Perth and Kinross Council
Planning and Placemaking Committee – 14 September 2022
Report of Handling by Head of Planning & Development
(Report No. 22/218) 
PROPOSAL: Formation of an up to 49.99MW energy storage compound
comprising battery storage units, ancillary buildings,
landscaping and associated works  
LOCATION: Land 60 metres north of Abernethy Cemetery, Newburgh Road,
Abernethy 
Ref. No: 22/00746/FLM
Ward No: P9 – Almond and Earn 
Summary 
This report recommends approval of the application, subject to conditions.  It
proposes the formation of a 49.9MW energy storage compound comprising 20
battery storage units, ancillary buildings, landscaping and associated works
including vehicle access on land South of the Jamesfield Farm Shop. The proposal
is considered as a minor departure to the Development Plan with there being
material considerations in this case which justify such a departure from the relevant
policy.   
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The site is c.1.6 hectares (Ha) in area and is located within an existing
agricultural field situated between the A913 Public Road (Abernethy Road) and
the Jamesfield Farm Shop, approximately 1 kilometre (km) east of Abernethy. 
Two local businesses are located near to the development, the farm shop
c.100m to the north, whilst the Jamesfield Garden Centre is located
approximately 200m to the north-west.  Other than these businesses, there is
an existing electrical substation, c.150m to the west.  The development itself
would comprise: a storage compound contained within a security fence (c.5,645
square metres (m2)). The balance land (c.7,867m2) comprises two site
accesses and landscaped areas. The wider land use beyond the immediate
surrounds is largely agricultural.  Local topography is generally level, with a
slight slope down to the north, whilst south of Abernethy Road there is a more
significant rise. 
2 More specifically, the proposal comprises: 20 containerised storage units
containing the batteries (dimensions 12.2 x 2.44 x 2.9m); a modular site office
and separate container, of the same dimensions; two electrical control room
buildings (dimensions 8.0 m x 6.5 x 2.84m and 10.0 x 10.0 x 2.84m).
Otherwise, the compound will be enclosed with security fencing (green or grey
in colour) and see CCTV, mounted on poles all measuring up to 3m in height.

Page 2

Parking and access are also proposed, off both Abernethy Road and the local
access road serving the Jamesfield Garden Centre, Farm Shop, etc.   
3 The development proposed is similar in nature, general form and functionality
to that proposed by Planning Application 22/00832/FLM, a separate agenda
item before this Committee.  That development is to be located approximately
100m to the north-east and also enables energy storage and transfer. Neither
application is linked in operational terms, however, both proposals have
advanced an operational need to be near to the existing Abernethy Substation,
which is indicated to have capacity for the unconstrained import and export of
electrical energy.   Both developments also offer carbon saving to support the
move to a greater reliance of renewable energy.  The site subject of the subject
application has no planning history. 
4 Significant planting set out in a landscaping scheme is proposed to assist with
visual integration into the wider surroundings.   
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
5 Directive 2011/92/EU (as amended) requires the ‘competent authority’ (in this
case Perth and Kinross Council) when giving a planning permission for
particular large-scale projects to do so in the knowledge of any likely significant
effects on the environment.  The Directive therefore sets out a procedure that
must be followed before ‘development consent’ can be given. 
6 This procedure, known as Environmental Impact Assessment (EIA), is a means
of drawing together, in a systematic way, an assessment of a project’s likely
significant environmental effects.  The EIA Report helps to ensure that the
importance of the predicted effects, and the scope for reducing any adverse
effects, are properly understood by the public and the relevant competent
authority before it makes its decision. 
7 An EIA screening has been undertaken.  The proposal being a Schedule 2
development in terms of the Town and Country Planning (Environmental Impact
Assessment) (Scotland) Regulations 2017.  In the case of these regulations,
prohibition is given to the granting of planning permission to “EIA development”
unless an environmental impact assessment has been undertaken. In this case
the Council has adopted the opinion that it is not EIA development, and that
sufficient information has been submitted with the application to enable a
determination in consideration of all relevant environmental matters. These
environmental aspects requiring further consideration, are namely: Noise,
Landscape and Visual Amenity, Ecological Values, Transportation and
Drainage matters.  These are examined in more detail within the appraisal
section of this report.   
PRE-APPLICATION CONSULTATION 
8 The proposal is a ‘Major’ development, in terms of the Town and Country
Planning (Hierarchy of Developments) (Scotland) Regulations 2009, due to the
potential energy storage capacity being in excess of 20MW.  The applicant was
therefore required to undertake formal pre-application consultation with the local

Page 3

community. Public concerns raised as part of this process identified noise,
landscaping and flood risk as being matters not addressed by the consultation
events.  These matters have been responded to in writing and included within
the Pre-Application Consultation (PAC) Report submitted with this application.   
9 The PAC Report notes that three online public events were held, as permitted
by the relevant regulations.  These online events were held on 16 December
2021, 1 February 2022 and 31 March 2022, with notice provided to local MPs
and MSPs and the Abernethy Community Council. Twelve interested parties
engaged with the consultation process, and a number of comments and
concerns were reviewed and addressed within the PAC Report and wider
planning submission. The content and coverage of the community consultation
exercise is considered sufficient, proportionate and in line with the
aforementioned regulations. 
NATIONAL POLICY AND GUIDANCE 
10 The Scottish Government expresses its planning policies through: The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework (NPF) 
11 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure.  Under the Planning etc. (Scotland) Act 2006, this is a statutory
document and a material consideration in any planning application.  It provides
a national context for development plans and planning decisions as well as
informing the on-going programmes of the Scottish Government, public
agencies and local authorities. 
12 The draft NPF4 which is currently out for consultation sets out that battery
energy storage facilities are supported in principle, subject to further onsite
considerations.   
Scottish Planning Policy (SPP) 2014 
13 The current SPP was published in June 2014 and sets out national planning
policies, which reflect Scottish Ministers’ priorities for operation of the planning
system and for the development and use of land.  It promotes consistency in
the application of policy across Scotland, whilst allowing sufficient flexibility to
reflect local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
14 The following sections of the SPP will be of particular importance in the
assessment of this proposal:

Page 4

• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Promoting Rural Development: paragraphs 74 – 91
• Supporting Business and Employment: paragraphs 92 – 108
• Delivering Heat and Electricity: paragraphs 152 – 173
• Valuing the Natural Environment: paragraphs 193 – 218
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
Planning Advice Notes 
15 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are also of relevance to the proposal: 
• PAN 3/2010 Community Engagement
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 73 Rural Diversification
• PAN 75 Planning for Transport
• The Future of Energy in Scotland: Scottish Energy Strategy (December 
2017) 
DEVELOPMENT PLAN 
16 The Development Plan for the area comprises: the TAYplan Strategic
Development Plan 2016-2036; and the Perth and Kinross Local Development
Plan 2014. 
TAYplan Strategic Development Plan 2016-2036 
17 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
18 Policy 7: Energy, Waste and Resources of TAYplan is of particular importance
in the assessment of this application. 
Perth and Kinross Local Development Plan 2019 
19 The Local Development Plan 2 (LDP) was adopted by Perth and Kinross
Council on 29 November 2019.  It sets out a vision statement for the area,
which includes that, “By 2036, the TAYplan area will be sustainable, more
attractive, competitive and vibrant without creating an unacceptable burden on
our planet. The quality of life will make it a place of first choice where more
people choose to live, work, study and visit and where businesses choose to
invest and create jobs.” It is the most recently adopted statement of Council

Page 5

policy and is augmented by Supplementary Guidance.  
20 The principal relevant policies are: 
• Policy 1A and 1B Placemaking
• Policy 2 Design Statements 
• Policy 5 Infrastructure Contributions
• Policy 8 Rural Business and Diversification
• Policy 26B Scheduled Monuments and Archaeology 
• Policy 33A Renewables and Low Carbon Energy 
• Policy 33B Repowering and Existing Facilities 
• Policy 35 Electrical Transmission 
• Policy 39 Landscape 
• Policy 41 Biodiversity
• Policy 47 River Tay Catchment Area 
• Policy 50 Prime Agricultural Land 
• Policy 51 Soils
• Policy 53 Water Environment and Drainage 
• Policy 55 Nuisance from Artificial Light Pollution 
• Policy 56 Noise Pollution 
• Policy 60B Transport Standards and Accessibility Requirements 
Other Policies 
21 Perth and Kinross Flood Risk and Flood Risk Assessments – Developer
Guidance, June 2021    
22    Perth and Kinross Supplementary Guidance: Landscape, February 2020 
23 Perth and Kinross Supplementary Guidance: Placemaking Guide, March 2020  
24 Perth and Kinross Planning for Nature, Development Management and Wildlife
Guide Supplementary Guidance, April 2022 
Site History 
25 21/00018/PAN A Proposal of Application Notice was accepted on 7 January
2022 for the formation of a battery energy storage compound, comprising:
battery storage units; ancillary buildings and equipment; landscaping; and
associated works 
26 22/00002/PAN A Proposal of Application Notice was accepted on 11 February
2022 for the Formation of a battery energy storage compound comprising
battery storage units, ancillary buildings and equipment, landscaping and
associated works 
CONSULTATIONS 
27 As part of the planning application process the following bodies were consulted:

Page 6

28 Scottish Water: No objection. Advice provided that no public sewer and water
supply options are available. 
29 Perth and Kinross Heritage Trust: No objection.  Subject to a condition that
the development sees an agreed archaeological watching brief undertaken
prior to work commencing.  Further comment provided as to potential impacts
on the setting of a nearby scheduled monument. Suggestions offered for
screening and softening of impact.   
30  Abernethy Community Council: No comments.   
31 Scottish Environment Protection Agency: No objections. Ask that the
applicant be made aware of relevant standing advice. 
30 Nature Scotland: No objection or comments.   
32 Transport Scotland: No objection.  Subject to conditions regarding the need
for further approval of signage, traffic control measures and abnormal sized
loads with respect to the use of the Trunk Road. 
33 Network Rail: No objection or comments.   
INTERNAL  
34 Biodiversity Officer: No comments.   
35 Structures and Flooding: No objection. Advise the development falls below
the threshold for consultation.  Ask that an informative note is attached to any
planning permission directing the applicant to the Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021. 
36 Environmental Health (Noise/ Odour): No objection, subject to a condition
regarding plant and or equipment noise during construction. 
37 Environmental Health (Private Water Supply): No objection, subject to a
condition requiring a pre-survey check and safeguarding investigation of private
water and wastewater infrastructure prior to works commencing. Request
informative notes in respect of existing wayleaves and obligations under the
Water Scotland Act 1980. 
38 Transport Planning: No objection, subject to a condition to ensure
construction traffic is appropriately managed. 
39 Development Contributions Officer: No objection, clarifying that no
contributions are required. 
Representations
40 Two objections have been received, summarised as follows: 
• Traffic and Transport Impacts, including impacts on the use of private land

Page 7

• Impacts on soils and agricultural land 
• Landscape Impacts
• Impacts on amenity  
• Noise Impacts 
• Artificial Light 
• Impacts on private water supply 
• Flooding and Drainage 
• Site decommissioning 
41 The matters raised are addressed in the Appraisal section of this report below 
ADDITIONAL STATEMENTS
42
Screening Opinion  Not EIA Development
Environmental Impact Assessment (EIA):
Environmental Report
Not Required 
Appropriate Assessment AA Not Required
Design Statement or Design and Access
Statement
Supporting Statement
Submitted.  
Report on Impact or Potential Impact  • Ecological Assessment 
• Noise Assessment 
• Pre-Application Consultation
Report 
• Supporting Statement with
Design Access Statement 
APPRAISAL 
43 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2 (2019).  The relevant policy considerations are outlined in
the policy section above and are considered in more detail below.  In terms of
other material considerations, this includes considerations of the Council’s
other approved policies and supplementary guidance as set out and specifically
Scottish Energy Strategy (SES) (December 2017), the future of energy in
Scotland. 
Principle 
44 The location is a peripheral rural area east of Abernethy, policy considerations
seeking to assess its suitability in principle are: Policies 1A, 1B, Placemaking;
Policy 8 Rural Diversification; Policy 33A and 33B Renewables and Low
Carbon Energy; Policy 50 Prime Agricultural Land; and Policy 51 Soils.  The
site has no planning history, and accordingly is advanced in this instance as a
minor departure to the LDP2, specifically Policies 1B and 50. The proposal is

Page 8

located on Prime agricultural land, whereby such developments will not be
permitted unless it is necessary to meet a specific established need, such as a
major infrastructure proposal, and only when there are no other suitable sites
available on non-prime land.   
45 The proposal would provide essential energy balancing services to the National
Grid, actively contributing towards Scotland's CO2 reduction targets, supporting
the strategy principles of the SES. Specifically, electricity would be drawn from
the Grid at times of low demand, stored and released back as required. When
demand is higher, greater generation from non-renewable sources is required
and energy storage facilities such as that proposed could reduce reliance on
non-renewable resources, thus decreasing CO2 emissions. 
46 In this case the applicant does acknowledge the temporary loss of prime
agricultural land as well as the corresponding loss of arable use over the life of
the facility.  However, it is advanced that the locational need for the
development close to the existing electrical substation, in addition to any
carbon offsetting potential, outweigh those impacts on landscape values and
agricultural use. The location in this case being chosen due to its proximity to
the Abernethy substation, which will enable easy connection to the grid
network, but also accounting for the fact that this substation has unconstrained
capacity to import and export the electrical energy required.  Notwithstanding
the conflict with Policies 1B and 50, Policy 33B specifically encourages low
carbon energy solutions where specific grid connection or the use of
established infrastructure can occur. The planning balance in this case is
considered to rest with supporting the development proposed, given the site-
specific reasoning for this major infrastructure proposal. Furthermore,
consideration must be had to the finite lifespan of this facility. Whilst the overall
operational life will be some 50 years, minimal disturbance to the site will be
required, allowing the pre-existing land use to resume afterwards. This matter
along with consideration of any soil disturbance is discussed further below. 
Design and Layout 
47 The design and layout proposed essentially reflects the physical and
engineering requirements, with infrastructure details consistent with industry
standards. In physical terms, the development will essentially see built form
contained below 3m in height.  The tallest built structures being the electrical
control rooms and the battery storage containers, both just under 3m.
Remaining built elements will vary in height but predominantly around 3m,
including permitter fencing and CCTV poles. All aspects within the storage
compound will be enclosed behind a security fence, painted grey or green, and
additional landscaping is also proposed. 
48 Having regard to the overall scale and height of built structures, horizontal
massing is more significant than vertical impacts. This aspect is further
considered in the landscape and visual impact sections below. Conditions are
recommended to control physical separation between containers / structures as
well as the colour / finish of materials.

Page 9

Landscape 
49 Landscape and or placemaking policy within LDP2 requires that a development
should be compatible with its setting and wider character. In this case the
proposal sits within Broad Valley Lowlands (Tayside Landscape Character
Type). This land use mainly comprises settled lowland agricultural valleys with
fertile soils dominated by arable crops. The site is currently visible in open
views across the strath, the Tay and towards the Sidlaw Hills Local Landscape
Area. Potential landscape receptors include a group of houses to the east,
intermittent views by vehicles and walkers along the A913 (Abernethy Road -
also a core path) and visitors to Jamesfield complex.   
50 A description of landscape and visual impacts along with a description of
mitigation proposals and visualisations have been provided in support of the
application. High detail photographic renders showing the likely appearance of
the development in its setting.  The proximity to Abernethy Road has a
significantly higher potential landscape impact than the consented/proposed
development further north (refs: 17/00951/FLL and 18/02336/FLL, which are
proposed to be superseded by 22/00832/FLM). It is accepted that the local
topography drops down and away northwards from the roadside and
accordingly the impact on views towards the Sidlaw Hills, across the Tay and
further to the north, would remain relatively unimpacted. Furthermore, proposed
planting will soften the landscape impact over time. In addition, views northward
from the public road (which is also a core path) present an already developed
and cluttered immediate landscape, containing: an existing wind turbine,
electricity pylons, substation, garden centre and farm shop. In addition,
consideration must also be given to the consented energy storage installations
to the northeast of this proposed development.  Consequently, concern is
raised in representations that the development if approved, will further erode
the landscape setting at this location, at odds with the pre-existing landscape
character type. 
51 As discussed above, it is considered that any landscape and or land
designation impacts arising would be outweighed by the operational and
locational need to position the development in proximity to the nearby
substation. That is, there is an established need and site-specific reasoning for
this major infrastructure development to be positioned in this location.  For this
reason, and in considering the proposed landscaping, combined with other
mitigation such the screen fence and ensuring the external finishes of the
development are acceptable, it is not considered that there would be
unacceptable impacts on landscape or visual amenity. Particular note is made
of the fact that the limited height of the development will see views from the
public realm north to the Sidlaw Hills and to the Garden Centre will not
significantly impacted.   Conditions are recommended to ensure the delivery of
the landscape mitigation as proposed.  (Conditions 8 and 9.) 
52 The proposal is considered to accord with Policies 1A, 1B and 39 of the LDP2.
Although the development has impacts on the wider landscape character it is
not considered that it will look wholly out of place in this setting, particularly
noting the consented energy storage facilities to the north-east, the existing
substation to the west and wind turbine also to the north.

Page 10

Residential Amenity 
53 The nearest residential receptors are more than 250m away, to the east and
are unlikely to be significantly impacted due to the physical distance of
separation, low vertical height of the development proposed, minor undulations
in local topography and through proposed landscaping. However, the
Jamesfield Farm Shop as well as the Jamesfield Garden Centre are both
located within 150m of the main site compound. Therefore, some direct
impacts, particularly during construction is inevitable.   
54 The Council’s Environmental Health team (EH) have reviewed the submitted
noise impact assessment, including any modelling results, and have no
objection. Potential noise sources include: air conditioning units; invertor
cooling fans; switchgears; transformer and background reactor noise; and
construction noise. EH advise a condition setting acceptable limits to all
approved plant and or equipment noise output. 
55 Compliance with the recommended condition see it considered that the
development will comply with Policy 33 of the LDP, with no likely unacceptable
impact on the amenity of residential properties. However, some impacts to local
businesses as discussed may occur during construction. However, ongoing
noise and nuisance impacts are considered very limited and unlikely to impacts
these sites in any significant way due to the low operational noise from the
facility.   
Lighting 
56 The impact of artificial lighting has been noted as a matter of concern in
representations.  However, the use of lighting is to be minimal and primarily for
security purposes.  Condition 4 can control spillage and limit operation to
acceptable levels. 
Roads and Access 
57 LDP2 Policy 60B requires that local road networks be capable of absorbing
traffic generated by development and that satisfactory access is provided. In
this regard two access points are proposed to this development, one from the
road serving Jamesfield complex and a second directly form the A913. No
concerns or further comments are raised by Transport Planning and or
Transport Scotland with respect of impacts to the local and or trunk road
networks, subject to conditions relating to a Construction Traffic Management
Scheme (CTMS) and further agreement for the passage of abnormal loads on
the road network. Conditions are therefore recommended to this effect,
particularly noting the need for further agreement for any signage, traffic
management and or abnormal loads.   
58 Overall, no significant road and or transport impacts are identified, and it is
concluded, subject to conditions 5-7, that the development conforms with Policy
60B.

Page 11

Drainage and Flooding 
59 Policy 52 requires development to appropriately consider flooding and
drainage. In this respect the site is not within an identified SEPA flood risk
location and the Council’s Flood Hazard and Structures Team does not raise
any objection. The applicant is directed to the Council’s Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 where applicable.   
60 The proposals are thus considered to satisfy policy 52 of LDP2. 
Natural Heritage and Biodiversity 
61 LDP2 Policies 39 and 41 are relevant considerations in respect of potential
biodiversity impacts or opportunities arising from the development. In this
respect the proposed Landscape Plan includes largely native species and
contains a number of positive elements, making a likely valuable contribution to
biodiversity. No adverse comment has been made by the Councils biodiversity
officer. 
62 A preliminary ecological assessment has been provided which does not raise
any significant concerns with the development proposed or the impacts to the
site.  Accordingly, subject to the delivery of landscaping as proposed the
development is considered to accord with Policies 39 and 41 of the LDP2.   
Archaeology 
63 The development proposal has been reviewed by the Perth and Kinross
Heritage trust who have not raised any objection to the development subject to
the imposition of an archaeological watching brief, to be imposed by condition.
Subject to the implementation of this condition and addressing any matters
raised in this investigation the development is considered to comply with Policy
26B of the LDP2. 
Private Water Supply 
64 The development is for an energy storage compound in a rural area with private
water supplies (including Jamesfield Borehole Supply) understood to serve
properties in the vicinity.  Whilst no specific impacts to private water supply are
identified, a safeguarding condition is considered reasonable and sufficient to
resolve any matters which may arise.  This will ensure both that the new
development has an adequate and consistently wholesome supply of water
(should that be required) and to maintain water quality and supply in the
interests of residential amenity.  In addition, to ensure the private water supply
or septic drainage systems of neighbours of the development remain
accessible for future maintenance. Otherwise, it should be noted that once the
development is operational Perth and Kinross Council Environmental Health
Services will have statutory duties detailed in the Water Intended for Human
Consumption (Private Supplies) (Scotland) Regulations 2017 to monitor the
water quality.  Further informative notes relative to existing wayleaves and
compliance with the Water Scotland Act 1980 are also recommended to be
appended to any positive decision notice.

Page 12

65 Condition 10 is recommended, requiring that the applicant confirm the location
of private water and wastewater infrastructure and any required protective
measures are put in place prior to works commencing.   
Developer Contributions 
66 There has been comment that no local benefits would result from the
development.  However, in planning policy terms, no developer contributions
are triggered for this type of development. As a result, the planning authority
cannot require the provision of money or infrastructure, not clearly required as a
result of the development. 
Economic Impact 
67 In the short term, construction will create jobs with scope for local employment.
Beyond this local employment opportunities are limited. However, there is a
clear fit between Scottish Government aims of promoting a transition to a low
carbon economy and this proposal. The proposal would also support local
renewable energy generation, by helping balance fluctuations of intermittent
energy generation.  It also represents a significant inward investment in rural
Perthshire, assisting in the creation of a national grid asset of regional
significance for the Perth and Kinross area. 
68 It is clear the development has benefits in renewable energy generation, and in
this case, it is considered that those benefits are sufficient to outweigh the
tension with Policies 1B and 50.   
Loss of Prime Agricultural Land and Soils 
69 In this case the site is identified as prime agricultural land and the development
of it therefore conflicts with Policy 50 which seeks to protect such land
resources. Furthermore, Policy 51 seeks to ensure high quality soils are not
damaged or eroded.  It is considered in this instance that there are material
circumstances which meet a specific need justifying the support of this major
infrastructure proposal.  Whilst objection is raised that this proposal promotes
the excessive occupation of prime land impacting the productive potential of the
land over the life of the facility, it is considered the planning balance in this case
sits with Policy 33B of the LDP2, which provides specific encouragement to use
existing infrastructure and promotes grid connection in support of this type of
proposal. Given the specific locational need justification provided it is unlikely
that this proposal will lead to further and excessive use of prime land elsewhere
within Perth and Kinross. Nor is it obvious that the development could be
located on non-prime land and still reasonably be connected to the substation. 
70 Whilst justification for the development location is accepted this does not
exclude a developer from overly damaging or impacting high quality soils at this
site. Particularly further regard must be had with respect to the future
decommissioning of the facility, to allow its previous land use to recommence at
that time.  Impacts to soils from this development relate specifically to
compaction and or removal from the site. Although the applicant has not stated

Page 13

intentions to overly compact and or excavate soil from the site, an additional
safeguarding condition is recommended, requiring soils which are excavated to
be reused or repurposed in a suitable way and which avoids further damage.
This may for example within landscaped areas, thereby protecting those soil
properties for later reuse (Condition 11). 
Lifespan of Facility 
71 The lifespan of the facility is confirmed to be approximately 50 years. As such,
Condition 12 can require that should the energy storage facility not be in use for
a continuous period of 12 months or at the conclusion of this term, that the site
is then decommissioned and re-instated to its original condition. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
70 None Required. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
71 The application must be determined in accordance with the adopted
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered a minor departure from the Development
Plan, specifically Policies 1B and 50 of LDP2. However, material considerations
allow this to be outweighed in this instance and justify an approval
recommendation.   
72 Accordingly, the proposal is recommended for approval subject to the following
conditions. 
A RECOMMENDATION    
Conditions and Reasons for Recommendation  
General 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice.  
Reason – To ensure the development is carried out in accordance with the
approved drawings and documents.  
Noise 
2. All hereby approved plant or equipment shall be so enclosed, attenuated and/or
maintained such that any noise therefrom shall not exceed Noise Rating 35
between 0700 and 2300 hours daily, or Noise Rating 20 between 2300 and
0700 hours daily, within any neighbouring residential property, with all windows
slightly open, when measured and/ or calculated and plotted on a rating curve
chart.

Page 14

Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality.  
3. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the
Planning Authority to carry out a noise assessment to verify compliance with
Condition 2.  The assessment will be carried out to an appropriate methodology
agreed in writing with the Planning Authority.  If the noise assessment shows
that the noise levels do not comply with Condition 2 a scheme of noise
mitigation shall be included with the noise assessment, specifying timescales
for the implementation of the scheme and shall be submitted to the Planning
Authority within 28 days of the assessment.  The mitigation scheme shall
thereafter be implemented in accordance with the approved scheme and
timescales.    
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality.  
Lighting 
4. All external lighting shall be sufficiently screened and aligned so as to ensure
that there is no direct illumination of residential property and that light spillage
beyond the boundaries of the site is minimised. In association, the operation of
the lighting shall be controlled so as to only be triggered by motion within the
security fenced boundaries of the site. 
Reason – In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality.  
Roads and Transport 
5. Prior to the commencement of works associated to the hereby approved
development, a Construction Traffic Management Scheme (TMS) shall be
submitted for the written approval of the Planning Authority, such TMS shall
include details of the following: 
(a)  restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used;
(b)  timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for queuing traffic to pass; 
(d)  arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e)  emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f)  arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development
being deposited on the road;
(g)  arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;

Page 15

(h)  arrangements for signage at site accesses and crossovers and on roads
to be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i)  details of information signs to inform other road users of construction
traffic;
(j)  arrangements to ensure that access for emergency service vehicles are
not impeded;
(k)  co-ordination with other significant developments known to use roads
affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m)  the provision and installation of traffic counters at the applicant's expense
at locations to be agreed prior to the commencement of construction; 
(n) monitoring, reporting and implementation arrangements; 
(o) arrangements for dealing with non-compliance; and
(p)  details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme all to the satisfaction of the Council as Planning
Authority. 
Reason – In the interests of road safety.  
6. The details of any abnormal load movements required, including any
accommodation measures necessary, shall be submitted to and agreed in
writing by the Planning Authority, in consultation with Transport Scotland and
the Councils Transport Planning team. Any request for approval shall be
submitted at least two months prior to the proposed load movement.        
Reason – To ensure that the transportation of abnormal loads will not have any
detrimental effect on the local or trunk road network  
7. Any additional signing or temporary traffic control measures deemed necessary
due to the size or length of loads being delivered to the development hereby
approved must be undertaken by a recognised Quality Assured Traffic
Management Consultant. The details of any temporary traffic control measures
shall be submitted to and agreed in writing by the Planning Authority, in
consultation with Transport Scotland and the Councils Transport Planning
team. Any request for such approval shall be submitted at least two months
prior to the proposed temporary control measured being implemented.        
Reason – To ensure that the transportation of abnormal loads will not have any   
detrimental effect on the trunk road network  
External Finishing Colour 
8. Prior to the commencement of the development hereby approved, details of the
recessive colour of the proposed external finishing materials to be used for the
hereby approved development components (i.e., battery storage containers,
transformers, DNO Switchgear, perimeter fencing etc) shall be submitted to and
agreed in writing by the Council as Planning Authority.  The scheme as agreed

Page 16

shall be implemented prior to the completion or bringing into use of the
development, whichever is the earlier.  
Reason – In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality.  
Biodiversity 
9. Prior to the commencement of the development hereby approved, a detailed
landscaping and planting scheme for the site shall be submitted to and
approved in writing by the Planning Authority.  The scheme shall include details
of the height and slopes of any mounding or recontouring of the site, full details
of all hard landscaping proposals including materials and installation methods
and, species, height, size and density of trees and shrubs to be planted.  The
scheme as subsequently approved shall be carried out and completed within
the first available planting season (October to March) after the completion or
bringing into use of the development, whichever is the earlier, and the date of
Practical Completion of the landscaping scheme shall be supplied in writing to
the Council as Planning Authority within 7 days of that date.  The scheme as
agreed and implemented shall thereafter be maintained to the satisfaction of
the Council as Planning Authority.    
Reason – In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme.  
Private Water Supply 
10. Prior to the commencement of the development hereby approved, details of the
location and measures proposed for the safeguarding and continued operation,
or replacement, of any septic tanks and soakaways, private water sources,
private water supply storage facilities and/or private water supply pipes serving
properties in the vicinity, sited within and running through the application site,
shall be submitted to and approved in writing by the Council as Planning
Authority.  The subsequently agreed protective or replacement measures shall
be put in place prior to the development being brought into use and shall
thereafter be so maintained insofar as it relates to the development hereby
approved.  
Reason – In the interests of protecting any existing private water infrastructure
and to ensure the development compliance with the Water Scotland Act 1980. 
Soil Management    
11. All soils excavated in the course of the development hereby approved shall be
retained onsite and repurposed unless otherwise approved in writing by the
Council as Planning Authority. Prior to the development hereby approved
commencing, a Soil Management Statement shall be submitted to the Planning
Authority for approval in writing, this Statement shall set out the extent of any
excavation works to be undertaken and how soils shall be reused and or
managed onsite. All excavation and repurposing of soil shall then proceed in
accordance with the agreed statement.

Page 17

Reason: In the interests of appropriately managing prime quality soils and 
minimising the long-term impacts of developing the site in accordance with
Policy 51 of the LDP2. 
Archaeology 
12. Development shall not commence until the developer has secured the
implementation of an archaeological watching brief, to be carried out by an
archaeological organisation acceptable to the Council as Planning Authority,
during development work. The retained archaeological organisation shall be
afforded access at all reasonable times and allowed to record and recover
items of interest and finds. The name of archaeological organisation retained by
the developer shall be given to the Planning Authority and Perth and Kinross
Heritage Trust in writing not less than fourteen days before the commencement
date provided in the Notice of Initiation of Development.   
Reason – To ensure archaeological monitoring is carried out to safeguard and
record any archaeological remains within the development area.  
Facility Lifespan 
13. In the event the hereby approved development fails to store electricity on a
commercial basis for a continuous period of 12 months, and or at the end of life
for the development (50 years from the commencement of electricity storage) it
shall be deemed to have permanently ceased to be required.  In either event
the development shall be decommissioned, and the relevant parts of the site
reinstated within such timescale as agreed in writing by the Council as Planning
Authority.  
Reason – To ensure the facility is removed from the site at the end of its
operational life, and to protect the character of the countryside, the visual
amenity of the area and nature conservation interests. 
B JUSTIFICATION 
The proposal is considered as a minor departure to the Development Plan as
there are material circumstances that would justify a departure from relevant
policies 1B and 50 of the LDP2.   
C PROCEDURAL NOTES 
None. 
D INFORMATIVES  
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period
(see section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended)).

Page 18

2. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority
written notice of that position.  
4. An application for Building Warrant may be required.  
5. The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains
advice relevant to your development.  
6. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended, it is an offence to remove, damage or destroy the nest of any wild
birds while that nest is in use or being built. Planning consent for a
development does not provide a defence against prosecution under this act.  
7. The applicant is reminded that, should any protected species be present a
licence may be required from Scottish Natural Heritage to disturb a protected
species. Failure to obtain a licence may constitute a criminal act under the
Habitats Regulations and penalties are severe for non-compliance.  
8. This development will require the 'Display of notice while development is
carried out', under Section 27C (1) of the Town and Country Planning Act 1997,
as amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. According to
Regulation 41 the notice must be:  
• Displayed in a prominent place at or in the vicinity of the site of the
development.
• Readily visible to the public.
• Printed on durable material.  
9. This planning permission is granted subject to conditions, some of which
require further information to be submitted to Development Management either
before works can start on site or at a certain time. The required information
must be submitted via the ePlanning portal if your original application was
lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk. Please be aware that a fee is payable
in respect of each request made, though there is no limit to the number of
conditions that can be discharged in a single request. The Fees Charter is
available on our website www.pkc.gov.uk.  The Council has two months to
consider the information. You should therefore submit the required information
more than two months before your permission expires. We cannot guarantee

Page 19

that submissions made within two months of the expiry date of your permission
will be able to be dealt with before your permission lapses.  
10. The developer is advised to contact Sophie Nicol, Historic Environment 
Manager (Tel: 01738 477027) Perth and Kinross Heritage Trust, to discuss 
terms of reference for work required. 
11. The applicant should ensure that any existing wayleaves for maintenance or 
repair to existing private water supply or septic drainage infrastructure in the 
development area are honoured throughout and after completion of the 
development.  
12. The applicant shall ensure the private water supply for the dwellinghouse/
development complies with the Water Scotland Act 1980 (Section 63), The
Private Water Supplies (Scotland) Regulations 2006 and The Water Intended
for Human Consumption (Private Supplies) (Scotland) Regulations 2017. 
Detailed information regarding the private water supply, including the nature,
location and adequacy of the source, any storage tanks/ pipework and the
filtration and disinfection treatment proposed to ensure provision of an
adequate and consistently wholesome water supply shall be submitted to Perth
and Kinross Council Environmental Health in line with the above Act and
Regulations. 
13. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland)
Act 1984, he/she/they must obtain from the Council, as Roads Authority,
consent to open an existing road or footway prior to the commencement of
works.  Information on junction types, requirements for Vehicular Access
consents (VA1) and application forms are available at
www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of surface water should
be sought at the initial stages of design from Scottish Water and the Scottish
Environmental Protection Agency.   
Background Papers:  2 letters of representation
Contact Officer:  Jamie Torrance 
Date:   2 September 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT