Perth and Kinross Council
Planning and Placemaking Committee – 1 June 2022
Report of Handling by Head of Planning & Development
(Report No. 22/111) 
PROPOSAL:  Formation of a battery storage system with associated work and
infrastructure of up to 49.9 MW 
LOCATION: Land 130 Metres South East of Coupar Angus Substation
Pleasance Road Coupar Angus 
Ref. No: 22/00195/FLM
Ward No: P2 - Strathmore 
Summary 
This report recommends approval of the application which proposes the formation
of an electrical energy storage facility, including up to 15 battery storage
containers and associated infrastructure, adjacent to Coupar Angus Substation.
The proposals are considered to comply with the relevant provisions of the
Development Plan with no material considerations apparent which outweigh the
Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The site is c.1.21 hectares (Ha) in area, with approximately 0.54Ha forming the
substations and equipment compound, contained within a security fence. The
balance comprises the access and landscaped areas. All located c.250m
south-west of the settlement boundary of Coupar Angus, and surrounded
largely by agricultural land (Broad Valley Lowland), other than the recently
upgraded substation directly west and properties to the north of the northern
section of the access. Local topography is generally level, with a slight slope up
to the north. 
2 In September 2019, Planning Permission (Ref: 19/00513/FLM) was granted at
this location for a similar battery storage facility, vehicular access and
associated works. Subsequently, after that development commenced in early
2021, as a result of various factors and resultant design modifications (i.e. more
efficient plant and equipment), the developer chose to depart from the
consented design.  This saw the development then being undertaken begin to
depart from the approved design.  Initially in June 2021 a non-material variation
to the approved development was submitted (Ref: 21/01186/FLL), but the
Planning Authority subsequently confirmed that those changes, although
relatively minor when considered individually, overall constituted a materially
different development and accordingly a new application for planning
permission was required.  This application now seeks planning permission for

Page 2

the revised development scheme, thus some of these preliminary elements are
retrospective.   
3 In physical terms, the proposals are for 15 containerised storage units
(dimensions 12.19 x 2.44 x 2.6m), housing 15 battery units; 15 Power
Conversion Systems (PCS) and transformers on skids; a District Network
Operator (DNO) substation; a medium voltage (MV) substation; LV Room,
Emergency Diesel Generator; welfare and parts storage facilitates; security
alarm, cameras; and access track. The access track (approximately 70m in
length) culminates at a new junction onto Pleasance Road. Supporting
infrastructure including a temporary construction compound is also required. 
4 The battery storage facility will be enclosed by a 3m high palisade security
fence, with a 3m high acoustic fence along the northern perimeter. Security
cameras and lighting columns, also up to 3m in height will also be proposed
along the perimeter fence.   
5 A significant planting and a landscaping scheme is proposed to assist integrate
the proposed development into the wider surroundings.   
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
6 Directive 2011/92/EU (as amended) requires the ‘competent authority’ (in this
case Perth and Kinross Council) when giving a planning permission for
particular large-scale projects to do so in the knowledge of any likely significant
effects on the environment.  The Directive therefore sets out a procedure that
must be followed before ‘development consent’ can be given. 
7 This procedure, known as Environmental Impact Assessment (EIA), is a means
of drawing together, in a systematic way, an assessment of a project’s likely
significant environmental effects.  The EIA Report helps to ensure that the
importance of the predicted effects, and the scope for reducing any adverse
effects, are properly understood by the public and the relevant competent
authority before it makes its decision. 
8 An EIA screening has previously been undertaken, concluding that an EIA was
not required as the proposal was not considered likely to have significant
environmental effects. However, a suite of supporting assessments, presenting
environmental information in respect of flooding, noise, ecology, traffic and
transport were required. 
PRE-APPLICATION CONSULTATION 
9 The proposed development is a ‘Major’ development, in terms of the Town and
Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009,
due to the potential energy storage capacity proposed being in excess of
20MW.  The applicant was therefore required to undertake formal pre-
application consultation with the local community. Public concerns raised as
part of this process identified noise, landscaping and flood risk as being matters
not addressed by the consultation events.  These matters have been responded

Page 3

to in writing by the agent and included within a Pre-Application Consultation
(PAC) Report submitted with this application.   
10 The PAC Report notes that a letter drop to local properties (within a 1 km
radius) was undertaken, outlining that consultation events were held online, as
permitted by the relevant regulations.  These online events were held on the 1st
and 16th of December between 4:30 and 6:30pm, with an additional event on
the 11th of January 2022. As the Coupar Angus Community Council was
disbanded in 2020 additional invites were provided to neighbouring community
councils, local MPs and MSPs and Council Members.  A total of 19 interested
parties attended the events and a number of comments and concerns were
reviewed and addressed within the PAC report and wider planning submission.
The content and coverage of the community consultation exercise is
considered sufficient and proportionate and in line with the aforementioned
regulations. 
NATIONAL POLICY AND GUIDANCE 
11 The Scottish Government expresses its planning policies through: The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars.   
National Planning Framework (NPF) 
12 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure.  Under the Planning etc. (Scotland) Act 2006, this is now a
statutory document and a material consideration in any planning application.  It
provides a national context for development plans and planning decisions as
well as informing the on-going programmes of the Scottish Government, public
agencies and local authorities. 
Scottish Planning Policy (SPP) 2014 
13 The current SPP was published in June 2014 and sets out national planning
policies, which reflect Scottish Ministers’ priorities for operation of the planning
system and for the development and use of land.  It promotes consistency in
the application of policy across Scotland, whilst allowing sufficient flexibility to
reflect local circumstances. It directly relates to: 
• The preparation of development plans;
• The design of development, from initial concept through to delivery; and
• The determination of planning applications and appeals. 
14 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability : paragraphs 24 – 35
• Placemaking : paragraphs 36 – 57

Page 4

• Promoting Rural Development: paragraphs  74 – 91
• Supporting Business and Employment: paragraphs 92 – 108
• Delivering Heat and Electricity: paragraphs 152 – 173
• Valuing the Natural Environment: paragraphs 193 – 218
• Managing Flood Risk and Drainage: paragraphs 254 – 268 
Planning Advice Notes 
15 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are also of relevance to the proposal: 
• PAN 3/2010 Community Engagement
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 73 Rural Diversification
• PAN 75 Planning for Transport
• The Future of Energy in Scotland: Scottish Energy Strategy (December 
2017) 
DEVELOPMENT PLAN 
16 The Development Plan for the area comprises: the TAYplan Strategic
Development Plan 2016-2036; and the Perth and Kinross Local Development
Plan 2014. 
TAYplan Strategic Development Plan 2016-2036 
17 TAYplan sets out a vision for how the region will be in 2036 and what must
occur to bring about change to achieve this vision. The vision states that: 
“By 2036 the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of
life will make it a place of first choice where more people choose to live, work,
study and visit, and where businesses choose to invest and create jobs.” 
18 Policy 7: Energy, Waste and Resources of TAYplan is of particular importance
in the assessment of this application. 
Perth and Kinross Local Development Plan 2019 
19 The Local Development Plan 2 (LDP) was adopted by Perth and Kinross
Council on the 29th November 2019.  It sets out a vision statement for the area,
which includes that, “By 2036, the TAYplan area will be sustainable, more
attractive, competitive and vibrant without creating an unacceptable burden on
our planet. The quality of life will make it a place of first choice where more
people choose to live, work, study and visit and where businesses choose to
invest and create jobs.” It is the most recently adopted statement of Council
policy and is augmented by Supplementary Guidance.

Page 5

20 The principal relevant policies are: 
• Policy 1A and 1B Placemaking
• Policy 2 Design Statements 
• Policy 5 Infrastructure Contributions
• Policy 6 Settlement Boundaries
• Policy 8 Rural Business and Diversification
• Policy 27A Listed Buildings 
• Policy 33A Renewables and Low Carbon Energy 
• Policy 33B Repowering and Existing Facilities 
• Policy 35 Electrical Transmission 
• Policy 39 Landscape 
• Policy 40 Forestry, Woodland and Trees
• Policy 41 Biodiversity
• Policy 47 River Tay Catchment Area 
• Policy 50 Prime Agricultural Land 
• Policy 52 New Development and Flooding 
• Policy 53 Water Environment and Drainage 
• Policy 55 Nuisance from Artificial Light Pollution 
• Policy 56 Noise Pollution 
• Policy 60B Transport Standards and Accessibility Requirements 
SITE HISTORY 
21 16/02230/FLL Erection of a switch-room facility at the adjacent sub-station
approved on 9 March 2017 
22 18/01672/FLL Formation of an energy storage compound including battery
storage containers, ancillary equipment, vehicular accesses, track and
associated works.  This application was returned on 19 November 2018,
following a screening which determined the proposal was a ‘Major’
development and required public consultation to take place. 
23 18/00016/PAN A ‘Proposal of Application Notice’ relating to a ‘Major’
development comprising: the formation of an energy storage compound
including 15 battery storage units, inverters and transformers, a substation,
ancillary equipment, store, vehicular access, track and associated works. PKC
confirmed on 6 February 2019 that the approach set out in the PAN was
accepted. 
24 19/00513/FLM Detailed planning permission for the formation of a battery
storage facility, vehicular access and associated works was approved on 24th
September 2019. 
25 21/00015/PAN A ‘Proposal of Application Notice’ relating to a ‘Major’
development comprising: Formation of battery energy storage system with
associated work and infrastructure of up to 49.9 MW saw PKC confirm on the
18th November 2021 that the approach set out in the PAN was accepted.

Page 6

26 21/01186/FLL A Non-Material Variation, in relation to changes to the layout of
19/00513/FLM, was sought.  On the 16 July 2021 this application was returned
as it was determined the changes proposed were material and a new
application for detailed planning permission would be required. 
CONSULTATIONS 
27 The following parties have been consulted: 
EXTERNAL 
28 Dundee Airport - No objection. No other Comments Provided 
29 Scottish Water - No objection. Informative noted in respect of drinking water 
and connection to sewer systems.   
30 National Grid: - No objection. The development is located outside of the High 
Risk zone for National Grid Gas Transmission. 
31 Perth and Kinross Heritage Trust - No objection and no additional comments 
made 
32 RSPB – No comments. 
INTERNAL  
33 Biodiversity Officer - No objection, subject to conditions regarding: the
implementation of biodiversity survey action points; a pre works check for
protected species; and the implementation of proposed landscaping.     
34 Strategy and Policy – No comments. 
35 Structures and Flooding - No comments.   
36 Community Greenspace - No comments. 
37 Environmental Health (Noise/ Odour) - No objection subject to conditions
regarding noise, external lighting and an external complaint procedure. 
38 Transport Planning - No objection subject to a condition to ensure
construction traffic is appropriately managed. 
39 Development Contributions Officer - No objection, clarifying that no
contributions are required. 
REPRESENTATIONS 
40 One objection has been received, with concerns summarised as follows: 
• Noise Impacts

Page 7

• Landscape impacts 
• Flooding and Drainage.   
41 The matters raised are addressed in the Appraisal section below. 
ADDITIONAL STATEMENTS 
Environment Report Not Required
Screening Opinion Undertaken – Not EIA
development.
Environmental Impact Assessment Not Required
Appropriate Assessment Not required
Design Statement  Submitted
Reports on Impact or Potential Impact
• Flood Risk Assessment 
• Landscape and Visual
Appraisal
• Preliminary Ecological
Appraisal  
• Noise Impact Assessment 
• Design and Access Statement 
• Construction traffic
Management Plan 
APPRAISAL 
42 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The adopted Development Plan comprises the TAYplan
Strategic Development Plan 2016–2036 and the Perth and Kinross Local
Development Plan 2 (2019).  The relevant policy considerations are outlined in
the policy section above and are considered in more detail below.  In terms of
other material considerations, this includes considerations of the Council’s
other approved policies and supplementary guidance as set out and specifically
Scottish Energy Strategy (SES) (December 2017), the future of energy in
Scotland. 
Principle 
43 The location is a peripheral rural area on the edge of Coupar Angus, policy
considerations seeking to assess its suitability in principle are: Policies 1A, 1B,
Placemaking, Policy 8 Rural Diversification, Policy 33A and 33B Renewables
and Low Carbon Energy and Policy 50 Prime Agricultural Land.  Furthermore,
and of significant material consideration in the assessment of this application is
the previous approval of planning permission for the development of a battery
energy storage facility, which overlaps the majority of the site area.

Page 8

44 In itself the proposal would provide essential energy balancing services to the
National Grid, actively contributing towards Scotland's CO2 reduction targets,
supporting the strategy principles of the SES. Specifically, electricity would be
drawn from the Grid at times of low demand, stored and released back as
required. When demand is higher, greater generation from non-renewable
sources is required and energy storage facilities such as that proposed could
reduce reliance on non-renewable resources, decreasing CO2 emissions. An
important consideration is that the principle of a development for a proposal of
this nature and at this location has already been established through the
granting of Planning Permission 19/00513/FLM. The changes from that
previously approved development are otherwise considered acceptable, as set
out below.   
Design and Layout 
45  The design and layout essentially reflect the physical and engineering
requirements, with infrastructure details consistent with industry standards. In
physical terms, the development will be contained below 4m in total height. 
The tallest visible built structure will be the substation building which will be
3.9m at its roof pitch above ground level. Remaining built elements will be
approximately 3.3m in height above ground level. All built development within
the storage compound will be enclosed behind a security fence and an acoustic
fence up to 3m in height.  Having regard to the overall scale and height of built
structures horizontal massing is more significant than vertical impacts. This
aspect is further considered in the landscape and visual impact sections below.
Physically separation between each container is a minimum of 3m and
colour/finishes can be controlled by condition 9. 
Landscape and Visual Impact 
46 Safeguarding and enhancing landscape character and green infrastructure is
considered via LDP Policies 1 and 33. In this instance, as said above the
proposed utilitarian design is largely set, thus some landscape and visual
impacts are inevitable. In this respect currently defined boundaries and
screening is limited, and the site is thus relatively prominent. Therefore, it is
especially important to ensure robust landscaping and associated green
infrastructure provides screening from key viewpoints, softens the immediate
and cumulative landscape impact, whilst also improving biodiversity
opportunities.  In line with Policy 33, the cumulative visual impact of the
proposal and the existing sub-station should also be taken into account. 
47 A landscape visual impact assessment (LVIA) was requested, along with a fully
detailed structural landscape plan. These were key in assessing if the
proposals could be successfully accommodated visually.   
48 Existing landscape features will be supplemented by robust and comprehensive
native planting (plan 22/00195/30) as well as an acoustic screening fence along
the northern compound boundary (plan 22/00195/30 and 22/00195/31). These
proposals are considered sufficient to satisfactorily accommodate the
development in the landscape. Following establishment, it is not considered

Page 9

that there would be unacceptable impact on landscape or visual amenity, with
photomontages (plan 22/00195/15) indicating the predicted situation. 
49 The proposal is therefore considered to accord with policies 1 and 33.   
Residential Amenity 
50 The closest residential properties (grouping of 5) are approximately 250m to the
northeast of the compound and immediately north of the northern section of the
access (including Tweedside Cottages, Tweedside Bungalow, Pleasance Farm
and The Firs), with further residential properties approximately 500m distant (off
Pleasance Road and within Abbey Gardens).   
51 PKC Environmental Health (EH) initially raised concerns on the potential of
noise impact on residential properties. Potential noise sources including: air
conditioning units, invertor cooling fans, switchgears, transformer and
background reactor noise, and in emergency circumstances the use of a diesel
generator.  A supporting noise impact assessment (NIA) assessed the potential
impact on nearby residential properties and sets out associated mitigation
recommendations. 
52 This NIA sees noise from the emergency generator scoped out, due to its
highly infrequent and short-term impacts. EH confirmed this is acceptable and
that any adverse impacts are covered by statutory nuisance legislation. 
Furthermore, the recommended noise based conditions are considered to allow
for mitigation.   
53 Based on the proposed mitigation measures outlined in the NIA (including the
provision of an acoustic fence) and subject to conditions 2, 3, 4 and 5, EH do
not object to the proposal and as such it is considered to comply with Policy 33
of the LDP, with no likely unacceptable impact on the amenity of residential
properties. 
Lighting 
54 The impact of artificial lighting has been noted as a matter of concern. 
However, the use of lighting is to be minimal and primarily for security
purposes. Condition 6 can control spillage and limit operation. 
Roads and Access 
55 LDP2 Policy 60B requires that local road networks be capable of absorbing
traffic generated by development and that satisfactory access is provided.  No
public objections have been raised with respect to traffic and access.   
56 The development proposes a new access off Precinct Street and this access
point was previously approved via 19/00513/FLM. Notwithstanding, it is
acknowledged that the present local road network layout and narrow pinch
points, sees potential for issues during the development phase, due to the size
of vehicles. As such a Construction Traffic Management Scheme (CTMS) can

Page 10

be required via condition 7, to ensure construction access requirements are
accommodated, including directing movements via alternative routes: such as
to avoid Precinct Street.   
57 Subject to compliance with condition 7 (CTMS) and Condition 8, requiring the
formation of a vehicle crossing, the proposal is considered to remain in
accordance with Policy 60B of LDP2.   
Drainage and Flooding 
58 Policy 52 requires development to appropriately consider flooding and
drainage. In this regard, the objection raises concerns in respect of flooding
from a tributary to the Coupar Burn.   
59 Having regard to the previous planning permission (Ref: 19/00513/FLM) both
SEPA and the Structures and Flooding team were satisfied that the
development was unlikely to be impacted by significant flooding.  With all
principal infrastructure elements situated out with the functional floodplain, and
there was unlikely to be any flood risk elsewhere.  Having regard to this
application, which is seeking minor changes to the layout and equipment types
only, the supporting flood impact assessment confirms there will be no
development within the functional floor plain.  Furthermore, no land raising and
landscape planting is proposed within the functional floodplain.  Consequently,
no further consultation was considered required.  Condition 14 has been
recommended to avoid raising ground within the flood plain to safeguard the
storage and conveyance function. 
60 The proposals are thus considered to satisfy policy 52 of LDP2 
Conservation Considerations 
61 In relation to above and below ground conservation considerations, there is no
indication of any significant designations locally. Otherwise, due to the low-lying
topography and existing/ proposed planting, inter-visibility will be limited and not
considered to cause any adverse impact on the setting of any listed buildings or
the conservation area of Coupar Angus. 
Natural Heritage and Biodiversity 
62 LDP2 Policies 39, 40 and 41 are relevant considerations in respect of potential
biodiversity impacts or opportunities arising from the development. In this
respect the Landscape Masterplan includes largely native species and contains
a number of positive elements, making a likely valuable contribution to
biodiversity, consistent with the Perth and Kinross Forestry and Woodland
Strategy. There are some sections of hedgerow, trees, etc. which may be
impacted by the development and conditions are recommended to ensure that
impacts on these or protected species, such as birds, are mitigated. (Conditions 11
and 12)

Page 11

63 The Councils biodiversity officer has reviewed the development proposal and
raised no objections subject to conditions seeking the adoption of proposed
landscaping, recommendations of the preliminary ecological appraisal and the
protection of nesting birds.  Subject to conditions 10-13 and compliance with
the action points noted in the biodiversity survey, the proposal is considered to
accord with policies 39-41 of the LDP2.   
Developer Contributions 
64 There has been comment that no local benefits would result from the
development.  However, in planning policy terms, no developer contributions
are triggered for this type of development. As a result the planning authority
cannot require the provision of money or infrastructure, not clearly required as a
result of the development. 
Economic Impact 
65 In the short term, construction will create jobs with scope for local employment.
Beyond this local employment opportunities are limited. However, there is a
clear fit between Scottish Government aims of promoting a transition to a low
carbon economy and this proposal. The proposal would also support local
renewable energy generation, by helping balance fluctuations of intermittent
energy generation.  It also represents a significant inward investment in rural
Perthshire, assisting in the creation of a national grid asset of regional
significance for the Perth and Kinross area. 
Loss of Prime Agricultural Land 
66 Policy 50 sets out that development outwith settlements shall not be permitted 
on prime agricultural land, unless necessary to meet a specific need such as: a 
major infrastructure proposal, and that there is no other suitable site available 
on non-prime land. 
67 Whilst the site comprises prime agricultural land (LCA Class 2). The reasons for
selecting the location are clearly set out in supporting documents and
considered reasonable, highlighting the proximity of the existing substation as
beneficial, reducing the need for long transmission cables and increasing the
efficiency of the storage facility. 
68 It is also clarified that there are no peat or carbon rich soils present and the
layout and design minimises land take, with no farm unit rendered unviable.
Measures to manage, protect and reinstate soils have been set out and are to
be incorporated into the development, which will be appropriately controlled by
condition 17, all satisfying the objective terms of Policy 50 of LDP2. 
69 Overall, the loss of this prime agricultural land has been limited and considered
acceptable, when balanced against the wider benefits of the proposed
development.

Page 12

Lifespan of Facility 
70 The lifespan of the facility is not specified. As such, condition 19 can require
that should the energy storage facility not be in use for a continuous period of
12 months, that the site is then decommissioned and re-instated to its original
condition. 
LEGAL AGREEMENTS 
71 None required 
DIRECTION BY SCOTTISH MINISTERS 
72 None. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
73 The application must be determined in accordance with the adopted
Development Plan, unless material considerations indicate otherwise. In this
respect, account has been taken of the Local Development Plan and
associated material considerations, with the proposal not assessed to conflict
with the development plan in this case.   
74 Accordingly the proposal is recommended for approval subject to the following
conditions. 
A RECOMMENDATION   
Conditions and Reasons for Recommendation 
General 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
Noise 
2. All hereby approved plant or equipment shall be so enclosed, attenuated and/or
maintained such that any noise therefrom shall not exceed Noise Rating 35
between 0700 and 2300 hours daily, or Noise Rating 20 between 2300 and
0700 hours daily, within any neighbouring residential property, with all windows
slightly open, when measured and/ or calculated and plotted on a rating curve
chart. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality.

Page 13

3. Noise from the hereby approved development shall not exceed 33dB LAeq,(15
min), including any relevant penalties for tonality, impulsivity, intermittency or
other sound characteristics, when measured at any residential property in
accordance with BS4142 – Method for Rating Industrial Noise Affecting Mixed
Residential and Industrial Areas. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
4. Noise mitigation measures outlined in Section 7.1 and Appendix 3 of the hereby
approved Noise Impact Assessment undertaken by ARCUS - dated February
2022 (Plan reference 22/00195/16) , shall be implemented prior to the hereby
approved development being brought into use. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
5. In the event of a justified noise complaint being received by the Council the
operator shall, at its own expense, employ a consultant approved by the
Planning Authority to carry out a noise assessment to verify compliance with
conditions 2 and 3.  The assessment will be carried out to an appropriate
methodology agreed in writing with the Planning Authority.  If the noise
assessment shows that the noise levels do not comply with conditions 2 and 3
a scheme of noise mitigation shall be included with the noise assessment,
specifying timescales for the implementation of the scheme and shall be
submitted to the Planning Authority within 28 days of the assessment.  The
mitigation scheme shall thereafter be implemented in accordance with the
approved scheme and timescales.   
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
Lighting 
6. All external lighting shall be sufficiently screened and aligned so as to ensure
that there is no direct illumination of residential property and that light spillage
beyond the boundaries of the site is minimised.  In association, the operation of
the lighting shall be controlled so as to only be triggered by motion within the
security fenced boundaries of the site. 
Reason - In the interests of residential amenity; to ensure a satisfactory
standard of local environmental quality. 
Roads and Transport 
7. Prior to the commencement of works associated to the hereby approved
development, a Construction Traffic Management Scheme (TMS) shall be
submitted for the written approval of the Planning Authority, such TMS shall
include details of the following:

Page 14

(a)  restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used;
(b)  timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c)  a code of conduct for HGV drivers to allow for queuing traffic to pass; 
(d)  arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e)  emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f)  arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development
being deposited on the road;
(g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
(h)  arrangements for signage at site accesses and crossovers and on roads
to be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i)  details of information signs to inform other road users of construction
traffic;
(j)  arrangements to ensure that access for emergency service vehicles are
not impeded;
(k)  co-ordination with other significant developments known to use roads
affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m)  the provision and installation of traffic counters at the applicant's expense
at locations to be agreed prior to the commencement of construction; 
(n)  monitoring, reporting and implementation arrangements; 
(o)  arrangements for dealing with non-compliance; and
(p)  details of HGV movements to and from the site.   
The TMS as approved shall be strictly adhered to during the entire site
construction programme all to the satisfaction of the Council as Planning
Authority. 
Reason - In the interests of road safety. 
8. Prior to the development hereby approved being completed or brought into use,
the vehicular access shall be formed in accordance with Perth & Kinross
Council's Road Development Guide Type C Figure 5.7 access detail, and of
Type B Road construction detail.   
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary.

Page 15

External Finishing Colour 
9. Prior to the commencement of the development hereby approved, details of the
recessive, natural colour of the proposed external finishing materials to be used
for the hereby approved fence and other structures (i.e. auxiliary generator,
battery pack kiosks, battery storage substation, client substation invertor and
LV Room, etc.) shall be submitted to and agreed in writing by the Council as
Planning Authority.  The scheme as agreed shall be implemented prior to the
completion or bringing into use of the development, whichever is the earlier. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
Biodiversity 
10. The conclusions and recommended action points within the supporting
Preliminary Ecological Appraisal Report, prepared by Arcus Consultancy
Services – dated January 2022 (plan 22/00195/25) hereby approved shall be
fully adhered to, respected and undertaken as part of the construction phase of
development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
11. No removal of hedgerows, trees or shrubs that may be used by breeding birds
shall take place between 1st March and 31st August inclusive, unless a
competent ecologist has undertaken a careful, detailed check of vegetation for
active birds’ nests immediately before the vegetation is cleared and provided
written confirmation that no birds will be harmed and/or that there are
appropriate measures in place to protect nesting bird interests on site. Any
such written confirmation should be submitted in advance to the local planning
authority. 
Reason - In the interests of employing best practice ecology and to ensure
there is no adverse impact on any protected species as identified under the
Wildlife and Countryside Act (1981). 
12. Measures to protect animals from being trapped in open excavations and/or
pipe and culverts shall be implemented for the duration of the construction
works of the development hereby approved.  These measures may include:
creation of sloping escape ramps for animals, which may be achieved by edge
profiling of trenches/excavations; or by using planks placed into them at the end
of each working day; and open pipework greater than 150 mm outside diameter
being closed off at the end of each working day 
Reason - In order to prevent animals from being trapped within any open
excavations. 
13. The detailed landscaping and planting scheme (plan 22/00195/30) which is
hereby approved shall be completed within the first available planting season
(October to March) after the completion or bringing into use of the

Page 16

development, whichever is the earlier.  The approved scheme shall thereafter
be maintained, with any planting which fails to become established within five
years being replaced in the following planting season with others of a size and
species as previously approved.   
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
Flooding / Drainage 
14. For the avoidance of doubt, parts of the site are located within the 1/200 (0.5%
AEP) flood extent, with a medium to high risk of flooding.  Such areas must not
be raised above existing ground levels.  This applies to the entirety of the site
as identified by the red line shown in drawing 22/00195/02, titled Proposed Site
Plan. 
Reason - Ensure no displacement of floodwater to the rest of floodplain 
Facility Lifespan 
15. In the event the hereby approved development fails to store electricity on a
commercial basis for a continuous period of 12 months, then it shall be deemed
to have permanently ceased to be required.  In such an event the development
shall be decommissioned and the relevant parts of the site reinstated within
such timescale as agreed in writing by the Council as Planning Authority. 
Reason - To ensure the facility is removed from the site at the end of its
operational life, and to protect the character of the countryside, the visual
amenity of the area and nature conservation interests. 
B JUSTIFICATION 
The proposal is considered to comply with the Development Plan and there are
no other material considerations that would justify a departure from the relevant
policies. 
C PROCEDURAL NOTES 
None. 
D INFORMATIVES 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period
(see section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as
amended)). 
2. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to

Page 17

commence the development.  A failure to comply with this statutory
requirement would constitute a breach of planning control under section 123(1)
of that Act, which may result in enforcement action being taken. 
3. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority
written notice of that position. 
4. An application for Building Warrant may be required. 
5. The applicant should be advised that in terms of Section 56 of the Roads
(Scotland) Act 1984 he must obtain from the Council as Roads Authority
consent to open an existing road or footway prior to the commencement of
works. Advice on the disposal of surface water must be sought at the initial
stages of design from Scottish Water and the Scottish Environment Protection
Agency. 
6.    The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended, it is an offence to remove, damage or destroy the nest of any wild
birds while that nest is in use or being built. Planning consent for a
development does not provide a defence against prosecution under this act. 
7. The applicant is reminded that, should any protected species be present a
licence may be required from Scottish Natural Heritage to disturb a protected
species. Failure to obtain a licence may constitute a criminal act under the
Habitats Regulations and penalties are severe for non-compliance. 
8. This development will require the 'Display of notice while development is
carried out', under Section 27C (1) of the Town and Country Planning Act 1997,
as amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. According to
Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development.
• Readily visible to the public.
• Printed on durable material. 
9. This planning permission is granted subject to conditions, some of which
require further information to be submitted to Development Management either
before works can start on site or at a certain time. The required information
must be submitted via the ePlanning portal if your original application was
lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk. Please be aware that a fee is payable
in respect of each request made, though there is no limit to the number of
conditions that can be discharged in a single request. The Fees Charter is
available on our website www.pkc.gov.uk.The Council has two months to
consider the information. You should therefore submit the required information

Page 18

more than two months before your permission expires. We cannot guarantee
that submissions made within two months of the expiry date of your permission
will be able to be dealt with before your permission lapses. 
Background Papers: 1 letter of representation
Contact Officer:  Jamie Torrance 
Date: 19 May 2022 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT