Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
05/09/2022 
A hybrid meeting of the Planning and Placemaking Committee will be held in the
Council Chamber on Wednesday, 14 September 2022 at 10:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Ian Massie  (Convener)
Councillor Grant Stewart  (Vice-Convener)
Councillor Hugh Anderson
Councillor Bob Brawn
Councillor Dave Cuthbert
Councillor Eric Drysdale
Councillor David Illingworth
Councillor Ian James
Councillor Brian Leishman
Bailie Claire McLaren
Councillor Crawford Reid
Councillor Richard Watters
Bailie Mike Williamson
Page 1 of 174

Page 2

Page 2 of 174

Page 3

Planning and Placemaking Committee 
Wednesday, 14 September 2022 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE PLANNING AND
PLACEMAKING COMMITTEE OF 10 AUGUST 2022 FOR
APPROVAL
(copy herewith) 
7 - 32 
4 DEPUTATIONS   
5 APPLICATIONS FOR DETERMINATION   
5(1)  MAJOR APPLICATIONS   
5(1)(i)  22/00102/FLM - ERECTION OF 4 REPLACEMENT POULTRY
REARING SHEDS, ANCILLARY FACILITIES, FORMATION OF
SUDS POND, LANDSCAPING AND ASSOCIATED WORKS,
KNAPPILANDS, STRATHALLAN, CRIEFF
Report of Handling by Head of Planning and Development (copy
herewith 22/216) 
33 - 58 
5(1)(ii)  22/00832/FLM - FORMATION OF A 49MW BATTERY ENERGY
STORAGE FACILITY COMPRISING BATTERY STORAGE
UNITS, ANCILLARY BUILDINGS, VEHICULAR ACCESS,
LANDSCAPING AND ASSOCIATED WORKS, LAND 140
METRES NORTH EAST OF JAMESFIELD ORGANIC CENTRE,
NEWBURGH
Report of Handling by Head of Planning and Development (copy
herewith 22/217) 
59 - 80
Page 3 of 174

Page 4

5(1)(iii)  22/00746/FLM - FORMATION OF AN UP TO 49.99MW
ENERGY STORAGE COMPOUND COMPRISING BATTERY
STORAGE UNITS, ANCILLARY BUILDINGS, LANDSCAPING
AND ASSOCIATED WORKS, LAND 60 METRES NORTH OF
ABERNETHY CEMETERY, NEWBURGH ROAD, ABERNETHY
Report of Handling by Head Planning and Development (copy
herewith 22/218) 
81 - 104 
5(2)  LOCAL APPLICATIONS   
5(2)(i)  22/00334/FLL ERECTION OF SHELTER BUILDING AND
ACOUSTIC FENCE, FORMATION OF CLAY PIGEON
SHOOTING RANGE AND EARTH BUNDS (IN PART
RETROSPECT), CRIEFF HYDRO HOTEL, FERNTOWER
ROAD, CRIEFF
Report by Head of Planning & Development (copy herewith
22/219) 
105 - 120 
5(2)(ii)  22/00711/FLL ERECTION OF VISITOR CENTRE COMPRISING
CRANNOG, ROUNDHOUSE, DEMONSTRATION
STRUCTURES, CAFÉ/RETAIL, MUSEUM/OFFICE, CAR AND
COACH PARKING, LANDSCAPING AND ASSOCIATED
WORKS, LAND 60 METRES SOUTH-EAST OF DRUMMOND
HOUSE, KENMORE
Report by Head of Planning & Development (copy herewith
22/220) 
121 - 154 
6 PROPOSAL OF APPLICATION NOTICES (PAN)   
6(i)  22/00018/PAN RESIDENTIAL DEVELOPMENT, FORMATION
OF OPEN SPACE, LANDSCAPING AND ASSOCIATED
WORKS, LAND 350 METRES NORTH-WEST OF DAVIS
PARK, SPRINGFIELD ROAD, KINROSS
Report by Head of Planning & Development (copy herewith
22/221) 
155 - 164 
6(ii)  22/00019/PAN CHANGE OF USE FROM AGRICULTURAL
LAND TO FORM EXTENTION TO CARAVAN PARK, LAND
200 METRES NORTH-EAST OF ERIGMORE CARAVAN SITE,
ST MARY'S ROAD, BIRNAM
Report by Head of Planning & Development (copy herewith
22/222) 
165 - 174 
Page 4 of 174

Page 5

Page 5 of 174

Page 6

Page 6 of 174

Page 7

PLANNING AND PLACEMAKING COMMITTEE 
Minute of hybrid meeting of the Planning and Placemaking Committee held in
Council Chambers, 2 High Street, Perth on Wednesday 10 August 2022 at 10.30am. 
Present:  Councillors I Massie, G Stewart, H Anderson, B Brawn, D Cuthbert,
E Drysdale, D Illingworth, I James, B Leishman, Bailie C McLaren, Councillors
C Reid, R Watters, and Bailie M Williamson. 
In Attendance: K Smith, S Panton, P Williamson, L MacLean and L Reid (all
Communities); G Fogg, D Williams, J Guild, A Brown and M Pasternak (all Corporate
and Democratic Services). 
Councillor I Massie, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed everyone present to the meeting.  No apologies
were noted. 
2. DECLARATIONS OF INTEREST 
Councillors D Illingworth and B Leishman declared a non-financial interest in
Item 6(1)(ii) – 21/02249/FLM. 
Councillor D Cuthbert and Bailie M Williamson declared a non-financial
interest in Item 7(iv) – 22/00017/PAN. 
3. MINUTES 
The minute of meeting of the Planning and Placemaking Committee of 6 July
2022, be approved. 
4. DEPUTATIONS 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No. Item No. 
21/00755/FLL     6(2)(i)   
5. APPLICATIONS PREVIOUSLY CONSIDERED 
(i) 22/00301/FLM S42 application to remove condition 14 (bus shelter
and information board) of planning permission 18/02139/FLM at 37
Angus Road, Scone 
Resolved:
Grant, subject to the following conditions, terms and informatives: 
3
Page 7 of 174

Page 8

Conditions
General
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents, unless
otherwise provided for by conditions imposed by this decision
notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
Finishes
2. Prior to the commencement of the development hereby
approved, details of the specification and colour of the proposed
external finishing materials to be used shall be submitted to and
agreed in writing by the Council as Planning Authority.  The
scheme as agreed shall be implemented prior to the completion
or bringing into use of the development, whichever is the earlier.
Reason – In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
Landscaping and Biodiversity
3. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme for the
site shall be submitted for the written agreement of the Council
as Planning Authority.  The scheme shall include details of the
height and slopes of any mounding or recontouring of the site,
full details of all hard landscaping proposals including materials
and installation methods and, species, height, size and density
of trees and shrubs to be planted.  The scheme as subsequently
approved shall be carried out and completed within the first
available planting season (October to March) after the
completion or bringing into use of the development, whichever is
the earlier, and the date of Practical Completion of the
landscaping scheme shall be supplied in writing to the Council
as Planning Authority within 7 days of that date.  The scheme as
agreed and implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.
Reason – To ensure a satisfactory standard of development and
environmental quality and to reserve the rights of the Planning
Authority.
4. Prior to the commencement of development hereby approved, a
Site Biodiversity Action Plan confirming the quantity, locations,
techniques, timescales and monitoring arrangements of
biodiversity enhancement measures recommended in
supporting Preliminary Ecological Appraisal by David Dodds
Associates Ltd dated August 2021 shall be submitted for the
written agreement of the Council as Planning Authority.  The
submission should clearly show how enhancement measures
have been incorporated into design schemes and architects'
drawings to ensure they are realised.  The scheme as
subsequently approved shall be carried out and completed to
the satisfaction of the Council as Planning Authority.
Reason – In the interests of protecting environmental quality and
of biodiversity.
Page 8 of 174

Page 9

5. The play park shall be implemented as part of the site
development programme and completed in full prior to the
occupation of the final dwellinghouse, to the satisfaction of the
Council as Planning Authority.
Reason – In the interests of the amenity of the area and to
ensure the satisfactory implementation of the play area.
Ground Contamination
6. Development shall not commence on site until an evaluation for
the potential of the site to be affected by contamination by a
previous use has been undertaken and, as a minimum, a
Preliminary Risk Assessment (Phase 1 Desk Study) has been
submitted for consideration and accepted by the Council as
Planning Authority.  If the preliminary risk assessment identifies
the need for further assessment, an intrusive investigation shall
be undertaken to identify;
I the nature, extent and type(s) of contamination on the site 
II measures to treat/remove contamination to ensure the
site is fit for the use proposed 
III measures to deal with contamination during construction
works
IV condition of the site on completion of decontamination
measures.
Prior to the completion or bringing into use of any part of the
development the measures to decontaminate the site shall be
fully implemented in accordance with the scheme subsequently
agreed by the Council as Planning Authority.  Verification that
the scheme has been fully implemented must also be submitted
to the Council as Planning Authority.
7. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been submitted
for the written agreement of the Council as Planning Authority, in
consultation with SEPA where necessary.  The scheme shall be
developed in accordance with the technical guidance contained
in The SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control. All works shall be carried out in
accordance with the agreed scheme and be operational prior to
the bringing into use of the development.
Reason – To ensure the provision of effective drainage for the
site.
Transport
8. Prior to the commencement of the development hereby
approved, the developer shall submit for the further agreement
of the Council as Planning Authority, in consultation with the
Roads Authority (Structures), a Construction Traffic
Management Scheme (TMS) which shall include the following:
(a) restriction of construction traffic to approved routes and
the measures to be put in place to avoid other routes
being used;
(b)  timing of construction traffic to minimise impact on local
communities particularly at school start and finishing
Page 9 of 174

Page 10

times, on days when refuse collection is undertaken, on
Sundays and during local events;
(c)  a code of conduct for HGV drivers to allow for queuing
traffic to pass; 
(d)  arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e)  emergency arrangements detailing communication and
contingency arrangements in the event of vehicle
breakdown;
(f)  arrangements for the cleaning of wheels and chassis of
vehicles to prevent material from construction sites
associated with the development being deposited on the
road;
(g)  arrangements for cleaning of roads affected by material
deposited from construction sites associated with the
development;
(h)  arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for pedestrians,
cyclists and equestrians;
(i)  details of information signs to inform other road users of
construction traffic;
(j)  arrangements to ensure that access for emergency
service vehicles are not impeded;
(k)  co-ordination with other significant developments known
to use roads affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m)  the provision and installation of traffic counters at the
applicant's expense at locations to be agreed prior to the
commencement of construction; 
(n)  monitoring, reporting and implementation arrangements; 
(o)  arrangements for dealing with non-compliance; and
(p)  details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during
the entire site construction programme. 
Justification
The proposal is in accordance with the Development Plan and there
are no material reasons which justify departing from the Development
Plan. 
Informatives
1. This planning permission will last only for three years from the
date of this decision notice, unless the development has been
started within that period (see section 58(1) of the Town and
Country Planning (Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning (Scotland)
Act 1997 (as amended) the person undertaking the development
is required to give the Planning Authority prior written notification
of the date on which it is intended to commence the
Page 10 of 174

Page 11

development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action being
taken.
3. As soon as practicable after the development is complete, the
person who completes the development is obliged by section
27B of the Town and Country Planning (Scotland) Act 1997 (as
amended) to give the Planning Authority written notice of that
position.
4. This planning permission is granted subject to conditions, some
of which require further information to be submitted to
Development Management either before works can start on site
or at a certain time.  Please send the required information to us
at developmentmanagement@pkc.gov.uk.  Please be aware
that the Council has two months to consider the information (or
four months in the case of a Major planning permission).  You
should therefore submit the required information more than two
months (or four months) before your permission expires.  We
cannot guarantee that submissions made within two months (or
four months) of the expiry date of your permission will be able to
be dealt with before your permission lapses.
5. Trees and scrub are likely to contain nesting birds between 1st
March and 31st August inclusive.  Trees and scrub are present
on the application site and are to be assumed to contain nesting
birds between the above dates.  The applicant is reminded that,
under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the
nest of any wild bird while that nest is in use or being built. 
Planning permission for a development does not provide a
defence against prosecution under this Act.
6. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in relation to
waste collection from the site and should ensure adequate
measures are provided on site to allow for the collection of
waste.
7. The applicant is advised to refer to Perth & Kinross Council's
Supplementary Guidance on Flood Risk and Flood Risk
Assessments 2021 as it contains advice relevant to your
development.
https://www.pkc.gov.uk/media/48541/Flood-Risk-Flood-Risk-
Assessment/pdf/Flood_Risk___Flood_Risk_Assessments_adop
ted_March21.pdf?m=637647027940470000
8. Application for a new postal address should be made via the
Street Naming and Numbering page on the Perth & Kinross
Council website at www.pkc.gov.uk/snn.  Please note there is a
charge for this service and submission cannot be made until the
relevant Building Warrant has been approved.
9. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the Town
and Country Planning Act 1997, as amended, and Regulation 41
of the Development Management Procedure (Scotland)
Page 11 of 174

Page 12

Regulations 2013.  The form of the notice is set out in Schedule
7 of the Regulations and a draft notice is included for your
guidance.  In accordance with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity of the
site of the development 
• Readily visible to the public 
• Printed on durable material.
10. No work shall be commenced until an application for building
warrant has been submitted and approved. 
6. APPLICATIONS FOR DETERMINATION 
(1) Major Applications 
(i) 21/02137/AMM Erection of a linked building for agricultural
research and development, industry engagement and skills
development and formation of roads, parking areas,
landscaping, infrastructure and associated works (approval
of matters specified by conditions 20/01103/IPM) at The
James Hutton Institute, Errol Road, Invergowrie. 
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
Conditions
1. The development hereby approved must be carried out
in accordance with the approved drawings and
documents, unless otherwise provided for by conditions
imposed by this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents. 
2. Prior to the use of any lifting equipment including cranes
etc the applicant must receive written confirmation from
Dundee Airport that aircraft departing and arriving on
runway 09/27 will be safeguarded.  Furthermore, the
applicant must receive written confirmation from Dundee
that the use of lights, during construction, shall not
dazzle nor distract aircraft preparing to land at Dundee
Airport, all to the satisfaction of the Council as Planning
Authority.
Reason – To not impact on the operations of Dundee
City Airport. 
3. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall
not exceed Noise Rating 35 between 0700 and 2300
hours daily, or Noise Rating 25 between 2300 and 0700
hours daily, within any neighbouring residential property,
with all windows slightly open, when measured and/ or
calculated and plotted on a rating curve chart.
Page 12 of 174

Page 13

Reason – In order to safeguard the residential amenity
of the area.
4. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct
illumination of neighbouring land and that light spillage
beyond the boundaries of the site is minimised to a
degree that it does not adversely affect the amenity of
the neighbouring land.
Reason – In order to safeguard the residential amenity
of the area.
5. No part of the development shall be occupied or brought
into use, whichever is the earlier, until the applicant has
provided the minimum parking provision as shown on
drawing number 39 hereby approved, to the satisfaction
of the Council as Planning Authority.  Once provided, the
parking shall thereafter be permanently retained as such
for the life of the development.
Reason – To provide a suitable parking provision for the
development.
6. Prior to the occupation of any of the development hereby
approved, the proposed modifications to the A90/Main
Street Roundabout, generally as illustrated on Drawing
No. 135585/sk7001 - page 86 of Transport Assessment
(PKC Ref: 20/01103/16) by Fairhurst dated April 2020,
shall be implemented and available for use for any
vehicles travelling to the site, subject to the satisfaction
of the Planning Authority, after consultation with
Transport Scotland.
Reason – To ensure that the standard of access layout
complies with the current standards, and that the safety
and free flow of traffic on the trunk road is not
diminished.
7. No part of the development hereby approved shall be
occupied until the Staff Travel Plan (STP) has been
updated to reflect the operational situation within the
development area identified on drawing number 1, all
aimed to encourage more sustainable means of travel. 
The updated STP shall be submitted to and agreed in
writing by the Council as Planning Authority in
consultation with Transport Planning.  The STP will have
particular regard to provision for walking, cycling and
public transport access to and within the site and will
identify the measures to be provided, the system of
management, monitoring, review, reporting and the
duration of the plan.
Reason – To promote sustainable transport options and
to meet advice within Scottish Planning Policy on
transport.
8. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further
written agreement of the Council as Planning Authority,
Page 13 of 174

Page 14

in consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
a. restriction of construction traffic to approved
routes and the measures to be put in place to
avoid other routes being used;
b. timing of construction traffic to minimise impact
on local communities particularly at school start
and finishing times, on days when refuse
collection is undertaken, on Sundays and during
local events;
c. a code of conduct for HGV drivers to allow for
queuing traffic to pass;
d. arrangements for liaison with the Roads
Authority regarding winter maintenance;
e. emergency arrangements detailing
communication and contingency arrangements
in the event of vehicle breakdown;
f. arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the
development being deposited on the road;
g. arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
h. arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe
access for pedestrians, cyclists and equestrians;
i. details of information signs to inform other road
users of construction traffic;
j. arrangements to ensure that access for
emergency service vehicles are not impeded;
k. co-ordination with other significant developments
known to use roads affected by construction
traffic;
l. traffic arrangements in the immediate vicinity of
temporary construction compounds;
m. the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction;
n. monitoring, reporting and implementation
arrangements; 
o. arrangements for dealing with non-compliance;
and;
p. details of HGV movements to and from the site.  
The TMS as approved shall be strictly adhered
to during the entire site construction programme. 
Reason – In the interest of proper site management.
9. Prior to the bringing into use of any part of the
development hereby approved, the proposed junction
Page 14 of 174

Page 15

modifications shown on drawing number 40 for the
signalisation and improvements to the A85 Riverside
Avenue/Main Street junction shall be implemented in full
and fully operational, to the satisfaction of Perth &
Kinross Council as Planning Authority.  Prior to the
implementation of the scheme, the relevant written
agreements must be sought from Perth & Kinross
Council and Dundee City Council as Roads Authorities. 
Evidence must be provided to Perth & Kinross Council
that the relevant agreements from Dundee City Council
are in place prior to the works being undertaken.  For the
avoidance of doubt, the active travel provision at the
junction shall be subject to further discussion and written
agreement from Perth & Kinross Council in consultation
with Dundee City Council.  The applicant shall also
provide specifications of the provision of Close Circuit
Television (CCTV) pole(s), camera(s) and hard line
connection to Dundee City Council Urban Traffic Control
System (UTC) for written agreement prior to any works
being undertaken.
Reason – In the interests of road safety and to provide
active travel routes to the development site.
10. Access along core path INGI/8 and Right of Way 52/8, or
along the short diversion as specified in drawing number
38 should remain open for responsible access
throughout the construction phase.  On completion the
diversion must be removed and access along the
original core path/Right of Way restored.
Reason – To ensure a satisfactory standard of local
environmental quality; to safeguard the core paths.
11. Development shall not commence on site until an
evaluation for the potential of the site to be affected by
contamination by a previous use has been undertaken
and, as a minimum, a Preliminary Risk Assessment
(Phase 1 Desk Study) has been submitted for
consideration and accepted by the Council as Planning
Authority.  If the preliminary risk assessment identifies
the need for further assessment, an intrusive
investigation shall be undertaken to identify; 
a. the nature, extent and type(s) of contamination
on the site 
b. measures to treat/remove contamination to
ensure the site is fit for the use proposed 
c. measures to deal with contamination during
construction works 
d. condition of the site on completion of
decontamination measures. 
Prior to the completion or bringing into use of any part of
the development the measures to decontaminate the site
shall be fully implemented in accordance with the
scheme subsequently agreed by the Council as Planning
Page 15 of 174

Page 16

Authority. Verification that the scheme has been fully
implemented must also be submitted to the Council as
Planning Authority.
Reason – To ensure a satisfactory standard of local
environmental quality.
12. The conclusions and recommended action points within
the supporting Ecological Surveys, Bird Mitigation Plan
and Biodiversity Action Plan submitted and hereby
approved (drawing numbers 26, 27 and 37) shall be fully
adhered to, respected and undertaken as part of the
construction phase of development.
Reason - To ensure a satisfactory standard of local
environmental quality; to safeguard the welfare of any
protected wildlife.
13. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved. The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into
them at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day. 
Reason – In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
14. The detailed landscaping and planting scheme (drawing
numbers 16, 23 and 31) which is hereby approved shall
be completed within the first available planting season
(October to March) after the completion or bringing into
use of the development, whichever is the earlier.  The
approved scheme shall thereafter be maintained to the
satisfaction of the Council as Planning Authority, with
any planting which fails to become established within
five years being replaced in the following planting
season with others of a size and species as previously
approved.
Reason – In the interests of visual amenity and to
ensure the satisfactory implementation of the proposed
planting scheme.
15. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority.  The scheme as agreed shall be
implemented prior to the completion or bringing into use
of the development, whichever is the earlier.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
Page 16 of 174

Page 17

Justification 
The proposals are considered to remain in accordance with the
Development Plan and there are no material considerations
which justify refusal of the planning application. 
Informatives
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period (see
section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action
being taken. 
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position.
4. No work shall be commenced until an application for
building warrant has been submitted and approved.
5. Existing buildings or structures may contain nesting birds
between 1st March and 31st August inclusive.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an
offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act.
6. The findings and recommendations contained with the
Bat Survey remain valid for a period of 24 months.  If the
approved planning permission is not implemented within
24 months of the date of the survey it is strongly
recommended that an updated Bat Survey is undertaken
prior to any works commencing.  Failure to do so could
potentially leave you open to prosecution should any bats
be harmed as a result of the works.  Please note that bats
are protected by law, and it is a criminal offence to
deliberately harm, capture, kill or disturb a bat or its
resting place.
7. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, he/she/they must obtain
from the Perth & Kinross Council and Dundee City
Council, as Roads Authorities, consent to open an
Page 17 of 174

Page 18

existing road or footway prior to the commencement of
works.  Advice on the disposal of surface water should be
sought at the initial stages of design from Scottish Water
and the Scottish Environmental Protection Agency.
8. The applicant should be advised that in terms of Section
21 of the Roads (Scotland) Act 1984 they must obtain
from the Dundee City Council, in collaboration with Perth
& Kinross Council as Roads Authority consent to
construct a new road prior to the commencement of
roadworks.  Advice on the disposal of surface water must
be sought at the initial stages of design from Scottish
Water and the Scottish Environment Protection Agency. 
Please note that a fee is chargeable for the processing of
RCC applications.
9. The applicant is advised that if there is any proposal to
alter a route of an existing core path or right of way a
further legal procedure is required. 
The granting of planning permission does not stop the
continued right of public access along the existing core
path or right of way.  An order under the Town and
Country Planning (Scotland) Act 1997, Section 208 or an
amendment of the Core Path Plan under the Land
Reform (Scotland) Act 2003 should be sought.
10. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development Supplementary Guidance -
Flood Risk and Flood Risk Assessments - Perth &
Kinross Council (pkc.gov.uk).
11. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
12. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
13. The applicant is advised that any proposed signage will
require a further application to be submitted for
Page 18 of 174

Page 19

advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
14. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
15. Further information on the need for and level of provision
of Changing Places Toilet Facilities can be found in
section 41B of the Town and Country Planning (Scotland)
Act 1997, the Town and Country Planning (Changing
Places Toilet Facilities) (Scotland) Regulations 2020 and
the associated Circular 1/2020: Changing Places Toilets
Regulations.
16. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity of
the site of the development 
• Readily visible to the public 
• Printed on durable material. 
HAVING DECLARED A NON-FINANCIAL INTEREST IN THE FOLLOWING ITEM
COUNCILLORS D ILLINGWORTH AND B LEISHMAN LEFT THE CHAMBERS. 
(ii) 21/02249/FLM Erection of replacement recreation centre
with swimming pool, sports hall, gymnasium, fitness suite,
dance studio and ancillary facilities, installation of a
substation, siting of sprinkler tank, air source heat pump
and bin store enclosures, formation of outdoor sports
pitch, parking areas, landscaping and associated works at
Blairgowrie Recreation Centre, Beeches Road, Blairgowrie. 
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
General
1. The development hereby approved must be carried out
in accordance with the approved drawings and
documents, unless otherwise provided for by conditions
imposed by this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.  
Page 19 of 174

Page 20

Finishes
2. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority.
The scheme as agreed shall be implemented prior to the
completion or bringing into use of the development,
whichever is the earlier.
Reason – In the interests of residential amenity; to
ensure a satisfactory standard of local environmental
quality.
Landscaping and Biodiversity
3. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted for the written agreement of
the Council as Planning Authority.  The scheme shall
include details of the height and slopes of any mounding
or recontouring of the site, full details of all hard
landscaping proposals including materials and installation
methods and, species, height, size and density of trees
and shrubs to be planted.  The scheme as subsequently
approved shall be carried out and completed within the
first available planting season (October to March) after
the completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.  The scheme as agreed and
implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
4. Prior to the commencement of development, the
proposed provision of biodiversity enhancement
measures for the site will be submitted for the written
agreement of the Council as Planning Authority. 
Thereafter, they shall be implemented prior to the
development being brought into use.
Reason - In the interests of protecting environmental
quality and of biodiversity.
Archaeology
5. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a written scheme
of archaeological investigation which has been submitted
by the applicant, and agreed in writing by the Council as
Planning Authority, in consultation with Perth and Kinross
Heritage Trust.  Thereafter, the developer shall ensure
that the programme of archaeological works is fully
Page 20 of 174

Page 21

implemented including that all excavation, preservation,
recording, recovery, analysis, publication and archiving of
archaeological resources within the development site is
undertaken.  In addition, the developer shall afford
access at all reasonable times to Perth and Kinross
Heritage Trust or a nominated representative and shall
allow them to observe work in progress.
Reason – To ensure a programme of archaeological
works is carried out to safeguard and record any
archaeological remains within the development area.
Amenity
6. Prior to the commencement of the development a Noise
Management Plan shall be submitted for the written
approval of the planning authority.  The plan shall include
all sources of noise associated with the use of the all-
weather pitch and recreation centre, including user noise,
activity noise and plant equipment and the measures that
will be put in place to minimise and/or control noise.  The
plan shall be reviewed on a regular basis or, following
receipt of a justified complaint or at the request of the
Planning Authority.  Once the Noise Management Plan
has been approved, it shall be fully implemented for the
lifetime of the development.
Reason – In order to safeguard the neighbouring
residential amenity in the area.
7. The hours of operation of the all-weather pitch and the
external floodlighting shall be restricted to 0800 hours to
2200 hours daily.  The use of the all-weather pitch may
have to be curtailed at the beginning and end of this
timeframe in order to comply with floodlighting restriction.
Reason – In order to safeguard the neighbouring
residential amenity in the area.
8. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason – In order to safeguard the neighbouring
residential amenity in the area.
9. No music amplified or otherwise shall be permitted
outside the premises and efforts must be made to
minimise the impact of noise from inside the premises so
no sound is audible in any nearby residential property. 
Reason – In order to safeguard the neighbouring
residential amenity in the area.
10. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
Page 21 of 174

Page 22

does not adversely affect the amenity of the neighbouring
land.
Reason – In order to safeguard the neighbouring
residential amenity in the area.
Transport
11. Prior to the commencement of the development hereby
approved, the developer shall submit for the further
written agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
(a)  restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b)  timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c)  a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d)  arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e)  emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f)  arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
(g)  arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h)  arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
(i)  details of information signs to inform other road
users of construction traffic;
(j)  arrangements to ensure that access for
emergency service vehicles are not impeded;
(k)  co-ordination with other significant developments
known to use roads affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m)  the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction;
(n)  monitoring, reporting and implementation
arrangements;
(o)  arrangements for dealing with non-compliance;
and
Page 22 of 174

Page 23

(p)  details of HGV movements to and from the site.
The TMS as approved shall be strictly adhered to during
the entire site construction programme.  
Reason – In the interests of pedestrian and traffic safety.
12. Development shall not commence until a detailed Travel
Plan (TP), aimed at encouraging more sustainable means
of travel, has been submitted to and agreed in writing by
the Council as Planning Authority.  The TP will have
particular regard to provision for walking, cycling and
public transport access to and within the site and will
identify the measures to be provided (including the
provision of new and/or enhanced public transport
services), any phasing, the system of management,
monitoring, review, reporting and the duration of the Plan. 
Prior to the operation of the development, the TP as
agreed shall be fully implemented to the satisfaction of
the Council as Planning Authority.  
Reason – To encourage sustainable means of travel by
site users.
Pitch Specification
13. The new floodlit synthetic pitch (minimum dimensions 106
x 66m) will be designed and constructed by a recognised
(e.g., SAPCA* registered) specialist pitch contractor(s). 
Details of the contractor(s) and pitch specification shall be
submitted for the written approval of the Planning
Authority prior to the commencement of development.
*SAPCA is The Sports and Play Construction Association
(www.sapca.org.uk).  
Reason – To ensure appropriate replacement provision is
provided.
Drainage
14. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control.  All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.  
Reason – To ensure the provision of effective drainage
for the site.
Sustainability
15. The recreation centre aims to achieve energy savings to
a standard equivalent to Passivhaus. Prior to the
occupation of the recreation centre building, a statement
shall be submitted by the applicant/agent to confirm that
Page 23 of 174

Page 24

this high level of sustainable building design has been
delivered.  
Reason – To ensure the proposal complies with Policy
34. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period (see
section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action
being taken.
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position.
4. No work shall be commenced until an application for
building warrant has been submitted and approved.
5. The findings and recommendations contained with the
Bat Survey remain valid for a period of 24 months. If the
approved planning permission is not implemented within
24 months of the date of the survey it is strongly
recommended that an updated Bat Survey is undertaken
prior to any works commencing.  Failure to do so could
potentially leave you open to prosecution should any bats
be harmed as a result of the works.  Please note that bats
are protected by law, and it is a criminal offence to
deliberately harm, capture, kill or disturb a bat or its
resting place.
6. The proposed demolition and/or building works likely to
cause harm to bats should not commence until the
applicant has obtained the relevant licence issued by
SNH pursuant to Regulation 53 of The Conservation of
Habitats and Species Regulations 2010 authorising the
specified activity/development to go ahead.  Existing
buildings or structures may contain nesting birds between
1st March and 31st August inclusive.  The applicant is
Page 24 of 174

Page 25

reminded that, under the Wildlife and Countryside Act
1981, as amended (section 1), it is an offence to remove,
damage or destroy the nest of any wild bird while that
nest is in use or being built.  Planning permission for a
development does not provide a defence against
prosecution under this Act.
7. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.
8. The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
9. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
10. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
11. The developer is advised to contact Sophie Nicol, Historic
Environment Manager (tel 01738 477027) Perth and
Kinross Heritage Trust, to discuss terms of reference for
work required.
12. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:
i. Displayed in a prominent place at or in the vicinity
of the site of the development
ii. Readily visible to the public
iii. Printed on durable material.
13. Further information on the need for and level of provision
of Changing Places Toilet Facilities can be found in
Page 25 of 174

Page 26

section 41B of the Town and Country Planning (Scotland)
Act 1997, the Town and Country Planning (Changing
Places Toilet Facilities) (Scotland) Regulations 2020 and
the associated Circular 1/2020: Changing Places Toilets
Regulations.
14. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to the floodlighting of
the sports pitch. 
COUNCILLORS D ILLINGWORTH AND B LEISHMAN RETURNED TO THE
CHAMBERS. 
(2) Local Applications 
(i) 21/00755/FLL Formation of a cemetery, columbarium, car
parking and track, landscaping and associated works at
Witches Knowe Wood, Rait 
Ms C Morgan, objector to the application, via audioconference,
and Mr A Threipland, applicant, addressed the Committee and
answered members questions. 
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.  
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
2. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted for the written agreement of
the Council as Planning Authority.  The scheme shall
include details of the height and slopes of any mounding
or recontouring of the site, full details of all hard
landscaping proposals including materials and installation
methods and, species, height, size and density of trees
and shrubs to be planted.  The scheme as subsequently
approved shall be carried out and completed within the
first available planting season (October to March) after
the completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.  The scheme as agreed and
Page 26 of 174

Page 27

implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.  Reason
- To ensure a satisfactory standard of development and
environmental quality and to reserve the rights of the
Planning Authority.
3. Any planting failing to become established within five
years shall be replaced in the following planting season
with others of similar size, species and number to the
satisfaction of the Council as Planning Authority.  
Reason – In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
4. All trees on site, other than those marked for felling on
the approved plans, shall be retained.  
Reason – In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
5. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document(s) relates) shall be fully adhered to,
respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.  
Reason – In the interests of protecting environmental
quality and of biodiversity.
6. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved.  The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.  
Reason – In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
7. Prior to the commencement of the development hereby
approved, a plan indicating provision of bird nesting
boxes, bricks or tubes shall be submitted along with the
timings associated with their installation.  Thereafter the
approved scheme shall be implemented in line with the
agreed timescales.  
Reason – In the interests of protecting environmental
quality and of biodiversity.
8. Prior to the development hereby approved being
completed or brought into use, the existing vehicular
access onto the C401 shall be formed with Type B Road
construction detail and shall continue into the entrance for
Page 27 of 174

Page 28

a distance of no less than 6 metres from the boundary of
the public road surface.  
Reason – In the interests of pedestrian and traffic safety.
9. Prior to the development hereby approved being
completed or brought into use, the car parking facilities
shown on the approved drawings shall be implemented
and thereafter maintained.  
Reason – In the interests of road safety; to ensure the
provision of adequate off-street car parking facilities.
10. Prior to the commencement of development, the
scheduled area shall be appropriately marked out prior to
and during site works, using markers placed out with the
scheduled area, to prevent inadvertent damage to the
scheduled monument.  
Reason – In order to comply with the aims of the Scottish
Planning Policy; to ensure any archaeological remains
are appropriately protected.
11. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a written scheme
of archaeological investigation which has been submitted
by the applicant and agreed in writing by the Council as
Planning Authority, in consultation with Perth and Kinross
Heritage Trust.  Thereafter, the developer shall ensure
that the programme of archaeological works is fully
implemented including that all excavation, preservation,
recording, recovery, analysis, publication and archiving of
archaeological resources within the development site is
undertaken.  In addition, the developer shall afford
access at all reasonable times to Perth and Kinross
Heritage Trust or a nominated representative and shall
allow them to observe work in progress.  
Reason – To ensure archaeological monitoring is carried
out to safeguard and record any archaeological remains
within the development area.
12. Prior to the commencement of the development hereby
approved, details of the location and measures proposed
for the safeguarding and continued operation, or
replacement, of any septic tanks and soakaways, private
water sources, private water supply storage facilities
and/or private water supply pipes serving properties in
the vicinity, sited within and running through the
application site, shall be submitted to and approved in
writing by the Council as Planning Authority.  The
subsequently agreed protective or replacement measures
shall be put in place prior to the commencement of the
development being brought into use and shall thereafter
be so maintained insofar as it relates to the development
hereby approved.  Reason – To ensure existing water
and drainage infrastructures are not compromised.
Page 28 of 174

Page 29

Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period (see
section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement
action being taken. 
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position.
4. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity
of the site of the development 
• Readily visible to the public 
• Printed on durable material.
5. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
6. The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
Page 29 of 174

Page 30

We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
7. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive.  Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act.
8. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to the layout
following Scottish Water feedback.
9. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
10. An application for Building Warrant may be required.
11. The applicant should be advised that in terms of Section
56 of the Roads (Scotland) Act 1984 they must obtain
from the Council as Roads Authority consent to open an
existing road or footway prior to the commencement of
works. Advice on the disposal of surface water must be
sought at the initial stages of design from Scottish Water
and the Scottish Environment Protection Agency.
12. The applicant should ensure that any existing wayleaves
for maintenance or repair to existing private water supply
or septic drainage infrastructure in the development area
are honoured throughout and after completion of the
development. 
(ii) 22/00803/FLL Change of use from dwellinghouse to holiday
accommodation unit Tatha View 4 Braes of Taymouth,
Kenmore, Aberfeldy PH15 2HQ 
Ms S Kirby, the applicant, was available via audio conference for
members questions.  There were no questions. 
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Page 30 of 174

Page 31

Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
2. The use hereby approved shall be limited to holiday
accommodation to the satisfaction of the Council as
Planning Authority.  The owner of the property shall
maintain an up-to-date register of the name of each
occupier of the property, their length of stay and their
main home address and shall make this information
available at all reasonable times to the Planning
Authority.
Reason – In order to clarify the terms of the permission;
to control and restrict the use of the building.
3. The application be granted for a temporary period of two
years. 
Reason – To allow embedding of new licensing laws
regarding Short Term Lets and in turn aid understanding
of volumes of Short Term Lets and impact within the
area.
4. Within two months of the date of this permission, a noise
management plan indicating how noise attributable to
occupants shall be managed and restricted as part of the
development shall be submitted for the agreement of the
Council as Planning Authority, in liaison with
Environmental Health.  Thereafter the management plan
shall be implemented in complete accordance with the
details as so agreed.
Reason – In order to safeguard the neighbouring
residential amenity in the area. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period (see
section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement
action being taken. 
3. As soon as practicable after the development is
complete, the person who completes the development is
Page 31 of 174

Page 32

obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position.
4. An application for Building Warrant may be required. 
7. PROPOSAL OF APPLICATION NOTICES (PAN) 
(i) 22/00013/PAN – Extension to Quarry, Balado, Kinross.
Councillor Cuthbert requested due consideration be given to ground
water, impacts upon private water supplies and to ensure conditions of
previous applications in relation to this site are satisfied. 
The contents of the Head of Planning & Development’s Report were
noted. 
(ii) 22/00015/PAN – Mixed use development comprising erection of 3
café/restaurant units (Class 3) with drive thru facilities, business
units (Class 4), electric vehicle charging hub and formation of
vehicular access, parking areas, landscaping and associated
works at land 90 metres south of 5 Broxden Avenue (E2), Broxden
Avenue, Perth. 
Bailie McLaren requested that due consideration is given to traffic
congestion, surface water, waste management and the core path link. 
Councillor James requested consultation take place with Transport
Scotland.   
The contents of the Head of Planning & Development’s Report were
noted. 
(iii) 22/00016/PAN – Formation of a 32MW solar farm, 16MW battery
energy storage system and associated works at Keithick Farms
Ltd, Keithick, Blairgowrie. 
Members were advised that the applicant of this PAN has since
withdrawn their application.  However, as the PAN had been
determined by Planning Officers, it must be presented to members for
comment. 
The contents of the Head of Planning & Development’s Report were
noted. 
(iv) 22/00017/PAN – Northern lateral extension to quarry with further
excavation works, Collace Quarry, Collace. 
The contents of the Head of Planning & Development’s Report were
noted.
Page 32 of 174

Page 33

Perth and Kinross Council
Planning and Placemaking Committee – 14 September 2022
Report of Handling by Head of Planning & Development
(Report No. 22/216) 
PROPOSAL: Erection of 4 replacement poultry rearing sheds, ancillary
facilities, formation of SUDS pond, landscaping and associated
works  
LOCATION: Knappilands, Strathallan, Crieff, PH5 2BG 
Ref. No: 22/00102/FLM
Ward No: P7 – Strathallan 
Summary 
This report recommends approval of the application which proposes the erection
of 4 replacement poultry rearing sheds, ancillary facilities, formation of SUDS pond,
landscaping and associated works at Knappilands Strathallan. The proposals are
considered to comply with the relevant provisions of the Development Plan with no
material considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL  
1. Planning consent is sought for the erection of 4 poultry rearing sheds, ancillary
facilities, formation of SUDS pond, landscaping and associated works on a site
occupied by 3 large redundant poultry units. Muthill village is located
approximately 3km to the North-West. There is an existing unoccupied
farmhouse which adjoins the site to the east and within the same ownership as
the applicant, however, does not form part of this application. The site is
relatively well contained by existing landscape features. A watercourse
(Machany Water) occupies the southern boundary of the site with woodland
beyond and farmland surrounds the site. The C457 public road and existing
farmhouse adjoins the site to the east with an intervening woodland area. 
2. Consent was originally granted for the replacement of a farmhouse with a new
dwellinghouse and the erection of 4 dwellinghouses in 2007 (07/01501/FUL)
which was subsequently renewed in 2012 (12/01699/FLL) and 2015
(15/01141/FLL), however, works have not commenced, and the consent has
since expired. 
3. This proposal is for a new pedigree lay farm consisting of four poultry buildings
holding a maximum of 4,000 birds in each building, a total of 16,000 birds. 
4. The submitted supporting statement specifies the site has been chosen for
several reasons, which include:
• Its previous use as a poultry farm, replacing derelict buildings;
5(1)(i)
Page 33 of 174

Page 34

• The agricultural setting and its distance from nearby properties (more than
330m away);
• Benefits from concealment provided by existing woodland and its distance
from any residential buildings. 
5. The development site area is approximately 2.1ha with each shed measuring
approximately 73m in length by 18.5m in width reaching a height of 5m to the
ridge. 
6. Access into the site will be taken from the east, via an existing farm access
adjacent to the southern boundary of the site. This will be upgraded with
adequate space provided for staff car parking and for delivery vehicles on site. 
7. The proposal will create one Farm Manager supported by 3 Team Leaders and
15 full time staff and a Cleaner. The applicant envisages that the staff will be
employed locally. 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
8. Directive 2011/92/EU (as amended) requires the ‘competent authority’ (in this
case Perth and Kinross Council) when giving a planning permission for
particular large-scale projects to do so in the knowledge of any likely significant
effects on the environment.  The Directive therefore sets out a procedure that
must be followed before ‘development consent’ can be given. 
9. This procedure, known as Environmental Impact Assessment (EIA), is a means
of drawing together, in a systematic way, an assessment of a project’s likely
significant environmental effects.  The EIA Report helps to ensure that the
importance of the predicted effects, and the scope for reducing any adverse
effects, are properly understood by the public and the relevant competent
authority before it makes its decision. 
10. An EIA screening has previously been undertaken, concluding that an EIA was
not required as the proposal was not considered likely to have significant
environmental effects. However, a suite of supporting assessments, presenting
environmental information in respect of flooding, noise, odour, ecology, traffic
and transport were required. 
Pre-Application Consultation 
11. The proposed development is a ‘Major’ development, in terms of the Town and
Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009,
due to the potential poultry sheds having a floor space greater than 500 square
metres. The applicant was therefore required to undertake formal pre-
application consultation with the local community. 
12. Public concerns raised as part of this process identified access and traffic,
odour, landscaping, ecology and wildlife and availability of water supply as
being matters not addressed by the consultation events.  These matters have
Page 34 of 174

Page 35

been responded to in writing by the agent and included within a Pre-Application
Consultation (PAC) Report submitted with this application.   
National Policy and Guidance 
13. The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework (NPF) 
14. NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
The Scottish Planning Policy (SPP) 2014 
15. The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
16. The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Promoting Rural Development: paragraphs 74 – 91
• Supporting Business and Employment: paragraphs 92 – 108
• Valuing the Natural Environment: paragraphs 193 – 218
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
Planning Advice Notes 
17. The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 3/2010 Community Engagement
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
Page 35 of 174

Page 36

• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 73 Rural Diversification
• PAN 75 Planning for Transport 
Development Plan 
18. The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2019. 
TAYplan Strategic Development Plan 2016-2036 
19. TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plans states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
20. The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application. – 
• Locational Priorities
• Shaping Better Quality Places
• Developer Contributions
• Energy, Waste and Resources
• Green Networks
• Manging TAYplan’s Assets 
Perth and Kinross Local Development Plan 2 
21. The Local Development Plan 2 (2019) (LDP2) was adopted by Perth and
Kinross Council on 29 November 2019. It sets out a vision statement for the
area which includes that. 
“By 2036, the TAYplan area will be more sustainable, more attractive,
competitive and vibrant without creating an unacceptable burden on our planet.
The quality of life will make it a place of first choice where more people choose
to live, work, study and visit and where businesses choose to invest and create
jobs.” It is the most recently adopted statement of Council policy and is
augmented by Supplementary Guidance.  
22. The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
Page 36 of 174

Page 37

• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
• Policy 8: Rural Business and Diversification
• Policy 15: Public Access
• Policy 27A: Listed Buildings
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 39: Landscape
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 50: Prime Agricultural Land
• Policy 51: Soils
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Other Policies   
Placemaking Supplementary Guidance March 2020 
23. The Council has prepared Placemaking Supplementary Guidance (2020) to
support Policy 1 (Placemaking) of the Perth and Kinross Local Development
Plan 2 (2019). It is to be used in the assessment of planning applications and to
assist in the placemaking process. 
Site History 
24. 07/01501/FUL Full planning permission was approved on 4 October 2007 for
replacement of existing farmhouse and erection of 4 dwellinghouses on former
chicken breeder unit. 
25. 12/01699/FLL Full planning permission was approved on 29 October 2012 for
renewal of planning consent (07/01501/FUL) to replace existing farmhouse and
erection of 4 dwellinghouses on former chicken breeder unit. 
26. 15/01141/FLL Full planning permission was approved on 3 March 2016 for
renewal of permission 12/01699/FLL for the erection of 4 dwellinghouses and
replacement farmhouse. 
Page 37 of 174

Page 38

27. 20/01829/SCRN Proposed poultry farm. Negative screening opinion adopted
on 24 December 2020. 
28. 21/00013/PAN A ‘Proposal of Application Notice’ relating to a ‘Major’
development comprising: erection of 4 replacement poultry rearing sheds and
associated works saw PKC confirm on 2 September 2021 that the approach set
out in the PAN was accepted.   
CONSULTATIONS 
29. As part of the planning application process the following bodies were consulted: 
External 
30. Scottish Water – No objection. There is sufficient capacity in the Turret Water
Treatment Works, however, no foul wastewater or surface water connection.  It
is noted that there is a water main within the site boundary and as such an
informative is recommended. 
31. Scottish Environment Protection Agency - No objection following receipt of
updated Flood Risk Assessment (FRA).  Comments noted in respect of
Ecology and Regulatory Matters. 
32. Muthill And Tullibardine Community Council - No response. 
33. NatureScot – No response. 
34. Historic Environment Scotland – No comments received. 
35. Perth and Kinross Heritage Trust – No objection. 
Internal 
36. Transport Planning – No objection subject to conditions to ensure
construction traffic is appropriately managed, a detailed design for the
proposed secure covered cycle parking facility be submitted prior to
commencement of development and the vehicular access to be formed in
accordance with Perth & Kinross Council's Road Development Guide. 
37. Environmental Health (Noise Odour) – No objection. Conditions
recommended to control odour, dust and noise. 
38. Development Contributions Officer - No objection, clarifying that no
contributions are required. 
39. Structures And Flooding – No objection. 
40. Biodiversity/Tree Officer – No objection, subject to conditions relating to
landscaping, implementation of landscaping biodiversity protection and
mitigation. 
Page 38 of 174

Page 39

41. Conservation Team – No objection. 
42. Environmental Health (Contaminated Land) – No objection. Condition
recommended to deal with potential contamination on site. 
Representations 
43. A total of three letters of representation have been received in respect of the
current application and one late comment. The main issues raised within the
representations are: 
• Road Safety Concerns/Traffic Congestion
• Water Supply
• Visual Amenity
• Flood Risk
• Inappropriate Land Use
• Noise Pollution
• Over Intensive Development
• Dust and Odour
• Tree Loss 
44. These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS 
Screening Opinion  Undertaken-Not EIA
development
Environmental Impact Assessment (EIA):
Environmental Report
Not Required
Appropriate Assessment Habitats Regulations:
AA Not Required
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact eg
Flood Risk Assessment
• Flood Risk Assessment
• Landscape and Visual
Context Plan
• Ecology Survey/Bat Survey
• Dust Emissions Report
• Tree Survey Report
• Noise Report 
APPRAISAL 
45. Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2019.  The relevant policy considerations are outlined in the
Page 39 of 174

Page 40

policy section above and are considered in more detail below.  In terms of other
material considerations, this involves considerations of the Council’s other
approved policies and supplementary guidance, namely Placemaking
Supplementary Guidance March 2020 
46. Section 64(1) of the Planning (Listed Buildings and Conservation Areas)
(Scotland) Act 1997 is relevant and requires planning authorities to pay special
attention to the desirability of preserving or enhancing the character or
appearance of the designated conservation area. 
Principle 
47. The proposed development is located on a redundant poultry farm in a rural
location approximately 3km South-East of the village of Muthill. Due to its
former use as a poultry farm, the principle is already established. The site is
surrounded by farmland and trees, offering a level of seclusion and screening
and the nearest residential property, out with the applicant’s ownership, is
approximately 330m away. Due to the nature of the process involved in the
production of eggs, the proposed development requires to be in an isolated
location. LDP2 Policy 8 Rural Business and Diversification provides support for
the creation of new business in rural areas and sites out-with settlement
boundaries may be acceptable if they are related to a specific resource
opportunity. 
48. The development requires to be in an isolated location, however, within close
proximity to the transport network. As such the location of the proposed
development accords with the objectives of the Local Development Plan
providing that the detail planning issues are satisfied. The key determining
issues are whether the proposal is consistent with the relevant provisions of the
Development Plan with regard to traffic implications, landscape and visual
impact of the proposal and impact on neighbouring amenity such as odour and
noise. 
Design and Layout 
49. The proposed buildings are similar in terms of scale and layout to other poultry
rearing developments by the applicant or other poultry facilities in Scotland. As
noted above, the proposed buildings will measure approximately 73m by 18.5m
to a height of 5m and will be linked to each other by covered walkways. The
poultry buildings will be steel framed with roof and side walls clad in 40mm
composite insulated panels, coloured Juniper Green. Additional equipment will
include feed stores, an emergency generator, water tanks, LPG tanks and a
staff amenity and egg storage building. 
50. The existing three buildings on site will be removed and replaced with four
buildings which will extend out with the existing site area to the north, over an
existing forestry track and agricultural land. To accommodate the buildings, it is
proposed to re-route the existing forestry track which will require the removal of
an existing hedgerow. The re-routing of the forestry track will be subject of a
separate application.
Page 40 of 174

Page 41

51. The proposed buildings are described by the applicant as “state of the art”,
designed to take account of energy saving. High levels of insulation, computer
controlled ventilation, energy efficient heating and lighting systems all form part
of the design. Their height, colour and materials relate well to the surrounding
character of the rural environment. The proposal therefore complies with LDP2
Policy 1 – Placemaking.   
Landscape Character and Visual Impact 
52. The supporting Planning Statement implies that the landscape impacts of the
development would be of minor significance. Moreso the proposed
developments seeks to improve the existing quality of the immediate landscape
through the removal of the derelict structures and use of muted colours, which
are more sympathetic to the natural surroundings. 
53. The proposed design and building height within this rural, secluded location
respects the site’s topography and skyline as well as the wider landscape
character of the area. The poultry buildings are low linear structures, coloured
in green to help integrate them into their surroundings. Applying LDP2 Policies
1 and 8, the proposed development is in compliance. 
54. In terms of Policy 40 of LDP2, the Council will apply the principles of the
Scottish Government Policy on Control of Woodland Removal and there will be
a presumption in favour of protecting woodland resources. Where the loss of
woodland is unavoidable, mitigation measures in the form of compensatory
planting will be required. Compensatory tree planting is required on a ratio of
1:3 for every tree loss as outlined in the PKC Planning for Nature
Supplementary Guidance Planning Guidance - Planning & Biodiversity - Perth
& Kinross Council (pkc.gov.uk). The submitted Landscaping Plan provides this
detail and the predominantly native species mix is welcomed. 
55. The proposed new native hedgerow will compensate for the loss of 120m of
hawthorn hedge which cannot be avoided. 
56. Applying LDP2 Policies 1, 8 and 40, the proposed development is in
compliance, subject to conditions 12 and 13. 
57. Furthermore, as noted above, the Council’s Biodiversity Officer has no
objections subject to conditions relating to landscaping, implementation of
landscaping biodiversity protection and mitigation. 
Residential Amenity 
58. The application contains the provision for poultry sheds with a capacity of
16,000 birds. This falls out with the 40,000 poultry threshold for the requirement
of Pollution Prevention and Control permit from SEPA. As the proposal is below
the PPC (Pollution Prevention Control) threshold, SEPA have no remit in
relation to odour, noise or air quality and as such no permit is required. An
application such as this, however, has the potential to lead to loss of amenity at
nearby receptors due to noise and odour. The site, however, is relatively
Page 41 of 174

Page 42

isolated with the closest residential property over 300m away (Ladystone
Cottage). 
Noise 
59. A Noise Impact Assessment (NIA) has been submitted by the applicant. The
NIA assess the potential impact of noise from the operations of the poultry farm
on nearby receptors. Environmental Health (EH) colleagues have been
consulted and assessed the potential impact of the proposed development on
residential properties in the area and made the following comments. 
60. The main source of noise will be from the ventilation fans and although the
exact model was not confirmed at the time of the NIA, the extractor fans have
the potential to run twenty four hours a day. 
61. The other source is from traffic associated with the development and lorry
movements will average 33 per 12 month cycle. Egg collection will average 68
per 12 month cycle and deliveries will be 2 per month for feed and fuel. 
62. The closest third party residential property, Ladystone Cottage, to the poultry
sheds is approximately 330m away. The existing farmhouse is approximately
54m away and will be the residential dwellinghouse for the farm manager. 
63. The NIA concluded that there will be a degree of impact on the farmhouse,
however, the impact will not be significant. The NIA recommended that as good
practice and site management, a noise management plan should be
implemented and followed on farm to cover all activities. As a consequence
Environmental Health have recommended noise conditions be attached to any
consent in the unlikely event that noise should ever become an issue.
Additionally, Environmental Health have recommended a condition on the
submission of an Operations Management Plan that shall include plans for the
control of noise.   
Dust 
64. A dust assessment report has been submitted by the applicant which has been
reviewed by the Council’s Environmental Health Team. The report concluded
that due to the features of the site and the small number of birds the impact on
nearby properties, as a result of the poultry farm, is negligible. The report
recommends that as good practices and site management, a dust management
plan shall be implemented covering all activities associated with the operations
of the poultry farm. Environmental Health have recommended a condition on
the submission of an Operations Management Plan that shall include plans for
the control of dust. 
Odour 
65. The applicant has submitted an odour assessment which has been reviewed by
the Council’s Environmental Health Team. The report concluded that properties
are predicted not to detect odours from the proposed development during the
Page 42 of 174

Page 43

normal operation of the poultry farm. The report recommends that as good
practices and site management, an odour management plan shall be
implemented covering all activities associated with the operations of the poultry
farm. Environmental Health have recommended a condition on the submission
of an Operations Management Plan that shall include plans for the control of
odour. 
66. Overall, Environmental Health have, subject to planning conditions, raised no
concerns over the potential for adverse noise and odour on residential
properties (Conditions 3 – 8). The proposal is therefore considered to comply
with LDP2 Policy 56, with no unacceptable impact on the amenity of residential
properties. 
Contamination 
67. The proposed development is on land that was formerly used for poultry
farming activities. PKC’s contaminated land team were consulted on the
proposal and advised that given this former use, historical site investigations
and current submitted reports there is the potential for associated
contamination. It is therefore necessary to undertake intrusive investigations to
assess the potential risk to all potential receptors. Subject to planning condition,
the proposal complies with LDP2 Policy 58A (Condition 2). 
Roads and Access 
68. LDP2 Policy 60B requires that local road networks be capable of absorbing
traffic generated by development and that satisfactory access is provided.
Concerns have been expressed in the letters of representation in respect to
road safety concerns and traffic congestion. 
69. The Supporting Planning Statement submitted with the application identified
both construction and operational traffic movements to and from the site. This
has been reviewed by Transport Planning colleagues. 
70. The site benefits from an existing access directly from the C458 public road
network approximately 40 metres south of the junction with the C457.   
71. The applicant has detailed the predicted level of traffic journeys to and from the
site throughout the year.  The large majority of vehicle movements to and from
the site, will be commuting trips with approximately 11 trips to and from the site
on a daily basis.  There will also be a number of HGV movements associated
with normal operations including the delivery of feed, fuel, poultry lorries and
egg collection lorries which all average out to be 12-13 HGVs per month visiting
the site under normal operations.  During the clean out period is anticipated that
agricultural vehicles and trailers, including slurry tankers will be used for the
removal of poultry litter and wastewater. 
72. During the construction phase it is anticipated that the following vehicles will
access the site: 
Page 43 of 174

Page 44

• 48 artic lorry deliveries over the course of the construction phase.
• Approximately 80 concrete delivery loads per building – these will be the
most frequent vehicle movements to the site and take place over a seven-
week period. These seven-week delivery periods will occur four times over
the construction period duration (four poultry buildings on site).
• All other vehicle movements will be small vans/two axle lorries. 
73. The application site is located in a rural area where public transport is
infrequent. The applicant, however, has advised that they would ideally like to
recruit from the local area, as detailed in Section 2.5 of the Supporting
Information.  As there is a desire to employ local people for the jobs at the site,
there is an opportunity for them to be within a distance that they could cycle to
the site.  As a result, it is recommended that secure covered cycle parking is
provided for any staff who may want to cycle to the site. 
74. The applicant is proposing to install a number of car parking spaces within the
site, with 13 standard parking bays and one disabled parking bay.  The
applicant is creating a number of turning areas within the site, which will mean
that vehicles will be able to access and egress in a forward facing gear. 
75. The Council’s Transport Planning Team is content that the proposed vehicular
movement is a reasonable appraisal of the traffic impact of the proposal at both
construction and operational stage. They will, however, require the existing
access to be reformed to meet their standards and have recommended a
construction traffic management plan will be required due to the number of
narrow roads, on approach to the site, so that the construction traffic can be
directed along appropriate roads. This will be controlled by condition. 
76. In terms of the proposed relocated forest track as noted on the drawings,
progressing with this application for the poultry sheds does not mean that the
changes proposed to the forest track will be granted through the planning
process. It will require the submission of a separate application. 
77. The proposals are considered to be in accordance with LDP2 Policy 60, subject
to conditions (conditions 9-11). 
Drainage and Flooding 
78. The proposed development lies partly within the functional floodplain of the
Machany Water, as shown by the SEPA flood mapping. The applicant has
submitted a Flood Risk Assessment (FRA) in support of the application and has
included detailed hydraulic modelling. The applicant states in the FRA checklist
that the proposed development is not within the functional floodplain. This has
been reviewed by the Council’s Flood Team and SEPA, who noted that the
model has not been run for the 200-year event without a climate change
allowance. This was raised with the applicant’s agent and an updated FRA was
provided to include this event which demonstrated that no development would
be undertaken within the functional floodplain. As such, no objections were
received.
Page 44 of 174

Page 45

Water Supply 
79. Concerns have been raised in the letters of representation regarding potential
reduction in the water supply as a result of the proposed development. In terms
of the supply to the site, it is mains connected and Scottish Water have
confirmed there is sufficient capacity in the Turret Water Treatment Works. It is
an existing poultry site so there is existing infrastructure which will be used
where possible. The applicant has confirmed best practice and steps to
minimise water use such as non-leaking drinking systems e.g. nipple drinkers
will be used on site as part of the daily operation. They propose to install
storage tanks within sheds where there will be 24 hours of water provided.
These will provide a backup supply and can be filled at times of low demand. 
Natural Heritage and Biodiversity 
80. LDP2 Policy 41 seeks to protect and enhance all wildlife and habitats. It
advises that planning permission will be granted where evidence is provided to
show there is no adverse effect on ecological interests. An Ecological Report
was submitted with the application, which was subsequently reviewed by PKC’s
Biodiversity Officer. 
The Ecological Report was not considered adequate insofar as it did not detail
the impact of this proposed development on biodiversity and did not set out the
required mitigation and compensation measures. Nor did the report contain
recommendations for further survey requirements. No evidence was provided
that the mitigation hierarchy had been followed and therefore it was not
possible to quantity the impact of this proposed development on biodiversity as
required by Policy 41. As a consequence, an updated Ecology Report was
submitted and reviewed by PKC’s Biodiversity Officer which was considered to
be sufficient with evidence the mitigation hierarchy has been followed. 
81. The site itself is brownfield, with various previously developed areas, including
hardstanding, with otherwise rough grassland and some scrub. The submitted
Ecology Report notes the presence of otter spraints on the watercourse within
the site. Due to this, mitigation measures are required to ensure otters will not
be disturbed during the construction and operation of the proposed
development. 
82. The submitted Ecology Report notes presence of Japanese knotweed but no
details on how these will be controlled or eradicated has been provided. An
Invasive Non-Native Species Control Plan is required. 
83. The submitted Bat Survey Report (27 June 2022) is in accordance with
published best practice. The buildings are assessed as moderate but during
dusk and dawn surveys undertaken in June 2022, no evidence of bat roosts
was observed. 
84. It is accepted that, subject to planning conditions, the proposal complies with
LDP2 Policy 41 (Conditions 14 - 18). 
Page 45 of 174

Page 46

Agricultural Land 
85. The site is identified as Class 3.1 prime agricultural land which is capable of
producing a moderate range of crops such as barley, oats and grass. The
majority of the proposed development is within the footprint of the existing
poultry farm, however, it is proposed to extend the site to the north. Some of
which is taken up by an existing farm track. It is proposed to form a new access
onto the C457 public road and re-route the farm access around the extended
site, however, this will be subject of a separate application. 
86. In terms of the extended site, the area of agricultural land measures
approximately 7,500sqm. As noted above, some of which is an existing access
track. A large proportion of the extended site will incorporate a poultry building,
suds pond and hardstanding. 
87. Policy 50 sets out that development out-with settlements shall not be permitted
on prime agricultural land, unless necessary to meet a specific need such as: a
major infrastructure proposal, and that there is no other suitable site available
on non-prime land.   
It further specifies that small scale development directly linked to rural business
may be acceptable on prime agricultural land, providing it is compatible with all
other aspects of the policy framework of the Plan and it does not adversely
affect the viability of the agricultural unit. 
88. All land surrounding the site is identified as Class 3.1 prime agricultural land,
therefore, there is no other suitable non-prime land adjoining the site which
could be considered as an alternative extension to the site chosen.  The
reasons for selecting the location are clearly set out in supporting documents
and considered reasonable. The area of prime land proposed for development
is considered small scale when compared to the extent of remaining prime land
available in this location. 
89. Overall, the loss of this prime agricultural land has been limited and considered
acceptable, when balanced against the wider benefits of the proposed
development and as such complies with policy 50 of LDP2. 
Developer Contributions 
90. The proposed site is located out with any area where financial contributions
towards roads infrastructure is required. As such, the Developer Contributions
Supplementary Guidance is not applicable to this application and therefore no
contributions are required in this instance. 
Economic Impact 
91. This development will create up to 20 direct employees and there will be a
significant number of downstream economic opportunities associated in terms
of the construction period and secondly employment in haulage and the
Page 46 of 174

Page 47

agricultural supply chain. As such the impact of the proposal on the rural
economy at this location is considered to be significantly positive. 
LEGAL AGREEMENTS 
92. None required. 
DIRECTION BY SCOTTISH MINISTERS 
93. Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
94. To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is considered to comply with the approved
TAYplan 2016 and the adopted Local Development Plan 2 (2019).  
Account has been taken account of the relevant material considerations and
none has been found that would justify overriding the adopted Development
Plan. 
95. Accordingly, the proposal is recommended for approval subject to the following
conditions. 
A  RECOMMENDATION   
Approve the application 
Conditions and Reasons for Recommendation 
General 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason – To ensure the development is carried out in accordance with the
approved drawings and documents. 
Contamination 
2. Development shall not commence on site until an evaluation for the potential of
the site to be affected by contamination by a previous use has been undertaken
and, as a minimum, a Preliminary Risk Assessment (Phase 1 Desk Study) has
been submitted for consideration and accepted by the Council as Planning
Authority.  If the preliminary risk assessment identifies the need for further
assessment, an intrusive investigation shall be undertaken to identify; 
Page 47 of 174

Page 48

I. the nature, extent and type(s) of contamination on the site 
II. measures to treat/remove contamination to ensure the site is fit for the use
proposed 
III. measures to deal with contamination during construction works 
IV.  condition of the site on completion of decontamination measures. 
Prior to the completion or bringing into use of any part of the development the
measures to decontaminate the site shall be fully implemented in accordance
with the scheme subsequently agreed by the Council as Planning Authority.
Verification that the scheme has been fully implemented must also be
submitted to the Council as Planning Authority. 
Reason – In order to deal with any potential contamination of the site as a
result of its former use. 
Residential Amenity 
3. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 20 between 2300 and 0700 hours daily,
within any neighbouring residential property, with all windows slightly open,
when measured and/ or calculated and plotted on a rating curve chart. 
Reason – In order to safeguard the residential amenity of the area. 
4. Should any aspect of the development result in verified noise complaint
determined by the Council as Planning Authority in consultation with
Environmental Health, within 14 days of written request by the Council as
Planning Authority, the applicant shall arrange for a Noise Impact Assessment
by a suitably qualified noise consultant with the scope and timescale submitted
to and agreed in writing with the Council as Planning Authority in consultation
with Environmental Health. Thereafter any agreed mitigation measures shall be
implemented to ameliorate the nuisance. 
Reason – In order to safeguard the residential amenity of the area. 
5. The poultry buildings shall not be occupied (or otherwise become operational)
until an operational plan for the management and control of potential nuisances
(including noise, odour, air quality (dust), flies and other pests) that would be
liable to arise at the site as a consequence of and/or in relation to, the operation
of the poultry buildings hereby approved, has first been submitted to, and
approved in writing by the Planning Authority. Thereafter the approved
nuisance control management plan shall be implemented as part of the
development. 
Reason – In  order to safeguard the residential amenity of the area. 
6. No deliveries or uplifting shall take place between the hours of 11.00pm and
6.30am on any day.
Page 48 of 174

Page 49

Reason – In order to safeguard the residential amenity of the area. 
7. Audible vehicle reversing alarms shall be operated on the method that they only
emit the warning, if necessary, e.g., on an infrared signal which detects persons
to the rear of the vehicle. 
Reason – In order to safeguard the residential amenity of the area. 
8. Should any aspect of the development result in verified odour complaint
determined by the Council as Planning Authority in consultation with
Environmental Health, within 14 days of written request by the Council as
Planning Authority, the applicant shall arrange for an Odour Impact
Assessment (OIA) to be carried out by a qualified consultant. The OIA findings
shall be submitted for the written approval of the Council as Planning Authority,
in consultation with Environmental Health and must draw conclusions and
make recommendations as necessary. Thereafter any necessary measures to
ameliorate the odour nuisance should be put in place, and a new or revised
Operational Management Plan must be submitted to the council within a
specified agreed timescale. 
Reason – In order to safeguard the residential amenity of the area. 
Roads and Access 
9. Prior to the development hereby approved being completed or brought into use,
the vehicular access shall be formed in accordance with Perth & Kinross
Council's Road Development Guide Type E Figure 5.7 access detail, of Type B
Road construction detail.  The Type B Road construction detail shall continue to
the entrance for a minimum distance of 15 metres from the edge of the
carriageway. 
Reason – In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
10. Prior to commencement of any development on site, a detailed design for the
proposed secure covered cycle parking facility for a minimum of 6 cycles shall
be submitted to and approved in writing by the Planning Authority in
consultation with the Roads Authority.  The applicant can seek guidance on the
detailed design and positioning of the cycle storage from Transport Scotland's
Cycling by Design 2021.  The cycle parking, as approved in writing, shall be
implemented in accordance with the approved details to the satisfaction of the
Council as Planning Authority prior to the development being brought into use. 
Reason – To encourage active travel and meet advice within Scottish Planning
Policy on transport. 
11. Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning
Authority, in consultation with the Roads Authority (Structures), a Construction
Traffic Management Scheme (CTMS) which shall include the following:
Page 49 of 174

Page 50

(a)  restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used; 
(b)  timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events; 
(c)  a code of conduct for HGV drivers to allow for queuing traffic to pass; 
(d)  arrangements for liaison with the Roads Authority regarding winter
maintenance; 
(e)  emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown; 
(f)  arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development
being deposited on the road; 
(g)  arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development; 
(h)  arrangements for signage at site accesses and crossovers and on roads
to be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians; 
(i)  details of information signs to inform other road users of construction
traffic; 
(j)  arrangements to ensure that access for emergency service vehicles are
not impeded; 
(k)  co-ordination with other significant developments known to use roads
affected by construction traffic; 
(l)  traffic arrangements in the immediate vicinity of temporary construction
compounds; 
(m)  monitoring, reporting and implementation arrangements; 
(n)  arrangements for dealing with non-compliance; and 
(o)  details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason – In the interest of proper site management. 
Page 50 of 174

Page 51

Landscape 
12. The detailed landscaping and planting scheme which is hereby approved shall
be completed within the first available planting season (October to March) after
the completion or bringing into use of the development, whichever is the earlier. 
The approved scheme shall thereafter be maintained, with any planting which
fails to become established within five years being replaced in the following
planting season with others of a size and species as previously approved. 
Reason – In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
13. Any planting failing to become established within five years shall be replaced in
the following planting season with others of similar size, species, and number. 
Reason – To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
Biodiversity 
14. The conclusions and recommended action points within the supporting ecology
surveys submitted and hereby approved (drawing numbers 22/00102/29 and
22/00102/30) shall be fully adhered to, respected and undertaken as part of the
construction phase of development, to the satisfaction of the Council as
Planning Authority. 
Reason – In the interests of protecting environmental quality and of biodiversity. 
15. An updated bat survey will be required prior to the commencement of works, if
works have not commenced within 24 months of the date of the bat survey
approved as part of this permission.  The updated survey shall be submitted to
the Council as Planning Authority for written agreement and works shall not
commence until after such written agreement has been issued by the Council. 
Reason – In the interests of protecting environmental quality and of biodiversity. 
16. Prior to the commencement of the development hereby approved, an Invasive
Non-Native Species Control Plan shall be provided for the written approval of
the Council as Planning Authority. The plan shall contain measures to eradicate
and control invasive non-native species. Thereafter, the agreed scheme shall
be implemented in full accordance during the construction phase. 
Reason – In the interests of protecting environmental quality and of biodiversity. 
17. Measures to protect animals from being trapped in open excavations and/or
pipe and culverts shall be implemented for the duration of the construction
works of the development hereby approved. The measures may include
creation of sloping escape ramps for animals, which may be achieved by edge
profiling of trenches/excavations or by using planks placed into them at the end
Page 51 of 174

Page 52

of each working day and open pipework greater than 150 mm outside diameter
being blanked off at the end of each working day. 
Reason – In order to prevent animals from being trapped within any open
excavations. 
18. Lighting will be designed and positioned in such a way as to prevent light
spillage into adjacent watercourses and woodland. 
Reason – In the interests of protecting environmental quality and of biodiversity. 
B JUSTIFICATION 
95. The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
C PROCEDURAL NOTES 
96. None. 
D INFORMATIVES 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period
(see section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended)). 
2. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority
written notice of that position. 
4. No work shall be commenced until an application for building warrant has been
submitted and approved. 
5. The applicant should take note of the information and advice contained within
the consultation response from Scottish Water. 
6. Existing buildings or structures may contain nesting birds between 1st March
and 31st August inclusive. The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is an offence to remove,
damage or destroy the nest of any wild bird while that nest is in use or being
Page 52 of 174

Page 53

built. Planning permission for a development does not provide a defence
against prosecution under this Act. 
7. This planning permission is granted subject to conditions, some of which
require further information to be submitted to Development Management either
before works can start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original application was
lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware that a fee is payable
in respect of each request made, though there is no limit to the number of
conditions that can be discharged in a single request.  The Fees Charter is
available on our website www.pkc.gov.uk.   
The Council has two months to consider the information.  You should therefore
submit the required information more than two months before your permission
expires.  We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your
permission lapses. 
8. The applicant is advised that any proposed signage will require a further
application to be submitted for advertisement consent unless it benefits from
express consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984. 
9. This development will require the 'Display of notice while development is
carried out', under Section 27C(1) of the Town and Country Planning Act 1997,
as amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013.  The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be: 
Displayed in a prominent place at or in the vicinity of the site of the
development 
Readily visible to the public 
Printed on durable material. 
10. Further information on the need for and level of provision of Changing Places
Toilet Facilities can be found in section 41B of the Town and Country Planning
(Scotland) Act 1997, the Town and Country Planning (Changing Places Toilet
Facilities) (Scotland) Regulations 2020 and the associated Circular 1/2020:
Changing Places Toilets Regulations. 
11. The applicant should be aware of the requirements of the Council's
Environment and Regulatory Services in relation to waste collection from the
site and should ensure adequate measures are provided on site to allow for the
collection of waste. 
Background Papers:  3 letters of representation
Contact Officer:  Gillian Peebles
Date: 2 September 2022
Page 53 of 174

Page 54

DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 54 of 174

Page 55

22/00102/FLM
Erection of 4 replacement poultry rearing sheds, ancillary facilities, formation of SUDS
pond, landscaping and associated works Knappilands Strathallan Crieff
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:25000
5(1)(i)
Page 55 of 174

Page 56

Page 56 of 174

Page 57

22/00102/FLM
Erection of 4 replacement poultry rearing sheds, ancillary facilities, formation of SUDS
pond, landscaping and associated works Knappilands Strathallan Crieff
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:1000
5(1)(i)
Page 57 of 174

Page 58

Page 58 of 174

Page 59

Perth and Kinross Council
Planning and Placemaking Committee – 14 September 2022
Report of Handling by Head of Planning & Development
(Report No. 22/217) 
PROPOSAL: Formation of a 49MW battery energy storage facility comprising
battery storage units, ancillary buildings, vehicular access,
landscaping and associated works  
LOCATION: Land 140 Metres North-East of Jamesfield Organic Centre,
Newburgh 
Ref. No: 22/00832/FLM
Ward No: P9 – Almond and Earn 
Summary 
This report recommends approval of the application which proposes the formation
of a 49MW electrical energy storage facility, including up to 26 battery storage
containers and associated infrastructure, including landscaping and vehicle access
north-east of Jamesfield Farm Shop. The proposal is considered to comply with the
relevant provisions of the Development Plan with no material considerations
apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The site is c.0.86 hectares (Ha) in area and largely comprises a storage
compound contained within a security fence. The remainder is an access and
landscaped areas. All located approximately 140m to the west of the
Jamesfield Garden Centre and 80m to the south west of the Jamesfield Farm
Shop, close to Abernethy.  There is also an existing electrical substation
located c.60m to the south west of the site access off the garden centre/farm
shop access road.  The wider land use beyond the immediate surrounds is in
agricultural use.  Local topography is generally level, with a slight slope up to
the north, whilst to the south the ground rises more steeply beyond Abernethy
Road. 
2 In September 2017, planning permission (Ref: 17/00951/FLM) was granted at
this location for a similar 30 MW battery storage facility, vehicular access and
associated works. The applicant referred to this development as ‘phase 1’.
Subsequently, in March 2019, a second planning permission (Ref:
18/02336/FLL) was granted for an additional 19 MW battery storage facility
immediately to the north of phase 1 and referred to as ‘phase 2’.  Both
permissions remain extant with works relating to phase 1, namely the access
constructed in September 2021. This application now seeks to combine these
phases 1 and 2 into a single development, with minor revisions to the site
layout. 
5(1)(ii)
Page 59 of 174

Page 60

3 In physical terms, the proposals are for 26 containerised storage units
containing batteries (10.3 x 1.75 x 3m); 13 transformer units, each 3.5m high;
two switch rooms and a Distribution Network Operator (DNO) switchgear room
(electrical equipment storage), each 4m high and three auxiliary transformers to
a height of 1.7m.  In addition, a laydown area is indicated close to the entrance
of the compound, where there would be two storage containers of 2.8m in
height. 
4 The battery storage facilities would be enclosed by a 2.4m palisade fence in a
green colour.  Security cameras and lighting columns, up to 4m in height are
also be proposed along the inside of the perimeter fence.     
5 A significant planting and landscaping scheme is also proposed, to assist with
integration of the facility into the wider surroundings.   
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
6 Directive 2011/92/EU (as amended) requires the ‘competent authority’ (in this
case Perth and Kinross Council) when giving a planning permission for
particular large-scale projects to do so in the knowledge of any likely significant
effects on the environment.  The Directive therefore sets out a procedure that
must be followed before ‘development consent’ can be given. 
7 This procedure, known as Environmental Impact Assessment (EIA), is a means
of drawing together, in a systematic way, an assessment of a project’s likely
significant environmental effects.  The EIA Report helps to ensure that the
importance of the predicted effects, and the scope for reducing any adverse
effects, are properly understood by the public and the relevant competent
authority before it makes its decision. 
8 An EIA screening has previously been undertaken, concluding that an EIA was
not required as the proposal was not considered likely to have significant
environmental effects. However, a suite of supporting assessments, presenting
environmental information in respect of archaeological, drainage, noise,
ecology, traffic and transport and landscape visual impact were required. 
PRE-APPLICATION CONSULTATION 
9 The proposed development is a ‘Major’ development, in terms of the Town and
Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009,
due to the potential energy storage capacity proposed being in excess of
20MW.  The applicant was therefore required to undertake formal pre-
application consultation with the local community. Public concerns raised as
part of this process identified noise, landscaping and flood risk as being matters
not addressed by the consultation events.  These matters have been responded
to in writing by the agent and included within a Pre-Application Consultation
(PAC) Report submitted with the application.   
10 The PAC Report notes that two online public events were held, as permitted by
the relevant regulations.  These online events were held on 10 February and
23 March 2022 both at 6pm, with notice provided to local MPs and MSPs and
Page 60 of 174

Page 61

Council Members as well as to Abernethy Community Council.  Three
interested parties attended the events, and a number of comments and
concerns were reviewed and addressed within the PAC report and wider
planning submission. The content and coverage of the community consultation
exercise is considered sufficient and proportionate and in line with the
aforementioned regulations. 
NATIONAL POLICY AND GUIDANCE 
11 The Scottish Government expresses its planning policies through: The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework (NPF) 
12 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure.  Under the Planning etc. (Scotland) Act 2006, this is now a
statutory document and a material consideration in any planning application.  It
provides a national context for development plans and planning decisions as
well as informing the on-going programmes of the Scottish Government, public
agencies and local authorities. 
Scottish Planning Policy (SPP) 2014 
13 The current SPP was published in June 2014 and sets out national planning
policies, which reflect Scottish Ministers’ priorities for operation of the planning
system and for the development and use of land.  It promotes consistency in
the application of policy across Scotland, whilst allowing sufficient flexibility to
reflect local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
14 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Promoting Rural Development: paragraphs 74 – 91
• Supporting Business and Employment: paragraphs 92 – 108
• Delivering Heat and Electricity: paragraphs 152 – 173
• Valuing the Natural Environment: paragraphs 193 – 218
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
Planning Advice Notes 
15 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are also of relevance to the proposal: 
Page 61 of 174

Page 62

• PAN 3/2010 Community Engagement
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 73 Rural Diversification
• PAN 75 Planning for Transport
• The Future of Energy in Scotland: Scottish Energy Strategy (December 
2017) 
DEVELOPMENT PLAN 
16 The Development Plan for the area comprises: the TAYplan Strategic
Development Plan 2016-2036; and the Perth and Kinross Local Development
Plan 2014. 
TAYplan Strategic Development Plan 2016-2036 
17 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
18 Policy 7: Energy, Waste and Resources of TAYplan is of particular importance
in the assessment of this application. 
Perth and Kinross Local Development Plan 2019 
19 The Local Development Plan 2 (LDP) was adopted by Perth and Kinross
Council on 29 November 2019.  It sets out a vision statement for the area,
which includes that, “By 2036, the TAYplan area will be sustainable, more
attractive, competitive and vibrant without creating an unacceptable burden on
our planet. The quality of life will make it a place of first choice where more
people choose to live, work, study and visit and where businesses choose to
invest and create jobs.” It is the most recently adopted statement of Council
policy and is augmented by Supplementary Guidance. 
20 The principal relevant policies are: 
• Policy 1A and 1B Placemaking
• Policy 2 Design Statements 
• Policy 5 Infrastructure Contributions
• Policy 8 Rural Business and Diversification
• Policy 26B Scheduled Monuments and Archaeology: Archaeology
• Policy 33A Renewables and Low Carbon Energy: New Proposals for
Renewable and Low Carbon Energy
• Policy 33B Repowering and Existing Facilities: Repowering and Extending
Page 62 of 174

Page 63

Existing Facilities 
• Policy 35 Electrical Transmission 
• Policy 39 Landscape 
• Policy 41 Biodiversity
• Policy 47 River Tay Catchment Area 
• Policy 50 Prime Agricultural Land 
• Policy 51: Soils
• Policy 52 New Development and Flooding
• Policy 53A Water Environment and Drainage: Water Environment
• Policy 53C Water Environment and Drainage: Surface Water Drainage 
• Policy 55 Nuisance from Artificial Light Pollution 
• Policy 56 Noise Pollution 
• Policy 60B Transport Standards and Accessibility Requirements 
Other Policies 
21 Perth and Kinross Flood Risk and Flood Risk Assessments – Developer
Guidance, June 2021   
22 Perth and Kinross Supplementary Guidance: Landscape, February 2020 
23 Perth and Kinross Supplementary Guidance: Placemaking Guide, March 2020 
24 Perth and Kinross Planning Planning for Nature, Development Management
and Wildlife Guide Supplementary Guidance, April 2022 
SITE HISTORY 
25 17/00951/FLL Full Planning Permission was granted on 18 September 2017 for
the Installation of an energy storage facility, formation of vehicular access,
erection of fence and associated works. 
26 18/02336/FLL Full Planning Permission was approved on 7 March 2019 for the
Installation of an energy storage facility, erection of fence and associated
works. 
27 22/00004/PAN A Proposal of Application Notice relating to a “major application
“ was submitted on the 15 February 2022 for the Formation of a battery energy
storage facility comprising battery storage units, ancillary buildings, storage
containers, landscaping, erection of fencing and associated works. 
28 22/00382/SCRN A Screening Opinion was issued by the Planning Authority on
12 April 2022 for the Installation of a 49MW battery energy storage facility,
formation of vehicular access, erection of fence, landscaping and associated
works. 
CONSULTATIONS 
29 The following parties have been consulted: 
Page 63 of 174

Page 64

EXTERNAL 
30 Scottish Water - No objection. Advisory note that no public sewer and water
supply options are available. 
31 Perth and Kinross Heritage Trust - No objection. Advise that the site has
already been investigated for archaeological records, with none found.   
32 Abernethy Community Council: No response.   
33 Scottish Environment Protection Agency: No comments. 
34 Nature Scotland: No comments. 
35 Transport Scotland: No objection, subject to conditions regarding the need for
further approval of signage, traffic control measures and abnormal sized loads
with respect to the use of the Trunk Road. (Conditions 6 and 7). 
INTERNAL  
36 Biodiversity Officer - No objection, subject to a condition regarding the
implementation of proposed landscaping. (Condition 9). 
37 Development Plans – No objection. The site is identified as prime agricultural
land. However, the principle of the development is established through the
previous granting of planning permission.   
38 Structures and Flooding – No objection. Informative note requested to direct
the applicant to the Council’s Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021. 
39 Environmental Health (Noise/ Odour) - No objection, subject to a condition
regarding plant and or equipment noise during construction. (Conditions 2 and
3). 
40 Transport Planning - No objection, subject to a condition to ensure
construction traffic is appropriately managed. (Condition 5). 
41 Development Contributions Officer - No objection, clarifying that no
contributions are required. 
REPRESENTATIONS 
42 Two objections have been received, with concerns summarised as follows: 
• Traffic and Transport Impacts, including impacts on the use of private land
• Impacts on soils and agricultural land 
• Landscape Impacts
• Impacts on amenity  
• Noise Impacts 
• Artificial Light 
Page 64 of 174

Page 65

• Impacts on private water supply 
• Flooding and Drainage 
• Site decommissioning 
43 The matters raised are addressed in the Appraisal section below, with the
exception of comments reflective of impacts resulting from the use of private
land to access this site. This is a private civil matter between the applicant and
the landowner and cannot be addressed by the Council. 
ADDITIONAL STATEMENTS
44
Environment Report Not Required
Screening Opinion Undertaken – Not EIA development.
Environmental Impact Assessment Not Required
Appropriate Assessment Not required
Design Statement  Submitted 
Reports on Impact or Potential Impact
• Archaeological Evaluation 
• Landscape and Planting
Report 
• Landscape and Visual
Assessment 
• Preliminary Ecological
Appraisal  
• Noise Impact Assessment 
• Battery Fire Safety
Management Plan 
• Drainage Strategy 
• Construction Traffic
Management Plan (CTMP) 
• Transport Statement   
APPRAISAL 
45 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2 (2019).  The relevant policy considerations are outlined in
the policy section above and are considered in more detail below.  In terms of
other material considerations, this includes considerations of the Council’s
other approved policies and supplementary guidance as set out and specifically
Scottish Energy Strategy (SES) (December 2017), the future of energy in
Scotland. 
Principle 
46 The location is a peripheral rural area east of Abernethy, policy considerations
seeking to assess its suitability in principle are: Policies 1A, 1B, Placemaking,
Page 65 of 174

Page 66

Policy 8 Rural Diversification, Policy 33A and 33B Renewables and Low
Carbon Energy, Policy 50 Prime Agricultural Land and Policy 51 Soils. 
Furthermore, and a significant material consideration is the existing approved
planning permissions for two battery energy storage facilities, which occupy
much of the site.   
47 The proposal would provide essential energy balancing services to the National
Grid, actively contributing towards Scotland's CO2 reduction targets, supporting
the strategy principles of the SES. Specifically, electricity would be drawn from
the Grid at times of low demand, stored and released back as required. When
demand is higher, greater generation from non-renewable sources is required
and energy storage facilities such as that proposed could reduce reliance on
non-renewable resources, thus decreasing CO2 emissions. Whilst the
development does in this case occupy prime agricultural land, conflicting with
the general aim of Policy 50 of LDP2 which seeks to avoid developing prime
agricultural land, unless necessary to meet a specific established need.  In this
respect, the proximity to the electricity grid/connection, gives site specific
reasoning for this major infrastructure proposal.  Additionally, it is important to
account for the important consideration of the extant approved Planning
Permissions (17/00951/FLL and 18/02336/FLL). Taking these two factors
together sees the development justifiable in this case. However, careful
consideration would be required if further intensification was proposed, and
additional land take required. The changes from those previously approved
developments are otherwise considered acceptable, as set out below.   
Design and Layout 
48 The design and layout essentially reflect the physical and engineering
requirements, with infrastructure details consistent with industry standards. In
physical terms, the development will essentially be contained below 4m in
height.  The tallest visible built structures being the switch rooms, DNO
Switchgear buildings and the CCTV poles - all c.4m above ground level.
Remaining built elements will vary in height but not above this height. The
development within the storage compound will be enclosed behind a security
fence and landscaping. In these regards the overall scale and height of built
structures horizontal massing is more significant than vertical impacts. These
aspects are further considered in the landscape and visual impact sections
below. Otherwise, physical separation between each container and
colour/finishes can be controlled by Conditions 1 and 8. 
Landscape and Visual Impact 
49 Safeguarding and enhancing landscape character and green infrastructure is
considered via LDP Policies 1 and 33. In this instance, as said above the
proposed utilitarian design is largely set, thus some landscape and visual
impact will result. Therefore, it is especially important to ensure robust
landscaping and associated green infrastructure provides mitigation from key
viewpoints, softens the immediate and cumulative landscape impact, whilst also
improving biodiversity opportunities.  In line with Policy 33, the cumulative
visual impact of the proposal and the existing sub-station should also be taken
into account. 
Page 66 of 174

Page 67

50 A landscape visual impact assessment (LVIA) was requested, along with a fully
detailed structural landscape plan. These were key in assessing if the
proposals could be successfully accommodated visually.   
51 Existing landscape features will be supplemented by robust and comprehensive
native planting (plan 22/00832/22) along the site perimeter. The proposed
planting is considered sufficient to satisfactorily accommodate the development
in the landscape, particularly as any vegetation matures.  Some short-term
impacts on views over the and across the site may be evident in the interim.
Following establishment, it is not considered that there would be unacceptable
impact on landscape or visual amenity, with photomontages contained within
the landscape and visual impact assessment indicating the predicted situation. 
52 The proposal is therefore considered to accord with Policies 1 and 33.   
Residential Amenity 
53 The nearest residential receptors are more than 250m away, to the east of the
site and are unlikely to be significantly impacted due to the physical distance of
separation, low vertical height of the development proposed, minor undulations
in local topography and through proposed landscaping by the applicant.
However, the Jamesfield Farmshop as well as the Jamesfield Garden Centre
are both located within 150m of the main site compound.  Although some
screening of the development exists from these locations due to existing farm
polytunnels some direct impacts, particularly during construction is inevitable.     
54 PKC Environmental Health (EH) have reviewed the supporting Noise Impact
Assessment, including any modelling results, and have not raised any
objections with the conclusions drawn, notably that the previous noise
restrictions related to the existing permissions can be achieved.  Potential noise
sources include; air conditioning units, invertor cooling fans, switchgears,
transformers, background reactor noise, and construction noise. EH advise a
condition setting acceptable limits to all approved plant and or equipment noise
output. 
55 Compliance with the recommended condition see it considered that the
development will comply with Policy 33 of the LDP, with no likely unacceptable
impact on the amenity of residential properties. 
Lighting 
56 The impact of artificial lighting has been noted as a matter of concern in
representations.  However, the use of lighting is to be minimal and primarily for
security purposes.  Condition 4 can control spillage and limit operation to
acceptable levels. 
Roads and Access 
57 LDP2 Policy 60B requires that local road networks be capable of absorbing
traffic generated by development and that satisfactory access is provided. 
Page 67 of 174

Page 68

Concern is raised that the adjoining garden centre would see use of its carpark
to facilitate access to the site.  Comment made that this carpark is busier than
in 2018 (when the previous planning permission was last assessed) and as
such the use of this space is seen as a safety concern, particularly during
construction periods. 
58 The proposal is to access via the road serving Jamesfield Organic Centre,
through the carpark and to the dedicated site access.  However, no concerns
are raised by Transport Planning, in relation to impacts on the local road
network, subject to a condition relating to a Construction Traffic Management
Scheme (CTMS). Nor have any concerns been raised the Transport Scotland
relative to the use of the Trunk Road, subject to conditions that further
agreement may be required for any signage, traffic management and or
abnormal loads (Conditions 6 and 7). 
59 Whilst the use of the parking area to provide site access may see issues
requiring of careful mitigation, particularly during the construction period, the
identified route appears to be over private ground ownership and falls out with
the locus of the Roads Authority. Consequently, it would be for the applicant to
negotiate any required right of access over this ground and management of
vehicle movements separately from the planning process, as impacts on the
parking area are not a material planning consideration. 
60 Overall, no unsurmountable road and or transport impacts are evident, and
subject to a condition regarding construction traffic management, that the
development confirms with Policy 60B. 
Drainage and Flooding 
61 Policy 52 requires development to appropriately consider flooding and drainage
issues. In this regard, objection raises concerns in respect of drainage impacts
beyond the site, as limited details were initially provided of drainage
arrangements.   
62 The applicant has subsequently provided a Drainage Strategy which sets out
that the development (including access road) is designed to see free drainage,
sufficient to accommodate a 100-year event plus 30% freeboard. No formal
runoff from the site is proposed. 
63 Otherwise, the site is not within a SEPA identified flood risk area and the
Council’s Flood Hazard and Structures Team do not raise any objection.
However, the applicant would be directed to the Council’s Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021.   
64 The proposals are thus considered to satisfy Policy 52 of LDP2. 
Natural Heritage and Biodiversity 
65 LDP2 Policies 39 and 40 are relevant considerations in respect of potential
biodiversity impacts or opportunities arising from the development. In this
respect the Landscape Plan includes largely native species and contains
Page 68 of 174

Page 69

several positive elements, making a likely valuable contribution to biodiversity,
consistent with the Perth and Kinross Forestry and Woodland Strategy. 
66 The Councils biodiversity officer has reviewed the proposals and raises no
objection, subject to conditions on delivery of the proposed landscaping. As
such, subject to Condition 10, the proposal is considered to accord with policies
39 and 40 of the LDP2.   
Private Water Supply 
67 The development is for an energy storage compound in a rural area where
there are private water supplies (including Jamesfield Borehole Supply)
understood to serve properties in the vicinity.  Whilst no specific impacts to
private water supply are obvious, a safeguarding condition is recommended
requiring that the applicant confirm the location of private water and wastewater
infrastructure and any required protective measures are put in place prior to
works commencing.  This will ensure both that the new development has an
adequate and consistently wholesome supply of water (should that be required)
and to maintain water quality and supply in the interests of residential amenity. 
In addition to ensure the private water supply or septic drainage systems of
neighbours of the development remain accessible for future maintenance.
Otherwise, it should be noted that once the development is operational Perth
and Kinross Council Environmental Health Services will have statutory duties
detailed in the Water Intended for Human Consumption (Private Supplies)
(Scotland) Regulations 2017 to monitor the water quality.  Further informative
notes relative to existing wayleaves and compliance with the Water Scotland
Act 1980 are also recommended to be appended to any positive decision
notice.   
Developer Contributions 
68 There has been comment in representations that no local benefits would result
from the development.  However, in planning policy terms, no developer
contributions are triggered for this type of development. As a result, the
planning authority cannot require the provision of money or infrastructure, not
clearly required as a result of the development. 
Archaeology 
69 The development proposal has been reviewed by the Perth and Kinross
Heritage trust who have not raised any objection to the development, noting the
previously consented schemes and previous site assessment undertaken.  The
development is considered to accord with Policy 26B of the LDP2. 
Economic Impact 
70 In the short term, construction will create jobs, with scope for local employment.
Beyond this there is a clear fit between Scottish Government aims of promoting
a transition to a low carbon economy and this proposal. Support for local
renewable energy generation would also result, by helping balance fluctuations
of intermittent energy generation.  The development also represents a
Page 69 of 174

Page 70

significant inward investment in rural Perthshire, assisting in the creation of a
national grid asset of regional significance for the Perth and Kinross area. 
Loss of Prime Agricultural Land and Soils 
71 Policy 50 sets out that development out with settlements shall not be permitted 
on prime agricultural land, unless necessary to meet a specific need such as: a 
major infrastructure proposal, and that there is no other suitable site available 
on non-prime land. Policy 51 seeks to protect soils from damage such as
erosion or compaction. Developments located on areas of good quality
agricultural soils must minimise impact to the soil resources and or consider
opportunities for re-use of the soils.   
72 In this case the site identifies as prime agricultural land and the development
does conflict with Policy 50. However, given that the development can proceed
in its current approved form, and there is no further land take proposed by this
application, the breach of the policy is largely outweighed by the material
circumstance. Having regard to any impacts on soils, compaction and or the
removal of high-quality soil from the development site is recognised as factors
in this instance.  Although the applicant has not stated intentions to overly
compact and or excavate soil from the site, an additional safeguarding
condition is recommended, requiring soils which are excavated to be reused or
repurposed in a suitable way onsite which avoids further damage, for example
within landscaped areas, thereby protecting those soil properties for later reuse. 
(Condition 11). 
Lifespan of Facility 
73 The lifespan of the facility is confirmed to be approximately 50 years. As such,
Condition 12 can require that should the energy storage facility not be in use for
a continuous period of 12 months or at the conclusion of this term, that the site
is then decommissioned and re-instated to its original condition. 
LEGAL AGREEMENTS 
74 None required. 
DIRECTION BY SCOTTISH MINISTERS 
75 None. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
76 The application must be determined in accordance with the adopted
Development Plan, unless material considerations indicate otherwise. In this
respect, account has been taken of the Local Development Plan and
associated material considerations, with the proposal not assessed to conflict
with the development plan in this case.   
77 Accordingly, the proposal is recommended for approval subject to the following
conditions: 
Page 70 of 174

Page 71

A RECOMMENDATION   
Conditions and Reasons for Recommendation 
General 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason – To ensure the development is carried out in accordance with the
approved drawings and documents. 
Noise 
2. All hereby approved plant or equipment shall be so enclosed, attenuated and/or
maintained such that any noise therefrom shall not exceed Noise Rating 35
between 0700 and 2300 hours daily, or Noise Rating 20 between 2300 and
0700 hours daily, within any neighbouring residential property, with all windows
slightly open, when measured and/ or calculated and plotted on a rating curve
chart. 
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
3. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the
Planning Authority to carry out a noise assessment to verify compliance with
Condition 2.  The assessment will be carried out to an appropriate methodology
agreed in writing with the Planning Authority.  If the noise assessment shows
that the noise levels do not comply with Condition 2 a scheme of noise
mitigation shall be included with the noise assessment, specifying timescales
for the implementation of the scheme, and shall be submitted to the Planning
Authority within 28 days of the assessment.  The mitigation scheme shall
thereafter be implemented in accordance with the approved scheme and
timescales.   
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
Lighting 
4. All external lighting shall be sufficiently screened and aligned so as to ensure
that there is no direct illumination of residential property and that light spillage
beyond the boundaries of the site is minimised. In association, the operation of
the lighting shall be controlled so as to only be triggered by motion within the
security fenced boundaries of the site. 
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
Page 71 of 174

Page 72

Roads and Transport 
5. Prior to the commencement of works associated to the hereby approved
development, a Construction Traffic Management Scheme (TMS) shall be
submitted for the written approval of the Planning Authority, such TMS shall
include details of the following: 
(a)  restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used;
(b)  timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c)  a code of conduct for HGV drivers to allow for queuing traffic to pass; 
(d)  arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e)  emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f)  arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development
being deposited on the road;
(g)  arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
(h)  arrangements for signage at site accesses and crossovers and on roads
to be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i)  details of information signs to inform other road users of construction
traffic;
(j)  arrangements to ensure that access for emergency service vehicles are
not impeded;
(k)  co-ordination with other significant developments known to use roads
affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m)  the provision and installation of traffic counters at the applicant's expense
at locations to be agreed prior to the commencement of construction; 
(n)  monitoring, reporting and implementation arrangements; 
(o)  arrangements for dealing with non-compliance; and
(p)  details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme all to the satisfaction of the Council as Planning
Authority. 
Reason – In the interests of road safety. 
6. The proposed route for any abnormal loads on the trunk road and local road
networks must be approved by the relevant roads authority prior to the
movement of any abnormal load. Any accommodation measures required
including the removal of street furniture, junction widening, traffic management
must similarly be approved. The details of any abnormal load movements
required, including any accommodation measures necessary, shall be
Page 72 of 174

Page 73

submitted to and agreed in writing by the Planning Authority, in consultation
with Transport Scotland and the Transport Planning. Any request for approval
shall be submitted at least two months prior to the proposed load movement.       
Reason – To ensure that the transportation of abnormal loads will not have any
detrimental effect on the trunk road network 
7. Any additional signing or temporary traffic control measures deemed necessary
due to the size or length of loads being delivered to the development hereby
approved must be undertaken by a recognised Quality Assured traffic
management consultant. The details of any temporary traffic control measures
shall be submitted to and agreed in writing by the Planning Authority, in
consultation with Transport Scotland and Transport Planning. Any request for
such approval shall be submitted at least two months prior to the proposed
temporary control measured being implemented.       
Reason – To ensure that the transportation of abnormal loads will not have any
detrimental effect on the trunk road network 
External Finishing Colour 
8. Prior to the commencement of the development hereby approved, details of the
recessive colour of the proposed external finishing materials to be used for the
hereby approved development components (i.e. battery storage containers,
transformers, customer switch rooms, DNO Switchgear etc) shall be submitted
to and agreed in writing by the Council as Planning Authority.  The scheme as
agreed shall be implemented prior to the completion or bringing into use of the
development, whichever is the earlier. 
Reason – In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
Biodiversity 
9. The detailed landscaping and planting report (plan 22/00832/22) which is
hereby approved shall be completed within the first available planting season
(October to March) after the completion or bringing into use of the
development, whichever is the earlier.  The approved scheme shall thereafter
be maintained, with any planting which fails to become established within five
years being replaced in the following planting season with others of a size and
species as previously approved.   
Reason – In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
Private Water Supply 
10. Prior to the commencement of the development hereby approved, details of the
location and measures proposed for the safeguarding and continued operation,
or replacement, of any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water supply pipes serving
Page 73 of 174

Page 74

properties in the vicinity, sited within and running through the application site,
shall be submitted to and approved in writing by the Council as Planning
Authority.  The subsequently agreed protective or replacement measures shall
be put in place prior to the development being brought into use and shall
thereafter be so maintained insofar as it relates to the development hereby
approved. 
Reason – In the interests of protecting any existing private water infrastructure
and to ensure the development compliance with the Water Scotland Act 1980. 
Soil Management   
11. All soils excavated in the course of the development hereby approved shall be
retained onsite and repurposed unless otherwise approved in writing by the
Council as Planning Authority. Prior to the development hereby approved
commencing, a Soil Management Statement shall be submitted to the Planning
Authority for approval in writing, this Statement shall set out the extent of any
excavation works to be undertaken and how soils shall be reused and or
managed onsite. All excavation and repurposing of soil shall then proceed in
accordance with the agreed statement.     
Reason – In the interests of soil protecting and management in accordance
with Policy 51 of the LDP2.     
Facility Lifespan 
12. In the event the hereby approved development fails to store electricity on a
commercial basis for a continuous period of 12 months, then it shall be deemed
to have permanently ceased to be required.  In such an event the development
shall be decommissioned, and the relevant parts of the site reinstated within
such timescale as agreed in writing by the Council as Planning Authority. 
Reason – To ensure the facility is removed from the site at the end of its
operational life, and to protect the character of the countryside, the visual
amenity of the area and nature conservation interests. 
B JUSTIFICATION 
The proposal is considered to comply with the Development Plan and there are
no other material considerations that would justify a departure from the relevant
policies. 
C PROCEDURAL NOTES 
None. 
D INFORMATIVES 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period
Page 74 of 174

Page 75

(see section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended)). 
2. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority
written notice of that position. 
4. An application for Building Warrant may be required. 
5. The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains
advice relevant to your development. 
6. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended, it is an offence to remove, damage or destroy the nest of any wild
birds while that nest is in use or being built. Planning consent for a
development does not provide a defence against prosecution under this act. 
7. The applicant is reminded that, should any protected species be present a
licence may be required from Scottish Natural Heritage to disturb a protected
species. Failure to obtain a licence may constitute a criminal act under the
Habitats Regulations and penalties are severe for non-compliance. 
8. This development will require the 'Display of notice while development is
carried out', under Section 27C (1) of the Town and Country Planning Act 1997,
as amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. According to
Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development.
• Readily visible to the public.
• Printed on durable material. 
9. This planning permission is granted subject to conditions, some of which
require further information to be submitted to Development Management either
before works can start on site or at a certain time. The required information
must be submitted via the ePlanning portal if your original application was
lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk. Please be aware that a fee is payable
in respect of each request made, though there is no limit to the number of
conditions that can be discharged in a single request. The Fees Charter is
Page 75 of 174

Page 76

available on our website www.pkc.gov.uk.The Council has two months to
consider the information. You should therefore submit the required information
more than two months before your permission expires. We cannot guarantee
that submissions made within two months of the expiry date of your permission
will be able to be dealt with before your permission lapses. 
10. The applicant should ensure that any existing wayleaves for maintenance or
repair to existing private water supply or septic drainage infrastructure in the
development area are honoured throughout and after completion of the
development. 
11. The applicant shall ensure the private water supply for the dwellinghouse/
development complies with the Water Scotland Act 1980 (Section 63), The
Private Water Supplies (Scotland) Regulations 2006 and The Water Intended
for Human Consumption (Private Supplies) (Scotland) Regulations 2017. 
Detailed information regarding the private water supply, including the nature,
location and adequacy of the source, any storage tanks/ pipework and the
filtration and disinfection treatment proposed to ensure provision of an
adequate and consistently wholesome water supply shall be submitted to Perth
and Kinross Council Environmental Health in line with the above Act and
Regulations. 
Background Papers: 2 letters of representation
Contact Officer:  Jamie Torrance 
Date:   2 September 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 76 of 174

Page 77

22/00832/FLM
Formation of a 49MW battery energy storage facility comprising battery storage units, ancillary buildings, vehicular
access, landscaping and associated works  Land 140 Metres North East Of Jamesfield Organic Centre Newburgh
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:10000
5(1)(ii)
Page 77 of 174

Page 78

Page 78 of 174

Page 79

22/00832/FLM
Formation of a 49MW battery energy storage facility comprising
battery storage units, ancillary buildings, vehicular access,
landscaping and associated works  Land 140 Metres North East Of
Jamesfield Organic Centre Newburgh
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form.
Scale 1:1250
5(1)(ii)
Page 79 of 174

Page 80

Page 80 of 174

Page 81

Perth and Kinross Council
Planning and Placemaking Committee – 14 September 2022
Report of Handling by Head of Planning & Development
(Report No. 22/218) 
PROPOSAL: Formation of an up to 49.99MW energy storage compound
comprising battery storage units, ancillary buildings,
landscaping and associated works  
LOCATION: Land 60 metres north of Abernethy Cemetery, Newburgh Road,
Abernethy 
Ref. No: 22/00746/FLM
Ward No: P9 – Almond and Earn 
Summary 
This report recommends approval of the application, subject to conditions.  It
proposes the formation of a 49.9MW energy storage compound comprising 20
battery storage units, ancillary buildings, landscaping and associated works
including vehicle access on land South of the Jamesfield Farm Shop. The proposal
is considered as a minor departure to the Development Plan with there being
material considerations in this case which justify such a departure from the relevant
policy.   
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The site is c.1.6 hectares (Ha) in area and is located within an existing
agricultural field situated between the A913 Public Road (Abernethy Road) and
the Jamesfield Farm Shop, approximately 1 kilometre (km) east of Abernethy. 
Two local businesses are located near to the development, the farm shop
c.100m to the north, whilst the Jamesfield Garden Centre is located
approximately 200m to the north-west.  Other than these businesses, there is
an existing electrical substation, c.150m to the west.  The development itself
would comprise: a storage compound contained within a security fence (c.5,645
square metres (m2)). The balance land (c.7,867m2) comprises two site
accesses and landscaped areas. The wider land use beyond the immediate
surrounds is largely agricultural.  Local topography is generally level, with a
slight slope down to the north, whilst south of Abernethy Road there is a more
significant rise. 
2 More specifically, the proposal comprises: 20 containerised storage units
containing the batteries (dimensions 12.2 x 2.44 x 2.9m); a modular site office
and separate container, of the same dimensions; two electrical control room
buildings (dimensions 8.0 m x 6.5 x 2.84m and 10.0 x 10.0 x 2.84m).
Otherwise, the compound will be enclosed with security fencing (green or grey
in colour) and see CCTV, mounted on poles all measuring up to 3m in height. 
5(1)(iii)
Page 81 of 174

Page 82

Parking and access are also proposed, off both Abernethy Road and the local
access road serving the Jamesfield Garden Centre, Farm Shop, etc.   
3 The development proposed is similar in nature, general form and functionality
to that proposed by Planning Application 22/00832/FLM, a separate agenda
item before this Committee.  That development is to be located approximately
100m to the north-east and also enables energy storage and transfer. Neither
application is linked in operational terms, however, both proposals have
advanced an operational need to be near to the existing Abernethy Substation,
which is indicated to have capacity for the unconstrained import and export of
electrical energy.   Both developments also offer carbon saving to support the
move to a greater reliance of renewable energy.  The site subject of the subject
application has no planning history. 
4 Significant planting set out in a landscaping scheme is proposed to assist with
visual integration into the wider surroundings.   
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
5 Directive 2011/92/EU (as amended) requires the ‘competent authority’ (in this
case Perth and Kinross Council) when giving a planning permission for
particular large-scale projects to do so in the knowledge of any likely significant
effects on the environment.  The Directive therefore sets out a procedure that
must be followed before ‘development consent’ can be given. 
6 This procedure, known as Environmental Impact Assessment (EIA), is a means
of drawing together, in a systematic way, an assessment of a project’s likely
significant environmental effects.  The EIA Report helps to ensure that the
importance of the predicted effects, and the scope for reducing any adverse
effects, are properly understood by the public and the relevant competent
authority before it makes its decision. 
7 An EIA screening has been undertaken.  The proposal being a Schedule 2
development in terms of the Town and Country Planning (Environmental Impact
Assessment) (Scotland) Regulations 2017.  In the case of these regulations,
prohibition is given to the granting of planning permission to “EIA development”
unless an environmental impact assessment has been undertaken. In this case
the Council has adopted the opinion that it is not EIA development, and that
sufficient information has been submitted with the application to enable a
determination in consideration of all relevant environmental matters. These
environmental aspects requiring further consideration, are namely: Noise,
Landscape and Visual Amenity, Ecological Values, Transportation and
Drainage matters.  These are examined in more detail within the appraisal
section of this report.   
PRE-APPLICATION CONSULTATION 
8 The proposal is a ‘Major’ development, in terms of the Town and Country
Planning (Hierarchy of Developments) (Scotland) Regulations 2009, due to the
potential energy storage capacity being in excess of 20MW.  The applicant was
therefore required to undertake formal pre-application consultation with the local
Page 82 of 174

Page 83

community. Public concerns raised as part of this process identified noise,
landscaping and flood risk as being matters not addressed by the consultation
events.  These matters have been responded to in writing and included within
the Pre-Application Consultation (PAC) Report submitted with this application.   
9 The PAC Report notes that three online public events were held, as permitted
by the relevant regulations.  These online events were held on 16 December
2021, 1 February 2022 and 31 March 2022, with notice provided to local MPs
and MSPs and the Abernethy Community Council. Twelve interested parties
engaged with the consultation process, and a number of comments and
concerns were reviewed and addressed within the PAC Report and wider
planning submission. The content and coverage of the community consultation
exercise is considered sufficient, proportionate and in line with the
aforementioned regulations. 
NATIONAL POLICY AND GUIDANCE 
10 The Scottish Government expresses its planning policies through: The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework (NPF) 
11 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure.  Under the Planning etc. (Scotland) Act 2006, this is a statutory
document and a material consideration in any planning application.  It provides
a national context for development plans and planning decisions as well as
informing the on-going programmes of the Scottish Government, public
agencies and local authorities. 
12 The draft NPF4 which is currently out for consultation sets out that battery
energy storage facilities are supported in principle, subject to further onsite
considerations.   
Scottish Planning Policy (SPP) 2014 
13 The current SPP was published in June 2014 and sets out national planning
policies, which reflect Scottish Ministers’ priorities for operation of the planning
system and for the development and use of land.  It promotes consistency in
the application of policy across Scotland, whilst allowing sufficient flexibility to
reflect local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
14 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
Page 83 of 174

Page 84

• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Promoting Rural Development: paragraphs 74 – 91
• Supporting Business and Employment: paragraphs 92 – 108
• Delivering Heat and Electricity: paragraphs 152 – 173
• Valuing the Natural Environment: paragraphs 193 – 218
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
Planning Advice Notes 
15 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are also of relevance to the proposal: 
• PAN 3/2010 Community Engagement
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 73 Rural Diversification
• PAN 75 Planning for Transport
• The Future of Energy in Scotland: Scottish Energy Strategy (December 
2017) 
DEVELOPMENT PLAN 
16 The Development Plan for the area comprises: the TAYplan Strategic
Development Plan 2016-2036; and the Perth and Kinross Local Development
Plan 2014. 
TAYplan Strategic Development Plan 2016-2036 
17 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
18 Policy 7: Energy, Waste and Resources of TAYplan is of particular importance
in the assessment of this application. 
Perth and Kinross Local Development Plan 2019 
19 The Local Development Plan 2 (LDP) was adopted by Perth and Kinross
Council on 29 November 2019.  It sets out a vision statement for the area,
which includes that, “By 2036, the TAYplan area will be sustainable, more
attractive, competitive and vibrant without creating an unacceptable burden on
our planet. The quality of life will make it a place of first choice where more
people choose to live, work, study and visit and where businesses choose to
invest and create jobs.” It is the most recently adopted statement of Council
Page 84 of 174

Page 85

policy and is augmented by Supplementary Guidance.  
20 The principal relevant policies are: 
• Policy 1A and 1B Placemaking
• Policy 2 Design Statements 
• Policy 5 Infrastructure Contributions
• Policy 8 Rural Business and Diversification
• Policy 26B Scheduled Monuments and Archaeology 
• Policy 33A Renewables and Low Carbon Energy 
• Policy 33B Repowering and Existing Facilities 
• Policy 35 Electrical Transmission 
• Policy 39 Landscape 
• Policy 41 Biodiversity
• Policy 47 River Tay Catchment Area 
• Policy 50 Prime Agricultural Land 
• Policy 51 Soils
• Policy 53 Water Environment and Drainage 
• Policy 55 Nuisance from Artificial Light Pollution 
• Policy 56 Noise Pollution 
• Policy 60B Transport Standards and Accessibility Requirements 
Other Policies 
21 Perth and Kinross Flood Risk and Flood Risk Assessments – Developer
Guidance, June 2021    
22    Perth and Kinross Supplementary Guidance: Landscape, February 2020 
23 Perth and Kinross Supplementary Guidance: Placemaking Guide, March 2020  
24 Perth and Kinross Planning for Nature, Development Management and Wildlife
Guide Supplementary Guidance, April 2022 
Site History 
25 21/00018/PAN A Proposal of Application Notice was accepted on 7 January
2022 for the formation of a battery energy storage compound, comprising:
battery storage units; ancillary buildings and equipment; landscaping; and
associated works 
26 22/00002/PAN A Proposal of Application Notice was accepted on 11 February
2022 for the Formation of a battery energy storage compound comprising
battery storage units, ancillary buildings and equipment, landscaping and
associated works 
CONSULTATIONS 
27 As part of the planning application process the following bodies were consulted: 
Page 85 of 174

Page 86

28 Scottish Water: No objection. Advice provided that no public sewer and water
supply options are available. 
29 Perth and Kinross Heritage Trust: No objection.  Subject to a condition that
the development sees an agreed archaeological watching brief undertaken
prior to work commencing.  Further comment provided as to potential impacts
on the setting of a nearby scheduled monument. Suggestions offered for
screening and softening of impact.   
30  Abernethy Community Council: No comments.   
31 Scottish Environment Protection Agency: No objections. Ask that the
applicant be made aware of relevant standing advice. 
30 Nature Scotland: No objection or comments.   
32 Transport Scotland: No objection.  Subject to conditions regarding the need
for further approval of signage, traffic control measures and abnormal sized
loads with respect to the use of the Trunk Road. 
33 Network Rail: No objection or comments.   
INTERNAL  
34 Biodiversity Officer: No comments.   
35 Structures and Flooding: No objection. Advise the development falls below
the threshold for consultation.  Ask that an informative note is attached to any
planning permission directing the applicant to the Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021. 
36 Environmental Health (Noise/ Odour): No objection, subject to a condition
regarding plant and or equipment noise during construction. 
37 Environmental Health (Private Water Supply): No objection, subject to a
condition requiring a pre-survey check and safeguarding investigation of private
water and wastewater infrastructure prior to works commencing. Request
informative notes in respect of existing wayleaves and obligations under the
Water Scotland Act 1980. 
38 Transport Planning: No objection, subject to a condition to ensure
construction traffic is appropriately managed. 
39 Development Contributions Officer: No objection, clarifying that no
contributions are required. 
Representations
40 Two objections have been received, summarised as follows: 
• Traffic and Transport Impacts, including impacts on the use of private land
Page 86 of 174

Page 87

• Impacts on soils and agricultural land 
• Landscape Impacts
• Impacts on amenity  
• Noise Impacts 
• Artificial Light 
• Impacts on private water supply 
• Flooding and Drainage 
• Site decommissioning 
41 The matters raised are addressed in the Appraisal section of this report below 
ADDITIONAL STATEMENTS
42
Screening Opinion  Not EIA Development
Environmental Impact Assessment (EIA):
Environmental Report
Not Required 
Appropriate Assessment AA Not Required
Design Statement or Design and Access
Statement
Supporting Statement
Submitted.  
Report on Impact or Potential Impact  • Ecological Assessment 
• Noise Assessment 
• Pre-Application Consultation
Report 
• Supporting Statement with
Design Access Statement 
APPRAISAL 
43 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2 (2019).  The relevant policy considerations are outlined in
the policy section above and are considered in more detail below.  In terms of
other material considerations, this includes considerations of the Council’s
other approved policies and supplementary guidance as set out and specifically
Scottish Energy Strategy (SES) (December 2017), the future of energy in
Scotland. 
Principle 
44 The location is a peripheral rural area east of Abernethy, policy considerations
seeking to assess its suitability in principle are: Policies 1A, 1B, Placemaking;
Policy 8 Rural Diversification; Policy 33A and 33B Renewables and Low
Carbon Energy; Policy 50 Prime Agricultural Land; and Policy 51 Soils.  The
site has no planning history, and accordingly is advanced in this instance as a
minor departure to the LDP2, specifically Policies 1B and 50. The proposal is
Page 87 of 174

Page 88

located on Prime agricultural land, whereby such developments will not be
permitted unless it is necessary to meet a specific established need, such as a
major infrastructure proposal, and only when there are no other suitable sites
available on non-prime land.   
45 The proposal would provide essential energy balancing services to the National
Grid, actively contributing towards Scotland's CO2 reduction targets, supporting
the strategy principles of the SES. Specifically, electricity would be drawn from
the Grid at times of low demand, stored and released back as required. When
demand is higher, greater generation from non-renewable sources is required
and energy storage facilities such as that proposed could reduce reliance on
non-renewable resources, thus decreasing CO2 emissions. 
46 In this case the applicant does acknowledge the temporary loss of prime
agricultural land as well as the corresponding loss of arable use over the life of
the facility.  However, it is advanced that the locational need for the
development close to the existing electrical substation, in addition to any
carbon offsetting potential, outweigh those impacts on landscape values and
agricultural use. The location in this case being chosen due to its proximity to
the Abernethy substation, which will enable easy connection to the grid
network, but also accounting for the fact that this substation has unconstrained
capacity to import and export the electrical energy required.  Notwithstanding
the conflict with Policies 1B and 50, Policy 33B specifically encourages low
carbon energy solutions where specific grid connection or the use of
established infrastructure can occur. The planning balance in this case is
considered to rest with supporting the development proposed, given the site-
specific reasoning for this major infrastructure proposal. Furthermore,
consideration must be had to the finite lifespan of this facility. Whilst the overall
operational life will be some 50 years, minimal disturbance to the site will be
required, allowing the pre-existing land use to resume afterwards. This matter
along with consideration of any soil disturbance is discussed further below. 
Design and Layout 
47 The design and layout proposed essentially reflects the physical and
engineering requirements, with infrastructure details consistent with industry
standards. In physical terms, the development will essentially see built form
contained below 3m in height.  The tallest built structures being the electrical
control rooms and the battery storage containers, both just under 3m.
Remaining built elements will vary in height but predominantly around 3m,
including permitter fencing and CCTV poles. All aspects within the storage
compound will be enclosed behind a security fence, painted grey or green, and
additional landscaping is also proposed. 
48 Having regard to the overall scale and height of built structures, horizontal
massing is more significant than vertical impacts. This aspect is further
considered in the landscape and visual impact sections below. Conditions are
recommended to control physical separation between containers / structures as
well as the colour / finish of materials.   
Page 88 of 174

Page 89

Landscape 
49 Landscape and or placemaking policy within LDP2 requires that a development
should be compatible with its setting and wider character. In this case the
proposal sits within Broad Valley Lowlands (Tayside Landscape Character
Type). This land use mainly comprises settled lowland agricultural valleys with
fertile soils dominated by arable crops. The site is currently visible in open
views across the strath, the Tay and towards the Sidlaw Hills Local Landscape
Area. Potential landscape receptors include a group of houses to the east,
intermittent views by vehicles and walkers along the A913 (Abernethy Road -
also a core path) and visitors to Jamesfield complex.   
50 A description of landscape and visual impacts along with a description of
mitigation proposals and visualisations have been provided in support of the
application. High detail photographic renders showing the likely appearance of
the development in its setting.  The proximity to Abernethy Road has a
significantly higher potential landscape impact than the consented/proposed
development further north (refs: 17/00951/FLL and 18/02336/FLL, which are
proposed to be superseded by 22/00832/FLM). It is accepted that the local
topography drops down and away northwards from the roadside and
accordingly the impact on views towards the Sidlaw Hills, across the Tay and
further to the north, would remain relatively unimpacted. Furthermore, proposed
planting will soften the landscape impact over time. In addition, views northward
from the public road (which is also a core path) present an already developed
and cluttered immediate landscape, containing: an existing wind turbine,
electricity pylons, substation, garden centre and farm shop. In addition,
consideration must also be given to the consented energy storage installations
to the northeast of this proposed development.  Consequently, concern is
raised in representations that the development if approved, will further erode
the landscape setting at this location, at odds with the pre-existing landscape
character type. 
51 As discussed above, it is considered that any landscape and or land
designation impacts arising would be outweighed by the operational and
locational need to position the development in proximity to the nearby
substation. That is, there is an established need and site-specific reasoning for
this major infrastructure development to be positioned in this location.  For this
reason, and in considering the proposed landscaping, combined with other
mitigation such the screen fence and ensuring the external finishes of the
development are acceptable, it is not considered that there would be
unacceptable impacts on landscape or visual amenity. Particular note is made
of the fact that the limited height of the development will see views from the
public realm north to the Sidlaw Hills and to the Garden Centre will not
significantly impacted.   Conditions are recommended to ensure the delivery of
the landscape mitigation as proposed.  (Conditions 8 and 9.) 
52 The proposal is considered to accord with Policies 1A, 1B and 39 of the LDP2.
Although the development has impacts on the wider landscape character it is
not considered that it will look wholly out of place in this setting, particularly
noting the consented energy storage facilities to the north-east, the existing
substation to the west and wind turbine also to the north.  
Page 89 of 174

Page 90

Residential Amenity 
53 The nearest residential receptors are more than 250m away, to the east and
are unlikely to be significantly impacted due to the physical distance of
separation, low vertical height of the development proposed, minor undulations
in local topography and through proposed landscaping. However, the
Jamesfield Farm Shop as well as the Jamesfield Garden Centre are both
located within 150m of the main site compound. Therefore, some direct
impacts, particularly during construction is inevitable.   
54 The Council’s Environmental Health team (EH) have reviewed the submitted
noise impact assessment, including any modelling results, and have no
objection. Potential noise sources include: air conditioning units; invertor
cooling fans; switchgears; transformer and background reactor noise; and
construction noise. EH advise a condition setting acceptable limits to all
approved plant and or equipment noise output. 
55 Compliance with the recommended condition see it considered that the
development will comply with Policy 33 of the LDP, with no likely unacceptable
impact on the amenity of residential properties. However, some impacts to local
businesses as discussed may occur during construction. However, ongoing
noise and nuisance impacts are considered very limited and unlikely to impacts
these sites in any significant way due to the low operational noise from the
facility.   
Lighting 
56 The impact of artificial lighting has been noted as a matter of concern in
representations.  However, the use of lighting is to be minimal and primarily for
security purposes.  Condition 4 can control spillage and limit operation to
acceptable levels. 
Roads and Access 
57 LDP2 Policy 60B requires that local road networks be capable of absorbing
traffic generated by development and that satisfactory access is provided. In
this regard two access points are proposed to this development, one from the
road serving Jamesfield complex and a second directly form the A913. No
concerns or further comments are raised by Transport Planning and or
Transport Scotland with respect of impacts to the local and or trunk road
networks, subject to conditions relating to a Construction Traffic Management
Scheme (CTMS) and further agreement for the passage of abnormal loads on
the road network. Conditions are therefore recommended to this effect,
particularly noting the need for further agreement for any signage, traffic
management and or abnormal loads.   
58 Overall, no significant road and or transport impacts are identified, and it is
concluded, subject to conditions 5-7, that the development conforms with Policy
60B. 
Page 90 of 174

Page 91

Drainage and Flooding 
59 Policy 52 requires development to appropriately consider flooding and
drainage. In this respect the site is not within an identified SEPA flood risk
location and the Council’s Flood Hazard and Structures Team does not raise
any objection. The applicant is directed to the Council’s Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 where applicable.   
60 The proposals are thus considered to satisfy policy 52 of LDP2. 
Natural Heritage and Biodiversity 
61 LDP2 Policies 39 and 41 are relevant considerations in respect of potential
biodiversity impacts or opportunities arising from the development. In this
respect the proposed Landscape Plan includes largely native species and
contains a number of positive elements, making a likely valuable contribution to
biodiversity. No adverse comment has been made by the Councils biodiversity
officer. 
62 A preliminary ecological assessment has been provided which does not raise
any significant concerns with the development proposed or the impacts to the
site.  Accordingly, subject to the delivery of landscaping as proposed the
development is considered to accord with Policies 39 and 41 of the LDP2.   
Archaeology 
63 The development proposal has been reviewed by the Perth and Kinross
Heritage trust who have not raised any objection to the development subject to
the imposition of an archaeological watching brief, to be imposed by condition.
Subject to the implementation of this condition and addressing any matters
raised in this investigation the development is considered to comply with Policy
26B of the LDP2. 
Private Water Supply 
64 The development is for an energy storage compound in a rural area with private
water supplies (including Jamesfield Borehole Supply) understood to serve
properties in the vicinity.  Whilst no specific impacts to private water supply are
identified, a safeguarding condition is considered reasonable and sufficient to
resolve any matters which may arise.  This will ensure both that the new
development has an adequate and consistently wholesome supply of water
(should that be required) and to maintain water quality and supply in the
interests of residential amenity.  In addition, to ensure the private water supply
or septic drainage systems of neighbours of the development remain
accessible for future maintenance. Otherwise, it should be noted that once the
development is operational Perth and Kinross Council Environmental Health
Services will have statutory duties detailed in the Water Intended for Human
Consumption (Private Supplies) (Scotland) Regulations 2017 to monitor the
water quality.  Further informative notes relative to existing wayleaves and
compliance with the Water Scotland Act 1980 are also recommended to be
appended to any positive decision notice.   
Page 91 of 174

Page 92

65 Condition 10 is recommended, requiring that the applicant confirm the location
of private water and wastewater infrastructure and any required protective
measures are put in place prior to works commencing.   
Developer Contributions 
66 There has been comment that no local benefits would result from the
development.  However, in planning policy terms, no developer contributions
are triggered for this type of development. As a result, the planning authority
cannot require the provision of money or infrastructure, not clearly required as a
result of the development. 
Economic Impact 
67 In the short term, construction will create jobs with scope for local employment.
Beyond this local employment opportunities are limited. However, there is a
clear fit between Scottish Government aims of promoting a transition to a low
carbon economy and this proposal. The proposal would also support local
renewable energy generation, by helping balance fluctuations of intermittent
energy generation.  It also represents a significant inward investment in rural
Perthshire, assisting in the creation of a national grid asset of regional
significance for the Perth and Kinross area. 
68 It is clear the development has benefits in renewable energy generation, and in
this case, it is considered that those benefits are sufficient to outweigh the
tension with Policies 1B and 50.   
Loss of Prime Agricultural Land and Soils 
69 In this case the site is identified as prime agricultural land and the development
of it therefore conflicts with Policy 50 which seeks to protect such land
resources. Furthermore, Policy 51 seeks to ensure high quality soils are not
damaged or eroded.  It is considered in this instance that there are material
circumstances which meet a specific need justifying the support of this major
infrastructure proposal.  Whilst objection is raised that this proposal promotes
the excessive occupation of prime land impacting the productive potential of the
land over the life of the facility, it is considered the planning balance in this case
sits with Policy 33B of the LDP2, which provides specific encouragement to use
existing infrastructure and promotes grid connection in support of this type of
proposal. Given the specific locational need justification provided it is unlikely
that this proposal will lead to further and excessive use of prime land elsewhere
within Perth and Kinross. Nor is it obvious that the development could be
located on non-prime land and still reasonably be connected to the substation. 
70 Whilst justification for the development location is accepted this does not
exclude a developer from overly damaging or impacting high quality soils at this
site. Particularly further regard must be had with respect to the future
decommissioning of the facility, to allow its previous land use to recommence at
that time.  Impacts to soils from this development relate specifically to
compaction and or removal from the site. Although the applicant has not stated
Page 92 of 174

Page 93

intentions to overly compact and or excavate soil from the site, an additional
safeguarding condition is recommended, requiring soils which are excavated to
be reused or repurposed in a suitable way and which avoids further damage.
This may for example within landscaped areas, thereby protecting those soil
properties for later reuse (Condition 11). 
Lifespan of Facility 
71 The lifespan of the facility is confirmed to be approximately 50 years. As such,
Condition 12 can require that should the energy storage facility not be in use for
a continuous period of 12 months or at the conclusion of this term, that the site
is then decommissioned and re-instated to its original condition. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
70 None Required. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
71 The application must be determined in accordance with the adopted
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered a minor departure from the Development
Plan, specifically Policies 1B and 50 of LDP2. However, material considerations
allow this to be outweighed in this instance and justify an approval
recommendation.   
72 Accordingly, the proposal is recommended for approval subject to the following
conditions. 
A RECOMMENDATION    
Conditions and Reasons for Recommendation  
General 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice.  
Reason – To ensure the development is carried out in accordance with the
approved drawings and documents.  
Noise 
2. All hereby approved plant or equipment shall be so enclosed, attenuated and/or
maintained such that any noise therefrom shall not exceed Noise Rating 35
between 0700 and 2300 hours daily, or Noise Rating 20 between 2300 and
0700 hours daily, within any neighbouring residential property, with all windows
slightly open, when measured and/ or calculated and plotted on a rating curve
chart.  
Page 93 of 174

Page 94

Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality.  
3. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the
Planning Authority to carry out a noise assessment to verify compliance with
Condition 2.  The assessment will be carried out to an appropriate methodology
agreed in writing with the Planning Authority.  If the noise assessment shows
that the noise levels do not comply with Condition 2 a scheme of noise
mitigation shall be included with the noise assessment, specifying timescales
for the implementation of the scheme and shall be submitted to the Planning
Authority within 28 days of the assessment.  The mitigation scheme shall
thereafter be implemented in accordance with the approved scheme and
timescales.    
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality.  
Lighting 
4. All external lighting shall be sufficiently screened and aligned so as to ensure
that there is no direct illumination of residential property and that light spillage
beyond the boundaries of the site is minimised. In association, the operation of
the lighting shall be controlled so as to only be triggered by motion within the
security fenced boundaries of the site. 
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality.  
Roads and Transport 
5. Prior to the commencement of works associated to the hereby approved
development, a Construction Traffic Management Scheme (TMS) shall be
submitted for the written approval of the Planning Authority, such TMS shall
include details of the following: 
(a)  restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used;
(b)  timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for queuing traffic to pass; 
(d)  arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e)  emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f)  arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development
being deposited on the road;
(g)  arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
Page 94 of 174

Page 95

(h)  arrangements for signage at site accesses and crossovers and on roads
to be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i)  details of information signs to inform other road users of construction
traffic;
(j)  arrangements to ensure that access for emergency service vehicles are
not impeded;
(k)  co-ordination with other significant developments known to use roads
affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m)  the provision and installation of traffic counters at the applicant's expense
at locations to be agreed prior to the commencement of construction; 
(n) monitoring, reporting and implementation arrangements; 
(o) arrangements for dealing with non-compliance; and
(p)  details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme all to the satisfaction of the Council as Planning
Authority. 
Reason – In the interests of road safety.  
6. The details of any abnormal load movements required, including any
accommodation measures necessary, shall be submitted to and agreed in
writing by the Planning Authority, in consultation with Transport Scotland and
the Councils Transport Planning team. Any request for approval shall be
submitted at least two months prior to the proposed load movement.        
Reason – To ensure that the transportation of abnormal loads will not have any
detrimental effect on the local or trunk road network  
7. Any additional signing or temporary traffic control measures deemed necessary
due to the size or length of loads being delivered to the development hereby
approved must be undertaken by a recognised Quality Assured Traffic
Management Consultant. The details of any temporary traffic control measures
shall be submitted to and agreed in writing by the Planning Authority, in
consultation with Transport Scotland and the Councils Transport Planning
team. Any request for such approval shall be submitted at least two months
prior to the proposed temporary control measured being implemented.        
Reason – To ensure that the transportation of abnormal loads will not have any   
detrimental effect on the trunk road network  
External Finishing Colour 
8. Prior to the commencement of the development hereby approved, details of the
recessive colour of the proposed external finishing materials to be used for the
hereby approved development components (i.e., battery storage containers,
transformers, DNO Switchgear, perimeter fencing etc) shall be submitted to and
agreed in writing by the Council as Planning Authority.  The scheme as agreed
Page 95 of 174

Page 96

shall be implemented prior to the completion or bringing into use of the
development, whichever is the earlier.  
Reason – In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality.  
Biodiversity 
9. Prior to the commencement of the development hereby approved, a detailed
landscaping and planting scheme for the site shall be submitted to and
approved in writing by the Planning Authority.  The scheme shall include details
of the height and slopes of any mounding or recontouring of the site, full details
of all hard landscaping proposals including materials and installation methods
and, species, height, size and density of trees and shrubs to be planted.  The
scheme as subsequently approved shall be carried out and completed within
the first available planting season (October to March) after the completion or
bringing into use of the development, whichever is the earlier, and the date of
Practical Completion of the landscaping scheme shall be supplied in writing to
the Council as Planning Authority within 7 days of that date.  The scheme as
agreed and implemented shall thereafter be maintained to the satisfaction of
the Council as Planning Authority.    
Reason – In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme.  
Private Water Supply 
10. Prior to the commencement of the development hereby approved, details of the
location and measures proposed for the safeguarding and continued operation,
or replacement, of any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water supply pipes serving
properties in the vicinity, sited within and running through the application site,
shall be submitted to and approved in writing by the Council as Planning
Authority.  The subsequently agreed protective or replacement measures shall
be put in place prior to the development being brought into use and shall
thereafter be so maintained insofar as it relates to the development hereby
approved.  
Reason – In the interests of protecting any existing private water infrastructure
and to ensure the development compliance with the Water Scotland Act 1980. 
Soil Management    
11. All soils excavated in the course of the development hereby approved shall be
retained onsite and repurposed unless otherwise approved in writing by the
Council as Planning Authority. Prior to the development hereby approved
commencing, a Soil Management Statement shall be submitted to the Planning
Authority for approval in writing, this Statement shall set out the extent of any
excavation works to be undertaken and how soils shall be reused and or
managed onsite. All excavation and repurposing of soil shall then proceed in
accordance with the agreed statement.   
Page 96 of 174

Page 97

Reason: In the interests of appropriately managing prime quality soils and 
minimising the long-term impacts of developing the site in accordance with
Policy 51 of the LDP2. 
Archaeology 
12. Development shall not commence until the developer has secured the
implementation of an archaeological watching brief, to be carried out by an
archaeological organisation acceptable to the Council as Planning Authority,
during development work. The retained archaeological organisation shall be
afforded access at all reasonable times and allowed to record and recover
items of interest and finds. The name of archaeological organisation retained by
the developer shall be given to the Planning Authority and Perth and Kinross
Heritage Trust in writing not less than fourteen days before the commencement
date provided in the Notice of Initiation of Development.   
Reason – To ensure archaeological monitoring is carried out to safeguard and
record any archaeological remains within the development area.  
Facility Lifespan 
13. In the event the hereby approved development fails to store electricity on a
commercial basis for a continuous period of 12 months, and or at the end of life
for the development (50 years from the commencement of electricity storage) it
shall be deemed to have permanently ceased to be required.  In either event
the development shall be decommissioned, and the relevant parts of the site
reinstated within such timescale as agreed in writing by the Council as Planning
Authority.  
Reason – To ensure the facility is removed from the site at the end of its
operational life, and to protect the character of the countryside, the visual
amenity of the area and nature conservation interests. 
B JUSTIFICATION 
The proposal is considered as a minor departure to the Development Plan as
there are material circumstances that would justify a departure from relevant
policies 1B and 50 of the LDP2.   
C PROCEDURAL NOTES 
None. 
D INFORMATIVES  
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period
(see section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended)).
Page 97 of 174

Page 98

2. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority
written notice of that position.  
4. An application for Building Warrant may be required.  
5. The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains
advice relevant to your development.  
6. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended, it is an offence to remove, damage or destroy the nest of any wild
birds while that nest is in use or being built. Planning consent for a
development does not provide a defence against prosecution under this act.  
7. The applicant is reminded that, should any protected species be present a
licence may be required from Scottish Natural Heritage to disturb a protected
species. Failure to obtain a licence may constitute a criminal act under the
Habitats Regulations and penalties are severe for non-compliance.  
8. This development will require the 'Display of notice while development is
carried out', under Section 27C (1) of the Town and Country Planning Act 1997,
as amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. According to
Regulation 41 the notice must be:  
• Displayed in a prominent place at or in the vicinity of the site of the
development.
• Readily visible to the public.
• Printed on durable material.  
9. This planning permission is granted subject to conditions, some of which
require further information to be submitted to Development Management either
before works can start on site or at a certain time. The required information
must be submitted via the ePlanning portal if your original application was
lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk. Please be aware that a fee is payable
in respect of each request made, though there is no limit to the number of
conditions that can be discharged in a single request. The Fees Charter is
available on our website www.pkc.gov.uk.  The Council has two months to
consider the information. You should therefore submit the required information
more than two months before your permission expires. We cannot guarantee
Page 98 of 174

Page 99

that submissions made within two months of the expiry date of your permission
will be able to be dealt with before your permission lapses.  
10. The developer is advised to contact Sophie Nicol, Historic Environment 
Manager (Tel: 01738 477027) Perth and Kinross Heritage Trust, to discuss 
terms of reference for work required. 
11. The applicant should ensure that any existing wayleaves for maintenance or 
repair to existing private water supply or septic drainage infrastructure in the 
development area are honoured throughout and after completion of the 
development.  
12. The applicant shall ensure the private water supply for the dwellinghouse/
development complies with the Water Scotland Act 1980 (Section 63), The
Private Water Supplies (Scotland) Regulations 2006 and The Water Intended
for Human Consumption (Private Supplies) (Scotland) Regulations 2017. 
Detailed information regarding the private water supply, including the nature,
location and adequacy of the source, any storage tanks/ pipework and the
filtration and disinfection treatment proposed to ensure provision of an
adequate and consistently wholesome water supply shall be submitted to Perth
and Kinross Council Environmental Health in line with the above Act and
Regulations. 
13. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland)
Act 1984, he/she/they must obtain from the Council, as Roads Authority,
consent to open an existing road or footway prior to the commencement of
works.  Information on junction types, requirements for Vehicular Access
consents (VA1) and application forms are available at
www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of surface water should
be sought at the initial stages of design from Scottish Water and the Scottish
Environmental Protection Agency.   
Background Papers:  2 letters of representation
Contact Officer:  Jamie Torrance 
Date:   2 September 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 99 of 174

Page 100

Page 100 of 174

Page 101

22/00746/FLM
Formation of an up to 49.99MW energy storage compound comprising battery storage units, ancillary buildings,
landscaping and associated works  Land 60 Metres North Of Abernethy Cemetery Newburgh Road Abernethy
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:10000
5(1)(iii)
Page 101 of 174

Page 102

Page 102 of 174

Page 103

22/00746/FLM
Formation of an up to 49.99MW energy storage compound comprising battery storage units, ancillary buildings,
landscaping and associated works  Land 60 Metres North Of Abernethy Cemetery Newburgh Road Abernethy
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:1250
5(1)(iii)
Page 103 of 174

Page 104

Page 104 of 174

Page 105

Perth and Kinross Council
Planning and Placemaking Committee – 14 September 2022
Report of Handling by Head of Planning & Development
(Report No. 22/219) 
PROPOSAL: Erection of shelter building and acoustic fence, formation of
clay pigeon shooting range and earth bunds (in part retrospect)  
LOCATION: Crieff Hydro Hotel, Ferntower Road, Crieff PH7 3LQ 
Ref. No: 22/00334/FLL
Ward No: P6 – Strathearn 
Summary 
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and
there are no material considerations apparent which outweigh the Development
Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1. Planning permission is sought (in part retrospect) for the use of a site located to
the north of the Crieff Hydro Hotel complex as a clay pigeon shooting range,
including associated formation of earth bunds, acoustic fence and erection of a
shelter building. 
2. The site lies c.1.3km north of the main hotel buildings, within a rural upland
area characterised by ancillary hotel leisure uses such as: golf, crazy golf, zip
line and rope courses, etc. 
3. A previous similar application (Ref: 19/01181/FLL) was withdrawn not long after
submission on 30 August 2019, following PKC Environmental Health requests
for further information. The current application is now supported by an updated
Noise Report and enhanced mitigation proposals.   
4. The bund and shelter building already exist, whilst a 1.5m absorptive acoustic
barrier is to be added to the top of the bund, on all three sides and acoustic tiles
added to the internal side walls and internal roof of the existing shelter building. 
5. The shooting activity will operate around 200 days a year at the following times:
Monday to Saturday – typically one or two, one hour sessions per day between
10am – 5pm and a Sunday – typically three to four, one hour sessions between
11am – 5pm.  No shooting is to take place after 5pm. 
5(2)(i)
Page 105 of 174

Page 106

Pre-Application Consultation 
6. The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009. Therefore, the applicant was not required to undertake any
formal pre-application consultation with the local community. 
National Policy and Guidance 
7. The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework 2014 
8. NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SSP) 
9. The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
10. The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Promoting Rural Development: paragraphs 74 – 91
• Supporting Business and Employment: paragraphs 92 – 108
• Valuing the Natural Environment: paragraphs 193 – 218 
Planning Advice Notes 
11. The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40: Development Management
• PAN 51: Planning, Environmental Protection and Regulation
Page 106 of 174

Page 107

Development Plan 
12. The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2019. 
TAYPlan Strategic Development Plan 2016-2036 
13. TAYPlan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plans states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
14. The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application: 
15. Policy 3A First Choice for Investment 
Perth and Kinross Local Development Plan 2 
16. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
17. The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 8: Rural Business and Diversification
• Policy 40: Biodiversity
• Policy 56: Noise Pollution 
Other Policies 
18. No other policies. 
Site History 
19. 19/01181/FLL A detailed planning application which proposed the erection of a
shelter building, formation of clay pigeon shooting range and earth bunds (in
retrospect) was withdrawn on 30 August 2019. 
CONSULTATIONS 
20. As part of the planning application process the following bodies were consulted:
Page 107 of 174

Page 108

External 
21. No external consultations required. 
Internal 
22. Structures And Flooding: No objection.  No comments in terms of flood risk. 
23. Environmental Health (Noise Odour): No objection. Comments made
regarding noise/operation and conditions recommended. 
24. Development Contributions Officer: Advise no developer contributions
required. 
Representations 
25. 73 objections were received, with the main issues raised summarised as
follows: 
• Noise pollution
• Out of character with the area
• Inappropriate land use
• Impact on birds/disturbance to habitat and protected species
• Lack of consultation/neighbour notification
• Excessive operating hours
• Adverse impact on tourism 
26. These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS 
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not Required
Appropriate Assessment Habitats Regulations Appraisal -
AA Not Required
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact e.g.
Flood Risk Assessment
• Supporting Statement
• Information on Noise
Impacts/Mitigation 
APPRAISAL 
27. Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2019.  The relevant policy considerations are outlined in the
Page 108 of 174

Page 109

policy section above and are considered in more detail below.  In terms of other
material considerations, this involves considerations of the Council’s other
approved policies and supplementary guidance. 
Principle 
28. The proposal is related to the existing leisure operation at Crieff Hydro Hotel
and the principle of development is considered under Policy 8 Rural Business
and Development   
29. Policy 8 favourably considers the expansion of existing businesses and the
creation of new ones in rural areas. There is generally a preference that this will
be within or adjacent to existing settlements. Sites out with settlements may be
acceptable where they offer opportunities to diversity an existing business or
are related to an existing site-specific resource or opportunity. The proposal is
for a clay pigeon shooting range that is related to a well-established existing
hotel operation.  The proposal therefore clearly associated to a site-specific
resource, as required by Policy 8.   
30. There are several criteria outlined within Policy 8 applicable, which require that
development contributes to the local economy, will not result in suburbanisation
nor encourage unsustainable travel patterns, be compatible with surrounding
land uses, can be accommodated within the landscape and environmental
capacity, meets a need by virtue of the location in relation to existing
business/tourist facilities, and that the road network can accommodate the
development.   
31. The principle of the development is considered acceptable in terms of Policy 8. 
The detail of the proposal and its impact on residential amenity, landscape and
other matters is considered below. 
Design and Layout 
32. The application is in part retrospective, as the range has been formed with a
bund on three sides to the north of the site, and a rough track to the south and
shooting hut sited at the east boundary.  The proposal retains the site as laid
out, with the addition of the recommendations in respect of noise require the
bund to be increased in height by 1.5m and absorptive acoustic tiles added to
the internal side walls and internal roof of the existing shooting hut. 
33. The design and layout are considered appropriate in scale and design and
conducive to the rural character and visual amenity of the area as required by
Policies 1A, 1B and the criteria outlined within Policy 8 of LDP2. 
Residential Amenity 
34. Previous application 19/01181/FLL was withdrawn by the applicant as the noise
assessment submitted did not meet the requirements of EH to determine the
noise impact on noise sensitive receptors (NSR). 
Page 109 of 174

Page 110

35. A further Noise Impact Assessment (NIA) was undertaken in June 2020 and
November 2020.  With a final survey conducted in January 2022.   
36. The NIA assessed the shooting noise at the nearest identified noise sensitive
receptors and a sound meter was positioned within the shooting enclosure and
additional sound meters at the various receptor locations, with background
levels LA90 measured at each location. These background levels are listed
below: 
• Location 1 – Hosh Farmhouse - LA90 40dB
• Location 2 – Aberturret House - LA90 49.4dB
• Location 4 – The Old Manse, Monzie - LA90 41.7dB
• Location 5 – Crieff Hydro Football Pitches - LA90 40.2dB
• Location 6 – Ardvreck School - LA90 46.6dB
• Location 7 – Mid-Lodge Ferntower - LA90 43dB 
37. One further location (Number 3) was agreed but was excluded from the survey
at the resident’s request. 
38. The NIA determined the noise shooting level in accordance with the Chartered
Institute of Environmental Health (CIEH) 2003 “Clay Target Shooting -
Guidance on the Control of Noise” and the shooting noise level at each location
was determined from the 25 highest shots measured at the receptors. 
39. Source noise measurements were conducted within the shooting enclosure at
approximately 1.5 metres away from the shooter and at a 90o angle.  The
shooter using a 12-gauge shotgun loaded with low noise 28g cartridges and a
20-gauge shotgun loaded with 14g cartridges, 60 shots were fired for each gun
at each location within the enclosure. The arc of fire was approximately 45o
horizontally and 40o vertically. 
40. All noise measurements were carried out in accordance with BS7445:1991
“Description and measurement of environmental noise”. 
41. The CIEH guidance states that the Shooting Noise Level should not exceed
55dB where the existing background level is below LA90 45dB 
42. The analysis of the sound level data and audio at receptors indicated that shots
were audible at Location 1 Hosh Farmhouse – LAFmax 47.8dB (12 gauge) and
47dB (20 gauge); Location 2 Aberturret House – LAFmax 51 dB (12 gauge) &
50.9 dB (20 gauge); and Location 6 Ardvreck School – LAFmax 50.3dB (12
gauge) & 50.2dB (20 gauge). 
43. At Locations 3, 4 and 5 there was no clear distinguishable gun shots. 
Otherwise, although the shots could subjectively be distinguished against the
ambient noise environment at Locations 1, 2 and 6, based on the noise survey
and local background levels, the shooting noise level was below the CIEH
guideline level of 55dB. The levels also comply with the BRE 1997 research
which states that “at shooting noise levels below the mid 50dB(A) there is little
evidence of significant levels of annoyance at any site”. 
Page 110 of 174

Page 111

44. The background level at Location 1 is lower than that at Location 2 and 6 and
therefore the shooting noise has the potential to be easily more identifiable
against the ambient noise environment and therefore perceived as more
intrusive.  The maximum noise level of the shots at Locations 2 and 6 is around
2-3 dB above the background levels and therefore likely to be effectively
masked by the ambient noise environment. 
45. A further site investigation was carried out by the consultant to determine if
mitigation measures could be implemented to reduce received levels of
shooting noise at the nearest identified noise sensitive receptors. 
46. The report dated 6 October 2020 recommended that further reductions in
received gunshot noise could be achieved by increasing the effective height of
the existing earth bunds. Increasing the height of the bund increases the path
difference from the source to the receiver, leading to reductions in noise level at
the receptor to the Northwest of the site. The report gave several options on
how the bund height could be increased, additional soil, hay bales, noise
barrier, etc.  The report also recommended further mitigation measures for the
shooting enclosures and that predictive noise modelling should be undertaken
to determine the reductions in received levels through the proposed mitigation
measures. 
47. Shooting noise levels were recorded at five locations on 21 September 2020,
within the site, and all measurements were in accordance with BS7445:1991.
Shots were fired within the shelter building using a 12-gauge shotgun loaded
with low noise 28g cartridges and 20-gauge shotgun with 14g cartridges. It is
understood that this combination of cartridges and shotguns is to be used. For
each shotgun and each location, two shots were fired from within the enclosure. 
48. The most recent report states noise levels from the clay pigeon shooting have
already been demonstrated to meet regulatory requirements, but levels were
audible at some NSR due to low background levels. The consultant states that
“in our professional opinion that further reductions in noise impact at the
nearest noise sensitive receivers (NSRs) could be further implemented”. 
49. The report recommends a 1.5-metre-high acoustic barrier on top of the existing
bunding, on all three sides, with modelling undertaken in this regard and
shooting noise source level taken from the onsite measurements recorded on
21 September 2020.  The model predicted an improvement of +5dBA would be
subjectively noticeable locally. The report states that the noise travelling to the
NSR will be critically reduced/disrupted and improvement of noise levels at the
NSR could be greater still.  The report also states that the use of ‘quieter’
shotgun cartridges demonstrates a holistic approach to ‘best practicable
means’ and strongly recommends the introduction of absorptive panels or foam
cells to the inside of the shooting enclosure. 
50. The applicant submitted a supporting statement which details the number of
proposed shooting days per year is two hundred and that the proposed hours of
operations for the clay shooting range were set out.  Also, that there would be a
maximum of six people at a time sharing three guns, with one instructor. 
Page 111 of 174

Page 112

51. The assessments submitted have demonstrated prior to any proposed
mitigation that the CIEH value level of <55dB can be achieved at the NSRs and
with the incorporation of an acoustic barrier along the top of the existing bund
and acoustic insulation to the existing shelter building that shooting noise levels
at NSRs could be reduced further.  However, it is recognised that noise is likely
to be audible at some NSRs, due to lower background levels.  Notwithstanding,
with further mitigation of noise at source the perception of noise should be
further reduced and within acceptable levels. 
52. Environmental Health have recommended conditions are applied to any
planning permission, to protect the residential amenity of noise sensitive
receptors (Conditions 1 -8).  From the perspective of site safety, Environmental
Health have also sought a condition (Condition 6) which shall necessitate the
provision of an exclusion zone and associated warning signage is provided
around the facility.  Overall, the proposal is considered acceptable in terms of
the residential amenity of neighbouring properties in accordance with the
placemaking Policies 1A and 1B and Policy 56 Noise. 
Roads and Access 
53. There is an existing rough track to the site with guests taken to the facility in an
off-road type of vehicle.   
Drainage and Flooding 
54. No drainage or flooding implications are likely from the proposal. 
Natural Heritage and Biodiversity 
55. It has been noted that the proposal could impact protected species. As the
development has taken place the physical site works are not considered to
impact on any habitats.  However, the noise generated could have an impact,
but the wider area is characterised by leisure uses which generate nose and
this activity is carried out within rural areas across Perth and Kinross without
the requirement for planning permission, all such that the impacts are likely to
be negligible. 
56. The agent has also confirmed that in the cartridges contain steel shot rather
than lead, which removes any potential lead contamination, particularly of the
water environment, within the local area. 
Developer Contributions 
57. The developer contributions guidance is not applicable to this proposal. 
Economic Impact 
58. The supporting statement details that the proposal will create the equivalent of
three full-time jobs.  The proposal will also contribute to the leisure offering the
hotel providing more choice in the facilities offered.    
Page 112 of 174

Page 113

VARIATION OF APPLICATION UNDER SECTION 32A 
59. This application was not varied prior to determination. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
60. Not applicable. 
DIRECTION BY SCOTTISH MINISTERS 
61. Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
62. To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is considered to comply with the approved
TAYplan 2016 and the adopted Local Development Plan 2 (2019).  Account
has been taken account of the relevant material considerations and none has
been found that would justify overriding the adopted Development Plan. 
63. Accordingly, the proposal is recommended for approval subject to the following
conditions: 
A RECOMMENDATION   
Conditions and Reasons for Recommendation 
1. Noise from operations on site shall not exceed L A90,1 hour background noise
level plus 5dB (A) when measured at any residential property. 
Reason – In order to safeguard the residential amenity of the area. 
2. No clay pigeon shooting is hereby permitted on site until a 1.5-metre-high
acoustic fence is installed in line with the recommendation of Noise
Assessment L-8112C-DJC-RGM dated 20 January 2022 and drawing No 04
and 07. 
Reason – In order to safeguard the residential amenity of the area. 
3. No clay pigeon shooting is hereby permitted on this site until the enclosure from
which shooting will take place has been acoustically insulated in accordance
with drawing 05 such that the walls, roof, and external wing walls of the
enclosure have been clad with noise insulating material, the details shall be first
submitted to and approved in writing by the Planning Authority in consultation
with Environmental Health. 
Reason – In order to safeguard the residential amenity of the area.
Page 113 of 174

Page 114

4. Within one month of the completion of the following mitigation measures;
acoustic insulation of the shooting enclosure and erection of acoustic fence at
the approved locations; a Noise Impact Assessment shall be undertaken by a
suitably qualified person and the Report submitted to, and approved in writing
by, the Planning Authority. The Report shall summarise the findings of the
Noise Impact Assessment and make recommendations for further mitigation
works if the noise of shooting is found to be over 55dB at the nearest noise
sensitive property. Once approved, any required mitigation must be
implemented in accordance with the approved details within 30 days, unless
otherwise first agreed in writing by the Planning Authority. 
Reason – In order to safeguard the residential amenity of the area. 
5. No clay pigeon shooting shall take place on the site other than between the
hours of 10:00 to 17:00 hours Monday to Friday and 11:00 hours to 17:00 hours
Saturday and Sunday. 
Reason – In order to safeguard the residential amenity of the area. 
6. No clay pigeon shooting shall take place unless and until the exclusion zone is
clearly marked out on site, and warning signs are erected on the access track
to the site, details of which shall first be approved in writing by the Planning
Authority. Thereafter, the approved scheme shall be implemented prior to the
first use of the development and retained in place for the duration of the use of
the land for clay target shooting. 
Reason – In order to safeguard the general public 
7. Only low noise cartridges as referenced in the Noise Impact Assessment (plan
ref 09) shall be used for the clay pigeon shooting and all shooting at the site
must be within the shooting enclosure at all times. 
Reason – In order to safeguard the residential amenity of the area. 
8. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the
Planning Authority to conduct a noise assessment to verify compliance with the
CIEH men shooting noise level below 55dB(A) and condition1 above. The
assessment will be conducted to an appropriate methodology agreed in writing
with the Planning Authority. If the noise assessment shows that the noise levels
do not comply with CIEH 55dB or condition 1, a scheme of noise mitigation
shall be included with the noise assessment, specifying timescales for the
implementation of the scheme, and shall be submitted to the Planning Authority
with 28 days of the assessment. The mitigation scheme shall thereafter be
implemented in accordance with the approved scheme and timescales. 
Reason – In order to safeguard the residential amenity of the area. 
Page 114 of 174

Page 115

B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
C PROCEDURAL NOTES 
Not required 
D INFORMATIVES 
Background Papers:  73 letters of representation
Contact Officer:  Joanne Ferguson
Date:   2 September 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 115 of 174

Page 116

Page 116 of 174

Page 117

22/00334/FLL
Erection of shelter building and acoustic fence, formation
of clay pigeon shooting range and earth bunds (in part
retrospect) Crieff Hydro Hotel Ferntower Road Crieff
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or
sell any of this data to third parties in any form.
Scale 1:25000
5(2)(i)
Page 117 of 174

Page 118

Page 118 of 174

Page 119

22/00334/FLL
Erection of shelter building and acoustic fence, formation
of clay pigeon shooting range and earth bunds (in part
retrospect) Crieff Hydro Hotel Ferntower Road Crieff
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or
sell any of this data to third parties in any form.
Scale 1:5000
5(2)(i)
Page 119 of 174

Page 120

Page 120 of 174

Page 121

Perth and Kinross Council
Planning and Placemaking Committee – 14 September 2022
Report of Handling by Head of Planning & Development
(Report No. 22/220) 
PROPOSAL: Erection of visitor centre comprising crannog, roundhouse,
demonstration structures, café/retail, museum/office, car and
coach parking, landscaping and associated works  
LOCATION: Land 60 Metres South-East of Drummond House, Kenmore 
Ref. No: 22/00711/FLL
Ward No: P4 – Highland 
Summary 
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and
there are no material considerations apparent which outweigh the Development
Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL  
1 Full planning permission is sought for the erection of a visitor centre associated
to the Scottish Crannog Centre (SCC).  It is proposed to develop a crannog,
roundhouse, demonstration structures, cafe/retail and museum/office facilities,
car and coach parking, landscaping and other associated works all at Dalerb on
the north shore of Loch Tay. Specifically positioned between the A827 and the
loch shore.  The development area extends to approximately 1.9 hectares and
is a broad, slightly projecting peninsula approximately 1km to the west of
Kenmore on the road towards Fearnan.  Loch Tay sits on its south and west
sides, whilst the A827 is to the north with single storey residential properties
beyond, and to the east is the remainder of the wider Dalerb site which is a
further 1.7 hectares in site area bringing the total land holding to 3.6 hectares. 
The land to the east may be proposed for further SCC associated development
in the future.  Topographically the site slopes from north to south, towards Loch
Tay, by approximately 8.5m. 
2 The site is currently used for recreation and was previously owned by Forestry
and Land Scotland.  There is an existing access onto the A827 and an access
track which links to a series of small car parking areas.  This enables members
of the public to access the loch shore, there are also scattered areas of
woodland and dense scrub, undulating areas of mown grassland, a small toilet
block and litter bins.  The loch shore comprises rock and shingle.  The western
part of the site is currently in separate private use for boat maintenance and
water access. 
5(2)(ii)
Page 121 of 174

Page 122

3 The Scottish Crannog Centre is currently located on the south side of Loch Tay
adjacent to Taymouth Marina and the submission indicates that that site no
longer has the capacity to meet the demands of the SCC’s operations, which
includes a visitor attraction, research facility, social enterprise and skills
development, interpretive exhibition and teaching space.  The Scottish Crannog
Centre Trust (SCCT) acquired the site at Dalerb in early 2020 and this
application forms phase 1 of a wider development project proposed to
accommodate up to 80,000 visitors per annum. 
4 In June 2021 there was a fire at the current SCC facility, which accelerated
plans to deliver the project at Dalerb. 
5 As outlined above the proposal is split into two phases, this application relates
to phase 1 and would enable the SCC to become operational at a new location,
by providing: an iron age village and roundhouse, construction of the first
crannog, footpaths, utilities and infrastructure.  A temporary car park is also
proposed along with a new visitor centre comprising a cafe, retail use, museum
and office.  It is indicated that a separate application will follow for the remainder
of the site, to expand the offering further. 
6 Phase 1 at Dalerb is proposed at the western side of the overall site, utilising
the existing access from the A827.  A car and coach parking area is proposed
on the eastern area, with associated access tracks.  Parking for 47 cars, four
disabled vehicles and three coaches together with a bus drop off point are
proposed. 
7 The main visitor centre is proposed to the south-west of the access, comprising
two interlinked timber clad modular buildings with ‘green’ roofs.  The northern
building will accommodate a museum area and office.  The link structure will
serve as the main entrance.  The southern building will accommodate the main
reception, a small retail area, cafe and accessible WC. 
8 To the north of the visitor centre a smaller timber clad toilet block and plant
room is proposed, largely re-using the existing toilet block.  This would be a
simple pitched roof structure with male, female and accessible WC facilities,
accessible shower and plant room.  A small office building is proposed to the
west of the plant room, contained within a portable cabin. 
9 A re-created iron age village is proposed to the north-west of the visitor centre
which, comprising numerous relatively small-scale structures to enable
demonstration of iron age life including: cooking, textiles, metal work and other
activities.  Structures will be of varying designs, with construction including the
use of drystane walling, turf and thatch roofs. 
10 A larger "roundhouse" is proposed as a focal point and used for education,
performance and interpretation.  It is also proposed to be constructed with turf
walling and a thatch roof. 
11 A "Woodman's Yard" would be developed to the north of the roundhouse,
containing two storage containers and will serve as the construction and
Page 122 of 174

Page 123

maintenance and training area for traditional skills such as: coppicing, timber
framing, green woodworking and other related craft skills. 
12 A series of footpaths are also proposed around the loch shore, together with
outdoor "performance spaces" scattered amongst the existing woodland. 
13 A crannog structure is proposed in the western area, extending into Loch Tay. 
This will be similar to the existing crannog at Taymouth and would provide a
learning and performance space.  It will be accessed via a timber walkway and
mounted on timber posts with a thatch roof. 
Pre-Application Consultation 
14 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009. Therefore, the applicant had no statutory requirement to
undertake any formal pre-application consultation with the local community. 
However, it is noted that numerous discussions have been undertaken with the
local community prior to the application being submitted. 
National Policy and Guidance 
15 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework 2014 
16 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SSP) 
17 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
18 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
Page 123 of 174

Page 124

• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Supporting Business and Employment: paragraphs 32 – 108
• Valuing the Historic Environment: paragraphs 135 – 151
• Managing Flood Risk and Drainage: paragraphs 254 – 268
• Promoting Sustainable Transport and Active Travel: paragraphs 269 – 291 
Planning Advice Notes 
19 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40: Development Management
• PAN 51: Planning, Environmental Protection and Regulation
• PAN 60: Natural Heritage
• PAN 61: Planning and Sustainable Urban Drainage Systems
• PAN 68: Design Statements
• PAN 69: Planning and Building standards Advice on Flooding
• PAN 75: Planning for Transport
• PAN 77: Designing Safer Places 
• PAN 79: Water and Drainage
• PAN 1/2011: Planning and Noise 
Creating Places 2013 
20 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
National Roads Development Guide 2014 
21 This document supports Designing Streets and expands on its principles and is
considered to be the technical advice that should be followed in designing and
approving of all streets including parking provision. 
Development Plan 
22 The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2019. 
TAYplan Strategic Development Plan 2016-2036 
23 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as set
out in the plan states that: 
Page 124 of 174

Page 125

“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
24 The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application. - Policy 1: Locational Priorities 
• Policy 2: Shaping Better Quality Places
• Policy 3: A First Choice for Investment 
• Policy 8: Green Networks
• Policy 9: Managing TAYplans Assets 
Perth and Kinross Local Development Plan 2 
25 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance.  
26 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
• Policy 8: Rural Business and Diversification
• Policy 15: Public Access
• Policy 27A: Listed Buildings
• Policy 28A: Conservation Areas: New Development
• Policy 29: Gardens and Designed Landscapes
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 38A: Environment and Conservation: International Nature
Conservation Sites
• Policy 38B: Environment and Conservation: National Designations
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 47: River Tay Catchment Area
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
Page 125 of 174

Page 126

• Policy 57: Air Quality
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Other Policies 
Developer Contributions and Affordable Housing Supplementary Guidance
April 2020 
27 This document sets out the Council’s policies on Developer Contributions in
relation to Primary Education and Transport Infrastructure/A9 junction
upgrades, as well as setting out what Affordable Housing provision is required
for new developments. 
Placemaking Supplementary Guidance 2020 
28 The Council has prepared Placemaking Supplementary Guidance (2020) to
support Policy 1 (Placemaking) of the Perth and Kinross Local Development
Plan 2 (2019). It is to be used in the assessment of planning applications and to
assist in the placemaking process. 
Flood Risk and Flood Risk Assessments Supplementary Guidance 2020 
29 The Adopted Flood Risk & Flood Risk Assessment (PDF) [5MB] supports the
Adopted Perth and Kinross Local Development Plan 2 (2019) Policy 52: New
Development and Flooding, and Policy 53: Water Environment and Drainage. 
Supplementary Guidance - Open Space Provision for New Development 
30 The Adopted Open Space Provision for New Developments Supplementary
Guidance (2021) (PDF) [6MB] has been produced to accompany the Local
Development Plan 2 (2019) Policy 14: Open Space Retention and Provision
and contains information on SUDS drainage design. 
Site History 
31 None relevant to this location/proposal. 
CONSULTATIONS 
32 As part of the planning application process the following bodies were consulted: 
External 
33 Nature Scot: No objection.  Subject to conditions which secure mitigation
relating to River Tay Special Area of Conservation. 
34 Perth and Kinross Heritage Trust: No objection subject to condition which
secure implementation of archaeological investigation. 
35 Kenmore Community Council: No comments.
Page 126 of 174

Page 127

36 Scottish Water: No Scottish Water infrastructure in the vicinity of the site and
therefore private treatment and water options are recommended. 
37 Scottish Environment Protection Agency (SEPA): No objection in relation to
flood risk and are content that there is no risk to hydromorphology.  SEPA are
content with the methodology and conclusions of the Ecological Impact
Assessment Report.  Further advice is also provided on the regulatory
requirements associated with the development. 
38 Historic Environment Scotland: No objection. 
Internal 
39 Transport Planning: No objection.  Access arrangements considered
acceptable, subject to a condition relating to a visibility splay and speed limit
reduction on the public road, which requires to be secured through a Traffic
Regulation Order.  Advise that proposed traffic generation is capable of being
accommodated on the public road and the level of car parking proposed is
appropriate.  A Travel Plan to encourage use of sustainable transport methods
should be secured by condition.  The proposed provision of electric car and
bicycle charging points is welcomed. 
40 Environmental Health (Private Water): No objection.  Subject to an
informative advising the developer of legal responsibilities regarding protection
of existing private water supplies. 
41 Enterprise Team: Advise that the supporting Business Plan and Economic
Statement are considered an accurate representation of the potential economic
benefit of development. 
42 Community Greenspace: No objection. Initial concerns regarding potential
impact on public access to the loch shore.  This has been addressed through
submission of further information which clarifies extent of impact and benefits
which the development will bring to the public and associated improvements to
facilities. 
43 Planning and Housing Strategy: No objection. Comments provided on policy
background of proposal provided, with the proposal generally considered to
comply with the Perth and Kinross Local Development Plan 2019. 
44 Biodiversity/Tree Officer: No objection. Advise Ecological Impact Assessment
Report findings and mitigation are considered acceptable, subject to conditions. 
Tree loss is also considered to be appropriate, subject to implementation of a
compensatory planting scheme. 
45 Commercial Waste Team: No objection. 
46 Environmental Health (Noise/Odour): No objection. Concerns initially
expressed regarding proposed “events” and use of generators and related noise
implications.  Further information and clarity submitted confirm comfort, subject
Page 127 of 174

Page 128

to conditions controlling noise levels, the number of events, ventilation,
chainsaw use, servicing, noise management and to ensure provision of a
complaints procedure. 
47 Structures and Flooding: No objection. 
Representations 
48 A total of 14 representations were received, 13 objecting and 1 in support. The
main issues raised within the objections are: 
• Impact on visual amenity
• Impact on residential amenity
• Overlooking
• Light pollution
• Loss of open space
• Noise pollution
• Traffic and pedestrian safety
• Traffic generation
• Lack of car parking
• Loss of public access to shore/site
• Loss of trees
• Impact of evening events
• Lack of compensatory planting
• Construction impact
• Lack of sustainable connections to site
• Land ownership
• Inappropriate land use
• Contrary to Development Plan
• Air pollution
• Over intensive development
• Loss of view 
49 The main issues raised within the letter of support are: 
• Economic benefit
• Job creation
• Opportunity for world class learning, social action research and education
facility
• Positive consultation with local community 
50 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS
51
Screening Opinion  Undertaken and EIA Not
Required (ref:21/01903/SCRN)
Environmental Impact Assessment (EIA):
Environmental Report
Not required
Page 128 of 174

Page 129

Appropriate Assessment Habitats Regulations
AA Completed
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact  • Landscape and Visual
Assessment
• Drainage Strategy Report
• Tree Survey
• Tree Protection Plan
• Archaeological Impact
Assessment
• Business Plan
• Economic Statement
• Transport Statement
• Traffic Survey
• Ecological Impact
Assessment 
APPRAISAL 
52 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2019.  The relevant policy considerations are outlined in the
policy section above and are considered in more detail below.  In terms of other
material considerations, this involves considerations of the Council’s other
approved policies and supplementary guidance which are outlined above. 
53 In this instance, section 14(2) of the Planning (Listed Buildings and
Conservation Areas) (Scotland) Act 1997 places a duty on planning authorities
in determining such an application as this to have special regard to the
desirability of preserving the building or its setting or any features of special
architectural or historic interest which it possesses.  Section 64(1) of the
Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997 is
relevant and requires planning authorities to pay special attention to the
desirability of preserving or enhancing the character or appearance of the
designated conservation area. 
Principle 
54 Policy 1 of TAYplan advocates the developing of land within the principal
settlements rather than beyond their boundaries. It does however acknowledge
the need to sustain rural economies while protecting the countryside, where it
genuinely contributes to the outcomes of the Plan. However, suburbanisation of
the countryside and unsustainable travel and development patterns should be
avoided. 
Page 129 of 174

Page 130

55 This principle is reflected in LDP2 Policy 6 - Settlement Boundaries, which
stipulates that for defined settlements development will not generally be permitted
out with settlement boundaries. 
56 Although the proposal is not located within a settlement boundary and thus fails
to comply with Policy 1 of TAYplan and Policy 6 of LDP2 there are exceptions. 
Particularly in this case through Policy 8: Rural Business Diversification, which
states that favourable consideration will be given to the expansion of existing
businesses or creation of new ones in rural areas, and that sites out with
settlements may be acceptable where they offer opportunities to diversify an
existing business or are related to a site-specific resource or opportunity. It is also
stated that proposals for new tourism related developments and the expansion of
existing facilities will be supported where it can be demonstrated that they
improve the quality of existing facilities, allow a new market to be exploited or
extend the tourism season. 
57 The proposed facilities clearly seek to improve and expand upon the existing
offering of the SCC, but at a new location. The submission explains that the
existing site is physically constrained with little opportunity for growth.  Whereas
Dalerb offers more space to allow the SCC to grow and provide an improved
visitor facility. The proposal is therefore considered to result in an improvement to
the existing facilities of the SCC, as required by Policy 8.  This will be considered
in more detail below. 
58 In addition to the above, Policy 8 also requires that the following criteria be
addressed: 
a) The proposal will contribute to the local economy through the provision of
permanent employment, visitor accommodation (see also Policy 9),
additional tourism or recreational facilities, or the re-use of existing
buildings;
b) The proposal will not result in suburbanisation of the rural area or
encourage unsustainable travel patterns;
c) The proposed use is compatible with the surrounding land uses and will not
detrimentally impact on the amenity of residential properties within or
adjacent to the site;
d) The proposal can be satisfactorily accommodated within the landscape and
environmental capacity of the site;
e) The proposal meets a specific need by virtue of its quality or location in
relation to existing business or tourist facilities;
f) Where any new building or extensions are proposed they should achieve a
high quality of design to reflect the rural nature of the site and be in keeping
with the scale of the existing buildings; and
g) The local road network must be able to accommodate, or be capable of
upgrading in order to accommodate, the nature and volume of the traffic
generated by the proposed development in terms of road capacity, safety
and environmental impact. 
59 Considering several of these detailed requirements of Policy 8, support is given
to the expansion of existing businesses. However, whilst it is more regularly the
case that expansion would be within or adjacent to the existing facility, the
Page 130 of 174

Page 131

applicant has set out the reasons why the current site is no longer appropriate
and an alternative sought.  Information is also provided on the options which
were considered.  As such it is considered that the proposal is generally in line
with the intentions of Policy 8.  Particularly there is clearly a site-specific
locational requirement for the siting of the Scottish Crannog Centre adjacent to
the loch shore.  The proposal would also offer improved tourism and visitor
facilities as required by criterion (a).   
60 The proposal is not considered to result in the ‘suburbanisation’ of the area nor
unacceptable or unsustainable travel patterns (as explained in the Traffic and
Transport section below), thus addressing criterion (b).  In terms of criterion (c)
there are residential buildings located to the north, beyond the A827, but given
the existing tree cover and the mitigation outlined within the submitted Noise
Impact Assessment the proposals are not considered likely to impact significantly
on residential amenity. However, detailed assessment of this is provided in the
Residential Amenity section below, with impacts, e.g., lighting and noise
generation controllable through conditions.  The proposal is therefore considered
to meet criterion (c).  The proposal can also be successfully accommodated
within the landscape as illustrated in the Design and Layout and Landscape
Impact paragraphs below and therefore meets criterion (d). 
61 Criterion (e) requires a specific need by virtue of its quality or location in relation
to existing business or tourism facilities. It is accepted that the proposal will
improve the quality of existing visitor facilities, albeit via relocation, and
information has been given on the economic impact of the proposal, how it will be
funded, and how the proposal will complement the existing visitor offer in the
area.  A business plan has been submitted, reviewed and accepted, so this
requirement of the policy has been met. 
62 Criterion (f) requires development to be of a high-quality design and to reflect the
rural nature of the site.  In this respect the proposed buildings will be scattered
amongst existing tree cover and will be of a scale and form which is conducive to
the rural character.  The Crannog building will be more visible, given it extends
into the loch, but this is already the case at Taymouth and not considered
unacceptable.  The scale of the development and associated work and their
relationship with the landscape is considered acceptable, as outlined in the
Design and Layout and Landscape Impact paragraphs below.  The proposal is
therefore considered to meet criterion (f). 
63 Criterion (g) requires the local road network to be capable of accommodating the
development.  This is considered in more detail in the Traffic and Transport
paragraphs below, where it is considered that the local road network can
accommodate the associated traffic. 
64 As such the proposal is considered to accord with the criteria contained within
policy 8 of LDP2. 
Design and Layout 
65 Policies 1A and B relate to placemaking and require new development to respect
the character and visual amenity of the area.  Furthermore policies 8 and 39 state
Page 131 of 174

Page 132

that the existing landscape should be capable of accommodating the new
development.  Further guidance is also provided within the associated
Placemaking Supplementary Guidance.  There are a number of buildings
proposed within the site but these are proposed be to be accommodated within
the woodland setting of the site and have been laid out to take account of the
findings of the topographical, tree and habitat surveys which accompany the
application.   
66 A Landscape and Visual Assessment (LVA) also accompanies the application
which provides a zone of theoretical visibility of the development, together with a
series of viewpoints and visualisations from various receptors.  Viewpoints were
agreed within the Planning Authority prior to submission and represent
residential, recreational, road and cultural heritage impacts.  The findings of the
LVA are accepted and the visualisations demonstrate that the visual impacts are
appropriate and in accordance with the placemaking requirements of the LDP2. 
67 The visual amenity of the area will clearly change as a result of the development,
with the introduction of a series of low-lying buildings and associated daytime
activity together with periodic evening activity.  Much of the development is set
back from the loch, which enables the retention of existing woodland along the
shore side, thus helping to provide screening and containment from users of the
loch and those on the southern shore.  The scale, form and material of the
numerous buildings will nestle appropriately within the existing woodland setting
and the proposed finishing materials, including timber, natural stone, turf and
thatch roofs are considered high quality and will contribute to the rural setting. 
68 The outlook from the existing residential properties on the north side of the A827
will change significantly as a result of the development, however existing mature
vegetation is proposed to be retained adjacent to the site entrance which will help
to provide a degree of screening.  Furthermore, following the submission of
amended plans a revised landscaping and planting scheme has been prepared
which includes enhanced native tree and shrub planting along the northern
boundary, screening views of the proposed car park from residential properties. 
The implementation of this landscaping will be secured by condition (Condition
4). 
69 The submitted Design Statement demonstrates the various alternative layouts
and arrangements considered, with the layout and design of the site as submitted
considered the most appropriate, whilst respecting the visual amenity and
character of the area. 
70 As such, the proposal is considered of appropriate scale and design and
conducive to the rural character and visual amenity of the area as required by
Policies 1A, 1B and the criteria outlined within Policy 8 of LDP2. 
Landscape Impact 
71 Policy 39: Landscape requires proposals to be compatible with the landscape
character of the area, where a good fit with the landscape and, amongst other
things, not erode local distinctiveness. Development and land use change should
also be compatible with the distinctive characteristics and features of Perth &
Page 132 of 174

Page 133

Kinross's (P&K) landscape. Generally, proposals will be supported where they do
not conflict with the aim of maintaining and enhancing the landscape qualities of
P&K.  An important consideration is that the site is located within the Loch Tay
Local Landscape Area (LLA). 
72 The criteria contained within Policy 39 seek to safeguard the tranquil qualities of
an area's landscape, safeguard local distinctiveness and the visual and scenic
qualities. Policy 39 also mentions the requirement to consider the Tayside
Landscape Character Assessment (TLCA), prepared by Nature Scot. 
73 The TLCA identifies this area as part of the 'Mid Upland with Lochs Character
Type' and highlights the extent of development which has occurred along the
shore of Loch Tay, particularly along the north side and eastern end of the loch. It
also identifies the importance of woodland along the loch shore. 
74 The detailed Landscape and Visual Assessment Report assesses the degree of
impact the proposal will have on landscape character.  The findings of the LVA, in
terms of landscape impact, is that they would be acceptable.  Particularly the
location within a lowland area adjacent to the loch shore, follows the landscape
character of development along the shore of the eastern end of Loch Tay.  The
proposal also involves the retention of the existing woodland which helps to retain
a key landscape element of this part of Loch Tay. 
75 The findings of the assessment are generally accepted, whereby it is concluded
that wider viewed landscape impacts will have minimal/negligible impacts on the
landscape character type and the local landscape area designation. In the
context of the LLA the reintroduction of the crannog to the loch can be considered
a beneficial impact given the cultural and historical significance of the structure
and the materials proposed. The use of appropriate materials and green roofs in
the new buildings is also supported and will help mitigate the impacts of the
development. The workshops appear to be largely in line with those at the
previous Crannog centre and are again low impact and appropriate to this
landscape. 
76 The new buildings and associated works are considered to respect site
topography and will not have any adverse impact on surrounding local
landmarks, views or skylines as demonstrated within the LVA. The proposal is
therefore considered to relate successfully to the established landscape
character of the area and therefore comply with Policy 39 of LDP2. 
Traffic and Transport 
77 Policy 60B of the LDP2 and the National Roads Development Guide are relevant
and require an assessment of the impact which the development may have on
pedestrian and traffic safety. The policy requires a Transport Statement to
demonstrate the extent of traffic movements for both staff, visitors and servicing
to the site and should be based on the TRICS database. All required demonstrate
the current baseline situation with traffic counts for all modes of transport to the
site, accessibility by all modes of transport including active travel, trip generation
for the site, distribution of traffic to the site and a traffic impact assessment on the
local roads. 
Page 133 of 174

Page 134

78 A Transport Statement (TS) has been submitted and outlines the implications on
the road network. 
79 The TS provides an indication of the existing operational characteristics of the
site, the existing road network and details on the proposed offering and transport
arrangements for the proposed development. It also includes trip generation data
based upon the TRICS database, an industry recognised standard in assessing
potential traffic generation. PKC Transport Planning have confirmed that the TS
has been undertaken using the correct methodology. 
80 The level of traffic generation for the development site has been estimated on a
forecasted visitor trip number of 80,000 by 2040.  The TS indicates that the
development will generate an estimated 100 visitor trips per day.  A traffic survey
has also been undertaken which shows that there is currently a low level of traffic
on the A827.  Transport Planning have also undertaken a review of publicly
available data in relation to traffic flows, in addition to the submitted information,
and have concluded that the road network can accommodate the development. 
81 Discussions between the applicant and Perth & Kinross Council (including Traffic
and Network) have taken place over the promotion of a 40mph speed limit on the
A827 and it is the intention to promote a 40mph speed limit at Dalreb, to suit the
proposed junction and visibility arrangements.  A condition is recommended to
ensure this is implemented and in place prior to the development being brought
into use (Condition 23).  
82 Proposed parking arrangements include 8 electric vehicle (EV) charging spaces. 
83 It is also proposed to include 15 cycle parking spaces, located at the ‘welcome’
building.  Ten e-Bike charging points are included, which is welcomed to
encourage visitors to cycle. 
84 There are also east and west bound bus stops located immediately adjacent to
the site access which are served four times a day.  The submission also
indicates that the intention to operate a peak season shuttle bus, as part of
phase 2, from Kenmore – but this does not form part of the current application.   
85 The existing vehicular access is to be upgraded to improve visibility, with a
condition recommended to ensure delivery (Condition 22).   
86 Transport Planning have assessed the TS and consider the level of additional
traffic to be acceptable, capable of being accommodated on the existing road
network and therefore accept the conclusions.  Conditions are recommended to
ensure implementation of the mitigation and improvements proposed and to
secure a Travel Plan Framework for the site to manage travel and transport to
and from the site (Conditions 24 and 25). 
87 Overall, the proposal is acceptable in terms of traffic and road safety and
therefore accords with Policy 60B of LDP2. 
Page 134 of 174

Page 135

Trees and Landscape 
88 Policy 40B of LDP2 relates to trees and woodland and requires a tree survey
accompany proposals where there are existing trees which may be affected.     
89 Policy 40B also notes the Council will follow the Scottish Government Policy on
Control of Woodland Removal (PCWR) which states that there is a presumption
in favour of protecting woodland resources. 
90 Policies 1A and B of the LDP2 seek (amongst other things) to ensure that all new
sites have a suitable landscape framework which can absorb the development
proposed and that development contributes positively to the surrounding built and
natural environment.  In this respect it is considered that the site has a suitable
landscape framework in the form of the existing trees, woodland and topography. 
91 The site is also generally contained by woodland which would be largely retained. 
There are 15 tree groups within the boundaries, six are to be removed, one due
to its condition.  This would see 27 trees felled, five due to their condition the rest
to accommodate the development.  In mitigation 66 native trees are to be planted
along the northern boundary.  These will help to screen development from the
A827 and adjacent residential properties.  The extent of compensatory planting is
considered to be appropriate, and its implementation can be secured by condition
(Condition 4).  It should also be noted that this is only phase 1 of a wider project,
thus there may be opportunity for additional compensatory planting. 
Furthermore, it is noted that the applicant has limited the amount of planting
proposed around the car parking area, given this aspect may be temporary and
over the mid to longer term replaced in phase 2 with additional built development
and alternative car parking arrangements presented.  All of this would be subject
to assessment as part of any future application.   
92 A condition is recommended to ensure the findings and mitigation contained
within the tree report and tree protection measures are implemented (Condition
2).  A further condition requiring the implementation of the landscaping plan is
also recommended, to compensate for the tree loss (Condition 4). 
93 Subject to the above conditions the proposal is considered to accord with Policies
1A and B relating to placemaking and 40B relating to trees and woodland of
LDP2. 
Biodiversity 
94 Policy 41 of the LDP2 states that the Council will seek to protect and enhance all
wildlife and habitats, whether formally designated or not, considering natural
processes in the area. Planning permission will not be granted for development
likely to have an adverse effect on protected species unless clear evidence can
be provided that the ecological impacts can be satisfactorily mitigated.  Loch Tay
is designated as part of The River Tay Special Area of Conservation (SAC) and
therefore Policy 38A is applicable. 
95 The submission includes an Ecological Impact Assessment Report (EIAR) which
has been reviewed and accepted by the Council's Biodiversity Officer. This
Page 135 of 174

Page 136

includes a survey of all potential species on the site as well as an aquatic survey,
given the loch shore location.  Furthermore, Nature Scot and SEPA have also
been consulted and have concluded that the assessment is appropriate subject
to the mitigation measures contained within the EIAR being secured by condition
(Condition 5).  A detailed Construction Method Statement will also be required to
ensure that the qualifying features of the SAC are not impacted upon during
construction operations.  This will also require details on how wastewater is
catered for during construction, as requested by Nature Scot (Condition 7). 
96 A Non-Native/Invasive Species Control Plan will also be secured by condition
(Condition 6).  A further condition (Condition 9) to ensure ramps to allow
mammals to escape from any excavations will also be applied.  Finally, a
condition to secure biodiversity enhancement across the site in accordance with
the measures outlined within the ecology report is also recommended (Condition
8). 
97 An Appropriate Assessment has been undertaken, reflecting the River Tay is an
SAC, and concludes that there is likely to be significant effect on the qualifying
features of the SAC but that these can be suitably addressed through the use of
an appropriately worded condition controlling construction methods (Condition 7). 
98 The submitted lighting scheme has been designed to minimise upward light
pollution as well as being an appropriate colour temperature to ensure there is no
impact on wildlife. 
99 Subject to these conditions it is considered that the proposal will meet the
requirements of Policies 38A and 41 of LDP2 in relation to the SAC and
Biodiversity. 
Flood Risk 
100 Policy 52 of the LDP2 states that there is a presumption against proposals for
built development or land raising on flood plains.  This proposed phase is located
out with the 1 in 200 year functional flood plain and therefore both SEPA and the
Council’s Structures and Flooding Team are content.  The proposal is therefore
considered to accord with Policy 52 of the LDP2. 
Drainage 
101 The submission indicates that the site will be served by private drainage
arrangements.  Policy 53B seeks to ensure that a public wastewater drainage
connection is utilised where available.  In this instance there is a public system
available at Kenmore, but not within the immediate vicinity of the site.   Given this
the principle of a private drainage system is considered acceptable.  The
developer, however, should be aware of the regulatory requirements under the
Water Environment (Controlled Activities) (Scotland) Regulations 2011 (as
amended) and should be aware that early engagement with SEPA's water
permitting team is recommended to ensure the requirements of these regulations
are met.  Details of proposed foul sewage for the construction phase have been
submitted.  These are acceptable in principle but again SEPA have indicated that
Page 136 of 174

Page 137

there are separate regulatory requirements which the developer should be aware
of.  An informative is recommended to make the developer aware. 
102 Policy 53C requires surface water drainage to be managed by a Sustainable
Urban Drainage System (SUDS).  The Drainage Report indicates that SUDS will
be accommodated within the site which is considered to accord with Policy 53C. 
There is also a requirement to manage surface water during the construction
phase of the development and this can be secured through the Construction
Method Statement which is referenced above. 
Private Water Supplies 
103 The submission indicates that the site is proposed to be served by a private water
supply provided via a borehole.  The use of a private water supply is considered
to be acceptable in principle and accords with the LDP2, however there are
separate legislative processes to ensure that the private water supply is
appropriate. 
104 The Council's Private Water Team have indicated that there are existing private
water supplies in the vicinity, which could be impacted upon by the development. 
Therefore, an informative is recommended to advise the developer of their
responsibilities regarding private water supplies under the relevant regulations. 
Cultural Heritage 
105 There are a significant number of cultural heritage designations in the
surroundings, including Kenmore Conservation Area to the east which includes a
number of listed buildings.  The Taymouth Castle Historic Garden and Designed
Landscape (HGDL) is located to the north, on the opposite side of the A827
public road.  Therefore, Policies 27A, 28A and 29 of the LDP2 are applicable. 
The LVA demonstrates that the site does have some visibility from the settlement
of Kenmore but this is c.1km distant and the existing tree cover ensures that
views will be limited.  Therefore, the proposal is not considered to impact on the
character of the Conservation Area or the setting of listed buildings within
Kenmore and therefore complies with Policies 27A and 28A. 
106 Historic Environment Scotland have been consulted given the proximity to the
HGDL and offered no objection. The extent of development proposed and the
location of the site next to the western edge of the HGDL is considered sufficient
to ensure the character and quality of the HGDL is not impacted upon by the
development.  The proposal is considered to accord with Policy 29 of the LDP2. 
Residential Amenity 
107 Policy 56 of the LDP2 relates to noise pollution and states that there is a
presumption against the siting of development which will generate high levels of
noise in the locality of existing noise sensitive land uses. 
108 Planning control has a duty to future occupiers not to create situations of potential
conflict between neighbours. 
Page 137 of 174

Page 138

109 As with all proposals, it is expected and anticipated that existing residential
amenity enjoyed by existing dwellinghouses will be protected.  There are
residential dwellings located to the north of the site and because of this a Noise
Impact Assessment (NIA) accompanies the application. 
110 The NIA makes reference to "events" to be held on the site and representations
raise concerns regarding what these will entail and the noise which may be
generated.  Environmental Health (EH) are aware of noise from a wedding event
which took place on the site prior to submission of the application, which resulted
in noise which impacted on residential amenity this is referenced in
representations.  Environmental Health consider the methodology of the NIA to
be appropriate.  Further information has been submitted on the proposed events,
advising they would generally consist of: storytelling, songs, open-air theatre, and
demonstrations of traditional crafts. That they would be acoustic only, with no
amplified music and/or speech.  There could be up to 15 events per year, with 12
finishing before 9pm and the remaining three by 10.30pm. Further information
has stated that generators (included in the predicted noise levels within the NIA)
will not be required during these events.  The number of events and their type are
considered acceptable and are not likely to impact significantly on residential
amenity.  A condition is recommended to ensure there is control over the number
and times of these events and to ensure that no amplified music or speech takes
place (Conditions 13 and 17). 
111 The submission makes reference to the use of chainsaws, to prepare wood for
craft displays, and the NIA concludes that the noise levels will be significantly
above measured ambient noise levels and advises that the hours of use should
be restricted and screened from receptors.  Due to this impact EH have
recommended a condition to limit the use of chainsaws to a one-hour period per
day and to ensure acoustic screening is put in place is undertaken out with these
agreed periods (Condition 18). 
112 A series of other conditions are also recommended to control servicing and
deliveries (Condition 12), noise levels (Conditions 14 and 19) and to ensure the
submission of a Noise Management Plan and implementation of a complaints
procedure (Conditions 20 and 21). 
113 Given the location of the buildings within the site and the site topography which
slopes away from the residential dwellings to the north, there are not considered
to be any concerns relating to overlooking or overshadowing from the
development. 
114 Whilst it is accepted that activity on the site will increase as a result of the
development and that the residential amenity of the neighbours to the north will
alter a result, the extent of change is considered to be acceptable and in
accordance with the requirements of Policies 1A and B and 56 of the LDP2. 
Mitigation can be secured by the conditions referenced above. 
Page 138 of 174

Page 139

Lighting 
115 Policy 55 of LDP2 relates to light pollution and states that consent will not be
granted for proposals where lighting would result in obtrusive and/or intrusive
effects. 
116 The original plans indicated that 29 x 4m high lighting columns would be installed,
but further information received from the applicant advises that this has been
reduced to 10.  Specifically, those next to the northern boundary are replaced by
low level bollard lighting, to reduce the impact on residential neighbours.   
117 The submission also includes a light spill plan demonstrating the illuminance
resulting from the lighting and demonstrates that it will not significantly impact on
nearby residences and that no light spill will occur beyond site boundaries. The
extent of lighting proposed is thus considered acceptable and will help to limit
light pollution as much as possible, whilst ensuring the safety of employees and
patrons of the visitor centre.   
118 For the avoidance of any doubt a condition is recommended to control lighting
levels (Condition 16). 
119 The proposal is therefore considered to accord with Policy 55 of the LDP2. 
Construction and Construction Access 
120 There is potential for construction operations and construction traffic to impact the
amenity of local residents.  It is therefore necessary to consider appropriate
mitigation measures during construction to limit this.  It is accepted that there will
be a degree of temporary disturbance during construction operations, as is
regularly the case with any development proposal.  There is separate legislation
in place which provides controls on construction hours.  A Construction Traffic
Management Plan will be requested by condition to ensure the extent of impact is
limited as much as possible (Condition 26). 
Public Access to Loch Shore 
121 The site currently provides access to the loch shore for various recreational users
including walkers, swimmers and boat users.  Policy 15 of the LDP2 is applicable. 
Representations have been received which raise concerns regarding the
reduction in public access to the shore.  The Council's Community Greenspace
Team also initially identified these concerns.   
122 The developer has indicated that they are committed to maintaining access to the
loch and picnic area at Dalerb.  The submission indicates that 82.5% of the
Dalerb site will remain accessible to the public with only 17.5% comprising the
new Crannog Centre.  Furthermore, it is indicated that public access will be
maintained during construction and a phasing strategy has been provided to
demonstrate this (doc ref: 15-17) 
123 There is a beach in the sites south-west corner, referenced within representations
and where the crannog is proposed.  The applicant's agent has clarified that the
Page 139 of 174

Page 140

crannog is located here as it represents the most technically feasible option,
results in limited tree loss and limits archaeological impacts. 
124 A series of marked improvements will be delivered as part of the development for
use by the public including: improved parking facilities, with electric car and cycle
charging points; upgraded footpaths and public toilets; and an accessible shower
room.  There is also a separate dedicated new boat mooring proposed. 
Furthermore, the presence of the Crannog Centre will potentially deter anti-social
behaviour, via an on-site presence and also maintain a clean and litter free
environment. 
125 On balance, whilst it is accepted that public access to part of the site will be lost
this is not considered to be unacceptable when considered against the overall
improvements which will result and the retention of public access to much of the
site.  Community Greenspace, following review of the above information, have
confirmed they have no concerns in relation to public access. 
Archaeology 
126 Policy 26B of the LDP2 states that the Council seeks to protect areas of known
archaeological interest and their settings.  The site is archaeologically sensitive
and Loch Tay contains and wealth of information on crannog structures.  Some
initial concerns had been expressed by Perth and Kinross Heritage Trust
regarding the impact which the new crannog structure may have on underwater
archaeological remains.  As a result, a Written Scheme of Investigation has been
prepared which outlines a desk-based assessment of marine archaeology.  This
has been accepted by (PKHT) and they are content for development to proceed
subject to a condition which ensures that a programme of archaeological
investigation is undertaken (Condition 11).  Subject to this condition the proposal
is considered to comply with Policy 26B of the LDP2. 
Waste 
127 Waste storage facilities are indicated on the submitted plans and Waste Services
have confirmed that these are acceptable.  Furthermore, swept path details for
waste vehicles have been provided and are acceptable.  Therefore, the
arrangements for waste storage and collection are appropriate. 
Economic Impact 
128 The objective of Scotland's National Strategy for Economic Transformation is to
build a more dynamic and faster growing economy that will increase prosperity,
help tackle Scotland's health and social challenges and establish a fairer and
more equal society. Sustainability is vital to help protect the environment and
ensure that future generations can enjoy a better quality of life. 
129 It is considered that it is undoubtable that there will be some economic benefit
associated with the operation of the new Scottish Crannog Centre, but this must
be seen in the context of the spatial strategy and general policies of the Local
Development Plan. 
Page 140 of 174

Page 141

130 When looking at Economic Development Policy 8: Rural Business and
Diversification, the submission is considered by Economic Development
colleagues to be sufficient to demonstrate that the proposal is an appropriate
rural business development in accordance with Policy 8 of LDP2. 
Page 141 of 174

Page 142

Active Travel Route 
131 The submission makes reference to a potential active travel route between the
site and Kenmore, to promote sustainable travel given the limited scope to walk
to the site from Kenmore along the A827, as there is no footway.  The proposed
phasing of this is outlined within the Design Statement and indicates that this
could potentially be routed through the Drummond Hill Wood to the north, with a
crossing point over the A827 identified.  This, however, does not form part of the
current submission.  A feasibility study is being undertaken to assess the viability
of this route, given the gradients.  The Design Statement references this being an
extension to the River Tay Way, a proposed new long distance active travel route
between Perth and Kenmore.  It is envisaged that the active travel route would be
submitted as part of a separate planning applicable in line with phase 2 of the
development.  Nevertheless, the proposal does involve facilities for active travel
users on the site which is welcomed. 
Low Carbon Technology 
132 Policy 32 (Embedding Low and Zero Carbon Generating Technology in New
Development) seeks to ensure that all proposals for new buildings are required to
demonstrate that at least 10% of the current carbon emissions set by the Scottish
Building Standards will be met through the installation and operation of low and
zero carbon generating technologies.  A statement to demonstrate this will be
required, as previously highlighted as part of the pre-application response.  This
can be secured by condition (Condition 10). 
Loss of View 
133 The loss of a view is not a material planning consideration and therefore has no
bearing on the assessment of this application.  
Developer Contributions 
134 There are no developer contributions required for this development. 
VARIATION OF APPLICATION UNDER SECTION 32A 
135 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the compensatory planting
lighting and clarity being provided on public access to the loch shore.  The
nature of the changes were not considered to require the application to be re-
advertised. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
136 None. 
Page 142 of 174

Page 143

CONCLUSION AND REASONS FOR RECOMMENDATION 
137 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is considered to be contrary to Policies 1 and 6 of
the Development Plan because the site is located out with a settlement,
however there are exceptions for this which are catered for by Policy 8 which
allows for development out with settlements subject to meeting specific criteria.
These criteria are met by this proposal and account has been taken of other
relevant material considerations and therefore a minor departure from the Perth
and Kinross Local Development Plan 2 (2019) is considered to be appropriate
in this instance. 
138 Accordingly, the proposal is recommended for approval subject to the following
conditions: 
A RECOMMENDATION   
Approve the application 
Conditions and Reasons for Recommendation 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason – To ensure the development is carried out in accordance with the
approved drawings and documents. 
2. Prior to the commencement of any works on site, all trees on site (other than
those marked for felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be retained and protected.
Protection methods shall be strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction and in accordance with the
mitigation outlined within the approved tree survey (doc ref:52).  Protection
measures, once in place, shall remain in place for the duration of construction. 
Reason – In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
3. All trees on site, other than those marked for felling on the approved plans, shall
be retained. 
Reason – In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
4. The detailed landscaping and planting scheme which is hereby approved shall
be completed within the first available planting season (October to March) after
the completion or bringing into use of the development, whichever is the earlier. 
The approved scheme shall thereafter be maintained to the satisfaction of the
Council as Planning Authority, with any planting which fails to become
Page 143 of 174

Page 144

established within five years being replaced in the following planting season
with others of a size and species as previously approved. 
Reason – In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
5. The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (document 103 relates)
shall be fully adhered to, respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council as Planning Authority. 
Reason – In the interests of protecting environmental quality and of biodiversity. 
6. Prior to the commencement of the development hereby approved, an Invasive
Non-Native Species Control Plan shall be provided for the written approval of
the Council as Planning Authority. The plan shall contain measures to eradicate
and control invasive non-native species. Thereafter, the agreed scheme shall
be implemented in full accordance during the construction phase. 
Reason – In the interests of protecting environmental quality and of biodiversity. 
7. Development shall not commence until a detailed Construction Method
Statement (CMS) has been submitted to and approved in writing by the Council
as Planning Authority. The CMS must identify measures to prevent harmful
materials entering the River Tay SAC, which could reduce water quality and
lead to a damaging impact on the salmon, otter and lamprey interests. The
CMS should include the following: 
(a)  pollution prevention safeguards including surface water drainage
arrangements and the possible use of siltation traps, settlement tanks and
bunds 
(b)  storage and disposal of materials including the siting of stock piles, use of
buffer strips and disposal methods 
(c)  construction site facilities including extent and location of construction site
huts, vehicles, equipment, fuel, chemicals and materials compound 
(d)  timing, duration and phasing of construction particularly in relation to
salmon and lamprey migration/spawning. 
(e)  measures to cater for waste water during construction 
The CMS and mitigations as agreed shall be fully implemented as part of the
planning permission. 
Reason – In  order to ensure the development does not impact negatively on
the nearby Special Area of Conservation. 
8. Prior to the commencement of development on site a Site Biodiversity Action
Plan which lists opportunities for Biodiversity Enhancement shall be submitted
Page 144 of 174

Page 145

to and approved in writing by the Planning Authority.  The Action Plan shall
include details of quantity, locations, techniques, timescales and monitoring
arrangements for the biodiversity enhancement measures outlined within the
Ecological Impact Assessment Report (doc ref: 103).  The Action Plan, as
approved in writing, shall be fully implemented for the lifetime of the
development. 
Reason – In the interests of protecting environmental quality and of biodiversity. 
9. Measures to protect animals from being trapped in open excavations and/or
pipe and culverts shall be implemented for the duration of the construction
works of the development hereby approved. The measures may include
creation of sloping escape ramps for animals, which may be achieved by edge
profiling of trenches/excavations or by using planks placed into them at the end
of each working day and open pipework greater than 150mm outside diameter
being blanked off at the end of each working day. 
Reason – In the interests of protecting environmental quality and of biodiversity. 
10. Prior to the commencement of development a detailed statement shall be
submitted for the approval of the Council as Planning Authority which
demonstrates that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. The approved measures shall
thereafter be implemented to the satisfaction of the Council as Planning
Authority. 
Reason – In order to demonstrate compliance with both Policy 32 of the local
development plan and the carbon emissions reduction set by Scottish Building
Standards. 
11. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
written scheme of archaeological investigation which has been submitted by the
applicant and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust. Thereafter, the developer
shall ensure that the programme of archaeological works is fully implemented
including that all excavation, preservation, recording, recovery, analysis,
publication and archiving of archaeological resources within the development
site is undertaken.  In addition, the developer shall afford access at all
reasonable times to Perth and Kinross Heritage Trust or a nominated
representative and shall allow them to observe work in progress. 
Reason – To ensure an appropriate archaeological standing building survey is
carried out and the resulting survey is recorded properly. 
12. Servicing of and deliveries to the premises shall be carried out between 0700
and 1900 Monday to Saturday only, with no servicing or deliveries permitted on
Sundays. 
Page 145 of 174

Page 146

Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
13. No amplified music or speech shall be permitted in any external area at any
time. 
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
14. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 20 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/or calculated and plotted on a rating curve chart. 
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
15.  Prior to the development hereby approved being completed or brought into use,
an effective ventilation system commensurate with the nature and scale of
cooking to be undertaken within the cafe shall be installed and operated such
that cooking odours are not exhausted into or escape into any neighbouring
buildings. Thereafter the system shall be maintained. 
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
16. All external lighting shall be sufficiently screened and aligned so as to ensure
that there is no direct illumination of neighbouring land and that light spillage
beyond the boundaries of the site is minimised to a degree that it does not
adversely affect the amenity of the neighbouring land. 
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
17. The maximum number of events held within any external area shall be
restricted to 15 per calendar year.  Up to three events per calendar year must
cease operation by 2230hrs.  The remaining twelve events must cease
operation by 2100hrs. 
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
18. The use of chainsaws shall be restricted to one hour per day.  This hour-long
period is restricted to between 0900-1700 Monday to Friday only.  Any use of
chainsaws out with these hours or for prolonged periods shall be discussed in
advance with the Planning Authority and details of acoustic screening to be
utilised shall be submitted for the written approval of the Planning Authority. 
The acoustic screening, as agreed in writing with the Planning Authority, shall
remain in place for the duration of the chainsaw use. 
Page 146 of 174

Page 147

Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
19. Between 0700hrs and 2300hrs noise from the premises shall not exceed L
A90,1 hour background noise level plus 5dB (A), including any relevant
penalties for tonality, impulsivity, intermittency, or other sound characteristics,
when measured at any residential property in accordance with BS4142:2014 
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
20. Prior to the commencement of the development a Noise Management Plan
shall be submitted for the written approval of the Planning Authority. The plan
shall include all sources of noise associated with the premise, including patron
noise and the measures that will be put in place to minimise and/or control
noise. The plan shall be reviewed on a regular basis or, following receipt of a
justified complaint or at the request of the planning authority. Once the Noise
Management Plan has been approved, it shall be fully implemented for the
lifetime of the development. 
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
21. In the event, that justified complaints for noise are received by the Council, the
applicant at their own expense, shall employ a consultant to carry out an
assessment of noise from the development, with the appointment and
methodology to be approved in writing by the Planning Authority. Thereafter
recommendations/mitigation measures along with timescales for
implementation will be submitted to the Planning Authority within 28 days of the
assessment.  All mitigation measures shall then subsequently be implemented
in accordance with the agreed timescales. 
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
22. Prior to the commencement of the development hereby approved, full visibility
splays of 120 metres shall be provided to the left and right of the access, at a
set-back of 2.4 metres measured 1.05m above the road level, insofar as the
land is in the control of the applicant, and thereafter maintained. 
Reason – In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
23. Prior to occupation and/or use of the development hereby approved the
applicant shall promote a Traffic Regulation Order (TRO) for a reduced speed
limit on the A827 for a distance to be agreed with the Council as Roads
Authority.  The speed limit on the A827 public road shall be reduced to the
agreed limit and distance prior to the occupation and/or use of the development. 
Reason – In the interests of road safety.
Page 147 of 174

Page 148

24. Prior to commencement of any development on site, a detailed design for the
proposed secure cycle parking facility for a minimum of 30 cycles shall be
submitted to and approved in writing by the Planning Authority in consultation
with the Roads Authority.  The applicant can seek guidance on the detailed
design and positioning of the cycle storage from Transport Scotland's Cycling
by Design 2021 or similar design guide.  The cycle parking, as approved in
writing, shall be implemented in accordance with the approved details to the
satisfaction of the Council as Planning Authority prior to the development being
brought into use. 
Reason – To encourage active travel and meet advice within Scottish Planning
Policy on transport. 
25. No part of the development shall be occupied until a Staff Travel Plan (STP),
aimed to encourage more sustainable means of travel, has been submitted to
and agreed in writing by the Council in consultation with Transport Planning.
The STP will have particular regard to provision for walking, cycling and public
transport access to and within the site and will identify the measures to be
provided, the system of management, monitoring, review, reporting and the
duration of the plan. 
Reason – To promote sustainable transport options and to meet advice within
Scottish Planning Policy on transport. 
26. Prior to the commencement of the development hereby approved, the
developer shall submit for the written agreement of the Council as Planning
Authority, in consultation with the Roads Authority (Structures), a Construction
Traffic Management Scheme (TMS) which shall include the following: 
(a)  restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used;
(b)  timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c)  a code of conduct for HGV drivers to allow for queuing traffic to pass;
(d)  arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e)  emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f)  arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;
(g)  arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
(h)  arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i)  details of information signs to inform other road users of construction
traffic;
(j)  arrangements to ensure that access for emergency service vehicles are
not impeded;
Page 148 of 174

Page 149

(k)  co-ordination with other significant developments known to use roads
affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m)  the provision and installation of traffic counters at the developer 's expense
at locations to be agreed prior to the commencement of construction;
(n)  monitoring, reporting and implementation arrangements; 
(o)  arrangements for dealing with non-compliance; and
(p)  details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason – In the interest of proper site management. 
B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
C PROCEDURAL NOTES 
None. 
D INFORMATIVES 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period
(see section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended)). 
2. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority
written notice of that position. 
4. No work shall be commenced until an application for building warrant has been
submitted and approved. 
5. Records indicate that at least part of the proposed development site lies within a
radon affected area where the measurement/monitoring of radon gas and the
installation of mitigation measures may be required. 
Page 149 of 174

Page 150

6. Further information on radon gas and the associated reports that can be
obtained is available at www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/. 
7. The applicant is advised that the granting of planning permission does not
guarantee a connection to Scottish Water’s assets. The applicant must make a
separate application to Scottish Water Planning & Development Services team
for permission to connect to the public wastewater system and/or water network
and all their requirements must be fully adhered to. 
8. The developer should be aware of the regulatory advice under the Water
Environment (Controlled Activities) (Scotland) Regulations 2011 contained
within SEPA's consultation response dated 21 July 2022. 
9. The applicant shall ensure the private water supply for the dwellinghouse/
development complies with the Water Scotland Act 1980 (Section 63), The
Private Water Supplies (Scotland) Regulations 2006 and The Water Intended
for Human Consumption (Private Supplies) (Scotland) Regulations 2017. 
Detailed information regarding the private water supply, including the nature,
location and adequacy of the source, any storage tanks/ pipework and the
filtration and disinfection treatment proposed to ensure provision of an adequate
and consistently wholesome water supply shall be submitted to Perth and
Kinross Council Environmental Health in line with the above Act and
Regulations. 
10. The developer is advised to contact Sophie Nicol, Historic Environment
Manager (Tel: 01738 477027) Perth and Kinross Heritage Trust, to discuss
terms of reference for work required. 
Background Papers:  14 letters of representation
Contact Officer:  John Williamson
Date:   2 September 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 150 of 174

Page 151

22/00711/FLL
Erection of visitor centre comprising crannog, roundhouse, demonstration structures, café/retail, museum/office, car and
coach parking, landscaping and associated works Land 60 Metres South East Of Drummond House Kenmore
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:10000
5(2)(ii)
Page 151 of 174

Page 152

Page 152 of 174

Page 153

22/00711/FLL
Erection of visitor centre comprising crannog, roundhouse, demonstration structures, café/retail, museum/office, car and
coach parking, landscaping and associated works Land 60 Metres South East Of Drummond House Kenmore
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:1000
5(2)(ii)
Page 153 of 174

Page 154

Page 154 of 174

Page 155

Perth and Kinross Council 
Planning and Placemaking Committee – 14 September 2022
Pre-Application Report by Head of Planning and Development
(Report No. 22/221) 
PROPOSAL: Residential-led development with associated open space, play
area and potential associated community facilities, landscaping,
access and associated works  
LOCATION: Land 350 metres North-West of Davis Park, Springfield Road,
Kinross 
Ref. No: 22/00018/PAN
Ward No: P8 – Kinross-shire 
Summary 
This report is to inform the Committee of a potential forthcoming planning
application in respect of a major development for residential-led development with
associated open space, play area and potential associated community facilities,
landscaping, access and associated works at land 350 metres North-West of Davis
Park, Springfield Road, Kinross.  The report also aims to highlight the key planning
policies and the likely stakeholders who would be involved in the decision making
process, and to offer a brief overview of the key planning issues which are likely to
be relevant to the proposal. 
BACKGROUND AND DESCRIPTION 
1. In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicants submitted a Proposal of Application
Notice (PoAN) on 15 July 2022. The purpose of this report is to inform the
Planning and Placemaking Committee of a forthcoming planning application in
respect of a major development for land 350 metres North-West of Davis Park,
Springfield Road, Kinross. This pre-application report gives the Committee an
opportunity to raise issues which it would like to see addressed in the planning
application. 
2. This PoAN seeks to formally establish a major development comprising
residential-led development with associated open space, play area and
potential associated community facilities, landscaping, access and associated
works. The exact range of uses, scale and design of the development will be
arrived at during pre-application discussions. 
6(i)
Page 155 of 174

Page 156

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
3. Due to the scale of the proposal, it will require to be screened as to whether
the proposal is an EIA development under the EIA 2017 Regulations. A
screening request (22/01300/SCRN) has been submitted and is currently
under consideration. 
PRE-APPLICATION PROCESS 
4. The PoAN (reference 22/00018/PAN) confirmed that two online public
consultation events will take place and a dedicated website will also provide
relevant information and opportunity for comments. In addition, Kinross
Community Council and the Ward Councillors have been notified. The results of
the community consultation will be submitted with the planning application as
part of the required Pre-Application Consultation (PAC) Report. 
NATIONAL POLICY AND GUIDANCE 
5. The Scottish Government expresses its planning policies through the National
Planning Framework (NPF) 3, the National Roads Development Guide 2014,
Scottish Planning Policy (SPP) 2014 and Planning Advice Notes (PAN). 
National Planning Framework 
6. The NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. Under the Planning etc. (Scotland) Act 2006, this is now a
statutory document and a material consideration in any planning application.
The document provides a national context for development plans and planning
decisions as well as informing the ongoing programmes of the Scottish
Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SPP) 
7. The SPP is a statement of Scottish Government policy on land use
planning. The following sections of the SPP will be of particular importance
in the assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Enabling Delivery of New Homes: paragraphs 109 – 134
• Valuing the Natural Environment: paragraphs 193 – 218
• Maximising the Benefits of Green Infrastructure: paragraphs 219 – 233
• Managing Flood Risk and Drainage: paragraphs 254 – 268
• Promoting Sustainable Transport and Active Travel: paragraphs 269 –
291 
8. The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal: 
Page 156 of 174

Page 157

• PAN 2/2011 Planning and Archaeology
• PAN 3/2010 Community Engagement
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 75 Planning for Transport
• PAN 79 Water and Drainage 
LOCAL POLICY AND GUIDANCE 
TAYplan Strategic Development Plan 2016-2036 
9. TAYplan sets out a vision for how the region will be in 2032 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plans states that: 
“By 2032 the TAYplan region will be sustainable, more attractive, competitive
and vibrant without creating an unacceptable burden on our planet. The quality
of life will make it a place of first choice where more people choose to live,
work, study and visit, and where businesses choose to invest and create jobs” 
10. The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application: 
• Policy 1 – Location Priorities
• Policy 2 – Shaping better quality places
• Policy 4 – Homes
• Policy 6 – Developer Contributions 
Perth and Kinross Local Development Plan 2019 
11. The Local Development Plan 2 (LDP2) was adopted by Perth and Kinross
Council on 29 November 2019. It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
12. The LDP2 sets out a vision statement for the area and states that: 
“Our vision is of a Perth and Kinross which is dynamic, attractive and effective
which protects its assets whilst welcoming population and economic growth.” 
13. Under the LDP2, the following polices are of particular importance in the
assessment of this application: 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 1C: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
Page 157 of 174

Page 158

• Policy 14A: Open Space Retention and Provision: Existing Areas
• Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
• Policy 15: Public Access
• Policy 20: Affordable Housing
• Policy 24: Maintaining an Effective Housing Land Supply
• Policy 25: Housing Mix
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 46A: Loch Leven Catchment Area
• Policy 46B: Loch Leven Catchment Area
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
• Development Proposals
• Policy 61: Airfield Safeguarding 
OTHER POLICIES 
14. The following supplementary guidance and documents are of
particular importance in the assessment of this application: 
• Placemaking Supplementary Guidance (March 2020) 
• Developer Contributions and Affordable Housing Supplementary Guidance
(July 2020)
• Flood Risk and Flood Risk Assessment Supplementary Guidance (March
2021) 
PLANNING SITE HISTORY 
15. In terms of the LDP history, the site was promoted in LDP1 for residential
development and included within the proposed plan. The Council in its
submission to the Examination acknowledged the volume of community support
for the removal of H46 from the Plan and acknowledged some unresolved
issues in relation to noise and access. The reporter concluded that it should be
removed from the plan and allocated as open space instead. 
Page 158 of 174

Page 159

16. The site was promoted again for inclusion within LDP2 for residential
development but was rejected at the Main Issues Report stage as there were
better options for housing land allocations available elsewhere and because of
access and open space issues. It was not included within the proposed plan for
LDP2 but was considered by the reporter during the Examination as the
landowner objected to its non-inclusion. The reporter concluded that the site
should not be allocated for residential development and that it should not be
included in the settlement boundary. 
CONSULTATIONS 
17. As part of the planning application process the following would be consulted: 
External 
• Scottish Environmental Protection Agency (SEPA)
• Scottish Water
• Transport Scotland
• Historic Environment Scotland
• Perth and Kinross Heritage Trust (PKHT)
• Kinross Community Council 
Internal 
• Environmental Health
• Planning and Housing Strategy
• Developer Contributions Officer
• Community Greenspace
• Transport Planning
• Structures and Flooding
• Waste Services
• Biodiversity/Tree Officer 
KEY ISSUES AGAINST WHICH A FUTURE APPLICATION WILL BE
ASSESSED 
18. The key considerations against which the eventual application will be assessed
include: 
a. Principle
b. Visual Impact
c. Scale, Design and Layout
d. Relationship to Nearby Land Uses
e. Natural Heritage and Ecology
f. Landscape and Open Space
g. Flooding and Drainage
h. Air Quality
i. Transport
j. Archaeology and Cultural Heritage
Page 159 of 174

Page 160

ADDITIONAL STATEMENTS WHICH WILL BE REQUIRED 
19. Should an EIA Report not be required the following supporting documents will
need to be submitted with any planning application: 
• Planning Statement
• Design and Access Statement
• Pre-Application Consultation (PAC) Report
• Transport Assessment
• Flood Risk and Drainage Assessment
• Landscape and Visual Impact Assessment
• Tree and Woodland Survey
• Habitat Survey
• Archaeological Assessment
• Sustainability Assessment
• Noise and Vibration Impact Assessment
• Air Quality Impact Assessment 
CONCLUSION AND RECOMMENDATION 
20. This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in
respect of this development and members are recommended to note these key
issues and advise officers of any other issues which they consider should be
included as part of the application and assessment. 
Background Papers:  None
Contact Officer:   Alex Gudgeon
Date:   2 September 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 160 of 174

Page 161

22/00018/PAN
Residential development, formation of open space,
landscaping and associated works Land 350 Metres
North West Of Davis Park Springfield Road Kinross
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or
sell any of this data to third parties in any form.
Scale 1:10000
6(i)
Page 161 of 174

Page 162

Page 162 of 174

Page 163

22/00018/PAN
Residential development, formation of open space,
landscaping and associated works Land 350 Metres
North West Of Davis Park Springfield Road Kinross
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or
sell any of this data to third parties in any form.
Scale 1:5000
6(i)
Page 163 of 174

Page 164

Page 164 of 174

Page 165

Perth and Kinross Council
Planning & Placemaking Committee –14 September 2022
Pre-Application Report by Head of Planning and Development
(Report No. 22/222) 
PROPOSAL: Change of use from agricultural land to form extension to
caravan park  
LOCATION: Land 200 Metres north east of Erigmore Caravan Site, St
Mary's Road, Birnam 
Ref. No: 22/00019/PAN 
Ward No: P5 – Strathtay 
Summary 
This report is to inform the Committee of a potential forthcoming planning application in
respect of a major development seeking a change of use of land from agricultural land
to land for an extension to a caravan park. The report also aims to highlight the key
planning policies and the likely stakeholders who would be involved in the decision-
making process, and to offer a brief overview of the key planning issues which are
likely to be relevant to the proposal. 
BACKGROUND AND DESCRIPTION 
1. In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicant has submitted a Proposal of Application
Notice (PoAN) on 22 July 2022. The purpose of this report is to inform the
Planning and Placemaking Committee of a forthcoming planning application in
for Verdant Leisure 2 Limited seeking a change in use of land from agricultural
land to land for an extension to an existing caravan park. The development
location is on land 200 metres North East of Erigmore Caravan Site, Birnam.
Continued use of the existing operational caravan site is proposed. Pre-
application reports give the Committee an opportunity to raise issues which it
would like to see addressed in the planning application. 
2. This PoAN seeks to formally establish this major development comprising a
change in use of land, forming an extension to an existing caravan park. The
plan boundary extends to approximately 4.58 hectares and seeks to occupy the
North-Western section of an existing agricultural field located between Birnam
and the River Tay to the North. The exact scale and design of the development
will be arrived at during ongoing discussions with the applicant.   
6(ii)
Page 165 of 174

Page 166

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
3. Due to the scale of the development it requires to be screened as to whether
the proposal is EIA development under the EIA 2017 Regulations. This will be a
matter for further consideration.   
PRE-APPLICATION PROCESS 
4. The PoAN confirms that two in person public events are to be held at Erigmore
House, Birnam on 1 and 28 September 2022, between 3pm and 7pm.  The
local MP, MSP, Ward Councillors and the Dunkeld and Birnam Community
Council have all been notified. The results of the community consultation will be
submitted with the planning application as part of the required Pre-Application
Consultation (PAC) Report. 
NATIONAL POLICY AND GUIDANCE 
5. The Scottish Government expresses its planning policies through the National
Planning Framework (NPF) 3, the National Roads Development Guide 2014,
Scottish Planning Policy (SPP) 2014 and Planning Advice Notes (PAN). 
National Planning Framework 
6. The NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. Under the Planning etc (Scotland) Act 2006, this is now a
statutory document and a material consideration in any planning application.
The document provides a national context for development plans and planning
decisions as well as informing the on-going programmes of the Scottish
Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SPP) 
7. The SPP is a statement of Scottish Government policy on land use planning.
The following sections of the SPP will be of particular importance in the
assessment of this proposal: - 
• Sustainability: paragraphs 24 – 35 
• Placemaking: paragraphs 36 – 57
• Promoting Rural Development: paragraphs 74 – 91
• Supporting Business and Employment: paragraphs 92 – 108
• Valuing the Historic Environment: paragraphs 135 – 151 
• Valuing the Natural Environment: paragraphs 193 – 218
• Promoting Responsible Extraction of Resources: Paragraphs 234 – 248
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
8. The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal: - 
• PAN 1/2011 Planning and Noise 
Page 166 of 174

Page 167

• PAN 2/2011 Planning and Archaeology
• PAN 3/2010 Community Engagement
• PAN1/2013 Environmental Impact Assessment
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 60 Planning for Natural Heritage
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 65 Planning and Open Space 
• PAN 75 Planning for Transport
• PAN 79 Water and Drainage
• PAN 81 Community Engagement: Planning with People 
LOCAL POLICY AND GUIDANCE 
TAYplan Strategic Development Plan 2016-2036 
9. TAYplan sets out a vision for how the region will be in 2032 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plan states that: 
“By 2032 the TAYplan region will be sustainable, more attractive, competitive
and vibrant without creating an unacceptable burden on our planet. The quality
of life will make it a place of first choice where more people choose to live,
work, study and visit, and where businesses choose to invest and create jobs” 
10. The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application: 
• Policy 2 – Shaping Better Quality Places
• Policy 3 – A first Choice for Investment 
• Policy 6 – Developer Contributions 
Perth and Kinross Local Development Plan 2019 
11. The Local Development Plan 2 (LDP2) was adopted by Perth and Kinross
Council on 29 November 2019.  It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
12.  The LDP2 sets out a vision statement for the area and states that: 
“Our vision is of a Perth and Kinross which is dynamic, attractive and effective
which protects its assets whilst welcoming population and economic growth.” 
13. Under the LDP2, the following polices are of particular importance in the
assessment of this application: 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 5: Infrastructure Contributions
Page 167 of 174

Page 168

• Policy 6: Settlement Boundaries 
• Policy 8: Rural Business and Diversification
• Policy 9B: Caravan Sites, Chalets and Timeshare Developments: New and
Expanded Touring Caravan, Motorhome/ Campervan, and Camping Sites 
• Policy 14A: Open Space Retention and Provision 
• Policy 15: Public Access 
• Policy 26B: Archaeology 
• Policy 29: Gardens and Designated Landscapes
• Policy 38B: Environment and Conservation - National designation 
• Policy 39: Landscape 
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity 
• Policy 50: Prime Agricultural Land 
• Policy 51: Soils
• Policy 52: New Development and Flooding 
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution 
• Policy 57: Air Quality 
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
OTHER POLICIES 
14. The following supplementary guidance and documents are of particular
importance in the assessment of this application: - 
• Perth and Kinross Air Quality Supplementary Guidance, January 2020 
• Perth and Kinross Flood Risk and Flood Risk Assessments – Developer
Guidance, June 2021
• Perth and Kinross Community Plan 2013/2023
• Perth and Kinross Planning Planning for Nature, Development
Management and Wildlife Guide Supplementary Guidance, April 2022
• Perth and Kinross Local Transport Strategy (2010)
• Perth and Kinross Supplementary Guidance: Developer Contributions and
Affordable Housing, 2020
• Perth and Kinross Supplementary Guidance: Landscape, February 2020
• Perth and Kinross Supplementary Guidance: Placemaking Guide, March
2020   
RECENT PLANNING SITE HISTORY 
15. 07/00828/FUL: Full Planning permission was granted on 10 July 2007 for the
formation of 3 static caravan pitches 
16. 21/00334/PREAPP: Extension to Leisure Park – advice provided 21 October
2021. 
Page 168 of 174

Page 169

CONSULTATIONS 
17. As part of the planning application process the following would be consulted: - 
External 
• Scottish Environmental Protection Agency 
• NatureScot 
• Scottish Water
• Transport Scotland
• Perth and Kinross Heritage Trust 
• Dunkeld and Birnam Community Council 
• Historic Environment Scotland 
Internal 
• Environmental Health 
• Strategic Planning and Policy
• Developer Contributions Officer
• Community Greenspace 
• Transport Planning
• Structures and Flooding
• Biodiversity Officer 
KEY ISSUES AGAINST WHICH A FUTURE APPLICATION WILL BE
ASSESSED 
18. The key considerations against which the eventual application will be assessed
include: 
• Visual Impact
• Scale, Design and Layout 
• Relationship to Nearby Land Uses 
• Natural Heritage and Ecology
• Landscape and Site modifications  
• Water Resources and Soils 
• Air Quality  
• Noise and Vibration Impacts 
• Transport Implications  
• Impact on Agriculture
• Archaeology and Cultural Heritage
• Impact upon Garden and Designed Landscape 
ADDITIONAL STATEMENTS WHICH WILL BE REQUIRED 
19. The following supporting documents will need to be submitted with any
planning application and should form of any EIA report: 
• Planning and or Suitability Statement
Page 169 of 174

Page 170

• Design and Access Statement
• Pre-Application Consultation (PAC) Report
• Landscape and Visual Impact Assessment, including cumulative impacts 
• Transport Assessment
• Flood Risk and Drainage Assessment
• Noise and Vibration Impact Assessment 
• Impacts on Climate Change and Greenhouse Gasses
• Impacts on Land Capacity and Soils 
• Ecological Impact Assessment / Information to inform a Habitat Regulations
Appraisal 
• Archaeological Assessment 
CONCLUSION AND RECOMMENDATION 
20. This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in
respect of this development and members are recommended to note these key
issues and advise officers of any other issues which they consider should be
included as part of the application and assessment.  
Background Papers:  None
Contact Officer:   Jamie Torrance 
Date:   2 September 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 170 of 174

Page 171

22/00019/PAN
Change of use from agricultural land to form extension to caravan park Land 200 Metres
North East Of Erigmore Caravan Site St Mary's Road Birnam   
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:10000
6(ii)
Page 171 of 174

Page 172

Page 172 of 174

Page 173

22/00019/PAN
Change of use from agricultural land to form extension to caravan park Land 200 Metres
North East Of Erigmore Caravan Site St Mary's Road Birnam   
Created by Caroline Stewart on 25 August 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:2500
6(ii)
Page 173 of 174

Page 174

Page 174 of 174