Democracy Spraffa

22/01191/Fll

Perth and Kinross Council · 15 November 2023
Back to Planning and Placemaking Committee — 15 November 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Perth and Kinross Council
Planning and Placemaking Committee – 15 November 2023
Report of Handling by Strategic Lead – Economy, Development and Planning
(Report No. 23/309) 
PROPOSAL: Erection of 16 dwellinghouses (3 with detached garages, one with
detached garage/ancillary accommodation), formation of 6 plots
for affordable dwellinghouses, formation of SUDS pond,
landscaping and associated works 
LOCATION: Land 100 Metres South East of Cragton Villa, Rost Gardens,
Scotlandwell 
Ref. No: 22/01191/FLL
Ward No: P8- Kinross-shire 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan.  Prior to the
release of planning permission, the applicant shall either require to enter into a
satisfactory agreement with the Planning Authority to secure: the necessary provision
of the serviced plots for affordable housing; and contributions for community open
space. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 Planning permission is sought for the erection of 16 dwellinghouses and the
formation of 6 serviced plots for affordable housing on a site on the southern
edge of Scotlandwell that is allocated for housing (Site H54) in the Perth and
Kinross Local Development plan (2019).  That allocation identifies the 1.7ha site
for between 21-32 homes.   
2 The area to be developed is currently an agricultural field bounded by existing
hedges to the east, west and south.  A field access transects the northern
boundary of the site.  The Causeway/B920 public road runs to the west, whilst
existing modern housing on Friar Place is to the north, with the Scotlandwell
Conservation Area beyond.   The proposal includes a SUDS basin in the south
east corner, which will be landscaped.  Two vehicle accesses are proposed onto
the B920, with one at the point of an existing field access and the other to the
south of six self-build/affordable plots.

Page 2

3 14 of the proposed houses are four bed detached properties with
accommodation over two levels, the other 2 two bed detached and single storey. 
All are to be finished in brick, render and timber with slate and pantile roofs on
the four bedded units and slate roofs on the bungalows.  Plots 1 – 3 in the south-
west area have detached garages with an internal width of around 4.5m.  Plot 4
has a larger garage (c.6.5m) with ancillary living accommodation above.  Plots 5
to 16 all have integrated garages around 3m in width.  The details of the 6
affordable plots will be subject to further planning applications and will be subject
to design criteria to be approved via condition and in consultation with the
Council’s Affordable Housing enablers. 
4 An earlier application (21/00997/FLL) for 22 dwellinghouses was withdrawn in
October 2022.  This current application is a re-thinking of that proposal, with 6 of
the plots for affordable housing – the self-build plots. 
Pre-Application Consultation 
5 Pre application Reference: 22/00197/PREAPP related to Erection of 16no
dwelling houses and proposed land for 6 no affordable custom build dwelling
houses and associated work  
6 Pre-application advice was given to the applicant, however due to the tight timing
of this being issued and the re-submission some issues raised in the pre-
application response were not included and have led to subsequent amendments
to the proposals whilst the application has been under consideration. 
7 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
DEVELOPMENT PLAN 
8 The Development Plan for the area comprises National Planning Framework 4
(NPF4) and the Perth and Kinross Local Development Plan 2 (2019) (LDP2). 
National Planning Framework 4 
9 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. This
strategy sets out how to improve people’s lives by making sustainable, liveable
and productive spaces. 
10 NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
11 The Council’s assessment of this application has considered the following
policies of NPF4:

Page 3

• Policy 1: Tackling the Climate and Nature Crisis
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 16: Quality Homes
• Policy 18: Infrastructure First
• Policy 22: Flood Risk and Water Management 
Perth and Kinross Local Development Plan 2 – Adopted November 2019 
12 The Local Development Plan 2 (LDP2) is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
13 The principal policies are: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
• Policy 17: Residential Areas
• Policy 25: Housing Mix
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 28A: Conservation Areas: New Development
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 39: Landscape
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 51: Soils
• Policy 52: New Development and Flooding
• Policy 53: Water Environment and Drainage
• Policy 56: Noise Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
The following site specific development requirements for H54 are set out in the
LDP: 
• Houses to be a maximum of one and a half storeys in height.

Page 4

• Flood Risk Assessment.
• Enhanced traffic calming at village edge.
• Form access from B920, The Causeway.
• Landscape Framework.
• Feasibility study to assess the restoration of the existing culvert.
• Open watercourses retained and minimum 6m buffer strip.
• An appropriate peat survey and management plan to minimise impact and
implement suitable mitigation measures. 
Statutory Supplementary Guidance 
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted
in 2021)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
OTHER POLICIES 
Non-Statutory Guidance 
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Conservation Areas 
NATIONAL GUIDANCE 
14 The Scottish Government expresses its planning policies through The National
Planning Framework, Planning Advice Notes, Creating Places, Designing
Streets, National Roads Development Guide and a series of Circulars. 
Planning Advice Notes 
15 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 68 Design Statements 
Creating Places 2013 
16 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and

Page 5

contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
17 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
18 This document supports Designing Streets and expands on its principles and is
considered to be the technical advice that should be followed in designing and
approving of all streets including parking provision. 
Site History 
19 17/0035/LDP2 A submission was made in 2017 to include the site as a LDP
proposal for a residential development of 21-32 units on a 1.7 ha site. At that
time, it was acknowledged that the site had previously been allocated for the
proposed use. 
20 21/00997/FLL A Full Planning Permission application was Withdrawn on 29
October 2021 for Erection of 22 dwellinghouses, 3 garages and a garage with
ancillary accommodation, formation of SUDS pond, landscaping and associated
works (LDP site H54). 
CONSULTATIONS 
21 As part of the planning application process the following bodies were consulted: 
External 
Scottish Environment Protection Agency 
22 No objection, following submission of information on flood risk and peat
management.  A ground investigation report including soil sampling confirmed
that the soils do not meet the criteria for being peat soil.  Furthermore, the
assessment of flood risk also demonstrated to SEPAs satisfaction that the site is
not in the flood risk area of the River Leven. 
Scottish Water 
23 No objection.  Confirm that there is sufficient capacity in the Glenfarg Water
Treatment Works to service the development.  Also confirm that there is sufficient

Page 6

capacity for a foul only connection to the Levenmouth WWTW.  They also
provide advice for the applicant on Scottish Water requirements. 
(Portmoak) Scottish Gliding Centre 
24 No comments. 
Perth And Kinross Heritage Trust 
25 No objection, subject to a condition to ensure archaeological recording of site is
undertaken prior to commencement of development. 
Portmoak Community Council 
26 Object.  Concerns raised about affordable housing provision, impact on peat,
placemaking and housing mix. 
Internal 
Transportation And Development 
27 No objection, subject to conditions and informatives. 
Structures And Flooding 
28 No objection, subject to condition relating to drainage.  Advise that Flood Team
require a detailed SUDS design (be approved) prior to commencement of
development. 
Development Contributions Officer 
Education 
29 No education contribution required. 
Affordable Housing 
30 The Council's Affordable Housing Policy requires that 25% of the total number of
houses, above a threshold of 5 units, is ‘affordable housing’. 
31 This sees a requirement for 5.5 affordable units. The plans include 6 custom
build plots, and this is permissible in relation to the Developer Contributions &
Affordable Housing Supplementary Guidance, which states that discounted
serviced plots for self-build can contribute to a site's affordable housing
requirement, particularly in rural areas (para 7.9).

Page 7

Affordable Housing Enabler 
32 Supports the provision of 6 serviced affordable housing plots. 
Development Plan 
33 Advice given on compliance with Development Plan policies. 
Community Waste Advisor - Environment Service 
34 Information supplied with regard to provision for waste and recycling facilities.
Condition and informative note to be attached. 
Biodiversity/Tree Officer 
35 No objection, subject to conditions relating to tree protection, landscaping, works
being undertaken in accordance with the Ecological Assessment, and
biodiversity mitigation matters.   
Environmental Health (Noise Odour) 
36 No objection. Informative note with regard to woodburning stoves recommended. 
Community Greenspace 
37 No play area would be required as part of this development, however there is an
above ground SUDS area that would need to be adopted by PKC. 
38 A commuted sum of £18,577.90 (22 x £844.45) is required for adoption of any
Public Open Space (POS).  Although no additional play area is necessary, a
contribution towards the maintenance and future renewal of the nearest play area
in Scotlandwell is required. This is calculated at £16,137.75.  Total Commuted
Sum required is £34,715.65. 
Conservation Team 
39 No objection, following visualisations to demonstrate the development would not
have an adverse impact on the conservation area setting. 
Representations 
40 Fifteen objections were received. The main issues raised are: 
• Contrary to Development Plan
• Visual amenity
• Out of character
• Inappropriate land use

Page 8

• Road safety, traffic congestion and parking
• Lack of public transport
• Lack of off-road path link to school
• Lack of services
• School capacity
• Impact on peat
• Pollution from woodburning stoves
• Impact on natural heritage
• Lack of housing mix
• Affordable housing
• Foul drainage capacity
• Flood risk
• Lack of play area/recreational space
• Impact on conservation area and archaeology
• Residential amenity
• Wayleave issues along northern boundary
• Construction impact
• Contaminated Land
• Precedent for future development to northeast
• Standard of development in relation to carbon emissions 
41 These issues are addressed in the appraisal section of the report. 
42 One representation was received in support of the proposal. 
ADDITIONAL STATEMENTS
43
Screening Opinion  EIA Required
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
AA Not Required
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact eg
Flood Risk Assessment
Information submitted including
Flood Risk Assessment, Peat
survey, ecological survey 
APPRAISAL 
44 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations

Page 9

indicate otherwise.  The Development Plan comprises NPF4 and the Perth and
Kinross Local Development Plan 2019.   
45 The relevant policy considerations are outlined in the policy section above and
are considered in more detail below.  In terms of other material considerations,
this involves considerations of the Council’s other approved policies and
supplementary guidance. 
Principle 
46 National Planning Framework Policy 16, Quality Homes, supports the delivery of
high quality, sustainable homes that meets the needs of people throughout their
lives.  Policy 14 supports development that is consistent with the six qualities of
successful places, including health and wellbeing, and safe and pleasant places
for people to meet.  Policy 9 b) does not support development on greenfield sites
unless the site has been allocated for development or the proposal is explicitly
supported by policies in the Local Development Plan.  Importantly the site is
allocated for residential development in the in the Perth and Kinross Local
Development Plan (2019).   
47 The principle of residential development on this site is acceptable, as a
consequence of its allocation within the LDP, and subject to meeting the terms of
the above requirements and a detailed consideration of Development Plan
policies and other matters including but not limited to design, residential amenity,
housing mix, parking and access, trees and biodiversity. 
Design and Layout 
48 Policies 1A and B Placemaking of LDP2 and Policy 14, Design, Quality and
Place, of NPF4 require the design and scale of development to respect its
surroundings and to deliver well designed development. 
49 The proposal is for 16 detached dwellinghouses and 6 serviced plots for
affordable housing, 22 units in total.  The proposals were amended from the
original submission to create additional greenspace to the south of plot 13 linking
the green space to the south of plot 12 and the open area around the proposed
suds basin. 
50 The proposed dwellings use a range of external fishing materials including
pantiles, slate, timber and brick.  The majority are one and a half storey with two
single storey.  This reflects the more recent developments at the southern edge
of Scotlandwell, either side of the Causeway. Overall the site is relatively flat with
Scotlandwell village rising up behind and backdropped by Bishop Hill.  A
visualisation giving an impression of what the development would look like in the
context of its surroundings has been submitted.  The existing hedges and
vegetation around the site will be retained and strengthened to help to soften the
edges of the development, particularly where it adjoins undeveloped areas.
Whilst the proposed layout of the site is different from the more organically

Page 10

developed, well established historic development in other parts of Scotlandwell it
is considered acceptable and in accordance with Policies 1A and B and Policy 14
of NPF4. 
51 Policy 25 of LDP2 Housing Mix requires the provision of an appropriate mix of
house types and sizes. This includes (but is not limited to) providing at least 10%
of the homes as 1 or 2 bedrooms. This is in addition to affordable housing
requirements.  To achieve this the proposal has been amended to provide two 2
bed single storey properties, which is sufficient to meet the terms of policy 25 in
relation to the 16 units proposed in detail.   
52 Community Greenspace has assessed the proposal in terms of open space
requirements and advises there is no requirement to provide an additional play
area. However, a contribution towards the maintenance and future renewal of the
nearest play area in Scotlandwell is to be made. The means to secure this either
a financial contribution or  planning agreement. Securing this would meet the
requirements of Policy 14B Open Space within New Developments of LDP2.  
Landscape 
53 The site is an area of flat land to the south of Scotlandwell village with some
existing trees and hedges around it, including along the frontage with the
Causeway.  The main part of the village is set at the foot of Bishop Hill, with
development extending to the south, until immediately north.  The visual
representation demonstrates that the development can be constructed without
significant impact on the wider setting of the village and its Conservation Area,
thereby being in accordance with Policy 39 Landscape of LDP2. 
Residential and Visual Amenity 
54 The proposed dwellinghouses are all detached, with an adequate level of
amenity ground and sufficient space between so as not to cause issues of
overlooking or overshadowing.  There was an objection relating to possible
overlooking from Plot 9 to existing properties to the north on Friar Place. This plot
has been amended to see a single-storey and does not cause any concern with
overlooking/loss of privacy to neighbouring properties.  Particularly as there a
vehicular access between the houses proposed at the north end of this site and
residential properties in Friar Place. 
55 Many of the properties are proposed to be fitted with woodburning stoves.  As
these will be of a domestic scale the impact is unlikely to cause any significant
issues. It is noted that that each stove will exit via a chimney either above or
close to roof ridge height, which will aid in dispersion of emissions. An
informative note (Informative 5) will be added to advise that smoke/odour could
be further minimised through the use of fuel recommended by the stove
manufacturer.

Page 11

56 The proposal will change the views of Scotlandwell, particularly from the
approach from the south on The Causeway.  The low lying nature of the site and
existing vegetation will ensure the impact on visual amenity is minimised,
particularly when coupled with the retention of existing boundary treatments and
tree/hedgerow cover, to be supplemented by additional planting, all thereby
aligning with Policy 39 Landscape of LDP2. 
Roads and Access 
57 Two junctions will be formed from the public road, creating a loop road within the
site.  Provision had originally been made for a footpath along the verge along the
western side of the site.  However, this would have resulted in the loss of the
hedge and it is now proposed to retain and strengthen this hedge and direct
pedestrians through the development rather than along the road.   
58 Transport Planning had previously asked for speed limit signs to be relocated. 
However, this has been superseded by the installation of a 20mph speed limit
that now extends past the southern junction.  A condition requiring a dropped
pedestrian crossing on the B920 to provide a suitable crossing from the existing
footway to the north west is recommended (Condition 12).  This also addresses
some of the concerns raised through representations. 
59 It is noted that public transport provision in the area is limited. However, a
condition will be attached requiring a residential travel plan to encourage more
sustainable means of travel (Condition 13).  Notwithstanding, access to bus
stops are located a short walking distance from the site, on Leslie Road, and the
A911.   
60 While the Community Council has requested that development is deferred until a
foot/cycle path is provided to link Scotlandwell to Kinnesswood, this is something
that is outwith the scope or control of this planning application and it would be
unreasonable to delay determination on this basis.  Upgrades to infrastructure
can only be sought where they are commensurate to the impact associated to
the level of development, and to mitigate the impacts of it.  In this instance, any
necessary improvements require to be restricted to the immediate environs of the
site as outlined through the site requirements relating to site H54. 
61 The proposal is considered acceptable in relation to roads and access matters
and accords with NPF4 Policy 13, Sustainable Transport and LDP2 Policy 60B
Transport Standards and Accessibility Requirements: New Development
Proposals.  The development is also adjoining and will be linked to an existing
settlement where there are opportunities to access existing path networks and
this would encourage active and sustainable travel.   
Drainage and Flooding 
62 Foul drainage is proposed to connect to existing Scottish Water infrastructure.
This will be subject to submitting a Drainage Impact Assessment (DIA) for

Page 12

confirmation that the foul water drainage infrastructure has capacity to service
the development.  It is noted in the drainage strategy that for plots 13-22 to
connect to the sewer this will require raising of existing ground levels.  Plots 1-12
will require foul water to be pumped via a new pumping station to the sewer. 
63 Surface water will be directed to existing ditches to the east and south with
attenuation of surface water run-off being proposed within a detention basin. 
PKC Flood Team has no objections but has requested full details of surface
water drainage be agreed by them prior to commencement of development. A
condition will be attached (Condition 14), which ensures the proposals are in
accordance with Policy 53 Water Environment and Drainage 
64  A Flood Risk Assessment was included but revised following an objection from
SEPA, this required more detailed survey work due to NPF4, which increased the
flood extents climate change uplift by 39%.   
65 This new information saw SEPA withdraw their objection, and the proposal is
therefore considered as being in accordance with NPF4 Policy 22: Flood Risk
and Water Management and LDP2 Policy 52 New Development and Flooding. 
Waste Collection 
66 The Council’s Community Waste Advisers have been consulted and have
provided information on what provision should be made for waste and recycling. 
In summary this is: sufficient space within property boundaries for waste and
recycling bins, and that developments of 10 or more houses may also be
considered for a glass collection point.  Such a facility has been added in the NW
corner of the site.  An informative note is recommended with regard to waste and
recycling provision will be attached to the permission (Informative 7). 
Conservation Considerations 
67 The proposed site is to the south of the Scotlandwell Conservation Area
boundary and the landscape setting of the conservation area is key to its
character and interest, with the relatively compact and linear village on sloping
ground with Bishop Hill forming a backdrop to the north. Distant views into and
from the conservation area are of particular significance. 
68 Information, in the form of visualisations of the proposed development have been
submitted to demonstrate that the proposed houses would generally be set at a
lower level than the existing historic development and will not cause an undue
intrusion into the landscape setting and the setting of the Scotlandwell
Conservation Area. 
69 Perth and Kinross Heritage Trust (PKHT) has been consulted and note that the
site lies within an area that is considered to have moderate archaeological
potential for currently unrecorded features that pre-date historic mapping.  It is
also located adjacent to a known important historic site: Scotlandwell Priory

Page 13

(MPK8536).   There have also been archaeological finds close to the site and
due to the proximity to areas of archaeological interest a suspensive condition
(Condition 3) is recommended.  Requiring that prior to commencement of
development there is an assessment of the character, condition and significance
of any archaeological deposits that may be present, the extent to which the
development will impact upon them and to inform a mitigation strategy if required.  
This would ensure the proposal is in compliance with NPF4 policy 7 Historic
Assets and Places and Policy 26B: Scheduled Monuments and Archaeology:
Archaeology. 
Natural Heritage and Biodiversity 
70 Policy 40, Forestry, Woodland and Trees, states that the Council will apply the
principles of the Scottish Government Policy on Control of Woodland Removal
and there will be a presumption in favour of protecting woodland resources.
Where the loss of woodland is unavoidable, mitigation measures in the form of
compensatory planting will be required. 
71 All trees are to be retained and the existing hedgerows will see limited removal
and areas infilled to retain habitat connectivity within the site, allowing wildlife to
move between gardens and other spaces and provide feeding and breeding
opportunities.  The planting of trees and shrubs linked to the existing soft
landscaping will encourage biological diversity. 
72  A detailed landscaping plan indicating species, location and density will be
secured by condition (Condition 5). Species should be native to Scotland and
include fruit-bearing trees to maximise the biodiversity value. 
73 Policy 41, Biodiversity, states that the Council will seek to protect and enhance
all wildlife and habitats, whether formally designated or not, considering natural
processes in the area. Planning permission will not be granted for development
likely to have an adverse effect on protected species unless clear evidence can
be provided that the ecological impacts can be satisfactorily mitigated. The
submitted Preliminary Ecological Appraisal Report (PEAR) was undertaken at the
correct time of year and does not recommend that any further survey is required
for the presence of protected species. 
Breeding Birds 
74 For all wild bird species in Great Britain, it is an offence to intentionally or
recklessly kill, injure or take a bird; take, damage, destroy or interfere with a nest
of any bird while it is in use or being built; or obstruct or prevent any bird from
using its nest. Clearance of vegetation should not take place during the bird
breeding season between 1st March and 31st August inclusive (Informative 8). 
75 If the development work takes place during the main nesting season it is
recommended that a pre-works nesting bird check be carried out immediately
beforehand, to identify and protect any active nests until the young fledge.

Page 14

Biodiversity Enhancement 
76 Enhancement of biodiversity should be demonstrated in all projects and needs to
be site specific based on surveys, location, development size, surrounding
habitats and landscape character, and follow ecologist recommendations. 
77 The submitted Design and Access Statement confirms that 5 Bat and 6 Swift
Boxes are to be added to plots around the proposed development, which
represents 25% of all houses and is in accordance with the PKC Planning for
Nature Guidance. An informative note will be added to request that the swift
boxes are moved closer together, reflecting the social nature of these birds. 
78 Hedgehogs are a key species in the Tayside Local Biodiversity Action Plan and
enhancing connectivity is an objective. There are records of hedgehogs in the
area and a condition will be attached to ensure that access for hedgehogs
commuting through the development is provided (Condition 11). Otherwise, to
avoid amphibians becoming trapped in gullies, a condition to require that wildlife
kerbs are installed adjacent to all road gullies constructed in association to the
development will be added (Condition 10). 
79 An informative note will be added to advise that development lighting should be
low lux-level, downward facing and directed away from hedgerows, treelines and
woodland to avoid fragmentation of foraging and commuting opportunities for
bats. 
80 The proposal provides opportunities to retain and strengthen existing landscape
features and to provide enhancement for biodiversity. As such it accords with
NPF Policy 3 and LDP2 Policy 40, Forestry, Woodland and Trees and Policy 41,
Biodiversity. 
Soils and Peat 
81 One of the site specific developer requirements was for “An appropriate peat
survey and management plan to minimise impact and implement suitable
mitigation measures” 
82 A peat survey report was submitted with the application and SEPA consulted,
who initially objected. Further information was submitted, including a Ground
Investigation Report which showed the results of additional soil sampling and lab
testing of organic matter at different depth horizons in the soil profile across the
site.  The results of this investigation demonstrated that the soil organic content
is less than 60% in all sampled depths and it was concluded that it does not meet
the criteria for being a peat soil. It is instead an ‘organo-mineral’ or ‘peaty’ soil. 
On this basis SEPA removed its objection and removed the requirement for a
peat management plan. 
83 The intention is that the excavated peaty/organi-mineral soil will be taken to
Turffit, the local turf company, which has a Waste Transfer Licence.  There is no

Page 15

requirement to condition this although it is noted that transferring this material to
a local company will minimise green house gas emissions in accordance with
NFP4, Policy 1.  It is also noted that the movement and use of soil is a regulatory
matter.  An informative note will be added with regard to this (Informative 6). 
This would therefore be compliant with the requirements of Policy 5 Soils of
NPF4 and Policy 51 Soils of LDP2. 
Embedding Low and Zero Carbon Generating Technology in New Development 
84 Policy 32 of the LDP requires that a proportion of the energy use of each building
is provided by low and zero-carbon generating technology. The applicant has
proposed that heat pumps and solar panels will be provided, although in some
cases wood burning stoves are included. A condition (Condition 15) will be
applied to require calculations to demonstrate compliance with policy 32 of LDP2,
and the wider principles of Policy 1: Tackling the Climate and Nature Crisis, and
Policy 2: Climate Mitigation and Adaptation of NPF4, with measures in place prior
to occupation of the properties. 
Developer Contributions 
Affordable Housing 
85 Policy 20 of the Local Development Plan requires developments of five or more
units to include provision of an affordable housing contribution amounting to an
equivalent of 25% of the total number of units proposed.  In this case the
proposal for 22 dwellinghouses, with 6 serviced plots for affordable housing. 
This exceeds the 5.5 unit requirement, which would meet the policy and
associated supplementary guidance on Developer Contributions & Affordable
Housing. 
86 The Council will acquire the serviced plots from the Developer and will market
them as affordable for sale, initially via PKC’s self-build register.  The means
through which this would be secured is likely to be via a s75 Planning obligation,
which would also cover the necessary contributions towards open
space/recreation. Planning permission will be required for each house, which will
be controlled by a Design Code and Plot Passport that will set out guidelines for
development of the plots.  (Condition 16) 
Education 
87 While concerns were raised through representations in respect of education
capacity, consultation with the Developer Obligations Officer has confirmed that
the proposal is within the catchment of Portmoak Primary School, and that
Education and Children’s Services (ECS) have no capacity concerns in this
catchment area.  The impact of the H54 allocation would also have been taken
into consideration and accounted for by ECS at the time the site was allocated
for housing development during the preparation of the LDP.

Page 16

Other matters raised in representations 
88 The other matters raised and not already considered above relate to: concern
over the impacts of the proposal in respect of Scottish Water wayleaves. 
However, this is ultimately a civil matter which the developer would require to
address, and may already have undertaken some due diligence upon.  It is not a
consideration to be addressed through the planning application process. 
Economic Impact 
89 The site will provide economic benefit during the construction phase of the
development and see additional economic activity associated to Scotlandwell as
a result of an increased population. 
VARIATION OF APPLICATION UNDER SECTION 32A 
90 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the house design, revised
house types on plots 9 and 16, provision of additional information with regard to
flood risk and peat.   
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
91 A satisfactory agreement with the Planning Authority is required to secure: the
necessary provision of the serviced plots for affordable housing, and
contributions for community open space. 
DIRECTION BY SCOTTISH MINISTERS 
92 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
93 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Development Plan. 
94 Accordingly the proposal is recommended for approval subject to the conclusion
of a satisfactory agreement with the Planning Authority to secure: the necessary
provision of the serviced plots for affordable housing, and contributions for
community open space, together with the following conditions.

Page 17

RECOMMENDATION   
Approve the application. 
Conditions and Reasons 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason:  This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason:  To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
written scheme of archaeological investigation which has been submitted by the
applicant, and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust. Thereafter, the developer
shall ensure that the programme of archaeological works is fully implemented
including that all excavation, preservation, recording, recovery, analysis,
publication and archiving of archaeological resources within the development site
is undertaken.  In addition, the developer shall afford access at all reasonable
times to Perth and Kinross Heritage Trust or a nominated representative and
shall allow them to observe work in progress. 
Reason:  To ensure a programme of archaeological works is carried out to
safeguard and record any archaeological remains within the development area. 
4. Prior to the commencement of any works on site, all trees and hedgerows on site
(other than those marked for felling on the approved plans) and those which have
Root Protection Areas which fall within the site shall be retained and protected.
Protection methods shall be strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction.  Protection measures, once in
place, shall remain in place for the duration of construction. 
Reason:  To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
5. Prior to the commencement of the development hereby approved, a detailed
landscaping and planting scheme for the site shall be submitted for the written

Page 18

agreement of the Council as Planning Authority.  The scheme shall include
details of the height and slopes of any mounding or recontouring of the site, full
details of all hard landscaping proposals including materials and installation
methods and, species, height, size and density of trees and shrubs to be planted. 
The scheme as subsequently approved shall be carried out and completed within
the first available planting season (October to March) after the completion or
bringing into use of the development, whichever is the earlier, and the date of
Practical Completion of the landscaping scheme shall be supplied in writing to
the Council as Planning Authority within 7 days of that date.  The scheme as
agreed and implemented shall thereafter be maintained to the satisfaction of the
Council as Planning Authority. 
Reason:  In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
6 Prior to commencement of development and in association with condition 5 a
detailed landscaping plan for open space illustrating accurate locations and
species for all planting, a maintenance schedule and areas of public open space
for adoption by the Council should be submitted for the written agreement of the
Council as Planning Authority in conjunction with Community Greenspace. 
7. The conclusions and recommended action points within the supporting
biodiversity survey submitted and hereby approved (Design and Access
Statement and Preliminary Ecological Assessment) shall be fully adhered to,
respected and undertaken as part of the construction phase of development, to
the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
8. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of
the development hereby approved. The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day. 
Reason:  In order to prevent animals from being trapped within any open
excavations. 
9. Prior to commencement of development an updated ecological survey shall be
undertaken and be submitted to the Council as Planning Authority for written
agreement.  Works shall not commence until after such written agreement has
been issued by the Council. 
Reason:  In the interests of employing best practice ecology and to ensure there
is no adverse impact on any protected species as identified under the Wildlife
and Countryside Act (1981).

Page 19

10. Prior to the completion of the development hereby approved, wildlife kerbs shall
be installed adjacent to road gullies associated to the sites development. 
Thereafter, these kerbs shall be retained in a reasonable condition for the life of
the development, to the satisfaction of the Council as Planning Authority. 
Reason:  In the interests of protecting environmental quality and of biodiversity. 
11. Prior to the completion or occupation of each dwellinghouse hereby approved,
whichever is the earlier, hedgehog highways shall be created by providing
access gaps in wooden fences on the related plot at least 13cm x 13cm at
ground level, to allow for the free movement of hedgehogs. 
Reason:  In the interests of protecting environmental quality and of biodiversity. 
12. Prior to the occupation of the first dwellinghouse hereby approved, provision of a
dropped pedestrian crossing shall be provided on the B920 to provide a suitable
perpendicular crossing from the existing footway to the proposed development
footway (to the north west of the site).  These details shall be submitted, and
approved in writing to satisfaction of the Council as Planning Authority in
consultation with the Roads Authority. 
Reason:  In the interests of pedestrian and traffic safety. 
13. Prior to the bringing into use of the first dwellinghouse hereby approved a
Residential Travel Plan (RTP), aimed to encourage more sustainable means of
travel, shall have been submitted to and approved in writing by the Council in
consultation with Transport Planning. The RTP will have particular regard to
provision for walking, cycling and public transport access to and within the site
and will identify the measures to be provided, the system of management,
monitoring, review, reporting and the duration of the plan. 
Reason:  To promote sustainable transport options and to meet advice within
Scottish Planning Policy on transport. 
14. The hereby approved development shall not commence until a detailed
sustainable urban drainage system (SUDS) has been submitted for the written
agreement of the Council as Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in accordance with the technical
guidance contained in The SUDS Manual (C753) and the Council’s Flood Risk
and Flood Risk Assessments Developer Guidance, and shall incorporate source
control. All works shall be carried out in accordance with the agreed scheme and
be operational prior to the bringing into use of the development.   
Reason:  To ensure the provision of effective drainage for the site. 
15. Prior to the commencement of the development hereby approved, a statement
which demonstrates that at least 10% of the current carbon emissions reduction
set by Scottish Building Standards will be met through the installation and

Page 20

operation of low and zero-carbon generating technologies shall be submitted to
and approved in writing by the Council as Planning Authority. The approved
statement shall thereafter be implemented in full. 
Reason:  In order to comply with Policy 32 of the adopted Perth and Kinross
Local Development Plan 2 (2019). 
16. Prior to the commencement of the development hereby approved a scheme,
including a design code (referring to the entire site) and plot passport (for
individual plots) outlining what can and cannot be built on each plot including
maximum size/footprint of dwellings, heights, recognised building lines, boundary
treatments and materials palette), shall be submitted for the written agreement of
the Council as Planning Authority.  The agreed scheme shall thereafter inform
and guide the delivery of the self build plots.   
Reason:  In order the interests of ensuring consistency throughout the overall
development, in the interests of visual and residential amenity, and to ensure a
satisfactory standard of local environmental quality. 
Justification 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
Informatives 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the planning authority written
notice of that position.  Please use the form attached herewith. 
3. No work shall be commenced until an application for building warrant has been
submitted and approved. 
4. The developer is advised to contact the Historic Environment Manager (tel 01738
477027) Perth and Kinross Heritage Trust, to discuss terms of reference for
archaeological work required. 
5. The approved stove system shall be installed and thereafter operated and
maintained in accordance with the manufacturer's recommendations, such that

Page 21

smoke odours are not exhausted into or escape into any neighbouring dwellings.
Failure to do so may result in an investigation and possible action by
Environmental Health under the Environmental Protection Act 1990. 
6. The applicant should note the contents of SEPA's letter dated 6th September.   
Details of SEPA's regulatory requirements and good practice advice, for example
in relation to private drainage and soil removal can be found on the regulations
section of SEPA's website. If you are unable to find the advice you need for a
specific regulatory matter, please contact a member of the local compliance team
at: FASP@sepa.org.uk   
7. The developer should please note the following: 
Refuse collection vehicles will only enter the site during development where there
is clear access and suitable turning; this means that Waste Services may not be
able to provide a full kerbside recycling service to residents whilst the build is
ongoing, and bins may have to be emptied from a specified collection point until
full access is made available for refuse collection vehicles. The developer should
make contact with the Community Waste Team to discuss bin collections as the
site progresses. 
Perth & Kinross council aim to introduce twin stream recycling and therefore
additional space is required for a second recycling bin. Further information is
available by contacting the Community Waste Team
communitywasteadvisers@pkc.gov.uk   
8. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act. 
9. The applicant is advised that in terms of Sections 56 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council, as Roads Authority, consent to
open an existing road or footway prior to the commencement of works. 
Information on junction types, requirements for Vehicular Access consents (VA1)
and application forms are available at www.pkc.gov.uk/vehicleaccess   Advice on
the disposal of surface water should be sought at the initial stages of design from
Scottish Water and the Scottish Environmental Protection Agency. 
10. The applicant is advised that in terms of Sections 21 of the Roads (Scotland) Act
1984 he/she/they must obtain from the Council as Roads Authority Road
Construction Consent (RCC) to construct a new road prior to the commencement
of roadworks.  Advice on the disposal of surface water must be sought at the
initial stages of design from Scottish Water and the Scottish Environment

Page 22

Protection Agency.  Please note that a fee is chargeable for the processing of
RCC applications. 
11. The applicant is advised to contact Perth & Kinross Council Street Lighting
Department to obtain technical approval for all street lighting provision. 
12. The Road Maintenance Partnership wish make the applicant aware of the
existence of a surface water pipe along the verge of the B920 in the vicinity of the
proposals. 
13. Development lighting should be low lux-level, downward facing and directed
away from hedgerows, treelines and woodland to avoid fragmentation of foraging
and commuting opportunities for bats. Guidance is available: Planning Guidance
- Planning & Biodiversity - Perth & Kinross Council (pkc.gov.uk) 
Procedural Notes 
Not Applicable. 
PLANS AND DOCUMENTS RELATING TO THIS DECISION 
Background Papers:  15 letters of representation
Date:    3 November 2023 
DAVID LITTLEJOHN
STRATEGIC LEAD – ECONOMY, DEVELOPMENT & PLANNING