Agenda Document Pack - Planning and Placemaking Committee - 11/10/2023

Perth and Kinross Council · 11 October 2023
Back to Planning and Placemaking Committee — 11 October 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
02/10/2023 
A hybrid meeting of the Planning and Placemaking Committee will be held in the
Council Chamber on Wednesday, 11 October 2023 at 09:30. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Ian Massie  (Convener)
Councillor Grant Stewart  (Vice-Convener)
Councillor Keith Allan
Councillor Bob Brawn
Councillor Dave Cuthbert
Councillor Ken Harvey
Councillor David Illingworth
Councillor Ian James
Councillor Brian Leishman
Bailie Claire McLaren
Councillor Crawford Reid
Councillor Richard Watters
Bailie Mike Williamson
Page 1 of 172

Page 2

Page 2 of 172

Page 3

Planning and Placemaking Committee 
Wednesday, 11 October 2023 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE PLANNING AND
PLACEMAKING COMMITTEE OF 6 SEPTEMBER 2023 FOR
APPROVAL
(revised copy herewith) 
7 - 30 
4 DEPUTATIONS   
5 APPLICATIONS FOR DETERMINATION   
5(1)  MAJOR APPLICATIONS   
5(1)(i)  22/00817/FLM - ERECTION OF 110 DWELLINGHOUSES,
ASSOCIATED INFRASTRUCTURE, ACCESS, SUDS AND
LANDSCAPING, LAND 150 METRES SOUTH WEST OF
KINTILLO CEMETERY (H14), BRIDGE OF EARN, PERTH
Report of Handling by Head of Planning and Development (copy
herewith 23/269) 
31 - 68 
5(1)(ii)  22/01501/FLM - ERECTION OF 90 DWELLINGHOUSES, 2
RESIDENTIAL BLOCKS CONSISTING 10 FLATS,
ASSOCIATED INFRASTRUCTURE, ACCESS, SUDS AND
LANDSCAPING (IN PART ALLOCATED SITE H69), LAND 150
METRES SOUTH OF STATION HOUSE, FORFAR ROAD,
MEIGLE
Report of Handling by Head of Planning and Development (copy
herewith 23/270) 
69 - 90
Page 3 of 172

Page 4

5(1)(iii)  22/02231/FLM - FORMATION OF A 49.99MW BATTERY
ENERGY STORAGE COMPOUND COMPRISING BATTERY
STORAGE UNITS, ANCILLARY BUILDINGS AND
EQUIPMENT, BOGLAND RESTORATION, LANDSCAPING
AND ASSOCIATED WORKS, SHINDOUR, FEDDAL HILL
WOOD, BRACO
Report of Handling by Head of Planning and Development (copy
herewith 23/271) 
91 - 120 
5(2)  LOCAL APPLICATIONS   
5(2)(i)  23/01044/FLL - CHANGE OF USE OF STORAGE SHED TO
FORM A SHOP, SITING OF A WORKSHOP UNIT FOR
FURNITURE RECYCLING/RESTORATION, FORMATION OF
PARKING AREA AND ASSOCIATED WORKS, LAND NORTH
EAST OF CAUSEWAY COTTAGE, SCOTLANDWELL,
KINROSS
Report of Handling by Head of Planning and Development (copy
herewith 23/272) 
121 - 134 
5(2)(ii)  23/01262/IPL - ERECTION OF A DWELLINGHOUSE (IN
PRINCIPLE), LAND 75 METRES NORTH WEST OF
MULLMAC, SAUCHER, KINROSSIE, PERTH
Report of Handling by Head of Planning and Development (copy
herewith 23/273) 
135 - 152 
6 PROPOSAL OF APPLICATION NOTICES (PAN)   
6(i)  23/00011/PAN - FORMATION OF 49.9MW BATTERY ENERGY
STORAGE FACILITY, FORMATION OF ACCESS AND
ASSOCIATED WORKS, LAND 400 METRES SOUTH EAST OF
ENDRIGG, JAMESFIELD, NEWBURGH, CUPAR
Pre-Application Report by Head of Planning and Development
(copy herewith 23/274) 
153 - 162 
6(ii)  23/00012/PAN - FORMATION OF 49.9MW SOLAR FARM
COMPRISING GROUND MOUNTED SOLAR ARRAYS,
INVERTERS, TRANSFORMERS, A SUBSTATION, A DNO
SUBSTATION, BATTERY STORAGE FACILITY, SECURITY
FENCING, CCTV CAMERAS, CABLING, ACCESS TRACKS
AND ASSOCIATED WORKS, KINNON PARK FARM,
METHVEN, PERTH
Pre-Application Report by Head of Planning and Development
(copy herewith 23/275) 
163 - 172 
Page 4 of 172

Page 5

Page 5 of 172

Page 6

Page 6 of 172

Page 7

PLANNING AND PLACEMAKING COMMITTEE 
Minute of hybrid meeting of the Planning and Placemaking Committee held in the
Council Chambers, 2 High Street, Perth, on Wednesday 6 September 2023 at
9:30am. 
Present: Councillors I Massie and G Stewart, Bailie C McLaren and Councillors
H Anderson, B Brawn, K Harvey, D Illingworth, I James, B Leishman, I MacPherson
(Substituting for Bailie M Williamson), C Reid and R Watters. 
In Attendance: A Deans, S Panton, L Reid, K Smith and P Williamson (all
Communities); C Elliott, J Guild, R Ramsay and M Pasternak (all Corporate and
Democratic Services). 
Apologies: Bailie M Williamson and Councillor D Cuthbert. 
Councillor I Massie, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed everyone present to the meeting.  Apologies were
noted as above. 
2. DECLARATIONS OF INTEREST 
No Declarations of Interest were made in terms of the Councillors Code of
Conduct. 
3. MINUTES 
The minute of meeting of the Planning and Placemaking Committee of
9 August 2023, be approved. 
4.  DEPUTATIONS 
Convener advised of no deputations in relation to the items of business on the
agenda, however, the applicant for Item 5(2)(i) was available to answer Members’
questions. 
In terms of Standing Order 19.9, Councillor Liz Barrett requested to address
the Committee in relation to Item 5(1)(i) as it affects her ward area.  Convener gave
his consent to this request. 
5. APPLICATIONS FOR DETERMINATION 
(1) Major Application 
(i) 20/00667/IPM – Mixed use development comprising
residential, business (class 4), general industry (class 5),
storage and distribution (class 6), shops (class 1), financial,
3
Page 7 of 172

Page 8

professional and other services (class 2), food and drink
(class 3), hotels (class 7), non-residential institutions (class
10), bus depot, car parking, Perth Innovation Highway,
hydrogen fuelling/charging centre, formation of road
junction, underpass and road network, road alterations,
footways, cycleways, greenspace, landscaping, and
associated works (in principle), Perth West (MU70), Old
Gallows Road, Perth – Report No. 23/239 – The John Dewar
Lamberkin Trust 
Councillor L Barrett addressed the Committee and answered
Member’s questions. 
Resolved:
Grant, subject to the following terms, conditions and
informatives: 
General AMSC
1. The Permission hereby approved shall be limited to:
(a) residential development of a maximum of 1,500
dwellings;
(b) commercial development of 26 hectares comprising:
business (class 4); general industry (class 5);
storage and distribution (class 6); shops (class 1);
financial; professional and other services (class 2);
food and drink (class 3); hotels (class 7); and non-
residential institutions (class 10); and
(c) Infrastructure development comprising: bus depot;
car parking; Perth Innovation Highway; hydrogen
fuelling/charging centre; formation of road junction;
underpass and road network; road alterations;
footways; cycleways; greenspace; landscaping; and
associated works. 
No works in connection with the development hereby
approved shall take place until full details of the siting,
design, external appearance and landscaping of the
development and the means of access serving the
development (hereinafter referred to as the ‘matters
specified by condition’) have been submitted to and
approved in writing by the Planning Authority. The
specified matters are:
(i) a detailed updated phasing and delivery plan
(incorporating commercial, residential, transport
infrastructure, drainage infrastructure and open
space) which shall specify that commercial uses
are delivered in the first zones within Phase 1 and
for the delivery of Phases 1-3 to accord with the
Transport Assessment (Ref: 20/00667/15);
(ii) a detailed levels survey (existing and proposed)
and cross sections showing proposed finished
Page 8 of 172

Page 9

ground and floor levels of all buildings forming part
of each development phase, relative to existing
ground levels and a fixed datum point. 
(iii) the siting, design, height, and external materials of
all buildings or structures;
(iv) the details of all access, car parking, public
transport facilities, footpaths/cycleways, the road
layout, design, and specification (including the
disposal of surface water) and related structures
throughout the development;
(v) details of any screen walls/fencing including any
retaining walls to be provided.
(vi) for each building, specifying measures to
maximise environmental sustainability through
design, orientation and planting or any other
means. These measures shall include a scheme
that demonstrates how current carbon emissions
reduction set by the Scottish Buildings Standards
will be met through the installation and operation of
low and zero-carbon technologies, specifying what
these technology types are, their location and
ongoing operation and maintenance; 
(vii) details of any landscaping, structure planting,
boundary treatments and screening associated
with the development;
(viii) full details of the proposed means of disposal of
foul and surface water from the development;
(ix) noise impact assessment
(x) lighting details;
(xi) bin storage, collection location, recycling facilities
provision and access;
(xii) biodiversity action plan 
(xiii) a green travel plan including provision of electric
vehicle (EV) charging points;
(xiv) archaeological working scheme of investigation;
(xv) updated Transport Assessment;
(xvi) updated Flood Risk Assessment
(xvii) updated Drainage Impact Assessment including
SUDs Design Principles
(xviii) updated Battlefield Conservation Plan.
(xix) updated landscape and visual impact assessment. 
Reason: This is a Planning Permission in Principle under
Section 59 of the Town and Country Planning (Scotland)
Act 1997 (as amended).
2. The submitted Masterplan (Ref: 20/00667/15) and
Development Parameters Plan and Schedule of Uses
and Floorspace (Ref: 20/00667/5) are purely indicative
only and are not approved.
Reason: The application is for planning permission in
principle only at this stage.
Page 9 of 172

Page 10

Roads
3. As part of any application for the Approval of Matters
Specified by Condition (AMSC) under Condition 1(iv), all
matters shall be in accordance with the standards
required by the Council as Roads Authority (as detailed in
the National Roads Development Guide) and to the
satisfaction of the Planning Authority.
Reason: In the interests of road safety.
4. The development of the application site shall be reviewed
by 2035 or when there have been 1,001 housing units or
20 hectares of employment land developed, whichever
comes first, to reassess the impact on the road network
and the amount of modal shift.  The applicant shall refer
to LDP2 Main Issue Report or page 52/189 of the Perth
West: Transport Assessment Ref: 
GB01T20A18.2PROJ.10964013 (SYSTRA, 22/05/20) for
details of the “Pause and Review”.  No development shall
take place until the review has been undertaken,
submitted, and agreed in writing by the Council as
Planning Authority.
Reason: In the interests of road safety.
5. As part of the first Approval of Matters Specified by
Condition (AMSC) application, details of the proposed
multi-storey car park shall be submitted for the approval
of the Council as Planning Authority. 
For the avoidance of doubt the multi-storey car park must
occur before the implementation of any parking
restrictions on Lamberkine Drive or Tweed Place and
continue to be available for the vehicles displaced as
result of the restrictions.  The number of parking spaces
to be made available for displaced vehicles shall be
agreed with the Council as Planning Authority before the
first AMSC application.
Reason: In the interests of road safety.
6. As part of any Approval of Matters Specified by Condition
(AMSC) application, all external lighting and streetlighting
details submitted under Conditions 1 (iv) and/or (x) shall
be designed to be sufficiently screened and aligned so as
to ensure that there is no direct illumination of
neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land.
Reason: In the interests of minimising light pollution,
protecting amenity and road safety.
7. As part of the first Approval of Matters Specified by
Condition (AMSC) application, a detailed design for the
signalisation identified for the A93/Lamberkine Drive shall
be provided and including the upgrade of the zebra
crossing on Lamberkine Drive to a controlled crossing, to
Page 10 of 172

Page 11

reduce the impact of queueing from the development.  A
detailed design shall be undertaken, along with a date for
their implementation by the developer, and shall be
agreed in writing by the Council as Planning Authority.
Thereafter the development shall be fully undertaken in
accordance with the approved scheme.
Reason: In the interests of road safety.
8. As part of the first Approval of Matters Specified by
Condition (AMSC) application, a scheme for mitigation
measures for the core path CTYS/112; Cycleway,
Lamberkine Drive & Cedar Drive to Fairhill View &
Glasgow Road at Woodlands, where it crosses
Lamberkine Drive, shall be submitted to and approved in
writing by the Council as Planning Authority. This scheme
shall include a detailed design that facilitates the safe
crossing of pedestrians and cyclists and must also
specify a date for its implementation by the developer.
The scheme as approved shall be implemented prior to
the occupation of the 100th dwellinghouse. 
Reason: In the interests of road safety.
9. As part of any application for the Approval of Matters
Specified by Condition (AMSC), the phasing of the project
as part of any approval under Condition 1(i) of this
permission, will be such that the upgraded A9(T)
Tibbermore grade-separated junction shall be operational
by the completion of the 1,001st housing unit on the site.
Reason: In the interests of road safety.
10. No development shall commence until appropriate
mitigation measures have been agreed to address the
impact of the development at the Broxden Roundabout
on the A9 trunk road. The nature of the mitigation shall
either be physical improvements to this junction in the
form of traffic signals and widening of approaches, or a
financial contribution in lieu of the said physical works.
The details of the physical works or the level of financial
contribution required shall be agreed in writing with the
Planning Authority, in consultation with Transport
Scotland.
Reason: To mitigate the adverse impact of the
development on the safe and efficient operation of the
trunk road network.
11. Prior to the commencement of any works on site, a
scheme for the delivery of the proposed Broxden
Underpass shall be submitted to and approved in writing
by the Planning Authority, in conjunction with Transport
Scotland. Thereafter, the approved details shall be
implemented in accordance with the approved
timescales.
Reason: To mitigate the impact of the development on
the safe and efficient operation of the trunk road.
Page 11 of 172

Page 12

12. Prior to the commencement of any works on site, a
scheme for the delivery of a signal controlled A93 /
Lamberkine Drive junction shall be submitted to and
approved in writing by the Planning Authority in
conjunction with Transport Scotland. Thereafter, the
approved details shall be implemented in accordance
with the approved timescales.
Reason: To mitigate the impact of the development on the
safe and efficient operation of the trunk road.
13. Prior to the commencement of any works on Phase 3 of
the development, a scheme for the delivery of the
proposed Tibbermore grade-separated junction shall be
submitted to and approved in writing by the Planning
Authority in conjunction with Transport Scotland.
Thereafter, the approved details shall be implemented in
accordance with the approved timescales.
Reason: To mitigate the impact of the development on
the safe and efficient operation of the trunk road.
14. Prior to the commencement of any works on Phase 3 of
the development, a scheme for the delivery of the
proposed Tibbermore Link Road shall be submitted to
and approved in writing by the Planning Authority in
conjunction with Transport Scotland. Thereafter, the
approved details shall be implemented in accordance
with the approved timescales.
Reason: To mitigate the impact of the development on
the safe and efficient operation of the trunk road.
15. Prior to the commencement of any works on site, a
scheme for the delivery of the proposed temporary
emergency access from the A9 at East Lamberkine Farm
shall be submitted to and approved in writing by the
Planning Authority in conjunction with Transport Scotland.
Thereafter, the approved details shall be implemented in
accordance with the approved timescales. The temporary
access shall be closed once the A9 Tibbermore grade-
separated junction becomes operational.
Reason: To mitigate the impact of the development on
the safe and efficient operation of the trunk road.
16. Prior to the commencement of any works on site, a
Construction Traffic Management Plan (CTMP) for each
phase of the development, covering the construction of
that phase, shall be submitted for prior approval of the
Planning Authority, after consultation with Transport
Scotland as the Trunk Road Authority.
Reason: To minimise interference with the safety and free
flow of the traffic on the trunk road; to ensure the safety of
pedestrians and cyclists using the trunk road and
adjacent facilities; and to be consistent with current
guidance and best practice.
Page 12 of 172

Page 13

17. Prior to the commencement of the development hereby
approved, the applicant shall submit for the further written
agreement of the Council as Planning Authority, in
consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (CTMS) which
shall include the following:
(a) restriction of construction traffic to approved routes
and the measures to be put in place to avoid other
routes being used;
(b) timing of construction traffic to minimise impact on
local communities particularly at school start and
finishing times, on days when refuse collection is
undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for
queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority
regarding winter maintenance;
(e) emergency arrangements detailing communication
and contingency arrangements in the event of
vehicle breakdown;
(f) arrangements for the cleaning of wheels and
chassis of vehicles to prevent material from
construction sites associated with the development
being deposited on the road;
(g) arrangements for cleaning of roads affected by
material deposited from construction sites
associated with the development;
(h) arrangements for signage at site accesses and
crossovers and on roads to be used by
construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road
users of construction traffic;
(j) arrangements to ensure that access for
emergency service vehicles are not impeded;
(k) co-ordination with other significant developments
known to use roads affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of
temporary construction compounds;
(m) the provision and installation of traffic counters at
the applicant's expense locations to be agreed
prior to the commencement of construction;
(n) monitoring, reporting and implementation
arrangements;
(o) arrangements for dealing with non-compliance;
and
(p) details of HGV movements to and from the site.
The CTMS as approved shall be strictly adhered to during
the entire site construction programme.
Reason: In the interests of road safety.
Page 13 of 172

Page 14

18. All vehicles transporting construction material to and from
the proposed development shall be sheeted. 
Reason: To ensure that material from the site is not
deposited on the trunk road to the detriment of road
safety.
19. Prior to the commencement of any works on site, vehicle
wheel cleaning facilities shall be installed and brought
into operation on the site, the design and siting of which
shall be subject to the prior approval of the Planning
Authority, after consultation with Transport Scotland as
the Trunk Road Authority. 
Reason: To ensure that material from the site is not
deposited on the trunk road to the detriment of road
safety.
20. Prior to the occupation of any part of the phased
development, a comprehensive Residential Travel Plan
that sets out proposals for reducing dependency on the
private car shall be submitted and approved in writing by
the Planning Authority, after consultation with Transport
Scotland as the Trunk Road Authority. The Travel Plan
shall identify measures to be implemented, the system of
management, monitoring, review, reporting and the
duration of the plan. 
Reason: To be consistent with the requirements of PAN
75 Planning for Transport.
21. Prior to the occupation of any part of the phased
development, a comprehensive Commercial Travel Plan
that sets out proposals for reducing dependency on the
private car shall be submitted to and approved in writing
by the Planning Authority, after consultation with
Transport Scotland as the Trunk Roads Authority. The
Travel Plan shall identify measures to be implemented,
the system of management, monitoring, review, reporting
and the duration of the plan.
Reason: To be consistent with the requirements of PAN
75 Planning for Transport.
22. Development shall not commence until a detailed Green
Travel Plan (GTP), aimed at encouraging more
sustainable means of travel, as required under Condition
1 (xiii), has been submitted to and agreed in writing by
the Council as Planning Authority. A strategy shall be
included in the GTP for monitoring, reporting, and
updating the plan as necessary. The GTP will have
particular regard to provision for:
(a) walking and cycling; 
(b) public transport access to and within the site; 
(c) provision of electric vehicle (EV) charging points
within all residential, commercial and community use
development parcels; 
Page 14 of 172

Page 15

(d) identify measures to be provided (including the
provision of new and/or enhanced public transport
services);
(e) any phasing, the system of management,
monitoring, review, reporting and the duration of the
Plan. 
The GTP as agreed shall be fully implemented by the
applicant. 
Reason: In the interests of sustainable transport.
23. Prior to the commencement of any phased development,
a Development Phasing Strategy shall be submitted to
and agreed in writing with the Planning Authority, after
consultation with Transport Scotland as the Trunk Road
Authority, that establishes what level of development
mitigation interventions will be required.
Reason: To minimise any interference with the safety and
free flow of traffic on the trunk road network.
24. Prior to the commencement of any phased development,
a Public Transport Strategy shall be submitted to and
agreed in writing with the Planning Authority, after
consultation with Transport Scotland as the Trunk Road
Authority, that considers the various public transport
improvements cited in the Transport Assessment.
Reason: To ensure that the development is adequately
served by public transport services; and to minimise any
interference with the safety and free flow of traffic on the
trunk road network.
25. A barrier of a type approved by the Planning Authority,
after consultation with Transport Scotland as the Trunk
Road Authority, shall be provided and maintained by the
developer or subsequent owner of the land along the
boundary of the site with the trunk road.
Reason: To minimise interference with the safety and free
flow of the traffic on the trunk road; and to minimise the
risk of pedestrians and animals gaining uncontrolled
access to the trunk road with the consequential risk of
accidents.
26. Prior to the commencement of any works on site, details
of the lighting within the site shall be submitted for the
approval of the Planning Authority, after consultation with
Transport Scotland as the Trunk Road Authority.
Reason: To ensure that there will be no distraction or
dazzle to drivers on the trunk road and that the safety of
the traffic on the trunk road will not be diminished.
27. There shall be no drainage connections to the trunk road
drainage system.
Reason: To ensure that the efficiency of the existing
drainage network is not aaffected.
Page 15 of 172

Page 16

28. The proposed development shall be limited to the scale
assessed within the Transport Assessment (Ref:
20/00667/15).
Reason: To ensure that the scale of development does
not exceed that assessed by the supporting Transport
Assessment and to ensure that the scale of development
is commensurate with the infrastructure required to
support the development.
Residential Amenity
29. Construction work shall be limited to Monday to Friday
0700 hours to 1900   hours and Saturday 0800 hours to
1300 hours with no noisy works out with these times or at
any time on Sundays or bank holidays (as identified by
the Scottish Government).
Reason: To ensure a satisfactory standard of local
environmental quality.
30. As part of any Approval of Matters Specified by Condition
(AMSC) application, a detailed Construction
Environmental Management Plan (CEMP) detailing
environmental mitigation measures and construction
method statements, including specific measures for
environmental monitoring during construction, shall be
submitted for the written agreement of the Council as
Planning Authority in consultation with NatureScot,
Scottish Environment Protection Agency (SEPA) and
Environmental Health.  Such details shall be submitted
not less than two months prior to the agreed scheduled
commencement date and shall incorporate detailed
pollution avoidance and mitigation measures for all
construction elements.  The CEMP shall include noise &
vibration and dust assessments; to assess the impacts
from construction operations. The CEMP shall also
include procedures, limit values and mitigation measures
to control noise and vibration and a detailed quantitative
dust assessment shall be undertaken. Thereafter the
development shall be fully undertaken in accordance with
the agreed CEMP. 
Reason: In the interest of proper site management and to
protect the amenity of the area.
31. Prior to the commencement of the development hereby
approved, an independent and suitably qualified
Ecological Clerk of Works (ECoW) shall be appointed at
the developers' expense. Details of this appointment shall
be subject to the prior written agreement of the Council
as Planning Authority. The appointed person will remain
in post for the duration and subsequent restoration of the
proposed development. The ECoW shall have
responsibility for the following:
Page 16 of 172

Page 17

• Implementation of the Construction Environmental
Management Plan (CEMP) approved by this
permission. 
• Implementation of the Aftercare Monitoring Plan
(AMP) required by this permission.
• Authority to stop operations or to alter construction
methods should there be any works occurring which
are having an adverse impact on the natural heritage. 
• Prior to the commencement of development, they
shall provide an environmental / ecological toolbox
talk for construction staff. 
• They will have authority to amend working practices in
the interests of natural heritage. Any amendments
shall be submitted to the Council as Planning
Authority as an addendum to the approved CEMP. 
• They shall make weekly visits to the development site
at a time of their choosing. No notification of this visit
is required to be given to the developer or contractor. 
• Within 10 working days of the end of each calendar
month, they are required to submit a detailed monthly
report for the review of the Planning Authority in
consultation with Scottish Environment Protection
Agency (SEPA) for the duration of development. 
• They shall notify the Council as Planning Authority in
writing of any requirement to halt development in
relation to this condition as soon as reasonably
practicable. 
The above shall be implemented throughout the
construction, re-instatement and de-commissioning of the
development hereby approved unless otherwise agreed
in writing with the Council as Planning Authority.  The
CEMP shall contain a site-specific Construction Method
Statement (CMS) which will provide concise details for
the implementation of the CEMP for site operatives.
Reason: In the interest of proper site management and to
protect the amenity of the area.
32. As part of any Approval of Matters Specified by Condition
(AMSC) application, a detailed Air Quality Assessment
(AQA) must be prepared by a suitable qualified party and
shall be submitted for the approval of the Council as
Planning Authority. Thereafter the agreed plan will be
undertaken in full to the satisfaction of the Council as
Planning Authority.
Reason: To ensure a satisfactory standard of local
environmental quality.
33. As part of any Approval of Matters Specified by Condition
(AMSC) application, a detailed Noise Impact Assessment
(NIA) must be prepared by a suitable qualified party and
shall be submitted for the approval of the Council as
Planning Authority. Thereafter the agreed plan will be
Page 17 of 172

Page 18

undertaken in full to the satisfaction of the Council as
Planning Authority.
Reason: To ensure a satisfactory standard of local
environmental quality.
34. As part of any Approval of Matters Specified by Condition
(AMSC) application, an evaluation for the potential of the
site to be affected by contamination by a previous use
has been undertaken and, as a minimum, a Preliminary
Risk Assessment (Phase 1 Desk Study) has been
submitted for consideration and accepted by the Council
as Planning Authority. If the preliminary risk assessment
identifies the need for further assessment, an intrusive
investigation shall be undertaken to identify: 
(a) the nature, extent, and type(s) of contamination on
the site 
(b) measures to treat/remove contamination to ensure
the site is fit for the use proposed 
(c) measures to deal with contamination during
construction works 
(d) condition of the site on completion of
decontamination measures. 
Prior to the completion or bringing into use of any part of
the development the measures to decontaminate the site
shall be fully implemented in accordance with the scheme
subsequently agreed by the Council as Planning
Authority. Verification that the scheme has been fully
implemented must also be submitted to the Council as
Planning Authority.
Reason: In order to deal with any potential contamination
of the site as a result of its former use.
Cultural Heritage
35. As part of any Approval of Matters Specified by Condition
(AMSC) application sought under Condition 1 a detailed
report setting out protection of key heritage assets and
their settings shall be submitted to and approved by the
Planning Authority in consultation with Perth and Kinross
Heritage Trust (PKHT). Thereafter the agreed actions will
be undertaken in full, to the satisfaction of the Council as
Planning Authority. 
Reason: the protection of key heritage assets. 
36. No development shall take place within the development
site until the developer has secured the implementation of
a programme of archaeological works in accordance with
a Written Scheme of Investigation which has been
submitted by the applicant, agreed by Perth and Kinross
Heritage Trust, and approved by the Planning Authority. 
Thereafter the developer shall ensure that the
programme of archaeological works is fully implemented
and that all recording and recovery of archaeological
resources within the development site is undertaken to
Page 18 of 172

Page 19

the satisfaction of the Planning Authority in agreement
with Perth and Kinross Heritage Trust
Reason: To safeguard archaeology in the area.
37. As part of any Approval of Matters Specified by Condition
(AMSC) application, a scheme detailing the provision and
timing of protective fencing shall be submitted to the
Council for approval as Planning Authority, in consultation
with Perth and Kinross Heritage Trust. Once approved,
the fencing shall be erected around the historic battlefield
area in a manner as approved and retained in
accordance with the approved scheme.  No works shall
take place within the area inside that fencing without prior
written agreement of the Council as Planning Authority in
consultation with Perth and Kinross Heritage Trust.
Reason: To ensure the preservation of the historic
environment.
38. As part of any Approval of Matters Specified by Condition
(AMSC) application sought under Condition 1 an Updated
Battlefield Conservation Plan (BCP) shall be submitted
for the approval of the Council as Planning
Authority. Thereafter the agreed plan will be undertaken
in full to the satisfaction of the Council as Planning
Authority.
Reason: To ensure the preservation and enhancement of
the historic environment.
Landscape
39. As part of any application for the Approval of Matters
Specified by Condition (AMSC) sought under Condition 1,
a detailed landscaping and planting scheme for each
phase shall be submitted for the approval of the Council
as Planning Authority.  The scheme shall include details
of the height and slopes of any mounding or recontouring
of the site, full details of all hard-landscaping proposals
including materials and installation methods and, species,
height, size and density of trees and shrubs to be
planted.  The scheme as subsequently approved shall be
carried out and completed within the first available
planting season (October to March) after the completion
or bringing into use of the development, whichever is the
earlier, and the date of Practical Completion of the
landscaping scheme shall be supplied in writing to the
Council as Planning Authority within 7 days of that date. 
The scheme as agreed and implemented shall thereafter
be maintained to the satisfaction of the Council as
Planning Authority. 
Reason: To ensure a satisfactory standard of local
environmental quality.
40. Prior to the occupation of the development or any phase
of the development, whichever is the sooner, a landscape
management plan, including long term design objectives,
Page 19 of 172

Page 20

management responsibilities and maintenance schedules
for all landscape areas (other than small privately-owned
domestic gardens) shall be submitted to and agreed in
writing by the Council as Planning Authority, for its
approved use. The landscape management plan as
agreed shall, where appropriate, include phased
implementation concurrent with the development and
shall be fully implemented to the satisfaction of the
Council as Planning Authority.   
Reason: To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
41. As part of any Approval of Matters Specified by Condition
(AMSC) application, a 1:200 site plan, which identifies the
Construction Exclusion Zone (CEZ), shall be submitted
for the written agreement of the Council as Planning
Authority.  This plan shall ensure all fencing adheres to
BS 5837 2012: Trees in Relation to Design, Demolition
and Construction are provided to demarcate the CEZ and
protect trees.  The CEZ as subsequently agreed shall be
strictly adhered to during construction of the
development. 
Reason: To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
42. As part of any Approval of Matters Specified by Condition
(AMSC) application, a Tree Protection Plan for all trees
on site (other than those marked for felling) and those
which have Root Protection Areas which fall within the
site shall be submitted for the written agreement of the
Council as Planning Authority shall be retained and
protected. Protection methods shall be strictly in
accordance with BS 5837 2012: Trees in Relation to
Design, Demolition and Construction.  The Tree
Protection Plan as subsequently agreed shall be strictly
adhered to during construction of the development. 
Reason: To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
43. As part of any Approval of Matters Specified by Condition
(AMSC) application, details of the proposed boundary
treatments for the site shall be submitted for the written
agreement of the Council as Planning Authority. The
scheme as subsequently agreed shall be implemented
prior to the completion or bringing into use of the
development, whichever is the earlier. 
Reason: To ensure a satisfactory standard of
development and environmental quality and to reserve
the rights of the Planning Authority.
Page 20 of 172

Page 21

44. The asserted right of way/core paths METH/121,
METH/13, METH/131 and CTYS/112 must not be
obstructed during building works or on completion of the
development.  Any damage done to the route and/or the
associated signage during building works must be made
good before the development is completed or brought
into use, whichever is the earlier. 
Reason: To ensure continued public access to the public
paths and in the interests of public safety within the site.
45. As part of any Approval of Matters Specified by Condition
(AMSC) application, a management plan indicating any
temporary diversions and signage needed to facilitate the
development and/or any works proposed to the right of
way/core path as part of the development shall be
submitted for the agreement of the Council as Planning
Authority.  The plan as agreed shall be implemented in
accordance with the timings identified in the plan. 
Reason: To ensure that public access is maintained at all
reasonable times, to the local path network.
Biodiversity
46. As part of any Approval of Matters Specified by Condition
(AMSC) application, a Biodiversity Action Plan shall be
submitted to and approved in writing by the Council as
Planning Authority. Any action or mitigation incorporated
within the approved Biodiversity Action Plan shall be
implemented in accordance with the approved plan. 
Reason: To ensure a satisfactory standard of local
environmental quality; to safeguard the welfare of any
protected wildlife.
47. As part of any Approval of Matters Specified by Condition
(AMSC) application, an updated Ecological Assessment
including breeding birds, protected species and deer shall
be submitted to and approved in writing by the Councils
as Planning Authority. The conclusions and
recommended action points shall be fully adhered to,
respected, and undertaken as part of the construction
phase of development.
Reason: To ensure a satisfactory standard of local
environmental quality; to safeguard the welfare of any
protected wildlife.
48. Measures to protect animals from being trapped in open
excavations and/or pipe and culverts shall be
implemented for the duration of the construction works of
the development hereby approved. The measures may
include creation of sloping escape ramps for animals,
which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them
at the end of each working day and open pipework
greater than 150 mm outside diameter being blanked off
at the end of each working day.
Page 21 of 172

Page 22

Reason: To ensure a satisfactory standard of local
environmental quality; to safeguard the welfare of any
protected wildlife.
49. As part of any Approval of Matters Specified by Condition
(AMSC) application, details of the location and
specification of the swift brick(s) or swift nest box(s) shall
be submitted for the written agreement of the Council as
Planning Authority. Thereafter, the swift brick(s) or swift
nest box(s) shall be installed in accordance with the
agreed details prior to the occupation of the relevant
residential unit.
Reason: In the interests of protecting environmental
quality and of biodiversity.
50. As part of any Approval of Matters Specified by Condition
(AMSC) application, details of the location and
specification of the bat brick(s) or bat nest box(s) shall be
submitted and approved in writing by the Council as
Planning Authority. Thereafter, the bat brick(s) or bat nest
box(s) shall be installed in accordance with the agreed
details prior to the occupation of the relevant residential
unit.
Reason: In the interests of protecting environmental
quality and of biodiversity.
Flood Risk and Drainage
51. As part of any Approval of Matters Specified by Condition
(AMSC) application, an Updated Flood Risk Assessment,
shall be submitted for approval of the Council as Planning
Authority, in consultation with SEPA where necessary. 
Thereafter the development shall be fully undertaken in
accordance with the agreed Flood Risk Assessment. 
Reason: To reduce flood risk.
52. As part of any Approval of Matters Specified by Condition
(AMSC) application, an updated Drainage Strategy
including detailed sustainable urban drainage system
(SUDS) shall been submitted for approval of the Council
as Planning Authority, in consultation with SEPA where
necessary.  The strategy and scheme shall be developed
in accordance with the technical guidance contained in
The SUDS Manual (C753) and the Council’s Flood Risk
and Flood Risk Assessments Developer Guidance and
shall incorporate source control. All works shall be carried
out in accordance with the agreed scheme and be
operational prior to the bringing into use of the
development. 
Reason: To ensure the provision of provide effective
drainage for the site.
53. Concurrent with the initiation of the development hereby
approved and for the duration of construction, a
temporary surface water treatment facility shall be
implemented on site and maintained for the duration of
Page 22 of 172

Page 23

the approved development works.  The temporary
surface water treatment facility shall remain in place until
the permanent surface water drainage scheme is
implemented unless otherwise agreed in writing by the
Council as Planning Authority. 
Reason: To ensure the appropriate management of
construction surface water run-off to minimise flooding
and avoid discharge of sediment/pollution to the local
water environment or neighbouring property, in the
interests of residential and environmental amenity.
54. As part of any Approval of Matters Specified by Condition
(AMSC) application, following consultation with SEPA
and NatureScot a detailed Blue/Green Infrastructure
Scheme, shall be submitted for approval of the Council as
Planning Authority.  All works shall be carried out in
accordance with the agreed scheme and be operational
prior to the bringing into use of the development. 
Reason: To ensure the provision of provide effective
drainage for the site in line with Councils policies on good
placemaking.
Heat and Energy
55. As part of any application for the Approval of Matters
Specified by Condition (AMSC), an updated, detailed
Energy Statement supporting a zero-carbon development
shall be submitted for the written agreement of the
Council as Planning Authority. The statement must
include timescales for the provision of zero carbon
developments within the site. The agreed energy
measures and zero-carbon initiatives shall thereafter be
implemented in accordance with the agreed details and
timescales. 
Reason: To reduce reliance on fossil fuels and to deliver
a zero-carbon development at Perth West.
Waste
56. Prior to the commencement of works on site, detailed
drawings showing waste and recycling facility enclosures
or waste and recycling facility storage areas and
associated locations for bin presentation shall be
submitted for the written agreement of the Council as
Planning Authority.  None of the commercial or residential
units shall be occupied until the agreed scheme has been
provided in full. 
Reason: In order to ensure adequate servicing facilities
are provided.
General
57. The development to which this permission in principle
relates shall be begun no later than the expiration of ten
years beginning with the date of grant of this permission.
Page 23 of 172

Page 24

Reason: This is an application in principle for which, in view
of the scale of the proposed development, this extended
period is appropriate. 
Justification
The proposal is considered to comply with National Planning
Framework 4 and there are material considerations that result in
departure from the approved Perth & Kinross Local
Development Plan 2 (2019). 
Planning Obligations and Legal Agreements
Following the recommendation of approval at the Planning &
Development Management Committee on 1 June 2021, a
Section 75 Legal Agreement has been in preparation, and is
now nearing completion. The Section 75 will need to be
completed and registered before the decision notice can be
issued. 
Informatives
1. This planning permission is granted subject to conditions,
some of which require further information to be submitted
to Development Management either before works can
start on site or at a certain time.  Please send the
required information to us at
developmentmanagement@pkc.gov.uk.  Please be
aware that the Council has two months to consider the
information (or four months in the case of a Major
planning permission).  You should therefore submit the
required information more than two months (or four
months) before your permission expires.  We cannot
guarantee that submissions made within two months (or
four months) of the expiry date of your permission will be
able to be dealt with before your permission lapses.
2. The developer is advised to contact Sophie Nicol, Historic
Environment Manager (Tel: 01738 477027) Perth and
Kinross Heritage Trust, to discuss terms of reference for
work required.
3. Trees and scrub are likely to contain nesting birds
between 1st March and 31st August inclusive. Trees and
scrub are present on the application site and are to be
assumed to contain nesting birds between the above
dates. The applicant is reminded that, under the Wildlife
and Countryside Act 1981, as amended (section 1), it is
an offence to remove, damage or destroy the nest of any
wild bird while that nest is in use or being built. Planning
permission for a development does not provide a defence
against prosecution under this Act.
4. The applicant should be advised that in terms of Section
21 of the Roads (Scotland) Act 1984 they must obtain
from the Council as Roads Authority consent to construct
Page 24 of 172

Page 25

a new road prior to the commencement of roadworks.
Advice on the disposal of surface water must be sought
at the initial stages of design from Scottish Water and the
Scottish Environment Protection Agency. 
5. The applicant should be advised that in terms of Section
56 of the Roads (Scotland) Act 1984 he must obtain from
the Council as Roads Authority consent to open an
existing road or footway prior to the commencement of
works. Advice on the disposal of surface water must be
sought at the initial stages of design from Scottish Water
and the Scottish Environment Protection Agency.
6. The applicant is advised to refer to Perth & Kinross
Council’s Supplementary guidance on Flood Risk and
Flood Risk Assessments 2014 as it contains advice
relevant to your development.
7. For information, foul flows only will be allowed to
discharge to the public system.  The Developer should
arrange to dispose of surface water privately, to the
satisfaction of the statutory Drainage Authority.
8. The applicant should take note of the information and
advice contained within the consultation response from
Scottish Water.
9. The applicant is advised that the granting of planning
permission does not guarantee a connection to Scottish
Water’s assets. The applicant must make a separate
application to Scottish Water Planning & Development
Services team for consent to connect to the public
wastewater system and/or water network and all their
requirements must be fully adhered to.
10. The granting of planning permission does not stop the
continued right of public access along the existing core
paths METH/121, METH/13, METH/131 and CTYS/112.
An order under the Town and Country Planning
(Scotland) Act 1997, Section 208 or an amendment of the
Core Path Plan under the Land Reform (Scotland) Act
2003 should be sought in advance of any works
authorised by this planning permission being
commenced. All relevant approvals should be in place
prior to any stopping up and diversion of the core path
taking place.
11. There is a Section 75 legal obligation associated with this
planning permission, which relates to affordable housing
provision (25%); primary education (provision of a new
primary school); and transport infrastructure including
public transport, open space, play areas, sports pitch
provision, health care provision, maintenance and core
path connections, and establishment of Project Design
Team for any detailed applications.  A copy is available to
view on the Council’s Public Access portal. 
Page 25 of 172

Page 26

Environmental Impact Assessment (EIA) Decision
1. The proposed development was determined by Perth &
Kinross Council under the provisions of the Town and
Country Planning (Environmental Impact Assessment)
(Scotland) Regulations 2017 to be EIA development. In
accordance with Regulation 29, notice of this decision is
hereby given in respect of the following:
2. The application submitted an EIA Report dated May
2020. The public had opportunity to participate in the
decision-making process through notification of the EIA
Report was undertaken for premises on neighbouring
land and it was publicised on the Planning Authority’s
website, in the Edinburgh Gazette and the Perthshire
Advertiser. The EIA Report was also available for public
inspection online. 
3. The EIA Report provides a summary of the baseline, the
information gathered to consider the likely significant
effects on the environment and details of environmental
mitigation and monitoring that are to be incorporated into
the proposal. The significant effects on the environment
were identified to be:
• Air Quality 
• Noise Pollution
• Ecology
• Traffic and Transport
• Flood Risk and Drainage
• Tippermuir Historic Battlefield Site
• Archaeology
• Blue/Green Infrastructure 
• Landscape and Visual Impact
4. The Planning Authority is satisfied that the EIA Report is
up-to-date and complies with Regulation 5 and is
therefore suitable for determination of the planning
application. 
5. The Planning Authority has considered the EIA Report,
other environmental information, and recommendation
from the consultation’s bodies. It is concluded that the
development will not give rise to any unacceptable
significant environmental effects. In reaching this
conclusion, regard has been given to environmental
design and mitigation measures incorporated into the
proposal, as well as a regime for the ongoing monitoring
measures for the construction and operation of the
development. These mitigation and monitoring measures
include the provision of the following: 
• Woodland Planting and Landscaping 
• Assessment of visual impact on wider are
Page 26 of 172

Page 27

• Construction and Environment Management Plan
(CEMP)
• Ecological Clerk of Works (ECoW)
• Construction Traffic Management Scheme (CTMS)
• Green Travel Plan
• Blue/Green Infrastructure
• Air Quality Assessment
• Noise Impact Assessment
• Habitat Assessment including Breeding Birds and
Protected Species 
• Landscape and Visual Impact Assessment
6. In the absence of unacceptable and significant
environmental impacts, and subject to the mitigation and
monitoring measures secured through planning
conditions 1, 4, 6, 8, 9, 16, 17, 20, 21, 22, 26, 29, 30, 31,
32, 33, 34, 35, 36, 38, 39, 40, 46, 47, 51, 52, 54 and 55
as set out herein, the proposal is acceptable and can be
approved. 
(2) Local Application 
(i) Extension to warehouse/offices to form additional office
space (class 2), product development/food preparation
areas with associated storage and distribution (class 6),
House of Bruar, Pitagowan, Blair Atholl, Pitlochry, PH18
5TW – Report No. 23/240 – House of Bruar 
Mr Patrick Birkbeck, applicant, attended the Committee and
answered Members’ questions. 
Resolved: 
Grant, subject to the following terms, conditions and
informatives: 
1. This planning permission will last only for three years
from the date of this decision notice, unless the
development has been lawfully started within that period.
Reason – This is a Planning Permission in terms of
Section 58 of the Town and Country Planning (Scotland)
Act 1997, as amended by Section 32 of the Planning
(Scotland) Act 2019.
2. The development hereby approved must be carried out in
accordance with the approved drawings and documents,
unless otherwise provided for by conditions imposed by
this decision notice.
Reason – To ensure the development is carried out in
accordance with the approved drawings and documents.
3. All plant or equipment shall be so enclosed, attenuated
and/or maintained such that any noise therefrom shall not
exceed Noise Rating 35 between 0700 and 2300 hours
Page 27 of 172

Page 28

daily, or Noise Rating 25 between 2300 and 0700 hours
daily, within any neighbouring residential property, with all
windows slightly open, when measured and/ or calculated
and plotted on a rating curve chart.
Reason – In order to protect existing residential amenity. 
4. Prior to the development hereby approved being
completed or brought into use, an effective ventilation
system commensurate with the nature and scale of
cooking to be undertaken shall be installed and operated
such that cooking odours are not exhausted into or
escape into any neighbouring buildings. Thereafter the
system shall be maintained.
Reason – In order to protect existing residential amenity.
5. All external lighting shall be sufficiently screened and
aligned so as to ensure that there is no direct illumination
of neighbouring land and that light spillage beyond the
boundaries of the site is minimised to a degree that it
does not adversely affect the amenity of the neighbouring
land. 
Reason – In order to protect existing residential amenity.
6. Prior to the commencement of the development hereby
approved, precise details of the means of surface water
disposal shall be submitted to and approved in writing by
the Council as Planning Authority. The approved details
shall thereafter be implemented in full.
Reason – In order to ensure the site is adequately
drained.
7. The footpath path leading from Pitagowan to the Falls of
Bruar must not be obstructed during the construction
phase, or on completion of the development.
Reason – In the interest of proper site management and
to ensure existing public access continues. 
8. The Construction Exclusion Zone (CEZ) as shown on
approved Plan 11 shall be adhered too in full, and all
fencing shall be BS 5837 2012: Trees in Relation to
Design, Demolition and Construction.  The CEZ shall be
strictly adhered to during the entire duration of the
construction phase of the development.
Reason – In order to ensure that existing trees are
suitability protected during the construction phase. 
9. Prior to the commencement of the development hereby
approved, all trees on site (other than those marked for
felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be
retained and protected. Protection methods shall be
strictly in accordance with BS 5837 2012: Trees in
Relation to Design, Demolition and Construction. 
Protection measures, once in place, shall remain in place
for the entire duration of the construction phase of the
development. 
Page 28 of 172

Page 29

Reason – In order to ensure that existing trees are
suitability protected during the construction phase.
10. Within 6 months of the completion of the development
hereby approved, the replanting and landscaping scheme
approved as Plan No 12, shall be implemented in full. 
Any planting failing within 5 years shall be replaced within
the next available planting season. 
11. The conclusions and recommended action points within
the supporting ecology survey submitted and hereby
approved as Plan 10 shall be fully adhered to, respected
and undertaken during the entire duration of the
construction phase of the development, and that all
mitigations measures are thereafter implemented. 
Reason – In order to ensure that biodiversity interested
are fully accommodated. 
12. Prior to the commencement of the development hereby
approved precise details of the area for, the means of
enclosures and the capacity for the provision of general
waste, recycling and food waste shall be submitted to and
approved in writing by the Council as Planning Authority.
The approved details shall thereafter be implemented and
be able for use prior to the extension being used. 
Reason – In order to ensure that suitable facilities for
waste and recycling are provided in a suitable location. 
Justification
The proposal is in accordance with the Development Plan and
there are no material reasons which justify departing from the
Development Plan. 
Informatives
1. Under Section 27A of the Town and Country Planning
(Scotland) Act 1997 (as amended) the person
undertaking the development is required to give the
Planning Authority prior written notification of the date on
which it is intended to commence the development.  A
failure to comply with this statutory requirement would
constitute a breach of planning control under Section
123(1) of that Act, which may result in enforcement action
being taken.  Please use the form attached herewith.
2. As soon as practicable after the development is
complete, the person who completes the development is
obliged by Section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the
Planning Authority written notice of that position.  Please
use the form attached herewith.
3. Records indicate that at least part of the proposed
development site lies within a radon affected area where
the measurement/monitoring of radon gas and the
installation of mitigation measures may be required.
Page 29 of 172

Page 30

Further information on radon gas and the associated
reports that can be obtained is available at
www.ukradon.org and at
http://shop.bgs.ac.uk/georeports/. 
Page 30 of 172

Page 31

Perth and Kinross Council
Planning and Placemaking Committee – 11 October 2023
Report of Handling by Head of Planning & Development
(Report No. 23/269) 
PROPOSAL: Erection of 110 dwellinghouses, associated infrastructure,
access, SUDS and landscaping 
LOCATION: Land 150 Metres South West of Kintillo Cemetery (H14), 
Bridge of Earn, Perth 
Ref. No: 22/00817/FLM
Ward No: P9 – Almond and Earn 
Summary 
This report recommends approval of the application, subject to conditions.  It
proposes the erection of 110 dwellinghouses, associated infrastructure, access,
SUDS and landscaping. 
The proposal is considered as a minor departure to the Development Plan with there
being material considerations in this case which justify such a departure from the
relevant policy. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The site is allocated in the Perth and Kinross Local Development Plan (2019)
(LDP2) as H14. The LDP2 allocations total area is 5.2ha with an indicative
range of 67-104 residential units. The application site extends to 6.7ha and
extends slightly outwith the settlement boundary to the south. Following an
amended masterplan, however, there is no longer any built development
beyond the settlement boundary. The site is currently an area of agricultural
land. The field has a rising topography to the south which would likely
increase visual/landscape impact of any development and therefore the extent
of the site was limited through the allocation as previously justified through
LDP1. Views are quite open from the surrounding area, particularly south and
east, so any visual/landscape impact is a key consideration here. 
2 During the LDP2 consultation process, the landowner sought to extend the
site (including increase in capacity range) but the Council argued against this
approach and the Reporter ultimately agreed to retain the same site
shape/extent as shown in LDP1. The reasoning for retaining the allocation
and the site boundary as was originally shown in LDP1 was due to the rise to
the ridge line in the south which would make development beyond here more
prominent in the landscape and to provide an organic landscape form to this
highly visible settlement edge. At examination of LDP2 the Reporter
5(1)(i)
Page 31 of 172

Page 32

considered the topography of the site and considered it would be
inappropriate to extend the developed over the ridgeline as this would result in
an undue increase in the prominence of the development within the landscape
setting for the village. Following discussion with the applicant, the proposal
has been revised to readjust the layout at the southern part of the site, in
particular plots 95-104 so that the dwellinghouses fall within the settlement
boundary and the housing retained behind the ridge line. 
3 The H14 site is located in the southeast corner of Bridge of Earn. It is bound
to the north and west by existing housing at Dunbarney Avenue and The
Meadows. The recently completed Ogilvie Homes housing development (LDP
Site H72), known as Ptak Way and Todd Place, is further to the west. To the
northeast of the site is Catalyst Events studio and workshop. To the south is
open farmland and to the east lies the Old Edinburgh Road/Wicks o’ Baiglie
Road and a large Gospel Hall, car parking area and the adjacent Kintillo
Cemetery. Further east is the M90 motorway. 
4 The scale of development proposed here for this site is 110 dwellinghouses
which is more than that indicated in the LDP2. Initially, a number of the
dwellinghouses were proposed to be built to the south of the road marked
“Secondary Lateral Street” (approximately plots 96-104) which fall outside the
existing settlement boundary, however, this has since been revised as noted
above. 
5 The area within the settlement boundary to the south is shown in the LDP2
indicative drawing as landscaping to provide a soft edge to the settlement.
This landscaping buffer is now brought further south beyond the settlement
boundary. 
6 There is an associated full planning application (22/02020/FLL) for the
formation of SUDS drainage outfall and associated works. These proposed
works are outwith the red line site boundaries for this current application,
however, require planning permission. As such a subsequent application was
requested and has since been approved. 
Environmental Impact Assessment (EIA) 
7 The proposed development, as an urban development project with a site area
exceeding 0.5ha, falls under Schedule 2 (10(b)) of the Environmental Impact
Assessment (Scotland) Regulations. The site was screened in November
2021 and was found not to require an EIA. 
Pre-Application Consultation 
8 The proposed development is classed as a Major development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009. The applicant was therefore required to undertake formal
pre-application consultation with the local community. Public concerns raised
as part of this process identified traffic congestion, flooding and drainage,
village infrastructure (School, Doctors Surgery, Dentist, Shops etc),
biodiversity and wildlife, construction impacts (air and noise pollution) as
Page 32 of 172

Page 33

being matters raised following the consultation events. These matters have
been responded to in writing by the applicant and included within a Pre-
Application Consultation (PAC) Report submitted with the application.   
9 The PAC Report notes that one online public event was held and one local
exhibition, as permitted by the relevant regulations.  The online event was in
the form of a dedicated on-line virtual exhibition and consultation hub which
was open from 24 November to 15 December 2021 and included a live
interactive web-based chat session on 1 December 2021. The second event
was a public exhibition held at the Bridge of Earn Institute on 31 March 2022
with notice provided to local MPs and MSPs and Council Members as well as
to Earn Community Council. A number of comments and concerns were
reviewed and addressed within the PAC report and wider planning
submission. The content and coverage of the community consultation
exercise is considered sufficient and proportionate and in line with the
aforementioned regulations. 
NATIONAL POLICY AND GUIDANCE 
10 The Scottish Government expresses its planning policies and guidance
through The National Planning Frameworks, Planning Advice Notes, Creating
Places, Designing Streets, National Roads Development Guide and a series
of Circulars.   
Planning Advice Notes 
11 The following Scottish Government Planning Advice Notes (PANs) and
Guidance Documents are of relevance to the proposal: 
• PAN 2/2010 Affordable Housing and Housing Land Audits
• PAN 3/2010 Community Engagement
• PAN 1/2011 Planning and Noise
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 60 Planning for Natural Heritage
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
• PAN 79 Water and Drainage 
Creating Places 2013 
12 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It
notes that successful places can unlock opportunities, build vibrant
communities and contribute to a flourishing economy and set out actions that
can achieve positive changes in our places. 
Page 33 of 172

Page 34

Designing Streets 2010 
13 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making
and away from a system focused upon the dominance of motor vehicles. It
was created to support the Scottish Government’s place-making agenda,
alongside Creating Places. 
National Roads Development Guide 2014 
14 This document supports Designing Streets and expands on its principles and
is considered to be the technical advice that should be followed in designing
and approving of all streets including parking provision. 
DEVELOPMENT PLAN 
15 The Development Plan for the area comprises National Planning Framework
4 (NPF4) and the Perth and Kinross Local Development Plan 2 (2019)
(LDP2). 
National Planning Framework 4 
16 The National Planning Framework 4 (NPF4) is the Scottish Government’s
long-term spatial strategy with a comprehensive set of national planning
policies.  This strategy sets out how to improve people’s lives by making
sustainable, liveable and productive spaces.   
17 NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan.   
18 In this instance the primary policies relevant seek to encourage, promote and
facilitate development that meet with the six overarching spatial principles,
which include: local living, compact urban growth and the creation of
sustainable and liveable places. This development proposal accords with the
principal intentions of this document.   
19 The Council’s assessment of this application has considered the following
policies of NPF4: 
20 The principal relevant policies are, in summary; 
• Policy 1: Sustainable Places
• Policy 2: Climate Mitigation and Adaption
• Policy 3: Biodiversity
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 16: Quality Homes
Page 34 of 172

Page 35

• Policy 18: Infrastructure First
• Policy 19: Heating and Cooling
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management 
Perth and Kinross Local Development Plan 2019 
21 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.” It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
22 The principal relevant policies are, in summary; 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 1D: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
• Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
• Policy 15: Public Access
• Policy 17: Residential Areas
• Policy 20: Affordable Housing
• Policy 23: Delivery of Development Sites
• Policy 24: Maintaining an Effective Housing Land Supply
• Policy 25: Housing Mix
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled
Monuments
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in
New Development
• Policy 34: Sustainable Heating and Cooling
• Policy 38: Environment and Conservation
• Policy 39: Landscape
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 47: River Tay Catchment Area
• Policy 50: Prime Agricultural Land
• Policy 52: Soils
• Policy 52: New Development and Flooding
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Pollution
• Policy 56: Noise Pollution
• Policy 57: Air Quality
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
Page 35 of 172

Page 36

• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
LDP2 Allocation – Site References H14 Old Edinburgh Road/Dunbarney
Avenue 
23 The site covering an area of 5.2ha is allocated for an indicative capacity of 67-
104 units. The Site-Specific Developer Requirements relative to H14 are: 
• A landscape framework is required. Developments to be contained north
of the ridgeline and a suitable boundary treatment to create village edge,
entrance biodiversity and create new habitats.
• Connections and enhancement to be made to the existing core path
network are required. In particular, vehicles and pedestrian links are
required to Old Edinburgh Road and The Meadows.
• Phased site development to reflect the construction of the new school at
Oudenarde.
• Drainage Impact Assessment will be required, including as assessment of
any consequent impacts on adjacent properties at Dunbarney Aveunue. 
OTHER POLICIES 
24 Statutory Supplementary Guidance 
• Supplementary Guidance - Air Quality (adopted in 2020)
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Open Space Provision for New Developments
(adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
25 Non Statutory Guidance 
• Planning Guidance - Delivery of Development Sites
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs
SAC and the River Tay SAC
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft) 
Site History 
26 21/00011/PAN A Proposal of Application Notice (PoAN) for residential
development, access, landscaping, suds and associated works (allocated site
H14) was considered sufficient in June 2021.
Page 36 of 172

Page 37

27 21/01941/SCRN EIA Screening Opinion for residential development, access,
landscaping, suds and associated works (allocated site H14). EIA not required
November 2021. 
28 21/00014/PAN A Proposal of Application Notice (PoAN) for residential
development, access, landscaping, SUDS and associated works (part
allocated as site H14) was considered sufficient in November 2021. 
29 22/02020/FLL Full Planning Permission for the formation of SUDS drainage
outfall and associated works (pending consideration). 
CONSULTATIONS 
30 As part of the planning application process the following bodies were
consulted: 
External 
31 Perth And Kinross Heritage Trust: No objection subject to condition. 
32 Transport Scotland: No objections. 
33 Earn Community Council: Concerns have been raised regarding primary
education provision and subsequently contrary to LDP2, traffic management,
flood risk/drainage. Concern was also expressed about the design and
appearance of the dwellinghouses and the impact on the Health Service. 
34 Scottish Water: No objections. Advise of water and wastewater capacity in
the area and that further investigations may be required to be carried out once
a formal application has been submitted to Scottish Water. Scottish Water
records indicate that there is live infrastructure in the proximity of the
development, therefore, the applicant must contact Scottish Water for an
appraisal of the proposals. 
35 Scottish Environment Protection Agency: No objections. 
36 Scottish Forestry: No Comments. 
Internal 
37 Structures And Flooding: No objections subject to conditions. 
38 Environmental Health (Noise Odour):  No objection on noise or air quality
grounds, however, related standard conditions recommended for dust
management and hours of operation for noisy working during the construction
phase. 
39 Transportation and Development: No objections subject to conditions. 
Page 37 of 172

Page 38

40 Development Contributions Officer: Due to the impact of the proposal a
Section 75 Legal Agreement will be required to secure the necessary
infrastructure and associated contribution payments. 
41 Community Waste Advisor:No objection, however, provided detailed advice
on the requirements for bin provision, vehicle and operative access, road
specifications and vehicle turning requirements. 
42 Biodiversity/Tree Officer:No objections subject to condition. 
43 Community Greenspace: No objections, subject to condition. 
44 Planning and Housing Strategy: Initially commented that the number of
dwellinghouses proposed exceeds the indicative range in LDP2 and that
whilst the submitted planning statement considers that there are no
detrimental impacts from the proposed development and that the small
increase still results in an appropriate density, this increase in dwellinghouses
extends to outside the settlement boundary which contravenes Policy 6
(Settlement Boundary). A reduction in the number of houses to within that
range would allow the proposal to be retained within the settlement boundary. 
Amendments were made to the site layout, in particular the southern part of
the site (plots 95-104) which provided a reshuffle of these plots and therefore
allowing the built development to be retained within the settlement boundary.
The landscape buffer shown in LDP2 settlement map and indicative drawing
has been pushed south outside the settlement boundary but forms a more
substantial buffer to the development than originally proposed and closer to
that indicated in LDP2 illustrations. Whilst, the landscape buffer is outwith the
settlement boundary, it is accepted that the proposed landscaping and
footpath provision/connection in to the Ogilvie site will result in a better
planning solution for the area. Whilst the proposal is a departure from LDP2, it
is considered to be minor and is acceptable. 
45 Environmental Health (Contaminated Land): Historical mapping indicates
that the site was previously occupied by railway land in addition to a cemetery
immediately east.  There is the potential for the site to be impacted by
contamination as a result of this former land use.  It will therefore be
necessary for an assessment of the site to be made to determine its suitability
for the proposed use.  No objection to the proposal, however, a condition is
recommended. 
Representations 
46 10 representations were received. The main issues raised within the
representations are: 
• Contrary to LDP
• Inappropriate housing density
• Over intensive development
• Lack or loss of car parking
• Light pollution
Page 38 of 172

Page 39

• Noise pollution
• Loss of open space
• Loss of trees
• Overlooking
• Capacity issues at Dunbarney Primary School
• Impact on Health Service
• Flooding and drainage
• Design and appearance
• Traffic congestion/road safety concerns
• Loss of agricultural land 
47 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS
48
Screening Opinion  EIA Not Required
Environmental Impact Assessment
(EIA): Environmental Report
Not Required
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
AA Not Required
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact
e.g. Flood Risk Assessment
• Drainage Impact
Assessment/Flood Risk
Assessment 
• Archaeological Desk Based
Assessment
• Air Quality Impact Assessment
• Noise Report
• Transport Assessment
• Arboriculture Assessment
• Pre-Application Consultation
(PAC) Report 
• Design and Access Statement 
APPRAISAL 
49 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997
(as amended) require the determination of the proposal to be made in
accordance with the provisions of the Development Plan, unless material
considerations indicate otherwise.  The Development Plan comprises NPF4
and the Perth and Kinross Local Development Plan 2019.  The relevant policy
considerations are outlined in the policy section above and are considered in
more detail below.  In terms of other material considerations, this involves
considerations of the Council’s other approved policies and supplementary
guidance. 
Page 39 of 172

Page 40

Principle 
50 The key determining policy issues for this specific proposal at this location
include: the principle of the development and its contribution towards
providing high quality, affordable and sustainable homes (Policy 20, 24 and
25 of the LDP2 and Policy 16 of the NPF4), liveable places (design, quality
and place) (Polices 1, 2, 55-58 of the LDP2 and Policy 14 of the NPF4),
impacts on prime agricultural land (Policy 50 of the LDP2 and Policy 5 of the
NPF4)), impacts on/from flooding and the water environment (Polies 52 and
53A of the LDP2 and Policy 22 of the NPF4), residential amenity (Policy 17 of
LDP2 and Policy 15 of the NPF4), historic assets and places (Policies 26A
and 26B, of the LDP2 and Policy 7 of the NPF4), biodiversity/ecological
impact (Policies 40 and 41 of the LDP2 and Policy 3 of the NPF4 and
transport (Policy 60A of the LDP2 and Policy 13 of the NPF4).   
51 The principle of residential development on the site is well established through
the allocation in LDP2 (and previous Local Development Plan). The principle
of residential development is thus established. It is, however, necessary to
undertake an assessment of the detail of this proposal. 
52 The determining issues in this case are whether; the proposal complies with
Development Plan policy; whether the proposal complies with supplementary
planning guidance; or if there are any other material considerations which
justify a departure from policy. 
LDP Allocation and Site Density 
53 It is noted within the representations received reference to the proposed
number of dwellinghouses exceeding that within LDP2 and therefore contrary
to the LDP. As with other sites in the LDP, this figure is indicative and is not
binding, therefore it is not a barrier to development looking at higher or lower
densities. 
54 The site capacity range of 67-104 units covers H14. The Site-Specific
Developer Requirements does identify H14 as requiring development to be
contained north of the ridge line and a suitable boundary treatment to create
village edge, connections and enhancements to be made to the existing core
path network and the requirement for a Drainage Impact Assessment. 
55 The applicant has taken account of some initial feedback following submission
regarding the built development outwith the settlement and south of the ridge
line and therefore the layout has been amended. Policy 6: Settlement
Boundary of the LDP2 restricts built development to within the settlement and
Policy 16(a) of NPF4 accords with this. Following revisions, there is no longer
built development outwith the settlement boundary and the housing will be
retained behind the ridge line. 
56 The proposed site is within an established residential area of Bridge of Earn
and is in an accessible location as it is close to the public transport network
and the services provided within the village. The proposed density of 110
units can be physically accommodated within the site, along with the
Page 40 of 172

Page 41

proposed woodland strip, enhanced core path provision, a SUDs pond and
open space that can be enjoyed by all residents in the area, further
demonstrating the sites capacity for the number of dwellings proposed. A
good level of rear private amenity space will be provided along with
landscaped frontages. Seventy-three of the proposed dwellinghouses will be
1, 2 and 3 bedroom units which will help meet current market demand for
smaller sized, easy to maintain dwellings especially for first time buyers or
those downsizing. All properties will have an acceptable amount of garden
ground whilst not adversely impacting on any of the surrounding properties in
terms of overlooking or overshadowing. The scale of development for this site
is acceptable. 
57 The proposed development accords with NPF4 Policy 16(a) and LDP2 Policy
1: Placemaking and Policy 17: Residential Areas. 
Design and Layout 
58 The applicant has submitted a supporting Design and Access Statement, as
required for an allocated site under LDP2 and a Supporting Planning
Statement. 
59 Policy 14: Design, Quality and Place, Policy 15: Local Living and 20 Minute
Neighbourhoods and Policy 16: Quality Homes of NPF4 are relevant as are
LDP2 Policy 1: Placemaking, Policy 14B: Open Space within New
Developments, Policy 17: Residential Areas, Policy 25: Housing Mix and
Policy 42: Green Infrastructure. Also relevant is the masterplan for the site
which sets out the key principles for the development. 
60 Through Designing Places (2001) The Scottish Government signalled the
importance they attach to achieving improvements in the design and quality of
new development and brining long-term benefits to the urban and rural
environment. It should be noted that good design should be the aim of
everyone in the planning and development process with it being important at
all scales of development. 
61 Designing Streets (2010) published by the Scottish Government suggests that
streets should be designed as social places, being well-connected at all levels.
It aims to move away from vehicle dominated road layouts in favour of streets
designed for people that achieve a sense of place, producing interesting
usable street layouts. 
62 NPF4. Policy 14 encourages, promotes and facilities well designed
development that makes successful places by taking a design-led approach.
Development proposals will be supported where they are consistent with the
six qualities of successful places; health, pleasant, connected, distinctive,
sustainable and adaptable. 
63 Permeability of places is a crucial component in good street design. Internal
permeability is important, however, any area should also be properly connected
with adjacent street networks. A development with poor links to the surrounding
area creates an enclave which encourages movement to and from it by car
Page 41 of 172

Page 42

rather than other modes. In this case the proposal includes two vehicular
accesses and five pedestrian/cyclist access points and is thereby considered to
be a permeable and well-connected site that accords with the National Roads
Development Guide 2014, NPF4 Policy 13 and LDP2 Policy 60B. 
64 When considering the layout of any new development, one of the key issues to
consider is creating the opportunity for natural surveillance. Buildings, spaces
and pedestrian routes should be located to maximise natural observation from
pedestrian and passing motorists. Active frontages should be encouraged
wherever possible i.e. doors leading onto the street and windows overlooking
all public areas. The proposed layout takes cognisance of Designing Streets
and incorporates appropriate natural surveillance of all areas of space and the
main pedestrian routes.  Frontages are planned to overlook all streets,
footpaths and open spaces to ensure passive surveillance. The proposal is,
therefore, in compliance with PAN 77 – Designing Safer Places, NPF4 Policy
13 and LDP2 Policy 1. 
65 The proposals consist of single storey, two storey, detached, semi-detached,
terraced and flatted properties providing a good mixture of house types. Whilst
the proposal to include shared surfaces is limited, it provides good linkages to
ensure the site is extremely permeable for all modes of transport especially
pedestrians and cyclists with footpaths located towards the village centre,
public transport connections and the surrounding neighbourhood. The use of
parking courts within the development is welcomed and ensures that the
proposal is not car dominated. 
66 In terms of the proposed design of each house type, there is an acceptable
range of design and materials proposed. The Planning Support Statement
describes the house designs as being a contemporary re-interpretation of
historic form designed to complement the local area. Houses are designed
with a lower eaves height so that the proportion, gable width and roof pitch
have a cohesive character fitting to the rural nature of the area and the scale of
traditional rural buildings. External finishing materials comprise of a
combination of white render with facing brick and dark grey windows and doors
Smooth grey coloured concrete interlocking roof tiles are proposed for the roof
covering. Feature panels of facing brick are incorporated to break up areas of
singular material. The colour of facing brick has not been confirmed,
however, this can be controlled by condition (Condition 37). 
67 In terms of housing mix, the development proposes a mix of 2-4-bedroom
properties as follows: 
Open Market   
• 2 x 1 bedroom ground floor apartment
• 2 x 1 bedroom first floor apartment
• 2 x 2 bedroom end terrace dwellinghouse
• 2 x 2 bedroom mid terrace dwellinghouse
• 18 x 3 bedroom semi-detached dwellinghouse
• 24 x 3 bedroom detached dwellinghouse 
Page 42 of 172

Page 43

• 33 x 4 bedroom detached dwellinghouse
Total = 83 
Affordable Housing 
• 2 x 1 bedroom ground floor apartment 
• 2 x 1 bedroom first floor apartment
• 4 x 2 bedroom semi-detached bungalow
• 2 x 3 bedroom semi-detached bungalow
• 3 x 2 bedroom mid-terraced dwellinghouse
• 2 x 3-bedroom semi-detached bungalow
• 4 x 3 bedroom end terrace dwellinghouse
• 4 x 3 bedroom semi detached dwellinghouse
• 4 x 4 bedroom semi detached dwellinghouse 
Total = 27 
68 NPF policy 16 supports development proposals that improve affordability and
choice including a range of size of homes whilst LDP2 Policy 25: Housing Mix
specifies for all proposals on sites with a total capacity of 20 or more homes,
at least 10% of their homes should be one or two bedroom homes. As noted
above, a total number of 16 one and two bedroom homes are proposed,
therefore, the proposal is in compliance with these policies. 
69 The site has been well laid out and designed, taking into account the key
constraints and opportunities of the. The site provides good connectivity, both
within the development and with the surrounding area, including providing
access to existing core path provision. The Design & Access Statement has
provided a sound justification for the design and layout of the site, considering
a range of key design parameters such as hierarchy of streets, broad
development parameters of the site, connectivity, use of landscaping and
external finishes, etc. The site also incorporates a range of 2–4-bedroom
units, with the affordable housing units integrated well within the site. The site
also mixes the size range of properties across the development. Overall, the
general layout, house designs and materials proposed are acceptable and
contribute positively to the quality of the surrounding built and natural
environment in compliance with relevant NPF4 and LDP2 policies. 
Landscape and Visual Amenity 
70 In terms of the impact on visual amenity of the area, a residential
development will inevitably change the visual appearance of the area,
however, the application site has been identified for residential use in the
LDP, therefore this degree of change was envisaged in the site allocation.   
71 The landscaping proposed to the south is outwith the settlement boundary,
however, it provides a good connection with the adjacent development and
associated landscaping although not as organic an edge as is envisaged in
LDP2. The applicant states that the requirement for the SUDS pond in the
north is the reason why the landscaping needs to be pushed outside the
settlement boundary, however, retaining the numbers to those indicated in the
Page 43 of 172

Page 44

capacity range would have limited the need for this change. The applicant
states that the landscaped buffer present an opportunity to create a defined
and attractive settlement edge for Bridge of Earn on the southern boundary of
the site. It will allow the continuation and consolidation of a new southern
edge to the settlement by creating a robust and attractive landscaped
boundary to the site which offers integration and a strong landscape structure. 
72 When comparing the option of reducing the units to within the capacity range
and what is proposed here for planting and a footpath outwith the boundary
will result in a better planning solution and betterment for this area of Bridge of
Earn with most of the southern boundary being well screened from the M90
and provide a clear consistent boundary. 
73 Whilst the proposal represents a minor departure from LDP2, it provides a
better planning, landscape and connectivity solution for this part of Bridge of
Earn and as such is considered on this occasion to be an acceptable
departure and therefore supportable. 
74 The Landscape Appraisal submitted for the site sets out how the southern and
eastern areas of landscaping will be managed and incorporated into site.  The
proposed landscape framework will ensure a robust, multi-functional
landscape that provides an attractive range of opportunities for outdoor
enjoyment and for biodiversity. The design and layout of the site, along with
the proposed landscaping to the south and proposed woodland strip that
bounds the site to the east is considered to be acceptable in landscape terms
and will not cause any unacceptable visual impacts. The Council’s Tree
Officer has reviewed the landscape plan and considers it to have thought
through the functionality of the sites open spaces. The species selection is
excellent, with a good use of native trees and shrubs. In addition, the
extensive use of suitable garden and street trees is supported, cross
referencing with the drainage plan does not show conflict with underground
services. The proposal meets the objectives of Policies 4, 6 and 14 of NPF4
and LDP2 Policies 1, 39 and 40B. 
Residential Amenity 
75 Residential amenity requires to be considered under NPF4 Policy 14 and
LDP2 Policies 1 and 17. 
Privacy, Daylight and Overshadowing 
76 The location of the proposed dwellinghouses relevant to existing residential
properties is such that there will be no loss of privacy or loss of daylight or
overshadowing. Similarly, the new properties are adequately spaced out to
prevent any impact on amenity in terms of loss of privacy, daylight or
overshadowing. The proposal is therefore considered to comply with NPF4
Policy 14 and LDP2 Policy 17.
Noise 
77 The applicant has submitted a noise impact assessment with this application.
Noise monitoring was undertaken at the location of the most likely exposed
Page 44 of 172

Page 45

proposed dwellinghouse at Plot 88 to road traffic noise from the M90. The NIA
concluded that road traffic sound levels are within the current planning
guidance criteria limits and therefore no need for further mitigation measures. 
78 Environmental Health colleagues were consulted and in light of the above
have no adverse comment to make in relation to noise and that the residential
amenity of the proposed dwellinghouses will not be adversely affected by road
traffic noise from the existing M90. There are therefore no conflicts with NPF4
Policy 14 and LDP2 Policy 56. 
Air Quality/Dust 
79 An Air Quality Impact Assessment (AQIA) was submitted and reviewed by
colleagues in Environmental Health. The AQIA assessed the impact on air
quality on existing and new receptors, due to the proposed development, from
road traffic emissions generated by the development and the pollutants of
concern are Nitrogen Dioxide (NO2), Particulate Matter (PM10 & PM2.5). It
was concluded as negligible significance for all pollutants. 
80 The AQIA has not assessed the impact of dust from groundworks and
construction operations for the development, however, Appendix 3 of the
report gives recommended mitigation measures to prevent or minimise the
release of dusts during the construction or groundwork phases of the
development. As such condition 9 asks that a Dust Management Plan be
prepared and submitted prior to commencement of works. Subject to
condition, the proposal complies with NPF4 Policy 14 and LDP2 Policy 57. 
Roads and Access 
81 A Transport Statement has been submitted in support of the application and
has been assessed by both Transport Scotland and the Council’s Transport
Planning team. 
82 A number of representations have raised concerns in relation to road issues
with 4 accesses proposed onto The Meadows comprising of a footpath
opposite Ptak Way, secondary vehicular access, sub-station access and new
house driveway. 
83 The applicant is proposing two vehicle accesses connecting to the existing
public road network, with one opposite 28 and 29 The Meadows and the other
vehicle access on Wicks O'Baiglie Road opposite The Gospel Hall. The
applicant will be providing footways on both sides of the vehicle access onto
Wicks O'Baiglie Road and on the northern side of the vehicle access onto The
Meadows.  An additional footway link will be provided onto Dunbarney
Avenue, albeit the applicant has not shown this to connect into an existing
footway, rather a grass verge, but this will be addressed in the Road
Construction Consent application, nevertheless, this footway link will provide a
shorter route for anyone going to the facilities on Wicks O'Baiglie Road, such
as The Gospel Hall or playing fields.   
Page 45 of 172

Page 46

84 To the south of the site, the applicant is proposing to provide additional
recreational paths, which will link to the existing paths at the end of The
Meadows and create a new link onto Wicks O'Baiglie Road, which has been
designated as Walking and Cycling Friendly Road, with a reduced speed limit
of 40mph.  For the avoidance of doubt the recreational paths to the south of
the site, will not form part of the road’s adoption.  
85 A Construction Traffic Management Plan will be required prior to
commencement of development and this will tie in with a maintenance
agreement for the existing public road which will deal with any liability in
respect of abnormal deterioration caused by the construction traffic. This
should help alleviate any concerns for existing residents. 
Parking 
86 The level of car parking proposed by the applicant is acceptable and meets
the standards of the National Roads Development Guide, whereby:
• 1 bedroom property will be provided with 1.5 spaces
• 2-3 bedroomed property will be provided with 2 car parking spaces
• 4 bedroomed property will be provided with 3 car parking spaces’ 
87 If the property requires the garage for car parking, the garage will have a
minimum internal dimension of 3 x 7 metres which also complies with the
National Roads Development Guide. 
88 Perth and Kinross Council Placemaking Guide 2020, page 39 specifies for off-
street parking that parking within the plot should not dominate the front garden
of houses. Similarly Designing Streets specifies that car parking should be
level with, or behind the main building line which is more aesthetically
pleasing in streetscape terms. It further references that parking within the front
curtilage should generally be avoided as it breaks up the frontage, can be
unsightly and restricts informal surveillance. 
89 Many of the parking spaces are situated to avoid a car dominated street view,
although this is not carried through the entire site, more so to the affordable
housing section in the west of the site. Whilst some revisions were made to
parking at plots 13-16 and 21, revisions were not extended to plots 53-71 as
the applicant’s desire was to maintain the landscape buffer along The
Meadows, particularly as the new housing will sit at a lower level than The
Meadows. 
Street Lighting 
90 Perth & Kinross Council’s Street Lighting Partnership have advised that an
approved street lighting design will be required, including the extension of
existing street lighting on Wicks O’Baiglie Road to encompass the sites
principal access and any adjustments required for the existing street lighting
on The Meadows or Dunbarney Avenue.  A condition is recommended to
secure the delivery of a suitable street lighting system (Condition 13). 
Page 46 of 172

Page 47

Public Transport 
91 Consultation has been undertaken with the Public Transport Unit and they do
not consider that bus service infrastructure is possible within the development
site but the upgrade of the existing shelter 64802272 – Kintillo, Kintillo Road
at Kintillo Place to support residents in the use of public transport.  Replacing
the existing shelter to provide additional capacity to a new 3 bay cantilever
shelter with a 24/7 electrical supply for courtesy lighting and supply and install
an RTPI bracket and display. 
92 Following discussion in terms of the location of the upgraded bus shelter, it
was felt that it would be more beneficial to have a shelter at the Ember Stop.
Ember operates an all-electric Express Coach Service between Dundee and
Edinburgh. This serves a bus stop on the A912 in Bridge of Earn, just off
Wicks O’Baiglie Road and this would benefit from having a bus shelter, 24/7
electricity supply and RTPI Digital Displays at that location. The Applicant was
agreeable to this as an alternative option to upgrading the Kintillo Road bus
shelter. It would benefit not only Kintillo residents but the wider Bridge of Earn
community wishing to access the Ember express services. The Developer has
to pay for all costs including the implementation of the bus shelter.  A
condition is recommended for the shelter to be installed prior to the
occupation of the 10th dwellinghouse (Condition 15). 
Visibility Splay 
93 The visibility splay onto the existing public road network is to an acceptable
standard.  It is noted that on the Wicks O’Baiglie Road the applicant is
proposing to plant a native hedge along the edge of the public road network,
this may have implications for the visibility splay.  A condition is, therefore,
recommended for planting and fence lines to be clear of the splay (Condition
17). 
Road Width 
94 The applicant has proposed to ensure that the width of Wicks O’Baiglie Road
is a minimum width of 6 metres from south of 52 Wicks O’Baiglie Road to a
distance of 6 metres south of the vehicle access bellmouth into the
development, where the width of the road will taper back to the original width
over a distance of at least 25 metres.  A condition is recommended for
securing a minimum road width of 6 metres, prior to the commencement of
works within the site, to ensure the road is a suitable width for construction
traffic (Condition 17). 
95 Both Transport Scotland and PKC Transport Planning offers no objection to
the proposal. The proposal accords with NPF4 Policies 13 and 14 and LDP2
Policies 1 and 60 by creating a coherent structure of streets and spaces that
are accessible for all, especially those on foot, bicycle and public transport
subject to planning conditions. The transport network can accommodate the
proposed level of traffic generation with minimal impact. Its location should
provide a realistic choice of more sustainable modes of transport and thereby
help reduce travel demand by car.
Page 47 of 172

Page 48

Open Space and Play Area 
96 Due to site levels, the SUDs pond is located at the northern edge of the site
with an area of open space and landscaping proposed at the southern edge
with footpath link into Site H72 both of which will be utilised by existing and
future residents. Community Greenspace confirmed during pre-application
discussions that only one of the two allocated sites at this location will be
required to provide a play area provided it was easily accessible from the
other. Site H72 has a play area with play equipment and a footpath is located
within the landscape buffer at the southern end of that site, therefore, the
footpath proposed at the southern side of this application will link into it. As
such there is no requirement for a play park in this application. The applicant
has, however, proposed an area of open space designed to provide play,
seating and open grass spaces. As such the proposal complies with NPF4
Policy 21 and LDP2 Policy 14B. 
Drainage and Flooding 
97 The site is not located within SEPA fluvial flood extents. SEPA surface water
maps show minimal impact at the northern end of the site, however, it is
considered reasonable that this can be managed by the proposed drainage
infrastructure. A SUDs facility is proposed to be located at the north end of the
site. 
98 The drainage plan indicates that the SUDs pond will discharge into the
existing ditch north of the Kintillo football pitch. The drainage plan assumed
this flows into the Yellow Burn but there was no confirmation. Perth & Kinross
Council (PKC) Flood Team carried out drainage investigation works in
February 2023 which confirmed that this ditch flows into the Yellow Burn
culvert (beneath Horsemill Place) which then discharges into the River Earn.
PKC Flood Team will, however, require confirmation that the developer has
obtained the necessary approval from appropriate landowners to install this
outfall and ensure that this ditch will be cleared of any debris/vegetation prior
to the commencement of any works. Condition 5 and Informative 18
adequately addresses this requirement. 
99 Initially, PKC Flood team reviewed the drainage calculations (submitted as
part of the FRA) and raised no issues, however, NPF4 came into force in
February 2023 and the climate change percentage in the submitted FRA did
not comply with the new legislation. Accordingly, the FRA was updated to
comply with the new climate change percentages (53%/39%). The detailed
design plan for the proposed SUDs will require to be submitted prior to
commencement of development, however, this can be controlled by condition
(Condition 6). 
100 It is also worth noting that the outfall is located outwith the red line site
boundaries for this application, therefore, a secondary application has been
submitted, planning reference 22/02020/FLL, and approved. 
101 Overall, the proposal is compliant with NPF4 Policy 22 and LDP2 Policy 52
and 53. 
Page 48 of 172

Page 49

Natural Heritage and Biodiversity 
102 The Council will seek to protect and enhance all wildlife and habitats, whether
formally designated or not, considering natural processes in the area.
Planning permission will not be granted for development likely to have an
adverse effect on protected species unless clear evidence can be provided
that the ecological impacts can be satisfactorily mitigated. 
103 The Council’s Biodiversity Officer has reviewed the submitted Ecological
Survey and Biodiversity Action Plan and in so far as biodiversity is concerned,
has no objections subject to conditions (Conditions 23-27). The proposed
development, therefore, complies with Policy 41 of LDP2 and Policy 3 of
NPF4. 
Waste Collection 
104 Waste collection is considered to be appropriately addressed through both the
provision and access to individual properties. A swept path diagram has been
submitted that confirms the site can be adequately serviced by refuse
vehicles. 
Health Care 
105 Concerns were raised in the letters of representations regarding the closure of
the GP practice in Bridge of Earn and the lack of Health Centre provision.
NHS/HSCP were asked to provide comments in this regard and advised that
they acknowledge that the development will place additional pressure on
health facilities, however, recognise that the site is an allocated site in the
LDP2 and has PPP consent and therefore it is too late to resist allocated sites
on NHS/HSCP grounds. 
Sustainability 
106 LDP2 Policy 32 requires proposals for new buildings to demonstrate that at
least 10% of the current carbon reduction emissions will be met though the
installation and operation of zero and low-carbon generating technology. It is
noted air source heating is suggested to be used; and that the designs include
a range of low and zero carbon generating technologies, which is welcomed.
However, the specific requirements of Policy 32 have not been formally
addressed in terms of the 10% requirement for the deployment of Low and
Zero Carbon Generating Technology in New Development (LZCGT). Solar PV
panels on each home are recommended along with air source heat pumps
(ASHP). Unless ASHP are the main source of heating for each dwelling (or
building in the case of flats) a calculation will be required to be provided
before occupation to demonstrate compliance with Policy 32. As required
under Policy 32 the applicant will need to demonstrate compliance in terms of
what LZCGTs will be deployed. As such a condition shall be imposed to
ensure this requirement is met. (Condition 32). 
Page 49 of 172

Page 50

Archaeology 
107 The proposed development site lies in an area that is archaeologically
sensitive. The location of the development lies on the post glacial shoreline
and recent archaeological research carried out by the Tay Landscape
Partnership on a similar site to the west of Bridge of Earn located a significant
Mesolithic camp site (MPK20049), the first monument site if its type found in
Perth and Kinross. The applicant has submitted a desk-based assessment
and fieldwalking were undertaking as part of the pre-application works. The
results of this survey concluded that further archaeological work was advised
and a draft WSI for trial trenching was submitted to Perth and Kinross
Heritage Trust (PKHT) for comment. 
108 As such, PKHT recommend that an archaeological evaluation should take
place to assess the presence/absence, character and significance of
archaeological deposits on the site and in line Scottish Planning Policy (SPP)
have recommended a condition for a programme of archaeological works be
attached to any consent (Condition 36). Whilst the consultation response
makes reference to SPP, which is no longer a material consideration, the
recommended condition is still relevant to accord with Policy 7 Historic Assets
and Places of NPF4 and LDP2 Policy 26B. 
Contamination 
109 Colleagues in Environmental Health were consulted and advised that
historical mapping indicates that the site was previously occupied by railway
land in addition to a cemetery immediately east. There is the potential for the
site to be impacted by contamination as a result of its former use. As such it is
necessary for an assessment of the site to be made to determine its suitability
for the proposed use. This can be addressed through the use of a condition
(Condition 35). 
Developer Contributions 
110 LDP2 Policy 5 – Infrastructure Contributions requires consideration of the
individual or cumulative impact of new development on infrastructure and
facilities and to secure contributions to address this impact where the
development exacerbates impacts or generates additional need. 
Education Provision 
111 The proposed development will result in the current primary school being over
capacity.  As a result, a financial contribution (£426,030) is required for 82.5
dwellings (110-27.5 affordable units). This contribution will be dealt with via
the Section 75 Legal Agreement. 
Affordable Housing 
112 The Council’s Affordable Housing Officer has confirmed that 25% will be
required for affordable housing. The proposal is for 110 dwellinghouses which
generates a requirement for 27.5 homes. The Accommodation Schedule plan
Page 50 of 172

Page 51

shows 27 affordable homes provided on-site. Payment of a commuted sum
for the remaining 0.5 units is acceptable. As a result, a financial contribution of
£14,000 is required. Delivery of the affordable housing units and the
contribution will be dealt with via the Section 75 Legal Agreement. 
Transport Contribution 
113 A financial contribution is required towards the cost of delivering the transport
infrastructure improvements needed for the release of all development site in
and around Perth. As a result a financial contribution ((82.5 x £3,657) + (27.5
(affordable units) x £1,828) = £301,702.50 + £50,270. 
Statement of Community Benefit 
114 NPF4 Policy 16 requires development proposals that include 50 or more
homes, and smaller developments if required by local policy or guidance,
should be accompanied by a Statement of Community Benefit. The Applicant
has submitted a Statement of Community Benefit which concludes that the
proposed development will have a positive benefit on the local community. It
will provide a broad range of new homes of varying sizes and tenures. It will
be accompanied by areas of extensive open space and associated facilities
and in addition to this it will provide a new bus shelter at the Ember stop all to
the benefit of the community. The proposed development, therefore, is in
compliance with NPF4 Policy 16. 
Economic Impact 
115 The impact to the local economy both during construction and occupation will
be reasonably significant with additional available expenditure on local
facilities and services. 
VARIATION OF APPLICATION UNDER SECTION 32A 
116 This application was varied prior to determination, in accordance with the
terms of section 32A of the Town and Country Planning (Scotland) Act 1997,
as amended.  The variations incorporate changes to: 
• Change in finishing materials. 
• Revision to house types for plots 3 and 4. 
• Removal of green strip to the rear of plots 45-51. 
• Reconfiguration of layout at the southern part of the site, in particular plots
95-104 (new vehicular access onto The Meadows for plot 104)
• Revision to garages on plots 1 and 10. 
• Change to orientation of plot 8. 
• Revisions to plots 53-67. 
• Revision to garage positions on plots 90-93. 
• Plots 18 and 19 extended. 
Page 51 of 172

Page 52

LEGAL AGREEMENTS 
117 A draft Heads of Terms is being agreed with the applicants and a Section 75
Legal Agreement is in the process of being prepared and will assess the
following matters; 
• On-site Affordable Housing provision (27 units) and commuted sum
(£14,000)
• Transport Infrastructure contribution (£351,972.50)
• Commuted sum for Primary School Education provision (£426,030)
• Open Space Provision and Maintenance
• Play Area Provision and Maintenance 
• Planting framework 
118 Maintenance arrangements (in perpetuity) of the agreed open space areas
can be maintained by a private factor, rather than adopted by the Council. The
exception to this is above ground SUDs and play areas, which must be
adopted by the Council. As such an option for private factoring has been
included in the Heads of Terms. 
DIRECTION BY SCOTTISH MINISTERS 
119 Under the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013, regulations 30 – 33 there have been
no directions by the Scottish Government in respect of an Environmental
Impact Assessment screening opinion, call in or notification relating to this
application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
120 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered a minor departure from the development
Plan, specifically Policy 6 of Local Development Plan 2 (2019).  Account has
been taken account of the relevant material considerations and none has
been found that would justify overriding the Development Plan. 
121 Accordingly the proposal is recommended for approval subject to the following
conditions. 
RECOMMENDATION   
Approve the application 
Conditions and Reasons for Recommendation 
General 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been started within that period.
Page 52 of 172

Page 53

Reason - This is a Planning Permission in terms of Section 58 of the Town
and Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by
conditions imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. No development shall commence until a detailed phasing strategy (supported
by appropriate plans) shall be submitted to and approved in writing by the
Council as Planning Authority. The phasing strategy shall include the following
details: 
(i)  The timing and number of dwellings to be developed in each phase;
(ii)  The timing and delivery of infrastructure, open space and landscaping;
(iii)  The timing and location of any temporary construction compound;
(iv)  The timing and delivery of the affordable housing units. 
Once approved, the development shall proceed in accordance with the
approved delivery phasing strategy to the satisfaction of the Council as
Planning Authority. 
Reason - In order to ensure the satisfactory implementation and completion of
the development. 
Drainage and Flooding 
4. The drainage outfall as agreed as part of planning permission 22/02020/FLL
or any other agreed in writing scheme by the Council, shall be implemented
as part of the SUDs basin delivery to the satisfaction of the Council as
Planning Authority. 
Reason - To ensure the provision of effective drainage for the site. 
5. Prior to the commencement and completion of works, the watercourse to the
northeast of the site, which the SUDs basin outfalls into, shall be cleared of
vegetation and debris to the satisfaction of the Council as Planning Authority. 
Reason - To ensure the provision of effective drainage for the site. 
6. Development shall not commence on site until a detailed sustainable urban
drainage system (SUDS) has been submitted for the written agreement of the
Council as Planning Authority, in consultation with SEPA where necessary. 
The scheme shall be developed in accordance with the technical guidance
contained in The SUDS Manual (C753) and the Council's Flood Risk and
Flood Risk Assessments Developer Guidance, and shall incorporate source
control. All works shall be carried out in accordance with the agreed scheme
and be operational prior to the bringing into use of the development.
Page 53 of 172

Page 54

Reason - To ensure the provision of effective drainage for the site. 
7. Concurrent with the initiation of the development hereby approved and for the
duration of construction, a temporary surface water treatment facility which
accords with Sustainable Urban Drainage System principles shall be
implemented for the site and maintained for the duration of the approved
development works.  The temporary surface water treatment facility shall
remain in place until the permanent surface water drainage scheme is
implemented. 
Reason - To ensure the appropriate management of construction surface
water run-off to minimise flooding and avoid discharge of sediment/pollution to
the local water environment or neighbouring property, in the interests of
residential and environmental amenity. 
8. Storm water drainage from all paved surfaces, including the access, shall be
disposed of by means of suitable a Sustainable Urban Drainage System to
meet the requirements of best management practices. 
Reason - To ensure the provision of effective drainage for the site. 
Residential Amenity 
9. Prior to the commencement of the development a Dust Management Plan
shall be submitted to and agreed in writing by the Council as the Planning
Authority and Environmental Health. The plan shall include measures for the
control of dust, monitoring, and complaints procedures, at the construction
stages of the development. 
Reason - In the interests of residential amenity. 
10. Construction work shall be limited to Monday to Friday 0700 hours to 1900
hours and Saturday 0800 hours to 1300 hours with no noisy works out with
these times or at any time on Sundays or bank holidays (as identified by
Scottish Government). 
Reason: In the interests of residential amenity. 
Roads and Transport 
11. Prior to the occupation of any residential plot, all matters regarding access,
car parking, road layout, design and specification, including the disposal of
surface water, shall be in accordance with the standards required by the
Council as Roads Authority and to the satisfaction of the Planning Authority. 
Reason - In the interests of vehicle and pedestrian safety and in accordance
with the policies of the adopted development plan. 
12. Prior to commencement of works on site, the width of Wicks O’Baiglie Road
shall be widened to a minimum width of 6 metres from south of 52 Wicks
O’Baiglie Road to a distance of 6 metres south of the vehicle access
bellmouth into the development, where the width of the road will taper back to
Page 54 of 172

Page 55

the original width over a distance of at least 25 metres.  The road widening
shall be constructed to the standard and specification required by the Council
as Roads Authority to the satisfaction of the Planning Authority. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
13. Prior to commencement of works, a street lighting design must be submitted
for the further written agreement of the Council as Planning Authority, in
consultation with Perth & Kinross Council’s Street Lighting Partnership.  The
scheme shall include details of light spill, brightness of the lighting and the
proposed hours of operation.  The agreed lighting scheme shall be
implemented and maintained in full accordance with the agreed scheme. 
Reason - In the interests of road safety. 
14. Prior to the commencement of the development hereby approved, the
applicant shall submit for the further written agreement of the Council as
Planning Authority, in consultation with the Roads Authority (Structures), a
Construction Traffic Management Scheme (TMS) which shall include the
following:
a. restriction of construction traffic to approved routes and the measures
to be put in place to avoid other routes being used;
b. timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
c. a code of conduct for HGV drivers to allow for queuing traffic to pass;
d. arrangements for liaison with the Roads Authority regarding winter
maintenance;
e. emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
f. arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the
development being deposited on the road;
g. arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
h. arrangements for signage at site accesses and crossovers and on
roads to be used by construction traffic in order to provide safe access
for pedestrians, cyclists and equestrians;
i. details of information signs to inform other road users of construction
traffic;
j. arrangements to ensure that access for emergency service vehicles
are not impeded;
k. co-ordination with other significant developments known to use roads
affected by construction traffic;
l. traffic arrangements in the immediate vicinity of temporary construction
compounds;
m. monitoring, reporting and implementation arrangements; 
n. arrangements for dealing with non-compliance; and
o. details of HGV movements to and from the site.   
Page 55 of 172

Page 56

The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interest of proper site management. 
15. Prior to the occupation of the tenth dwellinghouse, the developer shall install a
bus shelter at Old Edinburgh Road (NaPTAN ID 73729586) with a 3 bay bus
shelter supplied and installed with passenger information board, LED
spotlights (one per bay), a 28in Ultra-Wide Display Screen for Real Time
Passenger Information installed on the approach side of the shelter and a
24/7 electrical power supply to a Haldo pillar adjacent to the shelter to provide
power for the LED lighting and Real Time Passenger Information display.  The
design and specification shall be to the satisfaction of the Council as Planning
Authority, in consultation with Perth & Kinross Council’s Public Transport Unit. 
In the event that it is not possible to install at this location, an alternative shall
be agreed in writing with the planning authority. 
Reason - In the interest of sustainable travel. 
16. No part of the development shall be occupied until a Residential Travel Plan
(RTP), aimed to encourage more sustainable means of travel, has been
submitted to and agreed in writing by the Council in consultation with
Transport Planning. The RTP will have particular regard to provision for
walking, cycling and public transport access to and within the site and will
identify the measures to be provided, the system of management, monitoring,
review, reporting and the duration of the plan. 
Reason - To promote sustainable transport options and to meet advice within
Scottish Planning Policy on transport. 
17. Prior to the commencement of the development hereby approved, full visibility
splays for the vehicle access onto Wicks O’Baiglie Road of 120 metres along
the channel line shall be provided to the left and right of the access, at a set-
back of 2.4 metres from the edge of the carriageway, measured 1.05m above
the road level to the standard and specification required by the Council as
Roads Authority to the satisfaction of the Planning Authority.  The visibility
splays shall be physically formed on the ground and any existing fences,
walls, hedges or other means of enclosure or obstructions within the splays
shall be removed and relocated outwith the splays.  Once formed, the visibility
splays shall be permanently retained thereafter, and no visual obstruction of
any kind shall be permitted within the visibility splays so formed. 
Reason - In the interests of road safety; to ensure an acceptable standard of
construction within the public road boundary. 
18. Prior to the occupation of any residential plot, details of the specification
including materials of all footpaths shall be submitted to the Planning Authority
for further approval. The agreed detail shall thereafter be implemented prior to
the completion of the development. 
Reason – In the interests of pedestrian and cycle safety.
Page 56 of 172

Page 57

19. The occupation of the tenth dwellinghouse hereby approved shall not occur
until the proposed footpath connection surrounding the SUDS at the northern
side of the site and linking to both Dunbarney Avenue and Wicks O' Baiglie
Road, as shown on drawing number 22/00817/182, has been implemented in
line with the specification agreed as part of condition 18, and is operational to
the satisfaction of the Planning Authority. 
Reason - In the interest of sustainable transport. 
20. The occupation of the fifty-fifth dwellinghouse hereby approved shall not occur
until the proposed footpath connection at the southern side of the site, linking
this site to both Wicks O' Baiglie Road and The Meadows and the footpath
connection to the west of the site linking to The Meadows, opposite Ptak Way,
as shown on drawing number 22/00817/182, has been implemented in line
with the specification agreed as part of condition 18, and is operational to the
satisfaction of the Planning Authority. 
Reason - In the interest of sustainable transport. 
21. The Meadows shall not be used at any time by construction traffic associated
with the development, unless otherwise agreed by the Council as Planning
Authority. 
Reason - In the interests of pedestrian and traffic safety, residential amenity. 
Biodiversity 
22. Prior to the commencement of development a Construction Environmental
Management Plan (CEMP), incorporating a Construction Method Statement
(CMS), a Construction Traffic Management Plan (CTMP), a Site Waste
Management Plan (SWMP), a Site Access Management Plan, a Drainage
Management Plan (DMP) shall be submitted for the approval of the Planning
Authority. Thereafter the development shall be fully undertaken in accordance
with the CEMP unless otherwise agreed in writing by the Planning Authority. 
Reason - In the interests of protecting environmental quality and of
biodiversity. 
23. The conclusions and recommended action points within the supporting
Ecological Survey and Biodiversity Action Plan submitted and hereby
approved (document number 90 relates) shall be fully adhered to, respected
and undertaken as part of the construction phase of development, to the
satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of
biodiversity. 
24. An updated ecological survey will be required prior to the commencement of
works, if works have not commenced within 24 months of the date of the
survey approved as part of this permission.  The updated survey shall be
submitted to the Council as Planning Authority for written agreement and
Page 57 of 172

Page 58

works shall not commence until after such written agreement has been issued
by the Council. 
Reason - In the interests of protecting environmental quality and of
biodiversity. 
25. Prior to the completion or occupation of the development hereby approved,
whichever is the earlier, wildlife kerbs shall be installed adjacent to all road
gullies within 500metres of a SUDS pond or watercourse. Thereafter, the
kerbs shall be retained in a reasonable condition for the life of the
development, to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of
biodiversity. 
26. Prior to the completion or occupation of the development hereby approved,
whichever is the earlier, hedgehog highways shall be created by providing
access gaps in wooden fences on each plot at least 13cm x 13cm at ground
level, to allow for the free movement of hedgehogs. Thereafter, the hedgehog
highways shall be retained in a reasonable condition for the life of the
development, to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of
biodiversity. 
27. Measures to protect animals from being trapped in open excavations and/or
pipe and culverts shall be implemented for the duration of the construction
works of the development hereby approved. The measures may include
creation of sloping escape ramps for animals, which may be achieved by
edge profiling of trenches/excavations or by using planks placed into them at
the end of each working day and open pipework greater than 150 mm outside
diameter being blanked off at the end of each working day. 
Reason - In the interests of protecting environmental quality and of
biodiversity. 
Trees and Landscape 
28. Prior to the commencement of any works on site, all trees on site (other than
those marked for felling on the approved plans) and those which have Root
Protection Areas which fall within the site shall be retained and protected.
Protection methods shall be strictly in accordance with BS 5837 2012: Trees
in Relation to Design, Demolition and Construction.  Protection measures,
once in place, shall remain in place for the duration of construction. 
Reason - To ensure a satisfactory standard of development and
environmental quality and to reserve the rights of the Planning Authority. 
29. The detailed landscaping and planting scheme which is hereby approved shall
be completed within the first available planting season (October to March)
after the completion or bringing into use of the development, whichever is the
Page 58 of 172

Page 59

earlier.  The approved scheme shall thereafter be maintained to the
satisfaction of the Council as Planning Authority, with any planting which fails
to become established within five years being replaced in the following
planting season with others of a size and species as previously approved. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
30. The areas of public open space indicated in the approved landscape and
planting drawings shall be planted in accordance with the open space
standards of the Planning Authority and completed to phase with the adjacent
dwellinghouses in accordance with a programme to be submitted and agreed
in writing by the Planning Authority, prior to the commencement of
development. The scheme shall thereafter be maintained to the satisfaction of
the Council as Planning Authority. 
Reason – In the interests of visual amenity; to ensure a satisfactory standard
of local environmental quality and to reserve the rights of the Planning
Authority. 
31. All landscaped areas outwith the curtilages of the dwellings and shown on the
approved drawings shall be permanently retained as such and shall at no time
be used as private garden ground nor incorporated within the curtilage of any
of the dwellings hereby approved without the express grant of planning
permission by the Planning Authority. 
Reason - In the interests of the character and appearance of the
development. 
32. Prior to the occupation of the development or any phase of the development,
whichever is the sooner, a landscape management plan, including long term
design objectives, management responsibilities and maintenance schedules
for all landscape areas (other than small privately-owned domestic gardens)
shall be submitted to, and agreed in writing by, the Council as Planning
Authority. The landscape management plan as agreed shall, where
appropriate, include phased implementation concurrent with the development
and shall be fully implemented and adhered to. 
Reason - To ensure satisfactory management of the scheme. 
Sustainability 
33. Prior to the commencement of development hereby approved, a scheme shall
be submitted to, and approved in writing by, the Council as Planning Authority
that demonstrates how at least 10% of the current carbon emissions reduction
set by the Scottish Buildings Standards will be met through the installation
and operation of low and zero-carbon technologies. This scheme shall detail
for each building: 
a) the technology types;
Page 59 of 172

Page 60

b) illustrate, through technical calculations, that these will meet at least the
10% reduction;
c)  their siting and location; and
d)  ongoing operation and maintenance. 
Once approved, the development shall be completed in accordance with the
approved scheme and no individual unit shall be occupied until the scheme
has been installed and operating. 
Reason - To embed low and zero-carbon technologies within the development
in the interest of environmental sustainability. 
Waste 
34. Prior to the commencement of development a site specific plan detailing bin
storage areas, kerbside collection locations and recycling  facilities shall be
submitted to and approved in writing by the Planning Authority and thereafter
undertaken in accordance with the approved details. 
Reason - In the interest of the sustainable disposal of waste. 
Contamination 
35. Development shall not commence on site until an evaluation for the potential
of the site to be affected by contamination by a previous use has been
undertaken and, as a minimum, a Preliminary Risk Assessment (Phase 1
Desk Study) has been submitted for consideration and accepted by the
Council as Planning Authority. If the preliminary risk assessment identifies the
need for further assessment, an intrusive investigation shall be undertaken to
identify; 
I.  the nature, extent and type(s) of contamination on the site 
II.  measures to treat/remove contamination to ensure the site is fit for the use
proposed 
III.  measures to deal with contamination during construction works 
IV. condition of the site on completion of decontamination measures. 
Prior to the completion or bringing into use of any part of the development the
measures to decontaminate the site shall be fully implemented in accordance
with the scheme subsequently agreed by the Council as Planning Authority.
Verification that the scheme has been fully implemented must also be
submitted to the Council as Planning Authority. 
Reason - In order to deal with any potential contamination of the site as a
result of its former use. 
Archaeology 
36. Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
Written Scheme of Archaeological Investigation (WSI) which has been
Page 60 of 172

Page 61

submitted by the developer and agreed in writing by the Council as Planning
Authority, in consultation with Perth and Kinross Heritage Trust (PKHT).
Thereafter, the developer shall ensure that the programme of archaeological
works is fully implemented including that all excavation, preservation,
recording, recovery, analysis, publication and archiving of archaeological
resources within the development site is undertaken.  Should the
archaeological works, as required by the WSI, identify a requirement for post-
excavation analysis, the development as approved shall not be occupied or
brought into use until a Post-Excavation Research Design (PERD) has been
submitted to and agreed in writing by the Council as Planning Authority, in
consultation with PKHT. The PERD shall be carried out in complete
accordance with the approved details. Furthermore, the developer shall afford
access at all reasonable times to PKHT or a nominated representative and
shall allow them to observe work in progress. 
Reason - To ensure a programme of archaeological works is carried out to
safeguard and record any archaeological remains within the development
area. 
Materials 
37. Prior to the commencement of the development hereby approved, details of
the specification and colour of the proposed external finishing materials to be
used shall be submitted to and agreed in writing by the Council as Planning
Authority.  The scheme as agreed shall be implemented prior to the
completion or bringing into use of the development, whichever is the earlier. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard
of local environmental quality. 
B JUSTIFICATION 
The proposal is considered as a minor departure to the Development Plan as
there are material circumstances that would justify a departure from the
relevant Policy 6 of the LDP2. 
C PROCEDURAL NOTES 
Permission shall not to be issued until the Section 75 Agreement has been
signed and registered to take account of this application. The legal agreement
should be concluded and completed within 4 months of the date of any
Committee approval. Failure to conclude a legal agreement within 4 months
will result in the planning application being re-assessed through failing to
comply with the associated developer contributions policy and may be
ultimately recommended for refusal under delegated powers. 
D INFORMATIVES 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
planning authority prior written notification of the date on which it is intended
Page 61 of 172

Page 62

to commence the development. A failure to comply with this statutory
requirement would constitute a breach of planning control under section
123(1) of that Act, which may result in enforcement action being taken. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and
Country Planning (Scotland) Act 1997 (as amended) to give the planning
authority written notice of that position. 
3. This development will require the 'Display of notice while development is
carried out', under Section 27C(1) of the Town and Country Planning Act
1997, as amended, and Regulation 41 of the Development Management
Procedure (Scotland) Regulations 2013. The form of the notice is set out in
Schedule 7 of the Regulations and a draft notice is included for your
guidance. In accordance with Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the  
development 
• Readily visible to the public 
• Printed on durable material. 
4. The applicant is advised that any proposed signage will require a further
application to be submitted for advertisement consent unless it benefits from
express consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984. 
5. The applicant should be aware of the requirements of the Council's
Environment and Regulatory Services in relation to waste collection from the
site and should ensure adequate measures are provided on site to allow for
the collection of waste. 
6. The applicant is advised that in terms of Sections 56 of the Roads (Scotland)
Act 1984 he/she/they must obtain from the Council, as Roads Authority,
consent to open an existing road or footway prior to the commencement of
works.  Information on junction types, requirements for Vehicular Access
consents (VA1) and application forms are available at
www.pkc.gov.uk/vehicleaccess.  Advice on the disposal of surface water
should be sought at the initial stages of design from Scottish Water and the
Scottish Environment Protection Agency. 
7. The applicant should be advised that in terms of Section 21 of the Roads
(Scotland) Act 1984 they must obtain from the Council as Roads Authority
consent to construct a new road prior to the commencement of roadworks.
Advice on the disposal of surface water must be sought at the initial stages of
design from Scottish Water and the Scottish Environment Protection Agency.
Please note that a fee is chargeable for the processing of RCC applications. 
8. Prior to the commencement of works a maintenance agreement under
Section 96 of the Roads (Scotland) Act 1984 shall be entered in to in respect
of the C416 Wicks O’Baiglie Road between the A912 and the M90 overbridge,
Page 62 of 172

Page 63

a distance of approximately 1 km, whereby the road shall be inspected on a
regular basis and repairs carried out to the timescale and standards specified
by the Council as Roads Authority to the satisfaction of Perth & Kinross
Council. 
9. No work shall be commenced until an application for building warrant has
been submitted and approved. 
10. The applicant is advised that the granting of planning permission does not
guarantee a connection to Scottish Water’s assets. The applicant must make
a separate application to Scottish Water Planning & Development Services
team for permission to connect to the public wastewater system and/or water
network and all their requirements must be fully adhered to. 
11. This application was varied prior to determination, in accordance with the
terms of section 32A of the Town and Country Planning (Scotland) Act 1997,
as amended.  The variations incorporate changes to revise layout, materials
and garages. 
12. Application for a new postal address should be made via the Street Naming
and Numbering page on the Perth & Kinross Council website at
www.pkc.gov.uk/snn.  Please note there is a charge for this service and
submission cannot be made until the relevant Building Warrant has been
approved. 
13. The applicant is advised to refer to Perth & Kinross Council's Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains
advice relevant to your development. https://www.pkc.gov.uk/ldp2floodrisk 
14. This planning permission is granted subject to conditions, some of which
require further information to be submitted to Development Management
either before works can start on site or at a certain time.  The required
information must be submitted via the ePlanning portal if your original
application was lodged that way, otherwise send it to us at
developmentmanagement@pkc.gov.uk.  Please be aware that a fee is
payable in respect of each request made, though there is no limit to the
number of conditions that can be discharged in a single request.  The Fees
Charter is available on our website www.pkc.gov.uk.   
The Council has two months to consider the information.  You should
therefore submit the required information more than two months before your
permission expires.  We cannot guarantee that submissions made within two
months of the expiry date of your permission will be able to be dealt with
before your permission lapses. 
15. The planning permission decision notice shall not be issued until such time as
the required Developer Contributions have been secured or paid in full.   
In the event the applicant does not either make the required payment within
28 days from the date the agent/applicant is advised of the need for the
contributions, or complete a legal agreement for delayed payment within a 4
Page 63 of 172

Page 64

month period from the date the agent/applicant is advised of the need for the
contributions the application may be refused under delegated powers without
any further discussion with the applicant. 
16. The applicant is reminded that, should any protected species be present a
licence may be required from NatureScot. Failure to obtain a licence may
constitute a criminal act under the Habitats Regulations and penalties are
sever for non-compliance. 
17. The applicant is reminded to discuss with the Council’s Transport Unit the
supply of a bus service and public transport infrastructure to ensure an
adequate public transport provision for the site. 
18. The applicant is advised that the granting of planning permission does not
guarantee right of access to the site. This should be agreed with the relevant
landowner(s) prior to the commencement of the development. 
19. Trees and scrub are likely to contain nesting birds between 1st March and
31st August inclusive. Trees and scrub are present on the application site and
are to be assumed to contain nesting birds between the above dates. The
applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended (section 1), it is an offence to remove, damage or destroy the nest
of any wild bird while that nest is in use or being built. Planning permission for
a development does not provide a defence against prosecution under this Act. 
Background Papers:  10 letters of representation
Contact Officer:  Gillian Peebles
Date: 14 September 2023 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 64 of 172

Page 65

22/00817/FLM
Erection of 110 dwellinghouses, associated infrastructure, access, SUDS and landscaping
at Land 150 metres South West of Kintillo Cemetery (h14), Bridge of Earn
Planning and Placemaking
Committee - 11 October 2023
Created by Kirsty Strong on 14 September 2023
© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:10000
5(1)(i)
Page 65 of 172

Page 66

Page 66 of 172

Page 67

22/00817/FLM
Erection of 110 dwellinghouses, associated infrastructure, access, SUDS and landscaping
at Land 150 metres South West of Kintillo Cemetery (h14), Bridge of Earn
Planning and Placemaking
Committee - 11 October 2023
Created by Kirsty Strong on 14 September 2023
© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:5000
5(1)(i)
Page 67 of 172

Page 68

Page 68 of 172

Page 69

Perth and Kinross Council
Planning and Placemaking Committee – 11 October 2023
Report of Handling by Head of Planning & Development
(Report No. 23/270) 
PROPOSAL: Erection of 90 dwellinghouses, 2 residential blocks comprising 10
flats, associated infrastructure, access, SUDS and landscaping
(in part, allocated site H69) 
LOCATION: Land 150 Metres South of Station House, Forfar Road, Meigle 
Ref. No: 22/01501/FLM
Ward No: P2 – Strathmore 
Summary 
This report recommends approval of the application for a development comprising
the erection of 90 dwellinghouses and 10 flats with associated infrastructure, access,
SUDS and landscaping on land 150 Metres South of Station House, Forfar Road,
Meigle. 
The development is considered to comply with the relevant provisions of
the Development Plan and there are no material considerations that outweigh this
conclusion. 
BACKGROUND AND DESCRIPTION OF PROPOSAL  
1 The application site is located predominantly to the south of Forfar Road within
the village of Meigle and is currently in agricultural use. A small part of the site
includes an area to the north of Forfar Road, which is also currently in agricultural
use. The majority of the site, with the exception of the SUDS area, is within the
settlement boundary and is allocated within the Perth and Kinross Local
Development Plan 2 (2019) (LDP2) as housing proposal H69. 
2 The site extends to approximately 5.5ha and is bound to the north and west by
the rear of residential properties fronting Forfar Road, Strathmore Place and
Dundee Road. Meigle Primary School is also located just beyond the site’s
western boundary. Outwith the site boundary to the east is the route of a disused
railway and beyond this to a core path which runs parallel to it. The core path is
level with the site but is on the opposite side of the railway which is in a cutting
for most of its length where it runs adjacent to the site. Beyond the core path to
the east and to the south are agricultural fields.  
5(1)(ii)
Page 69 of 172

Page 70

3 The site will have a single vehicular access from Forfar Road at the north-east
corner. Pedestrian links will be provided to Strathmore Place at the north-west
corner, to Dundee Road to the south-west between the bowling green and
Kinloch Memorial Hall and to the agricultural land at the south-east corner. A
shared-use safe route to school will also be provided alongside the open space
adjacent to the school. 
4 The site will be laid out around a legible street hierarchy with a singular primary
route supplemented by shared surface streets, connecting to private drives and
parking courts. The majority of the houses are oriented to face a road or areas of
open space. The areas along the north and east boundaries of the site will be
landscaped and will incorporate footpath links through the site and adjoining
areas beyond. An area of green open space will be provided adjacent to the
school and will incorporate a shared use Safe Route to School. 
5 Of the 100 residential units proposed, 75 will be for private sale with 25
affordable homes. The dwellings comprise a mix of detached, semi-detached and
terraced houses and cottage flats. Eight of the dwellings will be bungalows,
which will be split equally between the market and affordable housing. The unit
numbers and tenure mix includes: 
• 27 x two-bedroom cottage flats and terraced/semi-detached dwellinghouses;
• 31 x three-bedroom terraced/semi-detached/detached dwellinghouses;
• 26 x four-bedroom detached dwellinghouses; and
• 16 x five-bedroom detached dwellinghouses. 
6 All of the properties will have access to a private external amenity area. The
properties will be finished with smooth white render with a grey coloured facing
brick base course and weatherboard. The roof coverings will be grey concrete
tiles. 
Pre-Application Consultation 
7 Pre-application reference: 22/00012/PAN 
8 The proposed development is classed as a ‘Major’ development in terms of the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009 as it proposes a residential development of 50 or more dwellings.
Therefore, the applicant was required to undertake formal preapplication
consultation with the local community and a Pre-Application Consultation (PAC)
Report has been submitted in support of the application. 
Environmental Impact Assessment (EIA) 
9 EIA screening reference: 22/00864/SCRN 
Page 70 of 172

Page 71

10 An EIA screening has been undertaken in relation to the proposal. The screening
exercise concluded concluding that an EIA was not required as the proposal was
not considered likely to have significant environmental effects.  
DEVELOPMENT PLAN
11 The Development Plan for the area comprises National Planning Framework 4
(NPF4) and the Perth and Kinross Local Development Plan 2 (2019) (LDP2). 
National Planning Framework 4 
12 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. This
strategy sets out how to improve people’s lives by making sustainable, liveable
and productive spaces.   
13 NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan.  The
Council’s assessment of this application has considered the following policies of
NPF4: 
• Policy 1: Sustainable Places
• Policy 2: Climate Mitigation and Adaption
• Policy 3: Biodiversity
• Policy 7: Historic Assets and Places
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 16: Quality Homes
• Policy 20: Blue and Green Infrastructure
• Policy 22: Flood Risk and Water Management 
Perth and Kinross Local Development Plan 2 
14 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
15 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 1D: Placemaking
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
Page 71 of 172

Page 72

• Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
• Policy 15: Public Access
• Policy 20: Affordable Housing
• Policy 25: Housing Mix
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 41: Biodiversity
• Policy 42: Green Infrastructure
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 53E: Water Environment and Drainage: Water Supply
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Supplementary Guidance 
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted
in 2021)
• Supplementary Guidance - Open Space Provision for New Developments
(adopted in 2021)
• Supplementary Guidance - Placemaking (adopted in 2020) 
Non Statutory Guidance 
• Planning Guidance - Delivery of Development Sites
• Planning Guidance - Loch Leven SPA, the Dunkeld-Blairgowrie Lochs SAC
and the River Tay SAC
• Planning Guidance - Planning & Biodiversity 
Planning Advice Notes 
16 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
Page 72 of 172

Page 73

• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport 
Creating Places 2013 
17 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
18 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
19 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision. 
Site History 
20 17/0050/LDP2 On 3 March 2022 for Residential development of 64-100 units
(limited to 50 during the lifetime of the plan) on a 5.7 ha site. The site has
previously been allocated for the proposed use. 
21 22/00864/SCRN On 8 June 2022 for Proposed housing development with
associated landscape framework and infrastructure (LDP H69). 
22 22/00012/PAN On 2 June 2022 for Residential development with associated
landscape framework and infrastructure (in part, allocated site H69).  
CONSULTATIONS 
23 As part of the planning application process the following bodies were consulted: 
External 
Scottish Water
24 No objections. There is currently insufficient capacity at Meigle Wastewater
Treatment Works to service the proposed development. However, a growth
enhancement project is currently underway at Meigle WWTW to provide
Page 73 of 172

Page 74

additional capacity that meet the needs of future growth ambitions in the
catchment, and this development has been included. 
Perth And Kinross Heritage Trust
25 No objections. Written Scheme of Investigation approved prior to the
commencement of works. 
Scottish Environment Protection Agency
26 No comments. 
Dundee Airport Ltd
27 No impact. 
Meigle Community Council
28 Object. Consider that there would be an adverse impact on visual amenity,
increased flood risk, the development has an inappropriate character and density
for the existing village, noise pollution, additional traffic, impact on local sewage
works, lack of environmental improvements and lack of opportunity for
employment provision. 
Internal 
Structures And Flooding
29 No objections. 
Biodiversity/Tree Officer
30 Biodiversity improvements to be secured via condition. 
Community Greenspace
31 No objections. Contribution required towards upgrade of Victory Park. 
Environmental Health (Noise Odour)
32 No objections. Request for a condition to ensure that potential noise from the air
source heat pumps is adequately attenuated. 
Environmental Health (Contaminated Land)
33 No objections. Condition required. 
Transportation And Development
34 No objections. Conditions required. 
Development Contributions Officer
35 No requirement for an education contribution. 25% affordable housing to be
provided on site. 
Community Waste Advisor - Environment Service
36 No objections.
Page 74 of 172

Page 75

Representations 
37 59 representations were received objecting to the proposal. The main issues
raised within the representations are: 
• Concerns over vehicular access to the site
• Increase in traffic
• Road safety concerns
• Loss of agricultural land
• Flooding concerns
• Increased pressure on local services
• Adverse effect on visual amenity
• Inappropriate housing density
• Development is out of character with the area
• Archaeological concerns
• Increased noise and air pollution
• Impact on sewer and drainage systems
• Loss of privacy
• Biodiversity impacts 
38 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS
39
Screening Opinion  EIA Not Required
Environmental Impact Assessment
(EIA): Environmental Report
Not Required
Appropriate Assessment under Habitats
Regulations
AA Not Required
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact eg
Flood Risk Assessment
• Archaeological Report
• Flood Risk Assessment
• Drainage Strategy Report
• Ecology Report
• Site Investigation Report
• Landscape and Visual Appraisal
• Road Safety Audit
• Transport Statement
• Statement of Community Benefit 
APPRAISAL 
40 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
Page 75 of 172

Page 76

indicate otherwise. The Development Plan comprises NPF4 and the Perth and
Kinross Local Development Plan 2019. The relevant policy considerations are
outlined in the policy section above and are considered in more detail below. In
terms of other material considerations, this involves considerations of the
Council’s other approved policies and supplementary guidance. 
Principle 
41 The principle of the proposal has been established through the site’s allocation
as H69 in LDP2 for a residential development. The LDP2 allocation advises that
the residential capacity of the site is 64-100 units, with this being limited to 50
during the lifetime of the Plan. When the limit of 50 units was proposed Local
Development Plans were required to be reviewed and replaced over a five-year
cycle, with the current LDP2 due to be replaced in 2024. However, the Planning
(Scotland) Act 2019 changed this to a 10-year cycle, with LDP3 now
programmed to be adopted in 2027. Had this not been changed, current build out
rates for residential development sites would mean it is unlikely that more than
50 units would be completed before 2024. Therefore, the proposal for 100 units
on the site is acceptable as it complies with the longer-term vision for the site in
LDP2. 
42 The principle of the development is acceptable provided the proposals are
compatible with relevant policies of the development plan. 
Design and Layout 
43 Policy 14: Design, Quality and Place, Policy 15: Local Living and 20 Minute
Neighbourhoods and Policy 16: Quality Homes of NPF4 are relevant as are
LDP2 Policy 1: Placemaking, Policy 14B: Open Space within New
Developments, Policy 17: Residential Areas, Policy 25: Housing Mix and Policy
42: Green Infrastructure. 
44 The layout seeks to provide a logical movement pattern, particularly for non-
motorised users with emphasis on creating permeability through the site.
Connections take cognisance of desire lines through the site, particularly to the
village centre to the north-west and Meigle Primary School that bounds part of
the  site to the west. The proposed core path to the east is not within the site
boundary and land ownership issues mean that it is not possible to include this
within the proposal. However, paths along eastern side of the site will ensure that
future links can be made to the core path. 
45 The proposed landscaping of the eastern boundary will form an appropriate
transitional area between the development and the open agricultural land to the
east. The landscaping will also play an important role in forming a green
connection through the site which will allow for a continuation of the landscape
character of the site edge. The use of feature walling at the access to the
development will create a welcoming entrance to the development.
Page 76 of 172

Page 77

46 The submitted landscape masterplan illustrates a number of trees and
hedgerows to be introduced as part of the development. However, it lacks
detailed information and a condition (Condition 3) requiring the submission of a
detailed planting plan indicating species, location and density will be necessary
to secure this. 
47 A total of 100 houses and flats are proposed. The majority of the units have been
orientated to face a road or areas of open space, where they can provide passive
surveillance. The proposal provides a suitable mix of 2-5 bedroom units,
addressing the needs of a range of households. All of the houses will have a
private garden area with the flats having private and communal spaces. Overall,
the scale and density of the development is commensurate with the prevailing
townscape within Meigle. 
48 The use of a mix of car parking within the development including in-curtilage, on-
street and parking courts ensures that the proposal is not car dominated. 
49 The proposed palette of materials, including coloured render with grey or buff
roof tiles is appropriate in this location and is considered acceptable. 
50 The site has been well laid out and designed, taking into account the key
constraints and opportunities. The site provides good connectivity, both within the
development and with the surrounding area. The Design & Access Statement
has provided a sound justification for the design and layout of the site,
considering a range of key design parameters. The site also incorporates a range
of 2–5- bedroom units, with the affordable housing units well interspersed within
the site and located close to local amenities. The site also mixes the size range
of properties across the development. Overall, the general layout, house designs
and materials proposed are acceptable and contribute positively to the quality of
the surrounding built and natural environment in compliance with relevant NPF4
and LDP2 policies. 
Residential Amenity 
51 Residential amenity requires to be considered under LDP Policy 1:
Placemaking and Policy 17: Residential Areas. 
Privacy, Daylight and Overshadowing 
52 The location of the proposed dwellinghouses relevant to existing residential
properties is such that there will be no loss of privacy or loss of daylight or
overshadowing. Similarly, the new properties are adequately spaced out to
prevent any impact on amenity in terms of loss of privacy, daylight or
overshadowing. The proposal is therefore considered to comply with Policy 17:
Residential Areas as the proposed use and impact is considered acceptable. 
Page 77 of 172

Page 78

Noise 
53 Some of the properties are to be fitted with air source heat pumps. Environmental
Health have requested that a condition (Condition 4) be imposed to control the
noise from the heat pumps in order to protect neighbouring amenity. There is
potential for noise issues during the construction phase. A condition (Condition 5)
is required to control working hours to ensure the construction activities are kept
within reasonable times. There are no noise concerns arising as a result of the
proposed development once completed. 
Air Quality 
54 The main potential long-term impact on air quality resulting from the development
will be from vehicular trips. The applicant has provided a Transport Statement
and traffic generation data which assess the impact of these trips. The increase
in vehicle traffic flow is below the criteria requiring a full Air Quality Assessment
to be undertaken. Any impact on air quality as a result of the development is
considered to be negligible. 
Contaminated Land 
55 In view of the historical agricultural activities conducted, in advance of any
development taking place it is deemed appropriate to have an assessment
undertaken to identify any potential constraint that would be required to be
mitigated through remedial measures (Condition 11). 
Roads and Access 
56 NPF4 Policy 13: Sustainable Transport seeks to encourage developments that
prioritise sustainable travel while LDP2 Policy 60 Transport Standards and
Accessibility Requirements requires consideration of transport and accessibility.
A supporting Transport Statement has been assessed by the Council’s Transport
Planning team, who do not object with the scale of development and the
proposed parking requirements are considered adequate. 
57 All the detached and semi-detached properties will have driveways, with parking
for the terraces and visitors largely provided in parking courts and on street.
Many of the properties have driveways extending along the gables to allow
vehicles to be parked away from the road in line with Designing Streets principles
and aiming to reduce the visual impact of parked cars within the street scene.
The use of shared surfaces within the development will reduce vehicle speeds
and create a more pleasant environment for cyclists and pedestrians. 
58 To encourage the use of sustainable transport to and from the development site,
the Public Transport Unit have recommended a bus stop is upgraded in Meigle to
include a Real Time Passenger Information Display Screen, supplied and fitted. It
is suggested that the bus stop at or opposite Meigle Post Office shall be
Page 78 of 172

Page 79

upgraded, or another location agreed with the team. A condition (Condition 6) will
be required to ensure the installation of the RTPI screen. 
59 Overall, the proposal is considered to comply with NPF4 Policy 13 and LDP2
Policy 60, subject to conditions on the installation of RTPI screen, the
requirement for a Residential Travel Plan (Condition 7) and the requirement for a
Construction Traffic Management Scheme (Condition 8). 
Drainage and Flooding 
60 A SUDS and Drainage Strategy Report has been submitted in support of the
application. Flooding and Structures have been consulted and initially sought
clarifications in relation to the SUDS proposals. However, following the
submission of further technical drawings and information, these concerns have
been addressed. 
61 Scottish Water has advised that there is currently insufficient capacity at the
Meigle Wastewater Treatment Works to service the development. They further
advise, however, that a growth enhancement project is currently underway at
Meigle WWTW to provide additional capacity that meet the needs of future
growth ambitions in the catchment, and this development has been included. The
developer will be required to undertake a separate consenting process with
Scottish Water before development can commence on the site. 
62 Overall, the proposal complies with NPF4 Policy 22: Flood Risk and Water
Management and LDP2 Policy 52: New Development and Flooding and Policy
53: Water Environment and Drainage. 
Waste Collection 
63 Waste collection is considered to be appropriately addressed through both the
provision and access to individual properties. A swept path diagram has been
submitted that confirms the site can be adequately serviced by refuse vehicles. 
Archaeology and Conservation Considerations 
64 The proposed development site is highly sensitive and is known to have
significant archaeological potential. An Archaeological Written Scheme of
Investigation (WSI) has been submitted and approved by the Council, in
consultation with Perth and Kinross Heritage Trust. The developer is currently in
the process of implementing the agreed programme of archaeological works,
during which significant archaeological remains have been identified. Most of the
field work has now been completed and the post excavation analysis is currently
being carried out. Although the WSI has been approved and partially
implemented, condition (Condition 9) is required to ensure that the programme of
archaeological works is fully completed. The requested condition will ensure that
Page 79 of 172

Page 80

the proposal complies with NPF4 Policy 7: Historic Assets and Places and LDP2
Policy 26: Scheduled Monuments and Archaeology. 
Natural Heritage and Biodiversity 
65 NPF4 Policy 1: Sustainable Places, Policy 3: Biodiversity and Policy 4: Natural
Places are relevant considerations as are LDP2 Policies 38: Environment and
Conservation, and 41: Biodiversity. 
66 A Preliminary Ecological Appraisal (PEA) has been submitted in support of the
proposal. The PEA advises that there was no evidence of protected species
found within the site. It is noted that the site currently holds little ecological value.
However, the development provides an opportunity to create biodiversity
enhancements. Therefore, a condition (Condition 10) will be imposed requiring
the submission of a Biodiversity Enhancement Plan for the site, in line with NPF4
and LDP2 principles. 
Developer Contributions 
67 It is proposed that 25% of the development will be affordable housing in line with
the requirement of NPF4 Policy 16: Quality homes and LDP2 Policy 20:
Affordable Housing. A Section 75 legal agreement will be required to secure the
delivery of the affordable housing. 
68 Community Greenspace have advised that the development falls within the
catchment for the play area at Victory Park. They have requested that a
contribution towards the ongoing maintenance and future upgrade of Victory Park
would be preferable to the provision of a new equipped play area within the
development as previously proposed, to which the developer has agreed. A sum
of £26,852 is sought, being the estimated cost of 10-year maintenance and
upgrade of Victory Park. 
69 Subject to completion of a Section 75, the application is considered to satisfy
contribution and infrastructure requirements. 
Economic Impact 
70 During the construction period, jobs will be created and sustained, supporting
indirect employment and revenue that this volume of construction activity will
generate from employees spending on local goods and services. Longer term,
additional residents to the area will support existing local employment and
services in the area. 
VARIATION OF APPLICATION UNDER SECTION 32A 
71 This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
Page 80 of 172

Page 81

amended.  The variations incorporate changes to the layout and connections
through the site. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
72 A Section 75 Agreement will be required to secure necessary infrastructure
requirements relating to affordable housing and the upgrade of Victory Park. 
DIRECTION BY SCOTTISH MINISTERS 
73 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
74 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019). Account has been taken of the relevant material
considerations and none has been found that would justify overriding the
Development Plan. 
75 Accordingly, the proposal is recommended for approval subject to the following
conditions. 
RECOMMENDATION   
Approve the application 
Conditions and Reasons for Recommendation 
1.  This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents.
Page 81 of 172

Page 82

3. Prior to the commencement of the development hereby approved, a detailed
landscaping and planting scheme for the site shall be submitted for the written
agreement of the Council as Planning Authority. The scheme shall include details
of the height and slopes of any mounding or recontouring of the site, full details
of all hard landscaping proposals including materials and installation methods
and, species, height, size and density of trees and shrubs to be planted. The
scheme as subsequently approved shall be carried out and completed within the
first available planting season (October to March) after the completion or bringing
into use of the development, whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied in writing to the Council
as Planning Authority within 7 days of that date. The scheme as agreed and
implemented shall thereafter be maintained to the satisfaction of the Council as
Planning Authority. 
Reason - In the interests of visual amenity and to ensure the satisfactory
implementation of the proposed planting scheme. 
4.  All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
5.  Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works out with these times
or at any time on Sundays or bank holidays (as identified by Scottish
Government). 
Reason - In order to safeguard the residential amenity of the area. 
6.  Prior to the occupation of any dwellinghouse approved as part of this permission,
a Real Time Passenger Information Display Screen will be supplied and installed
at the bus stop at Meigle Post Office, or another location as agreed with the
Public Transport Unit. 
Reason - To encourage the use of sustainable transport to and from the
development site. 
7. No part of the development shall be occupied until a Residential Travel Plan
(RTP), aimed to encourage more sustainable means of travel, has been
submitted to and agreed in writing by the Council as Planning Authority. The RTP
will have particular regard to provision for walking, cycling and public transport
access to and within the site and will identify the measures to be provided, the
system of management, monitoring, review, reporting and the duration of the
plan. 
Page 82 of 172

Page 83

Reason - To promote sustainable transport options and to meet advice within
Scottish Planning Policy on transport. 
8. Prior to the commencement of the development hereby approved, the developer
shall submit for the further written agreement of the Council as Planning
Authority, in consultation with the Roads Authority (Structures), a Construction
Traffic Management Scheme (TMS) which shall include the following: 
(a)  restriction of construction traffic to approved routes and the measures to
be put in place to avoid other routes being used;
(b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c)  a code of conduct for HGV drivers to allow for queuing traffic to pass;
(d)  arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e)  emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f)  arrangements for the cleaning of wheels and chassis of vehicles to
prevent material from construction sites associated with the development
being deposited on the road;
(g)  arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
(h)  arrangements for signage at site accesses and crossovers and on roads
to be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road users of construction
traffic;
(j)  arrangements to ensure that access for emergency service vehicles are
not impeded;
(k) co-ordination with other significant developments known to use roads
affected by construction traffic;
(l)  traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m) the provision and installation of traffic counters at the applicant's expense
at locations to be agreed prior to the commencement of construction;
(n)  monitoring, reporting and implementation arrangements;
(o)  arrangements for dealing with non-compliance; and
(p)  details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to during the entire site
construction programme. 
Reason - In the interests of road safety. 
9.  Development shall not commence until the developer has secured the
implementation of a programme of archaeological work in accordance with a
Page 83 of 172

Page 84

Written Scheme of Archaeological Investigation (WSI) which has been submitted
by the developer and agreed in writing by the Council as Planning Authority, in
consultation with Perth and Kinross Heritage Trust (PKHT). Thereafter, the
developer shall ensure that the programme of archaeological works is fully
implemented including that all excavation, preservation, recording, recovery,
analysis, publication and archiving of archaeological resources within the
development site is undertaken. Should the archaeological works, as required by
the WSI, identify a requirement for post-excavation analysis, the development as
approved shall not be occupied or brought into use until a Post-Excavation
Research Design (PERD) has been submitted to and agreed in writing by the
Council as Planning Authority, in consultation with PKHT. The PERD shall be
carried out in complete accordance with the approved details. Furthermore, the
developer shall afford access at all reasonable times to PKHT or a nominated
representative and shall allow them to observe work in progress. 
Reason - To ensure a programme of archaeological works is carried out to
safeguard and record any archaeological remains within the development area. 
10.  Prior to the commencement of the development hereby approved, a Biodiversity
Enhancement Plan for the site shall be submitted for the written agreement of the
Council as Planning Authority. Thereafter, the agreed scheme shall be
implemented to the satisfaction of the Council as Planning Authority. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
C PROCEDURAL NOTES 
Permission shall not to be issued until the Section 75 Agreement has been
signed and registered to take account of this application. The legal agreement
should be concluded and completed within 4 months of the date of any
Committee approval. Failure to conclude a legal agreement within 4 months will
result in the planning application being re-assessed through failing to comply with
the associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers. 
D INFORMATIVES 
1.  Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
Page 84 of 172

Page 85

which may result in enforcement action being taken. Please use the form
attached herewith. 
2.  As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position. Please use the form attached herewith. 
3.  This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time. The required information must be
submitted via the ePlanning portal if your original application was lodged that
way, otherwise send it to us at developmentmanagement@pkc.gov.uk. Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request.
The Fees Charter is available on our website www.pkc.gov.uk. 
The Council has two months to consider the information. You should therefore
submit the required information more than two months before your permission
expires. We cannot guarantee that submissions made within two months of the
expiry date of your permission will be able to be dealt with before your
permission lapses. 
4. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act. 
5. The applicant should be aware of the requirements of the Council's Environment
and Regulatory Services in relation to waste collection from the site and should
ensure adequate measures are provided on site to  allow for the collection of
waste. 
6.  The applicant is advised to refer to Perth & Kinross Council's Supplementary
Guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. https://www.pkc.gov.uk/ldp2floodrisk 
7.  Application for a new postal address should be made via the Street Naming and
Numbering page on the Perth & Kinross Council website at www.pkc.gov.uk/snn.
Please note there is a charge for this service and submission cannot be made
until the relevant Building Warrant has been approved. 
8.  This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
Page 85 of 172

Page 86

amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
• development 
• Readily visible to the public
• Printed on durable material. 
9. No work shall be commenced until an application for building warrant has been
submitted and approved. 
10. This application was varied prior to determination, in accordance with the terms
of section 32A of the Town and Country Planning (Scotland) Act 1997, as
amended.  The variations incorporate changes to the layout and connections
through the site. 
11. The applicant is advised that any proposed signage will require a further
application to be submitted for advertisement consent unless it benefits from
express consent as per the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984. 
Background Papers:  61 letters of representation
Contact Officer:  Alex Gudgeon
Date:  29 September 2023 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 86 of 172

Page 87

22/01501/FLM
Erection of 90 dwellinghouses, 2 residential blocks comprising 10 flats, associated infrastructure, access, SUDS and
landscaping (in part, allocated site H69) at Land 150 Metres South of Station House, Forfar Road, Meigle
Planning and Placemaking
Committee - 11 October 2023
Created by Kirsty Strong on 14 September 2023
© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:10000
5(1)(ii)
Page 87 of 172

Page 88

Page 88 of 172

Page 89

22/01501/FLM
Erection of 90 dwellinghouses, 2 residential blocks comprising 10 flats, associated infrastructure, access, SUDS and
landscaping (in part, allocated site H69) at Land 150 Metres South of Station House, Forfar Road, Meigle
Planning and Placemaking
Committee - 11 October 2023
Created by Kirsty Strong on 14 September 2023
© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:5000
5(1)(ii)
Page 89 of 172

Page 90

Page 90 of 172

Page 91

Perth and Kinross Council
Planning and Placemaking Committee – 11 October 2023
Report of Handling by Head of Planning & Development
(Report No. 23/271) 
PROPOSAL: Formation of a 49.99MW battery energy storage compound
comprising battery storage units, ancillary buildings and
equipment, bogland restoration, landscaping and associated
works 
LOCATION: Shindour, Feddal Hill Wood, Braco 
Ref. No: 22/02231/FLM
Ward No: P7 – Strathallan 
Summary 
This report recommends approval of the application, subject to a number of planning
conditions. The development is considered to comply with the relevant provisions of
the Development Plan and there are no material considerations which outweigh the
Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 This application seeks detailed planning permission to construct and operate an
energy storage facility immediately to the northeast of the existing Beauly Denny
transmission line at the Braco West substation. The site is located in Feddal
Forest on Feddal Hill, within an area previously planted with Sitka spruce trees
which were felled around 10 years ago by SSE as part of its work on the adjacent
electricity sub-station and pylon lines. The site of 0.7 hectares lies some 3.8km to
the west of Braco, 6.8km north of Dunblane and the nearest residential property
of Bentick Farm is 1.2km to the south. 
2 The proposed energy storage facility would accommodate up to 50 battery storage
units housed within steel shipping containers with associated inverter/transformer
units and ancillary structures including a store, office, parking and electrical control
building. The area which would be developed extends to 7,329m2. The site would
be surrounded by landscaping consisting of native trees along with an inner
security fence along with a drainage swale. An area to the north of the site would
be restored as bog habitat. 
3 The proposed energy storage facility of 49.9MW would provide rapid-response
electrical backup to the electricity grid. It would draw electrical power from the
5(1)(iii)
Page 91 of 172

Page 92

electricity grid and then store it. The storage of electricity is regarded as a
generation activity, however, the electrical power would be drawn power from the
electricity grid and stored, for release back into the grid when required. 
4 The proposed development will be accessed from an existing minor road and
forestry track to the south, connecting the site with the B5033 road at the Muckle
Burn. The route is 3.9km in length and has been upgraded to accommodate the
substation construction traffic and forestry equipment and timber lorries including
the provision of passing places. 
5 The proposed development would be temporary in nature, with consent being
sought for an operational period of up to 50 years. After this period the site would
be decommissioned and restored to blanket bog. 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
6 An EIA screening has been undertaken as part of this submission, concluding
that an EIA was not required, as the proposal was not considered likely to have
significant environmental effects. Nevertheless, a combined suite of supporting
environmental information was included in the supporting information, including
assessment of the following areas: 
• Transport
• Ecological Appraisal
• Sustainability including Carbon Assessment
• Construction and Environmental Management Plan (CEMP)
• Peat Management Plan
• Supporting Statement including Design and Access Statement; Landscape and
Visual Impact Assessment; Noise & Lighting Assessment 
Pre-Application Consultation 
7 The proposed development is a ‘Major’ development, in terms of the Town and
Country Planning (Hierarchy of Developments) (Scotland) Regulations 2009,
due to the potential energy storage capacity proposed. The applicant was
therefore required to undertake formal pre-application consultation with the local
community. The approach followed current Scottish Government guidance,
included a dedicated website for the project and two online events on
27 January 2022 and 17 February 2022 with a live presentation and question
and answer session. The Ward Councillors, MSP, MP, and Braco &
Greenloaning Community Council were advised of the event, alongside relevant
material being made available, both before and beyond the proposed online
events, all to give the public the best possible opportunity to have input.
Interested parties and landowners within a 500m radius of the site and those
that share the access route off the B8033 were contacted directly by the
developer. 
Page 92 of 172

Page 93

8 The submitted Pre-Application Consultation (PAC) Report identified that a single
member of the public attended each of the two consultation events, representing
other family members in each case. Each attendee was broadly supportive of the
proposal but expressed concerns with regard to potential traffic impact on local
roads through the construction phase. The developer has also engaged directly
with two other households in the vicinity of the development, following a request
for further information and queries regarding the ongoing maintenance of the
access route both during and following construction. No submissions or
representations have been made to the developer by any members of the public
or other consultees. The content and coverage of the community consultation
exercise is considered sufficient and proportionate. 
NATIONAL POLICY AND GUIDANCE 
9 The Scottish Government expresses its planning policies through The National
Planning Framework, the Scottish Planning Policy, Planning Advice Notes,
Creating Places, Designing Streets, National Roads Development Guide and a
series of Circulars.    
Planning Advice Notes 
10 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 3/2010 Community Engagement
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 69 Planning and Building standards Advice on Flooding
• PAN 75 Planning for Transport
• PAN 77 Designing Safer Places 
DEVELOPMENT PLAN 
11 The Development Plan for the area comprises NPF4 (as mentioned above) and
the Perth and Kinross Local Development Plan 2 (2019). 
National Planning Framework 4 
12 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces. 
13 The National Planning Framework 4 (NPF4) was approved by the Scottish
Parliament on 11 January 2023. NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan.
Page 93 of 172

Page 94

14 In this instance the primary policies relevant seek to encourage, promote and
facilitate development that meet with the six overarching spatial principles, which
include: local living, compact urban growth and the creation of sustainable and
liveable places. This development proposal accords with the principal intentions
of this document.   
15 The Council’s assessment of this application has considered the following
policies of NPF4: 
16 The principal relevant policies are, in summary; 
• Policy 1: Tackling the Climate and Nature Crisis
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 11: Energy
• Policy 13: Sustainable Transport
• Policy 18: Infrastructure First
• Policy 22: Flood Risk and Water Management
• Policy 23: Health and Safety 
Perth and Kinross Local Development Plan 2 2019 
17 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
18 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 33B: Repowering and Extending Existing Facilities
• Policy 35: Electricity Transmission Infrastructure
• Policy 39: Landscape
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 41: Biodiversity
Page 94 of 172

Page 95

• Policy 51: Soils
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 54: Health and Safety Consultation Zones
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
OTHER POLICIES 
19 Statutory Supplementary Guidance 
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
Site History 
20 05/01911/FUL Planning Permission for construction of 275/33kv electricity
substation, associated building and temporary storage areas, site huts,
upgrading/widening works to existing private access road and improvements to
junction where access road meets the B8033. Approved April 2006
21 13/01036/FLL Planning Permission for formation of a temporary works
compound and topsoil storage area. Approved July 2013 
22 14/01758/FLL Planning Permission for permanent retention of temporary access
track constructed as part of Beauly-Denny overhead power line. Approved
December 2014 
23 15/00470/FLL Planning Permission for erection of substation control building,
formation of access road and associated works. Approved June 2015 
24 16/01719/PN Prior Notification for formation of a forestry track. Approved
November 2016. 
25 17/01810/FLL Planning Permission for formation of an energy storage facility,
vehicular access, and associated works. Approved November 2017. 
26 20/00013/PAN Proposal of Application Notice for formation of an energy storage
facility comprising control building, battery storage container units, ancillary
equipment, parking, boundary treatments, landscaping, and associated works.
Approved February 2021. 
27 21/00756/FLM Formation of a 49.9MW energy storage facility comprising 50
battery storage container units, control building, ancillary equipment, parking,
Page 95 of 172

Page 96

access track, boundary treatments, landscaping and associated works. Approved
December 2021. 
28 21/00020/PAN Formation of a battery energy storage compound comprising
battery storage units, ancillary buildings and equipment, landscaping and
associated works. Approved February 2022. 
CONSULTATIONS 
29 As part of the planning application process the following bodies were consulted: 
External 
30 Scottish Environment Protection Agency: No objection following submission
of additional information. Condition recommended regarding peat management. 
31 NatureScot: No objection. 
32 Scottish Water: No objection. 
33 Transport Scotland: No objection, subject to planning conditions in respect of a
Construction Traffic Management Plan (CTMP). 
34 Scottish Forestry: No response. 
35 Braco and Greenloaning Community Council: No response. 
Internal 
36 Planning and Housing Strategy: No objection, subject to condition. 
37 Community Greenspace: No response. 
38 Transportation and Development: No objection, subject to condition. 
39 Structures and Flooding (Structures): No objection. 
40 Biodiversity/Tree Officer: No objection following submission of additional
information. A number of biodiversity maintenance and enhancement conditions
are recommended. 
41 Environmental Health (Noise Odour): No objection. Planning conditions are
requested in respect of controlling noise levels and hours of construction
operations. 
Page 96 of 172

Page 97

Representations 
42 None. 
ADDITIONAL STATEMENTS
43
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not Required
Appropriate Assessment under Habitats
Regulations
AA Not Required
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact eg
Flood Risk Assessment
• Ecological Appraisal 
• Habitat Assessment 
• Habitat Management Plan
• Draft Peat Management
Plan Carbon Assessment 
• Supporting Statement
including Noise. Lighting,
Transport, Heritage and
Landscape and Visual
Impact 
APPRAISAL 
44 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4 and the Perth and
Kinross Local Development Plan 2019.  The relevant policy considerations are
outlined in the policy section above and are considered in more detail below.  In
terms of other material considerations, this involves considerations of the
Council’s other approved policies and supplementary guidance, namely
Developer Contributions and Placemaking. 
Principle 
45 National and Local Planning Policies support the shift from fossil-fuels to
renewable and low carbon energy sources. The principal policy considerations
are NPF4 Policy 11 Energy which supports all forms of renewable, low-carbon
and zero emissions technologies including battery storage, Policy 11a (iii) refers.
LDP Policy 33A supports new proposals subject to an assessment of individual
and cumulative effects of developments on amongst other factors the natural and
built heritage, the amenity of neighbouring uses and traffic generation. LDP
Page 97 of 172

Page 98

Policy 33B specifically encourages low carbon energy solutions where specific
grid connection or the use of established infrastructure can occur. 
46 The proposal is located on class 5 carbon rich soils. Policy consideration
includes NPF4 Policy 5 which allows development proposals for essential
infrastructure where there is a specific locational need and no other suitable site,
and the generation of energy from renewable sources on valued soils and there
is secure provision for restoration only. National policy aligns with LDP Policy 51:
Soils. 
47 Whilst the proposal is not itself categorised as a renewable energy generator, its
role in enabling better and more efficient use of energy and renewable
technologies is acknowledged. This approach accords with the above objectives,
in terms of minimising the causes of climate change through assisting with the
efficient use of the energy generation from renewables and enabling the
temporary storage of surplus energy generated from a diverse range of
technologies. 
48 LDP2 Policy 33A implicitly supports the principle of energy storage as a means of
assisting grid balancing, subject to several criteria. Relevant to this site are visual
amenity, noise, and landscape impact. Overall, it is considered that the proposal
will contribute towards meeting carbon reduction and renewable energy
generation targets. 
49 In terms of the specific locational need for an energy storage facility, it is
accepted that available site locations are largely dependent on proximity to
existing grid infrastructure. In this case the principal site selection reason is its
proximity to the existing Braco West substation, which offers a nearby grid
connection. 
50 The proposal would provide essential energy balancing services to the National
Grid, actively contributing towards Scotland's CO2 reduction targets. Specifically,
electricity would be drawn from the Grid at times of low demand, stored and
released back as required. When demand is higher, greater generation from non-
renewable sources is required. Energy storage facilities such as that proposed
could help reduce reliance on non-renewable resources, decreasing CO2
emissions. The application supports the move to a greater reliance of renewable
energy. There is an established need and site-specific reasoning for this
essential infrastructure development to be positioned in this location. 
51 In conclusion it is accepted that there is a specific, locational need for the
proposed development due to the proximity to Braco West substation. This
development addresses the objectives of NPF4 Policy 11 and LDP2 Policies 33
and 51 for development of this type to help make more efficient use of the energy
generated by renewables. 
Page 98 of 172

Page 99

Design and Layout 
52 The proposed design and layout primarily reflect the physical and engineering
requirements to deliver and service an energy storage facility of this scale. The
specification of the development is consistent with industry standards and other
approved battery storage sites in Perth and Kinross. In physical terms, the
structures and engineered boundary treatment are primarily below 3m in height
(with the exception of the control building roof which reaches a height of 4.99m to
ridge). The resultant horizontal massing is therefore more significant than vertical
impacts. 
53 These visual impacts are further considered in the Landscape and Visual
Amenity section below. Internally within the site, separation between each
container is maintained for installation and maintenance purposes. The final
detailing, colour and material finishes of the proposed infrastructure, including
landscape boundary details are proposed to be controlled via conditions
(Conditions 9 and 20). Subject to verification of this final detail, the proposed
development is considered consistent with NPF4 Policy 14 and LDP2 Policy 1. 
Landscape and Visual Amenity 
54 There is no specific landscape policy in NPF4, however, Policy 4(a) states that
development proposals which have an unacceptable impact on the natural
environment will not be supported. In terms of the LDP2, Policies 1 and 39
require developments to contribute positively to the quality of the surrounding
built and natural environment and to not conflict with maintaining and enhancing
the landscape qualities of Perth and Kinross. 
55 LDP2 Policy 39 also seeks to safeguard and enhance landscape character and
green infrastructure. In this instance, the proposed design is largely set by
technical requirements, type of equipment and infrastructure required for
electricity storage. Given the rural landscape and location the visual impact of the
proposal is largely minimal as it will be surrounded by a coniferous tree plantation
and is less intrusive when compared to the adjacent substation. 
56 In association, LDP2 Policy 1B requires consideration to be given to a proposal’s
visual impact and landscape setting. In terms of enhancement and mitigation,
LDP2 Policy 40 supports planting of new trees and woodlands and new
landscape planting around the perimeter of the site is proposed. 
57 The visual impact during construction will be temporary and the proposed design,
existing and proposed woodland planting is considered robust and appropriate
mitigation for the resultant visual impact, subject to further conditional control
(Condition 9) to secure the detailing and timing for delivery, satisfying the terms
of NPF4 Policy 4 and LDP2 Policies 1 and 39. 
Page 99 of 172

Page 100

Residential Amenity 
58 In respect of residential amenity, NPF Policy 14 aligns with LDP2 Policy 55 which
seeks to avoid proposals which result in lighting with obtrusive and/or intrusive
effects. Additionally, NPF Policy 23 aligns with LDP2 Policy 56 which sets a
presumption against siting of development proposals involving elevated levels of
noise in the locality of existing or proposed noise sensitive land uses. The
context sees the closest residential properties of Tamano and Bentick Farm over
1km south east of the proposed site. 
Lighting 
59 The applicant has confirmed within the Supporting Statement that there will be
no permanent lighting within the site and that the only lighting will be motion-
sensitive lighting at the entrances to the various buildings and storage units.
They will also be downward facing to minimise light spillage. Environmental
Health have no adverse comments on this aspect of the proposal and no
condition has been requested. Therefore, the proposal is considered to comply
with NPF4 Policy 14 and LDP2 Policy 55. 
Noise 
60 Within the applicants Supporting Statement it states that the proposed energy
units will be acoustically enclosed to attenuate noise and meet the day and night-
time requirements for the nearest residential properties. The potential noise
emissions at the closest receptors of Tamano and Bentick Farm are over 1km
away and given the distance and forest landscape/topography the predicted
impact will not exceed any background levels. Operational vehicle movements
will be limited to occasional maintenance visits. Environmental Health agree but
recommend a standard noise condition is applied and is in line with similar
applications in the area (Condition 7). 
61 In terms of installation impact, this will be temporary. Environmental Health
recommend construction works shall be limited to Monday to Friday 0700 hours
to 1900hours and Saturday 0800 hours to 1300 hours with no noisy works out
with these time or at any time on Sundays or bank holidays. (Condition 8). 
62 Overall, Environmental Health have, subject to planning conditions, raised no
concerns over the potential for adverse noise and lighting impact on residential
properties (Conditions 7 and 8). The proposal is therefore considered to comply
with LDP2 Policies 55 and 56, with no unacceptable impact on the amenity of
residential properties. 
Roads and Access 
63 NPF4 Policy 13 aligns with LDP2 Policy 60 which requires local road networks
and accessibility requirements are sufficient and capable of absorbing traffic
Page 100 of 172

Page 101

generated by development, and also that satisfactory access is provided. Neither
Transport Scotland nor PKC Transport Planning have raised concerns in relation
to transport or access arrangements, either during construction or during
operation. 
64 It is recognised that the access route off the B8033 road to the proposed site and
existing substation also provides access to five residential properties. The access
route already serves the existing substation and, following installation of the
battery storage facility, the traffic impact will be minimal. 
65 Both Transport Scotland and Transport Planning recommend that construction
traffic be controlled to ensure suitable arrangements and routes are in place
(Conditions 4 and 5). Subject to compliance with these conditions, the impact on
the residents that share the access road will be minimised. The proposals are
considered to be in accordance with NPF4 Policy 13 and LDP2 Policy 60. 
Drainage and Flooding 
66 In respect of the flood risk and drainage, there are no flooding concerns identified
within the site. The requirements for sufficient surface water and SUDs detailing
can also be addressed in advance of development commencing (Condition 19).
The proposals are therefore considered to satisfy NPF Policy 22 and LDP2
Policy 53. 
Biodiversity and Woodland 
67 NPF4 Policies 1, 3, 4 and 6 and LDP2 Policies 38, 40 and 41 are all relevant
considerations in respect of potential biodiversity impacts or for identifying
opportunities arising from the development. It is noted that the proposed
development is on a recently felled commercial forestry plantation. Whilst we
usually require compensatory planting for trees lost in development, it is
important that no further tree planting takes place in the bog restoration
area. Any tree restocking will impact the drainage and water availability to the
site and the peatland restoration areas. NPF4 Policy 6 and LDP2 Policy 40 is
therefore complied with. 
68 NPF4 Policy 3 and LDP2 Policy 41 seeks to protect and enhance all wildlife and
habitats. It advises that planning permission will be granted where evidence is
provided to show there is no adverse effect on ecological interests. The applicant
has submitted an Ecological Appraisal and Habitat Survey which have been
assessed by the Councils Biodiversity/Tree Officer and ensure there will be no
adverse impact on protected species and reptiles. A number of conditions have
been recommended to ensure compliance with NPF4 Policy 3 and LDP2 Policy
41. (Conditions 12, 13, 15, 16, 17,18). 
Page 101 of 172

Page 102

Soil and Peatland 
69 NPF4 Policy 5 and LDP2 Policies 33A and 51 are relevant considerations in
respect of protecting carbon rich soils, restoration of peatlands and to minimise
disturbance of soils from development. Development is only permitted in certain
circumstances. To address this policy full information on the peat must be
provided. A draft peat management plan (PMP) has been provided as part of the
submitted draft Construction and Environmental Management Plan (CEMP). This
includes a peat survey. 
70 The draft PMP outlines that the site is underlain by peat and peaty soils which
are likely to have supported blanket bog habitat prior to being drained and
subsequently planted for commercial forestry. The draft PMP outlines that the
remaining peat within the site is shallow and degraded, and the peat depth
survey of the site indicates that peat depths are between 0.5m and 1m across
the majority of the site. The draft PMP identifies the extent of peat to be
excavated as a result of construction work, and how the excavated peat will be
reused within the site, namely in relation to the proposed bog restoration to the
north of the site. Further detailed information – through a finalised PMP – should
identify the finalised methods to be used to prevent or minimise the volumes of
extracted peat during the construction process. 
71 Carbon-rich soils are those with any surface organic (peaty or peat) layer.  Peat
in the Scottish soil classification is soil with more than 60% organic carbon and
exceeding 50cm in thickness. 
72 The proposed development is located on Class 5 soil (defined in the Carbon and
Peatland 2016 Mapping) which has little or no hazard of erosion and is mainly
used for pasture, forestland, and food for wildlife. In class 5 we are often looking
at forested sites where the land has been subject to disturbance through
drainage, furrowing, nutrient enrichment added at the time of tree planting and
then subsequent drying out as trees mature and then, in this case, clear felling
and replanting. Ecologically speaking the site may still be underlain with a
carbon-rich soil and that could be classed as peat and may even be quite deep in
parts but it’s no longer functioning as an ecologically intact peatland habitat.
Restoration to a functioning peatland may not be possible. 
73 In terms of Classes 1 and 2 we are concerned with which would be considered to
be of high conservation value and restoration potential. If we consider the
mitigation hierarchy (referred to in NPF4 policy 5a (i)) avoidance, minimisation,
restoration and offset. Just based on the mapping alone the proposal has
avoided areas of peatland in Classes 1 and 2. Section 3.2 in the Applicant’s
Habitat Survey describes the Carbon and Peatland 2016 map being used to
avoid Class 1 and 2 peatlands. The subsequent sections go on to describe the
habitats found in the wider survey area. The habitats found on the construction
site are ‘other coniferous woodland’ (figure 5). Some wet heath is located just
outwith the red line occupying an old forest ride. The site does not contain any
Page 102 of 172

Page 103

priority peatland habitats and with the influence of afforestation and subsequent
forestry operations the site does not support peatland habitats. 
74 NatureScot guidance on advising on peatlands specifies that if the proposed
development avoids priority peatlands habitats but the soils are still carbon-rich
or ‘peat’ then are they able to mitigate the impacts on this soil resource.
NatureScot guidance suggests; - 
Impacts on peatland can be reduced by:
▪ conducting detailed habitat surveys and peat depth surveys; 
▪ avoiding deeper peat and sensitive habitat;
▪ carefully planning drainage on the site and ensuring good maintenance of
mitigation measures on site. 
75 Disturbance of carbon rich soils, as set out in LDP2 Policies 33A and 51 should
be avoided. A Peat Survey and Draft Peat Management Plan have been
submitted and assessed by the Council, SEPA and NatureScot. Probing the soil
they have found depths of peat/carbon rich soil varying between 20 cm – 110 cm.
So, some deeper peat soils will be impacted. 
76 LDP2 Policy 51 also states that the Council is committed to ensuring that
development avoids disturbance to, and the loss of, carbon rich soils, including
peatland, which are of value as carbon stores. Development will only be
permitted on areas of carbon-rich soils, including peatland, where it has been
clearly demonstrated that there is no viable alternative, or where the economic
and social benefits of the development would outweigh any potential detrimental
effect on the environment. Where exceptions allow for development that would
disturb carbon rich soils, development should be informed by: 
• an appropriate peat survey and management plan;
• any disturbance or excavation be minimised; and
• an assessment of the likely effects of the development on carbon dioxide
emissions, and suitable mitigation measures implemented to
• minimise carbon emissions (with details of both submitted as part of the
application);
• details setting out how the development could contribute towards local or
strategic peatland habitat enhancement or restoration 
77 In offsetting the loss of peat, LDP2 Policy 51 then requires development to
implement appropriate peat management measures, adopt best practice when
moving, storing, and reinstating peat and consider the opportunity to re-use peat
necessarily excavated from the site. These requirements are proposed to be
secured via Condition 14 to addresses restoration, decommissioning and a
quantification of carbon loss and to demonstrate that the long term benefit will be
a significant biodiversity enhancement. 
Page 103 of 172

Page 104

78 Similarly, NPF4 Policy 5 intent is ‘to protect carbon-rich soils, restore peatlands
and minimise disturbance to soils from development’. And Policy 5d indicates
that where carbon-rich soils could be impacted assessments are needed, which
in this case the Applicant has done. The habitats survey, the peat depth plan and
their Draft Construction and Environmental Management Plan and Peat
Management Plan include an assessment of peat and options for reuse of the
peat which has been identified as bog restoration to the north of the site.   
79 The remaining surplus peat (88m3) is proposed for use in ditch blocking and bog
restoration within the area of recently felled plantation immediately to the north of
the site. Surplus peat will be used to block existing drains within the area, in
combination with sleeper dams and coir matting, to assist with the re-wetting of
the area. Bog restoration is welcomed but restoration to a fully ecologically
functioning bog could take a very long time, however, if the ground can be
sufficiently re-wetted through blocking of drainage, as noted above, this does
give a chance of sphagnum species re-establishing and it is these key species
that, through time and their own very slow decomposition, form peat. Monitoring
to check the restoration is being effective will be required. This, however, can be
controlled through condition. The applicant should refer to established guidance
on forest to bog restoration in preparing their detailed Peat Management Plan
and CEMP (required under Conditions 11 and 14). 
80 NPF4 does place more of a spotlight on soils and carbon-rich soils but across
Scotland carbon-rich and peat soils can be found that no longer support the peat
forming vegetation they used to, particularly true of afforested sites which can
often be found on sites with underlying carbon-rich soils. Sites like these that do
not support the peatland habitats anymore are not priority peatland habitats and
are not nationally significant. It might be possible to restore them but it may take
longer to do so given that the habitats and species associated with peat
formation are no longer present. 
81 The applicant has used the mitigation hierarchy in their approach and is
proposing compensation. If the bog restoration is successful in rewetting some of
the site to the north it is likely that this would offer a biodiversity benefit in
diversifying the type of habitats found locally which currently is a coniferous
forest with a very limited range of habitats. NPF4 Policy 5 and LDP2 Policies 33
and 51 have been satisfied. 
Carbon Impact 
82 The applicant has submitted a Peat Carbon Balance Assessment to inform the
wider carbon balance of the development project. This has been assessed by the
Council’s Strategy and Policy team. The summary of this assessment outlines
that the retention of all existing peat within the site, and the use of excavated
peat to restoring an adjacent area of damaged peatland will result in a significant
decrease in current carbon emissions from existing previously afforested
peatland, and the proposed peatland restoration will deliver carbon sequestration
Page 104 of 172

Page 105

within the managed area. In terms of supporting local peatland habitat
enhancement/restoration, it is noted that approximately half of the site is
proposed for bog restoration. 
83 The proposed construction of the project will lead to no net increase in carbon
emissions. The retention of all existing peat within the site, and the use of
excavated peat to restore an adjacent area of damaged peatland will result in a
significant decrease in current carbon emissions from the existing previously
afforested peatland. The proposed peatland restoration will deliver carbon
capture within the managed area. The proposal complies with NPF4 Policy 5 and
LDP Policy 51 as it will lead to peatland enhancement. 
Health and Safety 
84 National Grid advised that the access track crosses over their infrastructure. A
condition is recommended to ensure that there will be no risk of damage and
ensure compliance with NPF4 Policy 23 and LDP2 Policy 54 (Condition 6). 
Waste Collection 
85 There is minimal or no ongoing waste collection requirements anticipated post
construction. 
Developer Contributions 
86 No developer contributions are required for this type of development. 
Economic Impact 
87 In the short term, construction will create jobs with scope for local employment.
Beyond this, local employment opportunities will be limited. Holistically, however,
there is a clear fit between Scottish Government aims of promoting a transition to
a low carbon economy and this proposal. The proposal would directly support
local renewable energy generation, by helping balance fluctuations of intermittent
energy generation and more widely, assisting in the creation of a national grid
asset of regional significance for the Perth and Kinross Area. 
Lifespan of Facility 
88 Infrastructure developments of this nature tend to have a particularly long
lifespan and consideration should be given to the long-term maintenance and
eventual decommissioning of the proposal, including removal with site restoration
when not viable or obsolete. 
89 The lifespan of the facility has been proposed by the applicant to extend to 50
years. As such, a condition is proposed that places a simple requirement on the
operator/landowner that the site will be decommissioned and re-instated at the
Page 105 of 172

Page 106

end of the 50 year period (Condition 3) and should the energy storage facility (as
approved) not be in use for a continuous period of 12 months (Condition 21). 
Financial Provision 
90 Policy 33A(h) and NPF4 Policy 11(e), both of which note that financial
implications are to be factored in when considering site restoration plans and to
ensure these are financially safeguarded. NPF4 Policy 11(e) XII goes further and
states that consideration needs to be given to measures in place to safeguard or
guarantee availability of finances to effectively implement those plans. The Agent
has confirmed that the applicant has a funded agreement with the landowner to
restore the site, so restoration liabilities are covered, therefore, the submission of
this information can be secured by condition (Conditions 25 and 26). 
Decommissioning and Restoration 
91 Both the LDP2 and NPF4 require appropriate reinstatement of the site to be
undertaken.  The submission indicates that the battery energy storage units and
associated equipment will be removed from site and the site will be restored to
blanket bog, mirroring the area to the north of the site which is to be restored to
blanket bog throughout the construction phase of the development.  A condition
is recommended to ensure that full details of the restoration measures are
submitted for the approval of the Planning Authority prior to the works being
undertaken (Condition 23).  Condition 22 will also ensure that the restoration is
carried out in full within an appropriate timescale.  These conditions are
considered to meet the requirements of the LDP2 and NPF4 in terms of the
restoration of the site. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
92 None required. 
DIRECTION BY SCOTTISH MINISTERS 
93 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
94 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, and the adopted Local
Development Plan 2 (2019).  Account has been taken account of the relevant
material considerations and none has been found that would justify overriding the
Page 106 of 172

Page 107

Development Plan. The proposal will directly contribute towards meeting carbon
reduction and renewable energy generation targets. 
95 Accordingly the proposal is recommended for approval subject to the following
conditions. 
RECOMMENDATION   
Conditions and Reasons for Recommendation 
General 
1. This planning permission will last only for three years from the date of this
decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in terms of Section 58 of the Town and
Country Planning (Scotland) Act 1997, as amended by Section 32 of the
Planning (Scotland) Act 2019. 
2. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
3. The battery energy storage units and ancillary infrastructure shall be removed
from the site no later than 50 years after the date when the operation is first
brought into use unless otherwise approved by the Planning Authority through
the grant of a further planning permission following submission of an application.
Written confirmation of the commencement date of first operation shall be
provided to the Planning Authority within one month of that date. 
Reason - In order to limit the permission to the expected operational lifetime of
the battery storage units and to allow for restoration of the site in the event that
the use is not continued by a further grant of planning permission for a similar
form of development. 
Roads and Access 
4. Prior to the commencement of the development hereby approved, the developer
shall submit for the further written agreement of the Council as Planning
Authority, in consultation with the Roads Authority, a Construction Traffic
Management Scheme (CTMS) which shall include the following: 
Page 107 of 172

Page 108

(a) restriction of construction traffic to approved routes and the measures to be
put in place to avoid other routes being used;
(b) timing of construction traffic to minimise impact on local communities
particularly at school start and finishing times, on days when refuse
collection is undertaken, on Sundays and during local events;
(c) a code of conduct for HGV drivers to allow for queuing traffic to pass;
(d) arrangements for liaison with the Roads Authority regarding winter
maintenance;
(e) emergency arrangements detailing communication and contingency
arrangements in the event of vehicle breakdown;
(f) arrangements for the cleaning of wheels and chassis of vehicles to prevent
material from construction sites associated with the development being
deposited on the road;
(g) arrangements for cleaning of roads affected by material deposited from
construction sites associated with the development;
(h) arrangements for signage at site accesses and crossovers and on roads to
be used by construction traffic in order to provide safe access for
pedestrians, cyclists and equestrians;
(i) details of information signs to inform other road users of construction traffic;
(j) arrangements to ensure that access for emergency service vehicles are not
impeded;
(k) co-ordination with other significant developments known to use roads
affected by construction traffic;
(l) traffic arrangements in the immediate vicinity of temporary construction
compounds;
(m) monitoring, reporting and implementation arrangements;
(n) arrangements for dealing with non-compliance; and
(o) details of HGV movements to and from the site. 
The TMS as approved shall be strictly adhered to during the entire site
construction programme to the satisfaction of the Council as Planning Authority. 
Reason - To minimise interference with the safety and free flow of the traffic on
the access road off the B8033 road. 
5. Prior to the commencement of development, a comprehensive Construction
Traffic Management Plan shall be submitted for the approval of the Planning
Authority, after consultation with Transport Scotland. 
Reason - To minimise interference with the safety and free flow of the traffic on
the trunk road. 
Health and Safety 
6. Not less than two months from the date of this planning permission, a detailed
scheme for the management of vehicles crossing of the National Grid pipeline at
Easting 282178; Northing 709479 and any necessary reinforcement works of that
Page 108 of 172

Page 109

road and or crossing shall be submitted to, and approved in writing by, the
Planning Authority in consultation with National Grid. The scheme shall include
the frequency of vehicle movements during both the construction and operational
phases of development, specify vehicle weights and set out the technical
specification of the reinforcement works to the road or crossing point and their
delivery. Thereafter, the scheme shall be implemented in complete accordance
with the approved scheme and all reinforcement works complete prior to the
commencement of development hereby approved. 
Reason - In order to ensure that suitable vehicle crossing arrangements are
provided. 
Amenity 
7. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 20 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason - In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
8. Construction work shall be limited to Monday to Friday 0700 hours to 1900 hours
and Saturday 0800 hours to 1300 hours with no noisy works out with these times
or at any time on Sundays or bank holidays (as identified by Scottish
Government). 
Reason - In the interests of residential amenity; to ensure a satisfactory standard
of local environmental quality. 
Landscape 
9. Prior to the commencement of the development hereby approved, a detailed
boundary landscaping and planting scheme shall be submitted for the written
agreement of the Council as Planning Authority. The scheme shall include details
of the height and slopes of any mounding or recontouring of the site, full details
of all hard landscaping proposals including materials and installation methods
and, species, height, size and density of trees and shrubs to be planted. The
scheme as subsequently approved shall be carried out and completed within the
first available planting season (October to March) after the completion or bringing
into use of the development, whichever is the earlier, and the date of Practical
Completion of the landscaping scheme shall be supplied in writing to the Council
as Planning Authority within 7 days of that date. The scheme as agreed and
implemented shall thereafter be maintained by the site operator. 
Page 109 of 172

Page 110

Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
10. Any planting failing to become established within five years shall be replaced in
the following planting season with others of similar size, species and number to
the satisfaction of the Council as Planning Authority. 
Reason - In the interests of visual amenity and to ensure the satisfactory long-
term implementation of the proposed planting scheme. 
Ecology 
11. A minimum of two months prior to the commencement of development, a site-
specific Construction Environmental Management Plan (CEMP) which shall
include a Construction Method Statement (CMS) shall be submitted to and
approved by the Council as Planning Authority in consultation with key
stakeholders as deemed appropriate. The CEMP must also include a Pollution
Prevention Plan (PPP), Invasive Management Plan (IMP), Site Waste
Management Plan (SWMP), Site Access Management Plan (SAMP),
Construction Exclusion Zone (CEZ), Construction Traffic Management Plan
(CTMP), Environmental Management Plan (EMP). Proposed measures for bog
restoration methods, monitoring and ongoing long-term aftercare and
maintenance shall be included. Measures to ensure the public road network is
kept free from mud or debris shall also be required. The CEMP will remain a live
document, any working practices deemed to be having an adverse impact on
ecology or the environment will be the subject of revision. All revisions must be
submitted to the Planning Authority as soon as reasonably practicable.
Thereafter the development shall be fully undertaken in accordance with the
agreed CEMP. 
Reason - In the interest of protecting environmental quality and of biodiversity. To
minimise any associated adverse landscape and visual impact of the above
ground elements and protect the character and visual amenity of the immediate
and surrounding countryside and associated nature and cultural heritage
conservation interests. 
12. Prior to the commencement of the development hereby approved, an
independent and suitably qualified Ecological Clerk of Works (ECoW) shall be
appointed at the developers' expense. Details of this appointment shall be
subject to the prior written agreement of the Council as Planning Authority. The
appointed person will remain in post for the duration and subsequent restoration
of the proposed development. The ECoW shall have responsibility for the
following: 
(a) Overseeing the implementation of the Construction Environmental
Management Plan (CEMP) and habitat restoration approved by this
permission.
Page 110 of 172

Page 111

(b) Authority to stop operations or to alter construction methods should there be
any works occurring which are having an adverse impact on the natural
heritage.
(c) Prior to the commencement of development, they shall provide an
environmental / ecological toolbox talk for construction staff.
(d) They will have authority to amend working practices in the interests of
natural heritage. Any amendments shall be submitted to the Council as
Planning Authority as an addendum to the approved CEMP.
(e) They shall make weekly visits to the development site at a time of their
choosing. No notification of this visit is required to be given to the developer
or contractor.
(f) Within 10 working days of the end of each calendar month, they are
required to submit a detailed monthly report for the review of the Planning
Authority in consultation with Scottish Environment Protection Agency
(SEPA) for the duration of development.
(g) They shall notify the Council as Planning Authority in writing of any
requirement to halt development in relation to this condition as soon as
reasonably practicable. 
The above shall be implemented throughout the construction, (including re-
instatement and de-commissioning of the construction compounds) hereby
approved unless otherwise agreed in writing with the Council as Planning
Authority. The CEMP shall contain a site-specific Construction Method Statement
(CMS) which will provide concise details for the implementation of the CEMP for
site operatives. 
Reason - To avoid habitat damage and safeguard natural heritage interests. 
13. Measures to protect animals from being trapped in open excavations and/or pipe
and culverts shall be implemented for the duration of the construction works of
the development hereby approved. The measures may include creation of
sloping escape ramps for animals, which may be achieved by edge profiling of
trenches/excavations or by using planks placed into them at the end of each
working day and open pipework greater than 150 mm outside diameter being
blanked off at the end of each working day. 
Reason - In order to prevent animals from being trapped within any open
excavations. 
14. A minimum of two months prior to the commencement of development, a
Detailed Peat Management Plan shall be submitted for the written approval of the
Council as Planning Authority, in consultation with SEPA and the Council's
Biodiversity/Tree Officer, and all work shall be carried out in accordance with the
agreed plan. 
Reason - In the interests of protection of existing peatland. 
Page 111 of 172

Page 112

15. A minimum of two months prior to the commencement of development, an
updated Habitat Management Plan shall be submitted for the written approval of
the Council as Planning Authority, in consultation the Council's Biodiversity/Tree
Officer, and all work shall be carried out in accordance with the agreed plan. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
16. The conclusions and recommended action points within the supporting
Ecological Appraisal (October 2022) (drawing number 14) and Habitat Survey
(October 2022) (drawing number 15) submitted and hereby approved shall be
fully adhered to, respected, and undertaken as part of the construction phase of
development. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
17. Prior to the commencement of the development hereby approved, final details of
the proposed boundary fencing for the site shall be submitted for the written
agreement of the Council as Planning Authority. For the avoidance of doubt the
fencing will be required to be deer proofed. The scheme as subsequently agreed
shall be implemented prior to the completion or bringing into use of the
development, whichever is the earlier. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
18. Prior to the commencement of development, the developer shall provide full
written details of a scheme for mitigating any potential effects on reptiles on the
site during the construction and operation of the energy storage project. This
shall include: 
• The deployment and searching of artificial reptile refugia to allow the capture
and relocation to a suitable and safe area of reptiles within the site. Such
measures to be undertaken during the reptile active period of May to October
(inclusive).
• After an agreed period with no reptile captures, the site shall be cleared
outward to an agreed methodology from the site centre to allow any
remaining/undetected reptiles to disperse into adjacent habitats.
• The site shall then be maintained with no vegetation cover until construction
works commence.
• Habitat clearance works shall be undertaken during the reptile's active phase
i.e., April - October (inclusive).
• Details of proposals for the creation of reptile hibernacula within the site. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
Page 112 of 172

Page 113

Drainage 
19. Development shall not commence on site until a detailed sustainable urban
drainage system (SUDS) has been submitted for the further written agreement of
the Council as Planning Authority, in consultation with SEPA where necessary.
The scheme shall be developed in accordance with the technical guidance
contained in The SUDS Manual (C753) and the Council's Flood Risk and Flood
Risk Assessments Developer Guidance and shall incorporate source control. All
works shall be carried out in accordance with the agreed scheme and be
operational prior to the bringing into use of the development. 
Reason - To ensure the provision of appropriate and effective drainage for the
site. 
Finishes 
20. Prior to the commencement of the development hereby approved, details of the
specification and colour of the proposed external finishing materials to be used
shall be submitted to and agreed in writing by the Council as Planning Authority. 
The scheme as agreed shall be implemented prior to the completion or bringing
into use of the development, whichever is the earlier. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of
local environmental quality. 
Project Lifespan and Site Aftercare 
21. In the event the hereby approved development fails to store electricity on a
commercial basis for a continuous period of 12 months, then it shall be deemed
to have permanently ceased to be required. In such an event, the development
shall be decommissioned, and the relevant parts of the site brought into an
agreed condition within such timescale as agreed in writing by the Council as
Planning Authority. 
Reason - To ensure the facility is removed from the site at the end of its
operational life, to ensure no adverse impact on the visual amenity of the area
and a satisfactory standard of local environmental quality. 
Restoration 
22. The restoration of the site shall be completed in full within 12 months of its
decommissioning and shall be undertaken in full accordance with the submitted
restoration scheme to be approved under conditions 23 and 24 of this permission
and shall thereafter be maintained to the satisfaction of the Council as Planning
Authority. 
Reason - In the interests of visual and residential amenity.
Page 113 of 172

Page 114

23. Within 6 months of the date of this decision notice, a detailed decommissioning
and restoration scheme for the application site shall be submitted to and
approved in writing by the Planning Authority. The scheme shall set out the
means for restoring the site to blanket bog following the removal of the
components of the development. The applicants shall obtain written confirmation
from the Planning Authority that all decommissioning has been completed in
accordance with the approved scheme and (unless otherwise dictated through
the grant of a new planning permission for a similar form of development) the
restoration of the site shall be implemented in accordance with the approved
details and in accordance with the timescales outlined in condition 22 of this
permission and in any case before the expiry of the time period set by condition 3
of this planning permission. 
Reason - In the interests of visual and residential amenity. 
24. Prior to the commencement of the final restoration and re-instatement of the
application site as required by conditions 22 and 23 of this permission a detailed
scheme with final contours and an aftercare management plan for the site shall
be submitted to and approved in writing by the Planning Authority. Thereafter the
approved scheme shall be implemented in full.  
Reason - To ensure that final contours and an updated restoration plan and
aftercare plan are submitted prior to the site ceasing operation thereby ensuring
appropriate restoration in the interests of visual amenity and to minimise impacts
on the landscape. 
25. Prior to the commencement of any development on site, the following shall be
submitted to the Council as Planning Authority: 
a)  Details of a bond or other financial instrument which will ensure that
sufficient funds are available to meet the cost of implementing the removal
of all development granted by this permission and the approved restoration
scheme (relating to Conditions 23 and 24).
b)  Confirmation by an independent Chartered Surveyor (whose appointment
for this task has been approved by the Council as Planning Authority) that
the amount of the bond or financial instrument is sufficient to meet the cost
of the removal of all development granted by this permission and the site's
restoration. 
Reason - To ensure that at all times there are sufficient funds available to ensure
that the removal of all development and site restoration can occur. 
26. The approved bond or financial instrument shall be maintained throughout the
duration of the operation of the development hereby approved. At five-yearly
intervals (as a minimum) from the commencement of the development, an
independent review of the approved bond or financial instrument shall be carried
out and submitted to the Council as Planning Authority. The Council as Planning
Page 114 of 172

Page 115

Authority may direct that the approved bond or financial instrument be amended
if this is necessary to ensure that funds remain sufficient to cover the removal of
all development granted by this permission and the site's restoration. 
Reason - To ensure that at all times there are sufficient funds available to ensure
that the removal of all development and site restoration can occur. 
B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
C PROCEDURAL NOTES 
None. 
D INFORMATIVES 
1. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the
Planning Authority prior written notification of the date on which it is intended to
commence the development. A failure to comply with this statutory requirement
would constitute a breach of planning control under section 123(1) of that Act,
which may result in enforcement action being taken. Please use the form
attached herewith. 
2. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
3. This development will require the 'Display of notice while development is carried
out', under Section 27C(1) of the Town and Country Planning Act 1997, as
amended, and Regulation 41 of the Development Management Procedure
(Scotland) Regulations 2013. The form of the notice is set out in Schedule 7 of
the Regulations and a draft notice is included for your guidance. In accordance
with Regulation 41 the notice must be: 
• Displayed in a prominent place at or in the vicinity of the site of the
development 
• Readily visible to the public 
• Printed on durable material. 
4. This planning permission is granted subject to conditions, some of which require
further information to be submitted to Development Management either before
works can start on site or at a certain time.  The required information must be
submitted via the ePlanning portal if your original application was lodged that
Page 115 of 172

Page 116

way, otherwise send it to us at developmentmanagement@pkc.gov.uk. Please
be aware that a fee is payable in respect of each request made, though there is
no limit to the number of conditions that can be discharged in a single request.
The Fees Charter is available on our website www.pkc.gov.uk. The Council has
two months to consider the information. You should therefore submit the required
information more than two months before your permission expires.  We cannot
guarantee that submissions made within two months of the expiry date of your
permission will be able to be dealt with before your permission lapses. 
5. An application for Building Warrant may be required. 
6. The applicant is reminded that, under the Wildlife and Countryside Act 1981, as
amended (section 1), it is an offence to remove, damage or destroy the nest of
any wild bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act. 
7. The applicant is reminded that, should any protected species be present a
licence may be required from NatureScot to disturb a protected species. Failure
to obtain a licence may constitute a criminal act under the Habitats Regulations
and penalties are severe for non-compliance. 
8. Trees and scrub are likely to contain nesting birds between 1st March and 31st
August inclusive. Trees and scrub are present on the application site and are to
be assumed to contain nesting birds between the above dates. The applicant is
reminded that, under the Wildlife and Countryside Act 1981, as amended
(section 1), it is an offence to remove, damage or destroy the nest of any wild
bird while that nest is in use or being built. Planning permission for a
development does not provide a defence against prosecution under this Act. 
9. The applicant should take note of the information and advice contained within the
consultation response from Scottish Water. 
10. The applicant should take note of the information and advice contained within the
consultation response from Natural Gas. 
Background Papers:  No letters of representation.
Contact Officer: Gillian Peebles
Date: 29 September 2023 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 116 of 172

Page 117

22/02231/FLM
Formation of a 49.99MW battery energy storage compound comprising battery storage units, ancillary buildings
and equipment, bogland restoration, landscaping and associated works Shindour Feddal Hill Wood, Braco
Planning and Placemaking
Committee - 11 October 2023
Created by Kirsty Strong on 14 September 2023
© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:15000
5(1)(iii)
Page 117 of 172

Page 118

Page 118 of 172

Page 119

22/02231/FLM
Formation of a 49.99MW battery energy storage compound comprising battery storage units, ancillary buildings
and equipment, bogland restoration, landscaping and associated works Shindour Feddal Hill Wood, Braco
Planning and Placemaking
Committee - 11 October 2023
Created by Kirsty Strong on 14 September 2023
© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:10000
5(1)(iii)
Page 119 of 172

Page 120

Page 120 of 172

Page 121

Perth and Kinross Council
Planning and Placemaking Committee – 11 October 2023
Report of Handling by Head of Planning & Development
(Report No. 23/272) 
PROPOSAL: Change of use of storage shed to form a shop, siting of a
workshop unit for furniture recycling/restoration, formation of
parking area and associated works 
LOCATION: Land north east of Causeway Cottage, Scotlandwell, Kinross,
KY13 9JQ 
Ref. No: 23/01044/FLL
Ward No: P8- Kinross-shire 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The application is for change of use of storage shed to form a shop, siting of a
workshop unit for furniture recycling/restoration, formation of parking area and
associated works at land northeast of Causeway Cottage.   
2 The site forms part of the wider curtilage of Causeway Cottage and is accessed
directly from the public road. The larger site within the applicant's ownership is
bounded by the Portmoak Airfield (also known as the Scottish Gliding Centre) to
the west and south, by the B920 to the east, and by farmland to the north. The
site contains an operational cattery, stables, furniture restoration and visitor
accommodation use. The applicant’s house is also within the building grouping. 
3 The planning application is to provide additional accommodation to consolidate
and expand the existing rural business allowing for growth of the furniture
recycling restoration upcycling operation and some related diversification in the
sale of restored furniture and related products. 
4 The proposal is for a portacabin style structure directly adjacent to the existing
building grouping with this building being utilised as a workshop for the
restoration of furniture and related products. This in turn will free up space within
the existing adjacent storage workshop building in order to allow both furniture
5(2)(i)
Page 121 of 172

Page 122

restoration to be carried out in part of this area the rear section and also to
facilitate the display of restored furniture and related products for sale, including
products used in the restoration upcycling process the display sales area. The
application is in part retrospect as works have commenced on site. 
Pre-Application Consultation 
5 Pre application Reference: No pre-application enquiry.  
6 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community. 
DEVELOPMENT PLAN 
7 The Development Plan for the area comprises National Planning Framework 4
(NPF4) and the Perth and Kinross Local Development Plan 2 (2019) (LDP2). 
National Planning Framework 4   
8 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning
policies.  This strategy sets out how to improve people’s lives by making
sustainable, liveable and productive spaces.   
9 NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
10 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 9: Brownfield, Vacant and Derelict Land and Empty Buildings
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place
• Policy 28: Retail 
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2 
11 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. 
Page 122 of 172

Page 123

12 The principal relevant policies are, in summary: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 5: Infrastructure Contributions
• Policy 8: Rural Business and Diversification
• Policy 13: Retail and Commercial Leisure Proposals 
• Policy 46A: Loch Leven Catchment Area
• Policy 46B: Loch Leven Catchment Area
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance 
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020) 
• Supplementary Guidance - Placemaking (adopted in 2020) 
OTHER POLICIES 
13 Non-Statutory Guidance. 
• Planning Guidance - Planning & Biodiversity 
NATIONAL GUIDANCE 
14 The Scottish Government expresses its planning policies through The National
Planning Framework, Planning Advice Notes, Creating Places, Designing
Streets, National Roads Development Guide and a series of Circulars. 
Planning Advice Notes 
15 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 40 Development Management 
• PAN 61 Planning and Sustainable Urban Drainage Systems 
• PAN 68 Design Statements 
• PAN 75 Planning for Transport 
Creating Places 2013 
16 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places.
Page 123 of 172

Page 124

National Roads Development Guide 2014 
17 This document supports Designing Streets and expands on its principles and is
the technical advice that should be followed in designing and approving of all
streets including parking provision.  
Site History 
18 09/00936/FLL Full Planning Permission was Approved On 18 July 2014 for
Erection of a dwellinghouse. 
19 11/00588/FLL Full Planning Permission application was Withdrawn On
10 February 2014 for Site temporary static caravan (in retrospect). 
20 12/01935/FLL Full Planning Permission was Approved On 18 July 2014 for
Alterations to stable block. 
21 13/01312/FLL Full Planning Permission was Approved On 18 July 2014 for
Extension to cattery and office. 
22 15/00464/FLL  Modification of permission 09/00936/FLL (erection of
dwellinghouse) change of house type | Former Causeway Cottage Scotlandwell. 
23 18/01125/FLL Full Planning Permission was Approved On 16 August 2018 for
Erection of a workshop, a garage and extension to stable (in part retrospect). 
24 21/01531/FLL Full Planning Permission was Approved On 22 December 2021
for Change of use of workshop to holiday accommodation unit. 
25 23/00867/ADV Advertisement Consent was Approved On 18 July 2023 for
Display of sign (in retrospect). 
CONSULTATIONS 
26 As part of the planning application process the following bodies were consulted: 
External 
Portmoak Community Council 
27 Objection to proposal on the following grounds; style, materials, roof pitch and
overall appearance inappropriate, not quality design, not in keeping with
surroundings and inappropriate structure which appears permanent. 
28 Overall the CC wishes to state that they support and endorse rural business
diversification and enterprise but for the reasons noted cannot support this
development.  
Page 124 of 172

Page 125

(Portmoak) Scottish Gliding Centre 
29 No response within time. 
Internal 
Structures And Flooding 
30 No drainage or flood risks. 
Transportation And Development 
31 No objection existing arrangements acceptable. 
Environmental Health (Contaminated Land) 
32 A search of the historic records did not raise any concerns regarding ground
contamination. 
Environmental Health (Noise Odour) 
33 No objection, standard conditions recommended in relation to noise and hours of
operation. 
Commercial Waste Team 
34 No objection existing waste arrangements acceptable. 
Development Contributions Officer 
35 No contributions required. 
Representations 
36 1 representation was received from the community council issues summarised
above in consultee section. 
ADDITIONAL STATEMENTS
37
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable
Appropriate Assessment under Habitats
Regulations
Habitats Regulations AA Not
Required
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact eg
Flood Risk Assessment
Not Required
Page 125 of 172

Page 126

APPRAISAL 
38 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4 and the Perth and
Kinross Local Development Plan 2019.  The relevant policy considerations are
outlined in the policy section above and are considered in more detail below.  In
terms of other material considerations, this involves considerations of the
Council’s other approved policies and supplementary guidance. 
39 The determining issues in this case are whether; the proposal complies with
development plan policy; or if there are any other material considerations which
justify a departure from policy. 
Principle 
40 The proposal is to supplement an existing business therefore Policy 8 Rural
Business and Diversification of LDP2 and Policy 29 Rural Development of NPF4
are directly applicable.  These policies seek to support the expansion of existing
businesses in rural areas. 
41 There are a number of applicable criteria within both of these polices which
include that proposals shall contribute to the local economy, shall not
suburbanise a rural area or encourage unsustainable travel patterns, shall not
detrimentally impact residential amenity, can be accommodated within the
landscape capacity, meets a specific need by virtue of its location in relation to
existing business, is of high quality design and that the road network can
accommodate the development. 
42 The applicant has been operating a cattery business at this location since 2006
with expansion approved in 2013, has been resident on site since 1997, and has
also diversified her rural enterprise in the last 10 years to include the recycling
restoration upcycling of furniture for reuse sale, additional stables, and the
provision of visitor accommodation. This proposal will expand the second-hand
furniture business. 
43 The proposal expands an existing building so the development is acceptable in
principle and for further reasons detailed in subsequent sections the proposal is
considered to comply with policy.   
44 In terms of retail element of the proposal the small scale of this development is
not considered to generate any significant footfall therefore the proposal does not
raise any conflict in relation to Policy 13 Retail and Commercial Leisure
Proposals.  NPF4 Policy 28 Retail seeks to encourage retail investment and
supports this through town centre first principles.  There are some exceptions for
small scale and rural retail, and this proposal would be deemed to accord with
those in respect if it relating to shops ancillary to other uses, where the proposal
Page 126 of 172

Page 127

serve local needs, whilst avoiding impacts on nearby town and commercial
centres.  The proposal is for an ancillary retail element covering 90sqm for the
sale of upcycled furniture which will take place in the workshop and could be
restricted by condition to limit the retail space and the sale of upcycled furniture
only, hence the support given in this instance 
45 The proposal therefore complies with the rural business policies of both LDP2
and NPF4 as a compatible and appropriately scaled diversification of the existing
onsite business, and incorporates retail of a scale which would be appropriate in
the rural area.   
Design and Layout 
46 The proposal is to change of use of an existing storage shed to form a retail shop
and part workshop at rear for the renovation restoration upcycling, display and
sales of furniture.  A further building which is portacabin style has been sited to
the east of the storage shed to accommodate the main restoration workshop.
The workshop unit is currently under construction and this application is in part
retrospect.   
47 The unit is not complete with exposed timber frame and no cladding; therefore it
may be difficult to perceive the compatibility with the existing form of
development.  The building has a simple rectangular floor plan with a low
sloping mono pitch roof and deep overhang.  The building is no longer or higher
than the large storage shed which it sits in front of. The finishes will be timber
cladding and profiled sheet roof. 
48 In terms of the compatibility of the design, form and finish it is noted that the
existing building group does not contain historic or traditional buildings and is set
back a distance of 90m from the public road. The siting of the proposed building
sits in front of a larger scale corrugated agricultural shed.  The finish materials
are a material palette which matches/complements existing buildings in the group
the material finish also allows the building to blend into the background. 
49 The building is more functional in design but it is not considered to be
incompatible with the existing development on site and is not considered to have
a wider detrimental impact on the visual amenity of the area as the site is low
lying and well contained.   
50 As such, the proposal accords with NPF4 Policy 14 Design, quality and place,
and LDP2 Policies 1A and 1B Placemaking and the supplementary placemaking
guidance. 
Residential Amenity 
51 The closest residential property out with the applicant's ownership is Red House
which is approximately 95 metres to the east of the of proposed new workshop
building.
Page 127 of 172

Page 128

52 Environmental Health confirm that they have not had any complaints with regards
to noise from the existing Causeway Creations, furniture restoration business,
which is being undertaken within the existing storage building at present, or from
the cattery and the holiday accommodation adjacent to this site and are also
within the applicant's ownership. 
53 The hours of operations for Causeway Creations at present are Monday to
Sunday 10.00 to 17.00hours.  It is therefore considered that the expansion of the
business, if managed as it is as existing and with the addition of conditions to
control noise and operating would not detrimentally impact residential amenity. 
54 The proposal is therefore considered to accord with the relevant policies of the
LDP2 and NPF4 where they relate to respecting residential amenity. 
Roads and Access 
55 The vehicle access to the public road network for the site will be via the existing
vehicle access to the cottage off the B920. 
56 Parking will be provided on site for an additional five vehicles to support the
planned furniture restoration business. 
57 As such, the current proposal is acceptable in terms of roads and access, and
accords with NPF4 Policy 13 Sustainable Transport and LDP2 Policy 60B
Transport Standards and Accessibility Requirements: New Development
Proposals. 
Drainage and Flooding 
58 The development sits out with river and surface water flooding risk areas as
shown on SEPA flood maps. 
59 There are no new drainage proposals, and no new drainage infrastructure is
required. 
Waste Collection 
60 The waste collection is a road end service. The existing collection point and bins
on site will be sufficient for this proposal. 
Developer Contributions 
61 The proposal does not require any developer contributions. 
Economic Impact 
62 The expansion of the existing business will contribute positively to the local
economy. 
Page 128 of 172

Page 129

VARIATION OF APPLICATION UNDER SECTION 32A 
63 This application was not varied prior to determination. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
64 Not required. 
DIRECTION BY SCOTTISH MINISTERS 
65 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
66 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, the adopted Local
Development Plan 2 (2019) and statutory supplementary guidance.  Account
has been taken account of the relevant material considerations and none has
been found that would justify overriding the Development Plan. 
67 Accordingly the proposal is recommended for approval subject to the following
conditions. 
RECOMMENDATION   
Approve the application 
Conditions and Reasons for Recommendation 
1. The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the
approved drawings and documents. 
2. All plant or equipment shall be so enclosed, attenuated and/or maintained such
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within
any neighbouring residential property, with all windows slightly open, when
measured and/ or calculated and plotted on a rating curve chart. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
Page 129 of 172

Page 130

3. The hours of operations shall be restricted to 0700 hours to 1900 hours daily. 
Reason - In order to safeguard the neighbouring residential amenity in the area. 
4. The retail floor space shall be restricted to the sale of furniture and associated
home furnishing/décor goods in the area as annotated as retail on plan ref 07. 
Reason - In order to control and limit the retail element of the proposal. 
B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
C PROCEDURAL NOTES 
None required. 
D INFORMATIVES 
1. As soon as practicable after the development is complete, the person who
completes the development is obliged by section 27B of the Town and Country
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written
notice of that position.  Please use the form attached herewith. 
2. An application for Building Warrant may be required. 
Background Papers:  1 letter of representation
Date: 29th September 2023 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 130 of 172

Page 131

23/01044/FLL
Change of use of storage shed to form a shop, siting of a workshop unit for furniture recycling/restoration, formation of
parking area and associated works at Land 45 Metres North-East Of Causeway Cottage Scotlandwell Kinross KY13 9JQ
Planning and Placemaking
Committee - 11 October 2023
Created by Kirsty Strong on 15 September 2023
© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:10000
5(2)(i)
Page 131 of 172

Page 132

Page 132 of 172

Page 133

23/01044/FLL
Change of use of storage shed to form a shop, siting of a workshop unit for furniture recycling/restoration, formation of
parking area and associated works at Land 45 Metres North-East Of Causeway Cottage Scotlandwell Kinross KY13 9JQ
Planning and Placemaking
Committee - 11 October 2023
Created by Kirsty Strong on 15 September 2023
© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:5000
5(2)(i)
Page 133 of 172

Page 134

Page 134 of 172

Page 135

Perth and Kinross Council
Planning and Placemaking Committee – 11 October 2023
Report of Handling by Head of Planning & Development
(Report No. 23/273) 
PROPOSAL: Erection of a dwellinghouse (in principle) 
LOCATION: Land 75 metres North West of Mullmac, Saucher, Kinrossie,
Perth, PH2 6HY 
Ref. No: 23/01262/IPL
Ward No: P2 – Strathmore 
Summary 
This report recommends approval of the application as the development is considered
to comply with the relevant provisions of the Development Plan and there are no
material considerations apparent which outweigh the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL  
1 Planning permission in principle is sought for the erection of a dwellinghouse and
formation of a new access within a small hamlet called Saucher which is located
approximately 9.5 miles to the north east of Perth, a short distance from the A94. 
There are approximately 14 dwellings within the hamlet set around a square
green.  The application site is located in the north east corner of the hamlet and
extends to 0.27 hectares.  The application site is rectangular and an indicative
site plan has been submitted showing the possible position of a dwelling in the
southern corner.  Access is proposed to be taken from the public road to the
east partly utilising an existing access which serves properties within the group. 
2 This is a follow up application following the refusal of a previous application on a
similar site but which sought to utilise an alternative new access track which was
located outwith and along the edge of the building group (ref: 23/00923/IPL). 
Pre-Application Consultation 
3 Pre application Reference: 23/00047/PREAPL  
4 The proposed development is not classed as a Major development in terms of
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, therefore the applicant was not required to undertake not any
formal pre-application consultation with the local community.
5(2)(ii)
Page 135 of 172

Page 136

DEVELOPMENT PLAN  
5 The Development Plan for the area comprises National Planning Framework 4
(NPF4) and the Perth and Kinross Local Development Plan 2 (2019) (LDP2). 
National Planning Framework 4 
6 The National Planning Framework 4 (NPF4) is the Scottish Government’s long-
term spatial strategy with a comprehensive set of national planning policies. 
This strategy sets out how to improve people’s lives by making sustainable,
liveable and productive spaces.   
7 NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
8 The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 6: Forestry, Woodland and Trees
• Policy 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 16: Quality Homes
• Policy 17: Rural Homes
• Policy 22: Flood Risk and Water Management
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2 – Adopted November 2019 
9 The Local Development Plan 2 (LDP2) is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
10 The principal policies are: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 2: Design Statements
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
• Policy 19: Housing in the Countryside
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 39: Landscape
Page 136 of 172

Page 137

• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 51: Soils
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
Statutory Supplementary Guidance 
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted
in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Housing in the Countryside (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020) 
OTHER POLICIES 
Non Statutory Guidance 
• Planning Guidance - Planning & Biodiversity 
NATIONAL GUIDANCE 
11 The Scottish Government expresses its planning policies through The National
Planning Framework, Planning Advice Notes, Creating Places, Designing
Streets, National Roads Development Guide and a series of Circulars.   
Planning Advice Notes 
12 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 40 Development Management
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements
• PAN 75 Planning for Transport 
Creating Places 2013 
13 Creating Places is the Scottish Government’s policy statement on architecture
and place. It sets out the comprehensive value good design can deliver. It notes
Page 137 of 172

Page 138

that successful places can unlock opportunities, build vibrant communities and
contribute to a flourishing economy and set out actions that can achieve positive
changes in our places. 
Designing Streets 2010 
14 Designing Streets is the policy statement in Scotland for street design and
changes the emphasis of guidance on street design towards place-making and
away from a system focused upon the dominance of motor vehicles. It was
created to support the Scottish Government’s place-making agenda, alongside
Creating Places. 
National Roads Development Guide 2014 
15 This document supports Designing Streets and expands on its principles and is
considered to be the technical advice that should be followed in designing and
approving of all streets including parking provision. 
Site History 
16 23/00923/IPL was refused On 19 July 2023 for Erection of a dwellinghouse (in
principle). 
CONSULTATIONS 
17 As part of the planning application process the following bodies were consulted: 
External 
18 Scottish Water – no objection. 
Internal 
19 Transportation And Development – no objection. 
20 Biodiversity/Tree Officer – no comments. 
21 Development Contributions Officer – condition recommended. 
Representations 
22 8 representations were received. The main issues raised within the
representations are: 
• Impact on farming operations
• Loss of prime agricultural land
• Inappropriate land use which is out of character with area
Page 138 of 172

Page 139

• Inappropriate housing density
• Lack of car parking and impact on road safety / character
• Lack of sewage capacity
• Light pollution
• Loss of open space
• Loss of sunlight or daylight
• Loss of trees and ecological impact
• Noise Pollution including during construction
• Overlooking 
• Flood risk
• Contrary to Development Plan
• Land ownership
• Maintenance of private road 
23 These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS
24
Screening Opinion  Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not Required
Appropriate Assessment under Habitats
Regulations
Habitats Regulations Appraisal
AA Not Required
Design Statement or Design and Access
Statement
Submitted
Report on Impact or Potential Impact  Not Required  
APPRAISAL 
25 Sections 25 and 37(2) of the Town & Country Planning (Scotland) Act 1997 (as
amended) require the determination of the proposal to be made in accordance
with the provisions of the Development Plan, unless material considerations
indicate otherwise.  The Development Plan comprises NPF4 and the Perth and
Kinross Local Development Plan 2019.  The relevant policy considerations are
outlined in the policy section above and are considered in more detail below.  In
terms of other material considerations, this involves considerations of the
Council’s other approved policies and supplementary guidance, as outlined
elsewhere in this report. 
Principle 
26 In policy 19 - Housing in the Countryside of the Perth and Kinross Local
Development Plan 2019 (LDP2), it is acknowledged that opportunities do exist for
housing in rural areas to support the viability of communities, meet development
needs in appropriate locations while safeguarding the character of the countryside
as well as ensuring that a high standard of siting and design is achieved. Thus the
Page 139 of 172

Page 140

development of single houses or groups of houses which fall within the six
identified categories will be supported.  This is also referenced in the recently
adopted National Planning Framework 4 (NPF4) where Policy 9 states that
greenfield sites will be supported where there are explicitly supported by LDP
policies. 
27 Policy 17 of NPF4 is also relevant and seeks to encourage and promote and
facilitate affordable and sustainable homes in the right locations and provides
criteria in which proposals for new rural homes will be accepted. 
The Council will support proposals for the erection, or creation through conversion,
of single houses and groups of houses in the countryside which fall into at least
one of the following categories: 
1)  Building Groups
2)  Infill site
3)  New houses in the countryside on defined categories of sites as set out in
section 3 of the Supplementary Guidance
4)  Renovation or replacement of houses
5)  Conversion or replacement of redundant non-domestic buildings
6)  Development on rural brownfield land 
28 The proposal does not meet any the criteria for categories 2-6 of the SG, however
the proposed site is considered to be within a building group and therefore the
criteria within category 1 requires to be considered. 
29 Category 1 states that development will be granted for houses within building
groups provided it can be demonstrated that: 
• New housing will respect the character, scale and form of the existing group
and will be integrated into the existing layout and building pattern.
• New housing will not detract from the visual amenity of the group when viewed
from the wider landscape.
• A high standard of residential amenity will be provided for both existing and
new housing. 
30 In this instance the proposed position of the dwelling is considered to be located
within the existing building group, being adjacent to two existing dwellings and the
indicative layout which has been provided demonstrates that there is scope for the
dwelling to relate successfully to the character, layout and building pattern of the
group provided it is appropriately sited and appropriate landscaping is provided as
per the submitted indicative drawings.  The proposed house, in principle, is
therefore considered to accord with the criteria within category 1 of the SG. 
31 The previous refusal identified the position of the access, running along the edge
of and out with the building group, as a concern.  It was concluded that the
introduction of a new access extending approximately 70 metres along the edge
Page 140 of 172

Page 141

and out with the well defined building group failed to respect the existing layout
and building pattern of the group contrary to placemaking policies of the LDP2 in
that it failed to reinforce the street scene and open space of the grouping.  The
building group is well nucleated and is served by an existing access which
contributes to the character and building pattern of the grouping.  The introduction
of a new access as part of that previous proposal was considered to completely
alter the established character of the grouping and failed to relate to the building
pattern of the group, contrary to Placemaking Policies 1A and 1B(d) of the LDP2
and Policy 14(b) of NPF4 which requires accesses to reinforce the existing street
scene and development overall to contribute positively to the quality of the
surrounding built and natural environment.  In the Report of Handling for the
previous refusal it was made clear that should alternative access arrangement be
proposed which seeks to utilise the existing access which serves the grouping
then the proposal would be looked upon more favourably. 
32 The proposal now omits the previously proposed new access and instead seeks to
utilise the existing access which serves the wider building group.  The existing
access is located between Pathways and Kanrosmar to the north east and a row
of terraced cottages to the south west which front onto the village green.  The
proposal indicates that there is sufficient space between the Kanrosmar and
Pathways to then provide a driveway access from the existing access track into
the site.  Given the revised access arrangements which now sees the existing
access within the building group being used the proposal is now considered to
respect the building pattern and character of the grouping and is therefore
considered to comply with Policies 1A and B of the LDP2 and 14(b) of NPF4. 
Design and Layout 
33 Generally, the design and scale of development should respect its surroundings
and adhere to Policies 1A and B of LDP2 which relate to placemaking and Policy
14 of NPF4 which seeks to deliver well designed development.  Further guidance
is also provided within the associated Placemaking Supplementary Guidance. 
Furthermore, the siting criteria outlined within the Housing in the Countryside
Supplementary Guidance is also relevant.  Policy 4(a) of NPF4 is also applicable
and seeks to ensure that the development does not have an unacceptable impact
on the natural environment. 
34 The indicative site layout demonstrates that there is scope to accommodate a
dwelling on this site whilst respecting the character of the area.  The indicative
site plan showing the position of the dwelling along with associated planting
demonstrates that the house will essentially fill a gap between Pathways and
Kanrosmar and respect the established building line created by both of these
properties.  As outlined above the concerns regarding the access have now been
addressed.  A condition is recommended to ensure that any forthcoming detailed
application accords with the submitted indicative layout.  It is noted that the site
extends into an open field but the indicative layout which has been provided
demonstrates the provision of additional planting and landscaping to form a
Page 141 of 172

Page 142

defined edge to the site which follows the plot boundaries of the adjacent
dwellings. 
35 As this is an application in principle no detailed design or scale of dwelling has
been submitted at this stage and this matter can be further considered at the
detailed submission stage.  Given the indicative site plan site outlined above and
its relationship to the existing building group and the existing and proposed
landscaping on the site the development of a dwelling, subject to an appropriate
design and scale together with additional planting, will not have a detrimental
impact on the visual amenity or landscape character of the area.  The detailed
design can be considered further should a detailed application be made.  The
principle is therefore considered to comply with the above policy requirements. 
Residential Amenity 
36 The site is of sufficient scale and there is an opportunity to position any dwelling in
a location which ensures that the neighbouring properties are not overlooked. 
Furthermore, boundary planting to provide some screening and containment for
the site could be secured by condition at detailed stage should any permission be
granted.  As this application is only in principle there is no opportunity to assess
this in detail, at this stage, however this can be assessed when a detailed
application is received should any permission be granted.  It is noted that the site
is elevated above the site to the south west (Pathways) and this would mean that
the orientation and scale of the dwelling would require to be carefully considered to
ensure it does not impact on the amenity of the neighbour.  It is considered that
there is scope to do so but this would be considered through any detailed
application.  Window position and boundary treatments would require to be
carefully considered and would require to be orientated to the north west and north
east to avoid overlooking neighbours.  Furthermore, the scale and height of the
dwelling would require to be limited to ensure it does not result in overshadowing
to the neighbours.   
37 The orientation of the house and height, together with the window positions will be
an important consideration in the detailed application.  Overall, this issue can be
addressed at the detailed application stage. 
38 Furthermore, as the access is now revised the concerns regarding the previously
proposed new access and the issues of Kanrosmar and Mullmac being
sandwiched between two accesses have now been addressed with this revised
proposal. 
39 The proposal is therefore considered to accord with the relevant policies of the
LDP2 and NPF4 where they relate to respecting residential amenity. 
Roads and Traffic 
40 The site is capable of being safely accessed from the public road and the detailed
development will be subject to a further detailed application which will require to
Page 142 of 172

Page 143

comply with the LDP2 and National Roads Development Guide in terms of parking
provision, turning facilities, road safety and access.  Transportation and
Development have been consulted on the application and following clarity from the
agent on the ability of the access to be delivered have offered no objections. 
Letters of representation identified concerns with the ability of the site to be
accessed and the use of land in separate ownership to provide access into the
site.  The agent has been asked to clarify this and has advised that the applicant
has recently undertaken a mapping exercise to confirm their title and confirmed
that there is sufficient space within the client’s ownership between Pathways and
Kanrosmar (4.83m) to incorporate a site access from the existing road network. 
41 It is noted that part of the access may be used for agricultural operations currently. 
If this is the case an agreement would require to be reached between the farm and
developer regarding this issue.  This is considered to be a private civil matter and
not material to the assessment of this application. 
Drainage 
42 The application form indicates that the site is to connect to be served by a private
drainage system with surface water system catered for through a SUDS system. 
This is in accordance with Policy 53B and C of the LD2 and Policy 22 of NPF4. 
The proposal for a sustainable urban drainage system is considered to be
sufficient to cater for surface water drainage at the site.  The specific location of
the drainage system will require to be indicated in the detailed application and its
location relative to neighbours.  The letters of representation indicate that there
may be capacity constraints with the existing village septic tank.  This could
potentially be resolved through provision of a new private system serving the
dwelling and could be considered further should a detailed application be
submitted.  Any impact on any existing drainage connection/network for the
grouping, including the access being located on top of an existing septic tank
would be a civil matter between the developer and neighbours and not a material
planning consideration.  It would be for the developer to resolve this issue.  The
agent has confirmed that the applicant is aware of these issues. 
Flood Risk 
43 The site is not considered to be at risk from flooding according to SEPA’s flood
maps. 
Developer Contributions 
44 As this application is only in principle it is not possible to determine whether the
local school is at capacity.  However, to cover this aspect a condition is
recommended to ensure the Council's Developer Contributions Policy and
Supplementary Guidance is adhered to should any detailed application be
forthcoming. 
Page 143 of 172

Page 144

Ecology 
45 The existing trees may be habitat to protected species and therefore Policy 41 of
LDP2 applies which requires the protection of all wildlife and wildlife habitats and
ecological assessments to be undertaken to understand the extent of impact. 
Policy 3(a) Biodiversity of NPF4 seeks to protect but also enhance bio diversity on
a site.  Policy 40 of the LDP2 is also applicable which requires tree surveys to be
prepared.   
46 On that basis a detailed ecology survey is required and this can be ensured
through a condition to ensure it is submitted as part of a detailed submission. 
Furthermore, a condition is recommended to ensure none of the trees on site are
felled at this time as no information has been submitted in relation to the potential
impact on protected species from the tree felling.  All of these matters can be
considered should a detailed application be made.  This will ensure that protected
species are identified, and appropriate mitigation provided including timing of
works to ensure compliance with Policy 41 of the LDP2 and Policy 3 of NPF4 and
the protection of any identified protected species. 
Trees 
47 The Council will apply the principles of the Scottish Government Policy on Control
of Woodland Removal and there will be a presumption in favour of protecting
woodland resources. Where the loss of woodland is unavoidable, mitigation
measures in the form of compensatory planting will be required.  This is outlined
within Policy 40B of the LDP2 and NPF4 Policy 6(a).  The proposal does not
indicate any intention to fell trees and mentions that the trees on the north west
boundary would be retained.  A condition is recommended to ensure the retention
of these trees.  The conditions will also ensure that the development layout
accords with that indicate in the indicative plan which ensures development is
remote from the existing trees.  On that basis it is not considered to be necessary
to seek a tree survey as part of the detailed application. 
Construction Noise 
48 Whilst it is appreciated that there would be disturbance associated with
construction operations this would be for a temporary period and is not considered
to have any significant weighting in this determination. 
Prime Agricultural Land 
49 The site is identified as level 3.1 in terms of the soils classification for agriculture:
"Land capable of producing consistently high yields of a narrow range of crops or
moderate yields of a wider range of crops".  The area of land which would be lost
is considered to be limited and would not occupy a significant level of the existing
agricultural fields.  The proposal is therefore not considered to have a significant
impact on the availability of agricultural land in the area and therefore meets the
requirements of Policy 5 of NPF4.
Page 144 of 172

Page 145

Maintenance of Private Access 
50 The letters of representation raise concerns about the condition of the private
access, the presence of potholes and the possibility of additional traffic
exacerbating the poor condition. 
51 There are a number pot holes and Transportation and Development have offered
no objections to its use to serve the site.  No upgrade is recommended to serve a
single dwelling.  There will however, be responsibility for any future owner of the
site to contribute towards maintenance of the track.  This matter is a private civil
issue which will require to be agreed between users of the track.  The
maintenance of the track during construction periods will also be a private matter
between the parties involved and not something which planning legislation can
dictate.   
Neighbour Notification 
52 Having reviewed the neighbour notification undertaken, it has been undertaken in
accordance with the current legislative requirements.  Furthermore, the
application has also been advertised in accordance with the regulations. 
Economic Impact 
53 The economic impact of the proposal is likely to be minimal and limited to the
construction phase of the development. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
54 None required. 
DIRECTION BY SCOTTISH MINISTERS 
55 Under the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, regulations 30 – 33 there have been no directions
by the Scottish Government in respect of an Environmental Impact Assessment
screening opinion, call in or notification relating to this application. 
CONCLUSION AND REASONS FOR RECOMMENDATION 
56 To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise. In this
respect, the proposal is considered to comply with NPF4, the adopted Local
Development Plan 2 (2019) and statutory supplementary guidance.  Account
has been taken account of the relevant material considerations and none has
been found that would justify overriding the Development Plan. 
57 Accordingly the proposal is recommended for approval subject to the following
conditions.
Page 145 of 172

Page 146

RECOMMENDATION 
Approve the application 
Conditions and Reasons for Recommendation 
1. The development shall not commence until the following specified matters have
been the subject of a formal planning application for the approval of the Council
as Planning Authority: the siting, design and external appearance of the
development which should accord with the indicative layout as indicated on
approved drawing 09, the hard and soft landscaping of the site, all means of
enclosure, means of access to the site, road layout, vehicle parking and turning
facilities, levels, drainage including the disposal of surface water and waste
management provision. 
Reason - This is a Planning Permission in Principle under Section 59 of the Town
and Country Planning (Scotland) Act 1997 as amended by Section 21 of the
Planning etc. (Scotland) Act 2006. 
2. This planning permission in principle will last only for five years from the date of
this decision notice, unless the development has been lawfully started within that
period. 
Reason - This is a Planning Permission in Principle in terms of Section 59 of the
Town and Country Planning (Scotland) Act 1997, as amended by Section 32 of
the Planning (Scotland) Act 2019. 
3. Further to Condition 1 above, a detailed protected species survey covering the
site shall be submitted as part of the specified matters requiring to be the subject
of a further formal planning application for the approval of the Council as
Planning Authority.  The report shall include appropriate mitigations to protect
any identified species. 
Reason - In the interests of protecting environmental quality and of biodiversity. 
4. All existing trees and hedging on the site shall be retained and their retention or
proposed lopping, topping or felling shall be shown in the submission of the
matters specified in Condition 1 above. 
Reason - To ensure a satisfactory standard of development and environmental
quality and to reserve the rights of the Planning Authority. 
5. The development shall be in accordance with the requirements of Perth &
Kinross Council's Developer Contributions and Affordable Housing
Supplementary Guidance 2020 in line with Policy 5: Infrastructure Contributions
of the Perth & Kinross Local Development Plan 2 (2019) with particular regard to
primary education infrastructure, or such subsequent Guidance and Policy which
may replace these.
Page 146 of 172

Page 147

Reason - To ensure the development is in accordance with the terms of the Perth
and Kinross Local Development Plan 2 (2019) and to comply with the Council's
policy on Developer Contributions and Affordable Housing Supplementary
Guidance 2020. 
B JUSTIFICATION 
The proposal is in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.   
C INFORMATIVES 
1. No work shall be commenced until an application for building warrant has been
submitted and approved. 
2. The applicant should be aware of the requirements of the Council's Environment
and Regulatory Services in relation to waste collection from the site and should
ensure adequate measures are provided on site to allow for the collection of
waste. 
Background Papers:  8 letters of representation
Date: 29 September 2023 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 147 of 172

Page 148

Page 148 of 172

Page 149

© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form.
Planning and Placemaking
Committee - 11 October 2023 23/01262/IPL
Erection of a dwellinghouse (in principle) Land 75 Metres North-West of Mullmac, Saucher,
Kinrossie, Perth, PH2 6HY
Scale 1:7000
Created by Kirsty Strong on 15 September 2023
5(2)(ii)
Page 149 of 172

Page 150

Page 150 of 172

Page 151

© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form.
Planning and Placemaking
Committee - 11 October 2023 23/01262/IPL
Erection of a dwellinghouse (in principle) Land 75 Metres North-West of Mullmac, Saucher,
Kinrossie, Perth, PH2 6HY
Scale 1:5000
Created by Kirsty Strong on 15 September 2023
5(2)(ii)
Page 151 of 172

Page 152

Page 152 of 172

Page 153

Perth and Kinross Council
Planning and Placemaking Committee – 11 October 2023
Pre-Application Report by Head of Planning and Development
(Report No. 23/274) 
PROPOSAL: Formation of 49.9MW battery energy storage facility, formation
of access and associated works 
LOCATION: Land 400 metres South East of Endrigg, Jamesfield,
Newburgh, Cupar, KY14 6EW 
Ref. No: 23/00011/PAN 
Ward No: - P9 – Almond and Earn 
Summary 
This report is to inform the Committee of a potential forthcoming planning
application in respect of a major development for the formation of 49.9MW battery
energy storage facility, formation of access and associated works on land 400
Metres South East of Endrigg, Jamesfield, Newburgh, Cupar, KY14 6EW. The
report also aims to highlight the key planning policies and the likely stakeholders
who would be involved in the decision making process, and to offer a brief
overview of the key planning issues which are likely to be relevant to the proposal. 
BACKGROUND AND DESCRIPTION 
1. In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicants submitted a Proposal of Application
Notice (PoAN) on 24 July 2023. The purpose of this report is to inform the
Planning and Placemaking Committee of a forthcoming planning application in
respect of a major development for the formation of 49.9MW battery energy
storage facility, formation of access and associated works on land 400 Metres
South East of Endrigg, Jamesfield, Newburgh, Cupar, KY14 6EW. 
2. Pre-application reports give the Committee an opportunity to raise issues
which it would like to see addressed in the planning application. This PoAN
seeks to formally establish a major development. The exact range of uses,
scale and design of the development will be arrived at during pre-application
discussions. 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
3. Due to the scale of the proposal it will require to be screened as to whether
the proposal is an EIA development under the EIA 2017 Regulations. A
screening request is required to be submitted by the applicant. It is noted that
screening opinion has already been provided, reference 22/02120/SCRN, and
is not subject of an EIA development.
6(i)
Page 153 of 172

Page 154

PRE-APPLICATION PROCESS 
4. The PoAN (reference 23/00011/PAN) confirmed that a public exhibition will be
held at Williamson Hall, Kirk Wynd, Abernethy, PH2 9JD on 4 August between
4pm and 7pm and a second event will be held on 18 August between 4pm
and 7pm. The Ward Councillors and Abernethy and District Community
Council have been notified. The results of the community consultation will be
submitted with the planning application as part of the required Pre-Application
Consultation (PAC) Report. 
DEVELOPMENT PLAN 
5. The Development Plan for the area comprises National Planning Framework
4 (NPF4) and the Perth and Kinross Local Development Plan 2 (2019)
(LDP2). 
National Planning Framework 4 
6. The National Planning Framework 4 (NPF4) is the Scottish Government’s
long-term spatial strategy with a comprehensive set of national planning
policies.  This strategy sets out how to improve people’s lives by making
sustainable, liveable and productive spaces.   
7. NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
8. The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy1: Tackling the Climate and Nature Crisis
• Policy 2: Climate Mitigation and Adaptation
• Policy 3: Biodiversity
• Policy 4: Natural Places
• Policy 5: Soils
• Policy 7: Historic Assets and Places 
• Policy 11: Energy 
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place 
• Policy 18: Infrastructure First
• Policy 22: Flood Risk and Water Management
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
9. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.” It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
Page 154 of 172

Page 155

The principal relevant policies are, in summary; 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 2: Design Statements  
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
• Policy 8: Rural Business and Diversification
• Policy 26A: Scheduled Monuments and Archaeology: Scheduled
Monuments
• Policy 32: Renewable and Low-Carbon Energy
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 35: Electricity Transmission Infrastructure
• Policy 39: Landscape 
• Policy 41: Biodiversity 
• Policy 50: Prime Agricultural Land 
• Policy 51: Soils
• Policy 52: New Development and Flooding 
• Policy 53C: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution 
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals. 
OTHER POLICIES 
10. The following non statutory guidance and documents are of particular
importance in the assessment of this application:- 
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020)
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft)
• Perth and Kinross Community Plan 2013/2023
• Perth and Kinross Local Transport Strategy (2010) 
NATIONAL GUIDANCE 
11. The Scottish Government expresses its planning policies and guidance
through the National Planning Framework, Planning Advice Notes, Creating
Places, Designing Streets, National Roads Development Guide and a series
of Circulars.   
Page 155 of 172

Page 156

Planning Advice Notes 
12. The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal:- 
• PAN 1 /2011 Planning and Noise 
• PAN 2/2011 Planning and Archaeology
• PAN 3/2010 Community Engagement
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 73 Rural Diversification
• PAN 75 Planning for Transport
• PAN 79 Water and Drainage
• Energy Storage: Planning Advice (2011) 
PLANNING SITE HISTORY 
13. None. 
CONSULTATIONS 
14. As part of the planning application process the following would be consulted:- 
External 
• Scottish Environment Protection Agency
• NatureScot
• Perth and Kinross Heritage Trust 
• Abernethy and District Community Council  
Internal 
• Environmental Health - Noise and Odour
• Environmental Health – Contaminated Land 
• Environmental Health - Private Water Supply
• Development Contributions Officer
• Transportation and Development
• Structures and Flooding
• Biodiversity Officer 
KEY ISSUES AGAINST WHICH A FUTURE APPLICATION WILL BE
ASSESSED 
15. The key considerations against which the eventual application will be
assessed include: 
a.  Visual Impact 
b.  Scale, Design and Layout 
c.  Relationship to Nearby Land Uses 
Page 156 of 172

Page 157

d.  Natural Heritage and Ecology
e.  Landscape
f. Water Resources and Soils 
g.  Air Quality  
h.  Transport Implications 
i.  Tourism and Economy 
j.  Impact on Agriculture
k.  Archaeology and Cultural Heritage 
ADDITIONAL STATEMENTS WHICH WILL BE REQUIRED 
16. Should an EIA Report not be required the following supporting documents will
need to be submitted with any planning application: 
• Planning Statement
• Design and Access Statement
• Pre-Application Consultation (PAC) Report
• Transport Assessment
• Flood Risk and Drainage Assessment
• Landscape and Visual Impact Assessment
• Tree and Woodland Survey
• Habitat Survey
• Archaeological Assessment
• Sustainability Assessment
• Noise Impact Assessment
• Construction Traffic Management Plan (CTMP) 
CONCLUSION AND RECOMMENDATION 
17. This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in
respect of this development and members are recommended to note these
key issues and advise officers of any other issues which they consider should
be included as part of the application and assessment. 
Background Papers: None
Contact Officer: Kirsty Strong 
Date: 29 September 2023 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 157 of 172

Page 158

Page 158 of 172

Page 159

© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form.
Planning and Placemaking
Committee - 11 October 2023 23/00011/PAN
Formation of 49.9MW battery energy storage facility, formation of access and associated
works on Land 400 metres South East of Endrigg, Jamesfield, Newburgh, Cupar
Scale 1:7000
Created by Kirsty Strong on 15 September 2023
6(i)
Page 159 of 172

Page 160

Page 160 of 172

Page 161

© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form.
Planning and Placemaking
Committee - 11 October 2023 23/00011/PAN
Formation of 49.9MW battery energy storage facility, formation of access and associated
works on Land 400 metres South East of Endrigg, Jamesfield, Newburgh, Cupar
Scale 1:5000
Created by Kirsty Strong on 15 September 2023
6(i)
Page 161 of 172

Page 162

Page 162 of 172

Page 163

Perth and Kinross Council
Planning and Placemaking Committee – 11 October 2023
Pre-Application Report by Head of Planning and Development
(Report No. 23/275) 
PROPOSAL: Formation of a 49.9 MW solar farm comprising ground
mounted solar arrays, inverters, transformers, a substation, a
DNO substation, battery storage facility, security fencing,
CCTV cameras, cabling, access tracks and associated works 
LOCATION: Kinnon Park Farm, Methven, Perth, PH1 3NE 
Ref. No: 23/00012/PAN 
Ward No: P9 – Almond and Earn 
Summary 
This report is to inform the Committee of a potential forthcoming planning
application in respect of a major development for the formation of a 49.9 MW solar
farm comprising ground mounted solar arrays, inverters, transformers, a
substation, a DNO substation, battery storage facility, security fencing, CCTV
cameras, cabling, access tracks and associated works at Kinnon Park Farm,
Methven, Perth, PH1 3NE. The report also aims to highlight the key planning
policies and the likely stakeholders who would be involved in the decision making
process, and to offer a brief overview of the key planning issues which are likely to
be relevant to the proposal. 
BACKGROUND AND DESCRIPTION 
1. In accordance with the provisions of the Town & Country Planning (Scotland)
Act 1997 (as amended), the applicants submitted a Proposal of Application
Notice (PoAN) on 31 July 2023. The purpose of this report is to inform the
Planning and Placemaking Committee of a forthcoming planning application in
respect of a major development for the formation of a 49.9 MW solar farm
comprising ground mounted solar arrays, inverters, transformers, a
substation, a DNO substation, battery storage facility, security fencing, CCTV
cameras, cabling, access tracks and associated works at Kinnon Park Farm,
Methven, Perth, PH1 3NE. 
2. Pre-application reports give the Committee an opportunity to raise issues
which it would like to see addressed in the planning application. This PoAN
seeks to formally establish a major development. The exact range of uses,
scale and design of the development will be arrived at during pre-application
discussions. 
6(ii)
Page 163 of 172

Page 164

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 
3. Due to the scale of the proposal it will require to be screened as to whether
the proposal is an EIA development under the EIA 2017 Regulations. A
screening request is required to be submitted by the applicant.   
PRE-APPLICATION PROCESS 
4. The PoAN (reference 23/00012/PAN) confirmed that a public exhibition will be
held at Methven Community Hall, The Old Vestry, 28 Main Street, Methven,
PH1 3PU on Tuesday 22 August 2023 between 15.30pm and 19.30pm with a
second event held on Tuesday 24 October 2023 between 15.30pm and
19.30pm. The Ward Councillors, MP, MSP and Methven and District
Community Council have been notified. The results of the community
consultation will be submitted with the planning application as part of the
required Pre-Application Consultation (PAC) Report. 
DEVELOPMENT PLAN 
5. The Development Plan for the area comprises National Planning Framework
4 (NPF4) and the Perth and Kinross Local Development Plan 2 (2019)
(LDP2). 
National Planning Framework 4 
6. The National Planning Framework 4 (NPF4) is the Scottish Government’s
long-term spatial strategy with a comprehensive set of national planning
policies.  This strategy sets out how to improve people’s lives by making
sustainable, liveable and productive spaces.   
7. NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan. 
8. The Council’s assessment of this application has considered the following
policies of NPF4: 
• Policy 1: Tackling the Climate and Nature Crisis
• Policy 3: Biodiversity
• Policy 4: Natural Places 
• Policy 5: Soils 
• Policy 6: Forestry, Woodland and Trees
• Policy 7: Historic Assets and Places
• Policy 11: Energy
• Policy 13: Sustainable Transport
• Policy 14: Design, Quality and Place 
• Policy 18: Infrastructure First 
• Policy 20: Blue and Green Infrastructure 
• Policy 22: Flood Risk and Water Management 
Page 164 of 172

Page 165

• Policy 23: Health and Safety
• Policy 29: Rural Development 
Perth and Kinross Local Development Plan 2019 
9. The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for
the area and states that, “Our vision is of a Perth and Kinross which is
dynamic, attractive and effective which protects its assets whilst welcoming
population and economic growth.” It is the most recent statement of Council
policy and is augmented by Supplementary Guidance. 
The principal relevant policies are, in summary; 
• Policy 1A: Placemaking 
• Policy 1B: Placemaking
• Policy 1C: Placemaking 
• Policy 2: Design Statements  
• Policy 5: Infrastructure Contributions
• Policy 6: Settlement Boundaries
• Policy 8: Rural Business and Diversification
• Policy 15: Public Access 
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 29: Gardens and Designated Landscapes
• Policy 30: Protection, Promotion and Interpretation of Historic Battlefields 
• Policy 31: Other Historic Environment Assets
• Policy 32: Embedding Low and Zero Carbon Technology in New
Development
• Policy 33A: Renewable and Low Carbon Energy: New Proposals for
Renewable and Low-Carbon Energy
• Policy 33C: Renewable and Low Carbon Energy: Decommissioning and
Restoration of Existing Facilities
• Policy 35: Electricity Transmission Infrastructure
• Policy 38B: Environment and Conservation: National Designations
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape 
• Policy 40A: Forestry, Woodland and Trees: Forest and Woodland Strategy
• Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity 
• Policy 42: Green Infrastructure 
• Policy 43: Green Belt  
• Policy 47: River Tay Catchment Area
• Policy 50: Prime Agricultural Land 
• Policy 51: Soils
• Policy 52: New Development and Flooding 
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
Page 165 of 172

Page 166

• Policy 54: Health and Safety Consultation Zones 
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution 
• Policy 58A: Contaminated and Unstable Land: Contaminated Land
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals
• Policy 61: Airfield Safeguarding 
OTHER POLICIES 
10. The following non statutory guidance and documents are of particular
importance in the assessment of this application:- 
• Planning Guidance - Planning & Biodiversity
• Supplementary Guidance - Renewable & Low Carbon Energy (draft)
• Supplementary Guidance - Airfield Safeguarding (adopted in 2020)
• Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)
• Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
• Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
• Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
• Supplementary Guidance - Landscape (adopted in 2020)
• Supplementary Guidance - Placemaking (adopted in 2020)
• Perth and Kinross Community Plan 2013/2023
• Perth and Kinross Local Transport Strategy (2010) 
NATIONAL GUIDANCE 
11. The Scottish Government expresses its planning policies and guidance
through the National Planning Framework, Planning Advice Notes, Creating
Places, Designing Streets, National Roads Development Guide and a series
of Circulars.   
Planning Advice Notes 
12. The following Scottish Government Planning Advice Notes are likely to be of
relevance to the proposal:- 
• PAN 1/2011 Planning and Noise
• PAN 2/2011 Planning and Archaeology
• PAN 3/2010 Community Engagement
• PAN 40 Development Management
• PAN 51 Planning, Environmental Protection and Regulation
• PAN 61 Planning and Sustainable Urban Drainage Systems
• PAN 68 Design Statements 
• PAN 69 Planning and Building Standard Advice on Flooding
• PAN 73 Rural Diversification
Page 166 of 172

Page 167

PLANNING SITE HISTORY 
13. 04/02335/FUL Full Planning Permission application was withdrawn on
23 December 2005 for conversion of existing steading and erection of 11
dwellinghouses 
14. 05/01778/OUT was approved on 23 December 2005 for construction of golf
course and associated buildings and parking (in outline) 
CONSULTATIONS 
15. As part of the planning application process the following would be consulted: 
External 
• Scottish Environment Protection Agency
• NatureScot
• Historic Environment Scotland – Battlefield and Garden and Designed
Landscapes
• Forestry Commission Scotland
• Health and Safety Executive 
• Perth and Kinross Heritage Trust 
• Methven Community Council
• Blue Sky Experiences - Airfield Safeguarding
• National Grid - Gas  
Internal 
• Environmental Health - Noise and Odour
• Environmental Health – Contamination
• Environmental Health – Private Water 
• Planning and Housing Strategy
• Development Contributions Officer
• Community Greenspace including Access
• Transportation and Development
• Structures and Flooding
• Biodiversity Officer 
KEY ISSUES AGAINST WHICH A FUTURE APPLICATION WILL BE
ASSESSED 
16. The key considerations against which the eventual application will be
assessed include: 
a.  Visual Impact 
b.  Scale, Design and Layout 
c.  Relationship to Nearby Land Uses 
d.  Natural Heritage and Ecology
Page 167 of 172

Page 168

e.  Landscape
f.  Water Resources and Soils 
g.  Air Quality 
h.  Transport Implications 
i.  Tourism and Economy 
j.  Impact on Agriculture
k.  Archaeology and Cultural Heritage 
ADDITIONAL STATEMENTS WHICH WILL BE REQUIRED 
17. Should an EIA Report not be required the following supporting documents will
need to be submitted with any planning application: 
• Planning Statement
• Design and Access Statement
• Pre-Application Consultation (PAC) Report
• Leisure/Economic Impact Assessment 
• Transport Assessment
• Flood Risk and Drainage Assessment
• Landscape and Visual Impact Assessment
• Tree and Woodland Survey
• Habitat Survey
• Archaeological Assessment
• Sustainability Assessment 
CONCLUSION AND RECOMMENDATION 
18. This report summarises the key issues which should be considered as part of
the appraisal of any subsequent planning application which may be lodged in
respect of this development and members are recommended to note these
key issues and advise officers of any other issues which they consider should
be included as part of the application and assessment.  
Background Papers: None
Contact Officer: Kirsty Strong – Ext 01738 475333
Date: 29 September 2023 
DAVID LITTLEJOHN
HEAD OF PLANNING & DEVELOPMENT 
Page 168 of 172

Page 169

23/00012/PAN
Formation of a 49.9 MW solar farm comprising ground mounted solar arrays, inverters, transformers, a substation, a
DNO substation, battery 	storage facility, security fencing, CCTV cameras, cabling, access tracks and 	associated works at
Kinnon Park Farm, Methven, PH1 3NE
Planning and Placemaking
Committee - 11 October 2023
Created by Kirsty Strong on 15 September 2023
© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:15000
6(ii)
Page 169 of 172

Page 170

Page 170 of 172

Page 171

23/00012/PAN
Formation of a 49.9 MW solar farm comprising ground mounted solar arrays, inverters, transformers, a substation, a
DNO substation, battery 	storage facility, security fencing, CCTV cameras, cabling, access tracks and 	associated works at
Kinnon Park Farm, Methven, PH1 3NE
Planning and Placemaking
Committee - 11 October 2023
Created by Kirsty Strong on 15 September 2023
© Crown copyright and database rights 2023 Ordnance Survey
100016971. You are permitted to use this data solely to enable you to
respond to, or interact with, the organisation that provided you with
the data. You are not permitted to copy, sub-licence, distribute or sell
any of this data to third parties in any form. Scale 1:10000
6(ii)
Page 171 of 172

Page 172

Page 172 of 172