Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
25/05/2022 
A meeting of the Planning and Placemaking Committee will be held virtually on
Wednesday, 01 June 2022 at 10:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Ian Massie  (Convener)
Councillor Grant Stewart  (Vice-Convener)
Councillor Hugh Anderson
Councillor Bob Brawn
Councillor Dave Cuthbert
Councillor Eric Drysdale
Councillor David Illingworth
Councillor Ian James
Councillor Brian Leishman
Councillor Claire McLaren
Councillor Crawford Reid
Councillor Richard Watters
Councillor Mike Williamson
Page 1 of 110

Page 2

Page 2 of 110

Page 3

Planning and Placemaking Committee 
Wednesday, 01 June 2022 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE PLANNING AND
DEVELOPMENT MANAGEMENT COMMITTEE OF 13 APRIL
2022
(copy to follow) 
4 DEPUTATIONS   
5 APPLICATIONS FOR DETERMINATION   
5(1)  MAJOR APPLICATIONS   
5(1)(i)  22/00195/FLM - FORMATION OF A BATTERY STORAGE
SYSTEM WITH ASSOCIATED WORK AND
INFRASTRUCTURE OF UP TO 49.9MW, LAND 130 METRES
SOUTH EAST OF COUPAR ANGUS SUBSTATION,
PLEASANCE ROAD, COUPAR ANGUS
Report of Handling by Head of Planning and Development (copy
herewith 22/111) 
5 - 26 
5(1)(ii)  22/00301/FLM - S42 APPLICATION TO REMOVE CONDITION
14 (BUS SHELTER AND INFORMATION BOARD) OF
PLANNING PERMISSION 18/02139/FLM, WHEEL INN, 37
ANGUS ROAD, SCONE
Report of Handling by Head of Planning and Development (copy
herewith 22/112) 
27 - 44 
5(2)  LOCAL APPLICATIONS   
Page 3 of 110

Page 4

5(2)(i)  21/00248/FLL - ERECTION OF RETAIL UNIT (CLASS 1),
FORMATION OF ACCESS, CAR PARKING, ENGINEERING
WORKS, LANDSCAPING AND ASSOCIATED WORKS, LAND
WEST OF 4 PICKEMBERE, PITHEAVLIS, PERTH
Report of Handling by Head of Planning and Development (copy
herewith 22/213) 
45 - 72 
5(2)(ii)  21/01488/FLL - CHANGE OF USE FROM RETAIL UNIT
(CLASS 1) TO HOT FOOD TAKEAWAY (CLASS 3) AND
INSTALLATION OF FLUE, 96 GLENGARRY ROAD, PERTH
Report of Handling by Head of Planning and Development (copy
herewith 22/214) 
73 - 86 
5(2)(iii)  22/00228/FLL - INSTALLATION OF 2 CCTV CAMERAS (IN
RETROSPECT), LOGIEALMOND ESTATE, LOGIEALMOND
Report of Handling by Head of Planning and Development (copy
herewith 22/215) 
87 - 98 
5(2)(iv)  22/00529/FLL - ERECTION OF AN AGRICULTURAL
BUILDING, LAND EAST OF MOIVAIRD HOUSE,
OCHTERTYRE, CRIEFF
Report of Handling by Head of Planning and Development (copy
herewith 22/216) 
99 - 110 
Page 4 of 110

Page 5

Perth and Kinross Council
Planning and Placemaking Committee – 1 June 2022
Report of Handling by Head of Planning & Development
(Report No. 22/111) 
PROPOSAL:  Formation of a battery storage system with associated work and
infrastructure of up to 49.9 MW 
LOCATION: Land 130 Metres South East of Coupar Angus Substation
Pleasance Road Coupar Angus 
Ref. No: 22/00195/FLM
Ward No: P2 - Strathmore 
Summary 
This report recommends approval of the application which proposes the formation
of an electrical energy storage facility, including up to 15 battery storage
containers and associated infrastructure, adjacent to Coupar Angus Substation.
The proposals are considered to comply with the relevant provisions of the
Development Plan with no material considerations apparent which outweigh the
Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The site is c.1.21 hectares (Ha) in area, with approximately 0.54Ha forming the
substations and equipment compound, contained within a security fence. The
balance comprises the access and landscaped areas. All located c.250m
south-west of the settlement boundary of Coupar Angus, and surrounded
largely by agricultural land (Broad Valley Lowland), other than the recently
upgraded substation directly west and properties to the north of the northern
section of the access. Local topography is generally level, with a slight slope up
to the north. 
2 In September 2019, Planning Permission (Ref: 19/00513/FLM) was granted at
this location for a similar battery storage facility, vehicular access and
associated works. Subsequently, after that development commenced in early
2021, as a result of various factors and resultant design modifications (i.e. more
efficient plant and equipment), the developer chose to depart from the
consented design.  This saw the development then being undertaken begin to
depart from the approved design.  Initially in June 2021 a non-material variation
to the approved development was submitted (Ref: 21/01186/FLL), but the
Planning Authority subsequently confirmed that those changes, although
relatively minor when considered individually, overall constituted a materially
different development and accordingly a new application for planning
permission was required.  This application now seeks planning permission for
5(1)(i)
Page 5 of 110

Page 6

the revised development scheme, thus some of these preliminary elements are
retrospective.   
3 In physical terms, the proposals are for 15 containerised storage units
(dimensions 12.19 x 2.44 x 2.6m), housing 15 battery units; 15 Power
Conversion Systems (PCS) and transformers on skids; a District Network
Operator (DNO) substation; a medium voltage (MV) substation; LV Room,
Emergency Diesel Generator; welfare and parts storage facilitates; security
alarm, cameras; and access track. The access track (approximately 70m in
length) culminates at a new junction onto Pleasance Road. Supporting
infrastructure including a temporary construction compound is also required. 
4 The battery storage facility will be enclosed by a 3m high palisade security
fence, with a 3m high acoustic fence along the northern perimeter. Security
cameras and lighting columns, also up to 3m in height will also be proposed
along the perimeter fence.   
5 A significant planting and a landscaping scheme is proposed to assist integrate
the proposed development into the wider surroundings.   
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
6 Directive 2011/92/EU (as amended) requires the ‘competent authority’ (in this
case Perth and Kinross Council) when giving a planning permission for
particular large-scale projects to do so in the knowledge of any likely significant
effects on the environment.  The Directive therefore sets out a procedure that
must be followed before ‘development consent’ can be given. 
7 This procedure, known as Environmental Impact Assessment (EIA), is a means
of drawing together, in a systematic way, an assessment of a project’s likely
significant environmental effects.  The EIA Report helps to ensure that the
importance of the predicted effects, and the scope for reducing any adverse
effects, are properly understood by the public and the relevant competent
authority before it makes its decision. 
8 An EIA screening has previously been undertaken, concluding that an EIA was
not required as the proposal was not considered likely to have significant
environmental effects. However, a suite of supporting assessments, presenting
environmental information in respect of flooding, noise, ecology, traffic and
transport were required. 
PRE-APPLICATION CONSULTATION 
9 The proposed development is a ‘Major’ development, in terms of the Town and
Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009,
due to the potential energy storage capacity proposed being in excess of
20MW.  The applicant was therefore required to undertake formal pre-
application consultation with the local community. Public concerns raised as
part of this process identified noise, landscaping and flood risk as being matters
not addressed by the consultation events.  These matters have been responded
Page 6 of 110

Page 7

to in writing by the agent and included within a Pre-Application Consultation
(PAC) Report submitted with this application.   
10 The PAC Report notes that a letter drop to local properties (within a 1 km
radius) was undertaken, outlining that consultation events were held online, as
permitted by the relevant regulations.  These online events were held on the 1st
and 16th of December between 4:30 and 6:30pm, with an additional event on
the 11th of January 2022. As the Coupar Angus Community Council was
disbanded in 2020 additional invites were provided to neighbouring community
councils, local MPs and MSPs and Council Members.  A total of 19 interested
parties attended the events and a number of comments and concerns were
reviewed and addressed within the PAC report and wider planning submission.
The content and coverage of the community consultation exercise is
considered sufficient and proportionate and in line with the aforementioned
regulations. 
NATIONAL POLICY AND GUIDANCE 
11 The Scottish Government expresses its planning policies through: The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework (NPF) 
12 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure.  Under the Planning etc. (Scotland) Act 2006, this is now a
statutory document and a material consideration in any planning application.  It
provides a national context for development plans and planning decisions as
well as informing the on-going programmes of the Scottish Government, public
agencies and local authorities. 
Scottish Planning Policy (SPP) 2014 
13 The current SPP was published in June 2014 and sets out national planning
policies, which reflect Scottish Ministers’ priorities for operation of the planning
system and for the development and use of land.  It promotes consistency in
the application of policy across Scotland, whilst allowing sufficient flexibility to
reflect local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
14 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability : paragraphs 24 – 35
• Placemaking : paragraphs 36 – 57
Page 7 of 110

Page 8

• Promoting Rural Development: paragraphs  74 – 91
• Supporting Business and Employment: paragraphs 92 – 108
• Delivering Heat and Electricity: paragraphs 152 – 173
• Valuing the Natural Environment: paragraphs 193 – 218
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
Planning Advice Notes 
15 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are also of relevance to the proposal: 
• PAN 3/2010 Community Engagement
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 73 Rural Diversification
• PAN 75 Planning for Transport
• The Future of Energy in Scotland: Scottish Energy Strategy (December 
2017) 
DEVELOPMENT PLAN 
16 The Development Plan for the area comprises: the TAYplan Strategic
Development Plan 2016-2036; and the Perth and Kinross Local Development
Plan 2014. 
TAYplan Strategic Development Plan 2016-2036 
17 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
18 Policy 7: Energy, Waste and Resources of TAYplan is of particular importance
in the assessment of this application. 
Perth and Kinross Local Development Plan 2019 
19 The Local Development Plan 2 (LDP) was adopted by Perth and Kinross
Council on the 29th November 2019.  It sets out a vision statement for the area,
which includes that, “By 2036, the TAYplan area will be sustainable, more
attractive, competitive and vibrant without creating an unacceptable burden on
our planet. The quality of life will make it a place of first choice where more
people choose to live, work, study and visit and where businesses choose to
invest and create jobs.” It is the most recently adopted statement of Council
policy and is augmented by Supplementary Guidance.
Page 8 of 110

Page 9

20 The principal relevant policies are: 
• Policy 1A and 1B Placemaking
• Policy 2 Design Statements 
• Policy 5 Infrastructure Contributions
• Policy 6 Settlement Boundaries
• Policy 8 Rural Business and Diversification
• Policy 27A Listed Buildings 
• Policy 33A Renewables and Low Carbon Energy 
• Policy 33B Repowering and Existing Facilities 
• Policy 35 Electrical Transmission 
• Policy 39 Landscape 
• Policy 40 Forestry, Woodland and Trees
• Policy 41 Biodiversity
• Policy 47 River Tay Catchment Area 
• Policy 50 Prime Agricultural Land 
• Policy 52 New Development and Flooding 
• Policy 53 Water Environment and Drainage 
• Policy 55 Nuisance from Artificial Light Pollution 
• Policy 56 Noise Pollution 
• Policy 60B Transport Standards and Accessibility Requirements 
SITE HISTORY 
21 16/02230/FLL Erection of a switch-room facility at the adjacent sub-station
approved on 9 March 2017 
22 18/01672/FLL Formation of an energy storage compound including battery
storage containers, ancillary equipment, vehicular accesses, track and
associated works.  This application was returned on 19 November 2018,
following a screening which determined the proposal was a ‘Major’
development and required public consultation to take place. 
23 18/00016/PAN A ‘Proposal of Application Notice’ relating to a ‘Major’
development comprising: the formation of an energy storage compound
including 15 battery storage units, inverters and transformers, a substation,
ancillary equipment, store, vehicular access, track and associated works. PKC
confirmed on 6 February 2019 that the approach set out in the PAN was
accepted. 
24 19/00513/FLM Detailed planning permission for the formation of a battery
storage facility, vehicular access and associated works was approved on 24th
September 2019. 
25 21/00015/PAN A ‘Proposal of Application Notice’ relating to a ‘Major’
development comprising: Formation of battery energy storage system with
associated work and infrastructure of up to 49.9 MW saw PKC confirm on the
18th November 2021 that the approach set out in the PAN was accepted. 
Page 9 of 110

Page 10

26 21/01186/FLL A Non-Material Variation, in relation to changes to the layout of
19/00513/FLM, was sought.  On the 16 July 2021 this application was returned
as it was determined the changes proposed were material and a new
application for detailed planning permission would be required. 
CONSULTATIONS 
27 The following parties have been consulted: 
EXTERNAL 
28 Dundee Airport - No objection. No other Comments Provided 
29 Scottish Water - No objection. Informative noted in respect of drinking water 
and connection to sewer systems.   
30 National Grid: - No objection. The development is located outside of the High 
Risk zone for National Grid Gas Transmission. 
31 Perth and Kinross Heritage Trust - No objection and no additional comments 
made 
32 RSPB – No comments. 
INTERNAL  
33 Biodiversity Officer - No objection, subject to conditions regarding: the
implementation of biodiversity survey action points; a pre works check for
protected species; and the implementation of proposed landscaping.     
34 Strategy and Policy – No comments. 
35 Structures and Flooding - No comments.   
36 Community Greenspace - No comments. 
37 Environmental Health (Noise/ Odour) - No objection subject to conditions
regarding noise, external lighting and an external complaint procedure. 
38 Transport Planning - No objection subject to a condition to ensure
construction traffic is appropriately managed. 
39 Development Contributions Officer - No objection, clarifying that no
contributions are required. 
REPRESENTATIONS 
40 One objection has been received, with concerns summarised as follows: 
• Noise Impacts 
Page 10 of 110

Page 11

• Landscape impacts 
• Flooding and Drainage.   
41 The matters raised are addressed in the Appraisal section below. 
ADDITIONAL STATEMENTS 
Environment Report Not Required
Screening Opinion Undertaken – Not EIA
development.
Environmental Impact Assessment Not Required
Appropriate Assessment Not required
Design Statement  Submitted
Reports on Impact or Potential Impact
• Flood Risk Assessment 
• Landscape and Visual
Appraisal
• Preliminary Ecological
Appraisal  
• Noise Impact Assessment 
• Design and Access Statement 
• Construction traffic
Management Plan 
APPRAISAL 
42 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2 (2019).  The relevant policy considerations are outlined in
the policy section above and are considered in more detail below.  In terms of
other material considerations, this includes considerations of the Council’s
other approved policies and supplementary guidance as set out and specifically
Scottish Energy Strategy (SES) (December 2017), the future of energy in
Scotland. 
Principle 
43 The location is a peripheral rural area on the edge of Coupar Angus, policy
considerations seeking to assess its suitability in principle are: Policies 1A, 1B,
Placemaking, Policy 8 Rural Diversification, Policy 33A and 33B Renewables
and Low Carbon Energy and Policy 50 Prime Agricultural Land.  Furthermore,
and of significant material consideration in the assessment of this application is
the previous approval of planning permission for the development of a battery
energy storage facility, which overlaps the majority of the site area.   
Page 11 of 110

Page 12

44 In itself the proposal would provide essential energy balancing services to the
National Grid, actively contributing towards Scotland's CO2 reduction targets,
supporting the strategy principles of the SES. Specifically, electricity would be
drawn from the Grid at times of low demand, stored and released back as
required. When demand is higher, greater generation from non-renewable
sources is required and energy storage facilities such as that proposed could
reduce reliance on non-renewable resources, decreasing CO2 emissions. An
important consideration is that the principle of a development for a proposal of
this nature and at this location has already been established through the
granting of Planning Permission 19/00513/FLM. The changes from that
previously approved development are otherwise considered acceptable, as set
out below.   
Design and Layout 
45  The design and layout essentially reflect the physical and engineering
requirements, with infrastructure details consistent with industry standards. In
physical terms, the development will be contained below 4m in total height. 
The tallest visible built structure will be the substation building which will be
3.9m at its roof pitch above ground level. Remaining built elements will be
approximately 3.3m in height above ground level. All built development within
the storage compound will be enclosed behind a security fence and an acoustic
fence up to 3m in height.  Having regard to the overall scale and height of built
structures horizontal massing is more significant than vertical impacts. This
aspect is further considered in the landscape and visual impact sections below.
Physically separation between each container is a minimum of 3m and
colour/finishes can be controlled by condition 9. 
Landscape and Visual Impact 
46 Safeguarding and enhancing landscape character and green infrastructure is
considered via LDP Policies 1 and 33. In this instance, as said above the
proposed utilitarian design is largely set, thus some landscape and visual
impacts are inevitable. In this respect currently defined boundaries and
screening is limited, and the site is thus relatively prominent. Therefore, it is
especially important to ensure robust landscaping and associated green
infrastructure provides screening from key viewpoints, softens the immediate
and cumulative landscape impact, whilst also improving biodiversity
opportunities.  In line with Policy 33, the cumulative visual impact of the
proposal and the existing sub-station should also be taken into account. 
47 A landscape visual impact assessment (LVIA) was requested, along with a fully
detailed structural landscape plan. These were key in assessing if the
proposals could be successfully accommodated visually.   
48 Existing landscape features will be supplemented by robust and comprehensive
native planting (plan 22/00195/30) as well as an acoustic screening fence along
the northern compound boundary (plan 22/00195/30 and 22/00195/31). These
proposals are considered sufficient to satisfactorily accommodate the
development in the landscape. Following establishment, it is not considered
Page 12 of 110

Page 13

that there would be unacceptable impact on landscape or visual amenity, with
photomontages (plan 22/00195/15) indicating the predicted situation. 
49 The proposal is therefore considered to accord with policies 1 and 33.   
Residential Amenity 
50 The closest residential properties (grouping of 5) are approximately 250m to the
northeast of the compound and immediately north of the northern section of the
access (including Tweedside Cottages, Tweedside Bungalow, Pleasance Farm
and The Firs), with further residential properties approximately 500m distant (off
Pleasance Road and within Abbey Gardens).   
51 PKC Environmental Health (EH) initially raised concerns on the potential of
noise impact on residential properties. Potential noise sources including: air
conditioning units, invertor cooling fans, switchgears, transformer and
background reactor noise, and in emergency circumstances the use of a diesel
generator.  A supporting noise impact assessment (NIA) assessed the potential
impact on nearby residential properties and sets out associated mitigation
recommendations. 
52 This NIA sees noise from the emergency generator scoped out, due to its
highly infrequent and short-term impacts. EH confirmed this is acceptable and
that any adverse impacts are covered by statutory nuisance legislation. 
Furthermore, the recommended noise based conditions are considered to allow
for mitigation.   
53 Based on the proposed mitigation measures outlined in the NIA (including the
provision of an acoustic fence) and subject to conditions 2, 3, 4 and 5, EH do
not object to the proposal and as such it is considered to comply with Policy 33
of the LDP, with no likely unacceptable impact on the amenity of residential
properties. 
Lighting 
54 The impact of artificial lighting has been noted as a matter of concern. 
However, the use of lighting is to be minimal and primarily for security
purposes. Condition 6 can control spillage and limit operation. 
Roads and Access 
55 LDP2 Policy 60B requires that local road networks be capable of absorbing
traffic generated by development and that satisfactory access is provided.  No
public objections have been raised with respect to traffic and access.   
56 The development proposes a new access off Precinct Street and this access
point was previously approved via 19/00513/FLM. Notwithstanding, it is
acknowledged that the present local road network layout and narrow pinch
points, sees potential for issues during the development phase, due to the size
of vehicles. As such a Construction Traffic Management Scheme (CTMS) can
Page 13 of 110

Page 14

be required via condition 7, to ensure construction access requirements are
accommodated, including directing movements via alternative routes: such as
to avoid Precinct Street.   
57 Subject to compliance with condition 7 (CTMS) and Condition 8, requiring the
formation of a vehicle crossing, the proposal is considered to remain in
accordance with Policy 60B of LDP2.   
Drainage and Flooding 
58 Policy 52 requires development to appropriately consider flooding and
drainage. In this regard, the objection raises concerns in respect of flooding
from a tributary to the Coupar Burn.   
59 Having regard to the previous planning permission (Ref: 19/00513/FLM) both
SEPA and the Structures and Flooding team were satisfied that the
development was unlikely to be impacted by significant flooding.  With all
principal infrastructure elements situated out with the functional floodplain, and
there was unlikely to be any flood risk elsewhere.  Having regard to this
application, which is seeking minor changes to the layout and equipment types
only, the supporting flood impact assessment confirms there will be no
development within the functional floor plain.  Furthermore, no land raising and
landscape planting is proposed within the functional floodplain.  Consequently,
no further consultation was considered required.  Condition 14 has been
recommended to avoid raising ground within the flood plain to safeguard the
storage and conveyance function. 
60 The proposals are thus considered to satisfy policy 52 of LDP2 
Conservation Considerations 
61 In relation to above and below ground conservation considerations, there is no
indication of any significant designations locally. Otherwise, due to the low-lying
topography and existing/ proposed planting, inter-visibility will be limited and not
considered to cause any adverse impact on the setting of any listed buildings or
the conservation area of Coupar Angus. 
Natural Heritage and Biodiversity 
62 LDP2 Policies 39, 40 and 41 are relevant considerations in respect of potential
biodiversity impacts or opportunities arising from the development. In this
respect the Landscape Masterplan includes largely native species and contains
a number of positive elements, making a likely valuable contribution to
biodiversity, consistent with the Perth and Kinross Forestry and Woodland
Strategy. There are some sections of hedgerow, trees, etc. which may be
impacted by the development and conditions are recommended to ensure that
impacts on these or protected species, such as birds, are mitigated. (Conditions 11
and 12) 
Page 14 of 110

Page 15

63 The Councils biodiversity officer has reviewed the development proposal and
raised no objections subject to conditions seeking the adoption of proposed
landscaping, recommendations of the preliminary ecological appraisal and the
protection of nesting birds.  Subject to conditions 10-13 and compliance with
the action points noted in the biodiversity survey, the proposal is considered to
accord with policies 39-41 of the LDP2.   
Developer Contributions 
64 There has been comment that no local benefits would result from the
development.  However, in planning policy terms, no developer contributions
are triggered for this type of development. As a result the planning authority
cannot require the provision of money or infrastructure, not clearly required as a
result of the development. 
Economic Impact 
65 In the short term, construction will create jobs with scope for local employment.
Beyond this local employment opportunities are limited. However, there is a
clear fit between Scottish Government aims of promoting a transition to a low
carbon economy and this proposal. The proposal would also support local
renewable energy generation, by helping balance fluctuations of intermittent
energy generation.  It also represents a significant inward investment in rural
Perthshire, assisting in the creation of a national grid asset of regional
significance for the Perth and Kinross area. 
Loss of Prime Agricultural Land 
66 Policy 50 sets out that development outwith settlements shall not be permitted 
on prime agricultural land, unless necessary to meet a specific need such as: a 
major infrastructure proposal, and that there is no other suitable site available 
on non-prime land. 
67 Whilst the site comprises prime agricultural land (LCA Class 2). The reasons for
selecting the location are clearly set out in supporting documents and
considered reasonable, highlighting the proximity of the existing substation as
beneficial, reducing the need for long transmission cables and increasing the
efficiency of the storage facility. 
68 It is also clarified that there are no peat or carbon rich soils present and the
layout and design minimises land take, with no farm unit rendered unviable.
Measures to manage, protect and reinstate soils have been set out and are to
be incorporated into the development, which will be appropriately controlled by
condition 17, all satisfying the objective terms of Policy 50 of LDP2. 
69 Overall, the loss of this prime agricultural land has been limited and considered
acceptable, when balanced against the wider benefits of the proposed
development.   
Page 15 of 110

Page 16

Lifespan of Facility 
70 The lifespan of the facility is not specified. As such, condition 19 can require
that should the energy storage facility not be in use for a continuous period of
12 months, that the site is then decommissioned and re-instated to its original
condition. 
LEGAL AGREEMENTS 
71 None required 
DIRECTION BY SCOTTISH MINISTERS 
72 None. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
73 The application must be determined in accordance with the adopted
Development Plan, unless material considerations indicate otherwise. In this
respect, account has been taken of the Local Development Plan and
associated material considerations, with the proposal not assessed to conflict
with the development plan in this case.   
74 Accordingly the proposal is recommended for approval subject to the following
conditions. 
A RECOMMENDATION   
Conditions and Reasons for Recommendation 
General 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
Noise 
2. All hereby approved plant or equipment shall be so enclosed, attenuated and/or
maintained such that any noise therefrom shall not exceed Noise Rating 35
between 0700 and 2300 hours daily, or Noise Rating 20 between 2300 and
0700 hours daily, within any neighbouring residential property, with all windows
slightly open, when measured and/ or calculated and plotted on a rating curve
chart. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
Page 16 of 110

Page 17

3. Noise from the hereby approved development shall not exceed 33dB LAeq,(15
min), including any relevant penalties for tonality, impulsivity, intermittency or
other sound characteristics, when measured at any residential property in
accordance with BS4142 – Method for Rating Industrial Noise Affecting Mixed
Residential and Industrial Areas. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
4. Noise mitigation measures outlined in Section 7.1 and Appendix 3 of the hereby
approved Noise Impact Assessment undertaken by ARCUS - dated February
2022 (Plan reference 22/00195/16) , shall be implemented prior to the hereby
approved development being brought into use. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
5. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the
Planning Authority to carry out a noise assessment to verify compliance with
conditions 2 and 3.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the noise
assessment shows that the noise levels do not comply with conditions 2 and 3
a scheme of noise mitigation shall be included with the noise assessment,
specifying timescales for the implementation of the scheme and shall be
submitted to the Planning Authority within 28 days of the assessment.  The
mitigation scheme shall thereafter be implemented in accordance with the
approved scheme and timescales.   
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
Lighting 
6. All external lighting shall be sufficiently screened and aligned so as to ensure
that there is no direct illumination of residential property and that light spillage
beyond the boundaries of the site is minimised.  In association, the operation of
the lighting shall be controlled so as to only be triggered by motion within the
security fenced boundaries of the site. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
Roads and Transport 
7. Prior to the commencement of works associated to the hereby approved
development, a Construction Traffic Management Scheme (TMS) shall be
submitted for the written approval of the Planning Authority, such TMS shall
include details of the following: 
Page 17 of 110

Page 18

(a)  restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used;
(b)  timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c)  a code of conduct for HGV drivers to allow for queuing traffic to pass; 
(d)  arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e)  emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f)  arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development
being deposited on the road;
(g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
(h)  arrangements for signage at site accesses and crossovers and on roads
to be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i)  details of information signs to inform other road users of construction
traffic;
(j)  arrangements to ensure that access for emergency service vehicles are
not impeded;
(k)  co-ordination with other significant developments known to use roads
affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m)  the provision and installation of traffic counters at the applicant's expense
at locations to be agreed prior to the commencement of construction; 
(n)  monitoring, reporting and implementation arrangements; 
(o)  arrangements for dealing with non-compliance; and
(p)  details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme all to the satisfaction of the Council as Planning
Authority. 
Reason - In the interests of road safety. 
8. Prior to the development hereby approved being completed or brought into use,
the vehicular access shall be formed in accordance with Perth & Kinross
Council's Road Development Guide Type C Figure 5.7 access detail, and of
Type B Road construction detail.   
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
Page 18 of 110

Page 19

External Finishing Colour 
9. Prior to the commencement of the development hereby approved, details of the
recessive, natural colour of the proposed external finishing materials to be used
for the hereby approved fence and other structures (i.e. auxiliary generator,
battery pack kiosks, battery storage substation, client substation invertor and
LV Room, etc.) shall be submitted to and agreed in writing by the Council as
Planning Authority.  The scheme as agreed shall be implemented prior to the
completion or bringing into use of the development, whichever is the earlier. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
Biodiversity 
10. The conclusions and recommended action points within the supporting
Preliminary Ecological Appraisal Report, prepared by Arcus Consultancy
Services – dated January 2022 (plan 22/00195/25) hereby approved shall be
fully adhered to, respected and undertaken as part of the construction phase of
development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
11. No removal of hedgerows, trees or shrubs that may be used by breeding birds
shall take place between 1st March and 31st August inclusive, unless a
competent ecologist has undertaken a careful, detailed check of vegetation for
active birds’ nests immediately before the vegetation is cleared and provided
written confirmation that no birds will be harmed and/or that there are
appropriate measures in place to protect nesting bird interests on site. Any
such written confirmation should be submitted in advance to the local planning
authority. 
Reason - In the interests of employing best practice ecology and to ensure
there is no adverse impact on any protected species as identified under the
Wildlife and Countryside Act (1981). 
12. Measures to protect animals from being trapped in open excavations and/or
pipe and culverts shall be implemented for the duration of the construction
works of the development hereby approved.  These measures may include:
creation of sloping escape ramps for animals, which may be achieved by edge
profiling of trenches/excavations; or by using planks placed into them at the end
of each working day; and open pipework greater than 150 mm outside diameter
being closed off at the end of each working day 
Reason - In order to prevent animals from being trapped within any open
excavations. 
13. The detailed landscaping and planting scheme (plan 22/00195/30) which is
hereby approved shall be completed within the first available planting season
(October to March) after the completion or bringing into use of the
Page 19 of 110

Page 20

development, whichever is the earlier.  The approved scheme shall thereafter
be maintained, with any planting which fails to become established within five
years being replaced in the following planting season with others of a size and
species as previously approved.   
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
Flooding / Drainage 
14. For the avoidance of doubt, parts of the site are located within the 1/200 (0.5%
AEP) flood extent, with a medium to high risk of flooding.  Such areas must not
be raised above existing ground levels.  This applies to the entirety of the site
as identified by the red line shown in drawing 22/00195/02, titled Proposed Site
Plan. 
Reason - Ensure no displacement of floodwater to the rest of floodplain 
Facility Lifespan 
15. In the event the hereby approved development fails to store electricity on a
commercial basis for a continuous period of 12 months, then it shall be deemed
to have permanently ceased to be required.  In such an event the development
shall be decommissioned and the relevant parts of the site reinstated within
such timescale as agreed in writing by the Council as Planning Authority. 
Reason - To ensure the facility is removed from the site at the end of its
operational life, and to protect the character of the countryside, the visual
amenity of the area and nature conservation interests. 
B JUSTIFICATION 
The proposal is considered to comply with the Development Plan and there are
no other material considerations that would justify a departure from the relevant
policies. 
C PROCEDURAL NOTES 
None. 
D INFORMATIVES 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period
(see section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended)). 
2. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
Page 20 of 110

Page 21

commence the development.  A failure to comply with this statutory
requirement would constitute a breach of planning control under section 123(1)
of that Act, which may result in enforcement action being taken. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority
written notice of that position. 
4. An application for Building Warrant may be required. 
5. The applicant should be advised that in terms of Section 56 of the Roads
(Scotland) Act 1984 he must obtain from the Council as Roads Authority
consent to open an existing road or footway prior to the commencement of
works. Advice on the disposal of surface water must be sought at the initial
stages of design from Scottish Water and the Scottish Environment Protection
Agency. 
6.    The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended, it is an offence to remove, damage or destroy the nest of any wild
birds while that nest is in use or being built. Planning consent for a
development does not provide a defence against prosecution under this act. 
7. The applicant is reminded that, should any protected species be present a
licence may be required from Scottish Natural Heritage to disturb a protected
species. Failure to obtain a licence may constitute a criminal act under the
Habitats Regulations and penalties are severe for non-compliance. 
8. This development will require the 'Display of notice while development is
carried out', under Section 27C (1) of the Town and Country Planning Act 1997,
as amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. According to
Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development.
• Readily visible to the public.
• Printed on durable material. 
9. This planning permission is granted subject to conditions, some of which
require further information to be submitted to Development Management either
before works can start on site or at a certain time. The required information
must be submitted via the ePlanning portal if your original application was
lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk. Please be aware that a fee is payable
in respect of each request made, though there is no limit to the number of
conditions that can be discharged in a single request. The Fees Charter is
available on our website www.pkc.gov.uk.The Council has two months to
consider the information. You should therefore submit the required information
Page 21 of 110

Page 22

more than two months before your permission expires. We cannot guarantee
that submissions made within two months of the expiry date of your permission
will be able to be dealt with before your permission lapses. 
Background Papers: 1 letter of representation
Contact Officer:  Jamie Torrance 
Date: 19 May 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 22 of 110

Page 23

22/00195/FLM - Formation of battery energy storage system
with associated work and infrastructure of up to 49.9 MW
Land 130 Metres South East Of Coupar Angus Substation,
Pleasance Road, Coupar Angus
Created by Andrew Rennie on 02 May 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:20000
5(1)(i)
Page 23 of 110

Page 24

Page 24 of 110

Page 25

22/00195/FLM - Formation of battery energy storage system
with associated work and infrastructure of up to 49.9 MW
Land 130 Metres South East Of Coupar Angus Substation,
Pleasance Road, Coupar Angus
Created by Andrew Rennie on 02 May 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:5000
5(1)(i)
Page 25 of 110

Page 26

Page 26 of 110

Page 27

Perth and Kinross Council
Planning and Placemaking Committee – 1 June 2022
Report of Handling by Head of Planning & Development
(Report No. 22/112) 
PROPOSAL:  S42 application to remove condition 14 (bus shelter and
information board) of planning permission 18/02139/FLM 
LOCATION: Wheel Inn 37 Angus Road Scone Perth PH2 6RA 
Ref. No: 22/00301/FLM
Ward No: P2- Strathmore 
Summary 
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and
there are no material considerations apparent which outweigh the Development
Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The site benefits from planning permission for 51 retirement living
apartments, including 13 affordable apartments, provided across two blocks
which are age restricted (by planning condition) to residents aged 55 and
over. To facilitate the development, the proposal included the demolition of
the existing public house and restaurant known as the Wheel Inn. 
2 The application site is located within the Scone settlement boundary and
extends to 0.71 hectares in area (7100sqm). The site has a main vehicular
access from Angus Road, with a secondary access from Stormont Road to
the north. The site is bounded by a doctors’ surgery to the north, residential
properties to the south and west and larger dwellinghouses to the opposite
side of Angus Road to the east (elevated by topography). The topography
of the site is variable, with the ground sloping down from Angus Road
towards the car parking and then rising again to the rear of the site. 
3  Section 42 of the Act (Town and Country Planning (Scotland) Act 1997 (as
amended) relates to applications for planning permission to develop land which
depart from conditions attached to an existing permission.  The effect of
granting permission via a Section 42 (S42) application is therefore such that a
new and separate permission exists for the development with different (or no)
conditions attached.  The previous planning permission remains unaltered by,
and is not varied by, the decision on the section 42 application. 
5(1)(ii)
Page 27 of 110

Page 28

4 The primary purpose of this S42 application seeks to remove Condition 14 of
the extant planning permission 18/02139/FLM. 
5 The original wording of Condition 14 states: 
6 Prior to the development hereby approved being completed or brought into use,
a scheme for the location and specification of a 3-bay cantilever bus shelter
and information board shall be submitted to and approved in writing by the
Council as Planning Authority, in consultation with the Council’s Public
Transport Unit. The approved scheme shall thereafter be installed at the
applicant’s expense, in accordance with the agreed details and confirmed as
operational by the Council’s Public Transport Unit, prior to the occupation of the
last residential unit.
Reason – In the interest of promoting sustainable public transport. 
7 Assessment of the proposed removal of this condition is set out below. 
Pre-Application Consultation 
8 The Pre-Application Consultation (PAC) requirements have been fulfilled in
association with the submission of planning application 18/02139/FLM and
there is no further PAC needed procedurally in relation to this S42 application. 
National Policy and Guidance 
9 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework 2014 
10 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SPP) 
11 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals.
Page 28 of 110

Page 29

12 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability : paragraphs 24 – 35
• Placemaking : paragraphs 36 – 57   
Planning Advice Notes 
13 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 75 Planning for Transport 
Creating Places 2013 
14 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It
notes that successful places can unlock opportunities, build vibrant
communities and contribute to a flourishing economy and set out actions that
can achieve positive changes in our places. 
DEVELOPMENT PLAN 
15 The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2019. 
TAYplan Strategic Development Plan 2016-2036 
16 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plans states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
17 The following section of the TAYplan 2016 is of particular importance in the
assessment of this application. 
Policy 2: Shaping Better Quality Places 
18 Seeks to deliver distinctive places by ensuring that the arrangement, layout,
design, density and mix of development are shaped through incorporating and
enhancing natural and historic assets, natural processes, the multiple roles of
infrastructure and networks, and local design context. 
Page 29 of 110

Page 30

Perth and Kinross Local Development Plan 2 
19 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
20 The principal relevant policy is, in summary; 
Policy 60B - Transport Standards and Accessibility Requirements 
21 Development proposals that involve significant travel generation should be well
served by all modes of transport (in particular walking, cycling and public
transport), provide safe access and appropriate car parking. The aim of all
development should be to reduce travel demand by car and ensure a realistic
choice of access and travel modes is available, including opportunities for
active travel and green networks. 
SITE HISTORY OF RELEVANCE 
22 16/01122/FLL Formation of a sensory garden, erection of boundary
treatments, engineering works and other associated works Application
Approved under delegated powers 16 August 2016. 
23 18/00005/PAN Residential development PAN Decision Issued 12 June
2018. 
24 18/01466/FLM Erection of an assisted living facility comprising 55no.
accommodation units, communal area, office, store, 2no. plant rooms, bin
storage, boundary treatments and formation of parking areas, landscaping
and associated works. Application Withdrawn. 
25 18/02139/FLM Erection of 51 retirement flats and cycle store, formation of
parking and associated works. Application Approved at Planning and
Development Management Committee on 14 March 2019. 
26 19/02116/FLL Formation of car parking and associated works. Application
Approved under delegated powers on 26 February 2020. 
CONSULTATIONS 
27 As part of the planning application process the following bodies were consulted: 
External 
28 Scone and District Community Council - Objection on the grounds that the
bus stop is popular on the Number 7 bus route and as such the shelter and
noticeboard is required by the Scone residents.
Page 30 of 110

Page 31

Internal 
29 Transport Planning - No objections. 
Representations 
30 A total of 3 letters of representation has been received in respect of the current
application including one from the Community Council. Out of the 3 received, 2
object and one is in support. The main issues raised within the 2
representations are: 
• Increased car use/traffic
• Perth City Centre Congestion
• Contrary to Development Plan 
31 These issues are addressed in the Appraisal section of the report. 
32 The remaining letter of support suggested that as there is currently no bus
shelter at the bus stop in Angus Road in the northerly direction, a shelter could
be erected with a replacement notice board. 
ADDITIONAL STATEMENTS 
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not Required
Appropriate Assessment Habitats Regulations 
AA Not Required
Design Statement or Design and Access
Statement
Not Required
Report on Impact or Potential Impact eg
Flood Risk Assessment
Not Required 
APPRAISAL 
33 Section 42(1) of the Town & Country Planning (Scotland) Act 1997 (as
amended) relates to applications for planning permission for the development
of land without complying with conditions subject to which a previous
permission was granted. 
34 Section 42(2) requires that the Planning Authority shall consider only the
question of the condition(s) subject to which planning permission should be
granted, and: 
If they decide that planning permission should be granted subject to conditions
differing from those subject to which the previous permission was granted, or
that it would be granted unconditionally, they shall grant planning permission
accordingly;
Page 31 of 110

Page 32

If they decide that planning permission should be granted subject to the same
conditions as those subject to which the previous permission was granted, they
shall refuse the application. 
35 The determining issues in this case are whether the proposal complies with
Development Plan policy or if there are any other material considerations which
justify a departure from that policy. Currently the adopted Development Plan
comprises the TAYplan Strategic Development Plan 2016–2036 and the Perth
and Kinross Local Development Plan 2019. The relevant policy considerations
are outlined in the policy section above and are considered in more detail
below. In terms of other material considerations, this involves national policy
and guidance, the Council’s other approved policies, supplementary guidance,
statutory consultees and additional statements submitted. 
Principle 
36 The detail of the development subject of this application has been previously
established through the approval of the extant planning permission
(18/02139/FLM), and is therefore not reviewed as part of this S42 application.
The removal of Condition 14 (a scheme for the location and specification of a 3-
bay cantilever bus shelter and information board) is not in itself considered to
be contrary to the general terms of the Development Plan, however,
consideration must be given to the specific characteristics of the amendment
and whether any adverse impacts are anticipated. 
37 The original wording of Condition 14 of planning permission 18/02139/FLM
states: 
38 Prior to the development hereby approved being completed or brought into use,
a scheme for the location and specification of a 3-bay cantilever bus shelter
and information board shall be submitted to and approved in writing by the
Council as Planning Authority, in consultation with the Council’s Public
Transport Unit. The approved scheme shall thereafter be installed at the
applicant’s expense, in accordance with the agreed details and confirmed as
operational by the Council’s Public Transport Unit, prior to the occupation of the
last residential unit.
Reason – In the interest of promoting sustainable public transport. 
39 The applicant proposes the removal of Condition 14 as Perth and Kinross
Council’s Public Transport Unit specified the bus shelter is to be provided to the
existing bus stop location on Stormont Road.  In a supporting statement, the
applicant has stated that the existing footpath in this location is not wide
enough to accommodate a bus shelter, requiring it to be set back within the
grounds of Scone Surgery. 
40 The supporting statement further states that the applicant can only install the
bus shelter either within their site or on Council owned land or adopted land
and that it is unreasonable for the Council to require the applicant to negotiate
with another landowner to provide the bus shelter within their land. As a result,
Page 32 of 110

Page 33

they state that they are unable to comply with the requirement of this condition,
hence they are seeking the removal of the condition. 
Roads and Transport 
41 The wording of Condition 14 does not specify an exact location for the bus
shelter. It states a scheme for the location and specification of a 3-bay
cantilever bus shelter and information board shall be submitted. The applicant
submitted a scheme for a bus shelter at an existing bus stop in Angus Road,
however, after consultation, the Council’s Public Transport section specified it
was to be located in the same location as existing stop on Stormont Road, at
Scone Surgery. 
42 The Public Transport section acknowledged that in order to maintain footpath
accessibility, there would be a need to set the shelter back in the grounds of
Scone Surgery, with liaison with the Surgery regarding this. No evidence has
been submitted from the applicant which suggests this has been undertaken.
To the contrary, the supporting statement states they can only provide the bus
shelter if it is to be located within the application site or on Council owned or
adopted land and that the Council cannot reasonably require negotiations to
take place with another landowner to provide the facility within third party title. 
43 With regard to public transport, there is a frequent bus service operating near
the application site. Service No 7 calls at a stop (Stormont Road Surgery)
approximately 50 metres from the nearest residential block on Stormont Road
heading west and there is an adjacent bus stop (opp. Stormont Road Surgery)
heading east.  These stops are part of a circular route leading into Perth City
Centre and Hillend beyond. Other stops where shelters are present are within
walking distance on Angus Road to the east and Mansfield Road to the south,
albeit a much further distance than the stops at the Surgery on Stormont Road.
The service runs at approximately 20 minute intervals between 06.11 hours and
18.33 hours then moves on to an hourly service after 19.00 hours. There is also
a well serviced Park and Ride facility within Scone which also runs at
approximately 20 minute intervals. 
44 The objections have expressed concerns that a shelter is required in this
location to serve the development as it is aimed at persons over 55 and the
level of parking within the development does not allow for multiple cars per
household requiring reliance on public transport. 
45 It is recognised through the objections received that there is a perception that
the absence of a bus shelter in this location would give rise to an increase in
traffic movements leading to congestion within Perth city centre.  It is clear that
both national and local planning policies require new developments to be
sustainable. In order to offset the potential for increased unsustainable car
journeys, there is no doubt public transport enhancement measures would
assist, however, there is no information to suggest that in the absence of a bus
shelter in this location, car usage would increase and the use of public transport
would be reduced. It is, therefore, held that the current arrangements would not
discourage the use of public transport.
Page 33 of 110

Page 34

46 As noted above, the applicant has stated that it is unreasonable for the Council
to require negotiations with another landowner. The application submission is
unclear, however, it is assumed that no negotiations have been attempted with
the landowner and as a result the scheme cannot be delivered. Conditions
requiring works on third party land are not normally appropriate in any case and
possibly would have been clarified at the granting of the earlier permission, had
the full implications been known at that time. 
47 In summary, Condition 14 has been imposed on the development at the
request of the Public Transport section, with the support of adopted planning
policy in order to ensure that appropriate public transport improvements are
secured in the interests of sustainable development. No objections have been
received to the removal of Condition 14 from the Public Transport section who
originally recommended the inclusion of this condition and there is no evidence
to suggest that in the absence of a bus shelter in this location, public transport
usage will significantly change, as a result of the proposed residential
development. Furthermore, the existing bus service is frequent and reliable and
as noted above, there is a Park and Ride facility located within a short distance
of the site. On that basis the proposal to remove the condition is considered to
be acceptable.   
Developer Contributions 
48 No change to developer contributions through amending Condition 14
of planning permission 22/00301/FLM. 
Economic Impact 
49 The economic impact from this proposal is anticipated to be limited. 
LEGAL AGREEMENTS 
50 Not required. 
DIRECTION BY SCOTTISH MINISTERS 
51 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
52 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
The proposed development in this instance relates solely to the removal of
Condition 14 (bus shelter and information board). Having taken account of the
Local Development Plan and material considerations, the development
proposed does not conflict with the Development Plan. It should be noted that
Page 34 of 110

Page 35

all other matters are unaffected from the existing permission and, therefore, as
a new standalone permission would be granted here. 
53 Accordingly the proposal is recommended for approval subject to the following
conditions. 
A RECOMMENDATION   
Conditions and Reasons for Recommendation 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
2.  The occupation of the residential accommodation herby approved shall be
restricted to occupants aged 55 and over and shall not be occupied as the sole
or main residence of any occupant aged under 55 years of age. 
Reason - For the avoidance of doubt and to ensure occupation of the
development hereby approved complies with the relevant Perth and Kinross
Local Development Plan Policy. 
3. The detail and timing of the on-site affordable apartment delivery as agreed in
association with planning permission 18/02139/FLM (Kingdom Housing
Association letter dated 24th February 2022) shall be delivered and managed in
accordance with the agreed delivery mechanism and timing. 
Reason - To ensure the development is in accordance with the terms of the
relevant Perth and Kinross Council Local Development Plan and to comply with
the Council's policy on Developer Contributions and Affordable Housing
Supplementary Guidance 2016. 
4.  In line with planning permission 18/02139/FLM (drawing number 18/02139/38),
the agreed details of the specification and colour of the proposed external
finishing materials to be used shall be implemented prior to the completion or
bringing into use of the development, whichever is the earlier. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
5. As agreed on drawing number 18/02139/62 of planning permission
18/02139/FLM, all trees on site (other than those marked for felling on the
approved plans) and those which have Root Protection Areas which fall within
the site shall be retained and protected. Protection methods shall be strictly in
accordance with BS 5837 2012: Trees in Relation to Design, Demolition and
Construction.  Protection measures, once in place, shall remain in place for the
duration of construction. Any works required within the Root Protection Areas
Page 35 of 110

Page 36

shall be fully justified by an arborist and a detailed construction method
statement shall be submitted to and approved in writing by the Council as
Planning Authority with subsequent works being undertaken to fully comply with
the arborist recommendations. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Council as Planning Authority. 
6. The agreed landscaping and planting scheme in association with planning
permission 18/02139/FLM (drawing numbers 18/02139/54 and 18/02139/59
shall be carried out and completed within the first available planting season
(October to March) after the completion or bringing into use of the
development, whichever is the earlier, and the date of Practical Completion of
the landscaping scheme shall be supplied in writing to the Council as Planning
Authority within 7 days of that date.  The scheme as agreed and implemented
shall thereafter be maintained to the satisfaction of the Council as Planning
Authority. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
7. The recommendations within the supporting Bat Activity Survey Report
(drawing number 18/02139/28) hereby approved shall be fully adhered to,
respected and undertaken as part of the construction phase of development. 
Reason - In the interests of employing best practice ecology and to ensure
there is no adverse impact on any protected species as identified under the
Wildlife and Countryside Act (1981). 
8. No removal of hedgerows, trees or shrubs or works to, or demolition of,
buildings or structures that may be used by breeding birds shall take place
between 1st March and 31st August inclusive, unless a competent ecologist
has undertaken a careful, detailed check of vegetation for active birds' nests
immediately before the vegetation is cleared or building affected, and provided
written confirmation that no birds will be harmed and/or that there are
appropriate measures in place to protect nesting bird interest on site. Any such
written confirmation should be submitted to the local planning authority. 
Reason In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981). 
9. The bird box specification (Madrid swift nest box from Wildcare) and locations
in association with planning permission 18/02139/FLM (drawing number
18/02139/69) shall be installed in accordance with the agreed details prior to
the occupation of the relevant residential block. 
Reason - In the interests of enhancing biodiversity opportunities on the site. 
Page 36 of 110

Page 37

10. The agreed locations for bin collection presentation in association with planning
permission 18/02139/FLM (drawing number 18/02139/44) shall be implemented
as part of the development. 
Reason - In order to ensure adequate servicing facilities are provided. 
11. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily,
within any neighbouring residential property, with all windows slightly open,
when measured and/ or calculated and plotted on a rating curve chart. 
Reason - In the interests of public health and to prevent noise pollution. 
12. The agreed construction traffic management scheme (CTMS) in association
with planning permission 18/02139/FLM (drawing numbers 18/02139/50 and
18/02139/51) shall be adhered to during the entire site construction
programme. 
Reason - In the interests of pedestrian and traffic safety and in the interests of
free traffic flow. 
13. In line with planning permission 18/02139/FLM, the accesses at Angus Road
and Stormont Road shall be upgraded to the satisfaction of the Council as
Roads Authority and footpath links, including dropped kerbs shall be provided
at both accesses in accordance with the standards required by the Council as
Roads Authority. 
Reason - In the interest of pedestrian and cycle safety. 
14. The agreed sustainable urban drainage system (SUDS) in association with
18/02139/FLM (drawing number 18/02139/52) shall be implemented and all
works operational prior to the bringing into use of the development. 
Reason - For clarity and in order to ensure that surface water arising from the
development is adequately dealt with and that any sustainable urban drainage
system (SUDS) does not increase flood risk elsewhere. 
B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
C PROCEDURAL NOTES 
None. 
Page 37 of 110

Page 38

D INFORMATIVES 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period
(see section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended)). 
2. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority
written notice of that position. 
4. This development will require the 'Display of notice while development is carried
out', under Section 27C (1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013.  The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance.  According to
Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development;
• Readily visible to the public; and
• Printed on durable material. 
5. No work shall be commenced until an application for building warrant has been
submitted and approved. 
6. The applicant is reminded that, should any protected species be present a
licence may be required from Scottish Natural Heritage to disturb a protected
species.  Failure to obtain a licence may constitute a criminal act under the
Habitats Regulations and penalties are severe for non-compliance. 
7. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended, it is an offence to remove, damage or destroy the nest of any wild
birds while that nest is in use or being built.  Planning consent for a
development does not provide a defence against prosecution under this act. 
8. Swift brick installation should proceed in accordance with Swift Conservation
guidance available from swift-conservation.org. Installation of lighting and bat
boxes should proceed in accordance with Bat Conservation Trust guidance. 
Page 38 of 110

Page 39

9. The applicant is advised to refer to Perth & Kinross Council's Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains
advice relevant to your development. 
10. The applicant is advised that in terms of Sections 56 of the Roads (Scotland)
Act 1984 he/she/they must obtain from the Council, as Roads Authority,
consent to open an existing road or footway prior to the commencement of
works.  Information on junction types, requirements for Vehicular Access
consents (VA1) and application forms are available at
www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of surface water should
be sought at the initial stages of design from Scottish Water and the Scottish
Environment Protection Agency. 
11. The applicant is advised to allow for a maximum of 10 linear metres of level
hard standing from bin storage or presentation point to refuse collection vehicle
to reduce manual handling for bin collection crews. 
12. The applicant is recommended to discuss potential options with the Council’s
Waste Services team (Tel: 01738 475000) for securing an onsite glass
recycling point for the benefit of the development. 
Background Papers: 3 letters of representation
Contact Officer: Gillian Peebles 
Date: 19 May 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 39 of 110

Page 40

Page 40 of 110

Page 41

22/00301/FLM - S42 application to remove condition 14 (bus shelter
and information board) of planning permission 18/02139/FLM
Land at 37 Angus Road, Scone, Perth
Created by Andrew Rennie on 02 May 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:5000
5(1)(ii)
Page 41 of 110

Page 42

Page 42 of 110

Page 43

22/00301/FLM - S42 application to remove condition 14 (bus shelter
and information board) of planning permission 18/02139/FLM
Land at 37 Angus Road, Scone, Perth
Created by Andrew Rennie on 02 May 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:1250
5(1)(ii)
Page 43 of 110

Page 44

Page 44 of 110

Page 45

Perth and Kinross Council
Planning and Placemaking Committee – 1 June 2022
Report of Handling by Head of Planning & Development
(Report No. 22/113) 
PROPOSAL:  Erection of retail unit (Class 1), formation of access, car parking,
engineering works, landscaping and associated works 
LOCATION: Land west of 4 Pickembere, Pitheavlis, Perth 
Ref. No: 21/00248/FLL
Ward No: P10- Perth City South 
Summary 
This report recommends approval of the application, subject to receipt of or other
means of securing identified developer contributions and the revocation of the
aspect of planning permission 99/00818/FUL to remove the ability to use that
premises for Class 1 retail use at the applicants existing Glasgow Road store.
Although the development is not considered to fully comply with the relevant
provisions of the Development Plan, there are material considerations which
outweigh the position of the Development Plan and justify a recommendation of
approval. 
BACKGROUND AND DESCRIPTION OF PROPOSAL  
1 The application site is located within the settlement boundary of Perth, on the
southern edge.  The Aviva campus, the main building of which is Category A
listed, lies to the south in an elevated position. Currently access is from the
main Aviva service road, through a vacant site to the southwest.  This area
previously used as a hotel/training centre linked to Aviva.  Topography
generally falls by c.5 metres west to east towards woodland (forming the Buckie
Braes) and a row of traditional stone cottages.  To the northwest, across
Necessity Brae is a residential area. 
2 Outline planning permission has previously been granted on a wider site,  this
including office use on the site and the subsequently developed housing across
Necessity Brae. The office element has never progressed. 
3 Aldi have explored extending their current store at Glasgow Road, which is
allocated in the Perth and Kinross Local Development Plan 2 within an
‘Employment Safeguarding’ adjacent to the city centre.  However they consider
the site is not large enough to deliver the business requirements sought in this
proposal. The existing store extends to a gross floorspace of  1,173sq metres
and the new store would increase to 1,884sq metres. In order to limit the
drawing of trade away from the city centre area, the permission for the existing
5(2)(i)
Page 45 of 110

Page 46

store will in part be revoked, to remove the ability to use it for Class 1 (retail)
purposes and the new store, in terms of retail impacts on existing identified
centres, considered only on the basis of it’s uplift in retail floorspace rather than
in addition to the vacated store.  The revocation process would require to be
completed before any positive decision was issued, if this proposal is supported
by committee.   
4 In addition to delivering a new retail store, replacing that at Glasgow Road. The
plans also include a new access junction from Necessity Brae, parking facilities,
retaining structures and landscaping. 
Pre-Application Consultation 
5 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009. Therefore, the applicant was not required to undertake any
formal pre-application consultation with the local community. 
6 The applicant did however undertake engagement early with the local
community and Councillors, to inform their submission. 
7 Online consultations were held with virtual question and answer sessions.  The
report on this indicates that there was a good level of support for the scheme
from 250 respondents (c.64%), with the concerns raised being considered and
responded to in the final submitted design, etc. 
NATIONAL POLICY AND GUIDANCE 
8 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework 2014 
9 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SSP) 
10 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
Page 46 of 110

Page 47

• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
11 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Promoting Town Centres: paragraphs 58 – 73 
• Supporting Business and Employment: paragraphs 92 –108
• Valuing the Historic Environment: paragraphs 135 – 151 
• Valuing the Natural Environment: paragraphs 193 – 218 
• Maximising the Benefits of Green Infrastructure: paragraphs 219 – 233 
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
• Promoting Sustainable Transport and Active Travel: paragraphs 269 – 291 
Planning Advice Notes 
12 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
Other Material Considerations 
Getting the Right Change: A Retail Strategy for Scotland – March 2022 
Scotland Retail Strategy 
13 The ‘Place Principle’ adopted in this recent Scottish Government publication is
one where people, location and resources combine to create a sense of
identity and purpose, and is at the heart of addressing the needs and realising
the full potential of communities. Creating communities and places people
want to visit, live and shop in, is seen as vital to Scotland’s Covid recovery –
not only for retail, but for culture, hospitality and tourism too. Where there are
actions to support a strong local retail and cultural destinations, there will be
opportunities for other businesses, such as hospitality and tourism, to
capitalise on increased footfall. ‘20 minute’ neighbourhoods are places where
people live within 20 minutes of walking, wheeling, cycling or using public
transport to reach key amenities like shops, services and green spaces. 
Scotland's National Strategy for Economic Transformation: Published March
2022.
Page 47 of 110

Page 48

14 The Scottish Government launched its Economic Development Plan with a
vision to create a well-being economy: a society that is thriving across
economic, social, and environmental dimensions, and that delivers prosperity
for all Scotland's people and places. The aim to achieve this while respecting
environmental limits embodied by our climate and nature targets. Whilst
creating this vision to increase investment and increase productivity. 
Creating Places 2013 
15 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It
notes that successful places can unlock opportunities, build vibrant
communities and contribute to a flourishing economy and set out actions that
can achieve positive changes in our places. 
National Roads Development Guide 2014 
16 This document supports Designing Streets and expands on its principles and is
considered to be the technical advice that should be followed in designing and
approving of all streets including parking provision. 
DEVELOPMENT PLAN 
17 The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2019. 
TAYPlan Strategic Development Plan 2016-2036 
18 TAYPlan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plans states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
19 The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application. 
• Policy 3: First choice for investment
• Policy 5: Town Centres First 
Perth and Kinross Local Development Plan 2 
20 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance.
Page 48 of 110

Page 49

21 The principal relevant policies are, in summary: 
• Policy 1: Placemaking 
• Policy 2: Design Statements 
• Policy 5: Infrastructure Contributions 
• Policy 6: Settlement Boundaries 
• Policy 7: Employment and Mixed Used Areas: Business and Industrial
• Policy 13: Retail and Commercial Leisure Proposals
• Policy 15: Public Access 
• Policy 16: Social, Cultural and Communities Facilities 
• Policy 25: Housing Mix 
• Policy 27: Listed Buildings 
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development 
• Policy 38: Environment and Conservation 
• Policy 39: Landscape 
• Policy 40: Forestry, Woodland and Trees 
• Policy 41: Biodiversity 
• Policy 52: New Development and Flooding 
• Policy 53: Water Environment and Drainage 
• Policy 55: Nuisance from Artificial Light and Light Pollution 
• Policy 56: Noise Pollution 
• Policy 57: Air Quality 
• Policy 60: Transport Standards and Accessibility Requirements 
Other Policies
Developer Contributions and Affordable Housing Supplementary
Guidance April 2020 
22 This document sets out the Council’s policies on Developer Contributions in
relation to Primary Education and Transport Infrastructure/A9 junction
upgrades, as well as setting out what Affordable Housing provision is required
for new developments. 
Placemaking Supplementary Guidance 2020 
23 The Council has prepared Placemaking Supplementary Guidance (2020) to
support Policy 1 (Placemaking) of the Perth and Kinross Local Development
Plan 2 (2019). It is to be used in the assessment of planning applications and to
assist in the placemaking process. 
Perth and Kinross Town Centre and Retail Study 2016 
24 The retail study is the most up to date assessment that has been undertaken of
capacity across the city to accommodate additional retail floorspace. 
SITE HISTORY 
25 08/00122/OUT Outline planning permission was approved on 15 August 2008
for a mixed use development comprising residential, hotel with associated
Page 49 of 110

Page 50

public house/restaurant, care home and offices with associated car parking,
internal access roads and adjusted site levels. 
26 14/00269/AMM related to the above parent permission and a subsequent
Section 42 consent (11/00933/FLM) matters specified in conditions were
approved on 12 September 2014 for the residential development now present
on the north side of Necessity Brae. 
CONSULTATIONS 
27 As part of the planning application process the following bodies were consulted: 
External 
28  Historic Environment Scotland – No objection, initial concerns addressed by
submission of a Heritage Assessment. 
29 Scottish Water – No objection. Note that capacity is available for foul and
water, subject to an application to secure connections. 
Internal 
30  Biodiversity/Tree Officer – No objection. Advise of no impact on protected
species. Concerns raised over the removal of trees and limited of biodiversity
enhancements. 
31  Community Greenspace – Initially objected to the proposals on the basis of
landscape concerns.  It was considered that these were largely addressed by
the subsequent   heritage assessment, design/boundary revisions and updated
landscaping proposals. 
32  Development Contributions Officer – No objection. Advise a contribution is
required for transport infrastructure (£87,654). 
33  Environmental Health (Contaminated Land) – No objection and no
conditions required. 
34 Environmental Health (Noise Odour) - No objection. Conditions
recommended related to noise, lighting and constriction management. 
35  Structures And Flooding – No objection to drainage proposals. 
36 Transport Planning – No objection. Conditions recommended for construction
traffic management, road improvements and submission of travel plan.  
Representations 
37  27 representations have been received, 16 in support and 11 objections.  The
main issues raised within the representations are: 
Page 50 of 110

Page 51

38 Support 
• Employment Provision
• Enhances Character of Area
• Results in Environmental Improvements
• Supports Economic Development
• Provides a shop within walking distance/shorter car trips 
39 Objections 
• Impact on Buckie Braes 
• Out of character with the area
• Adverse effect on visual amenity
• Contrary to development plan policy
• Inappropriate land use
• Loss of open space
• Loss of trees
• Noise pollution
• Road safety concerns
• Traffic congestion
• Flooding 
40 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS 
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not Required
Appropriate Assessment Habitats Regulations Appraisal AA
Not Required
Design Statement or Design and Access
Statement
Submitted
Reports on Impact or Potential Impact • Heritage Assessment, 
• Landscape Design Statement,
• Tree Survey, 
• Planning and Retail Statement, 
• Employment Land and Viability
Report, 
• Drainage Impact Assessment
inc Flood Risk Assessment, 
• Geo-Environmental
Assessment, 
• Consultation Report, 
• Transport Assessment, 
• Ecological Survey, 
• Noise Report. 
Page 51 of 110

Page 52

APPRAISAL 
41 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2019.  The relevant policy considerations are outlined in the
policy section above and are considered in more detail below.  In terms of other
material considerations, this involves considerations of the Council’s other
approved policies and supplementary guidance. 
42 In this instance, section 14(2) of the Planning (Listed Buildings and
Conservation Areas) (Scotland) Act 1997 places a duty on planning authorities
in determining such an application as this to have special regard to the
desirability of preserving the building or its setting or any features of special
architectural or historic interest which it possesses.   
Principle 
43 Aldi currently operate two stores in Perth, with the Glasgow Road store one of
the smallest in their Scottish portfolio with a gross floorspace of 1,173sq
metres. As such Aldi have been exploring opportunities to improve this stores
offering to be more in line with its other stores, such as through an extension. 
However, they advise this has not been feasible, due to the physical and
operational constraints of that site. The alternative instead being to relocate to a
larger site within the city. As a result of the alternative location, the existing
store on Glasgow Road would be closed and the ability of the building to
operate as a Class 1 retail facility removed, through a formal revocation. 
44 In seeking a new site within the city, Aldi considered a range of options
including alternative locations within the city centre, although none were
available, nor any sequentially preferable – in terms of retail policy
considerations. Following this, efforts were focused on considering sites in the
southern part of Perth, given their existing presence at Inveralmond (covering
the north area), leading to the selection of the application site. The Necessity
Brae site considered to occupy a prominent location, in a walkable location
which is highly accessible via a range of sustainable transport modes, given the
proximity to the A93.  The proposal therefore aligns with the principles
contained within the Scottish Government’s Retail Strategy for Scotland
published in March of this year. 
45 The site has been allocated in Local Development Plans for employment uses
for a number of years and planning permission has previously been granted for
a mixed commercial development.  However, the site has remained vacant and
the supporting statement details that there has not been any credible interest
for office development. Furthermore, a viability appraisal has been completed
which further identifies that development of the site for office, industrial or hotel
use would not be viable due to the significant abnormal development costs
Page 52 of 110

Page 53

associated to the site adversely affecting returns on investment and making it
unattractive to investors. 
46 In terms of the principle of retail use the site is identified as employment site
E165 within LDP2, specifically for employment uses (core), hotel, and non-
residential institutions – reflective of the historic planning permission. 
47 Policy 7 Employment and mixed-use areas applies and in relation to a
proposed retail use it has the following limited exceptions: 
‘(d) Proposals for retail uses in employment areas will not be acceptable unless
they are ancillary to an acceptable use on the site: 
(e) Proposals for service facilities (should exclude retail and commercial
facilities over 100 m2) and should serve the business and industrial area rather
than draw out-side trade and cumulatively should not equal more than 15% of
the allocated employment area.’ 
48 The proposed retail use does not meet either of these exceptions. Thus, the
proposal is contrary to the LDP2 Policy 7 and to the uses identified for E165. 
49 The supporting Employment Land and Viability Report (ELVR) acknowledges
that PKC’s Employment Land Audit shows an employment land supply of
213ha within Perth Core. However, this land supply largely relies on sites yet to
be serviced. In terms of sites which are already serviced and more readily
available, such as E165, there is a more limited supply. When considering
impact on employment land supply the Employment Land Audit 2020 identifies
that of the 22.23 ha of serviced land available within Perth Core area, 2.15 ha is
within E165, and 0.97ha of it would be lost if this planning application is
approved. In this regard it is noted that PKC are committed to providing 11.25
ha of employment land over the next five years (to meet demand), although not
directly in control of delivery. 
50 The site has potential to attract employment uses (class 4, 5 or 6), due to the
good public transport provision, including dedicated bus services to the
adjacent Aviva.  It is however acknowledged that the Post covid-19 situation is
more uncertain. The ELVR also identifies that neither an office, industrial or
hotel scheme is likely to be viable on the site, given the significant costs of
developing the site. PKC’s Estates and Commercial Investment team have
confirmed that the ELVR is well researched and makes a robust supporting
case on non-viability.  Furthermore, given the lack of delivery of the 
employment uses on site while other aspects have been delivered, the tabled
proposal would also align with Scotland’s National Strategy for Economic
Transformation in that the development would increase investment in the area
whilst also catering for social and economic benefits locally. 
51 It must therefore be considered whether the loss of 0.97ha is significant in
terms of the serviced employment land and the wider supply.  In real terms
0.5% of the overall employment land allocation in Perth Core would be lost,
Page 53 of 110

Page 54

furthermore it would lead to a loss of 4.3% of the serviced employment land in
that Core.   
52 Policy 13 Retail and Commercial Leisure Proposals is another key policy in
terms of considering the principle of this proposal. The Council’s own Retail
Study from 2016 identifies convenience retail capacity within the Perth
catchment. From the applicant’s assessment, it is stated that this floorspace
uplift can easily be accommodated, without significant impact on any protected
centre. 
53 The proposed store is a direct, if slightly larger, replacement for Aldi’s existing
store at Glasgow Road.  However, if the planning permission is granted without
securing the revocation of the retail use of the Glasgow Road store then there
would be a need for a Retail Impact Assessment (RIA) to consider the impacts
of an additional of 1,884m2 gross convenience floor space on existing identified
centres. This being reflective of Policy 13 within LDP2 which states, “retail and
leisure development of 1,500 square metres or more gross floor space outwith
a defined town centre boundary, and not in accordance with the Development
Plan, will require a transport, retail or leisure impact assessment.” However, if
the existing out of centre retail use is revoked then this proposal would only
result in an additional 711m2 of gross floorspace, containing 444m2 of retail
floorspace (355m2 for food sales and 89 m2 non-food). Only on this basis is it
considered that a RIA is not required. 
54 The Perth and Kinross Town Centre and Retail Study 2016 acknowledges two
main considerations and states, “In terms of the distribution of potential
opportunities for new store development in the Perth sub area, it is reasonable
to consider that Scone is a possible location for new store development to
serve the local population. For example, there would be capacity to support the
existing supermarket consent at Scone, or an alternative proposal, such as a
discount food store.” 
55 It is considered that the additional 444m2 of discount store provision proposed
helps address spare capacity for discount food store identified in the Perth and
Kinross Town Centre and Retail Study 2016, although not in Scone. However
the south/west area of Perth is one which is now identified for significant future
growth and has seen some of this in recent years – post 2016.  Furthermore,
the applicant has submitted a sequential assessment and it is considered that
the proposal meets the sequential test, as there are no suitable opportunities
within sequentially preferable locations. 
56 The following are site specific developer requirements associated to the E165
allocation:   
• Connect to the core path network to east.
• Tree survey required: enhancement of biodiversity and habitats and retention
of existing woodland.
• Flood Risk Assessment. 
57 These are considered in more detail in subsequent sections of the report. 
Page 54 of 110

Page 55

58 Overall, the proposed retail use is contrary to LDP2 Policy 7: Employment and
Mixed - Use Areas as well as the specific land use allocation set out in E165,
thus a departure from the Development Plan. However, alongside the
revocation of the Glasgow Road retail use it is considered that the proposal is
in accordance with Policy 13: Retail and Commercial proposals, as it meets the
sequential test which indicates there are no suitable opportunities within better
locations. In addition, the proposal would see 0.97ha developed of the
remaining 2.1ha at E165, leaving 1.13 ha for employment uses.  In turn the
proposal could allow the existing Aldi site to be utilised for Class 4, 5 and 6
potentially bringing 0.4 ha of serviced employment land forward, which is
currently in Class 1 (retail) use. 
Design and Layout 
59 The proposed retail unit with car parking, servicing and landscaping sees a
single storey building located to the south of the site with the service area
contained to the rear.  The access is to the west onto Necessity Brae and the
carpark lies to the north/northwest.   
60 The building has a simple rectangular floor plan with a low mono-pitch roof. 
The site, due to the sloping topography, requires land engineering works to
increase levels and create a platform for development. The building is to be
sited in the northern part, where no significant increase in levels are required.
Where the levels require to be increased and retained, to a maximum height of
c.4.95m (to the north/east) carparking areas will be provided.  The platforming
and cut and fill of sloping sites is not uncommon and can include the use of
masonry/ concrete retaining walls, gabion baskets or a crib lock structures.
However, the approach proposed seeks to mitigate the impacts and provide a
softer solution via the use of ‘Tensar Greenslope’, which is a naturally
vegetated, steep-slope earth retaining system. 
61 The buildings finishes were originally to be a grey roof and wall cladding with a
small amount of timber.  The plans have since been revised and now see
expansive timber cladding to walls and the roof finished in green coloured
panels, to tie in with the natural character of the site and the immediate context
of the woodland backdrop. 
62 The design, siting and materials are considered to be acceptable and comply
with Policy 1 Placemaking and the Placemaking Supplementary Guidance. 
Residential Amenity 
63 The proposed opening hours of the store are between 8am and 10pm, Monday
to Saturday and 9am to 8pm on Sundays. 
64 The site sees the closest residential properties to the east at 1 to 4 Pickembere
(Low Road) and then to the northwest (separated by Necessity Brae) where
there are flatted properties at Arthur Park. 
Page 55 of 110

Page 56

65 The store and its service yard are located to the south of the site set at the
furthest point from these dwellings.  The car park is however sited closer to 1 to
4 Pickembere.     
Air Quality  
66 The site is within the Perth Air Quality Management Area (AQMA) and an Air
Quality Assessment (AQA) supports the application.  The AQA aligns with the
submitted Transport Assessment and has used the traffic data from the recently
produced Systra 2019 baseline traffic model for Perth.  In line with the Institute
Air Quality Management impact descriptor the AQA concluded that the impact
from the proposed development will be insignificant for all pollutants. 
67 A dust assessment was also undertaken to assess construction phase impacts
and concluded that dust generated from the site construction activities would be
low risk. However, a construction management plan shall be required by
condition to ensure control measures and procedure to mitigate the effects of
dust and noise during the construction period of the development. (Condition 7) 
Noise  
68 The submission is also accompanied by a Noise Impact Assessment (NIA)
which assesses noise from the proposed car park, store service area, fixed
plant noise sources and deposit return scheme facilities. 
69 The NIA concluded that no additional mitigation noise control measures would
be required. As the development is not likely to have a detrimental effect on the
existing residential amenity at closest dwellinghouses for both daytime and
night-time as target criteria levels are not exceeded.  Conditions are
recommended in relation to noise to ensure that residential amenity is protected
from noise from the daily operations of the development. (Conditions 2, 3, 4
and 5) 
70 The NIA did not assess construction noise at the closest noise sensitive
residential properties therefore, a condition to control noise during the
construction phase due to the close proximity of the site to residential
properties is proposed. (Condition 15) 
Lighting 
71 The carpark would be at a higher level than the current ground level, as a result
of site level works.  However, the retaining structure would form a pediment
enclosure to the boundaries which will screen car headlights.  Otherwise, an
overall lighting scheme is proposed for the carpark and a condition will be
added to ensure that this is adequately screened. (Condition 6) 
72 It is therefore concluded that there is no unacceptable impact on residential
amenity from lighting and, subject to the conditions proposed, the proposal
complies with LDP2 Policies 17, 55, 56 and 57. 
Page 56 of 110

Page 57

Contaminated Land 
73 Site investigations have been undertaken to support a previous application for a
larger site (which included the application site). This saw no constraints to the
site’s redevelopment due to the presence of any contamination. 
Roads and Access 
74 The proposed vehicle and pedestrian access is to be formed directly onto the
B9112 (Necessity Brae).  The site-specific developer requirements states that
connection is to be made to the core path network to east.  However, this is not
included in the proposal, due to the change in levels which would require a
substantial stepped/ramp access and also reduce the potential for
landscaping/compensatory planting.   It is also considered that the link would
offer little benefit, as the Buckie Breas lead out of Perth and do not connect any
residential areas.  As such this aspect is not considered necessary. 
75 The site will be served by 100 parking spaces, including 8 accessible (two of
which would see electric vehicle charging points (EVCP)) along with 9 parent
and child spaces, and 4 EVCPs, (2 of which will be accessible, in addition to
the 6 disabled spaces). Furthermore, ducting will be provided within the car
park for a further 16 EVCPs should the need arise in the future. Cycle stands
will also be installed at the shopfront, for up to 10 bicycles. This is an
acceptable level of car and cycle parking for the development.  A condition is
recommended to secure the minimum number of cycle parking spaces and the
timing of their installation. (Condition 11) 
76 The delivery regime for Aldi stores generally involves the following: one to two
HGV deliveries (16.5m vehicles) and a smaller milk delivery (small rigid truck)
each day.  The HGV driving forwards into the site, reversing into the carpark
and then exit the site in forward gear. 
77 To facilitate the vehicle access into the site, the proposal is to relocate the
southwest bound bus stop.    
78 Trip generation information for the development, shows that there will be a
number of new trips and pass-by trips attracted to the store. 
79 With approximately 300 residential properties to the northern side of Necessity
Brae, it is considered that a signalised pedestrian crossing should be provided
to enable residents to cross and access the proposed Aldi store.  The location
of the crossing shall be agreed with the roads authority and operational prior to
the store opening. (Condition 9) 
80 The footway on the southern side of Necessity Brae is currently slabbed and
resulting increased footfall sees it recommended that an alternative material is
considered, such as a Hot Rolled Asphalt.  Improving evenness and navigation
by those with visual impairment. (Condition 9) 
Page 57 of 110

Page 58

81 With the large employment at Aviva to the southwest, it is recommended that
the footway to the west of the proposed vehicle access is extended round into
the site to the gas meter housing, to reduce the conflict between pedestrians
and vehicles. (Condition 9) 
82 Proposed ‘yellow box’ junction markings shall be subject to further discussion
with Perth & Kinross Council and Police Scotland, therefore the implementation
of the yellow box markings would not be approved through this planning
application.  An informative is recommended for discussions to take place, prior
to the implementation on the public road network. (Informative 11) 
83 Overall, the proposal is considered to comply with LDP2 Policy 60: Transport
Standards and Accessibility Requirements. 
Drainage and Flooding 
84 The application is supported by a Drainage Impact Assessment which includes
a Flood Risk Assessment.  This sees the site not identified within an area of
flood risk, but there are known surface water flooding issues within the area. 
The reports submitted have considered these issues and drainage proposed to
ensure the development does not contribute to any existing issues.   
85 The development is also to be connected to the Scottish Water network for
water and foul drainage.  Scottish Water note that the following assets are
within/or close proximity: a 225mm foul and combined sewer, 100mm surface
water sewer and a 200mm distribution main.  These have impacted the
development layout and the planting scheme. 
86 It is considered that the proposal complies with LDP2 Policy 52 - New
Development and Flooding and Policy 53 - Water Environment and Drainage 
Conservation Considerations 
87 The site is located to the north of the category A listed Aviva Insurance
Building.  Historic Environment Scotland (HES) initially considered that the
development proposed could have a negative impact on key views from the
Aviva Building in the immediate designed landscape which slopes down to the
development site. To better understand the impacts, they recommended that
further analysis of the setting was carried out to inform the design, proposed
materials and mitigation measures. Also advising that visualisations should be
produced to confirm the appearance of the building and car park in key views
northwards from the Aviva Building. 
88 This information has been submitted and HES reconsulted, where they
welcome the amendments and supporting information in the revisions that are
in line with their previous advice. These include a new Heritage Assessment,
updated Design and Access statement and landscape design plan, and
changes to the building design. They particularly welcome the visualisations
which help to show how the building will be seen in key views from the Aviva
building.
Page 58 of 110

Page 59

89 It is therefore considered that the proposed mitigation measures – including
changes to the roof colour and removal of cowls, timber clad elevations, and
redefining of the northern edge of the site with micro siting of new trees - will
make the supermarket building sufficiently recessive in the setting of the Aviva
Building.  The proposal is therefore considered to comply with Policy 28 Listed
Budlings of LDP2. 
Natural Heritage and Biodiversity 
90 A Preliminary Ecological Appraisal Report (PEAR) was undertaken in
September 2020 in accordance with best practice guidance.  The PEAR
reported that the trees present were not suitable to support roosting bats and
no evidence of mammals were found within the site or immediate surroundings. 
91 Overall, the site was assessed as providing low suitability to support protected
species and no evidence was found during the survey. 
92 The PEAR notes that the trees provide suitable nesting habitat for small bird
species and several birds were recorded during the survey. The grassland
within the site was noted as having a tall sward height and suitable for breeding
birds, but that human disturbance may limit this. As recommended in section
5:2 of the PEAR, any vegetation clearance must be undertaken outside of the
bird breeding season.  This will be covered by recommended Condition 13. 
93 The Biodiversity Officer noted that the original landscaping scheme could offer
enhancement for biodiversity.  The revised plans have enhanced this by
including planting to tie in with the Buckie Braes, planting native trees, pollinator
friendly planting, installing a variety of bird boxes, a bee post and pole mounted
bat boxes. 
94 Although the proposal involves significant clearance of trees there will be no
detrimental impact on protected species and the proposal is incorporating
biodiversity enhancement.  The proposal is therefore considered to comply with 
Policy 41 Biodiversity. 
Trees/Landscape 
95 The site is covered by a mix of tree species that are spread throughout forming
small groupings and boundary screening.   It is evident that a significant
number of trees would need to be felled to enable the development of the site
as there is not any significant existing clearing for either a building or parking. 
In addition, the site layout requires a new access point, engineering works and
sewer diversions, all further impacting tree retention. This is also confirmed in
supporting documents, which confirm it would not be feasible to retain a
significant amount of the trees and see the site developed for any significant
use, not just a supermarket.  It is therefore accepted that trees will need to be
felled to facilitate the development of this site and whilst the level of tree felling
is unfortunate it must overall be weighted against the benefits of bringing a site
forward. All recognising that it is zoned for development, is within the settlement
Page 59 of 110

Page 60

boundary, meets a retail need within the area, will serve an existing residential
population who can access on foot and will also provide employment
opportunities.   
96 If the tree loss is accepted then the landscaping scheme must offer acceptable
mitigation.  In this sense the initial landscaping scheme has been revised to
address concerns regarding the species chosen, etc. but also due to
clarifications on drainage wayleaves which has seen planting removed from
areas where it was previously shown.  The revised scheme also includes a
small amount of planting beyond the site boundary which the agent confirms
has been discussed with the relevant landowners.  Whilst this planting is
welcomed it couldn’t be controlled via condition or enforced and is therefore not
a determining issue in relation to the acceptability of the scheme. 
97 The supporting statement advises that 95 trees are to be removed, with only
one tree at the north boundary identified for retention.  The revised landscape
plan sees 102 trees to be planted, comprising: 2 trees at the west boundary, 46
at north, 40 at east, with 14 trees off site.  Overall the increase in tree numbers
is heavily weighted to the east.  This provides screening of the site to walkers
accessing Buckie Braes addressing some of the Community Greenspace
comments it also affords screening to the local residents adjacent to the east
boundary.   
98 The landscaping scheme includes herbaceous planting along the boundary with
Necessity Brae, this offers benefit for pollinators but would not screen the
building.  The supporting documents note that due to wayleaves and position of
retaining slopes tree planting cannot be accommodated within this area.  It
must also be noted that in planning terms it is not necessary to hide or screen
the development it is more important that the cumulative impacts of the
proposal can be accommodated within the landscape capacity.  It is considered
that the design of the building and colour pallet of materials (timber
cladding/green roof) will enable the building to blend with the landscape
backdrop.  The use of the Tensar Greenslope will also help integrate the
retaining structures into the landscape framework the herbaceous planting can
contribute in providing a green edge. 
99 The landscape proposals for the site are considered to provide adequate
mitigation and to comply with Policy 1 Placemaking. The proposal is also
considered to comply with Policy 40 Forestry, Woodland and Trees as
mitigation in the form of replacement planting has been included. 
Developer Contributions   
100 The Councils Transport Infrastructure Developer Contributions Supplementary
Guidance requires a financial contribution towards the cost of delivering the
transport infrastructure improvements which are required for the release of all
development sites in and around Perth. 
101 In this regard the site is located in the Perth Transport Infrastructure zone
(Appendix 3 of the Supplementary Guidance). 
Page 60 of 110

Page 61

102 The planning application form confirms that the proposed retail unit is 1,884
sqm of gross floorspace, comprising; trading (1,315 sqm) and non-trading
floorspace (569 sqm).  In line with par 6.8 of the Supplementary Guidance,
trading floorspace is calculated under the “Retail” contribution rate (£154 per
sqm) and non-trading floorspace is calculated under the “Employment”
contribution rate (£14 per sqm). 
103 It is however proposed that the retail operator’s existing site (located on
Glasgow Road) will see its retail permission revoked if this proposal is granted.
Therefore, only the net increase in floorspace will be assessed for
Contributions. 
104 The applicant’s Planning Statement (par 1.11) indicates that the existing retail
site provides 1,173 sqm gross floorspace, comprising; 760 sqm net floorspace.
This provides 760 sqm trading and 413 sqm non-trading. The contribution
required is therefore as follows:  
105 Trading: (1,315 – 760 sqm) 555 sqm x £154 = £85,470 
Non-trading: (569 – 413 sqm) 156 x £14 = £2,184 
Total: £87,654 
Economic Impact 
106 The supporting information indicates that all existing employees at Glasgow
Road would be transferred to the proposed new store. with an opportunity for
further full and part time roles. It will also provide additional employment during
the construction process. 
107 The proposal will also in turn through the closure and vacating of the existing
store provide an opportunity for new uses and associated economic activity.  As
the existing building would no longer have a lawful use, due to the revocation,
its location within a Class 4, 5, 6 allocation within LDP2 would see the principle
of such uses and the associated employment opportunities acceptable in
principle – subject to obtaining planning permission for such a use. 
Sustainable Development   
108 Policy 32 requires that proposals for all new buildings are required to
demonstrate that at least 10% of the current carbon emissions reduction set by
Scottish Building Standards will be met through the installation and operation of
low and zero-carbon generating technologies. 
109 The supporting statement details that the objective is to minimise energy needs
in development by following the Government’s Energy Hierarchy approach to
minimising energy use. This includes the innovative “heat recovery” technology
which removes 100% of a store’s requirement for heating equipment by
recycling heat from the refrigeration units.  In this case a condition will be added
so this can be agreed formally as the details submitted don’t cover the specific
10% requirement as outlined in the policy. (Condition 14) 
Page 61 of 110

Page 62

VARIATION OF APPLICATION UNDER SECTION 32A 
110 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the landscaping scheme,
finish materials and submission of additional supporting documents. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
111 The applicant will be required to enter into a Section 75 legal agreement in
order to secure the necessary contributions towards transport infrastructure. 
112 The existing permission for the Glasgow Road store will need to be part
revoked so that the retail use is removed as the applicant is seeking to justify
this application as an uplift in the existing retail store offering and not as a new
store.  This can be done under Section 65 of the Town and Country Planning
(Scotland) Act (as amended) which allows a planning authority to revoke or
modify a planning consent. 
DIRECTION BY SCOTTISH MINISTERS 
113 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
114 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is contrary to Policy 7 in that it would provide a
non-conforming use (Class 1 –Retail) and lead to a loss of employment land,
however a justification has been provided for the retail need in the area in
accordance with Policy 13.  It is therefore considered due to the site forming a
small proportion of the overall employment land supply and that as there is no
available/more preferable site that in this case there is a justification to override
the adopted Development Plan. 
115 Accordingly the proposal is recommended for approval subject to conclusion of
the required legal agreement(s) and thereafter the following conditions. 
A RECOMMENDATION 
Conditions and Reasons for Recommendation 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Page 62 of 110

Page 63

Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
2. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily,
within any neighbouring residential property, with all windows slightly open,
when measured and/ or calculated and plotted on a rating curve chart. 
Reason - In order to safeguard the neighbouring residential amenity in the
area. 
3. Noise levels form the operation and servicing of the development shall be
limited to an internal night-time target noise level of 42 dB LAFmax at
residential receptors. 
Reason - In order to safeguard the neighbouring residential amenity in the
area. 
4. Prior to the commencement of the development a Service Delivery Noise
Management Plan, shall be submitted to and agreed in writing by the Council
as Planning Authority and Environmental Health.  The plan shall include the
procedures and mitigation measures to control noise from all service delivery
operations of the store.  The details as approved shall then be implemented in
full as part of the operation of the site. 
Reason - In order to safeguard the neighbouring residential amenity in the
area. 
5. In the event of a justified noise complaint being received by the Council relating
to the operation of the development hereby approved, the operator shall, at its
own expense, employ a consultant approved by the Planning Authority to carry
out a noise assessment.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the noise
assessment shows that the noise levels do not comply with noise conditions, a
scheme of noise mitigation shall be included with the noise assessment,
specifying timescales for the implementation of the scheme, and shall be
submitted to the Planning Authority with 28 days of the assessment.  The
mitigation scheme shall thereafter be implemented in accordance with the
approved scheme and timescales and included within an updated Noise
Management Plan. 
Reason - In order to safeguard the neighbouring residential amenity in the
area. 
6. All external lighting shall be sufficiently screened and aligned so as to ensure
that there is no direct illumination of neighbouring land and that light spillage
beyond the boundaries of the site is minimised to a degree that it does not
adversely affect the amenity of the neighbouring land. 
Page 63 of 110

Page 64

Reason - In order to safeguard the neighbouring residential amenity in the
area. 
7. Prior to the commencement of the development a Construction Management
Plan shall be submitted to and agreed in writing by the Council as Planning
Authority and Environmental Health.  The CMP shall include a Dust
Management Plan for the control of dust and Noise Management Plan for the
control of noise during the construction phase of the development. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
8. Prior to the commencement of the development hereby approved, the applicant
shall submit a street light system designed to EN 13201 / BS 5489 to be
provided at the vehicle entrance to the development.  The type and standard of
lighting shall be assessed using the zoning system outlined in ‘The Institution of
Lighting Engineers Guidance Notes for the Reduction of Light Pollution’ and be
agreed in writing with the Council as Planning Authority and implemented in
accordance with the approved plans.   
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
9. Prior to the commencement of development, a detail design showing the
vehicle access onto B9112 Necessity Brae with the following schemes shall be
provided for: 
(a) a signalised pedestrian crossing on B9112 Necessity Brae to link footways
on either side of the road from the development site to the housing on the
north and northwest;
(b) a footway from the west of the vehicle access into the site round to the gas
meter housing;
(c) the finalised position of the relocated bus stop and associated road
markings; and
(d) the footway along the B9112 removing the slabbing to replace with for
example hot rolled asphalt between Low Road and Aviva’s most northerly
vehicle access, 
The scheme shall be submitted to, and approved in writing by, the Council as
Planning Authority.  The submission will confirm the location, specification,
detailed design and delivery timescales for the pedestrian crossing, footway link
from the west into the site, the relocation of the bus stop and footway at the
frontage of the development site.  The scheme for the approved shall thereafter
be implemented in full, prior to the opening of the retail unit. 
Reason - In the interests of road, pedestrian safety and connectivity with the
residential developments to the north and northwest of the development. 
10. No part of the development shall be occupied until a Travel Plan (TP), aimed to
encourage more sustainable means of travel, has been submitted and
approved in writing by the Council. The TP will have particular regard to
Page 64 of 110

Page 65

provision for walking, cycling and public transport access to and within the site
and will identify the measures to be provided, the system of management,
monitoring, review, reporting and the duration of the plan. 
Reason - To promote sustainable transport options and to meet advice within
Scottish Planning Policy on transport. 
11. Prior to occupation of the development on site, a cycle parking facility (Sheffield
Stand or equivalent) for a minimum of 10 cycles shall be provided at the
location detailed on drawing ref 35. 
Reason - To encourage active travel and meet advice within Scottish Planning
Policy on transport. 
12. Prior to the commencement of the development hereby approved, the applicant
shall submit for the further written agreement of the Council as Planning
Authority, in consultation with the Roads Authority (Structures), a Construction
Traffic Management Scheme (TMS) which shall include the following: 
(a) restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used;
(b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f) arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development
being deposited on the road;
(g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
(h) arrangements for signage at site accesses and crossovers and on roads
to be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road users of construction
traffic;
(j) arrangements to ensure that access for emergency service vehicles are
not impeded;
(k) co-ordination with other significant developments known to use roads
affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m) the provision and installation of traffic counters at the applicant's expense
at locations to be agreed prior to the commencement of construction;
(n) monitoring, reporting and implementation arrangements; 
(o) arrangements for dealing with non-compliance; and
(p) details of HGV movements to and from the site.  
Page 65 of 110

Page 66

The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interest of proper site management 
13. No removal of hedgerows, trees or shrubs or works to, or demolition of,
buildings or structures that may be used by breeding birds shall take place
between 1st March and 31st August inclusive, unless a competent ecologist
has undertaken a careful, detailed check of vegetation for active birds' nests
immediately before the vegetation is cleared or building affected, and provided
written confirmation that no birds will be harmed and/or that there are
appropriate measures in place to protect nesting bird interest on site.  Any such
written confirmation should be submitted to the Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
14. Prior to the commencement of development a statement shall be submitted
demonstrating compliance that at least 10% of the current carbon emissions
reduction set by Scottish Building Standards will be met through the installation
and operation of low and zero-carbon generating technologies.  The measures
as agreed shall be installed prior to operation/binging into use of the
development. 
Reason - to comply with Policy 32 of the Local Development Plan 2  
15. Noisy Construction work shall be limited to Monday to Friday 0700 hours to
1900 hours and Saturday 0800 hours to 1300 hours with no noisy works out
with these times or at any time on Sundays or bank holidays (as identified by
Scottish Government). 
Reason - In order to safeguard the neighbouring residential amenity in the
area. 
16. The detailed landscaping and planting scheme which is hereby approved shall
be implemented as part of the site development programme and thereafter
maintained to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
B JUSTIFICATION 
There are material considerations that result in a recommendation to depart
from the approved Development Plan 
C PROCEDURAL NOTES 
Permission shall not to be issued until the Section 75 Agreement and
revocation of the use of the existing store has been signed and registered to
take account of this application. The legal agreement should be concluded and
Page 66 of 110

Page 67

completed within 4 months of the date of any Committee approval. Failure to
conclude a legal agreement within 4 months will result in the planning
application being re-assessed through failing to comply with the associated
developer contributions policy and may be ultimately recommended for refusal
under delegated powers 
D INFORMATIVES 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period
(see section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended)). 
2. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory
requirement would constitute a breach of planning control under section 123(1)
of that Act, which may result in enforcement action being taken. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority
written notice of that position. 
4. No work requiring of a building warrant shall be commenced until an application
for building warrant has been submitted and approved. 
5. Application for a new postal address should be made via the Street Naming
and Numbering page on the Perth & Kinross Council website at
www.pkc.gov.uk/snn.  Please note there is a charge for this service and
submission cannot be made until the relevant Building Warrant has been
approved. 
6. This planning permission is granted subject to conditions, some of which
require further information to be submitted to Development Management either
before works can start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original application was
lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware that a fee is payable
in respect of each request made, though there is no limit to the number of
conditions that can be discharged in a single request.  The Fees Charter is
available on our website www.pkc.gov.uk.   
7. An inspection of the proposed development site did not raise any identified
concerns, although historical mapping indicates there was previously a nearby
use which may have resulted in contamination in the vicinity of the site.  The
applicant is advised that, given historical uses of the wider area, there may be
potential for contamination within the site.  Should any contamination be found
Page 67 of 110

Page 68

during the approved works, works should cease and the Land Quality team
should be contacted on 01738 475000 or es@pkc.gov.uk for further advice. 
8. The applicant is advised that in terms of Sections 56 of the Roads (Scotland)
Act 1984 he/she/they must obtain from the Council, as Roads Authority,
consent to open an existing road or footway prior to the commencement of
works.  Information on junction types, requirements for Vehicular Access
consents (VA1) and application forms are available at
www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of surface water
should be sought at the initial stages of design from Scottish Water and the
Scottish Environment Protection Agency. 
9. Street lighting plant is present at the site, discussions must be had with the
Street Lighting Partnership to obtain the locations of plant and the position of
the lighting columns at the vehicle access.  Contact Mark Gorrie at Perth &
Kinross Council Street Lighting Department for further details. 
10. This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to landscaping, elevation
finishes and supporting docs. 
11. Prior to the installation of the Yellow Box Junction Markings on the B9112
Necessity Brae, approval must take place with Police Scotland and the Roads
Authority. The Yellow Box Junction Markings must comply with Section 8 of
Traffic Signs Manual, Chapter 5 – Road markings (Department of Transport,
2018), including their suitability.  The and Network Team should be contacted
in this regard traffic@pkc.gov.uk 
Background Papers:  27 letters of representation
Contact Officer:  Joanne Ferguson 
Date: 19 May 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 68 of 110

Page 69

21/00248/FLL - Erection of retail unit (Class 1), formation of access,
car parking, engineering works, landscaping and associated works
Land 80 Metres West Of 4 Pickembere, Pitheavlis, Perth
Created by Andrew Rennie on 02 May 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:5000
5(2)(i)
Page 69 of 110

Page 70

Page 70 of 110

Page 71

21/00248/FLL - Erection of retail unit (Class 1), formation of access,
car parking, engineering works, landscaping and associated works
Land 80 Metres West Of 4 Pickembere, Pitheavlis, Perth
Created by Andrew Rennie on 02 May 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:1250
5(2)(i)
Page 71 of 110

Page 72

Page 72 of 110

Page 73

Perth and Kinross Council
Planning and Placemaking Committee – 1 June 2022
Report of Handling by Head of Planning & Development
(Report No. 22/114) 
PROPOSAL:  Change of use from retail unit (Class 1) to hot food takeaway 
(Class 3) and installation of flue 
LOCATION: 96 Glengarry Road, Perth, PH2 0AB 
Ref. No: 21/01488/FLL
Ward No: P10 - Perth City South 
Summary 
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and
there are no material considerations apparent which outweigh the Development
Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL  
1 This application relates to ground floor retail unit at 96 Glengarry Road, within
the Moncreiffe area of Perth. The retail unit is presently vacant and is part of
terraced row of four ground floor units that form a small local shopping area for
the immediate residential area. The existing row of units presently hosts a
convenience store and two existing hot-food takeaways. Above the units there
is an upper floor that contains private flatted dwellings. 
2 Planning permission is being sought for the change of use the existing shop
unit (class 1) to form a hot food takeaway and the installation of an extraction
flue. The proposals seek to use the existing window and door openings with
little change to the building asides from the replacement of the existing glass
panes on the front elevation and the erection of an extraction flue on the rear.
The proposed flue will be a galvanised steel structure, similar to the existing
neighbouring flue, that will extend from the existing rear flat roofed extension,
terminating above eaves level. The proposed operating hours of the takeaway
will be Monday to Thursday 1600 – 2200, Friday and Saturday 1600 – 2300,
and Sunday 1600 – 2200. 
NATIONAL POLICY AND GUIDANCE 
3 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
5(2)(ii)
Page 73 of 110

Page 74

National Planning Framework 2014 
4 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
Scottish Planning Policy 2014 
5 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
6 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: 24 – 35
• Placemaking: 36 – 57
• Supporting Business and Employment: paragraphs 32 – 108   
Planning Advice Notes 
7 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 75 Planning for Transport
• PAN 1/2011: Planning and Noise 
Creating Places 2013 
8 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It
notes that successful places can unlock opportunities, build vibrant
communities and contribute to a flourishing economy and set out actions that
can achieve positive changes in our places. 
National Roads Development Guide 2014 
9 This document supports Designing Streets and expands on its principles and is
considered to be the technical advice that should be followed in designing and
approving of all streets including parking provision.
Page 74 of 110

Page 75

DEVELOPMENT PLAN 
10 The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2019. 
TAYplan Strategic Development Plan 2016-2036 
11 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plans states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
12 The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application; 
• Policy 2: Shaping Better Quality Places
• Policy 3: A First Choice for Investment 
Perth and Kinross Local Development Plan 2 
13 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
14 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 17: Residential Areas
• Policy 54: Health and Safety Consultation Zones
• Policy 56: Noise Pollution
• Policy 60B: Transport Standards and Accessibility Requirements 
OTHER POLICIES 
15 None 
RELEVANT SITE HISTORY 
16 No recent planning history 
CONSULTATIONS 
17 As part of the planning application process the following bodies were consulted:
Page 75 of 110

Page 76

External 
18 Scottish Water – No objection.  
19 Health and Safety Executive – No objection. 
Internal 
20 Transport Planning – No objection 
21 Environmental Health – No objection subject to conditions 
22 Contributions Officer – No contributions required. 
23 Structures And Flooding – No objection. 
REPRESENTATIONS 
24 Thirteen letters of representations have been received. The objections can be
summarised as follows: 
• Lack of need for additional hot food takeaway in local area
• Impact on residential amenity – noise/odour
• Anti-social behaviour / littering
• Increase in traffic and impact on existing parking facilities 
ADDITIONAL STATEMENTS 
25 Screening Opinion EIA not required 
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable 
Appropriate Assessment Not applicable 
Design Statement or Design and Access
Statement
Supporting Statement provided 
Report on Impact or Potential Impact None required 
APPRAISAL 
26 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2019 (LDP2). 
27 The determining issues in this case are whether; the proposal complies with
development plan policy; or if there are any other material considerations which
justify a departure from policy. 
Page 76 of 110

Page 77

Policy Appraisal 
28 The principal policy of relevance is Policy 17 ‘Residential Areas’. This policy
seeks, amongst other things, to ensure that all new developments do not
compromise residential amenity. This policy will be applied in addition to the
Placemaking Policies 1A and 1B, which seek to ensure that all new
developments contribute positively to the quality of place. 
29 As there is the potential for noise disturbance from the proposed development,
Policy 56 ‘Noise Pollution’ will also be applied. This policy will ensure that there
is no adverse noise pollution from the proposed change of use. 
30 For reasons discussed throughout this report, the proposed development is
considered to be compliant with the relevant provisions of the aforementioned
Local Development Plan. The use is considered to be compatible with
neighbouring uses without compromising the amenity of the area, subject to
conditional control. 
Design and Layout 
31 The proposals will not result in any significant alterations to the existing public
facing elements of the building. The external appearance of the building will
remain largely unchanged with the only changes to the shop front being the
replacement of the existing glass panes on the front elevation and the
introduction of a small air vent. 
32 In addition to the above, the proposals also propose to install a single extraction
flue on the rear of the building, projecting up from the flat roof extension and
terminated 1 metre above eaves level. This flue will be of a similar scale and
design to that of the existing extraction flues on the adjacent hot food
takeaways. The flue is also located on the rear of the building and will not been
visible from Glengarry Road. 
33 As such, it is considered that the scale and design is acceptable and meets
with the requirements of Policy 1A and 1B of LDP2. 
Residential Amenity 
34 The site is located within a residential area and there are flatted properties
directly above the proposed takeaway. As such, it is important that the amenity
of the area is not compromised from the proposed development, with particular
regarding to both noise and odours which are normally associated with this type
of use. 
35 In this regard, the applicant has submitted details of the proposed extraction
equipment that will comprise of a single external flue on the east (rear)
elevation that will terminate 1 metre above eaves level. The extraction system
will feature an acoustic attenuator and carbon pre-filters and filters to ensure
that odour and noise are adequately controlled. Environmental Health have
reviewed the proposals for the ventilation/extraction equipment and are
Page 77 of 110

Page 78

satisfied that the development should not impact on the neighbouring
residential properties subject to conditional control in relation to hours of
operation, noise and odours (Conditions 2, 3 & 4). 
36 It is also noted that concerns have been expressed regarding anti-social
behaviour resulting from the proposed use. Anti-social behaviour from patrons
of the takeaway is a matter controlled via other legislation, a matter for the
police and is not considered to be a material consideration in the assessment of
this planning application. Likewise, members of the public littering falls into the
same category, of seeing other legislative controls which should not be
considered or replicated by the planning system. 
Roads and Access 
37 Transport Planning have reviewed the proposal and have no objection to the
proposed development. Whilst it is noted that concerns have been expressed
regarding parking and traffic, it is considered that there is adequate parking
outside the proposed unit and there is also a bus stop for members of public
travelling by bus. It is also considered that the level of traffic generated by the
proposed use will not unacceptably impact on the local transport network. 
38 As such, it is considered that the proposed development will not have any
adverse impact on road safety and the requirements of policy 60B are met.   
Lack of demand 
39 Whilst there may be a number of other existing nearby hot food takeaways, the
perceived lack of need for additional hot food takeaways within immediate area
is not a material consideration in the assessment of this planning application. It
is not uncommon for hot food takeaways to be located within small local
shopping area, as demonstrated by the two existing takeaways within the
neighbouring units. There are also no policy restrictions within LDP2 that seek
to limit the number of such uses in any given area. 
Drainage and Flooding 
40 The proposed site is not at risk to flooding and there are no known issues or
concerns in relation to drainage. 
Hazardous Pipeline 
41 The site is located within the HSE consultation zone for the Morris Young
(Perth) Ltd, that lies within the harbour area. The proposed site lies on the edge
of the outer zone and HSE’s online consultation service has concluded that
they do not advise against the development. 
42 On that basis, the proposals comply with the requirements of Policy 54 of
LDP2. 
Page 78 of 110

Page 79

Developer Contributions 
43 The Developer Contributions Guidance is not applicable to this application and
therefore no contributions are required in this instance. 
Economic Impact 
44 The proposal will bring a vacant unit back into use which will have a positive
economic impact on the local economy. There will also be some economic gain
from the conversion stage of the development. 
VARIATION OF APPLICATION UNDER SECTION 32A 
45 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the internal layout and
proposed ventilation system. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
46 None required. 
DIRECTION BY SCOTTISH MINISTERS 
47 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
48 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is considered to comply with the approved
TAYplan 2016 and the adopted Local Development Plan 2 (2019). Account has
been taken account of the relevant material considerations and none has been
found that would justify overriding the adopted Development Plan. 
49 Accordingly, the proposal is recommended for approval subject to the following
direction and conditions. 
A RECOMMENDATION 
Approve 
Conditions and Reasons for Recommendation 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice.
Page 79 of 110

Page 80

Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
2. Servicing of and deliveries to the premises shall be carried out between 0700
and 1900 Monday to Saturday only, with no servicing or deliveries permitted on
Sundays. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
3.  All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily,
within any neighbouring residential property, with all windows slightly open,
when measured and/ or calculated and plotted on a rating curve chart. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
4. Prior to the development hereby approved being completed or brought into use,
an effective ventilation system commensurate with the nature and scale of
cooking to be undertaken shall be installed and operated such that cooking
odours are not exhausted into or escape into any neighbouring buildings.
Thereafter the system shall be maintained. 
Reason - In order to safeguard the amenity of occupants of nearby premises
and to ensure the provision of a satisfactory ventilation system for the
premises. 
B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
C PROCEDURAL NOTES 
None required. 
D INFORMATIVES  
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period
(see section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended)). 
2. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
Page 80 of 110

Page 81

3. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority
written notice of that position. 
4. No work shall be commenced until an application for building warrant has been
submitted and approved. 
5. The applicant should be mindful of the need for regular cleaning and
maintenance of the extract system to ensure that odour and/or noise is
adequately controlled. DEFRA guidance advises that cleaning is undertaken
every 2-6 months, dependant on daily usages and carbon filters are changed
every 4-6 months.  The applicant should ensure that the manufacturers/DEFRA
guidance is followed at all times. 
Background Papers: None
Contact Officer:  David Niven
Date: 19 May 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 81 of 110

Page 82

Page 82 of 110

Page 83

21/01488/FLL - Change of use from retail unit (Class 1) to
hot food takeaway (Class 3) and installation of flue
96 Glengarry Road,  Perth
Created by Andrew Rennie on 02 May 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:5000
5(2)(ii)
Page 83 of 110

Page 84

Page 84 of 110

Page 85

21/01488/FLL - Change of use from retail unit (Class 1) to
hot food takeaway (Class 3) and installation of flue
96 Glengarry Road,  Perth
Created by Andrew Rennie on 02 May 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:1250
5(2)(ii)
Page 85 of 110

Page 86

Page 86 of 110

Page 87

Perth and Kinross Council
Planning and Plaemaking Committee – 1 June 2022
Report of Handling by Head of Planning & Development
(Report No. 22/115) 
PROPOSAL:  Installation of 2 CCTV cameras (in retrospect) 
LOCATION: Logiealmond Estate, Logiealmond 
Ref. No: 22/00228/FLL
Ward No: P5- Strathtay 
Summary 
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and
there are no material considerations apparent which outweigh the Development
Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The site forms part of the southern policies of Logiealmond Estate, which is a
sporting estate set in an upland location to the west of Harrietfield. The
proposals are retrospective and relate to the installation of 2 CCTV camera
units on a 5-metre-high timber post within an area of land which is situated
close to the Core Path network and the main access into the estate from the
minor, B8063 public road. 
Pre-Application Consultation 
2 None undertaken. 
3 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009. Therefore, the applicant was not required to undertake any
formal pre-application consultation with the local community. 
National Policy and Guidance 
4 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
5(2)(iii)
Page 87 of 110

Page 88

National Planning Framework 2014 
5 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions as well as informing the on-going programmes of the
Scottish Government, public agencies and local authorities. 
The Scottish Planning Policy 2014 (SSP) 
6 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans.
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
7 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Supporting Business and Employment: paragraph 92   
Planning Advice Notes 
8 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 77 Designing Safer Places 
9 Pan 77 identifies that where the risk of crime is high, natural surveillance many
need to be complemented by a more formal surveillance mechanism such as
CCTV. The siting and design of CCTV cameras should be carefully considered
to ensure their presence is known, without being over dominant.
Development Plan 
10 The Development Plan for the area comprises the TAYplan Strategic 
Development Plan 2016-2036 and the Perth and Kinross Local Development 
Plan 2019. 
TAYplan Strategic Development Plan 2016-2036 
11 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plans states that:
Page 88 of 110

Page 89

“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
Perth and Kinross Local Development Plan 2 
12 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
13 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking 
• Policy 39: Landscape 
Other Policies 
14 Placemaking Guide 2020 
SITE HISTORY 
15 Several applications have been submitted for consideration at the estate,
following major investment and ongoing upgrade works. Recent applications in
the vicinity have obtained permission for work to the private access road, the
formation of a new section of core path and associated landscaping, installation
of lamp posts, creation of a bin storage area and a gated entrance feature. 
16 20/00483/FLL Full Planning Permission application was Withdrawn 5 May 2020
for Erection of entrance gates, bin store and associated works 
17  20/00790/FLL Full Planning Permission was Approved 25 September 2020 for
Erection of entrance gates, bin store and associated works 
18 20/01318/FLL Full Planning Permission was Approved 11 November 2020 for
Alterations to track and formation of turning circle (in retrospect) 
19 20/01365/FLL Full Planning Permission 24 December 2020 for Installation of
lamp posts 
20 21/00373/FLL Full Planning Permission was Approved 26 May 2021 for Land
engineering works associated with ground source heat pump system 
21 21/01614/FLL Full Planning Permission was Approved 5 November 2021 for
Installation of lamp posts
Page 89 of 110

Page 90

CONSULTATIONS 
22 No consultations have been undertaken.  
Representations 
23 A total of 25 representations were received in respect of the current
application. The comments are split between those supporting (13) and
objecting (12) to the proposal. 
24 The letters in support cite similar safety, security/crime deterrent concerns
raised on behalf of the applicants such as need to protect working dogs, theft
of tools or equipment, vandalism, fly tipping and other crime prevalent in
remote locations. 
25  The main issues raised within the representations are: 
• Inappropriate location
• Visual impact
• Out of character with rural location
• Overlooking and loss of privacy
• Intimidation with intent to deter public access 
26 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS 
Screening Opinion  Not Required
Environmental Impact Assessment (EIA): Environmental
Report
Not applicable
Appropriate Assessment Not Required
Design Statement or Design and Access Statement Not Required
Report on Impact or Potential Impact eg Flood Risk
Assessment
Not Required 
APPRAISAL 
27 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2019.  The relevant policy considerations are outlined in the
policy section above and are considered in more detail below.  In terms of other
material considerations, this involves considerations of the Council’s other
approved policies and supplementary guidance, namely the Placemaking
Guide 2020. 
Page 90 of 110

Page 91

Principle 
28 The site is located outwith any defined settlement boundary and, as such,
background policy considerations and supplementary guidance form the
determining factor in the assessment of this application. In general terms,
the principle of developments which are deemed acceptable in land use
terms will be supported, subject to securing minimal impact and a good fit
within the wider landscape setting. 
29 In this instance Policies 1A & B: Placemaking and 39: Landscape of the Perth
and Kinross Local Development Plan 2 (2019) (LDP2) are directly applicable. 
30 Policy 1A and B seeks to ensure that all developments contribute positively to
the quality of the surrounding built and natural environment, respecting the
character and amenity of the place. 
31 Policy 39 outlines that development proposals will be supported where they do
not conflict with the aim of maintaining and enhancing the landscape qualities
of Perth and Kinross 
Design and Layout 
32 The application site is located approximately 60 metres back from the public
road in a narrow section of rough ground which borders the main private
access road to the east and a track leading down to agricultural land, to the
west. 
33 Within the site, a redundant, 5-metre-high, timber telegraph pole exists. Two
round “Starlight” CCTV cameras have been fixed at a height of 4.5 metres from
ground level. The cameras are identical in size and form. The round viewing
dome is fixed to the post by a white hanging bracket. The specification included
indicates that the camera units are capable of auto tracking movement and
operation in low light levels. 
34 Confirmation has however been received from the installer that the units have
been programmed with a mask facility, so that the area of coverage extends to
the roadway only, in order to monitor vehicles entering and leaving the estate. 
35 The location of the cameras is logical given that the aim is to focus on the main
access route for vehicular traffic into and out of the estate, rather than the
extensive hinterland. The camera units are modest in size at 190mm by
332mm, featuring an inoffensive, contemporary “bubble” type design that is
routinely used in commercial, retail and domestic environments. The overall
impact of the supporting timber post and CCTV equipment is acceptable and
compatible with the placemaking policy considerations that seek to ensure
development contributes positively to its surroundings, is respectful of the
surrounding landscape character, is of an appropriate height and appearance
and will enable safe and accessible access, which in this case is to the
adjacent core path network. The proposal is therefore considered to comply
with these aspects of Policy 1A.
Page 91 of 110

Page 92

Landscape and Visual Impact 
36 The visual impact of the retrospective proposals is minimal in terms of the site
context within the wider landscape setting. The site is therefore acceptable in
terms of Policy 39 Landscape requirements as the distinctive local landscape
characteristics are unaffected. No landscape features of merit have been
affected by the proposals and nearby tree and shrub cover will screen the
proposals from the public road network. 
37 A more recessive green or black coloured camera housing unit would have
been less obtrusive, rather that the stark white bracket and framing which
exists. However, it is acknowledged as noted in PAN 77, that in terms of
security, the visibility itself of the CCTV equipment can act as a deterrent to
unwelcome individuals. The timber post on which the cameras are installed is
acceptable in terms of providing a natural material which will weather and
become less noticeable through time. No significant on- or off-site visual impact
concerns are raised by the development. The proposal is therefore considered
to comply with the relevant aspects of Policies 1B and 39. 
Residential Amenity 
38 There are no nearby residential properties or third-party land that would be
affected by the cameras. Comment has been made about the cameras being
able to look inside an objector’s house and people working the land. The
residential property concerned is however not in the direct line of sight of the
access road or camera range, being set over 800 metres away and the
masking facility is such that no nearby fields will be actively monitored. The
proposals as a result, raise no residential amenity concerns. 
Core Path Amenity 
39 A number of concerns have been raised by path users who have questioned
the need for CCTV in this location, claiming that it is being utilised more as a
means of intimidation to walkers and should be moved to the areas of value
which need security coverage. Whilst the perception of being monitored is
understandably not encouraging to core path users, the cameras in themselves
are not restricting access and the landowner is fully aware of the need to
continue to allow unhindered access. Supporting information provide on behalf
of the estate confirms that the units are not and will not be monitored, nor do
they contain face or number plate recognition capabilities. They are being used
as a deterrent and to assist Police when there is a need to report any criminal
activity. 
Roads and Access 
40 As there are no changes to the existing road or access provision, there are no
concerns associated with this proposed development. 
Page 92 of 110

Page 93

Waste Collection 
41 The waste collection area is unaffected by the proposals. 
Natural Heritage and Biodiversity 
42 No issues or concerns are raised with the proposals. 
Developer Contributions 
43 No developer contributions are required. 
Economic Impact 
44 The economic impact of the proposals is minimal. The security provided by the
cameras will however help to safeguard the financial investments and
operations at the estate. 
VARIATION OF APPLICATION UNDER SECTION 32A 
45 This application has not been varied. Confirmation has been obtained in
respect of the extent of camera coverage. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
46 None. 
DIRECTION BY SCOTTISH MINISTERS 
47 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
48 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is considered to comply with the approved
TAYplan 2016 and the adopted Local Development Plan 2 (2019).  Account
has been taken account of the relevant material considerations and none has
been found that would justify overriding the adopted Development Plan. 
49 Accordingly the proposal is recommended for approval subject to the following
conditions. 
Page 93 of 110

Page 94

A RECOMMENDATION   
Approve the application 
Conditions and Reasons for Recommendation 
1 The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by 
conditions imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
C PROCEDURAL NOTES 
None 
D INFORMATIVES 
There are no relevant Informatives. 
Background Papers: 25 letters of representation
Contact Officer: Alma Bendall
Date: 19 May 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 94 of 110

Page 95

22/00228/FLL - Installation of 2 CCTV cameras (in
retrospect)
Logiealmond Estate, Logiealmond
Created by Andrew Rennie on 02 May 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:25000
5(2)(iii)
Page 95 of 110

Page 96

Page 96 of 110

Page 97

22/00228/FLL - Installation of 2 CCTV cameras (in
retrospect)
Logiealmond Estate, Logiealmond
Created by Andrew Rennie on 02 May 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:1250
5(2)(iii)
Page 97 of 110

Page 98

Page 98 of 110

Page 99

Perth and Kinross Council
Planning and Placemaking Committee – 1 June 2022
Report of Handling by Head of Planning & Development
(Report No. 22/116) 
PROPOSAL:  Erection of an agricultural building 
LOCATION: Land east of Moivaird House, Ochtertyre, Crieff PH7 4JR 
Ref. No: 22/00529/FLL
Ward No: P6- Strathearn 
Summary 
This report recommends approval of the application as the development is
considered to comply with the relevant provisions of the Development Plan and
there are no material considerations apparent which outweigh the Development
Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The application site comprises agricultural land, extending to approximately 2
hectares to the east of Moivaird House, which is in the same ownership as the
residential dwellinghouse. 
2 The proposal seeks detailed planning permission for the erection of an L-shaped
timber agricultural shed, which has a modest footprint of 45sqm. The shed would
have benefitted from permitted development rights, and the simplified prior
notification process, had it not been for ground works being carried out in
preparation for the shed. 
Pre-Application Consultation 
3  Not Applicable. 
4 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009. Therefore, the applicant was not required to undertake any
formal pre-application consultation with the local community. 
NATIONAL POLICY AND GUIDANCE 
5 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.  
5(2)(iv)
Page 99 of 110

Page 100

6 The Scottish Planning Policy 2014 (SSP) 
7 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
8 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Gardens and Designed Landscapes: paragraph 148   
Planning Advice Notes 
9 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 40 Development Management 
DEVELOPMENT PLAN 
10 The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2 2019. 
TAYplan Strategic Development Plan 2016-2036 
11 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision for the area as
set out in the plans states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
Perth and Kinross Local Development Plan 2 
12 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population
and economic growth.”  It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. The principal relevant policies are, in
summary:
Page 100 of 110

Page 101

• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 29: Gardens and Designed Landscapes
• Policy 39: Landscape 
Other Policies 
Developer Contributions and Affordable Housing Supplementary
Guidance April 2020 
13 This document sets out the Council’s policies on Developer Contributions in
relation to Primary Education and Transport Infrastructure/A9 junction
upgrades, as well as setting out what Affordable Housing provision is required
for new developments. 
SITE HISTORY 
14 09/01975/FLL Full Planning Permission was Approved On 20 January 2010
for Alterations and extension to house 
15 12/01917/FLL  Full Planning Permission was Approved On 7 January 2013 for
Alterations and extension to dwellinghouse 
16 15/00048/FLL Full Planning Permission was Approved On 23 April 2015 for
Alterations and extension to existing dwellinghouse to form a larger modified
dwellinghouse. 
17 21/02301/FLL Full Planning Permission application was Withdrawn On 14
March 2022 for Erection of an agricultural building 
CONSULTATIONS 
18 As part of the planning application process the following bodies were consulted: 
External 
19 Scottish Water - No objection received. 
20 Historic Environment Scotland - No adverse comments on the impact of the
proposals on the Ochtertyre Garden and Designed Landscape. 
Internal 
21 Transport Planning - The proposal would utilise an existing vehicular access
from the adjacent private access track – No objections.  
Representations 
22 A total of 7 letters of representation have been received in respect of the
current application. The main issues raised within the representations are: 
Page 101 of 110

Page 102

• The proposal is contrary to the development plan
• Large proportions of the shed would be at odds with the area
• Impact of proposal on the designed landscape and surrounding area
• Potential of the timber shed to turn into a steading conversion for domestic
use
• Inadequate access and increase in volume of traffic 
23 These issues are addressed in the Appraisal section of the report. Speculative
concerns regarding potential future developments are not a material planning
consideration. 
ADDITIONAL STATEMENTS  
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not Applicable
Appropriate Assessment Habitats Regulations –
AA Not Required
Design Statement or Design and Access
Statement
Not Required
Report on Impact or Potential Impact eg Flood
Risk Assessment
Not Required 
APPRAISAL 
24 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2019.  The relevant policy considerations are outlined in the
policy section above and are considered in more detail below. 
Principle 
25 The provision of storage facilities on agricultural land, for the storage of
equipment to maintain the land, is generally considered to be acceptable in
principle. Nevertheless, consideration must be given to the specific details of
the proposed development, within the context of the application site, and
whether it would have an adverse impact on visual or residential amenity, the
character and appearance of the place or the designed landscape. 
Design and Layout 
26 The proposed timber agricultural shed has an L-shaped footprint with a shallow
pitched roof. It would measure 2.7 metres in height, with a maximum width of
7.4 metres and a maximum depth of 9.6 metres. It would be located within
agricultural land between Moivaird House and the ancillary outbuilding at the
neighbouring property, Gamefield. The position of the corner shed has been
Page 102 of 110

Page 103

selected by the applicant to sensitively integrate the proposal into the
surrounding built and natural environment as the location benefits from mature
beech hedging which exceeds the height of the proposed shed. 
Landscape 
27 Policies 29 (Ochtertyre Garden and Designed Landscape) and 39 (Upper
Strathearn Local Landscape Area) of LDP2 seek to safeguard the sensitive
nature of the protected landscape. The proposal consists of a low-rise, small
scale, implement and storage shed which would be sited within a well-screened
corner of the agricultural land. The proposal meets the requirements of policies
29 and 39. Therefore, concerns raised regarding the proposal having an
adverse impact on the landscape character of the area cannot be
substantiated. 
Residential Amenity 
28 Given the position and nature of the proposed agricultural building, the
residential amenity of neighbouring properties would not be adversely affected.
In the interests of establishing a clear distinction between the domestic
curtilage of Moivaird and its adjacent agricultural land, the applicant has offered
to build a separation fence with associated field access gate between the two
areas of land, along the blue dotted line on the site plan (drawing 04). This can
be secured by condition (Condition 2). 
Visual Amenity 
29 The agricultural storage shed is of small proportions, with a footprint of 45sqm,
and its L-shaped footprint would fit well within the corner of the agricultural land.
Therefore, it does not raise any concerns with regards to having an adverse
impact upon visual amenity. Therefore, policies 1A and 1B of LDP2 are
satisfied. 
Roads and Access 
30 The proposal would utilise an existing vehicular access from the adjacent
private access track. Vehicular activity along the private access track is unlikely
to substantially increase as a result of the proposed storage shed. Accordingly,
there are no road or access concerns associated with this proposed
development. 
Drainage and Flooding 
31 There are no drainage or flooding implications associated with this proposed
development. 
Developer Contributions 
32 No developer contributions are required for the scale of agricultural
development proposed.
Page 103 of 110

Page 104

Economic Impact 
33 The economic impact of the proposal is likely to be minimal and limited to the
construction phase of the development. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
34 None required.   
DIRECTION BY SCOTTISH MINISTERS 
35 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
36 To conclude, the application must be determined in accordance with the
adopted Development Plan unless material considerations indicate otherwise.
In this respect, the proposal is considered to comply with the approved
TAYplan 2016 and the adopted Local Development Plan 2 (2019).  Account
has been taken account of the relevant material considerations and none has
been found that would justify overriding the adopted Development Plan.
Accordingly, the proposal is recommended for approval subject to the following
conditions. 
A RECOMMENDATION   
Approve the application 
Conditions and Reasons for Recommendation 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
2. Prior to the use of the development hereby approved, a one-metre-tall post and
rail timber fence shall be erected along the dashed blue line on drawing 04,
with a field gate on the access link between the domestic curtilage and the
agricultural land. 
Reason - In the interests of amenity; to create distinction between the
residential curtilage and the agricultural land, to ensure a satisfactory standard
of local environmental quality. 
Page 104 of 110

Page 105

B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
C PROCEDURAL NOTES 
None Required. 
D INFORMATIVE NOTES 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period
(see section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended)). 
2. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority
written notice of that position. 
4. An application for Building Warrant may be required. 
Background Papers:  7 letters of representation
Contact Officer:  Keith Stirton
Date:  19 May 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 105 of 110

Page 106

Page 106 of 110

Page 107

22/00529/FLL - Erection of an agricultural building
Land East Of Moivaird House, Ochtertyre, Crieff
Created by Andrew Rennie on 02 May 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:25000
5(2)(iv)
Page 107 of 110

Page 108

Page 108 of 110

Page 109

22/00529/FLL - Erection of an agricultural building
Land East Of Moivaird House, Ochtertyre, Crieff
Created by Andrew Rennie on 02 May 2022
© Crown copyright and database rights 2022 Ordnance Survey
100016971. You are permitted to use this data solely to enable you
to respond to, or interact with, the organisation that provided you
with the data. You are not permitted to copy, sub-licence, distribute
or sell any of this data to third parties in any form.
Scale 1:1250
5(2)(iv)
Page 109 of 110