PLANNING AND PLACEMAKING COMMITTEE 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 11 October 2023 at 9:30am. 
Present: Councillors I Massie and G Stewart, Bailie C McLaren (Up to Item 5(1)(ii)),
Councillors K Allan, B Brawn, D Cuthbert, A Forbes (Substituting for I James),
K Harvey, D Illingworth, B Leishman, T McEwan (Substituting for Bailie
M Williamson), I MacPherson (Substituting for R Watters) and C Reid. 
In Attendance: S Panton, L Reid, K Smith and P Williamson (all Communities);
A Brown, G Fogg, J Guild and R Ramsay (all Corporate and Democratic Services). 
Apologies: Bailie M Williamson, Councillors I James and R Watters. 
Councillor I Massie, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed everyone present to the meeting.  Apologies were
noted as above. 
2. DECLARATIONS OF INTEREST 
In terms of the Councillors Code of Conduct, Councillor D Illingworth declared
a non-financial interest in Item 5(1)(i).   
3. MINUTES 
The minute of meeting of the Planning and Placemaking Committee of
6 September 2023, be approved. 
4.  DEPUTATIONS 
In terms of Standing Order 13, the Committee agreed to hear deputations in
relation to the following planning applications: 
Planning Application No.    Item No. 
22/00817/FLM     5(1)(i) 
22/01501/FLM     5(1)(ii) 
23/01262/IPL      5(2)(ii) 
HAVING DECLARED AN INTEREST IN THE FOLLOWING ITEM, COUNCILLOR D
ILLINGWORTH LEFT THE MEETING AT THIS POINT. 
5. APPLICATIONS FOR DETERMINATION 
(1) Major Applications 
(i) 22/00817/FLM – Erection of 110 dwellinghouses, associated
infrastructure, access, SUDS and landscaping, land 150

Page 2

metres south west of Kintillo Cemetery (H14), Bridge of
Earn, Perth 
Mr J Bruce, Chair of Earn Community Council and Dr G Lindsay,
both objectors to the application, addressed the Committee and
answered Members’ questions.  Mr R Laird, Planning and
Strategic Land Manager, Scotia Homes, addressed the
Committee and answered Members’ questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
General
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been started within that period.
Reason – This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
3. No development shall commence until a detailed phasing
strategy (supported by appropriate plans) shall be
submitted to and approved in writing by the Council as
Planning Authority. The phasing strategy shall include the
following details:
(i) The timing and number of dwellings to be
developed in each phase;
(ii) The timing and delivery of infrastructure, open
space and landscaping;
(iii) The timing and location of any temporary
construction compound;
(iv) The timing and delivery of the affordable housing
units.
Once approved, the development shall proceed in
accordance with the approved delivery phasing strategy
to the satisfaction of the Council as Planning Authority.
Reason – In order to ensure the satisfactory
implementation and completion of the development.
Drainage and Flooding
4. The drainage outfall as agreed as part of planning
permission 22/02020/FLL or any other agreed in writing
scheme by the Council, shall be implemented as part of
the SUDs basin delivery to the satisfaction of the Council
as Planning Authority.

Page 3

Reason – To ensure the provision of effective drainage
for the site.
5. Prior to the commencement and completion of works, the
watercourse to the northeast of the site, which the SUDs
basin outfalls into, shall be cleared of vegetation and
debris to the satisfaction of the Council as Planning
Authority.
Reason – To ensure the provision of effective drainage
for the site.
6. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the written agreement of the Council as
Planning Authority, in consultation with SEPA where
necessary.  The scheme shall be developed in
accordance with the technical guidance contained in The
SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall
incorporate source control. All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.
Reason – To ensure the provision of effective drainage
for the site.
7. Concurrent with the initiation of the development hereby
approved and for the duration of construction, a
temporary surface water treatment facility which accords
with Sustainable Urban Drainage System principles shall
be implemented for the site and maintained for the
duration of the approved development works.  The
temporary surface water treatment facility shall remain in
place until the permanent surface water drainage scheme
is implemented.
Reason – To ensure the appropriate management of
construction surface water run-off to minimise flooding
and avoid discharge of sediment/pollution to the local
water environment or neighbouring property, in the
interests of residential and environmental amenity.
8. Storm water drainage from all paved surfaces, including
the access, shall be disposed of by means of suitable a
Sustainable Urban Drainage System to meet the
requirements of best management practices.
Reason – To ensure the provision of effective drainage
for the site.
Residential Amenity
9. Prior to the commencement of the development a Dust
Management Plan shall be submitted to and agreed in
writing by the Council as the Planning Authority and
Environmental Health. The plan shall include measures
for the control of dust, monitoring, and complaints
procedures, at the construction stages of the
development.

Page 4

Reason – In the interests of residential amenity.
10. Construction work shall be limited to Monday to Friday
0700 hours to 1900 hours and Saturday 0800 hours to
1300 hours with no noisy works out with these times or at
any time on Sundays or bank holidays (as identified by
Scottish Government).
Reason – In the interests of residential amenity.
Roads and Transport
11. Prior to the occupation of any residential plot, all matters
regarding access, car parking, road layout, design and
specification, including the disposal of surface water,
shall be in accordance with the standards required by the
Council as Roads Authority and to the satisfaction of the
Planning Authority.
Reason – In the interests of vehicle and pedestrian safety
and in accordance with the policies of the adopted
development plan.
12. Prior to commencement of works on site, the width of
Wicks O’Baiglie Road shall be widened to a minimum
width of 6 metres from south of 52 Wicks O’Baiglie Road
to a distance of 6 metres south of the vehicle access
bellmouth into the development, where the width of the
road will taper back to the original width over a distance
of at least 25 metres.  The road widening shall be
constructed to the standard and specification required by
the Council as Roads Authority to the satisfaction of the
Planning Authority.
Reason – In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
13. Prior to commencement of works, a street lighting design
must be submitted for the further written agreement of the
Council as Planning Authority, in consultation with Perth
& Kinross Council’s Street Lighting Partnership.  The
scheme shall include details of light spill, brightness of
the lighting and the proposed hours of operation.  The
agreed lighting scheme shall be implemented and
maintained in full accordance with the agreed scheme.
Reason – In the interests of road safety.
14. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
a. restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
b. timing of construction traffic to minimise impact on
local communities particularly at school start and

Page 5

finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
c. a code of conduct for HGV drivers to allow for
queuing traffic to pass;
d. arrangements for liaison with the Roads Authority
regarding winter maintenance;
e. emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
f. arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
g. arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
h. arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
i. details of information signs to inform other road
users of construction traffic;
j. arrangements to ensure that access for
emergency service vehicles are not impeded;
k. co-ordination with other significant developments
known to use roads affected by construction traffic;
l. traffic arrangements in the immediate vicinity of
temporary construction compounds;
m. monitoring, reporting and implementation
arrangements; 
n. arrangements for dealing with non-compliance;
and
o. details of HGV movements to and from the site.  
The TMS as approved shall be strictly adhered to during
the entire site construction programme.
Reason – In the interest of proper site management.
15. Prior to the occupation of the tenth dwellinghouse, the
developer shall install a bus shelter at Old Edinburgh
Road (NaPTAN ID 73729586) with a 3 bay bus shelter
supplied and installed with passenger information board,
LED spotlights (one per bay), a 28in Ultra-Wide Display
Screen for Real Time Passenger Information installed on
the approach side of the shelter and a 24/7 electrical
power supply to a Haldo pillar adjacent to the shelter to
provide power for the LED lighting and Real Time
Passenger Information display.  The design and
specification shall be to the satisfaction of the Council as
Planning Authority, in consultation with Perth & Kinross
Council’s Public Transport Unit.  In the event that it is not
possible to install at this location, an alternative shall be
agreed in writing with the planning authority.

Page 6

Reason – In the interest of sustainable travel.
16. No part of the development shall be occupied until a
Residential Travel Plan (RTP), aimed to encourage more
sustainable means of travel, has been submitted to and
agreed in writing by the Council in consultation with
Transport Planning. The RTP will have particular regard
to provision for walking, cycling and public transport
access to and within the site and will identify the
measures to be provided, the system of management,
monitoring, review, reporting and the duration of the plan.
Reason – To promote sustainable transport options and
to meet advice within Scottish Planning Policy on
transport.
17. Prior to the commencement of the development hereby
approved, full visibility splays for the vehicle access onto
Wicks O’Baiglie Road of 120 metres along the channel
line shall be provided to the left and right of the access, at
a set-back of 2.4 metres from the edge of the
carriageway, measured 1.05m above the road level to the
standard and specification required by the Council as
Roads Authority to the satisfaction of the Planning
Authority.  The visibility splays shall be physically formed
on the ground and any existing fences, walls, hedges or
other means of enclosure or obstructions within the
splays shall be removed and relocated outwith the splays. 
Once formed, the visibility splays shall be permanently
retained thereafter, and no visual obstruction of any kind
shall be permitted within the visibility splays so formed.
Reason – In the interests of road safety; to ensure an
acceptable standard of construction within the public road
boundary.
18. Prior to the occupation of any residential plot, details of
the specification including materials of all footpaths shall
be submitted to the Planning Authority for further
approval. The agreed detail shall thereafter be
implemented prior to the completion of the development.
Reason – In the interests of pedestrian and cycle safety.
19. The occupation of the tenth dwellinghouse hereby
approved shall not occur until the proposed footpath
connection surrounding the SUDS at the northern side of
the site and linking to both Dunbarney Avenue and Wicks
O' Baiglie Road, as shown on drawing number
22/00817/182, has been implemented in line with the
specification agreed as part of condition 18, and is
operational to the satisfaction of the Planning Authority.
Reason - In the interest of sustainable transport.
20. The occupation of the fifty-fifth dwellinghouse hereby
approved shall not occur until the proposed footpath
connection at the southern side of the site, linking this site
to both Wicks O' Baiglie Road and The Meadows and the
footpath connection to the west of the site linking to The

Page 7

Meadows, opposite Ptak Way, as shown on drawing
number 22/00817/182, has been implemented in line with
the specification agreed as part of condition 18, and is
operational to the satisfaction of the Planning Authority.
Reason – In the interest of sustainable transport.
21. The Meadows shall not be used at any time by
construction traffic associated with the development,
unless otherwise agreed by the Council as Planning
Authority.
Reason – In the interests of pedestrian and traffic safety,
residential amenity.
Biodiversity
22. Prior to the commencement of development a
Construction Environmental Management Plan (CEMP),
incorporating a Construction Method Statement (CMS), a
Construction Traffic Management Plan (CTMP), a Site
Waste Management Plan (SWMP), a Site Access
Management Plan, a Drainage Management Plan (DMP)
shall be submitted for the approval of the Planning
Authority. Thereafter the development shall be fully
undertaken in accordance with the CEMP unless
otherwise agreed in writing by the Planning Authority. 
Reason – In the interests of protecting environmental
quality and of biodiversity.
23. The conclusions and recommended action points within
the supporting Ecological Survey and Biodiversity Action
Plan submitted and hereby approved (document number
90 relates) shall be fully adhered to, respected and
undertaken as part of the construction phase of
development, to the satisfaction of the Council as
Planning Authority.
Reason – In the interests of protecting environmental
quality and of biodiversity.
24. An updated ecological survey will be required prior to the
commencement of works, if works have not commenced
within 24 months of the date of the survey approved as
part of this permission.  The updated survey shall be
submitted to the Council as Planning Authority for written
agreement and works shall not commence until after such
written agreement has been issued by the Council.
Reason – In the interests of protecting environmental
quality and of biodiversity.
25. Prior to the completion or occupation of the development
hereby approved, whichever is the earlier, wildlife kerbs
shall be installed adjacent to all road gullies within
500metres of a SUDS pond or watercourse. Thereafter,
the kerbs shall be retained in a reasonable condition for
the life of the development, to the satisfaction of the
Council as Planning Authority.
Reason - In the interests of protecting environmental
quality and of biodiversity.

Page 8

26. Prior to the completion or occupation of the development
hereby approved, whichever is the earlier, hedgehog
highways shall be created by providing access gaps in
wooden fences on each plot at least 13cm x 13cm at
ground level, to allow for the free movement of
hedgehogs. Thereafter, the hedgehog highways shall be
retained in a reasonable condition for the life of the
development, to the satisfaction of the Council as
Planning Authority.
Reason – In the interests of protecting environmental
quality and of biodiversity.
27. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved. The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.
Reason – In the interests of protecting environmental
quality and of biodiversity.
Trees and Landscape
28. Prior to the commencement of any works on site, all trees
on site (other than those marked for felling on the
approved plans) and those which have Root Protection
Areas which fall within the site shall be retained and
protected. Protection methods shall be strictly in
accordance with BS 5837 2012: Trees in Relation to
Design, Demolition and Construction.  Protection
measures, once in place, shall remain in place for the
duration of construction.
Reason – To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
29. The detailed landscaping and planting scheme which is
hereby approved shall be completed within the first
available planting season (October to March) after the
completion or bringing into use of the development,
whichever is the earlier.  The approved scheme shall
thereafter be maintained to the satisfaction of the Council
as Planning Authority, with any planting which fails to
become established within five years being replaced in
the following planting season with others of a size and
species as previously approved.
Reason – In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.
30. The areas of public open space indicated in the approved
landscape and planting drawings shall be planted in

Page 9

accordance with the open space standards of the
Planning Authority and completed to phase with the
adjacent dwellinghouses in accordance with a
programme to be submitted and agreed in writing by the
Planning Authority, prior to the commencement of
development. The scheme shall thereafter be maintained
to the satisfaction of the Council as Planning Authority.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality and to
reserve the rights of the Planning Authority.
31. All landscaped areas outwith the curtilages of the
dwellings and shown on the approved drawings shall be
permanently retained as such and shall at no time be
used as private garden ground nor incorporated within
the curtilage of any of the dwellings hereby approved
without the express grant of planning permission by the
Planning Authority.
Reason – In the interests of the character and
appearance of the development.
32. Prior to the occupation of the development or any phase
of the development, whichever is the sooner, a landscape
management plan, including long term design objectives,
management responsibilities and maintenance schedules
for all landscape areas (other than small privately-owned
domestic gardens) shall be submitted to, and agreed in
writing by, the Council as Planning Authority. The
landscape management plan as agreed shall, where
appropriate, include phased implementation concurrent
with the development and shall be fully implemented and
adhered to.
Reason – To ensure satisfactory management of the
scheme.
Sustainability
33. Prior to the commencement of development hereby
approved, a scheme shall be submitted to, and approved
in writing by, the Council as Planning Authority that
demonstrates how at least 10% of the current carbon
emissions reduction set by the Scottish Buildings
Standards will be met through the installation and
operation of low and zero-carbon technologies. This
scheme shall detail for each building:
a) the technology types;
b) illustrate, through technical calculations, that these
will meet at least the 10% reduction;
c)  their siting and location; and
d)  ongoing operation and maintenance.
Once approved, the development shall be completed in
accordance with the approved scheme and no individual
unit shall be occupied until the scheme has been installed
and operating.

Page 10

Reason – To embed low and zero-carbon technologies
within the development in the interest of environmental
sustainability.
Waste
34. Prior to the commencement of development a site
specific plan detailing bin storage areas, kerbside
collection locations and recycling  facilities shall be
submitted to and approved in writing by the Planning
Authority and thereafter undertaken in accordance with
the approved details.
Reason – In the interest of the sustainable disposal of
waste.
Contamination
35. Development shall not commence on site until an
evaluation for the potential of the site to be affected by
contamination by a previous use has been undertaken
and, as a minimum, a Preliminary Risk Assessment
(Phase 1 Desk Study) has been submitted for
consideration and accepted by the Council as Planning
Authority. If the preliminary risk assessment identifies the
need for further assessment, an intrusive investigation
shall be undertaken to identify; 
I.  the nature, extent and type(s) of contamination on
the site 
II.  measures to treat/remove contamination to ensure
the site is fit for the use proposed 
III.  measures to deal with contamination during
construction works 
IV. condition of the site on completion of
decontamination measures. 
Prior to the completion or bringing into use of any part of
the development the measures to decontaminate the site
shall be fully implemented in accordance with the scheme
subsequently agreed by the Council as Planning
Authority. Verification that the scheme has been fully
implemented must also be submitted to the Council as
Planning Authority.
Reason – In order to deal with any potential
contamination of the site as a result of its former use.
Archaeology
36. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a Written
Scheme of Archaeological Investigation (WSI) which has
been submitted by the developer and agreed in writing by
the Council as Planning Authority, in consultation with
Perth and Kinross Heritage Trust (PKHT). Thereafter, the
developer shall ensure that the programme of
archaeological works is fully implemented including that
all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological

Page 11

resources within the development site is undertaken. 
Should the archaeological works, as required by the WSI,
identify a requirement for post-excavation analysis, the
development as approved shall not be occupied or
brought into use until a Post-Excavation Research Design
(PERD) has been submitted to and agreed in writing by
the Council as Planning Authority, in consultation with
PKHT. The PERD shall be carried out in complete
accordance with the approved details. Furthermore, the
developer shall afford access at all reasonable times to
PKHT or a nominated representative and shall allow them
to observe work in progress.
Reason – To ensure a programme of archaeological
works is carried out to safeguard and record any
archaeological remains within the development area.
Materials
37. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority.  The scheme as agreed shall be
implemented prior to the completion or bringing into use
of the development, whichever is the earlier.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality. 
Justification
The proposal is considered as a minor departure to the
Development Plan as there are material circumstances that
would justify a departure from the relevant Policy 6 of the LDP2. 
Procedural Notes
Permission shall not to be issued until the Section 75 Agreement
has been signed and registered to take account of this
application. The legal agreement should be concluded and
completed within 4 months of the date of any Committee
approval. Failure to conclude a legal agreement within 4 months
will result in the planning application being re-assessed through
failing to comply with the associated developer contributions
policy and may be ultimately recommended for refusal under
delegated powers. 
Informatives
1. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
planning authority prior written notification of the date on
which it is intended to commence the development. A
failure to comply with this statutory requirement would
constitute a breach of planning control under section

Page 12

123(1) of that Act, which may result in enforcement
action being taken. 
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the planning
authority written notice of that position.
3. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013. The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity of
the site of the   development 
• Readily visible to the public 
• Printed on durable material.
4. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984.
5. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
6. The applicant is advised that in terms of Sections 56 of
the Roads (Scotland) Act 1984 he/she/they must obtain
from the Council, as Roads Authority, consent to open an
existing road or footway prior to the commencement of
works.  Information on junction types, requirements for
Vehicular Access consents (VA1) and application forms
are available at www.pkc.gov.uk/vehicleaccess.  Advice
on the disposal of surface water should be sought at the
initial stages of design from Scottish Water and the
Scottish Environment Protection Agency.
7. The applicant should be advised that in terms of Section
21 of the Roads (Scotland) Act 1984 they must obtain
from the Council as Roads Authority consent to construct
a new road prior to the commencement of roadworks.
Advice on the disposal of surface water must be sought
at the initial stages of design from Scottish Water and the
Scottish Environment Protection Agency. Please note
that a fee is chargeable for the processing of RCC
applications.
8. Prior to the commencement of works a maintenance
agreement under Section 96 of the Roads (Scotland) Act
1984 shall be entered in to in respect of the C416 Wicks

Page 13

O’Baiglie Road between the A912 and the M90
overbridge, a distance of approximately 1 km, whereby
the road shall be inspected on a regular basis and repairs
carried out to the timescale and standards specified by
the Council as Roads Authority to the satisfaction of Perth
& Kinross Council.
9. No work shall be commenced until an application for
building warrant has been submitted and approved.
10. The applicant is advised that the granting of planning
permission does not guarantee a connection to Scottish
Water’s assets. The applicant must make a separate
application to Scottish Water Planning & Development
Services team for permission to connect to the public
wastewater system and/or water network and all their
requirements must be fully adhered to.
11. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to revise layout,
materials and garages.
12. Application for a new postal address should be made via
the Street Naming and Numbering page on the Perth &
Kinross Council website at www.pkc.gov.uk/snn.  Please
note there is a charge for this service and submission
cannot be made until the relevant Building Warrant has
been approved.
13. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk
14. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk.  Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk. 
The Council has two months to consider the information. 
You should therefore submit the required information
more than two months before your permission expires. 
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
15. The planning permission decision notice shall not be
issued until such time as the required Developer
Contributions have been secured or paid in full.

Page 14

16. In the event the applicant does not either make the
required payment within 28 days from the date the
agent/applicant is advised of the need for the
contributions, or complete a legal agreement for delayed
payment within a 4 month period from the date the
agent/applicant is advised of the need for the
contributions the application may be refused under
delegated powers without any further discussion with the
applicant.
17. The applicant is reminded that, should any protected
species be present a licence may be required from
NatureScot. Failure to obtain a licence may constitute a
criminal act under the Habitats Regulations and penalties
are sever for non-compliance.
18. The applicant is reminded to discuss with the Council’s
Transport Unit the supply of a bus service and public
transport infrastructure to ensure an adequate public
transport provision for the site.
19. The applicant is advised that the granting of planning
permission does not guarantee right of access to the site.
This should be agreed with the relevant landowner(s)
prior to the commencement of the development.
20. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive. Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates. The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act. 
THERE FOLLOWED A 5 MINUTE RECESS AND THE MEETING RECONVENED
AT 11:15AM. 
COUNCILLOR D ILLINGWORTH RETURNED TO THE MEETING AT THIS POINT. 
COUNCILLOR K HARVEY JOINED THE MEETING AT THIS POINT. 
(ii) 22/01501/FLM – Erection of 90 dwellinghouses, 2 residential
blocks comprising 10 flats, associated infrastructure,
access, SUDS and landscaping (in part allocated site H69),
land 150 metres south of Station House, Forfar Road,
Meigle 
Mr B Starck of Meigle and Ardler Community Council, 
Ms M Kaufmann, Mr E West and Mr P Menzies, all objectors to
the application, addressed the Committee and answered
Members’ questions.  Mr B Robb, Senior Partner, Oliver and

Page 15

Robb Architects LLP, on behalf of the agent, addressed the
Committee and answered Members’ questions. 
Motion (Councillors B Brawn and D Cuthbert) 
Refuse, as the proposal is contrary to Policies 1A, 1B(c) and 17
of Perth and Kinross Local Development Plan 2 (2019) and
Policy 14 of National Planning Framework 4, due to the
significant historical heritage within the village of Meigle, the
design of the proposed dwellings and the number of proposed
dwellings. 
Amendment (Bailie C McLaren and Councillor T McEwan) 
Grant, subject to the following terms, conditions and
informatives: 
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason – This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents. 
3. Prior to the commencement of the development hereby
approved, a detailed landscaping and planting scheme
for the site shall be submitted for the written agreement of
the Council as Planning Authority. The scheme shall
include details of the height and slopes of any mounding
or recontouring of the site, full details of all hard
landscaping proposals including materials and installation
methods and, species, height, size and density of trees
and shrubs to be planted. The scheme as subsequently
approved shall be carried out and completed within the
first available planting season (October to March) after
the completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date. The scheme as agreed and
implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority.
Reason – In the interests of visual amenity and to ensure
the satisfactory implementation of the proposed planting
scheme.

Page 16

4. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason – In order to safeguard the neighbouring
residential amenity in the area.
5. Construction work shall be limited to Monday to Friday
0700 hours to 1900 hours and Saturday 0800 hours to
1300 hours with no noisy works out with these times or at
any time on Sundays or bank holidays (as identified by
Scottish Government).
Reason – In order to safeguard the residential amenity of
the area.
6. Prior to the occupation of any dwellinghouse approved as
part of this permission, a Real Time Passenger
Information Display Screen will be supplied and installed
at the bus stop at Meigle Post Office, or another location
as agreed with the Public Transport Unit.
Reason – To encourage the use of sustainable transport
to and from the development site.
7. No part of the development shall be occupied until a
Residential Travel Plan (RTP), aimed to encourage more
sustainable means of travel, has been submitted to and
agreed in writing by the Council as Planning Authority.
The RTP will have particular regard to provision for
walking, cycling and public transport access to and within
the site and will identify the measures to be provided, the
system of management, monitoring, review, reporting and
the duration of the plan.
Reason – To promote sustainable transport options and
to meet advice within Scottish Planning Policy on
transport.
8. Prior to the commencement of the development hereby
approved, the developer shall submit for the further
written agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which
shall include the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c)  a code of conduct for HGV drivers to allow for
queuing traffic to pass;

Page 17

(d)  arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e)  emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f)  arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
(g)  arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h)  arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road
users of construction traffic;
(j)  arrangements to ensure that access for
emergency service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) the provision and installation of traffic counters at
the applicant's expense at locations to be agreed
prior to the commencement of construction;
(n)  monitoring, reporting and implementation
arrangements;
(o)  arrangements for dealing with non-compliance;
and
(p)  details of HGV movements to and from the site.
The TMS as approved shall be strictly adhered to during
the entire site construction programme.
Reason – In the interests of road safety.
9. Development shall not commence until the developer has
secured the implementation of a programme of
archaeological work in accordance with a Written
Scheme of Archaeological Investigation (WSI) which has
been submitted by the developer and agreed in writing by
the Council as Planning Authority, in consultation with
Perth and Kinross Heritage Trust (PKHT). Thereafter, the
developer shall ensure that the programme of
archaeological works is fully implemented including that
all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological
resources within the development site is undertaken.
Should the archaeological works, as required by the WSI,
identify a requirement for post-excavation analysis, the
development as approved shall not be occupied or
brought into use until a Post-Excavation Research Design

Page 18

(PERD) has been submitted to and agreed in writing by
the Council as Planning Authority, in consultation with
PKHT. The PERD shall be carried out in complete
accordance with the approved details. Furthermore, the
developer shall afford access at all reasonable times to
PKHT or a nominated representative and shall allow them
to observe work in progress.
Reason – To ensure a programme of archaeological
works is carried out to safeguard and record any
archaeological remains within the development area.
10. Prior to the commencement of the development hereby
approved, a Biodiversity Enhancement Plan for the site
shall be submitted for the written agreement of the
Council as Planning Authority. Thereafter, the agreed
scheme shall be implemented to the satisfaction of the
Council as Planning Authority.
Reason – In the interests of protecting environmental
quality and of biodiversity. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Procedural Notes
Permission shall not to be issued until the Section 75 Agreement
has been signed and registered to take account of this
application. The legal agreement should be concluded and
completed within 4 months of the date of any Committee
approval. Failure to conclude a legal agreement within 4 months
will result in the planning application being re-assessed through
failing to comply with the associated developer contributions
policy and may be ultimately recommended for refusal under
delegated powers. 
Informatives
1. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development. A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action
being taken. Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position. Please use the
form attached herewith.

Page 19

3. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time. The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk. Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request. The Fees
Charter is available on our website www.pkc.gov.uk.
The Council has two months to consider the information.
You should therefore submit the required information
more than two months before your permission expires.
We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
4. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive. Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates. The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act.
5. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste.
6. The applicant is advised to refer to Perth & Kinross
Council's Supplementary Guidance on Flood Risk and
Flood Risk Assessments 2021 as it contains advice
relevant to your development.
https://www.pkc.gov.uk/ldp2floodrisk
7. Application for a new postal address should be made via
the Street Naming and Numbering page on the Perth &
Kinross Council website at www.pkc.gov.uk/snn. Please
note there is a charge for this service and submission
cannot be made until the relevant Building Warrant has
been approved.
8. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013. The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:

Page 20

• Displayed in a prominent place at or in the vicinity of
the site of the
• development 
• Readily visible to the public
• Printed on durable material
9. No work shall be commenced until an application for
building warrant has been submitted and approved.
10. This application was varied prior to determination, in
accordance with the terms of section 32A of the Town
and Country Planning (Scotland) Act 1997, as amended. 
The variations incorporate changes to the layout and
connections through the site.
11. The applicant is advised that any proposed signage will
require a further application to be submitted for
advertisement consent unless it benefits from express
consent as per the Town and Country Planning (Control
of Advertisements) (Scotland) Regulations 1984. 
In terms of Standing Order 21.5, a roll call vote was taken. 
5 Members voted for the Motion as follows:
Councillors K Allan, B Brawn, D Cuthbert, A Forbes and C Reid. 
8 Members voted for the Amendment as follows:
Councillors K Harvey, D Illingworth, B Leishman, I Massie, Bailie
C McLaren, Councillors T McEwan, I MacPherson and G
Stewart. 
Resolved:
In accordance with the Amendment. 
THERE FOLLOWED A 45 MINUTE RECESS AND THE MEETING RECONVENED
AT 2:30PM. 
BAILIE C MCLAREN SUBMITTED APOLOGIES FOR THE REMAINDER OF THE
MEETING. 
(iii) 22/02231/FLM – Formation of a 49.99MW battery energy
storage compound comprising battery storage units,
ancillary buildings and equipment, bogland restoration,
landscaping and associated works, Shindour, Feddal Hill
Wood, Braco 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
General
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.

Page 21

Reason – This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2.  The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
3. The battery energy storage units and ancillary
infrastructure shall be removed from the site no later than
50 years after the date when the operation is first brought
into use unless otherwise approved by the Planning
Authority through the grant of a further planning
permission following submission of an application. Written
confirmation of the commencement date of first operation
shall be provided to the Planning Authority within one
month of that date.
Reason – In order to limit the permission to the expected
operational lifetime of the battery storage units and to
allow for restoration of the site in the event that the use is
not continued by a further grant of planning permission
for a similar form of development.
Roads and Access
4. Prior to the commencement of the development hereby
approved, the developer shall submit for the further
written agreement of the Council as Planning Authority, in
consultation with the Roads Authority, a Construction
Traffic Management Scheme (CTMS) which shall include
the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;

Page 22

(g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road
users of construction traffic;
(j) arrangements to ensure that access for
emergency service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) monitoring, reporting and implementation
arrangements;
(n) arrangements for dealing with non-compliance;
and
(o) details of HGV movements to and from the site.
The TMS as approved shall be strictly adhered to during
the entire site construction programme to the satisfaction
of the Council as Planning Authority.
Reason – To minimise interference with the safety and
free flow of the traffic on the access road off the B8033
road.
5. Prior to the commencement of development, a
comprehensive Construction Traffic Management Plan
shall be submitted for the approval of the Planning
Authority, after consultation with Transport Scotland
Reason – To minimise interference with the safety and
free flow of the traffic on the trunk road.
Health and Safety
6. Not less than two months from the date of this planning
permission, a detailed scheme for the management of
vehicles crossing of the National Grid pipeline at Easting
282178; Northing 709479 and any necessary
reinforcement works of that road and or crossing shall be
submitted to, and approved in writing by, the Planning
Authority in consultation with National Grid. The scheme
shall include the frequency of vehicle movements during
both the construction and operational phases of
development, specify vehicle weights and set out the
technical specification of the reinforcement works to the
road or crossing point and their delivery. Thereafter, the
scheme shall be implemented in complete accordance
with the approved scheme and all reinforcement works
complete prior to the commencement of development
hereby approved.
Reason – In order to ensure that suitable vehicle crossing
arrangements are provided.

Page 23

Amenity
7. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 20 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
8. Construction work shall be limited to Monday to Friday
0700 hours to 1900 hours and Saturday 0800 hours to
1300 hours with no noisy works out with these times or at
any time on Sundays or bank holidays (as identified by
Scottish Government).
Reason – In the interests of residential amenity; to ensure
a satisfactory standard of local environmental quality.
Landscape
9. Prior to the commencement of the development hereby
approved, a detailed boundary landscaping and planting
scheme shall be submitted for the written agreement of
the Council as Planning Authority. The scheme shall
include details of the height and slopes of any mounding
or recontouring of the site, full details of all hard
landscaping proposals including materials and installation
methods and, species, height, size and density of trees
and shrubs to be planted. The scheme as subsequently
approved shall be carried out and completed within the
first available planting season (October to March) after
the completion or bringing into use of the development,
whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied
in writing to the Council as Planning Authority within 7
days of that date. The scheme as agreed and
implemented shall thereafter be maintained by the site
operator.
Reason – To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
10. Any planting failing to become established within five
years shall be replaced in the following planting season
with others of similar size, species and number to the
satisfaction of the Council as Planning Authority.
Reason – In the interests of visual amenity and to ensure
the satisfactory long-term implementation of the proposed
planting scheme.
Ecology
11. A minimum of two months prior to the commencement of
development, a site-specific Construction Environmental
Management Plan (CEMP) which shall include a
Construction Method Statement (CMS) shall be submitted

Page 24

to and approved by the Council as Planning Authority in
consultation with key stakeholders as deemed
appropriate. The CEMP must also include a Pollution
Prevention Plan (PPP), Invasive Management Plan
(IMP), Site Waste Management Plan (SWMP), Site
Access Management Plan (SAMP), Construction
Exclusion Zone (CEZ), Construction Traffic Management
Plan (CTMP), Environmental Management Plan (EMP).
Proposed measures for bog restoration methods,
monitoring and ongoing long-term aftercare and
maintenance shall be included. Measures to ensure the
public road network is kept free from mud or debris shall
also be required. The CEMP will remain a live document,
any working practices deemed to be having an adverse
impact on ecology or the environment will be the subject
of revision. All revisions must be submitted to the
Planning Authority as soon as reasonably practicable.
Thereafter the development shall be fully undertaken in
accordance with the agreed CEMP.
Reason - In the interest of protecting environmental
quality and of biodiversity. To minimise any associated
adverse landscape and visual impact of the above ground
elements and protect the character and visual amenity of
the immediate and surrounding countryside and
associated nature and cultural heritage conservation
interests.
12. Prior to the commencement of the development hereby
approved, an independent and suitably qualified
Ecological Clerk of Works (ECoW) shall be appointed at
the developers' expense. Details of this appointment shall
be subject to the prior written agreement of the Council
as Planning Authority. The appointed person will remain
in post for the duration and subsequent restoration of the
proposed development. The ECoW shall have
responsibility for the following:
(a) Overseeing the implementation of the Construction
Environmental Management Plan (CEMP) and
habitat restoration approved by this permission.
(b) Authority to stop operations or to alter construction
methods should there be any works occurring
which are having an adverse impact on the natural
heritage.
(c) Prior to the commencement of development, they
shall provide an environmental / ecological toolbox
talk for construction staff.
(d) They will have authority to amend working
practices in the interests of natural heritage. Any
amendments shall be submitted to the Council as
Planning Authority as an addendum to the
approved CEMP.

Page 25

(e) They shall make weekly visits to the development
site at a time of their choosing. No notification of
this visit is required to be given to the developer or
contractor.
(f) Within 10 working days of the end of each
calendar month, they are required to submit a
detailed monthly report for the review of the
Planning Authority in consultation with Scottish
Environment Protection Agency (SEPA) for the
duration of development.
(g) They shall notify the Council as Planning Authority
in writing of any requirement to halt development
in relation to this condition as soon as reasonably
practicable.
The above shall be implemented throughout the
construction, (including re-instatement and de-
commissioning of the construction compounds) hereby
approved unless otherwise agreed in writing with the
Council as Planning Authority. The CEMP shall contain a
site-specific Construction Method Statement (CMS) which
will provide concise details for the implementation of the
CEMP for site operatives.
Reason – To avoid habitat damage and safeguard
natural heritage interests.
13. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved. The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.
Reason – In order to prevent animals from being trapped
within any open excavations.
14. A minimum of two months prior to the commencement of
development, a Detailed Peat Management Plan shall be
submitted for the written approval of the Council as
Planning Authority, in consultation with SEPA and the
Council's Biodiversity/Tree Officer, and all work shall be
carried out in accordance with the agreed plan.
Reason – In the interests of protection of existing
peatland.
15. A minimum of two months prior to the commencement of
development, an updated Habitat Management Plan shall
be submitted for the written approval of the Council as
Planning Authority, in consultation the Council's
Biodiversity/Tree Officer, and all work shall be carried out
in accordance with the agreed plan.

Page 26

Reason – In the interests of protecting environmental
quality and of biodiversity.
16. The conclusions and recommended action points within
the supporting Ecological Appraisal (October 2022)
(drawing number 14) and Habitat Survey (October 2022)
(drawing number 15) submitted and hereby approved
shall be fully adhered to, respected, and undertaken as
part of the construction phase of development.
Reason – In the interests of protecting environmental
quality and of biodiversity.
17. Prior to the commencement of the development hereby
approved, final details of the proposed boundary fencing
for the site shall be submitted for the written agreement of
the Council as Planning Authority. For the avoidance of
doubt the fencing will be required to be deer proofed. The
scheme as subsequently agreed shall be implemented
prior to the completion or bringing into use of the
development, whichever is the earlier.
Reason – In the interests of protecting environmental
quality and of biodiversity.
18. Prior to the commencement of development, the
developer shall provide full written details of a scheme for
mitigating any potential effects on reptiles on the site
during the construction and operation of the energy
storage project. This shall include:
• The deployment and searching of artificial reptile
refugia to allow the capture and relocation to a
suitable and safe area of reptiles within the site. Such
measures to be undertaken during the reptile active
period of May to October (inclusive).
• After an agreed period with no reptile captures, the
site shall be cleared outward to an agreed
methodology from the site centre to allow any
remaining/undetected reptiles to disperse into
adjacent habitats.
• The site shall then be maintained with no vegetation
cover until construction works commence.
• Habitat clearance works shall be undertaken during
the reptile's active phase i.e., April - October
(inclusive).
• Details of proposals for the creation of reptile
hibernacula within the site.
Reason – In the interests of protecting environmental
quality and of biodiversity.
Drainage
19. Development shall not commence on site until a detailed
sustainable urban drainage system (SUDS) has been
submitted for the further written agreement of the Council
as Planning Authority, in consultation with SEPA where
necessary. The scheme shall be developed in
accordance with the technical guidance contained in The

Page 27

SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance and shall
incorporate source control. All works shall be carried out
in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development.
Reason – To ensure the provision of appropriate and
effective drainage for the site.
Finishes
20. Prior to the commencement of the development hereby
approved, details of the specification and colour of the
proposed external finishing materials to be used shall be
submitted to and agreed in writing by the Council as
Planning Authority.  The scheme as agreed shall be
implemented prior to the completion or bringing into use
of the development, whichever is the earlier.
Reason – In the interests of visual amenity; to ensure a
satisfactory standard of local environmental quality.
Project Lifespan and Site Aftercare
21. In the event the hereby approved development fails to
store electricity on a commercial basis for a continuous
period of 12 months, then it shall be deemed to have
permanently ceased to be required. In such an event, the
development shall be decommissioned, and the relevant
parts of the site brought into an agreed condition within
such timescale as agreed in writing by the Council as
Planning Authority.
Reason – To ensure the facility is removed from the site
at the end of its operational life, to ensure no adverse
impact on the visual amenity of the area and a satisfactory
standard of local environmental quality.
Restoration
22. The restoration of the site shall be completed in full within
12 months of its decommissioning and shall be
undertaken in full accordance with the submitted
restoration scheme to be approved under conditions 23
and 24 of this permission and shall thereafter be
maintained to the satisfaction of the Council as Planning
Authority.
Reason – In the interests of visual and residential
amenity.
23. Within 6 months of the date of this decision notice, a
detailed decommissioning and restoration scheme for the
application site shall be submitted to and approved in
writing by the Planning Authority. The scheme shall set
out the means for restoring the site to blanket bog
following the removal of the components of the
development. The applicants shall obtain written
confirmation from the Planning Authority that all
decommissioning has been completed in accordance with
the approved scheme and (unless otherwise dictated

Page 28

through the grant of a new planning permission for a
similar form of development) the restoration of the site
shall be implemented in accordance with the approved
details and in accordance with the timescales outlined in
condition 22 of this permission and in any case before the
expiry of the time period set by condition 3 of this
planning permission.
Reason – In the interests of visual and residential
amenity.
24. Prior to the commencement of the final restoration and
re-instatement of the application site as required by
conditions 22 and 23 of this permission a detailed
scheme with final contours and an aftercare management
plan for the site shall be submitted to and approved in
writing by the Planning Authority. Thereafter the approved
scheme shall be implemented in full.
Reason – To ensure that final contours and an updated
restoration plan and aftercare plan are submitted prior to
the site ceasing operation thereby ensuring appropriate
restoration in the interests of visual amenity and to
minimise impacts on the landscape.
25. The approved bond or financial instrument shall be
maintained throughout the duration of the operation of the
development hereby approved. At five-yearly intervals (as
a minimum) from the commencement of the
development, an independent review of the approved
bond or financial instrument shall be carried out and
submitted to the Council as Planning Authority. The
Council as Planning Authority may direct that the
approved bond or financial instrument be amended if this
is necessary to ensure that funds remain sufficient to
cover the removal of all development granted by this
permission and the site's restoration.
Reason – To ensure that at all times there are sufficient
funds available to ensure that the removal of all
development and site restoration can occur. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Procedural Notes
Permission shall not be issued until a Section 75 legal
agreement has been signed and registered to take account of
the bond associated with this application. The legal agreement
should be concluded and completed within 4 months of the date
of any Committee approval.  Failure to conclude a legal
agreement within 4 months will result in the planning application
being re-assessed through failing to comply with the relevant

Page 29

policies and may ultimately be recommended for refusal under
delegated powers. 
Informatives
1. Under section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development. A
failure to comply with this statutory requirement would
constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action
being taken. Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position.  Please use the
form attached herewith.
3. This development will require the 'Display of notice while
development is carried out', under Section 27C(1) of the
Town and Country Planning Act 1997, as amended, and
Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013. The form of the
notice is set out in Schedule 7 of the Regulations and a
draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be:
• Displayed in a prominent place at or in the vicinity of
the site of the development 
• Readily visible to the public 
• Printed on durable material.
4. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  The required information
must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us
at developmentmanagement@pkc.gov.uk. Please be
aware that a fee is payable in respect of each request
made, though there is no limit to the number of conditions
that can be discharged in a single request. The Fees
Charter is available on our website www.pkc.gov.uk. The
Council has two months to consider the information. You
should therefore submit the required information more
than two months before your permission expires.  We
cannot guarantee that submissions made within two
months of the expiry date of your permission will be able
to be dealt with before your permission lapses.
5. An application for Building Warrant may be required.
6. The applicant is reminded that, under the Wildlife and
Countryside Act 1981, as amended (section 1), it is an

Page 30

offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act.
7. The applicant is reminded that, should any protected
species be present a licence may be required from
NatureScot to disturb a protected species. Failure to
obtain a licence may constitute a criminal act under the
Habitats Regulations and penalties are severe for non-
compliance.
8. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive. Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates. The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act.
9. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
10. The applicant should take note of the information and
advice contained within the consultation response from
Natural Gas. 
(2) Local Applications 
(i) 23/01044/FLL – Change of use of storage shed to form a
shop, siting of a workshop unit for furniture
recycling/restoration, formation of parking area and
associated works, land north east of Causeway Cottage,
Scotlandwell, Kinross 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
1. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
2. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all

Page 31

windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
3. Reason – In order to safeguard the neighbouring
residential amenity in the area.
The hours of operations shall be restricted to 0700 hours
to 1900 hours daily.
Reason – In order to safeguard the neighbouring
residential amenity in the area.
4. The retail floor space shall be restricted to the sale of
furniture and associated home furnishing/décor goods in
the area as annotated as retail on plan ref 07.
Reason – In order to control and limit the retail element of
the proposal. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives 
1. As soon as practicable after the development is
complete, the person who completes the development is
obliged by section 27B of the Town and Country Planning
(Scotland) Act 1997 (as amended) to give the Planning
Authority written notice of that position.  Please use the
form attached herewith.
2. An application for Building Warrant may be required. 
(ii) 23/01262/IPL – Erection of a dwellinghouse (in principle),
land 75 metres north west of Mullmac, Saucher, Kinrossie,
Perth 
Mr S Geddes, objector to the application, addressed the
Committee via telephone and answered Members’ questions. 
Motion (Councillors B Brawn and C Reid) 
Refuse, as the proposal is contrary to Policy 50 of Perth and
Kinross Local Development Plan 2 (2019) due to the proposed
use of prime agricultural land. 
Amendment (Councillors T McEwan and I Massie) 
Grant, subject to the following terms, conditions and
informatives: 
1. The development shall not commence until the following
specified matters have been the subject of a formal
planning application for the approval of the Council as
Planning Authority: the siting, design and external
appearance of the development which should accord with

Page 32

the indicative layout as indicated on approved drawing
09, the hard and soft landscaping of the site, all means of
enclosure, means of access to the site, road layout,
vehicle parking and turning facilities, levels, drainage
including the disposal of surface water and waste
management provision.
Reason – This is a Planning Permission in Principle
under Section 59 of the Town and Country Planning
(Scotland) Act 1997 as amended by Section 21 of the
Planning etc. (Scotland) Act 2006.
2. This planning permission in principle will last only for five
years from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason – This is a Planning Permission in Principle in
terms of Section 59 of the Town and Country Planning
(Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019.
3. Further to Condition 1 above, a detailed protected
species survey covering the site shall be submitted as
part of the specified matters requiring to be the subject of
a further formal planning application for the approval of
the Council as Planning Authority.  The report shall
include appropriate mitigations to protect any identified
species.
Reason – In the interests of protecting environmental
quality and of biodiversity.
4. All existing trees and hedging on the site shall be retained
and their retention or proposed lopping, topping or felling
shall be shown in the submission of the matters specified
in Condition 1 above.
Reason – To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
5. The development shall be in accordance with the
requirements of Perth & Kinross Council's Developer
Contributions and Affordable Housing Supplementary
Guidance 2020 in line with Policy 5: Infrastructure
Contributions of the Perth & Kinross Local Development
Plan 2 (2019) with particular regard to primary education
infrastructure, or such subsequent Guidance and Policy
which may replace these.
Reason – To ensure the development is in accordance
with the terms of the Perth and Kinross Local
Development Plan 2 (2019) and to comply with the
Council's policy on Developer Contributions and
Affordable Housing Supplementary Guidance 2020. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan.

Page 33

Informatives 
1. No work shall be commenced until an application for
building warrant has been submitted and approved.
2. The applicant should be aware of the requirements of the
Council's Environment and Regulatory Services in
relation to waste collection from the site and should
ensure adequate measures are provided on site to allow
for the collection of waste. 
In terms of Standing Order 21.5, a roll call vote was taken. 
3 Members voted for the Motion as follows:
Councillors K Allan, B Brawn and C Reid. 
8 Members voted for the Amendment as follows:
Councillors D Cuthbert, K Harvey, D Illingworth, B Leishman,
I Massie, T McEwan, I MacPherson and G Stewart. 
In terms of Standing Order 24.1, Councillor A Forbes advised he
lost internet connection and therefore was not present during
consideration of the whole item, and subsequently unable to
participate in the decision. 
Resolved:
In accordance with the Amendment. 
6. PROPOSAL OF APPLICATION NOTICES (PAN) 
(i) 23/00011/PAN – Formation of 49.9MW battery energy storage
facility, formation of access and associated works, land 400
metres south east of Endrigg, Jamesfield, Newburgh, Cupar 
Councillor Cuthbert requested due consideration be given to the
cumulative impact of similar sites nearby and the associated fire risk. 
The contents of the Head of Planning & Development’s Report were
noted. 
(ii) 23/00012/PAN – Formation of a 49.9MW solar farm comprising
ground mounted solar arrays, inverters, transformers, a
substation, a DNO substation, battery storage facility, security
fencing, CCTV cameras, cabling, access tracks and associated
works, Kinnon Park Farm, Methven, Perth 
Councillor Illingworth requested due consideration be given to
employment impacts, particularly with regard to arable land in
comparison to a solar farm, loss of prime agricultural land and food
producing land, visual impacts, use of chemicals for cleaning, the core
path network, impact on local housing and impacts on flooding.

Page 34

Councillor Cuthbert requested due consideration be given to elevation
of solar panels to allow land beneath to be utilised and minimise loss of
arable land. 
Councillor McEwan requested due consideration be given to glare from
solar panels onto the nearby roads. 
The contents of the Head of Planning & Development’s Report were