Report of Handling by Strategic Lead - Economy, Development & Planning
(Report No. 24/74) 
PROPOSAL: Siting of mobile crushing and screening plant (for a temporary
period) 
LOCATION: Newtyle Farm, Dunkeld, PH8 0HZ 
Ref. No: 23/01255/FLL
Ward No: P5 - Strathtay 
Summary 
This report recommends approval for the siting of mobile crushing and screening
machinery at Newtyle Farm, Dunkeld, as the development is considered to comply
with the relevant provisions of the Development Plan and there are no material
considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 This application seeks to obtain detailed planning permission for the siting of a
mobile crusher and screener (the ‘machinery’) for a two-year period at a former
slate extraction site at Newtyle Farm, Dunkeld. The machinery has previously
been sited and operated for several years on both this, and at various other
locations within the former slate extraction area. 
2 In its current location, detailed planning permission was granted in 2020 until 1
July 2023, at which point it should have been removed on the basis that it was no
longer required. This current application essentially looks to extend that
temporary period for a further 2-years, as there remain waste slate reserves to
gather, process and export. 
3 It should be noted that this planning application relates solely to the siting, and
operation of the machinery. The physical gathering and removal of the
surrounding waste slate material left over from the former mineral working
deposits is permitted development under the terms of Part 19, Class 66 of the
Town and Country Planning (General Permitted Development) (Scotland) Order
1992 (GPDO) and is subject to the specific conditions stated within that class –
which includes control over the eventual restoration of the site and details of the
vehicular access. For this particular part of the quarry the Class 66 authorisation
remains active, and material can still be removed from the site, but is not being
screened or crushed.

Page 2

PRE-APPLICATION CONSULTATION 
4 The proposal is not classified as ‘Major’ development and as such does not
require any statutory pre-application consultation with the local community. 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
5 The proposal has been screened and is not considered to require assessment
through EIA.  
DEVELOPMENT PLAN 
6 The Development Plan for the area comprises National Planning Framework 4
(NPF4), Perth and Kinross Local Development Plan 2 (2019) (LDP2) and
statutory supplementary planning guidance (SPG). 
National Planning Framework 4 
7 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. This
strategy sets out how to improve peoples lives by making sustainable, liveable
and productive spaces. 
8 NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
9 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 3: Biodiversity 
• Policy 4: Natural Places
• Policy 26: Business and industry 
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2 (2019)  
10 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
11 The site is located within the landward area of the LDP2, where the following
policies are applicable, 
• Policy 1A: Placemaking  
• Policy 1B: Placemaking  
• Policy 37: Inert and Construction Waste

Page 3

• Policy 38: Environment and Conservation  
• Policy 41: Bio-diversity 
• Policy 56: Noise Pollution  
• Policy 57: Air Quality 
Statutory Supplementary Planning Guidance 
12 The following statutory SPG are applicable to this proposal, 
• Placemaking 
• Delivering Zero Waste 
• Landscape 
OTHER PKC POLICIES 
Non-Statutory Planning Guidance (PG) 
13 The following non-statutory PG is applicable, 
• Planning & Nature 
NATIONAL PLANNING GUIDANCE 
14 The Scottish Government expresses its planning policies and guidance through
Advice Notes (PAN), Creating Places, Designing Streets, National Roads
Development Guide and a series of Circulars. 
Planning Advice Notes 
15 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding 
SITE HISTORY 
16 20/0005/NOTIF – Class 66 approval for the removal of slate waste from the area
directly surrounding the application site.   
17 20/00409/FLL – Detailed planning permission was approved until 1 July 2023 for
the siting of the mobile crusher and screener (for a temporary period).

Page 4

CONSULTATIONS 
18 As part of the planning application process the following bodies were consulted: 
External 
19 Dunkeld and Birnam Community Council - Object to the proposals. The
principle areas of concern relate to: traffic; ecological and landscapes impacts;
impacts on trees; and processing of waste materials.  Further concern is also
shared with regard to the Council’s enforcement of previous suspensive
conditions. 
Internal 
20 Environmental Health - No objection, subject to similar noise and dust
conditions being attached to any permission, as applied to 20/00409/FLL. 
REPRESENTATIONS 
21 Six objections have been received. Five from individuals, the other from Dunkeld
and Birnam Community Council. The principal issues raised are:   
• Contrary to the Development Plan 
• Impact on visual amenity 
• Traffic concerns 
• Impact on residential amenity (noise and dust)
• Impact on ecology 
• Impact on trees
• Loss of open space
• Inappropriate land use 
22 These issues are addressed below in the main appraisal section, however the
majority of them are not directly applicable to this planning application. They are
more applicable to the excavation activities. 
ADDITIONAL STATEMENTS
23
Screening Opinion  No EIA required
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable
Appropriate Assessment under Habitats
Regulations
AA not Required
Design Statement or Design and Access
Statement
Not required
Report on Impact or Potential Impact  Planning Statement

Page 5

APPRAISAL 
24 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4, the LDP2 and
statutory SPG. The relevant policy considerations are outlined in the policy
section above and are considered in more detail below.   
25 In terms of other material considerations, this involves considerations of the
Council’s non-statutory planning guidance and consideration of the sites planning
history. 
Policy 
26 There are relevant policies contained across the Development Plan. 
27 Within the NPF4, Policy 26 (Business and Industry) looks to encourage, promote
and facilitate business and industrial uses, whilst Policy 29 (Rural Development)
encourages rural economic activity and diversification – both subject to being in
suitable and appropriate locations. Both policies also look to ensure that the
nature and scale of the proposals is compatible, and in keeping with the
surrounding area. Policy 4 (Natural Places) seeks to ensure that our natural
assets are protected against inappropriate new developments. 
28 Within the LDP2, the site lies within the landward area where land use Policies 1
(Placemaking), 8 (Rural Business and Diversification), 37 (Management of Inert
and Construction Waste), 38 (Environment and Conservation) and 50 (noise)
would be directly applicable.  
29 Policy 1 seeks to ensure that all new developments do not have an adverse
impact on the local environment, which includes visual and residential amenity
impacts. Policy 8 supports the expansion of existing businesses and the creation
of new ones in rural areas and that there is a preference for such developments
to be within or adjacent to existing settlements. However, in this case, where the
location is out with a settlement proposals may be acceptable where they offer
opportunities to diversify an existing business or are related to a site-specific
resource or opportunity – providing that the proposal contributes positively to the
local economy through (amongst other things) the provision of permanent
employment. 
30 Policy 37 offers support for proposals which are for the recycling and processing
of insert and construction waste, providing they are environmentally acceptable
and take place in suitable locations – such as at existing industrial and brownfield
sites. Policy 38 seeks to ensure that our natural assets are protected against
inappropriate new development. 
31 Finally, Policy 56 states that there will be a presumption against development
which will generate high levels of noise in the locality of existing or proposed

Page 6

noise sensitive land uses, and similarly against the locating of noise sensitive
uses near to sources of noise generation.  
32 In terms of statutory SPG, the Council’s policies on Placemaking, Landscapes
and Delivering Zero Waste are applicable, and the content of these broadly
follows the comparable LDP2 policies. 
Land Use Acceptability  
33 As stated previously, this application is not related to the physical extraction of
any additional material, that being authorised under the explicit terms of Part 19,
Class 66 of the GPDO and that position will not change until the area of
extraction is exhausted. 20/0005/NOTIF relates to this, and there are no time
restrictions thereon.  
34 In light of this, the proposal is only concerned with siting machinery associated to
the further onsite processing of the remaining waste material, to effectively make
it more usable (and suitable) for use in the construction industry, all for a
temporary period of two years.  
35 Slate was originally quarried but has been exhausted. Left over from the
quarrying is a significant quantity of slate waste, a by-product, and this remains
across the former quarry site and on the land immediately surrounding the
proposed location of the machinery. The applicant is continuing to remove this
slate waste via their approval under Part 19, Class 66 of the GDPO. 
36 The removal and proposed processing of the slate waste, to make it a more
usable product, would effectively see the slate resource exhausted and quarrying
associated waste removed. 
37 The principle of this would align positively with Policy 37 of the LDP2, supporting
a proposal which involves recycling and processing of inert and construction
waste, which is environmentally acceptable, within an already industrial /
brownfield landscape, and the machinery will be removed upon exhaustion of the
slate resource. Given the site is in the middle of an area that has previously seen
slate quarrying and is currently having slate waste removed (lawfully), the area
where the machinery is to be sited can be considered to be both industrial and
brownfield in character already. 
38 In terms of rural business and diversification, Policy 8 of the LDP2 and Policies
26 and 29 of the NPF4 are all applicable. 
39 In the context of rural business, Policy 8 of the LDP2 and Policy 29 of the NPF4
both offer support for the expansion of existing businesses within rural areas,
when the proposal offers opportunities to diversify an existing business or when
the process is related to a site specific resource or opportunity – providing that
the proposal contributes positively to the local economy through (amongst other
things) the provision of permanent employment, and there is no adverse impact
on the environment or communities.

Page 7

40 The proposed siting of the machinery to further process onsite waste material
(with no need to import), and to make it more suitable for local businesses to use
for construction projects aligns positively with the aims and objectives of these
policies. There is no unacceptable harm to the environment via the use of the
machinery, and nuisance from noise and dust arising directly from the use of the
machinery is controllable to within tolerance levels. 
41 It is accepted that the principle of processing the waste slate onsite before
transporting it elsewhere is not new and does not constitute a diversification of
the existing business, rather it is the continuation of the business and has been
previously carried out across the wider area of waste reserves. Thus, the
proposal would be a continuation and expansion of an existing business, and an
opportunity to continue to use the associated site-specific resource. 
42 The proposal is therefore considered complaint with both Policy 8 of the LDP2
and Policy 29 of the NPF4, in relation to rural businesses and diversification. 
43 Support for business and industry in a general context is offered by Policy 26 of
the NPF4 which supports businesses and industry providing that proposals are of
a scale and nature which is compatible with the surrounding area, proposals are
compatible with the primary business function of the area and that protection is
afforded to residential amenity and the surrounding environment. In this context
the machinery will be sited within the centre of an area of quarry related waste, of
which processing will continue for the proposed duration of the siting of the
machinery. There will be no direct impact on the environment as a direct result of
this proposal (i.e. further physical excavations of material), and the impacts
associated to the operation of the machinery can be controlled so that nuisance
to residential properties is within acceptable tolerances. As such, there is not
considered to be any conflict with Policy 26 of the NPF4. 
Noise and Dust Pollution  
44 It is accepted that there has been and will be some noise and dust generation,
both from the excavation and removal of the slate waste from the site, and more
so by the operation of the machinery.    
45 It is important to clarify that the scope of the planning application under
consideration relates solely to the proposed siting of the machinery and its
processes only, and not any impacts from the associated physical removal of
slate waste. The potential for noise and dust generation by the proposed
equipment has been assessed fully Environmental Health and subject to
conditions 3 – 6, such nuisance can be a) controlled and b) monitored (if
required). 
46 The proposal is therefore considered in accordance with Policy 56 of the LDP2,
and the more generic amenity policies of the Development Plan.

Page 8

Residential Amenity  
47 In terms of overlooking or loss of privacy to neighbouring residential properties,
the proposal raises no concerns. The proposed location of the equipment being
some 160m from the closest residential dwelling. 
48 In terms of nuisance from dust and noise, as stated above these elements are
controllable to an acceptable level. 
49 It is accepted that there is noise and dust generated from the removal of the slate
waste, beyond that from the proposed machinery, and this is out with the scope
of planning control. However, it is considered that more noise and dust would be
generated by the operation of the machinery, and this can be subject to planning
control. Evidence indicates that due to the relatively large particulate size, most
dust arising from use of the machinery would be deposited within the immediate
vicinity - which sits within the larger area of slate waste working and would not
affect the residential properties directly. 
50 In terms of noise, subject to appropriate noise and operational time conditions,
nuisance should not occur to any existing residential property as a direct result of
the use of either the machinery. Subject to these proposed conditions, the use of
the equipment can be adequately controlled so that there is no unacceptable
impact on the residential amenity. 
Dust on the Local Road Network  
51 Although the removal of material from the site does not require planning
permission and cannot be controlled through this planning application, it is the
case that the proposed crushing and screening process may create additional
dust, over and above that which would be created just by collecting, loading and
transporting the waste material unprocessed. 
52 Accordingly, vehicles leaving the site therefore have the potential to transfer this
dust onto the public roads.  There have also been related complaints during
previous operations of screening and crushing machinery. 
53 However, the general state of the public road and its ability to accommodate
HGV movements associated with the removal of the slate waste from this site is
not a matter open for consideration under the limits of this planning application. 
54 Notwithstanding, controlling the transfer of dust (which could in part be seen to
be directly caused from the crushing / screening process) onto the public road is
a consideration and could cause nuisance to residential properties near the site,
and also properties which are located along the haulage routes.  
55 On this basis it is considered appropriate to try to minimise the level of additional
dust nuisance arising by seeking the further submission and approval of an
updated Dust Management Plan (Condition 6). It is expected that the dust

Page 9

management procedures will look to increase and improve upon some of the
existing measures, such as the wetting of exposed material and internal
roadways. during dry weather, regular use of a road sweeper and the potential
need for wheel wash facilities before vehicles leave the site. 
Roads and Access  
56 This proposal raises no issues over vehicular access or parking – which are all in
place. It is noted that concerns over the number of movements of HGVs on local
roads has been raised within the representations, and the impact that has been
having and will continue to have on road and pedestrian safety and the condition
of the roads themselves. However, the Class 66 approval allows for no specific
restrictions on these traffic movements. It is also important to note that the level
of HGV movements would not significantly differ between a) raw slate waste
being removed and b) processed slate waste being removed – the volumes
being largely comparable. Thus, also impact on local roads is appreciated, it is
not a material planning consideration for this application. 
Trees 
57 A number of objections, and the Community Council, comment on the impact that
this development will have on trees during the material harvesting. However,
again, this application is not for any removal of slate waste from the ground, just
the siting of machinery (on already excavated land) and the associated
processing by that machinery. As a result of this, there are no trees which are
affected directly by the proposal.    
Impact on National Scenic Area 
58 The extraction of the waste material is permitted development and is not
considered by this planning application. Policy 38 of the LDP2 and Policy 4 of the
NPF4 should be noted, however the siting of the machinery in the context of the
larger extraction areas are considered to have limited, temporary and ultimately
acceptable impact on the integrity of the National Scenic Area. 
Impact on Bio-diversity  
59 The siting and use of the proposed equipment would have little impact on any
local habitats or wildlife species. The areas where the machinery is to be located
are man-made ground, which has little in the way of habitat value. Noise arising
from the use of the crusher and screener would be in combination with existing
noise associated the extraction of the material and would not result in any
disturbance to wildlife in isolation.  
Drainage and Flooding  
60 The proposal raises no issues in terms of drainage or flooding.

Page 10

Developer Contributions  
61 The proposal has no requirement for any Developer Contributions or Affordable
Housing provision. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
62 None. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
63 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, the adopted Local
Development Plan 2 (2019) and statutory SPG. Account has been taken account
of the relevant material considerations and none has been found that would
justify overriding the Development Plan. 
64 Accordingly the proposal is recommended for approval subject to the following
conditions. 
RECOMMENDATION 
Approve the application, subject to the following conditions, 
1. Permission is hereby granted for a limited period until 13 March 2026. Prior to
this date, the use of all plant and machinery associated with this development
shall cease, and all associated equipment removed from the site. 
Reason - In view of the nature of the proposed development and to enable the
Planning Authority to review the circumstances pertaining to the proposal within a
reasonable period of time. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. Noise from any plant and machinery associated with this development shall be
controlled so that noise levels do not exceed 55dB LAeq, 1 hour (free field) at
any adjacent dwellinghouse. 
Reason - To ensure a satisfactory standard of local environmental quality. 
4. Prior to the commencement of the development hereby approved, confirmation of
the model of both crusher and screener shall be submitted to and approved in

Page 11

writing by the Council as Planning Authority.  Any change from the approved
model(s) shall be approved in writing with the Council before being brought into
site. All plant and equipment shall thereafter be operated and maintained
according to the manufacturer's recommendations.  This includes all necessary
servicing and the provision of satisfactory exhaust systems to ensure that noise
emissions are minimised.  Records regarding all services and modifications
made to all plant and equipment shall be kept on site and shall be available for
inspection by the Council as Planning Authority. 
Reason - To ensure a satisfactory standard of local environmental quality. 
5. The hours of operation of the plant and equipment hereby approved shall be
limited to 0700 hours to 1900 hours Monday to Friday and 0800 to1300 on
Saturdays, with no operation on Sunday. 
Reason - To ensure a satisfactory standard of local environmental quality. 
6. Prior to the commencement of the development hereby approved, a Dust
Management Plan must be submitted to and approval in writing by the Council as
Planning Authority.  The plan must include adequate precautions to ensure that
all times and at all stages of the process (including reinstatement), dust
generation on the site and outwith, is minimised by implementing agreed dust
prevention measures e.g. wheel washing facilities.  The plan shall also provide
details of future monitoring and reporting on the successfulness of the plan. The
approved plan shall thereafter be implemented in full. 
Reason - To ensure a satisfactory standard of local environmental quality 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Procedural Notes 
None. 
Informatives 
1. Under Section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development.  A failure to comply with this statutory requirement
would constitute a breach of planning control under Section 123(1) of that Act,
which may result in enforcement action being taken.  Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by Section 27B of the Town and Country

Page 12

Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
Background Papers:  6 letters of representation
Date: 1st March 2024 
DAVID LITTLEJOHN