Democracy Spraffa

23/00020/Pan

Perth and Kinross Council · 13 March 2024
Back to Planning and Placemaking Committee — 13 March 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Perth and Kinross Council
Planning and Placemaking Committee – 13 March 2024
Pre-Application Report by Strategic Lead – Economy, Development and Planning 
(Report No. 24/78) 
PROPOSAL: Formation of a 49.9MW Battery Energy Storage System
(BESS) and ancillary infrastructure 
LOCATION: Land 256 Metres South West of Taigh An Struith, Tibbermore,      
Perth 
Ref. No: 23/00020/PAN 
Ward No: P9- Almond and Earn 
Summary 
This report is to inform the Committee of a potential forthcoming planning
application in respect of a major development for formation of a 49.9MW battery
energy storage system (BESS) and ancillary infrastructure on land 256 metres
South West of Taigh An Struith, Tibbermore, Perth, PH1 1PZ. The report also aims
to highlight the key planning policies and the likely stakeholders who would be
involved in the decision making process, and to offer a brief overview of the key
planning issues which are likely to be relevant to the proposal. 
BACKGROUND AND DESCRIPTION 
1. In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicants submitted a Proposal of Application
Notice (PoAN) on 13 December 2023. The purpose of this report is to inform
the Planning and Placemaking Committee of a forthcoming planning
application in respect of a major development for formation of a 49.9MW
battery energy storage system (BESS) and ancillary infrastructure. Pre-
application reports give the Committee an opportunity to raise issues which it
would like to see addressed in the planning application.  
2. This PoAN seeks to formally establish a major development. The exact range
of uses, scale and design of the development will be arrived at during pre-
application discussions. 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
3. Due to the scale of the proposal it will require to be screened as to whether
the proposal is an EIA development under the EIA 2017 Regulations. A
screening request is required to be submitted by the applicant.

Page 2

PRE-APPLICATION PROCESS 
4. The PoAN (reference 23/00020/PAN) confirmed that two public exhibitions
will be held at The Beild Centre, Blackruthven House, Perth, PH1 1PY on 24
January 2024 and 21 February 2024 between 12pm and 7pm. The Ward
Councillors, and Methven Community Council have been notified. The results
of the community consultation will be submitted with the planning application
as part of the required Pre-Application Consultation (PAC) Report. 
DEVELOPMENT PLAN 
5. The Development Plan for the area comprises National Planning Framework
4 (NPF4) and the Perth and Kinross Local Development Plan 2 (2019)
(LDP2). 
National Planning Framework 4 
6. The National Planning Framework 4 (NPF4) is the Scottish Government’s
long-term spatial strategy with a comprehensive set of national planning
policies.  This strategy sets out how to improve people’s lives by making
sustainable, liveable and productive spaces.   
7. NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
8. The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crisis 
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 8: Green Belts 
• Policy 11: Energy
• Policy 14: Design, Quality and Place
• Policy 18: Infrastructure First
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
9. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.” It is the most recent statement of Council
policy and is augmented by Supplementary Guidance.

Page 3

The principal relevant policies are, in summary; 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 2: Design Statements  
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries 
• Policy 8: Rural Business and Diversification
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled
Monuments
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 30: Protection, Promotion and Interpretation of Historic Battlefields 
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 33C: Renewable and Low Carbon Energy: Decommissioning and
Restoration of Existing Facilities
• Policy 35: Electricity Transmission Infrastructure
• Policy 39: Landscape 
• Policy 40: Forestry, Woodland and Trees
• Policy 41: Biodiversity 
• Policy 43: Green Belt  
• Policy 50: Prime Agricultural Land 
• Policy 51: Soils
• Policy 52: New Development and Flooding 
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution 
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals
• Policy 61: Airfield Safeguarding 
OTHER POLICIES 
10. The following non statutory guidance and documents are of particular
importance in the assessment of this application:- 
• Supplementary Guidance - Airfield Safeguarding (adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in
2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020)
• Supplementary Guidance - Developers Contributions and Affordable
Housing (adopted 2023)
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft)
• Perth and Kinross Community Plan 2013/2023
• Perth and Kinross Local Transport Strategy (2010)

Page 4

NATIONAL GUIDANCE 
11. The Scottish Government expresses its planning policies and guidance
through the National Planning Framework, Planning Advice Notes, Creating
Places, Designing Streets, National Roads Development Guide and a series
of Circulars.   
Planning Advice Notes 
12. The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal:- 
• PAN 1/2011 Planning and Noise 
• PAN 2/2011 Planning and Archaeology
• PAN 3/2010 Community Engagement
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 73 Rural Diversification
• PAN 68: Design Statements 
• PAN 79: Water and Drainage 
PLANNING SITE HISTORY 
13. None. 
CONSULTATIONS 
14. As part of the planning application process the following would be consulted:- 
External 
• Scottish Environment Protection Agency (SEPA)
• Scottish Water
• Historic Environment Scotland (HES)
• Perth and Kinross Heritage Trust (PKHT)
• Methven Community Council
• Dundee Airport
• Scottish Fire and Rescue Service  
Internal 
• Environmental Health (Noise / Odour)
• Environmental Health (Contaminated Land) 
• Development Contributions Officer 
• Transportation and Development
• Structures and Flooding
• Biodiversity Officer

Page 5

KEY ISSUES AGAINST WHICH A FUTURE APPLICATION WILL BE
ASSESSED 
15. The key considerations against which the eventual application will be
assessed include: 
a.  Visual Impact 
b.  Scale, Design and Layout 
c.  Relationship to Nearby Land Uses 
d.  Natural Heritage and Ecology
e.  Landscape
f.   Water Resources and Soils 
g.  Air Quality  
h.  Transport Implications 
i.  Tourism and Economy 
j.  Impact on Agriculture
k.  Archaeology and Cultural Heritage
l.  Cumulative impacts of nearby projects 
ADDITIONAL STATEMENTS WHICH WILL BE REQUIRED 
16. Should an EIA Report not be required the following supporting documents will
need to be submitted with any planning application: 
• Planning Statement
• Design and Access Statement
• Pre-Application Consultation (PAC) Report
• Transport Assessment
• Flood Risk and Drainage Assessment
• Landscape and Visual Impact Assessment
• Tree and Woodland Survey
• Habitat Survey
• Archaeological Assessment
• Sustainability Assessment
• Noise Impact Assessment and Lighting Strategy
• Ecological Impact Assessment
• Construction Management Plan 
CONCLUSION AND RECOMMENDATION 
This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in
respect of this development and members are recommended to note these
key issues and advise officers of any other issues which they consider should
be included as part of the application and assessment.  
Background Papers: None
Contact Officer: Kirsty Strong – Ext 01738 475333
Date: 1st March 2024

Page 6

DAVID LITTLEJOHN
STRATEGIC LEAD - ECONOMY, DEVELOPMENT & PLANNING