Agenda Document Pack - Planning and Placemaking Committee - 23/11/2022

Perth and Kinross Council · 23 November 2022
Back to Planning and Placemaking Committee — 23 November 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
14/11/2022 
A hybrid meeting of the Planning and Placemaking Committee will be held in the
Council Chamber on Wednesday, 23 November 2022 at 10:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Ian Massie  (Convener)
Councillor Grant Stewart  (Vice-Convener)
Councillor Hugh Anderson
Councillor Bob Brawn
Councillor Dave Cuthbert
Councillor Eric Drysdale
Councillor David Illingworth
Councillor Ian James
Councillor Brian Leishman
Bailie Claire McLaren
Councillor Crawford Reid
Councillor Richard Watters
Bailie Mike Williamson
Page 1 of 168

Page 2

Page 2 of 168

Page 3

Planning and Placemaking Committee 
Wednesday, 23 November 2022 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE PLANNING AND
PLACEMAKING COMMITTEE OF 22 SEPTEMBER 2022
(copy herewith) 
5 - 38 
4 DEPUTATIONS   
5 APPLICATIONS FOR DETERMINATION   
5(1)  MAJOR APPLICATIONS   
5(1)(i)  21/02104/FLM - EXTENSION TO QUARRY AND ASSOCIATED
WORKS, LAND 750 METRES NORTH EAST OF MARLEE
QUARRY, ESSENDY, BLAIRGOWRIE
Report of Handling by Head of Planning and Development (copy
herewith 22/283) 
39 - 68 
5(1)(ii)  21/01968/FLM - FORMATION OF A9 SLIP ROAD AND
JUNCTION INCLUDING ROAD WIDENING, LANDSCAPING,
DRAINAGE WORKS AND ERECTION OF A REPLACEMENT
BRIDGE, LAND AT A9(T) AND SHINAFOOT ROAD (B9062)
NEAR AUCHTERARDER
Report of Handling by Head of Planning and Development (copy
herewith 22/284) 
69 - 92 
5(2)  LOCAL APPLICATIONS   
Page 3 of 168

Page 4

5(2)(i)  22/00546/FLL - FORMATION OF ROAD WIDENING AND
DRAINING WORKS ASSOCIATED WITH 21/01968/FLM
(WORKS TO A9(T) AND SHINAFOOT ROAD (B8062),
AUCHTERARDER
Report of Handling by Head of Planning and Development (copy
herewith 22/285) 
93 - 114 
5(2)(ii)  21/01755/FLL - ERECTION OF 3 DWELLNGHOUSES, 3
GARAGES AND ASSOCIATED WORKS, LAND 30 METRES
NORTH EAST OF RANTRIE KNOW, DRUM
Report of Handling by Head of Planning and Development (copy
herewith 22/286) 
115 - 134 
5(2)(iii)  21/02005/FLL - SITING OF 8 HOLIDAY ACCOMMODATION
UNITS, ERECTION OF ANCILLARY BUILDING,
ALTERATIOSN AND EXTENSION TO ANCILLARY
BUILDINGS, FORMATION OF LANDSCAPING AND PATHS,
EXTENSION TO CAR PARKING AND ASSOCIATED WORKS,
DUNKELD HOUSE HOTEL, DUNKELD
Report of Handling by Head of Planning and Development (copy
herewith 22/287) 
135 - 158 
6 PROPOSAL OF APPLICATION NOTICES (PAN)   
6(i)  22/00020/PAN - INSTALLATION OF A BATTERY ENERGY
STORAGE FACILITY COMPRISING BATTERY STORAGE
UNITS AND ASSOCIATED WORKS, LAND 100 METRES
SOUTH WEST OF BIRCH GROVE, KILLICHONAN
Pre-Application Report by Head of Planning and Development
(copy herewith 22/288) 
159 - 168 
Page 4 of 168

Page 5

PLANNING AND PLACEMAKING COMMITTEE 
Minute of hybrid meeting of the Planning and Placemaking Committee held in
Council Chambers, 2 High Street, Perth on Thursday 22 September 2022 at 9:30am. 
Present:  Councillors I Massie, H Anderson, B Brawn, D Cuthbert, E Drysdale,
D Illingworth, I James, K Harvey (substituting for Councillor R Watters), B Leishman,
Bailie C McLaren, Councillors C Reid, G Stewart, and Bailie M Williamson. 
In Attendance: K Smith, P Williamson, G Peebles, J Torrance, L MacLean and
L Reid (all Communities); C Elliott, J Guild, A Brown and M Pasternak (all Corporate
and Democratic Services). 
Apologies: Councillor R Watters. 
Councillor I Massie, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed everyone present to the meeting.  Apologies were
noted as above. 
2. DECLARATIONS OF INTEREST 
In terms of the Councillor’s Code of Conduct, no Declarations of Interest were
noted.   
3. MINUTES 
The minute of meeting of the Planning and Placemaking Committee of
10 August 2022, be approved as a correct record subject to Item 2. and Item 6(1)(ii)
being altered to indicate Councillors B Brawn and B Leishman declared an interest
and not Councillor D Illingworth. 
4. DEPUTATIONS 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No. Item No.
22/00102/FLM 5(1)(i)
22/00832/FLM 5(1)(ii)
22/00746/FLM 5(1)(iii)
22/00334/FLL 5(2)(i)
22/00711/FLL 5(2)(ii)          
3
Page 5 of 168

Page 6

5. APPLICATIONS FOR DETERMINATION 
(1) Major Applications 
(i) 22/00102/FLM Erection of 4 replacement poultry rearing
sheds, ancillary facilities, formation of SUDS pond,
landscaping and associated works, Knappilands,
Strathallan, Crieff 
Mr I Richmond, applicant, addressed the Committee and
answered Members’ questions. 
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
Conditions
General
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
Contamination
2. Development shall not commence on site until an
evaluation for the potential of the site to be affected by
contamination by a previous use has been undertaken
and, as a minimum, a Preliminary Risk Assessment
(Phase 1 Desk Study) has been submitted for
consideration and accepted by the Council as Planning
Authority. If the preliminary risk assessment identifies the
need for further assessment, an intrusive investigation
shall be undertaken to identify;
I.  the nature, extent and type(s) of contamination on
the site
II.  measures to treat/remove contamination to ensure
the site is fit for the use proposed
III. measures to deal with contamination during
construction works
IV. condition of the site on completion of
decontamination measures.
Prior to the completion or bringing into use of any part of
the development the measures to decontaminate the site
shall be fully implemented in accordance with the scheme
subsequently agreed by the Council as Planning
Authority. Verification that the scheme has been fully
implemented must also be submitted to the Council as
Planning Authority.
Page 6 of 168

Page 7

Reason – In order to deal with any potential
contamination of the site as a result of it’s former use.
Residential Amenity
3.  All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason – In order to safeguard the residential amenity of
the area.
4.  Should any aspect of the development result in verified
noise complaint determined by the Council as Planning
Authority in consultation with Environmental Health,
within 14 days of written request by the Council as
Planning Authority, the applicant shall arrange for a Noise
Impact Assessment by a suitably qualified noise
consultant with the scope and timescale submitted to and
agreed in writing with the Council as Planning Authority in
consultation with Environmental Health. Thereafter any
agreed mitigation measures shall be implemented to
ameliorate the nuisance.
Reason – In order to safeguard the residential amenity of
the area.
5.  The poultry buildings shall not be occupied (or otherwise
become operational) until an operational plan for the
management and control of potential nuisances (including
noise, odour, air quality (dust), flies and other pests) that
would be liable to arise at the site as a consequence of
and/or in relation to, the operation of the poultry buildings
hereby approved, has first been submitted to, and
approved in writing by the Planning Authority. Thereafter
the approved nuisance control management plan shall be
implemented as part of the development.
Reason – In order to safeguard the residential amenity of
the area.
6.  No deliveries or uplifting shall take place between the
hours of 11:00pm and 6:30am on any day. 
Reason – In order to safeguard the residential amenity of
the area.
7. Audible vehicle reversing alarms shall be operated on the
method that they only emit the warning, if necessary, e.g.,
on an infrared signal which detects persons to the rear of
the vehicle.
Reason – In order to safeguard the residential amenity of
the area.
8.  Should any aspect of the development result in verified
odour complaint determined by the Council as Planning
Authority in consultation with Environmental Health,
Page 7 of 168

Page 8

within 14 days of written request by the Council as
Planning Authority, the applicant shall arrange for an
Odour Impact Assessment (OIA) to be carried out by a
qualified consultant. The OIA findings shall be submitted
for the written approval of the Council as Planning
Authority, in consultation with Environmental Health and
must draw conclusions and make recommendations as
necessary. Thereafter any necessary measures to
ameliorate the odour nuisance should be put in place,
and a new or revised Operational Management Plan must
be submitted to the council within a specified agreed
timescale.
Reason – In order to safeguard the residential amenity of
the area.
Roads and Access 
9.  Prior to the development hereby approved being
completed or brought into use, the vehicular access shall
be formed in accordance with Perth & Kinross Council's
Road Development Guide Type E Figure 5.7 access
detail, of Type B Road construction detail.  The Type B
Road construction detail shall continue to the entrance for
a minimum distance of 15 metres from the edge of the
carriageway.
Reason – In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
10.  Prior to commencement of any development on site, a
detailed design for the proposed secure covered cycle
parking facility for a minimum of 6 cycles shall be
submitted to and approved in writing by the Planning
Authority in consultation with the Roads Authority.  The
applicant can seek guidance on the detailed design and
positioning of the cycle storage from Transport Scotland's
Cycling by Design 2021.  The cycle parking, as approved
in writing, shall be implemented in accordance with the
approved details to the satisfaction of the Council as
Planning Authority prior to the development being brought
into use.
Reason - To encourage active travel and meet advice
within Scottish Planning Policy on transport.
11. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (CTMS) which
shall include the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
Page 8 of 168

Page 9

(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road
users of construction traffic;
(j) arrangements to ensure that access for
emergency service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) monitoring, reporting and implementation
arrangements;
(n) arrangements for dealing with non-compliance;
and
(o) details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to during
the entire site construction programme.
Reason – in the interest of proper site management.
Landscape
12.  The detailed landscaping and planting scheme which is
hereby approved shall be completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier.  The approved scheme shall
thereafter be maintained, with any planting which fails to
become established within five years being replaced in
the following planting season with others of a size and
species as previously approved.
Page 9 of 168

Page 10

Reason – In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
13.  Any planting failing to become established within five
years shall be replaced in the following planting season
with others of similar size, species and number.
Reason – To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
Biodiversity 
14.  The conclusions and recommended action points within
the supporting ecology surveys submitted and hereby
approved (drawing numbers 22/00102/29 and
22/00102/30) shall be fully adhered to, respected and
undertaken as part of the construction phase of
development, to the satisfaction of the Council as
Planning Authority.
Reason – In the interests of protecting environmental
quality and of biodiversity.
15.  An updated bat survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the bat survey approved
as part of this permission.  The updated survey shall be
submitted to the Council as Planning Authority for written
agreement and works shall not commence until after such
written agreement has been issued by the Council.
Reason – In the interests of protecting environmental
quality and of biodiversity.
16.  Prior to the commencement of the development hereby
approved, an Invasive Non-Native Species Control Plan
shall be provided for the written approval of the Council
as Planning Authority. The plan shall contain measures to
eradicate and control invasive non-native species.
Thereafter, the agreed scheme shall be implemented in
full accordance during the construction phase.
Reason – In the interests of protecting environmental
quality and of biodiversity.
17.  Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved. The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.
Reason – In order to prevent animals from being trapped
within any open excavations.
Page 10 of 168

Page 11

18.  Lighting will be designed and positioned in such a way as
to prevent light spillage into adjacent watercourses and
woodland.
Reason – In the interests of protecting environmental
quality and of biodiversity. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period (see
section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action
being taken.
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position.
4.  No work shall be commenced until an application for
building warrant has been submitted and approved.
5.  The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
6.  Existing buildings or structures may contain nesting birds
between 1st March and 31st August inclusive. The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an
offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act.
7. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
Page 11 of 168

Page 12

at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
8. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
9. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance.  In accordance
with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity
of the site of the development 
• Readily visible to the public 
• Printed on durable material.
10. Further information on the need for and level of provision
of Changing Places Toilet Facilities can be found in
section 41B of the Town and Country Planning (Scotland)
Act 1997, the Town and Country Planning (Changing
Places Toilet Facilities) (Scotland) Regulations 2020 and
the associated Circular 1/2020: Changing Places Toilets
Regulations.
11.  The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste. 
(ii) 22/00832/FLM Formation of a 49MW battery energy storage
facility comprising battery storage units, ancillary
buildings, vehicular access, landscaping and associated
works, Land 140 metres North East of Jamesfield Organic
Centre, Newburgh 
Ms C Quinney, objector to the application, and Mr P Kavanagh,
applicant, via audioconference, addressed the Committee and
answered Members’ questions.
Page 12 of 168

Page 13

Resolved:
Grant, subject to the following conditions, terms and
informatives: 
Conditions
General
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents. 
Noise
2. All hereby approved plant or equipment shall be so
enclosed, attenuated and/or maintained such that any
noise therefrom shall not exceed Noise Rating 35
between 0700 and 2300 hours daily, or Noise Rating 20
between 2300 and 0700 hours daily, within any
neighbouring residential property, with all windows
slightly open, when measured and/ or calculated and
plotted on a rating curve chart.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
3.  In the event of a justified noise complaint being received
by the Council the operator shall, at its own expense,
employ a consultant approved by the Planning Authority
to carry out a noise assessment to verify compliance with
Condition 2.  The assessment will be carried out to an
appropriate methodology agreed in writing with the
Planning Authority.  If the noise assessment shows that
the noise levels do not comply with Condition 2 a scheme
of noise mitigation shall be included with the noise
assessment, specifying timescales for the implementation
of the scheme, and shall be submitted to the Planning
Authority within 28 days of the assessment.  The
mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales. 
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality. 
Lighting 
4. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of residential property and that light spillage beyond the
boundaries of the site is minimised. In association, the
operation of the lighting shall be controlled so as to only
be triggered by motion within the security fenced
boundaries of the site. 
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.  
Page 13 of 168

Page 14

Roads and Transport 
5. Prior to the commencement of works associated to the
hereby approved development, a Construction Traffic
Management Scheme (TMS) shall be submitted for the
written approval of the Planning Authority, such TMS
shall include details of the following: 
(a)  restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b)  timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c)  a code of conduct for HGV drivers to allow for
queuing traffic to pass; 
(d)  arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e)  emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f)  arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
(g)  arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h)  arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
(i)  details of information signs to inform other road
users of construction traffic;
(j)  arrangements to ensure that access for
emergency service vehicles are not impeded;
(k)  co-ordination with other significant developments
known to use roads affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m)  the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction; 
(n)  monitoring, reporting and implementation
arrangements; 
(o)  arrangements for dealing with non-compliance;
and
(p)  details of HGV movements to and from the site.  
The TMS as approved shall be strictly adhered to during
the entire site construction programme all to the
satisfaction of the Council as Planning Authority.
Page 14 of 168

Page 15

Reason – In the interests of road safety.
6. The proposed route for any abnormal loads on the trunk
road and local road networks must be approved by the
relevant roads authority prior to the movement of any
abnormal load. Any accommodation measures required
including the removal of street furniture, junction
widening, traffic management must similarly be approved.
The details of any abnormal load movements required,
including any accommodation measures necessary, shall
be submitted to and agreed in writing by the Planning
Authority, in consultation with Transport Scotland and the
Transport Planning. Any request for approval shall be
submitted at least two months prior to the proposed load
movement.
Reason – To ensure that the transportation of abnormal
loads will not have any detrimental effect on the trunk
road network.
7. Any additional signing or temporary traffic control
measures deemed necessary due to the size or length of
loads being delivered to the development hereby
approved must be undertaken by a recognised Quality
Assured traffic management consultant. The details of
any temporary traffic control measures shall be submitted
to and agreed in writing by the Planning Authority, in
consultation with Transport Scotland and Transport
Planning. Any request for such approval shall be
submitted at least two months prior to the proposed
temporary control measured being implemented.
Reason – To ensure that the transportation of abnormal
loads will not have any detrimental effect on the trunk
road network.
External Finishing Colour 
8. Prior to the commencement of the development hereby
approved, details of the recessive colour of the proposed
external finishing materials to be used for the hereby
approved development components (i.e. battery storage
containers, transformers, customer switch rooms, DNO
Switchgear etc) shall be submitted to and agreed in
writing by the Council as Planning Authority.  The scheme
as agreed shall be implemented prior to the completion or
bringing into use of the development, whichever is the
earlier.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
Biodiversity
9. The detailed landscaping and planting report (plan
22/00832/22) which is hereby approved shall be
completed within the first available planting season
(October to March) after the completion or bringing into
use of the development, whichever is the earlier.  The
Page 15 of 168

Page 16

approved scheme shall thereafter be maintained, with
any planting which fails to become established within five
years being replaced in the following planting season with
others of a size and species as previously approved.  
Reason – In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
Private Water Supply 
10. Prior to the commencement of the development hereby
approved, details of the location and measures proposed
for the safeguarding and continued operation, or
replacement, of any septic tanks and soakaways, private
water sources, private water supply storage facilities
and/or private water supply pipes serving properties in
the vicinity, sited within and running through the
application site, shall be submitted to and approved in
writing by the Council as Planning Authority.  The
subsequently agreed protective or replacement measures
shall be put in place prior to the development being
brought into use and shall thereafter be so maintained
insofar as it relates to the development hereby approved.
Reason – In the interests of protecting any existing
private water infrastructure and to ensure the
development compliance with the Water Scotland Act
1980. 
Soil Management
11. All soils excavated in the course of the development
hereby approved shall be retained onsite and repurposed
unless otherwise approved in writing by the Council as
Planning Authority. Prior to the development hereby
approved commencing, a Soil Management Statement
shall be submitted to the Planning Authority for approval
in writing, this Statement shall set out the extent of any
excavation works to be undertaken and how soils shall be
reused and or managed onsite. All excavation and
repurposing of soil shall then proceed in accordance with
the agreed statement.
Reason – In the interests of soil protecting and
management in accordance with Policy 51 of the LDP2.
Facility Lifespan 
12. In the event the hereby approved development fails to
store electricity on a commercial basis for a continuous
period of 12 months, then it shall be deemed to have
permanently ceased to be required.  In such an event the
development shall be decommissioned, and the relevant
parts of the site reinstated within such timescale as
agreed in writing by the Council as Planning Authority.
Reason – To ensure the facility is removed from the site
at the end of its operational life, and to protect the
Page 16 of 168

Page 17

character of the countryside, the visual amenity of the
area and nature conservation interests 
Justification
The proposal is considered to comply with the Development Plan
and there are no other material considerations that would justify
a departure from the relevant policies. 
Informatives
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period (see
section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action
being taken. 
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position.
4. An application for Building Warrant may be required.
5. The applicant is advised to refer to Perth & Kinross
Council’s Supplementary guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
6. The applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended, it is an offence to
remove, damage or destroy the nest of any wild birds
while that nest is in use or being built. Planning consent
for a development does not provide a defence against
prosecution under this act.
7. The applicant is reminded that, should any protected
species be present a licence may be required from
Scottish Natural Heritage to disturb a protected species.
Failure to obtain a licence may constitute a criminal act
under the Habitats Regulations and penalties are severe
for non-compliance.
8. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
Page 17 of 168

Page 18

notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity of
the site of the development 
• Readily visible to the public 
• Printed on durable material.
9. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can start
on site or at a certain time. The required information must
be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk. Please be aware
that a fee is payable in respect of each request made,
though there is no limit to the number of conditions that
can be discharged in a single request. The Fees Charter is
available on our website www.pkc.gov.uk.The Council has
two months to consider the information. You should
therefore submit the required information more than two
months before your permission expires. We cannot
guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with
before your permission lapses.
10. The applicant should ensure that any existing wayleaves
for maintenance or repair to existing private water supply
or septic drainage infrastructure in the development area
are honoured throughout and after completion of the
development.
11. The applicant shall ensure the private water supply for the
dwellinghouse/ development complies with the Water
Scotland Act 1980 (Section 63), The Private Water
Supplies (Scotland) Regulations 2006 and The Water
Intended for Human Consumption (Private Supplies)
(Scotland) Regulations 2017.  Detailed information
regarding the private water supply, including the nature,
location and adequacy of the source, any storage tanks/
pipework and the filtration and disinfection treatment
proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted to
Perth and Kinross Council Environmental Health in line
with the above Act and Regulations. 
(iii) 22/00746/FLM Formation of an up to 49.99MW energy
storage compound comprising battery storage units,
ancillary buildings, landscaping and associated works,
Land 60 metres North of Abernethy Cemetery, Newburgh
Road, Abernethy 
Page 18 of 168

Page 19

Ms C Quinney, objector to the application, Mr A Pringle,
applicant, and Mr D Grierson, agent, addressed the Committee
and answered Members’ questions. 
Motion (Councillors E Drysdale and D Cuthbert) 
Refuse, as the application is contrary to:
(1) the Perth and Kinross Local Development Plan 2 (2019)
Policy 1B(b): Placemaking as the proposal would be
predominant and visible within the wider landscape area,
and;
(2) the Perth and Kinross Local Development Plan 2 (2019)
Policy 50: Prime Agricultural Land as the proposal
involves the loss of prime agricultural land.  It has not
been satisfactorily demonstrated the proposal is
necessary in this location. 
Amendment (Councillors B Brawn and B Leishman) 
Grant, subject to the following conditions, terms and
informatives: 
General 
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
Noise 
2. All hereby approved plant or equipment shall be so
enclosed, attenuated and/or maintained such that any
noise therefrom shall not exceed Noise Rating 35
between 0700 and 2300 hours daily, or Noise Rating 20
between 2300 and 0700 hours daily, within any
neighbouring residential property, with all windows
slightly open, when measured and/ or calculated and
plotted on a rating curve chart.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
3. In the event of a justified noise complaint being received
by the Council the operator shall, at its own expense,
employ a consultant approved by the Planning Authority
to carry out a noise assessment to verify compliance with
Condition 2.  The assessment will be carried out to an
appropriate methodology agreed in writing with the
Planning Authority.  If the noise assessment shows that
the noise levels do not comply with Condition 2 a scheme
of noise mitigation shall be included with the noise
assessment, specifying timescales for the implementation
Page 19 of 168

Page 20

of the scheme and shall be submitted to the Planning
Authority within 28 days of the assessment.  The
mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales.  
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
Lighting 
4. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of residential property and that light spillage beyond the
boundaries of the site is minimised. In association, the
operation of the lighting shall be controlled so as to only
be triggered by motion within the security fenced
boundaries of the site. 
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
Roads and Transport 
5. Prior to the commencement of works associated to the
hereby approved development, a Construction Traffic
Management Scheme (TMS) shall be submitted for the
written approval of the Planning Authority, such TMS
shall include details of the following: 
a. restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b. timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c. a code of conduct for HGV drivers to allow for queuing
traffic to pass; 
d. arrangements for liaison with the Roads Authority
regarding winter maintenance;
e. emergency arrangements detailing communication
and contingency arrangements in the event of vehicle
breakdown;
f. arrangements for the cleaning of wheels and chassis
of vehicles to prevent material from construction sites
associated with the development being deposited on
the road;
g. arrangements for cleaning of roads affected by
material deposited from construction sites associated
with the development;
h. arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for pedestrians,
cyclists and equestrians;
i. details of information signs to inform other road users
of construction traffic;
Page 20 of 168

Page 21

j. arrangements to ensure that access for emergency
service vehicles are not impeded;
k. co-ordination with other significant developments
known to use roads affected by construction traffic;
l. traffic arrangements in the immediate vicinity of
temporary construction compounds;
m. the provision and installation of traffic counters at the
applicant's expense at locations to be agreed prior to
the commencement of construction; 
n. monitoring, reporting and implementation
arrangements; 
o. arrangements for dealing with non-compliance; and
p. details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during
the entire site construction programme all to the
satisfaction of the Council as Planning Authority.
Reason – In the interests of road safety.
6. The details of any abnormal load movements required,
including any accommodation measures necessary, shall
be submitted to and agreed in writing by the Planning
Authority, in consultation with Transport Scotland and the
Councils Transport Planning team. Any request for
approval shall be submitted at least two months prior to
the proposed load movement.
Reason – To ensure that the transportation of abnormal
loads will not have any detrimental effect on the local or
trunk road network
7. Any additional signing or temporary traffic control
measures deemed necessary due to the size or length of
loads being delivered to the development hereby
approved must be undertaken by a recognised Quality
Assured Traffic Management Consultant. The details of
any temporary traffic control measures shall be submitted
to and agreed in writing by the Planning Authority, in
consultation with Transport Scotland and the Councils
Transport Planning team. Any request for such approval
shall be submitted at least two months prior to the
proposed temporary control measured being
implemented.
Reason – To ensure that the transportation of abnormal
loads will not have any    detrimental effect on the trunk
road network
External Finishing Colour 
8. Prior to the commencement of the development hereby
approved, details of the recessive colour of the proposed
external finishing materials to be used for the hereby
approved development components (i.e., battery storage
containers, transformers, DNO Switchgear, perimeter
fencing etc) shall be submitted to and agreed in writing by
the Council as Planning Authority.  The scheme as
Page 21 of 168

Page 22

agreed shall be implemented prior to the completion or
bringing into use of the development, whichever is the
earlier.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
Biodiversity 
9. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted to and approved in writing
by the Planning Authority.  The scheme shall include
details of the height and slopes of any mounding or
recontouring of the site, full details of all hard landscaping
proposals including materials and installation methods
and, species, height, size and density of trees and shrubs
to be planted.  The scheme as subsequently approved
shall be carried out and completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.  The scheme as agreed and
implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.  
Reason – In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
Private Water Supply
10. Prior to the commencement of the development hereby
approved, details of the location and measures proposed
for the safeguarding and continued operation, or
replacement, of any septic tanks and soakaways, private
water sources, private water supply storage facilities
and/or private water supply pipes serving properties in
the vicinity, sited within and running through the
application site, shall be submitted to and approved in
writing by the Council as Planning Authority.  The
subsequently agreed protective or replacement measures
shall be put in place prior to the development being
brought into use and shall thereafter be so maintained
insofar as it relates to the development hereby approved.
Reason – In the interests of protecting any existing
private water infrastructure and to ensure the
development compliance with the Water Scotland Act
1980.
Soil Management 
11. All soils excavated in the course of the development
hereby approved shall be retained onsite and repurposed
unless otherwise approved in writing by the Council as
Planning Authority. Prior to the development hereby
Page 22 of 168

Page 23

approved commencing, a Soil Management Statement
shall be submitted to the Planning Authority for approval
in writing, this Statement shall set out the extent of any
excavation works to be undertaken and how soils shall be
reused and or managed onsite. All excavation and
repurposing of soil shall then proceed in accordance with
the agreed statement.
Reason: In the interests of appropriately managing prime
quality soils and minimising the long-term impacts of
developing the site in accordance with Policy 51 of the
LDP2.
Archaeology 
12. Development shall not commence until the developer has
secured the implementation of an archaeological
watching brief, to be carried out by an archaeological
organisation acceptable to the Council as Planning
Authority, during development work. The retained
archaeological organisation shall be afforded access at
all reasonable times and allowed to record and recover
items of interest and finds. The name of archaeological
organisation retained by the developer shall be given to
the Planning Authority and Perth and Kinross Heritage
Trust in writing not less than fourteen days before the
commencement date provided in the Notice of Initiation of
Development.   
Reason – To ensure archaeological monitoring is carried
out to safeguard and record any archaeological remains
within the development area.
Facility Lifespan 
13. In the event the hereby approved development fails to
store electricity on a commercial basis for a continuous
period of 12 months, and or at the end of life for the
development (50 years from the commencement of
electricity storage) it shall be deemed to have
permanently ceased to be required.  In either event the
development shall be decommissioned, and the relevant
parts of the site reinstated within such timescale as
agreed in writing by the Council as Planning Authority.
Reason – To ensure the facility is removed from the site
at the end of its operational life, and to protect the
character of the countryside, the visual amenity of the
area and nature conservation interests. 
Justification
The proposal is considered as a minor departure to the
Development Plan as there are material circumstances that
would justify a departure from relevant policies 1B and 50 of the
LDP2.   
Page 23 of 168

Page 24

Informatives
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period (see
section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action
being taken. 
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the planning
authority written notice of that position.
4. An application for Building Warrant may be required.
5. The applicant is advised to refer to Perth & Kinross
Council’s Supplementary guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
6. The applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended, it is an offence to
remove, damage or destroy the nest of any wild birds
while that nest is in use or being built. Planning consent
for a development does not provide a defence against
prosecution under this act.
7. The applicant is reminded that, should any protected
species be present a licence may be required from
Scottish Natural Heritage to disturb a protected species.
Failure to obtain a licence may constitute a criminal act
under the Habitats Regulations and penalties are severe
for non-compliance.
8. This development will require the 'Display of notice while
development is carried out', under Section 27C (1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013. The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. According to
Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity of
the site of the development.
• Readily visible to the public.
• Printed on durable material.
Page 24 of 168

Page 25

9. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time. The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk. Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request. The Fees
Charter is available on our website www.pkc.gov.uk.  The
Council has two months to consider the information. You
should therefore submit the required information more
than two months before your permission expires. We
cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
10. The developer is advised to contact Sophie Nicol, Historic
Environment  Manager (Tel: 01738 477027) Perth and
Kinross Heritage Trust, to discuss  terms of
reference for work required.
11. The applicant should ensure that any existing wayleaves
for maintenance or  repair to existing private water supply
or septic drainage infrastructure in the development area
are honoured throughout and after completion of the
development.
12. The applicant shall ensure the private water supply for
the dwellinghouse/ development complies with the Water
Scotland Act 1980 (Section 63), The Private Water
Supplies (Scotland) Regulations 2006 and The Water
Intended for Human Consumption (Private Supplies)
(Scotland) Regulations 2017.  Detailed information
regarding the private water supply, including the nature,
location and adequacy of the source, any storage tanks/
pipework and the filtration and disinfection treatment
proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted
to Perth and Kinross Council Environmental Health in line
with the above Act and Regulations.
13. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.   
Page 25 of 168

Page 26

In terms of Standing Order 21.5 a roll call vote was taken. 
5 members voted in accordance with the Motion as follows:
Councillors D Cuthbert, E Drysdale, I James, C Reid and Bailie
Williamson. 
7 members voted in accordance with the Amendment as follows:
Councillors H Anderson, B Brawn, D Illingworth, B Leishman,
Bailie C McLaren, Councillors I Massie and G Stewart. 
In terms of Standing Order 24.1, Councillor K Harvey was
unable to participate in the taking of a decision on this item due
to leaving the Chambers during discussion. 
Resolved:
In accordance with the Amendment. 
COMMITTEE ADJOURNED FOR A SHORT BREAK AT THIS POINT 
(2) Local Applications 
(i) 22/00334/FLL Erection of shelter building and acoustic
fence, formation of clay pigeon shooting range and earth
bunds (in part retrospect), Crieff Hydro Hotel, Ferntower
Road, Crieff 
Mr R Percival, Mr A Birnie, Ms A Crichton, objectors to the
application, addressed the Committee and answered members
questions.  Mr K Campbell, General Manager of Crieff Hydro
Hotel, James Denholm, agent, both for the applicants,
addressed the Committee and were joined by Mr D Chapman,
agent, to answer Members’ questions. 
Motion (Councillors B Brawn and C Reid) 
Grant, subject to the following conditions and terms: 
Conditions
1. Permission is hereby granted for a limited period until 22
September 2025. 
Reason – In view of the nature of the proposed
development, and to enable the Planning Authority to
review the circumstances pertaining to the proposal
within a reasonable period of time. 
2. Noise from operations on site shall not exceed L A90,1 hour
background noise level plus 5dB (A) when measured at
any residential property.
Reason – In order to safeguard the residential amenity of
the area.
Page 26 of 168

Page 27

3. No clay pigeon shooting is hereby permitted on site until a
1.5-metre-high acoustic fence is installed in line with the
recommendation of Noise Assessment L-8112C-DJC-
RGM dated 20 January 2022 and drawing No 04 and 07.
Reason – In order to safeguard the residential amenity of
the area.
4. No clay pigeon shooting is hereby permitted on this site
until the enclosure from which shooting will take place has
been acoustically insulated in accordance with drawing 05
such that the walls, roof, and external wing walls of the
enclosure have been clad with noise insulating material,
the details shall be first submitted to and approved in
writing by the Planning Authority in consultation with
Environmental Health. 
Reason – In order to safeguard the residential amenity of
the area.
5. Within one month of the completion of the following
mitigation measures; acoustic insulation of the shooting
enclosure and erection of acoustic fence at the approved
locations; a Noise Impact Assessment shall be
undertaken by a suitably qualified person and the Report
submitted to, and approved in writing by, the Planning
Authority. The Report shall summarise the findings of the
Noise Impact Assessment and make recommendations
for further mitigation works if the noise of shooting is
found to be over 55dB at the nearest noise sensitive
property. Once approved, any required mitigation must be
implemented in accordance with the approved details
within 30 days, unless otherwise first agreed in writing by
the Planning Authority.
Reason – In order to safeguard the residential amenity of
the area.
6. No clay pigeon shooting shall take place on the site other
than between the hours of 10:00 to 17:00 hours Monday
to Friday and 11:00 hours to 17:00 hours Saturday and
Sunday. 
Reason – In order to safeguard the residential amenity of
the area.
7. No clay pigeon shooting shall take place unless and until
the exclusion zone is clearly marked out on site, and
warning signs are erected on the access track to the site,
details of which shall first be approved in writing by the
Planning Authority. Thereafter, the approved scheme shall
be implemented prior to the first use of the development
and retained in place for the duration of the use of the
land for clay target shooting.
Reason – In order to safeguard the general public 
8. Only low noise cartridges as referenced in the Noise
Impact Assessment (plan ref 09) shall be used for the clay
Page 27 of 168

Page 28

pigeon shooting and all shooting at the site must be within
the shooting enclosure at all times.
Reason – In order to safeguard the residential amenity of
the area.
9. In the event of a justified noise complaint being received
by the Council the operator shall, at its own expense,
employ a consultant approved by the Planning Authority
to conduct a noise assessment to verify compliance with
the CIEH men shooting noise level below 55dB(A) and
condition1 above. The assessment will be conducted to
an appropriate methodology agreed in writing with the
Planning Authority. If the noise assessment shows that
the noise levels do not comply with CIEH 55dB or
condition 1, a scheme of noise mitigation shall be included
with the noise assessment, specifying timescales for the
implementation of the scheme, and shall be submitted to
the Planning Authority with 28 days of the assessment.
The mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales.
Reason – In order to safeguard the residential amenity of
the area. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Amendment (Councillors D Cuthbert and B Leishman)  
Refuse, as the proposal is contrary to the Perth and Kinross
Local Development Plan 2 (2019), Policy 8(c): Rural Business
and Diversification and Policy 56: Noise Pollution, as there has
been a failure to satisfactorily demonstrate that noise annoyance
will not occur at noise sensitive receptors. 
In terms of Standing Order 21.5 a roll call vote was taken.  
7 members voted in accordance with the Motion as follows:
Councillors B Brawn, D Illingworth, I James, Bailie C McLaren,
Councillors I Massie, C Reid and G Stewart  
6 members voted in accordance with the Amendment as follows:
Councillors H Anderson, D Cuthbert, E Drysdale, K Harvey, B
Leishman and Bailie M Williamson.  
Resolved:
In accordance with the Motion. 
Page 28 of 168

Page 29

(ii) 22/00711/FLL Erection of visitor centre comprising crannog
roundhouse, demonstration structures, café/retail,
museum/office, car and coach parking, landscaping and
associated works, Land 60 metres south east of Drummond
House, Kenmore 
Mr William Duff, objector, via audio conference, addressed the
Committee and answered Members’ questions.  Mr N Grant and
Mr M Benson, applicants, addressed the Committee and were
joined by Mr S Mackellar, agent, to answer Members’ questions. 
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
2. Prior to the commencement of any works on site, all trees
on site (other than those marked for felling on the
approved plans) and those which have Root Protection
Areas which fall within the site shall be retained and
protected. Protection methods shall be strictly in
accordance with BS 5837 2012: Trees in Relation to
Design, Demolition and Construction and in accordance
with the mitigation outlined within the approved tree
survey (doc ref:52).  Protection measures, once in place,
shall remain in place for the duration of construction.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
3. All trees on site, other than those marked for felling on
the approved plans, shall be retained.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
4. The detailed landscaping and planting scheme which is
hereby approved shall be completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier.  The approved scheme shall
thereafter be maintained to the satisfaction of the Council
as Planning Authority, with any planting which fails to
become established within five years being replaced in
the following planting season with others of a size and
species as previously approved
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
Page 29 of 168

Page 30

5. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document 103 relates) shall be fully adhered
to, respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.
Reason – In the interests of protecting environmental
quality and of biodiversity.
6. Prior to the commencement of the development hereby
approved, an Invasive Non-Native Species Control Plan
shall be provided for the written approval of the Council
as Planning Authority. The plan shall contain measures to
eradicate and control invasive non-native species.
Thereafter, the agreed scheme shall be implemented in
full accordance during the construction phase.
Reason – In the interests of protecting environmental
quality and of biodiversity.
7. Development shall not commence until a detailed
Construction Method Statement (CMS) has been
submitted to and approved in writing by the Council as
Planning Authority. The CMS must identify measures to
prevent harmful materials entering the River Tay SAC,
which could reduce water quality and lead to a damaging
impact on the salmon, otter and lamprey interests. The
CMS should include the following: 
(a) pollution prevention safeguards including surface
water drainage arrangements and the possible use
of siltation traps, settlement tanks and bunds 
(b) storage and disposal of materials including the
siting of stock piles, use of buffer strips and
disposal methods 
(c) construction site facilities including extent and
location of construction site huts, vehicles,
equipment, fuel, chemicals and materials
compound 
(d) timing, duration and phasing of construction
particularly in relation to salmon and lamprey
migration/spawning. 
(e) measures to cater for waste water during
construction
The CMS and mitigations as agreed shall be fully
implemented as part of the planning permission. 
Reason – In order to ensure the development does not
impact negatively on the nearby Special Area of
Conservation.
8. Prior to the commencement of development on site a Site
Biodiversity Action Plan which lists opportunities for
Biodiversity Enhancement shall be submitted to and
approved in writing by the Planning Authority.  The Action
Plan shall include details of quantity, locations,
Page 30 of 168

Page 31

techniques, timescales and monitoring arrangements for
the biodiversity enhancement measures outlined within
the Ecological Impact Assessment Report (doc ref: 103). 
The Action Plan, as approved in writing, shall be fully
implemented for the lifetime of the development.
Reason – In the interests of protecting environmental
quality and of biodiversity.
9. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved. The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150mm outside diameter being blanked off
at the end of each working day.
Reason – In the interests of protecting environmental
quality and of biodiversity.
10. Prior to the commencement of development a detailed
statement shall be submitted for the approval of the
Council as Planning Authority which demonstrates that at
least 10% of the current carbon emissions reduction set
by Scottish Building Standards will be met through the
installation and operation of low and zero-carbon
generating technologies. The approved measures shall
thereafter be implemented to the satisfaction of the
Council as Planning Authority.
Reason – In order to demonstrate compliance with both
Policy 32 of the local development plan and the carbon
emissions reduction set by Scottish Building Standards.
11. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a written scheme
of archaeological investigation which has been submitted
by the applicant and agreed in writing by the Council as
Planning Authority, in consultation with Perth and Kinross
Heritage Trust. Thereafter, the developer shall ensure
that the programme of archaeological works is fully
implemented including that all excavation, preservation,
recording, recovery, analysis, publication and archiving of
archaeological resources within the development site is
undertaken.  In addition, the developer shall afford
access at all reasonable times to Perth and Kinross
Heritage Trust or a nominated representative and shall
allow them to observe work in progress.
Reason – To ensure an appropriate archaeological
standing building survey is carried out and the resulting
survey is recorded properly.
Page 31 of 168

Page 32

12. Servicing of and deliveries to the premises shall be
carried out between 0700 and 1900 Monday to Saturday
only, with no servicing or deliveries permitted on
Sundays.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
13. No amplified music or speech shall be permitted in any
external area at any time.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
14. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/or calculated
and plotted on a rating curve chart.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
15. Prior to the development hereby approved being
completed or brought into use, an effective ventilation
system commensurate with the nature and scale of
cooking to be undertaken within the cafe shall be installed
and operated such that cooking odours are not exhausted
into or escape into any neighbouring buildings. Thereafter
the system shall be maintained. 
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
16. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
17. The maximum number of events held within any external
area shall be restricted to 15 per calendar year.  Up to
three events per calendar year must cease operation by
2230hrs.  The remaining twelve events must cease
operation by 2100hrs.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
18. The use of chainsaws shall be restricted to one hour per
day.  This hour-long period is restricted to between 0900-
1700 Monday to Friday only.  Any use of chainsaws out
with these hours or for prolonged periods shall be
discussed in advance with the Planning Authority and
details of acoustic screening to be utilised shall be
submitted for the written approval of the Planning
Page 32 of 168

Page 33

Authority.  The acoustic screening, as agreed in writing
with the Planning Authority, shall remain in place for the
duration of the chainsaw use.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
19. Between 0700hrs and 2300hrs noise from the premises
shall not exceed L A90,1 hour background noise level
plus 5dB (A), including any relevant penalties for tonality,
impulsivity, intermittency, or other sound characteristics,
when measured at any residential property in accordance
with BS4142:2014. 
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
20. Prior to the commencement of the development a Noise
Management Plan shall be submitted for the written
approval of the Planning Authority. The plan shall include
all sources of noise associated with the premise,
including patron noise and the measures that will be put
in place to minimise and/or control noise. The plan shall
be reviewed on a regular basis or, following receipt of a
justified complaint or at the request of the planning
authority. Once the Noise Management Plan has been
approved, it shall be fully implemented for the lifetime of
the development.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
21. In the event, that justified complaints for noise are
received by the Council, the applicant at their own
expense, shall employ a consultant to carry out an
assessment of noise from the development, with the
appointment and methodology to be approved in writing
by the Planning Authority. Thereafter
recommendations/mitigation measures along with
timescales for implementation will be submitted to the
Planning Authority within 28 days of the assessment.  All
mitigation measures shall then subsequently be
implemented in accordance with the agreed timescales.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
22. Prior to the commencement of the development hereby
approved, full visibility splays of 120 metres shall be
provided to the left and right of the access, at a set-back
of 2.4 metres measured 1.05m above the road level,
insofar as the land is in the control of the applicant, and
thereafter maintained.
Reason – In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
23. Prior to occupation and/or use of the development hereby
approved the applicant shall promote a Traffic Regulation
Page 33 of 168

Page 34

Order (TRO) for a reduced speed limit on the A827 for a
distance to be agreed with the Council as Roads
Authority.  The speed limit on the A827 public road shall
be reduced to the agreed limit and distance prior to the
occupation and/or use of the development.
Reason – In the interests of road safety.
24. Prior to commencement of any development on site, a
detailed design for the proposed secure cycle parking
facility for a minimum of 30 cycles shall be submitted to
and approved in writing by the Planning Authority in
consultation with the Roads Authority.  The applicant can
seek guidance on the detailed design and positioning of
the cycle storage from Transport Scotland's Cycling by
Design 2021 or similar design guide.  The cycle parking,
as approved in writing, shall be implemented in
accordance with the approved details to the satisfaction
of the Council as Planning Authority prior to the
development being brought into use.
Reason – To encourage active travel and meet advice
within Scottish Planning Policy on transport.
25. No part of the development shall be occupied until a Staff
Travel Plan (STP), aimed to encourage more sustainable
means of travel, has been submitted to and agreed in
writing by the Council in consultation with Transport
Planning. The STP will have particular regard to provision
for walking, cycling and public transport access to and
within the site and will identify the measures to be
provided, the system of management, monitoring, review,
reporting and the duration of the plan.
Reason – To promote sustainable transport options and
to meet advice within Scottish Planning Policy on
transport.
26. Prior to the commencement of the development hereby
approved, the developer shall submit for the written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
Page 34 of 168

Page 35

(e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road
users of construction traffic;
(j) arrangements to ensure that access for
emergency service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) the provision and installation of traffic counters at
the developer 's expense at locations to be agreed
prior to the commencement of construction;
(n) monitoring, reporting and implementation
arrangements; 
(o) arrangements for dealing with non-compliance;
and
(p) details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to during
the entire site construction programme.
Reason – In the interest of proper site management. 
Justification 
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period (see
section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
planning authority prior written notification of the date on
which it is intended to commence the development. A
Page 35 of 168

Page 36

failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement
action being taken. 
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the planning
authority written notice of that position.
4. No work shall be commenced until an application for
building warrant has been submitted and approved.
5. Records indicate that at least part of the proposed
development site lies within a radon affected area where
the measurement/monitoring of radon gas and the
installation of mitigation measures may be required.
6. Further information on radon gas and the associated
reports that can be obtained is available at
www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/.
7. The applicant is advised that the granting of planning
permission does not guarantee a connection to Scottish
Water’s assets. The applicant must make a separate
application to Scottish Water Planning & Development
Services team for permission to connect to the public
wastewater system and/or water network and all their
requirements must be fully adhered to.
8. The developer should be aware of the regulatory advice
under the Water Environment (Controlled Activities)
(Scotland) Regulations 2011 contained within SEPA's
consultation response dated 21 July 2022.
9. The applicant shall ensure the private water supply for
the dwellinghouse/ development complies with the Water
Scotland Act 1980 (Section 63), The Private Water
Supplies (Scotland) Regulations 2006 and The Water
Intended for Human Consumption (Private Supplies)
(Scotland) Regulations 2017.  Detailed information
regarding the private water supply, including the nature,
location and adequacy of the source, any storage tanks/
pipework and the filtration and disinfection treatment
proposed to ensure provision of an adequate and
consistently wholesome water supply shall be submitted
to Perth and Kinross Council Environmental Health in line
with the above Act and Regulations.
10. The developer is advised to contact Sophie Nicol,
Historic Environment Manager (Tel: 01738 477027) Perth
and Kinross Heritage Trust, to discuss terms of reference
for work required. 
Page 36 of 168

Page 37

6. PROPOSAL OF APPLICATION NOTICES (PAN) 
(i) 22/00018/PAN – Residential development, formation of open
space, landscaping and associated works, land 350 metres north
west of Davies Park, Springfield Road, Kinross. 
Due to lack of time, Members were encouraged to submit any
comments they may have on the proposal of application notice to the
relevant planning officer. 
No comments have been received. 
(ii) 22/00019/PAN – Change of use from agricultural land to form
extension to caravan park, land 200 metres north east of Erigmore
Caravan Site, St Mary’s Road, Birnam 
Due to lack of time, Members were encouraged to submit any
comments they may have on the proposal of application notice to the
relevant planning officer. 
Bailie McLaren requested that due consideration is given to waste
management and developer contributions. 
Page 37 of 168

Page 38

Page 38 of 168

Page 39

Perth and Kinross Council
Planning and Placemaking Committee – 23 November 2022
Report of Handling by Head of Planning & Development
(Report No. 22/283)
PROPOSAL: Extension to quarry and associated works 
LOCATION: Land 750 metres north east of Marlee Quarry, Essendy,
Blairgowrie 
Ref. No: 21/02104/FLM
Ward No: P3 – Blairgowrie and Glens 
Summary 
This report recommends approval of the application which proposes an extension
to the Marlee Quarry, by forming an extraction area north of the B947, as well as
providing for the continued use of ready-mix concrete plant, site access,
processing and stock piling area located to the south of the B947. Provided works
are undertaken in accordance with the recommendations of the Environmental
Impact Assessment Report, supporting information and planning conditions, the
development is considered to comply with the Development Plan. The application
is therefore recommended for approval, subject to conditions and a S.75
Agreement with a bank guarantee to secure site decommissioning, restoration and
aftercare. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 Marlee Quarry is an existing operational sand and gravel quarry situated in a 
rural location some 2.1 kilometres (km) to the west-south-west of Blairgowrie.
The quarry is located adjacent to the B947 and occupies an area of
approximately 40.1 hectares (ha).  Existing extraction and processing activities
are authorised by Planning Permission 17/01371/MWM. This permission
expires on 2 April 2026 meaning that all quarrying activities must cease by this
date.  In 2017 the quarry operator confirmed there were 6 years of aggregate
reserves remaining within the bounds of the existing quarry.   
2 This application b seeks an extension to the quarried area by an additional
29.54 ha, of which 14.44 ha will be proposed for sand and gravel extraction,
with the balance used for soil storage and peripheral land around the extraction
areas. The proposed extended extraction, or northern excavation, area would
allow for the winning of up to approximately 1.1 million tonnes of sand and
gravel and a supply rate of 75,000 tonnes per year.  Quarrying would therefore
occur for a period of 14 years and 8 months. However, allowing for enabling
works to be completed, such as the installation of infrastructure prior to
quarrying as well as restoration and aftercare works, following extraction, a term
of 16 years and 2 months is sought. Extraction would be undertaken over 5
phases, with partial restoration/ topsoil dressing being carried out at the
conclusion of each phase. Quarried material would be hauled by vehicle from
5(1)(i)
Page 39 of 168

Page 40

the new extraction area to be processed at the existing quarry site south of the
B947. A full description of the extraction process is contained within the
Environmental Impact Assessment Report (EIAR) Non-Technical Summary
Dated November 2021. 
3 The proposed northern extraction area occupies 3 arable fields located to the
southwest of Leys of Marlee Farm, some 630 metres (m) to the northeast of the
existing quarry and processing area. The B947 public road forms its southern
boundary.  The western boundary is defined by Palace Road and a narrow strip
of established vegetation, whilst the northern boundary is defined by the access
road to Leys of Marlee Farm.  Within the red line site boundary is a single
existing Scheduled Monument (SM) comprising the Leys of Marlee (SM7170)
which is located between phase areas 1A and 1B. Immediately to the southeast
and adjoining the red line site boundary is a second SM, being the Ring Ditch
Leys of Marlee (SM7171). Having regard to the wider context of the site
location, the Loch of Drumellie or Marlee Loch, part of the Blairgowrie Lochs, is
located approximately 650 m to the west of the site. This water body is
designated as a Special Area of Conservation (SAC) and a Site of Special
Scientific Interest (SSSI). Ardblair and Myreside Fens are located approximately
470 to the northeast of the site and are also designated a Site of Special
Scientific Interest (SSSI). The land surrounding the quarry is predominantly in
agricultural use with intermittent areas of woodland. There are individual
residential properties located at varying distances around the site. 
4 The existing quarry site sits to the south of and takes direct access off the
B947, and this access will continue to be utilised.  The proposed extension area
is separated from the existing quarry and processing area by the B947. It is
proposed to create a crossing point over the B947 to allow vehicles to haul
material back to the existing quarry for processing. The site office, car park,
welfare facilities, processing and stock piling areas and settlement ponds will
remain in their existing locations.  Soil stripping within the new extension area
will be undertaken.   All soils will be retained within the new extraction area.
Soils stripped from the initial extraction areas would be used to form screening
mounds. Thereafter, soils stripped shall be placed in storage or utilised in
progressive restoration. 
5 The design of the proposed excavations within the northern extraction area has
been influenced by topography, the presence of public utilities, local geology
and hydrogeology, engineering requirements, the market strategy with regards
to quarry production and product type, and the minimisation of potential impacts
(e.g., landscape, visual, noise, dust, ecology).  The maximum extraction depth
is within Phase 4 and will be 9m. However, Phases 1A and 1B will only be to a
depth of 6 and 6.5m. The shallowest extraction depth will be in respect of
Phase 2 at 3.1m.   
Page 40 of 168

Page 41

Pre-Application Consultation 
6 The proposed development is a ‘Major’ development, in terms of the Town and
Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009,
due to the size of the development area/site exceeding 2 Ha in area.  The
applicant was therefore required to undertake formal pre-application
consultation with the local community. Public concerns raised as part of this
process identified issues over a lack of consultation, the scale of the operational
area and timing, noise, dust, lighting, the effectiveness of restoration proposed
and a loss of soil carbon, road safety, landscaping and visual assessment, and
biodiversity values.  These matters have been responded to in writing by the
agent and included within a Pre-Application Consultation (PAC) Report
submitted with this application.   
7 The PAC Report notes that a letter drop to local properties (within a 300 m
radius) was undertaken, outlining that a consultation event was to be held
online, as permitted by the relevant regulations at the time.  The online event
was held on 30 March 2021 between 6pm and 8pm. In addition, residents were
also directed to a website for information, with full contact details for the agent
provided. Notice was also sent Blairgowrie and Rattray Community Council as
well as to local members.  A number of interested parties attended the online
events and comments and concerns were reviewed and addressed within the
PAC report and wider planning submission. The content and coverage of the
community consultation exercise is considered sufficient and proportionate and
in line with the aforementioned regulations. 
Environmental Impact Assessment 
8 Directive 2011/92/EU (as amended) requires the ‘competent authority’ (in this
case Perth and Kinross Council) when giving a planning permission for
particular large-scale projects to do so in the knowledge of any likely significant
effects on the environment.  The Directive therefore sets out a procedure that
must be followed before ‘development consent’ can be given. 
9 This procedure, known as Environmental Impact Assessment (EIA), is a means
of drawing together, in a systematic way, an assessment of a project’s likely
significant environmental effects.  The EIA Report (EIAR) helps to ensure that
the importance of the predicted effects, and the scope for reducing any adverse
effects, are properly understood by the public and the relevant competent
authority before it makes its decision. 
10 The types of development subject to EIA are listed in Schedule 1 and 2 of the
Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. An EIA is required for all Schedule 1 projects, whilst
Schedule 2 projects may only require an EIA, subject to factors such as their
nature, size, location or where there is potential for significant effects on the
environment. In respect of quarrying, where the surface area exceeds 25 ha the
development falls within Schedule 1. In the case of this application, the
application area extends to 29.55 ha which requires that EIA is mandatory. 
Page 41 of 168

Page 42

11 The applicant sought a scoping opinion from the Planning Authority to inform
the content of the EIAR. An opinion was issued on the 11 December 2020
which confirmed the 16 key matters which should be addressed within the EIA
Report 
NATIONAL POLICY AND GUIDANCE 
12 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework 2014 
13 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SSP) 
14 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
15 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Promoting Rural Development: paragraphs 74 – 91 
• Supporting Business and Employment: paragraphs 92 – 108 
• Valuing the Historic Environment: Paragraphs 137 - 151
• Valuing the Natural Environment: paragraphs 193 – 218 
• Promoting Responsible Extraction of Resources: Paragraphs 234 - 248
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
Planning Advice Notes 
16 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
Page 42 of 168

Page 43

• PAN 1/2011 Planning and Noise
• PAN 2/2011 Planning and Archaeology
• PAN 3/2010 Community Engagement
• PAN 1/2013 Environmental Impact Assessment
• PAN 40 Development Management
• PAN 50 Controlling the Environmental Effects of Surface Mineral Workings
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 60 Planning for Natural Heritage
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 64 Reclamation of Surface Mineral Workings
• PAN 73 Rural Diversification 
• PAN 75 Planning for Transport
• PAN 79 Water and Drainage
• PAN 81 Community Engagement: Planning with People 
DEVELOPMENT PLAN 
17 The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2 (2019). 
TAYplan Strategic Development Plan 2016-2036 
18 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plan states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
19 The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application. 
20 Policy 7: Energy Waste and Resources 
21 Seeks to deliver a low/zero carbon future.  Development proposals should
ensure all areas of search, sites and routes for energy, waste and resource
management infrastructure have been justified against a series of
considerations including: the specific land take requirements, the proximity of
resources, the sensitivity of the surrounding environment, health and safety
considerations, cumulative impacts, strategic cross-boundary impacts, and
consistency with the National Planning Framework. 
22 Policy 9: Managing TAYplans Assets 
Page 43 of 168

Page 44

23 Seeks to ensure responsible management of TAYplan’s assets by: using the
locational priorities of the Plan to identify and protect finite resources (mineral
deposits and important soils); Protecting Natura 2000 sites; and safeguarding
the integrity of natural and historic assets including habitats, wild land, sensitive
green spaces, forestry, water environment, wetlands, floodplains (in-line with
the Water Framework Directive), carbon sinks, species and wildlife corridors,
and also geo-diversity, landscapes, parks, townscapes, archaeology, historic
battlefields, historic buildings and monuments and by allowing development
where it does not adversely impact upon or preferably enhances these assets. 
Perth and Kinross Local Development Plan 2 (2019) 
24 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
25 The principal relevant policies are, in summary; 
• Policy 1A and 1B Placemaking 
• Policy 2 Design Statements  
• Policy 5 Infrastructure Contributions 
• Policy 8 Rural Business and Diversification 
• Policy 26A Scheduled Monuments 
• Policy 26B Archaeology 
• Policy 27A Listed Buildings  
• Policy 33A Renewables and Low Carbon Energy  
• Policy 33B Repowering and Existing Facilities 
• Policy 38A International Nature Conservation Sites 
• Policy 38B National Designations 
• Policy 38C Local Designations
• Policy 39 Landscape  
• Policy 40B Forestry, Woodland and Trees 
• Policy 41 Biodiversity 
• Policy 48A Sterilisation of Mineral Deposits 
• Policy 48B Advance Extraction
• Policy 49A Extraction 
• Policy 49B Restoration 
• Policy 50 Prime Agricultural Land  
• Policy 51 Soils 
• Policy 52 New Development and Flooding  
• Policy 53A Water Environment and Drainage: Water Environment 
• Policy 53C Water Environment and Drainage: Surface Water Flooding
• Policy 56 Noise Pollution
• Policy 57 Air Quality  
• Policy 60B Transport Standards and Accessibility Requirements 
Page 44 of 168

Page 45

OTHER POLICIES 
26 Supplementary Guidance – Air Quality, Adopted January 2020 
27 Supplementary Guidance – Flood Risk and Flood risk Assessment, Adopted
March 2021 
28 Supplementary Guidance – Landscape, Adopted January 2020 
29 Supplementary Guidance – Financial Guarantees for Minerals Development,
Adopted February 2021 
Non-Statutory Guidance 
30 Planning Guidance – Loch Leven SPA, The Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC 
31 Supplementary Guidance – Planning and Biodiversity Planning for Nature and
Wildlife Adopted April 2022 
SITE HISTORY 
32 92/00830/FUL Full Planning Permission was approved on 9 December 1994 for
extraction of sand and gravel at Marlee. 
33 17/01371/MWM Application under Section 42 of the Town and Country
Planning (Scotland) Act 1997 to extend the life of the existing quarry. A
variation to condition 1 of planning permission PK920831 (extraction of sand
and gravel) was sought and approved on 2 April 2019. 
34 20/00909/SCOP An opinion was issued on 11 December 2020 setting out
matters to be considered within an EIA Report pertaining to an extension to the
existing quarry. 
35 21/00002/PAN A proposal of application notice was sought and issued on 7
April 2021 for an extension to the existing quarry. 
CONSULTATIONS 
36 As part of the planning application process the following bodies were   
consulted: 
External 
37 Scottish Environment Protection Agency: No objection. Commentary is
provided in terms of ecology, disruption of groundwater and dependent
ecosystems, impacts on private water supply, de-watering and waste. The risk
to the Lochs SAC and Ardblair Fens SSSI in terms of dust, surface water
runoff, water quality and groundwater impacts are considered sufficiently
mitigated provided good practices in terms of site operations are implemented. 
Page 45 of 168

Page 46

In terms of water quality and quantity there was not considered to be any
impacts on the SSSI that feeds into Rae Loch or on wildlife and surrounding
reedbeds. The matters raised by SEPA have been addressed in conditions 14,
and 20.   
38 Scottish Government: No objection. 
39 NatureScot: No objection, subject to a condition that the development proposal
be implemented strictly in accordance with the mitigation measures described
within the Habitat Regulations Appraisal submitted.  Conditions 14, 16, 19, 20
and 21 are recommended.     
40 Scottish Water: No objection. Although the proposed extraction area is
bisected by an existing Scottish Water asset, no concerns are raised in respect
of impacts to this supply pipe.   
41 Historic Environment Scotland: No objection. Initially an objection was raised
as the development was considered to directly impact Schedule Monuments
(SM) SM 7170 and SM 7171. Some impacts to SM 1560 (located
approximately 150 west of SM7171) were also considered. (SM 7170 and SM
7171 are located within or immediately adjoining the new northern extraction
area).  The applicant subsequently provided a stability risk assessment and
additional information (dated 17 February 2022) to satisfy HES concerns.  Final
HES comments were received on 16 March 2022, confirming no objection,
subject to the mitigation measures noted within the risk assessment. This
included the exclusion of operational machinery from near to the SM’s by
fencing (Conditions 24). 
42 British Geological Survey: No objection. 
43 Perth And Kinross Heritage Trust: No objection. Initially concerns were
raised as the site is highly archaeologically sensitive, as is noted by its
proximity to nationally important archaeological assets.  However, PKHT having
reviewed additional information, including the site risk assessment noted
above, further visual assessment commentary, the timetable for works and
further commentary from the applicant’s archaeologist.  Now raise no objection,
subject to conditions regarding the securing of an implementation of
archaeological works and protective fencing around existing heritage assets.
Conditions 23 and 24 are recommended. 
44 Blairgowrie And Rattray Community Council: Objection. Concerns raised
regarding the effectiveness of any pre-application consultation by the applicant;
that the site is not designated within LDP2 for mineral extraction; the scale of
the development is disproportionate to the area in which it is situated; road
safety issues; noise in respect of nearby properties; dust impacts in respect of
Blairgowrie itself; impacts on carbon emissions from the quarry operations;
impacts to nearby land designations and conservation sites; the loss of soil
carbon; visual impacts; impacts to tourists. In addition, concerns are raised in
respect of impacts to wildlife at Rae Loch, located c.200m to the northeast of
the new quarry area.  
Page 46 of 168

Page 47

Internal Consultees 
45 Environmental Health (EH): No objection.  EH have reviewed the supporting
EIAR and raised no objections to the methodology or conclusions. Accordingly,
no objection is raised subject to conditions regarding, operating hours, external
lighting, noise, dust management and to ensure that no extracted material is
processed onsite within the new extraction area.  Conditions 9-15 are
recommended.   
46 Planning And Housing Strategy: No Objection, the development is adjacent
to an existing quarry which is already supporting market reserves for sand and
gravel. The proposal is therefore in compliance with this part of Policy 49A of
the LDP2. However, the applicant must also demonstrate that “their impact on
local communities and the environment has been assessed and does not have
an adverse residual effect after appropriate mitigation”.   
47 Transport Planning: No objection, subject to conditions pertaining to the
engineering standards of the new vehicle access and a construction traffic
management plan being submitted. Conditions 7 and 8 are recommended. 
Informatives advising of the need for a road opening permit and the disposal of
surface water are noted.   
48 Structures And Flooding: No objection. Upon initial review further clarification
was requested in respect of flood risk and site drainage. Upon submission of
further information those matters have now been addressed.   
49 Biodiversity/Tree Officer: No objection, subject to conditions pertaining to the
submission and implementation of an agreed landscape and planting scheme
as well as a site restoration plan; the protection of existing trees onsite; the
protection of nesting birds onsite; measures to protect animals from being
entrapped onsite; and ensuring that the conclusions and recommendations of
the submitted biodiversity survey are adhered to.  Conditions 19 - 22 are
recommended. 
50 Conservation Officer: Concerns raised; The development type has the
potential to be intrusive in spite of a negligible visual impact on listed buildings
nearby, and the submitted EIAR does not specifically address this. Further work
is therefore required to ensure that the listed buildings in proximity to the
proposed development are protected. Despite concerns being raised these
matters are addressed by conditions 9, 10, 11, 14 and 16. Furthermore, HES in
their own response has stated that in their opinion the impacts on heritage
assets within the Council’s remit and their settings are unlikely to significant.   
Representations
51 103 objections have been received. The main issues raised are:   
• Visual impact / scale of the activity 
• Noise 
• Road Safety 
Page 47 of 168

Page 48

• Dust 
• Impacts on nearby SSSI’s and Special Areas of Conservation
• Impacts on climate change and CO2 emissions 
• Loss of Prime Agricultural Land  
• Non-compliance with Policy 49A of the LDP2
• Impacts on tourism / recreation in the area / Core Paths 
52 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS
53
Scoping Opinion  EIA Required 
Environmental Impact Assessment
Report (EIAR): 
Submitted
Appropriate Assessment Habitats Regulations Appraisal
Submitted  
Additional Supporting Reports
Submitted 
• Pre-Application Consultation Report 
• Waste Management Plan
• Extended Phase 1 Habitat Survey 
• Summation of Information to Inform
a Habitats Appraisal Assessment  
• Assessment of Environmental
Impacts of Noise 
• Cultural Heritage Report 
• Scheduled Monument Stability Risk
Assessment 
• Crossing Plan 
• Pipeline Stability Assessment 
• EIAR Non-Technical Summary 
• Restoration Bond Quantification 
APPRAISAL 
54 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise. The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2 (2019). The relevant policy considerations are outlined in
the policy section above and are considered in more detail below.   
55 In this instance, section 14(2) of the Planning (Listed Buildings and
Conservation Areas) (Scotland) Act 1997 places a duty on planning authorities
in determining such an application as this to have special regard to the
desirability of preserving the building or its setting or any features of special
architectural or historic interest which it possesses.  
Page 48 of 168

Page 49

Principle 
56 The location is a peripheral rural area approximately 2.1 km west south west of
Blairgowrie. Policy considerations seeking to assess the developments
suitability are Policies 1A / 1B Placemaking; 8 Rural Diversification; 26A, 26B,
27A Scheduled Monument, Archaeology, and Listed Buildings; 39 and 41
Landscape and Biodiversity; 49A and 49B Mineral Extraction and Restoration;
50 Prime Agricultural Ladn; 56 Noise; 57 Air Quality; and 60B Transport.   
57 Objections have been raised questioning the need for this development
proposal. Section 2.8.2 of the EIAR states “it is accepted that the existing sand
and gravel quarries within Perth and Kinross or from adjacent regions could
potentially meet the demand currently met by Marlee Quarry. However, this
would result in greater haulage of material within Perth and Kinross, increasing
the carbon footprint of the industry.  Furthermore, as set out within Policy 49(b)
the requirement to source material from alternative locations would not resolve
the landbank deficit”.  The applicant estimates the existing sand and gravel
production within Perth and Kinross is approximately between 340,000 –
415,000 tonnes per annum (depending on operations at each of the 3 main
quarries – including Marlee) equating to a reserve life of between 5.75 and 7
years.  Both the SPP and Policy 49A(b) set out that maintaining a minimum of
10 years landbank of permitted reserves within a recognised market area is
preferred. In this case the proposal is adjacent to and seeks to extend an
existing quarry which already supports market requirements within Perth and
Kinross. The proposal therefore accords with the first part of Policy 49A.
However, it must be demonstrated that “their impact on local communities and
the environment has been assessed and does not have an adverse residual
effect after appropriate mitigation”.   This is discussed further below.   
Design and Layout 
58 The design and layout essentially reflect the physical geology, location of
material aggregate and engineering requirements for extraction of material at
this location.  The proposal is for the extraction of 1.1 million tonnes of sand
and gravel at an average rate of 75,000 tonnes per annum for a defined period
of 14 years and 8 months from commencement.  Consideration has been given
to limiting extraction volumes to no more than 75,000 per annum. However, if
for any reason the applicant was unable to extract 75,000 in any given year this
would preclude being able to access the full material volume over the term of
consent. To allow for this discrepancy a maximum volume of 100,000 tonnes
per annum is considered appropriate, although it is clearly stated this is not the
applicant’s intention.  It is noted that even working at 100,000 tonnes per
annum this is still significantly less than the presently permitted 250,000 tonnes
per annum afforded to the existing quarry operations under Planning
Permission 17/01371/MWM.  The proposed worked quarry zone occupies
some 14.44 ha of the total site area. Quarrying will occur over 5 phases
referred to as Phases 1 (comprising two areas of ground opening – 1A and 1B),
2, 3, 4 and 5. Whilst primarily only one phase will be operational at a time,
inevitably there will be periods of cross over as one is closed and restored with
Page 49 of 168

Page 50

a new phase opening – creating continuity of supply. The maximum depth of
extraction will be 9m within phase 4, however, the depths of extraction are not
uniform, with a 6.5m depth required for Phase 1B and only 3.1m in Phase 2. 
The development incorporates restoration at the conclusion of each phase, with
stripped soil and other waste material, (that being unsuitable for aggregate
use), being stored onsite and reused. Cross section restoration profiles have
been provided, referenced as 21/02104/FLM/15.  Soils stripped from the initial
phases would be used to form screening mounds located at the Junction of
Palace Road and the B947 as well as along the western boundary of the site,
adjacent to the existing residential properties on Palace Road.  Matters relating
to the submitted design and time period of permission are set out in conditions
1-3. Account has been given within the conditions for an initial 6-month period
for the implementation of enabling infrastructure (e.g., haulage routes) before
quarrying commences.   
59 Full details of the extraction profiles, soil bunds, restoration profiles and
financial quantifications are contained within the Environmental Impact
Assessment Report (EIAR), Restoration Bond Quantification and Drawing
Reference 21/02104/FLM/15. Whilst restoration profiles and aftercare details
have been submitted, Conditions 25 and 26 are recommended to secure
implementation and completion, as part of an agreed aftercare management
plan. In addition, a Section 75 Legal agreement is recommended to secure a
financial bond to deliver any restoration and aftercare in the event this is not
undertaken by the applicant. There is no doubting that the development will
result in a significant visual change to this location, particularly during
operations. However, it is concluded that those impacts to visual amenity are
able to be sufficiently mitigated through the use of: phasing, to minimise the
area of disturbance at any one time; the introduction of temporary soil bunds to
reduce open views across the site; the use of existing peripheral vegetation as
partial screening and by the position of extraction phase areas themselves,
which are set back from the field boundaries affording a physical buffer
between operational areas and those who live and or transition past this
location. Restoration and aftercare will revert the site back to its pre-existing
agricultural use at the conclusion of the consented term, being 16 years and 2
months after quarrying is initiated (condition 2).   
Landscape and visual amenity 
60 Safeguarding and enhancing landscape character forms part of policies 39 and
49B. In this instance, the position and means of extraction is based on local
geology and location of material required, which will remain unchanged. Thus,
landscape and visual impacts are inevitable given the openness of the site,
particularly from sections of the B947 public road. Therefore, it is especially
important to ensure robust landscaping, protection of existing trees along the
southern boundary of the new extraction area and aftercare to soften the
immediate and cumulative landscape impacts, whilst also improving biodiversity
opportunities. 
61 A full assessment of landscape character and impacts assessment is contained
within Section 6 of the EIAR. Mitigation is proposed, such as phasing of the
Page 50 of 168

Page 51

development, the infilling of Phase 1A to original ground levels, utilising shallow
final quarry slopes to form smooth landform transitions, soil bunds, tree planting
along the western site boundary and the restoration of the landform to a similar
landcover at present, being design led in consultation with NatureScot, HES
and the Council.  Overall, it is concluded from the EIAR that the landscape
impacts of the proposal are moderate during the operational phase, reducing to
slight upon final restoration. There is no identified potential for new significant
cumulative visual impacts. Having regard to the existing baseline character of
this location, which is predominately agricultural in nature, with the existing
quarry to the south of the proposed new extraction area, the Planning Authority
broadly accepts the conclusions of the EIAR.   
62 Subject to conditions requiring landscape details to be submitted and agreed,
the protection of existing trees, along with the implementation of restoration
agreements, the impacts on landscape and amenity are considered acceptable.
Conditions 15–22, 25 and 26 are all are recommended to address these
matters.   
63 The development is considered to accord with policies 38A, 38B, 39 and 49B.   
Roads and Access 
64 The application has been reviewed by the Council’s Transportation Planning
Service who have confirmed that they do not believe the development will have
a significant negative impact on the public road network. The data provided
shows that the additional vehicular traffic generated would be minimal and
should therefore not negatively impact the road network.  Full visibility
requirements for the access points have been met or can be met within land
owned by the applicant subject to some minor vegetation clearance. The
application states that a total of 8 HGV movements in and out of the new quarry
area (i.e 16 movements per day). This is less than the number of vehicles
movements occurring from the existing operation.   
65 Whilst few concerns are raised by the area Roads Authority a condition has
been recommended to secure the new vehicle access onto the public road in
accordance with Perth & Kinross Council's Road Development Guide Type D
Figure 5.7 access detail, of Type B Road construction detail.   A further
condition is recommended that the applicant supply a Construction Traffic
Management Plan, to be agreed by the Roads Authority prior to works
commencing.  Conditions 7 and 8 are recommended. 
66 Subject to conditions the development is considered to accord with Policy 60B
of the LDP2.   
Drainage and Flooding 
67 The site is outwith the functional floodplain and there are no land
drains/watercourses within the site hence fluvial flood risk is negligible.  In
terms of hydrogeology the site will be dry worked, meaning operations will be
above the water table, with the exception during rain fall events when water
Page 51 of 168

Page 52

may filter through the exposed areas.  No objections have been raised by
SEPA or the Council’s Flood Risk/Drainage Officer.  The development is
considered to accord with Policy 53 of the LDP2. 
Dust and Noise 
68 The development as proposed has the potential to generate noise and dust
nuisance which may differ from any existing quarry activities particularly on
residential receptors nearby, recreational users in a wider setting and on the
SAC, including the Lunan Burn (being part of the River Tay Special Area of
Conservation and SSSI, the Lochs Clunie and Marlee and The Ardblair and
Myreside Fens). Accordingly, Policies 38A and 38B in particular are applicable
in the assessment of this application.   
69 The application has been reviewed by Environmental Health in terms of Noise,
Air Quality and Dust, having regard to PAN 50 (Planning, Environmental
Protection and Restoration) and Annex B ‘The Control of Dust at Surface Mineral
Workings 1998’ and IAQM ‘Assessment of Mineral Dust Impacts for Planning
2016’ guidance. The EIAR concludes that noise levels at a worst case predicted
scenario will be above background levels at Marlee Mill Lodge. However, the
noise levels will remain within the acceptable level of 50dB(A) as set out in
World Health Organisation: Guidelines for Community Noise 1999.
Environmental Health have therefore raised no objection in respect of noise but
recommended conditions to control absolute noise levels as well as limiting
times of operation and any processing to be undertaken (Conditions 9-12).   
70 In respect of dust and air quality Section 10 of the EIAR states that the
assessment of the proposal as a new and additional source confirms that
objectives PM10 - 18 g/m3 and PM2.5 - 10g/m3 are met at the worst-case
scenario. The report states there are no operations in the vicinity of the site that
could give rise to a potential cumulative dust impact. Environmental Health in
their review confirm that operations can be undertaken without exceeding the Air
Quality Objectives for PM10 and PM2.5 and dust impacts are negligible to slight,
and no residual impacts have been identified. As such no objections are raised to
the development. However, conditions are recommended to ensure no
processing of material is carried out within the new northern extension area and
that the applicant shall submit a Dust Management Plan for approval prior to the
commencement of works. (Conditions 15 and 16).   
71 Objections have been raised by residents relative to dust at their own properties
and in terms of potential impacts to the SAC, Lochs Clunie and Marlee as well as
the Ardblair and Myreside Fens. These concerns have been raised with both the
Council’s Biodiversity Officer and NatureScot who also confirmed in their
consultee responses that subject to the mitigation measures outlined within the
Phase 1 Ecological Survey and Habitat assessment and Habitat Regulations
Appraisal being adopted, no objections are raised.  Conditions 15, 16, 19, 20 and
21 are recommended.  It is concluded that the development, subject to this
mitigation, accords with Policies 39-41 and Policy 51 of the LDP2.  
Tourism and Recreation 
Page 52 of 168

Page 53

72 Whilst the development is a continuation of an existing quarry, by an
established operator at the location, the proposed expansion and new
extraction area has the potential for adverse impacts on recreational users in a
wider setting, and in particular along existing core path routes nearby, namely
Core Path BLAI/135. 
73 The EIAR considers amenity effects on local sensitive receptors, including
socio-economic receptors.  None of the assessments identify significant effects
on tourism or recreational receptors. Only limited views of the proposed
operations (although those views will be open and extend across the whole
extraction area) will be visible from the B947, and no significant views will be
possible from the surrounding core paths.  In terms of holiday lets or bed and
breakfast activities the proposed development is not anticipated to lead to
significant changes in the number of tourists visiting the local area or any
investment in this sector, particularly in view of the proposed mitigation
measures which will be adopted through conditions (as discussed above).   
74 The primary impacts are considered to be from noise and or dust during
operational activities. These have been assessed above are not considered to
raise any significant impacts subject to conditions pertaining to; plant noise,
operating times, ensuring the processing of material occurs at the existing
processing area, and the implementation of a Dust Management Plan.
Conditions 9-16 have been recommended.     
Heritage Assets / Archaeology   
75 The proposed new extraction area is referred to as being ‘highly
archaeologically sensitive’, as it is located adjacent to known nationally
important archaeological assets, including the Leys of Marlee Stone Circle
Scheduled Monument (SM) 1560 as well as buried archaeological material
identified during previous preliminary investigation work.  In addition, in a wider
setting, the Leys of Marlee Farmstead is located to the immediate north of the
quarry extension area (being a Category C Listed Building) and Ardblair Castle
(Category A Listed) is located approximately 560 m to the northeast.   
76 Initially, the Perth and Kinross Heritage Trust (PKHT), Historic Environment
Scotland (HES) and the Council’s own Conservation Officer raised concerns
regarding impacts from the development. PKHT raised concerns in respect of a
lack of pre-commencement work and in terms of the visual impacts of the
development. HES raised concerns more specifically in respect of Scheduled
Monuments (SM) located within and or immediately adjacent to the site
boundary being the Leys of Marlee, a ring-ditch 400m SSW of (SM7170) and
the Leys of Marlee ring-ditch 450m S of (SM7171). Those concerns related to
direct impacts on those monuments in terms of slippage caused by quarrying
activities. The applicant has, following concerns being raised, submitted a
Stability Risk Assessment, prepared by DAL, dated 17 February 2022 which
has subsequently been reviewed by HES and PKHT.  Both parties have now
agreed that subject to works commencing in accordance with the details
submitted and fencing being erected around the SMs to exclude operational
works in their proximity (Condition 24), their objections are withdrawn.  PKHT
Page 53 of 168

Page 54

has also requested an archaeological watching brief be submitted and agreed
prior to works commencing (condition 23).   
77 The concerns raised by the Council’s Conservation Officer noted that the
development may not directly impact nearby listed buildings in terms of visual
impacts, but may have impacts in terms of noise, dust and vibration on their
settings. These matters have also been addressed by HES in their final
response. HES have confirmed that the Applicant’s submission gives no
analysis of potential impacts on the setting of the Leys of Marlee Farm or the
stone circle, Blairgowrie-Lethendy Road, 460m SE of (SM1560) caused by
noise and dust. That said, “we are content that these impacts would be of a
limited magnitude and would not raise issues of national interest”.
Consequently, subject to conditions 9 - 16, 25 and 26 the development is
considered to accord with policies 26A, 26B and 27A of the LDP2.     
Natural Heritage and Biodiversity 
78 The LDP contains a number of policies that seek to protect important species
and sites designated for their natural heritage interest and to ensure that
proposals that may affect them are properly assessed.  Ardblair and Myreside
Fens (SSSI) lies 470 m to the north-east. Loch Marlee, lies approximately 820m
west of new extraction area, and forms part of the Dunkeld - Blairgowrie Lochs
Special Area of Conservation (SAC). Lunan Burn, which flows from Marlee
Loch and within 60m of the south-east corner of the existing consented quarry
and stockpile area and is a tributary of the River Isla and as such is included
within the River Tay SAC. 
79 The applicant has undertaken a Phase 1 Ecological Survey and provided
information to inform a Habitat Regulations Appraisal with mitigation measures
outlined. These documents have been reviewed by NatureScot and the
Council’s Biodiversity Officer. Subject to the implementation in full of all
mitigation measures, no objections have been raised.  Furthermore, SEPA in
their own consultation response have raised no objection relative to hydrology
and or hydrogeology from the development. Conditions 19-22 are
recommended 
80 Whilst the development may be located within the catchment of such
designations, subject to conditions to ensure mitigation measures are in place,
the development is considered to accord with policies 38A, 38C, 40 and 41 of
the LDP2.   
Loss of Agricultural Land / Soil Carbon 
81 Policy 50 sets out that development outwith settlements shall not be permitted
on prime agricultural land, unless necessary to meet a specific need such as: a
major infrastructure proposal, and that there is no other suitable site available
on non-prime land. 
82 Whilst the existing use of the site comprises agricultural land the Land
Capability Classification for agriculture defines the soil type for this site as being
Page 54 of 168

Page 55

LCA Class 4, such a classification indicating that the land is capable of
producing a narrow range of crops due to the soil acidity. The land is thus not
defined as prime agricultural land. The reasons for selecting the location are
clearly set out and considered within the EIAR, highlighting that this application
represents an extension to an existing quarry where there are identified
deposits.  The close proximity of the new northern extraction area reflects the
need to haul material from this location to the existing quarry for processing. 
The continuation of quarrying at this general location will reduce the haulage of
material within Perth and Kinross whilst also meeting with the SPP and LDP2
land bank targets for maintaining 10 years of aggregate supply within a
recognised market area. 
83 Measures to manage, protect and reinstate soils have been set out within the
EIAR which will be appropriately covered by conditions 25 and 26 satisfying the
objective terms of Policy 50 of LDP2. On balance, noting the narrow range of
crops able to be produced at this location, and therefore the limited production
capacity that will be lost, and having regard to the fact that this is a temporary
activity, (with a permission term of 16 years and 2 months from
commencement) it is considered the loss of agricultural land will have only a
negligible impact. Following restoration and aftercare the site will be returned to
agricultural use.   
84 Having regard to soil carbon loss, it is noted that the stripped soils will be wholly
retained and managed onsite and reused following each phase.  It is also
confirmed that part of the site restoration plan proposes biodiversity
improvements in the form of a small woodland and shrub planting as well as a
wetland pond within part of the northern extraction area. Such improvements
will remove and retire 2.4 ha from agricultural working permanently reducing
carbon loss from such processes.  The EIAR states that only a proportion of the
site will actually be worked at any one time and as such the amount of carbon
lost will be less than might otherwise be expected through arable cropping
practices. Overall, it is considered any impacts to soil carbon loss will be
acceptable, having regard to the restoration commitments and phasing of the
development.   
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
85 A Section 75 legal agreement will be required to secure the terms of a bond or
financial instrument to guarantee the delivery of site decommissioning and
restoration over the lifetime of the development and beyond. A bond
quantification document has been submitted and peer reviewed in accordance
with the Council’s Supplementary Guidance in relation to Financial Guarantees
for Mineral Development. The restoration quantification has been based on the
cost of bringing appropriate external contractors on-site to carry out the
required works in the event the applicant is not able to deliver this restoration in
accordance with the phased details submitted. Provision has been made for
aftercare over a period of 5 years. In keeping with the estimation of potential
restoration liability (including a contingency of 5% and accounting for the
phased approach to excavation as proposed), it is recommended that the
commencement bond be set at an initial value of approximately £241,000 to be
Page 55 of 168

Page 56

reviewed every 3 years. The financial guarantee offered by the applicant is a
bank guarantee, the details of which will be reviewed and determined
acceptable prior to the completion of any formal legal agreement.     
DIRECTION BY SCOTTISH MINISTERS 
86 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
87 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is considered to comply with the approved TAYplan
2016 and the adopted Local Development Plan 2 (2019). Account has been
taken of the relevant material considerations and none has been found that
would justify overriding the adopted Development Plan. Accordingly, the
proposal is recommended for approval subject to the following conditions. 
RECOMMENDATION   
Conditions and Reasons for Recommendation 
General 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
2. The term of approval for this permission shall be 16 years and 2 months from
the date of Notification of Initiation of Development. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
3. All sand and gravel extraction within the site shall be completed within 15 years
and 2 months from of the date of Notification of Initiation of Development. All
plant and machinery shall be removed from the site and the land entirely
reinstated to the satisfaction of the Council as Planning Authority at the
termination of operations or the expiry of the term of approval specified by
Condition 2, whichever is the earlier. Termination of operations shall be
deemed to be on the cessation of sand and gravel extraction operations for a
period of 6 consecutive months. 
Page 56 of 168

Page 57

Reason - In accordance with the terms of the application and for the Planning
Authority to maintain control of the period of application in the interests of visual
and residential amenity. 
4. The extraction of sand and gravel shall commence and proceed only in
accordance with the submitted details of phasing, direction and depth of
working, as shown on the plans herewith approved.  No deviations from the
phasing plan shall be permitted.  No more than two phases shall be worked at
any one time.  Restoration of the land to the agreed ‘after use’ shall take place
concurrently with extraction to the satisfaction of the Council as Planning
Authority. 
Reason - In the interests of visual and residential amenity. 
5. The rate of extraction of material from the site shall not exceed 100,000 tonnes
per annum. 
Reason - To secure the proper development of the site. 
6. A record of the quantity of material extracted shall be submitted to the Council
as Planning Authority on an annual basis. 
Reason - To secure the proper development of the site. 
Transport and Planning 
7. Prior to the development hereby approved being completed or brought into use,
the vehicular access shall be formed in accordance with Perth & Kinross
Council's Road Development Guide Type D Figure 5.7 access detail, of Type B
Road construction detail. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
8. Prior to the commencement of the development hereby approved, the
developer shall submit for the written agreement of the Council as Planning
Authority, in consultation with the Roads Authority (Structures), a Construction
Traffic Management Scheme (TMS) which shall include the following: 
(a)  restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used;
(b)  timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c)  a code of conduct for HGV drivers to allow for queuing traffic to pass;
(d)  arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e)  emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
Page 57 of 168

Page 58

(f)  arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;
(g)  arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
(h)  arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i)  details of information signs to inform other road users of construction traffic;
(j)  arrangements to ensure that access for emergency service vehicles are not
impeded;
(k)  co-ordination with other significant developments known to use roads
affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m) the provision and installation of traffic counters at the developers expense
at locations to be agreed prior to the commencement of construction;
(n)  monitoring, reporting and implementation arrangements; 
(o)  arrangements for dealing with non-compliance; and
(p)  details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason: In the interests of Road Safety 
Noise 
9. The hours of operation for excavation works shall be restricted to between 0800
hours and 1600 hours Monday to Friday only, with no operations permitted on
Saturdays and Sundays. All other operations will be restricted to 0700 hours and
1900 hours Monday to Saturday, with no operations permitted on Sundays. 
Reason - In the interests of amenity; to ensure a satisfactory standard of local
environmental quality. 
10. Noise from quarry operations, excluding soil handling activity and other works
in connection with landscaping shall not exceed 45 dB LAeq,1hr when
measured and assessed in accordance with PAN 50 at any existing residential
property, except for Marlee Mill Lodge. 
Reason - In the interests of amenity; to ensure a satisfactory standard of local
environmental quality. 
11. Noise from quarry operations, excluding soil handling activity and other works
in connection with landscaping shall not exceed 47 dB LAeq,1hr when
measured and assessed in accordance with PAN 50 Marlee Mill Lodge. 
Reason - In the interests of amenity; to ensure a satisfactory standard of local
environmental quality.
Page 58 of 168

Page 59

12. Soil handling activity and other works in connection with landscaping shall not
exceed 70 dB LAeq,1hr when measured and assessed in accordance with PAN
50 at any residential property and be limited to a period not exceeding 8 weeks. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
13. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the
Planning Authority to carry out a noise assessment to verify compliance with
conditions 10 -12 above.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority. If the noise
assessment shows that the noise levels do not comply with conditions 10 -12 a
scheme of noise mitigation shall be included with the noise assessment,
specifying timescales for the implementation of the scheme and shall be
submitted to the Planning Authority for written apprvoal with 28 days of the
assessment.  The mitigation scheme shall thereafter be implemented in
accordance with the approved scheme and timescales. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
14. No mineral processing operations at any time are permitted within the proposed
extraction areas, referenced in Drawing 03 hereby approved. 
Reason: In the interests of protecting amenity for nearby residential receptors,
and to mitigate noise and or dust impacts on identified natural and historical
interests located in proximity to extraction areas hereby approved.   
Dust 
15. A Site Dust Management Plan (SDMP) for the development hereby approved
shall be submitted to and agreed in writing by the Council as Planning
Authority, in consultation with Environmental Health. The SDMP shall set out
dust control mitigation measures and a complaints procedure as outlined in
Section 10.9 of the supporting Environmental Impact Assessment Report dated
November 2021. All dust management onsite shall thereafter proceed in
accordance with the approved scheme for the duration of this permission. 
Reason: In the interests of protecting amenity for nearby residential receptors,
and to mitigate noise and or dust impacts on identified natural and historical
interests located in proximity to the northern excavation area hereby approved. 
16. The stockpiling of any extracted and or processed material shall only occur
within the Existing Stocking and Processing Area as defined by drawing 17
hereby approved. The maximum height of any stockpile shall not exceed 12
metres from existing ground level.   
Reason - In the interests of the visual amenity of the area.   
Page 59 of 168

Page 60

Lighting 
17. All external lighting shall be sufficiently screened and aligned so as to ensure
that there is no direct illumination of residential property and that light spillage
beyond the boundaries of the site is minimised. In association, the operation of
the lighting shall be controlled so as to only be triggered by motion within the
boundaries of the site. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
18. The operation of the silt ponds and settling beds required shall be on a closed-
circuit system to ensure no discharge to the water environment to the
satisfaction of the Planning Authority. 
Reason - To secure the proper development of the site and avoid pollution. 
Biodiversity 
19. Prior to the commencement of the development hereby approved, a detailed
landscaping and planting scheme for the site shall be submitted for the written
agreement of the Council as Planning Authority.  The scheme shall include
details of the height and slopes of any mounding or recontouring of the site, full
details of all hard landscaping proposals including materials and installation
methods and, species, height, size and density of trees and shrubs to be
planted.  The scheme as subsequently approved shall be carried out and
completed within the first available planting season (October to March) after the
completion or bringing into use of the development, whichever is the earlier,
and the date of Practical Completion of the landscaping scheme shall be
supplied in writing to the Council as Planning Authority within 7 days of that
date.  The scheme as agreed and implemented shall thereafter be maintained
to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
20. Prior to the commencement of any works on site, all trees on site (other than
those marked for felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be retained and protected.
Protection methods shall be strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction.  Protection measures, once in
place, shall remain in place for the duration of construction. 
Reason: In the interests of amenity and enhancement of local biodiversity values. 
21. The conclusions and recommended action points within the supporting Extended
Phase 1 Habitat Survey, prepared by Direct Ecology, dated 27.10.2021 Version
3 submitted and hereby approved shall be fully adhered to, respected and
undertaken as part of the construction phase of development. 
Page 60 of 168

Page 61

Reason - In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
22. Measures to protect animals from being trapped in open excavations and/or
pipe and culverts shall be implemented for the duration of the construction
works of the development hereby approved. The measures may include
creation of sloping escape ramps for animals, which may be achieved by edge
profiling of trenches/excavations or by using planks placed into them at the end
of each working day and open pipework greater than 150 mm outside diameter
being blanked off at the end of each working day. 
Reason - In the interests of employing best practice ecology and to ensure
there is no adverse impact on any protected species as identified under the
Wildlife and Countryside Act (1981). 
Archaeology 
23. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
written scheme of archaeological investigation which has been submitted by the
applicant and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust. Thereafter, the developer
shall ensure that the programme of archaeological works is fully implemented
including that all excavation, preservation, recording, recovery, analysis,
publication and archiving of archaeological resources within the development
site is undertaken. In addition, the developer shall afford access at all
reasonable times to Perth and Kinross Heritage Trust or a nominated
representative and shall allow them to observe work in progress. 
Reason: In the interests of protection the historical environment and in order to
protect any archaeological assets that may be present within the site. 
24. Prior to the commencement of the development hereby approved,
protective fencing shall be erected where required around Leys of Marlee
(SM7170), Ring Ditch Leys of Marlee (SM7171), Burnside enclosure
(MPK18893) and potentially other sites dependent on the approved WSI in
a manner to be agreed in advance with the Council as Planning Authority
in consultation with Perth and Kinross Heritage Trust. No works shall take
place within the area inside that fencing without prior written agreement of
the Council as Planning Authority in consultation with Perth and Kinross
Heritage Trust.
Reason: In the inserts of protecting national significant Historical assets.  
Aftercare and Restoration 
25. Restoration shall be undertaken in a progressive manner in accordance
with the restoration commitments detailed in Sections 4.3 and 4.4 of the
Dalgleish Associates Ltd Environmental Impact Assessment Report dated
22 November 2021 and the indicative restoration plan Figure 4.1.  
Page 61 of 168

Page 62

Reason - In the interests of visual amenity, landscape quality and
ecological interest and diversity.
26 Within six months of final cessation of quarrying a scheme for final
landform restoration and aftercare, shall be submitted for the prior
approval of the Planning Authority and shall be based on the restoration
and aftercare commitments detailed in Sections 4.3 and 4.4 of the
Dalgleish Associates Ltd Environmental Impact Assessment Report dated
22 November 2021 hereby approved. Thereafter, the final landform
restoration operations and aftercare scheme shall be implemented in
accordance with the approved details. 
Reason - To ensure that the final contours, updated restoration plans and
any after care management for the site are adopted and that the site is
capable of beneficial after use, whilst minimising impacts on the
landscape, nature conservation and amenity of the surrounding area. 
B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
C PROCEDURAL NOTES 
Consent shall not to be issued until a Section 75 Agreement to secure the
terms of the bond or financial instrument associated with site decommissioning,
restoration and aftercare has been completed and signed along with that bond
or financial instrument. The legal agreement should be concluded and
completed within 4 months of the date of any Committee approval. Failure to
conclude a legal agreement within 4 months may result in the planning
application being re-assessed through failing to comply with the Minerals and
Other Extractive Activities Policy 49B; Restoration and will be ultimately
recommended for refusal under delegated powers. 
D INFORMATIVES 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken.  
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority
written notice of that position. 
3. This development will require the ‘Display of notice while development is
carried out’, under Section 27C (1) of the Town and Country Planning Act
1997, as amended, and Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013. The form of the notice is set out in
Page 62 of 168

Page 63

Schedule 7 of the Regulations and a draft notice is included for your guidance.
According to Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site
of the development
• Readily visible to the public
• Printed on durable material. 
4. The applicant is advised that in terms of Sections 56 of the Roads (Scotland)
Act 1984 they must obtain from the Council as Roads Authority consent to open
an existing road or footway prior to the commencement of works. Advice on the
disposal of surface water must be sought at the initial stages of design from
Scottish Water and the Scottish Environmental Protection Agency (SEPA).
5. Advice on the disposal of surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environmental Protection Agency.
6. The applicant is reminded that, should any protected species be present a
licence may be required from NatureScot to disturb a protected species. Failure
to obtain a licence may constitute a criminal act under the Habitats Regulations
and penalties are severe for non-compliance.
7. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended, it is an offence to remove, damage or destroy the nest of any
wildbirds while that nest is in use or being built. Planning consent for a
development does not provide a defence against prosecution under this act.
8. An updated ecology survey is required if work has not commenced within 2
years of date of last survey (September 2021) approved as part of this
permission.  The updated survey shall be submitted to the Council as Planning
Authority for further written agreement. 
9. Results of restoration monitoring be sent to the Local Authority via
Biodiversity@pkc.gov.uk
10. The presence of protected species, and the extent to which they could be
affected by the proposed development, should be established before works
commence. Should protected species be identified within the site the developer
should ensure that all appropriate measures required to comply with the
relevant legislation are carried out.
11. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act. 
Background Papers:  103 letters of representation
Contact Officer:  Jamie Torrance
Date:  11 November 2022
Page 63 of 168

Page 64

DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 64 of 168

Page 65

21/02104/FLM
Extension to quarry and associated works Land 750 Metres
North East Of Marlee Quarry Essendy
Planning and Placemaking
Committee - 23 November
2022
Created by Kirsty Strong on 25 October 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:25000
5(1)(i)
Page 65 of 168

Page 66

Page 66 of 168

Page 67

21/02104/FLM
Extension to quarry and associated works Land 750 Metres
North East Of Marlee Quarry Essendy
Planning and Placemaking
Committee - 23 November
2022
Created by Kirsty Strong on 25 October 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:10000
5(1)(i)
Page 67 of 168

Page 68

Page 68 of 168

Page 69

Perth and Kinross Council
Planning and Placemaking Committee – 23 November 2022
Report of Handling by Head of Planning & Development
(Report No. 22/284) 
PROPOSAL: Formation of A9 slip road and junction including road
widening, landscaping, drainage works and erection of a
replacement bridge 
LOCATION: Land at A9(T) and Shinafoot Road (B8062) near Auchterarder 
Ref. No: 21/01968/FLM
Ward No: P7 – Strathallan 
Summary 
This report recommends refusal of the application which proposes: the formation
of a southbound off slip road from the A9 at Shinafoot, Auchterarder; a new
junction onto the B8602, with associated road widening, drainage, landscaping
and a replacement bridge over Ruthven Water.  The proposal fails to accord with
the Development Plan, raising concerns in relation to traffic safety and biodiversity,
and there are no material considerations apparent which outweigh the
Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The application site is c4.42 hectares (ha) in area, situated at Shinafoot, some
1.7 kilometres (km) north-east of Auchterarder.  The proposed slip road would
replace approximately 3ha area of semi natural / mixed woodland adjacent to
the existing A9 Trunk Road (A9).  The Ochils Special Landscape Area
boundary is some 500 metres (m) to the east and the Ochil Range Site of
Special Scientific Interest (SSSI) 1km to the south-east.   
2 The proposal is to form a new grade separated junction, comprising a south
bound off slip road from the A9.  Additional and associated works are also
proposed to the B8602, (which will connect to the new slip road), including road
widening, drainage works and the installation of a replacement bridge across
the Ruthven Water.   The most significant visual impact will result from the
earthworks with a cut through an existing embankment and woodland with
ground levels lowered by up to 10m to facilitate the road geometry.  Proposed
ground profiles are illustrated in Drawing Reference 21/01968/07 - Landscape
Cross Sections. 
3 The Auchterarder Expansion Townhead & Northeast Development Framework
(DF) was originally adopted by the Council in February 2008 as planning
guidance under the adopted Local Plan at that time, the Strathearn Area Local
Plan 2001. In the DF, Trunk Road junction improvements at Shinafoot are
identified as a requirement for the delivery of the Auchterarder Development
5(1)(ii)
Page 69 of 168

Page 70

Framework housing sites. Those housing opportunities being under the control
of the applicants. The DF reports Transport Scotland’s requirements for the
junction improvements, as set out at that time. The improvements were
designed to address safety issues and not operational capacity restrictions. 
Following on from the DF for Auchterarder outline Planning Permission was
granted in 2008 (Ref: 08/01133/OUT) for a ‘Major’ mixed use development,
including: residential, business, general industrial and storage uses. That
application was subject to a Section 75 Planning Obligation limiting the
occupation of no more than 389 open market dwellinghouses, until “a new
grade separated junction on the A9 at Shinafoot Road (B8602) by way of
provision of southbound on and off slips and utilising the existing Shinafoot
Road underpass together with associated works generally in accordance with
the specification and layout on Drawing No. BT1202803/901270/05 Dated April
2002” had been completed. 
4 This application seeks to begin implementation of the transport obligations
under this section 75 legal agreement, to enable the limit on housing
occupation to be lifted.  However, the aforementioned and defined “Shinafoot
Junction Improvement Works” requires that the Consortium (being the
applicants in this case) is contracted to provide a new grade separated junction
with two essential design features. The first is that it has southbound on and off
slips, and the second is that those on and off slips require to be accessed via
the existing Shinafoot Road underpass. In this context the extent of
development proposed in the current application does not include a southbound
on slip to the A9 and as such it fails to meet the full junction improvement works
required by legal agreement. Further details are discussed below.     
5 The Council’s Supplementary Guidance “Planning for Nature – Development
Management and Wildlife Guide, April 2022”, sets out the requirement for
developments to provide compensatory planting in circumstances where trees
or woodland will be lost. Where woodland loss is unavoidable, and mitigation is
required, the Council will follow the Scottish Government’s Policy on the Control
of Woodland Removal (PCWR).  It is expected that landscape proposals are
provided detailing replacement or compensatory planting, wherever possible
within, or adjacent to, the site of loss. The development proposed would see
the loss of 3.3 ha of woodland and only 1.7 ha of compensatory planting is set
out within the site boundary.  This leaves a net shortfall of 1.6 ha of woodland
which will be lost and not replaced. The applicant was requested to provide
alternative planting options but has been unable to do so. To offset any loss in
woodland the applicant has offered to make a one-off single payment to the
Council of £24,000, with the expectation that PKC provide off site planting
elsewhere. The payment would be made under Section 69 of the Local
government (Scotland) Act 1973 and secured through legal agreement.   Whilst
the payment is at the discretion of the Council whether to accept, the Planning
Authority is concerned by the precedent that seeking a payment of this type
may set in terms future applications.  It is considered that this financial offset
offer does not comply with the PCWR or Policy 41 of the Local Development
Plan 2 (2019). 
Page 70 of 168

Page 71

6 There are two associated ‘local’ planning applications which propose further
related works connected to those contained in this application. 
7 The first being 22/00546/FLL which proposes additional road widening and
drainage works related to both the proposed new A9 off slip and at Shinafoot
Road. These works resulted from discussions with the Council’s Transportation
& Development team, following submission of the application subject of this
report (Ref: 21/01968/FLM), which confirmed that additional road widening, and
drainage works were required, over and above those set out in this application.
Rather than withdraw, amend and resubmit 21/01968/FLM those matters are
contained within that separate related application which is subject to a separate
report on the agenda for this committee. 
8 The second associated application is 22/00724/FLL, which proposes to form a
new vehicle layby within the A9 road boundary, as the proposed off slip junction
requires removal of an existing layby. The revised location has been agreed
with Transport Scotland. This application was approved on the 13 July under
delegated authority.   
Environmental Impact Assessment 
9 Directive 2011/92/EU (as amended) requires the ‘competent authority’ (in this
case Perth and Kinross Council) when giving a planning permission for certain
large-scale projects to do so in the knowledge of any likely significant effects on
the environment.  The Directive therefore sets out a procedure that must be
followed before ‘development consent’ can be given. 
10 This procedure, known as Environmental Impact Assessment (EIA), is a means
of drawing together, in a systematic way, an assessment of a project’s likely
significant environmental effects.  The EIA Report helps to ensure that the
importance of the predicted effects, and the scope for reducing any adverse
effects, are properly understood by the public and the relevant competent
authority before it makes its decision. 
11 An EIA screening has previously been undertaken by the Planning Authority
(Reference 21/00206/SCRN), concluding that an EIA was not required as the
proposal was not considered likely to have significant environmental effects.
However, a suite of supporting assessments, presenting environmental
information in respect of: flooding, noise, ecology, traffic and transport were
required and submitted in support of this application.   
Pre-Application Consultation 
12 The proposed development is a ‘Major’ development, in terms of the Town and
Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009,
due to scale and size of the application area exceeding 2 ha.  The applicant
was therefore required to undertake formal pre-application consultation with the
local community. The PAC Report notes that a letter drop to local properties
(within a 250 m radius) was undertaken, outlining that a consultation event was
to be held online, in accordance with the relevant regulations in place at the
Page 71 of 168

Page 72

time.  This online event was held on Wednesday 30 June 2021, between 11am
and 1pm and again from 5pm to 8pm. The local MP, MSP and Council
Members were also notified. A total of 7 individuals made comment during the
events and 11 completed feedback forms.  The content and coverage of the
community consultation exercise is considered sufficient and proportionate and
in line with the regulations.   
13 Public concerns raised during this pre application consultation process related
to: pedestrian access; access to private land adjoining the development; noise;
impacts; impact on traffic flow and congestion; flooding of the Ruthven Water;
being considered a departure from road construction standards; access to other
local roads; impacts on traffic flows in Auchterarder; ongoing maintenance of
the road; safety of all road users and in particular concerns about the closure of
the Aberuthven Junction. These matters have been responded to in writing by
the agent and included within a Pre-Application Consultation (PAC) Report
submitted with this application.   
NATIONAL POLICY AND GUIDANCE 
14 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework 2014 
15 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SSP) 
16 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
17 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
Page 72 of 168

Page 73

• Valuing the Natural Environment: paragraphs 193 – 218 
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
• Promoting Sustainable Transport and Active Travel: paragraphs 270 – 291  
Planning Advice Notes 
18 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 66 Trunk Road planning applications best practise guidance. 
• PAN 68 Design Statements
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
• PAN 79 Water and Drainage 
• PAN 1/2011/: Planning and Noise 
• PAN 3/2010 Community Engagement 
National Transport Strategy 2020 
19 The Strategy presents the vision for Scotland’s transport system over the next
20 years. This focuses on four key priorities, reducing inequalities, taking
climate action, delivering inclusive economic growth and focusing on the health
and wellbeing of community.     
20 The development will increase traffic congestion within Auchterarder daily and
thus has a net determinant to the health and wellbeing of the community. The
corresponding potential for additional risk to pedestrians and cyclists is also
increased. However, the development will have economic benefits to the
community in terms of allowing further housing development.  On balance whilst
the development does promote some of the aims of the transport strategy those
impacts to health and wellbeing are considered to carry the greater planning
weight in this case. The development does therefore not align with the
Transportation Strategy. 
National Roads Development Guide 2014 
21 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
22 The proposed development is considered by the Council’s Transportation &
Development team to be of concern in terms of road safety, pedestrian
movements and air quality while further increasing traffic congestion. The
development does not accord with the Roads Development Guide. 
Page 73 of 168

Page 74

Scottish Government’s Policy on the Control of Woodland Removal (CWRP) 
23 To provide policy direction for decisions on woodland removal in Scotland.  The
proposed development is seeking to remove an area of approximately 1.6ha of
woodland without offering compensatory planting within or near to the
development site. Means of mitigation is offered in the form of financial
compensation to the Council to provide offsite planting.  The CWRP
implementation guide has some guidance on compensation and planning
requirements (see annex 6) and leaves it up to councils as to whether a sum
would be acceptable. Following the CWRP the Council would be seeking an
area at least equal to the area removed and of a native mix appropriate to the
area in which it is planted. There are requirements in the CWRP for certainty
such as requiring a compensatory planting plan before felling is approved, and
planting to be complete within 5 years of the permission.  The provision of a
commuted sum in this case does not seek to offer any planting plan.
Furthermore, the sum does not account for labour costs or ongoing monitoring.
Overall, it is considered that the mitigation offer does not align with the CWRP
of the Council’s supplementary Guidance on Woodland Removal.     
DEVELOPMENT PLAN 
24 The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2019. 
TAYplan Strategic Development Plan 2016-2036 
25 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the development plan states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
26 The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application. 
• Policy 2 Shaping Better Quality Places 
• Policy 6 Developer Contributions 
• Policy 8 Green Networks 
• Policy 10 Connecting People, Place and Markets 
Perth and Kinross Local Development Plan 2 
27 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
Page 74 of 168

Page 75

and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
28 The principal relevant policies are in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 5: Infrastructure Contributions
• Policy 23 Delivery of Development Sites 
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 51: Soils
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
OTHER POLICIES 
29 The relevant Supplementary Guidance are, 
• Supplementary Guidance: Air Quality, February 2020
• Supplementary Guidance: Developer Contributions and Affordable Housing,
April 2020
• Supplementary Guidance: Flood Risk and Flood Risk Assessments, March
2021
• Supplementary Guidance: Forest & Woodland Strategy, February 2020
• Supplementary Guidance: Landscape (February 2020)
• Supplementary Guidance: Placemaking (February 2020) 
Non-Statutory Supplementary Guidance 
• Supplementary Guidance: Planning for Nature – Development Management
and Wildlife Guide, April 2022 
Auchterarder Expansion Townhead & Northeast Development Framework 
30 A need for improved access to the A9 trunk road north and south of the
settlement is identified in the Local Development Plan 2, forming part of the
Auchterarder Settlement summary description. To date a new trunk road
junction at Loaninghead south of Auchterarder has been completed. However,
a trunk road junction north of the settlement is also needed as the planned
expansion of the settlement continues beyond the identified threshold, to
address safety issues. A specific location for the new junction was not identified
Page 75 of 168

Page 76

within the Local Development Plan, however the Plan highlights that Shinafoot
is the planned location. 
31 Within the Development Framework (DF), Trunk Road junction improvements
at Shinafoot are identified as a requirement for the full development of the
Auchterarder DF housing sites. The detail as to what works are required and
why is set out and can be summarised as follows:  
• The DF reports Transport Scotland’s requirements for the junction
improvements as set out at that time. The improvements proposed to
address safety issues and not operational capacity restrictions. Transport
Scotland describe the type and location of the required trunk road junction
at Shinafoot, “…the new Interchange at Shinafoot would include the
provision of southbound on and off slips and would utilise the existing
Shinafoot Road underpass below the A9 to accommodate the grade
separated crossing of the A9 from the southbound carriageway.”
• The DF also notes that Transport Scotland suggest staging of the trunk
road improvements as development progresses. 
• A modest development of 50 residential units would be acceptable without
junction improvements.
• The Loaninghead improvement (permitting the closure of the central
reserve gap at Auchterarder South) should be implemented first, followed
by Shinafoot (permitting the closure of the gap at Aberuthven)
• The full Masterplan development at Auchterarder would require the
provision of both Loaninghead and Shinafoot Junction Improvements.
• Detailed assessment would be required to establish an acceptable
intervening level of development that could be accommodated with the
Loaninghead Improvement 
• The DF included the figure of up to 350 dwellings could be accommodated
within the Loaninghead junction improvement. 
32 After the adoption of the DF and as noted in Paragraph 3, Planning Permission
08/01133/OUT was granted, subject to a Section 75 legal agreement restricting
open market housing development to no more than 389 units until after the
completion of the agreed roads junction improvements.  The DF is no longer
supplementary guidance within the LDP2 but is considered a material
consideration in any decision.   
SITE HISTORY OF RELEVANCE 
33 08/01133/IPM Planning Permission in Principle was granted on 31 October
2013 for a mixed-use development including residential, Class 4 (Business),
Class 5 (General Industry) & Class 6 (storage and distribution) uses on Land at
Castlemains and Kirkton, Auchterarder. 
34 21/00206/SCRN A Screening Opinion was issued by the Planning Authority on
the 1 April 2021 for the construction of a new southbound diverge slip road on
the A9, connecting Shinafoot Road (B8602) with a simple priority junction as
well as including landscaping, drainage and associated works. 
Page 76 of 168

Page 77

35 21/00008/PAN A Proposal of Application Notice related to the formation of an
A9 slip road and junction with the B8062 and other road infrastructure including
landscaping, drainage and associated works was submitted and PKC, with a
response issued on 1 June 2021. 
36 22/00546/FLL A ‘Local’ application proposing the Formation of road widening
and drainage works associated with 21/01968/FLM (works to A9 trunk road) is
presented elsewhere on this Committee Agenda. 
37 22/00724/FLL Planning Permission was granted on the 13 July 2022 for the
formation of a layby and associated works related to 21/01968/FLM (works to
A9 trunk road) on land At A9(T) And Shinafoot Road (B8062)
Auchterarder. 
CONSULTATIONS 
38 As part of the planning application process the following bodies were consulted: 
External 
39 Transport Scotland (TS): No objection, subject to conditions related to a
replacement layby, and that works accord with the details submitted. 
Informative notes are requested to flag the need for further engagement with
Transport Scotland at the construction phase.   
40 Auchterarder and District Community Council (ADCC): Object. Raise
concerns that the proposals do not accord with the Section 75 and that failure
to implement the full junction works previously agreed will impact traffic
movement and road safety.   
41 Scottish Environment Protection Agency (SEPA): No objection, subject to a
condition to narrow the upstream splay span of the Ruthven Water Bridge
during its replacement, in line with the flood risk assessment provided by the
applicant. SEPA has agreed with the flood risk assessment conclusions and
notes that works overall will have a neutral impact on flooding.   Advise a CAR
Licence has already been obtained for the works within Ruthven Water.   
42 Scottish Water (SW): No objection or further commentary provided.   
Internal 
43 Structures And Flooding (S&F): No objection. The applicant is directed to the
Council’s Technical Design Standards for Roads and Bridges.   
44 Environmental Health (Contaminated Land) (EHCL): No objection, subject to
condition to secure a site evaluation to confirm the potential for any
contamination.   
45 Biodiversity/Tree Officer. No objection. Initially requested revisions to the
draft Construction Environmental Management Plan (CEMP) and the need for
Page 77 of 168

Page 78

compensatory planting. Also, that an Ecological Clerk of Works (ECoW) be
secured. Note compensatory planting in full is not possible within land under
the applicant’s ownership and that to address this shortfall a one off £24,000
payment is being offered under Section 69 of the Local Government Act
(Scotland) 1973 to the Council for biodiversity use.  Advise that the principle of
this payment as a means or addressing the Supplementary Guidance raises
concern in terms of the precedent it will set for future applications.  However, do
not objection.   
46 Environmental Health (Noise Odour) (EHNO): No objection subject to
conditions to secure acoustic mitigation barriers along the B8062, such noise
mitigation as set out within the supporting Noise and Vibration Assessment
Report, and the provision of a Dust Management Plan. 
47 Planning and Housing Strategy: Advise that the need for new junction
connections to the A9 north and south of Auchterarder are set out within the
Local Development Plan 2 and that consideration in any decision must be given
to both the original Development Framework and the most recent consultation
with Transport Scotland.   
48 Development Contributions Officer: No objection. Commentary provided in
respect of the Section 75 obligations and confirmation that if the proposals are
approved a modification to the Section 75 Agreements will be required in
accordance with Section 75A(2) of the Town and Country Planning (Scotland)
Act 1997 (as amended).  Also confirm that any modification of the planning
obligation, owing to the extent of the changes likely, would require a formal
application. 
49 Transport Planning (TP): Objection. Significant commentary provided in
respect of traffic modelling within Auchterarder, noting the impacts of the
proposed development compared with the full junction works as set out in the
Section 75. The development will increase the number of vehicle movements
through Auchterarder town daily by over 1000 vehicles and 70 HGVs. It is the
view of TP that such increases are detrimental to Auchterarder’s sense of
place, health & wellbeing, and active & sustainable travel methods. Thus, they
are contrary to Design Streets, the National Roads Development Guide and the
National Transport Strategy. These policy documents are clear that traffic
capacity should not always be of prime consideration in decision making and
that weight must be given to the Place Principle. The increased traffic
generation raises concern in relation to matters of road safety, pedestrian
movement, and air quality. 
REPRESENTATIONS 
50 5 objections have been received. The main issues raised are:   
• Visual impacts
• Noise from construction and traffic 
• Traffic and road safety Impacts
• Air pollution from construction and road traffic 
Page 78 of 168

Page 79

• Flooding 
• An overall sense that there will be no local benefits to the development as
proposed 
51 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS
52
Screening Opinion  No EIA required
Environmental Impact Assessment
(EIA): Environmental Report
Not Required
Appropriate Assessment Habitats Regulations Appraisal – Not
Required   
Design Statement or Design and
Access Statement
Submitted
Report on Impact or Potential Impact  • Ecological Impact Report 
• Landscape and Visual Assessment 
• Planning Statements 1 and 2,
Including Design Report – A9
Shinafoot Junction (February 2020)
• Drainage Impact Assessment 
• Noise and Vibration Impact
Assessment 
• Air Quality Impact Assessment
Report 
• Flood Risk Assessment 
APPRAISAL 
53 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2019.  The relevant policy considerations are outlined in the
policy section above and are considered in more detail below.   
Principle 
54 The location is a peripheral rural area outside Auchterarder adjacent to the A9.
LDP2 policy considerations in assessing its suitability in principle are Policies
1A and 1B: Placemaking; Policy 23: Delivery of Development Sites; Policies 39-
41: Landscape, Trees and Woodland and Biodiversity; Policy 53: Water
Environment and Drainage; and Policy 60B: Transport Standards and
Accessibility – New Development Proposals. Furthermore, consideration must
also be had to the Auchterarder Development Framework and the Auchterarder
Page 79 of 168

Page 80

‘settlement description’ set out within the LDP2, which identifies the need for
improved access to the A9 to the North of the Settlement. 
55  Having regard to the National Transport Strategy 2020, the Auchterarder
Development Framework and the LDP2 there is a general policy presumption in
favour of the development of a new grade separated junction at Shinafoot.
However, when considering the proposal in detail against the requirements of
the outline planning permission, including the Section 75 Legal Agreement, the
development does not deliver the full package of roads improvements required
and as such would result in adverse road safety, pedestrian movement and
potential air quality implications.  As the revised junction proposal fails to
provide a southbound on-slip and has not been proposed as a partial delivery
of the required traffic obligations by the Section 75 agreement. It is therefore
unacceptable in planning terms and should be refused on these grounds. 
Design and Layout 
56 The design and layout of works essentially reflects the physical and
engineering requirements associated to the improvements proposed, with
infrastructure details consistent with industry standards. In physical terms, the
most significant visual change will arise as a result of the earthworks necessary
to form the slip road and the related cutting through the existing embankment. 
57 A Landscape and Visual Impact assessment supports the application and
concludes that although earthworks, cut slopes, embankments and the
associated introduction of swales and water attenuation features are noted
landform changes they are similar to those within the existing road corridor and
therefore not out of place.  Overall, wider landscape character and form would
remain largely unchanged, with any built aspects having limited influence in a
wider context.  In terms of the location alone, any landscape impacts are not
considered unacceptable when considered in a context that a new junction at
this location has been proposed and accepted by the Council for some time.  
However, as noted above the proposed design and layout do not deliver the full
roads improvements that is legally required, and therefore do not meet the
expectation of the Planning Authority or the wider community.  In addition, as
discussed below, the single slip design presents offsite impacts in terms of
traffic movements which on preliminary investigation have not been mitigated.
Therefore, on balance the design and layout of the development are
unacceptable in planning terms.   
Landscape 
58 Safeguarding and enhancing landscape character and green infrastructure is
required to be considered via LDP2 Policies 1 and 39. In this instance, the
proposed utilitarian design is largely set via the engineering requirements, thus
some landscape and visual impact is inevitable. Furthermore, development of
this type and nature has been intended at this location for some time, having
formed part of the Auchterarder Development Framework intentions and being
agreed through a previous Section 75 agreement and outline planning
permission.  However, and notwithstanding these material considerations, it is
Page 80 of 168

Page 81

especially important to ensure robust landscaping and associated green
infrastructure provides mitigation from key viewpoints, softens the immediate
and cumulative landscape impact, whilst also improving biodiversity
opportunities. A Landscape Visual Impact Assessment (LVIA) was requested,
along with a fully detailed structural landscape plan.   
59 The Council applies the principles of the Scottish Government Policy on Control
of Woodland Removal, which presumes in favour of protecting woodland
resources. However, where the loss of woodland is unavoidable, mitigation
measures in the form of compensatory planting will be sought. The submitted
Ecological Impact Report states that approximately 3.3ha of immature / semi-
mature mixed plantation woodland will be lost to allow the development to
proceed. This without mitigation would see adverse effects. The application
proposes 1.7ha of planting within the site boundary, as set out in landscape
masterplan drawing reference 21/01968/06.  However, this leaves a shortfall of
c.1.6 ha of woodland which would be lost. The Council’s Supplementary
Guidance: Planning for Nature and Wildlife provides that compensatory planting
must be at least compatible to existing trees and woodland. Given that the
applicant advises that they cannot achieve off-site planting within other land
they control, (and no other private agreement has been explored), mitigation
has been offered via a lump sum payment of £24,000, to be used by the
Council for biodiversity mitigation offsite.  The payment is sought to be made as
a one off under Section 69 of the Local Government (Scotland) Act 1973. The
Planning for Nature Guidance doesn’t reference directly the use of Section 69
Agreements, but rather advises that where woodland loss is unavoidable, and
mitigation is required, the Council will follow the Scottish Government’s Policy
on the Control of Woodland Removal (PCWR).  It is at the discretion of the
Council whether to accept a Section 69 agreement and the Planning Authority
is not aware of this option having been considered before. The Scottish
Government’s policy on control of woodland removal: implementation guidance,
February 2019 under the section on Guiding Principles paragraph 4 states:
“Planning conditions and agreements are used to mitigate the environmental
impacts arising from development and Scottish Forestry will also encourage
their application to development-related woodland removal”. Mitigation
measures must be fully explained in the EIA Report and agreed with Scottish
Forestry. They should not be left to post-consent agreements, but instead
conditioned within the planning approval. 
60 Concern is raised by the Planning Authority that this type of offer may set a
precedent for future applications.  Furthermore, as discussed above this type of
agreement does not align with the PCWR Policy nor the Council’s
Supplementary Guidance on this matter. The onus should always be on the
developer to avoid, mitigate and compensate for any harmful impacts (in that
order). For the greatest certainty, relevance and enforceability the best option is
to replace woodland on land the applicant controls ideally close to the
woodland that will be lost. Whilst steps have been taken as far as practical to
minimise the loss of woodland, very limited details have been submitted as to
whether alternative offsite solutions near to the development have been
considered. The Planning Authority does not consider the Financial Offset
Mitigation offer reasonable in the absence of further information or clarifying
Page 81 of 168

Page 82

alternatives considered. In addition, the value sum offered has not been fully
costed in terms of labour and any ongoing maintenance required by the
Council.   
Residential Amenity 
61 Matters pertaining to Noise, Dust, Air Quality and Vibration which would arise
both during construction and once the new junction is open are considered by
Policies 56 and 57 of the LDP2.  The submitted Air Quality Impact Assessment
Report and Noise and Vibration Impact Assessment have been reviewed by
Environmental Health Officers.  Those properties most impacted by the
development are those adjoining or accessing directly off the B8062 Shinafoot
Road, including a caravan park directly downstream of the Ruthven Water
Bridge. There are also properties located in direct proximity to the north-west
and south-east of Shinafoot Road as well as an existing caravan park.   
62 Environmental Health have raised no objections or concerns in relation to
impacts on residential amenity, subject to recommended conditions.
Notwithstanding the conclusions from EH officers Transport Planning have
raised concerns that the proposal development in comparison with the two-slip
junction design agreed within the Section 75 will result in additional traffic
movements within Auchterarder Township. It is anticipated that this will have
corresponding impacts on air quality, though any actual impacts have not been
modelled.         
Roads and Access 
63 LDP2 Policy 60B requires that local road networks be capable of absorbing
traffic generated by development and that satisfactory access is provided. In
this case public objections have raised concerns over potential impacts on
traffic and road safety as a result of the development.   
64 Matters relating to the Trunk Road Network have been considered by Transport
Scotland and no objection is raised, subject to recommended conditions. 
65 In respect of any impacts to the local road network, significant concerns have
been raised by the Council's Transportation and Development team. 
Specifically, these impacts relate to the design of the new junction which, as
noted, seeks to incorporate only a single slip design solution, thereby omitting
the southbound on-slip from the previously secured design. In order to consider
the impacts of the development proposed against the full road improvements
required by the Section 75 legal agreement, officers have sought to model
vehicle movements between a single slip, proposed, against a second option of
a two slip, grade separated diverge & merge junction, (the design previously
secured). The modelling for the single slip design shows an increase to both
journey times, for vehicles traveling from central Auchterarder south bound on
the A9, and to the number of vehicle movements through Auchterarder. 
Modelling shows traffic increases as follows:  
• Orchil Road AM +140 vehicles (up 36%), PM + 91 vehicles (up 22%).
Page 82 of 168

Page 83

• Hunter Street AM +30 vehicles (up 12.8%), PM +17 vehicles (up 8%)
• A824 (west of) junction with Hunter Street AM +117 (up 15%) vehicles, PM
+83 (up 11%) vehicles.
• A824 (east of) junction with Hunter Street AM +47 (up 7%) vehicles, PM +51
(up 8%) vehicles. 
66 A high-level review of the model data shows that westbound traffic movements
through Auchterarder increase significantly. The High Street in the vicinity of the
school sees an increase of 1,040 vehicles during the day (7am – 7pm) a 28.5%
increase in daily traffic flows. Within this, daily HGV movements increase
westbound by 74 vehicles, a 68.5% increase. This is mirrored further west at
Townhead (in the vicinity of Orchil Road) where an increase of 1,050 vehicles
occurs, a 33.9% increase in daily traffic flows. Within this, HGV daily
movements increase westbound by 73 vehicles, an 80.2% increase. While all
eastbound traffic movements remain static (all traffic less than 0.01% increase,
HGV less than 1.3% increase). 
67 Based on the modelled outputs, the Transportation & Development team has
concluded that in isolation a single slip design has a determinantal impact to the
local road network within Auchterarder when compared to the full set of roads
improvements previous secured. Having discussed the initial consultation
response with the applicants, a review of the submitted application was
undertaken. Subsequently a further technical note was produced by way of
addendum.  This additional information was submitted to the Council in
September 2022 and included several recommended infrastructure
improvements to support the application and redress concerns raised. The
additional recommendations included, vehicle signage measures, a 20mph
zone extension, restricting Hunter Street to one-way traffic and a traffic
controlled pedestrian crossing in the vicinity of the Community School. The
applicant has offered £100,000 to fund delivery of this infrastructure by Perth
and Kinross Council. However, having reviewed these mitigation offerings,
transportation officers have confirmed the recommendations lack detailed
costings, design, testing and crucially no consultation with key stakeholders or
the community. Whilst officers have not been able to wholly assess the validity
of the mitigation offering, on preliminary assessment they have advised that
they do not consider these will be anywhere near adequate to offset the
absence of the southbound on slip. 
68 In conclusion, the development proposed will have a net determinant to the
local road network within Auchterarder when compared with the full road's
improvements secured via the Section 75 agreement.  The identified increases
in traffic generation are considered to impact road safety, pedestrian movement
and may also impact air quality. As such the development is considered
detrimental to Auchterarder’s sense of place, health & wellbeing, and may
impact other active sustainable travel methods. Thus, the proposal overall is
contrary to the National Roads Development Guide, the National Transport
Strategy and Policy 60B of the LDP2 (2019). 
Page 83 of 168

Page 84

Drainage and Flooding 
69 Policies 52 and 53 of the LDP2, require development to appropriately consider
flooding and drainage. The application has been reviewed by both SEPA and
the Council’s Structures and Flooding Team and neither raise objections.   
70 In terms of flood impacts resulting from the replacement bridge over the
Ruthven Water it is confirmed that the cross-sectional area is slightly larger
than the existing structure, at 7.6m wide verses 7 m. Consequently, any flood
risk upstream is slightly reduced from any existing impacts. It should be noted
that the nearest property which could be at risk, being part of an existing
caravan park, is located on the downstream side of the bridge (below the
confluence of the Ruthven Water and Pairney Burn) is already at severe flood
risk, as identified on SEPA flood risk maps. This risk would not be increased by
this development. 
71 Otherwise, the majority of the slip road is out with any area of flood risk and
cuts through higher ground.  Where the slip road meets the B8062, small
sections of raised embankment are proposed, partly within the flood extents of
the Pairney Burn, as shown on the SEPA flood maps.  However, SEPA have
confirmed that any loss of storage here will be minimal and negligible to the
overall flood risk in the area. Furthermore, there will be no increase in risk
downstream towards any buildings/caravan park, as flows are controlled by an
existing culvert under the A9. Overall, all drainage is to be controlled from the
slip road via road runoff and interception via SUDS in accordance with best
practice design.   
Natural Heritage and Biodiversity 
72 LDP2 Policy 41 is a relevant consideration in respect of potential biodiversity
impacts or opportunities arising from the development. In this respect the
Landscape Masterplan includes largely native species and contains a number
of positive elements, making a likely valuable contribution to biodiversity,
consistent with the Perth and Kinross Supplementary Guidance: Planning for
Nature Development Management and Wildlife. As noted in paragraph 59
mitigation in the form of financial renumeration is offered. 
73 The Council’s biodiversity officer has reviewed the development proposal and
raised no specific objections to the works, subject to conditions seeking the
adoption of proposed landscaping, the provision of an agreed Construction
Environmental Management Plan and the appointment of an ecological clerk of
works to oversee development implementation.  However, significant concern is
raised with respect to the proposed financial agreement to offset the lack of
physical mitigation proposed and the potential for a precedent to be set.
Commentary is provided that whilst the financial offer will likely be sufficient to
accommodate planting of comparable scale to that lost, no financial account
has been made in respect of labour or future maintenance costs. As such the
value offer is insufficient. Whilst the Ecological Impact Assessment Report,
dated 24 June 2022, sufficiently confirms any ecological impacts from this
development are acceptable, the proposal overall fails to accord with policy 41
Page 84 of 168

Page 85

of the LDP2 on account of the loss of woodland and adequate mitigation
planting being offered.     
Developer Contributions 
74 The junction improvement works are identified as a requirement for
“Auchterarder Development Framework” sites, included within Section 75
Agreements agreed as part of Outline Permission 08/01133/IPM. The works,
defined as “the Shinafoot Junction Improvement Works” in these Agreements
was previously agreed with design and specifications which differ to the
proposal submitted. If the proposals are deemed acceptable a modification to
the Section 75 Agreements will be required. As the agreed junction
improvements are part of a previous decision on the outline planning
permission further contributions could not be added now.  However, and
notwithstanding this matter the junction improvements do not trigger any
contributions under the Developer Contributions and Affordable Housing
Supplementary Guidance.   
75 Whilst no specific developer contributions are required, the applicant has
sought to address shortfalls in mitigation both in terms of woodland loss and as
a result of impacts to the local road network, specifically increases in traffic
movements through Auchterarder.  A payment of £24,000 is proposed as
financial offset for woodland loss, whilst a payment of £100,000 is offered to
carry out road's improvements within Auchterarder.  Both payments are to be
single lump sum payments under Section 69 of the Local Government
(Scotland) Act 1973. Legal Services have agreed that this can be secured via a
legal agreement, and it is at the discretion of the Council whether to accept
these offers.  The Planning Authority does not consider the financial offers are
acceptable.   
Economic Impact 
76 In the short term, construction will create jobs with scope for local employment
but in the operational period local employment opportunities are limited.
However, there is a clear fit between Scottish Government aims of enabling
new development whilst promoting investment within the Perth and Kinross
area.  This development proposal should be viewed as seeking to deliver traffic
obligations required to enable further housing development within Auchterarder
and as such there are longer term economic opportunities. However, the
development raises concerns in terms of road safety and in terms of limited
overall biodiversity enhancement opportunities in proximity to the site.   
VARIATION OF APPLICATION UNDER SECTION 32A 
77 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporated changes to the submitted bridge design
over the Ruthven Water which comprised minor alterations to the cross-section
design of the structure, which do not significantly alter its wider appearance or
location.   
Page 85 of 168

Page 86

PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
78 The development in isolation is not required to be subject to any Section 75
legal agreement. However, it must be seen in association to the wider proposal
to implement transport obligations agreed via a Section 75 legal agreement
associated to a significant mixed-use development (reference Planning
Permission 08/01133/OUT). In this regard the works proposed within this
application do not comply in full of the transport obligations set out in that
Section 75. 
79 The development is recommended for refusal due to impacts on the local road
network. As such a comprehensive assessment relative to the proposed
financial mitigation offsets has not been undertaken. However, Legal Services
have confirmed the proposed payments under Section 69 of the Local
Government (Scotland) Act 1973 to secure single lump sum payments is at the
discretion of the Council whether to accept. This type of agreement has not
been accepted in the past and does not accord with the LDP2 or Scottish
Government Policy.   
CONCLUSION AND REASONS FOR RECOMMENDATION 
80 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is considered to not comply with the approved
TAYplan 2016 and the adopted Local Development Plan 2 (2019).  Account
has been taken of the relevant material considerations and none has been
found that would justify overriding the adopted Development Plan. 
81 Accordingly, the proposal is recommended for refusal. 
RECOMMENDATION   
Reasons for Refusal Recommendation 
1. The development proposed is contrary to the Auchterarder Expansion
Townhead & Northeast Development Framework as well as policy 60B of the
adopted Perth and Kinross Local Development Plan 2 (2019). 
2. The projected vehicle movement increases through Auchterarder are
detrimental to the town’s sense of place, its health and wellbeing and may
impact other forms of active and sustainable travel methods. Accordingly, the
proposal is contrary to the Scottish Government National Roads Development
Guide 2014 and National Transport Strategy 2020. 
3. The proposed financial offset to mitigate the loss of woodland and biodiversity
within the site is considered to set a precedent and fails to accord with the
principles of the Scottish Government Policy on Control of Woodland
Removal. The proposal is therefore contrary to Policy 41 of the adopted Perth
and Kinross Local Development Plan 2 (2019) and fails to accord with the
Page 86 of 168

Page 87

principals of the Perth and Kinross Planning for Nature Development
Management and Wildlife Guide April 2022.   
Background Papers:  6 letters of representation
Contact Officer:   Jamie Torrance  
Date:  11 November 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING AND DEVELOPMENT & CHIEF PLANNING OFFICER 
Page 87 of 168

Page 88

Page 88 of 168

Page 89

21/01968/FLM
Formation of A9 slip road and junction including road widening, landscaping, drainage works and
erection of a replacement bridge at Land At A9(T) And Shinafoot Road (B8062) Auchterarder
Planning and Placemaking
Committee - 23 November
2022
Created by Kirsty Strong on 25 October 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:5000
5(1)(ii)
Page 89 of 168

Page 90

Page 90 of 168

Page 91

21/01968/FLM
Formation of A9 slip road and junction including road widening, landscaping, drainage works and
erection of a replacement bridge at Land At A9(T) And Shinafoot Road (B8062) Auchterarder
Planning and Placemaking
Committee - 23 November
2022
Created by Kirsty Strong on 25 October 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:25000
5(1)(ii)
Page 91 of 168

Page 92

Page 92 of 168

Page 93

Perth and Kinross Council
Planning and Placemaking Committee – 23 November 2022
Report of Handling by Head of Planning & Development
(Report No. 22/285) 
PROPOSAL: Formation of road widening and drainage works associated with   
21/01968/FLM (works to A9 trunk road) 
LOCATION: Land at A9(T) and Shinafoot Road (B8062), Auchterarder   
Ref. No: 22/00546/FLL
Ward No: P7 – Strathallan 
Summary 
This report recommends conditional approval of the application, which proposes
road widening and drainage works which, although considered on their own
merits, are effectively associated with Planning Application 21/01968/FLM, which
is presented elsewhere on the agenda for this meeting of the Planning &
Placemaking Committee. The proposals are considered to comply with the
relevant provisions of the Development Plan with no material considerations
apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The application site is c.0.82 hectares (ha) in area, situated at Shinafoot,
located 1.2 kilometres (km) north-east of Auchterarder.  The wider landscape
type is ‘broad valley lowlands’.  The proposal is related to a wider roadworks
scheme, including a proposed new southbound off slip road and other related
works as set out in planning application 21/01968/FLM and planning permission
22/00724/FLL.  These overall works extend to around 4.4ha including 3.3ha of
mainly semi natural / mixed woodland adjacent to the existing A9 Trunk Road
(A9).  The Ochils Special Landscape Area boundary is located approximately
0.5 kilometres (km) east and the Ochil Range Site of Special Scientific Interest
(SSSI) 1km to the south-east.   
2 The development proposed comprises drainage works and road widening along
the B8062 Shinafoot Road between Ruthven Water Bridge and the A9 Trunk
Road, forming part of the aforementioned wider roadworks scheme being
reported to Committee elsewhere on this agenda.  The requirement for these
works became apparent during the processing of application 21/01968/FLM
and could not be accommodated as part of that submission.  To address this,
rather than withdraw and expand the proposals into a single ‘Major’ application,
the applicant has chosen to incorporate them through this further ‘Local’
application.  As noted, application 21/01968/FLM is reported elsewhere on this
Agenda and sets out in more detail the full extent of the roads works scheme
proposed.   
5(2)(i)
Page 93 of 168

Page 94

Environmental Impact Assessment 
3 Directive 2011/92/EU (as amended) requires the ‘competent authority’ (in this
case Perth and Kinross Council) when giving a planning permission for
particular large-scale projects to do so in the knowledge of any likely significant
effects on the environment.  The Directive therefore sets out a procedure that
must be followed before ‘development consent’ can be given. 
4 This procedure, known as Environmental Impact Assessment (EIA), is a means
of drawing together, in a systematic way, an assessment of a project’s likely
significant environmental effects.  The EIA Report helps to ensure that the
importance of the predicted effects, and the scope for reducing any adverse
effects, are properly understood by the public and the relevant competent
authority before it makes its decision. 
5 An EIA screening has previously been undertaken by the Planning Authority
(reference 21/00206/SCRN) in connection with major application
21/01968/FLM, concluding that an EIA was not required as the proposal was
not considered likely to have significant environmental effects. However, a suite
of supporting assessments, presenting environmental information in respect of
flooding, noise, ecology, traffic and transport were required and submitted in
support of this application as well as the major application.   
Pre Application Consultation 
6 The proposed development is not a ‘Major’ development, in terms of the Town
and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009, due to scale and size of the application area. The applicant was therefore
not required to undertake formal pre-application consultation with the local
community. However, formal public consultation has been undertaken in
respect of the overall roadworks scheme, specifically related to application
21/01968/FLM. 
NATIONAL POLICY AND GUIDANCE 
7 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework 2014 
8 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SSP) 
9 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
Page 94 of 168

Page 95

the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
10 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Valuing the Natural Environment: paragraphs 193 – 218 
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
• Promoting Sustainable Transport and Active Travel: paragraphs 270 - 291  
Planning Advice Notes 
11 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 66 Trunk Road planning applications best practise guidance. 
• PAN 68 Design Statements
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
• PAN 79 Water and Drainage 
• PAN 1/2011/: Planning and Noise 
• PAN 3/2010 Community Engagement 
National Roads Development Guide 2014 
12 This document supports Designing Streets and expands on its principles and is
considered to be the technical advice that should be followed in designing and
approving of all streets including parking provision. 
DEVELOPMENT PLAN 
13 The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2019. 
TAYplan Strategic Development Plan 2016-2036 
14 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plan's states that: 
Page 95 of 168

Page 96

“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
15 The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application. 
• Policy 2 Shaping Better Quality Places 
• Policy 6 Developer Contributions 
• Policy 8 Green Networks 
• Policy 10 Connecting People, Place and Markets 
Perth and Kinross Local Development Plan 2 
16 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
17 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 5: Infrastructure Contributions
• Policy 23 Delivery of Development Sites 
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 51: Soils
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 60B: Transport Standards and Accessibility Requirements: Existing
Infrastructure
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
OTHER POLICIES 
18 The relevant Supplementary Guidance are, 
• Supplementary Guidance: Air Quality, February 2020
• Supplementary Guidance: Developer Contributions and Affordable Housing,
April 2020
• Supplementary Guidance: Flood Risk and Flood Risk Assessments, March
2021
Page 96 of 168

Page 97

• Supplementary Guidance: Forest & Woodland Strategy, February 2020
• Supplementary Guidance: Landscape (February 2020)
• Supplementary Guidance: Placemaking (February 2020)
• Supplementary Guidance: Planning for Nature – Development Management
and Wildlife Guide, April 2022 
Auchterarder Expansion Townhead & North East Development Framework 
19 A need for improved access to the A9 trunk road north and south of the
settlement is identified in the Local Development Plan 2, forming part of the
Auchterarder Settlement summary description. As part of this development of a
new trunk road junction at Loaninghead south of Auchterarder is complete.
However, a trunk road junction north of the settlement is also needed as the
planned expansion of the settlement continues beyond the identified threshold,
to address safety issues. A specific location for the new junction was not
identified on the Local Development Plan proposals map, however the Plan
highlights that Shinafoot is planned. 
20 Within the Development Framework, Trunk Road junction improvements at
Shinafoot are identified as a requirement for full development of the
Auchterarder Development Framework sites. The detail as to what works are
required and why is set out and can be summarised as follows:  
• The development framework reports Transport Scotland’s requirements for
the junction improvements as set out at that time. The improvements
proposed to address safety issues and not operational capacity restrictions.
Transport Scotland describe the type and location of the required trunk
road junction at Shinafoot, “…the new Interchange at Shinafoot would
include the provision of southbound on and off slips and would utilise the
existing Shinafoot Road underpass below the A9 to accommodate the
grade separated crossing of the A9 from the southbound carriageway.”
• The Development Framework also notes that Transport Scotland suggest
staging of the trunk road improvements as development progresses. 
• A modest development of 50 residential units would be acceptable without
junction improvements.
• The Loaninghead improvement (permitting the closure of the central
reserve gap at Auchterarder South) should be implemented first, followed
by Shinafoot (permitting the closure of the gap at Aberuthven)
• The full Masterplan development at Auchterarder would require the
provision of both Loaninghead and Shinafoot Junction Improvements.
• Detailed assessment would be required to establish an acceptable
intervening level of development that could be accommodated with the
Loaninghead Improvement 
• The Development Framework included the figure of up to 350 dwellings
could be accommodated with the Loaninghead junction improvement. 
Site History of Relevance 
21 08/01133/IPM Planning Permission was granted on 31 October 2013 for
Residential and Class 4 (Business), Class 5 (General Industry) & Class 6
Page 97 of 168

Page 98

(storage and distribution) development (in principle) on Land at Castlemains
and Kirkton, Auchterarder. 
22 21/00206/SCRN A Screening Opinion was issued by the Planning Authority for
the construction of a new southbound diverge slip road on the A9 connecting
Shinafoot Road (B 8602) with a simple priority junction including landscaping,
drainage and associated works on 1 April 2021. 
23 21/00008/PAN  A Proposal of Application Notice related to the formation of an
A9 slip road and junction with the B8062 and other road infrastructure including
landscaping, drainage and associated works, was submitted and PKC, with a
response issued on 1 June 2021. 
24 21/01968/FLM A ‘Major’ application reported elsewhere on the Agenda of this
Committee proposes the formation of an A9 slip road and junction including
road widening, landscaping, drainage works as well as the erection of a
replacement bridge.   
25 22/00724/FLL Planning Permission was granted on 13 July 2022 for the
formation of a layby and associated works associated with 21/01968/FLM
(works to A9 trunk road) on Land at A9(T) and Shinafoot Road (B8062)
Auchterarder.  
CONSULTATIONS 
26 As part of the planning application process the following bodies were consulted: 
External 
27 Transport Scotland: (TS) No objection or further commentary provided.   
28 Auchterarder and District Community Council (ADCC): No objection.
Comment is made raising concerns that the development does not accord with
a Section 75 relative to residential development previously approved within
Auchterarder.  Further concerns are raised relative to road safety and traffic
flow management.   
29 Scottish Environment Protection Agency (SEPA): A single response has
been provided in respect of this and the linked ‘Major’ application (Ref:
21/01968/FLM). No objection is raised to either, subject to a condition requiring
the narrowing of the upstream face of the Ruthven Water replacement road
bridge by 1.15m, in accordance with the Flood Risk Assessment (FRA)
submitted. Also confirm that a CAR Licence is required for all proposed works.   
30 Scottish Water (SW): No comments. 
Internal 
31 Structures and Flooding (S&F): No comments.   
32 Biodiversity/Tree Officer: No comments.   
Page 98 of 168

Page 99

33 Transportation and Development Team (TP): No objection, owing to the
scale of development proposed. Informatives are noted relative to the need to
obtain Road Authority Consent and approvals to carry out works within the
public road.   
REPRESENTATIONS 
34 7 objections have been received. The main issues raised are:   
• Visual impacts
• Noise from construction and traffic 
• Traffic and road safety Impacts
• Air pollution from construction and road traffic 
• Flooding 
• Failure to correctly identify property boundaries 
35 With the exception of the final matter relating to property boundaries (which is
not a material planning consideration), these issues are addressed in the
Appraisal section of the report. 
ADDITIONAL STATEMENTS
36
Screening Opinion  No EIA Required
Environmental Impact Assessment
(EIA): Environmental Report
Not Required
Appropriate Assessment Habitats Regulations Appraisal – Not
Required  
Design Statement or Design and
Access Statement
Submitted
Report on Impact or Potential Impact  • Ecological Impact Report
• Landscape and Visual Assessment 
• Planning Statements 1 and 2,
Including Design Report – A9
Shinafoot Junction (February 2020)
• Drainage Impact Assessment 
• Noise and Vibration Impact
Assessment 
• Air Quality Impact Assessment
Report 
• Flood Risk Assessment 
APPRAISAL 
37 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2019.  The relevant policy considerations are outlined in the
policy section above and are considered in more detail below.   
Page 99 of 168

Page 100

Principle 
38 The location is a peripheral rural area outside Auchterarder and adjacent/close
to the A9, LDP2 policy considerations in assessing its suitability in principle are
Policies 1A and 1B: Placemaking; Policy 23: Delivery of Development Sites;
Policies 39-41: Landscape, Trees and Woodland and Biodiversity; Policy 53:
Water Environment and Drainage; and Policy 60B: Transport Standards and
Accessibility – New Development Proposals. Furthermore, and a significant
material consideration in the assessment of this application is the previous
approval of outline planning permission 08/01133/OUT and the Section 75
Legal Agreement requirement to secure a southbound on and off slip roads
from the A9 Trunk Road at this location, thereby enabling further development
associated to that planning permission within Auchterarder.        
39 Matters relating to the existing Section 75 agreement are not discussed in any
detail within this report as they will be considered in the assessment of
application 21/01968/FLM. This reflects that this application proposes limited
works in the wider scheme and is being considered concurrently to the ‘Major’
application.  The principle of support for this application is in no way connected
with any recommendation related to ‘Major’ application (21/01968/FLM) which
is presented elsewhere on the Agenda for this Committee (23 November 2022).
This application must be considered in isolation to the “Major” application as the
extent of works and any impacts are specific to a small area of road widening
and drainage works only. Furthermore, it should be noted that this application is
only ever likely to be implemented if that larger scheme was undertaken.   
Design and Layout 
40 The design and layout of works essentially reflects the physical and
engineering requirements associated to the road widening and associated
drainage works proposed, with infrastructure details consistent with industry
standards. In physical terms, it is anticipated that the work set out in this
application would only be undertaken if application 21/01968/FLM was
approved, with both proposals implemented as a single project.   
41 A Landscape and Visual Impact assessment supports the application and
concludes that although earthworks, cut slopes, embankments and the
associated introduction of swales and water attenuation features are noted
landform changes they are similar to those within the existing road corridor and
therefore not out of place.  Overall, wider landscape character and would
remain largely unchanged with any built aspects having limited influence in a
wider context. As such landscape impacts are not considered unacceptable. In
the context of this application the works predominantly relate to those
undertaken on the B8062 Shinafoot Road which are of significantly less scale
than those set out in 21/01968/FLM.   
Landscape 
42 Safeguarding and enhancing landscape character and green infrastructure is
required to be considered via LDP2 Policies 1 and 33. In this instance, as said
above, the proposed utilitarian design is largely set, thus some landscape and
visual impact is inevitable. A full landscape assessment will be discussed within
Page 100 of 168

Page 101

the report associated to application 21/01968/FLM and this is not replicated in
detail within this report. As noted above, a landscape and visual impact
assessment has been carried out which concludes that any impacts are
considered negligible. Therefore, subject to conditions requiring the provision of
a Construction Environmental Management Plan (CEMP) and the adoption of
mitigation set out within the Ecological Impact Assessment Report the impacts
to landscape are considered acceptable (Conditions 8 and 9). 
43 Subject to landscape conditions the development is considered to accord with
policies 39 and 40 of the LDP2.   
Residential Amenity 
44 Matters pertaining to Noise, Dust, Air Quality and Vibration which would arise
both during construction and once the new junction is open are considered by
policies 56 and 57 of the LDP2.  The submitted Air Quality Impact Assessment
Report and Noise and Vibration Assessment associated with the major
application have been reviewed by EH.  Those properties most impacted by the
proposed development are those adjoining or accessing directly off the B8062
Shinafoot Road, including a caravan park directly downstream of the Ruthven
Water Bridge. There are also properties located in direct proximity to the north-
west and south-east of Shinafoot Road as well as an existing caravan park.   
45 Environmental Health have raised no objections or concerns in relation to
impacts on residential amenity, subject to their recommended conditions.
(Conditions 3-7).        
Roads and Access 
46 LDP2 Policy 60B requires that local road networks be capable of absorbing
traffic generated by development and that satisfactory access is provided. In
this case public objections have raised concerns over potential impacts on
traffic and road safety as a result of the development.   
47 Whilst some of the representations received reflect road safety and traffic
volume impacts related to the wider roadworks scheme, other concerns are
raised by immediate local residents that the widening of the road will bring
noise and dust impacts from traffic closer to their homes. Whilst such impacts
have the potential to cause increased impact, they are considered relatively
minor and can be addressed through conditions. Any ongoing impacts from the
subsequent use of the new local road have been considered in the
aforementioned report on the major application. By way of summary the LDP2
sets out a need for improved access to the A9 (within the Auchterarder
settlement summary), and the principle of new junctions north and south of the
town are set out as part of the proposals for Auchterarder. A trunk road junction
north of Auchterarder is also needed as the planned expansion of the
settlement continues, to address safety issues. A specific location for the new
junction is not identified on the Local Development Plan proposals map,
however LDP2 highlights that Shinafoot is its planned location. In this case the
principle of road widening and improved connection with the A9 at this location
utilising Shinafoot Road has largely been agreed and as such any localised
Page 101 of 168

Page 102

impacts, subject to conditions to avoid or mitigate them, are therefore
considered acceptable.   
48 Subject to compliance with conditions 9 (Construction Environmental
Management Plan), 10 (Construction Traffic Management Plan) and Condition
11 (requiring a final design review, to ensure works are undertaken in
accordance with the approved details) the proposal is considered in accordance
with Policy 60B of LDP2. 
Drainage and Flooding 
49 Policies 52 and 53 of the LDP2, require development to appropriately consider
flooding and drainage. In this regard the application has been reviewed by both
SEPA and the Council’s Structures and Flooding Team and neither raise
objections.   
50 Works are proposed to proceed in accordance with best practise and
recommended Condition 12 will provide the opportunity to confirm and agree
the design specifications for the works. 
Natural Heritage and Biodiversity 
51 LDP2 Policy 41 is a relevant consideration in respect of potential biodiversity
impacts or opportunities arising from the development. In this respect the wider
Landscape Masterplan for the overall development scheme includes largely
native species and contains a number of positive elements, making a likely
valuable contribution to biodiversity, consistent with the Perth and Kinross
Forestry and Woodland Strategy. Given the scale and extent of the proposed
road widening by this application no specific biodiversity or landscape matters
are raised.  Overall, in landscape terms, subject to conditions 7 - 9 and
compliance with the action points noted in the Ecological Impact Assessment
Report, dated 24 June 2022, the proposal is considered to accord with policy 41
of the LDP2.   
Developer Contributions 
52 Development contributions are not applicable to this application but have been
considered in respect of the application 21/01968/FLM.   
Economic Impact 
53 In the short term, construction will create jobs with scope for local employment,
in the operational period local employment opportunities are limited. However,
there is a clear fit between Scottish Government aims of enabling new
development whilst promoting investment within the Perth and Kinross area. 
This development proposal should be viewed as part of delivering traffic
obligations required to enable further housing development within Auchterarder
and as such there are considered to be longer term economic opportunities.   
Page 102 of 168

Page 103

VARIATION OF APPLICATION UNDER SECTION 32A 
54 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate minor amendments to the submitted
landscape design.   
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
55 The development in isolation is not required to be subject to any legal
agreements but is seeking to partially implement transport obligations agreed
via a previous Section 75 legal agreement (reference Planning Permission
08/01133/OUT). This is discussed in more detail as part of planning application
report 21/01968/FLM. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
56 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is considered to comply with the approved
TAYplan 2016 and the adopted Local Development Plan 2 (2019).  Account
has been taken account of the relevant material considerations and none has
been found that would justify overriding the adopted Development Plan. 
57 Accordingly, the proposal is recommended for approval subject to the following
conditions. 
A RECOMMENDATION   
Conditions and Reasons for Recommendation 
General 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
2. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period
(see section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended)). 
Reason: This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019.   
Page 103 of 168

Page 104

Noise 
3. Construction work shall be limited to Monday to Friday 07:00 to 19:00 and
Saturday 08:00 to 13:00 with no noisy works out with these times or at any
time on Sundays or Bank Holidays. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
4. Prior to the commencement of development hereby approved, the developer
shall submit a detailed scheme and specification for the proposed mitigation
acoustic barriers on the B8062 to ensure a 10db reduction as outlined in the
Noise and Vibration Assessment Report 2060467.RSK-001-(00) dated 14
March 2022 undertaken by RSK Environmental Ltd for the written approval of
the planning authority.  Thereafter the approved scheme for the acoustic
barriers shall be installed to the satisfaction of the planning authority prior to the
operation of the Shinafoot Junction. 
Reason - In the interests of residential amenity and avoiding adverse direct
impacts on those properties adjoining the B8062 local road.   
5. The Best Practical Means Control Measures outlined in Section 5.3 of the
hereby approved Noise and Vibration Assessment Report 2060467RSK001-
(001) dated 14 March 2022 undertaken by RSK Environmental Ltd (Plan
reference 21/01968/), shall be implemented prior to the hereby approved
development being brought into use. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
6. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the
Planning Authority to carry out a noise assessment to verify compliance with
conditions 3 - 5.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the noise
assessment shows that the noise levels do not comply with conditions 4 and 5
a scheme of noise mitigation shall be included with the noise assessment,
specifying timescales for the implementation of the scheme and shall be
submitted to the Planning Authority within 28 days of the assessment.  The
mitigation scheme shall thereafter be implemented in accordance with the
approved scheme and timescales.   
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
Dust 
7. Prior to the commencement of the development hereby approved a Dust
Management Plan (DMP) shall be submitted to and agreed in writing by the
Council as Planning Authority in consultation with Environmental Health. The
DMP shall be adhered to throughout the construction stage of the development
Page 104 of 168

Page 105

and shall be reviewed by the applicant on request of the Planning Authority or
Environmental Health. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
Biodiversity 
8. The mitigation and compensation strategy recommended action points within
the hereby approved Ecological Impact Assessment Report, prepared by Eco
North Ecological Consultants – dated 24 June 2022 shall be fully adhered to,
respected and undertaken as part of the construction phase of development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
9. No later than two months prior to the commencement of development hereby
approved, an updated Construction Environment Management Plan (CEMP),
incorporating a Construction Method Statement (CMS), a Site Waste
Management Plan (SWMP), a Drainage Management Statement (DMS), a Dust
management Plan (DMP) and Environmental Management Plan (EMP)
detailing pollution prevention and control measures for all phases of the felling,
construction and operation programmes shall be submitted to and be approved
in writing by the Council as Planning Authority, in consultation with Transport
Scotland and the Council’s Biodiversity Officer. 
The Construction Environment Management Plan (CEMP) approved via
condition 8 shall incorporate detailed pollution avoidance and mitigation
measures for all construction elements. Thereafter the development shall be
fully undertaken in accordance with the CEMP. 
Reason - In the interest of protecting environmental quality and to mitigate the
adverse impact of development on the local environment. 
Traffic and Transport 
10. Two months prior to the commencement of works on the development hereby
approved, the applicant shall submit for the written approval of the Planning
Authority a Construction Traffic Management Plan (CTMP) which shall include
the following: 
(a) restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used; 
(b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events; 
(c) a code of conduct for HGV drivers to allow for queuing traffic to pass; 
(d) arrangements for liaison with the Roads Authority regarding winter
maintenance; 
Page 105 of 168

Page 106

(e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown; 
(f) arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development
being deposited on the road; 
(g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development; 
(h) arrangements for signage at site accesses and crossovers and on roads
to be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians; 
(i) details of information signs to inform other road users of construction
traffic; 
(j) arrangements to ensure that access for emergency service vehicles are
not impeded;
(k) co-ordination with other significant developments known to use roads
affected by construction traffic; 
(l) traffic arrangements in the immediate vicinity of temporary construction
compounds; 
(m) the provision and installation of traffic counters at the applicant's expense
at locations to be agreed prior to the commencement of construction; 
(n) monitoring, reporting and implementation arrangements; 
(o) arrangements for dealing with non-compliance; and 
(p) details of HGV movements to and from the site.    
The CTMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interests of vehicle and pedestrian safety.   
11. At least two months prior to the commencement of works to upgrade the
B8062, including any works to the bridge over Ruthven Water, the developer
shall submit all final road construction drawings and any engineering
specifications pertaining to these works to the Planning Authority, in
consultation with the Roads Authority, for written approval. No development
shall commence until the prior written approval and agreement has been
obtained.  Prior to the opening or public use of the new southbound A9 diverge
slip hereby approved, all road infrastructure upgrade works to the B8062,
including the promoting of any amendments to the existing traffic regulation
orders, shall be complete to a design & specification to the satisfaction of Perth
and Kinross Council as Planning Authority and in consultation with the Roads
Authority.   
Page 106 of 168

Page 107

Reason - In the interests of road safety and to ensure that the works meet the
necessary engineering standards for road construction. 
12. The upstream splayed span of the Replacement Ruthven Water Road Bridge
hereby approved, shall be reduced by 1.15 metres in accordance with the
submitted Flood Risk Assessment prepared by Fairhurst, dated 14th March
2022. At least two months prior to the commencement of works to replace the
bridge the finalised bridge design shall be submitted to the Council as Planning
Authority, in consultation with the Roads Authority for agreement and written
approval in accordance with condition 11. No development shall commence
until the prior written approval and agreement has been obtained. 
Reason - To ensure the development has no significant negative flood impacts
and proceeds in accordance with the flood risk assessment submitted. 
B JUSTIFICATION 
The proposal is considered to comply with the Development Plan and there are
no other material considerations that would justify a departure from the relevant
policies. 
C PROCEDURAL NOTES 
None. 
D INFORMATIVES 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority
written notice of that position. 
3. The applicant is advised to refer to Perth & Kinross Council's Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains
advice relevant to your development. 
https://www.pkc.gov.uk/media/48541/Flood-Risk-Flood-Risk-
Assessment/pdf/Flood_Risk___Flood_Risk_Assessments_adopted_March21.p
df?m=637647027940470000   
4. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland)
Act 1984, he/she/they must obtain from the Council, as Roads Authority,
consent to open an existing road or footway prior to the commencement of
works.  Information on junction types, requirements for Vehicular Access
consents (VA1) and application forms are available at
www.pkc.gov.uk/vehicleaccess. Advice on the disposal of surface water should
Page 107 of 168

Page 108

be sought at the initial stages of design from Scottish Water and the Scottish
Environment Protection Agency. 
5. The applicant should be advised that in terms of Section 21 of the Roads
(Scotland) Act 1984 they must obtain from the Council as Roads Authority
consent to construct a new road prior to the commencement of roadworks.
Advice on the disposal of surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environmental Protection Agency. 
6. The applicant should be advised that in terms of Section 96 of the Roads
(Scotland) Act 1984 a road condition survey will be required to be agreed with
the Council as Roads Authority prior to the commencement of works. To ensure
the public road is reinstated to its present standard.
7. All proposed structures supporting the road, or which the developer is intending
the Council adopt, will require technical approval in accordance with the Design
Manual for Roads & Bridges standard BD 2/12 (& HD 22/08 where relevant). 
Bridges and culverts shall also be designed in accordance with the
requirements contained within Perth & Kinross Council’s Developers Guidance
Note on Flooding & Drainage.  The developer is advised to contact Perth &
Kinross Council’s Structures & Flooding Team (tel 01738 475000, email
structuresplanning@pkc.gov.uk) for further information and prior to
commencing designs in order to ensure technical compliance. 
8. The applicant should be informed that the granting of planning permission does
not carry with it the right to carry out works within the trunk round boundary and
that permission must be granted by Transport Scotland Roads Directorate.
Where any works are required on the trunk road, contact details are provided
on Transport Scotland’s response to the planning authority which is available
on the Council’s planning portal. 
9. Trunk road modification works shall, in all respects, comply with the Design
Manual for Roads and Bridges and the Specification for Highway Works
published by HMSO. The developer shall issue a certificate to that effect,
signed by the design organisation. 
10. Trunk road modifications shall, in all respects, be designed and constructed to
arrangements that comply with the Disability Discrimination Act: Good Practice
Guide for Roads published by Transport Scotland. The developer shall provide
written confirmation of this, signed by the design organisation. 
11. The road works which are required due to the above Conditions will require a
Road Safety Audit as specified by the Design Manual for Roads and Bridges
Any trunk road works will necessitate a Minute of Agreement with the Trunk
Roads Authority prior to commencement Any additional works required to
mitigate the impact on the trunk road will necessitate a Legal Agreement with
the Trunk Roads Authority prior to commencement. 
12.    An application for Building Warrant may be required. 
13. This planning permission is granted subject to conditions, some of which
require further information to be submitted to Development Management either
before works can start on site or at a certain time.  The required information
Page 108 of 168

Page 109

must be submitted via the ePlanning portal if your original application was
lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware that a fee is payable
in respect of each request made, though there is no limit to the number of
conditions that can be discharged in a single request.  The Fees Charter is
available on our website www.pkc.gov.uk.   
Background Papers:  7 letters of representation
Contact Officer:  Jamie Torrance  
Date:  11 November 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 109 of 168

Page 110

Page 110 of 168

Page 111

22/00546/FLL
Formation of road widening and drainage works associated with 21/01968/FLM
(works to A9 trunk road) at Land At A9(T) And Shinafoot Road (B8062) Auchterarder
Planning and Placemaking
Committee - 23 November
2022
Created by Kirsty Strong on 25 October 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:25000
5(2)(i)
Page 111 of 168

Page 112

Page 112 of 168

Page 113

22/00546/FLL
Formation of road widening and drainage works associated with 21/01968/FLM
(works to A9 trunk road) Land At A9(T) And Shinafoot Road (B8062) Auchterarder
Planning and Placemaking
Committee - 23 November
2022
Created by Kirsty Strong on 25 October 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:5000
5(2)(i)
Page 113 of 168

Page 114

Page 114 of 168

Page 115

Perth and Kinross Council
Planning and Placemaking Committee – 23 November 2022
Report of Handling by Head of Planning & Development
(Report 22/286) 
PROPOSAL: Erection of 3 dwellinghouses, 3 garages and associated works 
LOCATION: Land 30 metres north east of Rantrie Knowe, Drum 
Ref. No: 21/01755/FLL
Ward No: P8 – Kinross-shire 
Summary 
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and
there are no material considerations apparent which outweigh the Development
Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 Full planning permission is sought for the erection of three dwellinghouses each
with detached garages and other associated works, including a SUDS pond,
within Drum, Crook of Devon.  The application site is approximately 0.3ha in
area and extends to the south, towards the B9097, to accommodate drainage
infrastructure. 
2 The site is considered an ‘infill’ and is bound by: the A977 public road to the
north-west; a line of mature trees to the north-east, with residential
development beyond; to the south-west by Rantrie Knowe, a dwellinghouse
owned by the applicant; and to the south-east by open fields where the
drainage system would be located. 
3 The existing access onto the A977 which serves Rantrie Knowe would be used. 
Plot 1 is proposed to the immediate east of this access and would extend to
773sqm.  A new access track and turning head is proposed to the south of Plot
1 and would serve Plot 2 (875sqm) and Plot 3 (817sqm) in the eastern part of
the site.   
4 Plot 1 is proposed to have a 3-bedroom dwellinghouse with a rectangular
footprint and see accommodation over two levels, with the upper floors served
by dormer windows on both north and south elevations.  It is proposed to be
finished in smooth white render, cedral weatherboarding and a natural slate
roof. 
5 Plot 2 is of a similar design/footprint to Plot 1 and with 3 bedrooms, however
dormer windows are only proposed on the south-west elevation.  Larger
window openings are proposed on the gables.
5(2)(ii)
Page 115 of 168

Page 116

6 Plot 3 is the largest, containing 4 bedrooms, and would have pitched roof
projections on the north-west and south-east elevations.  All houses are
proposed to be c.8 metres in height. 
7 There is a considerable amount of history associated with this site.  A planning
permission in principle was originally granted in April 2008 and this consent
was renewed in May 2011 under application 11/00461/IPL.  In January 2012
there was a serious accident on the A977 adjacent to the site where
approximately 20,000 litres of aviation fuel was released from a tanker and
caused contamination on the site, which was cleared up under direction from
SEPA.  A further renewal of the consent was then approved under application
14/00732/IPL.  Following this an Approval of Matters application for three
dwellings, with exactly the same layout as the application under consideration
here, was approved in June 2017 (17/00606/AML) but this has since expired. 
NATIONAL POLICY AND GUIDANCE 
8 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework 2014 
9 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SSP) 
10 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
11 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Enabling Delivery of New Homes: paragraphs 109-134 
• Valuing the Natural Environment: paragraphs 193-218 
Page 116 of 168

Page 117

• Managing Flood Risk and Drainage: paragraphs 254-268 
Planning Advice Notes 
12 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
• PAN 69 Planning and Building standards Advice on Flooding 
• PAN 75 Planning for Transport 
• PAN 77 Designing Safer Places 
• PAN 79 Water and Drainage 
Creating Places 2013 
13 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It
notes that successful places can unlock opportunities, build vibrant
communities and contribute to a flourishing economy and set out actions that
can achieve positive changes in our places. 
Designing Streets 2010 
14 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
15 This document supports Designing Streets and expands on its principles and is
considered to be the technical advice that should be followed in designing and
approving of all streets including parking provision. 
DEVELOPMENT PLAN 
16 The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2019. 
Page 117 of 168

Page 118

TAYPlan Strategic Development Plan 2016-2036 
17  TAYPlan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plans states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
Perth and Kinross Local Development Plan 2 
18 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
19 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
• Policy 17: Residential Areas
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 56: Noise Pollution
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
OTHER POLICIES 
Developer Contributions and Affordable Housing Supplementary
Guidance April 2020 
Placemaking Supplementary Guidance 2020 
SITE HISTORY 
20  07/02361/OUT was approved on 5 April 2008 for the erection of 3
dwellinghouses with double garages (in outline) 
21  11/00461/IPL was approved on 19 May 2011 for the renewal of planning
consent 07/02361/OUT for the erection of 3 dwellinghouses with double
garages (in principle)
Page 118 of 168

Page 119

22 14/00732/IPL was approved on 17 July 2014 for the renewal of permission
(11/00461/IPL) erection of three dwellinghouses with double garages (in
principle) 
23 17/00606/AML was approved on 13 June 2017 for the erection of three
dwellinghouses and garages (matters specified by conditions 14/00732/IPL) 
24 20/00706/AML Renewal of permission 17/00606/AML (Erection of 3
dwellinghouses and garages) - Withdrawn on 25 August 2020 
25 21/01164/FLL Full Planning Permission application for the erection of 3
dwellinghouses, 3 garages and associated works - Withdrawn on 27 August
2020  
CONSULTATIONS 
26 As part of the planning application process the following bodies were consulted: 
External 
Scottish Water 
27 No objection, advise that a separate application is required to connect to their
assets. 
Fossoway And District Community Council 
28 Object, due to flood risk both on site and the impact development may have on
flood risk downstream.  Concerns have also been expressed regarding
contamination of site from aviation fuel spill. 
Internal 
Transport Planning 
29 No objection.  Access and parking arrangements considered to be acceptable
and public road capable of accommodating increased traffic associated with
development. 
Development Contributions Officer 
30 No contribution required as there are no capacity constraints at Fossoway
Primary School. 
Biodiversity/Tree Officer 
31 No comments. 
Page 119 of 168

Page 120

Environmental Health (Contaminated Land) 
32 No objection. Advise the site is fit for residential development following clean-up
of aviation fuel. 
Environmental Health (Noise Odour) 
33 No objection. Consider the Noise Impact Assessment submitted in relation to
road traffic noise acceptable, subject to conditional control. 
Structures And Flooding 
34 No objection. Advise the information submitted demonstrates that the proposals
will have a neutral impact on flood risk and therefore are acceptable. 
REPRESENTATIONS
35 Seven representations were received. The main issues raised are: 
• Visual impact
• Flood risk and surface water drainage
• Wastewater drainage capacity
• Loss of open space
• Loss of trees
• Road safety and traffic generation
• Contamination from fuel spill
• Neighbour notification process
• Servitude rights of access/impacts on existing drainage system 
36 These issues are addressed in the appraisal section of the report. However,
servitude rights of access/impacts are not a material planning consideration. 
ADDITIONAL STATEMENTS
37
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not Required
Appropriate Assessment Habitats Regulations Appraisal
AA Not Required
Design Statement or Design and Access
Statement
Not Required
Report on Impact or Potential Impact  • Flood Risk Assessment
• Drainage Design and Storm
Water Calculations
• Tree Survey 
• Noise Impact Assessment
for Road Traffic Noise 
Page 120 of 168

Page 121

APPRAISAL 
38 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2019.  The relevant policy considerations are outlined in the
policy section above and are considered in more detail below.  In terms of other
material considerations, this involves considerations of the Council’s other
approved policies and supplementary guidance, namely Placemaking
Supplementary Guidance and the Developer Contributions and Affordable
Housing Supplementary Guidance. 
Principle 
39 Crook of Devon/Drum is identified as a settlement within the Perth and Kinross
Local Development Plan 2 (2019) and the identified as "white land" where Policy
17 applies.  This states that infill residential development will be appropriate
subject to it reflecting the character, layout and amenity of the area.  Policies 1A
and B echo this and state that new development should complement its
surroundings in terms of form, appearance, height, scale, massing, materials,
finishes and colours, amongst other criteria.   
40 There have been numerous ‘in principle’ and ‘detailed’ permissions on this site,
which are material considerations, and the site is seen as a logical infill site given
the residential development which surrounds.   
41 The general principle of the residential development is therefore acceptable and
the proposal and is considered to accord with Policy 17 of the LDP2.  An
assessment of the design and layout along with other technical matters including
drainage and access is provided below. 
Design and Layout 
42 Generally, the design and scale of development should respect its surroundings
and adhere to Policies 1A and B of LDP2, which relate to placemaking.  Further
guidance is also provided within the associated Placemaking Supplementary
Guidance.   
43 Furthermore, through Creating Places 2013, Scottish Ministers set out the
comprehensive value good design can deliver. It notes that successful places
can unlock opportunities, build vibrant communities and contribute to a
flourishing economy and set out actions that can achieve positive changes in our
places. 
44 The character of the area is relatively uniform, with detached properties located
to the west and east of the site, fronting the public road but also extending
southwards.  Plot sizes are relatively mixed but generally quite large and
contributing to an open feel to the area. 
Page 121 of 168

Page 122

45 The proposal to accommodate three detached dwellings and garages on the site
is considered to be appropriate in the context of the areas character.  The plot
sizes and build to plot ratios are generally considered to reflect the established
character and therefore the proposal is considered to comply with the Council's
Placemaking Supplementary Guidance (SG) and Policies 1 and 17 of the LDP2. 
Furthermore, the layout and design of the dwellinghouses is identical to that
which was approved in 2017.  Whilst a new Local Development Plan has been
published since then, the policies in terms of design and layout are broadly
similar. 
46 The proposal for one and three-quarter storey dwellings and single storey
detached garages is considered appropriate in terms of scale and mass for this
site.  The area being characterised by a mixture of single storey and two storey
dwellings.  The design and scale of each dwelling is considered to be appropriate
and utilises high quality materials which would respect the context.   
47 The proposed layout and design of the houses is therefore considered to reflect
the character and amenity of the area and therefore complies with the criteria
outlined in policies 1A, B and 17 of the LDP2 and the associated SG.   
Landscape 
48 The previous approval on the site included a condition to ensure the provision of
appropriate landscaping and boundary treatments for the site.  The submission
includes some reference to additional planting on the site but no details on
species and density of planting has been submitted.  It is considered necessary
to secure details of the proposed planting and boundary treatments, as this
remains an important part of the original planning approval.  Accordingly, these
details will be secured through conditions (Conditions 3 and 4). 
Trees 
49 Scottish Planning Policy specifies that trees which have a significant biodiversity
value and make a significant contribution to landscape character and quality
should be protected from adverse impacts resulting from development. 
50 In support of this application a tree survey had been undertaken in accordance
with BS:5837 Trees in relation to construction and the recommendations
contained within are considered to comply with Policy 40B. The tree locations are
also shown on the site plan to demonstrate the relationship of the houses to the
trees. 
51 In this case there is a slight overlap between Plot 2 and the root protection area
and further mitigation will be required to facilitate the construction of the dwelling
in this location and these mitigation measures are indicated within the tree
survey and are considered to be acceptable.  Conditions are recommended to
ensure implementation of this mitigation (Conditions 6 and 7). 
Page 122 of 168

Page 123

Residential Amenity 
52 Policy 1A and B require any development to not detrimentally impact on
residential amenity and to ensure any occupiers of new development have an
adequate level of residential amenity. 
Impacts on adjoining properties 
53 The formation of residential development has the potential to result in
overlooking and overshadowing to neighbouring dwellings and garden ground. 
There is a need to secure privacy for all the parties to the development those
who would live in the new dwellings, those that live in the existing house and
those that live in adjoining dwellings.  Planning control has a duty to future
occupiers not to create situations of potential conflict between neighbours.   
54 The Council's guidance generally seeks to ensure there is a minimum distance of
9m from windows to boundaries in order to mitigate overlooking from new
development.  In this instance the windows on the north facing elevation of plot 2
are within 7.5m of the boundary to the north, however these are only ground floor
windows and thus boundary is occupied by a number of mature trees which will
provide screening.  This is considered to be acceptable.  There are not
considered to be any overlooking concerns from the other plots. 
Daylight/Overshadowing 
55 Although overshadowing is not a matter specifically referred to in ministerial
guidance, the protection of neighbouring developments from unreasonable loss
of light is a well-established proper planning consideration. 
56 The Council's adopted Supplementary Guidance relating to Placemaking
includes specific information on how the issue of overshadowing can be
assessed.  This is known as the 25 degrees rule.  Any proposed development
should maintain and allow for a reasonable amount of natural daylight to the
internal living space of neighbouring residential properties.  Established practise
determines that 25 degrees is a suitable maximum obstruction path which should
be afforded directly to a front or rear aspect.   Having carried out an assessment
of the proposed development the height of the proposed buildings does not
breach the 25-degree obstruction path as outlined in the Supplementary
Guidance.  Therefore, the proposed development is thus considered acceptable
in terms of its impact on daylight. 
Private Amenity Space 
57 The extent in which private amenity space is used relates specifically to the
dwellings occupant. It is therefore particularly difficult to forecast the extent of
garden ground required and ultimately overtime this will change with any new
inhabitant. Nevertheless, it is important to seek an outside area that can perform
the minimum to be expected of a garden i.e., clothes drying, dustbin storage and
sitting out.  Each house is provided with an adequate level of garden ground for
the size of house. 
Page 123 of 168

Page 124

58 Overall, the development is considered acceptable in terms of the impact on
residential amenity of neighbours and the amenity of future occupiers and
therefore accords with the Local Development Plan where it relates to residential
amenity. 
Road Traffic Noise 
59 The planning system has an important role to play in preventing and limiting
noise pollution. Although the planning system cannot tackle existing noise
problems directly, it has the task of guiding development to the most suitable
locations and regulating the layout and design of new development. The noise
implications of development can be a material consideration in determining
applications for planning permission. In this instance the applicant has submitted
information on noise as this was identified as an issue with previous applications
on the site including a Noise Impact Assessment (NIA) to consider the impact
which road traffic noise from the A977 may have on occupiers of the dwellings. 
60 The NIA assessment states that the external noise; daytime would be 59dB (A)
and for night-time would be 49 dB (A) at Plot 1, the closest proposed
dwellinghouse to the road. 
61 The NIA assessment concludes that there will be a negligible adverse effect on
future residents and slight significance during the night.  During the daytime the
effects on future residents from road noise will be a minor adverse impact and
slight /moderate significance during the day. 
62 Environmental Health (EH) note that the applicant must however ensure a
reduction of at least 19dB to meet the BS 8233:2014 internal night-time bedroom
criteria of 30 dB (A). The World Health Organisation (WHO) also recommends
that the outside garden areas should be no more than 55 dB (A). 
63 Therefore, to protect residential amenity from road traffic noise EH recommend
conditional control to comply with Policy 56 of the Local Development Plan 2.
(Condition 8). 
Flooding and Surface Water Drainage 
64 There are surface water/ground water issues in the wider Drum area and a
series of photographs have been received in letters of representation showing
flooding.  The proposal includes the formation of a SUDS pond to the south-east
of plot 3, in order to cater for surface water flood risk.   Concerns have been
expressed in letters of representation that developing the site and increasing the
extent of hardstanding may alter/increase downstream flood risk.  The Council's
Structures and Flooding Team (S&F) therefore requested that a Flood Risk
Assessment (FRA) be carried out.  S&F raised a number of queries following
review of the letters of representation and the FRA.   This sought clarity from the
author of the FRA on various matters including input rainfall information and
surface water modelling, amongst other issues.  They also sought clarity on the
design and operation of the proposed SUDS pond.  There was some concern
that the development will exacerbate downstream flood risk, by increasing
impermeable areas.  However, the provision of a suitably designed drainage
Page 124 of 168

Page 125

system should ensure that the development will have a neutral impact on flood
risk in the local area.   S&F sought clarity on the sizing of the system, to account
for additional surface water that enters the site from the NW (as shown by the
FRA).  They also sought confirmation of the proposed 2.4l/s discharge rate, with
submission of the greenfield run-off rate calculations to evidence this. 
65 This further information has been submitted and reviewed by S&F.  The agent
has also provided a basic overland flow route for the post-development situation,
which shows surface water being directed toward the drainage system which
helped to clarify the queries raised by S&F. 
66 The applicant's consultant clarified the approach taken within the FRA, which has
been accepted by S&F and the drainage design is considered acceptable.  This
will ensure that the site will have at least a neutral impact on flood risk in the
wider area, through the attenuation and controlled discharge of surface water
from impermeable areas of the site.  For the avoidance of any doubt a condition
(Condition 10) is recommended to ensure the detailed finalised design of the
SUDS system is submitted for approval. 
67 It is important to note that there are known wider flooding issues in the area.
However, the information submitted by the developer and their consultants
demonstrates that the proposals will have a neutral impact on flood risk.  The
proposal is therefore considered to comply with Policy 53C of the LDP2. 
Foul Drainage 
68 The proposal is to connect the development to the Scottish Water foul drainage
infrastructure which is appropriate and accords with the requirements of Policy
53B of the LDP2.  However, a separate application process to Scottish Water is
required to connect to their assets and a condition (Condition 9) is recommended
to ensure the development connects to the public drainage system.  An
informative is also recommended to make the developer aware of the
requirement for a separate application to Scottish Water. 
Contaminated Land 
69 As mentioned above there was a serious accident where a lorry carrying aviation
fuel crashed causing contamination on the site.  Letters of representation have
raised concern that there is a noticeable amount of Extractable Petroleum
Hydrocarbons (EPH) in flood water, evidenced by an oily film.  This matter has
been discussed within the Council's Contaminated Land Team who have clarified
that SEPA were the lead authority in the clean-up operation following the
accident and have declared that the site is suitable for development and that it
has been decontaminated appropriately.  Investigations were undertaken at the
time and a remedial scheme was designed and implemented to remove/treat the
identified impacted soils and groundwater.  In addition, ground water monitoring
at the site was undertaken up to February 2014.  This has been reviewed and
the Contaminated Land Team are satisfied that the levels of hydrocarbon being
recorded do not present a risk in relation to the development of the land for
residential use.  On that basis it is not considered necessary for a contaminated
land investigation to be carried out on site.
Page 125 of 168

Page 126

Access and Parking 
70 Policy 60B of LDP2 is relevant and requires that new development does not
impact on the road safety of the area.  The National Roads Development Guide
(NRDG) is also considered to be relevant.  This provides detail on parking and
access requirements.  The proposed access arrangements and parking levels
are considered to be acceptable.  Each dwelling is provided with a large parking
and turning area together with garages.  Furthermore, the existing public road
network is capable of accommodating the traffic associated with the
development.  Transport Planning have offered no objection to the application. 
The proposal therefore complies with Policy 60B of the LDP2.   
Developer Contributions 
71 The Council Developer Contributions Supplementary Guidance requires a
financial contribution towards increased primary school capacity in areas where a
primary school capacity constraint has been identified. A capacity constraint is
defined as where a primary school is operating at over 80% and is likely to be
operating following completion of the proposed development, extant planning
permissions and Local Development Plan allocations, at or above 100% of total
capacity. 
72 This proposal is within the catchment of Fossoway Primary School.   Education &
Children's Services have no capacity concerns in this catchment area at this time
and therefore no developer contributions are required. 
Servitude Rights of Access/Impacts on Existing Drainage Systems 
73 Letters of representation raise concern that the development may impact on
existing servitude rights of access.  However, such matters are not a material
planning consideration and rather a private civil matter between the parties
involved.  It should be noted that the granting of planning permission does not
overwrite any existing rights of access or land ownership issues/restrictions
which are apparent on any area of land or access and the applicant has been
made aware of the comments received from neighbours regarding these issues. 
It would be up to the applicant to resolve these issues should they wish to
develop the site.   
Neighbour Notification Process 
74 The neighbour notification and public advertisement process has been
undertaken in accordance with the relevant legislation. 
Economic Impact 
75 The economic impact of the proposal is likely to be minimal and limited to the
construction phase of the development. 
VARIATION OF APPLICATION UNDER SECTION 32A 
76 There have been no variations to the application.
Page 126 of 168

Page 127

PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
77 None. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
78 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is considered to comply with the approved
TAYplan 2016 and the adopted Local Development Plan 2 (2019).  Account
has been taken account of the relevant material considerations and none has
been found that would justify overriding the adopted Development Plan. 
79 Accordingly, the proposal is recommended for approval subject to the following
conditions. 
RECOMMENDATION   
Approve the application 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. Prior to the commencement of the development hereby approved, details of the
proposed boundary treatments for the site shall be submitted for the written
agreement of the Council as Planning Authority. The scheme as subsequently
agreed shall be implemented prior to the completion or bringing into use of the
development, whichever is the earlier. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
4. Prior to the commencement of the development hereby approved, a detailed
landscaping and planting scheme for the site shall be submitted for the written
agreement of the Council as Planning Authority.  The scheme shall include
details of the height and slopes of any mounding or recontouring of the site, full
details of all hard landscaping proposals including materials and installation
methods and, species, height, size and density of trees and shrubs to be
Page 127 of 168

Page 128

planted.  The scheme as subsequently approved shall be carried out and
completed within the first available planting season (October to March) after the
completion or bringing into use of the development, whichever is the earlier,
and the date of Practical Completion of the landscaping scheme shall be
supplied in writing to the Council as Planning Authority within 7 days of that
date.  The scheme as agreed and implemented shall thereafter be maintained
to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
5. Any planting failing to become established within five years shall be replaced in
the following planting season with others of similar size, species and number to
the satisfaction of the Council as Planning Authority. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
6. Prior to the commencement of any works on site, all trees on site (other than
those marked for felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be retained and protected.
Protection methods shall be strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction.  Protection measures, once in
place, shall remain in place for the duration of construction. 
Reason - To ensure the protection of all retained trees, in the interests of visual
amenity. 
7. Prior to the commencement of the development hereby approved, a 1:200 site
plan which identifies the Construction Exclusion Zone (CEZ) shall be submitted
for the written agreement of the Council as Planning Authority.  This plan shall
ensure all fencing adheres to BS 5837 2012: Trees in Relation to Design,
Demolition and Construction.  The CEZ as subsequently agreed shall be strictly
adhered to during construction of the development. 
Reason - To ensure the protection of all retained trees, in the interests of visual
amenity. 
8. The dwellinghouses shall be designed and constructed such that at the time of
completion internal noise levels in bedrooms from road traffic noise shall not
exceed LAeq 2300-0700 30dB, with windows open.  Any bedroom where such
a level is not achievable with windows open, sound insulating mechanical
ventilators shall be installed in addition to any acoustic trickle ventilators to be
provided. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
9. The foul drainage for the development shall be drained to the public mains
sewerage system. 
Page 128 of 168

Page 129

Reason- To ensure appropriate drainage arrangements are installed thereby
ensuring compliance with Policy 53B of the Local Development Plan 2019. 
10. Development shall not commence on site until a detailed sustainable urban
drainage system (SUDS) has been submitted for the further written agreement
of the Council as Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in accordance with the technical
guidance contained in The SUDS Manual (C753) and the Council's Flood Risk
and Flood Risk Assessments Developer Guidance, and shall incorporate
source control and shall be based upon the information submitted and
discussed with PKC Structures and Flooding. All works shall be carried out in
accordance with the agreed scheme and be operational prior to the bringing
into use of the development. 
Reason - To ensure the provision of effective drainage for the site. 
B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
C PROCEDURAL NOTES 
None. 
D INFORMATIVES 
1. Records indicate that at least part of the proposed development site lies within
a radon affected area where the measurement/monitoring of radon gas and the
installation of mitigation measures may be required. 
2. Further information on radon gas and the associated reports that can be
obtained is available at www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/. 
3. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
4. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority
written notice of that position. 
5. No work shall be commenced until an application for building warrant has been
submitted and approved. 
Page 129 of 168

Page 130

6. The applicant is advised that the granting of planning permission does not
guarantee a connection to Scottish Water’s assets. The applicant must make a
separate application to Scottish Water Planning & Development Services team
for permission to connect to the public wastewater system and/or water network
and all their requirements must be fully adhered to. 
7. Please consult the Street Naming and Numbering Officer, The Environment
Service, Perth and Kinross Council, Pullar House, 35 Kinnoull Street, Perth
PH1 5GD for a new postal address.  The form is downloadable from
www.pkc.gov.uk and should be returned to snn@pkc.gov.uk. 
8. The applicant is advised that in terms of Sections 56 of the Roads (Scotland)
Act 1984 he/she/they must obtain from the Council, as Roads Authority,
consent to open an existing road or footway prior to the commencement of
works.  Information on junction types, requirements for Vehicular Access
consents (VA1) and application forms are available at
www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of surface water should
be sought at the initial stages of design from Scottish Water and the Scottish
Environmental Protection Agency. 
Background Papers:  7 letters of representation
Contact Officer: John Williamson 
Date: 11 November 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 130 of 168

Page 131

21/01755/FLL
Erection of 3 dwellinghouses, 3 garages and associated works
at Land 30 Metres North East Of Rantrie Knowe Drum
Planning and Placemaking
Committee - 23 November
2022
Created by Kirsty Strong on 25 October 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:5000
5(2)(ii)
Page 131 of 168

Page 132

Page 132 of 168

Page 133

21/01755/FLL
Erection of 3 dwellinghouses, 3 garages and associated works
at Land 30 Metres North East Of Rantrie Knowe Drum
Planning and Placemaking
Committee - 23 November
2022
Created by Kirsty Strong on 25 October 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:2500
5(2)(ii)
Page 133 of 168

Page 134

Page 134 of 168

Page 135

Perth and Kinross Council
Planning & Placemaking Committee – 23 November 2022
Report of Handling by Head of Planning & Development
(Report No. 22/287) 
PROPOSAL: Siting of 8 holiday accommodation units, erection of ancillary
building, alterations and extension to ancillary buildings,
formation of landscaping and paths, extension to car parking
and associated works 
LOCATION: Dunkeld House Hotel, Dunkeld 
Ref. No: 21/02005/FLL
Ward No: P5 – Strathtay 
Summary 
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and
there are no material considerations apparent which outweigh the Development
Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 Dunkeld House Hotel is a category C listed building dating from 1900. It is set
within substantial landscaped grounds which are included on the Inventory of
Gardens and Designed Landscapes for Scotland.   The hotel has had various
extensions over its life, with other developments undertaken within the grounds
– including a marquee and a timeshare development to the west of the hotel. 
The hotel and wider grounds are also covered by several ancient woodland
designations and a number of ancient trees are present.   
2 This is a revised proposal which follows on from two withdrawn applications
and seeks to address issues regarding the accuracy of plans and the siting of
lodges.  The revisions also see the number of lodges reduced from 14 to 8, and
lodges re-sited to reflect the findings of an updated tree survey. 
3 The site where lodges would be situated comprises a dell surrounded by steep
sloping sides. The dell floor is mostly clear of trees but covered in bracken.
Otherwise, the dell slopes vary in the density of trees, with some areas open
and others featuring dense woodland.  The proposal will retain all the existing
trees and aims to have minimal impact on them.  The 8 lodges would be set
within existing open areas/clearings free of trees. A central access track is
proposed, but the main parking areas are a distance to the west adjoining the
main hotel access road.  A such the access track is primarily for small service
vehicles and not guest traffic, as such there would be limited vehicular traffic.
The two lodges closest to the hotel and parking would be ‘accessible’ with clear
access without steps. A further 6 lodges will utilise the existing slopes and be
placed on raised platforms accessed via steps and paths.  Additional works will
5(2)(iii)
Page 135 of 168

Page 136

see the extension of two ancillary buildings and erection of a small tank room
building. 
4 Wider access to the site will be via the existing hotel access road.  9 parking
spaces are to be added in the west of the site, accessed off the existing access
road and a further 6 added to the existing parking area to the rear of the hotel. 
Pre-Application Consultation 
5 Concerns have been raised regarding the lack of public consultation on the
proposal.  However, the proposed development is not classed as a Major
development in terms of the Town and Country Planning (Hierarchy of
Developments) (Scotland) Regulations 2009. As such the applicant was not
required to undertake any formal pre-application consultation with the local
community. 
NATIONAL POLICY AND GUIDANCE 
6 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework 2014 
7 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SSP) 
8 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
9 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability : paragraphs 24 – 35
• Placemaking : paragraphs 36 – 57
• Promoting Rural Development : paragraphs 74- 83
• Supporting Business and Employment : paragraphs 92 -108 
Page 136 of 168

Page 137

• Valuing the Historic Environment paragraphs : 135 - 151
• Valuing the Natural Environment paragraphs : 193 - 218 
Planning Advice Notes 
10 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statement
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 60 Natural Heritage 
• PAN 75 Planning for Transport 
National Roads Development Guide 2014 
11 This document supports Designing Streets and expands on its principles and is
considered to be the technical advice that should be followed in designing and
approving of all streets including parking provision. 
DEVELOPMENT PLAN 
12 The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2019. 
TAYPlan Strategic Development Plan 2016-2036 
13 TAYPlan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plans states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
14 The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application. – 
• Policy 1: Locational Priorities 
• Policy 2: Shaping Better Quality Places 
• Policy 3: A First Choice For Investment  
• Policy 9: Managing TAYplans Assets 
Perth and Kinross Local Development Plan 2 
15 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
Page 137 of 168

Page 138

the area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
16 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 8: Rural Business and Diversification
• Policy 9C: Caravan Sites, Chalets and Timeshare Developments: Chalets,
Timeshare and Fractional Ownership
• Policy 27A: Listed Buildings
• Policy 29: Gardens and Designed Landscapes
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 38A: Environment and Conservation: International Nature Conservation
Sites
• Policy 39: Landscape
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 47: River Tay Catchment Area
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
OTHER POLICIES 
Placemaking Supplementary Guidance 2020 
17 The Council has prepared Placemaking Supplementary Guidance (2020) to
support Policy 1 (Placemaking) of the Perth and Kinross Local Development
Plan 2 (2019). It is to be used in the assessment of planning applications and to
assist in the placemaking process. 
Forest and Woodland Strategy Supplementary Guidance 2020 
18 The council has prepared guidance relating to the Perth and Kinross Local
Development Plan (2019) Policy 40: Forestry, Woodland and Trees, and will be
used in the assessment of planning applications. The Guidance has been
updated to align with the adopted Local Development Plan (2019) and changes
Page 138 of 168

Page 139

to national policy particularly the publication of the Scottish Forestry Strategy
(2019-2029). 
SITE HISTORY 
19 20/01799/FLL A Full Planning Permission application was withdrawn on 18
March 2021, this has proposed the siting of 14 holiday accommodation units,
erection of ancillary building, alterations and extensions to ancillary buildings,
formation of landscaping and paths, extension to car parking and associated
works 
20 21/00436/FLL A second Full Planning Permission application was withdrawn
on 29 November 2021, again proposing the for siting of 14 holiday
accommodation units, erection of ancillary building, alterations and extensions
to ancillary buildings, formation of landscaping and paths, extension to car
parking and associated works 
CONSULTATIONS 
21 As part of the planning application process the following bodies were consulted: 
External 
Dunkeld And Birnam Community Council
22 Object. Citing the following reasons: impact on natural heritage, contrary to
Scottish Government Policy, light pollution, increase in traffic, detrimental visual
impact and that there was no public consultation. 
Historic Environment Scotland
23 No objection, in terms of impact on Historic Garden and Designed Landscape
and scheduled ancient monuments. 
Scottish Water
24 No objection.  Advise the nearest public water main is 1.5km distant and that
there is no foul connection. 
Scottish Environment Protection Agency
25 No consultation required. 
NatureScot
26 No objection. They consider the proposal will not adversely affect the integrity
of the NSA or the objectives of the designation 
Scottish Forestry
27 No comments.  Although it should be noted that no trees are to be felled and
ancient woodland considerations are set out in supporting information. 
Page 139 of 168

Page 140

Internal 
Transport Planning
28 No objection.  Advise that access and parking arrangements are acceptable.
No conditions requested. 
Development Contributions Officer
29 Advise that no developer contributions are required. 
Biodiversity/Tree Officer
30 Tree Officer: No objection, request detailed conditions associated to tree
protection during construction.  Biodiversity Officer: No objection, note
biodiversity enhancements proposed and surveys are to be conditioned. 
Structures And Flooding
31 No objection. The Flood Officer has previously confirmed that there is no flood
risk associated with the site and that drainage arrangements can be controlled
by condition.   
Commercial Waste Team
32 No objection.  Advise the hotel is already served by commercial waste
collections. 
Perth And Kinross Heritage Trust
33 No objection. No archaeological concerns.   
Environmental Health (Noise Odour)
34 No objection, due to site being well contained within a hotel resort complex. 
REPRESENTATIONS
35 A total of 41 letters of objection have been received, the main issues raised are: 
- Impact on woodland/ancient woodland
- Impact on wildlife/habitat
- Construction Impacts
- Noise pollution
- Light pollution 
- Overlooking
- Adverse effect on visual amenity
- Inappropriate land use
- Over intensive development
- Lack of details on drainage 
- Inappropriate design and finishes 
- Contrary to Development Plan Policy
- No business plan
- Loss of open space
- Out of character with the area
- Lack or loss of car parking 
- Traffic congestion
- Road safety concerns
Page 140 of 168

Page 141

- Lack of parking generally within hotel ground 
- Loss of a view
- Reduction of rental income 
36 These issues are addressed in the appraisal section of the report. Other than:
loss of a view or impact on a view, and reduction of rental income which are not
material planning considerations. 
ADDITIONAL STATEMENTS 
37
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not Required
Appropriate Assessment Habitats Regulations Appraisal
completed 
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact eg
Flood Risk Assessment
• Arboriculture Assessment;
• Heritage, Design and Impact
Assessment; 
• Mammal and Tree Report;
• Ecological Appraisal;
• Landscape Strategy and
Report.   
APPRAISAL 
38 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2019.  The relevant policy considerations are outlined in the
policy section above and are considered in more detail below.  In terms of other
material considerations, this involves considerations of the Council’s other
approved policies and supplementary guidance. 
39 In this instance, section 14(2) of the Planning (Listed Buildings and
Conservation Areas) (Scotland) Act 1997 places a duty on planning authorities
in determining such an application as this to have special regard to the
desirability of preserving the building or its setting or any features of special
architectural or historic interest which it possesses.   
Principle 
40 The proposals are related to a long-established hotel business operating within
large grounds out with the settlement boundary of Dunkeld, on the banks of the
River Tay.  The principle of development is thus to be primarily considered
Page 141 of 168

Page 142

under LDP2 Policy 8: Rural Business and Diversification and Policy 9: Caravan
Sites, Chalets and Timeshare Developments. 
41 Policy 8 considers the expansion of existing businesses and the creation of
new ones in rural areas. There is generally a preference that such development
will be within or adjacent to existing settlements. However, sites out with
settlements may be acceptable where they offer opportunities to diversity an
existing business or are related to an existing site-specific resource or
opportunity.  The proposal is for holiday accommodation that is related to a
well-established existing hotel operation and is an opportunity to diversify an
existing business with a site-specific resource. 
42 There are a number of criteria outlined within the policy which require
development to contribute to the local economy, not to result in suburbanisation
or encourage unsustainable travel patterns, be compatible with surrounding
land uses, able to be accommodated within the landscape and environmental
capacity, meets a need by virtue of the location in relation to existing
business/tourist facilities, be of high-quality design, and that the road network
can accommodate development traffic.   
43 Therefore, in this case the policy supports the expansion of existing businesses
and for reasons covered in more detail below the proposal is considered to
meet the Policy criteria. 
44 Policy 9C refers to ‘chalet style’ developments and states that favourable
consideration will be given where these cannot be used as permanent
residences.  It goes on to provide criteria for development proposals to satisfy
and indicates that the expansion of an of an existing hotel offering will be
supported.  The criteria require that a proposal doesn’t involve an
overdevelopment of a site or its setting and meets a specific need by virtue of
its quality or location in relation to existing tourism facilities.  In this instance the
proposal involves a relatively small-scale expansion of an existing well-
established hotel offer and therefore the principle of extending the level of
accommodation across the wider site, given the facilities already available, is
considered acceptable and in accordance with the requirements of Policy 9C. 
Condition 3 is recommended to ensure each unit is solely used for holiday
accommodation only and not as a permanent residence. 
45 The principle of the development is considered acceptable in terms of both
Policy 8 and 9.  The detail of the proposal and its impact on residential amenity,
landscape and other matters is considered below. 
Design and Layout 
46 The lodges are proposed to be sited within an area aptly known as ‘The Dell’
and characterised by steeply sloping banks and areas of mature tree coverage. 
The lodges are generally to be placed on stilts, to raise them above the
gradients the dell floor, and accessed via a deck, steps or paths depending on
the immediate terrain.  The lodges all have a similar layout and design:
bedroom, bathroom and an open plan living/kitchen space. A large floor to
ceiling window will be positioned within the living space.  Two of the lodges
Page 142 of 168

Page 143

although of similar layout are designed to be ‘accessible’ accommodation with
low gradient ground level access.  
47 The lodges are of a panel-built construction system, designed for easy on-site
assembly, responding to the complex site constraints. Externally cladding with
Larch boards is proposed, whilst the roof is a dark grey single ply roofing
membrane. The windows are dark framed and double glazed. 
48 The site is well contained with the scale of the development and siting of the
lodging taking cognisance of the site limitations.  As such, the proposal is
considered to be of an appropriate scale and design and is considered to be
conducive to the rural character and visual amenity of the area as required by
Policies 1A, 1B and the criteria outlined within Policy 8 of LDP2 
Residential Amenity 
49 The nearest residential properties are located in excess of 350m away.  There
are holiday homes located to the west, but as the development is of a similar
use it is considered that any noise from the operation of the lodges would not
be different to that which already exists.   Concerns have also been noted in
relation to overlooking but the distance between the nearest proposed and
existing holiday unit is in excess of 100 metres and not considered to result in
any unacceptable impingement. 
50 The application includes the extension of three buildings, to be used to house
the biomass, plant equipment and tank/pump. As above due to the intervening
distance there would be no unacceptable impact on residential amenity of
neighbouring properties. 
51 Overall, the proposal is considered to be acceptable in terms of the residential
amenity of neighbouring properties in accordance with the placemaking policies
1A and 1B. 
Light Pollution 
52 Policy 55 of LDP2 states that consent will not be granted for proposals where
lighting would result in obtrusive or intrusive effects. The plans indicate low
level lighting but to ensure that the details are fully agreed with an appropriate
scheme a condition will be added (Condition 5). 
Conservation Considerations 
53 The proposed development is located within the Dunkeld House designed
landscape, which is included in the Inventory of Gardens and Designed
Landscapes, in recognition of its national importance.  The hotel building is also
Category C(s) listed, whilst Kings Seat Scheduled Monument lies to the north-
west.   
54 Historic Environment Scotland (HES) have considered the proposals and were
involved previously in discussions regarding opportunities for development
within the wider hotel grounds.  They consider that this enclosed and secluded
Page 143 of 168

Page 144

part of the designed landscape could, in principle, accommodate a very limited
level of development. This was subject to any lodge development being
carefully designed to have the minimum impact on the character of this part of
the inventory landscape.  Such a development should be: a small number of
lodges, with minimal landforming (cut and fill) and infrastructure (pedestrian
access rather than road, minimal lighting and service infrastructure). HES noted
that great care should be taken to ensure that the number and location of units,
design, scale, access and landscaping and planting reinforced the parkland
character of this part of the inventory landscape. 
55 HES have considered the current proposals and are satisfied that the form of
development would not have a detrimental impact on this part of the Inventory
site or the setting of the scheduled monument.  It is further considered that for
the reasons stated by HES that the development is adequately screened and
separated from the listed building that it would not impact the setting. 
56 The proposal is therefore considered to comply with Policy 26A Scheduled
Monuments, Policy 27A Listed Buildings and Policy 29 Gardens and
Designated Landscapes.   
Landscape 
57 Policy 39: Landscape, requires proposals to be compatible with the landscape
character of the area and be a good fit with the landscape and amongst other
things, not erode local distinctiveness.  In general development and land use
change should be compatible with the distinctive characteristics and features of
Perth & Kinross's landscape, with proposals that do not conflict with the aim of
maintaining and enhancing the landscape qualities of Perth and Kinross
supported. 
58 The site is within a National Scenic Area (NSA) and whilst concerns are noted
within representations regarding a lack of information, in particular a Landscape
and Visual Impact Assessment, the small scale of the proposal and the
containment within the landscape combined with the comments from Historic
Environment Scotland and NatureScot conclude that an LVIA is not
proportionately required. 
59 The proposal is therefore considered of small scale and within an existing hotel
complex, so as to be readily accommodated with the capacity of the landscape
and therefore complies with Policy 39 of LDP2. 
River Tay Special Area of Conservation    
60 The River Tay Special Area of Conservation (SAC) is located approximately
150 metres to the southeast and separated by existing development, with no
watercourses adjacent.  In this context consideration of impacts during the
construction period could be adequately covered by a Construction Method
Statement. (Condition 4) 
Page 144 of 168

Page 145

Natural Heritage and Biodiversity 
61 Dunkeld Estate is a candidate local nature conservation site in the process of
survey and assessment. Until designation, this is covered by Policy 38C:
Nature Conservation.  However it has clearly been identified as an area at least
of local importance for biodiversity, either in the past or due to expert opinion,
and therefore a precautionary approach should be taken to impacts via
consideration against Policy 41 Biodiversity. 
62 The additional survey requirements outlined in an updated Preliminary
Ecological Appraisal Report (PEAR) (Echoes Ecology Ltd, 2020) and requested
in previous applications have been carried out and the results are reported in
the submitted Mammal Survey (29 September 2021). In addition, red squirrel
and bat surveys were undertaken.  It is noted that the survey requirement
sections in the PEAR have not been updated to reflect that all surveys have
been completed.  All recommendations outlined in the submitted Mammal
Survey will require to be implemented and fully adhered to (Condition 10). 
63 Overall enhancement of biodiversity should be demonstrated in all projects and
needs to be site specific based on surveys, location, development size,
surrounding habitats and landscape character, and follow ecologist
recommendations.  Opportunities for enhancement are discussed within the
PEAR and include: deadwood retention, provision of bird and bat boxes,
planting wildflower meadows and native shrubs. All these measures would be
welcomed as positive measures for biodiversity. A Site Biodiversity Action Plan
was encouraged but not provided. Therefore, enhancement shall be confirmed
via condition (Condition 12). 
Ancient Woodland/Trees 
64 Large areas of the surrounding land and part of the application site are
identified within Scotland’s Ancient Woodland Inventory. This defines land that
is currently and has continually been wooded since at least 1750.  Although not
legally protected, Ancient Woodland Inventory sites are an important and
irreplaceable habitat and the Tayside Local Biodiversity Action Plan seeks to
enhance, restore and extend coverage of ancient woodland.  There are no
LDP2 policies which prohibit development within ancient woodland, although
the impact of development must be carefully considered. One tree of cultural
merit is a veteran European Larch tag no. T1362 known as the ‘Pedestal
Larch’. 
65 As mentioned, the site itself is partially zoned as Ancient Woodland, with 5 of
the 8 lodges within the zoning.  The hotel grounds arelargely designated as
such and as such opportunities to develop out with the designation are limited. 
The area selected also has areas of natural clearings which allow development
to be sited without tree removal. 
66 The number of chalets proposed has been reduced (14 to 8) from the previous
application, and the chalet positions are now in a preferable location, less likely
to affect trees. 
Page 145 of 168

Page 146

67 The information provided advises that as a mitigation method to reduce impact
on tree roots, the chalet units would be secured through the use of screw piling
and a galvanised steel framework.  The use of ‘Bogmats’ to minimise ground
disturbance is also proposed and welcomed.  The application is also supported
by a detailed method statement setting out how the works will be undertaken,
the phasing of the operations and the control measures to be adopted. Strict
compliance with the terms of the Arboricultural Method Statement will be
conditioned as well as pre-start meetings to control site operations and tree
protection systems (Conditions 6, 7, 8 and 9). 
Roads and Access 
68 The accommodation units will use the existing road infrastructure from the
public road network to access the site and no changes are proposed. 
69 Associated with the development is the provision of an additional 15 car parking
spaces.  The level of parking provision for the one bedroomed holiday units is
acceptable and meets the minimum requirements in the National Roads
Development Guide.  As it is likely that the associated parking requirement
would be one space per lodge it is considered that the proposal will create
more parking than needed, adding to the hotels overall provision. 
70 The access along the main front drive, as shown in the red line boundary, to the
site sees regular passing places along its length.  This will provide space for
vehicles to pass.  It has been noted that there is an additional access to the
hotel which could also be utilised. However, this has not been indicated as the
proposed access and is not currently promoted for hotel patrons.     
71  Whilst public transport does not serve the hotel, Dunkeld sees bus and train
services.  There are also opportunities for walking and cycling in the area and
the proposal is of a relatively small scale so as not to encourage unsustainable
travel patterns or result in suburbanisation of the rural area.   
72 Overall, the proposal is acceptable in terms of traffic and road safety and
therefore accords with Policy 60B of LDP2. 
Drainage and Flooding 
73 SEPA’s indicative flood maps do not identify the site as being at risk of flooding
and there are no known issues or concerns in respect to flooding at the site.
74 The site is accompanied by drainage information which shows a number of
small soakaways and a piped connection to the existing sewage treatment
plant. These mainly follow the proposed paths and roads to minimise ground
works. 
75 The Flood Team note that it is not clear to what rainfall event the soakaways
have been designed.  However as this is private on-site drainage any impacts
would be to the wider site which is under the applicant's control. The Flood
Team therefore advise the applicant to consider where the potential overland
flow paths would go if the drainage capacity were to be exceeded. A SUDs
condition is recommended (Condition 13).
Page 146 of 168

Page 147

Waste Collection 
76 The existing hotel is served by commercial bin collection and the small scale of
the proposal is not considered to have a significant impact on these
arrangements.   
Embedding Low & Zero Carbon Generating Technologies 
77 Policy 32 states that all new buildings will be required to demonstrate that at
least 10% of the current carbon emissions reduction set by Scottish Building
Standards will be met through the installation and operation of low and zero-
carbon generating technologies. It further specifies that a statement must be
submitted demonstrating compliance with this requirement. 
78 There are no details within the submission of any renewable technologies and
with most developments it is considered that some measures could be
incorporated.  It is therefore considered that a planning condition can be added
to require the inclusion of low and zero-carbon generating technologies 
(Condition 14). 
Developer Contributions 
79 There are no developer contributions applicable to the site. 
Economic Impact 
80 The proposal provides additional tourist accommodation increasing the choice
of accommodation at the hotel and potential employment opportunities. This is
likely to create a positive economic impact. There is also likely to be some
short-term economic gain from the construction phase of the development. 
VARIATION OF APPLICATION UNDER SECTION 32A 
81 This application was not varied prior to determination. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
82 Not required.
DIRECTION BY SCOTTISH MINISTERS 
83 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
84 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is considered to comply with the approved
TAYplan 2016 and the adopted Local Development Plan 2 (2019).  Account
Page 147 of 168

Page 148

has been taken account of the relevant material considerations and none has
been found that would justify overriding the adopted Development Plan. 
85 Accordingly the proposal is recommended for approval subject to the following
conditions. 
RECOMMENDATION   
Approve the application. 
Conditions and Reasons for Recommendation 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. The development hereby approved shall be used solely for holiday
accommodation and shall not be occupied as the sole or main residence of any
occupant. 
Reason - In order to clarify the terms of the permission; to control and restrict
the use of the building. 
4. Development shall not commence until a detailed Construction Method
Statement (CMS) has been submitted to the Council as Planning Authority and
agreed in writing.  The CMS must identify measures to prevent harmful
materials entering the River Tay SAC, which could reduce water quality and
lead to a damaging impact on the salmon, otter and lamprey interests. The
CMS should include the following: 
(a)  pollution prevention safeguards including drainage arrangements and the
possible use of siltation traps, settlement tanks and bunds 
(b)  storage and disposal of materials including the siting of stock piles, use of
buffer strips and disposal methods 
(c)  construction site facilities including extent and location of construction site
huts, vehicles, equipment, fuel, chemicals and materials compound 
(d)  timing, duration and phasing of construction particularly in relation to
salmon and lamprey migration/spawning.
Page 148 of 168

Page 149

The CMS and mitigations as agreed shall be fully implemented as part of the
planning permission. 
Reason - In order to ensure the development does not impact negatively on the
nearby Special Area of Conservation. 
5. Prior to the installation of any external lighting, the details of all external lighting
shall be submitted for the written agreement of the Council as Planning
Authority.  The scheme shall include details of light spill, brightness of the
lighting and the proposed hours of operation.  The agreed lighting scheme shall
be implemented and maintained in full accordance with the agreed scheme. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
6. Prior to the commencement of any works on site, an independent and fully
qualified Arboricultural Clerk of Works (ArbCow) shall be appointed at the
developers' expense. Details of this appointment shall be subject to the prior
written agreement of the Council as Planning Authority. The appointed person
will remain in post for the duration of the construction and shall have the
responsibility of ensuring tree protection measures are implemented in
accordance with BS 5837 2012: Trees in Relation to Design, Demolition and
Construction, and tree protection measures are maintained secure at all times,
and until completion of the development. In addition the following is required; 
(a)  The developer's appointed ArbCow to contact the local planning authority
tree officer in order to arrange a prestart meeting to agree on site tree
pruning works required to facilitate the development, but before
commencement of development. 
(b)  The developer's appointed ArbCow to contact the local planning authority
tree officer to arrange a prestart meeting for inspection of all tree & ground
protection measures, before commencement of development. 
(c) The developer's appointed ArbCow to contact the local planning authority
tree officer to agree drainage installation method, and non-dig geocell
technique used to form the access pathway in accordance with Chapter
14 (New Surfaces Detailed Specification) of Roavr Environmental Tree
Report dated 10.10.21. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
7. The development shall be undertaken in full compliance with the Arboricultural
Method Statement by Roavr Environmental, Tree Report dated 10.10.21
Chapter 9  (plan ref 31, 32, 33, 34)  submitted and hereby approved shall be
fully adhered to, respected and undertaken as part of the construction phase of
development. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority.
Page 149 of 168

Page 150

8. Prior to the commencement of development a detailed plan that shows the
exact position of the proposed fencing, development, trees, and demarcating
the Construction Exclusion Zone, (with protective fence type specification) shall
be submitted to and agreed in writing with the Council as Planning Authority. 
The plan as approved shall be fully adhered to, respected and undertaken as
part of the construction phase of development. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
9. Prior to the commencement of development  a planting plan for the site
showing augmentation planting, using native local provenance sourced
pedunculate oak, sessile oak, silver birch, Scots pine, holly, yew, and non-
native Quercus ilex (evergreen oak), shall be submitted op agreed in writing by
the Council as Planning Authority.  The new tree planting to be subject to
protection from vermin, including deer .  The scheme as subsequently
approved shall be carried out and completed within the first available planting
season (October to March) after the completion or bringing into use of the
development, whichever is the earlier, and the date of Practical Completion of
the landscaping scheme shall be supplied in writing to the Council as Planning
Authority within 7 days of that date.  The scheme as agreed and implemented
shall thereafter be maintained to the satisfaction of the Council as Planning
Authority. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
10. The conclusions and recommended action points within the supporting
biodiversity surveys Red Squirrel Survey Report, Bat Survey Report, Mammal
Survey and Bat Survey of Trees Report and Ecological Appraisal by Echoes
Ecology Limited dated 29.06.22, 30.08.2022, 29.09.21, 29.09.21 (Plan ref 49,
48, 46, 45, 44) submitted and hereby approved shall be fully adhered to,
respected and undertaken as part of the construction phase of development, to
the satisfaction of the Council as Planning Authority.  Attention is drawn to both
survey documents – Preliminary Ecological Appraisal Report (Echoes Ecology
Ltd, 2020) and Mammal Survey and Bat Survey of Trees (Echoes Ecology Ltd,
2021) and need for pre-works checks (in Section 6 - Ecological Constraints
Plan) with the results of these checks be submitted to the Planning Authority
(Condition ).   In addition, the recommendations outlined in Section 7 -
Ecological Constraints and Opportunities Plan – of the submitted PEAR
(Echoes Ecology Ltd, 2020) must be implemented and adhered to in full also.
Reference to the measures for invasive non-native species, reptiles, and
breeding birds. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
11. Measures to protect animals from being trapped in open excavations and/or
pipe and culverts shall be implemented for the duration of the construction
works of the development hereby approved. The measures may include
creation of sloping escape ramps for animals, which may be achieved by edge
profiling of trenches/excavations or by using planks placed into them at the end
Page 150 of 168

Page 151

of each working day and open pipework greater than 150 mm outside diameter
being blanked off at the end of each working day. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
12. Prior to the commencement of development hereby approved, details of the
location and specification of the biodiversity enhancement measures listed in
the submitted Preliminary Ecological Appraisal Report (September 2022) (Plan
ref 47) including a barn owl box, bat boxes, bird boxes and native planting shall
be submitted for the further written agreement of the Council as Planning
Authority. Thereafter, the agreed scheme shall be maintained in a reasonable
condition for the life of the development, to the satisfaction of the Council as
Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
13. Storm water drainage from all paved surfaces, including the access, shall be
disposed of by means of suitable Sustainable Urban Drainage Systems to meet
the requirements of best management practices. 
Reason - To ensure the provision of effective drainage for the site. 
14. Prior to the commencement of development hereby approved, a scheme shall
be submitted to, and approved in writing by, the Council as Planning Authority
that demonstrates how at least 10% of the current carbon emissions reduction
set by the Scottish Buildings Standards will be met through the installation and
operation of low and zero-carbon technologies. This scheme shall detail for
each building: 
a) the technology types;
b) illustrate, through technical calculations, that these will meet at least the   
10% reduction; 
c) their siting and location; and 
d) ongoing operation and maintenance. 
Once approved, the development shall be completed in accordance with the
approved scheme and no individual unit shall be occupied until the scheme has
been installed and operating. 
Reason – to comply with Policy 32 of the Local Development Plan 2 
B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
C PROCEDURAL NOTES 
None. 
Page 151 of 168

Page 152

D INFORMATIVES 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority
written notice of that position. 
3. An application for Building Warrant may be required. 
4.  This planning permission is granted subject to conditions, some of which
require further information to be submitted to Development Management either
before works can start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original application was
lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware that a fee is payable
in respect of each request made, though there is no limit to the number of
conditions that can be discharged in a single request.  The Fees Charter is
available on our website www.pkc.gov.uk.   
5. The Council has two months to consider the information.  You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of
the expiry date of your permission will be able to be dealt with before your
permission lapses. 
6. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act. 
7 Existing buildings or structures may contain nesting birds between 1st March
and 31st August inclusive. The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is an offence to remove,
damage or destroy the nest of any wild bird while that nest is in use or being
built. Planning permission for a development does not provide a defence
against prosecution under this Act. 
Background Papers:  41 representations
Contact Officer:  Joanne Ferguson
Date: 11 November 2022 
Page 152 of 168

Page 153

DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 153 of 168

Page 154

Page 154 of 168

Page 155

21/02005/FLL
Siting of 8 holiday accommodation units, erection of ancillary building, alterations and extension to
ancillary buildings, formation of landscaping and paths, extension to car parking and associated
works at Dunkeld House Hotel Dunkeld PH8 0HX
Planning and Placemaking
Committee - 23 November
2022
Created by Kirsty Strong on 25 October 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:15000
5(2)(iii)
Page 155 of 168

Page 156

Page 156 of 168

Page 157

21/02005/FLL
Siting of 8 holiday accommodation units, erection of ancillary building, alterations and extension to
ancillary buildings, formation of landscaping and paths, extension to car parking and associated
works at Dunkeld House Hotel Dunkeld PH8 0HX
Planning and Placemaking
Committee - 23 November
2022
Created by Kirsty Strong on 25 October 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:7000
5(2)(iii)
Page 157 of 168

Page 158

Page 158 of 168

Page 159

Perth and Kinross Council
Planning & Placemaking Committee – 23 November 2022
Pre-Application Report by Head of Planning and Development
(Report No. 22/288) 
Installation of a battery energy storage facility comprising battery storage units and
associated works, land 100 Metres Southwest of Birch Grove, Killichonan. 
Ref. No: 22/00020/PAN 
Ward No: P4 – Highland 
Summary 
This report is to inform the Committee of a potential forthcoming planning
application in respect of a major development for the Installation of a 20 Megawatt
(MW) grid connected battery energy storage facility along with ancillary
infrastructure, on land 100 Metres Southwest of Birch Grove, Killichonan, Loch
Rannoch. The report also aims to highlight the key planning policies and the likely
stakeholders who would be involved in the decision-making process, and to offer a
brief overview of the key planning issues which are likely to be relevant to the
proposal. 
BACKGROUND AND DESCRIPTION 
1 In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicant has submitted a Proposal of Application
Notice (PoAN) on 5 October 2021. The purpose of this report is to inform the
Planning and Placemaking Committee of a forthcoming planning application in
respect of a major development for Muirden Energy LLP, pertaining to the
installation of a 20 MW battery energy storage facility along with associated
infrastructure. Pre-application reports give the Committee an opportunity to
raise issues which it would like to see addressed in the planning application. 
2 This PoAN seeks to formally establish a major development. The exact scale
and design of the development will be arrived at during ongoing discussions
with the applicant and are not provided at this time. 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
3      Due to the scale of the proposal it will require to be screened as to whether the
proposal is an Environmental Impact Assessment (EIA) development under the
EIA 2017 Regulations. A screening opinion has already been provided by the
Planning Authority for a 20 MW Battery Energy Storage at this location dated
30 September 2021. In terms of extent, scale, magnitude, complexity,
6(i)
Page 159 of 168

Page 160

probability, duration, frequency and reversibility, it was considered unlikely that
the development would have a significant effect on the environment. 
PRE-APPLICATION PROCESS 
4 The PoAN confirmed that two in person public events are to be held at the
Bridge of Gaur Hall on 15 November 2022 and 1 December 2022. The Ward
Councillors as well as the Rannoch Community Trust and Killiecrankie,
Fincastle and Tummel Community Council have all been notified. Subsequent
notifications will also be provided to the Local MP and MSP. The results of the
community consultation will be submitted with the planning application as part
of the required Pre-Application Consultation (PAC) Report. 
NATIONAL POLICY AND GUIDANCE 
5 The Scottish Government expresses its planning policies through the National
Planning Framework (NPF) 3, the National Roads Development Guide 2014,
Scottish Planning Policy (SPP) 2014 and Planning Advice Notes (PAN). 
National Planning Framework 
6 The NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. Under the Planning etc (Scotland) Act 2006, this is now a
statutory document and a material consideration in any planning application.
The document provides a national context for development plans and planning
decisions as well as informing the on-going programmes of the Scottish
Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SPP) 
7 The SPP is a statement of Scottish Government policy on land use planning.
The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35 
• Placemaking: paragraphs 36 – 57
• Promoting Rural Development: paragraphs 74 – 91
• Supporting Business and Employment: paragraphs 92 – 108
• Valuing the Historic Environment: paragraphs 135 – 151 
• Delivering Heat and Electricity: Paragraphs 152 -174
• Valuing the Natural Environment: paragraphs 193 – 218
• Maximising the Benefits of Green Infrastructure: paragraphs 219 – 233
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
8 The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal: 
• PAN 3/2010 Community Engagement 
Page 160 of 168

Page 161

• PAN 1/2011 Planning and Noise
• PAN 2/2011 Planning and Archaeology
• PAN 1/2013 Environmental Impact Assessment  
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 60 Natural Heritage 
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 73 Rural Diversification
• PAN 79 Water and Drainage 
• Energy Storage: Planning Advice (2011) 
LOCAL POLICY AND GUIDANCE 
TAYplan Strategic Development Plan 2016-2036 
9 TAYplan sets out a vision for how the region will be in 2032 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plan states that: 
“By 2032 the TAYplan region will be sustainable, more attractive, competitive
and vibrant without creating an unacceptable burden on our planet. The quality
of life will make it a place of first choice where more people choose to live,
work, study and visit, and where businesses choose to invest and create jobs” 
10 The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application: 
• Policy 1 – Location Priorities 
• Policy 2 – Shaping better quality places
• Policy 3 – A First Choice for Investment 
• Policy 7 – Energy, Waste and Resources 
• Policy 9 – Managing Tayplan’s Assets 
Perth and Kinross Local Development Plan 2019 
11 The Local Development Plan 2 (LDP2) was adopted by Perth and Kinross
Council on 29 November 2019.  It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
12 The LDP2 sets out a vision statement for the area and states that: 
“Our vision is of a Perth and Kinross which is dynamic, attractive and effective
which protects its assets whilst welcoming population and economic growth.” 
13 Under the LDP2, the following polices are of particular importance in the
assessment of this application: 
• Policy 1: Placemaking 
• Policy 2: Design Statements   
Page 161 of 168

Page 162

• Policy 8: Rural Business and Diversification
• Policy 15: Public Access 
• Policy 26B Archaeology 
• Policy 27A Listed Buildings 
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 35: Electricity Transmission Infrastructure
• Policy 37: Management of Inert and Construction Waste
• Policy 38B National Designations 
• Policy 39: Landscape 
• Policy 40: Forestry, Woodland and Trees 
• Policy 41: Biodiversity 
• Policy 42: Green Infrastructure 
• Policy 47 River Tay catchment Area 
• Policy 52: New Development and Flooding 
• Policy 53: Water Environment and Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution 
• Policy 56: Noise Pollution 
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
OTHER POLICIES 
14 The following supplementary guidance and documents may be of particular
importance in the assessment of this application: 
• Placemaking Supplementary Guidance March 2020
• Landscape Supplementary Guidance February 2020
• Flood Risk and Flood Risk Assessments – Developer Guidance June 2021
• Perth and Kinross Green and Blue Infrastructure (2020) 
• Renewables and Low Carbon Energy (draft) 
• Perth and Kinross Community Plan 2013/2023 
PLANNING SITE HISTORY  
15 21/01700/SCRN: Screening Opinion Request for the Installation of a 20MW
grid connected battery storage facility and associated infrastructure on land 100
Metres Southwest of Birch Grove, Killichonan. Opinion Issued 30th September
2021. 
CONSULTATIONS 
16 As part of the planning application process the following would be consulted: 
Page 162 of 168

Page 163

External 
• Scottish Environment Protection Agency (SEPA)
• NatureScot
• Scottish Water 
• Transport Scotland
• Perth and Kinross Heritage Trust (PKHT)
• Historic Environment Scotland 
• Rannoch Community Trust 
• Killiecrankie, Fincastle and Tummell Community Council (Rannoch
Community Council is not active) 
Internal 
• Environmental Health 
• Strategic Planning and Policy
• Developer Contributions Officer
• Community Greenspace including Access
• Transport Planning
• Structures and Flooding
• Biodiversity Officer 
KEY ISSUES AGAINST WHICH A FUTURE APPLICATION WILL BE
ASSESSED 
17 The key considerations against which the eventual application will be assessed
include: 
• Planning Statement 
• Impacts on local Archaeology in the area
• Impacts on the setting of Rannoch Power Station listed as a Category A
Listed Building  
• Noise from Operation on nearby residents 
• Biodiversity impacts, including protected species 
• Flood and drainage impacts
• Landscape and visual impacts, including on the National Scenic Area 
• Traffic and Transport Impacts     
ADDITIONAL STATEMENTS WHICH WILL BE REQUIRED 
18 The following supporting documents will need to be submitted with any
planning application: 
• Planning Statement 
• Design and Access Statement 
• Pre-Application Consultation (PAC) Report 
• Transport Assessment 
• Flood Risk and Drainage Assessment 
Page 163 of 168

Page 164

• Landscape and Visual Impact Assessment 
• Noise and Light Assessment 
• Grid Connection Site Survey  
• Construction Traffic Management Plan 
• Habitat survey, including protected species 
• Construction Method statement 
CONCLUSION AND RECOMMENDATION 
19 This report summarises the key issues which should be considered as part of the
appraisal of any subsequent planning application which may be lodged in respect
of this development and members are recommended to note these key issues
and advise officers of any other issues which they consider should be included
as part of the application and assessment. 
Background Papers: None
Contact Officer: Jamie Torrance  
Date: 11 October 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 164 of 168

Page 165

22/00020/PAN
Installation of 20MW battery storage facility at Land 100 Metres
South West Of Birch Grove Killchonan
Planning and Placemaking
Committee - 23 November
2022
Created by Kirsty Strong on 25 October 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:25000
6(i)
Page 165 of 168

Page 166

Page 166 of 168

Page 167

22/00020/PAN
Installation of 20MW battery storage facility at Land 100 Metres
South West Of Birch Grove Killchonan
Planning and Placemaking
Committee - 23 November
2022
Created by Kirsty Strong on 25 October 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:10000
6(i)
Page 167 of 168

Page 168

Page 168 of 168