No work shall be commenced until an application for
building warrant has been submitted and approved.
6. The applicant is advised that the granting of planning
permission does not guarantee a connection to Scottish
Water’s assets.  The applicant must make a separate
application to Scottish Water Planning & Development
Services team for permission to connect to the public
wastewater system and/or water network and all their
requirements must be fully adhered to.
7. Please consult the Street Naming and Numbering Officer,
The Environment Service, Perth and Kinross Council,
Pullar House, 35 Kinnoull Street, Perth PH1 5GD for a
new postal address.  The form is downloadable from
www.pkc.gov.uk and should be returned to
snn@pkc.gov.uk.
8. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.

Page 13

(iii) 21/02005/FLL Siting of 8 holiday accommodation units,
erection of ancillary building, alteration and extension to
ancillary buildings, formation of landscaping and paths,
extension to car parking and associated works, Dunkeld
House Hotel, Dunkeld 
Mr W Gunn, objector to the application, addressed the
Committee and was joined by Mr G Dimeck, Independent
Planning Consultant, to answer Members’ questions.   
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
Conditions
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period.
Reason – This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
3. The development hereby approved shall be used solely
for holiday accommodation and shall not be occupied as
the sole or main residence of any occupant.
Reason – In order to clarify the terms of the permission;
to control and restrict the use of the building.
4. Development shall not commence until a detailed
Construction Method Statement (CMS) has been
submitted to the Council as Planning Authority and
agreed in writing.  The CMS must identify measures to
prevent harmful materials entering the River Tay SAC,
which could reduce water quality and lead to a damaging
impact on the salmon, otter and lamprey interests. The
CMS should include the following:
a) pollution prevention safeguards including drainage
arrangements and the possible use of siltation
traps, settlement tanks and bunds
b) storage and disposal of materials including the
siting of stock piles, use of buffer strips and
disposal methods
c) construction site facilities including extent and
location of construction site huts, vehicles,
equipment, fuel, chemicals and materials
compound

Page 14

d) timing, duration and phasing of construction
particularly in relation to salmon and lamprey
migration/spawning.
The CMS and mitigations as agreed shall be fully
implemented as part of the planning permission. 
Reason – In order to ensure the development does not
impact negatively on the nearby Special Area of
Conservation.
5. Prior to the installation of any external lighting, the details
of all external lighting shall be submitted for the written
agreement of the Council as Planning Authority.  The
scheme shall include details of light spill, brightness of
the lighting and the proposed hours of operation.  The
agreed lighting scheme shall be implemented and
maintained in full accordance with the agreed scheme.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
6. Prior to the commencement of any works on site, an
independent and fully qualified Arboricultural Clerk of
Works (ArbCow) shall be appointed at the developers'
expense. Details of this appointment shall be subject to
the prior written agreement of the Council as Planning
Authority. The appointed person will remain in post for
the duration of the construction and shall have the
responsibility of ensuring tree protection measures are
implemented in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction, and
tree protection measures are maintained secure at all
times, and until completion of the development. In
addition, the following is required;
a) The developer's appointed ArbCow to contact the
local planning authority tree officer in order to
arrange a prestart meeting to agree on site tree
pruning works required to facilitate the
development, but before commencement of
development.
b) The developer's appointed ArbCow to contact the
local planning authority tree officer to arrange a
prestart meeting for inspection of all tree & ground
protection measures, before commencement of
development.
c) The developer's appointed ArbCow to contact the
local planning authority tree officer to agree
drainage installation method, and non-dig geocell
technique used to form the access pathway in
accordance with Chapter 14 (New Surfaces
Detailed Specification) of Roavr Environmental
Tree Report dated 10.10.21.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority

Page 15

7. The development shall be undertaken in full compliance
with the Arboricultural Method Statement by Roavr
Environmental, Tree Report dated 10.10.21 Chapter 9
(plan ref 31, 32, 33, 34) submitted and hereby approved
shall be fully adhered to, respected and undertaken as
part of the construction phase of development.
Reason – To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
8. Prior to the commencement of development, a detailed
plan that shows the exact position of the proposed
fencing, development, trees, and demarcating the
Construction Exclusion Zone, (with protective fence type
specification) shall be submitted to and agreed in writing
with the Council as Planning Authority.  The plan as
approved shall be fully adhered to, respected and
undertaken as part of the construction phase of
development.
Reason – To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
9. Prior to the commencement of development a planting
plan for the site showing augmentation planting, using
native local provenance sourced pedunculate oak,
sessile oak, silver birch, Scots pine, holly, yew, and non-
native Quercus ilex (evergreen oak), shall be submitted
op agreed in writing by the Council as Planning Authority. 
The new tree planting to be subject to protection from
vermin, including deer.  The scheme as subsequently
approved shall be carried out and completed within the
first available planting season (October to March) after
the completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.  The scheme as agreed and
implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.
Reason – In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
10. The conclusions and recommended action points within
the supporting biodiversity surveys Red Squirrel Survey
Report, Bat Survey Report, Mammal Survey and Bat
Survey of Trees Report and Ecological Appraisal by
Echoes Ecology Limited dated 29.06.22, 30.08.2022,
29.09.21, 29.09.21 (Plan ref 49, 48, 46, 45, 44) submitted
and hereby approved shall be fully adhered to, respected
and undertaken as part of the construction phase of
development, to the satisfaction of the Council as
Planning Authority.  Attention is drawn to both survey

Page 16

documents – Preliminary Ecological Appraisal Report
(Echoes Ecology Ltd, 2020) and Mammal Survey and Bat
Survey of Trees (Echoes Ecology Ltd, 2021) and need
for pre-works checks (in Section 6 - Ecological
Constraints Plan) with the results of these checks be
submitted to the Planning Authority (Condition).  In
addition, the recommendations outlined in Section 7 -
Ecological Constraints and Opportunities Plan – of the
submitted PEAR (Echoes Ecology Ltd, 2020) must be
implemented and adhered to in full also. Reference to the
measures for invasive non-native species, reptiles, and
breeding birds. Reason – In the interests of protecting
environmental quality and of biodiversity.
Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved. The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.
Reason – In the interests of protecting environmental
quality and of biodiversity.
11. Prior to the commencement of development hereby
approved, details of the location and specification of the
biodiversity enhancement measures listed in the
submitted Preliminary Ecological Appraisal Report
(September 2022) (Plan ref 47) including a barn owl box,
bat boxes, bird boxes and native planting shall be
submitted for the further written agreement of the Council
as Planning Authority. Thereafter, the agreed scheme
shall be maintained in a reasonable condition for the life
of the development, to the satisfaction of the Council as
Planning Authority.
Reason – In the interests of protecting environmental
quality and of biodiversity.
12. Storm water drainage from all paved surfaces, including
the access, shall be disposed of by means of suitable
Sustainable Urban Drainage Systems to meet the
requirements of best management practices.
Reason – To ensure the provision of effective drainage
for the site.
13. Prior to the commencement of development hereby
approved, a scheme shall be submitted to, and approved
in writing by, the Council as Planning Authority that
demonstrates how at least 10% of the current carbon
emissions reduction set by the Scottish Buildings
Standards will be met through the installation and

Page 17

operation of low and zero-carbon technologies. This
scheme shall detail for each building:
a) the technology types;
b) illustrate, through technical calculations, that these
will meet at least the 10% reduction;
c) their siting and location; and
d) ongoing operation and maintenance.
Once approved, the development shall be completed in
accordance with the approved scheme and no individual
unit shall be occupied until the scheme has been
installed and operating.
Reason – to comply with Policy 32 of the Local
Development Plan 2 (2019). 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives 
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement
action being taken. 
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.
3. An application for Building Warrant may be required.
4. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
5. The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two

Page 18

months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
6. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive. Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates. The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act.
7. Existing buildings or structures may contain nesting birds
between 1st March and 31st August inclusive. The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an
offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act. 
6. PROPOSAL OF APPLICATION NOTICES (PAN) 
(i) 22/00020/PAN Installation of a battery energy storage facility
comprising battery storage units and associated works, land 100
metres south west of Birch Grove, Killichonan 
Bailie Williamson and Councillor James requested that due
consideration is given to traffic management during construction,
specifically in relation to wide loads and requirement of a police escort
on the B8019; the design of the proposal complimenting the nearby
listed building, Rannoch Power Station; site security; light pollution and
hours of construction. 
The contents of the Head of Planning & Development’s Report were
noted.