Perth and Kinross Council
Planning and Placemaking Committee – 23 November 2022
Report of Handling by Head of Planning & Development
(Report No. 22/284) 
PROPOSAL: Formation of A9 slip road and junction including road
widening, landscaping, drainage works and erection of a
replacement bridge 
LOCATION: Land at A9(T) and Shinafoot Road (B8062) near Auchterarder 
Ref. No: 21/01968/FLM
Ward No: P7 – Strathallan 
Summary 
This report recommends refusal of the application which proposes: the formation
of a southbound off slip road from the A9 at Shinafoot, Auchterarder; a new
junction onto the B8602, with associated road widening, drainage, landscaping
and a replacement bridge over Ruthven Water.  The proposal fails to accord with
the Development Plan, raising concerns in relation to traffic safety and biodiversity,
and there are no material considerations apparent which outweigh the
Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The application site is c4.42 hectares (ha) in area, situated at Shinafoot, some
1.7 kilometres (km) north-east of Auchterarder.  The proposed slip road would
replace approximately 3ha area of semi natural / mixed woodland adjacent to
the existing A9 Trunk Road (A9).  The Ochils Special Landscape Area
boundary is some 500 metres (m) to the east and the Ochil Range Site of
Special Scientific Interest (SSSI) 1km to the south-east.   
2 The proposal is to form a new grade separated junction, comprising a south
bound off slip road from the A9.  Additional and associated works are also
proposed to the B8602, (which will connect to the new slip road), including road
widening, drainage works and the installation of a replacement bridge across
the Ruthven Water.   The most significant visual impact will result from the
earthworks with a cut through an existing embankment and woodland with
ground levels lowered by up to 10m to facilitate the road geometry.  Proposed
ground profiles are illustrated in Drawing Reference 21/01968/07 - Landscape
Cross Sections. 
3 The Auchterarder Expansion Townhead & Northeast Development Framework
(DF) was originally adopted by the Council in February 2008 as planning
guidance under the adopted Local Plan at that time, the Strathearn Area Local
Plan 2001. In the DF, Trunk Road junction improvements at Shinafoot are
identified as a requirement for the delivery of the Auchterarder Development

Page 2

Framework housing sites. Those housing opportunities being under the control
of the applicants. The DF reports Transport Scotland’s requirements for the
junction improvements, as set out at that time. The improvements were
designed to address safety issues and not operational capacity restrictions. 
Following on from the DF for Auchterarder outline Planning Permission was
granted in 2008 (Ref: 08/01133/OUT) for a ‘Major’ mixed use development,
including: residential, business, general industrial and storage uses. That
application was subject to a Section 75 Planning Obligation limiting the
occupation of no more than 389 open market dwellinghouses, until “a new
grade separated junction on the A9 at Shinafoot Road (B8602) by way of
provision of southbound on and off slips and utilising the existing Shinafoot
Road underpass together with associated works generally in accordance with
the specification and layout on Drawing No. BT1202803/901270/05 Dated April
2002” had been completed. 
4 This application seeks to begin implementation of the transport obligations
under this section 75 legal agreement, to enable the limit on housing
occupation to be lifted.  However, the aforementioned and defined “Shinafoot
Junction Improvement Works” requires that the Consortium (being the
applicants in this case) is contracted to provide a new grade separated junction
with two essential design features. The first is that it has southbound on and off
slips, and the second is that those on and off slips require to be accessed via
the existing Shinafoot Road underpass. In this context the extent of
development proposed in the current application does not include a southbound
on slip to the A9 and as such it fails to meet the full junction improvement works
required by legal agreement. Further details are discussed below.     
5 The Council’s Supplementary Guidance “Planning for Nature – Development
Management and Wildlife Guide, April 2022”, sets out the requirement for
developments to provide compensatory planting in circumstances where trees
or woodland will be lost. Where woodland loss is unavoidable, and mitigation is
required, the Council will follow the Scottish Government’s Policy on the Control
of Woodland Removal (PCWR).  It is expected that landscape proposals are
provided detailing replacement or compensatory planting, wherever possible
within, or adjacent to, the site of loss. The development proposed would see
the loss of 3.3 ha of woodland and only 1.7 ha of compensatory planting is set
out within the site boundary.  This leaves a net shortfall of 1.6 ha of woodland
which will be lost and not replaced. The applicant was requested to provide
alternative planting options but has been unable to do so. To offset any loss in
woodland the applicant has offered to make a one-off single payment to the
Council of £24,000, with the expectation that PKC provide off site planting
elsewhere. The payment would be made under Section 69 of the Local
government (Scotland) Act 1973 and secured through legal agreement.   Whilst
the payment is at the discretion of the Council whether to accept, the Planning
Authority is concerned by the precedent that seeking a payment of this type
may set in terms future applications.  It is considered that this financial offset
offer does not comply with the PCWR or Policy 41 of the Local Development
Plan 2 (2019).

Page 3

6 There are two associated ‘local’ planning applications which propose further
related works connected to those contained in this application. 
7 The first being 22/00546/FLL which proposes additional road widening and
drainage works related to both the proposed new A9 off slip and at Shinafoot
Road. These works resulted from discussions with the Council’s Transportation
& Development team, following submission of the application subject of this
report (Ref: 21/01968/FLM), which confirmed that additional road widening, and
drainage works were required, over and above those set out in this application.
Rather than withdraw, amend and resubmit 21/01968/FLM those matters are
contained within that separate related application which is subject to a separate
report on the agenda for this committee. 
8 The second associated application is 22/00724/FLL, which proposes to form a
new vehicle layby within the A9 road boundary, as the proposed off slip junction
requires removal of an existing layby. The revised location has been agreed
with Transport Scotland. This application was approved on the 13 July under
delegated authority.   
Environmental Impact Assessment 
9 Directive 2011/92/EU (as amended) requires the ‘competent authority’ (in this
case Perth and Kinross Council) when giving a planning permission for certain
large-scale projects to do so in the knowledge of any likely significant effects on
the environment.  The Directive therefore sets out a procedure that must be
followed before ‘development consent’ can be given. 
10 This procedure, known as Environmental Impact Assessment (EIA), is a means
of drawing together, in a systematic way, an assessment of a project’s likely
significant environmental effects.  The EIA Report helps to ensure that the
importance of the predicted effects, and the scope for reducing any adverse
effects, are properly understood by the public and the relevant competent
authority before it makes its decision. 
11 An EIA screening has previously been undertaken by the Planning Authority
(Reference 21/00206/SCRN), concluding that an EIA was not required as the
proposal was not considered likely to have significant environmental effects.
However, a suite of supporting assessments, presenting environmental
information in respect of: flooding, noise, ecology, traffic and transport were
required and submitted in support of this application.   
Pre-Application Consultation 
12 The proposed development is a ‘Major’ development, in terms of the Town and
Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009,
due to scale and size of the application area exceeding 2 ha.  The applicant
was therefore required to undertake formal pre-application consultation with the
local community. The PAC Report notes that a letter drop to local properties
(within a 250 m radius) was undertaken, outlining that a consultation event was
to be held online, in accordance with the relevant regulations in place at the

Page 4

time.  This online event was held on Wednesday 30 June 2021, between 11am
and 1pm and again from 5pm to 8pm. The local MP, MSP and Council
Members were also notified. A total of 7 individuals made comment during the
events and 11 completed feedback forms.  The content and coverage of the
community consultation exercise is considered sufficient and proportionate and
in line with the regulations.   
13 Public concerns raised during this pre application consultation process related
to: pedestrian access; access to private land adjoining the development; noise;
impacts; impact on traffic flow and congestion; flooding of the Ruthven Water;
being considered a departure from road construction standards; access to other
local roads; impacts on traffic flows in Auchterarder; ongoing maintenance of
the road; safety of all road users and in particular concerns about the closure of
the Aberuthven Junction. These matters have been responded to in writing by
the agent and included within a Pre-Application Consultation (PAC) Report
submitted with this application.   
NATIONAL POLICY AND GUIDANCE 
14 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework 2014 
15 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SSP) 
16 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
17 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57

Page 5

• Valuing the Natural Environment: paragraphs 193 – 218 
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
• Promoting Sustainable Transport and Active Travel: paragraphs 270 – 291  
Planning Advice Notes 
18 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 66 Trunk Road planning applications best practise guidance. 
• PAN 68 Design Statements
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
• PAN 79 Water and Drainage 
• PAN 1/2011/: Planning and Noise 
• PAN 3/2010 Community Engagement 
National Transport Strategy 2020 
19 The Strategy presents the vision for Scotland’s transport system over the next
20 years. This focuses on four key priorities, reducing inequalities, taking
climate action, delivering inclusive economic growth and focusing on the health
and wellbeing of community.     
20 The development will increase traffic congestion within Auchterarder daily and
thus has a net determinant to the health and wellbeing of the community. The
corresponding potential for additional risk to pedestrians and cyclists is also
increased. However, the development will have economic benefits to the
community in terms of allowing further housing development.  On balance whilst
the development does promote some of the aims of the transport strategy those
impacts to health and wellbeing are considered to carry the greater planning
weight in this case. The development does therefore not align with the
Transportation Strategy. 
National Roads Development Guide 2014 
21 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
22 The proposed development is considered by the Council’s Transportation &
Development team to be of concern in terms of road safety, pedestrian
movements and air quality while further increasing traffic congestion. The
development does not accord with the Roads Development Guide.

Page 6

Scottish Government’s Policy on the Control of Woodland Removal (CWRP) 
23 To provide policy direction for decisions on woodland removal in Scotland.  The
proposed development is seeking to remove an area of approximately 1.6ha of
woodland without offering compensatory planting within or near to the
development site. Means of mitigation is offered in the form of financial
compensation to the Council to provide offsite planting.  The CWRP
implementation guide has some guidance on compensation and planning
requirements (see annex 6) and leaves it up to councils as to whether a sum
would be acceptable. Following the CWRP the Council would be seeking an
area at least equal to the area removed and of a native mix appropriate to the
area in which it is planted. There are requirements in the CWRP for certainty
such as requiring a compensatory planting plan before felling is approved, and
planting to be complete within 5 years of the permission.  The provision of a
commuted sum in this case does not seek to offer any planting plan.
Furthermore, the sum does not account for labour costs or ongoing monitoring.
Overall, it is considered that the mitigation offer does not align with the CWRP
of the Council’s supplementary Guidance on Woodland Removal.     
DEVELOPMENT PLAN 
24 The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2019. 
TAYplan Strategic Development Plan 2016-2036 
25 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the development plan states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
26 The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application. 
• Policy 2 Shaping Better Quality Places 
• Policy 6 Developer Contributions 
• Policy 8 Green Networks 
• Policy 10 Connecting People, Place and Markets 
Perth and Kinross Local Development Plan 2 
27 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population

Page 7

and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
28 The principal relevant policies are in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 5: Infrastructure Contributions
• Policy 23 Delivery of Development Sites 
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 51: Soils
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
OTHER POLICIES 
29 The relevant Supplementary Guidance are, 
• Supplementary Guidance: Air Quality, February 2020
• Supplementary Guidance: Developer Contributions and Affordable Housing,
April 2020
• Supplementary Guidance: Flood Risk and Flood Risk Assessments, March
2021
• Supplementary Guidance: Forest & Woodland Strategy, February 2020
• Supplementary Guidance: Landscape (February 2020)
• Supplementary Guidance: Placemaking (February 2020) 
Non-Statutory Supplementary Guidance 
• Supplementary Guidance: Planning for Nature – Development Management
and Wildlife Guide, April 2022 
Auchterarder Expansion Townhead & Northeast Development Framework 
30 A need for improved access to the A9 trunk road north and south of the
settlement is identified in the Local Development Plan 2, forming part of the
Auchterarder Settlement summary description. To date a new trunk road
junction at Loaninghead south of Auchterarder has been completed. However,
a trunk road junction north of the settlement is also needed as the planned
expansion of the settlement continues beyond the identified threshold, to
address safety issues. A specific location for the new junction was not identified

Page 8

within the Local Development Plan, however the Plan highlights that Shinafoot
is the planned location. 
31 Within the Development Framework (DF), Trunk Road junction improvements
at Shinafoot are identified as a requirement for the full development of the
Auchterarder DF housing sites. The detail as to what works are required and
why is set out and can be summarised as follows:  
• The DF reports Transport Scotland’s requirements for the junction
improvements as set out at that time. The improvements proposed to
address safety issues and not operational capacity restrictions. Transport
Scotland describe the type and location of the required trunk road junction
at Shinafoot, “…the new Interchange at Shinafoot would include the
provision of southbound on and off slips and would utilise the existing
Shinafoot Road underpass below the A9 to accommodate the grade
separated crossing of the A9 from the southbound carriageway.”
• The DF also notes that Transport Scotland suggest staging of the trunk
road improvements as development progresses. 
• A modest development of 50 residential units would be acceptable without
junction improvements.
• The Loaninghead improvement (permitting the closure of the central
reserve gap at Auchterarder South) should be implemented first, followed
by Shinafoot (permitting the closure of the gap at Aberuthven)
• The full Masterplan development at Auchterarder would require the
provision of both Loaninghead and Shinafoot Junction Improvements.
• Detailed assessment would be required to establish an acceptable
intervening level of development that could be accommodated with the
Loaninghead Improvement 
• The DF included the figure of up to 350 dwellings could be accommodated
within the Loaninghead junction improvement. 
32 After the adoption of the DF and as noted in Paragraph 3, Planning Permission
08/01133/OUT was granted, subject to a Section 75 legal agreement restricting
open market housing development to no more than 389 units until after the
completion of the agreed roads junction improvements.  The DF is no longer
supplementary guidance within the LDP2 but is considered a material
consideration in any decision.   
SITE HISTORY OF RELEVANCE 
33 08/01133/IPM Planning Permission in Principle was granted on 31 October
2013 for a mixed-use development including residential, Class 4 (Business),
Class 5 (General Industry) & Class 6 (storage and distribution) uses on Land at
Castlemains and Kirkton, Auchterarder. 
34 21/00206/SCRN A Screening Opinion was issued by the Planning Authority on
the 1 April 2021 for the construction of a new southbound diverge slip road on
the A9, connecting Shinafoot Road (B8602) with a simple priority junction as
well as including landscaping, drainage and associated works.

Page 9

35 21/00008/PAN A Proposal of Application Notice related to the formation of an
A9 slip road and junction with the B8062 and other road infrastructure including
landscaping, drainage and associated works was submitted and PKC, with a
response issued on 1 June 2021. 
36 22/00546/FLL A ‘Local’ application proposing the Formation of road widening
and drainage works associated with 21/01968/FLM (works to A9 trunk road) is
presented elsewhere on this Committee Agenda. 
37 22/00724/FLL Planning Permission was granted on the 13 July 2022 for the
formation of a layby and associated works related to 21/01968/FLM (works to
A9 trunk road) on land At A9(T) And Shinafoot Road (B8062)
Auchterarder. 
CONSULTATIONS 
38 As part of the planning application process the following bodies were consulted: 
External 
39 Transport Scotland (TS): No objection, subject to conditions related to a
replacement layby, and that works accord with the details submitted. 
Informative notes are requested to flag the need for further engagement with
Transport Scotland at the construction phase.   
40 Auchterarder and District Community Council (ADCC): Object. Raise
concerns that the proposals do not accord with the Section 75 and that failure
to implement the full junction works previously agreed will impact traffic
movement and road safety.   
41 Scottish Environment Protection Agency (SEPA): No objection, subject to a
condition to narrow the upstream splay span of the Ruthven Water Bridge
during its replacement, in line with the flood risk assessment provided by the
applicant. SEPA has agreed with the flood risk assessment conclusions and
notes that works overall will have a neutral impact on flooding.   Advise a CAR
Licence has already been obtained for the works within Ruthven Water.   
42 Scottish Water (SW): No objection or further commentary provided.   
Internal 
43 Structures And Flooding (S&F): No objection. The applicant is directed to the
Council’s Technical Design Standards for Roads and Bridges.   
44 Environmental Health (Contaminated Land) (EHCL): No objection, subject to
condition to secure a site evaluation to confirm the potential for any
contamination.   
45 Biodiversity/Tree Officer. No objection. Initially requested revisions to the
draft Construction Environmental Management Plan (CEMP) and the need for

Page 10

compensatory planting. Also, that an Ecological Clerk of Works (ECoW) be
secured. Note compensatory planting in full is not possible within land under
the applicant’s ownership and that to address this shortfall a one off £24,000
payment is being offered under Section 69 of the Local Government Act
(Scotland) 1973 to the Council for biodiversity use.  Advise that the principle of
this payment as a means or addressing the Supplementary Guidance raises
concern in terms of the precedent it will set for future applications.  However, do
not objection.   
46 Environmental Health (Noise Odour) (EHNO): No objection subject to
conditions to secure acoustic mitigation barriers along the B8062, such noise
mitigation as set out within the supporting Noise and Vibration Assessment
Report, and the provision of a Dust Management Plan. 
47 Planning and Housing Strategy: Advise that the need for new junction
connections to the A9 north and south of Auchterarder are set out within the
Local Development Plan 2 and that consideration in any decision must be given
to both the original Development Framework and the most recent consultation
with Transport Scotland.   
48 Development Contributions Officer: No objection. Commentary provided in
respect of the Section 75 obligations and confirmation that if the proposals are
approved a modification to the Section 75 Agreements will be required in
accordance with Section 75A(2) of the Town and Country Planning (Scotland)
Act 1997 (as amended).  Also confirm that any modification of the planning
obligation, owing to the extent of the changes likely, would require a formal
application. 
49 Transport Planning (TP): Objection. Significant commentary provided in
respect of traffic modelling within Auchterarder, noting the impacts of the
proposed development compared with the full junction works as set out in the
Section 75. The development will increase the number of vehicle movements
through Auchterarder town daily by over 1000 vehicles and 70 HGVs. It is the
view of TP that such increases are detrimental to Auchterarder’s sense of
place, health & wellbeing, and active & sustainable travel methods. Thus, they
are contrary to Design Streets, the National Roads Development Guide and the
National Transport Strategy. These policy documents are clear that traffic
capacity should not always be of prime consideration in decision making and
that weight must be given to the Place Principle. The increased traffic
generation raises concern in relation to matters of road safety, pedestrian
movement, and air quality. 
REPRESENTATIONS 
50 5 objections have been received. The main issues raised are:   
• Visual impacts
• Noise from construction and traffic 
• Traffic and road safety Impacts
• Air pollution from construction and road traffic

Page 11

• Flooding 
• An overall sense that there will be no local benefits to the development as
proposed 
51 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS
52
Screening Opinion  No EIA required
Environmental Impact Assessment
(EIA): Environmental Report
Not Required
Appropriate Assessment Habitats Regulations Appraisal – Not
Required   
Design Statement or Design and
Access Statement
Submitted
Report on Impact or Potential Impact  • Ecological Impact Report 
• Landscape and Visual Assessment 
• Planning Statements 1 and 2,
Including Design Report – A9
Shinafoot Junction (February 2020)
• Drainage Impact Assessment 
• Noise and Vibration Impact
Assessment 
• Air Quality Impact Assessment
Report 
• Flood Risk Assessment 
APPRAISAL 
53 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2019.  The relevant policy considerations are outlined in the
policy section above and are considered in more detail below.   
Principle 
54 The location is a peripheral rural area outside Auchterarder adjacent to the A9.
LDP2 policy considerations in assessing its suitability in principle are Policies
1A and 1B: Placemaking; Policy 23: Delivery of Development Sites; Policies 39-
41: Landscape, Trees and Woodland and Biodiversity; Policy 53: Water
Environment and Drainage; and Policy 60B: Transport Standards and
Accessibility – New Development Proposals. Furthermore, consideration must
also be had to the Auchterarder Development Framework and the Auchterarder

Page 12

‘settlement description’ set out within the LDP2, which identifies the need for
improved access to the A9 to the North of the Settlement. 
55  Having regard to the National Transport Strategy 2020, the Auchterarder
Development Framework and the LDP2 there is a general policy presumption in
favour of the development of a new grade separated junction at Shinafoot.
However, when considering the proposal in detail against the requirements of
the outline planning permission, including the Section 75 Legal Agreement, the
development does not deliver the full package of roads improvements required
and as such would result in adverse road safety, pedestrian movement and
potential air quality implications.  As the revised junction proposal fails to
provide a southbound on-slip and has not been proposed as a partial delivery
of the required traffic obligations by the Section 75 agreement. It is therefore
unacceptable in planning terms and should be refused on these grounds. 
Design and Layout 
56 The design and layout of works essentially reflects the physical and
engineering requirements associated to the improvements proposed, with
infrastructure details consistent with industry standards. In physical terms, the
most significant visual change will arise as a result of the earthworks necessary
to form the slip road and the related cutting through the existing embankment. 
57 A Landscape and Visual Impact assessment supports the application and
concludes that although earthworks, cut slopes, embankments and the
associated introduction of swales and water attenuation features are noted
landform changes they are similar to those within the existing road corridor and
therefore not out of place.  Overall, wider landscape character and form would
remain largely unchanged, with any built aspects having limited influence in a
wider context.  In terms of the location alone, any landscape impacts are not
considered unacceptable when considered in a context that a new junction at
this location has been proposed and accepted by the Council for some time.  
However, as noted above the proposed design and layout do not deliver the full
roads improvements that is legally required, and therefore do not meet the
expectation of the Planning Authority or the wider community.  In addition, as
discussed below, the single slip design presents offsite impacts in terms of
traffic movements which on preliminary investigation have not been mitigated.
Therefore, on balance the design and layout of the development are
unacceptable in planning terms.   
Landscape 
58 Safeguarding and enhancing landscape character and green infrastructure is
required to be considered via LDP2 Policies 1 and 39. In this instance, the
proposed utilitarian design is largely set via the engineering requirements, thus
some landscape and visual impact is inevitable. Furthermore, development of
this type and nature has been intended at this location for some time, having
formed part of the Auchterarder Development Framework intentions and being
agreed through a previous Section 75 agreement and outline planning
permission.  However, and notwithstanding these material considerations, it is

Page 13

especially important to ensure robust landscaping and associated green
infrastructure provides mitigation from key viewpoints, softens the immediate
and cumulative landscape impact, whilst also improving biodiversity
opportunities. A Landscape Visual Impact Assessment (LVIA) was requested,
along with a fully detailed structural landscape plan.   
59 The Council applies the principles of the Scottish Government Policy on Control
of Woodland Removal, which presumes in favour of protecting woodland
resources. However, where the loss of woodland is unavoidable, mitigation
measures in the form of compensatory planting will be sought. The submitted
Ecological Impact Report states that approximately 3.3ha of immature / semi-
mature mixed plantation woodland will be lost to allow the development to
proceed. This without mitigation would see adverse effects. The application
proposes 1.7ha of planting within the site boundary, as set out in landscape
masterplan drawing reference 21/01968/06.  However, this leaves a shortfall of
c.1.6 ha of woodland which would be lost. The Council’s Supplementary
Guidance: Planning for Nature and Wildlife provides that compensatory planting
must be at least compatible to existing trees and woodland. Given that the
applicant advises that they cannot achieve off-site planting within other land
they control, (and no other private agreement has been explored), mitigation
has been offered via a lump sum payment of £24,000, to be used by the
Council for biodiversity mitigation offsite.  The payment is sought to be made as
a one off under Section 69 of the Local Government (Scotland) Act 1973. The
Planning for Nature Guidance doesn’t reference directly the use of Section 69
Agreements, but rather advises that where woodland loss is unavoidable, and
mitigation is required, the Council will follow the Scottish Government’s Policy
on the Control of Woodland Removal (PCWR).  It is at the discretion of the
Council whether to accept a Section 69 agreement and the Planning Authority
is not aware of this option having been considered before. The Scottish
Government’s policy on control of woodland removal: implementation guidance,
February 2019 under the section on Guiding Principles paragraph 4 states:
“Planning conditions and agreements are used to mitigate the environmental
impacts arising from development and Scottish Forestry will also encourage
their application to development-related woodland removal”. Mitigation
measures must be fully explained in the EIA Report and agreed with Scottish
Forestry. They should not be left to post-consent agreements, but instead
conditioned within the planning approval. 
60 Concern is raised by the Planning Authority that this type of offer may set a
precedent for future applications.  Furthermore, as discussed above this type of
agreement does not align with the PCWR Policy nor the Council’s
Supplementary Guidance on this matter. The onus should always be on the
developer to avoid, mitigate and compensate for any harmful impacts (in that
order). For the greatest certainty, relevance and enforceability the best option is
to replace woodland on land the applicant controls ideally close to the
woodland that will be lost. Whilst steps have been taken as far as practical to
minimise the loss of woodland, very limited details have been submitted as to
whether alternative offsite solutions near to the development have been
considered. The Planning Authority does not consider the Financial Offset
Mitigation offer reasonable in the absence of further information or clarifying

Page 14

alternatives considered. In addition, the value sum offered has not been fully
costed in terms of labour and any ongoing maintenance required by the
Council.   
Residential Amenity 
61 Matters pertaining to Noise, Dust, Air Quality and Vibration which would arise
both during construction and once the new junction is open are considered by
Policies 56 and 57 of the LDP2.  The submitted Air Quality Impact Assessment
Report and Noise and Vibration Impact Assessment have been reviewed by
Environmental Health Officers.  Those properties most impacted by the
development are those adjoining or accessing directly off the B8062 Shinafoot
Road, including a caravan park directly downstream of the Ruthven Water
Bridge. There are also properties located in direct proximity to the north-west
and south-east of Shinafoot Road as well as an existing caravan park.   
62 Environmental Health have raised no objections or concerns in relation to
impacts on residential amenity, subject to recommended conditions.
Notwithstanding the conclusions from EH officers Transport Planning have
raised concerns that the proposal development in comparison with the two-slip
junction design agreed within the Section 75 will result in additional traffic
movements within Auchterarder Township. It is anticipated that this will have
corresponding impacts on air quality, though any actual impacts have not been
modelled.         
Roads and Access 
63 LDP2 Policy 60B requires that local road networks be capable of absorbing
traffic generated by development and that satisfactory access is provided. In
this case public objections have raised concerns over potential impacts on
traffic and road safety as a result of the development.   
64 Matters relating to the Trunk Road Network have been considered by Transport
Scotland and no objection is raised, subject to recommended conditions. 
65 In respect of any impacts to the local road network, significant concerns have
been raised by the Council's Transportation and Development team. 
Specifically, these impacts relate to the design of the new junction which, as
noted, seeks to incorporate only a single slip design solution, thereby omitting
the southbound on-slip from the previously secured design. In order to consider
the impacts of the development proposed against the full road improvements
required by the Section 75 legal agreement, officers have sought to model
vehicle movements between a single slip, proposed, against a second option of
a two slip, grade separated diverge & merge junction, (the design previously
secured). The modelling for the single slip design shows an increase to both
journey times, for vehicles traveling from central Auchterarder south bound on
the A9, and to the number of vehicle movements through Auchterarder. 
Modelling shows traffic increases as follows:  
• Orchil Road AM +140 vehicles (up 36%), PM + 91 vehicles (up 22%).

Page 15

• Hunter Street AM +30 vehicles (up 12.8%), PM +17 vehicles (up 8%)
• A824 (west of) junction with Hunter Street AM +117 (up 15%) vehicles, PM
+83 (up 11%) vehicles.
• A824 (east of) junction with Hunter Street AM +47 (up 7%) vehicles, PM +51
(up 8%) vehicles. 
66 A high-level review of the model data shows that westbound traffic movements
through Auchterarder increase significantly. The High Street in the vicinity of the
school sees an increase of 1,040 vehicles during the day (7am – 7pm) a 28.5%
increase in daily traffic flows. Within this, daily HGV movements increase
westbound by 74 vehicles, a 68.5% increase. This is mirrored further west at
Townhead (in the vicinity of Orchil Road) where an increase of 1,050 vehicles
occurs, a 33.9% increase in daily traffic flows. Within this, HGV daily
movements increase westbound by 73 vehicles, an 80.2% increase. While all
eastbound traffic movements remain static (all traffic less than 0.01% increase,
HGV less than 1.3% increase). 
67 Based on the modelled outputs, the Transportation & Development team has
concluded that in isolation a single slip design has a determinantal impact to the
local road network within Auchterarder when compared to the full set of roads
improvements previous secured. Having discussed the initial consultation
response with the applicants, a review of the submitted application was
undertaken. Subsequently a further technical note was produced by way of
addendum.  This additional information was submitted to the Council in
September 2022 and included several recommended infrastructure
improvements to support the application and redress concerns raised. The
additional recommendations included, vehicle signage measures, a 20mph
zone extension, restricting Hunter Street to one-way traffic and a traffic
controlled pedestrian crossing in the vicinity of the Community School. The
applicant has offered £100,000 to fund delivery of this infrastructure by Perth
and Kinross Council. However, having reviewed these mitigation offerings,
transportation officers have confirmed the recommendations lack detailed
costings, design, testing and crucially no consultation with key stakeholders or
the community. Whilst officers have not been able to wholly assess the validity
of the mitigation offering, on preliminary assessment they have advised that
they do not consider these will be anywhere near adequate to offset the
absence of the southbound on slip. 
68 In conclusion, the development proposed will have a net determinant to the
local road network within Auchterarder when compared with the full road's
improvements secured via the Section 75 agreement.  The identified increases
in traffic generation are considered to impact road safety, pedestrian movement
and may also impact air quality. As such the development is considered
detrimental to Auchterarder’s sense of place, health & wellbeing, and may
impact other active sustainable travel methods. Thus, the proposal overall is
contrary to the National Roads Development Guide, the National Transport
Strategy and Policy 60B of the LDP2 (2019).

Page 16

Drainage and Flooding 
69 Policies 52 and 53 of the LDP2, require development to appropriately consider
flooding and drainage. The application has been reviewed by both SEPA and
the Council’s Structures and Flooding Team and neither raise objections.   
70 In terms of flood impacts resulting from the replacement bridge over the
Ruthven Water it is confirmed that the cross-sectional area is slightly larger
than the existing structure, at 7.6m wide verses 7 m. Consequently, any flood
risk upstream is slightly reduced from any existing impacts. It should be noted
that the nearest property which could be at risk, being part of an existing
caravan park, is located on the downstream side of the bridge (below the
confluence of the Ruthven Water and Pairney Burn) is already at severe flood
risk, as identified on SEPA flood risk maps. This risk would not be increased by
this development. 
71 Otherwise, the majority of the slip road is out with any area of flood risk and
cuts through higher ground.  Where the slip road meets the B8062, small
sections of raised embankment are proposed, partly within the flood extents of
the Pairney Burn, as shown on the SEPA flood maps.  However, SEPA have
confirmed that any loss of storage here will be minimal and negligible to the
overall flood risk in the area. Furthermore, there will be no increase in risk
downstream towards any buildings/caravan park, as flows are controlled by an
existing culvert under the A9. Overall, all drainage is to be controlled from the
slip road via road runoff and interception via SUDS in accordance with best
practice design.   
Natural Heritage and Biodiversity 
72 LDP2 Policy 41 is a relevant consideration in respect of potential biodiversity
impacts or opportunities arising from the development. In this respect the
Landscape Masterplan includes largely native species and contains a number
of positive elements, making a likely valuable contribution to biodiversity,
consistent with the Perth and Kinross Supplementary Guidance: Planning for
Nature Development Management and Wildlife. As noted in paragraph 59
mitigation in the form of financial renumeration is offered. 
73 The Council’s biodiversity officer has reviewed the development proposal and
raised no specific objections to the works, subject to conditions seeking the
adoption of proposed landscaping, the provision of an agreed Construction
Environmental Management Plan and the appointment of an ecological clerk of
works to oversee development implementation.  However, significant concern is
raised with respect to the proposed financial agreement to offset the lack of
physical mitigation proposed and the potential for a precedent to be set.
Commentary is provided that whilst the financial offer will likely be sufficient to
accommodate planting of comparable scale to that lost, no financial account
has been made in respect of labour or future maintenance costs. As such the
value offer is insufficient. Whilst the Ecological Impact Assessment Report,
dated 24 June 2022, sufficiently confirms any ecological impacts from this
development are acceptable, the proposal overall fails to accord with policy 41

Page 17

of the LDP2 on account of the loss of woodland and adequate mitigation
planting being offered.     
Developer Contributions 
74 The junction improvement works are identified as a requirement for
“Auchterarder Development Framework” sites, included within Section 75
Agreements agreed as part of Outline Permission 08/01133/IPM. The works,
defined as “the Shinafoot Junction Improvement Works” in these Agreements
was previously agreed with design and specifications which differ to the
proposal submitted. If the proposals are deemed acceptable a modification to
the Section 75 Agreements will be required. As the agreed junction
improvements are part of a previous decision on the outline planning
permission further contributions could not be added now.  However, and
notwithstanding this matter the junction improvements do not trigger any
contributions under the Developer Contributions and Affordable Housing
Supplementary Guidance.   
75 Whilst no specific developer contributions are required, the applicant has
sought to address shortfalls in mitigation both in terms of woodland loss and as
a result of impacts to the local road network, specifically increases in traffic
movements through Auchterarder.  A payment of £24,000 is proposed as
financial offset for woodland loss, whilst a payment of £100,000 is offered to
carry out road's improvements within Auchterarder.  Both payments are to be
single lump sum payments under Section 69 of the Local Government
(Scotland) Act 1973. Legal Services have agreed that this can be secured via a
legal agreement, and it is at the discretion of the Council whether to accept
these offers.  The Planning Authority does not consider the financial offers are
acceptable.   
Economic Impact 
76 In the short term, construction will create jobs with scope for local employment
but in the operational period local employment opportunities are limited.
However, there is a clear fit between Scottish Government aims of enabling
new development whilst promoting investment within the Perth and Kinross
area.  This development proposal should be viewed as seeking to deliver traffic
obligations required to enable further housing development within Auchterarder
and as such there are longer term economic opportunities. However, the
development raises concerns in terms of road safety and in terms of limited
overall biodiversity enhancement opportunities in proximity to the site.   
VARIATION OF APPLICATION UNDER SECTION 32A 
77 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporated changes to the submitted bridge design
over the Ruthven Water which comprised minor alterations to the cross-section
design of the structure, which do not significantly alter its wider appearance or
location.

Page 18

PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
78 The development in isolation is not required to be subject to any Section 75
legal agreement. However, it must be seen in association to the wider proposal
to implement transport obligations agreed via a Section 75 legal agreement
associated to a significant mixed-use development (reference Planning
Permission 08/01133/OUT). In this regard the works proposed within this
application do not comply in full of the transport obligations set out in that
Section 75. 
79 The development is recommended for refusal due to impacts on the local road
network. As such a comprehensive assessment relative to the proposed
financial mitigation offsets has not been undertaken. However, Legal Services
have confirmed the proposed payments under Section 69 of the Local
Government (Scotland) Act 1973 to secure single lump sum payments is at the
discretion of the Council whether to accept. This type of agreement has not
been accepted in the past and does not accord with the LDP2 or Scottish
Government Policy.   
CONCLUSION AND REASONS FOR RECOMMENDATION 
80 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is considered to not comply with the approved
TAYplan 2016 and the adopted Local Development Plan 2 (2019).  Account
has been taken of the relevant material considerations and none has been
found that would justify overriding the adopted Development Plan. 
81 Accordingly, the proposal is recommended for refusal. 
RECOMMENDATION   
Reasons for Refusal Recommendation 
1. The development proposed is contrary to the Auchterarder Expansion
Townhead & Northeast Development Framework as well as policy 60B of the
adopted Perth and Kinross Local Development Plan 2 (2019). 
2. The projected vehicle movement increases through Auchterarder are
detrimental to the town’s sense of place, its health and wellbeing and may
impact other forms of active and sustainable travel methods. Accordingly, the
proposal is contrary to the Scottish Government National Roads Development
Guide 2014 and National Transport Strategy 2020. 
3. The proposed financial offset to mitigate the loss of woodland and biodiversity
within the site is considered to set a precedent and fails to accord with the
principles of the Scottish Government Policy on Control of Woodland
Removal. The proposal is therefore contrary to Policy 41 of the adopted Perth
and Kinross Local Development Plan 2 (2019) and fails to accord with the

Page 19

principals of the Perth and Kinross Planning for Nature Development
Management and Wildlife Guide April 2022.   
Background Papers:  6 letters of representation
Contact Officer:   Jamie Torrance  
Date:  11 November 2022 
DAVID LITTLEJOHN