PLANNING AND PLACEMAKING COMMITTEE 
Minute of hybrid meeting of the Planning and Placemaking Committee held in
Council Chambers, 2 High Street, Perth on Wednesday 10 August 2022 at 10.30am. 
Present:  Councillors I Massie, G Stewart, H Anderson, B Brawn, D Cuthbert,
E Drysdale, D Illingworth, I James, B Leishman, Bailie C McLaren, Councillors
C Reid, R Watters, and Bailie M Williamson. 
In Attendance: K Smith, S Panton, P Williamson, L MacLean and L Reid (all
Communities); G Fogg, D Williams, J Guild, A Brown and M Pasternak (all Corporate
and Democratic Services). 
Councillor I Massie, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed everyone present to the meeting.  No apologies
were noted. 
2. DECLARATIONS OF INTEREST 
Councillors D Illingworth and B Leishman declared a non-financial interest in
Item 6(1)(ii) – 21/02249/FLM. 
Councillor D Cuthbert and Bailie M Williamson declared a non-financial
interest in Item 7(iv) – 22/00017/PAN. 
3. MINUTES 
The minute of meeting of the Planning and Placemaking Committee of 6 July
2022, be approved. 
4. DEPUTATIONS 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No. Item No. 
21/00755/FLL     6(2)(i)   
5. APPLICATIONS PREVIOUSLY CONSIDERED 
(i) 22/00301/FLM S42 application to remove condition 14 (bus shelter
and information board) of planning permission 18/02139/FLM at 37
Angus Road, Scone 
Resolved:
Grant, subject to the following conditions, terms and informatives:

Page 2

Conditions
General
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents, unless
otherwise provided for by conditions imposed by this decision
notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
Finishes
2. Prior to the commencement of the development hereby
approved, details of the specification and colour of the proposed
external finishing materials to be used shall be submitted to and
agreed in writing by the Council as Planning Authority.  The
scheme as agreed shall be implemented prior to the completion
or bringing into use of the development, whichever is the earlier.
Reason – In the interests of residential amenity; to ensure a
satisfactory standard of local environmental quality.
Landscaping and Biodiversity
3. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme for the
site shall be submitted for the written agreement of the Council
as Planning Authority.  The scheme shall include details of the
height and slopes of any mounding or recontouring of the site,
full details of all hard landscaping proposals including materials
and installation methods and, species, height, size and density
of trees and shrubs to be planted.  The scheme as subsequently
approved shall be carried out and completed within the first
available planting season (October to March) after the
completion or bringing into use of the development, whichever is
the earlier, and the date of Practical Completion of the
landscaping scheme shall be supplied in writing to the Council
as Planning Authority within 7 days of that date.  The scheme as
agreed and implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.
Reason – To ensure a satisfactory standard of development and
environmental quality and to reserve the rights of the Planning
Authority.
4. Prior to the commencement of development hereby approved, a
Site Biodiversity Action Plan confirming the quantity, locations,
techniques, timescales and monitoring arrangements of
biodiversity enhancement measures recommended in
supporting Preliminary Ecological Appraisal by David Dodds
Associates Ltd dated August 2021 shall be submitted for the
written agreement of the Council as Planning Authority.  The
submission should clearly show how enhancement measures
have been incorporated into design schemes and architects'
drawings to ensure they are realised.  The scheme as
subsequently approved shall be carried out and completed to
the satisfaction of the Council as Planning Authority.
Reason – In the interests of protecting environmental quality and
of biodiversity.

Page 3

5. The play park shall be implemented as part of the site
development programme and completed in full prior to the
occupation of the final dwellinghouse, to the satisfaction of the
Council as Planning Authority.
Reason – In the interests of the amenity of the area and to
ensure the satisfactory implementation of the play area.
Ground Contamination
6. Development shall not commence on site until an evaluation for
the potential of the site to be affected by contamination by a
previous use has been undertaken and, as a minimum, a
Preliminary Risk Assessment (Phase 1 Desk Study) has been
submitted for consideration and accepted by the Council as
Planning Authority.  If the preliminary risk assessment identifies
the need for further assessment, an intrusive investigation shall
be undertaken to identify;
I the nature, extent and type(s) of contamination on the site 
II measures to treat/remove contamination to ensure the
site is fit for the use proposed 
III measures to deal with contamination during construction
works
IV condition of the site on completion of decontamination
measures.
Prior to the completion or bringing into use of any part of the
development the measures to decontaminate the site shall be
fully implemented in accordance with the scheme subsequently
agreed by the Council as Planning Authority.  Verification that
the scheme has been fully implemented must also be submitted
to the Council as Planning Authority.
7. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been submitted
for the written agreement of the Council as Planning Authority, in
consultation with SEPA where necessary.  The scheme shall be
developed in accordance with the technical guidance contained
in The SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control. All works shall be carried out in
accordance with the agreed scheme and be operational prior to
the bringing into use of the development.
Reason – To ensure the provision of effective drainage for the
site.
Transport
8. Prior to the commencement of the development hereby
approved, the developer shall submit for the further agreement
of the Council as Planning Authority, in consultation with the
Roads Authority (Structures), a Construction Traffic
Management Scheme (TMS) which shall include the following:
(a) restriction of construction traffic to approved routes and
the measures to be put in place to avoid other routes
being used;
(b)  timing of construction traffic to minimise impact on local
communities particularly at school start and finishing

Page 4

times, on days when refuse collection is undertaken, on
Sundays and during local events;
(c)  a code of conduct for HGV drivers to allow for queuing
traffic to pass; 
(d)  arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e)  emergency arrangements detailing communication and
contingency arrangements in the event of vehicle
breakdown;
(f)  arrangements for the cleaning of wheels and chassis of
vehicles to prevent material from construction sites
associated with the development being deposited on the
road;
(g)  arrangements for cleaning of roads affected by material
deposited from construction sites associated with the
development;
(h)  arrangements for signage at site accesses and
crossovers and on roads to be used by construction
traffic in order to provide safe access for pedestrians,
cyclists and equestrians;
(i)  details of information signs to inform other road users of
construction traffic;
(j)  arrangements to ensure that access for emergency
service vehicles are not impeded;
(k)  co-ordination with other significant developments known
to use roads affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m)  the provision and installation of traffic counters at the
applicant's expense at locations to be agreed prior to the
commencement of construction; 
(n)  monitoring, reporting and implementation arrangements; 
(o)  arrangements for dealing with non-compliance; and
(p)  details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during
the entire site construction programme. 
Justification
The proposal is in accordance with the Development Plan and there
are no material reasons which justify departing from the Development
Plan. 
Informatives
1. This planning permission will last only for three years from the
date of this decision notice, unless the development has been
started within that period (see section 58(1) of the Town and
Country Planning (Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning (Scotland)
Act 1997 (as amended) the person undertaking the development
is required to give the Planning Authority prior written notification
of the date on which it is intended to commence the

Page 5

development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action being
taken.
3. As soon as practicable after the development is complete, the
person who completes the development is obliged by section
27B of the Town and Country Planning (Scotland) Act 1997 (as
amended) to give the Planning Authority written notice of that
position.
4. This planning permission is granted subject to conditions, some
of which require further information to be submitted to
Development Management either before works can start on site
or at a certain time.  Please send the required information to us
at developmentmanagement@pkc.gov.uk.  Please be aware
that the Council has two months to consider the information (or
four months in the case of a Major planning permission).  You
should therefore submit the required information more than two
months (or four months) before your permission expires.  We
cannot guarantee that submissions made within two months (or
four months) of the expiry date of your permission will be able to
be dealt with before your permission lapses.
5. Trees and scrub are likely to contain nesting birds between 1st
March and 31st August inclusive.  Trees and scrub are present
on the application site and are to be assumed to contain nesting
birds between the above dates.  The applicant is reminded that,
under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the
nest of any wild bird while that nest is in use or being built. 
Planning permission for a development does not provide a
defence against prosecution under this Act.
6. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in relation to
waste collection from the site and should ensure adequate
measures are provided on site to allow for the collection of
waste.
7. The applicant is advised to refer to Perth & Kinross Council's
Supplementary Guidance on Flood Risk and Flood Risk
Assessments 2021 as it contains advice relevant to your
development.
https://www.pkc.gov.uk/media/48541/Flood-Risk-Flood-Risk-
Assessment/pdf/Flood_Risk___Flood_Risk_Assessments_adop
ted_March21.pdf?m=637647027940470000
8. Application for a new postal address should be made via the
Street Naming and Numbering page on the Perth & Kinross
Council website at www.pkc.gov.uk/snn.  Please note there is a
charge for this service and submission cannot be made until the
relevant Building Warrant has been approved.
9. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the Town
and Country Planning Act 1997, as amended, and Regulation 41
of the Development Management Procedure (Scotland)

Page 6

Regulations 2013.  The form of the notice is set out in Schedule
7 of the Regulations and a draft notice is included for your
guidance.  In accordance with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity of the
site of the development 
• Readily visible to the public 
• Printed on durable material.
10. No work shall be commenced until an application for building
warrant has been submitted and approved. 
6. APPLICATIONS FOR DETERMINATION 
(1) Major Applications 
(i) 21/02137/AMM Erection of a linked building for agricultural
research and development, industry engagement and skills
development and formation of roads, parking areas,
landscaping, infrastructure and associated works (approval
of matters specified by conditions 20/01103/IPM) at The
James Hutton Institute, Errol Road, Invergowrie. 
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
Conditions
1. The development hereby approved must be carried out
in accordance with the approved drawings and
documents, unless otherwise provided for by conditions
imposed by this decision notice.
Reason - To ensure the development is carried out in
accordance with the approved drawings and documents. 
2. Prior to the use of any lifting equipment including cranes
etc the applicant must receive written confirmation from
Dundee Airport that aircraft departing and arriving on
runway 09/27 will be safeguarded.  Furthermore, the
applicant must receive written confirmation from Dundee
that the use of lights, during construction, shall not
dazzle nor distract aircraft preparing to land at Dundee
Airport, all to the satisfaction of the Council as Planning
Authority.
Reason – To not impact on the operations of Dundee
City Airport. 
3. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall
not exceed Noise Rating 35 between 0700 and 2300
hours daily, or Noise Rating 25 between 2300 and 0700
hours daily, within any neighbouring residential property,
with all windows slightly open, when measured and/ or
calculated and plotted on a rating curve chart.

Page 7

Reason – In order to safeguard the residential amenity
of the area.
4. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct
illumination of neighbouring land and that light spillage
beyond the boundaries of the site is minimised to a
degree that it does not adversely affect the amenity of
the neighbouring land.
Reason – In order to safeguard the residential amenity
of the area.
5. No part of the development shall be occupied or brought
into use, whichever is the earlier, until the applicant has
provided the minimum parking provision as shown on
drawing number 39 hereby approved, to the satisfaction
of the Council as Planning Authority.  Once provided, the
parking shall thereafter be permanently retained as such
for the life of the development.
Reason – To provide a suitable parking provision for the
development.
6. Prior to the occupation of any of the development hereby
approved, the proposed modifications to the A90/Main
Street Roundabout, generally as illustrated on Drawing
No. 135585/sk7001 - page 86 of Transport Assessment
(PKC Ref: 20/01103/16) by Fairhurst dated April 2020,
shall be implemented and available for use for any
vehicles travelling to the site, subject to the satisfaction
of the Planning Authority, after consultation with
Transport Scotland.
Reason – To ensure that the standard of access layout
complies with the current standards, and that the safety
and free flow of traffic on the trunk road is not
diminished.
7. No part of the development hereby approved shall be
occupied until the Staff Travel Plan (STP) has been
updated to reflect the operational situation within the
development area identified on drawing number 1, all
aimed to encourage more sustainable means of travel. 
The updated STP shall be submitted to and agreed in
writing by the Council as Planning Authority in
consultation with Transport Planning.  The STP will have
particular regard to provision for walking, cycling and
public transport access to and within the site and will
identify the measures to be provided, the system of
management, monitoring, review, reporting and the
duration of the plan.
Reason – To promote sustainable transport options and
to meet advice within Scottish Planning Policy on
transport.
8. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further
written agreement of the Council as Planning Authority,

Page 8

in consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
a. restriction of construction traffic to approved
routes and the measures to be put in place to
avoid other routes being used;
b. timing of construction traffic to minimise impact
on local communities particularly at school start
and finishing times, on days when refuse
collection is undertaken, on Sundays and during
local events;
c. a code of conduct for HGV drivers to allow for
queuing traffic to pass;
d. arrangements for liaison with the Roads
Authority regarding winter maintenance;
e. emergency arrangements detailing
communication and contingency arrangements
in the event of vehicle breakdown;
f. arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the
development being deposited on the road;
g. arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
h. arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe
access for pedestrians, cyclists and equestrians;
i. details of information signs to inform other road
users of construction traffic;
j. arrangements to ensure that access for
emergency service vehicles are not impeded;
k. co-ordination with other significant developments
known to use roads affected by construction
traffic;
l. traffic arrangements in the immediate vicinity of
temporary construction compounds;
m. the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction;
n. monitoring, reporting and implementation
arrangements; 
o. arrangements for dealing with non-compliance;
and;
p. details of HGV movements to and from the site.  
The TMS as approved shall be strictly adhered
to during the entire site construction programme. 
Reason – In the interest of proper site management.
9. Prior to the bringing into use of any part of the
development hereby approved, the proposed junction

Page 9

modifications shown on drawing number 40 for the
signalisation and improvements to the A85 Riverside
Avenue/Main Street junction shall be implemented in full
and fully operational, to the satisfaction of Perth &
Kinross Council as Planning Authority.  Prior to the
implementation of the scheme, the relevant written
agreements must be sought from Perth & Kinross
Council and Dundee City Council as Roads Authorities. 
Evidence must be provided to Perth & Kinross Council
that the relevant agreements from Dundee City Council
are in place prior to the works being undertaken.  For the
avoidance of doubt, the active travel provision at the
junction shall be subject to further discussion and written
agreement from Perth & Kinross Council in consultation
with Dundee City Council.  The applicant shall also
provide specifications of the provision of Close Circuit
Television (CCTV) pole(s), camera(s) and hard line
connection to Dundee City Council Urban Traffic Control
System (UTC) for written agreement prior to any works
being undertaken.
Reason – In the interests of road safety and to provide
active travel routes to the development site.
10. Access along core path INGI/8 and Right of Way 52/8, or
along the short diversion as specified in drawing number
38 should remain open for responsible access
throughout the construction phase.  On completion the
diversion must be removed and access along the
original core path/Right of Way restored.
Reason – To ensure a satisfactory standard of local
environmental quality; to safeguard the core paths.
11. Development shall not commence on site until an
evaluation for the potential of the site to be affected by
contamination by a previous use has been undertaken
and, as a minimum, a Preliminary Risk Assessment
(Phase 1 Desk Study) has been submitted for
consideration and accepted by the Council as Planning
Authority.  If the preliminary risk assessment identifies
the need for further assessment, an intrusive
investigation shall be undertaken to identify; 
a. the nature, extent and type(s) of contamination
on the site 
b. measures to treat/remove contamination to
ensure the site is fit for the use proposed 
c. measures to deal with contamination during
construction works 
d. condition of the site on completion of
decontamination measures. 
Prior to the completion or bringing into use of any part of
the development the measures to decontaminate the site
shall be fully implemented in accordance with the
scheme subsequently agreed by the Council as Planning

Page 10

Authority. Verification that the scheme has been fully
implemented must also be submitted to the Council as
Planning Authority.
Reason – To ensure a satisfactory standard of local
environmental quality.
12. The conclusions and recommended action points within
the supporting Ecological Surveys, Bird Mitigation Plan
and Biodiversity Action Plan submitted and hereby
approved (drawing numbers 26, 27 and 37) shall be fully
adhered to, respected and undertaken as part of the
construction phase of development.
Reason - To ensure a satisfactory standard of local
environmental quality; to safeguard the welfare of any
protected wildlife.
13. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved. The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into
them at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day. 
Reason – In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
14. The detailed landscaping and planting scheme (drawing
numbers 16, 23 and 31) which is hereby approved shall
be completed within the first available planting season
(October to March) after the completion or bringing into
use of the development, whichever is the earlier.  The
approved scheme shall thereafter be maintained to the
satisfaction of the Council as Planning Authority, with
any planting which fails to become established within
five years being replaced in the following planting
season with others of a size and species as previously
approved.
Reason – In the interests of visual amenity and to
ensure the satisfactory implementation of the proposed
planting scheme.
15. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority.  The scheme as agreed shall be
implemented prior to the completion or bringing into use
of the development, whichever is the earlier.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.

Page 11

Justification 
The proposals are considered to remain in accordance with the
Development Plan and there are no material considerations
which justify refusal of the planning application. 
Informatives
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period (see
section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action
being taken. 
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position.
4. No work shall be commenced until an application for
building warrant has been submitted and approved.
5. Existing buildings or structures may contain nesting birds
between 1st March and 31st August inclusive.  The
applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an
offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act.
6. The findings and recommendations contained with the
Bat Survey remain valid for a period of 24 months.  If the
approved planning permission is not implemented within
24 months of the date of the survey it is strongly
recommended that an updated Bat Survey is undertaken
prior to any works commencing.  Failure to do so could
potentially leave you open to prosecution should any bats
be harmed as a result of the works.  Please note that bats
are protected by law, and it is a criminal offence to
deliberately harm, capture, kill or disturb a bat or its
resting place.
7. The applicant is advised that, in terms of Sections 56 of
the Roads (Scotland) Act 1984, he/she/they must obtain
from the Perth & Kinross Council and Dundee City
Council, as Roads Authorities, consent to open an

Page 12

existing road or footway prior to the commencement of
works.  Advice on the disposal of surface water should be
sought at the initial stages of design from Scottish Water
and the Scottish Environmental Protection Agency.
8. The applicant should be advised that in terms of Section
21 of the Roads (Scotland) Act 1984 they must obtain
from the Dundee City Council, in collaboration with Perth
& Kinross Council as Roads Authority consent to
construct a new road prior to the commencement of
roadworks.  Advice on the disposal of surface water must
be sought at the initial stages of design from Scottish
Water and the Scottish Environment Protection Agency. 
Please note that a fee is chargeable for the processing of
RCC applications.
9. The applicant is advised that if there is any proposal to
alter a route of an existing core path or right of way a
further legal procedure is required. 
The granting of planning permission does not stop the
continued right of public access along the existing core
path or right of way.  An order under the Town and
Country Planning (Scotland) Act 1997, Section 208 or an
amendment of the Core Path Plan under the Land
Reform (Scotland) Act 2003 should be sought.
10. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development Supplementary Guidance -
Flood Risk and Flood Risk Assessments - Perth &
Kinross Council (pkc.gov.uk).
11. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
12. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
13. The applicant is advised that any proposed signage will
require a further application to be submitted for

Page 13

advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
14. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
15. Further information on the need for and level of provision
of Changing Places Toilet Facilities can be found in
section 41B of the Town and Country Planning (Scotland)
Act 1997, the Town and Country Planning (Changing
Places Toilet Facilities) (Scotland) Regulations 2020 and
the associated Circular 1/2020: Changing Places Toilets
Regulations.
16. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity of
the site of the development 
• Readily visible to the public 
• Printed on durable material. 
HAVING DECLARED A NON-FINANCIAL INTEREST IN THE FOLLOWING ITEM
COUNCILLORS D ILLINGWORTH AND B LEISHMAN LEFT THE CHAMBERS. 
(ii) 21/02249/FLM Erection of replacement recreation centre
with swimming pool, sports hall, gymnasium, fitness suite,
dance studio and ancillary facilities, installation of a
substation, siting of sprinkler tank, air source heat pump
and bin store enclosures, formation of outdoor sports
pitch, parking areas, landscaping and associated works at
Blairgowrie Recreation Centre, Beeches Road, Blairgowrie. 
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
General
1. The development hereby approved must be carried out
in accordance with the approved drawings and
documents, unless otherwise provided for by conditions
imposed by this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.

Page 14

Finishes
2. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority.
The scheme as agreed shall be implemented prior to the
completion or bringing into use of the development,
whichever is the earlier.
Reason – In the interests of residential amenity; to
ensure a satisfactory standard of local environmental
quality.
Landscaping and Biodiversity
3. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted for the written agreement of
the Council as Planning Authority.  The scheme shall
include details of the height and slopes of any mounding
or recontouring of the site, full details of all hard
landscaping proposals including materials and installation
methods and, species, height, size and density of trees
and shrubs to be planted.  The scheme as subsequently
approved shall be carried out and completed within the
first available planting season (October to March) after
the completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.  The scheme as agreed and
implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.
Reason - To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
4. Prior to the commencement of development, the
proposed provision of biodiversity enhancement
measures for the site will be submitted for the written
agreement of the Council as Planning Authority. 
Thereafter, they shall be implemented prior to the
development being brought into use.
Reason - In the interests of protecting environmental
quality and of biodiversity.
Archaeology
5. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a written scheme
of archaeological investigation which has been submitted
by the applicant, and agreed in writing by the Council as
Planning Authority, in consultation with Perth and Kinross
Heritage Trust.  Thereafter, the developer shall ensure
that the programme of archaeological works is fully

Page 15

implemented including that all excavation, preservation,
recording, recovery, analysis, publication and archiving of
archaeological resources within the development site is
undertaken.  In addition, the developer shall afford
access at all reasonable times to Perth and Kinross
Heritage Trust or a nominated representative and shall
allow them to observe work in progress.
Reason – To ensure a programme of archaeological
works is carried out to safeguard and record any
archaeological remains within the development area.
Amenity
6. Prior to the commencement of the development a Noise
Management Plan shall be submitted for the written
approval of the planning authority.  The plan shall include
all sources of noise associated with the use of the all-
weather pitch and recreation centre, including user noise,
activity noise and plant equipment and the measures that
will be put in place to minimise and/or control noise.  The
plan shall be reviewed on a regular basis or, following
receipt of a justified complaint or at the request of the
Planning Authority.  Once the Noise Management Plan
has been approved, it shall be fully implemented for the
lifetime of the development.
Reason – In order to safeguard the neighbouring
residential amenity in the area.
7. The hours of operation of the all-weather pitch and the
external floodlighting shall be restricted to 0800 hours to
2200 hours daily.  The use of the all-weather pitch may
have to be curtailed at the beginning and end of this
timeframe in order to comply with floodlighting restriction.
Reason – In order to safeguard the neighbouring
residential amenity in the area.
8. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason – In order to safeguard the neighbouring
residential amenity in the area.
9. No music amplified or otherwise shall be permitted
outside the premises and efforts must be made to
minimise the impact of noise from inside the premises so
no sound is audible in any nearby residential property. 
Reason – In order to safeguard the neighbouring
residential amenity in the area.
10. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it

Page 16

does not adversely affect the amenity of the neighbouring
land.
Reason – In order to safeguard the neighbouring
residential amenity in the area.
Transport
11. Prior to the commencement of the development hereby
approved, the developer shall submit for the further
written agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
(a)  restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b)  timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c)  a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d)  arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e)  emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f)  arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
(g)  arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h)  arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
(i)  details of information signs to inform other road
users of construction traffic;
(j)  arrangements to ensure that access for
emergency service vehicles are not impeded;
(k)  co-ordination with other significant developments
known to use roads affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m)  the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction;
(n)  monitoring, reporting and implementation
arrangements;
(o)  arrangements for dealing with non-compliance;
and

Page 17

(p)  details of HGV movements to and from the site.
The TMS as approved shall be strictly adhered to during
the entire site construction programme.  
Reason – In the interests of pedestrian and traffic safety.
12. Development shall not commence until a detailed Travel
Plan (TP), aimed at encouraging more sustainable means
of travel, has been submitted to and agreed in writing by
the Council as Planning Authority.  The TP will have
particular regard to provision for walking, cycling and
public transport access to and within the site and will
identify the measures to be provided (including the
provision of new and/or enhanced public transport
services), any phasing, the system of management,
monitoring, review, reporting and the duration of the Plan. 
Prior to the operation of the development, the TP as
agreed shall be fully implemented to the satisfaction of
the Council as Planning Authority.  
Reason – To encourage sustainable means of travel by
site users.
Pitch Specification
13. The new floodlit synthetic pitch (minimum dimensions 106
x 66m) will be designed and constructed by a recognised
(e.g., SAPCA* registered) specialist pitch contractor(s). 
Details of the contractor(s) and pitch specification shall be
submitted for the written approval of the Planning
Authority prior to the commencement of development.
*SAPCA is The Sports and Play Construction Association
(www.sapca.org.uk).  
Reason – To ensure appropriate replacement provision is
provided.
Drainage
14. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control.  All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.  
Reason – To ensure the provision of effective drainage
for the site.
Sustainability
15. The recreation centre aims to achieve energy savings to
a standard equivalent to Passivhaus. Prior to the
occupation of the recreation centre building, a statement
shall be submitted by the applicant/agent to confirm that

Page 18

this high level of sustainable building design has been
delivered.  
Reason – To ensure the proposal complies with Policy
34. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period (see
section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action
being taken.
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position.
4. No work shall be commenced until an application for
building warrant has been submitted and approved.
5. The findings and recommendations contained with the
Bat Survey remain valid for a period of 24 months. If the
approved planning permission is not implemented within
24 months of the date of the survey it is strongly
recommended that an updated Bat Survey is undertaken
prior to any works commencing.  Failure to do so could
potentially leave you open to prosecution should any bats
be harmed as a result of the works.  Please note that bats
are protected by law, and it is a criminal offence to
deliberately harm, capture, kill or disturb a bat or its
resting place.
6. The proposed demolition and/or building works likely to
cause harm to bats should not commence until the
applicant has obtained the relevant licence issued by
SNH pursuant to Regulation 53 of The Conservation of
Habitats and Species Regulations 2010 authorising the
specified activity/development to go ahead.  Existing
buildings or structures may contain nesting birds between
1st March and 31st August inclusive.  The applicant is

Page 19

reminded that, under the Wildlife and Countryside Act
1981, as amended (section 1), it is an offence to remove,
damage or destroy the nest of any wild bird while that
nest is in use or being built.  Planning permission for a
development does not provide a defence against
prosecution under this Act.
7. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.
8. The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
9. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
10. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
11. The developer is advised to contact Sophie Nicol, Historic
Environment Manager (tel 01738 477027) Perth and
Kinross Heritage Trust, to discuss terms of reference for
work required.
12. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:
i. Displayed in a prominent place at or in the vicinity
of the site of the development
ii. Readily visible to the public
iii. Printed on durable material.
13. Further information on the need for and level of provision
of Changing Places Toilet Facilities can be found in

Page 20

section 41B of the Town and Country Planning (Scotland)
Act 1997, the Town and Country Planning (Changing
Places Toilet Facilities) (Scotland) Regulations 2020 and
the associated Circular 1/2020: Changing Places Toilets
Regulations.
14. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to the floodlighting of
the sports pitch. 
COUNCILLORS D ILLINGWORTH AND B LEISHMAN RETURNED TO THE
CHAMBERS. 
(2) Local Applications 
(i) 21/00755/FLL Formation of a cemetery, columbarium, car
parking and track, landscaping and associated works at
Witches Knowe Wood, Rait 
Ms C Morgan, objector to the application, via audioconference,
and Mr A Threipland, applicant, addressed the Committee and
answered members questions. 
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.  
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
2. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted for the written agreement of
the Council as Planning Authority.  The scheme shall
include details of the height and slopes of any mounding
or recontouring of the site, full details of all hard
landscaping proposals including materials and installation
methods and, species, height, size and density of trees
and shrubs to be planted.  The scheme as subsequently
approved shall be carried out and completed within the
first available planting season (October to March) after
the completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date.  The scheme as agreed and

Page 21

implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.  Reason
- To ensure a satisfactory standard of development and
environmental quality and to reserve the rights of the
Planning Authority.
3. Any planting failing to become established within five
years shall be replaced in the following planting season
with others of similar size, species and number to the
satisfaction of the Council as Planning Authority.  
Reason – In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
4. All trees on site, other than those marked for felling on
the approved plans, shall be retained.  
Reason – In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
5. The conclusions and recommended action points within
the supporting biodiversity survey submitted and hereby
approved (document(s) relates) shall be fully adhered to,
respected and undertaken as part of the construction
phase of development, to the satisfaction of the Council
as Planning Authority.  
Reason – In the interests of protecting environmental
quality and of biodiversity.
6. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved.  The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.  
Reason – In the interests of employing best practice
ecology and to ensure there is no adverse impact on any
protected species as identified under the Wildlife and
Countryside Act (1981).
7. Prior to the commencement of the development hereby
approved, a plan indicating provision of bird nesting
boxes, bricks or tubes shall be submitted along with the
timings associated with their installation.  Thereafter the
approved scheme shall be implemented in line with the
agreed timescales.  
Reason – In the interests of protecting environmental
quality and of biodiversity.
8. Prior to the development hereby approved being
completed or brought into use, the existing vehicular
access onto the C401 shall be formed with Type B Road
construction detail and shall continue into the entrance for

Page 22

a distance of no less than 6 metres from the boundary of
the public road surface.  
Reason – In the interests of pedestrian and traffic safety.
9. Prior to the development hereby approved being
completed or brought into use, the car parking facilities
shown on the approved drawings shall be implemented
and thereafter maintained.  
Reason – In the interests of road safety; to ensure the
provision of adequate off-street car parking facilities.
10. Prior to the commencement of development, the
scheduled area shall be appropriately marked out prior to
and during site works, using markers placed out with the
scheduled area, to prevent inadvertent damage to the
scheduled monument.  
Reason – In order to comply with the aims of the Scottish
Planning Policy; to ensure any archaeological remains
are appropriately protected.
11. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a written scheme
of archaeological investigation which has been submitted
by the applicant and agreed in writing by the Council as
Planning Authority, in consultation with Perth and Kinross
Heritage Trust.  Thereafter, the developer shall ensure
that the programme of archaeological works is fully
implemented including that all excavation, preservation,
recording, recovery, analysis, publication and archiving of
archaeological resources within the development site is
undertaken.  In addition, the developer shall afford
access at all reasonable times to Perth and Kinross
Heritage Trust or a nominated representative and shall
allow them to observe work in progress.  
Reason – To ensure archaeological monitoring is carried
out to safeguard and record any archaeological remains
within the development area.
12. Prior to the commencement of the development hereby
approved, details of the location and measures proposed
for the safeguarding and continued operation, or
replacement, of any septic tanks and soakaways, private
water sources, private water supply storage facilities
and/or private water supply pipes serving properties in
the vicinity, sited within and running through the
application site, shall be submitted to and approved in
writing by the Council as Planning Authority.  The
subsequently agreed protective or replacement measures
shall be put in place prior to the commencement of the
development being brought into use and shall thereafter
be so maintained insofar as it relates to the development
hereby approved.  Reason – To ensure existing water
and drainage infrastructures are not compromised.

Page 23

Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period (see
section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement
action being taken. 
3. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position.
4. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013.  The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity
of the site of the development 
• Readily visible to the public 
• Printed on durable material.
5. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
6. The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires.

Page 24

We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
7. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive.  Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates.  The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act.
8. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to the layout
following Scottish Water feedback.
9. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
10. An application for Building Warrant may be required.
11. The applicant should be advised that in terms of Section
56 of the Roads (Scotland) Act 1984 they must obtain
from the Council as Roads Authority consent to open an
existing road or footway prior to the commencement of
works. Advice on the disposal of surface water must be
sought at the initial stages of design from Scottish Water
and the Scottish Environment Protection Agency.
12. The applicant should ensure that any existing wayleaves
for maintenance or repair to existing private water supply
or septic drainage infrastructure in the development area
are honoured throughout and after completion of the
development. 
(ii) 22/00803/FLL Change of use from dwellinghouse to holiday
accommodation unit Tatha View 4 Braes of Taymouth,
Kenmore, Aberfeldy PH15 2HQ 
Ms S Kirby, the applicant, was available via audio conference for
members questions.  There were no questions. 
Resolved:
Grant, subject to the following conditions, terms and
informatives: 
Conditions
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.

Page 25

Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
2. The use hereby approved shall be limited to holiday
accommodation to the satisfaction of the Council as
Planning Authority.  The owner of the property shall
maintain an up-to-date register of the name of each
occupier of the property, their length of stay and their
main home address and shall make this information
available at all reasonable times to the Planning
Authority.
Reason – In order to clarify the terms of the permission;
to control and restrict the use of the building.
3. The application be granted for a temporary period of two
years. 
Reason – To allow embedding of new licensing laws
regarding Short Term Lets and in turn aid understanding
of volumes of Short Term Lets and impact within the
area.
4. Within two months of the date of this permission, a noise
management plan indicating how noise attributable to
occupants shall be managed and restricted as part of the
development shall be submitted for the agreement of the
Council as Planning Authority, in liaison with
Environmental Health.  Thereafter the management plan
shall be implemented in complete accordance with the
details as so agreed.
Reason – In order to safeguard the neighbouring
residential amenity in the area. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period (see
section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended)).
2. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement
action being taken. 
3. As soon as practicable after the development is
complete, the person who completes the development is

Page 26

obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position.
4. An application for Building Warrant may be required. 
7. PROPOSAL OF APPLICATION NOTICES (PAN) 
(i) 22/00013/PAN – Extension to Quarry, Balado, Kinross.
Councillor Cuthbert requested due consideration be given to ground
water, impacts upon private water supplies and to ensure conditions of
previous applications in relation to this site are satisfied. 
The contents of the Head of Planning & Development’s Report were
noted. 
(ii) 22/00015/PAN – Mixed use development comprising erection of 3
café/restaurant units (Class 3) with drive thru facilities, business
units (Class 4), electric vehicle charging hub and formation of
vehicular access, parking areas, landscaping and associated
works at land 90 metres south of 5 Broxden Avenue (E2), Broxden
Avenue, Perth. 
Bailie McLaren requested that due consideration is given to traffic
congestion, surface water, waste management and the core path link. 
Councillor James requested consultation take place with Transport
Scotland.   
The contents of the Head of Planning & Development’s Report were
noted. 
(iii) 22/00016/PAN – Formation of a 32MW solar farm, 16MW battery
energy storage system and associated works at Keithick Farms
Ltd, Keithick, Blairgowrie. 
Members were advised that the applicant of this PAN has since
withdrawn their application.  However, as the PAN had been
determined by Planning Officers, it must be presented to members for
comment. 
The contents of the Head of Planning & Development’s Report were
noted. 
(iv) 22/00017/PAN – Northern lateral extension to quarry with further
excavation works, Collace Quarry, Collace. 
The contents of the Head of Planning & Development’s Report were
noted.